iv. Work Order ~ Georgia Power Company ~ Lighting Services -Georgia Power Company MSA Energy-Related Equipment Sale and Installation ~ Phase I Interior Lighting Package (Not to Exceed $2,872,951)

Summary: Presented by: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations
Request: It is requested that the DeKalb County Board of Education approve the work order to Georgia Power Company under the Georgia Power Company’s Master Service Agreement for Energy Conservation Measures for the Phase 1 Interior LED Lighting Upgrade, not to exceed $2,872,951.
Why: Approval of the Work Order will allow Georgia Power to upgrade interior lighting at the schools identified in Phase 1 of the Energy Conservation Services Agreement- Lighting Survey, in the effort to upgrade the necessary lighting in classrooms and spaces within the schools.
Details: At its business meeting on Monday, May 12, 2025, the Board approved DeKalb County School District’s (DCSD) participation in Georgia Power’s Energy Conservation Measure Service utilizing the Savannah-Chatham County Public School System (SCCPSS) Request for Proposal (“RFP”) C21-03. The partnership with Georgia Power has allowed DCSD to use the Energy Conservation Service Agreement to obtain the services of upgrading LED lights within our schools. The approved work order will be used under the Master Services Agreement for Energy-Related Equipment Sale and Installation.

Phase 1 Schools:


Bob Mathis Elementary
Browns Mill Elementary
Chapel Hill Elementary
Columbia Elementary
Stephenson Elementary
Princeton Elementary
Rock Chapel Elementary
Shadow Rock Elementary
Wadsworth Magnet at Knollwood ES
Huntley Hills Elementary
Stone Mountain Elementary
Marbut Elementary
Montgomery Elementary
Lithonia Middle
Woodward Elementary
Redan High
Redan Middle
Snapfinger Elementary

Sustainability: Benefits to upgrading to LED Lights
The schools identified in Phase 1 of the Lighting Survey Audit were selected as these schools currently utilize T12 Fluorescent bulbs. The production of T12 bulbs has been phased out due to federal energy efficiency regulations favoring T5s and LED lighting. For the District, T12s are essentially discontinued, and will be replaced with more modern, efficient LED lighting.

Details on T12 Fluorescent Bulbs:

Federal Ban (2012): The U.S. Department of Energy (DOE) mandated an end to the production and import of most T12 lamps and magnetic ballasts, citing energy inefficiency.
Energy Efficiency: T12s are outdated; T8, T5, and especially LEDs offer better performance, lower energy use, and less heat.
State-Level Bans: Several states (like CA, OR, WA, NJ, etc.) have enacted their own bans on the sale of fluorescent lighting, accelerating the transition away from T12s and other types.
Supply Issues: Because manufacturing stopped, finding new T12 bulbs, starters, and ballasts has become difficult and expensive, with prices often tripling.
Replacement Focus: The industry is focused on retrofitting T12 fixtures to use LED tubes, which offer significant long-term savings.

The Division of Operations recognized the need to upgrade all rooms and spaces within our schools to LED lighting. This is in alignment with DCSD Board Policy EBL - Environmental Programs, adopted 07/14/2008, that calls for a comprehensive Lighting Energy Audit and subsequent implementation of a conservation and improvement plan.
Financial impact: The total budget of $2,872,951 for this project is allocated from the cost code (100.2600.543009.00011.7520.9990.8013.040.0000) under the Division of Operations General Fund Budget.
Contact: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations, 678.676.1470
Mr. Hans G. Williams, Director of Planning & E-SPLOST Programming, Division of Operations, 678.676.1588
Mr. Bobby Moncrief, Director of Facilities, Division of Operations, 678-676-1478
Effective: Upon Board Approval
Status: Approved by the Office of Legal Affairs
Making Energy Simple
for DeKalb County Schools

LED Lighting Survey
January 6, 2026




                            1
Today’s Conversation

                       LED Lighting Survey Aduit
                       Approach/Deliverable- Phase 1 (18
                       Schools)


                       Overview of Survey/Analysis of
                       DCS Lighting Phase 1



                       GPC Value Proposition/ Cash
                       Proforma



                       Our Path Forward


                                                        2
Lighting Survey Audit Approach & Deliverable
                             Detailed Audit :

                             • Number of fixtures by Room/Area Type/Building
                             • Action or Non-Action if existing LED; Convert to LED
                             • Provide Spec Sheets on each LED Solution
                             • Maintain DCS/IES Standards

                             Analysis to include:

                             • Project Cost per Building for LED Conversion
                             • Energy and Operational Savings
                             • ROI/Simple Payback per Building
                             • Hours of Operation used per Building
                             • $/kilowatt (kWh) hour
                             • Georgia Power Rebates
                             • Annual financial cost based on estimated interest
                               rates

                                                                                      3
DeKalb County School District Phase 1




                      urvey/Proposal Timeline




                                                4
LED Lighting Phase 1 Mapped




                              5
 Phase 1: LED Lighting Survey Findings/ Overview
LED Lighting Fixture Family                                            Existing Footcandle Levels
                                   Existing Qty of   Proposed Qty of                                                                                       Media
                                                                       School Name                 Hallway      Cafeteria    Classrooms        Gym         Center
       Fixture Family                 Fixtures           Fixtures
                                                                       Bob Mathis Elementary      25 - 65 FC    35 - 40 FC     40 - 55 FC   30 - 45 FC    45 - 55 FC
     Troffer 1x4 (Fluorescent)           104               104
     Troffer 2x2 (Fluorescent)           165               165         Browns Mill Elementary     55 - 115 FC   45 - 55 FC     30 - 40 FC   90 - 100 FC   40 - 55 FC
     Troffer 2x4 (Fluorescent)          9,368             9,368        Chapel Hill Elementary      50 - 65 FC   20 - 25 FC     40 - 55 FC    35 - 45 FC   40 - 55 FC
      Troffer 2x4 (Linear LED)           387               387         Columbia Elementary        40 - 110 FC   35 - 45 FC     30 - 70 FC   90 - 100 FC   30 - 55 FC
           Recessed Cans                 648               648         Huntley Hills Elementary    40 - 55 FC   30 - 40 FC     40 - 45 FC    15 - 45 FC   30 - 40 FC
            Strip Fixtures               542               542         Kingsley Elementary        20 - 100 FC   35 - 45 FC     15 - 30 FC   90 - 100 FC   32 - 45 FC
         Industrial Fixtures             353               353         Lithonia Middle            35 - 70 FC    30 - 35 FC     25 - 40 FC   60 - 70 FC    50 - 60 FC
            Wrap Fixtures                343               343         Marbut Elementary          60 - 80 FC    60 - 70 FC     40 - 65 FC   10 - 20 FC    30 - 50 FC
      Direct/Indirect Fixtures           77                77
                                                                       Montgomery Elementary       5 - 30 FC    15 - 20 FC     30 - 60 FC   40 - 50 FC    15 - 20 FC
             Vapor Tight                 112               112
                                                                       Pine Ridge Elementary      60 - 80 FC    35 - 50 FC     30 - 40 FC   30 - 40 FC    60 - 70 FC
              High Bay                   42                42
                                                                       Princeton Elementary       10 - 40 FC    70 - 80 FC     35 - 45 FC   30 - 45 FC    60 - 70 FC
       Wall Packs (Exterior)             251               251
          Drums (Exterior)               156               156         Redan High                 15 - 50 FC    35 - 65 FC     20 - 30 FC   35 - 80 FC    35 - 75 FC
    Canopy Fixtures (Exterior)           142               142         Redan Middle               20 - 45 FC    20 - 30 FC     30 - 45 FC   20 - 35 FC    30 - 40 FC
          Floods (Exterior)              91                91          Rock Chapel Elementary     15 - 40 FC    20 - 30 FC     30 - 40 FC   15 - 20 FC    40 - 50 FC
 Shoe Box/Pole Lights (Exterior)         34                34          Shadow Rock Elementary     10 - 35 FC    30 - 40 FC     30 - 80 FC   25 - 35 FC    25 - 40 FC
        Misc (Dec, Inc, etc.)            173               173         Snapfinger Elementary      35 - 80 FC    40 - 55 FC     30 - 45 FC   10 - 20 FC    35 - 50 FC
  zDo Nothing (LED Flat Panels)         7,085
                                                                       Wadsworth Elementary        45-75 FC     40 - 55 FC     30 - 55 FC   30 - 100 FC   10 - 30 FC
   zDo Nothing (LED Trofferss)           680
                                                                       Woodward Elementary         45-75 FC     30 - 40 FC     10 - 35 FC   60 - 80 FC    30 - 55 FC
 zDo Nothing (Existing LED, Dec,
        Theatrical, etc.)               3,325
                                                                                                         Higher than IES Standards                           6
          Grand Total                  24,078            12,988
                                                                                                         Lower than IES Standards
 Phase 1: LED Lighting Survey Findings/ Overview

Existing Conditions Summary
1. LED Flat Panel Fixtures (Hallways, Offices, Cafeterias,
   Media Centers)
   • Wattage Range: 40W–60W (varied across spaces)
   • Mounting: Fixtures not securely tied off to the structure above —
     potential safety and maintenance concern

2. Classrooms
   • Condition: Not updated; many fixtures still fluorescent or older LED
     types
   • Lighting Quality: Under-lit, with frequent lamp and ballast outages

3. Color Temperature
   • Mixed (3000K / 4000K / 5000K), leading to inconsistent visual
     appearance

Key Issues Identified
• Safety/Installation: Hanging fixtures not properly supported
• Lighting Uniformity: Large variation in wattage and color temperature
  across spaces                                                             7
DeKalb County School District – Value Proposition
LED Lighting Recommendation Options
• Option 1 – Replace All Existing Troffers with New LED Flat Panels
  – Include Existing LED Flat Panels in Over Lit Areas - (3,149) Fixtures
  – Tie Off to Structure Above


• Option 2 - Replace All Existing Troffers with New LED Flat Panels
  – Do Not Include Existing LED Flat Panels in Over Lit Areas - (3,149) Fixtures


• Option 3 - Replace All Existing Troffers with New LED Flat Panels
  – Do Not Include Existing LED Flat Panels in Over Lit Areas - (3,149) Fixtures
  – Tie Off to Structure Above - (3,149) Fixtures




                                                                                   8
LED Lighting – Cash Proforma – Option 2
                                                            Annual Savings                 Payback
               School                    Price      Energy  HVAC     M&O         Total      (Years) GPC Rebates
Bob Mathis Elementary                    $149,524   $22,253 $2,536 $2,711       $27,500       5.4       $16,176
Browns Mill Elementary                   $162,669   $32,674 $4,988 $4,188       $41,849       3.9       $17,598
Chapel Hill Elementary                    $31,698    $2,434    $93      $493      $3,020     10.5        $3,429
Columbia Elementary                      $125,409   $26,740 $3,833 $3,030       $33,603       3.7       $13,567
Pine Ridge Elementary                    $189,716   $24,308 $3,136 $3,200       $30,644       6.2       $20,524
Princeton Elementary                     $275,809   $29,789 $4,104 $5,347       $39,239       7.0       $29,837
Rock Chapel Elementary                   $148,439   $21,729 $2,942 $3,005       $27,676       5.4       $16,058
Shadow Rock Elementary                   $142,087   $18,706 $2,412 $3,649       $24,767       5.7       $15,372
Wadsworth Magnet & Knollwood
ES                                       $124,168   $16,825   $2,064   $2,271   $21,161      5.9        $13,433
Huntley Hills Elementary                  $60,574   $10,579   $1,595   $1,256   $13,431      4.5         $6,553
Kingsley Elementary                       $55,712   $15,029   $2,062   $1,330   $18,421      3.0         $6,027
Marbut Elementary                        $162,670   $24,752   $3,290   $3,714   $31,756      5.1        $17,597
Montgomery Elementary                     $21,794    $5,366    $475     $648     $6,488      3.4         $2,358
Lithonia Middle School                   $287,237   $30,730   $4,076   $6,548   $41,354      6.9        $31,074
Woodward Elementary                      $106,562   $16,285   $2,326   $1,825   $20,436      5.2        $11,528
Redan High                               $418,271   $40,717   $6,733   $8,007   $55,457      7.5        $45,250
Redan Middle School                      $138,761   $18,238   $1,910   $3,018   $23,165      6.0        $15,010
Snapfinger Elementary                    $172,029   $20,995   $2,687   $2,551   $26,233      6.6        $18,609

                                Total   $2,773,129 $378,149 $51,263 $56,788 $486,200         5.7      $300,000

                 Financial Overview
Project Cost                                 $2,773,129
Annual Savings                                 $486,200
Annual Payment (10 yr., 7.0%)                ($394,831)
                                                                                                                  9
Net Positive Cashflow                           $91,369
DeKalb County School District – Value Proposition



        1                         2                          3                            4                        5                        6

    Design                    Funding                     Savings                  Financing                     Return             Responsibility
      GPC works            GPC funds the LED           GPC will maximize        Utilize GPC's MSA bill       Lower energy costs,        Single source
 collaboratively with    Retrofit Project upfront      energy efficiency        pay in lieu of 3rd party    reduced maintenance     responsibility provided
DeKalb County School     with no DeKalb County      rebates to offset project   financing eliminating         expenses, reduced            by GPC
   to design a cost-      School District capital   costs and guarantee the               debt                 carbon footprint,
effective LED Lighting            required              energy savings                                     enhance occupant well-
    Retrofit System                                                                                                 being




                                                                                                                                                        10
Our Path Forward