Roof Proposal - Sagamore Hills ES

AID 1969553 · View on Simbli

Agenda Item

v. Contract ~ ITB 21-752-018 Roofing Contractor Services ~ Core Roofing Systems, Inc. ~ Roof Restoration /Replacement ~ Sagamore Hills Elementary School and Canby Lane Elementary School (Not to Exceed $2,500,000)

Summary: Presented by: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations
Request: It is requested that the DeKalb County Board of Education (“the Board”) approve use of the ITB 21- 752-018 Roofing Contractor Services Contract between DeKalb County School District (“DCSD”) and Core Roofing Systems, Inc. to provide expedited roof repair services for the Sagamore Hills Elementary School and Canby Lane Elementary School projects for an amount not to exceed amount of $2,500,000.
Why: This request is to approve the use of ITB 21-752-752 - Roofing Contractor Services. Core Roofing Systems, Inc., an approved vendor, will provide urgent roofing services for the Sagamore Hills Elementary and Canby Lane Elementary Schools to mitigate deterioration and structural integrity of the roofing and supporting systems without interruption to school operations and functions.
Details: The roofing systems at Sagamore Hills Elementary and Canby Lane Elementary Schools have reached conditions that pose an expedited need for replacement/repair while the building is unoccupied. These circumstances meet the definition of an emergency purchase under Board policy. Therefore, expedited procurement is required. This Exceptions to Competitive Selection approach will provide safe, clean, and efficient learning environments and preserve DCSD’s capital assets and prevent further deterioration.
Financial impact: The total contract amount for these services in the amount not to exceed $2,500,000 will be funded from the Local Capital Project Fund.
Contact: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations, 678.676.1465
Mr. Hans G. Williams, Director of Planning & CIP Programming, Division of Operations, 678.676.1588
Mr. Artis Johnson, HPM Program Director, Division of Operations, 404.790.8985
Effective: Upon Board Approval
Status: Approved by the Office of Legal Affairs
                                              2/20/2026




Sagamore Hills Elementary School
  1865 Alderbrook Rd. NE, Atlanta, Ga 30345

          Attn: Khal Booth
          Project Manager
        Dekalb County Schools
Khal_Booth@dekalbcountyschoolsga.org




                                              Page 1 of 4
                                   1385 Union Hill Industrial Court ~Alpharetta, GA 770-777-6703 ~ 770-753-2728-fax




                                                                                             2/20/2026
Khal Booth
Dekalb County Schools
678-898-4579
Khal_booth@dekalbschoolsga.org

Projects: Roof Project at Sagamore Hills Elementary School – 1865 Alderbrook Rd NE, Atlanta, Ga

Subject: The following proposal outlines the scopes of work to install TPO roof systems per the
manufacturer’s specifications.

Delivery, Storage and Handling:
    •   Deliver products in manufacturer’s original containers, dry, undamaged with seals and
        labels intact.
    •   Store products in weather protected environment, clear of ground and moisture.
    •   Materials will be always stored evenly on the roof.
    •   Materials will be covered, protected and properly secured from the elements.
    •   No materials will be placed within a ten-foot perimeter of the buildings open edge.
    •   Material Safety Data Sheets (MSDS) to always be on site.
    •   Keep combustible materials away from ignition sources.
Project Preparation:
    •   Perform a pre-job inspection with the building owner representative to determine best
        set up area, dumpster locations and debris removal locations.
    •   Furnish and install all required safety equipment per Core Roofing Systems and OSHA
        guidelines.
    •   Upload all materials to complete the project in accordance with good roofing practices.
System Installation: Sagamore Hills Elementary School (Approximately 49,100 Sqft)
    •   Remove the existing roofing down to the existing structural concrete decking. Clean all
        debris from the decking and allow NOVA Engineering to perform their chain drag test
        and core sampling to determine if any structural concrete repairs are necessary.
    •   In the instance NOVA Engineering finds areas of back decking, Core will remove any
        loose concrete decking to create a suitable surface for the installation of new Quik Set
        Concrete Grout. All deck repairs performed by Core Roofing Systems will be charged as a
        change order at a unit cost of $60.00 per Square Foot.
    •   After all testing and decking repairs have been completed and cured, we will install new
        modified base sheet and adhere it to the concrete decking using moisture cured
        adhesive per the manufacturer’s warranty requirements. This layer will act as the vapor
        barrier.
    •   Provide and install all new wood nailer around the perimeter of the roof and at all
        expansion joints to account for the new roof height. This allows for proper termination
        of the new edge metal and TPO membrane.
    •   Provide and fully adhere (2) layers of 2.0” polyisocyanurate insulation over the existing
        decking. All insulation will be installed using low-rise insulation adhesive at the
        application rate required by the manufacturer to meet warranty requirements


                                                                                                   Page 2 of 4
   •   Provide and fully adhere new 1/8” per foot fully tapered insulation over the newly
       installed base insulation to provide adequate slope to the new roof system, allowing for
       proper water shed. The tapered insulation will be installed using low-rise insulation
       adhesive at the application rate required by the manufacturer to meet warranty
       requirements
   •   Provide and fully adhere new ¼” per foot tapered insulation crickets between the
       primary drains to direct all waterflow to the drains, allowing for proper drainage. All
       insulation will be installed using low-rise insulation adhesive at the application rate
       required by the manufacturer to meet warranty requirements
   •   Provide and fully adhere new .060 TPO membrane over the newly installed
       polyisocyanurate insulation using the manufacturer’s standard solvent based bonding
       adhesive per the manufacturer’s warranty requirements.
   •   Flash up all perimeter parapet walls with new .060 TPO membrane and terminate into
       the walls using termination bar and counterflashing.
   •   Provide and install TPO curb and penetration flashings per manufacturer’s specifications
       and approved project details.
Sheet Metal
   •   Shop fabricate and install approximately 1,710 linear feet of new 24-gauge galvanized
       gravel stop to replace the existing.
   •   Shop fabricate and install approximately 280 linear feet of new 24-gauge galvanized
       coping cap to replace the existing on all expansion joints
   •   Shop fabricate and install approximately 380 linear feet of new 24-gauge galvanized
       downspouts to replace the existing.
   •   Shop fabricate and install approximately 1,100 linear feet of new 24-gauge galvanized
       counter/slip-flashing to replace the existing.
           o Metal color to be chosen from a standard metal era color chart by an approved
                project representative
Unit Costs and Time and Material
   •   Provide walkway mat adds……………………………………………………………….…$35.00/linear foot
   •   Concrete Decking Repairs (as described above)..………………………….……………….$60.00/Sqft
   •   Additional Structural Concrete Repairs…………………………………….…………………Cost plus 15%
Non-Related Work/Exclusions:
   •   Work not shown in the above scope
   •   Exterior Façade Work
   •   Painting Gas Lines
   •   NOVA Engineering Fees
   •   Recalibrating satellite dishes
   •   Replacing Gas Line Supports
   •   Gym Roof Replacement
   •   Lifting or raising HVAC, gas lines or conduit
   •   PVC conduit replacement
   •   Drain bowl/line replacement or repairs
   •   Disconnect or reconnect HVAC or electrical equipment
Warranty:
   •   Core Roofing Systems (5) five-year guarantee.
   •   Manufacturer’s (20) twenty-year NDL warranty.

                                                                                    Page 3 of 4
Base Bid Pricing: Minimum R-25 Insulation Value
Sagamore Hills ES…..…..….……………………………………………….……………………….$1,603,627.00
       Structural concrete repairs allowance……………………………………………….$75,000.00
Total Contract Value…………………………………………………………………………………$1,678,627.00

Deductive Alternate: Average R-25 Insulation Value
Sagamore Hills ES…………………………………………………………………………………….$1,462,019.00
       Structural concrete repairs allowance……………………………………..……….$75,000.00
Total Contract Value………………………………………………………………………………..$1,537,019.00

*Deductive alternate includes (1) layer of 1.0” base insulation in lieu of (2) layers of
2.0” base insulation. All other aspects of the scope of work remain the same.

Regards,

Alex May
Senior Account Manager
CORE Roofing Systems
1385 Union Hill Industrial Court
Alpharetta, GA 30004
Office: 770-777-6703 ext. 2846
Direct: 678-514-2603
Mobile: 678-787-4920
Email: amay@coreroofing.net
Website: www.coreroofing.net




                                                                                 Page 4 of 4