New Sequoyah Middle and High School
101-36
October 10, 2023
Gilbane Building Company
New Sequoyah Middle and High School
new middle and high school
29 29 03/13/2025
11 27 03/13/2025
32 72 02/03/2025
10 10 03/13/2025
30 30 03/13/2025
two hundred twenty-eight
million, six hundred sixty-one thousand, four 228,661,425.00
hundred twenty-five dollars and zero cents.
six million, four hundred forty-one thousand, eight hundred
6,441,827.00 twenty-seven dollars and
zero cents.
fifteen million, five hundred seventy-six thousand, six hundred
15,576,618.00 eighteen
dollars and
zero cents.
zero
00 0.00
seven million, four hundred ninety-two
thousand, forty-six 00
7,492,046.00
3.0
five million, one hundred thirty-nine thousand, nine hundred
Multiple - See attached seventy-six 00 5,139,976.00
zero 00
0.00
02/17/2025
one thousand, five hundred seventy-nine 1,579
06/15/2029
Sequoyah Middle & High School | 80% CD Estimate Deliverable | Rev 0 Gilbane Building Company
New Middle & High
School at Sequoyah
Final GMP Deliverable
Revision 0
Published 03/13/2025
v.5/1/2023
Sequoyah Middle & High School | 80% CD Estimate Deliverable | Rev 0 Gilbane Building Company
Table of Contents
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
Table of Contents
Summary
Final GMP Estimate
Clarifications
General
Insurance and Taxes
Contingency
Construction Manager's Fee
Project Indirect Costs
Assumptions
Document Enumeration
Detail
Allowances
Alternates
Schedule and Logistics
Milestone Project Schedule
Site Logistics & Phasing
Supporting Documentation
Exhibit A - 100% CD Drawing Log
Exhibit B - 100% CD Specification Log
Exhibit C - RFI Log
Exhibit D – Trophy Display Case Alternate
Exhibit E – Turf Specifications
EXHIBIT E.1 – Track Drainage Assumptions
Exhibit F – Pro Bel Façade Maintenance Layout
Exhibit G – Irrigation Layout
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
Summary
v.5/1/2023
Sequoyah Middle & High School
Dekalb County School District
Doraville, GA 3/13/2025
GMP Estimate (100% CDs) R0
BP# BID PACKAGE Final GMP w/ Field House $/GSF
01A SITE SERVICES $ 3,390,407 $ 7.35
02A BUILDING DEMOLITION $ 1,395,492 $ 3.02
03A TURNKEY CONCRETE $ 8,435,098 $ 18.28
04A MASONRY $ 9,606,447 $ 20.82
05A STRUCTURAL STEEL & MISC METALS $ 17,331,226 $ 37.56
07A ROOFING & SHEET METAL $ 3,811,540 $ 8.26
07B METAL PANELS $ 11,710,977 $ 25.38
07C WATERPROOFING $ 2,010,750 $ 4.36
07D FIREPROOFING $ 766,382 $ 1.66
08A DOORS, FRAMES, HARDWARE - MATERIAL $ 1,491,446 $ 3.23
08B DOORS, FRAMES, HARDWARE - INSTALL $ 214,012 $ 0.46
08C GLASS & GLAZING $ 5,489,350 $ 11.90
08E OVERHEAD DOORS $ 784,464 $ 1.70
09A DRYWALL, FRAMING & ACOUSTICAL $ 14,100,250 $ 30.56
09B FLOORING & TILE $ 2,971,850 $ 6.44
09C ATHLETIC FLOORING $ 962,531 $ 2.09
09D EPOXY FLOORING $ 687,107 $ 1.49
09E PAINTING & WALLCOVERING $ 2,034,705 $ 4.41
09F POLISHED CONCRETE $ 104,800 $ 0.23
10A SPECIALTIES $ 1,778,242 $ 3.85
10B SIGNAGE $ 466,848 $ 1.01
10C PREFABRICATED CANOPIES $ 257,174 $ 0.56
11A FOOD SERVICE EQUIPMENT $ 2,168,930 $ 4.70
11B RESIDENTIAL APPLIANCES $ 109,847 $ 0.24
11C ATHLETIC EQUIPMENT $ 500,560 $ 1.08
11F FAÇADE MAINTENANCE $ 102,385 $ 0.22
11G COMMERCIAL LAUNDRY EQUIPMENT $ 46,632 $ 0.10
12A WINDOW TREATMENTS $ 332,081 $ 0.72
12B.1 MILLWORK & CASEWORK $ 2,258,675 $ 4.90
12B.2 LAB CASEWORK $ 1,918,750 $ 4.16
12C AUDITORIUM SEATING $ 240,764 $ 0.52
12D TELESCOPING BLEACHERS $ 709,650 $ 1.54
14A ELEVATORS $ 698,156 $ 1.51
21A FIRE PROTECTION $ 2,278,696 $ 4.94
22A PLUMBING $ 9,140,750 $ 19.81
23A HVAC $ 20,733,192 $ 44.93
26A ELECTRICAL $ 26,843,185 $ 58.18
27A AUDIO VISUAL $ 1,552,126 $ 3.36
27B THEATER LIGHTING $ 2,106,336 $ 4.56
31A SITEWORK & UTILITIES $ 9,248,450 $ 20.04
31B AGGREGATE PIERS $ 549,208 $ 1.19
31C SHORING $ 409,371 $ 0.89
32A ATHLETIC FIELDS & EQUIPMENT $ 4,274,599 $ 9.26
32B TENNIS COURTS $ 294,317 $ 0.64
32C LANDSCAPE & HARDSCAPE $ 4,335,170 $ 9.40
32D ASPHALT PAVING $ 2,332,913 $ 5.06
32E STRIPING & SITE SIGNAGE $ 35,032 $ 0.08
32F FENCING $ 607,699 $ 1.32
Subtotal Direct Cost $ 183,628,571 $ 397.97
Indirect Costs Total Cost
Design & Estimating Contingency $ -
Subtotal 1 $ 183,628,571
Escalation (2.0%) - Owner Allowance $ 3,672,571
Subtotal 2 $ 187,301,143
SDI (1.3%) $ 2,532,311
Builders Risk $ 1,037,058
Insurances (2.5%) $ 5,716,536
Payment & Performance Bond (0.78%) $ 1,783,559
Subtotal 3 $ 198,370,607
Building Permits $ 530,328
CM General Conditions $ 15,576,618
Preconstruction Services $ 250,000
Subtotal 4 $ 214,727,553
CM Fee (3%) $ 6,441,827
Subtotal 5 $ 221,169,380
CM Contingency (4%) $ 7,492,046
Total Costs $ 228,661,425 $ 495.56
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
Clarifications
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
Clarifications
General
1. This Final GMP stated herein pertains to Change Order #02, a Final release package of the Guarantee
Maximum Price, approving a total funding total of $228,661,425 to the previous awarded package of
$87,219,255 for the New Sequoyah Middle and High School Project.
2. This Final GMP for the Sequoyah Middle & High School is based on 100% CD Drawings and
Specifications prepared by Goodwyn Mills Cawood dated December 13, 2024. See the Document
Enumeration Section for a complete list of documents used to prepare the GMP.
3. The Overall Project Substantial Completion date is June 15, 2029 assuming a Notice to Proceed date of
February 17, 2025. Substantial completion for the Middle School (Phase 1) is June 15, 2027. For more
detailed schedule information and assumptions, see the attached detailed project schedule.
4. Substantial Completion for the Middle School (Phase 1) shall be established upon the issuance of a
Certificate of Occupancy, indicating that the designated portion of work is completed for its intended
purpose. At this juncture, the Owner shall release the retained funds in accordance with the terms of
the agreement and shall assume ownership of the building, including the responsibilities of managing
insurance coverages, utility consumption, and maintenance. The warranty period for this portion of
the work shall commence. Liquidated damages, if applicable, shall be assessed solely on the remaining
contract price for Phase 2.
5. Upon turnover of the Middle School (Phase 1), Gilbane reserves the right to reconcile the project
schedule for the High School (Phase 2).
6. The GMP does not include acceleration or related premium time. Construction hours are assumed to
be 1st shift other than occasional off-hours work to accommodate tie-ins or shutdowns / connections
of major systems.
7. Pricing includes a [1]-year labor and material warranty for all components unless a longer warranty is
stipulated by the specifications.
8. Changes in law or policies and resulting costs and schedule impacts are not reasonably foreseeable,
calculable, or identifiable, and, as such, all such resulting costs and impacts are hereby specifically
excluded from this Final GMP. More specifically, this GMP excludes, without limitation, costs and
schedule impacts resulting from labor shortages, increased labor costs, supply chain disruptions,
increased or new taxes or tariffs on goods and materials, resulting delivery delays, and other similar
impacts resulting from such changes in laws or governmental policies.
9. The pricing is based upon open, competitive bidding by prequalified subcontractors and suppliers.
Unless specifically articulated, there will be no proprietary materials or vendors. It is assumed that all
trades and materials will be an open specification and alternatives will be considered.
10. This will not be a line item GMP. Individual line-item savings within the GMP will be addressed in
accordance with the contract.
11. No retainage shall be held on Gilbane Fee, General Conditions, or Insurances.
12. This Final GMP includes project retainage at five-percent (5%) withheld in accordance with OCGA Sec.
13-10-80.
13. Union prevailing wages/ merit shop is not included.
14. The Final GMP include fees payable to the City of Doraville and DeKalb County for tree removal, land
disturbances, impact fees for water and sewer, and Georgia EPD Notice of Intent permits. All other
regulatory, utility service provider fees or jurisdictional fees are excluded.
15. This Final GMP assumes billing for offsite stored material is acceptable. Applications for Payment
including stored materials shall include bill of sale, invoice, insurance for the storage location, photo
documentation and/ or other documentation in accordance with the Gilbane CM Contract.
16. Georgia Power to establish permanent power no later than June 26, 2026. See full Schedule for
Georgia Power critical dates.
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
17. The cost of the Construction Manager’s supplies and communications, cost of Corporate and regional
data processing/MIS services shall be reimbursable are at included in the labor billing rates noted
below. The cost of corporate and regional data processing is billable at the rate of $5.23 per labor
hour expended for the Project. Note costs for technology and hardware/equipment are not included
in the labor rate.
18. The following supervisory and administrative personnel are home office personnel stationed at a
location other than the project site, only for that portion of time spent directly working on the project
shall be billed to the project: Project Executive, Estimators, Regional Safety Manager, Accounting,
Scheduling, Virtual Design & Construction (VDC), Operational Excellence, Economic Inclusion, and
Purchasing.
19. Wages or salaries of the Construction Manager’s supervisory and administrative personnel are
included below and shall be authorized to bill at the below stipulated rates. Below rates are not
subject to audit.
Position Hourly Rate
Lead Superintendent $ 128.60
Superintendent $ 108.97
MEP Manager $ 126.83
Sr. Project Manager $ 139.60
Project Manager $ 107.37
Field Engineer $ 80.14
Sr. General Superintendent $ 167.43
Sr. Project Safety Manager $ 109.91
Construction Intern $ 43.10
Safety Manager $ 179.85
Chief Scheduler $ 224.36
Chief Purchasing Agent $ 202.37
Purchasing Manager $ 172.08
Controller $ 207.92
Accountant $ 132.93
VDC Manager $ 167.64
Sr. Project Executive $ 241.49
Sr. Operational Excellence Manager $ 176.85
Econ Inclusion Sr. Manager $ 193.18
Sr. Estimator $ 132.10
Preconstruction Executive $ 259.57
**Labor rates are subject to annual increases per company policy in March of each of year.
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
20. The Owner acknowledges that Next 150 Construction, LLC is a Delaware limited liability company in
which Gilbane Building Company is the sole and managing member. Gilbane will utilize Next 150
Construction, LLC for Site Services tasks. The labor rates will be billed at the hourly rates and shall be
authorized to bill at the below stipulated rates.
Position Hourly Rate
Labor Journeyman / Operator $ 35.00
Labor Foreman $ 50.00
Carpenter Journeyman $ 45.00
Carpenter Foreman $ 60.00
Assistant Superintendent $ 75.00
**Labor rates are subject to annual increases per company policy in March of each of year.
21. General Conditions are to be converted to lump sum amount in this Final GMP. Notwithstanding
anything to the contrary set forth in this Agreement, the Owner’s audit rights shall not be used as a
means or basis to renegotiate any lump sum amounts, unit rates, established charges, fixed rates or
multipliers which have been previously approved and accepted by the Owner.
22. This Final GMP carries a specific number of monthly anticipated Adverse Weather Delay based on a [5] Day
Work Week:
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
3 3 3 2 2 3 3 3 2 2 2 2
23. Only Gilbane employees will undergo background checks with DeKalb County School District Public
Safety office. All other workers/ Trade Partners will provide formal written documentation certifying
meeting contractual requirements pertaining to background checks.
24. Gilbane will provide a 3rd party envelope review and Interdisciplinary Coordination (IDC) Review
Report which addresses coordination and scope review issues. These reports will be forwarded to the
Architect. Neither is intended as a substitute for engineering or architectural review by licensed design
professionals. The comments contained in the reports represent observations and/or suggestions
intended for consideration and possible incorporation into the Design Documents. Items not
incorporated into the Contract Documents are excluded from the GMP. No design liability has been
assumed by Gilbane, or 3rd party envelope Reviewer as a result of the information contained in the
reports. Items not incorporated into the Contract Documents are excluded from the GMP.
25. Items to be furnished by Owner to support the project are defined in the attached Supply and Install
Matrix that delineates design and supply responsibilities for equipment.
Insurance and Taxes
1. Gross receipts tax is included.
2. Sales tax is included.
3. Subcontractor Default Insurance is included at a fixed rate of $13.00 per $1,000 of subtotal direct costs. The
rate basis for contractor default insurance includes all subcontracted work on the project (pending Gilbane
prequalification standards), excluding any architect or engineering consultants and certain general conditions
items.
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
4. Payment and Performance Bonds are included payable upon issuance as a Cost of Work at the fixed rate of
$7.80 per $1,000 of total Contract Value. Should the project value exceed $250M, then this rate is subject to
change.
5. The Builders Risk premium is subject to market conditions at the time of construction commencement.
Builders Risk deductibles are not included in the estimate.
6. A Contractor Controlled Insurance Program (CCIP), to provide on-site General Liability, Excess Liability, and
Workers Compensation is included for coverage of Gilbane and our enrolled Trade Contractors at a fixed rate
of $25 per $1,000 of total Contract Value. All trade packages covered by the CCIP are represented net of the
covered insurance. This rate includes Gilbane’s non-CCIP required insurance. Premiums for insurance shall be
payable in one installment in the first application for payment after commencement of the Construction Phase
of the Project based upon the Final contract amount. Additional premiums for Change Orders will be included
and invoiced with the approved Change Order.
7. Construction Manager’s liability insurance does not include the Owner’s Program Manager and/or Architect as
additional insureds. It is assumed that these entities will carry their own liability coverage.
8. Insurance and bond rates are not subject to audit. All payments are due at the start of construction phase.
9. Construction Manager has not included an Owner’s Protective Liability Policy for the project.
10. This Final GMP does not include insurance requirements to meet specific FM Global standards.
Contingency
1. A Construction Contingency is included for the project. This is intended for Gilbane’s exclusive use for
any items constituting Cost for the Work and associated Subcontractor Default Insurance (SDI) which
are not the basis of a Change Order.
2. Trade Allowances and Unbought costs are reconciled by Gilbane Construction Contingency. Unbought
items are scope which is included in the cost of the work that is shown within the Contract
Documents, but not yet procured through a specific trade contractor. No prior authorization is
required for these expenditures. These shall not be used for Design Changes.
3. Escalation allowance of 2.0% has been included in the Final GMP. In the event of phasing changes, the
project start is postponed, or the construction duration is extended, pricing should be adjusted
accordingly to account for cost escalation and local market conditions.
4. An Owner Contingency is not included for the project. It is recommended an Owner’s Contingency be
carried in the project budget for changes in the work.
Construction Manager’s Fee
1. The Construction Manager’s Fee is 3.00%
2. Fee has not been included on contingency and will be adjusted monthly for cost of work changes (in scope).
Out of scope fee will be added in change orders.
Project Indirect Costs
Project indirect costs are clarified as follows:
Not
Project Indirect Costs Included
Included
Land acquisition •
Tree removal, land disturbance, impact fees for water and sewer, Georgia EPD Notice of •
Intent permits.
Regulatory, utility service provider fees and all other permit fees not included above. •
Impact fees, approval fees, licensing fees •
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
Off-site improvements other than those indicated on the document set (Adjacent roadway •
improvements, traffic lights, turn lanes, public utility mains, etc.)
Geotechnical Surveys and testing •
Independent material testing during construction •
3rd Party Commissioning (In House Commissioning included w/ construction) •
Environmental testing and remediation costs (Asbestos, contaminated soils, USTs, etc.) •
Operating supplies and expenses. •
Owner required furniture, fixtures and equipment – Including but not limited to loose •
equipment, furniture, workstations, computers, phones, voice/data/security equipment,
indoor plantings and artwork.
Utility Infrastructure and Connection Fees (power, gas, telephone, data…) •
Utility consumption (power, gas, telephone, data…) during construction •
Offsite utility infrastructure and connection fees (Power, gas, telephone, data, etc.) •
Standalone mock-ups and model units that are not part of permanent construction •
Fit-out of tenant spaces •
Owner legal and financing costs •
Other Owner Insurance •
Voice, Data, and Security cabling / wiring. •
Voice, Data, and Security Equipment and installation. •
Radio and distributed antenna systems. •
Assumptions – By Bid Package
01A Site Services
1. General Requirements / Site Services are included in this Final GMP to cover costs associated with
general temporary construction required for a complete construction estimate. This includes but is
not limited to: site fencing and protection, safety related items, dumpsters, temporary toilets,
construction way finding, progress photos, interim and Final cleaning, temporary utility consumption,
etc.
2. Excludes the costs for moving of the existing Sequoyah Middle School employees’ belongings,
furnishings or furniture to be salvaged.
02A Demolition
1. This Final GMP includes an Owner Allowance for Abatement of Existing Structures in the amount of
$500,000.
2. Eight (8) of the nine (9) 65’x65’ 1-Story Buildings on and adjacent to the existing soccer fields on Sheet
C-003 were removed from the site by others prior to mobilization. Demolition of the remaining one (1)
building is included in the Final GMP.
3. The six (6) single wide trailers shown on sheet C-003 were removed from the site by others prior to
mobilization. Demolition cost for these trailers is not included in the Final GMP.
4. Existing structures will be demolished as indicated in the Contract Documents. Utilities that interfere
with new construction will be removed as needed. Existing utilities that do not interfere with new
construction may be left in place (flow-filled or otherwise) at Construction Manager’s discretion.
03A Concrete
1. The site retaining walls at the Middle School Courtyard stairs are not detailed in the contract documents.
These walls are assumed to match the thickness and reinforcing per concrete wall type of those shown in the
High School Courtyard.
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
2. This Final GMP includes termite treatment at slab on grade locations as Bayer Premise Pre-Construction.
3. Porosity inhibiting admixture is not included at slab on grade or elevated slabs. Moisture testing of concrete
slabs will be conducted prior to flooring installation to ensure proper substrate conditions in accordance with
flooring manufacturer requirements.
4. Joint sealants at slab on grade contraction joints per detail J3/S3.02 is not included. These joints will be
prepped to ensure they do not telegraph through finished flooring.
04A Masonry
1. This Final GMP includes Regular Grey Lightweight CMU. Block fill and reinforcing are included per the
Contract Documents.
05A Structural Steel & Miscellaneous Metals
1. This Final GMP includes standard angle brick support in lieu of Fero-Fast.
2. This Final GMP includes an assumption of ten (10) six-inch steel bollards with concrete fill as none are shown.
3. This Final GMP includes an Owner Allowance of $100/LF for 8x8x1/2” angle at glazing support not currently
shown (1,182LF total included). This allowance will be reconciled pending engineering of cold-formed exterior
wall framing by delegated-design engineer.
07A Roofing
1. Aluminum coping is included at top of parapet all locations where the façade material on the parapet is Brick
Veneer.
07B Metal Wall Panels
1. This Final GMP includes standard manufacturer standard colors for MCM panels and accessories.
Color selections are required no later than 05/30/2025 in order to maintain the schedule.
2. This Final GMP includes MCM panel fins in locations indicated in the Contract Documents. Fins
include vertical MCM panels folded in a tube-like shape and returned back to a supporting bracket.
Fins are closed on both ends.
3. This Final GMP includes MCM Coping at all locations where the façade material on the parapet is
MCM Metal Panels.
4. There is “RA3” called out for the Middle School & High School bridge soffits, but there is no product
specified for RA3. This Final GMP includes MCM in a standard color at both bridge soffits to match
building façade material.
5. This Final GMP includes manufacturer’s standard color joint sealants at metal panel systems.
6. At MCM panels noted to be perforated, this Final GMP includes manufacturer’s standard round
perforations. Custom/non-standard perforated shapes are not included.
07C Waterproofing
1. This Final GMP includes firestopping at the edge of slab throughout the entire building.
2. This Final GMP includes waterproofing on exterior walls below grade to extend 1’ onto top of exterior
side footing. Waterproofing around the entirety of concrete footing is not included.
3. This Final GMP does not include Stainless Steel Flashing at the Fluid-Applied Air Barrier system.
Manufacturer’s standard terminations will be used at fluid-applied air barrier system.
4. This Final GMP includes standard color for fire safing and sealants at the top of CMU partitions.
07D Spray Fireproofing
1. This Final GMP includes intumescent fireproofing at exposed columns.
2. This Final GMP includes spray applied cementitious fireproofing at primary structural steel decking to
achieve a 1 hr. Rating.
3. This Final GMP does not include spray fireproofing at secondary members over 20’ as it is not
required.
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
08A Doors, Frames, Hardware - Material
1. This Final GMP includes power supplies for electrified doors/hardware as indicated in the door
hardware schedule/specifications.
2. This Final GMP does not include any sound control doors as none are scheduled. Additional
gasketing/seals are included per the door schedule and hardware specifications as required.
3. This Final GMP includes hollow metal frames face weld along the joint between the head and jamb
faces along their length either internally or externally.
4. This Final GMP does not include bituminous coating on the interior of grout filled jambs.
08B Doors, Frames, Hardware – Install
1. This Final GMP assumes that installing all permanent cores will be the Owner's responsibility.
08C Glass & Glazing
1. This Final GMP includes 3M Double Layer Attachment Film at “ESF-R” and Safe Haven Double Layer
Attachment Film at “ESF-B” locations. Bullet resistant glazing is not included.
2. This Final GMP includes the below glazing, storefront, and curtain wall systems:
o Exterior Storefront: EFCO 5600 Series or Oldcastle Reliance, Clear Anodized Class 1
o Exterior Curtain Wall: EFCO 406 Series or Oldcastle FG-6000, Clear Anodized Class 1
o Exterior Doors: EFCO 403 Series or Oldcastle FG-3000, Clear Anodized Class 1. 1 ¾” thick
wide stile doors with 12” rails.
o Interior Storefront: EFCO 402 Series or Oldcastle FG-2000, Clear Anodized Class 1
o Interior Fire Rated Systems: Saftii First Interior Series GPX & Curtainwall Systems
o GL-1: 1” Vitro R100 Clear over Clear
o GL-2: 1” Vitro R100 Clear over Spandrel Surface #4
o GL-3 Door Lites: ¼” Clear Glazing
3. This Final GMP includes manufacturer’s standard color joint sealants at glazing systems.
4. Smoke rated interior storefront elevations are fully sealed around the perimeter to resist the passage
of smoke per RFI Response #91. Smoke rated glazing or frames are not included.
08E Overhead Doors
1. This Final GMP includes electric operation for overhead doors only where indicated in the Contract
Documents. The Final GMP does not include tying in overhead doors to intrusion/security system.
09A Drywall & Acoustical
1. This Final GMP includes Impact Resistant Gyp Board at corridors and electrical/low voltage closets.
2. This Final GMP assumes that EQ framing is allowable.
3. This Final GMP includes the hanging of gypsum wall board prior to complete building closure and
conditioning in order to maintain project schedule. Moisture resistant board will be utilize as needed.
4. This Final GMP only includes Level 5 finish at wallcoverings locations.
09B Flooring & Tile
1. This Final GMP does not include Quarry Tile as currently schedule in the following areas: Culinary Art Room
1805, Storage/Laundry Room 1805.3, Storage Room 1805.4, Storage Room 1928.1, Kitchen Area, and Serving
Areas per Owner direction. Epoxy flooring will be provided in these areas per Owner direction.
2. This Final GMP does not include ceramic tile at restrooms. Epoxy flooring will be provided in these areas per
Owner direction.
09C Athletic Flooring
1. This Final GMP includes Connor NeoShok for WF-1, and Connor ProForma III for WF-2.
2. This Final GMP includes NWR PROXL for RF-1 and RF-2 in lieu of the specified Mondo products.
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
3. This Final GMP includes Connor ElastiPlus for RF-3.
4. This Final GMP includes WF-1 & WF-2 in accordance with specification section 09 64 66 in lieu of the
products noted in the Finish Schedule on sheet A8.20.
5. This Final GMP includes an Owner Allowance for Custom Logos at the gyms, which includes the below:
a. Middle School Gymnasium:
i. One center circle painted logo
b. High School Gymnasium:
i. One center circle painted logo
c. High School Aux Gymnasium:
i. One center circle painted logo
ii. 4’ wide painted end border
iii. 2’ wide painted side court border
iv. 3’ high end court texts to read “SEQUOYAH” on each end
09D Epoxy Flooring
1. This Final GMP includes Stonhard Stonshield HRI System as it is the Basis of Design.
2. This Final GMP includes epoxy flooring, Stonclad UL and Stonkote HT4, at all areas currently scheduled to
receive Quarry Tile including Culinary Art Room 1805, Storage/Laundry Room 1805.3, Storage Room 1805.4,
Storage Room 1928.1, Kitchen Area, and Serving Areas, per Owner direction.
3. This Final GMP includes epoxy flooring, Stonshield SLT System, at all areas currently scheduled to receive
Ceramic Tile and all gang restrooms per Owner direction.
09E Painting & Wallcovering
1. This Final GMP includes billing for wall covering at time of order. No retainage shall be held on this material
cost.
2. This Final GMP does not include TS-1 Tackable Surface Panels at Corridor 0100, which is not used in the plans.
3. Digital Graphic Wallcoverings are only included in the Final GMP as noted in the elevation sheets. These have
not been priced as an alternate as noted on sheet A8.11A.
4. This Final GMP includes an Owner Allowance for interior graphics, which includes the below:
a. Painted Mural Athletic Branding (THIS IS OUR HOUSE!)
b. Painted Lettering - MS Gym (WIN AS ONE SHINE AS MANY)
c. Custom Mural, Vinyl Applied Logo on A1/A7.33 and A2/A7.10
10A Specialties
1. This Final GMP includes Penco Metal Shelving, 18"D x 36"W x 87"H for what is called out as S-22 on the
Specialty Equipment Schedule. The standard Penco 6-tier shelving height is in excess of the specified height of
84”H.
2. Mirror Mastic and Shatterproof Safety Backing per 08 83 00 is excluded for S35 Channel Framed Mirrors. This
should only be required on large frameless mirrors, such as in gym rooms that are adhesively mounted. The
S35 Channel Framed Mirrors have full backings and will be mounted with an H-Bracket.
3. This Final GMP includes manufacturer 2-year warranty for the electrical components in the LED mirrors. 5-
year warranty is included on the mirror glass and frame.
4. Due to Mirrors being exceptionally large and framed, Mirrors will be butted together horizontally to make
mirrors to size. 108" Mirrors and 96"H units to be formed from multiple smaller units where 1-piece units are
outside of manufacturer's capabilities.
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
5. This Final GMP includes (1) standard blackout curtain and track for room 1611 as there are no specified
product information shown in plans.
6. This Final GMP does not include sliding visual display units noted in the specifications as all visual display units
are shown to be fixed.
7. S12 Tackboard, S14 Markerboard and S18 Markerboard will be joined with an H-Bar on site with 2 separate
smaller units due to the unavailability in manufactured size.
8. This Final GMP does not include end wall guards noted in Specification 10 26 00, as there is no product
specified in the specification and none shown in plans.
9. This Final GMP includes TA44 Folding Shower Seat, 28”W x 15”D in lieu of what is called out as 26”W x 15”D
due to manufacturer availability.
10. This Final GMP includes grab bars in all required locations as identified in the General Series drawings.
11. This Final GMP does not include Extinguisher Theft Alarm, as it is not a standard option for the JL Industries
Ambassador Series.
12. This Final GMP includes locker types in accordance with finish schedule and elevations where notes on floor
plan and/or specifications are in conflict.
13. This Final GMP includes 2-tier S41 locker units based on dimensions for rooms 0412 and 1805.1 as no locker
types were shown in plans.
14. This Final GMP includes S30 and S37 Locker Benches in all required locations. S38 Locker Benches are noted in
Finish Schedule per Sheet A8.20A but not shown in plans.
15. This Final GMP includes Standard Lyon Hardwood tops only at locker benches.
16. This Final GMP includes S40 MVP Storage Locker that have 21” depth in lieu of the specified 22” depth units.
17. This Final GMP includes S36 Locker Benches, 42”x 20” in lieu of the specified 42”x 22” locker benches.
18. This Final GMP does not include the below items, as they are assumed to be Owner provided FF&E:
a. S16 Smartboard
b. S17 Printer
c. S23 Drying Rack
d. S32 TV
e. Kilns
10B Signage
1. This Final GMP includes $25,000 to assist with wayfinding signage between phases.
2. This Final GMP includes an Owner Allowance for the 35’x 3’-6” sign with 1’6” aluminum letter per the
note on A1.11F. There is no detail showing this sign in the Contract Documents.
3. This Final GMP includes an Owner Allowance for the 6’x 33’ school sign with 2’ aluminum letter per
the note on A1.10C. There is no detail showing this sign in the Contract Documents.
10C Prefabricated Canopies
1. This Final GMP does not include the prefabricated canopy called out on A2.10B. It is shown on A2.10B
but it is not shown on any elevations or section cuts.
2. This Final GMP includes Mitchell Metals as pre-fabricated canopy trade partner to meet design intent.
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
11A Food Service Equipment
1. This Final GMP assumes the Cafeteria Point-of-Sale (POS) system is furnished and installed by Owner.
2. This Final GMP assumes that the exterior refrigeration condenser units for the walk-in refrigeration
units (x3) will be located on the roof above the kitchen. No location is currently shown.
11B Residential Appliances
1. This Final GMP includes the following residential appliances:
a) (Qty 1) Summit 4.2 cu. ft 24 Inch Built-In Undercounter Refrigerator, model number - AL55
b) (Qty 18) Whirlpool 25.2 cu. ft Full-Depth French Door Bottom Mount Refrigerator, model number -
WRFF3036RZ
c) (Qty 23) GE ADA Compliant Stainless Steel Interior Dishwasher, model number - GDT226SSLSS
d) (Qty 10) GE 30" Free-Standing Electric Range, model number - GRF40HSVSS
e) (Qty 10) GE Profile 30" Under The Cabinet Hood, model number - PVX7300SJSS
f) (Qty 3) 525 lb. Prodigy ELITE® Full Cube Ice Machine w/ Bin - 536 lb. Storage, model number - MC0530MA-
1/B530P
g) (Qty 5) GE Profile 2.2 Cu. Ft. Built-In Sensor Microwave Oven, model number - PEB7227ANDD
a. GE Required 27” Built-In Trim Kit, model number – JX7227SLSS
11C Athletic Equipment
1. This Final GMP includes an Owner Allowance for Fitness Room Equipment.
2. This Final GMP includes an Owner Allowance for Weight Room Equipment.
3. This Final GMP does not include any equipment at the JROTC, as it is assumed to be Owner Provided
FF&E.
4. This Final GMP excludes the gym divider curtains called out in Specification 11 66 23, which was
specified to not be included in the gym.
11F Façade Maintenance Equipment
1. This Final GMP includes façade maintenance per Pro Bel preliminary layout (Exhibit F).
11G Commercial Laundry Equipment
1. This Final GMP includes an alternate to the Commercial Laundry Equipment called out in the documents as the
trade contractor was not able to obtain pricing on the Basis of Design. Please see below model numbers:
a) S1 Residential Washer at rooms 0107, 0412, 0501.2, and 0503.1: Unimac Light Commercial Washer, model
UFNE5BJP115TW01
b) S2 Residential Dryer at rooms 0107, 0412, 0501.2, and 0503.1: Unimac Light Commercial Electric Dryer,
model UDEE5BGS173CW01
c) Commercial Washer at Laundry 1308: Unimac 40-pound cabinet Washer-Extractor, model number
UCT040QN0VXU70B000
d) Commercial Dryer at 1308: Unimac 55-pound gas drying tumbler, model number UT055NVN0RBA6W0000
12A Window Treatments
1. This Final GMP does not include Horizontal Louver blinds per Specification 12 321 13 as none is shown in the
plans.
2. This Final GMP includes 145 linear feet of a blackout shades at Drama Classroom/Black Box 1526. Extents are
currently unclear.
3. Interior Finish Legend A8.20 notes Motorized Roller Shade with Location: Gymnasium. No motorized blackout
shades are included at the Gymnasium as none are shown.
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
12B.1 Millwork & Manufactured Casework
1. This Final GMP includes windowsills where the window is elevated off the floor. Storefronts and windows that
extend to the floor do not have sills included. Sills included based on Finish Note on sheet A8.20 “All Windows
To Have Solid Surface Sill, U.N.O.”.
2. This Final GMP includes an Owner Allowance for the reclaimed wood wall on A7.35 as a product/manufacturer
was not provided.
3. This Final GMP includes an alternate product for the wood trophy cases. Please see Exhibit D.
4. This Final GMP includes WDT-1 Wood Trim only at locations indicated in the RFI #95.
5. This Final GMP excludes Media Shelving and Mobile Library Shelves. These are OFOI per RFI Response #20.
6. This Final GMP excludes single source responsibility for all architectural woodwork and countertops.
12B.2 Lab Casework
1. This Final GMP excludes the below for the casework:
a. Locks other than teacher cabinets as drawn
b. Pull out trays
c. Non-standard colors
2. This Final GMP excludes the below for the fume hoods:
a. Horizontal or combination sashes
b. Distillation racks
c. Oxy-cleaned fixtures or piping
3. This Final GMP includes ¼” laminated glass at the glazed doors of the upper cabinets.
12C Auditorium Seating
1. This Final GMP does not include wood seat pan, which is not available on this model (approved
manufacturer -Hussey Seating, per RFI#13 response).
12D Telescoping Bleachers
2. This Final GMP does not include choral risers at Middle School or High School Choir Rooms. All
seating/tiered risers in these locations are assumed to be Owner-Furnished FF&E.
3. This Final GMP includes manufacturer standard polymer option seating type.
4. This Final GMP includes an estimate of $5,000 per end curtain Xtreme Logo (3 color signature logo).
14A Elevators
1. This Final GMP Includes KONE as Elevator Trade Partner. KONE payment terms of fifty-percent (50%)
due at Subcontract execution, thirty percent (30%) due at delivery of material to site, and twenty
percent (20%) due as monthly progress payments based on installation completion shall be
incorporated.
2. Shaft sizes will be modified to accommodate KONE equipment as needed.
3. This Final GMP includes 2-Way communication devices in elevator cabs per code.
4. This Final GMP includes spare data cabling in elevator traveling cables. Security provisions (card
readers and cameras) are not included and shall be provided by others if required.
5. This Final GMP includes KONE standard cab and ceiling finishes.
6. This Final GMP includes cellular devices for elevator controllers. Cost of cellular service shall be paid
by Owner after substantial completion.
21A Fire Protection
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
1. This Final GMP includes a design build fire sprinkler system to meet local AHJ Requirements.
2. This Final GMP includes fire protection drawings with National Institute for Certification in Engineering
Technologies (NICET) Stamp for submission to AHJ. Professional Engineer (PE) Stamp of fire
protection drawings is not included.
3. This Final GMP includes dry systems at metal panel soffits at courtyard entries and middle school art
patio.
4. This Final GMP includes free-standing, remote FDCs per the Contract Documents.
22A Plumbing
1. This Final GMP includes new gas service is from the meter to the building. Gas meter and service feed
to the meter is by the utility company.
23A HVAC & Building Controls
1. Ductwork layout and installation will be coordinated via Building Information Modeling and shop
drawings process to meet the architectural layouts as shown and mechanical design criteria.
2. This Final GMP includes mechanical equipment by manufacturers approved in the specification. Basis
of design equipment is not carried on all equipment types.
3. This Final GMP includes building automation and controls system by CCI.
4. This Final GMP includes all roof top units (RTUs) that are 5-ton capacity and below to be single stage
cooling.
5. This Final GMP does not include dryer booster fans as none are shown in plans or schedules.
26A Electrical
1. This Final GMP includes raceway and pull-string for Owner low-voltage contractor from in-wall devices
to accessible ceilings only in accordance with the Electrical Auxiliary plans. Structured cabling for
data/IT and/or security (cameras/card readers, etc.) is not included.
2. This Final GMP includes cable tray and sleeves as shown in the Electrical Auxiliary plans. Additional
sleeves and firestopping of Owner’s low voltage contractor’s work is not included.
3. This Final GMP includes grounding to bus bar as shown in the contract documents. Grounding of
Owner provided low voltage systems (racks/panels) is assumed to be by Owner’s low voltage provider.
4. This Final GMP includes raceway and quazite boxes for incoming fiber optic cabling per site electrical
plan. Intercept and re-route of fiber optic cable is assumed to be by Owner’s service provider.
5. This Final GMP includes fire alarm system by Johnson Controls.
6. This Final GMP includes intercom & clock system by SWC.
7. This Final GMP does not include EV Charging Stations or associated raceway, cabling, or Final
connections. This work is to be performed turnkey by Georgia Power. It is assumed that Georgia
Power will complete this work in accordance with the Gilbane project schedule. Failure to complete
this work by Georgia Power, and any associated delays to Substantial Completion and/or Final
inspections by AHJ, are considered outside the scope of this Final GMP.
8. This Final GMP does not include Parking Lot Site Lighting, Athletic Field Lighting, or associated
raceway, cabling, or Final connections. This work is to be performed turnkey by Georgia Power. It is
assumed that Georgia Power will complete this work in accordance with the Gilbane project schedule.
Failure to complete this work by Georgia Power, and any associated delays to Substantial Completion
and/or Final inspections by AHJ, are considered outside the scope of this Final GMP.
9. This Final GMP includes Emergency Responder Radio Communication System (ERRCS) installation and
testing. Distributed Antenna System for cellular service inside the building is not included.
27A Audio Visual
1. This Final GMP does not include equipment or cabling for CCTV, Access Control, or Intrusion
Detection. Pathway only is included.
2. This Final GMP includes an Owner Allowance for AV Model upgrades based on 2030 Tech.
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
31A Sitework & Utilities
1. This Final GMP excludes the domestic water meter, fire water meter and irrigation meter and
associated vaults. These are assumed to be furnished and installed by Dekalb Co. Watershed.
2. This Final GMP excludes the natural gas line and meter which is assumed to be by Atlanta Gas Light
(AGL).
3. This Final GMP does not include additional accommodations for building addressing to satisfy Atlanta
Gas Light requirements for concurrent services at single address. It is assumed that this coordination
will be conducted by Owner.
4. This Final GMP does not include micro-bioretention soils or plantings at the detention pond as none
are shown/required based on discussion with Civil Engineer.
5. This Final GMP includes an Owner Allowance for Unsuitable Soils/Rock Removal in the amount of
$250,000.
6. This Final GMP excludes tap fees.
7. This Final GMP does not include environmental permitting and/or testing/sampling associated with
the sanitary sewer aerial creek crossing. It is assumed these items will be provided by the Civil
Engineer and Owner’s Testing Agency, respectively.
8. This Final GMP does not include any undercutting and/or ground improvements at the aerial creek
crossing. No Geotechnical information has been provided.
9. This Final GMP includes an Owner Allowance for MSE Retaining Wall & Guardrail not shown at the Fire
Access Lane adjacent to the Stewart Road Entry. This wall is assumed to be 10’H (avg) and 450’ long.
Based on site conditions a retaining wall will be needed at the back of curb in this location.
31B Aggregate Piers
1. This Final GMP includes Delegated-Design rammed aggregate pier system per loads provided the
Structural Engineer of Record.
32A Athletic Fields & Equipment
1. At the baseball/softball field, this Final GMP includes Fielder’s Choice 50 Sport Turf in the infield, and
PowerHouse 46Q Sport Turf in the outfield and foul areas. Please see Exhibit E.
2. At the football/soccer field, this Final GMP includes GameChanger 46Q Sport Turf. Please see Exhibit
E.
3. This Final GMP includes an Owner Allowance for custom logos at the center and end zones of the
football/soccer field.
4. This Final GMP includes the below profile for the athletic track is included:
o 4” crushed stone base
o 2” 19mm asphalt binder course
o 1.5” 9.5mm type II asphalt topping
5. Track drainage design included in 100% CD Documents is currently incomplete. This GMP assumes
drainage system similar to that shown in Exhibit E.1 – Track Drainage Assumptions.
6. This Final GMP includes the Track Surface BSS 300 by Beynon Sports. An add alternate is provided for
Beynon BSS 1000.
7. This Final GMP includes dugout rails, netting and padding.
32B Tennis Courts
1. This Final GMP does not include a concrete header curb at the tennis courts as it is not shown.
32C Landscape & Hardscape
1. This Final GMP includes the below irrigation system at all landscape areas of the site. See Exhibit G.
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
2. This Final GMP assumes that any costs associated with tree recompensing will be the responsibility of
the Owner.
3. This Final GMP includes 1-year maintenance for landscaping.
4. This Final GMP does not include hand watering beyond substantial completion.
5. This Final GMP does not include engineered soils as they are not required.
6. This Final GMP includes 4” of topsoil per Specification Section 32 90 00.
32D Asphalt Paving
1. This Final GMP does not include any mill and overlay of existing asphalt at Aztec Road and Stewart Road. An
add alternate is provided.
32E Striping, Site Signage
1. This Final GMP includes band practice numbers and striping per Sheet L1.02.
32F Fencing
1. This Final GMP includes a yellow topper and windscreen at the baseball and football chain link fencing only.
2. This Final GMP includes 7’ High Ameristar Impasse II Strong Hold Picket Fencing at the Equipment Patio and
Art Patio (0106.4) per Sheet AS1.10. This fencing is not included as 4’ high or 8’ high as called out by Note G26
and G27 on Sheet A1.101A. This fencing is included as standard black.
3. This Final GMP includes a 4’ high standard black 3-rail ornamental fencing with an egress gate at the MS
Dining Patio (A1.10D).
4. This Final GMP includes 30’ wide swing arm gates at two locations as shown on Sheet C1.01. Two gates are
included per location. These are assumed to be mechanically operated.
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
Document Enumeration
The following documents were used in the preparation of this Final GMP
Plans & Other Documents
1. Exhibit A – 100% CD Drawing Log
2. Exhibit B – 100% CD Specification Log
3. Exhibit C – RFI Log
4. Exhibit D – Trophy Display Case Alternate
5. Exhibit E – Turf Specifications
6. Exhibit E.1 – Track Drainage Assumptions
7. Exhibit F – Pro Bel Façade Maintenance Layout
8. Exhibit G – Irrigation Layout
9. Appendix A – Geotech Report
10. Appendix B – Science Lab Drawings 07.23.2024
11. Appendix C – Fume Hood Drawings
12. Addendum 1
a. Narrative
b. Drawings
i. Addendum 1_Architecture
ii. Addendum 1_Food Service
iii. Addendum 1_Landscape
iv. Addendum 1_Plumbing
v. Addendum 1 _Structural
vi. Addendum 1_Theatrical
vii. Addendum 1_Electrical
viii. Addendum 1_HVAC
c. RFI Log
d. Specs
i. 00 01 10-Table of Contents_AD1
ii. Addendum 1_Digital Addressable Fire Alarm System-28.31.00
iii. Addendum 1_Door Hardware (08.71.00)
iv. Addendum 1_Plumbing Systems Testing (22.70.00)
v. Addendum 1_Specs_Steel Decking (05.31.00)
vi. Addendum 1_Track and Field Equipment (68.33.43)
e. Substitution Request
i. AALCO GYMNASIUM EQUIPMENT - APPROVED AS NOTED
ii. AVL Substitution Request-signed - APPROVED AS NOTED
iii. Cardinal Acoustics Substitution Request Form - APPROVED AS NOTED
iv. Frasch Substitution Request Sequoyah MS and HS - NOTE MARKINGS
7. Addendum 2
a. Narrative
i. ADDENDUM 2
ii. Addendum-2_Theatrical-Narrative
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
b. Drawings
i. Addendum-2_Architecture
ii. Addendum-2_Field House
iii. Addendum-2_Plumbing
iv. Addendum-2_Theatrical
c. RFI Log
d. Specs
i. 22 11 19 - Domestic Water Piping Specialties
ii. 22 70 00 - Plumbing Systems Testing
8. Addendum 2 Revised
a. Narrative
i. ADDENDUM 2R Summary
ii. Sequoyah Addendum #2 Revised
b. Drawings
i. Architecture Drawings Addendum 2R
ii. M-Set
c. RFI Log
v.5/1/2023
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
Detail
v.5/1/2023
Sequoyah Middle & High School
Dekalb County School District
Doraville, GA 3/13/2025
Allowances R0
OWNER ALLOWANCES DIRECT COST
01 Escalation (2% Direct Cost) $ 3,672,571
02 Abatement - Hazardous Material Removal $ 500,000
03 Glazing Sill Supports not Currently Shown ($100/LF) $ 118,200
04 Custom Logo / Text Allowance @ HS Main Gym, Aux Gym $ 10,000
05 Interior Graphic Signage Allowance $ 50,000
08 Reclaimed Wood Wall on A7.35 $ 30,205
09 AV Model Upgrades Based on 2030 Tech $ 100,000
10 Rock Removal/Unsuitable Soils $ 250,000
11 Custom Logos at the Center and End Zones of the Football/Soccer Field $ 78,000
12 MSE Retaining Wall & Guardrail at Fire Access Lane $ 171,000
13 Exterior Signage - 35’x 3’-6” Sign with 1’6” Aluminum Lettering at Main Entry $ 30,000
14 Exterior Signage - 6’x 33’ School Sign with 2’ Aluminum Lettering at Rear of MS Gym $ 30,000
Sequoyah Middle & High School
Dekalb County School District
Doraville, GA 3/13/2025
Alternates R0
TOTAL COST
1 Mill & Overlay Aztec Road After Construction (10,000 SY) $ 283,950
2 Track Surface BSS 1000 in lieu of BSS 300 by Beynon Sports $ 74,220
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
Schedule and
Logistics
v.5/1/2023
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
Sequoyah Middle and High School GMP Schedule 1648 1156 22-Feb-23 A 27-Aug-29
Milestones 1648 1146 22-Feb-23 A 27-Aug-29
MLS-1000 Project Kick-Off 0 0 22-Feb-23 A Project Kick-Off
MLS-1010 Site Mobilization ( Phase 1 ) 0 0 16-Sep-24 A Site Mobilization ( Phase 1 )
A14420 Dekalb County Issue NTP 0 0 17-Feb-25* Dekalb County Issue NTP
A15410 Building Permit Attained 0 0 09-Apr-25 Building Permit Attained
A15380 GMP ( Board Approval ) 0 0 17-Apr-25 GMP ( Board Approval )
A14370 Foundations Start ( Phase 1 ) 0 0 06-Jun-25 Foundations Start ( Phase 1 )
A14340 Steel Erection Start ( Phase 1 ) 0 0 25-Sep-25 Steel Erection Start ( Phase 1 )
A14280 Temporary Power 0 0 08-Dec-25 Temporary Power
A14920 Phase 1 Middle School Tower Steel Structure Complete 0 0 17-Dec-25 Phase 1 Middle School Tower Steel Structure Complete
A14950 Middle School Kitchen & Gym Area 0 0 12-Jan-26 Middle School Kitchen & Gym Area
A14930 Phase 2 High School Steel Structure Complete 0 0 01-May-26 Phase 2 High School Steel Structure Complete
A14390 Dry-in ( Phase 1 ) 0 0 16-Jun-26 Dry-in ( Phase 1 )
A14300 Permanent Power 0 0 12-Oct-26 Permanent Power
A14290 Conditioned Air Available ( Phase 1 ) 0 0 09-Nov-26 Conditioned Air Available ( Phase 1 )
A14250 Site Office Trailer Relocation ( Phase 2 ) 0 0 14-Dec-26* Site Office Trailer Relocation ( Phase 2 )
MLS-1020 Middle School Substantial Completion 0 0 15-Jun-27 Middle School Substantial Completion
A14600 Middle School End Of Year Turn-over Time 5 5 15-Jun-27 22-Jun-27 Middle School End Of Year Turn-over Time
A14260 Close Out ( Phase 1 ) 50 50 15-Jun-27 25-Aug-27 Close Out ( Phase 1 )
A14610 Cary Reynolds & Sequoyah Existing School Relocation 15 15 22-Jun-27 14-Jul-27 Cary Reynolds & Sequoyah Existing School Relocation
A14620 Existing Schools Hazardous Abatement 40 40 07-Jul-27 01-Sep-27 Existing Schools Hazardous Abatement
A14240 Phase 2 Demolition Start 0 0 04-Aug-27 Phase 2 Demolition Start
A14360 Foundations Start ( Phase 2 ) 0 0 30-Sep-27 Foundations Start ( Phase 2 )
A14350 Steel Erection Start ( Phase 2 ) ( Structure Start ) 0 0 01-Mar-28 Steel Erection Start ( Phase 2 ) ( Structure Start )
A14940 Phase 2 Admin, Gym & Theater Areas Steel Structure Complete 0 0 24-Apr-28 Phase 2 Admin, Gym & Theater Areas Steel Structure Complete
A14380 Dry-in ( Phase 2 ) 0 0 10-Jul-28 Dry-in ( Phase 2 )
A14400 Conditioned Air Available ( Phase 2 ) 0 0 27-Sep-28 Conditioned Air Available ( Phase 2 )
MLS-1030 Phase 2 Substantial Completion 0 0 15-Jun-29 Phase 2 Substantial Completion
A14270 Close Out ( Phase 2 ) 50 50 15-Jun-29 27-Aug-29 Close Out ( Phase 2 )
Preconstruction 1519 1027 22-Feb-23 A 23-Feb-29
Design 795 303 22-Feb-23 A 14-Apr-26
DES-1000 Stakeholder Engagement & Preliminary Reports/Concepts 92 0 22-Feb-23 A 30-Jun-23 A Stakeholder Engagement & Preliminary Reports/Concepts
DES-1010 Schematic Design 53 0 03-Jul-23 A 15-Sep-23 A Schematic Design
DES-1020 Design Development 100 0 06-Oct-23 A 29-Feb-24 A Design Development
DES-1030 Construction Documents 138 0 01-Mar-24 A 13-Sep-24 A Construction Documents
DES-1040 30% Construction Documents 0 0 21-Jun-24 A 30% Construction Documents
DES-1050 80% Construction Documents 0 0 13-Sep-24 A 80% Construction Documents
A14530 80% CD Estimate 25 0 16-Sep-24 A 18-Oct-24 A 80% CD Estimate
A14570 Submit 80% GMP Pricing To DCSD & GMC 0 0 18-Oct-24 A Submit 80% GMP Pricing To DCSD & GMC
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 1 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A14550 80% CD Price Comment Incorporation 20 0 21-Oct-24 A 18-Nov-24 A 80% CD Price Comment Incorporation
DES-1060 100% Construction Documents 0 0 13-Dec-24 A 100% Construction Documents
A15340 GMC Transmit BIM Model 35 1 13-Dec-24 A 03-Feb-25 GMC Transmit BIM Model
A15470 DeKalb Located Sanitary Structure 0 0 19-Dec-24 A DeKalb Located Sanitary Structure
A15360 Addendum 1 0 0 10-Jan-25 A Addendum 1
A14540 Final GMP Pricing 36 20 10-Jan-25 A 28-Feb-25 Final GMP Pricing
A15480 Sanitary Structrue Design Team Meeting 0 0 16-Jan-25 A Sanitary Structrue Design Team Meeting
A15490 Sanitary Structure As-Built Sent To Design Team 0 0 23-Jan-25 A Sanitary Structure As-Built Sent To Design Team
A15500 Sanitary Re-route Redsign 12 5 23-Jan-25 A 07-Feb-25 Sanitary Re-route Redsign
A15370 Addendum 2 0 0 24-Jan-25 A Addendum 2
A16050 Addendum 2 Revisions 0 0 05-Feb-25* Addendum 2 Revisions
A14840 Building Electrical Load Calculations ( To Release Permanent Transformers
0) 0 28-Feb-25 Building Electrical Load Calculations ( To Release Permanent Transformers )
A16060 Addendum 3 0 0 28-Feb-25* Addendum 3
A14560 Submit Final GMP Pricing To DCSD & GMC 0 0 28-Feb-25 Submit Final GMP Pricing To DCSD & GMC
A15390 Building Permit Comment Reconciliation ( GMC ) 10 10 12-Mar-25 25-Mar-25 Building Permit Comment Reconciliation ( GMC )
Design Load Calculations 43 19 08-Nov-24 A 28-Feb-25
A15430 Gilbane & GMC Square D Redesign Meeting Review 0 0 08-Nov-24 A Gilbane & GMC Square D Redesign Meeting Review
A15450 Gilbane Sent Design Options To GMC 0 0 11-Nov-24 A Gilbane Sent Design Options To GMC
A15460 GMC Responded (Not Incorporating Design Change After 100% CDs ) 0 0 11-Dec-24 A GMC Responded (Not Incorporating Design Change After 100% CDs )
A15440 Electrical Redesign 40 19 16-Dec-24 A 28-Feb-25 Electrical Redesign
Georgia Power 473 297 07-May-24 A 14-Apr-26
Transformer 297 297 10-Feb-25 14-Apr-26
A14770 Temp Transformer Sizing ( Sent To GA Power ) 0 0 10-Feb-25 Temp Transformer Sizing ( Sent To GA Power )
A14780 Temp Transformer Lead Times 200 200 11-Feb-25 21-Nov-25 Temp Transformer Lead Times
A11290 Permanent Transformers (Georgia Power Processing) 30 30 28-Feb-25 11-Apr-25 Permanent Transformers (Georgia Power Processing)
A12670 Permanent Transformer Leadtimes ( 120/208 & 277/480 ) 250 250 11-Apr-25 08-Apr-26 Permanent Transformer Leadtimes ( 120/208 & 277/480 )
A14710 Install UG For Temp Transformer 10 10 07-Nov-25 21-Nov-25 Install UG For Temp Transformer
A14720 Install Temp Transformer 3 3 24-Nov-25 26-Nov-25 Install Temp Transformer
A14760 Set & Connect Temp Eyline Panel 5 5 01-Dec-25 05-Dec-25 Set & Connect Temp Eyline Panel
A14740 Set Permanent Transformer 2 2 08-Apr-26 10-Apr-26 Set Permanent Transformer
A14750 Connect Permanent Transformer 2 2 10-Apr-26 14-Apr-26 Connect Permanent Transformer
Power Poles & Line Relocation ( Design change To Avoid ) 91 0 07-May-24 A 07-Oct-24 A
A14790 Pole And Transformer Relocation Meeting ( Distribution Team ) 0 0 07-May-24 A Pole And Transformer Relocation Meeting ( Distribution Team )
A14800 Pole and Transmission Relocation Meeting ( Transmission Team ) 0 0 30-May-24 A Pole and Transmission Relocation Meeting ( Transmission Team )
A14830 GA Power Schedule Kick off Meeting 1 0 03-Jun-24 A 19-Jul-24 A GA Power Schedule Kick off Meeting
A14810 Kick-off Meeting For Non Binding Relocation Estimate & Time line ( Transmition
25 0 03-Sep-24
Engineering Team ) A 07-Oct-24 A Kick-off Meeting For Non Binding Relocation Estimate & Time line ( Transmition Engineering Team )
Permitting 195 47 01-Jul-24 A 08-Apr-25
A14440 Owner Affidavit Signatures For Trees 25 0 01-Jul-24 A 05-Aug-24 A Owner Affidavit Signatures For Trees
A14430 Owner Affidavit Signatures For LDP & Trailer 19 0 17-Jul-24 A 12-Aug-24 A Owner Affidavit Signatures For LDP & Trailer
A12900 LDP 80 0 13-Aug-24 A 27-Dec-24 A LDP
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 2 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A14640 Doraville City Comments 1 0 03-Sep-24 A 03-Sep-24 A Doraville City Comments
A14450 Tree Removal Permit 20 0 10-Sep-24 A 07-Oct-24 A Tree Removal Permit
A15330 DCSD/ City Of Doraville LDP Negotiation 15 0 05-Dec-24 A 26-Dec-24 A DCSD/ City Of Doraville LDP Negotiation
A15510 Gilbane Notified Of Doraville Permit Fees 0 0 12-Dec-24 A Gilbane Notified Of Doraville Permit Fees
PER-1000 Building Permit Review (Doraville & Dekalb ) 60 27 16-Dec-24 A 11-Mar-25 Building Permit Review (Doraville & Dekalb )
A15520 Gilbane Paid Fees ( Doraville LDP ) 0 0 17-Dec-24 A Gilbane Paid Fees ( Doraville LDP )
A15530 Doraville Issued LDP 0 0 17-Dec-24 A Doraville Issued LDP
A15540 Gilbane Notified Dekalb LDP ( Sewer Access Fee Required ) 0 0 19-Dec-24 A Gilbane Notified Dekalb LDP ( Sewer Access Fee Required )
A15550 Gilbane Direct to Pay ( DeKalb Sewer Acces Fees ) 0 0 06-Jan-25 A Gilbane Direct to Pay ( DeKalb Sewer Acces Fees )
A15560 Gilbane Paid ( DeKalb Sewer Access Fees ) 0 0 14-Jan-25 A Gilbane Paid ( DeKalb Sewer Access Fees )
A15350 DeKalb LDP Release 15 0 14-Jan-25 A 14-Feb-25 A DeKalb LDP Release
A15400 Permit Approval ( City of Doraville ) 10 10 26-Mar-25 08-Apr-25 Permit Approval ( City of Doraville )
Contracting 110 76 13-Dec-24 A 19-May-25
Early Release/Long Lead Packages 110 76 13-Dec-24 A 19-May-25
Bid & Prep Trades Contracts 100 66 13-Dec-24 A 05-May-25
PRC-1000 Sitework 20 0 13-Dec-24 A 13-Jan-25 A Sitework
A14580 Food Service 20 0 13-Dec-24 A 13-Jan-25 A Food Service
A14470 Foundations Package 28 0 13-Dec-24 A 23-Jan-25 A Foundations Package
PRC-1130 Electrical Equipment 16 0 07-Jan-25 A 28-Jan-25 A Electrical Equipment
PRC-1160 Mechanical & Plumbing Eqipment Equipment 20 1 07-Jan-25 A 03-Feb-25 Mechanical & Plumbing Eqipment Equipment
PRC-1100 Structural Steel 20 20 03-Feb-25 03-Mar-25 Structural Steel
A15660 Glazing 20 20 03-Feb-25 03-Mar-25 Glazing
A16100 Milwork 20 20 03-Feb-25 03-Mar-25 Milwork
A16040 Stage Flooring 20 20 03-Feb-25 03-Mar-25 Stage Flooring
A14500 Lab Case Work 20 20 11-Feb-25 10-Mar-25 Lab Case Work
A15710 Exterior Metal Panels 20 20 10-Mar-25* 07-Apr-25 Exterior Metal Panels
A15970 Flooring 25 25 10-Mar-25* 14-Apr-25 Flooring
A15950 AV Systems 25 25 10-Mar-25* 14-Apr-25 AV Systems
A15980 Sports Flooring 25 25 10-Mar-25* 14-Apr-25 Sports Flooring
A16120 Bleachers & Specialty Seating 20 20 24-Mar-25* 21-Apr-25 Bleachers & Specialty Seating
A14490 Elevators 20 20 08-Apr-25 05-May-25 Elevators
Trades Contract Approvel & Execution 90 76 14-Jan-25 A 19-May-25
A14590 Food Service 6 0 14-Jan-25 A 21-Jan-25 A Food Service
PRC-1190 Sitework 7 0 14-Jan-25 A 22-Jan-25 A Sitework
A14480 Foundations Package 10 4 24-Jan-25 A 06-Feb-25 Foundations Package
PRC-1210 Electrical Equipment 10 7 29-Jan-25 A 11-Feb-25 Electrical Equipment
PRC-1220 Mechanical & Plumbing Equipment 10 10 04-Feb-25 17-Feb-25 Mechanical & Plumbing Equipment
PRC-1200 Structural Steel 10 10 03-Mar-25 17-Mar-25 Structural Steel
A15670 Glazing 10 10 03-Mar-25 17-Mar-25 Glazing
A16110 Milwork 10 10 03-Mar-25 17-Mar-25 Milwork
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 3 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A16030 Stage Flooring 10 10 03-Mar-25 17-Mar-25 Stage Flooring
A14520 Lab Case Work 10 10 11-Mar-25 24-Mar-25 Lab Case Work
A15720 Exterior Metal Panels 10 10 07-Apr-25 21-Apr-25 Exterior Metal Panels
A15990 Flooring 10 10 14-Apr-25 28-Apr-25 Flooring
A15960 AV Systems 10 10 14-Apr-25 28-Apr-25 AV Systems
A16000 Sports Flooring 10 10 14-Apr-25 28-Apr-25 Sports Flooring
A16130 Bleachers & Specialty Seating 10 10 21-Apr-25 05-May-25 Bleachers & Specialty Seating
A14510 Elevators 10 10 06-May-25 19-May-25 Elevators
Engineering 1060 1027 16-Dec-24 A 23-Feb-29
Submittals ( Submittal & Approval ) 971 938 16-Dec-24 A 16-Oct-28
Coordination 133 100 16-Dec-24 A 24-Jun-25
A11260 Load Calculations & Study 15 0 16-Dec-24 A 07-Jan-25 A Load Calculations & Study
A15690 Cold Form Metal Framing ( Engineered Shop Drawings ) 1 1 03-Feb-25 04-Feb-25 Cold Form Metal Framing ( Engineered Shop Drawings )
A11270 BIM Coordination 60 60 04-Feb-25 28-Apr-25 BIM Coordination
A15680 Glazing Calculations ( For Exteroir Wall Framing Loads ) 0 0 05-May-25 Glazing Calculations ( For Exteroir Wall Framing Loads )
A15700 Metal Panel Calculations 0 0 24-Jun-25 Metal Panel Calculations
Electrical 130 130 28-Feb-25 03-Sep-25
A11280 Switch Gear 30 30 28-Feb-25 11-Apr-25 Switch Gear
A12910 Bus Duct 30 30 28-Feb-25 11-Apr-25 Bus Duct
A11310 Panels & Breakers 30 30 27-May-25 09-Jul-25 Panels & Breakers
A11300 Generator 35 35 15-Jul-25 03-Sep-25 Generator
Plumbing 30 30 18-Feb-25 31-Mar-25
A11320 Fixtures 25 25 18-Feb-25 24-Mar-25 Fixtures
A12190 Gas Hot Water Boil er 30 30 18-Feb-25 31-Mar-25 Gas Hot Water Boil er
A15870 Electric Water Heater 30 30 18-Feb-25 31-Mar-25 Electric Water Heater
A11330 Pumps 30 30 18-Feb-25 31-Mar-25 Pumps
Mechanical 60 60 18-Feb-25 12-May-25
Phase 1 30 30 18-Feb-25 31-Mar-25
A11360 Water Source Heat Pump ( Mid dle School ) 30 30 18-Feb-25 31-Mar-25 Water Source Heat Pump ( Mid dle School )
A12170 Energy Recovery Wheel 30 30 18-Feb-25 31-Mar-25 Energy Recovery Wheel
A15850 Fan ( EF 0-1,2,3,4,5,6 & 1-1,6,8 ) 30 30 18-Feb-25 31-Mar-25 Fan ( EF 0-1,2,3,4,5,6 & 1-1,6,8 )
A12160 Split System ( Ductless& Electric ) 30 30 18-Feb-25 31-Mar-25 Split System ( Ductless& Electric )
A12200 Water Source Heat Pump ( High School ) 30 30 18-Feb-25 31-Mar-25 Water Source Heat Pump ( High School )
A15860 Plate Frame Heat Exchanger ( Primary Mech ) 30 30 18-Feb-25 31-Mar-25 Plate Frame Heat Exchanger ( Primary Mech )
A11350 RTUs 30 30 18-Feb-25 31-Mar-25 RTUs
A12180 Cooling Tower 30 30 18-Feb-25 31-Mar-25 Cooling Tower
Phase 2 ( Gym, Auditorium, Administration ) 30 30 01-Apr-25 12-May-25
A15880 Split Systems ( SS HP-1,2 ) 30 30 01-Apr-25 12-May-25 Split Systems ( SS HP-1,2 )
A15920 Fans ( EF 1-1,2,3,4,5,7 ) 30 30 01-Apr-25 12-May-25 Fans ( EF 1-1,2,3,4,5,7 )
A15900 RTUs ( Admin.4 Thru 12 ) 30 30 01-Apr-25 12-May-25 RTUs ( Admin.4 Thru 12 )
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 4 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A15910 RTUs ( Drama & Auditorium 13 Thru 19) 30 30 01-Apr-25 12-May-25 RTUs ( Drama & Auditorium 13 Thru 19)
A15890 RTUs ( Gym & Track 22 Thru 27 ) 30 30 01-Apr-25 12-May-25 RTUs ( Gym & Track 22 Thru 27 )
Foundations 65 65 06-Mar-25 05-Jun-25
A12440 Rebar ( Shop Drawing Development ) 25 25 06-Mar-25 09-Apr-25 Rebar ( Shop Drawing Development )
A11230 Shoring 15 15 10-Mar-25 28-Mar-25 Shoring
A11220 Rebar ( Submittal & Approval ) 20 20 10-Apr-25 07-May-25 Rebar ( Submittal & Approval )
A11240 Concrete 20 20 08-May-25 05-Jun-25 Concrete
Steel 230 230 17-Mar-25 12-Feb-26
Structure 230 230 17-Mar-25 12-Feb-26
A12210 Middle School Tower ( Shop Drawing Development ) 45 45 17-Mar-25 19-May-25 Middle School Tower ( Shop Drawing Development )
A11060 Middle School Tower ( Submittal & Approval ) 30 30 19-May-25 01-Jul-25 Middle School Tower ( Submittal & Approval )
A12220 Middle School Gymnasium & Dining ( Shop Drawing Development ) 30 30 19-May-25 01-Jul-25 Middle School Gymnasium & Dining ( Shop Drawing Development )
A11070 Middle School Gymnasium & Dining ( Submittal & Approval ) 30 30 01-Jul-25 13-Aug-25 Middle School Gymnasium & Dining ( Submittal & Approval )
A12230 High School Tower ( Shop Drawing Development ) 45 45 01-Jul-25 04-Sep-25 High School Tower ( Shop Drawing Development )
A11080 High School Tower ( Submittal & Approval ) 30 30 04-Sep-25 16-Oct-25 High School Tower ( Submittal & Approval )
A12240 High School Gym & Track, Aux Gym ( Shop Drawing Development ) 30 30 04-Sep-25 16-Oct-25 High School Gym & Track, Aux Gym ( Shop Drawing Development )
A11090 High School Gym & Track, Aux Gym ( Submittal & Approval ) 30 30 16-Oct-25 02-Dec-25 High School Gym & Track, Aux Gym ( Submittal & Approval )
A12250 Middle School & High School Administration ( Shop Drawing Development
30 ) 30 16-Oct-25 02-Dec-25 Middle School & High School Administration ( Shop Drawing Development )
A12260 High School Drama & Auditorium ( Shop Drawing Development ) 20 20 02-Dec-25 31-Dec-25 High School Drama & Auditorium ( Shop Drawing Development )
A11100 Middle School & High School Administration ( Submittal & Approval ) 30 30 02-Dec-25 15-Jan-26 Middle School & High School Administration ( Submittal & Approval )
A11110 High School Drama & Auditorium ( Submittal & Approval ) 30 30 31-Dec-25 12-Feb-26 High School Drama & Auditorium ( Submittal & Approval )
Misc. Metals 110 110 17-Mar-25 20-Aug-25
A12270 Stringers & Rails ( St-01 ) ( Shop Drawing Development ) 25 25 17-Mar-25 21-Apr-25 Stringers & Rails ( St-01 ) ( Shop Drawing Development )
A12280 Stringers & Rails ( St-02 ) ( Shop Drawing Development ) 25 25 17-Mar-25 21-Apr-25 Stringers & Rails ( St-02 ) ( Shop Drawing Development )
A12290 Stringers & Rails ( St-3 ) ( Shop Drawing Development ) 25 25 17-Mar-25 21-Apr-25 Stringers & Rails ( St-3 ) ( Shop Drawing Development )
A12300 Stringers & Rails ( St-07 ) ( Shop Drawing Development ) 15 15 21-Apr-25 12-May-25 Stringers & Rails ( St-07 ) ( Shop Drawing Development )
A12350 Stringers & Rails ( St-06 ) ( Shop Drawing Development ) 25 25 21-Apr-25 27-May-25 Stringers & Rails ( St-06 ) ( Shop Drawing Development )
A15930 Stringers & Rails ( St-04 ) ( Shop Drawing Development ) 25 25 21-Apr-25 27-May-25 Stringers & Rails ( St-04 ) ( Shop Drawing Development )
A12340 Stringers & Rails ( St-05 ) ( Shop Drawing Development ) 25 25 21-Apr-25 27-May-25 Stringers & Rails ( St-05 ) ( Shop Drawing Development )
A11120 Stringers & Rails ( St-01 ) ( Submittal & Approval ) 30 30 21-Apr-25 03-Jun-25 Stringers & Rails ( St-01 ) ( Submittal & Approval )
A11130 Stringers & Rails ( St-02 ) ( Submittal & Approval ) 30 30 21-Apr-25 03-Jun-25 Stringers & Rails ( St-02 ) ( Submittal & Approval )
A11140 Stringers & Rails ( St-3 ) ( Submittal & Approval ) 30 30 21-Apr-25 03-Jun-25 Stringers & Rails ( St-3 ) ( Submittal & Approval )
A11150 Stringers & Rails ( St-07 ) ( Submittal & Approval ) 30 30 12-May-25 24-Jun-25 Stringers & Rails ( St-07 ) ( Submittal & Approval )
A11200 Stringers & Rails ( St-06 ) ( Submittal & Approval ) 30 30 27-May-25 09-Jul-25 Stringers & Rails ( St-06 ) ( Submittal & Approval )
A11180 Stringers & Rails ( St-04 ) ( Submittal & Approval ) 30 30 27-May-25 09-Jul-25 Stringers & Rails ( St-04 ) ( Submittal & Approval )
A11190 Stringers & Rails ( St-05 ) ( Submittal & Approval ) 30 30 27-May-25 09-Jul-25 Stringers & Rails ( St-05 ) ( Submittal & Approval )
A12310 Stringers & Rails At Running Track Access ( Shop Drawing Development15
) 15 17-Jun-25 09-Jul-25 Stringers & Rails At Running Track Access ( Shop Drawing Development )
A12320 Spiral Stair ( Shop Drawing Development ) 15 15 17-Jun-25 09-Jul-25 Spiral Stair ( Shop Drawing Development )
A11160 Stringers & Rails At Running Track Access ( Submittal & Approval ) 30 30 09-Jul-25 20-Aug-25 Stringers & Rails At Running Track Access ( Submittal & Approval )
A11170 Spiral Stair ( Submittal & Approval ) 30 30 09-Jul-25 20-Aug-25 Spiral Stair ( Submittal & Approval )
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 5 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
Elevators 79 79 20-May-25 11-Sep-25
A11380 Elev 01 (Shop Drawings Development ) 25 25 20-May-25 24-Jun-25 Elev 01 (Shop Drawings Development )
A11390 Elev 02 ( Shop Drawings Development ) 25 25 20-May-25 24-Jun-25 Elev 02 ( Shop Drawings Development )
A12510 Elev 01 ( Submittal & Approval) 20 20 25-Jun-25 23-Jul-25 Elev 01 ( Submittal & Approval)
A12520 Elev 02 ( Submittal & Approval) 20 20 25-Jun-25 23-Jul-25 Elev 02 ( Submittal & Approval)
A11400 Elev 03 ( Shop Drawings Development ) 25 25 09-Jul-25 13-Aug-25 Elev 03 ( Shop Drawings Development )
A12530 Elev 03 ( Submittal & Approval) 20 20 13-Aug-25 11-Sep-25 Elev 03 ( Submittal & Approval)
Lab Case Work 45 45 25-Mar-25 27-May-25
A12540 Shop Drawing Development 25 25 25-Mar-25 28-Apr-25 Shop Drawing Development
A12550 Submittal & Approval 20 20 29-Apr-25 27-May-25 Submittal & Approval
Frames & Glazing 710 710 17-Mar-25 07-Jan-28
A14100 Middle School & HIgh School Tower Galzin g Frames, Glass 35 35 17-Mar-25 05-May-25 Middle School & HIgh School Tower Galzin g Frames, Glass
A14120 Middle School & HIgh School Gym & Dining Areas Glazing Frames, Glass
35 35 25-Sep-25 14-Nov-25 Middle School & HIgh School Gym & Dining Areas Glazing Frames, Glass
A14140 Interior Glazing Frames & Glass 35 35 19-Dec-25 10-Feb-26 Interior Glazing Frames & Glass
A14110 Middle School & High School Addministration & High School Dinning 35 35 24-Sep-27 15-Nov-27 Middle School & High School Addministration & High School Dinning
A14130 Operable Partitions 35 35 15-Nov-27 07-Jan-28 Operable Partitions
Metal Panels 95 95 21-Apr-25 04-Sep-25
A12450 MCM 1 ( Shop Drawings Development ) 25 25 21-Apr-25 27-May-25 MCM 1 ( Shop Drawings Development )
A12490 MCM 5 ( Shop Drawings Development ) 25 25 21-Apr-25 27-May-25 MCM 5 ( Shop Drawings Development )
A12460 MCM 2 ( Shop Drawings Development ) 25 25 21-Apr-25 27-May-25 MCM 2 ( Shop Drawings Development )
A12470 MCM 3 ( Shop Drawings Development ) 25 25 21-Apr-25 27-May-25 MCM 3 ( Shop Drawings Development )
A12480 MCM4 ( Shop Drawings Development ) 25 25 21-Apr-25 27-May-25 MCM4 ( Shop Drawings Development )
A11510 MCM 1 ( Submittal & Approval ) 20 20 27-May-25 24-Jun-25 MCM 1 ( Submittal & Approval )
A11530 MCM 2 ( Submittal & Approval) 20 20 27-May-25 24-Jun-25 MCM 2 ( Submittal & Approval)
A11540 MCM 3 ( Submittal & Approval) 20 20 27-May-25 24-Jun-25 MCM 3 ( Submittal & Approval)
A11550 MCM4 ( Submittal & Approval) 20 20 27-May-25 24-Jun-25 MCM4 ( Submittal & Approval)
A11560 MCM 5 ( Submittal & Approval) 20 20 27-May-25 24-Jun-25 MCM 5 ( Submittal & Approval)
A12500 MCM 6 ( Mural ) ( Shop Drawings Development ) 40 40 27-May-25 23-Jul-25 MCM 6 ( Mural ) ( Shop Drawings Development )
A11570 MCM 6 ( Mural ) ( Submittal & Approval ) 30 30 23-Jul-25 04-Sep-25 MCM 6 ( Mural ) ( Submittal & Approval )
Exterior CFMF 160 160 24-Jun-25 12-Feb-26
A15730 Middle School Tower ( Shop Drawing Development ) 40 40 24-Jun-25 20-Aug-25 Middle School Tower ( Shop Drawing Development )
A15740 Middle School Tower ( Shop Drawing Review & Approval ) 20 20 20-Aug-25 18-Sep-25 Middle School Tower ( Shop Drawing Review & Approval )
A15750 Central Plant ( Shop Drawing Development ) 30 30 20-Aug-25 02-Oct-25 Central Plant ( Shop Drawing Development )
A15760 Central Plant ( Shop Drawing Review & Approval ) 20 20 02-Oct-25 30-Oct-25 Central Plant ( Shop Drawing Review & Approval )
A15770 High School Tower ( Shop Drawing Development ) 40 40 02-Oct-25 02-Dec-25 High School Tower ( Shop Drawing Development )
A15780 High School Tower ( Shop Drawing Review & Approval ) 20 20 02-Dec-25 31-Dec-25 High School Tower ( Shop Drawing Review & Approval )
A15790 Administration ( Shop Drawing Development ) 30 30 02-Dec-25 15-Jan-26 Administration ( Shop Drawing Development )
A15800 Administration ( Shop Drawing Review & Approval ) 20 20 15-Jan-26 12-Feb-26 Administration ( Shop Drawing Review & Approval )
Kitchen Equipment 45 45 19-Feb-25 22-Apr-25
A12580 Shop Drawing Development 25 25 19-Feb-25 25-Mar-25 Shop Drawing Development
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 6 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A12590 Submittal & Approval 20 20 26-Mar-25 22-Apr-25 Submittal & Approval
Specialty Flooring 50 50 17-Mar-25 27-May-25
A16020 Stage Flooring 20 20 17-Mar-25 14-Apr-25 Stage Flooring
A12410 Rubber Flooring & Stair Treades 20 20 28-Apr-25 27-May-25 Rubber Flooring & Stair Treades
A12370 Carpet 20 20 28-Apr-25 27-May-25 Carpet
A12380 LVT 20 20 28-Apr-25 27-May-25 LVT
A12400 Polished & Sealed Concrete 20 20 28-Apr-25 27-May-25 Polished & Sealed Concrete
A12420 Wood Flooring ( Sports Flooring ) 20 20 28-Apr-25 27-May-25 Wood Flooring ( Sports Flooring )
A12390 Tile ( HTF-1, HTF-2 & Quarry Tile ) 20 20 28-Apr-25 27-May-25 Tile ( HTF-1, HTF-2 & Quarry Tile )
A16010 Quary Tile 20 20 28-Apr-25 27-May-25 Quary Tile
Show & A/V Systems 785 785 28-Apr-25 05-Jun-28
A11520 Equipment 25 25 28-Apr-25 03-Jun-25 Equipment
A12430 Infrastructure 25 25 28-Apr-28 05-Jun-28 Infrastructure
Finishes 908 908 17-Mar-25 16-Oct-28
A11760 Millwork 20 20 17-Mar-25 14-Apr-25 Millwork
A11740 Gym Bleachers 20 20 05-May-25 03-Jun-25 Gym Bleachers
A11750 Drama & Auditorium Seating 20 20 05-May-25 03-Jun-25 Drama & Auditorium Seating
A11770 Paint & Coatings 20 20 19-May-26 17-Jun-26 Paint & Coatings
A11730 Drapery 20 20 18-Sep-28 16-Oct-28 Drapery
Leadtimes 1022 1022 10-Feb-25 23-Feb-29
Civil 386 386 10-Feb-25 18-Aug-26
A15570 Sanitary Re-route Structures & Pipe 20 20 10-Feb-25 07-Mar-25 Sanitary Re-route Structures & Pipe
A11450 Storm & Sanitary Structure 25 25 25-Feb-25 01-Apr-25 Storm & Sanitary Structure
A11470 Water Meter & Vault Castings 45 45 18-Mar-25 20-May-25 Water Meter & Vault Castings
A11460 Pipe 25 25 15-Apr-25 20-May-25 Pipe
A11440 Grease Trap 20 20 21-Jul-26 18-Aug-26 Grease Trap
Electrical 350 350 11-Apr-25 28-Aug-26
A12600 Switch Board ( MP-L & MP-H ) 350 350 11-Apr-25 28-Aug-26 Switch Board ( MP-L & MP-H )
A12620 Middle School bus Duct 200 200 28-Apr-25 12-Feb-26 Middle School bus Duct
A12700 Level -01 Panels ( SB-1, LS-1, LP-3, HP-2 ) 200 200 28-May-25 13-Mar-26 Level -01 Panels ( SB-1, LS-1, LP-3, HP-2 )
A12630 MS Panels ( LS-08 Thru LS-11 ) 150 150 09-Jul-25 12-Feb-26 MS Panels ( LS-08 Thru LS-11 )
A12640 MS Panels ( LP-10 Thru LP-13 ) 150 150 09-Jul-25 12-Feb-26 MS Panels ( LP-10 Thru LP-13 )
A12650 MS Panels ( HP-09 Thru HP-12 ) 150 150 09-Jul-25 12-Feb-26 MS Panels ( HP-09 Thru HP-12 )
A12660 MS Panels ( SB-5 Thru SB6 ) 150 150 09-Jul-25 12-Feb-26 MS Panels ( SB-5 Thru SB6 )
A12720 MS Panels ( MSL1-10 ) 150 150 09-Jul-25 12-Feb-26 MS Panels ( MSL1-10 )
A12680 Generator 250 250 03-Sep-25 28-Aug-26 Generator
A12610 High School Bus Duct 150 150 29-Oct-25 04-Jun-26 High School Bus Duct
A12710 HS Panels ( HSL -01 Thru HSL -12) 150 150 29-Oct-25 04-Jun-26 HS Panels ( HSL -01 Thru HSL -12)
A12730 HS Panels ( SB -02 Thru SB-04 ) 150 150 29-Oct-25 04-Jun-26 HS Panels ( SB -02 Thru SB-04 )
A12740 HS Panels ( HP -03 Thru HP-08 ) 150 150 29-Oct-25 04-Jun-26 HS Panels ( HP -03 Thru HP-08 )
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 7 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A12750 HS Panels ( LP -04 Thru LP-09 ) 150 150 29-Oct-25 04-Jun-26 HS Panels ( LP -04 Thru LP-09 )
A12760 HS Panels ( LS -03 Thru LS-07 ) 150 150 29-Oct-25 04-Jun-26 HS Panels ( LS -03 Thru LS-07 )
A11480 Transfer Switch ( 400 & 600 AMP ) 200 200 13-Nov-25 28-Aug-26 Transfer Switch ( 400 & 600 AMP )
A12690 Primary Panels ( SBD, LSD, LPK, HPK, LP1, HP1, LP2, LS2 ) 200 200 13-Nov-25 28-Aug-26 Primary Panels ( SBD, LSD, LPK, HPK, LP1, HP1, LP2, LS2 )
Mechanical & Plumbing 811 811 01-Apr-25 14-Jun-28
Phase 1 332 332 01-Apr-25 23-Jul-26
A13130 Energy Recovery Wheels 220 220 01-Apr-25 12-Feb-26 Energy Recovery Wheels
A13190 Water Source Heat Pump ( Middle School Tower ) 220 220 01-Apr-25 12-Feb-26 Water Source Heat Pump ( Middle School Tower )
A13110 RTUs MS Tower ( 1-3 ) 250 250 28-Apr-25 23-Apr-26 RTUs MS Tower ( 1-3 )
A13330 RTUs MS Gym ( 41-42 ) 250 250 28-Apr-25 23-Apr-26 RTUs MS Gym ( 41-42 )
A13340 RTUs Kitchen Dinning ( 28-36 ) 250 250 28-Apr-25 23-Apr-26 RTUs Kitchen Dinning ( 28-36 )
A13180 Fan ( EF 0-1,2,3,4,5,6 & 1-1,6,8 ) 180 180 28-May-25 12-Feb-26 Fan ( EF 0-1,2,3,4,5,6 & 1-1,6,8 )
A13150 Cooling Tower ( Mech Yard ) 200 200 02-Jun-25 18-Mar-26 Cooling Tower ( Mech Yard )
A13310 Plate Frame Heat Exchanger ( Primary Mech ) 200 200 10-Jun-25 26-Mar-26 Plate Frame Heat Exchanger ( Primary Mech )
A13140 Pump ( Primary Mech ) 160 160 07-Jul-25 24-Feb-26 Pump ( Primary Mech )
A13160 Gas Hot Water Boil er ( Prim ary Mech ) 180 180 09-Jul-25 26-Mar-26 Gas Hot Water Boil er ( Primary Mech )
A13170 Electric Water Heater 180 180 09-Jul-25 26-Mar-26 Electric Water Heater
A13350 Water Source Heat Pump ( High School Tower ) 220 220 24-Jul-25 05-Jun-26 Water Source Heat Pump ( High School Tower )
A13320 RTUs HS Tower ( 38-40 ) 250 250 28-Jul-25 23-Jul-26 RTUs HS Tower ( 38-40 )
A13120 Split Systems 160 160 12-Nov-25 01-Jul-26 Split Systems
Phase 2 ( Gym, Auditorium, Administration ) 469 469 06-Aug-26 14-Jun-28
A13280 Split Systems ( SS HP-1,2 ) 100 100 06-Aug-26 30-Dec-26 Split Systems ( SS HP-1,2 )
A13300 RTUs ( Gym & Track 22 Thru 27 ) 250 250 06-May-27 02-May-28 RTUs ( Gym & Track 22 Thru 27 )
A13200 RTUs ( Admin.4 Thru 12 ) 250 250 18-Jun-27 14-Jun-28 RTUs ( Admin.4 Thru 12 )
A13290 RTUs ( Drama & Auditorium 13 Thru 19) 250 250 18-Jun-27 14-Jun-28 RTUs ( Drama & Auditorium 13 Thru 19)
A13270 Fans ( EF 1-1,2,3,4,5,7 ) 180 180 03-Aug-27 19-Apr-28 Fans ( EF 1-1,2,3,4,5,7 )
Steel 698 698 01-Jul-25 05-Apr-28
Structure 698 698 01-Jul-25 05-Apr-28
A10900 Middle School Tower 60 60 01-Jul-25 25-Sep-25 Middle School Tower
A10910 Middle School Gymnasium & Dining 40 40 13-Aug-25 09-Oct-25 Middle School Gymnasium & Dining
A10920 High School Tower 60 60 16-Oct-25 15-Jan-26 High School Tower
A10930 High School Gym & Track, Aux Gym 75 75 10-Nov-27 01-Mar-28 High School Gym & Track, Aux Gym
A10940 Middle School & High School Administration 75 75 06-Dec-27 22-Mar-28 Middle School & High School Administration
A10950 High School Drama & Auditorium 75 75 20-Dec-27 05-Apr-28 High School Drama & Auditorium
Misc. Metals 669 669 29-Jul-25 22-Mar-28
A10960 Stringers & Rails ( MS St-01 ) 40 40 29-Jul-25 23-Sep-25 Stringers & Rails ( MS St-01 )
A10970 Stringers & Rails ( MS St-02 ) 40 40 07-Aug-25 02-Oct-25 Stringers & Rails ( MS St-02 )
A10980 Stringers & Rails ( MS St-3 ) 40 40 18-Aug-25 13-Oct-25 Stringers & Rails ( MS St-3 )
A10990 Stringers & Rails ( MS St-07 ) 30 30 08-Oct-25 19-Nov-25 Stringers & Rails ( MS St-07 )
A11020 Stringers & Rails ( HS St-04 ) 40 40 31-Oct-25 31-Dec-25 Stringers & Rails ( HS St-04 )
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 8 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A11030 Stringers & Rails ( HS St-05 ) 40 40 24-Nov-25 22-Jan-26 Stringers & Rails ( HS St-05 )
A11040 Stringers & Rails ( HS St-06 ) 40 40 08-Dec-25 03-Feb-26 Stringers & Rails ( HS St-06 )
A11000 Stringers & Rails At Running Track Access 50 50 12-Jan-28 22-Mar-28 Stringers & Rails At Running Track Access
A11010 Spiral Stair ( Auditorium ) 30 30 19-Jan-28 01-Mar-28 Spiral Stair ( Auditorium )
Exteroir CFMF 643 643 09-Oct-25 26-Apr-28
A15810 Middle School Tower 40 40 09-Oct-25 09-Dec-25 Middle School Tower
A15820 Central Plant 30 30 08-Jan-26 19-Feb-26 Central Plant
A15830 High School Tower 40 40 23-Feb-26 20-Apr-26 High School Tower
A15840 Administration 30 30 15-Mar-28 26-Apr-28 Administration
Plumbing 774 774 23-Jan-26 14-Feb-29
A11500 Water Fountain Frames ( Middle School ) 60 60 23-Jan-26 17-Apr-26 Water Fountain Frames ( Middle School )
A13360 Water Fountain Frames ( H igh School ) 60 60 29-Apr-26 24-Jul-26 Water Fountain Frames ( High School )
A13020 Water Fountains ( Mid dle School ) 120 120 30-Jun-26 22-Dec-26 Water Fountains ( Mid dle School )
A13400 Plumbing Fixtures ( Middle School ) 80 80 26-Aug-26 22-Dec-26 Plumbing Fixtures ( Middle School )
A13370 Water Fountains ( High School ) 120 120 09-Sep-26 03-Mar-27 Water Fountains ( High School )
A13410 Plumbing Fixtures ( High School ) 80 80 04-Nov-26 03-Mar-27 Plumbing Fixtures ( High School )
A13380 Water Fountain Frames ( Phase 2 ) 60 60 17-Apr-28 12-Jul-28 Water Fountain Frames ( Phase 2 )
A13390 Water Fountains ( Phase 2 ) 120 120 22-Aug-28 14-Feb-29 Water Fountains ( Phase 2 )
A13420 Plumbing Fixtures ( Phase 2 ) 80 80 18-Oct-28 14-Feb-29 Plumbing Fixtures ( Phase 2 )
Metal Panels 137 137 12-Dec-25 26-Jun-26
Phase 1 40 40 12-Dec-25 10-Feb-26
A11580 MCM 1 40 40 12-Dec-25 10-Feb-26 MCM 1
A11590 MCM 2 40 40 12-Dec-25 10-Feb-26 MCM 2
A11600 MCM 3 40 40 12-Dec-25 10-Feb-26 MCM 3
A11610 MCM 4 40 40 12-Dec-25 10-Feb-26 MCM 4
A11620 MCM 5 40 40 12-Dec-25 10-Feb-26 MCM 5
Phase 2 60 60 02-Apr-26 26-Jun-26
A11690 MCM 6 ( Mural ) 60 60 02-Apr-26 26-Jun-26 MCM 6 ( Mural )
A11640 MCM 1 40 40 30-Apr-26 26-Jun-26 MCM 1
A11650 MCM 2 40 40 30-Apr-26 26-Jun-26 MCM 2
A11660 MCM 3 40 40 30-Apr-26 26-Jun-26 MCM 3
A11670 MCM 4 40 40 30-Apr-26 26-Jun-26 MCM 4
A11680 MCM 5 40 40 30-Apr-26 26-Jun-26 MCM 5
Frames & Glazing 871 871 12-Sep-25 23-Feb-29
Phase 1 296 296 12-Sep-25 13-Nov-26
A13430 Glazing Frames ( Middle School Tower ) 100 100 12-Sep-25 06-Feb-26 Glazing Frames ( Middle School Tower )
A13470 Glazing Frames ( Middle School Gym Kitchen ) 100 100 14-Nov-25 09-Apr-26 Glazing Frames ( Middle School Gym Kitchen )
A13490 Glazing Frames ( High School ) 100 100 05-Feb-26 26-Jun-26 Glazing Frames ( High School )
A13440 Glass ( Middle School Tower ) 20 20 06-Feb-26 06-Mar-26 Glass ( Middle School Tower )
A13560 Interior Glazing Frames 100 100 10-Feb-26 01-Jul-26 Interior Glazing Frames
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 9 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A13480 Glass ( Middle School Gym Kitchen ) 20 20 15-Apr-26 13-May-26 Glass ( Middle School Gym Kitchen )
A13500 Glass ( High School ) 20 20 24-Jun-26 23-Jul-26 Glass ( High School )
A13570 Interior Glass 20 20 15-Oct-26 13-Nov-26 Interior Glass
Phase 2 309 309 06-Dec-27 23-Feb-29
A13450 Glazing Frames ( High School Dining & Gym ) 100 100 06-Dec-27 26-Apr-28 Glazing Frames ( High School Dining & Gym )
A13510 Glazing Frames ( MS & HS Administration & Drama ) 100 100 21-Dec-27 11-May-28 Glazing Frames ( MS & HS Administration & Drama )
A13460 Glass ( High School Dining & Gym ) 20 20 17-Apr-28 15-May-28 Glass ( High School Dining & Gym )
A13530 Operable Glass Partitions 140 140 28-Apr-28 16-Nov-28 Operable Glass Partitions
A13540 Interior Glazing Frames 100 100 11-May-28 03-Oct-28 Interior Glazing Frames
A13520 Glass ( MS & HS Administration & Drama ) 20 20 22-May-28 20-Jun-28 Glass ( MS & HS Administration & Drama )
A13550 Interior Glass 20 20 26-Jan-29 23-Feb-29 Interior Glass
Specialty Flooring 613 613 14-Aug-26 19-Jan-29
A12820 Wood Flooring MS Gym 65 65 14-Aug-26 17-Nov-26 Wood Flooring MS Gym
A12810 Rubber Flooring & Stair Treades MS 40 40 17-Sep-26 13-Nov-26 Rubber Flooring & Stair Treades MS
A12770 Carpet MS 35 35 24-Sep-26 13-Nov-26 Carpet MS
A12780 LVT MS 30 30 01-Oct-26 13-Nov-26 LVT MS
A12790 Tile ( HTF-1, HTF-2 & Quarry Tile ) 40 40 01-Oct-26 01-Dec-26 Tile ( HTF-1, HTF-2 & Quarry Tile )
A12800 Polished & Sealed Concrete 20 20 15-Oct-26 13-Nov-26 Polished & Sealed Concrete
A12870 Rubber Flooring & Stair Treades HS 40 40 30-Nov-26 27-Jan-27 Rubber Flooring & Stair Treades HS
A12850 Carpet HS 35 35 07-Dec-26 27-Jan-27 Carpet HS
A12860 LVT HS 30 30 14-Dec-26 27-Jan-27 LVT HS
A12830 Wood Flooring HS Aux. Gym. & Gym 65 65 14-Jun-28 15-Sep-28 Wood Flooring HS Aux. Gym. & Gym
A12840 Wood Flooring ( Drama & Auditorium Stage ) 65 65 01-Aug-28 01-Nov-28 Wood Flooring ( Drama & Auditorium Stage )
A12880 Carpet ( Administration MS, HS ) 35 35 29-Nov-28 19-Jan-29 Carpet ( Administration MS, HS )
A12890 LVT ( Administration MS, HS ) 30 30 06-Dec-28 19-Jan-29 LVT ( Administration MS, HS )
Show & A/V Systems 200 200 12-Jan-28 23-Oct-28
A15940 B&D Speakers & AMPs 200 200 12-Jan-28 23-Oct-28 B&D Speakers & AMPs
A14220 Show System 120 120 03-May-28 23-Oct-28 Show System
Elevators 300 300 24-Jul-25 29-Sep-26
A11410 Elev 01 220 220 24-Jul-25 05-Jun-26 Elev 01
A11420 Elev 02 220 220 03-Oct-25 17-Aug-26 Elev 02
A11430 Elev 03 220 220 17-Nov-25 29-Sep-26 Elev 03
Lab Case Work 430 430 28-May-25 10-Feb-27
A14210 Lab Case Work ( Middle School ) 120 120 28-May-25 14-Nov-25 Lab Case Work ( Middle School )
A14200 Lab Case Work ( High School ) 120 120 18-Aug-26 10-Feb-27 Lab Case Work ( High School )
Kitchen Equipment 80 80 19-Aug-26 15-Dec-26
A12930 Walk-in ( Cooler/ Freezer ) 80 80 19-Aug-26 15-Dec-26 Walk-in ( Cooler/ Freezer )
A12940 Cooking Equipment 80 80 19-Aug-26 15-Dec-26 Cooking Equipment
A12920 Hoods 60 60 17-Sep-26 15-Dec-26 Hoods
Finishes 658 658 17-Jul-26 23-Feb-29
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 10 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D J F A J J AS N J A J J AS D JF A JJ AS
A11700 Middle School Gym Bleachers 100 100 17-Jul-26 10-Dec-26 Middle School Gym Bleachers
A16070 Milwork MS 60 60 02-Sep-26 01-Dec-26 Milwork MS
A16080 Milwork HS 60 60 12-Nov-26 10-Feb-27 Milwork HS
A11710 High School Gym, Aux Gym Bleachers & Drama, Auditorium Seating 100 100 24-May-28 16-Oct-28 High School Gym, Aux Gym Bleachers & Drama, Audito
A16090 Milwork Administration 60 60 13-Nov-28 09-Feb-29 Milwork Administration
A11720 JROTC Range Equipment 60 60 29-Nov-28 23-Feb-29 JROTC Range Equipment
Construction 1235 1101 29-Jul-24 A 15-Jun-29
Phase I 1171 1037 29-Jul-24 A 16-Mar-29
Middle School Tower & Gym, Dining 1171 1037 29-Jul-24 A 16-Mar-29
Exterior Work 565 431 29-Jul-24 A 21-Oct-26
Civil 565 431 29-Jul-24 A 21-Oct-26
Mobilization 344 210 29-Jul-24 A 08-Dec-25
A14630 Install Site Fencing 3 0 29-Jul-24 A 31-Jul-24 A Install Site Fencing
A4410 Install Temp Power & Distribution ( Trailer ) 5 0 09-Sep-24 A 13-Sep-24 A Install Temp Power & Distribution ( Trailer )
A4420 Connect Water Lines 3 0 11-Sep-24 A 13-Sep-24 A Connect Water Lines
A1160 Mobilization & Trailer Setup 10 0 16-Sep-24 A 27-Sep-24 A Mobilization & Trailer Setup
A14650 Tree Removal Back Of School & Aztec Road 10 0 08-Oct-24 A 21-Oct-24 A Tree Removal Back Of School & Aztec Road
A4430 Install Silt Fencing & BMPs 6 6 10-Feb-25 18-Feb-25 Install Silt Fencing & BMPs
A1010 Clear & Grading 30 30 18-Feb-25 01-Apr-25 Clear & Grading
A1000 Relocate Sanitary Sewer 15 15 10-Mar-25 28-Mar-25 Relocate Sanitary Sewer
A14320 Set New Permanent Power Poles & Meeter ( GA Power ) 4 4 24-Nov-25 01-Dec-25 Set New Permanent Power Poles & Meeter ( GA Power )
A14330 Install Temp Power Distribution Panel ( Building ) 5 5 02-Dec-25 08-Dec-25 Install Temp Power Distribution Panel ( Building )
Detention & Stewart Road & Midddle School Parking 395 395 01-Apr-25 21-Oct-26
Detention Ponds 10 10 01-Apr-25 15-Apr-25
A1020 Install Detention Area 10 10 01-Apr-25 15-Apr-25 Install Detention Area
Stewart Rd. Extension 385 385 15-Apr-25 21-Oct-26
A1030 Install UG Storm to Detention Area Along Stewart Rd 10 10 15-Apr-25 29-Apr-25 Install UG Storm to Detention Area Along Stewart Rd
A1050 Grade Stewart Rd Extension & Stone 15 15 29-Apr-25 20-May-25 Grade Stewart Rd Extension & Stone
A1300 Install Sanitary Sewer 15 15 29-Apr-25 20-May-25 Install Sanitary Sewer
A1310 Install Domestic Water & Fire Water Vaults & City Taps 10 10 20-May-25 04-Jun-25 Install Domestic Water & Fire Water Vaults & City Taps
A1280 Install Fire Water 10 10 04-Jun-25 18-Jun-25 Install Fire Water
A1290 Install Domestic Water 10 10 04-Jun-25 18-Jun-25 Install Domestic Water
A14850 Install Gas Line To Mech Yard Area 10 10 10-Aug-26 24-Aug-26 Install Gas Line To Mech Yard Area
A4260 Install Curb & Gutter ( Stewart Rd. Extention & Parking Lot ) 10 10 24-Aug-26 08-Sep-26 Install Curb & Gutter ( Stewart Rd. Extention & Parking Lot )
A4270 Fine Grade ( Stewart Rd. Extension & Parking Lot ) 5 5 08-Sep-26 15-Sep-26 Fine Grade ( Stewart Rd. Extension & Parking Lot )
A4280 Install Binder ( Stewart Rd. Extension & Parking Lot ) 5 5 15-Sep-26 22-Sep-26 Install Binder ( Stewart Rd. Extension & Parking Lot )
A4290 Install Wearing Surface ( Stewart Rd. Extension & Parking Lot ) 3 3 16-Oct-26 21-Oct-26 Install Wearing Surface ( Stewart Rd. Extension & Parking Lot )
Middle School Parking Lot 0 0
Building Pad 23 23 31-Mar-25 30-Apr-25
A14190 Install Lagging Wall 15 15 31-Mar-25 18-Apr-25 Install Lagging Wall
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 11 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A1080 Cut Building Pad To Grade 8 8 21-Apr-25 30-Apr-25 Cut Building Pad To Grade
Equipment Yards 122 122 18-Mar-26 09-Sep-26
A4060 Set Cooling Tower 6 6 18-Mar-26 26-Mar-26 Set Cooling Tower
A4040 Set transformer ( GA Power ) 5 5 01-Apr-26 08-Apr-26 Set transformer ( GA Power )
A3220 Install Grease Traps 4 4 18-Aug-26 24-Aug-26 Install Grease Traps
A4050 Set Generator & Connect 6 6 31-Aug-26 09-Sep-26 Set Generator & Connect
Hardscape & Landscaping 39 39 11-Aug-26 06-Oct-26
A4240 Place MS Dining Patio 5 5 11-Aug-26 18-Aug-26 Place MS Dining Patio
A4230 Place Loading Dock Paving 5 5 24-Aug-26 31-Aug-26 Place Loading Dock Paving
A4250 Place Side Walks 20 20 08-Sep-26 06-Oct-26 Place Side Walks
Foundation 113 113 01-May-25 09-Oct-25
Install Aggregate Piers 33 33 01-May-25 17-Jun-25
A15620 Aggregate Piers ( Foundation Wal & HS Gym ) 5 5 01-May-25 07-May-25 Aggregate Piers ( Foundation Wall & HS Gym )
A15580 Aggregate Piers ( M1& M2 ) 8 8 08-May-25 19-May-25 Aggregate Piers ( M1& M2 )
A15590 Aggregate Piers ( M4& M3 ) 5 5 20-May-25 27-May-25 Aggregate Piers ( M4& M3 )
A15600 Aggregate Piers ( M5 ) 5 5 28-May-25 03-Jun-25 Aggregate Piers ( M5 )
A15610 Aggregate Piers ( H1 &H2 & H3 ) 10 10 04-Jun-25 17-Jun-25 Aggregate Piers ( H1 &H2 & H3 )
Middle School Tower 56 56 06-Jun-25 25-Aug-25
A1180 Install Spread Footings 20 20 06-Jun-25 03-Jul-25 Install Spread Footings
A1190 Install Continues Stripe Footings 30 30 13-Jun-25 25-Jul-25 Install Continues Stripe Footings
A1320 Form Slab Edge M1 5 5 07-Jul-25 11-Jul-25 Form Slab Edge M1
A1230 UG SOG M1 10 10 07-Jul-25 18-Jul-25 UG SOG M1
A1210 Prep SOG M1 7 7 21-Jul-25 29-Jul-25 Prep SOG M1
A1200 Lay CMU To Finish Floor 10 10 21-Jul-25 01-Aug-25 Lay CMU To Finish Floor
A1330 Form Slab Edge M2 5 5 28-Jul-25 01-Aug-25 Form Slab Edge M2
A1220 Place SOG M1 2 2 30-Jul-25 31-Jul-25 Place SOG M1
A1240 UG SOG M2 10 10 30-Jul-25 12-Aug-25 UG SOG M2
A1250 Prep SOG M2 7 7 13-Aug-25 21-Aug-25 Prep SOG M2
A1260 Place SOG M2 2 2 22-Aug-25 25-Aug-25 Place SOG M2
Middle School Gymnasium & Dinning 108 108 08-May-25 09-Oct-25
A1170 Install Foundation Wall Foundatio ns 20 20 08-May-25 05-Jun-25 Install Foundation Wall Foundatio ns
A1040 Install Foundation Wall 40 40 06-Jun-25 01-Aug-25 Install Foundation Wall
A3010 Install Strip Foundations 45 45 17-Jun-25 19-Aug-25 Install Strip Foundations
A1270 Install Water Proofin g & French Drain Along Foundation Wall 10 10 04-Aug-25 15-Aug-25 Install Water Proofin g & French Drain Along Foundation Wall
A3040 Lay CMU To Finish Floor 15 15 06-Aug-25 26-Aug-25 Lay CMU To Finish Floor
A3030 Install UG Utilities SOG ( M-03 ) 7 7 15-Aug-25 25-Aug-25 Install UG Utilities SOG ( M-03 )
A3020 Install Spread Foundations 10 10 20-Aug-25 03-Sep-25 Install Spread Foundations
A3050 Prep SOG ( M-03 ) 6 6 26-Aug-25 03-Sep-25 Prep SOG ( M-03 )
A3200 Install UG Utilities SOG ( M-04 ) 7 7 26-Aug-25 04-Sep-25 Install UG Utilities SOG ( M-04 )
A3170 Place SOG ( M-03 ) 2 2 04-Sep-25 05-Sep-25 Place SOG ( M-03 )
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 12 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A3150 Prep SOG ( M-04 ) 6 6 05-Sep-25 12-Sep-25 Prep SOG ( M-04 )
A3210 Install UG Utilities SOG ( M-05 ) 15 15 05-Sep-25 25-Sep-25 Install UG Utilities SOG ( M-05 )
A3180 Place SOG ( M-04 ) 2 2 15-Sep-25 16-Sep-25 Place SOG ( M-04 )
A3160 Prep SOG ( M-05 ) 8 8 26-Sep-25 07-Oct-25 Prep SOG ( M-05 )
A3190 Place SOG ( M-05 ) 2 2 08-Oct-25 09-Oct-25 Place SOG ( M-05 )
Structure 188 188 01-Aug-25 30-Apr-26
Middle School Tower 118 118 01-Aug-25 22-Jan-26
A1340 Lay Stair One 10 10 01-Aug-25 14-Aug-25 Lay Stair One
A1350 Lay Stair 2 & Core Area 20 20 26-Aug-25 23-Sep-25 Lay Stair 2 & Core Area
A12980 Install Stair -01 7 7 24-Sep-25 02-Oct-25 Install Stair -01
A1360 Lay Stair 3 10 10 24-Sep-25 07-Oct-25 Lay Stair 3
A1370 Erect Steel Structure M1 ( All Levels ) 20 20 25-Sep-25 23-Oct-25 Erect Steel Structure M1 ( All Levels )
A12990 Install Stair -02 7 7 03-Oct-25 13-Oct-25 Install Stair -02
A13000 Install Star -03 7 7 14-Oct-25 22-Oct-25 Install Star -03
A1390 Install Decking M1 ( Level 01 ) 4 4 23-Oct-25 29-Oct-25 Install Decking M1 ( Level 01 )
A1380 Erect Steel Structure M2 ( All Levels ) 20 20 23-Oct-25 21-Nov-25 Erect Steel Structure M2 ( All Levels )
A1440 Install Decking M1 ( Level 02 ) 4 4 29-Oct-25 04-Nov-25 Install Decking M1 ( Level 02 )
A1430 Lay Out Track & Shoot "Z" Clips To Beam M1 ( Level 00 ) 10 10 29-Oct-25 13-Nov-25 Lay Out Track & Shoot "Z" Clips To Beam M1 ( Level 00 )
A1490 Install Decking M1 ( Level 03 ) 4 4 04-Nov-25 10-Nov-25 Install Decking M1 ( Level 03 )
A1400 In-slab Rough-in M1 ( Level 01) 8 8 04-Nov-25 17-Nov-25 In-slab Rough-in M1 ( Level 01)
A1530 Install Decking M1 ( Level Roof ) 4 4 10-Nov-25 17-Nov-25 Install Decking M1 ( Level Roof )
A1450 In-slab Rough-in M1 ( Level 01) 8 8 10-Nov-25 21-Nov-25 In-slab Rough-in M1 ( Level 01)
A1410 Prep Composite Deck M1 ( Level 01) 4 4 17-Nov-25 21-Nov-25 Prep Composite Deck M1 ( Level 01)
A1500 In-slab Rough-in M1 ( Level 01) 8 8 17-Nov-25 01-Dec-25 In-slab Rough-in M1 ( Level 01)
A1420 Place Composite Slab M1 ( Level 01 ) 2 2 21-Nov-25 25-Nov-25 Place Composite Slab M1 ( Level 01 )
A1550 Install Decking M2 ( Level 01 ) 4 4 21-Nov-25 01-Dec-25 Install Decking M2 ( Level 01 )
A1460 Prep Composite Deck M1 ( Level 02) 4 4 21-Nov-25 01-Dec-25 Prep Composite Deck M1 ( Level 02)
A12060 Apply Fire Proofing ( M1 Level 00 ) 5 5 25-Nov-25 04-Dec-25 Apply Fire Proofing ( M1 Level 00 )
A15040 Lay Out Track & Shoot "Z" Clips To Beam M1 ( Level 01 ) 8 8 25-Nov-25 09-Dec-25 Lay Out Track & Shoot "Z" Clips To Beam M1 ( Level 01 )
A1470 Place Composite Slab M1 ( Level 02 ) 2 2 01-Dec-25 03-Dec-25 Place Composite Slab M1 ( Level 02 )
A1560 Install Decking M2 ( Level 02 ) 4 4 01-Dec-25 05-Dec-25 Install Decking M2 ( Level 02 )
A1510 Prep Composite Deck M1 ( Level 03) 4 4 01-Dec-25 05-Dec-25 Prep Composite Deck M1 ( Level 03)
A15050 Lay Out Track & Shoot "Z" Clips To Beam M1 ( Level 02 ) 8 8 03-Dec-25 15-Dec-25 Lay Out Track & Shoot "Z" Clips To Beam M1 ( Level 02 )
A12070 Apply Fire Proofing ( M1 Level 01 ) 5 5 04-Dec-25 11-Dec-25 Apply Fire Proofing ( M1 Level 01 )
A1520 Place Composite Slab M1 ( Level 03 ) 2 2 05-Dec-25 09-Dec-25 Place Composite Slab M1 ( Level 03 )
A1580 Install Decking M2 ( Level 03 ) 4 4 05-Dec-25 11-Dec-25 Install Decking M2 ( Level 03 )
A1570 In-slab Rough-in M1 ( Level 01) 8 8 05-Dec-25 17-Dec-25 In-slab Rough-in M1 ( Level 01)
A12080 Apply Fire Proofing ( M1 Level 02 ) 5 5 09-Dec-25 16-Dec-25 Apply Fire Proofing ( M1 Level 02 )
A15060 Lay Out Track & Shoot "Z" Clips To Beam M1 ( Level 03 ) 8 8 09-Dec-25 19-Dec-25 Lay Out Track & Shoot "Z" Clips To Beam M1 ( Level 03 )
A1600 Install Decking M2 ( Level Roof ) 4 4 11-Dec-25 17-Dec-25 Install Decking M2 ( Level Roof )
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 13 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A1590 In-slab Rough-in M1 ( Level 01) 8 8 11-Dec-25 23-Dec-25 In-slab Rough-in M1 ( Level 01)
A12090 Apply Fire Proofing ( M1 Level 03 ) 5 5 16-Dec-25 23-Dec-25 Apply Fire Proofing ( M1 Level 03 )
A1610 Prep Composite Deck M2 ( Level 01) 4 4 17-Dec-25 23-Dec-25 Prep Composite Deck M2 ( Level 01)
A1630 In-slab Rough-in M1 ( Level 01) 8 8 17-Dec-25 30-Dec-25 In-slab Rough-in M1 ( Level 01)
A1540 Install Roof Curbs & Penitrations M1& M2 ( Level Roof) 8 8 17-Dec-25 30-Dec-25 Install Roof Curbs & Penitrations M1& M2 ( Level Roof)
A15070 Lay Out Track & Shoot "Z" Clips To Beam M2 ( Level 00 ) 8 8 19-Dec-25 02-Jan-26 Lay Out Track & Shoot "Z" Clips To Beam M2 ( Level 00 )
A1620 Place Composite Slab M2 ( Level 01 ) 2 2 23-Dec-25 26-Dec-25 Place Composite Slab M2 ( Level 01 )
A1640 Prep Composite Deck M2 ( Level 02) 4 4 23-Dec-25 30-Dec-25 Prep Composite Deck M2 ( Level 02)
A12100 Apply Fire Proofing ( M2 Level 00 ) 5 5 26-Dec-25 05-Jan-26 Apply Fire Proofing ( M2 Level 00 )
A15080 Lay Out Track & Shoot "Z" Clips To Beam M2 ( Level 01 ) 8 8 26-Dec-25 08-Jan-26 Lay Out Track & Shoot "Z" Clips To Beam M2 ( Level 01 )
A1650 Place Composite Slab M2 ( Level 02 ) 2 2 30-Dec-25 02-Jan-26 Place Composite Slab M2 ( Level 02 )
A1660 Prep Composite Deck M2 ( Level 03) 4 4 30-Dec-25 06-Jan-26 Prep Composite Deck M2 ( Level 03)
A15090 Lay Out Track & Shoot "Z" Clips To Beam M2 ( Level 02 ) 8 8 02-Jan-26 14-Jan-26 Lay Out Track & Shoot "Z" Clips To Beam M2 ( Level 02 )
A12110 Apply Fire Proofing ( M2 Level 01 ) 5 5 05-Jan-26 12-Jan-26 Apply Fire Proofing ( M2 Level 01 )
A1670 Place Composite Slab M2 ( Level 03 ) 2 2 06-Jan-26 08-Jan-26 Place Composite Slab M2 ( Level 03 )
A12120 Apply Fire Proofing ( M2 Level 02 ) 5 5 08-Jan-26 15-Jan-26 Apply Fire Proofing ( M2 Level 02 )
A15100 Lay Out Track & Shoot "Z" Clips To Beam M2 ( Level 03 ) 8 8 08-Jan-26 20-Jan-26 Lay Out Track & Shoot "Z" Clips To Beam M2 ( Level 03 )
A12130 Apply Fire Proofing ( M2 Level 03 ) 5 5 15-Jan-26 22-Jan-26 Apply Fire Proofing ( M2 Level 03 )
Middle School Gymnasium & Dining 156 156 17-Sep-25 30-Apr-26
Middle School Gymnasium & Locker Rooms 51 51 17-Sep-25 01-Dec-25
A3060 Lay CMU 25 25 17-Sep-25 21-Oct-25 Lay CMU
A3070 Install Bar Joist 7 7 22-Oct-25 30-Oct-25 Install Bar Joist
A3080 Install Decking 13 13 31-Oct-25 19-Nov-25 Install Decking
A3590 Set roof Top Curbs And Penetrations 6 6 20-Nov-25 01-Dec-25 Set roof Top Curbs And Penetrations
Middle Kitchen & Dining Areas 131 131 22-Oct-25 30-Apr-26
A3090 Lay CMU ( Including South Wall Of Gym & Track To low Roof Elevation )20 20 22-Oct-25 19-Nov-25 Lay CMU ( Including South Wall Of Gym & Track To low Roof Elevation )
A13010 Install Stair -07 5 5 20-Nov-25 26-Nov-25 Install Stair -07
A3100 Erect Steel Structure 18 18 21-Nov-25 19-Dec-25 Erect Steel Structure
A3110 Install Decking ( Level -01 ) 7 7 19-Dec-25 31-Dec-25 Install Decking ( Level -01 )
A4030 Install Decking ( Level Roof ) 7 7 31-Dec-25 12-Jan-26 Install Decking ( Level Roof )
A3850 Install Roof Top Curbs & Penetrattions 5 5 12-Jan-26 19-Jan-26 Install Roof Top Curbs & Penetrattions
A3820 In-Slab Rough-in Composite Deck ( Level 01 ) 7 7 12-Jan-26 21-Jan-26 In-Slab Rough-in Composite Deck ( Level 01 )
A3830 Prep Composite Deck ( Level 01 ) 5 5 21-Jan-26 28-Jan-26 Prep Composite Deck ( Level 01 )
A3780 Place Composite Deck ( Level 01 ) 2 2 28-Jan-26 30-Jan-26 Place Composite Deck ( Level 01 )
A12140 Apply Fire Proofing ( Level 00 ) 7 7 30-Jan-26 10-Feb-26 Apply Fire Proofing ( Level 00 )
A12150 Apply Fire Proofing ( Level 01 ) 7 7 10-Feb-26 19-Feb-26 Apply Fire Proofing ( Level 01 )
A3860 Set Roof Top Equipment 5 5 23-Apr-26 30-Apr-26 Set Roof Top Equipment
Exterior Envelope 186 186 09-Dec-25 01-Sep-26
Middle School Tower 131 131 09-Dec-25 15-Jun-26
A1790 Frame M1 ( All Levels ) 28 28 09-Dec-25 20-Jan-26 Frame M1 ( All Levels )
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 14 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A1750 Install Sheathing M1 ( All Levels ) 20 20 19-Dec-25 20-Jan-26 Install Sheathing M1 ( All Levels )
A1800 Apply Air Barrier M1 ( All Levels ) 15 15 20-Jan-26 10-Feb-26 Apply Air Barrier M1 ( All Levels )
A1860 Frame M2 ( All Levels ) 28 28 20-Jan-26 27-Feb-26 Frame M2 ( All Levels )
A1870 Install Sheathing M2 ( All Levels ) 20 20 30-Jan-26 27-Feb-26 Install Sheathing M2 ( All Levels )
A1830 Field Measure For Metal Panels M1 ( All Levels ) 10 10 10-Feb-26 24-Feb-26 Field Measure For Metal Panels M1 ( All Levels )
A1770 Install Glazing Frames M1 ( All Levels ) 18 18 10-Feb-26 06-Mar-26 Install Glazing Frames M1 ( All Levels )
A2180 Install Roof Drain Laterals & Fixtures 15 15 12-Feb-26 05-Mar-26 Install Roof Drain Laterals & Fixtures
A1880 Apply Air Barrier M2 ( All Levels ) 15 15 27-Feb-26 20-Mar-26 Apply Air Barrier M2 ( All Levels )
A1810 Install Glazing M1 ( All Levels ) 20 20 06-Mar-26 03-Apr-26 Install Glazing M1 ( All Levels )
A1820 Install Metal Panels M1 ( All Levels ) 40 40 10-Mar-26 05-May-26 Install Metal Panels M1 ( All Levels )
A1900 Field Measure For Metal Panels M2 ( All Levels ) 10 10 20-Mar-26 03-Apr-26 Field Measure For Metal Panels M2 ( All Levels )
A1890 Install Glazing Frames M2 ( All Levels ) 18 18 20-Mar-26 15-Apr-26 Install Glazing Frames M2 ( All Levels )
A1840 Install Masonry M1& M2 ( 00 Level ) 15 15 15-Apr-26 06-May-26 Install Masonry M1& M2 ( 00 Level )
A1910 Install Glazing M2 ( All Levels ) 20 20 15-Apr-26 13-May-26 Install Glazing M2 ( All Levels )
A1920 Install Metal Panels M2 ( All Levels ) 40 40 17-Apr-26 15-Jun-26 Install Metal Panels M2 ( All Levels )
Middle School Gymnasium & Dinning 136 136 19-Feb-26 01-Sep-26
A14860 Frame Parapet Walls 5 5 19-Feb-26 26-Feb-26 Frame Parapet Walls
A3410 Exterior Framing 8 8 19-Feb-26 03-Mar-26 Exterior Framing
A14870 Hang Inside Parapet Walls 5 5 26-Feb-26 05-Mar-26 Hang Inside Parapet Walls
A3420 Hang Sheathing 7 7 03-Mar-26 12-Mar-26 Hang Sheathing
A3370 Apply Weather Barrier 20 20 12-Mar-26 09-Apr-26 Apply Weather Barrier
A3380 Field Measure For Metal Panels 10 10 09-Apr-26 23-Apr-26 Field Measure For Metal Panels
A3330 Install Glazing Frames 20 20 09-Apr-26 07-May-26 Install Glazing Frames
A3350 Lay Brick Veneer 22 22 07-May-26 09-Jun-26 Lay Brick Veneer
A3340 Install Glazing 23 23 13-May-26 16-Jun-26 Install Glazing
A3360 Install Metal Panels 45 45 15-Jun-26 18-Aug-26 Install Metal Panels
A3390 Install Aluminum Canopy 10 10 18-Aug-26 01-Sep-26 Install Aluminum Canopy
Roofing 133 133 17-Feb-26 25-Aug-26
A1930 Middle School Tower Roofing 35 35 17-Feb-26 07-Apr-26 Middle School Tower Roofing
A3840 Kitchen & Dining Area Roofing 15 15 05-Mar-26 26-Mar-26 Kitchen & Dining Area Roofing
A3230 Middle School Gymnasium & Locker Room Roofing 20 20 26-Mar-26 23-Apr-26 Middle School Gymnasium & Locker Room Roofing
A12960 Install Coping Caps MS Gymnasium & Locker Room Areas 4 4 09-Jun-26 15-Jun-26 Install Coping Caps MS Gymnasium & Locker Room Areas
A12950 Install Coping Caps MS Tower 7 7 15-Jun-26 24-Jun-26 Install Coping Caps MS Tower
A12970 Install Coping Caps Kitchen & Dining Areas 5 5 18-Aug-26 25-Aug-26 Install Coping Caps Kitchen & Dining Areas
Interior Work 838 838 20-Nov-25 16-Mar-29
Middle School Tower 364 364 08-Jan-26 15-Jun-27
Inspection & Commisioning 55 55 29-Mar-27 15-Jun-27
A6280 Final Inspections 10 10 29-Mar-27 12-Apr-27 Final Inspections
A14880 Punch Out 10 10 29-Mar-27 12-Apr-27 Punch Out
A15650 Gilbane Final Commisioning & Cleaning 45 45 12-Apr-27 15-Jun-27 Gilbane Final Commisioning & Cleaning
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 15 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
Plan MEP Risers & Elevator 186 186 08-Jan-26 29-Sep-26
A2220 Install Sprinkler Riser ( Middle School Tower) 10 10 08-Jan-26 22-Jan-26 Install Sprinkler Riser ( Middle School Tower)
A2210 Install HVAC Duct Riser ( Middle School Tower) 13 13 22-Jan-26 10-Feb-26 Install HVAC Duct Riser ( Middle School Tower)
A2200 Install Plumbing Riser ( Middle School Tower) 15 15 22-Jan-26 12-Feb-26 Install Plumbing Riser ( Middle School Tower)
A2190 Install Electrical Riser ( Middle School Tower) 15 15 12-Feb-26 05-Mar-26 Install Electrical Riser ( Middle School Tower)
A8530 Install Process Piping Riser 10 10 05-Mar-26 19-Mar-26 Install Process Piping Riser
A3800 Install Elevator -01 50 50 08-Jun-26 17-Aug-26 Install Elevator -01
A8510 Install Elevator -02 30 30 18-Aug-26 29-Sep-26 Install Elevator -02
Interior Level 03 260 260 22-Jan-26 02-Feb-27
A2980 Install Fire Sprinkler Main Runs 15 15 22-Jan-26 12-Feb-26 Install Fire Sprinkler Main Runs
A14960 Frame Priority Walls 10 10 29-Jan-26 12-Feb-26 Frame Priority Walls
A14970 Top Out & Finish Priority Walls 10 10 12-Feb-26 26-Feb-26 Top Out & Finish Priority Walls
A2990 Install OH Mechanical Main Trunk Lines 20 20 13-Feb-26 12-Mar-26 Install OH Mechanical Main Trunk Lines
A3000 Install OH Electrical Main Runs / Rough 20 20 05-Mar-26 02-Apr-26 Install OH Electrical Main Runs / Rough
A2780 Install OH Plumbing 8 8 13-Mar-26 24-Mar-26 Install OH Plumbing
A8560 Install Process Piping 10 10 19-Mar-26 02-Apr-26 Install Process Piping
A2770 Insulate Duct Mains Runs 8 8 07-Apr-26 17-Apr-26 Insulate Duct Mains Runs
A2760 Frame Walls 14 14 17-Apr-26 07-May-26 Frame Walls
A2790 In-Wall Rough 18 18 07-May-26 03-Jun-26 In-Wall Rough
A2800 In-Wall Inspectio ns 5 5 03-Jun-26 10-Jun-26 In-Wall Inspectio ns
A2810 Hang Walls 15 15 10-Jun-26 01-Jul-26 Hang Walls
A2820 Finish Walls 10 10 01-Jul-26 16-Jul-26 Finish Walls
A2830 Prime And First Coat 5 5 16-Jul-26 23-Jul-26 Prime And First Coat
A2840 Install ACT Grid 15 15 23-Jul-26 13-Aug-26 Install ACT Grid
A2850 Make Sprinkler Drops Into Ceiling 5 5 13-Aug-26 20-Aug-26 Make Sprinkler Drops Into Ceiling
A2860 Install Grilles & Difussers 10 10 20-Aug-26 03-Sep-26 Install Grilles & Difussers
A2870 Install Lighting 12 12 03-Sep-26 22-Sep-26 Install Lighting
A2880 OH Inspections 5 5 22-Sep-26 29-Sep-26 OH Inspections
A2890 Install ACT Tile 13 13 26-Oct-26 13-Nov-26 Install ACT Tile
A2900 Install Flooring 10 10 13-Nov-26 01-Dec-26 Install Flooring
A2910 Install Lockers 7 7 01-Dec-26 10-Dec-26 Install Lockers
A2920 Install Millwork 15 15 01-Dec-26 22-Dec-26 Install Millwork
A2930 Set Plumbing Fixtures 8 8 22-Dec-26 05-Jan-27 Set Plumbing Fixtures
A2940 Install Doors 4 4 05-Jan-27 11-Jan-27 Install Doors
A2950 Install RR Partitions 8 8 05-Jan-27 15-Jan-27 Install RR Partitions
A2960 Trim-out 10 10 11-Jan-27 25-Jan-27 Trim-out
A2970 Final Paint 6 6 25-Jan-27 02-Feb-27 Final Paint
Interior Level 02 258 258 12-Feb-26 19-Feb-27
A14980 Frame Priority Walls 10 10 12-Feb-26 26-Feb-26 Frame Priority Wal s
A2730 Install Fire Sprinkler Main Runs 15 15 12-Feb-26 05-Mar-26 Install Fire Sprinkler Main Runs
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 16 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A14990 Top Out & Finish Priority Walls 10 10 26-Feb-26 12-Mar-26 Top Out & Finish Priority Walls
A2740 Install OH Mechanical Main Trunk Lines 20 20 13-Mar-26 09-Apr-26 Install OH Mechanical Main Trunk Lines
A8570 Install Process Piping 10 10 02-Apr-26 16-Apr-26 Install Process Piping
A2750 Install OH Electrical Main Runs / Rough 20 20 02-Apr-26 30-Apr-26 Install OH Electrical Main Runs / Rough
A2530 Install OH Plumbing 8 8 10-Apr-26 21-Apr-26 Install OH Plumbing
A2520 Insulate Duct Mains Runs 8 8 17-Apr-26 29-Apr-26 Insulate Duct Mains Runs
A2510 Frame Walls 14 14 07-May-26 28-May-26 Frame Walls
A2540 In-Wall Rough 18 18 28-May-26 23-Jun-26 In-Wall Rough
A2550 In-Wall Inspectio ns 5 5 23-Jun-26 30-Jun-26 In-Wall Inspectio ns
A2560 Hang Walls 15 15 01-Jul-26 23-Jul-26 Hang Walls
A2570 Finish Walls 10 10 23-Jul-26 06-Aug-26 Finish Walls
A2580 Prime And First Coat 5 5 06-Aug-26 13-Aug-26 Prime And First Coat
A2590 Install ACT Grid 15 15 13-Aug-26 03-Sep-26 Install ACT Grid
A2600 Make Sprinkler Drops Into Ceiling 5 5 03-Sep-26 11-Sep-26 Make Sprinkler Drops Into Ceiling
A2610 Install Grilles & Diffusers 10 10 11-Sep-26 25-Sep-26 Install Grilles & Diffusers
A2620 install Lighting 12 12 25-Sep-26 13-Oct-26 install Lighting
A2630 OH Inspections 5 5 13-Oct-26 20-Oct-26 OH Inspections
A2640 Install ACT Tile 13 13 13-Nov-26 04-Dec-26 Install ACT Tile
A2650 Install Flooring 10 10 04-Dec-26 18-Dec-26 Install Flooring
A2660 Install Lockers 7 7 18-Dec-26 30-Dec-26 Install Lockers
A2670 Install Millwork 15 15 18-Dec-26 12-Jan-27 Install Millwork
A2680 Set Plumbing Fixtures 8 8 12-Jan-27 22-Jan-27 Set Plumbing Fixtures
A2690 Install Doors 4 4 22-Jan-27 28-Jan-27 Install Doors
A2700 Install RR Partitions 8 8 22-Jan-27 03-Feb-27 Install RR Partitions
A2710 Trim-out 10 10 28-Jan-27 11-Feb-27 Trim-out
A2720 Final Paint 6 6 11-Feb-27 19-Feb-27 Final Paint
Interior Level 01 261 261 26-Feb-26 10-Mar-27
A15000 Frame Priority Walls 10 10 26-Feb-26 12-Mar-26 Frame Priority Wal s
A2480 Install Fire Sprinkler Main Runs 15 15 05-Mar-26 26-Mar-26 Install Fire Sprinkler Main Runs
A15010 Top Out & Finish Priority Walls 10 10 17-Mar-26 31-Mar-26 Top Out & Finish Priority Walls
A2490 Install OH Mechanical Main Trunk Lines 20 20 10-Apr-26 07-May-26 Install OH Mechanical Main Trunk Lines
A8580 Install Process Piping 10 10 16-Apr-26 30-Apr-26 Install Process Piping
A2500 Install OH Electrical Main Runs / Rough 20 20 30-Apr-26 29-May-26 Install OH Electrical Main Runs / Rough
A2280 Install OH Plumbing 8 8 08-May-26 19-May-26 Install OH Plumbing
A2270 Insulate Duct Mains Runs 8 8 08-May-26 19-May-26 Insulate Duct Mains Runs
A2260 Frame Walls 14 14 28-May-26 17-Jun-26 Frame Walls
A2290 In-Wall Rough 18 18 17-Jun-26 14-Jul-26 In-Wall Rough
A2300 In-Wall Inspectio ns 5 5 14-Jul-26 21-Jul-26 In-Wall Inspections
A2310 Hang Walls 15 15 23-Jul-26 13-Aug-26 Hang Walls
A2320 Finish Walls 10 10 13-Aug-26 27-Aug-26 Finish Walls
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 17 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A2330 Prime And First Coat 5 5 27-Aug-26 03-Sep-26 Prime And First Coat
A2340 Install ACT Grid 15 15 03-Sep-26 25-Sep-26 Install ACT Grid
A2350 Make Sprinkler Drops Into Ceiling 5 5 25-Sep-26 02-Oct-26 Make Sprinkler Drops Into Ceiling
A2360 Install Grilles & Diffusers 10 10 02-Oct-26 16-Oct-26 Install Grilles & Diffusers
A2370 install Lighting 12 12 16-Oct-26 03-Nov-26 install Lighting
A2380 OH Inspections 5 5 03-Nov-26 10-Nov-26 OH Inspections
A2390 Install ACT Tile 13 13 04-Dec-26 23-Dec-26 Install ACT Tile
A2400 Install Flooring 10 10 23-Dec-26 08-Jan-27 Install Flooring
A2410 Install Lockers 7 7 08-Jan-27 19-Jan-27 Install Lockers
A2420 Install Millwork 15 15 08-Jan-27 29-Jan-27 Install Millwork
A2430 Set Plumbing Fixtures 8 8 29-Jan-27 10-Feb-27 Set Plumbing Fixtures
A2440 Install Doors 4 4 10-Feb-27 16-Feb-27 Install Doors
A2450 Install RR Partitions 8 8 10-Feb-27 22-Feb-27 Install RR Partitions
A2460 Trim-out 10 10 16-Feb-27 02-Mar-27 Trim-out
A2470 Final Paint 6 6 02-Mar-27 10-Mar-27 Final Paint
Interior Level 00 264 264 12-Mar-26 29-Mar-27
A15020 Frame Priority Walls 10 10 12-Mar-26 26-Mar-26 Frame Priority Walls
A2150 Install Fire Sprinkler Main Runs 15 15 26-Mar-26 16-Apr-26 Install Fire Sprinkler Main Runs
A15030 Top Out & Finish Priority Walls 10 10 06-Apr-26 20-Apr-26 Top Out & Finish Priority Walls
A8590 Install Process Piping 10 10 30-Apr-26 14-May-26 Install Process Piping
A1940 Install OH Mechanical Main Trunk Lines 20 20 08-May-26 05-Jun-26 Install OH Mechanical Main Trunk Lines
A1950 Install OH Electrical Main Runs / Rough 20 20 29-May-26 26-Jun-26 Install OH Electrical Main Runs / Rough
A2040 Insulate Duct Mains Runs 8 8 08-Jun-26 17-Jun-26 Insulate Duct Mains Runs
A2050 Install OH Plumbing 8 8 08-Jun-26 17-Jun-26 Install OH Plumbing
A1960 Frame Walls 14 14 18-Jun-26 08-Jul-26 Frame Walls
A1970 In-Wall Rough 18 18 09-Jul-26 03-Aug-26 In-Wall Rough
A2120 In-Wall Inspectio ns 5 5 04-Aug-26 10-Aug-26 In-Wall Inspectio ns
A1980 Hang Walls 15 15 13-Aug-26 03-Sep-26 Hang Walls
A1990 Finish Walls 10 10 03-Sep-26 18-Sep-26 Finish Walls
A2000 Prime And First Coat 5 5 18-Sep-26 25-Sep-26 Prime And First Coat
A2010 Install ACT Grid 15 15 25-Sep-26 16-Oct-26 Install ACT Grid
A2160 Make Sprinkler Drops Into Ceiling 5 5 16-Oct-26 23-Oct-26 Make Sprinkler Drops Into Ceiling
A2020 Install Grilles & Diffusers 10 10 23-Oct-26 06-Nov-26 Install Grilles & Diffusers
A2030 install Lighting 12 12 06-Nov-26 25-Nov-26 install Lighting
A2110 OH Inspections 5 5 25-Nov-26 04-Dec-26 OH Inspections
A2230 Install ACT Tile 13 13 23-Dec-26 13-Jan-27 Install ACT Tile
A2070 Install Flooring 10 10 13-Jan-27 27-Jan-27 Install Flooring
A2080 Install Lockers 7 7 27-Jan-27 05-Feb-27 Install Lockers
A2250 Install Millwork 15 15 27-Jan-27 17-Feb-27 Install Millwork
A2060 Set Plumbing Fixtures 8 8 17-Feb-27 01-Mar-27 Set Plumbing Fixtures
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 18 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A2090 Install Doors 4 4 01-Mar-27 05-Mar-27 Install Doors
A2240 Install RR Partitions 8 8 01-Mar-27 11-Mar-27 Install RR Partitions
A2140 Trim-out 10 10 05-Mar-27 19-Mar-27 Trim-out
A2130 Final Paint 6 6 19-Mar-27 29-Mar-27 Final Paint
Middle School Gymnasium & Dining 838 838 20-Nov-25 16-Mar-29
Middle School Gymnasium & Locker Rooms 273 273 20-Nov-25 22-Dec-26
A3540 OH Plumbing ( Roof Drains ) 8 8 20-Nov-25 03-Dec-25 OH Plumbing ( Roof Drains )
A3240 Install OH Mech 15 15 20-Feb-26 13-Mar-26 Install OH Mech
A3530 Install Fire Sprinkle Mains 8 8 24-Feb-26 06-Mar-26 Install Fire Sprinkle Mains
A3250 Install OH Electrical 20 20 13-Mar-26 10-Apr-26 Install OH Electrical
A3560 Frame Hard Ceilings (Locker Rooms ) 6 6 23-Mar-26 31-Mar-26 Frame Hard Ceilings (Locker Rooms )
A4220 OH Rough-in In Hard Ceilings 10 10 31-Mar-26 14-Apr-26 OH Rough-in In Hard Ceilings
A8600 Install Process Piping 10 10 02-Apr-26 16-Apr-26 Install Process Piping
A4210 OH Inspections 5 5 14-Apr-26 21-Apr-26 OH Inspections
A3570 Hang Hard Ceilings (Locker Rooms ) 5 5 21-Apr-26 28-Apr-26 Hang Hard Ceilings (Locker Rooms )
A3580 Finish Hard Ceilings (Locker Rooms ) 5 5 28-Apr-26 05-May-26 Finish Hard Ceilings (Locker Rooms )
A3260 Prime And First Coat CMU & Ceilings 10 10 05-May-26 19-May-26 Prime And First Coat CMU & Ceilings
A3270 Fog Out Ceiling 8 8 19-May-26 01-Jun-26 Fog Out Ceiling
A3280 Install Basket Ball Goals 10 10 01-Jun-26 15-Jun-26 Install Basket Ball Goals
A3290 Install Score Board & Systems 7 7 15-Jun-26 24-Jun-26 Install Score Board & Systems
A3300 Install Flooring ( Gymnasium Flooring ) 15 15 17-Nov-26 10-Dec-26 Install Flooring ( Gymnasium Flooring )
A3310 Install Bleachers 8 8 10-Dec-26 22-Dec-26 Install Bleachers
Middle School PE Storage & Band & Orchestra Rooms 271 271 04-Dec-25 31-Dec-26
A3500 OH Plumbing For Roof Drains 5 5 04-Dec-25 10-Dec-25 OH Plumbing For Roof Drains
A3490 Install Fire Sprinkler Mains 5 5 06-Mar-26 13-Mar-26 Install Fire Sprinkler Mains
A3470 OH Mech 8 8 13-Mar-26 25-Mar-26 OH Mech
A8550 Install Process Piping Main Lines & Valve Off & AT Tower 10 10 19-Mar-26 02-Apr-26 Install Process Piping Main Lines & Valve Off & AT Tower
A3480 OH Electrical Rough 8 8 25-Mar-26 06-Apr-26 OH Electrical Rough
A3920 Frame Walls 10 10 06-Apr-26 20-Apr-26 Frame Walls
A8610 Install Process Piping 10 10 16-Apr-26 30-Apr-26 Install Process Piping
A3950 In-Wall Rough 7 7 20-Apr-26 29-Apr-26 In-Wall Rough
A3960 In-Wall Inspectio ns 5 5 29-Apr-26 06-May-26 In-Wall Inspectio ns
A3930 Hang Walls 8 8 06-May-26 18-May-26 Hang Walls
A3940 Finish Walls 7 7 18-May-26 28-May-26 Finish Walls
A3900 Prime & First Coat Walls 5 5 28-May-26 04-Jun-26 Prime & First Coat Walls
A3600 install ACT Grid 8 8 04-Jun-26 16-Jun-26 install ACT Grid
A3610 Install Grills & Diffusers In Grid 6 6 16-Jun-26 24-Jun-26 Install Grills & Diffusers In Grid
A3630 Make Sprinkler Drops in Grid 5 5 24-Jun-26 01-Jul-26 Make Sprinkler Drops in Grid
A3620 install Lighting In Grid 7 7 01-Jul-26 13-Jul-26 install Lighting In Grid
A3640 OH inspections 5 5 13-Jul-26 20-Jul-26 OH inspections
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 19 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A3650 Install ACT Tiles 6 6 09-Nov-26 18-Nov-26 Install ACT Tiles
A3910 Final Paint 4 4 18-Nov-26 24-Nov-26 Final Paint
A3660 Install Acoustical Wall Treatments 6 6 24-Nov-26 04-Dec-26 Install Acoustical Wall Treatments
A4190 Install Flooring 8 8 04-Dec-26 16-Dec-26 Install Flooring
A4180 Install Doors & Hardware 4 4 16-Dec-26 22-Dec-26 Install Doors & Hardware
A3970 Trim-Out & Accesories Install 10 10 16-Dec-26 31-Dec-26 Trim-Out & Accesories Install
Middle School Kitchen & Dining Areas 270 270 05-Jan-26 28-Jan-27
A3890 Install Roof Drain Risers 5 5 05-Jan-26 12-Jan-26 Install Roof Drain Risers
A3520 OH Plumbing 10 10 21-Jan-26 04-Feb-26 OH Plumbing
A3440 OH Mechanical 15 15 30-Jan-26 20-Feb-26 OH Mechanical
A3510 Install Fire Sprinkler Mains 10 10 10-Feb-26 24-Feb-26 Install Fire Sprinkler Mains
A3450 OH Electrical Rough 15 15 20-Feb-26 13-Mar-26 OH Electrical Rough
A3740 Frame Hard Ceilings 6 6 13-Mar-26 23-Mar-26 Frame Hard Ceilings
A4070 OH Rough-in In Hard Ceiling 10 10 23-Mar-26 06-Apr-26 OH Rough-in In Hard Ceiling
A8540 Install Process Piping Main Lines & Valve Off 10 10 02-Apr-26 16-Apr-26 Install Process Piping Main Lines & Valve Off
A8620 Install Process Piping 10 10 30-Apr-26 14-May-26 Install Process Piping
A3710 OH Inspections 5 5 14-May-26 21-May-26 OH Inspections
A3750 Hang Hard Ceilings 5 5 21-May-26 29-May-26 Hang Hard Ceilings
A3760 Finish Hard Ceilings 6 6 29-May-26 08-Jun-26 Finish Hard Ceilings
A3730 Prime & First Coat 4 4 08-Jun-26 12-Jun-26 Prime & First Coat
A4110 Install RR Fixtures 7 7 12-Jun-26 23-Jun-26 Install RR Fixtures
A3670 Install ACT Grid 10 10 12-Jun-26 26-Jun-26 Install ACT Grid
A4120 Install RR Partitions & Accessories 6 6 23-Jun-26 01-Jul-26 Install RR Partitions & Accessories
A3680 Install Grill And Diffuser In Grid 6 6 26-Jun-26 07-Jul-26 Install Grill And Diffuser In Grid
A3700 Make Sprinkler Drops In Grid 5 5 07-Jul-26 14-Jul-26 Make Sprinkler Drops In Grid
A3550 Install Kitchen Fire Suppression System 5 5 07-Jul-26 14-Jul-26 Install Kitchen Fire Suppression System
A3690 Install Lighting in Grid 7 7 14-Jul-26 23-Jul-26 Install Lighting in Grid
A4080 OH Inspections ( ACT Ceiling Areas ) 5 5 23-Jul-26 30-Jul-26 OH Inspections ( ACT Ceiling Areas )
A3720 Install ACT Tile 7 7 18-Nov-26 01-Dec-26 Install ACT Tile
A3770 Install Lockers 3 3 01-Dec-26 04-Dec-26 Install Lockers
A4170 Install Flooring ( Kitchen Area ) 10 10 01-Dec-26 15-Dec-26 Install Flooring ( Kitchen Area )
A4150 Trim Out 10 10 01-Dec-26 15-Dec-26 Trim Out
A4140 Final Paint 6 6 15-Dec-26 23-Dec-26 Final Paint
A4160 Install Flooring ( Main Area ) 15 15 15-Dec-26 07-Jan-27 Install Flooring ( Main Area )
A3430 Install Kitchen Equipment 20 20 15-Dec-26 14-Jan-27 Install Kitchen Equipment
A4200 Install Doors & Hardware 5 5 07-Jan-27 14-Jan-27 Install Doors & Hardware
A4130 MEP Connections To Kitchen Equipment 5 5 14-Jan-27 21-Jan-27 MEP Connections To Kitchen Equipment
A3460 Install Serving Line Millwork 5 5 14-Jan-27 21-Jan-27 Install Serving Line Millwork
A4090 Health Department Inspections 4 4 21-Jan-27 27-Jan-27 Health Department Inspections
A4100 Kitchen Burn-in 5 5 21-Jan-27 28-Jan-27 Kitchen Burn-in
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 20 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
High School Fitness & Lockers ( Level 01 ) 810 810 05-Jan-26 16-Mar-29
A3870 Install Roof Drain Riser 5 5 05-Jan-26 12-Jan-26 Install Roof Drain Riser
A3880 Install Roof Drain & Latterals 7 7 12-Jan-26 21-Jan-26 Install Roof Drain & Latterals
A8630 Install Process Piping 10 10 14-May-26 29-May-26 Install Process Piping
A14150 Install JROTC Rang Systems 15 15 23-Feb-29 16-Mar-29 Install JROTC Rang Systems
Main Mechanical & Fire Pump & Electrical Rooms 181 181 24-Feb-26 09-Nov-26
A4020 Install Fire Protection Pumps 15 15 24-Feb-26 17-Mar-26 Install Fire Protection Pumps
A4000 Set Pumps & Boilers & Heat Exchanger 15 15 26-Mar-26 16-Apr-26 Set Pumps & Boilers & Heat Exchanger
A3980 Set Permanent Transformers 10 10 08-Apr-26 22-Apr-26 Set Permanent Transformers
A4010 Pipe To Pumps & Boilers & Heat Exchanger 25 25 16-Apr-26 21-May-26 Pipe To Pumps & Boilers & Heat Exchanger
A3120 Insulate Pipe To Pumps & Boilers & Heat Exchanger 5 5 21-May-26 29-May-26 Insulate Pipe To Pumps & Boilers & Heat Exchanger
A3130 Connect Switch Gear To Service 5 5 21-Aug-26 28-Aug-26 Connect Switch Gear To Service
A3990 Set Distribution Panels 10 10 28-Aug-26 14-Sep-26 Set Distribution Panels
A3140 Pipe & Connect Power To MS Electrical Rooms 15 15 28-Aug-26 21-Sep-26 Pipe & Connect Power To MS Electrical Rooms
A14310 Pull Wire To Transformers & Heat Up 20 20 14-Sep-26 12-Oct-26 Pull Wire To Transformers & Heat Up
A15630 Equipment Start-up 20 20 12-Oct-26 09-Nov-26 Equipment Start-up
Phase II 956 956 04-Sep-25 15-Jun-29
High School Tower 956 956 04-Sep-25 15-Jun-29
Exterior 360 360 04-Sep-25 09-Feb-27
Foundations 46 46 04-Sep-25 06-Nov-25
Tower HS-1 36 36 04-Sep-25 23-Oct-25
A4560 Install Strip Footings 12 12 04-Sep-25* 19-Sep-25 Install Strip Footings
A4550 Install Spread Footings 5 5 10-Sep-25 16-Sep-25 Install Spread Footings
A4570 Install UG Utilities SOG H1 10 10 24-Sep-25 07-Oct-25 Install UG Utilities SOG H1
A4600 Lay CMU To FF 4 4 07-Oct-25 10-Oct-25 Lay CMU To FF
A4580 Prep SOG H1 7 7 13-Oct-25 21-Oct-25 Prep SOG H1
A4590 Place SOG H1 2 2 22-Oct-25 23-Oct-25 Place SOG H1
Tower HS-2 31 31 22-Sep-25 03-Nov-25
A6190 Install Spread Footings 5 5 22-Sep-25 26-Sep-25 Install Spread Footings
A6200 Install Strip Footings 15 15 22-Sep-25 10-Oct-25 Install Strip Footings
A6160 Install UG Utilities SOG H2 10 10 08-Oct-25 21-Oct-25 Install UG Utilities SOG H2
A6210 Lay CMU To FF 4 4 13-Oct-25 16-Oct-25 Lay CMU To FF
A6170 Prep SOG H2 7 7 22-Oct-25 30-Oct-25 Prep SOG H2
A6180 Place SOG H2. 2 2 31-Oct-25 03-Nov-25 Place SOG H2.
Tower HS-3 19 19 13-Oct-25 06-Nov-25
A6260 Install Strip Footings 4 4 13-Oct-25 16-Oct-25 Install Strip Footings
A6250 Install Spread Footings 3 3 17-Oct-25 21-Oct-25 Install Spread Footings
A6270 Lay CMU To FF 3 3 17-Oct-25 21-Oct-25 Lay CMU To FF
A6220 Install UG Utilities SOG H3 3 3 22-Oct-25 24-Oct-25 Install UG Utilities SOG H3
A6230 Prep SOG H3 3 3 31-Oct-25 04-Nov-25 Prep SOG H3
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 21 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A6240 Place SOG H3 2 2 05-Nov-25 06-Nov-25 Place SOG H3
Structure 148 148 20-Nov-25 23-Jun-26
Tower HS-1 103 103 20-Nov-25 20-Apr-26
A4890 Lay CMU ( Stair 04) 10 10 20-Nov-25 05-Dec-25 Lay CMU ( Stair 04)
A13030 Install Stair -04 8 8 13-Jan-26 22-Jan-26 Install Stair -04
A5190 Erect Steel Structure H1 ( All Levels ) 20 20 15-Jan-26 12-Feb-26 Erect Steel Structure H1 ( All Levels )
A5210 Install Decking H1 ( Level 01 ) 4 4 12-Feb-26 18-Feb-26 Install Decking H1 ( Level 01 )
A5220 Install Decking H1 ( Level 02 ) 4 4 18-Feb-26 24-Feb-26 Install Decking H1 ( Level 02 )
A5240 Install Decking H1 ( Level 03 ) 4 4 24-Feb-26 02-Mar-26 Install Decking H1 ( Level 03 )
A5230 In-slab Rough-in H1 ( Level 01) 8 8 24-Feb-26 06-Mar-26 In-slab Rough-in H1 ( Level 01)
A6060 Install Decking H1 ( Level 04 ) 4 4 02-Mar-26 06-Mar-26 Install Decking H1 ( Level 04 )
A5250 In-slab Rough-in H1 ( Level 02) 8 8 02-Mar-26 12-Mar-26 In-slab Rough-in H1 ( Level 02)
A15200 Lay Out Track & Shoot "Z" Clips To Beam H1 ( Level 00 ) 8 8 04-Mar-26 16-Mar-26 Lay Out Track & Shoot "Z" Clips To Beam H1 ( Level 00 )
A5270 Prep Composite Deck H1 ( Level 01) 4 4 06-Mar-26 12-Mar-26 Prep Composite Deck H1 ( Level 01)
A5260 Install Decking H1 ( Level Roof ) 4 4 06-Mar-26 12-Mar-26 Install Decking H1 ( Level Roof )
A5280 In-slab Rough-in H1 ( Level 03) 8 8 06-Mar-26 18-Mar-26 In-slab Rough-in H1 ( Level 03)
A5290 Place Composite Slab H1 ( Level 01 ) 2 2 12-Mar-26 16-Mar-26 Place Composite Slab H1 ( Level 01 )
A5300 Prep Composite Deck H1 ( Level 02) 4 4 12-Mar-26 18-Mar-26 Prep Composite Deck H1 ( Level 02)
A6070 In-slab Rough-in H1 ( Level 04) 8 8 12-Mar-26 24-Mar-26 In-slab Rough-in H1 ( Level 04)
A11920 Apply Fire Proofing ( H1 Level 00 ) 5 5 16-Mar-26 23-Mar-26 Apply Fire Proofing ( H1 Level 00 )
A15210 Lay Out Track & Shoot "Z" Clips To Beam H1 ( Level 01 ) 8 8 16-Mar-26 26-Mar-26 Lay Out Track & Shoot "Z" Clips To Beam H1 ( Level 01 )
A5320 Place Composite Slab H1 ( Level 02 ) 2 2 18-Mar-26 20-Mar-26 Place Composite Slab H1 ( Level 02 )
A5330 Prep Composite Deck H1 ( Level 03) 4 4 18-Mar-26 24-Mar-26 Prep Composite Deck H1 ( Level 03)
A15220 Lay Out Track & Shoot "Z" Clips To Beam H1 ( Level 02 ) 8 8 20-Mar-26 01-Apr-26 Lay Out Track & Shoot "Z" Clips To Beam H1 ( Level 02 )
A11930 Apply Fire Proofing ( H1 Level 01 ) 5 5 23-Mar-26 30-Mar-26 Apply Fire Proofing ( H1 Level 01 )
A5350 Place Composite Slab H1 ( Level 03 ) 2 2 24-Mar-26 26-Mar-26 Place Composite Slab H1 ( Level 03 )
A6080 Prep Composite Deck H1 ( Level 04) 4 4 24-Mar-26 30-Mar-26 Prep Composite Deck H1 ( Level 04)
A15230 Lay Out Track & Shoot "Z" Clips To Beam H1 ( Level 03 ) 8 8 26-Mar-26 07-Apr-26 Lay Out Track & Shoot "Z" Clips To Beam H1 ( Level 03 )
A6090 Place Composite Slab H1 ( Level 04 ) 2 2 30-Mar-26 01-Apr-26 Place Composite Slab H1 ( Level 04 )
A11940 Apply Fire Proofing ( H1 Level 02 ) 5 5 30-Mar-26 06-Apr-26 Apply Fire Proofing ( H1 Level 02 )
A15240 Lay Out Track & Shoot "Z" Clips To Beam H1 ( Level 04 ) 8 8 01-Apr-26 13-Apr-26 Lay Out Track & Shoot "Z" Clips To Beam H1 ( Level 04 )
A11950 Apply Fire Proofing ( H1 Level 03 ) 5 5 06-Apr-26 13-Apr-26 Apply Fire Proofing ( H1 Level 03 )
A11960 Apply Fire Proofing ( H1 Level 04 ) 5 5 13-Apr-26 20-Apr-26 Apply Fire Proofing ( H1 Level 04 )
Tower HS-2 120 120 08-Dec-25 28-May-26
A4910 Lay CMU Elevator & Restrooms 17 17 08-Dec-25 31-Dec-25 Lay CMU Elevator & Restrooms
A4900 Lay CMU ( Stair 05) 7 7 02-Jan-26 12-Jan-26 Lay CMU ( Stair 05)
A13040 Install Stair -05 8 8 23-Jan-26 03-Feb-26 Install Stair -05
A5200 Erect Steel Structure H2 ( All Levels ) 20 20 12-Feb-26 12-Mar-26 Erect Steel Structure H2 ( All Levels )
A5310 Install Decking H2 ( Level 01 ) 4 4 12-Mar-26 18-Mar-26 Install Decking H2 ( Level 01 )
A5340 Install Decking H2 ( Level 02 ) 4 4 18-Mar-26 24-Mar-26 Install Decking H2 ( Level 02 )
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 22 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D J F A J J AS N J A J J AS D JF A JJ AS
A15250 Lay Out Track & Shoot "Z" Clips To Beam H2 ( Level 00 ) 8 8 18-Mar-26 30-Mar-26 Lay Out Track & Shoot "Z" Clips To Beam H2 ( Level 00 )
A5370 Install Decking H2 ( Level 03 ) 4 4 24-Mar-26 30-Mar-26 Install Decking H2 ( Level 03 )
A5360 In-slab Rough-in H2 ( Level 01) 8 8 24-Mar-26 03-Apr-26 In-slab Rough-in H2 ( Level 01)
A5850 Install Decking H2 ( Level 04 ) 4 4 30-Mar-26 03-Apr-26 Install Decking H2 ( Level 04 )
A5380 In-slab Rough-in H2 ( Level 02) 8 8 30-Mar-26 09-Apr-26 In-slab Rough-in H2 ( Level 02)
A5390 Install Decking H2 ( Level Roof ) 4 4 03-Apr-26 09-Apr-26 Install Decking H2 ( Level Roof )
A5410 Prep Composite Deck H2 ( Level 01) 4 4 03-Apr-26 09-Apr-26 Prep Composite Deck H2 ( Level 01)
A5420 In-slab Rough-in H2 ( Level 03) 8 8 03-Apr-26 15-Apr-26 In-slab Rough-in H2 ( Level 03)
A5430 Place Composite Slab H2 ( Level 01 ) 2 2 09-Apr-26 13-Apr-26 Place Composite Slab H2 ( Level 01 )
A5440 Prep Composite Deck H2 ( Level 02) 4 4 09-Apr-26 15-Apr-26 Prep Composite Deck H2 ( Level 02)
A6130 In-slab Rough-in H2 ( Level 04) 8 8 09-Apr-26 21-Apr-26 In-slab Rough-in H2 ( Level 04)
A5400 Install Roof Curbs & Penitrations H1& H2 ( Level Roof) 8 8 09-Apr-26 21-Apr-26 Install Roof Curbs & Penitrations H1& H2 ( Level Roof)
A15290 Lay Out Track & Shoot "Z" Clips To Beam H2 ( Level 01 ) 8 8 13-Apr-26 23-Apr-26 Lay Out Track & Shoot "Z" Clips To Beam H2 ( Level 01 )
A5450 Place Composite Slab H2 ( Level 02 ) 2 2 15-Apr-26 17-Apr-26 Place Composite Slab H2 ( Level 02 )
A5460 Prep Composite Deck H2 ( Level 03) 4 4 15-Apr-26 21-Apr-26 Prep Composite Deck H2 ( Level 03)
A11970 Apply Fire Proofing ( H2 Level 00 ) 5 5 20-Apr-26 27-Apr-26 Apply Fire Proofing ( H2 Level 00 )
A5470 Place Composite Slab H2 ( Level 03 ) 2 2 21-Apr-26 23-Apr-26 Place Composite Slab H2 ( Level 03 )
A6140 Prep Composite Deck H2 ( Level 04) 4 4 21-Apr-26 27-Apr-26 Prep Composite Deck H2 ( Level 04)
A15280 Lay Out Track & Shoot "Z" Clips To Beam H2 ( Level 02 ) 8 8 23-Apr-26 05-May-26 Lay Out Track & Shoot "Z" Clips To Beam H2 ( Level 02 )
A6150 Place Composite Slab H2 ( Level 04 ) 2 2 27-Apr-26 29-Apr-26 Place Composite Slab H2 ( Level 04 )
A11980 Apply Fire Proofing ( H2 Level 01 ) 5 5 27-Apr-26 04-May-26 Apply Fire Proofing ( H2 Level 01 )
A11990 Apply Fire Proofing ( H2 Level 02 ) 5 5 04-May-26 11-May-26 Apply Fire Proofing ( H2 Level 02 )
A15270 Lay Out Track & Shoot "Z" Clips To Beam H2 ( Level 03 ) 8 8 05-May-26 15-May-26 Lay Out Track & Shoot "Z" Clips To Beam H2 ( Level 03 )
A12000 Apply Fire Proofing ( H2 Level 03 ) 5 5 11-May-26 18-May-26 Apply Fire Proofing ( H2 Level 03 )
A15260 Lay Out Track & Shoot "Z" Clips To Beam H2 ( Level 04 ) 8 8 15-May-26 28-May-26 Lay Out Track & Shoot "Z" Clips To Beam H2 ( Level 04 )
A11890 Apply Fire Proofing ( H2 Level 04 ) 5 5 18-May-26 26-May-26 Apply Fire Proofing ( H2 Level 04 )
Tower HS-3 114 114 13-Jan-26 23-Jun-26
A4920 Lay CMU ( Stair 06 ) & Teacher Work Room 15 15 13-Jan-26 02-Feb-26 Lay CMU ( Stair 06 ) & Teacher Work Room
A13050 Install Stair -06 8 8 04-Feb-26 13-Feb-26 Install Stair -06
A5860 Erect Steel Structure H3 ( All Levels ) 15 15 12-Mar-26 02-Apr-26 Erect Steel Structure H3 ( All Levels )
A5930 Install Decking H3 ( Level 01 ) 4 4 09-Apr-26 15-Apr-26 Install Decking H3 ( Level 01 )
A5940 Install Decking H3 ( Level 02 ) 4 4 15-Apr-26 21-Apr-26 Install Decking H3 ( Level 02 )
A15320 Lay Out Track & Shoot "Z" Clips To Beam H3 ( Level 01 ) 8 8 15-Apr-26 27-Apr-26 Lay Out Track & Shoot "Z" Clips To Beam H3 ( Level 01 )
A5960 Install Decking H3 ( Level 03 ) 4 4 21-Apr-26 27-Apr-26 Install Decking H3 ( Level 03 )
A5950 In-slab Rough-in H3 ( Level 01) 8 8 21-Apr-26 01-May-26 In-slab Rough-in H3 ( Level 01)
A5980 Install Decking H3 ( Level Roof ) 4 4 27-Apr-26 01-May-26 Install Decking H3 ( Level Roof )
A5970 In-slab Rough-in H3 ( Level 02) 8 8 27-Apr-26 07-May-26 In-slab Rough-in H3 ( Level 02)
A5990 Prep Composite Deck H3 ( Level 01) 4 4 01-May-26 07-May-26 Prep Composite Deck H3 ( Level 01)
A4930 Install Roof Curbs & Penitrations 5 5 01-May-26 08-May-26 Install Roof Curbs & Penitrations
A6000 In-slab Rough-in H3 ( Level 03) 8 8 01-May-26 13-May-26 In-slab Rough-in H3 ( Level 03)
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 23 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A6010 Place Composite Slab H3 ( Level 01 ) 2 2 07-May-26 11-May-26 Place Composite Slab H3 ( Level 01 )
A6020 Prep Composite Deck H3 ( Level 02) 4 4 07-May-26 13-May-26 Prep Composite Deck H3 ( Level 02)
A15310 Lay Out Track & Shoot "Z" Clips To Beam H3 ( Level 02 ) 8 8 11-May-26 21-May-26 Lay Out Track & Shoot "Z" Clips To Beam H3 ( Level 02 )
A6030 Place Composite Slab H3 ( Level 02 ) 2 2 13-May-26 15-May-26 Place Composite Slab H3 ( Level 02 )
A6040 Prep Composite Deck H3 ( Level 03) 4 4 13-May-26 19-May-26 Prep Composite Deck H3 ( Level 03)
A6050 Place Composite Slab H3 ( Level 03 ) 2 2 19-May-26 21-May-26 Place Composite Slab H3 ( Level 03 )
A15300 Lay Out Track & Shoot "Z" Clips To Beam H3 ( Level 03 ) 8 8 21-May-26 03-Jun-26 Lay Out Track & Shoot "Z" Clips To Beam H3 ( Level 03 )
A12010 Apply Fire Proofing ( H3 Level 00 ) 5 5 26-May-26 02-Jun-26 Apply Fire Proofing ( H3 Level 00 )
A12020 Apply Fire Proofing ( H3 Level 01 ) 5 5 02-Jun-26 09-Jun-26 Apply Fire Proofing ( H3 Level 01 )
A11900 Apply Fire Proofing ( H3 Level 02 ) 5 5 09-Jun-26 16-Jun-26 Apply Fire Proofing ( H3 Level 02 )
A11910 Apply Fire Proofing ( H3 Level 03 ) 5 5 16-Jun-26 23-Jun-26 Apply Fire Proofing ( H3 Level 03 )
Exterior Envelope 203 203 20-Apr-26 09-Feb-27
High School Tower 203 203 20-Apr-26 09-Feb-27
A6480 Install Roof Drain Laterals & Fixtures 15 15 20-Apr-26 11-May-26 Install Roof Drain Laterals & Fixtures
A6430 Frame H1 ( All Levels ) 23 23 20-Apr-26 21-May-26 Frame H1 ( All Levels )
A6460 Install Roof Drain Riser 10 10 11-May-26 26-May-26 Install Roof Drain Riser
A6440 Install Sheathing H1 ( All Levels ) 10 10 21-May-26 05-Jun-26 Install Sheathing H1 ( All Levels )
A6450 Frame MH2 ( All Levels ) 20 20 21-May-26 19-Jun-26 Frame MH2 ( All Levels )
A6490 Apply Air Barrier H1 ( All Levels ) 15 15 05-Jun-26 26-Jun-26 Apply Air Barrier H1 ( All Levels )
A6470 Install Sheathing H2 ( All Levels ) 8 8 19-Jun-26 01-Jul-26 Install Sheathing H2 ( All Levels )
A6600 Frame MH3 ( All Levels ) 13 13 23-Jun-26 13-Jul-26 Frame MH3 ( All Levels )
A6510 Field Measure For Metal Panels H1 ( All Levels ) 10 10 26-Jun-26 13-Jul-26 Field Measure For Metal Panels H1 ( All Levels )
A6500 Install Glazing Frames H1 ( All Levels ) 18 18 26-Jun-26 23-Jul-26 Install Glazing Frames H1 ( All Levels )
A6520 Apply Air Barrier H2 ( All Levels ) 15 15 01-Jul-26 23-Jul-26 Apply Air Barrier H2 ( All Levels )
A6690 H3 Exterior Ceiling MEP OH Rough For Slab ( Level 00) 5 5 06-Jul-26 13-Jul-26 H3 Exterior Ceiling MEP OH Rough For Slab ( Level 00)
A6670 Install Masonry H1 ( 00 Level ) 15 15 10-Jul-26 31-Jul-26 Install Masonry H1 ( 00 Level )
A6610 Install Sheathing H3 ( All Levels ) 6 6 13-Jul-26 21-Jul-26 Install Sheathing H3 ( All Levels )
A6700 H3 Exterior Ceiling Framing ( Level 00) 6 6 13-Jul-26 21-Jul-26 H3 Exterior Ceiling Framing ( Level 00)
A6710 H3 Exterior Ceiling MEP OH Rough In Framing ( Level 00) 4 4 21-Jul-26 27-Jul-26 H3 Exterior Ceiling MEP OH Rough In Framing ( Level 00)
A6620 Apply Air Barrier H3 ( All Levels ) 15 15 21-Jul-26 11-Aug-26 Apply Air Barrier H3 ( All Levels )
A6560 Field Measure For Metal Panels H2 ( All Levels ) 10 10 23-Jul-26 06-Aug-26 Field Measure For Metal Panels H2 ( All Levels )
A6550 Install Glazing Frames H2 ( All Levels ) 18 18 23-Jul-26 18-Aug-26 Install Glazing Frames H2 ( All Levels )
A6530 Install Glazing H1 ( All Levels ) 20 20 23-Jul-26 20-Aug-26 Install Glazing H1 ( All Levels )
A6720 H3 Exterior Ceiling OH Inspection ( Level 00) 3 3 27-Jul-26 30-Jul-26 H3 Exterior Ceiling OH Inspection ( Level 00)
A6540 Install Metal Panels H1 ( All Levels ) 40 40 27-Jul-26 22-Sep-26 Install Metal Panels H1 ( All Levels )
A6730 H3 Exterior Ceiling Hang Sheathing ( Level 00) 5 5 30-Jul-26 06-Aug-26 H3 Exterior Ceiling Hang Sheathing ( Level 00)
A6570 Install Masonry H2 ( 00 Level ) 15 15 05-Aug-26 26-Aug-26 Install Masonry H2 ( 00 Level )
A6640 Field Measure For Metal Panels H3 ( All Levels ) 10 10 11-Aug-26 25-Aug-26 Field Measure For Metal Panels H3 ( All Levels )
A6630 Install Glazing Frames H3 ( All Levels ) 18 18 18-Aug-26 14-Sep-26 Install Glazing Frames H3 ( All Levels )
A6580 Install Glazing H2 ( All Levels ) 20 20 18-Aug-26 16-Sep-26 Install Glazing H2 ( All Levels )
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 24 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A6680 Install Masonry H3 ( 00 Level ) 15 15 31-Aug-26 22-Sep-26 Install Masonry H3 ( 00 Level )
A6650 Install Glazing H3 ( All Levels ) 20 20 14-Sep-26 12-Oct-26 Install Glazing H3 ( All Levels )
A6590 Install Metal Panels H2 ( All Levels ) 40 40 22-Sep-26 18-Nov-26 Install Metal Panels H2 ( All Levels )
A6660 Install Metal Panels H3 ( All Levels ) 40 40 18-Nov-26 19-Jan-27 Install Metal Panels H3 ( All Levels )
A7170 Install Cooping Caps 15 15 19-Jan-27 09-Feb-27 Install Cooping Caps
Roofing 28 28 19-Jun-26 30-Jul-26
A8640 Install Roofing H1 & H2 16 16 19-Jun-26 14-Jul-26 Install Roofing H1 & H2
A8650 Install Roofing H3 7 7 14-Jul-26 23-Jul-26 Install Roofing H3
A14160 Set Roof Top Equipment ( H1-3 ) 5 5 23-Jul-26 30-Jul-26 Set Roof Top Equipment ( H1-3 )
Interior 792 792 29-Apr-26 15-Jun-29
Inspections & Comisioning 495 495 01-Jul-27 15-Jun-29
A15110 High School Tower Punch 15 15 01-Jul-27 22-Jul-27 High School Tower Punch
A8710 Final Inspections High School Tower 10 10 20-Jul-27 02-Aug-27 Final Inspections High School Tower
A14230 Final Inspections ( Phase 2 ) 10 10 29-Mar-29 12-Apr-29 Final Inspections ( Phase 2 )
A15640 Gilbane Final Commisioning, Cleaning 45 45 12-Apr-29 15-Jun-29 Gilbane Final Commisioning, Cleaning
MEP Risers & Elevator 167 167 29-Apr-26 28-Dec-26
A8460 Install Sprinkler Riser ( High School Tower) 10 10 29-Apr-26 13-May-26 Install Sprinkler Riser ( High School Tower)
A8480 Install HVAC Duct Riser ( High School Tower) 13 13 13-May-26 02-Jun-26 Install HVAC Duct Riser ( High School Tower)
A8470 Install Plumbing Riser ( High School Tower) 15 15 13-May-26 04-Jun-26 Install Plumbing Riser ( High School Tower)
A8520 Install Process Piping Riser 10 10 14-May-26 29-May-26 Install Process Piping Riser
A8490 Install Electrical Riser ( High School Tower) 15 15 04-Jun-26 25-Jun-26 Install Electrical Riser ( High School Tower)
A8500 Install Elevator -03 60 60 30-Sep-26 28-Dec-26 Install Elevator -03
Level 04 237 237 04-May-26 12-Apr-27
A8450 Frame Priority Walls 10 10 04-May-26 18-May-26 Frame Priority Wal s
A8200 Install Fire Sprinkler Main Runs 15 15 13-May-26 04-Jun-26 Install Fire Sprinkler Main Runs
A9990 Top Out & Finish Priority Walls 10 10 26-May-26 09-Jun-26 Top Out & Finish Priority Walls
A8660 Install Process Piping 10 10 29-May-26 12-Jun-26 Install Process Piping
A8210 Install OH Mechanical Main Trunk Lines 20 20 08-Jun-26 06-Jul-26 Install OH Mechanical Main Trunk Lines
A8220 Install OH Electrical Main Runs / Rough 20 20 22-Jun-26 20-Jul-26 Install OH Electrical Main Runs / Rough
A8240 Install OH Plumbing 8 8 07-Jul-26 16-Jul-26 Install OH Plumbing
A8230 Insulate Duct Mains Runs 8 8 14-Jul-26 24-Jul-26 Insulate Duct Mains Runs
A8250 Frame Walls 14 14 24-Jul-26 13-Aug-26 Frame Walls
A8260 In-Wall Rough 18 18 13-Aug-26 09-Sep-26 In-Wall Rough
A8270 In-Wall Inspectio ns 5 5 09-Sep-26 16-Sep-26 In-Wall Inspections
A8280 Hang Walls 15 15 16-Sep-26 07-Oct-26 Hang Walls
A8290 Finish Walls 10 10 07-Oct-26 21-Oct-26 Finish Walls
A8300 Prime And First Coat 5 5 21-Oct-26 28-Oct-26 Prime And First Coat
A8310 Install ACT Grid 15 15 28-Oct-26 19-Nov-26 Install ACT Grid
A8320 Make Sprinkler Drops Into Ceiling 5 5 19-Nov-26 30-Nov-26 Make Sprinkler Drops Into Ceiling
A8330 Install Grilles & Diffusers 10 10 30-Nov-26 14-Dec-26 Install Grilles & Diffusers
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 25 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A8340 install Lighting 12 12 14-Dec-26 31-Dec-26 install Lighting
A8350 OH Inspections 5 5 31-Dec-26 08-Jan-27 OH Inspections
A8360 Install ACT Tile 13 13 08-Jan-27 27-Jan-27 Install ACT Tile
A8370 Install Flooring 10 10 27-Jan-27 10-Feb-27 Install Flooring
A8380 Install Lockers 7 7 10-Feb-27 19-Feb-27 Install Lockers
A8390 Install Millwork 15 15 10-Feb-27 03-Mar-27 Install Millwork
A8400 Set Plumbing Fixtures 8 8 03-Mar-27 15-Mar-27 Set Plumbing Fixtures
A8410 Install Doors 4 4 15-Mar-27 19-Mar-27 Install Doors
A8420 Install RR Partitions 8 8 15-Mar-27 25-Mar-27 Install RR Partitions
A8430 Trim-out 10 10 19-Mar-27 02-Apr-27 Trim-out
A8440 Final Paint 6 6 02-Apr-27 12-Apr-27 Final Paint
Level 03 244 244 18-May-26 04-May-27
A15120 Frame Priority Walls 15 15 18-May-26 09-Jun-26 Frame Priority Wal s
A7950 Install Fire Sprinkler Main Runs 15 15 04-Jun-26 25-Jun-26 Install Fire Sprinkler Main Runs
A15130 Top Out & Finish Priority Walls 15 15 09-Jun-26 30-Jun-26 Top Out & Finish Priority Walls
A8670 Install Process Piping 10 10 12-Jun-26 26-Jun-26 Install Process Piping
A7960 Install OH Mechanical Main Trunk Lines 20 20 07-Jul-26 03-Aug-26 Install OH Mechanical Main Trunk Lines
A7970 Install OH Electrical Main Runs / Rough 20 20 21-Jul-26 17-Aug-26 Install OH Electrical Main Runs / Rough
A7980 Insulate Duct Mains Runs 8 8 04-Aug-26 13-Aug-26 Insulate Duct Mains Runs
A7990 Install OH Plumbing 8 8 04-Aug-26 13-Aug-26 Install OH Plumbing
A8000 Frame Walls 14 14 18-Aug-26 04-Sep-26 Frame Walls
A8010 In-Wall Rough 18 18 08-Sep-26 01-Oct-26 In-Wall Rough
A8020 In-Wall Inspectio ns 5 5 02-Oct-26 08-Oct-26 In-Wall Inspectio ns
A8030 Hang Walls 15 15 09-Oct-26 29-Oct-26 Hang Walls
A8040 Finish Walls 10 10 30-Oct-26 13-Nov-26 Finish Walls
A8050 Prime And First Coat 5 5 16-Nov-26 20-Nov-26 Prime And First Coat
A8060 Install ACT Grid 15 15 23-Nov-26 15-Dec-26 Install ACT Grid
A8070 Make Sprinkler Drops Into Ceiling 5 5 16-Dec-26 22-Dec-26 Make Sprinkler Drops Into Ceiling
A8080 Install Grilles & Diffusers 10 10 23-Dec-26 07-Jan-27 Install Grilles & Diffusers
A8090 install Lighting 12 12 08-Jan-27 25-Jan-27 install Lighting
A8100 OH Inspections 5 5 26-Jan-27 01-Feb-27 OH Inspections
A8110 Install ACT Tile 13 13 02-Feb-27 18-Feb-27 Install ACT Tile
A8120 Install Flooring 10 10 19-Feb-27 04-Mar-27 Install Flooring
A8130 Install Lockers 7 7 05-Mar-27 15-Mar-27 Install Lockers
A8140 Install Millwork 15 15 05-Mar-27 25-Mar-27 Install Millwork
A8150 Set Plumbing Fixtures 8 8 26-Mar-27 06-Apr-27 Set Plumbing Fixtures
A8160 Install Doors 4 4 07-Apr-27 12-Apr-27 Install Doors
A8170 Install RR Partitions 8 8 07-Apr-27 16-Apr-27 Install RR Partitions
A8180 Trim-out 10 10 13-Apr-27 26-Apr-27 Trim-out
A8190 Final Paint 6 6 27-Apr-27 04-May-27 Final Paint
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 26 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
Level 02 249 249 09-Jun-26 02-Jun-27
A15140 Frame Priority Walls 15 15 09-Jun-26 30-Jun-26 Frame Priority Walls
A7700 Install Fire Sprinkler Main Runs 15 15 25-Jun-26 17-Jul-26 Install Fire Sprinkler Main Runs
A8680 Install Process Piping 10 10 26-Jun-26 13-Jul-26 Install Process Piping
A15150 Top Out & Finish Priority Walls 15 15 30-Jun-26 22-Jul-26 Top Out & Finish Priority Walls
A7710 Install OH Mechanical Main Trunk Lines 20 20 04-Aug-26 31-Aug-26 Install OH Mechanical Main Trunk Lines
A7720 Install OH Electrical Main Runs / Rough 20 20 18-Aug-26 15-Sep-26 Install OH Electrical Main Runs / Rough
A7730 Insulate Duct Mains Runs 8 8 01-Sep-26 11-Sep-26 Insulate Duct Mains Runs
A7740 Install OH Plumbing 8 8 01-Sep-26 11-Sep-26 Install OH Plumbing
A7750 Frame Walls 14 14 16-Sep-26 05-Oct-26 Frame Walls
A7760 In-Wall Rough 18 18 06-Oct-26 29-Oct-26 In-Wall Rough
A7770 In-Wall Inspectio ns 5 5 30-Oct-26 05-Nov-26 In-Wall Inspectio ns
A7780 Hang Walls 15 15 06-Nov-26 01-Dec-26 Hang Walls
A7790 Finish Walls 10 10 02-Dec-26 15-Dec-26 Finish Walls
A7800 Prime And First Coat 5 5 16-Dec-26 22-Dec-26 Prime And First Coat
A7810 Install ACT Grid 15 15 23-Dec-26 14-Jan-27 Install ACT Grid
A7820 Make Sprinkler Drops Into Ceiling 5 5 15-Jan-27 21-Jan-27 Make Sprinkler Drops Into Ceiling
A7830 Install Grilles & Diffusers 10 10 22-Jan-27 04-Feb-27 Install Grilles & Diffusers
A7840 install Lighting 12 12 05-Feb-27 22-Feb-27 install Lighting
A7850 OH Inspections 5 5 23-Feb-27 01-Mar-27 OH Inspections
A7860 Install ACT Tile 13 13 02-Mar-27 18-Mar-27 Install ACT Tile
A7870 Install Flooring 10 10 19-Mar-27 01-Apr-27 Install Flooring
A7880 Install Lockers 7 7 02-Apr-27 12-Apr-27 Install Lockers
A7890 Install Millwork 15 15 02-Apr-27 22-Apr-27 Install Millwork
A7900 Set Plumbing Fixtures 8 8 23-Apr-27 04-May-27 Set Plumbing Fixtures
A7910 Install Doors 4 4 05-May-27 10-May-27 Install Doors
A7920 Install RR Partitions 8 8 05-May-27 14-May-27 Install RR Partitions
A7930 Trim-out 10 10 11-May-27 24-May-27 Trim-out
A7940 Final Paint 6 6 25-May-27 02-Jun-27 Final Paint
Level 01 254 254 30-Jun-26 30-Jun-27
A15160 Frame Priority Walls 15 15 30-Jun-26 22-Jul-26 Frame Priority Wal s
A8690 Install Process Piping 10 10 13-Jul-26 27-Jul-26 Install Process Piping
A7450 Install Fire Sprinkler Main Runs 15 15 17-Jul-26 07-Aug-26 Install Fire Sprinkler Main Runs
A15170 Top Out & Finish Priority Walls 15 15 22-Jul-26 12-Aug-26 Top Out & Finish Priority Walls
A7460 Install OH Mechanical Main Trunk Lines 20 20 01-Sep-26 29-Sep-26 Install OH Mechanical Main Trunk Lines
A7470 Install OH Electrical Main Runs / Rough 20 20 16-Sep-26 13-Oct-26 Install OH Electrical Main Runs / Rough
A7480 Insulate Duct Mains Runs 8 8 30-Sep-26 09-Oct-26 Insulate Duct Mains Runs
A7490 Install OH Plumbing 8 8 30-Sep-26 09-Oct-26 Install OH Plumbing
A7500 Frame Walls 14 14 14-Oct-26 02-Nov-26 Frame Walls
A7510 In-Wall Rough 18 18 03-Nov-26 01-Dec-26 In-Wall Rough
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 27 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A7520 In-Wall Inspectio ns 5 5 02-Dec-26 08-Dec-26 In-Wall Inspections
A7530 Hang Walls 15 15 09-Dec-26 30-Dec-26 Hang Walls
A7540 Finish Walls 10 10 31-Dec-26 14-Jan-27 Finish Walls
A7550 Prime And First Coat 5 5 15-Jan-27 21-Jan-27 Prime And First Coat
A7560 Install ACT Grid 15 15 22-Jan-27 11-Feb-27 Install ACT Grid
A7570 Make Sprinkler Drops Into Ceiling 5 5 12-Feb-27 18-Feb-27 Make Sprinkler Drops Into Ceiling
A7580 Install Grilles & Diffusers 10 10 19-Feb-27 04-Mar-27 Install Grilles & Diffusers
A7590 install Lighting 12 12 05-Mar-27 22-Mar-27 install Lighting
A7600 OH Inspections 5 5 23-Mar-27 29-Mar-27 OH Inspections
A7610 Install ACT Tile 13 13 30-Mar-27 15-Apr-27 Install ACT Tile
A7620 Install Flooring 10 10 16-Apr-27 29-Apr-27 Install Flooring
A7630 Install Lockers 7 7 30-Apr-27 10-May-27 Install Lockers
A7640 Install Millwork 15 15 30-Apr-27 20-May-27 Install Millwork
A7650 Set Plumbing Fixtures 8 8 21-May-27 02-Jun-27 Set Plumbing Fixtures
A7660 Install Doors 4 4 03-Jun-27 08-Jun-27 Install Doors
A7670 Install RR Partitions 8 8 03-Jun-27 14-Jun-27 Install RR Partitions
A7680 Trim-out 10 10 09-Jun-27 22-Jun-27 Trim-out
A7690 Final Paint 6 6 23-Jun-27 30-Jun-27 Final Paint
Media Stair Case & Seating 8 8 03-Nov-26 13-Nov-26
A14410 Frame Stair & Seating Area 8 8 03-Nov-26 13-Nov-26 Frame Stair & Seating Area
Level 00 257 257 22-Jul-26 27-Jul-27
A15180 Frame Priority Walls 15 15 22-Jul-26 12-Aug-26 Frame Priority Walls
A8700 Install Process Piping 10 10 27-Jul-26 10-Aug-26 Install Process Piping
A7200 Install Fire Sprinkler Main Runs 15 15 07-Aug-26 28-Aug-26 Install Fire Sprinkler Main Runs
A15190 Top Out & Finish Priority Walls 15 15 12-Aug-26 02-Sep-26 Top Out & Finish Priority Walls
A7210 Install OH Mechanical Main Trunk Lines 20 20 30-Sep-26 27-Oct-26 Install OH Mechanical Main Trunk Lines
A7220 Install OH Electrical Main Runs / Rough 20 20 14-Oct-26 10-Nov-26 Install OH Electrical Main Runs / Rough
A7230 Insulate Duct Mains Runs 8 8 28-Oct-26 06-Nov-26 Insulate Duct Mains Runs
A7240 Install OH Plumbing 8 8 28-Oct-26 06-Nov-26 Install OH Plumbing
A7250 Frame Walls 14 14 09-Nov-26 01-Dec-26 Frame Walls
A7260 In-Wall Rough 18 18 02-Dec-26 28-Dec-26 In-Wall Rough
A7270 In-Wall Inspectio ns 5 5 29-Dec-26 05-Jan-27 In-Wall Inspections
A7280 Hang Walls 15 15 06-Jan-27 26-Jan-27 Hang Walls
A7290 Finish Walls 10 10 27-Jan-27 09-Feb-27 Finish Walls
A7300 Prime And First Coat 5 5 10-Feb-27 16-Feb-27 Prime And First Coat
A7310 Install ACT Grid 15 15 17-Feb-27 09-Mar-27 Install ACT Grid
A7320 Make Sprinkler Drops Into Ceiling 5 5 10-Mar-27 16-Mar-27 Make Sprinkler Drops Into Ceiling
A7330 Install Grilles & Diffusers 10 10 17-Mar-27 30-Mar-27 Install Grilles & Diffusers
A7340 install Lighting 12 12 31-Mar-27 15-Apr-27 install Lighting
A7350 OH Inspections 5 5 16-Apr-27 22-Apr-27 OH Inspections
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 28 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A7360 Install ACT Tile 13 13 23-Apr-27 11-May-27 Install ACT Tile
A7370 Install Flooring 10 10 12-May-27 25-May-27 Install Flooring
A7380 Install Lockers 7 7 26-May-27 04-Jun-27 Install Lockers
A7390 Install Millwork 15 15 26-May-27 16-Jun-27 Install Millwork
A7400 Set Plumbing Fixtures 8 8 17-Jun-27 28-Jun-27 Set Plumbing Fixtures
A7410 Install Doors 4 4 29-Jun-27 02-Jul-27 Install Doors
A7420 Install RR Partitions 8 8 29-Jun-27 09-Jul-27 Install RR Partitions
A7430 Trim-out 10 10 06-Jul-27 19-Jul-27 Trim-out
A7440 Final Paint 6 6 20-Jul-27 27-Jul-27 Final Paint
Choir, Band & Orchestra Rooms 0 0
Dance 0 0
Visual Arts 0 0
Life Skills & Early Childhood Lab 0 0
Administration / Gym & Theater Areas 463 463 28-May-27 29-Mar-29
Exterior Work 394 394 28-May-27 20-Dec-28
Civil 394 394 28-May-27 20-Dec-28
Trailer Relocation 26 26 28-May-27 07-Jul-27
A4390 Connect Water Lines For Trailers 5 5 28-May-27 07-Jun-27 Connect Water Lines For Trailers
A4380 Set Temp Power Poles & D istrobution Panels 6 6 07-Jun-27 15-Jun-27 Set Temp Power Poles & Distrobution Panels
A4370 Re-set Up Trailers 5 5 15-Jun-27 22-Jun-27 Re-set Up Trailers
A4440 Set Up Site Fencing & BMPs 10 10 22-Jun-27 07-Jul-27 Set Up Site Fencing & BMPs
Demo 75 75 07-Jul-27 21-Oct-27
A4320 Cup & Cap All Exsisting Utilities 8 8 07-Jul-27 19-Jul-27 Cup & Cap All Exsisting Utilities
A4330 Abatement Sequoyah MS 20 20 07-Jul-27 04-Aug-27 Abatement Sequoyah MS
A14460 Abatement Cary Reynolds MS 20 20 04-Aug-27 01-Sep-27 Abatement Cary Reynolds MS
A4340 Demolish Sequoyah Middle School ( 7th & 8th Grades ) 30 30 04-Aug-27 16-Sep-27 Demolish Sequoyah Middle School ( 7th & 8th Grades )
A4350 Demolish Cary Reynolds Middle School ( 5th & 6th Grades ) 25 25 16-Sep-27 21-Oct-27 Demolish Cary Reynolds Middle School ( 5th & 6th Grades )
Building ( Level -01 ) 39 39 16-Sep-27 10-Nov-27
A5480 Cut Pad To Grade 5 5 16-Sep-27 23-Sep-27 Cut Pad To Grade
A14910 Back Fill Gym Area Along Foundation Wall 5 5 27-Oct-27 03-Nov-27 Back Fill Gym Area Along Foundation Wall
A6360 Back Fill Foundation Wal s 5 5 03-Nov-27 10-Nov-27 Back Fill Foundation Wal s
Main Parking & Drive 313 313 23-Sep-27 20-Dec-28
A5520 Cut Parking & Drive To Grade 8 8 23-Sep-27 05-Oct-27 Cut Parking & Drive To Grade
A5530 Install UG Storm 15 15 05-Oct-27 26-Oct-27 Install UG Storm
A5540 Install Temp GAB 8 8 26-Oct-27 05-Nov-27 Install Temp GAB
A5490 Install Water Lines 10 10 26-Oct-27 09-Nov-27 Install Water Lines
A13770 Install UG Power ( Site Lighting & Field Support ) 10 10 09-Nov-27 24-Nov-27 Install UG Power ( Site Lighting & Field Support )
A13790 Install Pole Base ( Parking Lot & Drive Lighting ) 8 8 24-Nov-27 08-Dec-27 Install Pole Base ( Parking Lot & Drive Lighting )
A13780 Set Light Pole ( Georgia Power ) 5 5 13-Mar-28 20-Mar-28 Set Light Pole ( Georgia Power )
A13750 Install Irrigation 10 10 25-Apr-28 09-May-28 Install Irrigation
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 29 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A13740 Plant Trees 5 5 09-May-28 16-May-28 Plant Trees
A13690 Install Curb And Gutter 10 10 14-Jun-28 28-Jun-28 Install Curb And Gutter
A13700 Grade For Paving 8 8 28-Jun-28 11-Jul-28 Grade For Paving
A13710 Install Binder ( Parking, Drive ) 8 8 11-Jul-28 21-Jul-28 Install Binder ( Parking, Drive )
A13760 Install Landscaping 5 5 13-Sep-28 20-Sep-28 Install Landscaping
A13720 Install Wearing Surface ( Parking, Drive, Field Apron& Drive Areas ) 5 5 06-Dec-28 13-Dec-28 Install Wearing Surface ( Parking, Drive, Field Apron
A13730 Stripe & Pant ( Parking, Drive, Field aprkin& Drive Areas ) 5 5 13-Dec-28 20-Dec-28 Stripe & Pant ( Parking, Drive, Field aprkin& Drive A
Football Field & Track 266 266 05-Oct-27 23-Oct-28
A5570 Cut Area To Grade 10 10 05-Oct-27 19-Oct-27 Cut Area To Grade
A5770 Install UG Storm 5 5 26-Oct-27 02-Nov-27 Install UG Storm
A5630 Install UG Power 10 10 24-Nov-27 10-Dec-27 Install UG Power
A13810 Install Pole Base ( Field Lighting ) 10 10 08-Dec-27 22-Dec-27 Install Pole Base ( Field Lighting )
A13870 Install Field Fencing 10 10 14-Feb-28 28-Feb-28 Install Field Fencing
A14090 Install Field Lighting ( Georgia Power ) 10 10 28-Feb-28 13-Mar-28 Install Field Lighting ( Georgia Power )
A5590 Install Track Surface 15 15 13-Mar-28 03-Apr-28 Install Track Surface
A5580 Install Irrigation 5 5 09-May-28 16-May-28 Install Irrigation
A13900 Install Trees 5 5 16-May-28 23-May-28 Install Trees
A5610 Install Field Grass 10 10 14-Jun-28 28-Jun-28 Install Field Grass
A13680 Install Bleachers 15 15 02-Oct-28 23-Oct-28 Install Bleachers
Tennis Courts & Field House 99 99 19-Oct-27 13-Mar-28
A5760 Cut to Grade 5 5 19-Oct-27 26-Oct-27 Cut to Grade
A6290 Install UG Storm 8 8 02-Nov-27 15-Nov-27 Install UG Storm
A5550 Install Water Lines 3 3 01-Dec-27 06-Dec-27 Install Water Lines
A5640 UG Power 6 6 10-Dec-27 20-Dec-27 UG Power
A13820 Install Pole Base ( Field Lighting ) 5 5 22-Dec-27 30-Dec-27 Install Pole Base ( Field Lighting )
A5680 Install Court Fencing 5 5 07-Feb-28 14-Feb-28 Install Court Fencing
A14080 Install Court Lighting ( Georgia Power ) 5 5 21-Feb-28 28-Feb-28 Install Court Lighting ( Georgia Power )
A5660 Install Court Surface 10 10 28-Feb-28 13-Mar-28 Install Court Surface
Baseball & Parking 223 223 26-Oct-27 13-Sep-28
A5750 Cut to Grade 8 8 26-Oct-27 05-Nov-27 Cut to Grade
A6300 Install UG Storm 13 13 15-Nov-27 06-Dec-27 Install UG Storm
A5560 Grade For Parking Area Paving 6 6 06-Dec-27 14-Dec-27 Grade For Parking Area Paving
A5730 Install UG Water Lin es 10 10 06-Dec-27 20-Dec-27 Install UG Water Lin es
A13840 Temp Stone Road & Parking Area 4 4 14-Dec-27 20-Dec-27 Temp Stone Road & Parking Area
A5650 UG Power 10 10 20-Dec-27 05-Jan-28 UG Power
A13830 Install Pole Base ( Field Lighting ) 5 5 30-Dec-27 07-Jan-28 Install Pole Base ( Field Lighting )
A5700 Install Dugout Structures 15 15 05-Jan-28 26-Jan-28 Install Dugout Structures
A13880 Install Field Fencing 8 8 26-Jan-28 07-Feb-28 Install Field Fencing
A5710 Install Site lighting ( Georgia Power ) 10 10 07-Feb-28 21-Feb-28 Install Site lighting ( Georgia Power )
A5690 Install Irrigation 5 5 16-May-28 23-May-28 Install Irrigation
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 30 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A13890 Install Trees 5 5 23-May-28 31-May-28 Install Trees
A14060 Install Field Turf 15 15 23-May-28 14-Jun-28 Install Field Turf
A5740 Install Curb & Gutter ( Baseball Parking Lot ) 5 5 28-Jun-28 06-Jul-28 Install Curb & Gutter ( Baseball Parking Lot )
A13850 Grade For Paving 8 8 11-Jul-28 21-Jul-28 Grade For Paving
A13860 Install Binder ( Field Parking& Drive Areas ) 4 4 21-Jul-28 27-Jul-28 Install Binder ( Field Parking& Drive Areas )
A14070 Install Drive Lighting ( Georgia Power ) 5 5 27-Jul-28 03-Aug-28 Install Drive Lighting ( Georgia Power )
A5720 Install Bleachers 8 8 28-Jul-28 09-Aug-28 Install Bleachers
A13670 Install Landscaping Around Field 10 10 29-Aug-28 13-Sep-28 Install Landscaping Around Field
Court Yard Areas 43 43 31-Jul-28 29-Sep-28
Middle School 38 38 31-Jul-28 22-Sep-28
A5780 Rough Grade 3 3 31-Jul-28 03-Aug-28 Rough Grade
A13590 Install Trees 2 2 08-Aug-28 10-Aug-28 Install Trees
A5790 Install Hardscapes 10 10 10-Aug-28 24-Aug-28 Install Hardscapes
A13580 Install Irrigation 3 3 08-Sep-28 13-Sep-28 Install Irrigation
A5800 Install Landscaping 5 5 13-Sep-28 20-Sep-28 Install Landscaping
A13650 Install Patio Furniture 2 2 20-Sep-28 22-Sep-28 Install Patio Furniture
High School 40 40 03-Aug-28 29-Sep-28
A13620 Rough Grade 3 3 03-Aug-28 08-Aug-28 Rough Grade
A13610 Install Trees 2 2 08-Aug-28 10-Aug-28 Install Trees
A13630 Install Hardscapes 10 10 24-Aug-28 08-Sep-28 Install Hardscapes
A13600 Install Irrigation 3 3 13-Sep-28 18-Sep-28 Install Irrigation
A13640 Install Landscaping 5 5 20-Sep-28 27-Sep-28 Install Landscaping
A13660 Install Patio Furniture 2 2 27-Sep-28 29-Sep-28 Install Patio Furniture
Hard Scapes 105 105 06-Jul-28 06-Dec-28
A13910 Grade For Side Walk Areas ( Baseball Field ) 4 4 06-Jul-28 12-Jul-28 Grade For Side Walk Areas ( Baseball Field )
A13920 Form & Prep Side Walk Areas ( Baseball Field ) 8 8 12-Jul-28 24-Jul-28 Form & Prep Side Walk Areas ( Baseball Field )
A13930 Place Side Walk Areas ( Baseball Field ) 4 4 24-Jul-28 28-Jul-28 Place Side Walk Areas ( Baseball Field )
A13940 Grade For Side Walk Areas ( Baseball Field Parking ) 6 6 28-Jul-28 07-Aug-28 Grade For Side Walk Areas ( Baseball Field Parking )
A13950 Form & Prep Side Walk Areas ( Baseball Field Parking ) 10 10 07-Aug-28 21-Aug-28 Form & Prep Side Walk Areas ( Baseball Field Parking )
A13960 Place Side Walk Areas ( Baseball Field Parking ) 6 6 21-Aug-28 29-Aug-28 Place Side Walk Areas ( Baseball Field Parking )
A13970 Grade For Side Walk Areas ( Tennis & Football Field ) 5 5 29-Aug-28 06-Sep-28 Grade For Side Walk Areas ( Tennis & Football Field )
A13980 Form & Prep Side Walk Areas ( Tennis & Footbal Field) 10 10 06-Sep-28 20-Sep-28 Form & Prep Side Walk Areas ( Tennis & Football Field)
A13990 Place Side Walk Areas ( Tennis & Football Field ) 8 8 20-Sep-28 02-Oct-28 Place Side Walk Areas ( Tennis & Football Field )
A14000 Grade For Side Walk Areas ( School Main Entry & Drive ) 6 6 02-Oct-28 10-Oct-28 Grade For Side Walk Areas ( School Main Entry & Drive
A14010 From & Prep Side Walk Areas ( School Main Entry & Drive ) 10 10 10-Oct-28 24-Oct-28 From & Prep Side Walk Areas ( School Main Entry & Dr
A14020 Place Side Walk Areas ( School Main Entry & Drive ) 6 6 24-Oct-28 01-Nov-28 Place Side Walk Areas ( School Main Entry & Drive )
A14030 Grade For Side Walk Areas ( Main Parking Area ) 6 6 01-Nov-28 09-Nov-28 Grade For Side Walk Areas ( Main Parking Area )
A14040 Form & Prep Side Walk Areas ( Main Parking Area ) 10 10 09-Nov-28 28-Nov-28 Form & Prep Side Walk Areas ( Main Parking Area )
A14050 Place Side Walk Areas ( Main Parking Area ) 6 6 28-Nov-28 06-Dec-28 Place Side Walk Areas ( Main Parking Area )
Foundations 96 96 30-Sep-27 18-Feb-28
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 31 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
Dining 28 28 30-Sep-27 09-Nov-27
A4510 Install Remaining Foundation Wal Footings 8 8 30-Sep-27 12-Oct-27 Install Remaining Foundation Wal Footings
A4520 Install Spread Footings 4 4 12-Oct-27 18-Oct-27 Install Spread Footings
A4500 Install Remaining Foundation Wal 7 7 12-Oct-27 21-Oct-27 Install Remaining Foundation Wall
A4640 Install Strip Footings 3 3 18-Oct-27 21-Oct-27 Install Strip Footings
A14900 Install Water Proofin g Along Foundation Wall 4 4 21-Oct-27 27-Oct-27 Install Water Proofin g Along Foundation Wall
A4680 Install UG Utilities SOG A2 4 4 21-Oct-27 27-Oct-27 Install UG Utilities SOG A2
A4650 Lay CMU To FF 3 3 27-Oct-27 01-Nov-27 Lay CMU To FF
A4690 Prep SOG A2 4 4 01-Nov-27 05-Nov-27 Prep SOG A2
A4700 Place SOG A2 2 2 05-Nov-27 09-Nov-27 Place SOG A2
Gym & Track 67 67 30-Sep-27 10-Jan-28
A14890 Install Deep Spread Footing & Columns 8 8 30-Sep-27 12-Oct-27 Install Deep Spread Footing & Columns
A6400 Install Spread Footings 5 5 03-Nov-27 10-Nov-27 Install Spread Footings
A6410 Install Strip Footings 18 18 10-Nov-27 09-Dec-27 Install Strip Footings
A6390 Lay CMU To FF 5 5 09-Dec-27 16-Dec-27 Lay CMU To FF
A4770 Install UG Utilities SOG A1 8 8 09-Dec-27 21-Dec-27 Install UG Utilities SOG A1
A4780 Prep SOG A1 10 10 21-Dec-27 06-Jan-28 Prep SOG A1
A4790 Place SOG A1 2 2 06-Jan-28 10-Jan-28 Place SOG A1
Administration Offices & Theater BOH 78 78 12-Oct-27 04-Feb-28
A4480 Install Remaining Foundation Wal Footings 8 8 12-Oct-27 22-Oct-27 Install Remaining Foundation Wall Footings
A4450 Install Remaining Foundation Wal 4 4 22-Oct-27 28-Oct-27 Install Remaining Foundation Wal
A6350 Water Proof Foundation Walls 4 4 28-Oct-27 03-Nov-27 Water Proof Foundation Walls
A4470 Install Strip Footings 13 13 09-Dec-27 29-Dec-27 Install Strip Footings
A4460 Install Spread Footings 6 6 29-Dec-27 07-Jan-28 Install Spread Footings
A4710 Install UG Utilities SOG A3 8 8 29-Dec-27 11-Jan-28 Install UG Utilities SOG A3
A4660 Lay CMU To FF 5 5 07-Jan-28 14-Jan-28 Lay CMU To FF
A4720 Prep SOG A3 8 8 11-Jan-28 21-Jan-28 Prep SOG A3
A4830 Install UG Utilities SOG A4 8 8 11-Jan-28 21-Jan-28 Install UG Utilities SOG A4
A4730 Place SOG A3 2 2 21-Jan-28 25-Jan-28 Place SOG A3
A4840 Prep SOG A4 8 8 21-Jan-28 02-Feb-28 Prep SOG A4
A4850 Place SOG A4 2 2 02-Feb-28 04-Feb-28 Place SOG A4
Drama Class Room & Auditorium Area 30 30 07-Jan-28 18-Feb-28
A4540 Install Strip Footings & Spread Footing 20 20 07-Jan-28 04-Feb-28 Install Strip Footings & Spread Footing
A4670 Lay CMU To FF 5 5 21-Jan-28 28-Jan-28 Lay CMU To FF
A4740 Install UG Utilities SOG A6 5 5 04-Feb-28 11-Feb-28 Install UG Utilities SOG A6
A4750 Prep SOG A6 3 3 11-Feb-28 16-Feb-28 Prep SOG A6
A4760 Place SOG A6 2 2 16-Feb-28 18-Feb-28 Place SOG A6
Structure 82 82 10-Jan-28 03-May-28
Dining & Gym Areas 82 82 10-Jan-28 03-May-28
A4940 Lay CMU Dinning & AUX Gym Wallls 7 7 10-Jan-28 19-Jan-28 Lay CMU Dinning & AUX Gym Wallls
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 32 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A4950 Lay CMU Gym Walls 30 30 19-Jan-28 01-Mar-28 Lay CMU Gym Walls
A4960 Install Steel Structure ( Level 01 at HS Dining ) 4 4 01-Mar-28 07-Mar-28 Install Steel Structure ( Level 01 at HS Dining )
A4980 Install Bar Joist ( Level Aux. Gym Roof ) 2 2 07-Mar-28 09-Mar-28 Install Bar Joist ( Level Aux. Gym Roof )
A4990 Install Decking ( Level Aux. Gym Roof ) 2 2 09-Mar-28 13-Mar-28 Install Decking ( Level Aux. Gym Roof )
A5110 Install Steel Structure ( Level 02 Elevated Track ) 6 6 09-Mar-28 17-Mar-28 Install Steel Structure ( Level 02 Elevated Track )
A4970 Install Decking ( Level 01 at HS Dining ) 2 2 13-Mar-28 15-Mar-28 Install Decking ( Level 01 at HS Dining )
A5100 Set Roof Top Curbs & Penetrations ( Aux Gym ) 3 3 15-Mar-28 20-Mar-28 Set Roof Top Curbs & Penetrations ( Aux Gym )
A4800 Install UG Utilities Composite Deck A2 5 5 15-Mar-28 22-Mar-28 Install UG Utilities Composite Deck A2
A5130 Install Bar Joist ( Level Gym & Track Roof ) 3 3 17-Mar-28 22-Mar-28 Install Bar Joist ( Level Gym & Track Roof )
A5120 Install Decking ( Level 02 Elevated Track ) 3 3 22-Mar-28 27-Mar-28 Install Decking ( Level 02 Elevated Track )
A4810 Prep Composite Deck A2 4 4 22-Mar-28 28-Mar-28 Prep Composite Deck A2
A5140 Install Decking ( Level Gym & Track Roof) 7 7 27-Mar-28 05-Apr-28 Install Decking ( Level Gym & Track Roof)
A4820 Place Composite Deck A2 2 2 28-Mar-28 30-Mar-28 Place Composite Deck A2
A12040 Apply Fire Proofing ( Level 00) 4 4 30-Mar-28 05-Apr-28 Apply Fire Proofing ( Level 00)
A6900 Set Roof Top Curbs & Penetrations ( Gym & Track ) 3 3 05-Apr-28 10-Apr-28 Set Roof Top Curbs & Penetrations ( Gym & Track )
A13060 Install Railing At Track Level -02 10 10 05-Apr-28 19-Apr-28 Install Railing At Track Level -02
A13070 Install In-slab Utilities ( Track Area Level -02 ) 4 4 19-Apr-28 25-Apr-28 Install In-slab Utilities ( Track Area Level -02 )
A13080 Prep Composite Slab ( Track Area Level -02 ) 4 4 25-Apr-28 01-May-28 Prep Composite Slab ( Track Area Level -02 )
A13090 Place Composite Slab ( Track Area Level -02 ) 2 2 01-May-28 03-May-28 Place Composite Slab ( Track Area Level -02 )
Administration Offices & Theater BOH 25 25 22-Mar-28 26-Apr-28
A5020 Install Steel Structure 10 10 22-Mar-28 05-Apr-28 Install Steel Structure
A5030 Install Decking ( Level Roof ) 8 8 05-Apr-28 17-Apr-28 Install Decking ( Level Roof )
A6420 Install Decking ( Level 01 Slab A5 ) 3 3 07-Apr-28 12-Apr-28 Install Decking ( Level 01 Slab A5 )
A4860 Install UG Utilities Composite Deck A5 4 4 12-Apr-28 18-Apr-28 Install UG Utilities Composite Deck A5
A7100 Install Roof Curbs & Penetrations 5 5 17-Apr-28 24-Apr-28 Install Roof Curbs & Penetrations
A12050 Apply Fire Proofing 7 7 17-Apr-28 26-Apr-28 Apply Fire Proofing
A4870 Prep Composite Deck A5 4 4 18-Apr-28 24-Apr-28 Prep Composite Deck A5
A4880 Place Composite Deck A5 2 2 24-Apr-28 26-Apr-28 Place Composite Deck A5
Drama Class Room & Auditorium Area 38 38 01-Mar-28 24-Apr-28
A5040 Lay CMU Auditorium & Sceen Shop Areas 14 14 01-Mar-28 21-Mar-28 Lay CMU Auditorium & Sceen Shop Areas
A13100 Set Spiral Stair Case 5 5 21-Mar-28 28-Mar-28 Set Spiral Stair Case
A5050 Lay CMU Drama Class Room & BOH 6 6 21-Mar-28 29-Mar-28 Lay CMU Drama Class Room & BOH
A5170 Install Bar Joist ( Drams Class Room & Event Lobby Roof ) 2 2 05-Apr-28 07-Apr-28 Install Bar Joist ( Drams Class Room & Event Lobby Roof )
A5150 Install Bar Joist ( Auditorium & Sceen Shop Roof ) 3 3 07-Apr-28 12-Apr-28 Install Bar Joist ( Auditorium & Sceen Shop Roof )
A5180 Install Decking ( Drams Class Room & Event Lobby Roof) 2 2 17-Apr-28 19-Apr-28 Install Decking ( Drams Class Room & Event Lobby Roof)
A5160 Install Decking ( Auditorium & Sceen Shop Roof) 3 3 19-Apr-28 24-Apr-28 Install Decking ( Auditorium & Sceen Shop Roof)
Exterior Envelope 101 101 27-Mar-28 17-Aug-28
Dining & Gym Areas 83 83 27-Mar-28 24-Jul-28
A6820 Install Roof Drain Riser Lower Roof 3 3 27-Mar-28 30-Mar-28 Install Roof Drain Riser Lower Roof
A6840 Install Roof Drain Laterals & Fixtures ( Lower Roof ) 5 5 30-Mar-28 06-Apr-28 Install Roof Drain Laterals & Fixtures ( Lower Roof )
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 33 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A6810 Install Roof Drain Riser High Roof 4 4 31-Mar-28 06-Apr-28 Install Roof Drain Riser High Roof
A6770 Apply Air Barrier System 15 15 05-Apr-28 26-Apr-28 Apply Air Barrier System
A6830 Install Roof Drain Laterals & Fixtures ( High Roof ) 7 7 06-Apr-28 17-Apr-28 Install Roof Drain Laterals & Fixtures ( High Roof )
A6850 Install Glazing Frames ( HS Dining ) 5 5 26-Apr-28 03-May-28 Install Glazing Frames ( HS Dining )
A6860 Install Glazing Frames ( HS Aux. Gym ) 4 4 03-May-28 09-May-28 Install Glazing Frames ( HS Aux. Gym )
A6780 Install Brick Veneer ( HS Dining ) 8 8 03-May-28 15-May-28 Install Brick Veneer ( HS Dining )
A6870 Install Glazing ( HS Dining ) 4 4 15-May-28 19-May-28 Install Glazing ( HS Dining )
A6890 Measure For Metal Panels 6 6 17-May-28 25-May-28 Measure For Metal Panels
A6880 Install Glazing ( HS Aux. Gym ) 3 3 19-May-28 24-May-28 Install Glazing ( HS Aux. Gym )
A6760 Install Glazing Frames ( Gym & Track ) 10 10 24-May-28 08-Jun-28 Install Glazing Frames ( Gym & Track )
A6790 Install Metal Panels 30 30 25-May-28 10-Jul-28 Install Metal Panels
A6800 Install Glazing ( Gym & Track ) 8 8 08-Jun-28 20-Jun-28 Install Glazing ( Gym & Track )
A7180 Install Coping Caps 10 10 10-Jul-28 24-Jul-28 Install Coping Caps
Administration Offices & Theater BOH 83 83 17-Apr-28 14-Aug-28
A7110 Install Roof Drain Risers & Fixtures 10 10 17-Apr-28 01-May-28 Install Roof Drain Risers & Fixtures
A6910 Install Exterior Framing 7 7 26-Apr-28 05-May-28 Install Exterior Framing
A6920 Hang Exterior Sheathing 5 5 05-May-28 12-May-28 Hang Exterior Sheathing
A7050 MS Exterior Ceiling MEP OH Rough For Slab ( Level 00) 5 5 05-May-28 12-May-28 MS Exterior Ceiling MEP OH Rough For Slab ( Level 00)
A6950 Apply Air Barrier 6 6 12-May-28 22-May-28 Apply Air Barrier
A7060 MS Exterior Ceiling Framing ( Level 00) 6 6 12-May-28 22-May-28 MS Exterior Ceiling Framing ( Level 00)
A7070 MS Exterior Ceiling MEP OH Rough In Framing ( Level 00) 4 4 22-May-28 26-May-28 MS Exterior Ceiling MEP OH Rough In Framing ( Level 00)
A6990 Measure For Metal Panels 5 5 22-May-28 30-May-28 Measure For Metal Panels
A6960 Install Glazing Frames 15 15 24-May-28 15-Jun-28 Install Glazing Frames
A7080 MS Exterior Ceiling OH Inspection ( Level 00) 3 3 26-May-28 01-Jun-28 MS Exterior Ceiling OH Inspection ( Level 00)
A7090 MS Exterior Ceiling Hang Sheathing ( Level 00) 5 5 01-Jun-28 08-Jun-28 MS Exterior Ceiling Hang Sheathing ( Level 00)
A6940 Install Masonry 8 8 15-Jun-28 27-Jun-28 Install Masonry
A6970 Install Glazing 13 13 20-Jun-28 10-Jul-28 Install Glazing
A6980 Install Metal Panels 15 15 10-Jul-28 31-Jul-28 Install Metal Panels
A7190 Install Coping Caps 10 10 31-Jul-28 14-Aug-28 Install Coping Caps
Drama Class Room & Auditorium Area 76 76 01-May-28 17-Aug-28
A7160 Install Roof Drains 5 5 01-May-28 08-May-28 Install Roof Drains
A7140 Apply Air Barrier 8 8 22-May-28 02-Jun-28 Apply Air Barrier
A7130 Install Masonry 15 15 27-Jun-28 19-Jul-28 Install Masonry
A7150 Install Coping Cap 3 3 14-Aug-28 17-Aug-28 Install Coping Cap
Roofing 55 55 06-Apr-28 23-Jun-28
A6750 Install Roofing Aux gym. & High School Dining Area 5 5 06-Apr-28 13-Apr-28 Install Roofing Aux gym. & High School Dining Area
A6740 Install Roofing Gym & Track High Roof 13 13 13-Apr-28 02-May-28 Install Roofing Gym & Track High Roof
A14170 Set Roof Top Equipment ( Gym Areas ) 6 6 02-May-28 10-May-28 Set Roof Top Equipment ( Gym Areas )
A6930 Install Roofing ( Administration & Theater BOH ) 17 17 12-May-28 07-Jun-28 Install Roofing ( Administration & Theater BOH )
A7120 Install Roofing ( Drama Class Room & Auditorium ) 5 5 07-Jun-28 14-Jun-28 Install Roofing ( Drama Class Room & Auditorium )
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 34 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A14180 Set Roof Top Equipment ( Administration & Theater ) 7 7 14-Jun-28 23-Jun-28 Set Roof Top Equipment ( Administration & Theater )
Interior Work 418 418 03-Aug-27 29-Mar-29
High School Weight & Locker Room Areas ( Level 01 ) 40 40 03-Aug-27 28-Sep-27
A4310 Set-up Temporary Administration Space 40 40 03-Aug-27 28-Sep-27 Set-up Temporary Administration Space
Dining & Gym Areas 229 229 13-Apr-28 12-Mar-29
High School Dining Area 110 110 13-Apr-28 19-Sep-28
A8730 Install Fire Sprinkler Main Runs 4 4 13-Apr-28 19-Apr-28 Install Fire Sprinkler Main Runs
A8740 Install Process Piping & Units 5 5 19-Apr-28 26-Apr-28 Install Process Piping & Units
A8720 Install OH Mechanical 10 10 19-Apr-28 03-May-28 Install OH Mechanical
A9010 OH Electrical Rough 5 5 03-May-28 10-May-28 OH Electrical Rough
A8750 Frame Walls 5 5 10-May-28 17-May-28 Frame Walls
A8970 Cut in Doors ( Weekend Or Off Hours Work ) 2 2 17-May-28 19-May-28 Cut in Doors ( Weekend Or Off Hours Work )
A8760 Electrical In-wall Rough 6 6 17-May-28 25-May-28 Electrical In-wall Rough
A8770 Plumbing In-wall Rough 6 6 17-May-28 25-May-28 Plumbing In-wall Rough
A8800 Frame Hard Ceilings 8 8 17-May-28 30-May-28 Frame Hard Ceilings
A8780 In-wall Inspections 3 3 25-May-28 31-May-28 In-wall Inspections
A8840 Install Sprinkler Flex Heads (Hard Ceiling Areas) 3 3 30-May-28 02-Jun-28 Install Sprinkler Flex Heads (Hard Ceiling Areas)
A8830 OH Rough-in MEP (Hard Ceilings) 4 4 30-May-28 05-Jun-28 OH Rough-in MEP (Hard Ceilings)
A8790 Hang Walls 3 3 31-May-28 05-Jun-28 Hang Walls
A8850 OH Inspections (Hard Ceiling Areas ) 4 4 05-Jun-28 09-Jun-28 OH Inspections (Hard Ceiling Areas )
A8860 Hang Hard Ceilings 5 5 09-Jun-28 16-Jun-28 Hang Hard Ceilings
A8810 Finish Walls & Hard Ceil ing Areas 5 5 16-Jun-28 23-Jun-28 Finish Walls & Hard Ceil ing Areas
A8820 Prime & First Coat Walls, H ard Ceili ngs 5 5 23-Jun-28 30-Jun-28 Prime & First Coat Walls, Hard Ceilings
A8870 Install ACT Ceiling Grid 7 7 30-Jun-28 12-Jul-28 Install ACT Ceiling Grid
A8890 Install Grilles & Diffusers 4 4 12-Jul-28 18-Jul-28 Install Grilles & Diffusers
A8880 Install Lights In ACT Grid 5 5 18-Jul-28 25-Jul-28 Install Lights In ACT Grid
A9020 Install Sprinkler Flex Heads In ACT Ceiling 3 3 25-Jul-28 28-Jul-28 Install Sprinkler Flex Heads In ACT Ceiling
A8900 OH Inspection ACT Areas 4 4 28-Jul-28 03-Aug-28 OH Inspection ACT Areas
A8910 Install ACT Tile 5 5 03-Aug-28 10-Aug-28 Install ACT Tile
A8990 Install Flooring & Wall Base 7 7 10-Aug-28 21-Aug-28 Install Flooring & Wal Base
A8920 Install Millwork ( RR & Serving Line ) 6 6 21-Aug-28 29-Aug-28 Install Millwork ( RR & Serving Line )
A9000 Install Kitchen Equipment In Serving Line 4 4 29-Aug-28 05-Sep-28 Install Kitchen Equipment In Serving Line
A8930 Install Plumbing Fixtures 6 6 29-Aug-28 07-Sep-28 Install Plumbing Fixtures
A8940 Install RR Accessories 3 3 07-Sep-28 12-Sep-28 Install RR Accessories
A8980 Install Doors 3 3 07-Sep-28 12-Sep-28 Install Doors
A8950 Trim out 5 5 07-Sep-28 14-Sep-28 Trim out
A8960 Final Paint 3 3 14-Sep-28 19-Sep-28 Final Paint
High School Gym and Track & Aux. Gym 225 225 19-Apr-28 12-Mar-29
Auxillary Gym 136 136 19-Apr-28 31-Oct-28
A9030 Install Fire Sprinkler 5 5 19-Apr-28* 26-Apr-28 Install Fire Sprinkler
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 35 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A9040 Install OH Mechanical 7 7 26-Apr-28 05-May-28 Install OH Mechanical
A9050 Install OH Electrical Rough-in 6 6 05-May-28 15-May-28 Install OH Electrical Rough-in
A9080 Install Lighting 5 5 15-May-28 22-May-28 Install Lighting
A9090 Pull Wire 4 4 22-May-28 26-May-28 Pull Wire
A9060 Prime First Coat Walls 5 5 22-May-28 30-May-28 Prime First Coat Walls
A9070 Fog Out Ceiling 7 7 26-May-28 07-Jun-28 Fog Out Ceiling
A9110 Install Tectum Panels 8 8 07-Jun-28 19-Jun-28 Install Tectum Panels
A9100 Device Out 8 8 19-Jun-28 29-Jun-28 Device Out
A9130 Install Basketball Goals 4 4 29-Jun-28 06-Jul-28 Install Basketball Goals
A9330 Install Score Board & Systems 7 7 06-Jul-28 17-Jul-28 Install Score Board & Systems
A9140 Install Flooring 8 8 15-Sep-28 27-Sep-28 Install Flooring
A9120 Install OH Door 2 2 27-Sep-28 29-Sep-28 Install OH Door
A9150 Install Telescoping Ble achers 5 5 16-Oct-28 23-Oct-28 Install Telescoping Bleachers
A9340 Final Paint 6 6 23-Oct-28 31-Oct-28 Final Paint
Gym & Track 135 135 03-May-28 14-Nov-28
A9200 Install Fire Sprinkler 12 12 03-May-28 19-May-28 Install Fire Sprinkler
A9210 Install OH Mechanical 18 18 05-May-28 01-Jun-28 Install OH Mechanical
A9220 Install OH Electrical Rough-in 18 18 18-May-28 14-Jun-28 Install OH Electrical Rough-in
A9260 Install Sprinkler Runs ( RR & Under Track Hard Ceilings ) 3 3 19-May-28 24-May-28 Install Sprinkler Runs ( RR & Under Track Hard Ceilings )
A9240 OH Mechanical Rough-in ( RR & Under Track Hard Ceilings ) 3 3 01-Jun-28 06-Jun-28 OH Mechanical Rough-in ( RR & Under Track Hard Ceilings )
A9250 OH Electrical Rough-in ( RR & Under Track Hard Ceilings) 4 4 14-Jun-28 20-Jun-28 OH Electrical Rough-in ( RR & Under Track Hard Ceilings)
A9370 Install Lighting 8 8 14-Jun-28 26-Jun-28 Install Lighting
A9300 Frame Walls ( RR & Storage Areas) 4 4 20-Jun-28 26-Jun-28 Frame Walls ( RR & Storage Areas)
A9230 Frame Hard Ceilings ( RR & Under Track Hard Ceilings ) 12 12 20-Jun-28 07-Jul-28 Frame Hard Ceilings ( RR & Under Track Hard Ceilings )
A9350 Pull Wire 10 10 26-Jun-28 11-Jul-28 Pull Wire
A9310 In-wall Electrical Rough 4 4 07-Jul-28 13-Jul-28 In-wall Electrical Rough
A9490 Fog Out Ceiling 12 12 11-Jul-28 27-Jul-28 Fog Out Ceiling
A9480 In-wall & OH Inspcetion ( RR, Ctorage & Hard Ceiling ) 4 4 13-Jul-28 19-Jul-28 In-wall & OH Inspcetion ( RR, Ctorage & Hard Ceiling )
A9520 Hang Walls & Hard Ceilings 6 6 19-Jul-28 27-Jul-28 Hang Walls & Hard Ceilings
A9510 Finish Walls & Ceil in gs 8 8 27-Jul-28 08-Aug-28 Finish Walls & Ceil in gs
A9280 Prime And First Coat Gym Walls 8 8 27-Jul-28 08-Aug-28 Prime And First Coat Gym Walls
A9390 Install Tectum Paneling 10 10 27-Jul-28 10-Aug-28 Install Tectum Paneling
A9500 Prime & First Coat ( RR, Storage & Hard Ceiling Areas ) 4 4 08-Aug-28 14-Aug-28 Prime & First Coat ( RR, Storage & Hard Ceiling Areas )
A9380 Install Score Board & Systems 15 15 10-Aug-28 31-Aug-28 Install Score Board & Systems
A9290 Install ACT Grid 2 2 14-Aug-28 16-Aug-28 Install ACT Grid
A9410 Install MEP In ACT ( Concessions ) 2 2 16-Aug-28 18-Aug-28 Install MEP In ACT ( Concessions )
A9420 Set Sprinkler Heads ACT Grid ( Concessions ) 2 2 18-Aug-28 22-Aug-28 Set Sprinkler Heads ACT Grid ( Concessions )
A9270 OH Inspections ( Concessions) 4 4 22-Aug-28 28-Aug-28 OH Inspections ( Concessions)
A9430 Install ACT Tile ( Concessions ) 2 2 28-Aug-28 30-Aug-28 Install ACT Tile ( Concessions )
A9440 Install Millwork 3 3 30-Aug-28 05-Sep-28 Install Millwork
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 36 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A9360 Install Basketball Goals 10 10 31-Aug-28 15-Sep-28 Install Basketball Goals
A9450 Install Plumbing Fixture 8 8 05-Sep-28 15-Sep-28 Install Plumbing Fixture
A9320 Install Track Surface 8 8 15-Sep-28 27-Sep-28 Install Track Surface
A9460 Install RR Partitions & Accessories 8 8 15-Sep-28 27-Sep-28 Install RR Partitions & Accessories
A9470 Install Gym Floor 18 18 27-Sep-28 23-Oct-28 Install Gym Floor
A9400 Install OH Doors ( Gym & Consessions ) 3 3 23-Oct-28 26-Oct-28 Install OH Doors ( Gym & Consessions )
A9530 Install Telescoping Ble achers 15 15 23-Oct-28 14-Nov-28 Install Telescoping Ble achers
Gym Corridor 147 147 09-Aug-28 12-Mar-29
A9900 Framing For Ceiling Wood Paneling 4 4 09-Aug-28 15-Aug-28 Framing For Ceiling Wood Paneling
A9910 Prime & First Coat Walls 3 3 24-Oct-28 27-Oct-28 Prime & First Coat Wal s
A9180 Install ACT Grid 4 4 15-Nov-28 21-Nov-28 Install ACT Grid
A9870 Install Lights In ACT Grid 3 3 19-Dec-28 22-Dec-28 Install Lights In ACT Grid
A9880 OH Inspection ( ACT Ceiling ) 2 2 22-Dec-28 27-Dec-28 OH Inspection ( ACT Ceiling )
A9890 Install ACT Tile 3 3 19-Jan-29 24-Jan-29 Install ACT Tile
A9190 Install Flooring 3 3 09-Feb-29 14-Feb-29 Install Flooring
A9160 Install Wood Ceiling Panels 6 6 23-Feb-29 05-Mar-29 Install Wood Ceiling Panels
A9170 Install Backlit Resin Fin Panels 5 5 05-Mar-29 12-Mar-29 Install Backlit Resin Fin Panels
Administration Offices & Theater BOH 226 226 05-May-28 29-Mar-29
Middle School & High School Addministration Offices 219 219 05-May-28 20-Mar-29
A9540 Install Sprinkler Main Runs 10 10 05-May-28 19-May-28 Install Sprinkler Main Runs
A9550 Install OH Mechanical Rough-Main Runs 16 16 19-May-28 13-Jun-28 Install OH Mechanical Rough-Main Runs
A9820 Install Process Piping & Units 15 15 13-Jun-28 05-Jul-28 Install Process Piping & Units
A9560 Install OH Electrical Rough-in 20 20 13-Jun-28 12-Jul-28 Install OH Electrical Rough-in
A9570 Frame Walls 15 15 12-Jul-28 02-Aug-28 Frame Walls
A9640 Frame Hard Ceilings 5 5 02-Aug-28 09-Aug-28 Frame Hard Ceilings
A9580 In-wall Electrical 10 10 02-Aug-28 16-Aug-28 In-wall Electrical
A9650 OH Mechanical Rough ( Hard Ceilings ) 3 3 09-Aug-28 14-Aug-28 OH Mechanical Rough ( Hard Ceilings )
A9660 OH Electrical Rough ( Hard Ceilings ) 3 3 16-Aug-28 21-Aug-28 OH Electrical Rough ( Hard Ceilings )
A9590 In-wall Plumbing 8 8 16-Aug-28 28-Aug-28 In-wall Plumbing
A9670 Install Sprinkler Flex Heads ( Hard Ceilings ) 3 3 21-Aug-28 24-Aug-28 Install Sprinkler Flex Heads ( Hard Ceilings )
A9600 In-wall & OH Hard Ceiling Inspections 5 5 28-Aug-28 05-Sep-28 In-wall & OH Hard Ceiling Inspections
A9610 Hang Walls 20 20 05-Sep-28 03-Oct-28 Hang Walls
A9840 Hang ( Hard Ceilings ) 3 3 03-Oct-28 06-Oct-28 Hang ( Hard Ceilings )
A9780 Install Interior Glazing Frames 6 6 03-Oct-28 11-Oct-28 Install Interior Glazing Frames
A9620 Finish Dry-wall 10 10 03-Oct-28 17-Oct-28 Finish Dry-wall
A9850 Finish ( Hard Ceilings ) 5 5 06-Oct-28 13-Oct-28 Finish ( Hard Ceilings )
A9630 Prime & First Coat Walls 5 5 17-Oct-28 24-Oct-28 Prime & First Coat Walls
A9680 Install ACT Grid 15 15 24-Oct-28 15-Nov-28 Install ACT Grid
A9690 Install Diffusers & Grills ( ACT Ceiings ) 11 11 15-Nov-28 04-Dec-28 Install Diffusers & Grills ( ACT Ceiings )
A9700 Install Lights ( ACT Ceilings ) 11 11 04-Dec-28 19-Dec-28 Install Lights ( ACT Ceilings )
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 37 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A9710 Install Sprinkler Flex Heads ( ACT Ceilings ) 8 8 19-Dec-28 02-Jan-29 Install Sprinkler Flex Heads ( ACT Ceilings )
A9720 OH Inspections ( ACT Ceilings ) 5 5 02-Jan-29 09-Jan-29 OH Inspections ( ACT Ceilings )
A9730 Install ACT Tile 8 8 09-Jan-29 19-Jan-29 Install ACT Tile
A9740 Install Flooring 15 15 19-Jan-29 09-Feb-29 Install Flooring
A9800 Install Millwork ( Health Clinic & Repection ) 3 3 09-Feb-29 14-Feb-29 Install Millwork ( Health Clinic & Repection )
A9770 Install Doors 4 4 09-Feb-29 15-Feb-29 Install Doors
A9830 Install Plumbing Fixtures 6 6 14-Feb-29 22-Feb-29 Install Plumbing Fixtures
A9860 Install Specialty Ceilings 6 6 15-Feb-29 23-Feb-29 Install Specialty Ceilings
A9790 Install Interior Glazing 4 4 23-Feb-29 01-Mar-29 Install Interior Glazing
A9750 Device & Trim Out 10 10 23-Feb-29 09-Mar-29 Device & Trim Out
A9760 Final Paint 5 5 09-Mar-29 16-Mar-29 Final Paint
A9810 Install Curtain Tracks & Curtians ( MS/ HS Health Clinics ) 2 2 16-Mar-29 20-Mar-29 Install Curtain Tracks & Curtians ( MS/ HS He
Theater Lobby & BOH Areas 216 216 19-May-28 29-Mar-29
A10110 Install Sprinkler Main Runs 5 5 19-May-28 26-May-28 Install Sprinkler Main Runs
A11830 OH Mechanical Rough-in 6 6 13-Jun-28 21-Jun-28 OH Mechanical Rough-in
A11820 OH Electrical Rough-in 8 8 12-Jul-28 24-Jul-28 OH Electrical Rough-in
A10180 Frame Walls 6 6 02-Aug-28 10-Aug-28 Frame Walls
A10020 Interior Store Front Frame 4 4 10-Aug-28 16-Aug-28 Interior Store Front Frame
A10090 Frame Hard Ceilings 7 7 10-Aug-28 21-Aug-28 Frame Hard Ceilings
A10190 Electrical In-wall Rough-in 8 8 16-Aug-28 28-Aug-28 Electrical In-wall Rough-in
A10100 OH Mechanical Rough-in Hard Ceilings 3 3 21-Aug-28 24-Aug-28 OH Mechanical Rough-in Hard Ceilings
A10130 Install Lighting Hard Ceilings 4 4 24-Aug-28 30-Aug-28 Install Lighting Hard Ceilings
A10200 In-wall Plumbing 4 4 28-Aug-28 01-Sep-28 In-wall Plumbing
A10120 Install Flex Heads Hard Ceilings 3 3 30-Aug-28 05-Sep-28 Install Flex Heads Hard Ceilings
A11840 In-wall Inspections 4 4 01-Sep-28 08-Sep-28 In-wall Inspections
A10150 OH Inspections Hard Ceiling Areas 4 4 05-Sep-28 11-Sep-28 OH Inspections Hard Ceiling Areas
A11850 Hang Walls 7 7 08-Sep-28 19-Sep-28 Hang Walls
A10140 Hang Hard Ceilings 6 6 11-Sep-28 19-Sep-28 Hang Hard Ceilings
A11860 Finish Walls 6 6 19-Sep-28 27-Sep-28 Finish Walls
A10160 Finish Hard Ceilings 6 6 19-Sep-28 27-Sep-28 Finish Hard Ceilings
A10170 Prime And First Coat Hard Ceilings 3 3 27-Sep-28 02-Oct-28 Prime And First Coat Hard Ceilings
A10300 Prime & First Coat CMU, Wal s 5 5 27-Sep-28 04-Oct-28 Prime & First Coat CMU, Wal s
A10040 Operable Glass Partitions 6 6 16-Nov-28 28-Nov-28 Operable Glass Partitions
A10210 Install ACT Grid 5 5 21-Nov-28 30-Nov-28 Install ACT Grid
A11880 Install Flooring Theater Lobby 3 3 28-Nov-28 01-Dec-28 Install Flooring Theater Lobby
A10030 Interior Store Front Glazing 3 3 28-Nov-28 01-Dec-28 Interior Store Front Glazing
A10290 Install Interior Glazing At Door ( 1603 ) 1 1 01-Dec-28 04-Dec-28 Install Interior Glazing At Door ( 1603 )
A10010 Wood Wall Paneling 6 6 01-Dec-28 11-Dec-28 Wood Wall Paneling
A10230 Install Grills & Diffusers ACT Ceiilings 3 3 04-Dec-28 07-Dec-28 Install Grills & Diffusers ACT Ceiilings
A10000 Perforated Metal Panel System 8 8 11-Dec-28 21-Dec-28 Perforated Metal Panel System
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 38 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A10220 Install Lighting ACT Ceilings 4 4 19-Dec-28 26-Dec-28 Install Lighting ACT Ceilings
A10240 Install Flex Heads ACT Ceilings 3 3 02-Jan-29 05-Jan-29 Install Flex Heads ACT Ceilings
A10340 OH Inspections ACT Ceilings 5 5 05-Jan-29 12-Jan-29 OH Inspections ACT Ceilings
A11870 Install ACT Tile 3 3 12-Jan-29 17-Jan-29 Install ACT Tile
A10270 Install Flooring Dressing & Broadcast, Video Production Areas 3 3 15-Feb-29 20-Feb-29 Install Flooring Dressing & Broadcast, Video Pro
A10280 Install Doors 2 2 20-Feb-29 22-Feb-29 Install Doors
A10080 Install Millwork At Ticketing & Dressing Room 3 3 20-Feb-29 23-Feb-29 Install Millwork At Ticketing & Dressing Room
A10250 Install Dressing Room Mirrors 2 2 23-Feb-29 27-Feb-29 Install Dressing Room Mirrors
A10330 Install Specialty Ceilings 6 6 23-Feb-29 05-Mar-29 Install Specialty Ceilings
A10260 Install Dressing Room Mirror Lights 2 2 27-Feb-29 01-Mar-29 Install Dressing Room Mirror Lights
A10320 Device & Trim Out 10 10 09-Mar-29 23-Mar-29 Device & Trim Out
A10310 Final Paint ( Walls & Ceiling ) 4 4 23-Mar-29 29-Mar-29 Final Paint ( Wal s & Ceiling )
Drama Class Room & Auditorium Area 201 201 17-May-28 06-Mar-29
Drama Class Room 189 189 05-Jun-28 06-Mar-29
A10460 Install Sound Deadening In Ceiling 3 3 05-Jun-28 08-Jun-28 Install Sound Deadening In Ceiling
A10360 Sprinkler Main Runs & Heads 6 6 08-Jun-28 16-Jun-28 Sprinkler Main Runs & Heads
A10430 OH Electrical Rough-in 6 6 22-Jun-28 30-Jun-28 OH Electrical Rough-in
A10350 Install OH Mechanical 8 8 30-Jun-28 13-Jul-28 Install OH Mechanical
A10440 Pull OH Electrical Power & LV Connections 5 5 13-Jul-28 20-Jul-28 Pull OH Electrical Power & LV Connections
A10380 Prime & First Coat CMU Walls 4 4 20-Jul-28 26-Jul-28 Prime & First Coat CMU Walls
A9920 Install House Lighting 5 5 26-Jul-28 02-Aug-28 Install House Lighting
A10370 Fog Out Ceiling 3 3 02-Aug-28 07-Aug-28 Fog Out Ceiling
A10470 Install Ceiling Reflectors 10 10 07-Aug-28 21-Aug-28 Install Ceiling Reflectors
A9930 Install Speaker System 15 15 21-Aug-28 12-Sep-28 Install Speaker System
A9940 Install Flooring 8 8 30-Jan-29 09-Feb-29 Install Flooring
A10390 Final Paint Walls 3 3 09-Feb-29 14-Feb-29 Final Paint Walls
A10410 Install Drapery 2 2 14-Feb-29 16-Feb-29 Install Drapery
A10420 Install Show Lighting 3 3 14-Feb-29 19-Feb-29 Install Show Lighting
A10620 Aim Show Lighting 2 2 19-Feb-29 21-Feb-29 Aim Show Lighting
A10450 Install Masonite Finish Flooring 5 5 21-Feb-29 28-Feb-29 Install Masonite Finish Flooring
A10400 Install Seating 4 4 28-Feb-29 06-Mar-29 Install Seating
Auditorium 193 193 17-May-28 22-Feb-29
A9950 Install Scaffolding Dance Floor 3 3 17-May-28 22-May-28 Install Scaffolding Dance Floor
A10710 Install Sound Deadening In Ceiling 4 4 22-May-28 26-May-28 Install Sound Deadening In Ceiling
A10520 Sprinkler Main Runs 5 5 26-May-28 05-Jun-28 Sprinkler Main Runs
A9960 OH Electrical Rough-in 8 8 05-Jun-28 15-Jun-28 OH Electrical Rough-in
A10510 OH Mechanical Rough-in 6 6 15-Jun-28 23-Jun-28 OH Mechanical Rough-in
A10530 Frame Hard Ceiling 6 6 21-Aug-28 29-Aug-28 Frame Hard Ceiling
A10540 Electrical Rough-in Hard Ceilings 4 4 29-Aug-28 05-Sep-28 Electrical Rough-in Hard Ceilings
A10650 Frame Hard Clouds/ Reflectors 5 5 29-Aug-28 06-Sep-28 Frame Hard Clouds/ Reflectors
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 39 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A10550 Install Grills & Diffusers Hard Ceilings 3 3 05-Sep-28 08-Sep-28 Install Grills & Diffusers Hard Ceilings
A10660 Install Flex Heads Clouds/ Reflectors 2 2 06-Sep-28 08-Sep-28 Install Flex Heads Clouds/ Reflectors
A10670 OH Inspections Clouds/ Reflectors 2 2 08-Sep-28 12-Sep-28 OH Inspections Clouds/ Reflectors
A10560 Install Flex Heads Hard Ceilings 2 2 08-Sep-28 12-Sep-28 Install Flex Heads Hard Ceilings
A10570 OH Inspections Hard Ceiling 3 3 12-Sep-28 15-Sep-28 OH Inspections Hard Ceiling
A10680 Hang Clouds/ Reflectors 4 4 12-Sep-28 18-Sep-28 Hang Clouds/ Reflectors
A10580 Hang Hard Ceiling 4 4 15-Sep-28 21-Sep-28 Hang Hard Ceiling
A10690 Finish Clouds/ Reflectors 4 4 18-Sep-28 22-Sep-28 Finish Clouds/ Reflectors
A10590 Finish Hard Ceiling 5 5 21-Sep-28 28-Sep-28 Finish Hard Ceiling
A10700 Prime & First Coat Clouds/ Reflectors 2 2 22-Sep-28 26-Sep-28 Prime & First Coat Clouds/ Reflectors
A10480 OH Electrical Power & LV Wire Pull 10 10 26-Sep-28 10-Oct-28 OH Electrical Power & LV Wire Pull
A10600 Prime & First Coat Hard Ceiling 2 2 28-Sep-28 02-Oct-28 Prime & First Coat Hard Ceiling
A10490 Install House Lighting 4 4 10-Oct-28 16-Oct-28 Install House Lighting
A11790 Fog Out High Ceiling Area 3 3 16-Oct-28 19-Oct-28 Fog Out High Ceiling Area
A10610 Final Paint Clouds/ Reflectors 2 2 19-Oct-28 23-Oct-28 Final Paint Clouds/ Reflectors
A10070 Install Speaker Systems 6 6 23-Oct-28 31-Oct-28 Install Speaker Systems
A10500 Install Show Lighting 7 7 23-Oct-28 01-Nov-28 Install Show Lighting
A10630 Break Down Scaffolding Dance Floor 2 2 01-Nov-28 03-Nov-28 Break Down Scaffolding Dance Floor
A10060 Install Stage Flooring 4 4 01-Nov-28 07-Nov-28 Install Stage Flooring
A11800 Final Paint Walls Ceiling To 5 Foot AFF 4 4 03-Nov-28 09-Nov-28 Final Paint Walls Ceili ng To 5 Foot AFF
A10050 Aim Show Lighting 4 4 07-Nov-28 14-Nov-28 Aim Show Lighting
A10730 Polish Concrete 4 4 09-Nov-28 16-Nov-28 Polish Concrete
A10640 Install Drapery 4 4 14-Nov-28 20-Nov-28 Install Drapery
A10890 Install Stage Floor Masonite 2 2 20-Nov-28 22-Nov-28 Install Stage Floor Masonite
A10740 Install Carpet & LVT 4 4 09-Feb-29 15-Feb-29 Install Carpet & LVT
A10750 Install Doors 2 2 15-Feb-29 19-Feb-29 Install Doors
A10720 Install Seating 3 3 15-Feb-29 20-Feb-29 Install Seating
A11810 Final Paint Walls 5 Foot AFF To FF 2 2 20-Feb-29 22-Feb-29 Final Paint Walls 5 Foot AFF To FF
Scene Shop 192 192 26-May-28 02-Mar-29
A10860 Install Sound Deadening In Ceiling 3 3 26-May-28 01-Jun-28 Install Sound Deadening In Ceiling
A9970 Sprinkler Main Runs & Heads 3 3 05-Jun-28 08-Jun-28 Sprinkler Main Runs & Heads
A10760 OH Electrical Rough-in 5 5 15-Jun-28 22-Jun-28 OH Electrical Rough-in
A9980 Install OH Mechanical 5 5 23-Jun-28 30-Jun-28 Install OH Mechanical
A10790 Pull Electrical & LV OH 3 3 30-Jun-28 06-Jul-28 Pull Electrical & LV OH
A10770 Install Lighting 3 3 06-Jul-28 11-Jul-28 Install Lighting
A10810 Fog Out Ceiling 3 3 19-Oct-28 24-Oct-28 Fog Out Ceiling
A10800 Prime & First Coat Walls 3 3 24-Oct-28 27-Oct-28 Prime & First Coat Wal s
A10780 Install Cord Reels 2 2 27-Oct-28 31-Oct-28 Install Cord Reels
A10820 Install Flooring 2 2 15-Feb-29 19-Feb-29 Install Flooring
A10830 Install Millwork 2 2 19-Feb-29 21-Feb-29 Install Millwork
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 40 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
Activity ID Activity Name Orig Remaining Start Finish
Dur Duration 2023 2024 2025 2026 2027 2028 2029 2030
JF A J J AS J F A JJ AS J F A J J AS J A J J AS N J A J J AS D JF A J J AS N J A J J AS D JF A JJ AS
A10840 Device & Trim Out 5 5 21-Feb-29 28-Feb-29 Device & Trim Out
A10850 Final Paint 2 2 28-Feb-29 02-Mar-29 Final Paint
Remaining Level of Effort Critical Milestones
Finish Date: 27-Aug-29
Data Date: 03-Feb-25 Actual Level of Effort Milestone
Actual Work
Sequoyah Middle and High School GMP Schedule
Page 41 of 41 Remaining Work
Critical Remaining Work
Summary Milestones
1 2 3 4 5 6 7 8 9 10 11 12
Sequoyah Middle School-High School
K Phase 1 K
Gate 1 - Main Construction Gate
Site Logistics Plan
K LANE
SANTA FE TRAIL
REQ'D SMOOTH
CONNECTION TO
EXISTING PAVEMENT
CREE
ROW)
(60' ROW)
REQ'D STRIPED ISLAND REQ'D SMOOTH
REQ'D PAVEMENT MARKING
ARBOR(60'
(PER GDOT STANDARDS) CONNECTION TO
(PER GDOT STANDARDS) EXISTING PAVEMENT
REQ'D 6" GRANITE CURB REQ'D 6" GRANITE CURB
TO MATCH EXISTING CURB
ALONG AZTEC ROAD
TO MATCH EXISTING CURB
ALONG AZTEC ROAD Buckhoist Location EX. CROSSWALK
917
940
935
91 5
ROAD CL
945
939 ROAD CL REQ'D ADA RAMP
4
91
941
3
AZTEC ROAD
94
R2.0'
(60' ROW)
J J
8
REQ'D ADA RAMP
94
.5'
REQ'D 6' BLACK, VINYL COATED
5.5'
'
R105
REQ'D STOP SIGN &
R8
.0 CHAIN LINK FENCE. POSTS
56.4'
78
9.
R10
STOP BAR
R100.0'
R SHALL BE SPACED 10' o.c.
0'
REQ'D STOP SIGN &
6120 POWERS FERRY RD NW SUITE 200
REQ'D PAVEMENT MARKING STOP BAR
(PER GDOT STANDARDS)
REQ'D 24" CURB &
5' GUTTER (TYP.)
73.
R1 REQ'D PAVEMENT LEGEND
(PER GDOT STANDARDS)
24 R11
952
4.0 REQ'D (2) 8' WIDE
.0' ' GATES
0'
4.
R
REQ'D PAVEMENT
16 75' BUFFER
.5 MARKING (PER
'
GDOT STANDARDS)
24.0' MICROPOOL
REQ'D 24" CURB &
ATLANTA, GA 30339
AREA
GMCNETWORK.COM
GUTTER (TYP.)
REQ'D 24" CURB &
GUTTER (TYP.) 12.0'
T 770.952.2481
REQ'D PAVEMENT 50' UNDISTURBED NATURAL
H PINE STREET
(60' ROW)
24
.0 REQ'D CROSSWALK (PER
MARKING (PER
GDOT STANDARDS) Temporary Toilets &
VEGETATIVE BUFFER H
36
' GDOT STANDARDS)
.0
'
.0
'
R4 12.0' MICROPOOL
EXTENDED
Hand Washing Stations
10 20 30 40 50 40 30 20 10 DETENTION POND
Stewart Rd.
24
.0 REQ'D STOP SIGN 5.0'
36
'
.0
& STOP BAR
'
5.
REQ'D DO NOT ENTER
0'
SIGN
56
MICROPOOL
9 36
.0
AREA
'
36
.0
FOOTBALL/SOCCER
'
FIELD
TRACK R4.0'
DN
02/23/2024
09/15/2023
REQ'D PAVEMENT MARKING
ISSUE DATE
36
(PER GDOT STANDARDS)
X. XXX
X. XXX
.0
'
UP
G G
16
REQ'D CROSSWALK (PER
.5
GDOT STANDARDS)
'
10 20 40
SCHEMATIC DESIGN
CHECKED BY:
DRAWN BY:
DESIGN DEVELOPMENT
30 50 40 30 20 10
REQ'D WHITE STRIPED
REQ'D ADA STRIPING & SIGNAGE
CENTERLINE (PER GDOT
REQ'D ADA RAMP W/
Crane Roads DETECTABLE WARNING STRIP
COURTYARD
STANDARDS)
(SEE REQ'D PAVEMENT
964 LANDSCAPE MARKING (PER
PLANS) GDOT STANDARDS)
36 REQ'D PAVEMENT MARKING
.0
'
(PER GDOT STANDARDS)
Dumpster Location
CONCESSIONS/
RESTROOMS
LOCKERS/
TENNIS 75' BUFFER
F PINE STREET COURTS
REQ'D CROSSWALK (PER F
DOES NOT GDOT STANDARDS) REQ'D (2) 8' WIDE
CONNECT TO GATES
REQ'D STOP SIGN
AZTEC ROAD & STOP BAR 50' UNDISTURBED NATURAL
VEGETATIVE BUFFER
REQ'D CROSSWALK R300
.0'
PINE STREET (PER GDOT REQ'D
(60' ROW) STANDARDS) CROSSWALK
(PER GDOT
Dumpster Location R325.0
'
16.5'
STANDARDS)
24.0'
9.0'
REQ'D SMOOTH
CONNECTION TO
Temporary Shade Break REQ'D STAIRS & HANDRAIL
(SEE LANDSCAPE PLANS)
EXISTING PAVEMENT
Area with Tables Phase 1
8.0'
REQ'D 24" CURB &
E E
972
GUTTER (TYP.)
REQ'D STOP SIGN Work
16.5'
8.0'
& STOP BAR
REQ'D ADA STRIPING & SIGNAGE
Area
AZTEC ROAD
REQ'D ADA RAMP W/
UP
DETECTABLE WARNING STRIP COURTYARD 29
(60' ROW)
DN
(SEE .6
8.
24.0' '
in n
0'
LANDSCAPE
Temporary Toilets &
24.0'
ag w
PLANS)
g
REQ'D 24" CURB &
St Do
GUTTER (TYP.)
Hand Washing Stations 16.5'
UP
DN
y
La
R4.0'
d.
0 50' 100'
tR
GMC PROJECT #CATL______
&
0'
'
5.0
5.
974
Scale: 1" = 50'
R1
ar
R2
REQ'D ADA STRIPING & SIGNAGE
D 16.5' REQ'D ADA RAMP W/ D
ew
DETECTABLE WARNING STRIP REQ'D ALTERNATE
PARKING AREA
WITH RETAINING
Site Data
St
WALL
'
5.0
24.0'
R1
36.0'
R2
00
SEQUOYAH HIGH AND
75' BUFFER Zoning R-1
.0
DRAWING FILE: T:\1 Projects\GA\DeKalb County School District\CATL230020 - Sequoyah Middle & High School\0 DWG\1 PLANS\02 SHEETS\03 CIVIL\C-100 OVERALL SITE PLAN.dwg
16.5'
'
24.0' R4.0'
REQ'D PAVEMENT
Current Use Elementary & Middle School
9.0'
MARKING (PER
'
.0
Lay Down GDOT STANDARDS)
24
16.5'
Gilbane Trailer Proposed Use Middle & High School
MIDDLE SCHOOL
'
7.5
BASEBALL
& Staging R6 50' UNDISTURBED NATURAL Minimum Public
9.0'
FIELD .0' 30-Feet 0
12
R2
R3 VEGETATIVE BUFFER 50' 100'
Road Frontage
.0'
34
3456 AZTEC ROAD #2702
.0
6.0
'
12
SOFTBALL 24.0'
'
R75.5'
.0'
DORAVILLE, GA 30340
FIELD 16' High by 15 wide Minimum Front Yard 20-Feet Scale: 1" = 50'
5.0
REQ'D CROSSWALK (PER
Leave-out in block
'
C
GDOT STANDARDS)
REQ'D STAIRS &
16.5' 0'
REQ'D STRIPED ISLAND Building Setback C
9.0'
8.
HANDRAIL (SEE (PER GDOT STANDARDS) For Bar Joist
Minimum SideYard 5-Feet
974
.0'
REQ'D STAIRS & HANDRAIL LANDSCAPE
0 .0
'
74
Erection With Boom
Phase 1 (SEE LANDSCAPE PLANS) PLANS)
R4 Truck Building Setback
R1
Minimum Front Yard 10-Feet
24.0'
Muster Point 9.0'
50' UNDISTURBED NATURAL
VEGETATIVE BUFFER Temporary Toilets &
Building Setback
16.5'
.0'
REQ'D STOP BAR R4 75' BUFFER
Hand Washing Stations
98.8'
3
(Corner)
R3
& STOP SIGN .0'
REQ'D STOP BAR Minimum Rear Yard 25-Feet
0'
& STOP SIGN
Building Setback
00.
R174.0'
R202.0'
'
R25.0
R2
'
.0 5
R2
Maximum Impervious 40 %
2
97 Lot Coverage
REQ'D 24" CURB &
REQ'D DO NOT
GUTTER (TYP.)
REQ'D PAVEMENT Site Area 1,483,539 s.f.
STEWART ROAD ENTER SIGNAGE MARKING (PER
951
5
B B
94
5
GDOT STANDARDS)
(60' ROW)
Building Area
967
95
LEGEND 197,992 s.f.
2
96
REQ'D CROSSWALK (PER
GDOT STANDARDS) REQ'D LANE
REQ'D PAVEMENT TRANSITION 720 EX. MAJOR CONTOUR Paved Area 359,933 s.f.
MARKING (PER 718 EX. MINOR CONTOUR
GDOT STANDARDS)
EX. WATER LINE
Coverage 37.60%
EX. BURIED CABLE
Minimum
EX. GAS LINE 521
Parking Req'd
Temporary Toilets & EX. STORM SEWER LINE
Target Parking
C-101
726
Hand Washing Stations EX. STORM INLET
Temp To Permanent
EX. LIGHT POLE Req'd
Gate 2 - Personnel Gate EX. POWER POLE
582
Parking Provided
Stone / Paving
EX. FIRE HYDRANT
PLOTTED: Feb 22, 2024 - 12:23pm
LIGHT DUTY ASPHALT PAVEMENT
Regular Parking 570
A A
PLAN
ADA Parking 2% Total=12
SITE
HEAVY DUTY ASPHALT PAVEMENT
Req'd
CONCRETE PAVEMENT
ADA Parking 12
CONCRETE SIDEWALK Provided
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
Sequoyah Middle School-High School
K
Phase 2 K
Site Logistics Plan
K LANE
SANTA FE TRAIL
REQ'D SMOOTH
CONNECTION TO
EXISTING PAVEMENT
CREE
Gate 1 - Main Construction Gate
ROW)
(60' ROW)
REQ'D STRIPED ISLAND REQ'D SMOOTH
REQ'D PAVEMENT MARKING
ARBOR(60'
(PER GDOT STANDARDS) CONNECTION TO
(PER GDOT STANDARDS) EXISTING PAVEMENT
REQ'D 6" GRANITE CURB REQ'D 6" GRANITE CURB
TO MATCH EXISTING CURB TO MATCH EXISTING CURB
ALONG AZTEC ROAD ALONG AZTEC ROAD EX. CROSSWALK
ROAD CL
ROAD CL REQ'D ADA RAMP
AZTEC ROAD R2.0'
(60' ROW)
J REQ'D ADA RAMP J
.5'
REQ'D 6' BLACK, VINYL COATED
Buckhoist Location
5.5'
'
R105
REQ'D STOP SIGN &
R8
.0 CHAIN LINK FENCE. POSTS
56.4'
78
9.
R10
STOP BAR
Temporary Toilets &
R100.0'
R SHALL BE SPACED 10' o.c.
0'
REQ'D STOP SIGN &
6120 POWERS FERRY RD NW SUITE 200
REQ'D PAVEMENT MARKING STOP BAR
(PER GDOT STANDARDS)
Gilbane Trailer Hand Washing Stations 3.
5'
REQ'D 24" CURB &
GUTTER (TYP.)
7
R1 REQ'D PAVEMENT LEGEND
Temporary Shade Break 24
.0'
R11
4.0
'
(PER GDOT STANDARDS)
REQ'D (2) 8' WIDE
Phase 2 GATES
0'
Area with Tables
4.
R
REQ'D PAVEMENT
16
.5 MARKING (PER
Muster Point '
REQ'D 24" CURB &
GDOT STANDARDS)
24.0' MICROPOOL
ATLANTA, GA 30339
Work Being AREA
GMCNETWORK.COM
GUTTER (TYP.)
REQ'D 24" CURB &
GUTTER (TYP.)
Done During 12.0'
T 770.952.2481
REQ'D PAVEMENT
PINE STREET MARKING (PER
H 24 REQ'D CROSSWALK (PER H
(60' ROW) .0 GDOT STANDARDS)
Phase 1 But
36
' GDOT STANDARDS)
.0
'
.0
'
R4 12.0' MICROPOOL
10 20 30 40 50 40 30 20 10
Turned Over EXTENDED
DETENTION POND
24
.0 REQ'D STOP SIGN In Phase 2 5.0'
36
'
.0
& STOP BAR
'
5.
REQ'D DO NOT ENTER
0'
SIGN
MICROPOOL
36
.0
AREA
'
36
.0
FOOTBALL/SOCCER
'
FIELD
TRACK R4.0'
Lay Down
DN
02/23/2024
09/15/2023
REQ'D PAVEMENT MARKING
ISSUE DATE
36
(PER GDOT STANDARDS)
X. XXX
X. XXX
.0
& Staging
'
UP
G G
16
REQ'D CROSSWALK (PER
.5
GDOT STANDARDS)
e
'
Dumpster Location
riv
10 20 40
SCHEMATIC DESIGN
CHECKED BY:
DRAWN BY:
DESIGN DEVELOPMENT
30 50 40 30 20 10
REQ'D WHITE STRIPED
REQ'D ADA STRIPING & SIGNAGE
D
CENTERLINE (PER GDOT
REQ'D ADA RAMP W/
STANDARDS)
DETECTABLE WARNING STRIP
n
ai
COURTYARD
Gate 2 - (SEE REQ'D PAVEMENT
M
LANDSCAPE MARKING (PER
PLANS) GDOT STANDARDS)
Personnel Gate 36
.0
REQ'D PAVEMENT MARKING
(PER GDOT STANDARDS)
'
Phase 2
CONCESSIONS/
RESTROOMS
LOCKERS/
TENNIS 75' BUFFER
F REQ'D CROSSWALK (PER F
e
PINE STREET COURTS GDOT STANDARDS) REQ'D (2) 8' WIDE
riv
DOES NOT
CONNECT TO GATES
REQ'D STOP SIGN
AZTEC ROAD
D
& STOP BAR 50' UNDISTURBED NATURAL
VEGETATIVE BUFFER
n
ai
REQ'D CROSSWALK R300
.0'
M
PINE STREET (PER GDOT REQ'D
R325.0
(60' ROW) STANDARDS) CROSSWALK '
(PER GDOT
16.5'
STANDARDS)
24.0'
Main Drive
9.0'
REQ'D SMOOTH
REQ'D STAIRS & HANDRAIL
Crane Roads
(SEE LANDSCAPE PLANS)
CONNECTION TO
EXISTING PAVEMENT
8.0'
REQ'D 24" CURB &
E GUTTER (TYP.) E
REQ'D STOP SIGN
16.5'
8.0'
& STOP BAR
REQ'D ADA STRIPING & SIGNAGE
AZTEC ROAD
REQ'D ADA RAMP W/
UP
DETECTABLE WARNING STRIP COURTYARD 29
(60' ROW)
DN
(SEE .6
8.
24.0' '
0'
LANDSCAPE
24.0'
PLANS)
REQ'D 24" CURB &
Temporary Toilets & GUTTER (TYP.) 16.5'
UP
DN
Hand Washing Stations R4.0'
0 50' 100'
Temp To
GMC PROJECT #CATL______
0'
'
5.0
5.
Scale: 1" = 50'
Permanate Stone /
R1
R2
REQ'D ADA STRIPING & SIGNAGE 16' High by 15 wide
D 16.5' REQ'D ADA RAMP W/
Leave-out in block D
Baseball Drive &
DETECTABLE WARNING STRIP REQ'D ALTERNATE
Paving For Bar Joist PARKING AREA
WITH RETAINING
Erection With Boom WALL Site Data
'
5.0
24.0'
Truck
R1
36.0'
R2
Parking
00
SEQUOYAH HIGH AND
Zoning R-1
.0
DRAWING FILE: T:\1 Projects\GA\DeKalb County School District\CATL230020 - Sequoyah Middle & High School\0 DWG\1 PLANS\02 SHEETS\03 CIVIL\C-100 OVERALL SITE PLAN.dwg
16.5'
'
24.0' R4.0'
REQ'D PAVEMENT
Current Use Elementary & Middle School
9.0'
MARKING (PER
'
.0
GDOT STANDARDS)
24
16.5'
Proposed Use Middle & High School
MIDDLE SCHOOL
'
BASEBALL 7.5
R6 Minimum Public
9.0'
FIELD .0' 30-Feet
12
R2
R3
Road Frontage
.0'
34
3456 AZTEC ROAD #2702
.0
6.0
'
12
SOFTBALL 24.0'
'
R75.5'
.0'
DORAVILLE, GA 30340
FIELD Minimum Front Yard 20-Feet
5.0
REQ'D CROSSWALK (PER
'
C
GDOT STANDARDS)
REQ'D STAIRS &
16.5' 0'
REQ'D STRIPED ISLAND Building Setback C
9.0'
8.
HANDRAIL (SEE (PER GDOT STANDARDS)
REQ'D STAIRS & HANDRAIL LANDSCAPE
.0
'
.0'
74 Minimum SideYard 5-Feet
(SEE LANDSCAPE PLANS) PLANS) 0
R4 Building Setback
R1
Minimum Front Yard 10-Feet
24.0'
50' UNDISTURBED NATURAL
9.0' VEGETATIVE BUFFER
Building Setback
16.5'
.0'
REQ'D STOP BAR R4 75' BUFFER
98.8'
3
(Corner)
R3
& STOP SIGN .0'
REQ'D STOP BAR Minimum Rear Yard 25-Feet
' .0
& STOP SIGN
Building Setback
R174.0'
200
R202.0'
'
R25.0
R
'
.0 5
R2
Maximum Impervious 40 %
Lot Coverage
REQ'D 24" CURB &
REQ'D DO NOT
GUTTER (TYP.)
REQ'D PAVEMENT Site Area 1,483,539 s.f.
STEWART ROAD ENTER SIGNAGE MARKING (PER
B GDOT STANDARDS) B
(60' ROW)
REQ'D CROSSWALK (PER LEGEND Building Area 197,992 s.f.
GDOT STANDARDS) REQ'D LANE
REQ'D PAVEMENT TRANSITION 720 EX. MAJOR CONTOUR Paved Area 359,933 s.f.
MARKING (PER 718 EX. MINOR CONTOUR
GDOT STANDARDS)
EX. WATER LINE
Coverage 37.60%
Gate 3 - EX. BURIED CABLE
EX. GAS LINE
Minimum
521
Parking Req'd
Personnel Gate EX. STORM SEWER LINE
Target Parking
C-101
EX. STORM INLET 726
EX. LIGHT POLE Req'd
EX. POWER POLE
Parking Provided 582
EX. FIRE HYDRANT
PLOTTED: Feb 22, 2024 - 12:23pm
LIGHT DUTY ASPHALT PAVEMENT
Regular Parking 570
A A
PLAN
ADA Parking 2% Total=12
SITE
HEAVY DUTY ASPHALT PAVEMENT
Req'd
CONCRETE PAVEMENT
ADA Parking 12
CONCRETE SIDEWALK Provided
1 2 3 4 5 6 7 8 9 10 11 12
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
Supporting
Documentation
v.5/1/2023
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Current Drawings
Drawing No. Drawing Title Revision Drawing Date Received Date Set
Architectural
100% CONSTRUCTION DRAWINGS
A1.00 LEVEL 00 - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.01 LEVEL 01 - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.02 LEVEL 02 - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.03 LEVEL 03 - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.04 LEVEL 04 - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.10A LEVEL 00 - AREA A - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.10B LEVEL 00 - AREA B - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.10C LEVEL 00 - AREA C - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.10D LEVEL 00 - AREA D - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.10H LEVEL 00 - AREA H - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.10J LEVEL 00 - AREA J - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.10K LEVEL 00 - AREA K - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.11A LEVEL 01 - AREA A - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.11B LEVEL 01 - AREA B - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.11D LEVEL 01 - AREA D - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.11E LEVEL 01 - AREA E - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.11F LEVEL 01 - AREA F - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.11G LEVEL 01 - AREA G - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.11H LEVEL 01 - AREA H - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
A1.11J LEVEL 01 - AREA J - FLOOR PLAN 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 1 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.11K LEVEL 01 - AREA K - FLOOR 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.12A LEVEL 02 - AREA A - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.12B LEVEL 02 - AREA B - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.12E LEVEL 02 - AREA E - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.12F LEVEL 02 - AREA F - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.12G LEVEL 02 - AREA G - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.12J LEVEL 02 - AREA J - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.12K LEVEL 02 - AREA K - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.13A LEVEL 03 - AREA A - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.13B LEVEL 03 - AREA B - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.13J LEVEL 03 - AREA J - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.13K LEVEL 03 - AREA K - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.14J LEVEL 04 - AREA J - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.14K LEVEL 04 - AREA K - FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.20 PLAN DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.21 PLAN DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.22 PLAN DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.23 PLAN DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.30 PERFORMING ARTS CENTER - ENLARGED PLANS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.31 PERFORMING ARTS CENTER - ENLARGED PLANS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.32 PERFORMING ARTS CENTER - REFLECTED CEILING PLANS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.33 PERFORMING ARTS CENTER - SECTION + DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
Page 2 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
A1.34 PERFORMING ARTS CENTER - FINISH PLANS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.35 PERFORMING ARTS CENTER - INT ELEV 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.36 PERFORMING ARTS CENTER - VERTICAL CIRCULATION 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.40 HS GYMNASIUMS - ENLARGED PLANS 3 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.41 MS GYMNASIUM - ENLARGED PLAN + DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A1.42 HS GYMNASIUM - DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.00 LEVEL 00 - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.01 LEVEL 01 - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.02 LEVEL 02 - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.03 LEVEL 03 - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.04 LEVEL 04 - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.10A LEVEL 00 - AREA A - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.10B LEVEL 00 - AREA B - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.10C LEVEL 00 - AREA C - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.10D LEVEL 00 - AREA D - REFLECTED CEILING PLAN. 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.10H LEVEL 00 - AREA H - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.10J LEVEL 00 - AREA J - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.10K LEVEL 00 - AREAS K - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.11A LEVEL 01 - AREA A - REFLECTED CEILING PLAN. 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.11B LEVEL 01 - AREA B - REFLECTED CEILING PLAN. 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.11D LEVEL 01 - AREA D - REFLECTED CEILING PLAN. 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.11E LEVEL 01 - AREA E - REFLECTED CEILING PLAN. 2 12/13/2024 12/13/2024
(12/13/24)
A2.11F LEVEL 01 - AREA F - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 3 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.11G LEVEL 01 - AREA G - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.11H LEVEL 01 - AREA H - REFLECTED CEILING PLAN. 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.11J LEVEL 01 - AREA J - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.11K LEVEL 01 - AREAS K - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.12A LEVEL 02 - AREA A - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.12B LEVEL 02 - AREA B - REFLECTED CEILING PLAN. 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.12E LEVEL 02 - AREA E - REFLECTED CEILING PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.12F LEVEL 02 - AREA F - REFLECTED CEILING PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.12G LEVEL 02 - AREA G - REFLECTED CEILING PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.12J LEVEL 02 - AREA J - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.12K LEVEL 02 - AREA K - REFECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.13A LEVEL 03 - AREA A - REFLECTED CEILING PLAN. 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.13B LEVEL 03 - AREA B - REFLECTED CEILING PLAN. 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.13J LEVEL 03 - AREA J - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.13K LEVEL 03 - AREA K - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.14J LEVEL 04 - AREA J - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.14K LEVEL 04 - AREA K - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.20 REFLECTED CEILING PLAN DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A2.21 REFLECTED CEILING PLAN DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.00 OVERALL ROOF PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.10A ROOF PLAN - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.10B ROOF PLAN - AREA B 2 12/13/2024 12/13/2024
(12/13/24)
Page 4 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
A3.10C ROOF PLAN - AREAC 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.10D ROOF PLAN - AREA D 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.10E ROOF PLAN - AREA E 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.10F ROOF PLAN - AREA F 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.10G ROOF PLAN - AREA G 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.10H ROOF PLAN - AREA H 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.10J ROOF PLAN - AREA J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.10K ROOF PLAN - AREA K 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.20 ROOF DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.21 ROOF DETAIL 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.30 CANOPY PLANS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.31 CANOPY PLANS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.32 CANOPY AXON 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A3.33 CANOPY PLANS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A4.01 OVERALL EXTERIOR ELEVATIONS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A4.02 EXTERIOR ELEVATIONS - MS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A4.03 EXTERIOR ELEVATIONS - MS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A4.04 EXTERIOR ELEVATIONS - MS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A4.05 EXTERIOR ELEVATIONS - MS COURTYARD 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A4.06 EXTERIOR ELEVATIONS - MS COURTYARD 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A4.07 EXTERIOR ELEVATIONS - CORE 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A4.08 EXTERIOR ELEVATIONS - HS COURTYARD 1 12/13/2024 12/13/2024
(12/13/24)
A4.09 EXTERIOR ELEVATIONS - HS COURTYARD 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 5 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
A4.10 EXTERIOR ELEVATIONS - HS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A4.11 EXTERIOR ELEVATIONS - HS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A4.12 EXTERIOR ELEVATIONS - HS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.01 BUILDING SECTIONS - MS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.02 BUILDING SECTION - MS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.03 BUILDING SECTIONS - CORE 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.04 BUILDING SECTIONS - CORE 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.05 BUILDING SECTIONS - HS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.06 BUILDING SECTIONS - HS GYM 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.07 BUILDING SECTIONS - ELEVATED BRIDGES 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.08 BUILDING SECTIONS - AUDITORIUM & BLACK BOX 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.10 WALL SECTIONS - AREA A 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.11 WALL SECTIONS - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.12 WALL SECTIONS - A/B 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.13 WALL SECTIONS - AREA B/C 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.14 WALL SECTIONS - AREA C/D 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.15 WALL SECTIONS - AREA D/F 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.16 WALL SECTIONS - AREA F/G 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.17 WALL SECTIONS - AREA H/J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.18 WALL SECTIONS - AREA J 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.19 WALL SECTIONS - AREA K 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.20 WALL SECTIONS - AREA K 1 12/13/2024 12/13/2024
(12/13/24)
Page 6 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
A5.21 SECTION DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.22 SECTION DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.24 EXPANSION JOINT DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.25 EXPANSION JOINT DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.26 EXPANSION JOINT DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.31 VERTICAL CIRCULATION - STAIR 1 PLANS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.32 VERTICAL CIRCULATION - STAIR 2 PLANS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.33 VERTICAL CIRCULATION - STAIR 3 PLANS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.34 VERTICAL CIRCULATION - STAIR 4 PLANS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.35 VERTICAL CIRCULATION - STAIR 5 PLANS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.36 VERTICAL CIRCULATION - STAIR 6, 7 & LULA PLANS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.37 VERTICAL CIRCULATION - STAIR 8 & ELEVATOR 2 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.38 VERTICAL CIRCULATION - ELEVATOR 1 & 3 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.39 VERTICAL CIRCULATION - ROOF ACCESS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.41 RAILING SCHEDULE & DETAILS I 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A5.42 RAILING SCHEDULE & DETAILS II 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A6.01 DOOR LEGEND & NOTES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A6.02 DOOR SCHEDULE 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A6.03 DOOR SCHEDULE 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A6.04 DOOR SCHEDULE 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A6.05 DOOR SCHEDULE 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A6.10 INTERIOR GLAZING TYPES 2 12/13/2024 12/13/2024
(12/13/24)
A6.11 EXTERIOR GLAZING TYPES 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 7 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
A6.12 EXTERIOR CURTAIN WALL TYPES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A6.20 EXTERIOR DOOR AND WINDOW DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A6.21 INTERIOR DOOR AND WINDOW DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A6.22 STOREFRONT DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A6.23 CURTAIN WALL DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A6.24 EXTERIOR ROLL UP DOOR DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A6.25 EXTERIOR ROLL UP DOOR DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A6.26 INTERIOR ROLL UP DOOR DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.01 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.02 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.03 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.04 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.05 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA B 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.06 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA B 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.07 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA B 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.08 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA C 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.09 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA C 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.10 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA C 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.11 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA C 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.12 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA C 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.13 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA D 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.14 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA H 2 12/13/2024 12/13/2024
(12/13/24)
Page 8 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
A7.15 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.16 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.17 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.18 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.19 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.20 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA K 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.21 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA K 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.22 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA K 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.23 ENLARGED PLANS & ELEVATIONS - LEVEL 00 - AREA K 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.24 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.25 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.26 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.27 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA B 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.28 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA D 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.29 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA D 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.30 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA E 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.31 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA E 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.32 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA E 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.33 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA E 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.34 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA F 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.35 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA F 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.36 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA G 2 12/13/2024 12/13/2024
(12/13/24)
A7.37 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA G 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 9 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.38 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA H 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.39 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA H 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.40 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA H 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.41 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA H 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.42 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.43 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA K 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.44 ENLARGED PLANS & ELEVATIONS - LEVEL 01 - AREA K 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.45 ENLARGED PLANS & ELEVATIONS - LEVEL 02 - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.46 ENLARGED PLANS & ELEVATIONS - LEVEL 02 - AREA B 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.47 ENLARGED PLANS & ELEVATIONS - LEVEL 02 - AREA J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.48 ENLARGED PLANS & ELEVATIONS - LEVEL 02 - AREA K 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.49 ENLARGED PLANS & ELEVATIONS - LEVEL 03 - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.50 ENLARGED PLANS & ELEVATIONS - LEVEL 03 - AREA B 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.51 ENLARGED PLANS & ELEVATIONS - LEVEL 03 - AREA J 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.52 ENLARGED PLANS & ELEVATIONS - LEVEL 03 - AREA K 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A7.53 ENLARGED PLANS & ELEVATIONS - LEVEL 04 - AREA J 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.00 LEVEL 00 - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.01 LEVEL 01 - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.02 LEVEL 02 - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.03 LEVEL 03 - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.04 LEVEL 04 - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.10A LEVEL 00 - AREA A - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
Page 10 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
A8.10B LEVEL 00 - AREA B - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.10C LEVEL 00 - AREA C - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.10D LEVEL 00 - AREA D - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.10H LEVEL 00 - AREA H - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.10J LEVEL 00 - AREA J - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.10K LEVEL 00 - AREA K - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.11A LEVEL 01 - AREA A - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.11B LEVEL 01 - AREA B - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.11D LEVEL 01 - AREA D - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.11E LEVEL 01 - AREA E - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.11F LEVEL 01 - AREA F - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.11G LEVEL 01 - AREA G - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.11H LEVEL 01 - AREA H - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.11J LEVEL 01 - AREA J - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.11K LEVEL 01 - AREA K - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.12A LEVEL 02 - AREA A - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.12B LEVEL 02 - AREA B - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.12E LEVEL 02 - AREA E - FINISH PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.12F LEVEL 02 - AREA F - FINISH PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.12J LEVEL 02 - AREA J - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.12K LEVEL 02 - AREA K - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.13A LEVEL 03 - AREA A - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
A8.13B LEVEL 03 - AREA B - FINISH PLAN 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 11 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.13J LEVEL 03 - AREA J - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.13K LEVEL 03 - AREA K - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.14J LEVEL 04 - AREA J - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.14K LEVEL 04 - AREA K - FINISH PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.20 INTERIOR FINISH LEGEND 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.20A INTERIOR FINISH NOTES & SCHEDULES 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.21 ROOM FINISH SCHEDULE - LEVEL 00 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.22 ROOM FINISH SCHEDULE - LEVEL 01 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.23 ROOM FINISH SCHEDULE - LEVEL 02 & 03 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A8.24 ROOM FINISH SCHEDULE - LEVEL 04 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A9.00A INTERIOR DETAILS - FLOOR TRANSITION DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A9.00B INTERIOR DETAILS - RESTROOM WALL TILE PATTERNS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A9.00C INTERIOR DETAILS - MILLWORK 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A10.00 SIGNAGE - EXTERIOR 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A10.01 SIGNAGE - INTERIOR ROOM SIGNAGE DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
A10.02 SIGNAGE - INTERIOR ROOM SIGNAGE SCHEDULE 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AD1.00 SITE DEMOLITION PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AF1.00 FIELD HOUSE FLOOR PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AF1.01 FIELD HOUSE DIMENSION PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AF1.02 DUGOUT DRAWINGS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AF2.00 FIELD HOUSE REFLECTED CEILING PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AF3.00 FIELD HOUSE ROOF PLAN 1 12/13/2024 12/13/2024
(12/13/24)
Page 12 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
AF3.01 FIELD HOUSE ROOF DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AF4.00 FIELD HOUSE ELEVATIONS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AF5.00 FIELD HOUSE SECTIONS & WALL SECTIONS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AF5.01 FIELD HOUSE SECTION DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AF5.02 FIELD HOUSE METAL CANOPY SECTIONS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AF7.00 FIELD HOUSE - INTERIOR ELEVATIONS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AF8.00 FIELD HOUSE - FINISH PLAN AND SCHEDULE 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AS1.00 ARCHITECTURAL SITE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AS1.01 TEMPORARY FLOOR PLAN & SECTION 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AS1.02 TEMPORARY WALL SECTION 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AS1.03 MONUMENTAL SIGN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AS1.10 SPECIALTY SITE FENCING 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
AS1.11 SPECIALTY SITE FENCING 0 12/13/2024 12/13/2024
(12/13/24)
Civil
100% CONSTRUCTION DRAWINGS
C-001 PROJECT NOTES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-003 EXISTING CONDITIONS PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-004 DEMOLITION PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-005 EXISTING SANITARY SEWER RE-ROUTE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-101 SITE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-102 STRIPING & SIGNAGE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-201 GRADING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-301 SANITARY SEWER & WATER UTILITY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-302 STORM SEWER UTILITY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
Page 13 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
C-303 FIRE SITE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-401 STORM SEWER PROFILES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-402 STORM SEWER PROFILES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-403 SEWER PROFILES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-601 EROSION AND SEDIMENT CONTROL PLAN NOTES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-602 EROSION AND SEDIMENT CONTROL PLAN NOTES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-603 EROSION AND SEDIMENT CONTROL PLAN NOTES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-604 EROSION AND SEDIMENT CONTROL PLAN NOTES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-701 PHASE l EROSION CONTROL PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-702 PHASE ll EROSION CONTROL PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-703 PHASE lll EROSION CONTROL PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-704 PHASE lV EROSION CONTROL PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-705 PHASE V EROSION CONTROL PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-901 DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-902 DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-903 DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-904 DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-905 DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-906 DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-907 DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-908 DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-909 DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
C-910 DETAILS 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 14 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-911 DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-912 DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-913 DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-914 DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
C-915 DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G-001 COVER SHEET 1 12/13/2024 12/13/2024
(12/13/24)
Code
100% CONSTRUCTION DRAWINGS
CP1.00 LEVEL 00 - CODE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.00a LEVEL 00 - CODE PLAN - PHASE 1 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.01 LEVEL 01 - CODE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.01a LEVEL 01 - CODE PLAN PHASE 1 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.02 LEVEL 02 - CODE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.03 LEVEL 03 - CODE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.04 LEVEL 04 - CODE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.05 LEVEL 00 - PLUMBING FIXTURE CODE PLANS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.06 LEVEL 01 - PLUMBING FIXTURE CODE PLANS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.07 LEVEL 02 - PLUMBING FIXTURE CODE PLANS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.08 LEVEL 03 - PLUMBING FIXTURE CODE PLANS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.09 LEVEL 04 - PLUMBING FIXTURE CODE PLANS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.10A LEVEL 00 - AREA A - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.10B LEVEL 00 - AREA B - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.10C LEVEL 00 - AREA C - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
Page 15 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
CP1.10D LEVEL 00 - AREA D - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.10H LEVEL 00 - AREA H - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.10J LEVEL 00 - AREA J - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.10K LEVEL 00 - AREA K - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.11A LEVEL 01 - AREA A - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.11B LEVEL 01 - AREA B - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.11D LEVEL 01 - AREA D - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.11E LEVEL 01 - AREA E - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.11F LEVEL 01 - AREA F - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.11G LEVEL 01 - AREA G - CODE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.11H LEVEL 01 - AREA H - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.11J LEVEL 01 - AREA J - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.11K LEVEL 01 - AREA K - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.12A LEVEL 02 - AREA A - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.12B LEVEL 02 - AREA B - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.12E LEVEL 02 - AREA E - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.12G LEVEL 02 - AREA G - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.12J LEVEL 02 - AREA J - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.12K LEVEL 02 - AREA K - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.13A LEVEL 03 - AREA A - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.13B LEVEL 03 - AREA B - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.13J LEVEL 03 - AREA J - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
CP1.13K LEVEL 03 - AREA K - CODE PLAN 0 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 16 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.14J LEVEL 04 - AREA J - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
CP1.14K LEVEL 04 - AREA K - CODE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
Electrical
100% CONSTRUCTION DRAWINGS
E0.01 ELECTRICAL SITE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E0.02 ELECTRICAL SITE PLAN RISER DIAGRAM & ELECTRICAL LAYOUT 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E0.03 ELECTRICAL SITE LIGHTING PLAN PART A 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E0.03 E0.04 ELECTRICAL SITE LIGHTING PLAN PART C 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E0.04 ELECTRICAL SITE LIGHTING PLAN PART B 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.10A LEVEL 00 - AREA A - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.10B LEVEL 00 - AREA B - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.10C LEVEL 00 - AREA C - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.10D LEVEL 00 - AREA D - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.10H LEVEL 00 - AREA H - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.10J LEVEL 00 - AREA J - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.10K LEVEL 00 - AREA K - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.10M ENLARGED KITCHEN & CULINARY ARTS POWER PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.11A LEVEL 01 - AREA A - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.11B LEVEL 01 - AREA B - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.11D LEVEL 01 - AREA D - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.11E LEVEL 01 - AREA E - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.11F LEVEL 01 - AREA F - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.11G LEVEL 01 - AREA G - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
Page 17 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
E1.11GA LEVEL 01 - AREA G - POWER PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.11H LEVEL 01 - AREA H - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.11J LEVEL 01 - AREA J - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.11K LEVEL 01 - AREA K - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.12A LEVEL 02 - AREA A - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.12B LEVEL 02 - AREA B - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.12E LEVEL 02 - AREA E - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.12J LEVEL 02 - AREA J - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.12K LEVEL 02 - AREA K - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.13A LEVEL 03 - AREA A - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.13B LEVEL 03 - AREA B - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.13J LEVEL 03 - AREA J - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.13K LEVEL 03 - AREA K - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.14J LEVEL 04 - AREA J - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E1.14K LEVEL 04 - AREA K - POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.10A LEVEL 00 - AREA A - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.10B LEVEL 00 - AREA B - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.10C LEVEL 00 - AREA C - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.10D LEVEL 00 - AREA D - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.10H LEVEL 00 - AREA H - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.10J LEVEL 00-AREA J - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.10K LEVEL 00 - AREA K - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
E2.11A LEVEL 01 - AREA A - LIGHTING PLAN 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 18 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.11B LEVEL 01 - AREA B - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.11D LEVEL 01 - AREA D - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.11E LEVEL 01 - AREA E - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.11F LEVEL 01 - AREA F - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.11G LEVEL 01 - AREA G - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.11G1 LEVEL 01 - AREA G - LIGHTING PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.11GA LEVEL 01 - AREA G - LIGHTING PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.11GB LEVEL 01 - AREA G - LIGHTING PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.11GC LEVEL 01 - AREA G - LIGHTING PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.11GFL LEVEL 01 - AREA G - FLOOR LIGHTING PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.11H LEVEL 01 - AREA H - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.11J LEVEL 01 - AREA J - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.11K LEVEL 01 - AREA K - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.12A LEVEL 02 - AREA A - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.12B LEVEL 01 - AREA B - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.12E LEVEL 02 - AREA E - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.12J LEVEL 02 - AREA J - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.12K LEVEL 02 - AREA K - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.13A LEVEL 03 - AREA A - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.13B LEVEL 03 - AREA B - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.13J LEVEL 03 - AREA J - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.13K LEVEL 03 - AREA K - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
Page 19 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
E2.14J LEVEL 04 - AREA J - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.14K LEVEL 04 - AREA K - LIGHTING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E2.14L LEVEL 00-04 - STAIR LIGHTING PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.10A LEVEL 00 - AREA A - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.10B LEVEL 00 - AREA B - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.10C LEVEL 00 - AREA C - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.10D LEVEL 00 - AREA D - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.10H LEVEL 00 - AREA H - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.10J LEVEL 00 - AREA J - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.10K LEVEL 00 - AREA K - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.11A LEVEL 01 - AREA A - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.11B LEVEL 01 - AREA B - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.11D LEVEL 01 - AREA D - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.11E LEVEL 01 - AREA E - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.11F LEVEL 01 - AREA F - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.11G LEVEL 01 - AREA G - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.11H LEVEL 01 - AREA H - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.11J LEVEL 01 - AREA J - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.11K LEVEL 01 - AREA K - MECHANICAL POWER PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.12A LEVEL 02 - AREA A - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.12B LEVEL 02 - AREA B - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.12F LEVEL 02 - AREA E - MECHANICAL POWER PLAN 1 12/13/2024 12/13/2024
(12/13/24)
E3.12G LEVEL 02 - AREA G - MECHANICAL POWER PLAN 1 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 20 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.12J LEVEL 02 - AREA J - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.12K LEVEL 02 - AREA K - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.13A LEVEL 03 - AREA A - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.13B LEVEL 03 - AREA B - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.13J LEVEL 03 - AREA J - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.13K LEVEL 03 - AREA K - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.14J LEVEL 04 - AREA J - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.14K LEVEL 04 - AREA K - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.15A ROOF - AREA A - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.15B ROOF - AREA B - MECHANICAL POWER PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.15C ROOF - AREA C - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.15D ROOF - AREA D - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.15E ROOF - AREA E - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.15F ROOF - AREA F - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.15G ROOF - AREA G - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.15H LEVEL 01 - ROOF - AREA H - MECHANICAL POWER PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.15J ROOF - AREA J - MECHANICAL POWER PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E3.15K ROOF - AREA K - MECHANICAL POWER PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.10A LEVEL 00 - AREA A - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.10B LEVEL 00 - AREA B - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.10C LEVEL 00 - AREA C - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.10D LEVEL 00 - AREA D - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
Page 21 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
E4.10H LEVEL 00 - AREA H - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.10J LEVEL 00 - AREA J - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.10K LEVEL 00 - AREA K - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.11A LEVEL 01 - AREA A - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.11B TRUE NORTH 1 2 3 4 5 6 7 8 9 10 11 12 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.11D LEVEL 01 - AREA D - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.11E LEVEL 01 - AREA E - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.11F LEVEL 01 - AREA F - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.11G LEVEL 01 - AREA G - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.11H LEVEL 01 - AREA H - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.11J LEVEL 01 - AREA J - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.11K LEVEL 01 - AREA K - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.12A LEVEL 02 - AREA A - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.12B LEVEL 02 - AREA B - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.12G LEVEL 02 - AREA G - AUXILIARY PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.12J LEVEL 02 - AREA J - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.12K LEVEL 02 - AREA K - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.13A LEVEL 03 - AREA A - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.13B LEVEL 03 - AREA B - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.13J LEVEL 03 - AREA J - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.13K LEVEL 03 - AREA K - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E4.14J LEVEL 04 - AREA J - AUXILIARY PLAN 2 12/13/2024 12/13/2024
(12/13/24)
E4.14K LEVEL 04 - AREA K - AUXILIARY PLAN 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 22 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
E5.01 ELECTRICAL DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E5.02 ELECTRICAL DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E5.03 ELECTRICAL DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E5.04 ELECTRICAL DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E5.05 ELECTRICAL DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E5.06 ELECTRICAL DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E5.07 ELECTRICAL DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E5.08 ELECTRICAL DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E5.09 ELECTRICAL DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E5.10 ELECTRICAL DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E6.01 OVERALL ELECTRICAL RISER DIAGRAM 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E6.02 ELECTRICAL RISER DIAGRAM - PART 'A' 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E6.03 ELECTRICAL RISER DIAGRAM 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E6.04 ELECTRICAL RISER DIAGRAM 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.01 CENTER CORE - LEVEL 00 PANELBOARD SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.02 CENTER CORE - LEVEL 00 & LEVEL 01 PANELBOARD SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.03 CENTER CORE - LEVEL 01 PANELBOARD SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.04 CENTER CORE - LEVEL 01 PANELBOARD SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.05 MIDDLE SCHOOL - LEVEL 00 PANELBOARD SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.06 MIDDLE SCHOOL - LEVEL 00 PANELBOARD SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.07 HIGH SCHOOL - LEVEL 00 PANELBOARD SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.08 MIDDLE SCHOOL LEVEL 01 PANELBOARD SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
Page 23 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
E7.09 HIGH SCHOOL -LEVEL 01 PANELBOARD SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.10 MIDDLE SCHOOL - LEVEL 02 PANELBOARD SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.11 HIGH SCHOOL - LEVEL 02 PANELBOARD SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.12 MIDDLE SCHOOL - LEVEL 03 PANELBOARD SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.13 MIDDLE SCHOOL - LEVEL 03 PANELBOARD SCHEDULES 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.14 HIGH SCHOOL - LEVEL 03 PANELBOARD SCHEDULES 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.15 HIGH SCHOOL - LEVEL 04 PANELBOARD SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.16 LUMINAIRE & RELAY SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.17 GENERAL EQUIPMENT SCHEDULES 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.18 GENERAL EQUIPMENT SCHEDULES 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E7.19 GENERAL EQUIPMENT SCHEDULES 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E8.01 FIELD HOUSE POWER & MECHANICAL POWER PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E8.02 FIELD HOUSE LIGHTING & AUXILIARY PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E8.03 FIELD HOUSE ELECTRICAL RISER DIAGRAM & PANEL SCHEDULE 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.10A LEVEL 00 - AREA A - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.10B LEVEL 00 - AREA B - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.10C LEVEL 00 - AREA C - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.10D LEVEL 00 - AREA D - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.10H LEVEL 00 - AREA H - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.10J LEVEL 00 - AREA J - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.10K LEVEL 00 - AREA K - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.11A LEVEL 01 - AREA A - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
E9.11B LEVEL 01 - AREA B - INTERCOM PLAN 0 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 24 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.11D LEVEL 01 - AREA D - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.11E LEVEL 01 - AREA E - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.11F LEVEL 01 - AREA F - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.11G LEVEL 01 - AREA G - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.11H LEVEL 01 - AREA H - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.11J LEVEL 01 - AREA J - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.11K LEVEL 01 - AREA K - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.12A LEVEL 02 - AREA A - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.12B LEVEL 02 - AREA B - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.12J LEVEL 02 - AREA J - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.12K LEVEL 02 - AREA K - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.13A LEVEL 03 - AREA A - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.13B LEVEL 03 - AREA B - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.13J LEVEL 03 - AREA J - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.13K LEVEL 03 - AREA K - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.14J LEVEL 04 - AREA J - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E9.14K LEVEL 04 - AREA K - INTERCOM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.10A LEVEL 00 - AREA A - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.10B LEVEL 00 - AREA B - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.10C LEVEL 00 - AREA C - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.10D LEVEL 00 - AREA D - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.10H LEVEL 00 - AREA H - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
Page 25 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
E10.10J LEVEL 00 - AREA J - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.10K LEVEL 00 - AREA K - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.11A LEVEL 01 - AREA A - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.11B LEVEL 01 - AREA B - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.11D LEVEL 01 - AREA D - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.11E LEVEL 01 - AREA E - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.11F LEVEL 01 - AREA F - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.11G LEVEL 01 - AREA G - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.11H LEVEL 01 - AREA H - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.11J LEVEL 01 - AREA J - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.11K LEVEL 01 - AREA K - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.12A LEVEL 02 - AREA A - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.12B LEVEL 02 - AREA B - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.12J LEVEL 02 - AREA J - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.12K LEVEL 02 - AREA K - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.13A LEVEL 03 - AREA A - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.13B LEVEL 03 - AREA B - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.13J LEVEL 03 - AREA J - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.13K LEVEL 03 - AREA K - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.14J LEVEL 04 - AREA J - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
E10.14K LEVEL 04 - AREA K - FIRE ALARM PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
GE0.01 ELECTRICAL LEGENDS & NOTES 2 12/13/2024 12/13/2024
(12/13/24)
GE0.02 ELECTRICAL NOTES & ABBREVIATIONS 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 26 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
Equipment
100% CONSTRUCTION DRAWINGS
QF0.0 FOODSERVICE GENERAL NOTES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF0.1 FOODSERVICE EQUIPMENT STANDARD DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF0.2 FOODSERVICE EQUIPMENT STANDARD DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF1.0 FOODSERVICE EQUIPMENT PLAN - OVERALL LEVEL 00 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF1.1 FOODSERVICE EQUIPMENT PLAN - OVERALL LEVEL 01 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF1.2 FOODSERVICE EQUIPMENT PLAN - HIGH SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF1.3 FOODSERVICE EQUIPMENT PLAN - MIDDLE SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF1.4 FOODSERVICE EQUIPMENT PLAN - CULINARY 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF1.5 FOODSERVICE EQUIPMENT SCHEDULE 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF1.6 FOODSERVICE EQUIPMENT SCHEDULE 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF1.7 FOODSERVICE EQUIPMENT SCHEDULE 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF2.1 FOODSERVICE EQUIPMENT ELEVATION KEY PLAN - HIGH SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF2.2 FOODSERVICE EQUIPMENT ELEVATION KEY PLAN - MIDDLE SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF2.3 FOODSERVICE EQUIPMENT ELEVATION KEY PLAN - CULINARY 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF2.4 FOODSERVICE EQUIPMENT ELEVATIONS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF2.5 FOODSERVICE EQUIPMENT ELEVATIONS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF2.6 FOODSERVICE EQUIPMENT ELEVATIONS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF2.7 FOODSERVICE EQUIPMENT ISOMETRIC VIEW - HIGH & MIDDLE SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF2.8 FOODSERVICE EQUIPMENT ISOMETRIC VIEW - CULINARY 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF3.1 FOODSERVICE EQUIPMENT PLUMBING SUPPLY PLAN - HIGH SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF3.2 FOODSERVICE EQUIPMENT PLUMBING SUPPLY PLAN - MIDDLE SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
Page 27 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
QF3.3 FOODSERVICE EQUIPMENT PLUMBING SUPPLY PLAN - CULINARY 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF3.4 FOODSERVICE EQUIPMENT PLUMBING DRAIN PLAN - HIGH SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF3.5 FOODSERVICE EQUIPMENT PLUMBING DRAIN PLAN - MIDDLE SCHOOL 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF3.6 FOODSERVICE EQUIPMENT PLUMBING DRAIN PLAN - CULINARY 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF3.7 FOODSERVICE EQUIPMENT PLUMBING SCHEDULES 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF4.1 FOODSERVICE EQUIPMENT ELECTRICAL PLAN - HIGH SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF4.2 FOODSERVICE EQUIPMENT ELECTRICAL PLAN - MIDDLE SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF4.3 FOODSERVICE EQUIPMENT ELECTRICAL PLAN - CULINARY 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF4.4 FOODSERVICE EQUIPMENT ELECTRICAL SCHEDULE 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF4.5 FOODSERVICE EQUIPMENT ELECTRICAL SCHEDULE - CON'T 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF5.1 FOODSERVICE EQUIPMENT SLAB PENETRATION PLAN - HIGH SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF5.2 FOODSERVICE EQUIPMENT SLAB PENETRATION PLAN - MIDDLE SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF5.3 FOODSERVICE EQUIPMENT SLAB PENETRATION PLAN - CULINARY 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF6.1 FOODSERVICE WALK-IN VENDOR DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF6.2 FOODSERVICE REFRIGERATION SYSTEM VENDOR DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF6.3 FOODSERVICE WALK-IN STANDARD DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF7.1 FOODSERVICE EQUIPMENT SPECIAL CONDITIONS PLAN - HIGH SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF7.2 FOODSERVICE EQUIPMENT SPECIAL CONDITIONS PLAN - MIDDLE SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF7.3 FOODSERVICE EQUIPMENT SPECIAL CONDITIONS PLAN - CULINARY 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QF8.1 FOODSERVICE POWERWASH VENDOR DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT0.01 THEATRICAL GENERAL INFORMATION 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT1.11 THEATRICAL LIGHTING PLAN, AUDITORIUM, LEVEL 1 2 12/13/2024 12/13/2024
(12/13/24)
QT1.12 THEATRICAL LIGHTING PLAN, BLACK BOX, LEVEL 1 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 28 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT1.13 THEATRICAL LIGHTING PLAN, BROADCAST STUDIO, LEVEL 1 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT1.14 THEATRICAL LIGHTING PLAN, AUDITORIUM, LEVEL 2 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT1.15 THEATRICAL LIGHTING PLAN, BLACK BOX, LEVEL 2 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT1.16 THEATRICAL LIGHTING PLAN, BROADCAST STUDIO, LEVEL 2 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT1.21 THEATRICAL DRAPERY PLAN, AUDITORIUM, LEVEL 1 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT1.22 THEATRICAL DRAPERY PLAN, BLACK BOX, LEVEL 1 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT1.23 THEATRICAL DRAPERY PLAN, VIDEO PRODUCTION, LEVEL 1 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT1.31 THEATRICAL RIGGING PLAN, AUDITORIUM, LEVEL 1 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT1.32 THEATRICAL RIGGING PLAN, AUDITORIUM, LEVEL 2 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT1.33 THEATRICAL RIGGING PLAN, BLACK BOX, LEVEL 2 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT1.34 THEATRICAL RIGGING PLAN, VIDEO PRODUCTION, LEVEL 1 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT1.41 THEATRICAL MODULAR PLATFORM PLAN, BLACK BOX, LEVEL 1 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT3.21 THEATRICAL DRAPERY, LONGITUDINAL SECTION, AUDITORIUM 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT3.22 THEATRICAL DRAPERY, LONGITUDINAL SECTION, BLACK BOX 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT3.23 THEATRICAL DRAPERY, LONGITUDINAL SECTION, VIDEO PRODUCTION 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT3.31 THEATRICAL RIGGING, LONGITUDINAL SECTION, AUDITORIUM 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT3.32 THEATRICAL RIGGING, TRANSVERSE SECTION, AUDITORIUM 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT3.33 THEATRICAL RIGGING, LONGITUDINAL SECTION, BLACK BOX 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT3.34 THEATRICAL RIGGING LONGITUDINAL SECTION, VIDEO PRODUCTION 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT5.01 THEATRICAL WIRING DEVICE DETAILS & SCHEDULE 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT5.02 THEATRICAL CONTROL DEVICE DETAILS & SCHEDULE 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT5.21 THEATRICAL & ACOUSTIC DRAPERY DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
Page 29 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
QT5.31 THEATRICAL RIGGING DETAILS, MOTORIZED 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT5.32 THEATRICAL RIGGING DETAILS, DEAD-HUNG AND PIPE GRID 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT5.41 THEATRICAL PORTABLE PLATFORM DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT6.01 THEATRICAL LIGHTING CONTROL DIAGRAM 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT6.02 THEATRICAL LIGHTING PANEL SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
QT6.03 THEATRICAL LIGHTING PANEL SCHEDULES 1 12/13/2024 12/13/2024
(12/13/24)
General
100% CONSTRUCTION DRAWINGS
G1.01 DRAWING INDEX 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.02 DRAWING INDEX 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.03 GENERAL NOTES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.04 GENERAL INFORMATION & MOCKUP WALL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.11 ACCESSIBILITY DATA 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.12 ACCESSIBLE PLUMBING LAYOUTS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.20 TYPICAL CONSTRUCTION TYPES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.21 PARTITION TYPES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.22 PARTITION DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.23 UL ASSEMBLY U465 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.24 UL ASSEMBLY U411 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.25 UL ASSEMBLY U415 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.26 UL ASSEMBLY U444 + U445 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.27 UL ASSEMBLY U419 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.28 UL ASSEMBLY U454 + U905 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
G1.31 PENETRATION FIRESTOPPING SYSTEMS 2 12/13/2024 12/13/2024
(12/13/24)
Page 30 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
G2.00 LIFE SAFETY - CODE ANALYSIS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
T1 TITLE SHEET 2 12/13/2024 12/13/2024
(12/13/24)
Landscape
100% CONSTRUCTION DRAWINGS
L0.00 HARDSCAPE NOTES 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L1.00 OVERALL HARDSCAPE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L1.01 HARDSCAPE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L1.02 HARDSCAPE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L1.03 HARDSCAPE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L1.04 HARDSCAPE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L1.05 HARDSCAPE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L1.06 HARDSCAPE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L1.07 HARDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L1.08 HARDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L1.09 HARDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L1.10 HARDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L1.11 GRADING & DRAINAGE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L1.12 GRADING & DRAINAGE PLAN 3 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L1.13 GRADING & DRAINAGE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L2.01 HARDSCAPE DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L2.02 HARDSCAPE DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L2.03 HARDSCAPE DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L2.04 HARDSCAPE DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L2.05 HARDSCAPE DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
Page 31 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
L2.06 HARDSCAPE DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L2.07 HARDSCAPE DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L2.08 HARDSCAPE DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L3.00 OVERALL LANDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L3.01 LANDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L3.02 LANDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L3.03 LANDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L3.04 LANDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L3.05 HARDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L3.06 LANDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L3.07 LANDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L3.08 LANDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L3.09 LANDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L3.10 LANDSCAPE PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
L3.11 LANDSCAPE PLANT SCHEDULE 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
LP.01 TREE REMOVAL PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
LP.02 TREE RECOMPENSE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
Mechanical
100% CONSTRUCTION DRAWINGS
M1.00 LEVEL 0 - OVERALL FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.00F LEVEL 01 - FIELDHOUSE - HVAC FLOOR PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.01 LEVEL 01 - OVERALL FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.02 LEVEL 02 - OVERALL FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.03 LEVEL 03 - OVERALL FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
Page 32 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
M1.04 LEVEL 04 - OVERALL FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.05 HVAC ROOF PLAN - AREA A & B 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.06 HVAC ROOF PLAN - AREA C & D 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.07 HVAC ROOF PLAN - AREA E & F 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.08 HVAC ROOF PLAN - AREA G & H 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.09 HVAC ROOF PLAN - AREA J & K 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.10A LEVEL 00 - AREA A - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.10B LEVEL 00 - AREA B - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.10C LEVEL 00 - AREA C - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.10D LEVEL 00 - AREA D - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.10H LEVEL 00 - AREA H - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.10J LEVEL 00 - AREA J - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.10K LEVEL 00 - AREA K & L - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.11A LEVEL 01 - AREA A - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.11B LEVEL 01 - AREA B - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.11D LEVEL 01 - AREA D - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.11E LEVEL 01 - AREA E - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.11F LEVEL 01 - AREA F - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.11G LEVEL 01 - AREA G - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.11H LEVEL 01 - AREA H - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.11J LEVEL 01 - AREA J - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.11K LEVEL 01 - AREA K & L - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
M1.12A LEVEL 02 - AREA A - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 33 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.12B LEVEL 02 - AREA B - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.12E LEVEL 02 - AREA E - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.12F LEVEL 02 - AREA F & G - HVAC FLOOR PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.12J LEVEL 02 - AREA J HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.12K LEVEL 02 - AREA K & L - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.13A LEVEL 03 - AREA A - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.13B LEVEL 03 - AREA B - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.13J LEVEL 03 - AREA J HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.13K LEVEL 03 - AREA K & L - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.14J LEVEL 04 - AREA J - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M1.14K LEVEL 04 - AREA K - HVAC FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.10A LEVEL 00 - AREA A - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.10B LEVEL 00 - AREA B - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.10C LEVEL 00 - AREA C - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.10J LEVEL 00 - AREA J - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.10K LEVEL 00 - AREA K & L - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.11A LEVEL 01 - AREA A - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.11B LEVEL 01 - AREA B - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.11D LEVEL 01 - AREA D - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.11H LEVEL 01 - AREA H - ERU FLOOR PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.11J LEVEL 01 - AREA J - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.11K LEVEL 01 - AREA K & L - ERU FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
Page 34 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
M2.12A LEVEL 02 - AREA A - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.12B LEVEL 02 - AREA B - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.12J LEVEL 02 - AREA J - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.12K LEVEL 02 - AREA K & L - ERU FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.13A LEVEL 03 - AREA A - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.13B LEVEL 03 - AREA B - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.13J LEVEL 03 - AREA J - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.13K LEVEL 03 - AREA K & L - ERU FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.14J LEVEL 04 - AREA J - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M2.14K LEVEL 04 - AREA K - ERU FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.10A LEVEL 00 - AREA A - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.10B LEVEL 00 - AREA B - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.10C LEVEL 00 - AREA C - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.10D LEVEL 00 - AREA D - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.10H LEVEL 00 - AREA H - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.10J LEVEL 00 - AREA J - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.10K LEVEL 00 - AREA K & L - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.11A LEVEL 01 - AREA A - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.11B LEVEL 01 - AREA B - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.11D LEVEL 01 - AREA D - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.11H LEVEL 01 - AREA H - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.11J LEVEL 01 - AREA J - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
M3.11K LEVEL 01 - AREA K & L - PIPING FLOORPLAN 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 35 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.12A LEVEL 02 - AREA A - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.12B LEVEL 02 - AREA B - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.12J LEVEL 02 - AREA J - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.12K LEVEL 02 - AREA K & L - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.13A LEVEL 03 - AREA A - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.13B LEVEL 03 - AREA B - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.13J LEVEL 03 - AREA J - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.13K LEVEL 03 - AREA K & L - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.14J LEVEL 04 - AREA J - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M3.14K LEVEL 04 - AREA K - PIPING FLOORPLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M4.00 ENLARGED VIEWS - MECHANICAL ROOM 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M4.01 ENLARGED VIEWS - LEVEL 00 - AREA D 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M4.02 ENLARGED VIEWS - LEVEL 01 - AREA J 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M5.00 SECTION VIEWS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M5.01 SECTION VIEWS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M6.00 HVAC SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M6.01 HVAC SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M6.02 HVAC SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M6.03 HVAC SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M7.00 HVAC DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M7.01 HVAC DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M7.02 HVAC DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
Page 36 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
M7.03 HVAC DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M7.04 HVAC DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M7.05 HVAC DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M7.06 HVAC DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M7.07 HVAC DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M7.08 HVAC DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M7.09 HVAC DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M8.00 HVAC CONTROLS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
M9.00 HVAC COMCHECK 0 12/13/2024 12/13/2024
(12/13/24)
Plumbing
100% CONSTRUCTION DRAWINGS
P0.0 PLUMBING LEGENDS AND SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P1.00 LEVEL 00 - FIRE SPRINKLER FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P1.01 LEVEL 01 - FIRE SPRINKLER FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P1.02 LEVEL 02 - FIRE SPRINKLER FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P1.03 LEVEL 03 - FIRE SPRINKLER FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P1.04 LEVEL 04 - FIRE SPRINKLER FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.10A LEVEL 00 - AREA A - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.10B LEVEL 00 - AREA B - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.10C LEVEL 00 - AREA C - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.10D LEVEL 00 - AREA D - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.10H LEVEL 00 - AREA H - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.10J LEVEL 00 - AREA J - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.10K LEVEL 00 - AREAS K&L - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
Page 37 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
P2.11A LEVEL 01 - AREA A - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.11B LEVEL 01 - AREA B - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.11D LEVEL 01 - AREA D - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.11E LEVEL 01 - AREA E - S,W&V FLOOR PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.11F LEVEL 01 - AREA F - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.11G LEVEL 01 - AREA G - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.11H LEVEL 01 - AREA H - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.11J LEVEL 01 - AREA J - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.11K LEVEL 01 - AREAS K&L - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.12A LEVEL 02 - AREA A - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.12B LEVEL 02 - AREA B - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.12J LEVEL 02 - AREA J - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.12K LEVEL 02 - AREAS K&L - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.13A LEVEL 03 - AREA A - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.13B LEVEL 03 - AREA B - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.13J LEVEL 03 - AREA J - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.13K LEVEL 03 - AREAS K&L - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.14J LEVEL 04 - AREA J - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P2.14K LEVEL 04 - AREA K - S,W&V FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.10A LEVEL 00 - AREA A - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.10B LEVEL 00 - AREA B - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.10C LEVEL 00 - AREA C - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
P3.10D LEVEL 00 - AREA D - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 38 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.10H LEVEL 00 - AREA H - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.10J LEVEL 00 - AREA J - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.10K LEVEL 00 - AREAS K&L - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.11 A LEVEL 01 -AREA A - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.11B LEVEL 01 - AREA B - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.11D LEVEL 01 - AREA D - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.11E LEVEL 01 - AREA E - H&CW FLOOR PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.11F LEVEL 01 - AREA F - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.11G LEVEL 01 - AREA G - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.11H LEVEL 01 - AREA H - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.11 J LEVEL 01 - AREA J - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.11K LEVEL 01 - AREAS K&L - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.12A LEVEL 02 - AREA A - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.12B LEVEL 02 - AREA B - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.12J LEVEL 02 - AREA J - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.12K LEVEL 02 - AREAS K&L - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.13A LEVEL 03 - AREA A - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.13B LEVEL 03 - AREA B - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.13J LEVEL 03 - AREA J - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.13K LEVEL 03 - AREAS K&L - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.14J LEVEL 04 - AREA J - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.14K LEVEL 04 - AREA K - H&CW FLOOR PLAN 2 12/13/2024 12/13/2024
(12/13/24)
Page 39 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
P3.15A ROOF LEVEL - AREA A - GAS ROOF PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.15B ROOF LEVEL - AREA B - GAS ROOF PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.15C ROOF LEVEL - AREA C - GAS ROOF PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.15D ROOF LEVEL - AREA D - GAS ROOF PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.15E ROOF LEVEL - AREA E - GAS ROOF PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.15F ROOF LEVEL - AREA F - GAS ROOF PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.15G ROOF LEVEL - AREA G - GAS ROOF PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.15H ROOF LEVEL - AREA H - GAS ROOF PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.15J ROOF LEVEL - AREA J - GAS ROOF PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P3.15K ROOF LEVEL - AREA K - GAS ROOF PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P4.01 ENLARGED PLANS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P5.01 RISERS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P6.01 DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P6.02 DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P6.03 DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
P6.04 DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
PX2.01 ACCESSORY BUILDING 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
PX3.01 ACCESSORY BUILDING 1 12/13/2024 12/13/2024
(12/13/24)
Structural
100% CONSTRUCTION DRAWINGS
S0.01 NOTES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S0.02 STRUCTURAL GENERAL NOTES & SPECIAL INSPECTIONS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S0.03 STRUCTURAL GENERAL NOTES, SYMBOLS & ABBREVIATIONS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.10A LEVEL 00 - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
Page 40 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
S1.10B LEVEL 00 - AREA B 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.10C LEVEL 00 - AREA C 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.10D LEVEL 00 - AREA D 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.10E LEVEL 00 - AREA E 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.10G LEVEL 00 - AREA G 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.10H LEVEL 00 - AREA H 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.10J LEVEL 00 - AREA J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.10K LEVEL 00 - AREA K 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.11A LEVEL 01 - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.11B LEVEL 01 - AREA B 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.11C LEVEL 01 - AREA C 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.11D LEVEL 01 - AREA D 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.11E LEVEL 01 - AREA E 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.11F LEVEL 01 - AREA F 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.11G LEVEL 01 - AREA G 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.11H LEVEL 01 - AREA H 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.11J LEVEL 01 - AREA J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.11K LEVEL 01 - AREA K 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.12A LEVEL 02 - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.12B LEVEL 02 - AREA B 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.12C LEVEL 02 - AREA C 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.12D LEVEL 02 - AREA D 2 12/13/2024 12/13/2024
(12/13/24)
S1.12E LEVEL 02 - AREA E 2 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 41 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.12F LEVEL 02 - AREA F 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.12G LEVEL 02 - AREA G 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.12H LEVEL 02 - AREA H 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.12J LEVEL 02 - AREA J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.12K LEVEL 02 - AREA K 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.13A LEVEL 03 - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.13B LEVEL 03 - AREA B 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.13E LEVEL 03 - AREA E 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.13F LEVEL 03 - AREA F 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.13G LEVEL 03 - AREA G 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.13H LEVEL 03 - AREA H 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.13J LEVEL 03 - AREA J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.13K LEVEL 03 - AREA K 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.14A LEVEL 04 - AREA A 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.14B LEVEL 04 - AREA B 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.14J LEVEL 04 - AREA J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.14K LEVEL 04 - AREA K 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.15J LEVEL 05 - AREA J 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S1.15K LEVEL 05 - AREA K 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S2.01 STRUCTURAL ELEVATIONS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S2.02 STRUCTURAL ELEVATIONS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S3.01 TYPICAL CONCRETE DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
Page 42 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
S3.02 TYPICAL CONCRETE DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S3.03 TYPICAL CONCRETE DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S4.01 TYPICAL MASONRY DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S4.02 TYPICAL MASONRY DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S5.01 TYPICAL STEEL DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S5.02 TYPICAL STEEL DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S5.03 TYPICAL STEEL DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S5.04 COLUMN SCHEDULE - HIGH SCHOOL 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S5.05 COLUMN SCHEDULE - ADMIN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S6.01 STRUCTURAL SECTIONS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S6.02 STRUCTURAL SECTIONS - MIDDLE SCHOOL 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S6.03 STRUCTURAL SECTIONS - CENTRAL 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S6.04 STRUCTUAL SECTIONS - HIGH SCHOOL 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S6.05 STRUCTURAL SECTIONS - HIGH SCHOOL 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S6.06 STRUCTURAL SECTIONS - ADMIN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S6.07 STRUCTURAL SECTIONS - AUD 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
S6.08 STRUCTURAL SECTIONS - SITE 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
SF1.01 LEVEL 01 - DUGOUTS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
SF1.02 LEVEL 01 - FIELD HOUSE 0 12/13/2024 12/13/2024
(12/13/24)
Telecommunications
100% CONSTRUCTION DRAWINGS
TA0.01 AUDIOVISUAL GENERAL NOTES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA0.02 AUDIOVISUAL GENERAL DETAILS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.00C LEVEL 00 - AREA C - WIRING DEVICE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
Page 43 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
TA1.00D LEVEL 00 - AREA D - WIRING DEVICE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.00H LEVEL 00 - AREA H - WIRING DEVICE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.01E LEVEL 01 - AREA E - WIRING DEVICE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.01F LEVEL 01 - AREA F - WIRING DEVICE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.01G LEVEL 01 - AREA G - WIRING DEVICE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.01H LEVEL 01 - AREA H - WIRING DEVICE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.02E LEVEL 02 - AREA E - WIRING DEVICE PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.02F LEVEL 02 - AREA F - WIRING DEVICE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1 .02G LEVEL 02 - AREA G - WIRING DEVICE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1 .03G CATWALK - AREA G - WIRING DEVICE PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.10C LEVEL 00 - AREA C - EQUIPMENT PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.10D LEVEL 00 - AREA D - EQUIPMENT PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.10H LEVEL 00 - AREA H - EQUIPMENT PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.11E LEVEL 01 - AREA E - EQUIPMENT PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.11F LEVEL 01 - AREA F - EQUIPMENT PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.11G LEVEL 01 - AREA G - EQUIPMENT PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.11H LEVEL 01 - AREA H - EQUIPMENT PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.12F LEVEL 02 - AREA F - EQUIPMENT PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA1.12G LEVEL 02 - AREA G - EQUIPMENT PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA2.00D LEVEL 00 - AREA D - REFLECTED CEILING PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA2.00H LEVEL 00 - AREA H - REFLECTED CEILING PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA2.01C LEVEL 01 - AREA C - REFLECTED CEILING PLAN 0 12/13/2024 12/13/2024
(12/13/24)
TA2.01E LEVEL 01 - AREA E - REFLECTED CEILING PLAN 0 12/13/2024 12/13/2024 100% CONSTRUCTION DRAWINGS
Page 44 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA2.01F LEVEL 01 - AREA F - REFLECTED CEILING PLAN 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA2.01G LEVEL 01 - AREA G - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA2.01H LEVEL 01 - AREA H - REFLECTED CEILING PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA2.02E LEVEL 02 - AREA E - REFLECTED CEILING PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA2.02F LEVEL 02 - AREA F - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA2.02G LEVEL 02 - AREA G - REFLECTED CEILING PLAN 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA2.02H LEVEL 02 - AREA H - REFLECTED CEILING PLAN 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA4.01 ELEVATIONS, SECTIONS AND 3D VIEWS 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA4.02 ELEVATIONS, SECTIONS AND 3D VIEWS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA4.03 ELEVATIONS, SECTIONS AND 3D VIEWS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA4.04 ELEVATIONS, SECTIONS AND 3D VIEWS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA4.05 ELEVATIONS, SECTIONS AND 3D VIEWS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA4.06 ELEVATIONS, SECTIONS AND 3D VIEWS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA4.07 ELEVATIONS, SECTIONS AND 3D VIEWS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA5.01 AUDIOVISUAL SYSTEMS DIAGRAM 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA5.02 AUDIOVISUAL SYSTEMS DIAGRAM 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA5.03 AUDIOVISUAL SYSTEMS DIAGRAM 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA5.04 AUDIOVISUAL SYSTEMS DIAGRAM 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA5.05 AUDIOVISUAL SYSTEMS DIAGRAM 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA5.06 AUDIOVISUAL SYSTEMS DIAGRAM 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA5.07 AUDIOVISUAL SYSTEMS DIAGRAM 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA5.08 AUDIOVISUAL SYSTEMS DIAGRAM 0 12/13/2024 12/13/2024
(12/13/24)
Page 45 of 46
EXHIBIT A - 100% CD DRAWING LOG
Printed on Thu Dec 19, 2024 at 11:35 am EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
100% CONSTRUCTION DRAWINGS
TA5.09 AUDIOVISUAL SYSTEMS DIAGRAM 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA6.01 AUDIOVISUAL DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA6.02 AUDIOVISUAL DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA6.03 AUDIOVISUAL DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA6.04 AUDIOVISUAL DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA6.11 AUDIOVISUAL RACK ELEVATIONS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA6.12 AUDIOVISUAL RACK ELEVATIONS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA6.21 AUDIOVISUAL RACK PANEL DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA6.51 AUDIOVISUAL WIRING DEVICE DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA6.52 AUDIOVISUAL WIRING DEVICE DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA6.53 AUDIOVISUAL WIRING DEVICE DETAILS 1 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA6.54 AUDIOVISUAL WIRING DEVICE DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA6.55 AUDIOVISUAL WIRING DEVICE DETAILS 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA7.01 AUDIOVISUAL SCHEDULES 2 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA7.02 AUDIOVISUAL SCHEDULES 0 12/13/2024 12/13/2024
(12/13/24)
100% CONSTRUCTION DRAWINGS
TA7.03 AUDIOVISUAL SCHEDULES 0 12/13/2024 12/13/2024
(12/13/24)
Page 46 of 46
EXHIBIT B - 100% CD SPECIFICATION LOG
Printed on Thu Dec 19, 2024 at 04:23 pm EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Current Specifications
Number Description Revision Issued Date Received Date Set
00 - Procurement and Contracting Requirements
00 00 00 Cover Sheet 2 12/13/24 12/13/24 100% Specifications
00 01 03 Project Directory 2 12/13/24 12/13/24 100% Specifications
00 01 07 Seals Page 2 12/13/24 12/13/24 100% Specifications
00 01 10 Table of Contents 2 12/13/24 12/13/24 100% Specifications
00 31 00 Available Project Information 2 12/13/24 12/13/24 100% Specifications
00 60 00 Project Forms 2 12/13/24 12/13/24 100% Specifications
00 60 00.01 RFI Form 1 12/13/24 12/13/24 100% Specifications
00 60 00.02 Substitution Request Form (Before Bid) 1 12/13/24 12/13/24 100% Specifications
00 60 00.03 Substitution Request Form (After Bid) 1 12/13/24 12/13/24 100% Specifications
01 - General Requirements
01 10 00 Summary 2 12/13/24 12/13/24 100% Specifications
01 20 00 Price And Payment Procedures 2 12/13/24 12/13/24 100% Specifications
01 21 00 Allowances 1 12/13/24 12/13/24 100% Specifications
01 22 00 Unit Prices 1 12/13/24 12/13/24 100% Specifications
01 23 00 Alternates 0 12/13/24 12/13/24 100% Specifications
01 25 00 Substitution Procedures 2 12/13/24 12/13/24 100% Specifications
01 30 00 Administrative Requirements 2 12/13/24 12/13/24 100% Specifications
01 32 16 Construction Progress Schedule 2 12/13/24 12/13/24 100% Specifications
01 35 53 Security Procedures 2 12/13/24 12/13/24 100% Specifications
01 40 00 Quality Requirements 2 12/13/24 12/13/24 100% Specifications
01 41 00 Regulatory Requirements 2 12/13/24 12/13/24 100% Specifications
01 42 16 Definitions 2 12/13/24 12/13/24 100% Specifications
01 42 19 Reference Standards 1 12/13/24 12/13/24 100% Specifications
01 43 39 Stand-Alone Exterior Mockup 2 12/13/24 12/13/24 100% Specifications
01 45 33 Code-Required Special Inspections and Procedures 2 12/13/24 12/13/24 100% Specifications
01 50 00 Temporary Facilities and Controls 2 12/13/24 12/13/24 100% Specifications
01 60 00 Product Requirements 2 12/13/24 12/13/24 100% Specifications
01 70 00 Execution and Closeout Requirements 2 12/13/24 12/13/24 100% Specifications
01 71 23 Field Engineering 2 12/13/24 12/13/24 100% Specifications
01 74 19 Construction Waste Management and Disposal 2 12/13/24 12/13/24 100% Specifications
01 78 00 Closeout Submittals 2 12/13/24 12/13/24 100% Specifications
01 79 00 Demonstration and Training 2 12/13/24 12/13/24 100% Specifications
Page 1 of 8
EXHIBIT B - 100% CD SPECIFICATION LOG
Printed on Thu Dec 19, 2024 at 04:23 pm EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Number Description Revision Issued Date Received Date Set
02 - Existing Conditions
02 41 16 Structure Demolition 2 12/13/24 12/13/24 100% Specifications
03 - Concrete
03 10 00 Concrete Forming and Accessories 2 12/13/24 12/13/24 100% Specifications
03 20 00 Concrete Reinforcing 2 12/13/24 12/13/24 100% Specifications
03 30 00 Cast-in-Place Concrete 2 12/13/24 12/13/24 100% Specifications
03 35 11 Concrete Floor Finishes 2 12/13/24 12/13/24 100% Specifications
04 - Masonry
04 05 23 Adjustable Brickwork Support Systems 2 12/13/24 12/13/24 100% Specifications
04 20 00 Unit Masonry 2 12/13/24 12/13/24 100% Specifications
05 - Metals
05 12 00 Structural Steel Framing 2 12/13/24 12/13/24 100% Specifications
05 12 13 Architecturally-Exposed Structural Steel 2 12/13/24 12/13/24 100% Specifications
05 21 00 Steel Joist Framing 2 12/13/24 12/13/24 100% Specifications
05 31 00 Steel Decking 2 12/13/24 12/13/24 100% Specifications
05 40 00 Cold-Formed Metal Framing 2 12/13/24 12/13/24 100% Specifications
05 50 00 Metal Fabrications 2 12/13/24 12/13/24 100% Specifications
05 51 00 Metal Stairs 2 12/13/24 12/13/24 100% Specifications
05 52 00 Metal Railings 2 12/13/24 12/13/24 100% Specifications
05 59 23 Modular Steel Auditorium Catwalk Assemblies 2 12/13/24 12/13/24 100% Specifications
05 73 00 Decorative Metal Railings 2 12/13/24 12/13/24 100% Specifications
057113 Fabricated Metal Spiral Stairs 0 12/13/24 12/13/24 100% Specifications
06 - Wood, Plastics, and Composites
06 05 73 Wood Treatment 1 12/13/24 12/13/24 100% Specifications
06 10 00 Rough Carpentry 2 12/13/24 12/13/24 100% Specifications
06 16 00 Sheathing 2 12/13/24 12/13/24 100% Specifications
06 20 00 Finish Carpentry 2 12/13/24 12/13/24 100% Specifications
06 40 00 Architectural Woodwork 2 12/13/24 12/13/24 100% Specifications
06 64 20 Decorative Architectural Panels 1 12/13/24 12/13/24 100% Specifications
07 - Thermal and Moisture Protection
07 05 53 Fire and Smoke Assembly Identification 2 12/13/24 12/13/24 100% Specifications
07 11 13 Bituminous Dampproofing 2 12/13/24 12/13/24 100% Specifications
07 13 00 Sheet Waterproofing 2 12/13/24 12/13/24 100% Specifications
07 14 00 Fluid-Applied Waterproofing 1 12/13/24 12/13/24 100% Specifications
07 21 00 Thermal Insulation 2 12/13/24 12/13/24 100% Specifications
07 27 26 Fluid-Applied Air Barriers 2 12/13/24 12/13/24 100% Specifications
07 41 13 Metal Roof Panels 2 12/13/24 12/13/24 100% Specifications
Page 2 of 8
EXHIBIT B - 100% CD SPECIFICATION LOG
Printed on Thu Dec 19, 2024 at 04:23 pm EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Number Description Revision Issued Date Received Date Set
07 42 13.13 Metal Wall Panels 2 12/13/24 12/13/24 100% Specifications
07 42 13.23 Metal Composite Material Wall Panels 1 12/13/24 12/13/24 100% Specifications
07 54 23 Thermoplastic-Polyolefin (TPO) Membrane Roofing 0 12/13/24 12/13/24 100% Specifications
07 62 00 Sheet Metal Flashing and Trim 2 12/13/24 12/13/24 100% Specifications
07 71 00 Roof Specialties 2 12/13/24 12/13/24 100% Specifications
07 72 00 Roof Accessories 2 12/13/24 12/13/24 100% Specifications
07 81 00 Applied Fireproofing 2 12/13/24 12/13/24 100% Specifications
07 81 23 Intumescent Fireproofing 2 12/13/24 12/13/24 100% Specifications
07 84 00 Firestopping 2 12/13/24 12/13/24 100% Specifications
07 87 00 Smoke Containment Barriers 0 12/13/24 12/13/24 100% Specifications
07 92 00 Joint Sealants 2 12/13/24 12/13/24 100% Specifications
07 95 13 Expansion Joint Cover Assemblies 2 12/13/24 12/13/24 100% Specifications
08 - Openings
08 11 13 Hollow Metal Doors and Frames 2 12/13/24 12/13/24 100% Specifications
08 14 16 Flush Wood Doors 2 12/13/24 12/13/24 100% Specifications
08 31 00 Access Doors and Panels 2 12/13/24 12/13/24 100% Specifications
08 33 13 Coiling Counter Doors 2 12/13/24 12/13/24 100% Specifications
08 33 23 Overhead Coiling Doors 2 12/13/24 12/13/24 100% Specifications
08 33 26 Overhead Coiling Grilles 2 12/13/24 12/13/24 100% Specifications
08 34 73 Sound Control Door Assemblies 2 12/13/24 12/13/24 100% Specifications
08 35 13 Glass BI-Folding Doors 2 12/13/24 12/13/24 100% Specifications
08 36 13.16 Glazed Overhead Sectional Doors 1 12/13/24 12/13/24 100% Specifications
08 41 13 Aluminum-Framed Entrances and Storefronts 2 12/13/24 12/13/24 100% Specifications
08 44 13 Glazed Aluminum Curtain Walls 2 12/13/24 12/13/24 100% Specifications
08 56 59 Ticket Window Units 0 12/13/24 12/13/24 100% Specifications
08 56 73 Sound Control Windows 0 12/13/24 12/13/24 100% Specifications
08 71 00 Door Hardware 2 12/13/24 12/13/24 100% Specifications
08 80 00 Glazing 2 12/13/24 12/13/24 100% Specifications
08 83 00 Mirrors 2 12/13/24 12/13/24 100% Specifications
08 91 00 Louvers 2 12/13/24 12/13/24 100% Specifications
09 - Finishes
09 05 61 Common Work Results for Flooring Preparation 2 12/13/24 12/13/24 100% Specifications
09 22 16 Non-Structural Metal Framing 2 12/13/24 12/13/24 100% Specifications
09 29 00 Gypsum Board 2 12/13/24 12/13/24 100% Specifications
09 30 00 Tiling 2 12/13/24 12/13/24 100% Specifications
09 51 13 Acoustical Panel Ceilings 2 12/13/24 12/13/24 100% Specifications
09 54 29 Wood Wall and Ceiling Panels 1 12/13/24 12/13/24 100% Specifications
Page 3 of 8
EXHIBIT B - 100% CD SPECIFICATION LOG
Printed on Thu Dec 19, 2024 at 04:23 pm EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Number Description Revision Issued Date Received Date Set
09 64 66 Wood Flooring 2 12/13/24 12/13/24 100% Specifications
09 65 00 Resilient Flooring 2 12/13/24 12/13/24 100% Specifications
09 65 13 Resilient Wall Base and Accessories 2 12/13/24 12/13/24 100% Specifications
09 65 66 Resilient Athletic Flooring 2 12/13/24 12/13/24 100% Specifications
09 67 23 Resinous Flooring 1 12/13/24 12/13/24 100% Specifications
09 68 13 Tile Carpeting 2 12/13/24 12/13/24 100% Specifications
09 72 00 Wall Coverings 2 12/13/24 12/13/24 100% Specifications
09 72 13 Cork Wall Coverings 1 12/13/24 12/13/24 100% Specifications
09 83 00 Acoustic Finishes 0 12/13/24 12/13/24 100% Specifications
09 84 16 Fixed Sound-Reflective Panels 0 12/13/24 12/13/24 100% Specifications
09 84 33 Sound-Absorbing Wall Units 1 12/13/24 12/13/24 100% Specifications
09 84 36 Sound-Absorbing Ceiling Units 1 12/13/24 12/13/24 100% Specifications
09 91 13 Exterior Painting 2 12/13/24 12/13/24 100% Specifications
09 91 23 Interior Painting 2 12/13/24 12/13/24 100% Specifications
09 96 00 High Performance Coatings 2 12/13/24 12/13/24 100% Specifications
10 - Specialties
10 11 00 Visual Display Units 2 12/13/24 12/13/24 100% Specifications
10 14 00 Signage 2 12/13/24 12/13/24 100% Specifications
10 14 19 Dimensional Letter Signage 2 12/13/24 12/13/24 100% Specifications
10 21 13.19 Solid Plastic Toilet Compartments 1 12/13/24 12/13/24 100% Specifications
10 21 23 Cubicle Curtains 2 12/13/24 12/13/24 100% Specifications
10 26 00 Wall and Door Protection 2 12/13/24 12/13/24 100% Specifications
10 28 00 Toilet, Bath, and Laundry Accessories 2 12/13/24 12/13/24 100% Specifications
10 44 00 Fire Protection Specialties 2 12/13/24 12/13/24 100% Specifications
10 51 13 Metal Lockers 2 12/13/24 12/13/24 100% Specifications
10 51 13.13 Weapons Storage Cabinets - ROTC 0 12/13/24 12/13/24 100% Specifications
10 56 13 Metal Storage Shelving 0 12/13/24 12/13/24 100% Specifications
10 73 16.13 Metal Canopies 1 12/13/24 12/13/24 100% Specifications
10 75 00 Flagpoles 2 12/13/24 12/13/24 100% Specifications
10 82 13 Exterior Grilles and Screens 2 12/13/24 12/13/24 100% Specifications
11 - Equipment
11 24 23 Window Washing System 0 12/13/24 12/13/24 100% Specifications
11 30 00 Appliances and Equipment 1 12/13/24 12/13/24 100% Specifications
11 40 00 Foodservice Equipment 2 12/13/24 12/13/24 100% Specifications
11 53 13 Laboratory Fume Hoods and Related Products 0 12/13/24 12/13/24 100% Specifications
11 61 13 Networked Lighting Control System 2 12/13/24 12/13/24 100% Specifications
11 61 16 Theatrical Wiring Devices 1 12/13/24 12/13/24 100% Specifications
Page 4 of 8
EXHIBIT B - 100% CD SPECIFICATION LOG
Printed on Thu Dec 19, 2024 at 04:23 pm EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Number Description Revision Issued Date Received Date Set
11 61 19 Stage Lighting Fixtures 2 12/13/24 12/13/24 100% Specifications
11 61 23 Drapery and Track 2 12/13/24 12/13/24 100% Specifications
11 61 33 Motorized Rigging 2 12/13/24 12/13/24 100% Specifications
11 61 37 Pipe Grids, Pin Rails, and Fixed Lighting Positions 2 12/13/24 12/13/24 100% Specifications
11 61 46 Portable Modular Platform System 2 12/13/24 12/13/24 100% Specifications
11 61 63 Portable Access Equipment 2 12/13/24 12/13/24 100% Specifications
11 66 23 Gymnasium Equipment 2 12/13/24 12/13/24 100% Specifications
11 66 43 Interior Scoreboards 1 12/13/24 12/13/24 100% Specifications
11 68 33 Athletic Field Equipment 1 12/13/24 12/13/24 100% Specifications
12 - Furnishings
12 21 13 Horizontal Louver Blinds 2 12/13/24 12/13/24 100% Specifications
12 24 00 Roller Window Shades 2 12/13/24 12/13/24 100% Specifications
12 32 00 Manufactured Wood Casework 2 12/13/24 12/13/24 100% Specifications
12 35 53.13 Metal Laboratory Casework 1 12/13/24 12/13/24 100% Specifications
12 36 00 Countertops 2 12/13/24 12/13/24 100% Specifications
12 61 00 Upholstered Fixed Audience Seating 1 12/13/24 12/13/24 100% Specifications
12 61 03 Loose Audience Seating 2 12/13/24 12/13/24 100% Specifications
12 66 13 Telescoping Bleachers 2 12/13/24 12/13/24 100% Specifications
14 - Conveying Equipment
14 21 00 Electric Traction Elevators 2 12/13/24 12/13/24 100% Specifications
14 26 00 Limited-Use-Limited-Application Elevators 1 12/13/24 12/13/24 100% Specifications
21 - Fire Suppression
21 05 00 Common Work Results for Fire Suppression 2 12/13/24 12/13/24 100% Specifications
21 13 13 Wet-Pipe Sprinkler Systems 2 12/13/24 12/13/24 100% Specifications
22 - Plumbing
22 05 00 Common Work Results for Plumbing 2 12/13/24 12/13/24 100% Specifications
22 05 19 Meters and Gages for Plumbing Piping 2 12/13/24 12/13/24 100% Specifications
22 05 23 General-Duty Valves for Plumbing 2 12/13/24 12/13/24 100% Specifications
22 05 29 Hangers and Supports for Plumbing 2 12/13/24 12/13/24 100% Specifications
22 05 53 Identification for Plumbing Piping 2 12/13/24 12/13/24 100% Specifications
22 07 00 Plumbing Piping Insulation 2 12/13/24 12/13/24 100% Specifications
22 11 16 Domestic Water Piping 2 12/13/24 12/13/24 100% Specifications
22 11 19 Domestic Water Piping Specialties 2 12/13/24 12/13/24 100% Specifications
22 13 16 Sanitary Waste and Vent Piping 2 12/13/24 12/13/24 100% Specifications
22 13 19 Drainage Piping Specialties 2 12/13/24 12/13/24 100% Specifications
22 14 13 Storm Drainage Piping 2 12/13/24 12/13/24 100% Specifications
22 14 23 Storm Drainage Piping Specialties 2 12/13/24 12/13/24 100% Specifications
Page 5 of 8
EXHIBIT B - 100% CD SPECIFICATION LOG
Printed on Thu Dec 19, 2024 at 04:23 pm EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Number Description Revision Issued Date Received Date Set
22 15 13 Compressed Air Piping 2 12/13/24 12/13/24 100% Specifications
22 15 19 Packaged Air Compressors and Receivers 2 12/13/24 12/13/24 100% Specifications
22 33 00 Electric Domestic Water Heaters 2 12/13/24 12/13/24 100% Specifications
22 34 00 Fuel-Fired Domestic Water Heaters 2 12/13/24 12/13/24 100% Specifications
22 38 00 Sump Pumps 2 12/13/24 12/13/24 100% Specifications
22 40 00 Plumbing Fixtures 2 12/13/24 12/13/24 100% Specifications
22 47 00 Drinking Fountains And Water Coolers 2 12/13/24 12/13/24 100% Specifications
22 66 00 Chemical-Waste Systems for Science Labs 2 12/13/24 12/13/24 100% Specifications
22 70 00 Plumbing Systems Testing 2 12/13/24 12/13/24 100% Specifications
23 - Heating, Ventilating, and Air Conditioning (HVAC)
23 05 00 Common Work Results for HVAC 2 12/13/24 12/13/24 100% Specifications
23 05 13 Common Motor Requirements for HVAC Equipment 2 12/13/24 12/13/24 100% Specifications
23 05 19 Meters And Gages For HVAC Piping 2 12/13/24 12/13/24 100% Specifications
23 05 23 General Duty Valves for HVAC Piping 2 12/13/24 12/13/24 100% Specifications
23 05 29 Hangers and Supports for HVAC Piping and Equipment 2 12/13/24 12/13/24 100% Specifications
23 05 53 Identification for HVAC Piping and Equipment 2 12/13/24 12/13/24 100% Specifications
23 05 93 Testing, Adjusting, And Balancing for HVAC 2 12/13/24 12/13/24 100% Specifications
23 07 00 HVAC Insulation 2 12/13/24 12/13/24 100% Specifications
23 08 00 Mechanical Commissioning Requirements 2 12/13/24 12/13/24 100% Specifications
23 09 00 Instrumentation and Controls 2 12/13/24 12/13/24 100% Specifications
23 11 23 Fuel Gas Piping 2 12/13/24 12/13/24 100% Specifications
23 21 13 Hydronic Piping 2 12/13/24 12/13/24 100% Specifications
23 21 16 Hydronic Piping Specialties 2 12/13/24 12/13/24 100% Specifications
23 21 23 Hydronic Pumps 2 12/13/24 12/13/24 100% Specifications
23 23 00 Refrigerant Piping 2 12/13/24 12/13/24 100% Specifications
23 25 00 HVAC Water Treatment 2 12/13/24 12/13/24 100% Specifications
23 31 13 Ductwork 2 12/13/24 12/13/24 100% Specifications
23 33 00 Air Duct Accessories 2 12/13/24 12/13/24 100% Specifications
23 34 23 HVAC Power Ventilators 2 12/13/24 12/13/24 100% Specifications
23 36 00 Air Terminal Units 0 12/13/24 12/13/24 100% Specifications
23 37 13 Diffusers, Registers, And Grilles 2 12/13/24 12/13/24 100% Specifications
23 38 13 Commercial-Kitchen Hoods 0 12/13/24 12/13/24 100% Specifications
23 38 14 Residential Range Hoods 2 12/13/24 12/13/24 100% Specifications
23 41 00 Particulate Air Filtration 2 12/13/24 12/13/24 100% Specifications
23 43 10 Bi-Polar Ionization Units 2 12/13/24 12/13/24 100% Specifications
23 51 00 Breechings, Chimneys, And Stacks 2 12/13/24 12/13/24 100% Specifications
23 52 16 Condensing Boilers 2 12/13/24 12/13/24 100% Specifications
Page 6 of 8
EXHIBIT B - 100% CD SPECIFICATION LOG
Printed on Thu Dec 19, 2024 at 04:23 pm EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Number Description Revision Issued Date Received Date Set
23 55 43 Electric Heaters 2 12/13/24 12/13/24 100% Specifications
23 57 00 Heat Exchangers 2 12/13/24 12/13/24 100% Specifications
23 65 00 Cooling Towers 2 12/13/24 12/13/24 100% Specifications
23 72 00 Packaged Energy Recovery Ventilation Units 2 12/13/24 12/13/24 100% Specifications
23 81 26 Ductless Split System Heat Pump Units 2 12/13/24 12/13/24 100% Specifications
23 81 30 Rooftop Units 2 12/13/24 12/13/24 100% Specifications
23 81 46 Water Source Unitary Heat Pumps 2 12/13/24 12/13/24 100% Specifications
26 - Electrical
26 00 00 Electrical 2 12/13/24 12/13/24 100% Specifications
26 05 04 Provisions for Electric Utility Service 2 12/13/24 12/13/24 100% Specifications
26 05 19 Low-Voltage Electrical Power Conductors and Cables 2 12/13/24 12/13/24 100% Specifications
26 05 26 Grounding and Bonding for Electrical Systems 2 12/13/24 12/13/24 100% Specifications
26 05 29 Hangers and Supports for Electrical Systems 2 12/13/24 12/13/24 100% Specifications
26 05 33 Raceways and Boxes for Electrical Systems 2 12/13/24 12/13/24 100% Specifications
26 05 36 Cable Trays 2 12/13/24 12/13/24 100% Specifications
26 05 44 Sleeves and Seals for Electrical Raceways and Cabling 2 12/13/24 12/13/24 100% Specifications
26 05 53 Identification for Electrical Systems 2 12/13/24 12/13/24 100% Specifications
26 05 73 Overcurrent Protective Device Coordination Study 2 12/13/24 12/13/24 100% Specifications
26 05 74 Overcurrent Protective Device Arc-Flash Study 2 12/13/24 12/13/24 100% Specifications
26 06 03 Heat Tracing for Plumbing Piping 2 12/13/24 12/13/24 100% Specifications
26 09 23 Lighting Control Devices 2 12/13/24 12/13/24 100% Specifications
26 22 00 Low-Voltage Transformers 0 12/13/24 12/13/24 100% Specifications
26 23 00 Low-Voltage Switchgear 2 12/13/24 12/13/24 100% Specifications
26 24 13 Switchboards 2 12/13/24 12/13/24 100% Specifications
26 24 16 Panelboards 2 12/13/24 12/13/24 100% Specifications
26 25 13 Low-Voltage Busways 2 12/13/24 12/13/24 100% Specifications
26 25 50 Generator Docking Station 2 12/13/24 12/13/24 100% Specifications
26 27 13 Electricity Metering 2 12/13/24 12/13/24 100% Specifications
26 27 26 Wiring Devices 2 12/13/24 12/13/24 100% Specifications
26 28 13 Fuses 2 12/13/24 12/13/24 100% Specifications
26 28 16 Enclosed Switches and Circuit Breakers 2 12/13/24 12/13/24 100% Specifications
26 32 13.16 Gaseous Emergency Engine Generators 2 12/13/24 12/13/24 100% Specifications
26 36 00 Transfer Switches 2 12/13/24 12/13/24 100% Specifications
26 41 13 Lightning Protection For Structures 1 12/13/24 12/13/24 100% Specifications
26 43 13 Surge Protection for Low-Voltage Electrical Power Circuits 2 12/13/24 12/13/24 100% Specifications
26 51 19 LED Interior Lighting 2 12/13/24 12/13/24 100% Specifications
26 60 10 Through-Penetration Firestop Systems 2 12/13/24 12/13/24 100% Specifications
Page 7 of 8
EXHIBIT B - 100% CD SPECIFICATION LOG
Printed on Thu Dec 19, 2024 at 04:23 pm EST
Job #: B10134.000 Middle School And High School At Sequoyah
3456 Aztec Road
Doraville, Georgia 30340
Gilbane Building Company
Number Description Revision Issued Date Received Date Set
26 91 00 Occupancy Sensors 2 12/13/24 12/13/24 100% Specifications
27 - Communications
27 41 16 Integrated Audiovisual Systems and Equipment 2 12/13/24 12/13/24 100% Specifications
27 50 00 Integrated Electronic Communications Network 1 12/13/24 12/13/24 100% Specifications
28 - Electronic Safety and Security
28 31 00 Fire Alarm System 0 12/13/24 12/13/24 100% Specifications
28 78 00 Emergency Responder Radio Coverage System 1 12/13/24 12/13/24 100% Specifications
31 - Earthwork
31 10 00 Site Clearing 2 12/13/24 12/13/24 100% Specifications
31 20 00 Earth Moving 2 12/13/24 12/13/24 100% Specifications
31 25 00 Erosion and Sedimentation Control 2 12/13/24 12/13/24 100% Specifications
31 66 13 Rammed Aggregate Piers 2 12/13/24 12/13/24 100% Specifications
32 - Exterior Improvements
32 11 23.23 Base Course Drainage Layers 1 12/13/24 12/13/24 100% Specifications
32 12 16 Asphalt Paving 2 12/13/24 12/13/24 100% Specifications
32 13 13 Concrete Paving 2 12/13/24 12/13/24 100% Specifications
32 16 13 Curbs and Gutters 2 12/13/24 12/13/24 100% Specifications
32 17 23 Pavement Markings 2 12/13/24 12/13/24 100% Specifications
32 18 23.39 Synthetic Track Surfacing 1 12/13/24 12/13/24 100% Specifications
32 31 00 Frame Roller Gates & Hydraulic Operator Systems 0 12/13/24 12/13/24 100% Specifications
32 31 13 Chain Link Fences and Gates 1 12/13/24 12/13/24 100% Specifications
32 85 05 Synthetic Turf 2 12/13/24 12/13/24 100% Specifications
32 85 10 Synthetic Field Sport Surfacing 0 12/13/24 12/13/24 100% Specifications
32 90 00 Exterior Landscape 2 12/13/24 12/13/24 100% Specifications
33 - Utilities
33 10 00 Water Utilities 2 12/13/24 12/13/24 100% Specifications
33 30 00 Sanitary Sewerage 2 12/13/24 12/13/24 100% Specifications
33 40 00 Stormwater Utilities 2 12/13/24 12/13/24 100% Specifications
Page 8 of 8
EXHIBIT C - 100% RFI LOG
Sequoyah Middle School & High School
Doraville, GA
PRE-CONSTRUCTION RFI LOG - 100% CDs
Set # RFI # Date Discipline Sheet/Detail or Spec # Question Response Required Response Date Response By Response
09 67 00 Fluid Applied Flooring should be 09 67 23 Resinous Flooring
09 67 00 - Fluid-Applied Flooring 098430 got split into 098416, 098433, and 098436. There’s no section 098430
09 84 30 - Sound-Absorbing Wall and Ceilign Units anymore.
10 21 13 - Toiliet Compartments
10 22 26 - Folding Panel Partitions 102113 is now 102113.19
11 30 13 - Residential Appliances
11 52 13 - Projection Screens 113013 was revised to 113000.
11 61 53 - Acoustic Equipment 100% Specifications were not provided for the follwing specifcations. Please confirm that these
1 01 12/19/24 All
11 68 33.43 - Track And Field Equipment specifcations can be omitted. Projection screens were incorporated into the Audio Visual equipment section.
22 70 00 - Plumbing Systems Testing
28 31 11 - Digital, Addressable Fire Alarm System 116153 was intentionally omitted.
31 23 23 - EPS Geofoam Fill
32 84 23 - Planting Irrigation (Performance Spec) 116833.43, 227000, 283111 were issued and included in the TOC. Not sure
32 85 01 - Natural Turf Atheltic Fields why they are not seeing it.
32 86 50 - Athletic Field Grassing 2270000 Plumbing System Testing provdied in Addednum 2 specs.
283111 became 283100
Sections Geofoam & all section 32 specs listed can be omitted.
Sheet C-102 Striping & Signage Plan includes notes to reference electrical drawings for EV
Parking Spaces. Sheet E0.01 does not include provisions for EV Charging Stations. Please my understanig is this will a separate item that will be handled by the owner and
1 02 12/23/24 Civil / Electrical C-102 - Site Plan & E0.01 - Electrical Site Plan 01/06/25 TdS
confrim that these will be furnished and installed by GA Power from independent power source Ga Power.
and that no provisions are required by General Contractor.
Sheet C-101 notes "Req'd Swing Arm Gate (See Electrical)" at each end of the fire access road at
1 03 12/23/24 Civil / Electrical C-101 - Site Plan & E0.01 - Electrical Site Plan the rear of the building. Sheet E0.01 - Electrical Site Plan does not include any details for these 01/06/25 wil there will not be any electrical connections required for the gate
gates. Please provide details/requirements for swing are gate.
Sheet C-301 shows the irrigation meter & backflow location and notes "(See Irrigation & Electrical
irrigation system is design build by contractor, irrigation is solely to ensure plant
Plas for Coordination)". No further information is included on electrical plans and no irrigation plan
1 04 12/23/24 Civil / Ladscape C-301 - Sanitary Sewer & Water Utility Plan 1/6/2025 1/8/2025 MM /TdS establishment and survivability up to the 1-year warranty date. Controller
can be located. Please provide further information on irrigation controller location and
location to be shown on landscape and building electrical drawings. Electrical
requirements.
connection shown on Sheet E1.10K. Data connection shown on Sheet E4.10K.
Profile for SSMH-C to Ex SSMH showing the creek crossing notes "2 -Conc. Anchor Collars (70' This is to be coordinated following a site visit to review newly located structure
1 05 12/23/24 Civil C-403 Sewer Profiles
Apart)". Please provide sizing, diameter and thickness, for required concrete collars. on DCSD property.
The spread footing schedule on S3.03 does not include rebar sizing/spacing for all footing types.
1 06 12/23/24 Structural S3.03 - Typical Concrete Details 01/06/25 SB Will be added in Addendum #1
Please clarify.
Please provide column Reactions for column footings (unfactored dead and live loads in kips) and
Required bearing capacities and maximum settlement limits have been
1 07 12/23/24 Structural Aggregate Piers continuous foundations (kips per linear foot) for use in preparation of Aggregate Pier Shop 01/06/25 SB
provided.
Drawings
Please provide CAD files of Structural Foundation Plans for use in preparation of Aggregate Pier
1 08 12/23/24 Structural Aggregate Piers 01/06/25 SB This should be submitted as a separate request outside of bidding RFI's
Shop Drawings.
Details 4-5-6 / A2.21 from the 80% CD Set showing the interior ceiling to curtainwall/glazing
conditions have been deleted from the 100% CD Set. No other details reflecting these conditions
1 09 12/23/24 Architectural Ceiling to Curtainwall Details 01/10/25 KO See Revised sheet in Addendum
can be located. Please provide details for interior ceiling to curtain wall/glazing conditions,
including locations at which horizontal mullion is below ceiling height.
Please see attached substitution request for AWP-3 or Specification Section 09 84 33 Acoustical
1 10 12/23/24 Architectural Substitution Request (Specification Section 09 84 33) Note markings on attached substitution request form.
Wall Panels.
1 11 12/23/24 Architectural Substitution Request (Wood Fiber Wall Panels) Please see attached substitution request for the Wood Fiber Wall Panels. Note markings on attached substitution request form.
Per discussions with the Concrete Trade Contractor, it is recommended the brickledge shown on
1 12 01/02/25 Structural Sheet S1.10A (see specifically A12/S2.02) sheet S1.10A (see specifically A12/S2.02) is either removed or replaced with a secondary "curb". 01/08/25 SB Brick ledges to be bid as currently shown
Please clarify intent. As shown, this detail is going to be extremely expensive.
While Hussey is specified as the basis of design for the telescopic seating, it appears to have
been omitted as an acceptable manufacturer for the fixed auditorium seating in specification
1 13 01/02/25 Architectural Specification Section 12 61 00 section 126100. Please confirm Hussey is an acceptable bidder for this scope as well. Hussey 01/10/25 MLG Yes, Hussey is an acceptable manufacturer.
seating meets all the requirements outlined in the specifications, ensuring the high standards
expected for this project.
1 14 01/03/25 Architectural Substitution Request (Robbins Bio Cushion Flooring) Please see attached substitution request for the Robbins Bio Cushion Flooring. Note markings on attached substitution request form.
Sheet A7.22 has conflicting information at the learning stairs. Elevation H5 calls out concrete
stairs on geofoam substrate and H9 calls out maple veneer plywood. Please confirm which
1 15 01/03/25 Architectural Sheet A7.22 01/07/25 BW Please refer to revised Sheet A7.22 for clarifications.
material should be used at these learning stairs. H5 also shows what appears to be a wood panel,
please advise if this is wood paneling or wall covering.
1 16 01/03/25 Architectural A1/A1.35 See A1/A1.35, please confirm that paneling is WC-1B. 01/07/25 BW Wood paneling in this elevation should be WDP-4
The finish on the benches in this area should be QS-1 to match the adjacent
1 17 01/03/25 Architectural A1/A7.30 01/07/25 BW
plinth.
A1/A7.30 – Confirm bench material/Section cut below AWP-4 Panels
1 of 6
EXHIBIT C - 100% RFI LOG
Sequoyah Middle School & High School
Doraville, GA
PRE-CONSTRUCTION RFI LOG - 100% CDs
Set # RFI # Date Discipline Sheet/Detail or Spec # Question Response Required Response Date Response By Response
Please confirm the "reclaimed wood" detailed on G5/A7.35 is to be included millwork scope.
1 18 01/03/25 Architectural G5/A7.35 Please provide a specification for “reclaimed wood” required as the material cost will vary based Please see updated sheet in addendum.
on cut, species, etc.
Is WDP-4 the same as WWC-1, which is WWC-1B? They are used in the same location in the WWC-1A and WWC-1B is intended to be a veneer applied to abuse resistant
1 19 01/03/25 Architectural 01/07/25 BW
Auditorium, and we want to confirm that they are the same material. drywall. WDP-4 is a panel product intended to will match the wood veneer.
Please confirm that casework in Media 1929 is furniture and not in millwork scope of work
1 20 01/03/25 Architectural C1/A7.43 01/08/25 MWE All Media Center Shelving will be in the furniture package.
(C1/A7.43).
On the overall landscape plan, there is an area that is shown that states it should be on L3.09,
1 21 01/06/24 Landscape L3.09 however when we go to L3.09, the plant legend for that page actually covers that area and we 01/06/25 MM to be revised on drawings
cannot provide an accurate count. Please advise.
Some of the call outs for the groundcovers say CYN TI3 as noted in red even though the image for
1 22 01/06/24 Landscape L3.01 & L3.02 the groundcover is CYN HYB based on the plant schedule. What type of type of sod should be 01/06/25 MM to be revised on drawings
used?
Please provide a specific manufacturer and ballistic rating for the required GL-AR & GL-1BR GL-AR and GL-1BR legend descriptions have been updated to match spec
1 23 01/06/24 Architectural Sheet A6.12 glazing. The glazing spec only indicates ballistic rated film. If frame and glass is required, please 01/07/25 M.Mass verbage. This should help with finding the correct specs for each glazing type.
provide a manufacturer with testing requirements for the frame and system. Updated sheets include A6.01, A6.10, A6.11, and A6.12
Please see updated Legend notes that corrispond to the specs. Both the specs
Please verify if the ballistic rated film will only need to be applied to the exterior or interior lite of
1 24 01/06/24 Architectural Sheet A6.12 01/09/25 M.Mass regarding the Ballistic and riot glazing will be able to verify exterior and interior
glass?
lite layers
GL-4 calls out Sound control Glazing. We can provide laminated glazing that achieves an STC of
As long as the final, in-place assembly has an effective STC rating of 35, this is
1 25 01/06/24 Architectural Sheet A6.12, Specification Section 08 56 73 25 with storefront to achieve a completion of 35. Please verify if glass and frame is acceptable to 01/10/25 MLG
acceptable.
meet the STC Requirements of 35.
Glazing spec 088800 contains a glazing film type F-1 & F-2. Please verify the locations of these
1 26 01/06/24 Architectural Specification Section 08 80 00 01/10/25 M.Mass See glazing legends that coordinate with specs and where film is.
film applications as pertains to glazing.
Please verify the system components of the TIG-RB glazing types as shown on pages A6.11. Are TIG-RB notes have been changed to GL-AR/1BR. This note dictates that the
1 27 01/06/24 Architectural Sheet A6.11 01/07/25 M.Mass
these conditions standard lites with glazing film? window pane could be riot or ballistic and it will be indicated on the floor plan
Elevation ESF A17 contains 1-hour rated glass. Please verify if glass and frame truly need to be
1 28 01/06/24 Architectural Sheet A6.11 01/07/25 KO See Revised sheet in Addendum
fire rated? If so, we may not be able to produce a width of 816”.
Storefront and curtain wall frames should have clear anodized
1 29 01/06/24 Architectural Specification Section 08 41 13 / 08 44 13 Please verify if a 2-coat or 3-coat painted finish will be required for this project. 01/10/25 MLG
finish - no paint.
Please provide floor plan indicators for the door locations as shown on the window and door
1 30 01/06/24 Architectural 01/09/25 KO See Revised sheet in Addendum
schedule. Doors 1401E thru 1401I are labeled as rated 45 MIN.
Several signs are missing a sign type on the Interior Room Finish Schedule, Please confirmt hat
1 31 01/06/24 Architectural Sheet A10.02 these areas don’t require a sign. If a sign is required, then please provide the specifed sign type 01/08/25 MWE See Revised sheet in Addendum
required for that location.
The exterior elevations show metal panels with widths ranging from 1' to 4'6". In discussions with
our metal panel trade partner, they recommend providing more consistent widths of 4' or 5' (or 2'
and 2.5') to minimize the amount of waste on the project. The current design will cause a
1 32 01/06/24 Architectural Sheets A4.01 - A4.12 01.1.2025 MLG We can set up a meeting to address this. Price as drawn for now.
significant increase in the waste and labor costs from the 80% CD design. Please let us know if
the design team is open to changing the metal panel widths. We can set up a meeting with the
metal panel trade partner to discuss.
Sheet A1/ A7.36 shows three monitor displays as "NIC" outside of the Auditorium in the 100% CD
1 33 01/06/24 Architectural Sheet A1/A7.36 01/08/25 MWE These Displays are required. Provide Electrical and Blocking for each.
design. Please confirm if the three monitor displays are still required.
GL-1BR is GL-1 with F-1 film applied. Total thickness that will be accepted by
Please confirm the glass size of GL-1BR and GL-1AR so that we can provide the correct adaptors the frame is 1" (thickness of the insulated glazing unit), as the film will stop
2 34 01/07/25 Architectural 02.05.2025 MLG
for the frames. short of the frame and be sealed to it. Same applies to GL-1AR, except with
film F-2 applied rather than F-1.
ISF-1 is one hour fire resistive glazing. Thickness shall be as required to
achieve the specified fire rating. This will be incorporated into the glazing
specification in future, but in the interim, Acceptable products (subject to
compliance with specified requirements) include:
2 35 01/07/25 Architectural Some interior and exterior frames show glass “ISF-1”, what type of glass is it? Thickness? 02.05.2025 MLG a. InterEdge Technologies; Pyrobel.
b. Pilkington / Nippon Sheet Glass Company Ltd.; Pyrostop.
c. Nippon Electric Company, Ltd. (Technical Glass Products); FireLite Plus.
d. VETROTECH Saint-Gobain NA, Inc.; SSG Contraflam or SSG
Swissflam.
2 36 01/07/25 Architectural Are frames ECW C1 and ECW C2 Fire Rated? 01/09/25 KO No- Check Revised Sheets in Addendum
Are frames ISF B2 and ISF B3 in room 0209 on sheet A1.10B, a fire rated or smoke rated frame? Smoke rated, per sheet Cp1.10B these windows sit in a smoke rated wall and
2 37 01/07/25 Architectural 01/10/24 M.Mass
Or will they be typical alum sf frame with typical glass? thus need to be smoke rated as well.
Doors:0300a,0310a,0100 is correct in plans (no rating needed), and 1500 and
Please confirm if these elevations/doors are fire rated: ISF-R-D1, ESF A7 (Door 0300a, 0300a),
1500.1 does not exist:1500a-c and1500.1a-c should not be rated, 0116 is
2 38 01/07/25 Architectural ESF-R C5 (Doors 0300a, 0310a), ESF-R B4 (Door 0100), ESF A17, ESF A18, Door 1500, Door 01/08/25 KO
smoke-rated like shown in plans Elevations:
1500.1, Door 0116.
See Revised sheet in Addendum
Please confirm if these doors are smoke rated: Door 0103, 1139. 1218,2117, 2218, 3117, 3219,
2 39 01/07/25 Architectural 01/08/25 KO Smoke rated
1919, 1920, 1921, 1924, 1925, 1926, 1927, 1928, 1928a.
Where are doors 0419 and 1614? Also, please provide hardware set # for the doors 1500f and
2 40 01/07/25 Architectural 01/08/25 KO 0419-area H level 0, 1614- area B level 0
1401b.
2 of 6
EXHIBIT C - 100% RFI LOG
Sequoyah Middle School & High School
Doraville, GA
PRE-CONSTRUCTION RFI LOG - 100% CDs
Set # RFI # Date Discipline Sheet/Detail or Spec # Question Response Required Response Date Response By Response
Yes HM but it should not be attached/ included to the curtain wall (shown on
2 41 01/07/25 Architectural 01/08/25 KO
plans)
Can we assume that the frames in rooms 0102.1 and 0104 are HM and should be excluded?
2 42 01/07/25 Architectural 01/08/25 KO No- See Revised Sheet in Addendum
Is the Door1522 and frame an alum sf frame and door?
2 43 01/07/25 Architectural 01/08/25 KO No HM frame is shown in phase 1 schedule
Are the frames at rooms 1221 and 1222 alum sf? If so, what is the height?
2 44 01/07/25 Architectural 01/08/25 KO No HM frame is shown in phase 1 schedule
Are the frames in room 1703.1 and 1703.3 alum sf? If so, what is the height?
Frames ECW A1, ECW A2, ECW A3, ECW A4, ECW E1 and ECW E2, is the top portion, clouded The top portion is not a part of the curtainwall frame; it is metal paneling. See
2 45 01/07/25 Architectural 01/09/25 KO
below, part of the curtainwall frame? Revised Sheets in Addendum
Frames ECW B1, ECW B2, ECW B3, ECW B4, ECW B5, ECW B6, ECW F3, and ECW F4 is the The top portion is not a part of the curtainwall frame; it is metal paneling. See
2 46 01/07/25 Architectural 01/09/25 KO
top portion, clouded below, part of the curtainwall frame? Revised Sheets in Addendum
With regards to the flat panel drains for the fields, can you please confirm if they want 12”, 8” or
2 47 01/07/25 Landscape 6”? Detail 7 on L2.03 shows 12”, detail 10 on L2.01 shows 6” and there’s a note in right field of the 01/08/25 MM 12"
baseball field that calls it an 8” panel drain.
Please confirm the size perimeter drain they would like for the synthetic turf fields. Detail 7 on
2 48 01/07/25 Landscape L2.03 shows a 6” pipe for the collector line which is atypical. We typically see 10” or 12” for the 01/08/25 MM 12"
collector pipe.
Please confirm if they want the home plate area and warning track of the baseball field to be
synthetic turf or an infield mix. The field drawing calls out details 7 and 9 on L2.04 which refer to
2 49 01/07/25 Landscape 01/08/25 MM all baseball field areas will be synthetic turf
SAF MARMOUND MIX and SAF TRAC respectively. There will be a significant amount of
maintenance anytime you install a clay/infield mix type material directly beside synthetic turf.
2 50 01/07/25 Landscape Sheet C-101 Please provide specifications for the new tennis courts located on page C-101. 01/08/25 MM see hardscape drawings for all elements behind the curb (sidewalks,
It calls out the turf requested for the BB/SB field, however the other field has a couple options.
One area calls for Slit-2”-50oz system and then calls for a Slit/Mono- 2”- 46oz system. Can you The specification for the soccer field is “Rootzone 3D3 Blend” by Astroturf
2 51 1/7/2025 Landscape confirm what they are requesting for the field (soccer/FB)? installed per manufacturer’s recommendations.
2 52 1/9/2025 Plumbing P3.10H/PX3.01 Provide model number/size on gas heaters.not shown/specification 1/23/2025 BR SEE ADDENDUM #2 DRAWINGS
Will the state elevator inspector allow the control panel in pit? If not This is the way we have always shown it and I am unaware of any issues with
2 53 1/9/2025 Plumbing provide location. 1/23/2025 MK this. Unsure to current state inspector's view.
2 54 1/9/2025 Plumbing Please provide location of hub drains for HVAC heat pumps/mini split units? 1/23/2025 BR SEE ADDENDUM #2 DRAWINGS
2 55 1/9/2025 Plumbing Provide model number/manufacture on the roof hydrant, not in on drawing and or specification 1/23/2025 MK SEE ADDENDUM #2 Specs
Provide model number/manufacture on circulation pump, not shown on drawings and or
2 56 1/9/2025 Plumbing specification 1/23/2025 BR SEE ADDENDUM #2 DRAWINGS
Per specification 224000-11 base of design of 383-2/383-3 wall hung lavatoires to be Bradley.
2 57 1/9/2025 Plumbing Spec Section 224000-11 Bradley offers 4 different style of fauct.Provide model number. 1/23/2025 MK Refer to 2.1 Lavatory Faucets
Will the gas boilers in room #0414 required storage tank? If so provide size/schematic
2 58 1/9/2025 Plumbing P210H/RM 0414 drawing on boiler/storage tank. 1/23/2025 BR No, the gas boilers will not require storage tanks.
2 59 1/9/2025 Plumbing P3.15D Drawing shows 1'' gas line ? What equipment does the serve? 1/23/2025 BR DRYER IN LAUNDRY 1308 - P3.11D
YES, GAS WILL BE ROUTED TO THE TEACHERS DESK ONLY. (TYPICAL
2 60 1/9/2025 Plumbing P4.01 Will the Environmetal secience lab rm #2305 required gas? Not shown 1/23/2025 BR ALL 2ND FLOOR LABS) SEE ADDENDUM #2 DRAWINGS
The specification calls out two diffent blocking support for the gas piping (1) in Mechanical 220529 2.7 and 231123 2.6 show identical model numbers. Use either of these
2 61 1/9/2025 Plumbing spec and (1) in Plumbing spec. Provide which spec to use. 1/23/2025 MK lists.
2 62 1/9/2025 Plumbing Please provide complete design for the rain waterpiping. Not completed in 100% CDs 1/23/2025 BR SEE ADDENDUM #2 DRAWINGS
2 63 1/9/2025 Plumbing P4.01 Provide model/manufacturer on the ICIMET controller for the gas in lab rooms .Note #12 1/23/2025 BR SEE ADDENDUM #2 DRAWINGS
2 64 1/9/2025 Plumbing The drawings do not show make up water to cooling tower. Provide size pipe size. 1/23/2025 BR SEE ADDENDUM #2 DRAWINGS
2 65 1/9/2025 Plumbing PX3.01 Provide water heater size for the Field House 1/23/2025 BR SEE ADDENDUM #2 DRAWINGS
Provide the point of use acid neutralzation tank in sience room model number/manufacture/
2 66 1/9/2025 Plumbing PO.0/P3.12A CS203 connection 1/23/2025 BR SEE ADDENDUM #2 DRAWINGS
3 of 6
EXHIBIT C - 100% RFI LOG
Sequoyah Middle School & High School
Doraville, GA
PRE-CONSTRUCTION RFI LOG - 100% CDs
Set # RFI # Date Discipline Sheet/Detail or Spec # Question Response Required Response Date Response By Response
Potential acceptable manufacturers are: AstroTurf, FieldTurf, or Shaw. Needs
to be a specific concern for an equal alternate. VE alternates will be considered
2 67 1/9/2025 Landscape Spec Section 328505 - Synthetic Turf Please review proposed substitution request for Synthetic Turf and confirm acceptance. on a case by case basis. -MM
Wood Paneling - Question 2: In corridor 1600 on drawing A2.11G at the lobby bridge (where detail
11/A5.16 is referenced), there are two wood panel ceiling types referenced at the same location.
Both WDP-3 and C19 (which is WDP-1) point to the same ceiling. Detail 11/A5.16 cutting through Refer to updated Key Notes, C19 refers to WDP-3. Refer to updated finish
1/23/2025 BW
this ceiling identifies it only as WDP-3 but also indicates that there is WDP-2 adjacent to this notes in 11/A5.16
ceiling which is not indicated on the RCPs. Referencing details A1 & D3/A7.36 which are the
interior elevations at this location (reference A1.11G) this wood panel ceiling is adjacent to wood
2 68 1/9/2025 Architectural A1.11G, A2.11G, A5.16, A7.36 wall covering WWC-1B on both sides and no WDP-2 is identified. Please advise.
Wood Paneling - Question 3: Detail A1/A7.36 which is the east facing interior elevation at lobby
corridor 1600 on drawing A1.11G, indicates wood wall covering WWC-1A on the left side of the
elevation. However, detail A9/A1.33 referenced at that location indicates that unidentified wood Refer to revised note to clarify that this wall would be abuse resistant gypsum
1/23/2025 BW
panels are to be installed there. Please confirm whether detail A9/A1.33 is wrong and that wood with WWC-1A.
wall coverings are to be installed at this location directly attached to the scheduled wall per the
2 69 1/9/2025 Architectural A1.11G, A1.33, A7.36 elevation.
Wood Paneling - Question 4: Interior elevation A1/A1.35 referenced on A1.30 shows type WC-1B
"wood paneling" and "wood wall paneling." Elevation H1/A1.33, also referenced on A1.30, leads to
section H4/A1.33 which also shows type WC-1B "wood veneer panel." Detail H10/A1.33, which
appears to be a section through where WC-1B is called out at the bottom of A1/A1.35 and is near
where detail H1/A1.33 is referenced on A1.30, shows WDP-4 panels. What is the difference Refer to details listed for revised notes to clarify wood finish for these
between wood paneling, wood wall paneling, and wood veneer paneling? Is WC-1B supposed to 1/23/2025 BW auditorium details (WDP-4). Updates found on A1.33, A1.32, A1.35 , AND
be WDP-4, or wall covering WWC-1B, or something else? In addition, the extent of WC-1B on A2.00
A1/A1.35 cannot be determined in combination with other available details since the locations
where WC-1B are referenced on A1/A1.35 are not identified as WC-1B on the walls or ceiling of
other elevations or RCPs for this area. Please advise. (Please also reference related question
2 70 1/9/2025 Architectural A1.11G, A1.30, A1.33, A1.35 Wood Paneling
Wood Paneling - Question
- Question 5).
5: (Please reference Wood Paneling - Question 4 when answering
this question. Assumption in this question is that panels referenced are confirmed to be
WDP-4): Detail H10/A1.33, referenced between the seating and the stage on A1.30,
shows WDP-4 panels.
Bullnose edge is millwork stained to match WDP-4. WDP-4 extends around
Part 1: Is the bullnosed edge and horizontal portion shown as wood adjacent to the 1/23/2025 BW lower walls of audience chamber. Refer to updated notes found on A1.33 and
vertical panels on H10/A1.33 also WDP-4? A1.35.
Part 2: What is the extent of these panels on page A1.30? Does it continue around the
north and south of the seating area? North seating elevation H1/A1.33 indicates a wood
2 71 1/9/2025 Architectural A1.11G, A1.30, A1.33 veneer panel WC-1B (reference previous question).
Wood Paneling - Question 6: (Please reference Wood Paneling - Questions 4 & 5 when
Refer to detail for clarification, wood panels at this location should be WDP-4.
answering this question): Detail H6/A1.33 referenced on A1.30 appears to show wood 1/23/2025 BW
Updated notes found on A1.33.
panels similar to other details such as H4 & H10/A1.33. Please advise what this is and
2 72 1/9/2025 Architectural A1.11G, A1.30, A1.33 what specifically W-18 is since this is not referenced anywhere other than on this detail.
Wood Paneling - Question 7: (Please reference Wood Paneling - Questions 4 to 6 when
answering this question): Referencing sound booth detail A11/A1.31 shown on A1.30, 1/23/2025 BW Vertical finishes for sound booth shall be PL-1. Updated notes on A1.31
section D10/A1.31 going through the sound booth shows "wood veneer panels." Please
2 73 1/9/2025 Architectural A1.11G, A1.30, A1.31 identify what type of panel this is and the extent of these panels at this location?
Acoustic Wall Panel - Question 1: Detail H6/A1.31 is referenced in drama classroom 1526
(A1/A1.31) and calls out acoustic wall panel AWP-4 continuing around the perimeter of the room. Wall panels in the black box should be AWP-5, elevation is updated to
This detail as well as details 1 & 4/A5.08 appear to be the only elevation details of this room and 1/23/2025 BW reference mounting height dimensions, panels extend the full perimeter of the
do not visualy show any panels. The detail also says to center panels on the center of a wall which room. Updates notes on A1.31.
is not clear. Please advise on the extent AWP-4 should be installed in this room and include at
2 74 1/9/2025 Architectural A1.11F, A1.31 what height panels should begin at to what height the panels should be installed off the ground.
Acoustic Wall Panel - Question 2: On A1/A1.30, detail D1/A1.35 calls out AWP-6 wall panels but
does not clearly indicate the extent that the panels are meant to be installed. Is AWP-6 supposed
to be installed from a height of 24' above level 1 down 16' to the height of the "solid wood cap"
(per H9/A1.31) and extend further towards the stage along the 45 degree sloped lighting towards Updated shading for AWP-6 wall panels to clarify extents. Updated notes on
the stage right up to the wood slat wall panels? Detail G1/A1.35 on the opposite side of the room 1/23/2025 BW A1.35. INTERNAL NOTE - need help with elevation G1/A1.35, the hatch will
and A6/A1.35 on the west side of the room do not call out AWP-6 or any wall panels but seem to not update for the wall panels...
show the same shading and lighting pattern on D1/A1.35. Please advise if AWP-6 is required on
these elevations. If required on A6/A1.35, please advise at what height the panels start and to
2 75 1/9/2025 Architectural A1.11G, A1.30, A1.31, A1.35 what height the panels extend.
4 of 6
EXHIBIT C - 100% RFI LOG
Sequoyah Middle School & High School
Doraville, GA
PRE-CONSTRUCTION RFI LOG - 100% CDs
Set # RFI # Date Discipline Sheet/Detail or Spec # Question Response Required Response Date Response By Response
Acoustic Wall Panel - Question 3: (Please reference Acoustic Wall Panel - Question 2 when
answering this question): Looking at detail A5/A1.34, we see 11/A1.22 referenced which
shows acoustic panels attached directly CMU. However, on detail A5/A1.31, detail INTERNAL NOTE: 3fORM SHOWS TO DIRECT MOUNT HUSH PANELS TO
J11/A1.31 is referenced which indicates that acoustic panels are attached via z-clips THE WALL - ZCLIPS NOT REQUIRED - DO WE WANT THEM? Should the
(which are not shown on the manufacturer installation instructions for AWP-6). wall be furred behind the panels?
Additionally, this detail shows a drywall reveal between panels and wall type OGF
installed Infront of the panels. Please confirm that the assembly should depict the CMU
wall, followed by wall type OGF with z clips, the drywall reveal installed between the
2 76 1/9/2025 Architectural A1.22, A1.31, A1.34 drywall panels from wall type OGF, and the acoustic panels directly attached to drywall.
2 77 1/10/2025 Architectural Spec Section 09 64 66 Please review proposed substitution request for Wood Dance Flooring and confirm acceptance. The proposed alternate product is acceptable.
Please clarify the placement and height at which the wall tile, HTW-2, is to stop at in room 0405 or 1/23/2025 BW Refer to A8.10D and A8.10H for clarification on wall tile extents.
3 78 1/13/2025 Architectural A8.10D provide elevation drawings for room 0405.
Several products already have model numbers listed - these all refer to
ProMaxima brand. Those without model numbers are generic products with no
specified manufacturer required. Some additional detail has been provided
3 79 1/13/2025 Architectural A1.42 Please provide manufacturers and model numbers for Weight Equipment schedule. 02.05.2024 MLG above.
RFI 09 above, requested details for the interior ceiling to curtain wall/glazing conditions. The
response notes to "See Revised sheet in Addendum". However, the added detail 9 / Sheet A2.21 Apologies for the confusion...ceiling heights at those locations have been
does not provide detail on how to address the typical condition in which the horizontal mullion at 9'- adjusted to coordinate with mullion heights, so the detail provided will match
Detail 9 / A2.21 - Ceiling to Curtainwall - Roller Shade 4" AFF is below the ceiling height of 10'-0" AFF. Please provide detail as to how the interior side the typical condition. Ceiling sheets showing this change were omitted from
3 80 1/13/2025 Architectural Detail of the curtain wall system should be finished at this condition. 01.24.2024 MLG Addendum #1 but are provided as part of Addendum #1.
Spec 116133 – Section 2.6B – calls for ¼” lift lines. But 2.6C (and drawings) call for the P1500E Smaller lift line diameter is acceptable so long as the cable meets the 8:1
3 81 1/14/2025 Theater Lighting Spec Section 116133 hoist which has 3/16” lift lines. What is the required lift line diameter? 1/21/2025 JGH safety factor outlined in 116133.2.4.A.1
Theatrical Lighting system consists for 5 electrics. But the spec is calling for a Foundation Desk.
3 82 1/14/2025 Theater Lighting Please confirm that this is the controller required, or would a more basic controller be preferred? 1/21/2025 JGH Quicktouch + MK2 is an acceptable substitution for this system
Spec Section 260519 Item 3.1.B Notes that copper feeders are required for feeders smaller than
No. 4 AWG and that aluminum feeders are acceptable for No. 4 AWG and larger. However,
Spec Section 260519 vs Sheet GE0.02 - Electrical General Notes 11 and 12 on Sheet GE0.02 note that copper wiring and conductors are required.
3 83 1/14/2025 Electrical Notes & Abbreviations Please confirm that aluminum feeders are acceptable per the spec. 02.05.2024 JZ Aluminum feeders are not acceptable, please provide copper only.
Sheet C-301 does not show gas meter location or load for the building. Please confirm gas load GAS METER AND GAS LOAD IS SHOWN ON SHEET P3.10D. SEE
3 84 1/14/2025 Plumbing/Civil Utility Plan C-301 and meter location for coordination with AGL. 1/23/2025 BR ADDENDUM #2 DRAWINGS
Please clarify the finish product for WC-18 (Darker Wood). This finish type is not shown on A8.20 1/23/2025 BW This panel should be WDP-4.
3 85 1/15/2025 Architectural A1.33 & A8.20 Interior Finish Schedule.
Please clarify if the wood paneling that is called out on A1.35 to be over 7/8" furring, is the wood
veneer walcovering, WC-1B, per A8.20. If the wood paneling is WC-1B, please change the 1/23/2025 BW This panel should be WDP-4.
3 86 1/15/2025 Architectural A1.35 & A8.20 description to wood walcovering in lieu of wood paneling.
A1/A4.09 shows interior frame windows" ISF E1" on the northewest elevation of the HS courtyard.
Interior frame elevations are hollow metal, but these windows are also shown on exterior plans.
Please clarify if the window system "ISF E1" is meant to be hollow metal on the interior and
3 87 1/15/2025 Architectural A1/A4.09, A6.11 & A2/A7.38 aluminum on the exterior. 1/22/2025 KO Windows are to be ESF A1- Updated on revised sheets
5 of 6
EXHIBIT C - 100% RFI LOG
Sequoyah Middle School & High School
Doraville, GA
PRE-CONSTRUCTION RFI LOG - 100% CDs
Set # RFI # Date Discipline Sheet/Detail or Spec # Question Response Required Response Date Response By Response
Almost all restroom elevations are noting "paint" above wall tile but there is not paint specified on
the elevation drawings. For instance restrooms 1705.1 and 1705.2 indicates HTW-3 and HTW5 on
the finish plan and room finihs schedule, but the elevation detail J6/A7.40 shows paint above the
tile. Please clarify the paint type that is going above the wall tile. Also, please clarify if the other Where Paint is noted in Restrooms provide Epoxy Paint in color PNT-1. The
3 88 1/15/2025 Architectural J6/A7.40, A8.11H, & A8.22 three walls are to receive the same finish as shown on J6/A7.40 or if the tile is to go to ceiling. 1/22/2025 MWE other three walls will receive the same finish as shown on J6/A7.40
RFI #23 does not provide a manufacturer with testing requirements for the frame, and only refers
to the GL-1AR and GL-1BR glazing. Per spec section 088000, glass types GL-1AR and GL-1BR
are the same as typical except apply F-2 and F-1 film respectively. Exterior glazing is 1” thick
insulated glass units, therefore, please confirm that the framing does not require Ballistic/Attack
3 89 1/15/2025 Architectural Specification 088000 & RFI#23 resistant testing. 1/22/2025 KO Frame dose not need Ballistic/Attack resistant testing
Per RFI #89, Please confirm that the F-2 and F-1 film are to be provided at the exterior of the These films are referred to as F-2 and F-1 in the specs and as GL-1AR and GL-
3 90 1/15/2025 Architectural Specification 088000 glass 01.22.2025 MLG 1BR on the drawings. They are corresponding products.
There are several interior elevations indicating a smoke rated system, but there is no smoke rated These aseemblies are in smoke partitions , not smoke barriers . Therefore, the
specification in the contract documetns. Please provide a fire rated and smoke rated specification assembly itself does not need to have any sort of rating, but must be fully
3 91 1/15/2025 Architectural for the glazing stystem. 01.24.2025 MLG sealed around the perimeter to resist the free passage of smoke.
Please provide a specific manufacturer for the the fire rated spandrel glass that is to be installed in
3 92 1/15/2025 Architectural the glazing systems. 01.24.2025 MLG Ther will be no fire rated spandrel glass on the project.
Please confirm that the SOG Type SG5 is required to be 4x4-w2.9/w2.9 in lieu of the previously
3 93 1/16/2025 Structural S0.03 - Structural Slabs & Decks shown 6x6 w2.1/w2.1. 1/21/2005 SB Correct
The WWC-1a & 1b wallcovering do not have the ability to wrap around corners and will need to be
cut. There is close to a thousand lineal foot of this condition to be accounted for and at this time
there are no trims noted in the finish legend or in the specification. Outside corner trim at WWC-1A and WWC-1b shall be WDT-1, miter
Please clarify if you want sharp cuts at the corrners or if a trim is reuired. If a trim is required, cut, stained to match wall finish. (I will update the Match WWC-A to
4 95 1/21/2025 Architectural A8.20 please provide the product specification to be utilized. 02.05.2024 BW match wall finish and cloud for sheet A8.20)
The specifications for Wood Flooring Section 09 64 66 notes the basis of design for WF-1 as
Robbins BioCushion Classic and WF-2 as Robbins Danzaire. The Interior Finish Legend A8.20
notes WF-1 as Robbins Air Channel Star and WF-2 as Robbins BioChannel Classic. These are
two completely different systems as the product noted in the specifications is a floating system and
the products noted in the Finish Legend are fixed systems. Please clarify if the wood flooring
4 96 1/21/2025 Architectural A8.20 & Specification 09 64 66 slection WF-1 & WF2 that is on A8.20 is the correct flooring and provide an updated specifcation. 02.05.2024 MLG & BW The products as listed in the specification section are acceptable.
6 of 6
EXHIBIT D - TROPHY DISPLAY
CASE ALTERNATE
Display Cases:
Recessed Display Case with Sliding Glass Doors [SDS]
For Recessed Display Cases with Sliding Glass Doors
• These attractive Display Cases have repositionable shelving that will accommodate any accolade.
• Sliding doors are made of 1/4" tempered glass.
• Continuous stainless steel piano hinge.
• Wood box made of 3/4" plywood with birch veneer with clear natural finish. Additional finish options available.
Imagination made easy.™
EXHIBIT D - TROPHY DISPLAY
CASE ALTERNATE
Suggested Specifications
PART 1: general
1.1 SECTION INCLUDES
A. Vinyl Cork Tackboard Display Case.
1.2 RELATED SECTIONS
A. Section 06100 – Wood or Steel Blocking.
B. Section 09000 – Gypsum Wall Board.
C. Section 09720 – Vinyl Wall Coverings.
D. Section 09900 – Paints and Coatings.
1.3 REFERENCES
A. ASTM B221 – Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and
Tubes.
B. ASTM E84 –Test Method for Surface Burning and Characteristics of Building Materials.
1.4 SUBMITTALS
A. Submit products and samples under provisions of Section 01300.
B. Product Data: Provide technical data for products specified. Include Material Safety Data Sheets, when applicable.
C. Shop Drawings: Provide shop drawings for each type of visual display board specified including section details
indicating trim, face, core and backing materials, dimensions, joint locations and special anchor details.
D. Color Samples: Submit set of color chips displaying manufacturer’s full range of colors and finishes.
E. Product Samples: Submit samples not less than twelve inches square and framed on two adjacent sides, to illustrate
materials, finish, color, and configuration of each type of visual display board required.
F. Care and Maintenance Data: Provide data on cleaning requirements, stain removal, and recommended maintenance
precautions.
1.5 DELIVERY, STORAGE AND HANDLING
A. Comply with manufacturer’s instructions for handling and storage of Display Cases.
1.6 PROJECT CONDITIONS
A. Field measure prior to fabrication to ensure proper fit.
B. General contractor to maintain proper climate before, during and after installation.
1.7 WARRANTY
A. Submit manufacturer’s “One Year” warranty, stating that under normal usage and maintenance, and when installed in
accordance with manufacturer’s instructions and recommendations, Display Cases are warranted for one year.
B. Warranty shall cover replacement of defective workmanship and product defects. Warranty does not cover the cost of
removal or reinstallation.
PART 2: products
2.1 MANUFACTURERS
A. Provide visual display boards as manufactured by Platinum Visual Systems™, Corona, California. Tel.: (800)498-2990
Fax: (951)817-9900. Email: info@pvsusa.com. Website: www.pvsusa.com.
B. Substitutions: See Section 01600 – Product Requirements.
[SDS SERIES]
EXHIBIT D - TROPHY DISPLAY
CASE ALTERNATE
2.2 RECESSED DISPLAY CASE MATERIALS
A. Vinyl Face Sheets: Vinyl surface will be Type II self-healing, weighing not less than 21 ounces per lineal yard. Pattern
to be a Harborweave.
1. Vinyl shall be washable and mildew resistant.
B. Core Material: 1/4" natural cork underlayment.
C. Wood Box Material: 3/4" plywood with Birch veneer.
D. Metal Trim: 6063 aluminum alloy with a T5 temper.
E. Glass: 1/4" tempered glass.
F. Adhesive: As recommended by manufacturer for project conditions.
2.3 RECESSED DISPLAY CASE WITH SLIDING GLASS DOORS
A. Provide Recessed Display Cases with Sliding Glass Doors for project from manufacturer’s SDS Series
1. Metal trim and accessories: SDS Series thick wall aluminum extrusions with clear satin anodized finish.
a. Housing AT220: One piece aluminum 2" x 2" angle perimeter housing.
b. Door Frame CH200: Channel frame with plastic seal at glass. Channel to have integrated wheels.
c. Top Door Track TT760: One piece aluminum channel with plastic guides at top of glass.
d. Bottom Door Track BT660: One piece aluminum channel with roller guide.
e. Lock: Sliding ratchet lock.
2. Back Panel: Vinyl cork tackboard standard.
3. Glass Doors and Shelves: 1/4" tempered glass.
a. Doors: 4', 5' and 6' widths to have two doors, 8' and 10' widths to have three doors, 12' width to have four
doors and 16' width to have five doors. Doors shall have pencil edge finish.
b. Shelves: Two 6", 8", 10" or 12" deep rows of glass shelves with pencil edge finish and adjustable brackets
on standards.
4. Wood Box: 3/4 inch plywood with Birch veneer with clear natural fi nish. Depth to be 12", 16" or 24". Optional
finishes available.
5. Size: 4' high x 4', 5', 6', 8', 10', 12', or 16' wide x 12", 16" or 24" deep.
6. Color: As selected from manufacturer’s standard colors.
7. Light: Optional fluorescent light available.
2.4 FABRICATION
A. Laminate facing sheet and backing sheet to core material under pressure, using manufacturer’s recommended
adhesive.
B. Provide factory-assembled visual display boards, except where sizes demand partial field assembly.
PART 3: execution
3.1 EXAMINATION
A. Verify that substrates are properly prepared to receive Display Cases. Do not begin installation until unsatisfactory
conditions have been corrected.
3.2 INSTALLATION
A. Comply with manufacturer’s installation instructions.
B. Install visual display boards level and plumb, keeping perimeter trim aligned in accordance with manufacturer’s
recommendations.
3.3 ADJUSTING AND CLEANING
A Verify that all accessories are installed as required for each unit.
B. Upon completion of installation, clean surfaces and trim in accordance with manufacturer’s recommendations,
leaving all materials ready for use.
[SDS SERIES]
EXHIBIT D - TROPHY DISPLAY
CASE ALTERNATE
SDS: Specifications
FINISHED OPENING
PLEASE SPECIFY
AT220 ANGLE FACE FRAME
TT760 DOUBLE CHANNEL
NYLON GUIDE
TACKABLE BACK PANEL
VINYL ON 1/4" CORK ON
3/4" PLYWOOD
1/4" TEMPERED GLASS
FINISHED OPENING
PLEASE SPECIFY
1/4" TEMPERED GLASS SHELVES
WITH ADJUSTABLE BRACKETS
ON STANDARDS
3/4" BIRCH VENEER AT TOP,
BOTTOM AND SIDES
CH200 SHOE
WHEEL ASSEMBLY
BT660 RAIL
2"
1451 E. Sixth Street, Corona, CA 92879
800 498 2990 | 951 817 2200 | FAX 951 817 9900
www.pvsusa.com | info@pvsusa.com
EXHIBIT E - TURF SPECIFICATIONS
Fielder’s Choice 50
Polyethylene Slit Film
™
Texturized Polypropylene
PROPERTY DESCRIPTION FL416-50
Primary Yarn Polymer Polyethylene; Polypropylene PRESSURE TREATED 2X4 ANCHOR TO
CONCRETE CURB W/ 1/2"Ø STAINLESS
SLOPE SUBGRADE @ .5%
TOWARDS COLLECTOR TRENCH
STEEL EXPANSION ANCHORS GEOTEXTILE FABRIC,
COVER ENTIRE SUBGRADE
Polyethylene Slit Film; RESILIENT SURFACING
Yarn Cross Section PANEL DRAIN
Texturized Polypropylene ASPHALT
INFILLED SYNTHETIC
TURF SYSTEM
2" DEPTH 1/4"-3/8"
Standard Color Field; Terra Cotta CLEAN AGGREGATE
4" DEPTH 3/4" TURF
AGGREGATE
Additional Colors Available White
8" FLYASH UNDER
16" FLYASH UNDER TURF GRAVEL
UV Stabilized Yes ASPHALT
MIN.
9"
6" X 12" CONC. CURB W/
TWO #4 REBAR
6" 6"
Fabric Construction Tufted 9" PERFORATED COLLECTOR
SUB-DRAIN
MIN. MIN. COMPACTED SUBGRADE
INSTALL FILTER FABRIC BELOW AGGREGATE BASE
COURSE AND AT BOTTOM & SIDES OF TRENCH
Primary Backing Dual layered woven polypropylene CURB
Coating Type SilverBack™ Polyurethane HOME PLATE
FOLD TURF 2"X4" SHELF TO ADHERE INFILLED
Perforations Yes BATTER'S BOX
(WHITE TURF)
OVER
ANCHOR SYNTHETIC TURF SYSTEM
CONCRETE SYNTHETIC TURF ANCHOR,
Polyethylene Yarn Denier/Ends 8000/1 (Slit) PROVIDE SMOOTH TOP
INFILLED
4600/8 (Texturized PP) SYNTHETIC
TURF SYSTEM
Recommended Infill 1 lb. Silica Sand; 2.75 lbs. SBR Rubber FREE DRAINING
FINISHING STONE,
LASER GRADE ONLY
Pile Height 1 ¾” THOROUGHLY
COMPACTED
PREPARED OR BASE STONE
Pile Weight 50 oz. UNDISTURBED
SUBGRADE
EQUIPMENT
Standard Line and Field Colors*
APPLICATION
This is a field product. This product should be installed outdoors on a compacted aggregate base. Custom
designed for baseball, Fielder’s Choice has the added durability designed to reduce infill splash and migration
which is extremely important in gameplay.
™
*Custom colors available upon request
200 Howell Dr. Dalton GA 30721 www.sporturf.com 800.798.1056
EXHIBIT E - TURF SPECIFICATIONS
TESTING FIELDER’S CHOICE 50
FINISHED FABRIC ENGLISH SYSTEM METRIC SYSTEM ASTM TEST
Nominal Specification Value Units Value Units Method
Pile Height (Nominal) 1 3/4 In. 44.45 mm. D-5823
Face Weight 50 oz/yd2 1695 g/m2 D-5848
Total Fabric Weight 77 oz/yd2 2611 g/m2 D-5848
Primary backing Weight 7.4 oz/yd2 251 g/m2 D-5848
Secondary Coating Weight 22 oz/yd2 746 g/m2 D-5848
Tuft Bind >10 lbs. >4.5 Kg. D-1335
Grab Tear Strength (Average) >200 lbs. >91 Kg. D-2256
Lead Content <50 ppm <50 ppm D-2765
Total Yarn Linear Density 12,600 Denier 14,000 D-Tex D-1577
Tensile Strength (Slit PE) 8 lbs. 3.63 Kg. D-5034
Tensile Strength (Texturized PP) 3.7 lbs. 1.7 Kg. D-789
Stitch Rate 11.5 Per 3” 15.07 Per 10 cm D-5793
Machine Gauge 1/2 In. 1.27 Cm. D-5793
Flammability TEST PASSED TEST PASSED D-2859
Water Permeability w/infill >30 In./Hr. >30 Cm./Hr. F-1551
Fiber Thickness (Slit PE) 9.4 mils 100 microns D-3218
Fabric Width 15 Ft. 4.6 M None
08/25/2023
It is the policy of Sporturf™ to continuously improve their line of products. Therefore, Sporturf™ reserves the right to change,
modify or discontinue systems, specifications and accessories of all products at any time without notice or obligation to purchaser.
EXHIBIT E - TURF SPECIFICATIONS
PowerHouse 46Q
™
Polyethylene Slit Film
PROPERTY DESCRIPTION FL452Q-46
Primary Yarn Polymer Polyethylene PRESSURE TREATED 2X4 ANCHOR TO
CONCRETE CURB W/ 1/2"Ø STAINLESS
SLOPE SUBGRADE @ .5%
TOWARDS COLLECTOR TRENCH
STEEL EXPANSION ANCHORS GEOTEXTILE FABRIC,
COVER ENTIRE SUBGRADE
RESILIENT SURFACING
Yarn Cross Section Polyethylene Slit Film ASPHALT
PANEL DRAIN
INFILLED SYNTHETIC
TURF SYSTEM
2" DEPTH 1/4"-3/8"
Standard Color Field; Field/Lime CLEAN AGGREGATE
4" DEPTH 3/4" TURF
White, Yellow, Red, Florida Blue, Black, AGGREGATE
Additional Colors Available* Orange, Terra Cotta 8" FLYASH UNDER
16" FLYASH UNDER TURF GRAVEL
UV Stabilized Yes ASPHALT
MIN.
9"
6" X 12" CONC. CURB W/
TWO #4 REBAR
Fabric Construction Tufted 9" PERFORATED COLLECTOR
SUB-DRAIN
6" 6"
MIN. MIN. COMPACTED SUBGRADE
INSTALL FILTER FABRIC BELOW AGGREGATE BASE
COURSE AND AT BOTTOM & SIDES OF TRENCH
Primary Backing Dual layered woven polypropylene CURB
Coating Type SilverBack™ Polyurethane EXISTING EQUIPMENT
FOUNDATION GRADE LUMBER OR
Perforations Yes RECYCLED PLASTIC. ATTACH WITH
S.S CONCRET SCREWS & WASHERS
@ 18" O.C.
Polyethylene Yarn Denier/Ends 8000/1 (Slit) INFILLED SYNTHETIC TURF SYSTEM
5000/1 (Slit)
THOROUGHLY COMPACTED
MATERIAL AT EDGE
Recommended Infill 1 lb. Silica Sand; 3.25 lbs. SBR Rubber
FREE DRAINING FINISHING STONE,
LASER GRADE ONLY
Pile Height 2 ¼” FREE DRAINING BASE STONE
GEOTEXTILE FABRIC
Pile Weight 46 oz. COMPACTED SUBGRADE
EQUIPMENT
Standard Line and Field Colors*
APPLICATION
This is a high use field product. This product should be installed outdoors on a compacted aggregate base.
The PowerHouse series is made up of some of the most proven and durable fibers in the world. The 2C “Double
Coverage” system allows for more face yarn to show off its beautiful colors. This 13,000 denier system will keep
your field looking newer, longer.
™
*Custom colors available upon request
200 Howell Dr. Dalton GA 30721 www.sporturf.com 800.798.1056
EXHIBIT E - TURF SPECIFICATIONS
TESTING POWERHOUSE 46Q
FINISHED FABRIC ENGLISH SYSTEM METRIC SYSTEM ASTM TEST
Nominal Specification Value Units Value Units Method
Pile Height (Nominal) 2 1/4 In. 57.15 mm. D-5823
Face Weight 46 oz/yd2 1560 g/m2 D-5848
Total Fabric Weight 73 oz/yd2 2475 g/m2 D-5848
Primary backing Weight 7.4 oz/yd2 251 g/m2 D-5848
Secondary Coating Weight 22 oz/yd2 746 g/m2 D-5848
Tuft Bind >10 lbs. >4.5 Kg. D-1335
Grab Tear Strength (Average) >200 lbs. >91 Kg. D-2256
Lead Content <50 ppm <50 ppm D-2765
Total Yarn Linear Density 13,000 Denier 14,443 D-Tex D-1577
Tensile Strength (Slit) 8 lbs. 3.6 Kg. D-789
Stitch Rate 8 Per 3” 10.49 Per 10 cm D-5793
Machine Gauge 1/2 In. 1.27 Cm. D-5793
Flammability TEST PASSED TEST PASSED D-2859
Water Permeability w/infill >30 In./Hr. >76 Cm./Hr. F-1551
Fiber Thickness (Slit) 9.4 mils 100 microns D-3218
Fabric Width 15 Ft. 4.6 M None
8/28/2023
It is the policy of Sporturf™ to continuously improve their line of products. Therefore, Sporturf™ reserves the right to change,
modify or discontinue systems, specifications and accessories of all products at any time without notice or obligation to purchaser.
EXHIBIT E - TURF SPECIFICATIONS
GameChanger™
Series
PRODUCT FIELD GUIDE
EXHIBIT E - TURF SPECIFICATIONS
UNLEASH THE
ULTIMATE PLAY
Every game, every sport, every day. GameChanger™
adds what you and your athletes need to win in any
condition. GameChanger™’s unique construction allows
athletes to play focused. When safety, performance and
maximum control are requried, GameChanger™ provides
the technology to achieve your goals.
EXHIBIT E - TURF SPECIFICATIONS
GameChanger™
The GameChanger™ series is the world’s first tufted fabric utilizing 3 ends
per needle. The 3C “Triple Coverage” system allows for more face yarn to
show off its beautiful colors. This 14,000 denier system will keep your field
looking newer, longer with over 50% more yarn denier above the infill. This
field product should be installed outdoors on a compacted aggregate base.
PROPERTY DESCRIPTION
Primary Yarn Polymer Polyethylene
Yarn Cross Section Polyethylene Monofilament;
Polyethylene Slit Film
Standard Color Field; Field/Lime
Additional Colors Available White, Yellow, Red, Florida Blue,
Black, Orange, Terra Cotta
UV Stabilized Yes
Fabric Construction Tufted
Primary Backing Dual layered woven polypropylene
Coating Type SilverBack™ Polyurethane
Perforations Yes
Polyethylene Yarn Denier/Ends 1500/6 (Mono)
5000/1 (Slit)
Recommended Infill 1 lb. Silica Sand; 3 lbs. SBR Rubber
Pile Height 2” - 2½”
Pile Weight 40-52 oz.
Standard Line and Field Colors*
GAMECHANGER 40Z PICTURED
Polyethylene Monofilament
Polyethylene Slit-Film
*Custom colors available upon request
EXHIBIT E - TURF SPECIFICATIONS
Game Day, Every Day
GO BEYOND ELITE
The days of closing the field to only the elite are over. With high quality
products from Sporturf, your field will be there for your team and fans day
and night. Turf technology is our business and our desire to always be
improving allows us to provide a superior product. Our products can take
the beating you will throw at them.
We stand committed to continuous improvement. We don’t just offer the
highest-quality synthetic turf available, we blend it with the expertise of over
25 years of experience and research in what we believe is the best in athletic
field construction. We can list the benefits you should expect from us:
An Enhanced Game Surface
Excellent Quality Over and Over Again
Superior Speed of Play Combined With Comfort
High Shock Attenuation Lowering Likelihood of
Over Use Injuries
EXHIBIT E - TURF SPECIFICATIONS
EXHIBIT E - TURF SPECIFICATIONS
ATTENTION TO EVERY DETAIL
You are putting your best on our field every day. Before it arrives to
you, we have put our best on it as well. From manufacturing to a full in
house laboratory, we make sure your choice was the right choice.
EXHIBIT E - TURF SPECIFICATIONS
When quality matters,
Sporturf™ delivers
LISPORT
This machine simulates wear and tear on the product,
allowing Sporturf™ to determine durability and longevity of
the turf. Each cycle the Lisport makes correlates to the
amount of years that the turf would be in use.
INSTRON
The Instron measures the tuft bind of a product. This means
that it simulates the force needed to pull the yarn from the
backing of the turf. It also measures tensile strength and tests
delamination, ensuring top yarn quality and consistency.
WEIGHT CHECKS
Weight checks are necessary to make sure that each sample
is made proportionately within +/- 0.5%. This helps maintain
quality control.
10MP MICROSCOPE CAMERA
When a yarn sample is placed on the 10MP microscope, all the
wear and tear that’s not visible to the human eye becomes
observable. This also allows inspection of the quality and
cellular composition of the SilverBack™ coating on our turf.
HIGH SPEED CURING OVEN
This assists in the new product development process by
curing test products and SilverBack™ samples to ensure that
Sporturf’s turf is of the highest quality.
EXHIBIT E - TURF SPECIFICATIONS
Contractor Direct Installations
GAMECHANGER™ FIELDS COMPLETED 2004-2013
FACILITY FACILITY
Millard North Farragut High School (2012)
CITY/STATE CITY/STATE
Omaha, NE Knoxville, TN
CONTRACTOR/INSTALLER CONTRACTOR/INSTALLER
Nemaha Landscape Playrite Sports
Sporturf Midwest Playrite Sports
STYLE/YARN TYPE STYLE/YARN TYPE
GameChanger™ / Wetekam GameChanger™ / Quad & XP Pro
OUNCE WT/PILE HEIGHT OWNER/CONTACT OWNER/CONTACT
OUNCE WT/PILE HEIGHT
40 oz / 2½ in Brian Begley (402)715-1365 46 oz / 2¼ in Dan Pritt (419)306-5960
(85,000 sq/ft outdoor)
FACILITY FACILITY
Maryland Soccer Plex (2007) Knoxville Catholic (2012)
CITY/STATE CITY/STATE
Boyds, MD Knoxville, TN
CONTRACTOR/INSTALLER CONTRACTOR/INSTALLER
DOC Contract Playrite Sports
DOC Inc. Playrite Sports
STYLE/YARN TYPE STYLE/YARN TYPE
GameChanger™ / XP/Mono GameChanger™ / Quad & XP Pro
OUNCE WT/PILE HEIGHT OWNER/CONTACT OUNCE WT/PILE HEIGHT
42 oz / 21⁄8 in Doc Boyd (410)271-9953 46 oz / 2¼ oz
FACILITY FACILITY
Orchard Lake St. Mary’s HS Grace Academy (2011)
(2013)
CITY/STATE CITY/STATE
Orchard Lake, MI Knoxville, TN
CONTRACTOR/INSTALLER CONTRACTOR/INSTALLER
Oakwood Construction Inc. Baseline Sports
Oakwood Construction Inc. Kalmia Installations
STYLE/YARN TYPE STYLE/YARN TYPE
GameChanger™ / XP Pro Quad GameChanger™ / XP Pro/Q
OUNCE WT/PILE HEIGHT OUNCE WT/PILE HEIGHT
44 oz / 2½ in 50 oz / 2¼ in
FACILITY FACILITY
*Samford University (2014) Missouri State Univ. (2014)
CITY/STATE CITY/STATE
Birmingham, AL Springfield, MO
CONTRACTOR/INSTALLER CONTRACTOR/INSTALLER
Russell Turf Company Byrne and Jones
Sporturf Construction Inc. Sporturf Midwest
STYLE/YARN TYPE STYLE/YARN TYPE
GameChanger™ / Ten Cate 8000 GameChanger™ / XP Pro
OUNCE WT/PILE HEIGHT OWNER/CONTACT OUNCE WT/PILE HEIGHT OWNER/CONTACT
42 oz / 2¼ in Joe Collins (205) 329-8278 52 oz / 2½ in Casey Hunt (417)836-5346
(105,0000 sq/ft outdoor)
EXHIBIT E - TURF SPECIFICATIONS
PURE, QUIET
™ STRENGTH.
Imagine having the strength of seven Olympic weight lifters or weighing over
400 lbs and being able to do one armed pull-ups. Our new SilverBack™
system is the quiet strength under your new synthetic turf that gives you the
peace of mind that your investment is protected by unmatched strength.
PURE TECHNOLOGY
• SilverBack’s coating system takes advantage
of the most advanced technology in the
coating industry.
• Engineered with quality in mind from the pure
polyurethane chemistry to the application
system.
OLD BACKING • Features technologically advanced chemistry
focusing on offering the highest quality
components to create the best coating
system available.
• Applied using an application system designed
specifically for this coating process in order to
have full control of the entire product.
• Certified Quality – Our ISO 9001 – 2008, ISO
14001 and OHSAS 18001
SILVERBACK™ BACKING
EXHIBIT E - TURF SPECIFICATIONS
MISSOURI STATE UNIVERSITY
Plaster Football Stadium
EXHIBIT E - TURF SPECIFICATIONS
TURN KEY SOLUTIONS FROM CONCEPT TO DELIVERY
PRESSURE TREATED 2X4 ANCHOR TO SLOPE SUBGRADE @ 7% EXISTING EQUIPMENT
CONCRETE CURB W/ 1/2"Ø STAINLESS TOWARDS COLLECTOR TRENCH
STEEL EXPANSION ANCHORS GEOTEXTILE FABRIC, FOUNDATION GRADE LUMBER OR
COVER ENTIRE SUBGRADE
RESILIENT SURFACING RECYCLED PLASTIC. ATTACH WITH
PANEL DRAIN S.S CONCRET SCREWS & WASHERS
ASPHALT
INFILLED SYNTHETIC @ 18" O.C.
TURF SYSTEM
2" DEPTH 1/4"-3/8" INFILLED SYNTHETIC TURF SYSTEM
CLEAN AGGREGATE
THOROUGHLY COMPACTED
4" DEPTH 3/4" TURF MATERIAL AT EDGE
AGGREGATE
FREE DRAINING FINISHING STONE,
8" FLYASH UNDER LASER GRADE ONLY
16" FLYASH UNDER TURF GRAVEL
FREE DRAINING BASE STONE
ASPHALT
MIN.
9"
6" X 12" CONC. CURB W/ GEOTEXTILE FABRIC
TWO #4 REBAR
9" PERFORATED COLLECTOR 6" 6" COMPACTED SUBGRADE
MIN. MIN. COMPACTED SUBGRADE
SUB-DRAIN INSTALL FILTER FABRIC BELOW AGGREGATE BASE
COURSE AND AT BOTTOM & SIDES OF TRENCH
CURB EQUIPMENT
EXHIBIT E - TURF SPECIFICATIONS
800 798 1056 www.sporturf.com 200 Howell Drive, Dalton, GA 30721
EXHIBIT E.1 - TRACK DRAINAGE ASSUMPTIONS
*Track drainage design included in 100% CD Documents is currently incomplete.
This GMP assumes drainage system similar to that shown above.
1 2 3 4 5 6 7 8 9 10 11 12
KEY NOTES - ROOF PLAN
KEY KEYNOTE
R1 HATCH INDICATES TAPERED INSULATION, TYP.
R2 ROOF-TO-ROOF LADDER WITH PLATFORM
K R3 30"X54" ROOF HATCH W/SAFETY RAILS K
R4 36" WALKING PAD
24" - TO BE CONFIRMED BY ROOFING CONTRACTOR AND EOR
R5 MECHANICAL SCREEN, TOP OF SCREEN 10' ABOVE FINSIHED ROOF.
1,000 LB
WORKING LOAD R6 MECHANICAL SCREEN, TOP OF SCREEN 6' ABOVE FINSIHED ROOF.
45
R7 WALLS ON ROOF PEDESTAL, 8" ABV, FINISHED ROOF
R8 CURBED ROOF EXPANSION JOINT
R9 OVERFLOW SCUPPER
R10 CANOPY BELOW, REF SHEET A3.30
R11 48"x96" SMOKE HATCH
JANUARY 22ND, 2025 R12 30" x 54" ROOF HATCH
1 R13 48" X 48" ROOF HATCH WITH SAFETY RAILS
J R14 30" x 54" ROOF HATCH
J
1 R15 ACCESS PANEL LOCATIONS
R16 SWING ARM DAVIT - PRO-BEL A100 AND 600 SERIES DAVIT BASE WELDED
\\Probel-nt1\engineering\0- STD. WORKING DIRECTORY\0- SALES & MARKETING\EXTENDED MARKETING DIRECTORY\8. MISC\Hoists\Marketing - Autocad\New Hoist\M-HSTM-180-520.dwg, 10/21/2005 1:48:51 PM, annettef
TO STRUCTUREOR SIMILAR
6120 Powers Ferry Road NW, Suite 200
NO SPECIFICATIONS ON HOIST ARM
PROVIDED. QUOTING 1,000LB WORKING
IF NOTCHING OF LOAD ELECTRIC HOIST ARM WITH 8'6" MAX
BASE PLATES NOT SCREENWALL IS REACH. POWER AT ROOF BY OTHERS. ONLY
REQUIRED AT ROOF ONE ARM INCLUDED. TO BE MOVED
ROOF HATCH LEGEND
REQUIRED BY
Goodwyn Mills Cawood, LLC
ANCHOR BETWEEN ROOF LEVELS.
OTHERS.
LOCATIONS ANY TAPERED INSULATION ROOF WALK PAD
LONGER DUE TO
GMCNETWORK.COM
H H
MEMBER SIZES
R O O F TIE L E G E N D
Atlanta, GA 30339
770.952.2481
WELDED ROOF ANCHOR WITH BASE PLATE WELDED ROOF ANCHOR
TYP G5
___________________ WELDED WALL ANCHOR
S4.02
7" TYP
UNO
T
W12X16 W14X22
G MEMBRANE ROOF G
OVER 6" MIN. RIGID
W12X16 W14X22 W12X16
W14X22 INSULATION ON
METAL DECK
DESIGN DEVELOPMENT 02.23.2024
SCHEMATIC DESIGN 09.15.2023
80% CONSTRUCTION DOCUMENTS 09.13.2024
30% CONSTRUCTION DOCUMENTS 06.21.2024
W18X35
ISSUED FOR CONSTRUCTION 12.13.2024
R16
W18X35
ADDENDUM #1 01.10.2025
W12X14 *
W12X14 *
DATE
Checker
9' - 6"
W12X14 *
W12X14 *
Author
10' - 11"
32 1 R4
SIM J1
___________________
TYP A5.26
S4.02
W14X22 W16X26
DRAWN BY:
CHECKED BY:
W12X26 N
ISSUE
W12X14 *
W12X14 *
W12X14 *
W18X35
W14X22
8' - 8"
R8
W12X14 *
W12X14 *
A
W14X22 SIM ___________________
G7
S4.02
F R6 F
W14X22
R13 B
W12X14 *
W12X16
F
W16X31 W12X14 C
1 W E
A5.39 E
G
PD/OD
W16X26
W14X22
W18X40
D
1
H
1/4" / 1'-0"
W16X31 W12X14
K
W16X26
J
SQUARE FOOTAGE: 477,706.52
8' - 8"
W16X31
S
DOE FACILITY CODE: 0916
KEY PLAN
E W12X19 W18X35 E
R1
GaDOE REQUIRED INFO
1/4" / 1'-0" 1/4" / 1'-0" W18X35
2
FTE: 1200 MS & 1600 HS
LOW POINT LOW POINT
A5.26
W12X14 *
ROOF DECK ROOF DECK
SR3
SR3
T/ST'L =45'-9" HIGH POINT T/ST'L =45'-9 PD/OD PD/OD
IUs: 74 MS & 84 HS
ROOF DECK
T/ST'L = 47'-3" MEMBRANE ROOF
W12X19 W18X35 OVER 6" MIN. RIGID W18X40
PARKING: 594
INSULATION ON
METAL DECK
R16 750 LBS
W18X35
W18X35
W18X35
W12X14 *
2
A5.39 R4 9
W16X26 (45' - 9")
W16X26
10
W12X19 W16X31 W16X31
W18X35
PD/OD
D D
5' - 9"
W12X19
W16X31 W16X31
R12
HIGH SCHOOL AT SEQUOYAH
W24X55
W18X35
W18X35
9
R5
NEW MIDDLE SCHOOL AND
750 LBS
YP @ TOP 9
OF CW E11 17 18'-6"
___________________ 750 LBS
S6.01 W12X26 W18X35
DORAVILLE, GA 30340
W18X35
W12X14 *
3835 LBS
W12X26
6' - 7"
W12X26
9
GMC # AATL220022
W12X19 W18X35 W18X35
DLR # 46-23101-00
3456 AZTEC RD
W16X26
9 R1
W12X14 *
W12X14 *
C L4X4X5/16 DIAGONAL C
W18X35
SCREENWALL 750 LBS
W12X14 *
R1 BRACES (4-PLACES)
W12X26 W18X35 W18X35
GENERAL NOTES - ROOF PLAN
W12X14 *
W18X35
W21X44
32 A. ROOF PLAN GENERAL NOTES APPLY TO ALL ROOF PLAN SHEETS.
B. ROOF SLOPES ARE CREATED BY SLOPING THE ROOF STRUCTURE UNLESS
W16X26
TYP
PD/OD
(+45'-4")
W12X14 W18X35 NOTED OTHERWISE. SEE STRUCTURAL DRAWINGS FOR ELEVATIONS OF
SF6.5
W16X31 W12X26 W12X14 W14X22 THE HIGH AND LOW POINTS TO DETERMINE PROPER TAPER IN
W12X14 *
INSULATION.
B8
___________________
W12X14 *
S6.02
C. TAPERED INSULATION SHALL PROVIDE A MINIMUM OF 1/4-INCH PER
B8
___________________
W14X22 *
FOOT OF SLOPE TO ROOF DRAINS, UNLESS NOTED OTHERWISE.
B S6.02
D. ALL ROOF CURBS TO BE A MINIMUM OF 8 INCHES ABOVE ROOFING
B
W12X14 W18X40
TEMPLATE VERSION: 2022.1
W18X35 W12X14
LEVELS. PROVIDE TAPERED INSULATION ROOF SADDLES AT ROOF
W12X14 *
CURBS TO PROVIDE DRAINAGE AROUND CURB.
9
8890 LBS
E. SEE STRUCTURAL DRAWINGS FOR FRAMING AROUND ROOF
PENETRATIONS.
F. COORDINATE THE SIZE AND LOCATION OF ROOF PENETRATIONS FOR
A3.10A
MECHANICAL AND ELECTRICAL EQUIPMENT. REFER TO MECHANICAL AND
ROOF PLAN - AREA A
R9 R9 R9
ELECTRICAL DRAWINGS FOR PENETRATIONS NOT SHOWN ON THIS
DRAWING.
G. FLASH DRAINS, CURBS, VENTS AND STACKS PER MANUFACTURER'S
OS OS OS
RECOMMENDATIONS IF DETAIL NOT SHOWN ON DRAWINGS.
H. NO ROOF PENETRATIONS ALLOWED WITHIN 4'-0" EACH SIDE OF
1/10/2025 4:27:07 PM
A FIREWALL. SEE CODE PLAN FOR FIRE WALL LOCATIONS. A
I. PROVIDE SEISMIC RESTRAINT FOR NONSTRUCTURAL PARAPET AND
EXTERIOR NONSTRUCTURAL WALLS AS REQUIRED BY SEISMIC DESIGN
(OPEN TO BELOW) 1
PD/OD PD PD PD CATEGORY B AND C INDICATED IN STRUCTURAL DRAWINGS.
1 ROOF PLAN - AREA A J. CRICKETS SHALL BE INSTALLED ON THE HIGH SIDE OF ALL ROOF CURBS
TRUE
NORTH SCALE: 1/8" = 1'-0"
EXHIBIT F - PRO BEL FACADE MAINTENANCE LAYOUT TO MAINTAIN POSITIVE DRAINAGE. WATER SHALL NOT BE ALLOWED TO
STAND BEHIND CURBS.
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
IF NOTCHING OF
KEY NOTES - ROOF PLAN
SCREENWALL IS KEY KEYNOTE
REQUIRED BY R1 HATCH INDICATES TAPERED INSULATION, TYP.
OTHERS. R2 ROOF-TO-ROOF LADDER WITH PLATFORM
K R3 30"X54" ROOF HATCH W/SAFETY RAILS K
R4 36" WALKING PAD
24" - TO BE CONFIRMED BY ROOFING CONTRACTOR AND EOR
1 R5 MECHANICAL SCREEN, TOP OF SCREEN 10' ABOVE FINSIHED ROOF.
R6 MECHANICAL SCREEN, TOP OF SCREEN 6' ABOVE FINSIHED ROOF.
R7 WALLS ON ROOF PEDESTAL, 8" ABV, FINISHED ROOF
R8 CURBED ROOF EXPANSION JOINT
R9 OVERFLOW SCUPPER
R10 CANOPY BELOW, REF SHEET A3.30
W12X14
R11 48"x96" SMOKE HATCH
W12X14 *
R12 30" x 54" ROOF HATCH
W12X14 *
W12X14 *
W16X26
R13 48" X 48" ROOF HATCH WITH SAFETY RAILS
J R14 30" x 54" ROOF HATCH
J
W18X35 W12X14 W16X36
R15 ACCESS PANEL LOCATIONS
9074 LBS
W12X14 *
W12X14
R16 SWING ARM DAVIT - PRO-BEL A100 AND 600 SERIES DAVIT BASE WELDED
9
R O OTOF STRUCTUREOR
HATCH LEGEND
W18X35
W16X31
SIMILAR
B8
6120 Powers Ferry Road NW, Suite 200
W12X14 W12X14 W12X14 ___________________
S6.02
W12X14 W16X36 TAPERED INSULATION ROOF WALK PAD
W12X14
W12X14 *
BASE PLATES NOT
W12X14 *
W12X14 *
REQUIRED AT ROOF R O O F TIE L E G E N D
W12X14 *
32
Goodwyn Mills Cawood, LLC
TYP ANCHOR
(OPEN TO BELOW) W18X35 W12X14 W16X31 W16X36
PD/OD
LOCATIONS ANY
WELDED ROOF ANCHOR WITH BASE PLATE WELDED ROOF ANCHOR
LONGER DUE TO
W16X26
W12X14 *
GMCNETWORK.COM
B8
___________________
W12X14 *
H MEMBER SIZES H
W12X14 *
S6.02 WELDED WALL ANCHOR
W12X14 *
Atlanta, GA 30339
770.952.2481
13 W12X14 W16X36
W12X14
45
7" TYP
W12X14 *
W16X31
UNO
W18X35
W18X35 W12X14
W12X14 W16X36
T
W18X35
W12X14 * W12X14 *
W12X14 *
JANUARY 22ND, 2025
W12X14 *
W12X14 *
W18X35 3831 LBS 17
9
W12X14 * W12X14 *
W16X31
G 9 G
W12X14 1250 LBS W18X35
W12X14 *
W16X26
W12X14 *
W12X14 *
9
W12X14 *
7' - 7 1/2"
750 LBS
DESIGN DEVELOPMENT 02.23.2024
SCHEMATIC DESIGN 09.15.2023
80% CONSTRUCTION DOCUMENTS 09.13.2024
W12X14 *
30% CONSTRUCTION DOCUMENTS 06.21.2024
ISSUED FOR CONSTRUCTION 12.13.2024
ADDENDUM #1 01.10.2025
DATE
Checker
W18X35 W12X14 W12X14
W12X14 *
W12X14 *
W12X14
Author
W12X14 * W18X35
W12X14 * SIM G7
___________________
W12X14 *
S4.02 W12X26
7' - 7 1/2"
PD/OD 1750 LBS
W21X44
W18X35
W12X14 *
W16X26
1300 LBS
W18X35
DRAWN BY:
CHECKED BY:
9 N
9
ISSUE
W12X26 W18X35
W12X26
2' - 9"
6' - 6 1/2"
W14X22 W18X35
R5 L4X4X5/16 DIAGONAL A
SCREENWALL
W16X26
BRACES (4-PLACES)
W12X14 * W18X35
F LOW POINT LOW POINT B F
W12X14 *
SR3
SR3
ROOF DECK ROOF DECK
6' - 6 1/2"
T/ST'L =45'-9" HIGH POINT T/ST'L =45'-9"
ROOF DECK F
C
R1 T/ST'L = 47'-3" W18X35 W E
E
W14X22 W18X35 G
1/4" / 1'-0"
TYP @ TOP
D
1
OF CW
E11
W18X35
W18X35
___________________ 9 9 H
S6.01
W12X14 *
750 LBS 750 LBS
W16X31
W18X35
K
W12X14 * W18X35 5
J
A5.26
SQUARE FOOTAGE: 477,706.52
9
W14X22 W18X35 750 LBS
S
DOE FACILITY CODE: 0916
KEY PLAN
E E
W16X26
GaDOE REQUIRED INFO
PD/OD
FTE: 1200 MS & 1600 HS
W12X14 *
W12X14 * W18X35
10
IUs: 74 MS & 84 HS
W12X14 W12X14
R1
PARKING: 594
W16X26
W12X14
W12X14 * W16X31
W12X14 *
W12X14 W12X16
W16X26
W18X35
W14X22
W16X26
14' - 9"
9
W12X14 *
SIM ___________________
J1
750 LBS
W12X14 S4.02 W12X14 W12X14 *
D D
W14X22
W12X14 *
1/4" / 1'-0"
HIGH SCHOOL AT SEQUOYAH
W16X26
32 SIM G7
___________________
4
NEW MIDDLE SCHOOL AND
TYP S4.02
W14X22 R7
W18X40 A5.26
R8
W18X35
DORAVILLE, GA 30340
W12X14 *
MEMBRANE ROOF
PD/OD OVER 6" MIN. RIGID
INSULATION ON
GMC # AATL220022
DLR # 46-23101-00
METAL DECK W14X22 W14X22 W12X14
3456 AZTEC RD
C C
W12X14 *
W12X14 *
W12X14 *
W24X55
12' - 3"
W16X31
MEMBRANE ROOF
OVER 6" MIN. RIGID
GENERAL NOTES - ROOF PLAN
R4
W16X31 W16X31 INSULATION ON
METAL DECK A. ROOF PLAN GENERAL NOTES APPLY TO ALL ROOF PLAN SHEETS.
B. ROOF SLOPES ARE CREATED BY SLOPING THE ROOF STRUCTURE UNLESS
W21X50
W18X35
W12X14 *
W12X14 *
NOTED OTHERWISE. SEE STRUCTURAL DRAWINGS FOR ELEVATIONS OF
W12X14 *
12' - 3"
THE HIGH AND LOW POINTS TO DETERMINE PROPER TAPER IN
INSULATION.
PD C. TAPERED INSULATION SHALL PROVIDE A MINIMUM OF 1/4-INCH PER
W14X22 W14X22
FOOT OF SLOPE TO ROOF DRAINS, UNLESS NOTED OTHERWISE.
B D. ALL ROOF CURBS TO BE A MINIMUM OF 8 INCHES ABOVE ROOFING
B
TEMPLATE VERSION: 2022.1
W12X14
LEVELS. PROVIDE TAPERED INSULATION ROOF SADDLES AT ROOF
R10 CURBS TO PROVIDE DRAINAGE AROUND CURB.
W14X22 W14X22 E. SEE STRUCTURAL DRAWINGS FOR FRAMING AROUND ROOF
PENETRATIONS.
OS
F. COORDINATE THE SIZE AND LOCATION OF ROOF PENETRATIONS FOR
E9
___________________ MECHANICAL AND ELECTRICAL EQUIPMENT. REFER TO MECHANICAL AND
A3.10B
ROOF PLAN - AREA B
S6.01
ELECTRICAL DRAWINGS FOR PENETRATIONS NOT SHOWN ON THIS
DRAWING.
G. FLASH DRAINS, CURBS, VENTS AND STACKS PER MANUFACTURER'S
RECOMMENDATIONS IF DETAIL NOT SHOWN ON DRAWINGS.
H. NO ROOF PENETRATIONS ALLOWED WITHIN 4'-0" EACH SIDE OF
1/10/2025 4:27:18 PM
A FIREWALL. SEE CODE PLAN FOR FIRE WALL LOCATIONS. A
I. PROVIDE SEISMIC RESTRAINT FOR NONSTRUCTURAL PARAPET AND
EXTERIOR NONSTRUCTURAL WALLS AS REQUIRED BY SEISMIC DESIGN
TRUE
NORTH
1 ROOF PLAN - AREA B
SCALE: 1/8" = 1'-0"
EXHIBIT F - PRO BEL FACADE MAINTENANCE LAYOUT
J.
CATEGORY B AND C INDICATED IN STRUCTURAL DRAWINGS.
CRICKETS SHALL BE INSTALLED ON THE HIGH SIDE OF ALL ROOF CURBS
TO MAINTAIN POSITIVE DRAINAGE. WATER SHALL NOT BE ALLOWED TO
1
STAND BEHIND CURBS.
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY NOTES - ROOF PLAN
KEY KEYNOTE
R1 HATCH INDICATES TAPERED INSULATION, TYP.
R2 ROOF-TO-ROOF LADDER WITH PLATFORM
K R3 30"X54" ROOF HATCH W/SAFETY RAILS K
R4 36" WALKING PAD
R5 MECHANICAL SCREEN, TOP OF SCREEN 10' ABOVE FINSIHED ROOF.
R9 R9 R9
1,000 LB
R6 MECHANICAL SCREEN, TOP OF SCREEN 6' ABOVE FINSIHED ROOF.
WORKING LOAD
R7 WALLS ON ROOF PEDESTAL, 8" ABV, FINISHED ROOF
OS OS OS R8 CURBED ROOF EXPANSION JOINT
R9 OVERFLOW SCUPPER
R10 CANOPY BELOW, REF SHEET A3.30
R11 48"x96" SMOKE HATCH
R12 30" x 54" ROOF HATCH
PD PD PD 6
A5.26 R13 48" X 48" ROOF HATCH WITH SAFETY RAILS
J R14 30" x 54" ROOF HATCH
J
R15 ACCESS PANEL LOCATIONS
R16 SWING ARM DAVIT - PRO-BEL A100 AND 600 SERIES DAVIT BASE WELDED
R O OTOF STRUCTUREOR
HATCH LEGEND
SIMILAR
6120 Powers Ferry Road NW, Suite 200
\\Probel-nt1\engineering\0- STD. WORKING DIRECTORY\0- SALES & MARKETING\EXTENDED MARKETING DIRECTORY\8. MISC\Hoists\Marketing - Autocad\New Hoist\M-HSTM-180-520.dwg, 10/21/2005 1:48:51 PM, annettef
TAPERED INSULATION ROOF WALK PAD
NO SPECIFICATIONS ON HOIST ARM
R1 PROVIDED. QUOTING 1,000LB WORKING
LOAD ELECTRIC HOIST ARM WITH 8'6" MAX
REACH. POWER AT ROOF BY OTHERS. ONLY
Goodwyn Mills Cawood, LLC
ONE ARM INCLUDED. TO BE MOVED
BETWEEN ROOF LEVELS.
1/4" / 1'-0"
R16
GMCNETWORK.COM
H H
3
MEMBRANE ROOF R13
Atlanta, GA 30339
770.952.2481
OVER 6" MIN. RIGID A5.39
INSULATION ON
METAL DECK
T
G G
45
R4
DESIGN DEVELOPMENT 02.23.2024
SCHEMATIC DESIGN 09.15.2023
80% CONSTRUCTION DOCUMENTS 09.13.2024
30% CONSTRUCTION DOCUMENTS 06.21.2024
ISSUED FOR CONSTRUCTION 12.13.2024
ADDENDUM #1 01.10.2025
DATE
Checker
Author
JANUARY 22ND, 2025
DRAWN BY:
CHECKED BY:
1 N
ISSUE
5
A5.26 A
F B F
R16
R2 F
C
W E
E
R9 R9 G
D
1
OS OS H
K
J
SQUARE FOOTAGE: 477,706.52
S
DOE FACILITY CODE: 0916
PD PD KEY PLAN
1/4" / 1'-0"
E E
GaDOE REQUIRED INFO
FTE: 1200 MS & 1600 HS
IUs: 74 MS & 84 HS
4
A5.26
PARKING: 594
R8
MEMBRANE ROOF
1/4" / 1'-0"
OVER 6" MIN. RIGID
D INSULATION ON D
METAL DECK
HIGH SCHOOL AT SEQUOYAH
NEW MIDDLE SCHOOL AND
R4
DORAVILLE, GA 30340
R1 9
GMC # AATL220022
A5.26
DLR # 46-23101-00
3456 AZTEC RD
PD
1/4" / 1'-0"
C C
MEMBRANE ROOF
R9 OVER RIGID
INSULATION ON GENERAL NOTES - ROOF PLAN
METAL DECK
OS FIREPROOFING NOT REQUIRED FOR A. ROOF PLAN GENERAL NOTES APPLY TO ALL ROOF PLAN SHEETS.
ROOF STRUCTURE MEMBERS AT B. ROOF SLOPES ARE CREATED BY SLOPING THE ROOF STRUCTURE UNLESS
MIDDLE SCHOOL GYMNASIUM
WHERE STRUCTURE IS MORE THAN NOTED OTHERWISE. SEE STRUCTURAL DRAWINGS FOR ELEVATIONS OF
20' ABOVE FLOOR BELOW. THE HIGH AND LOW POINTS TO DETERMINE PROPER TAPER IN
INSULATION.
C. TAPERED INSULATION SHALL PROVIDE A MINIMUM OF 1/4-INCH PER
FOOT OF SLOPE TO ROOF DRAINS, UNLESS NOTED OTHERWISE.
B D. ALL ROOF CURBS TO BE A MINIMUM OF 8 INCHES ABOVE ROOFING
B
TEMPLATE VERSION: 2022.1
R1 LEVELS. PROVIDE TAPERED INSULATION ROOF SADDLES AT ROOF
CURBS TO PROVIDE DRAINAGE AROUND CURB.
E. SEE STRUCTURAL DRAWINGS FOR FRAMING AROUND ROOF
PENETRATIONS.
F. COORDINATE THE SIZE AND LOCATION OF ROOF PENETRATIONS FOR
A3.10C
MECHANICAL AND ELECTRICAL EQUIPMENT. REFER TO MECHANICAL AND
ROOF PLAN - AREA C
PD PD
ELECTRICAL DRAWINGS FOR PENETRATIONS NOT SHOWN ON THIS
DRAWING.
G. FLASH DRAINS, CURBS, VENTS AND STACKS PER MANUFACTURER'S
RECOMMENDATIONS IF DETAIL NOT SHOWN ON DRAWINGS.
R9 R9 H. NO ROOF PENETRATIONS ALLOWED WITHIN 4'-0" EACH SIDE OF
1/10/2025 4:27:24 PM
OS OS
A FIREWALL. SEE CODE PLAN FOR FIRE WALL LOCATIONS. A
I. PROVIDE SEISMIC RESTRAINT FOR NONSTRUCTURAL PARAPET AND
EXTERIOR NONSTRUCTURAL WALLS AS REQUIRED BY SEISMIC DESIGN
TRUE
NORTH
1 ROOF PLAN - AREA C
SCALE: 1/8" = 1'-0"
EXHIBIT F - PRO BEL FACADE MAINTENANCE LAYOUT
J.
CATEGORY B AND C INDICATED IN STRUCTURAL DRAWINGS.
CRICKETS SHALL BE INSTALLED ON THE HIGH SIDE OF ALL ROOF CURBS
TO MAINTAIN POSITIVE DRAINAGE. WATER SHALL NOT BE ALLOWED TO
1
STAND BEHIND CURBS.
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY NOTES - ROOF PLAN
KEY KEYNOTE
R1 HATCH INDICATES TAPERED INSULATION, TYP.
R2 ROOF-TO-ROOF LADDER WITH PLATFORM
K R3 30"X54" ROOF HATCH W/SAFETY RAILS K
R4 36" WALKING PAD
R5 MECHANICAL SCREEN, TOP OF SCREEN 10' ABOVE FINSIHED ROOF.
R6 MECHANICAL SCREEN, TOP OF SCREEN 6' ABOVE FINSIHED ROOF.
1,000 LB
R7 WALLS ON ROOF PEDESTAL, 8" ABV, FINISHED ROOF
WORKING LOAD
R8 CURBED ROOF EXPANSION JOINT
45
R9 OVERFLOW SCUPPER
R10 CANOPY BELOW, REF SHEET A3.30
R11 48"x96" SMOKE HATCH
R12 30" x 54" ROOF HATCH
JANUARY 22ND, 2025 R13 48" X 48" ROOF HATCH WITH SAFETY RAILS
J R14 30" x 54" ROOF HATCH
J
1 R15 ACCESS PANEL LOCATIONS
R16 SWING ARM DAVIT - PRO-BEL A100 AND 600 SERIES DAVIT BASE WELDED
R O OTOF STRUCTUREOR
HATCH LEGEND
SIMILAR
6120 Powers Ferry Road NW, Suite 200
\\Probel-nt1\engineering\0- STD. WORKING DIRECTORY\0- SALES & MARKETING\EXTENDED MARKETING DIRECTORY\8. MISC\Hoists\Marketing - Autocad\New Hoist\M-HSTM-180-520.dwg, 10/21/2005 1:48:51 PM, annettef
TAPERED INSULATION ROOF WALK PAD
NO SPECIFICATIONS ON HOIST ARM
PROVIDED. QUOTING 1,000LB WORKING
LOAD ELECTRIC HOIST ARM WITH 8'6" MAX
Goodwyn Mills Cawood, LLC
REACH. POWER AT ROOF BY OTHERS. ONLY
ONE ARM INCLUDED. TO BE MOVED
BETWEEN ROOF LEVELS.
GMCNETWORK.COM
H H
Atlanta, GA 30339
770.952.2481
R16
T
R16
R4
G R16 G
MEMBRANE ROOF OVER RIGID
INSULATION ON METAL DECK
DESIGN DEVELOPMENT 02.23.2024
SCHEMATIC DESIGN 09.15.2023
80% CONSTRUCTION DOCUMENTS 09.13.2024
30% CONSTRUCTION DOCUMENTS 06.21.2024
4
ISSUED FOR CONSTRUCTION 12.13.2024
ADDENDUM #1 01.10.2025
DATE
Checker
A5.39
Author
R14
DRAWN BY:
CHECKED BY:
N
ISSUE
A
F B F
F
1/4" / 1'-0"
C
W E
E
G
D
1
H
1/4" / 1'-0"
K
J
SQUARE FOOTAGE: 477,706.52
S
DOE FACILITY CODE: 0916
KEY PLAN
E MEMBRANE ROOF OVER RIGID
E
GaDOE REQUIRED INFO
INSULATION ON METAL DECK
FTE: 1200 MS & 1600 HS
FIREPROOFING NOT REQUIRED FOR ROOF STRUCTURE
MEMBERS AT "AREA D" WHERE STRUCTURE IS MORE
THAN 20' ABOVE FLOOR BELOW
IUs: 74 MS & 84 HS
R1
PARKING: 594
D D
PD/OD PD/OD PD/OD
HIGH SCHOOL AT SEQUOYAH
NEW MIDDLE SCHOOL AND
9
A5.26
DORAVILLE, GA 30340
GMC # AATL220022
DLR # 46-23101-00
3456 AZTEC RD
C C
GENERAL NOTES - ROOF PLAN
A. ROOF PLAN GENERAL NOTES APPLY TO ALL ROOF PLAN SHEETS.
B. ROOF SLOPES ARE CREATED BY SLOPING THE ROOF STRUCTURE UNLESS
NOTED OTHERWISE. SEE STRUCTURAL DRAWINGS FOR ELEVATIONS OF
THE HIGH AND LOW POINTS TO DETERMINE PROPER TAPER IN
INSULATION.
C. TAPERED INSULATION SHALL PROVIDE A MINIMUM OF 1/4-INCH PER
2.1%
R10 FOOT OF SLOPE TO ROOF DRAINS, UNLESS NOTED OTHERWISE.
B D. ALL ROOF CURBS TO BE A MINIMUM OF 8 INCHES ABOVE ROOFING
B
TEMPLATE VERSION: 2022.1
LEVELS. PROVIDE TAPERED INSULATION ROOF SADDLES AT ROOF
CURBS TO PROVIDE DRAINAGE AROUND CURB.
E. SEE STRUCTURAL DRAWINGS FOR FRAMING AROUND ROOF
PENETRATIONS.
F. COORDINATE THE SIZE AND LOCATION OF ROOF PENETRATIONS FOR
A3.10D
MECHANICAL AND ELECTRICAL EQUIPMENT. REFER TO MECHANICAL AND
ROOF PLAN - AREA D
ELECTRICAL DRAWINGS FOR PENETRATIONS NOT SHOWN ON THIS
DRAWING.
G. FLASH DRAINS, CURBS, VENTS AND STACKS PER MANUFACTURER'S
RECOMMENDATIONS IF DETAIL NOT SHOWN ON DRAWINGS.
H. NO ROOF PENETRATIONS ALLOWED WITHIN 4'-0" EACH SIDE OF
1/10/2025 4:27:30 PM
A FIREWALL. SEE CODE PLAN FOR FIRE WALL LOCATIONS. A
I. PROVIDE SEISMIC RESTRAINT FOR NONSTRUCTURAL PARAPET AND
TRUE 1 ROOF PLAN - AREA D
SCALE: 1/8" = 1'-0"
J.
EXTERIOR NONSTRUCTURAL WALLS AS REQUIRED BY SEISMIC DESIGN
CATEGORY B AND C INDICATED IN STRUCTURAL DRAWINGS.
CRICKETS SHALL BE INSTALLED ON THE HIGH SIDE OF ALL ROOF CURBS
1
NORTH
EXHIBIT F - PRO BEL FACADE MAINTENANCE LAYOUT TO MAINTAIN POSITIVE DRAINAGE. WATER SHALL NOT BE ALLOWED TO
STAND BEHIND CURBS.
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY NOTES - ROOF PLAN
KEY KEYNOTE
R1 HATCH INDICATES TAPERED INSULATION, TYP.
R2 ROOF-TO-ROOF LADDER WITH PLATFORM
K R3 30"X54" ROOF HATCH W/SAFETY RAILS K
R4 36" WALKING PAD
R5 MECHANICAL SCREEN, TOP OF SCREEN 10' ABOVE FINSIHED ROOF.
1,000 LB
R6 MECHANICAL SCREEN, TOP OF SCREEN 6' ABOVE FINSIHED ROOF.
WORKING LOAD
R7 WALLS ON ROOF PEDESTAL, 8" ABV, FINISHED ROOF
45
R8 CURBED ROOF EXPANSION JOINT
R9 OVERFLOW SCUPPER
R10 CANOPY BELOW, REF SHEET A3.30
1 R11 48"x96" SMOKE HATCH
R12 30" x 54" ROOF HATCH
JANUARY 22ND, 2025
R13 48" X 48" ROOF HATCH WITH SAFETY RAILS
J R14 30" x 54" ROOF HATCH
J
R15 ACCESS PANEL LOCATIONS
R16 SWING ARM DAVIT - PRO-BEL A100 AND 600 SERIES DAVIT BASE WELDED
R O OTOF STRUCTUREOR
HATCH LEGEND
SIMILAR
6120 Powers Ferry Road NW, Suite 200
\\Probel-nt1\engineering\0- STD. WORKING DIRECTORY\0- SALES & MARKETING\EXTENDED MARKETING DIRECTORY\8. MISC\Hoists\Marketing - Autocad\New Hoist\M-HSTM-180-520.dwg, 10/21/2005 1:48:51 PM, annettef
TAPERED INSULATION ROOF WALK PAD
2 NO SPECIFICATIONS ON HOIST ARM
A5.02 PROVIDED. QUOTING 1,000LB WORKING
LOAD ELECTRIC HOIST ARM WITH 8'6" MAX
REACH. POWER AT ROOF BY OTHERS. ONLY
Goodwyn Mills Cawood, LLC
ONE ARM INCLUDED. TO BE MOVED
BETWEEN ROOF LEVELS.
GMCNETWORK.COM
H H
Atlanta, GA 30339
R1
770.952.2481
PD/OD PD/OD
R1
T
8
G G
A5.26
DESIGN DEVELOPMENT 02.23.2024
SCHEMATIC DESIGN 09.15.2023
80% CONSTRUCTION DOCUMENTS 09.13.2024
30% CONSTRUCTION DOCUMENTS 06.21.2024
ISSUED FOR CONSTRUCTION 12.13.2024
ADDENDUM #1 01.10.2025
DATE
Checker
Author
PD/OD
PD/OD PD/OD PD/OD
DRAWN BY:
CHECKED BY:
N
ISSUE
1 1
A
R1
F B F
F
C
W E
E
G
D
1
H
K
FIREPROOFING NOT REQUIRED FOR ROOF STRUCTURE J
SQUARE FOOTAGE: 477,706.52
MEMBRANE ROOF OVER RIGID MEMBERS AT "AREA E" WHERE STRUCTURE IS MORE
INSULATION ON METAL DECK THAN 20' ABOVE FLOOR BELOW.
S
DOE FACILITY CODE: 0916
KEY PLAN
E E
GaDOE REQUIRED INFO
FTE: 1200 MS & 1600 HS
IUs: 74 MS & 84 HS
1/4" / 1'-0"
PARKING: 594
D D
HIGH SCHOOL AT SEQUOYAH
NEW MIDDLE SCHOOL AND
R4
1/4" / 1'-0"
R9
DORAVILLE, GA 30340
OS
MEMBRANE ROOF OVER RIGID
GMC # AATL220022
DLR # 46-23101-00
INSULATION ON METAL DECK
3456 AZTEC RD
C 3 C
A5.14
PD 6
A5.26
GENERAL NOTES - ROOF PLAN
R1 A. ROOF PLAN GENERAL NOTES APPLY TO ALL ROOF PLAN SHEETS.
B. ROOF SLOPES ARE CREATED BY SLOPING THE ROOF STRUCTURE UNLESS
NOTED OTHERWISE. SEE STRUCTURAL DRAWINGS FOR ELEVATIONS OF
THE HIGH AND LOW POINTS TO DETERMINE PROPER TAPER IN
R1 INSULATION.
C. TAPERED INSULATION SHALL PROVIDE A MINIMUM OF 1/4-INCH PER
FOOT OF SLOPE TO ROOF DRAINS, UNLESS NOTED OTHERWISE.
B D. ALL ROOF CURBS TO BE A MINIMUM OF 8 INCHES ABOVE ROOFING
B
1
TEMPLATE VERSION: 2022.1
1 R2
LEVELS. PROVIDE TAPERED INSULATION ROOF SADDLES AT ROOF
PD/OD PD/OD PD/OD CURBS TO PROVIDE DRAINAGE AROUND CURB.
PD/OD
3
E. SEE STRUCTURAL DRAWINGS FOR FRAMING AROUND ROOF
A5.39
R13 PENETRATIONS.
F. COORDINATE THE SIZE AND LOCATION OF ROOF PENETRATIONS FOR
MECHANICAL AND ELECTRICAL EQUIPMENT. REFER TO MECHANICAL AND
ROOF PLAN - AREA E
A3.10E
ELECTRICAL DRAWINGS FOR PENETRATIONS NOT SHOWN ON THIS
DRAWING.
G. FLASH DRAINS, CURBS, VENTS AND STACKS PER MANUFACTURER'S
RECOMMENDATIONS IF DETAIL NOT SHOWN ON DRAWINGS.
H. NO ROOF PENETRATIONS ALLOWED WITHIN 4'-0" EACH SIDE OF
1/10/2025 4:27:36 PM
A FIREWALL. SEE CODE PLAN FOR FIRE WALL LOCATIONS. A
I. PROVIDE SEISMIC RESTRAINT FOR NONSTRUCTURAL PARAPET AND
1 ROOF PLAN - AREA E EXTERIOR NONSTRUCTURAL WALLS AS REQUIRED BY SEISMIC DESIGN
CATEGORY B AND C INDICATED IN STRUCTURAL DRAWINGS. 1
TRUE SCALE: 1/8" = 1'-0"
J. CRICKETS SHALL BE INSTALLED ON THE HIGH SIDE OF ALL ROOF CURBS
NORTH
EXHIBIT F - PRO BEL FACADE MAINTENANCE LAYOUT TO MAINTAIN POSITIVE DRAINAGE. WATER SHALL NOT BE ALLOWED TO
STAND BEHIND CURBS.
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY NOTES - ROOF PLAN
KEY KEYNOTE
R1 HATCH INDICATES TAPERED INSULATION, TYP.
R2 ROOF-TO-ROOF LADDER WITH PLATFORM
K R3 30"X54" ROOF HATCH W/SAFETY RAILS K
R4 36" WALKING PAD
R5 MECHANICAL SCREEN, TOP OF SCREEN 10' ABOVE FINSIHED ROOF.
1,000 LB
WORKING LOAD
R6 MECHANICAL SCREEN, TOP OF SCREEN 6' ABOVE FINSIHED ROOF.
R7 WALLS ON ROOF PEDESTAL, 8" ABV, FINISHED ROOF
45
R8 CURBED ROOF EXPANSION JOINT
R9 OVERFLOW SCUPPER
R10 CANOPY BELOW, REF SHEET A3.30
R11 48"x96" SMOKE HATCH
JANUARY 22ND, 2025 R12 30" x 54" ROOF HATCH
R13 48" X 48" ROOF HATCH WITH SAFETY RAILS
J R14 30" x 54" ROOF HATCH
J
R15 ACCESS PANEL LOCATIONS
R16 SWING ARM DAVIT - PRO-BEL A100 AND 600 SERIES DAVIT BASE WELDED
TO STRUCTUREOR SIMILAR
6120 Powers Ferry Road NW, Suite 200
\\Probel-nt1\engineering\0- STD. WORKING DIRECTORY\0- SALES & MARKETING\EXTENDED MARKETING DIRECTORY\8. MISC\Hoists\Marketing - Autocad\New Hoist\M-HSTM-180-520.dwg, 10/21/2005 1:48:51 PM, annettef
NO SPECIFICATIONS ON HOIST ARM ROOF HATCH LEGEND
PROVIDED. QUOTING 1,000LB WORKING
LOAD ELECTRIC HOIST ARM WITH 8'6" MAX
REACH. POWER AT ROOF BY OTHERS. ONLY TAPERED INSULATION ROOF WALK PAD
ONE ARM INCLUDED. TO BE MOVED
Goodwyn Mills Cawood, LLC
BETWEEN ROOF LEVELS.
GMCNETWORK.COM
H H
Atlanta, GA 30339
770.952.2481
T
1
G G
5
A3.33
DESIGN DEVELOPMENT 02.23.2024
SCHEMATIC DESIGN 09.15.2023
80% CONSTRUCTION DOCUMENTS 09.13.2024
30% CONSTRUCTION DOCUMENTS 06.21.2024
ISSUED FOR CONSTRUCTION 12.13.2024
ADDENDUM #1 01.10.2025
DATE
Checker
Author
R10
DRAWN BY:
CHECKED BY:
N
ISSUE
FIREPROOFING NOT REQUIRED FOR
ROOF STRUCTURE MEMBERS AT
2 "BLACK BOX THEATER" WHERE
A
A3.33 STRUCTURE IS MORE THAN 20'
ABOVE FLOOR BELOW.
3
F B F
A3.33
F
C
PD/OD W E
E
G
R1
D
1
H
K
J
SQUARE FOOTAGE: 477,706.52
S
DOE FACILITY CODE: 0916
KEY PLAN
E R16 E
GaDOE REQUIRED INFO
FTE: 1200 MS & 1600 HS
IUs: 74 MS & 84 HS
5
R16
1/4" / 1'-0"
A5.39
PARKING: 594
R12
7 MEMBRANE ROOF
A5.26 OVER RIGID
R8 INSULATION ON
2
A3.31 METAL DECK
D D
1
HIGH SCHOOL AT SEQUOYAH
NEW MIDDLE SCHOOL AND
R4 PD/OD
DORAVILLE, GA 30340
GMC # AATL220022
DLR # 46-23101-00
R1
3456 AZTEC RD
C C
PD/OD PD/OD
R1 GENERAL NOTES - ROOF PLAN
A. ROOF PLAN GENERAL NOTES APPLY TO ALL ROOF PLAN SHEETS.
B. ROOF SLOPES ARE CREATED BY SLOPING THE ROOF STRUCTURE UNLESS
NOTED OTHERWISE. SEE STRUCTURAL DRAWINGS FOR ELEVATIONS OF
8
THE HIGH AND LOW POINTS TO DETERMINE PROPER TAPER IN
A5.26 INSULATION.
C. TAPERED INSULATION SHALL PROVIDE A MINIMUM OF 1/4-INCH PER
FOOT OF SLOPE TO ROOF DRAINS, UNLESS NOTED OTHERWISE.
B D. ALL ROOF CURBS TO BE A MINIMUM OF 8 INCHES ABOVE ROOFING
B
TEMPLATE VERSION: 2022.1
LEVELS. PROVIDE TAPERED INSULATION ROOF SADDLES AT ROOF
PD/OD PD/OD PD/OD
PD/OD CURBS TO PROVIDE DRAINAGE AROUND CURB.
E. SEE STRUCTURAL DRAWINGS FOR FRAMING AROUND ROOF
PENETRATIONS.
1 1
F. COORDINATE THE SIZE AND LOCATION OF ROOF PENETRATIONS FOR
MECHANICAL AND ELECTRICAL EQUIPMENT. REFER TO MECHANICAL AND
ROOF PLAN - AREA F
A3.10F
ELECTRICAL DRAWINGS FOR PENETRATIONS NOT SHOWN ON THIS
DRAWING.
R1
G. FLASH DRAINS, CURBS, VENTS AND STACKS PER MANUFACTURER'S
RECOMMENDATIONS IF DETAIL NOT SHOWN ON DRAWINGS.
H. NO ROOF PENETRATIONS ALLOWED WITHIN 4'-0" EACH SIDE OF
1/10/2025 4:27:42 PM
A FIREWALL. SEE CODE PLAN FOR FIRE WALL LOCATIONS. A
I. PROVIDE SEISMIC RESTRAINT FOR NONSTRUCTURAL PARAPET AND
TRUE
1 ROOF PLAN - AREA F
SCALE: 1/8" = 1'-0"
J.
EXTERIOR NONSTRUCTURAL WALLS AS REQUIRED BY SEISMIC DESIGN
CATEGORY B AND C INDICATED IN STRUCTURAL DRAWINGS.
CRICKETS SHALL BE INSTALLED ON THE HIGH SIDE OF ALL ROOF CURBS
1
NORTH
EXHIBIT F - PRO BEL FACADE MAINTENANCE LAYOUT TO MAINTAIN POSITIVE DRAINAGE. WATER SHALL NOT BE ALLOWED TO
STAND BEHIND CURBS.
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY NOTES - ROOF PLAN
KEY KEYNOTE
R1 HATCH INDICATES TAPERED INSULATION, TYP.
R2 ROOF-TO-ROOF LADDER WITH PLATFORM
K R3 30"X54" ROOF HATCH W/SAFETY RAILS K
R4 36" WALKING PAD
R5 MECHANICAL SCREEN, TOP OF SCREEN 10' ABOVE FINSIHED ROOF.
R6 MECHANICAL SCREEN, TOP OF SCREEN 6' ABOVE FINSIHED ROOF.
1,000 LB
WORKING LOAD R7 WALLS ON ROOF PEDESTAL, 8" ABV, FINISHED ROOF
45
R8 CURBED ROOF EXPANSION JOINT
R9 OVERFLOW SCUPPER
R10 CANOPY BELOW, REF SHEET A3.30
R11 48"x96" SMOKE HATCH
R12 30" x 54" ROOF HATCH
JANUARY 22ND, 2025 R13 48" X 48" ROOF HATCH WITH SAFETY RAILS
J R14 30" x 54" ROOF HATCH
J
R15 ACCESS PANEL LOCATIONS
R16 SWING ARM DAVIT - PRO-BEL A100 AND 600 SERIES DAVIT BASE WELDED
R O OTOF STRUCTUREOR
HATCH LEGEND
SIMILAR
6120 Powers Ferry Road NW, Suite 200
\\Probel-nt1\engineering\0- STD. WORKING DIRECTORY\0- SALES & MARKETING\EXTENDED MARKETING DIRECTORY\8. MISC\Hoists\Marketing - Autocad\New Hoist\M-HSTM-180-520.dwg, 10/21/2005 1:48:51 PM, annettef
TAPERED INSULATION ROOF WALK PAD
NO SPECIFICATIONS ON HOIST ARM
PROVIDED. QUOTING 1,000LB WORKING
LOAD ELECTRIC HOIST ARM WITH 8'6" MAX
REACH. POWER AT ROOF BY OTHERS. ONLY
Goodwyn Mills Cawood, LLC
ONE ARM INCLUDED. TO BE MOVED
BETWEEN ROOF LEVELS.
GMCNETWORK.COM
H H
1
Atlanta, GA 30339
770.952.2481
T
G G
DESIGN DEVELOPMENT 02.23.2024
SCHEMATIC DESIGN 09.15.2023
80% CONSTRUCTION DOCUMENTS 09.13.2024
30% CONSTRUCTION DOCUMENTS 06.21.2024
H10
ISSUED FOR CONSTRUCTION 12.13.2024
ADDENDUM #1 01.10.2025
DATE
Checker
Author
A1.31
DRAWN BY:
CHECKED BY:
N
ISSUE
R11
A
R1
F MEMBRANE ROOF
B F
6" MIN. RIGID
R4 INSULATION ON R11 F
METAL DECK C
TOTAL SMOKE VENT AREA: 128 SF W E
E
TOTAL STAGE AREA: 2,376 SF G
SMOKE VENT COVERAGE AREA = 5.39% OF STAGE AREA
R4 (5% REQUIRED BY IBC 2018 SECTION 410) D
1
H
K
R11 J
SQUARE FOOTAGE: 477,706.52
S
DOE FACILITY CODE: 0916
KEY PLAN
E E
R11
GaDOE REQUIRED INFO
FTE: 1200 MS & 1600 HS
R1
IUs: 74 MS & 84 HS
PARKING: 594
5
A5.39
R12
D D
1/4" / 1'-0"
4'-8 1/8"
1/4" / 1'-0"
1/4" / 1'-0"
MEMBRANE ROOF
HIGH SCHOOL AT SEQUOYAH
6" MIN. RIGID R2
INSULATION ON R2 1/4" / 1'-0"
NEW MIDDLE SCHOOL AND
METAL DECK
R2 7'-4" R2
DORAVILLE, GA 30340
GMC # AATL220022
DLR # 46-23101-00
3456 AZTEC RD
C C
R4
GENERAL NOTES - ROOF PLAN
A. ROOF PLAN GENERAL NOTES APPLY TO ALL ROOF PLAN SHEETS.
B. ROOF SLOPES ARE CREATED BY SLOPING THE ROOF STRUCTURE UNLESS
6
NOTED OTHERWISE. SEE STRUCTURAL DRAWINGS FOR ELEVATIONS OF
A5.05
1/4" / 1'-0" THE HIGH AND LOW POINTS TO DETERMINE PROPER TAPER IN
INSULATION.
C. TAPERED INSULATION SHALL PROVIDE A MINIMUM OF 1/4-INCH PER
FOOT OF SLOPE TO ROOF DRAINS, UNLESS NOTED OTHERWISE.
B D. ALL ROOF CURBS TO BE A MINIMUM OF 8 INCHES ABOVE ROOFING
B
R1
TEMPLATE VERSION: 2022.1
LEVELS. PROVIDE TAPERED INSULATION ROOF SADDLES AT ROOF
CURBS TO PROVIDE DRAINAGE AROUND CURB.
E. SEE STRUCTURAL DRAWINGS FOR FRAMING AROUND ROOF
PENETRATIONS.
F. COORDINATE THE SIZE AND LOCATION OF ROOF PENETRATIONS FOR
A3.10G
ROOF PLAN - AREA G
MECHANICAL AND ELECTRICAL EQUIPMENT. REFER TO MECHANICAL AND
PD/OD
ELECTRICAL DRAWINGS FOR PENETRATIONS NOT SHOWN ON THIS
R1
DRAWING.
1 G. FLASH DRAINS, CURBS, VENTS AND STACKS PER MANUFACTURER'S
RECOMMENDATIONS IF DETAIL NOT SHOWN ON DRAWINGS.
H. NO ROOF PENETRATIONS ALLOWED WITHIN 4'-0" EACH SIDE OF
1/10/2025 4:27:48 PM
A FIREWALL. SEE CODE PLAN FOR FIRE WALL LOCATIONS. A
I. PROVIDE SEISMIC RESTRAINT FOR NONSTRUCTURAL PARAPET AND
TRUE 1 ROOF PLAN - AREA G
SCALE: 1/8" = 1'-0"
J.
EXTERIOR NONSTRUCTURAL WALLS AS REQUIRED BY SEISMIC DESIGN
CATEGORY B AND C INDICATED IN STRUCTURAL DRAWINGS.
CRICKETS SHALL BE INSTALLED ON THE HIGH SIDE OF ALL ROOF CURBS
1
NORTH
EXHIBIT F - PRO BEL FACADE MAINTENANCE LAYOUT TO MAINTAIN POSITIVE DRAINAGE. WATER SHALL NOT BE ALLOWED TO
STAND BEHIND CURBS.
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY NOTES - ROOF PLAN
KEY KEYNOTE
R1 HATCH INDICATES TAPERED INSULATION, TYP.
R2 ROOF-TO-ROOF LADDER WITH PLATFORM
K R3 30"X54" ROOF HATCH W/SAFETY RAILS K
R4 36" WALKING PAD
R5 MECHANICAL SCREEN, TOP OF SCREEN 10' ABOVE FINSIHED ROOF.
R6 MECHANICAL SCREEN, TOP OF SCREEN 6' ABOVE FINSIHED ROOF.
R7 WALLS ON ROOF PEDESTAL, 8" ABV, FINISHED ROOF
R8 CURBED ROOF EXPANSION JOINT
R9 OVERFLOW SCUPPER
R4 R10 CANOPY BELOW, REF SHEET A3.30
R11 48"x96" SMOKE HATCH
R12 30" x 54" ROOF HATCH
PD/OD MEMBRANE ROOF PD/OD R13 48" X 48" ROOF HATCH WITH SAFETY RAILS
J OVER RIGID J
INSULATION ON R14 30" x 54" ROOF HATCH
METAL DECK
R15 ACCESS PANEL LOCATIONS
1/4" / 1'-0" R16 SWING ARM DAVIT - PRO-BEL A100 AND 600 SERIES DAVIT BASE WELDED
R O OTOF STRUCTUREOR
HATCH LEGEND
SIMILAR
6120 Powers Ferry Road NW, Suite 200
1
TAPERED INSULATION ROOF WALK PAD
Goodwyn Mills Cawood, LLC
GMCNETWORK.COM
H H
Atlanta, GA 30339
770.952.2481
T
FIREPROOFING NOT REQUIRED FOR
G ROOF STRUCTURE MEMBERS AT
G
R1
AUXILLIARY GYMNASIUM WHERE
STRUCTURE IS MORE THAN 20'
ABOVE FLOOR BELOW.
DESIGN DEVELOPMENT 02.23.2024
SCHEMATIC DESIGN 09.15.2023
80% CONSTRUCTION DOCUMENTS 09.13.2024
30% CONSTRUCTION DOCUMENTS 06.21.2024
ISSUED FOR CONSTRUCTION 12.13.2024
ADDENDUM #1 01.10.2025
DATE
Checker
Author
PD/OD PD/OD
DRAWN BY:
CHECKED BY:
N
ISSUE
A
R2
F B F
F
C
W E
E
G
D
1
H
R8 K
J
SQUARE FOOTAGE: 477,706.52
R2
S
DOE FACILITY CODE: 0916
KEY PLAN
E E
GaDOE REQUIRED INFO
FTE: 1200 MS & 1600 HS
1/4" / 1'-0"
R4
R16
IUs: 74 MS & 84 HS
R1
PARKING: 594
D PD/OD D
HIGH SCHOOL AT SEQUOYAH
NEW MIDDLE SCHOOL AND
45
DORAVILLE, GA 30340
R10
1/4" / 1'-0"
GMC # AATL220022
DLR # 46-23101-00
JANUARY 22ND, 2025
3456 AZTEC RD
C C
GENERAL NOTES - ROOF PLAN
A. ROOF PLAN GENERAL NOTES APPLY TO ALL ROOF PLAN SHEETS.
B. ROOF SLOPES ARE CREATED BY SLOPING THE ROOF STRUCTURE UNLESS
NOTED OTHERWISE. SEE STRUCTURAL DRAWINGS FOR ELEVATIONS OF
THE HIGH AND LOW POINTS TO DETERMINE PROPER TAPER IN
1,000 LB
INSULATION.
WORKING LOAD
C. TAPERED INSULATION SHALL PROVIDE A MINIMUM OF 1/4-INCH PER
FOOT OF SLOPE TO ROOF DRAINS, UNLESS NOTED OTHERWISE.
B D. ALL ROOF CURBS TO BE A MINIMUM OF 8 INCHES ABOVE ROOFING
B
TEMPLATE VERSION: 2022.1
LEVELS. PROVIDE TAPERED INSULATION ROOF SADDLES AT ROOF
CURBS TO PROVIDE DRAINAGE AROUND CURB.
R1 E. SEE STRUCTURAL DRAWINGS FOR FRAMING AROUND ROOF
PENETRATIONS.
F. COORDINATE THE SIZE AND LOCATION OF ROOF PENETRATIONS FOR
A3.10H
MECHANICAL AND ELECTRICAL EQUIPMENT. REFER TO MECHANICAL AND
ROOF PLAN - AREA H
ELECTRICAL DRAWINGS FOR PENETRATIONS NOT SHOWN ON THIS
DRAWING.
G. FLASH DRAINS, CURBS, VENTS AND STACKS PER MANUFACTURER'S
\\Probel-nt1\engineering\0- STD. WORKING DIRECTORY\0- SALES & MARKETING\EXTENDED MARKETING DIRECTORY\8. MISC\Hoists\Marketing - Autocad\New Hoist\M-HSTM-180-520.dwg, 10/21/2005 1:48:51 PM, annettef
RECOMMENDATIONS IF DETAIL NOT SHOWN ON DRAWINGS.
H. NO ROOF PENETRATIONS ALLOWED WITHIN 4'-0" EACH SIDE OF
1/10/2025 4:27:54 PM
A NO SPECIFICATIONS ON HOIST ARM FIREWALL. SEE CODE PLAN FOR FIRE WALL LOCATIONS. A
PROVIDED. QUOTING 1,000LB WORKING I. PROVIDE SEISMIC RESTRAINT FOR NONSTRUCTURAL PARAPET AND
LOAD ELECTRIC HOIST ARM WITH 8'6" MAX
1
EXTERIOR NONSTRUCTURAL WALLS AS REQUIRED BY SEISMIC DESIGN
ROOF PLAN - AREA H 1
REACH. POWER AT ROOF BY OTHERS. ONLY
ONE ARM INCLUDED. TO BE MOVED CATEGORY B AND C INDICATED IN STRUCTURAL DRAWINGS. 1
TRUE SCALE: 1/8" = 1'-0"
J. CRICKETS SHALL BE INSTALLED ON THE HIGH SIDE OF ALL ROOF CURBS
NORTH A5.03
EXHIBIT F - PRO BEL FACADE MAINTENANCE LAYOUT BETWEEN ROOF LEVELS.
TO MAINTAIN POSITIVE DRAINAGE. WATER SHALL NOT BE ALLOWED TO
STAND BEHIND CURBS.
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY NOTES - ROOF PLAN
KEY KEYNOTE
R1 HATCH INDICATES TAPERED INSULATION, TYP.
R2 ROOF-TO-ROOF LADDER WITH PLATFORM
K R3 30"X54" ROOF HATCH W/SAFETY RAILS K
R4 36" WALKING PAD
R5 MECHANICAL SCREEN, TOP OF SCREEN 10' ABOVE FINSIHED ROOF.
R6 MECHANICAL SCREEN, TOP OF SCREEN 6' ABOVE FINSIHED ROOF.
R7 WALLS ON ROOF PEDESTAL, 8" ABV, FINISHED ROOF
1,000 LB
WORKING LOAD
R8 CURBED ROOF EXPANSION JOINT
45
R9 OVERFLOW SCUPPER
R10 CANOPY BELOW, REF SHEET A3.30
R11 48"x96" SMOKE HATCH
R12 30" x 54" ROOF HATCH
R13 48" X 48" ROOF HATCH WITH SAFETY RAILS
J JANUARY 22ND, 2025 J
R14 30" x 54" ROOF HATCH
R15 ACCESS PANEL LOCATIONS
R16 SWING ARM DAVIT - PRO-BEL A100 AND 600 SERIES DAVIT BASE WELDED
R O OTOF STRUCTUREOR
HATCH LEGEND
SIMILAR
6120 Powers Ferry Road NW, Suite 200
\\Probel-nt1\engineering\0- STD. WORKING DIRECTORY\0- SALES & MARKETING\EXTENDED MARKETING DIRECTORY\8. MISC\Hoists\Marketing - Autocad\New Hoist\M-HSTM-180-520.dwg, 10/21/2005 1:48:51 PM, annettef TAPERED INSULATION ROOF WALK PAD
NO SPECIFICATIONS ON HOIST ARM
PROVIDED. QUOTING 1,000LB WORKING R O O F TIE L E G E N D
LOAD ELECTRIC HOIST ARM WITH 8'6" MAX
Goodwyn Mills Cawood, LLC
REACH. POWER AT ROOF BY OTHERS. ONLY
ONE ARM INCLUDED. TO BE MOVED
WELDED ROOF ANCHOR WITH BASE PLATE WELDED ROOF ANCHOR
BETWEEN ROOF LEVELS.
GMCNETWORK.COM
H H
WELDED WALL ANCHOR
Atlanta, GA 30339
770.952.2481
T
G G
DESIGN DEVELOPMENT 02.23.2024
SCHEMATIC DESIGN 09.15.2023
80% CONSTRUCTION DOCUMENTS 09.13.2024
30% CONSTRUCTION DOCUMENTS 06.21.2024
ISSUED FOR CONSTRUCTION 12.13.2024
ADDENDUM #1 01.10.2025
DATE
Checker
Author
DRAWN BY:
CHECKED BY:
N
ISSUE
A
F B F
F
C
W E
E
G
1
D
1
H
TYP @ TOP
OF CW K
T/ST'L =61'-1"
E11
ROOF DECK
___________________
LOW POINT
7" TYP
J
UNO
S6.01
SQUARE FOOTAGE: 477,706.52
MP4.0 MP4.0 S
DOE FACILITY CODE: 0916
W16X31 W16X31 W16X31 W16X31 W16X31 W14X22 KEY PLAN
E MW14
MW12 MW12 E
GaDOE REQUIRED INFO
FTE: 1200 MS & 1600 HS
R8
MW14
MP2.0a SIM G7
___________________
R1
M
S4.02
6
IUs: 74 MS & 84 HS
MW12
MW12
W12X19
W12X14
W12X14 *
13
W12X14 *
MW14
10
PD/OD PD/OD
PARKING: 594
MP2.0a
R3
W16X26
W16X36
W16X36
W16X36
W18X35
W16X36
W16X26
W12X14 * W12X14 *
MW12
MW12 W12X14 *
SIM G7
___________________ R1 W14X30 W12X14 *
SR3
S4.02
10
D A5.26 R4 9 D
32
8882 LBS
9250
TYP
MW12
HIGH SCHOOL AT SEQUOYAH
R7 W16X36 W16X36 W16X36 W16X36
1/4" / 1'-0"
W16X36 W12X14 W12X14
MW14 9' - 0" 9' - 0" 9' - 0"
NEW MIDDLE SCHOOL AND
7' - 0" MEMBRANE ROOF
1' - 6"
W12X14 *
W12X14
W12X22
W12X19
W12X14
W12X14
OVER 6" MIN. RIGID
W12X14 INSULATION ON
METAL DECK 32
DORAVILLE, GA 30340
HIGH POINT
ROOF DECK
TYP
T/ST'L = 62'-0"
W16X36 W16X36 W16X36 W16X36 W16X36 W16X36 W16X36 W16X26
GMC # AATL220022
DLR # 46-23101-00
1/4" / 1'-0"
3456 AZTEC RD
750 LBS
MW14
9 9
9 9 9 9
C TYP G5
___________________ 750 LBS 9 C
S4.02
750 LBS 750 LBS R1 1010 LBS
1010 LBS
625 LBS
W16X40
27' - 3"
W16X40 W16X40
W16X31 GENERAL NOTES - ROOF PLAN
W16X40
W16X40
W12X14 * W12X14 *
A. ROOF PLAN GENERAL NOTES APPLY TO ALL ROOF PLAN SHEETS.
PD/OD PD/OD
750 LBS B. ROOF SLOPES ARE CREATED BY SLOPING THE ROOF STRUCTURE UNLESS
9 9 9 NOTED OTHERWISE. SEE STRUCTURAL DRAWINGS FOR ELEVATIONS OF
9 750 LBS
750 LBS 750 LBS
THE HIGH AND LOW POINTS TO DETERMINE PROPER TAPER IN
750 LBS 9
9 9
INSULATION.
9 9 9
W16X26 C. TAPERED INSULATION SHALL PROVIDE A MINIMUM OF 1/4-INCH PER
750 LBS 750 LBS 750 LBS 750 LBS 750 LBS
FOOT OF SLOPE TO ROOF DRAINS, UNLESS NOTED OTHERWISE.
B D. ALL ROOF CURBS TO BE A MINIMUM OF 8 INCHES ABOVE ROOFING
B
TEMPLATE VERSION: 2022.1
W16X31 W16X31 W16X31 W16X31 W16X31 W16X31 W16X31 LEVELS. PROVIDE TAPERED INSULATION ROOF SADDLES AT ROOF
CURBS TO PROVIDE DRAINAGE AROUND CURB.
T'L =61'-1"
OF DECK
W POINT
TYP @ TOP E. SEE STRUCTURAL DRAWINGS FOR FRAMING AROUND ROOF
OF CW E11
___________________ PENETRATIONS.
F. COORDINATE THE SIZE AND LOCATION OF ROOF PENETRATIONS FOR
MECHANICAL AND ELECTRICAL EQUIPMENT. REFER TO MECHANICAL AND
ROOF PLAN - AREA J
A3.10J
ELECTRICAL DRAWINGS FOR PENETRATIONS NOT SHOWN ON THIS
DRAWING.
1 G. FLASH DRAINS, CURBS, VENTS AND STACKS PER MANUFACTURER'S
A5.18 RECOMMENDATIONS IF DETAIL NOT SHOWN ON DRAWINGS.
H. NO ROOF PENETRATIONS ALLOWED WITHIN 4'-0" EACH SIDE OF
1/10/2025 4:28:00 PM
A FIREWALL. SEE CODE PLAN FOR FIRE WALL LOCATIONS. A
I. PROVIDE SEISMIC RESTRAINT FOR NONSTRUCTURAL PARAPET AND
TRUE
1 ROOF PLAN - AREA J
SCALE: 1/8" = 1'-0"
J.
EXTERIOR NONSTRUCTURAL WALLS AS REQUIRED BY SEISMIC DESIGN
CATEGORY B AND C INDICATED IN STRUCTURAL DRAWINGS.
CRICKETS SHALL BE INSTALLED ON THE HIGH SIDE OF ALL ROOF CURBS
1
NORTH
EXHIBIT F - PRO BEL FACADE MAINTENANCE LAYOUT TO MAINTAIN POSITIVE DRAINAGE. WATER SHALL NOT BE ALLOWED TO
STAND BEHIND CURBS.
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY NOTES - ROOF PLAN
KEY KEYNOTE
hU
R1 HATCH INDICATES TAPERED INSULATION, TYP.
R2 ROOF-TO-ROOF LADDER WITH PLATFORM
3"
'-
27
K R3 30"X54" ROOF HATCH W/SAFETY RAILS K
R4 36" WALKING PAD
24" - TO BE CONFIRMED BY ROOFING CONTRACTOR AND EOR
MW
R5 MECHANICAL SCREEN, TOP OF SCREEN 10' ABOVE FINSIHED ROOF.
14
1/
4" h9 R6 MECHANICAL SCREEN, TOP OF SCREEN 6' ABOVE FINSIHED ROOF.
/1
'-0
1,000 LB
"
WORKING LOAD R7 WALLS ON ROOF PEDESTAL, 8" ABV, FINISHED ROOF
14
W
45
M
R8 CURBED ROOF EXPANSION JOINT
8"
'-
11 2
R9 OVERFLOW SCUPPER
h8 4X2
W
1 R10 CANOPY BELOW, REF SHEET A3.30
R11 48"x96" SMOKE HATCH
R12 30" x 54" ROOF HATCH
JANUARY 22ND, 2025
W
16
14
R13 48" X 48" ROOF HATCH WITH SAFETY RAILS
X2
W
6
J J
M
R14 30" x 54" ROOF HATCH
SIM G7
___________________
= EC T
'L D IN
R15 ACCESS PANEL LOCATIONS
45 K
3"
S4.02
ST F O
9"
T/ ROO W P
'-
'-
2
27
9'
X2 R16 SWING ARM DAVIT - PRO-BEL A100 AND 600 SERIES DAVIT BASE WELDED
LO
-0
MW
14
R O OTOF STRUCTUREOR
HATCH LEGEND
3 /8
14
W
"
SIMILAR
MW
6120 Powers Ferry Road NW, Suite 200
14
\\Probel-nt1\engineering\0- STD. WORKING DIRECTORY\0- SALES & MARKETING\EXTENDED MARKETING DIRECTORY\8. MISC\Hoists\Marketing - Autocad\New Hoist\M-HSTM-180-520.dwg, 10/21/2005 1:48:51 PM, annettef
TAPERED INSULATION ROOF WALK PAD
9'
BASE PLATES NOT
-8
W
NO SPECIFICATIONS ON HOIST ARM
16
"
W
X2
PROVIDED. QUOTING 1,000LB WORKING
16
REQUIRED AT ROOF
6
X2
14
R1
W
6
LOAD ELECTRIC HOIST ARM WITH 8'6" MAX
R O O F TIE L E G E N D
M
ANCHOR REACH. POWER AT ROOF BY OTHERS. ONLY
Goodwyn Mills Cawood, LLC
LOCATIONS ANY ONE ARM INCLUDED. TO BE MOVED
9'
-8
0
X3
"
14 E11
___________________ LONGER DUE TO BETWEEN ROOF LEVELS.
TYP @ TO WELDED ROOF ANCHOR WITH BASE PLATE WELDED ROOF ANCHOR
PD
W
S6.01 OF CW
/O
MEMBER SIZES
GMCNETWORK.COM
W
D
H H
16
X2
WELDED WALL ANCHOR
6
'L DE INT
"
-0
Atlanta, GA 30339
9'
46 K
14
ST F O
770.952.2481
= C
1'
-8
"
T/ OO H P
ME VER LAT ECK
W
' -8
"
/
M
M 6" ION
O SU L D
R IG
4"
BR M O
H
1/
IN ETA
W
AN IN N
16
M
SIM G7
E .R
___________________
"
X2
-3
RO IG
6
1'
S4.02
OF ID
W
MW
16
X2
14
6
0
X3
14
W
6
"
-0
6
1'
A5.05
T
/
A5.20
4"
W
W
1/
16
14
6
X3
X2
X3
16
6
0
W
W
E11
15
TYP @ TOP ___________________
16
'-
X2
9"
OF CW S6.01
SR
G W G
6
3
h9 16 hZ
X2
6
10
'-
PD
7 " NO
0"
/O
hAA
DESIGN DEVELOPMENT 02.23.2024
TY
SCHEMATIC DESIGN 09.15.2023
80% CONSTRUCTION DOCUMENTS 09.13.2024
30% CONSTRUCTION DOCUMENTS 06.21.2024
D
U
ISSUED FOR CONSTRUCTION 12.13.2024
5'
ADDENDUM #1 01.10.2025
DATE
P
Checker
-9
HS (5
Author
"
S1 6'-6
W W
2X ")
16
= EC T
'L D IN
12
6X
X2
45 K
32
ST F O
X1
9"
10
5/8
6
T/ ROO W P
4
'-
'-
TY
LO
W
P
J9
DRAWN BY:
CHECKED BY:
W
16 N
R1
___________________
14
X2
ISSUE
X3
S6.05
1
6
X3
0
W '-1
21
16
W
16
1
'-
16
W
(6
X3 )
6"
X2
1
1
6
"
A
hAB
1
X3
T/ COL
16
W
1'
W
12
-6
F 61'-1" F
X1
"
B
4
4*
*
X1
E7
___________________
12
W
5
W
18
SR
X3 S6.05
8]
X3 F
3
18
W '-1
2[
W
9'
5 C
16
W
16
1
-3
X42
(6
X3
X3 )
X2
141
W E
1
3 /4
W12X
16
1
6 E
"
W
4*
W
"
M
G
X1
P2
1 12
.8a
W
0
X3
1
4 D
X3
4
1
1
X1
16
W 12 H
W
M
W
W
16
12
12
X3
W
W '-1
M
T/ COL
1
14
K
(6
X2 )
W
1
1
60'-4"
2
12
X3
J
X1
16
"
4
W
SQUARE FOOTAGE: 477,706.52
9
X1
1
4
R1
6'
X1
4
7'
12
-2
X1
12
-7
W
1 /2
12
W
S
1 /2
T/ST'L =61'-1"
W
"
ROOF DECK
LOW POINT
"
4
W
DOE FACILITY CODE: 0916
X1
7" TYP
KEY PLAN
M
16
UNO
P2
E E
12
X3
SIM G11
.8
W
___________________
6'
1
a
GaDOE REQUIRED INFO
4
-3
X1
8'
S5.02
"
1
12
-1
FTE: 1200 MS & 1600 HS
W
1 /2
"
W16X31 W14X22 W16X31 W21X48 W21X68 W16X31 W16X31
MW12 MW12 PD/OD
IUs: 74 MS & 84 HS
W12X14
W12X14
TYP G7
___________________ W12X14 * W12X14 *
MP2.0a
R1
PARKING: 594
M
S4.02
6
W
12
MW12
SIM ___________
G5
MW12
W12X19
W12X14
W12X14 *
13 W12X14 * W12X14 * S4.
1
W12X14 *
10
PD/OD MP2.0a PD/OD
R3
W16X36
W16X40
W16X36
W16X36
W16X36
MW14
E1
W18X35
1/4" / 1'-0"
A7.44 W14X30
W16X26
W16X26
W12X14 * W12X14 *
MW12
MW12 W12X14 *
W12X14 * W12X14 *
MEMBRANE ROOF
D W14X30 W12X14 *
OVER 6" MIN. RIGID D
INSULATION ON
MW12
9 METAL DECK
W21X55
W21X62
1/4" / 1'-0"
W18X46
1550 LBS
W16X31
HIGH SCHOOL AT SEQUOYAH
9
R4
8882 LBS
NEW MIDDLE SCHOOL AND
E6
MW12 A7.44 W12X14
W12X14 W12X14 W12X14 W18X50 W16X36 W16X36
1/4" / 1'-0"
W16X36 W12X14 W12X14 R4
9' - 0" 9' - 0" 9' - 0"
G10 12' - 9" 10' - 10"
DORAVILLE, GA 30340
MEMBRANE ROOF 1' - 6"
W12X14 *
W12X14
W12X14
W12X22
W12X22
W12X14
W12X14
W12X14
OVER 6" MIN. RIGID 9 A7.44
W12X14
INSULATION ON 9142 LBS
METAL DECK 1 32 2550 LBS
GMC # AATL220022
HIGH POINT
DLR # 46-23101-00
ROOF DECK
TYP
T/ST'L = 62'-0"
9
3456 AZTEC RD
1/4" / 1'-0"
C W16X36 W16X36 W16X26 W16X26 W18X35 W21X55 W14X22 W14X22 W14X22 W14X22 W14X22 MP3.4 MW14 MP3.4 C
750 LBS 9
9
W12X14 *
9 9 9 5173 LBS
750 LBS 9
1010 LBS 625 LBS
1010 LBS SR3 GENERAL NOTES - ROOF PLAN
1 TYP G7
___________________
W14X26 S4.02 10 A. ROOF PLAN GENERAL NOTES APPLY TO ALL ROOF PLAN SHEETS.
W16X40
W18X35
W18X35
W14X30
W14X30
W14X30
W16X31
W12X14 *
MW14
MW14
1 W16X31
W12X14 * W12X14 * W12X14 *
B. ROOF SLOPES ARE CREATED BY SLOPING THE ROOF STRUCTURE UNLESS
PD/OD PD/OD
W16X40
W16X40
W18X35
W16X40
W18X35
W18X35
W12X14 * W12X14 * NOTED OTHERWISE. SEE STRUCTURAL DRAWINGS FOR ELEVATIONS OF
THE HIGH AND LOW POINTS TO DETERMINE PROPER TAPER IN
PD/OD
W12X14 *
750 LBS INSULATION.
W12X14 * W12X14 *
750 LBS
9 C. TAPERED INSULATION SHALL PROVIDE A MINIMUM OF 1/4-INCH PER
9 FOOT OF SLOPE TO ROOF DRAINS, UNLESS NOTED OTHERWISE.
B 9
1250 LBS D. ALL ROOF CURBS TO BE A MINIMUM OF 8 INCHES ABOVE ROOFING
B
TEMPLATE VERSION: 2022.1
9 W12X14 * W12X14 *
W16X26 W16X26 W18X35 W18X35 W14X22 W14X22 W14X22 W14X22 W14X22
750 LBS MP3.4 LEVELS. PROVIDE TAPERED INSULATION ROOF SADDLES AT ROOF
CURBS TO PROVIDE DRAINAGE AROUND CURB.
ST'L =61' - 2 7/8"
MW14 MP3.4
OOF DECK E. SEE STRUCTURAL DRAWINGS FOR FRAMING AROUND ROOF
OW POINT
W16X31 W16X31
E11
___________________ PENETRATIONS.
S6.01 F. COORDINATE THE SIZE AND LOCATION OF ROOF PENETRATIONS FOR
TYP @ TOP
A3.10K
MECHANICAL AND ELECTRICAL EQUIPMENT. REFER TO MECHANICAL AND
ROOF PLAN - AREA K
ELECTRICAL DRAWINGS FOR PENETRATIONS NOT SHOWN ON THIS
DRAWING.
G. FLASH DRAINS, CURBS, VENTS AND STACKS PER MANUFACTURER'S
RECOMMENDATIONS IF DETAIL NOT SHOWN ON DRAWINGS.
H. NO ROOF PENETRATIONS ALLOWED WITHIN 4'-0" EACH SIDE OF
1/10/2025 4:28:06 PM
A FIREWALL. SEE CODE PLAN FOR FIRE WALL LOCATIONS. A
I. PROVIDE SEISMIC RESTRAINT FOR NONSTRUCTURAL PARAPET AND
1 ROOF PLAN - AREA K EXTERIOR NONSTRUCTURAL WALLS AS REQUIRED BY SEISMIC DESIGN
CATEGORY B AND C INDICATED IN STRUCTURAL DRAWINGS. 1
TRUE SCALE: 1/8" = 1'-0"
J. CRICKETS SHALL BE INSTALLED ON THE HIGH SIDE OF ALL ROOF CURBS
NORTH
EXHIBIT F - PRO BEL FACADE MAINTENANCE LAYOUT TO MAINTAIN POSITIVE DRAINAGE. WATER SHALL NOT BE ALLOWED TO
STAND BEHIND CURBS.
1 2 3 4 5 6 7 8 9 10 11 12
M C
BF RS
6" 6"
6" 1
2 2"
6"
4"
PHASE_-_I
4"
6"
4"
2"
4"
4"
2"
2"
2"
2"
1.0
2" 2"
1.0
C3 BF3 2.0
2" RS
2" 1"
2" 2.0
2" 2.0
1.0
2"
4"
2" 2"
2" 2.0
2.0
2.0
2"
2"
1.0
1.0
1.0
2"
2"
6"
2"
1.0
2.0
2.0 2"
2.0
2.0
2.0
1.0 2"
2"
2"
2" 6"
2"
2"
2"
1.5
2"
6"
4"
MIDDLE_SCHOOL_COURTYARD 6"
4"
2" 2" 3.0
2" 2"
2"
3.0
2.0
4"
4" 2.0
6"
6"
2"
2.0
6"
6" 4"
4" 2"
MAIN_ENTRY
1.0
6"
1.0
6"
6"
6"
2"
2" HIGH_SCHOOL_COURTYARD
2" 2"
2"
6" 6" 6"
2"
2"
4" 6"
2"
1.0 1.0 1.5
4"
2" 6"
4" C2
1" BF2
2.0
2" RS 2.0
2" 3.0 1.5
1.0
6" 1.5 3.0
1.0 2.0
2"
6" 6" 6"
2"
2.0
1.5
2" 2.0
6"
4"
2.0
6"
2.0
6" 6" 6"
2.0
2.0
2.0
2.0
9' 1.0
1.5
K
K 6"
6" 1.0
1.5
2" 2" 1.5
K K
2"
1.0
M
6"
M
1.5 6"
6" 1.0
2.0
3.0 6"
1.0
6" 6"
6" 2.0
3.0 2"
2.0
1.0
3.0
2.0
2.0
4"
1.5
K
6"
2.0
4"
K 1.5 2.0 1.0
K
2" K
2"
2" 2"
4" 4"
4"
4"
6"
6" 4"
2"
2"
SCALE 1" = 60'
0' 30' 60' 120'
SITEONE LANDSCAPE SUPPLY, LLC (“WE”, “US”, “OUR”) MAKES NO REPRESENTATION OR
WARRANTY ABOUT THE SUITABILITY OF ANY OF THE INFORMATION, MATERIALS AND/OR
SERVICES (“SERVICES”) PROVIDED BY US IN CONNECTION WITH YOUR USE OF OUR
PROJECT SERVICES. SERVICES ARE PROVIDED “AS-IS” WITHOUT REPRESENTATION OR
WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. WE DO NOT ASSUME ANY FOR MORE INFORMATION PLEASE CONTACT
RESPONSIBILITY OR LIABILITY WHATSOEVER FOR YOUR USE OF THE SERVICES. ANY USE 1-843-873-4062 OR VISIT OUR WEBSITE AT
OF THE SERVICES IS DONE AT YOUR OWN DISCRETION AND RISK AND YOU WILL BE www.SITEONE.com
SOLELY RESPONSIBLE FOR ANY DAMAGE AND/OR LOSS CAUSED BY YOUR USE OF THE
SERVICES. OUR SERVICES ARE PROVIDED IN ACCORDANCE WITH OUR WEBSITE TERMS PROJECT NAME: SEQUOYAH MIDDLE AND HIGH SCHOOL
AND CONDITIONS SET FORTH AT https://www.siteone.com/en/termsandconditions AND
BY USING OUR SERVICES YOU CONSENT TO SUCH TERMS AND CONDITIONS. EXHIBIT G - IRRIGATION LAYOUT PROJECT NUMBER:
DATE:
353367
01/02/2025 (REV)
4"
2"
2"
2"
2"
2"
1.0
2"
2"
2.0
1.0
1.0
2"
1.0
2.0
2.0
2.0
2.0
2.0
1.0
2"
2"
2"
6"
4"
4"
4"
4"
6"
6"
2"
6"
6" 4"
4"
6"
SCALE 1" = 30'
0' 15' 30' 60'
SITEONE LANDSCAPE SUPPLY, LLC (“WE”, “US”, “OUR”) MAKES NO REPRESENTATION OR
WARRANTY ABOUT THE SUITABILITY OF ANY OF THE INFORMATION, MATERIALS AND/OR
SERVICES (“SERVICES”) PROVIDED BY US IN CONNECTION WITH YOUR USE OF OUR
PROJECT SERVICES. SERVICES ARE PROVIDED “AS-IS” WITHOUT REPRESENTATION OR
WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. WE DO NOT ASSUME ANY FOR MORE INFORMATION PLEASE CONTACT
RESPONSIBILITY OR LIABILITY WHATSOEVER FOR YOUR USE OF THE SERVICES. ANY USE 1-843-873-4062 OR VISIT OUR WEBSITE AT
OF THE SERVICES IS DONE AT YOUR OWN DISCRETION AND RISK AND YOU WILL BE
SOLELY RESPONSIBLE FOR ANY DAMAGE AND/OR LOSS CAUSED BY YOUR USE OF THE
www.SITEONE.com
SERVICES. OUR SERVICES ARE PROVIDED IN ACCORDANCE WITH OUR WEBSITE TERMS SEQUOYAH MIDDLE AND HIGH SCHOOL
AND CONDITIONS SET FORTH AT https://www.siteone.com/en/termsandconditions AND
BY USING OUR SERVICES YOU CONSENT TO SUCH TERMS AND CONDITIONS. EXHIBIT G - IRRIGATION LAYOUT PROJECT NAME:
PROJECT NUMBER:
DATE:
353367
01/02/2025 (REV)
M C
BF RS
6" 6"
6" 1
2 2"
6"
4"
PHASE_-_I
4"
6"
4"
4"
4"
2"
2"
1.0
2"
1.0
C3 BF3 2.0
RS
2" 1"
2" 2.0
2" 2.0
4"
2"
2" 2.0
2.0
2"
2"
1.0
2"
6"
2"
2"
2"
2"
2" 6"
2"
2"
2"
1.5
2"
MIDDLE_SCHOOL_COURTYARD 6"
2" 2" 3.0
2" 2"
2"
3.0
2.0
4" 2.0
2"
2.0
2"
MAIN_ENTRY
1.0
SCALE 1" = 30'
0' 15' 30' 60'
SITEONE LANDSCAPE SUPPLY, LLC (“WE”, “US”, “OUR”) MAKES NO REPRESENTATION OR
WARRANTY ABOUT THE SUITABILITY OF ANY OF THE INFORMATION, MATERIALS AND/OR
SERVICES (“SERVICES”) PROVIDED BY US IN CONNECTION WITH YOUR USE OF OUR
PROJECT SERVICES. SERVICES ARE PROVIDED “AS-IS” WITHOUT REPRESENTATION OR
WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. WE DO NOT ASSUME ANY FOR MORE INFORMATION PLEASE CONTACT
RESPONSIBILITY OR LIABILITY WHATSOEVER FOR YOUR USE OF THE SERVICES. ANY USE 1-843-873-4062 OR VISIT OUR WEBSITE AT
OF THE SERVICES IS DONE AT YOUR OWN DISCRETION AND RISK AND YOU WILL BE
www.SITEONE.com
SOLELY RESPONSIBLE FOR ANY DAMAGE AND/OR LOSS CAUSED BY YOUR USE OF THE
SERVICES. OUR SERVICES ARE PROVIDED IN ACCORDANCE WITH OUR WEBSITE TERMS SEQUOYAH MIDDLE AND HIGH SCHOOL
AND CONDITIONS SET FORTH AT https://www.siteone.com/en/termsandconditions AND
BY USING OUR SERVICES YOU CONSENT TO SUCH TERMS AND CONDITIONS. EXHIBIT G - IRRIGATION LAYOUT PROJECT NAME:
PROJECT NUMBER:
DATE:
353367
01/02/2025 (REV)
4"
4"
6"
6"
2"
6"
6" 4"
4" 2"
6"
6"
6"
2"
2"
2" 2"
6" 6" 6"
2"
2"
4" 6"
2"
1.0 1.0
4"
4"
2.0
2"
1.0
6"
1.0
6" 6" 6"
2"
2.0
2" 2.0
2.0
6"
2.0
6" 6" 6"
2.0
2.0
2.0
2.0
9' 1.0
1.5
K
K 6"
6" 1.0
1.5
2" 2" 1.5
K K
1.0
M
M
1.5
6" 1.0
2.0
3.0
1.0
6" 6"
6" 2.0
3.0
1.0
3.0
2.0
1.5
K
2.0
K 1.5
K
2" K
2"
2" 2"
4" 4"
4"
4"
6"
6" 4"
2"
2"
SCALE 1" = 30'
0' 15' 30' 60'
SITEONE LANDSCAPE SUPPLY, LLC (“WE”, “US”, “OUR”) MAKES NO REPRESENTATION OR
WARRANTY ABOUT THE SUITABILITY OF ANY OF THE INFORMATION, MATERIALS AND/OR
SERVICES (“SERVICES”) PROVIDED BY US IN CONNECTION WITH YOUR USE OF OUR
PROJECT SERVICES. SERVICES ARE PROVIDED “AS-IS” WITHOUT REPRESENTATION OR
WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. WE DO NOT ASSUME ANY FOR MORE INFORMATION PLEASE CONTACT
RESPONSIBILITY OR LIABILITY WHATSOEVER FOR YOUR USE OF THE SERVICES. ANY USE 1-843-873-4062 OR VISIT OUR WEBSITE AT
OF THE SERVICES IS DONE AT YOUR OWN DISCRETION AND RISK AND YOU WILL BE www.SITEONE.com
SOLELY RESPONSIBLE FOR ANY DAMAGE AND/OR LOSS CAUSED BY YOUR USE OF THE
SERVICES. OUR SERVICES ARE PROVIDED IN ACCORDANCE WITH OUR WEBSITE TERMS PROJECT NAME: SEQUOYAH MIDDLE AND HIGH SCHOOL
AND CONDITIONS SET FORTH AT https://www.siteone.com/en/termsandconditions AND
BY USING OUR SERVICES YOU CONSENT TO SUCH TERMS AND CONDITIONS. EXHIBIT G - IRRIGATION LAYOUT PROJECT NUMBER:
DATE:
353367
01/02/2025 (REV)
2" 2" 3.0
2" 2"
2"
3.0
2.0
4" 2.0
2"
2.0
2"
MAIN_ENTRY
1.0
1.0
6"
HIGH_SCHOOL_COURTYARD
2"
1.5
2" 6"
BF2 C2
1"
2" RS 2.0
2" 3.0 1.5
1.5 3.0
2.0
2"
1.5
6"
4"
1.5
1.0
6"
1.5
2"
1.0
6"
1.5 6"
1.0
2.0
6"
2.0
2"
2.0
2.0
2.0
4"
6"
4"
2.0 1.0
2"
4"
SCALE 1" = 30'
0' 15' 30' 60'
SITEONE LANDSCAPE SUPPLY, LLC (“WE”, “US”, “OUR”) MAKES NO REPRESENTATION OR
WARRANTY ABOUT THE SUITABILITY OF ANY OF THE INFORMATION, MATERIALS AND/OR
SERVICES (“SERVICES”) PROVIDED BY US IN CONNECTION WITH YOUR USE OF OUR
PROJECT SERVICES. SERVICES ARE PROVIDED “AS-IS” WITHOUT REPRESENTATION OR
WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. WE DO NOT ASSUME ANY FOR MORE INFORMATION PLEASE CONTACT
RESPONSIBILITY OR LIABILITY WHATSOEVER FOR YOUR USE OF THE SERVICES. ANY USE
OF THE SERVICES IS DONE AT YOUR OWN DISCRETION AND RISK AND YOU WILL BE
1-843-873-4062 OR VISIT OUR WEBSITE AT
SOLELY RESPONSIBLE FOR ANY DAMAGE AND/OR LOSS CAUSED BY YOUR USE OF THE www.SITEONE.com
SERVICES. OUR SERVICES ARE PROVIDED IN ACCORDANCE WITH OUR WEBSITE TERMS
AND CONDITIONS SET FORTH AT https://www.siteone.com/en/termsandconditions AND
BY USING OUR SERVICES YOU CONSENT TO SUCH TERMS AND CONDITIONS. EXHIBIT G - IRRIGATION LAYOUT PROJECT NAME:
PROJECT NUMBER:
DATE:
SEQUOYAH MIDDLE AND HIGH SCHOOL
353367
01/02/2025 (REV)
IRRIGATION SCHEDULE-PHASE - I IRRIGATION SCHEDULE MAIN ENTRY IRRIGATION SCHEDULE_HIGH SCHOOL COURTYARD IRRIGATION SCHEDULE MIDDLE SCHOOL COURTYARD
SYMBOL MANUFACTURER/MODEL QTY SYMBOL MANUFACTURER/MODEL QTY SYMBOL MANUFACTURER/MODEL QTY SYMBOL MANUFACTURER/MODEL QTY
RAIN BIRD 1804 SPRAY HEAD 15 STRIP SERIES 167 RAIN BIRD 1804 SPRAY HEAD 15 STRIP SERIES 1 RAIN BIRD 1812 SPRAY HEAD 15 STRIP SERIES 4 RAIN BIRD 1812 SPRAY HEAD 15 STRIP SERIES 5
EST LCS RCS CST SST EST LCS RCS CST SST EST LCS RCS CST SST EST LCS RCS CST SST
RAIN BIRD 1804 SPRAY HEAD 8 SERIES MPR 208 RAIN BIRD 1804 SPRAY HEAD 8 SERIES MPR 1 RAIN BIRD 1812 SPRAY HEAD 8 SERIES MPR 15 RAIN BIRD 1812 SPRAY HEAD 10 SERIES MPR 9
Q T H F Q T H F Q T H F Q T H F
RAIN BIRD 1804 SPRAY HEAD 10 SERIES MPR 27 RAIN BIRD 1804 SPRAY HEAD 10 SERIES MPR 2 RAIN BIRD 1812 SPRAY HEAD 10 SERIES MPR 8 RAIN BIRD 1812 SPRAY HEAD 12 SERIES MPR 6
Q T H F Q T H F Q T H F Q T H TQ F
RAIN BIRD 1804 SPRAY HEAD 12 SERIES MPR 21 RAIN BIRD 1804 SPRAY HEAD 12 SERIES MPR 7 RAIN BIRD 1812 SPRAY HEAD 12 SERIES MPR 4 RAIN BIRD 1812 SPRAY HEAD 15 SERIES MPR 16
Q T H TQ F Q T H TQ F Q T H TQ F Q T H TQ F
RAIN BIRD 1804 SPRAY HEAD 15 SERIES MPR 56 RAIN BIRD 1804 SPRAY HEAD 15 SERIES MPR 14 RAIN BIRD 1812 SPRAY HEAD 15 SERIES MPR 3 RAIN BIRD 1804-1400 FLOOD BUBBLER 11
Q T H TQ F Q T H TQ F Q T H TQ F 1401 1402 1404
RAIN BIRD 1812 SPRAY HEAD 15 STRIP SERIES 260 RAIN BIRD 1812 SPRAY HEAD 15 STRIP SERIES 15 RAIN BIRD 1804-1400 FLOOD BUBBLER 3 SYMBOL MANUFACTURER/MODEL QTY
EST LCS RCS CST SST EST LCS RCS CST SST 1401 1402 1404
1.0 RAIN BIRD 5004-PC FC-LA ROTOR 1.0 3
RAIN BIRD 1812 SPRAY HEAD 8 SERIES MPR 125 RAIN BIRD 1812 SPRAY HEAD 10 SERIES MPR 1 SYMBOL MANUFACTURER/MODEL QTY
Q T H F 2.0 RAIN BIRD 5004-PC FC-LA ROTOR 2.0 5
Q T H F
GATE VALVE (MAINLINE SIZE) 1
RAIN BIRD 1812 SPRAY HEAD 10 SERIES MPR 16 RAIN BIRD 1812 SPRAY HEAD 12 SERIES MPR 9 SYMBOL MANUFACTURER/MODEL QTY
Q T H F Q T H TQ F
BF2 ZURN 975XL RPZ 3/4" 1
GATE VALVE (MAINLINE SIZE) 1
RAIN BIRD 1812 SPRAY HEAD 12 SERIES MPR 40 RAIN BIRD 1812 SPRAY HEAD 15 SERIES MPR 4
C2 IRRIGATION CONTROLLER 1
Q T H TQ F Q T H TQ F
BF3 ZURN 975XL RPZ 3/4" 1
RS RAIN SENSOR 1
RAIN BIRD 1812 SPRAY HEAD 15 SERIES MPR 46 RAIN BIRD 1804-1400 FLOOD BUBBLER 13
C3 IRRIGATION CONTROLLER 1
Q T H TQ F 1401 1402 1404 POINT OF CONNECTION 1
RS RAIN SENSOR 1
M L O HUNTER MP 1000 RAINBIRD 1804 ROTATOR 2 SYMBOL MANUFACTURER/MODEL QTY IRRIGATION MAINLINE: PVC CLASS 200 SDR 21 1" 19.8 L.F.
POINT OF CONNECTION 1
1.5 RAIN BIRD 5004-PC FC ROTOR 1.5 4 PIPE SLEEVE: PVC CLASS 200 SDR 21 2" 42.9 L.F.
K G R HUNTER MP 2000 RAINBIRD 1804 ROTATOR 8 IRRIGATION MAINLINE: PVC CLASS 200 SDR 21 1" 19.2 L.F.
1.0 RAIN BIRD 5004-PC FC-LA ROTOR 1.0 2
PIPE SLEEVE: PVC CLASS 200 SDR 21 2" 68.8 L.F.
2.0 RAIN BIRD 5004-PC FC-LA ROTOR 2.0 2
HUNTER MP800SR RAINBIRD 1804 ROTATOR 3
ADJ. 360 FLOW TOTALS HIGH SCHOOL COURTYARD
3.0 RAIN BIRD 5004-PC FC-LA ROTOR 3.0 2 Bubbler: 1.5
Shrub Spray: 21.0
RAIN BIRD 1804-1400 FLOOD BUBBLER 311
1401 1402 1404 Total: 22.5 GPM
SYMBOL MANUFACTURER/MODEL QTY FLOW TOTALS MIDDLE SCHOOL COURTYARD
FLOW AVAILABLE 12 GPM @ 70 PSI Bubbler: 5.5
SYMBOL MANUFACTURER/MODEL QTY IRRIGATION MAINLINE: PVC CLASS 200 SDR 21 2 1/2" 426.8 L.F.
Shrub Spray: 41.5
1.5
Turf Rotor: 13.1
RAIN BIRD 5004-PC FC ROTOR 1.5 7 PIPE SLEEVE: PVC CLASS 200 SDR 21 4" 16.1 L.F. Total: 60.1 GPM
3.0 RAIN BIRD 5004-PC FC ROTOR 3.0 4 PIPE SLEEVE: PVC CLASS 200 SDR 21 6" 93.8 L.F. FLOW AVAILABLE 12 GPM @ 70 PSI
1.0 RAIN BIRD 5004-PC FC-LA ROTOR 1.0 16
2.0 RAIN BIRD 5004-PC FC-LA ROTOR 2.0 25
FLOW TOTALS MAIN ENTRY
Bubbler: 6.5
3.0 RAIN BIRD 5004-PC FC-LA ROTOR 3.0 1 Shrub Spray: 28.8
Turf Rotor: 18.3
SYMBOL MANUFACTURER/MODEL QTY Turf Spray: 30.5
Total: 84.1 GPM
GATE VALVE (MAINLINE SIZE) 4
FLOW AVAILABLE 50 GPM @ 70 PSI
BF ZURN 975XL RPZ 2" 1
C IRRIGATION CONTROLLER 1
RS RAIN SENSOR 1
ONLY SOD & PLANT MATERIAL HAVE BEEN
M WATER METER 2" 1
COVERED.
IRRIGATION MAINLINE: PVC CLASS 200 SDR 21 2 1/2" 5,731 L.F.
PIPE SLEEVE: PVC CLASS 200 SDR 21 2" 572.3 L.F.
PIPE SLEEVE: PVC CLASS 200 SDR 21 4" 462.9 L.F.
PIPE SLEEVE: PVC CLASS 200 SDR 21 6" 759.4 L.F.
FLOW TOTALS PHASE - I
Bubbler: 155.5
Shrub Spray: 390.7
Turf Rotary: 4.8
Turf Rotor: 92.6
Turf Spray: 394.2
Total: 1,038 GPM
FLOW AVAILABLE 50 GPM @ 70 PSI
SITEONE LANDSCAPE SUPPLY, LLC (“WE”, “US”, “OUR”) MAKES NO REPRESENTATION OR
THIS DRAWING IS A COVERAGE PLAN
WARRANTY ABOUT THE SUITABILITY OF ANY OF THE INFORMATION, MATERIALS AND/OR
SERVICES (“SERVICES”) PROVIDED BY US IN CONNECTION WITH YOUR USE OF OUR
FOR ESTIMATING PURPOSES ONLY.
PROJECT SERVICES. SERVICES ARE PROVIDED “AS-IS” WITHOUT REPRESENTATION OR
WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. WE DO NOT ASSUME ANY
THIS IS NOT A DESIGN AND IS NOT TO FOR MORE INFORMATION PLEASE CONTACT
1-843-873-4062 OR VISIT OUR WEBSITE AT
RESPONSIBILITY OR LIABILITY WHATSOEVER FOR YOUR USE OF THE SERVICES. ANY USE
OF THE SERVICES IS DONE AT YOUR OWN DISCRETION AND RISK AND YOU WILL BE
BE USED FOR INSTALLATION. THIS www.SITEONE.com
SOLELY RESPONSIBLE FOR ANY DAMAGE AND/OR LOSS CAUSED BY YOUR USE OF THE
SERVICES. OUR SERVICES ARE PROVIDED IN ACCORDANCE WITH OUR WEBSITE TERMS
IS SUBJECT TO CHANGE UPON FINAL PROJECT NAME: SEQUOYAH MIDDLE AND HIGH SCHOOL
AND CONDITIONS SET FORTH AT https://www.siteone.com/en/termsandconditions AND
BY USING OUR SERVICES YOU CONSENT TO SUCH TERMS AND CONDITIONS. EXHIBIT G - IRRIGATION LAYOUT LANDSCAPE AND SITE DESIGN. PROJECT NUMBER:
DATE:
353367
01/02/2025 (REV)
Sequoyah Middle & High School | GMP Estimate Deliverable | Rev 0 Gilbane Building Company
v.5/1/2023