2026 Chronology ICN- Summer Renovations

AID 2002952 · View on Simbli

Agenda Item

k. Approval of Network Cabling, Fiber Infrastructure, and Wireless Equipment Relocation Services with Integrated Communication Networks, Inc. (ICN) for Ashford Park, Champion Theme Middle School, Cross Keys High School, Idlewood Elementary School, The International Student Center, Murphey Candler Elementary School and Park Lake Administrative Building (Not to Exceed $543,114.85)

Summary: Presented by: Dr. Kermit Belcher, Chief Information Officer, Division of Information and Instructional Technology
Request: It is requested that the DeKalb County Board of Education approve the purchase of network cabling, fiber infrastructure, testing, repair, and wireless equipment relocation services from Integrated Communication Networks, Inc. (ICN) to support infrastructure improvements and operational readiness at Ashford Park, Champion Theme Middle School, Cross Keys High School, Idlewood Elementary School, The International Student Center, Murphey Candler Elementary School and Park Lake Administrative Building at cost not to exceed $543,114.85.
Why: Ongoing facility improvements, maintenance activities, and operational needs across multiple district locations require upgrades, repairs, and reconfiguration of existing network infrastructure to ensure continued reliability and performance of instructional, administrative, safety, and operational systems. The services provided by Integrated Communication Networks, Inc. (ICN) supports structured cabling enhancements, fiber connectivity, wireless access point relocation, and infrastructure cleanup activities necessary to maintain district technology standards and ensure uninterrupted connectivity across impacted sites.
Details: The network infrastructure scope for Ashford Park Elementary School, Champion Theme Middle School, Cross Keys High School, Idlewood Elementary School, The International Student Center, Murphey Candler Elementary School and Park Lake Administrative Building was developed in coordination with district operations, technology staff, and facility teams to address identified infrastructure needs resulting from renovations, maintenance activities, and system upgrades.

Key Services Include:

Structured Cabling Systems, Fiber Connectivity, Repairs & Testing = $367,396.07

Integrated Communication Networks, Inc. (ICN) will perform installation, replacement, repair, and testing of Category 6 and Category 6A structured cabling systems to support administrative offices, instructional spaces, and operational areas across district facilities. This includes new cabling pathways, telecommunications room buildouts, and expansion of network infrastructure to support instructional and operational environments. Work also includes installation of armored single-mode fiber connectivity between Main Distribution Frame (MDF) and Intermediate Distribution Frame (IDF) locations to strengthen network backbone capacity, improve redundancy, and support scalable connectivity.

Network Infrastructure Cleanup & Cable Management = $3,625

ICN will perform ceiling cleanup and cable management activities, including dressing, supporting, and organizing low-voltage cabling across instructional and operational spaces. These services improve safety, organization, and long-term maintainability of the network infrastructure while aligning with district installation standards.

Wireless Access Point and Security Device Relocation = $26,705.70

Wireless and security device relocation services include the removal, storage, and reinstallation of wireless access points and security cameras to maintain system functionality following facility renovations and infrastructure modifications.

Labor = $74,547.01

Labor services include installation, termination, testing, certification, relocation, and configuration of structured cabling, fiber infrastructure, and wireless equipment. These services ensure all systems meet district performance standards and are fully operational upon project completion.

Contingency = $70,841.07

A contingency amount is included to address unforeseen conditions associated with renovation and infrastructure modification activities, ensuring flexibility and timely completion of all work.
Financial impact: SPLOST VI
306.2210.530000.80336.7600.9990.8010.070.0000 Professional Services
306.2210.561600.80336.7600.9990.8010.070.0000 Expendable Equipment
Contact: Dr. Kermit Belcher, Chief Information Officer, Division of Information and Instructional Technology, 678.676.1274
Effective: Upon Board Approval
Status: Pending Approval by the Office of Legal Affairs
Chronology: Network Cabling, Fiber Infrastructure, and Wireless Equipment
Relocation (ICN)

Ashford Park Elementary School, Champion Theme Middle School, Cross Keys High School, Idlewood
Elementary School, The International Student Center, Murphey Candler Elementary School, and Park
Lake Administrative Building

The Division of Information and Instructional Technology (DIIT) identified the need for targeted network
infrastructure improvements, repairs, and reconfiguration services across multiple district facilities.
These needs were validated through coordination with district operations, facility maintenance activities,
and technology staff to ensure continued reliability, safety, and performance of instructional,
administrative, and operational systems.

Following the planning phase, DIIT worked with Integrated Communication Networks, Inc. (ICN) to
develop a comprehensive scope of services focused on maintaining and enhancing the district’s
existing network infrastructure while also supporting new and reconfigured instructional and operational
spaces. The proposed work includes structured cabling installation and repair, fiber connectivity
enhancements, telecommunications room buildouts, cable management improvements, wireless
access point and security device relocation, and associated labor services. All work is coordinated with
ongoing facility improvements and operational needs to ensure minimal disruption and continued
system functionality.

Key Services Include:

Structured Cabling Systems, Fiber Connectivity, Repairs & Testing = $367,396.07

   ●​ Ashford Park Elementary School
         ○​ Installation of Category 6A structured cabling to support administrative offices, media
            center, cafe areas, and non-classroom operational spaces
         ○​ Installation of patch panels, cabling pathways, and supporting infrastructure to align with
            district standards
   ●​ Champion Theme Middle School
         ○​ Installation of Category 6A data drops in front office and media center areas to support
            administrative and instructional operations
         ○​ Expansion of structured cabling infrastructure to improve connectivity and capacity
   ●​ Cross Keys High School
         ○​ Installation of Category 6A structured cabling across multiple building sections (D, H, J,
            L)
         ○​ Support for temporary MDF environments, new IDF buildouts, and upgrades to existing
            IDF locations
         ○​ Installation of telecommunications cabinets, ladder rack systems, fiber shelves, and
            patch panel infrastructure
         ○​ Deployment of fiber connectivity components and associated terminations to strengthen
            network backbone
         ○​ Installation of structured cabling, wireless data drops, and camera cabling to support
            portable classroom environments
   ●​ Idlewood Elementary School
          ○​ Installation of Category 6A structured cabling for administrative offices, media center,
             and shared operational spaces
          ○​ Installation of cabling pathways and patch panels to support district-standard
             connectivity
   ●​ The International Student Center
          ○​ Installation of Category 6A structured cabling to support administrative and operational
             areas
          ○​ Relocation of IDF infrastructure including associated fiber and copper cabling systems
          ○​ Installation of ladder racks, pathway supports, and associated infrastructure
   ●​ Murphey Candler Elementary School
          ○​ Installation of Category 6A structured cabling to support administrative offices, media
             center, cafe areas, and shared spaces
          ○​ Installation of patch panels and supporting infrastructure to ensure consistent network
             performance
   ●​ Park Lake Administrative Building
          ○​ Replacement and repair of existing Category 6 cabling infrastructure
          ○​ Installation of armored single-mode fiber connectivity between MDF and multiple IDF
             locations
          ○​ Installation of fiber shelves, modules, and patching infrastructure to support backbone
             connectivity
          ○​ Testing and validation of existing and newly installed cabling systems

Network Infrastructure Cleanup & Cable Management = $3,625.00

Ashford Park Elementary School
Ceiling cleanup and cable management, including dressing and supporting low-voltage cabling in
classrooms and hallways
Installation of J-hooks, supports, and pathway components to improve cable organization and safety
Idlewood Elementary School
Ceiling cleanup and cable management across instructional and hallway spaces
Installation of cable supports and pathway components to align with district standards

Wireless Access Point and Security Device Relocation = $26,705.70

   ●​ Ashford Park Elementary School
          ○​ Removal, storage, and reinstallation of wireless access points and interior cameras to
             support facility improvements
   ●​ Champion Theme Middle School
          ○​ Removal and reinstallation of wireless access points and cameras to maintain system
             functionality during renovations
   ●​ Idlewood Elementary School
          ○​ Removal and reinstallation of wireless access points and cameras, including temporary
             storage and redeployment
   ●​ The International Student Center
          ○​ Removal and reinstallation of wireless access points and interior cameras to support
             facility reconfiguration
   ●​ Cross Keys High School
         ○​ Installation and activation support for wireless access points within portable classroom
            environments
         ○​ Support for wireless connectivity to ensure consistent instructional access across
            temporary spaces
   ●​ Park Lake Administrative Building
         ○​ Installation and configuration of wireless access points and supporting infrastructure to
            maintain administrative connectivity

Labor = $74,547.01

   ●​ Installation, repair, and configuration of structured cabling and fiber infrastructure across all
      locations
   ●​ Termination, testing, certification, and validation of copper and fiber systems
   ●​ Removal and reinstallation of wireless access points and security devices
   ●​ Cable management, pathway installation, and infrastructure cleanup activities
   ●​ Coordination with district operations, facility teams, and project stakeholders to ensure
      alignment with timelines and district standards

Contingency = $70,841.07

A contingency amount of 15% above quoted costs is included to address unforeseen conditions
associated with renovation, repair, and infrastructure modification activities and to ensure timely
completion of all work.

Procurement:
Pursuant to Board of Education Purchasing Policy DJE III.C.3., purchases or contracts with a total
estimated cost of $100,000.00 or more shall be awarded through a written competitive sealed bid
process to the lowest responsible, responsive bidder, or through a competitive request for proposal
process where the offer deemed to be the most advantageous to the District may be selected.
Integrated Communication Networks, Inc. (ICN) was awarded through RFP 26-703 for District-Wide
Cabling Equipment and Services. This procurement will be executed in accordance with applicable
district purchasing policies and established contracting vehicles

Financial Impact:
 Category                         Description                                              Cost

 Structured Cabling Systems,      Category 6/6A cabling installation, repair, fiber        $367,396.07
 Fiber Connectivity & Wireless    backbone installation, testing, IDF/MDF buildouts,
                                  and infrastructure improvements across all locations

 Network Infrastructure           Cable organization, pathway support, and                 $3,625.00
 Cleanup & Cable Management       infrastructure cleanup

 Wireless Access Point and        Wireless equipment installation and relocation,          $26,705.70
 Security Device Relocation       including access points and supporting components

 Labor                            Installation, configuration, testing, relocation, and    $74,547.01
                                  project coordination

 Contingency                      Additional 15% above quoted amount for unforeseen        $70,841.07
                                  conditions

                                                                                   TOTAL   $543,114.85