Roof Proposal - Canby Lane ES

AID 1969554 · View on Simbli

Agenda Item

v. Contract ~ ITB 21-752-018 Roofing Contractor Services ~ Core Roofing Systems, Inc. ~ Roof Restoration /Replacement ~ Sagamore Hills Elementary School and Canby Lane Elementary School (Not to Exceed $2,500,000)

Summary: Presented by: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations
Request: It is requested that the DeKalb County Board of Education (“the Board”) approve use of the ITB 21- 752-018 Roofing Contractor Services Contract between DeKalb County School District (“DCSD”) and Core Roofing Systems, Inc. to provide expedited roof repair services for the Sagamore Hills Elementary School and Canby Lane Elementary School projects for an amount not to exceed amount of $2,500,000.
Why: This request is to approve the use of ITB 21-752-752 - Roofing Contractor Services. Core Roofing Systems, Inc., an approved vendor, will provide urgent roofing services for the Sagamore Hills Elementary and Canby Lane Elementary Schools to mitigate deterioration and structural integrity of the roofing and supporting systems without interruption to school operations and functions.
Details: The roofing systems at Sagamore Hills Elementary and Canby Lane Elementary Schools have reached conditions that pose an expedited need for replacement/repair while the building is unoccupied. These circumstances meet the definition of an emergency purchase under Board policy. Therefore, expedited procurement is required. This Exceptions to Competitive Selection approach will provide safe, clean, and efficient learning environments and preserve DCSD’s capital assets and prevent further deterioration.
Financial impact: The total contract amount for these services in the amount not to exceed $2,500,000 will be funded from the Local Capital Project Fund.
Contact: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations, 678.676.1465
Mr. Hans G. Williams, Director of Planning & CIP Programming, Division of Operations, 678.676.1588
Mr. Artis Johnson, HPM Program Director, Division of Operations, 404.790.8985
Effective: Upon Board Approval
Status: Approved by the Office of Legal Affairs
                                   1385 Union Hill Industrial Court ~Alpharetta, GA 770-777-6703 ~ 770-753-2728-fax




                                                                                             1/29/2026
Demeterius Blount
Dekalb County Schools
678-898-4579
Demeterius_blount@dekalbschoolsga.org

Projects: Roof Project at Canby Lane Elementary School

Subject: The following proposal outlines the scopes of work to install TPO roof systems per the
manufacturer’s specifications.

Delivery, Storage and Handling:
    • Deliver products in manufacturer’s original containers, dry, undamaged with seals and
        labels intact.
    • Store products in weather protected environment, clear of ground and moisture.
    • Materials will be always stored evenly on the roof.
    • Materials will be covered, protected and properly secured from the elements.
    • No materials will be placed within a ten-foot perimeter of the buildings open edge.
    • Material Safety Data Sheets (MSDS) to always be on site.
    • Keep combustible materials away from ignition sources.
Project Preparation:
    •   Perform a pre-job inspection with the building owner representative to determine best
        set up area, dumpster locations and debris removal locations.
    •   Furnish and install all required safety equipment per Core Roofing Systems and OSHA
        guidelines.
    •   Upload all materials to complete the project in accordance with good roofing practices.
System Installation: Canby Lane Elementary School (Approximately 13,600 Sqft)
    •   Remove the existing roofing down to the existing structurally sloped steel decking. Only
        remove what can be replaced the same day.
    •   Remove and replace a 30’x30’ area of severely rusted out structural steel decking with
        new decking to match the existing
    •   Provide and mechanically attached (2) layers of 2.2” polyisocyanurate insulation over
        the existing decking per the manufacturer’s warranty requirements
    •   Provide and mechanically attached new ½” per foot tapered insulation crickets between
        the primary drains to direct all waterflow to the drains, allowing for proper drainage.
    •   Provide and mechanically attached new .060 TPO membrane over the newly installed
        polyisocyanurate insulation per the manufacturer’s warranty requirements
    •   Flash up and over all perimeter parapet walls with new .060 TPO membrane prior to the
        installation of new edge metal.
    •   Provide and install TPO curb and penetration flashings per manufacturer’s specifications
        and approved details.




                                                                                                   Page 1 of 2
Sheet Metal
    •   Shop fabricate and install approximately 730 linear feet of new 24-gauge galvanized
        Fascia to replace the existing coping cap.
    •   Shop fabricate and install approximately 140 linear feet of new 24-gauge galvanized
        counter/slip-flashing to replace the existing.
            o Metal color to be chosen from a standard metal era color chart by an approved
                project representative

Unit Costs and Time and Material
    •   Provide walkway mat adds……………………………………………………………….…$39.00/linear foot
    •   Remove and replace damaged metal deck………………………….……………….$33.00/Sqft
    •   Prime and Paint rusted metal deck………………………….…………………………..$2.95/Sqft

Non-Related Work/Exclusions:
    •   Work not shown in the above scope
    •   Stucco/EFIS work
    •   Painting Gas Lines
    •   Liability for penetrating deck mounted conduit lines
    •   Recalibrating satellite dishes
    •   Replacing Gas Line Supports
    •   Lifting or raising HVAC, gas lines or conduit
    •   PVC conduit replacement
    •   Disconnect or reconnect HVAC or electrical equipment

Warranty:
    •   Core Roofing Systems (2) two-year guarantee.
    •   Manufacturer’s (20) year NDL warranty.

Base Bid Pricing:
Canby Lane ES…..…..….……………………………………………….………………………….$176,725.00

Regards,

Alex May
Senior Account Manager
CORE Roofing Systems
1385 Union Hill Industrial Court
Alpharetta, GA 30004
Office: 770-777-6703 ext. 2846
Direct: 678-514-2603
Mobile: 678-787-4920
Email: amay@coreroofing.net
Website: www.coreroofing.net




                                                                                 Page 2 of 2