Executive Summary Report

AID 1753449 · View on Simbli

Agenda Item

c. E-Rate Award Extension: Self-Provisioned Fiber Maintenance (Not to exceed $205,320) ~ Updated 3.7.2025

Summary: Presented by: Dr. Kermit Belcher, Chief Information Officer, Division of Information & Instructional Technology
Request: It is requested that the Board of Education approve an extension of the contract for Self-Provisioned Fiber Maintenance to the Zayo Group in an amount not exceed $205,320. This award is in accordance with the federal government's E-rate bidding process and allows the district to continue seeking Category 1 reimbursement for Internet Connections and non-recurring services. This is year 4 of a five-year agreement.
Why: The purpose of this recommendation is to provide maintenance on the DCSD Self Provisioned Fiber (SPF) Optics Network.
Details: DCSD will continue to use this ERATE award to seek reimbursement for the Self-Provisioned Fiber of the DCSD Fiber Optic Network. The FCC's E-Rate program makes telecommunications and information services more affordable for schools and libraries. With funding from the Universal Service Fund, E-Rate provides discounts for telecommunications, Internet access, and internal connections to eligible schools and libraries. The discount percentage is based off the Districts Free and reduced lunch percentage.
This year there was (1) vendor response to the Districts ERATE 470 bid for (Self Provisioned Fiber). The response was evaluated by an internal team that consisted of the Network Manager, PMO Manager, IT Project Manager, and Wi-Fi Engineer.

The 1 vendor that responded to the DCSD 470 requests for Self-Provisioned Fiber (SPF) Maintenance is:
• Zayo

The criteria used to evaluate the companies and Products and Services were based off a 100 Point Scale:

• Price 30
• Experience with DeKalb County School District 25
• Product/Service Features 20
• Reliability 20
• Local Preference 5


Based upon a thorough and detailed evaluation of how well each of the vendors met the major criteria considered, Zayo was selected as the best choice.

As part of the E-rate competitive bidding process, this request for proposal was available to potential vendors, nationally. It is also important to note that Zayo/AGLN designed and built the district’s fiber network and has provided maintenance for the past 15 years.

The E-rate program provides discounts to assist schools and libraries in the United States to obtain affordable telecommunications and Internet access. The program is funded through the Universal Service fee. E-rate regulations require that Cost has a higher weighting. However, E-rate regulations do not require selection of lowest cost proposal as part of the evaluation process. The above criteria meet E-rate regulations.
Financial impact: $205,320
General Fund
100.2800.543200.00011.7600.9990.0308.070.0000

DCSD will seek 90% reimbursement against a maximum expenditure of $205,320.
Contact: Dr. Kermit Belcher, Chief Information Officer, Division of Information & InstructionalTechnology, 678.676.1274
Effective: March 2025
Status: Approved by Office of Legal Affairs
 E-Rate Response Evaluations for FY2022 - 2023
USAC Form 470 and DeKalb County School District
            (DCSD) Requirements


 Executive Summary and Supporting Document




                   E-Rate Project Team:
              Natalie Terrell, PMO Manager
         Jimmy Crum, Network Services Manager
      Manager William Clowers, Sr. Project Manager
              Cedric Brown, System Engineer
  Consulting Team: Educational Funding Group, Inc. (EFG)
                            1
                                                  TABLE OF CONTENT


Executive Summary........................................................................................................... Page 3

Supporting Documents

          Appendix I Evaluation Team’s Credentials......................................................... Page 4

          Appendix II: Evaluation Summaries................................................................... Page 5
                         Category 2: Wireless Access Points (APs) …………………………....... Page 5 - 6
                         Category 2: Internal Connections............................................... Page 7
                         Category 1: SPF Maintenance..................................................... Page 8
                         Category 2: Stadiums Fiber…………….…………………………………………Page 9




                                                                  2
                      E-Rate Response Evaluations for FY2022 – 2023
           USAC Form 470 and DeKalb County School District (DCSD) Requirements
                                  Executive Summary

Purpose

The purpose of this evaluation is to request funding from Universal Service Administrative
Company (USAC), which manages the contribution of revenue to and distribution of E-Rate
funding from the Universal Service Fund. The funding is provided for broadband, Internet
access, and internal connections to eligible schools and libraries. DeKalb County School District
(DCSD) is eligible for these services. Funding is being requested in two categories:

   •   Category 1 (includes services needed to support broadband connectivity to schools and
       libraries) - The district has requested: Self-Provisioned Fiber Maintenance
   •   Category 2 (includes the internal connections needed for broadband connectivity) - The
       district has requested: Internal Connections (Cabling) and Wireless Access Points (APs)

Background and Process

The evaluation team was made up of five (5) district staff members in the Division of
Information and Instructional Technology (DIIT). A (brief) summary of each team member’s IT
experience and education is in Appendix I, p.4. Form 470, which is the form published by USAC
of the district’s requirements for each solicitation. The form was written by the district E-Rate
consulting team and approved by IT’s management staff. It was published on February 17 for 28
days as required by USAC. Evaluations began on Friday, March 18 and completed on Monday,
March 21 to meet USAC deadlines for March 22. There were 18 responses for 5 different
solicitations in the two categories in the Form 470 requirements. The team reviewed 18 of the
18 responses in 2 days (for 6 hours). Due to the immediate needs of the district, the team made
recommendations for 4 of the 16 solicitations for the funding year 2022 - 2023.

Evaluation Results

See the results in the evaluation table in Appendix II, pp. 6 - 14.




                                                  3
Appendix I: Evaluation Team’s Credentials

   1. Natalie Terrell, IT PMO Manager III
         a. Role: Evaluation Facilitator – Led the RFP process for most of the IT RFPs for the last 7
              years
          b. Years in IT: 27 Years (technology teacher, trainer, project manager, and IT PMO
              Manager) with 21 years in DCSD IT and 15 years in the IT PMO
          c. Education: BBA in Management and MS in Education in Instructional Technology, PMP
              Certified
   2. Jimmy Crum, Information Security Officer
          a. Role: Team Member – Two years of experience at DCSD evaluating solicitations
          b. Years in IT: 17.5 years with 2.5 years in DCSD IT with 10 Years as Senior Internet
              Engineer and 5 Years as Program Director Cybersecurity/Cybersecurity
          c. Education: MS in Computer Science and CCSENT (Cisco networking) Certified
   3. William Clowers, IT Project Manager
          a. Role: Team Member and Project Manager of all E-Rate Projects
          b. Years in IT: 31 years with 13 years in DCSD IT PMO
          c. Education: BEE in Electrical Engineering and Executive MBA, PMP
   4. Cedric Brown, Wireless Network Engineer
           a. Role: Team Member – Secure wireless technologies, internet service operations
              and managed wi-Fi product development
           b. Years in IY: 21.5 years as Sr. Director and above within the Internet Service
              Provider Industry
           c. Education: BS Dual Degree in Mathematics and Computer Science
   5. Educational Funding Group, Inc. (EFG)
               This organization was formed in 2004 in Cleveland, Ohio. EFG provides full-service E-rate
               consulting services to its clients offering comprehensive, personalized services designed
               to maximize the benefits received from the E-rate program.
                    i. Paul Karas - Founder and President of EFG, has been an E-rate consultant since
                       the inception of the E-rate program and provides high-level solution-based
                       support, as well as extensive technical expertise.
                   ii. Courtney Cikach – Has served as the district’s account manager for the past
                       seven years and tends diligently to all the District’s E-rate needs.




                                                  4
Appendix II: Evaluation Summaries

 VENDOR
 DECISION/EVALUATION
 MATRIX
 SCHOOL OR LIBRARY NAME:
 DeKalb Co. SD                                       Date: March 18 and 22, 2022               E-rate: 2022-23

                                                                     Choose and indicate
                                                                         the service       Int. Connections or MIBS
                                                                       (1 per Matrix):      or Basic Maintenance:
                                                                                             Internal Connections
               Eligible Service:                CATEGORY 2:            →'→'→'→'→'→                   (APs)
                                                                                             SERVICE PROVIDERS
                                      Total
                                     Points
 Factors                            Available    VENDOR 1                VENDOR 2                VENDOR 3
                                                    ICN                     PCS                    Layer 3
                                                $3,700,920.00           $2,784,000.00           $3,729,571.80
 Price                                 30            25                      30                      25
 Past Experience / Relationship
 with Respondent                       20            20                      10                      20
 Technical Capability, Quality of
 Work, Ability to Provide
 Services Purchased / Turnkey
 Solution, Qualified Personnel         25            25                      25                      25
 Comparable Work for Other
 Applicants                            10            10                      10                      10
 Changeover Costs                      10            10                      0                       10

 Willingness to invoice via SPI        5             5                                                5

                                                                 5
TOTAL POINTS:                         100                 95                        75                          95


Winning bidder based on most points was: ICN
NOTES:
PCS - We will not consider the Extreme; it may be cheaper, the district already has licenses for 6400 devices already
installed; All new licenses and infrastructure, training, and operational tools would be required. the cost of these items is
prohibited.




                                                                       6
7
                                       VENDOR DECISION/EVALUATION MATRIX
                                                                                          E-rate: 2022-
SCHOOL OR LIBRARY NAME: DeKalb Co. SD                                                          23
Eligible Service:                       Self-Provisioned Network Maintenance



Factors                                  Total Points Available                Vendor 1
                                                                                Zayo


Price                                             30                             30
Experience                                        25                             25
Product/ Service Features                         20                             20
Reliability                                       20                             20
Local Preference                                   5                              5
TOTAL POINTS:                                     100                            100

The winning bidder based on the most
points was: Zayo


NOTES:
1) multi-year relationship
2) one-respondent, the incumbent




                                                                  8
                               BID EVALUATION MATRIX
                     Dekalb CSD Self-Provisioned Fiber 60 months
                                        03/22/22
                                E-Rate Funding Year 2022
                      Eligible Service: Data Transmission Service

            Halford Stadium
                                             Total       Zayo (SP        Zayo (DF
                                            Points      Fiber) 2, 4,   Fiber) 2, 4, or
Factors                                    Available    or 6 strand       6 strand       Zayo lit fiber
Price                                         30             30              30               25
Responsiveness                                20             20              20               20
Reliability                                   25             25             25                25
Past Experience                               25             25             25                25
TOTAL POINTS:                                 100            100            100               95

Pricing: Monthly                                        $14,160.00      $14,160.00        $42,000.00
NRC                                                     $116,806.68    $116,806.68       $116,806.68
Total Fiber                                             $130,966.68    $130,966.68       $158,806.68
Total Electronics - Layer 3                             $21,768.98      $21,768.98          $0.00
Project Total                                           $152,735.66    $152,735.66       $158,806.68

The winning bidder based on most
points was:                                             SF

Selection team member initials:


Disqualified bidders, if any:

Notes:

             Adams Stadium
                                             Total       Zayo (SP        Zayo (DF
                                            Points      Fiber) 2, 4,   Fiber) 2, 4, or
Factors                                    Available    or 6 strand       6 strand       Zayo lit fiber
Price                                         30             30              30               25
Responsiveness                                20             20              20               20
Reliability                                   25             25              25               25
Past Experience                               25             25              25               25


                                                    9
TOTAL POINTS:                        100            100            100               95

Pricing: Monthly                               $14,160.00      $14,160.00       $42,000.00
NRC                                            $29,199.96      $29,199.96       $29,199.96
Total Fiber                                    $43,359.96      $43,359.96       $71,199.96
Total Electronics - Layer 3                    $21,768.98      $21,768.98         $0.00
Project Total                                  $65,128.94      $65,128.94       $71,199.96

The winning bidder based on most
points was:                                    SF

Selection team member initials:

Disqualified bidders, if any:

Notes:

              Godfrey Stadium
                                     Total      Zayo (SP        Zayo (DF
                                    Points     Fiber) 2, 4,   Fiber) 2, 4, or
Factors                            Available   or 6 strand       6 strand       Zayo lit fiber
Price                                 30            30              30               25
Responsiveness                       20             20             20                20
Reliability                          25             25             25                25
Past Experience                      25             25             25                25
TOTAL POINTS:                        100            100            100               95

Pricing: Monthly                               $14,160.00      $14,160.00       $42,000.00
NRC                                            $33,641.88      $33,641.88       $33,641.88
Total Fiber                                    $47,801.88      $47,801.88       $75,641.88
Total Electronics - Layer 3                    $21,768.98      $21,768.98         $0.00
Project Total                                  $69,570.86      $69,570.86       $75,641.88

The winning bidder based on most
points was:                                    SF

Selection team member initials:

Disqualified bidders, if any:


                                        10
Notes:

           Avondale Stadium
                                     Total       Zayo (SP        Zayo (DF
                                    Points      Fiber) 2, 4,   Fiber) 2, 4, or
Factors                            Available    or 6 strand       6 strand       Zayo lit fiber
Price                                 30             30              30               25
Responsiveness                        20             20              20               20
Reliability                           25             25              25               25
Past Experience                      25              25             25                25
TOTAL POINTS:                        100             100            100               95

Pricing: Monthly                                $14,160.00      $14,160.00        $42,000.00
NRC                                             $63,522.45      $63,522.45        $63,522.45
Total Fiber                                     $77,682.45      $77,682.45       $105,522.45
Total Electronics - Layer 3                     $21,768.98      $21,768.98          $0.00
Project Total                                   $99,451.43      $99,451.43       $105,522.45

The winning bidder based on most
points was:                                     SF

Selection team member initials:

Disqualified bidders, if any:

Notes:

          North Dekalb Stadium
                                     Total       Zayo (SP        Zayo (DF
                                    Points      Fiber) 2, 4,   Fiber) 2, 4, or
Factors                            Available    or 6 strand       6 strand       Zayo lit fiber
Price                                 30             30              30               25
Responsiveness                        20             20              20               20
Reliability                           25             25              25               25
Past Experience                       25             25              25               25
TOTAL POINTS:                         100           100             100               95

Pricing: Monthly                                $14,160.00      $14,160.00       $42,000.00


                                           11
NRC                                     $63,620.09   $63,620.09    $63,620.09
Total Fiber                             $77,780.09   $77,780.09   $105,620.09
Total Electronics - Layer 3             $21,768.98   $21,768.98      $0.00
Project Total                           $99,549.07   $99,549.07   $105,620.09

The winning bidder based on most
points was:                             SF

Selection team member initials:

Disqualified bidders, if any:

Notes:




                                   12