EXHIBIT M
GMP AMENDMENT TO AGREEMENT BETWEEN OWNER AND
CONSTRUCTION CONTRACTOR
AMENDMENT NO. 1 TO AGREEMENT BETWEEN OWNER AND
CONSTRUCTION CONTRACTOR FOR
New Dresden Elementary School Project
AGREEMENT NO. RFQu. 23-752-021
Pursuant to Sections 4.B and 7.A of the Construction Management Agreement
(“Agreement”), dated August 31, 2023. between The School Board of DeKalb County, Georgia
(“Owner”) and The Winter Construction Company (“Construction Contractor”), with
respect to th e construction of Owner’s New Dresden Elementary School Project (“Project”),
Owner and Construction Contractor hereby agree to amend and modify the Agreement by this
Amendment No. 1 and establish a Guaranteed Maximum Price and Contract Time for all the Work as
set forth below. All capitalized terms not defined herein shall have the meaning ascribed to them in
the Agreement, unless otherwise noted.
ARTICLE 1
SCOPE OF WORK
The scope of the Work consists of the construction of a multi-phase 140,146 SF new elementary
school including demolition of existing school, in accordance with the Agreement, this
Amendment and the other Contract Documents listed as Attachments 1 through 8 below, which are
hereby incorporated into and made a part of the Amendment by this reference:
Attachment No. Description Pages Date
1. List of Drawings, Specifications
and Addendums M-6 through M-30 03/05/2024
2. Allowances M-31 through M-31 03/07/2024
3. Assumptions and Clarifications M-32 through M-47 03/07/2024
4. Completion Schedule M-48 through M-50 02/26/2024
5. Schedule of Values M-51 through M-52 03/05/2024
6. List of Itemized General Conditions M-53 through M-53 03/07/2024
7. List of Subcontractors and
Major Suppliers M-54 through M-56 03/07/2024
8. Alternates M-57 through M-58 03/07/2024
M- l
ARTICLE 2
GUARANTEED MAXIMUM PRICE
2.1 Construction Contractor’s Guaranteed Maximum Price (“GMP”) for the Work,
including the estimated Cost of the Work as defined in Section 5 of the Agreement and the
Construction Management Fee as defined in Section 4 of the Agreement, is Seventy-Two Million
Three Hundred Twenty-Three Thousand Seven Hundred and Seventy-Four and 00/100 Dollars
($72,323,774.00).
2.2 The Construction Management Fee for the entire Work anticipated on this Project
is hereby established as a lump sum amount of Three Million Four Hundred Eleven Thousand
One Hundred Seventy-Four and 00/100 Dollars ($3,411,174.00), said lump sum amount is
included within the above noted GMP.
2.3 The general condition expenses for the entire Work anticipated on this Project are
hereby established as a lump sum amount of Four Million Four Hundred Forty-Nine Thousand
Six Hundred Six and 00/100 Dollars ($4,449,606.00), said lump sum amount is included within
the above noted GMP (“General Conditions Expenses”). The items included as General
Condition Expenses are listed in the List of Itemized General Conditions attached hereto and
incorporated herein as Attachment No. 6 . Except as said lump sum amount for General
Condition Expenses may be expressly adjusted by Change Order or Construction Change
Directive, Construction Contractor acknowledges and agrees that Owner shall have no liability
for any General Condition expenses beyond payment of the above noted lump sum amount and
Construction Contractor agrees that it shall not be entitled to receive any additional compensation
from Owner for the General Conditions beyond the above lump sum amount. There shall be no
additional General Conditions Expenses payable to Construction Contractor on the first Five
Hundred Thousand and No/100 Dollars ($500,000.00) of Change Order or Construction Change
Directive Work (i.e. the lump sum amount specified in this Subsection includes consideration for
up to $500,000.00 of Change Order and/or Construction Change Directive Work). Further, there
shall be no mark-up for a subcontractor’s General Conditions expenses on the first One Hundred
Thousand and No/100 Dollars ($l00,000.00) of Change Order and Construction Change
Directive Work to be performed by such subcontractor.
2.4 Monthly installment payment of the Construction Management Fee and the General
Condition Expenses shall be based upon the percent completion of the designated portion of the
Work for each particular month.
2.5 In order to efficiently and timely address any unknown or unanticipated conditions
that are within the scope of the Work and are otherwise reimbursable without duplication as a Cost
of the Work, but excluding all items that are to be reimbursed under the lump sum General
Condition expense amount noted in Subsection 2.4 above, the parties have agreed to establish a
contingency within the GMP in an amount not-to-exceed amount of Zero and 00/100 Dollars
($0.00) (“Owner’s Contingency”). Owner’s Contingency funds shall be used to cover costs that
may result from incomplete design and unanticipated costs that arise during construction that are not
M-4
identified by the construction documents. Construction Contractor shall not proceed with any portion
of the Work which it intends to charge against the Owner’s Contingency without first obtaining
Owner’s express written authorization to proceed. Construction Contractor acknowledges and
agrees that any portion of the Work which is to be charged against the Owner’s Contingency that
does not receive such prior written approval from Owner shall be deemed to be part of
Construction Contractor’s Work compensated within the GMP and not chargeable against
Owner’s Contingency. Owner reserves the right, at its sole discretion, to withhold its consent on
Owner’s Contingency expenditures. Further, the work that is the subject of any Owner’s
Contingency expenditures shall be deemed part of the Work. The GMP shall be reduced by
unused Owner’s Contingency remaining at the completion of the Work. Construction Contractor
has no entitlement to any portion of any unused Owner’s Contingency.
2.6 In order to efficiently and timely address any unknown or unanticipated
conditions that are within the scope of the Work and are otherwise reimbursable without
duplication as a Cost of the Work, but excluding all items that are to be reimbursed under the lump
sum General Condition expense amount noted in Subsection 2.4 above, the parties have agreed to
establish a contingency within the GMP in an amount not-to-exceed One Million Seven
Hundred Thirty-Nine Thousand Five Hundred Seventy-Four and 00/100 Dollars
($1,739,574.00) (“Contractor’s Contingency”). Construction Contractor shall not proceed
with any portion of the Work which it intends to charge against the Contractor’s Contingency
without first obtaining Owner’s express written authorization to proceed. Construction Contractor
acknowledges and agrees that any portion of Work which is to be charged against the Contractor’s
Contingency that does not receive such prior written approval from Owner shall be deemed to be
part of Construction Contractor’s Work compensated within the GMP and not chargeable against
Contractor’s Contingency. Owner reserves the right, at its sole discretion, to withhold its consent
on Contractor’s Contingency expenditures. Further, the work that is the subject of any Owner’s
Contingency expenditures shall be deemed part of the Work. The GMP shall be reduced by unused
Contractor’s Contingency remaining at the completion of the Work. Construction Contractor has no
entitlement to any portion of any unused Contractor’s Contingency. Construction Contractor
shall be entitled to an increase in the Construction Management Fee in the amount of 4.95% of
the Cost of the Work charged against the Contractor’s Contingency.
2.7 The parties have agreed to establish an allowance within the GMP for
Permitting & Impact Fees, Escalation, Moving & Storage, Abatement, Right-of-Way Work and
Jack & Bore, Rock Blasting and Unsuitable Soil, Irrigation, Perimeter Fence, Dumpster Pad &
Enclosure, Architectural Millwork, Doors/Frames & Hardware (Material), Interior Paint at
Corridors, Art Mural at Courtyard, Building Signage, Monument Sign, Stage Curtain, Modular
Classrooms, Electrical Changes per 80% CDs, Intercom, and ERRC in the amount of Eight
Million Eight Hundred Fifty-Four Thousand Four Hundred Ninety-Seven and 00/100 Dollars
($8,854,497.00). Construction Contractor shall not proceed with any portion of the Work
associated with the aforesaid allowance (“Allowance Work”) without first obtaining Owner’s
express written authorization to proceed with said Allowance Work. Allowance Amounts are
reflected in Attachment 2 . Unless otherwise provided in the Contract Documents: (a)
allowances amounts shall cover the cost to Construction Contractor of materials and equipment
delivered at the site and all required taxes, less applicable trade discounts; (b) Construction
Contractor’s costs for unloading and handling at the site, labor, installation costs, overhead, profit
and other expenses contemplated for stated allowance amounts shall be included in the GMP but
not in the allowances, unless otherwise stated in the allowance; and (c) whenever costs are more
M-4
than or less than allowances, the GMP shall be adjusted accordingly by Change Order.
2.8 Pursuant to Subsection 12.3 of Exhibit A to the Agreement, if at the time final
payment is made to Construction Contractor the total Cost of the Work has been increased by
approved Change Orders in an amount causing the original GMP as set forth in this Amendment
to be exceeded by more than Five Hundred Thousand and 00/100 Dollars ($500,000.00),
then Construction Contractor shall be entitled to an increase in the Construction Management
Fee in the percentage of (4.95%) of the amount exceeding the sum of Five Hundred Thousand and
00/100 Dollars ($500,000.00) plus that original GMP amount.
2.9 Construction Contractor recognizes that the Contract includes work for trench
excavation in excess of five feet deep. Construction Contractor acknowledges the requirements
set forth by all federal, state and local requirements. Construction Contractor certifies that the
required trench safety standards will be in effect during the period of construction of the Project and
Construction Contractor agrees to comply with all such required trench safety standards.
2.10.1 The amount of Zero and 00/100 Dollars ($0.00) has been separately
identified for the cost of compliance with the required trench safety standards; said amount is
included within the GMP.
2.10 At the completion of the Work, should the actual amount of “General
Requirements” expenses be less than the amount included therefor in the Schedule of Values
approved by Owner, the resulting “savings” shall accrue to the benefit of Owner and a deductive
Change Order or Construction Change Directive shall be issued reducing the GMP by the amount
of such savings. For the avoidance of doubt, any savings obtained General Requirements expenses
may not be moved to contingency or be used to offset cost overruns in other items within the GMP.
Further, the line item for General Requirements expenses in the Schedule of Values constitutes a
separate guaranteed maximum price for such expenses and any overruns in General Requirements
expenses shall be borne by Construction Contractor without reimbursement from Owner.
2.1 l By executing this Amendment and furnishing Owner with a GMP based on a
detailed Schedule of Values and a Master Project Schedule, Construction Contractor represents and
warrants that the Contract Documents, including the Construction Documents, as well as other
materials, and information furnished Construction Contractor as of the date of this Amendment
have described the scope, construction requirements, and design intent of the Work in detail
su1"ficient to enable Construction Contractor to establish firmly the GMP, Contract Time and the
Project Schedule. To the extent that the Construction Documents are anticipated to require further
development, Construction Contractor has provided in the GMP for such further development
consistent with the Contract Documents and reasonably inferable therefrom.
2.12 Savings will be computed as of the date of final completion of the Work and shall
consist of the difference between (i) the Guaranteed Maximum Price (as it may be adjusted in
accordance with the terms of the Contract Documents) and (ii) the total aggregate sum of the
Cost of the Work plus the Construction Management Fee paid by Owner shall accrue to the sole
benefit of Owner.
M-4
ARTICLE 3
CONTRACT TIME
3.1 The Construction Phase Commencement Date for the Work is May 28, 2024. The
total period of time beginning with the Construction Phase Commencement Date through the date
required for Substantial Completion of the Work is One Thousand and Forty-Nine Days
(1,049) days ("Contract Time"). THE SUBSTANTIAL COMPLETION DATE IS
THEREFORE ESTABLISHED AS April 12, 2027. One-year warranties per Article 24.1 of
the Agreement shall start following the completion of each construction phase as follows:
A. Phase 2 – Phase 1 Building & Sitework
B. Phase 3 – Phase 2 Building & Sitework
C. Phase 4 Sitework
3.2 Pursuant to the Agreement, the parties have established liquidated damage rates for
reasons stated therein, which the parties acknowledge and agree apply to this Amendment and
Construction Contractor’s responsibility to substantially complete the Work within the Contract
Time as stated herein and finally complete the Work within the time prescribed in the Contract.
Accordingly, the liquidated damage rates established in the Agreement shall be assessed against
Construction Contractor for each calendar day Construction Contractor fails to achieve Substantial
Completion of the Work within the Contract Time or final completion of the Work within the time
prescribed in the Contract.
ARTICLE 4
MISCELLANEOUS
4.1 Except as expressly modified herein, the terms and conditions of the Agreement
remain unchanged. All terms not specifically defined herein shall have the meaning ascribed to
them in the Agreement. In the event of a conflict between the terms of this Amendment and
those of the Agreement, Owner and Construction Contractor agree that the terms of this
Amendment shall prevail and control. This Amendment may be executed in counterparts, each
of which shall be deemed to be an original, but all of which shall constitute one and the same
instrument.
Owner Construction Contractor
By: By:____________________________
Its: _____________________________ Its: Margaret Rauber, Vice President
Date: ___________________________ Date: March 07, 2024
Attest: __________________________ Attest: __________________________
M-5
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Current Drawings
Drawing No. Drawing Title Revision Drawing Date Received Date Set
Architectural
New Dresden ES School 30% CD (01/
A-0-100 ARCHITECTURE - FULL SITE PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-0-110 LEVEL 0 - OVERALL PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-0-111 LEVEL 1 - OVERALL PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-0-112 LEVEL 2 - OVERALL PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-0-113 LEVEL 3 - OVERALL PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-0-120 LEVEL 0 - OVERALL RCP 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-0-121 LEVEL 1 - OVERALL RCP 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-0-122 LEVEL 2 - OVERALL RCP 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-0-123 LEVEL 3 - OVERALL RCP 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-0-130 OVERALL ROOF PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-110 PHASE 1 - KEY PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-110A PHASE 1 - LEVEL 0 ZONE PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-110B PHASE 1 - LEVEL 0 ZONE PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-111A PHASE 1 - LEVEL 1 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-111B PHASE 1 - LEVEL 1 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-112A PHASE 1 - LEVEL 2 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-112B PHASE 1 - LEVEL 2 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-113 PHASE 1 - LEVEL 3 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-120 PHASE 1 - RCP KEY PLANS 1 01/17/2024 01/17/2024
17/24)
A-1-120A PHASE 1 - RCP LEVEL 0 ZONE PLANS 1 01/17/2024 01/17/2024 New Dresden ES School 30% CD (01/
M-6
Page 1 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
17/24)
New Dresden ES School 30% CD (01/
A-1-120B PHASE 1 - RCP LEVEL 0 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-121A PHASE 1 - RCP LEVEL 1 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-121B PHASE 1 - RCP LEVEL 1 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-122A PHASE 1 - RCP LEVEL 2 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-122B PHASE 1 - RCP LEVEL 2 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-123 PHASE 1 - RCP LEVEL 3 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-200 COMPLETE BUILDING ELEVATIONS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-201 PHASE 1 - EXTERIOR ELEVATIONS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-202 PHASE 1 - EXTERIOR ELEVATIONS 1 01/17/2024 01/29/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-203 PHASE 1 - EXTERIOR ELEVATIONS 1 01/17/2024 01/29/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-301 PHASE 1 - BUILDING SECTIONS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-302 PHASE 1 - BUILDING SECTIONS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-310 PHASE 1 - WALL SECTIONS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-311 PHASE 1 - WALL SECTIONS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-312 PHASE 1 - WALL SECTIONS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-401 PHASE 1 - ENLARGED PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-402 PHASE 1 - ENLARGED PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-403 PHASE 1 - ENLARGED PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-404 PHASE 1 - ENLARGED PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-405 PHASE 1 - ENLARGED TOILET PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-410 PHASE 1 - VERTICAL CIRCULATION 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-411 PHASE 1 - VERTICAL CIRCULATION 1 01/17/2024 01/17/2024
17/24)
M-7
Page 2 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
New Dresden ES School 30% CD (01/
A-1-412 PHASE 1 - VERTICAL CIRCULATION 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-501A PHASE 1 - LEVEL 0 ZONE FINISH PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-501B PHASE 1 - LEVEL 0 ZONE FINISH PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-502A PHASE 1 - LEVEL 1 ZONE FINISH PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-502B PHASE 1 - LEVEL 1 ZONE FINISH PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-503A PHASE 1 - LEVEL 2 ZONE FINISH PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-503B PHASE 1 - LEVEL 2 ZONE FINISH PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-504 PHASE 1 - LEVEL 3 ZONE FINISH PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-510 PHASE 1 - INTERIOR ELEVATIONS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-511 PHASE 1 - INTERIOR ELEVATIONS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-512 PHASE 1 - INTERIOR ELEVATIONS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-520A PHASE 1 - LEVEL 0 ZONE FURNITURE PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-520B PHASE 1 - LEVEL 0 ZONE FURNITURE PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-521A PHASE 1 - LEVEL 1 ZONE FURNITURE PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-521B PHASE 1 - LEVEL 1 ZONE FURNITURE PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-522A PHASE 1 - LEVEL 2 ZONE FURNITURE PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-522B PHASE 1 - LEVEL 2 ZONE FURNITURE PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-1-523 PHASE 1 - LEVEL 3 ZONE FURNITURE PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-110 PHASE 2 - KEY PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-111A PHASE 2 - LEVEL 1 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-111B PHASE 2 - LEVEL 1 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-111C PHASE 2 - LEVEL 1 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
A-2-112A PHASE 2 - LEVEL 2 ZONE PLANS 1 01/17/2024 01/17/2024 New Dresden ES School 30% CD (01/
Page 3 of 20
M-8
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
17/24)
New Dresden ES School 30% CD (01/
A-2-112B PHASE 2 - LEVEL 2 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-113A PHASE 2 - LEVEL 3 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-120 PHASE 2 - RCP KEY PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-121A PHASE 2- RCP LEVEL 1 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-121B PHASE 2- RCP LEVEL 1 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-122A PHASE 2- RCP LEVEL 2 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-122B PHASE 2- RCP LEVEL 2 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-123A PHASE 2- RCP LEVEL 3 ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-201 PHASE 2 - EXTERIOR ELEVATIONS 1 01/17/2024 01/29/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-202 PHASE 2 - EXTERIOR ELEVATIONS 1 01/17/2024 01/29/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-203 PHASE 2 - EXTERIOR ELEVATIONS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-301 PHASE 2 - BUILDING SECTIONS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-302 PHASE 2 - BUILDING SECTIONS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-310 PHASE 2 - WALL SECTIONS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-311 PHASE 2 - WALL SECTIONS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-401 PHASE 2 - ENLARGED PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-402 PHASE 2 - ENLARGED PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-403 PHASE 2 - ENLARGED PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-404 PHASE 2 - ENLARGED PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-405 PHASE 2 - ENLARGED PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-406 PHASE 2 - ENLARGED PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-407 PHASE 2 - ENLARGED PLANS 0 01/17/2024 01/17/2024
17/24)
M-9
Page 4 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
New Dresden ES School 30% CD (01/
A-2-408 PHASE 2 - ENLARGED PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-409 PHASE 2 - ENLARGED TOILET PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-410 PHASE 2 - VERTICAL CIRCULATION 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-411 PHASE 2 - VERTICAL CIRCULATION 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-501A PHASE 2 - LEVEL 1 ZONE FINISH PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-501B PHASE 2 - LEVEL 1 ZONE FINISH PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-502A PHASE 2 - LEVEL 2 ZONE FINISH PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-502B PHASE 2 - LEVEL 2 ZONE FINISH PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-503 PHASE 2 - LEVEL 3 ZONE FINISH PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-510 PHASE 2 - INTERIOR ELEVATIONS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-511 PHASE 2 - INTERIOR ELEVATIONS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-530A PHASE 2 - LEVEL 1 ZONE FURNITURE PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-530B PHASE 2 - LEVEL 1 ZONE FURNITURE PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-531A PHASE 2 - LEVE 2 ZONE FURNITURE PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-531B PHASE 2 - LEVEL 2 ZONE FURNITURE PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-2-532 PHASE 2 - LEVEL 3 ZONE FURNITURE PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-526 MILLWORK 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-530 INTERIOR SIGNAGE DETAILS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-601 DOOR SCHEDULE 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-602 DOOR DETAILS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-603 DOOR DETAILS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-610 STOREFRONT ELEVATIONS 1 01/17/2024 01/29/2024
17/24)
A-611 STOREFRONT ELEVATIONS 1 01/17/2024 01/29/2024 New Dresden ES School 30% CD (01/
M-10
Page 5 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
17/24)
New Dresden ES School 30% CD (01/
A-612 STOREFRONT ELEVATIONS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-613 STOREFRONT ELEVATIONS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-614 STOREFRONT ELEVATIONS - INTERIOR 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-615 WINDOW DETAILS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-616 ROOM FINISH SCHEDULE 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-617 FINISH LEGEND 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-701 PLAN DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-710 SECTION DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-711 SECTION DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-712 SECTION DETAILS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-720 ROOF DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-801 WALL TYPES 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-802 WALL TYPES 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-803 WALL TYPES 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
A-804 WALL TYPES 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
AD-101 DEMO FLOOR PLAN - PHASE 1 0 01/17/2024 01/17/2024
17/24)
Civil
New Dresden ES School 30% CD (01/
C000 COVER SHEET 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C001 BOUNDARY & TOPOGRAPHIC SURVEY 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C002 BOUNDARY & TOPOGRAPHIC SURVEY 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C090 EC 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C100 OVERALL PLAN 0 01/17/2024 01/17/2024
17/24)
M-11
Page 6 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
New Dresden ES School 30% CD (01/
C150 DEMOLITION & REMOVAL PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C155 DEMOLITION & REMOVAL PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C200 LAYOUT & PAVING PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C205 LAYOUT & PAVING PLAN 1 01/17/2024 02/06/2024
17/24)
New Dresden ES School 30% CD (01/
C210 WALL ELEVATIONS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C300 GRADING PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C305 GRADING PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C306 COURTYARD ENLARGEMENT GRADING PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C310 DRAINAGE PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C315 DRAINAGE PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C316 COURTYARD ENLARGEMENT STORM PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C320 PIPE PROFILES 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C400 NPDES NOTES 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C405 NPDES NOTES 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C440 ES&PC DETAILS & CALCULATIONS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C500 UTILITY PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C510 UTILITY PROFILES 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C600 LANDSCAPE PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C700 SITE WORK CONSTRUCTION DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C701 SITE WORK CONSTRUCTION DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C702 SITE WORK CONSTRUCTION DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
C710 DEKALB COUNTY STANDARD CONSTRUCTION DETAILS 0 01/17/2024 01/17/2024
17/24)
C711 DEKALB COUNTY STANDARD CONSTRUCTION DETAILS 0 01/17/2024 01/17/2024 New Dresden ES School 30% CD (01/
M-12
Page 7 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
17/24)
New Dresden ES School 30% CD (01/
C712 G.D.O.T. STANDARD CONSTRUCTION DETAILS 0 01/17/2024 01/17/2024
17/24)
Electrical
New Dresden ES School 30% CD (01/
E-001 ELECTRICAL LEGEND & ABBREVIATIONS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-401 ENLARGED KITCHEN PLANS - ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-402 ENLARGED FLOOR PLANS - ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-403 ENLARGED FLOOR PLANS - ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-404 ENLARGED FLOOR PLANS - ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-501 ELECTRICAL GROUNDING DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-502 LIGHTNING PROTECTION DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-503 ELECTRICAL POWER DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-504 ELECTRICAL LIGHTING DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-601 ONE LINE DIAGRAM 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-701 ELECTRICAL SCHEDULES 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-702 PANEL SCHEDULES 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-703 PANEL SCHEDULES 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-704 PANEL SCHEDULES 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-705 PANEL SCHEDULES 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-706 PANEL SCHEDULES 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-707 PANEL SCHEDULES 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
E-708 PANEL SCHEDULES 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EG-1-110 PHASE 1-LEVEL 0-PLAN-GROUNDING 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EG-2-110 PHASE 2-LEVEL 1-PLAN-GROUNDING 1 01/17/2024 01/17/2024
17/24)
M-13
Page 8 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
New Dresden ES School 30% CD (01/
EL-1-120A PHASE 1- LEVEL 0-RCP-ZONES A/B-LIGHTING 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EL-1-120B PHASE 1-LEVEL 0-RCP-ZONE C- LIGHTING 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EL-1-121A PHASE 1-LEVEL 1-RCP-ZONES A/B-LIGHTING 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EL-1-121B PHASE 1-LEVEL 1-RCP-ZONE C-LIGHTING 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EL-1-122A PHASE 1-LEVEL 2-RCP-ZONES A/B-LIGHTING 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EL-1-122B PHASE 1-LEVEL 2-RCP-ZONE C- LIGHTING 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EL-1-123 PHASE 1-LEVEL 3 -RCP-LIGHTING 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EL-2-121A PHASE 2- LEVEL 1- RCP- ZONES D/E- LIGHTING 1 01/17/2024 02/05/2024
17/24)
New Dresden ES School 30% CD (01/
EL-2-121B PHASE 2-LEVEL 1-RCP-ZONES F/G-LIGHTING 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EL-2-121C PHASE 2 - LEVEL 1-RCP-ZONE H-LIGHTING 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EL-2-122A PHASE 2-LEVEL 2- RCP- ZONES D/E- LIGHTING 1 01/17/2024 02/05/2024
17/24)
New Dresden ES School 30% CD (01/
EL-2-122B PHASE 2-LEVEL 2-RCP-ZONES F/G -LIGHTING 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EL-2-123A PHASE 2-LEVEL 3-RCP-ZONES F/G-LIGHTING 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
ELP-1-111 PHASE 1-ROOF PLAN-LIGHTNING PROTECTION 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
ELP-2-111 PHASE 2-ROOF PLAN-LIGHTNING PROTECTION 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EP-1-110A PHASE 1-LEVEL 0 PLAN-ZONES A/B- ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EP-1-110B PHASE 1-LEVEL 0 PLAN-ZONE C- ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EP-1-111A PHASE 1-LEVEL 1 PLAN-ZONES A/B- ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EP-1-111B PHASE 1-LEVEL 1 PLAN-ZONE C- ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EP-1-112A PHASE 1-LEVEL 2 PLAN-ZONES A/B- ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EP-1-112B PHASE 1-LEVEL 2 PLAN-ZONE C- ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EP-1-113A PHASE 1-LEVEL 3 PLAN-ZONE A- ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
EP-2-111A PHASE 2-LEVEL 1 PLAN-ZONES D/E- ELECTRICAL 1 01/17/2024 02/05/2024 New Dresden ES School 30% CD (01/
M-14
Page 9 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
17/24)
New Dresden ES School 30% CD (01/
EP-2-111B PHASE 2-LEVEL 1 PLAN-ZONES F/G- ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EP-2-111C PHASE 2-LEVEL 1 PLAN-ZONE H- ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EP-2-112A PHASE 2-LEVEL 2 PLAN-ZONES D/E- ELECTRICAL 1 01/17/2024 02/05/2024
17/24)
New Dresden ES School 30% CD (01/
EP-2-112B PHASE 2-LEVEL 2 PLAN-ZONES F/G- ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
EP-2-113A PHASE 2-LEVEL 3 PLAN-ZONES F/G- ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
ES-0-100 SITE PLAN - ELECTRICAL 1 01/17/2024 01/17/2024
17/24)
Fire Alarm
New Dresden ES School 30% CD (01/
FA-1-110A PHASE 1- LEVEL 0 PLAN- ZONES A/B- FIRE ALARM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FA-1-110B PHASE 1- LEVEL 0 PLAN- ZONE C- FIRE ALARM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FA-1-111A PHASE 1- LEVEL 1 PLAN- ZONES A/B- FIRE ALARM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FA-1-111B PHASE 1- LEVEL 1 PLAN- ZONE C- FIRE ALARM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FA-1-112A PHASE 1- LEVEL 2 PLAN- ZONES A/B- FIRE ALARM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FA-1-112B PHASE 1- LEVEL 2 PLAN- ZONE C- FIRE ALARM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FA-1-113 PHASE 1- LEVEL 3 PLAN- ZONE A- FIRE ALARM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FA-2-111A PHASE 2- LEVEL 1 PLAN- ZONES D/E- FIRE ALARM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FA-2-111B PHASE 2- LEVEL 1 PLAN- ZONES F/G- FIRE ALARM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FA-2-112A PHASE 2- LEVEL 2 PLAN- ZONES D/E- FIRE ALARM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FA-2-112B PHASE 2- LEVEL 2 PLAN- ZONES F/G- FIRE ALARM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FA-2-113 PHASE 2- LEVEL 3 PLAN- ZONES F/G- FIRE ALARM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FA-501 FIRE ALARM DETAILS 0 01/17/2024 01/17/2024
17/24)
Fire Protection
New Dresden ES School 30% CD (01/
FX001 NOTES - FIRE PROTECTION 0 01/17/2024 01/17/2024
17/24)
FX101 LEVELS 0 & 1 COMPOSITE PLANS - FP 0 01/17/2024 01/17/2024 New Dresden ES School 30% CD (01/
M-15
Page 10 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
17/24)
New Dresden ES School 30% CD (01/
FX102 LEVELS 2 & 3 COMPOSITE PLANS - FIRE PROTECTION 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX103 PHASE 1 - LEVEL 0 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX104 PHASE 1 - LEVEL 0 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX105 PHASE 1 - LEVEL 1 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX106 PHASE 1 - LEVEL 1 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX107 PHASE 1 - LEVEL 2 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX108 PHASE 1 - LEVEL 2 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX109 PHASE 1 - LEVEL 3 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX110 PHASE 2 - LEVEL 1 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX111 PHASE 2 - LEVEL 1 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX112 PHASE 2 - LEVEL 1 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX113 PHASE 2 - LEVEL 2 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX114 PHASE 2 - LEVEL 2 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX115 PHASE 2 - LEVEL 2 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX116 PHASE 2 - LEVEL 3 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX117 PHASE 2 - LEVEL 3 - FIRE PROT. ZONE PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX401 STAIR SECTIONS - FIRE PROTECTION 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
FX501 DETAILS - FIRE PROTECTION 0 01/17/2024 01/17/2024
17/24)
General
New Dresden ES School 30% CD (01/
G-001 COVER SHEET 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
G-002 SHEET INDEX 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
G-003 ABBREVIATIONS, SYMBOLS, GENERAL NOTES 1 01/17/2024 01/17/2024
17/24)
M-16
Page 11 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
New Dresden ES School 30% CD (01/
G-010 ACCESSIBILITY INFORMATION 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
G-011 SCHEDULE OF SPACES 1 01/17/2024 01/17/2024
17/24)
Kitchen
New Dresden ES School 30% CD (01/
K000 FOODSERVICE COVER PAGE 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K101 FOODSERVICE EQUIPMENT PLAN AND SCHEDULE 0 11/30/2023 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K102 FS MECHANICAL CONNECTION PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K103 FS ELECTRICAL CONNECTION PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K104 FS SPECIAL CONDITIONS PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K104D FS SPECIAL CONDITIONS DETAILS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K105 FS MECH & PLUMBING LOAD SCHEDULE 0 11/30/2023 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K106 FS ELECTRICAL UTILITY LOAD SCHEDULE 0 11/30/2023 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K107 FS ELEVATIONS 0 11/30/2023 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K108 FS ELEVATIONS 0 11/30/2023 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K201 FS VENTILATION DRAWING 0 11/30/2023 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K202 FS VENTILATION DRAWING 0 11/30/2023 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K203 FS VENTILATION DRAWING 0 11/30/2023 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K204 FS VENTILATION DRAWING 0 11/30/2023 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K205 FS VENTILATION DRAWING 0 11/30/2023 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K206 FS VENTILATION DRAWING 0 11/30/2023 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K207 FS VENTILATION DRAWING 0 11/30/2023 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K208 FS VENTILATION DRAWING 0 11/30/2023 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
K209 FS WALK-IN DRAWING 0 11/30/2023 01/17/2024
17/24)
Life Safety
M-17
Page 12 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
New Dresden ES School 30% CD (01/
LS-001 CODE SUMMARY 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
LS-100 LIFE SAFETY PLAN - COMPOSITE 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
LS-101 LIFE SAFETY PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
LS-102 LIFE SAFETY PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
LS-200 LIFE SAFETY PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
LS-201 LIFE SAFETY PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
LS-202 LIFE SAFETY PLAN 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
LS-203 LIFE SAFETY PLAN 0 01/17/2024 01/17/2024
17/24)
Mechanical
New Dresden ES School 30% CD (01/
M-001 LEGENDS & GENERAL NOTES 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-1-111A PHASE 1 LEVEL 1 ZONE HVAC PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-1-111B PHASE 1 LEVEL 1 ZONE HVAC PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-1-112A PHASE 1 LEVEL 2 ZONE HVAC PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-1-112B PHASE 1 LEVEL 2 ZONE HVAC PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-1-113A PHASE 1 LEVEL 3 ZONE HVAC PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-1-113B PHASE 1 LEVEL 3 ZONE HVAC PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-1-114 PHASE 1 LEVEL 4 ZONE HVAC PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-1-131 PHASE 1 ROOF PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-2-112A PHASE 2 LEVEL 2 ZONE HVAC PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-2-112B PHASE 2 LEVEL 2 ZONE HVAC PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-2-113A PHASE 2 LEVEL 3 ZONE HVAC PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-2-113B PHASE 2 LEVEL 3 ZONE HVAC PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-2-114 PHASE 2 LEVEL4 ZONE HVAC PLANS 1 01/17/2024 01/17/2024
17/24)
M-18
Page 13 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
New Dresden ES School 30% CD (01/
M-2-131 PHASE 2 ROOF PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-010 OVERALL HVAC PLAN -LEVEL 0 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-011 OVERALL HVAC PLAN - LEVEL 1 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-012 OVERALL HVAC PLAN - LEVEL 2 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-013 OVERALL HVAC PLAN -LEVEL 3 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-501 MECHANICAL DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-502 MECHANICAL DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-601 MECHANICAL SCHEDULES 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-602 MECHANICAL SCHEDULES 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-701 CONTROL DIAGRAMS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
M-702 CONTROL DIAGRAMS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
MD-101 HVAC DEMOLITION FLOOR PLAN 1 01/17/2024 01/17/2024
17/24)
Plumbing
New Dresden ES School 30% CD (01/
P-0-001 ABBREVIATIONS, LEGEND AND GENERAL NOTES 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-100 PHASE 1 - PLUMBING SITE PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-110 PHASE 1 - PLUMBING KEY PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-111A PHASE 1 - LEVEL 0 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-111B PHASE 1 - LEVEL 0 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-112A PHASE 1 - LEVEL 0 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-112B PHASE 1 - LEVEL 0 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-113A PHASE 1 - LEVEL 1 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-113B PHASE 1 - LEVEL 1 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-114A PHASE 1 - LEVEL 2 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
M-19
Page 14 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
New Dresden ES School 30% CD (01/
P-1-114b PHASE 1 - LEVEL 2 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-115A PHASE 1 - LEVEL 3 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-115B PHASE 1 - LEVEL 3 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-116A PHASE 1 - ROOF - PLUMBING ZONE 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-401 PLUMBING ENLARGED PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-402 PLUMBING ENLARGED PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-403 PLUMBING ENLARGED PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-404 PLUMBING ENLARGED PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-405 PLUMBING ENLARGED PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-406 PLUMBING ENLARGED PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-407 PLUMBING ENLARGED PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-408 PLUMBING ENLARGED PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-409 PLUMBING ENLARGED PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-501 PLUMBING DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-502 PLUMBING DETAILS 1 01/17/2024 01/17/2024
17/24)
P-1-503 PLUMBING DETAILS 0 11/30/2023 11/30/2023 Dresden DD Set (11/30/23)
New Dresden ES School 30% CD (01/
P-1-601 PLUMBING SCHEDULES 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-602 PLUMBING SCHEDULES 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-901 SANITARY ISOMETRICS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-902 SANITARY ISOMETRICS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-903 SANITARY ISOMETRICS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-904 GREASE ISOMETRICS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-905 STORM DRAINAGE ISOMETRICS 0 01/17/2024 01/17/2024
17/24)
M-20
Page 15 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
New Dresden ES School 30% CD (01/
P-1-906 DOMESTIC WATER ISOMETRICS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-907 DOMESTIC WATER ISOMETRICS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-908 DOMESTIC WATER ISOMETRICS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-909 DOMESTIC WATER ISOMETRICS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-910 DOMESTIC WATER ISOMETRICS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-1-911 NATURAL GAS ISOMETRICS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-100 PHASE 2 - PLUMBING SITE PLAN 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-110 PHASE 2 - PLUMBING KEY PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-111A PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-111B PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-112A PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-112B PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-112C PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-113A PHASE 2 - LEVEL 2 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-113B PHASE 2 - LEVEL 2 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-114A PHASE 2 - LEVEL 3 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-114B PHASE 2 - LEVEL 3 - PLUMBING ZONE PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-115A PHASE 2 - ROOF - PLUMBING ZONE 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-401 PLUMBING ENLARGED PLANS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-402 PLUMBING ENLARGED PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-403 PLUMBING ENLARGED PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-901 SANITARY ISOMETRICS 0 01/17/2024 01/17/2024
17/24)
P-2-902 STORM ISOMETRICS 0 01/17/2024 01/17/2024 New Dresden ES School 30% CD (01/
M-21
Page 16 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
17/24)
New Dresden ES School 30% CD (01/
P-2-903 NATURAL GAS ISOMETRICS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
P-2-904 DOMESTIC WATER ISOMETRICS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
PD-101 DEMO FLOOR PLANS 1 01/17/2024 01/17/2024
17/24)
Structural
New Dresden ES School 30% CD (01/
S001 GENERAL NOTES 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-1-110A PHASE 1 - LEVEL 0 FOUND.PLAN - ZONE A,B 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-1-110B PHASE 1 - LEVEL 0 FOUND. PLAN - ZONE C 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-1-111A PHASE 1 - LEVEL 1 PLAN - ZONE A,B 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-1-111B PHASE 1 - LEVEL 1 PLAN - ZONE C 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-1-112A PHASE 1 - LEVEL 2 PLAN - ZONE A,B 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-1-112B PHASE 1 - LEVEL 2 PLAN - ZONE C 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-1-113A PHASE 1 - LEVEL 3 PLAN - ZONE A,B 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-1-113B PHASE 1 - LEVEL 3 - ZONE C 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-1-114A PHASE 1 - ROOF PLAN - ZONE A 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S002 GENERAL NOTES 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-2-111A PHASE 2 - LEVEL 1 FOUND. PLAN - ZONE D,E 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-2-111B PHASE 2 - LEVEL 1 FOUND. PLAN - ZONE F,G 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-2-112A PHASE 2 - LEVEL 2 PLAN - ZONE D,E 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-2-112B PHASE 2 - LEVEL 2 PLAN - ZONE F,G 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-2-113A PHASE 2 - LEVEL 3 - ZONE D,E 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-2-113B PHASE 2 - LEVEL 3 PLAN - ZONE F,G 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S-2-114B PHASE 2 - ROOF PLAN - ZONE F,G 1 01/17/2024 01/17/2024
17/24)
M-22
Page 17 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
New Dresden ES School 30% CD (01/
S003 3D VIEWS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S004 TYPICAL DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S005 TYPICAL DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S006 TYPICAL DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S007 TYPICAL DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S008 TYPICAL DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S009 TYPICAL DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S010 TYPICAL DETAILS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S201 FOUNDATION SECTIONS AND DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S202 FOUNDATION SECTIONS AND DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S203 FOUNDATION SECTIONS AND DETAILS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S301 PHASE 1 COLUMN SCHEDULE 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S302 PHASE 2 COLUMN SCHEDULE 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S401 BRACED FRAME ELEVATIONS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S501 FRAMING SECTIONS AND DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S502 FRAMING SECTIONS AND DETAILS 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
S503 FRAMING SECTIONS AND DETAILS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
SD-101 LEVEL 1 FOUND. PLAN - DEMO. PHASE 1 1 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
SD-102 LEVEL 2 FOUND. PLAN - DEMO. PHASE 1 1 01/17/2024 01/17/2024
17/24)
Technology
New Dresden ES School 30% CD (01/
T-001 COMMUNICATIONS LEGEND & ABBREVIATIONS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-1-100 PHASE 1-LEVEL 0 PLAN- CABLE TRAY 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-1-101 PHASE 1-LEVEL 1 PLAN- CABLE TRAY 0 01/17/2024 01/17/2024
17/24)
M-23
Page 18 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
New Dresden ES School 30% CD (01/
T-1-102 PHASE 1-LEVEL 2 PLAN- CABLE TRAY 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-1-103 PHASE 1- LEVEL 3 PLAN- CABLE TRAY 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-1-110A PHASE 1- LEVEL 0 PLAN- ZONES A/B- TELECOM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-1-110B PHASE 1- LEVEL 0 PLAN- ZONE C- TELECOM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-1-111A PHASE 1- LEVEL 1 PLAN- ZONES A/B- TELECOM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-1-111B PHASE 1- LEVEL 1 PLAN- ZONE C- TELECOM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-1-112A PHASE 1- LEVEL 2 PLAN- ZONES A/B- TELECOM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-1-112B PHASE 1- LEVEL 2 PLAN- ZONE C- TELECOM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-1-113 PHASE 1- LEVEL 3 PLAN- ZONE A- TELECOM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-2-101 PHASE 2- LEVEL 1 PLAN- CABLE TRAY 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-2-102 PHASE 2- LEVEL 2 PLAN- CABLE TRAY 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-2-103 PHASE 2- LEVEL 3 PLAN- CABLE TRAY 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-2-111A PHASE 2- LEVEL 1 PLAN- ZONES D/E- TELECOM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-2-111B PHASE 2- LEVEL 1 PLAN- ZONES F/G- TELECOM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-2-111C PHASE 2- LEVEL 1 PLAN- ZONE H- TELECOM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-2-112A PHASE 2- LEVEL 2 PLAN- ZONES D/E- TELECOM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-2-112B PHASE 2- LEVEL 2 PLAN- ZONES F/G- TELECOM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-2-113 PHASE 2- LEVEL 3 PLAN- ZONES F/G- TELECOM 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-401 PHASE 1 ENLARGED TELECOM PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-402 PHASE 2 ENLARGED TELECOM PLANS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-501 TELECOM DETAILS 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
T-502 TELECOM DETAILS 0 01/17/2024 01/17/2024
17/24)
T-601 ONE LINE DIAGRAM 0 01/17/2024 01/17/2024 New Dresden ES School 30% CD (01/
M-24
Page 19 of 20
ATTACHMENT 1
March pm
Printed on Mon Feb 19, 2024 at 03:12 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
17/24)
New Dresden ES School 30% CD (01/
TG-1-100 PHASE 1- LEVEL 0 PLAN - COMM GROUND 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
TG-1-101 PHASE 1-LEVEL 1 PLAN - COMM GROUND 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
TG-1-102 PHASE 1- LEVEL 2 PLAN - COMM GROUND 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
TG-1-103 PHASE 1- LEVEL 3 PLAN - COMM GROUND 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
TG-2-101 PHASE 2- LEVEL 1 PLAN- COMM GROUND 0 01/17/2024 01/17/2024
17/24)
New Dresden ES School 30% CD (01/
TG-2-102 PHASE 2- LEVEL 2 PLAN- COMM GROUND 0 01/17/2024 01/17/2024
17/24)
M-25
Page 20 of 20
ATTACHMENT 1
March pm
Printed on Tue Feb 6, 2024 at 01:15 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Current Specifications
Number Description Revision Issued Date Received Date Set
00 - Procurement and Contracting Requirements
00 01 10 Table of Contents 0 01/17/24 01/17/24 New Dresden ES School 30% CD
01 - General Requirements
01 45 33 Structural Testing and Special Inspection Services 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 - Existing Conditions
02 05 00 Common Works for Exterior Improvements 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 10 00 Site Clearing 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 12 00 Flexible Paving 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 20 00 Site Preparation and General Site Work 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 21 10 Grading 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 22 00 Existing Conditions Information 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 26 00 Hazardous Material Assessment 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 32 00 Geotechnical Investigations 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 40 00 Site Demolition 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 50 00 Site Concrete Work 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 54 00 Erosion & Sedimentation Controls 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 70 00 Water Utility Distribution Piping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 72 00 Storm Drainage Utilities 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 73 00 Sanitary Utility Sewerage Piping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 79 10 Rubber Mulch Playground Protective Surfacing 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 83 00 Chain Link Fences and Gates 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 90 00 Planting Preparation 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 92 00 Turf and Grasses 0 01/17/24 01/17/24 New Dresden ES School 30% CD
02 97 50 Cleaning & Waste Management 0 01/17/24 01/17/24 New Dresden ES School 30% CD
03 - Concrete
03 10 00 Concrete Forming and Accessories 0 01/17/24 01/17/24 New Dresden ES School 30% CD
03 20 00 Concrete Reinforcing 0 01/17/24 01/17/24 New Dresden ES School 30% CD
03 30 00 Cast-in-Place Concrete 0 01/17/24 01/17/24 New Dresden ES School 30% CD
04 - Masonry
04 05 30 Masonry Flashing & Accessories 0 01/17/24 01/17/24 New Dresden ES School 30% CD
04 20 00 Unit Masonry 0 01/17/24 01/17/24 New Dresden ES School 30% CD
05 - Metals
05 12 00 Structural Steel Framing 0 01/17/24 01/17/24 New Dresden ES School 30% CD
Page 1 of 5
M-26
ATTACHMENT 1
March pm
Printed on Tue Feb 6, 2024 at 01:15 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Number Description Revision Issued Date Received Date Set
05 12 13 Architecturally Exposed Structural Steel Framing 0 01/17/24 01/17/24 New Dresden ES School 30% CD
05 21 00 Steel Joist Framing 0 01/17/24 01/17/24 New Dresden ES School 30% CD
05 31 00 Steel Decking 0 01/17/24 01/17/24 New Dresden ES School 30% CD
05 50 00 Metal Fabrications 0 01/17/24 01/17/24 New Dresden ES School 30% CD
06 - Wood, Plastics, and Composites
06 10 53 Miscellaneous Rough Carpentry 0 01/17/24 01/17/24 New Dresden ES School 30% CD
06 16 00 Sheathing 0 01/17/24 01/17/24 New Dresden ES School 30% CD
07 - Thermal and Moisture Protection
07 13 26 Self-Adhering Sheet Waterproofing 0 01/17/24 01/17/24 New Dresden ES School 30% CD
07 21 00 Thermal Insulation 0 01/17/24 01/17/24 New Dresden ES School 30% CD
07 25 00 Weather Barriers 0 01/17/24 01/17/24 New Dresden ES School 30% CD
07 26 00 Vapor Retarders 0 01/17/24 01/17/24 New Dresden ES School 30% CD
07 54 19 Polyvinyl-Chloride Roofing 0 01/17/24 01/17/24 New Dresden ES School 30% CD
07 62 00 Sheet Metal Flashing and Trim 0 01/17/24 01/17/24 New Dresden ES School 30% CD
07 72 00 Roof Accessories 0 01/17/24 01/17/24 New Dresden ES School 30% CD
07 84 13 Penetration Firestopping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
07 84 43 Joint Firestopping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
07 92 00 Joint Sealants 0 01/17/24 01/17/24 New Dresden ES School 30% CD
07 95 00 Expansion Control 0 01/17/24 01/17/24 New Dresden ES School 30% CD
08 - Openings
08 11 13 Hollow Metal Doors and Frames 0 01/17/24 01/17/24 New Dresden ES School 30% CD
08 14 16 Flush Wood Doors 0 01/17/24 01/17/24 New Dresden ES School 30% CD
08 31 13 Access Doors and Frames 0 01/17/24 01/17/24 New Dresden ES School 30% CD
08 34 73 Wood Sound Control Door Assemblies 0 01/17/24 01/17/24 New Dresden ES School 30% CD
08 41 13 Aluminum-Framed Entrances and Storefronts 0 01/17/24 01/17/24 New Dresden ES School 30% CD
08 44 13 Glazed Aluminum Curtain Walls 0 01/17/24 01/17/24 New Dresden ES School 30% CD
08 71 11 Door Hardware 0 01/17/24 01/17/24 New Dresden ES School 30% CD
08 80 00 Glazing 0 01/17/24 01/17/24 New Dresden ES School 30% CD
09 - Finishes
09 29 00 Gypsum Board 0 01/17/24 01/17/24 New Dresden ES School 30% CD
09 51 13 Acoustical Panel Ceilings 0 01/17/24 01/17/24 New Dresden ES School 30% CD
09 65 66 Resilient Athletic Flooring 0 01/17/24 01/17/24 New Dresden ES School 30% CD
09 67 23 Resinous Flooring 0 01/17/24 01/17/24 New Dresden ES School 30% CD
09 68 13 Tile Carpeting 0 01/17/24 01/17/24 New Dresden ES School 30% CD
09 84 33 Sound-Absorbing Wall Units 0 01/17/24 01/17/24 New Dresden ES School 30% CD
09 84 36 Sound-Absorbing Ceiling Units 0 01/17/24 01/17/24 New Dresden ES School 30% CD
09 91 13 Exterior Painting 0 01/17/24 01/17/24 New Dresden ES School 30% CD
Page 2 of 5
M-27
ATTACHMENT 1
March pm
Printed on Tue Feb 6, 2024 at 01:15 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Number Description Revision Issued Date Received Date Set
09 91 23 Interior Painting 0 01/17/24 01/17/24 New Dresden ES School 30% CD
10 - Specialties
10 11 00 Visual Display Units 0 01/17/24 01/17/24 New Dresden ES School 30% CD
10 12 00 Display Cases 0 01/17/24 01/17/24 New Dresden ES School 30% CD
10 14 00 Signage 0 01/17/24 01/17/24 New Dresden ES School 30% CD
10 21 13 Plastic Toilet Compartments 0 01/17/24 01/17/24 New Dresden ES School 30% CD
10 28 00 Toilet, Bath, and Laundry Accessories 0 01/17/24 01/17/24 New Dresden ES School 30% CD
10 44 00 Fire Protection Specialties 0 01/17/24 01/17/24 New Dresden ES School 30% CD
10 51 13 Metal Lockers 0 01/17/24 01/17/24 New Dresden ES School 30% CD
10 56 13 Metal Storage Shelving 0 01/17/24 01/17/24 New Dresden ES School 30% CD
10 73 00 Protective Covers & Exterior Sun Control Systems 0 01/17/24 01/17/24 New Dresden ES School 30% CD
10 75 16 Ground-Set Flagpoles 0 01/17/24 01/17/24 New Dresden ES School 30% CD
11 - Equipment
11 30 13 Residential Appliances 0 01/17/24 01/17/24 New Dresden ES School 30% CD
11 40 00 Foodservice Equipment 0 01/17/24 01/17/24 New Dresden ES School 30% CD
11 52 13 Projection Screens 0 01/17/24 01/17/24 New Dresden ES School 30% CD
11 58 50 Kiln 0 01/17/24 01/17/24 New Dresden ES School 30% CD
11 66 23 Gymnasium Equipment 0 01/17/24 01/17/24 New Dresden ES School 30% CD
12 - Furnishings
12 21 13 Horizontal Louver Blinds 0 01/17/24 01/17/24 New Dresden ES School 30% CD
12 32 13 Manufactured Wood-Veneer-Faced Casework 0 01/17/24 01/17/24 New Dresden ES School 30% CD
14 - Conveying Equipment
14 21 23 Machine Room-Less Electric Traction Passenger Elevators 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 - Plumbing
22 05 00 Common Work Results for Plumbing 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 05 13 Common Motor Requirements for Plumbing Equipment 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 05 16 Expansion Fittings and Loops for Plumbing Piping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 05 17 Sleeves and Sleeve Seals for Plumbing Piping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 05 18 Escutcheons for Plumbing Piping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 05 19 Meters and Gages for Plumbing Piping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 05 23.12 Ball Valves for Plumbing Piping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 05 23.13 Butterfly Valves for Plumbing Piping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 05 23.14 Check Valves for Plumbing Piping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 05 23.15 Gate Valves for Plumbing Piping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 05 29 Hangers and Supports for Plumbing Piping and Equipment 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 05 48.13 Vibration Controls for Plumbing Piping and Equipment 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 05 53 Identification for Plumbing Piping and Equipment 0 01/17/24 01/17/24 New Dresden ES School 30% CD
Page 3 of 5
M-28
ATTACHMENT 1
March pm
Printed on Tue Feb 6, 2024 at 01:15 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Number Description Revision Issued Date Received Date Set
22 07 19 Plumbing Piping Insulation 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 11 16 Domestic Water Piping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 11 19 Domestic Water Piping Specialties 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 11 23.21 Inline, Domestic-Water Pumps 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 13 16 Sanitary Waste and Vent Piping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 13 19 Sanitary Waste Piping Specialties 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 13 19.13 Sanitary Drains 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 13 23 Sanitary Waste Interceptors 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 14 13 Facility Storm Drainage Piping 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 14 23 Storm Drainage Piping Specialties 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 14 29 Sump Pumps 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 33 00 Electric, Domestic-Water Heaters 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 34 00 Fuel-Fired, Domestic Water Heaters 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 42 13.13 Commercial Water Closets 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 42 13.16 Commercial Urinals 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 42 16.13 Commercial Lavatories and Sinks 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 42 16.16 Commercial Sinks 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 42 33 Wash Fountains 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 45 00 Emergency Plumbing Fixtures 0 01/17/24 01/17/24 New Dresden ES School 30% CD
22 47 16 Pressure Water Coolers 0 01/17/24 01/17/24 New Dresden ES School 30% CD
23 - Heating, Ventilating, and Air Conditioning (HVAC)
23 65 14.16 Closed-Circuit, Induced-Draft, Counterflow Cooling Towers 0 01/17/24 01/17/24 New Dresden ES School 30% CD
23 74 33 Packaged, Outside Air-Handling Units 0 01/17/24 01/17/24 New Dresden ES School 30% CD
23 90 00 Building Automation Systems 0 01/17/24 01/17/24 New Dresden ES School 30% CD
26 - Electrical
26 00 10 Basic Electrical Requirements 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 05 19 Low-Voltage Electrical Power Conductors and Cables 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 05 26 Grounding and Bonding for Electrical Systems 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 05 29 Hangers and Supports for Electrical Systems 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 05 33 Raceway and Boxes for Electrical Systems 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 05 36 Cable Trays for Electrical Systems 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 05 43 Underground Ducts and Utility Structures 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 05 53 Identification for Electrical Systems 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 05 73.13 Short-Circuit Studies 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 05 73.16 Coordination Studies 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 05 73.19 Arc-Flash Hazard Analysis 0 01/17/24 01/18/24 New Dresden ES School 30% CD
Page 4 of 5
M-29
ATTACHMENT 1
March pm
Printed on Tue Feb 6, 2024 at 01:15 5, 2024
EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Number Description Revision Issued Date Received Date Set
26 08 00 Commissioning of Electrical Systems 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 09 23 Lighting Control Devices 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 22 00 Low-Voltage Transformers 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 24 13 Switchboards 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 24 16 Panelboards 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 27 26 Wiring Devices 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 28 13 Fuses 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 28 16 Enclosed Switches and Circuit Breakers 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 32 13.16 Gas-Engine-Driven Generator Sets 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 36 00 Transfer Switches 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 36 00.13 Trystar Docking Station 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 41 13 Lightning Protection for Structures 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 51 19 LED Interior Lighting 0 01/17/24 01/18/24 New Dresden ES School 30% CD
26 56 19 LED Exterior Lighting 0 01/17/24 01/18/24 New Dresden ES School 30% CD
27 - Communications
27 05 28 Pathways for Communications Systems 0 01/17/24 01/18/24 New Dresden ES School 30% CD
27 05 36 Cable Trays for Communications Systems 0 01/17/24 01/18/24 New Dresden ES School 30% CD
27 10 00 Structured Cabling 0 01/17/24 01/18/24 New Dresden ES School 30% CD
28 - Electronic Safety and Security
28 31 11 Fire Alarm Systems 0 01/17/24 01/18/24 New Dresden ES School 30% CD
Page 5 of 5
M-30
ATTACHMENT 2
Allowance Log
New Dresden Elementary School Project
#24-016
March 7, 2024
# Item Allowance Cost-to-Date Remaining Allowance
1 Permitting & Impact Fees $ 140,000
2 Escalation $ 997,356
3 Moving and Storage $ 413,490
4 Abatement $ 155,059
5 Right-of-Way Work and Jack & Bore (If needed) $ 516,863
6 Mass Rock (deposited on site = $85.25/CUYD, hauled off-site = $107.98/CUYD) $ 399,476
7 Trench Rock (deposited on site = $170.49/CUYD, hauled off-site = $193.22/CUYD) $ 375,980
8 Unsuitable Soils (deposited on site = $17.06/CUYD, hauled off-site = $51.15/CUYD) $ 286,684
9 Bring in Topsoils (suitable soil from on site = $36.37/CUYD, topsoil = $73.88/CUYD) $ 137,467
10 Stone/GAB (#3/#34 = $73.88/ton, #57 = $76.15/ton, Rip Rap III = $90.93/ton, GAB = $72.74/ton) $ 200,680
11 Geotech Fabric ($6.82/SQYD) $ 14,100
12 Irrigation $ 36,180
13 Perimeter Fence 8'-0" Black, Vinyl Chain Link Fence $ 155,060
14 Dumpster Pad and Enclosure $ 51,686
15 Architectural Millwork $ 492,260
16 Doors, Frames & Hardware (Material) $ 560,337
17 Interior Paint at Corridors $ 51,686
18 Art Mural Wall at Courtyard $ 10,337
19 Building Signage $ 127,618
20 Monument Signage $ 82,698
21 Stage Curtain $ 31,012
22 Modular Classrooms/Offices $ 2,515,402
23 Electrical Scope Changes per 80% Construction Drawings $ 516,862
24 Intercom System $ 379,460
25 ERRC $ 206,746
Allowances Total $ 8,854,497
M-31
ATTACHMENT 3
DRESDEN ELEMENTARY SCHOOL
ASSUMPTIONS & CLARIFICATIONS – 30% CD
March 7, 2024
GENERAL
01.01 This GMP Estimate is based upon:
a. The Winter Construction Phasing Plan submitted with our Proposal and the attached schedule;
the construction schedule is 36 months. The construction schedule is based on the following:
01. Phased Completion dates:
a. Phase 2 Construction – Phase 1 Building: 12/08/2025
b. Phase 3 Construction – Phase 2 Building: 01/12/2027
c. Phase 4 Construction – Final Substantial Completion: 04/12/2027
02. Student/Teacher move dates:
a. Phase 1 Construction – From existing building into modulars: 10/14/2024 –
10/18/2024
b. Phase 2 Construction – From existing building into new Phase 1 building:
12/22/2025 – 01/05/2026
c. Phase 3 Construction – From modulars into new Phase 2 building: 02/15/2027 –
02/22/2027
03. DeKalb County School District (DCSD) being moved out of old buildings by date:
a. To start Phase 2 Construction: 10/18/2024
b. To start Phase 3 Construction: 01/05/2026
c. To start Phase 4 Construction: 02/22/2027
b. To complete the scope of work, some assumptions noted below are based on Indian Creek
Elementary School.
c. Winter Environmental visited the site and we have included an allowance for abatement as a
placeholder (as noted in the Allowance Log).
d. Winter is carrying an allowance for moving and storage as noted in the Allowance Log.
e. Winter is carrying an allowance for unforeseen subsurface conditions, including but not limited
to rock, wet soils, contaminated soils, unsuitable soils, groundwater, etc. as noted in the
Allowance Log.
f. Winter is carrying an allowance for blasting rock as noted in the Allowance Log.
g. Winter is carrying an allowance for permit review and impact fees as noted in the Allowance
Log. Building permit fees are assumed to be exempt.
h. Warranties will be based on phased construction and include one (1) year for materials and
workmanship, unless otherwise specified in the specifications, from the date of Substantial
Completion for each phase.
i. The phase breakdown in the GMP estimate is for accounting purposes only.
j. Phase 1 / Phase 2 temporary partition finishes are included as follows:
01. CMU partitions serving as temporary exterior partitions will have CMU cells filled with
perlite and the exterior face of the block will be painted.
02. Temporary partitions at corridors are included as framing and drywall with Densglass
sheathing and painting on the exterior face.
Page 1 of 6
M-32
ATTACHMENT 3
DRESDEN ELEMENTARY SCHOOL
ASSUMPTIONS & CLARIFICATIONS – 30% CD
March 7, 2024
k. It is agreed that the Project Schedule includes weather days based on the below
table. Extensions of time will be granted when the total number of weather days for a month
exceeds the number of days in the table below (all days below are work days):
January 5 days July 5 days
February 4 days August 4 days
March 4 days September 4 days
April 4 days October 4 days
May 4 days November 4 days
June 5 days December 5 days
l. See the attached RFI Log, dated 02/23/2024, containing Preconstruction clarifications. Only
Closed RFIs were accounted for in this GMP Estimate.
01.02. General Exclusions:
a. Unforeseen existing conditions in the existing buildings.
b. FF&E is assumed to be supplied and installed by the Owner.
c. FAA Review/Determination fees.
d. Seismic bracing or supports.
e. NPDES monitoring.
f. Sustainability consulting or LEED certification services.
g. Commissioning.
h. Utility costs for modulars, construction office, and project construction are by Owner.
i. Is it assumed that there is no waterproofing consultant.
SITEWORK/DEMOLITION
02.01. Inclusions:
a. Assumed all retaining walls to be cast-in-place concrete.
b. Shoring design criteria was not provided and is included as a design-build scope. Shoring in
Phase 1 is to be abandoned in place.
c. The security fence at the courtyard is assumed to be a 7’-0” tall black, aluminum mechanical
screening.
d. Removal or relocation of any existing loose furnishings or equipment is included in the
Allowance Log.
e. Any jack and bore required is to be covered by the Right of Way Allowance as noted in the
Allowance Log.
f. Perimeter Fencing has been included as 8’-0” black, vinyl chain link fence as noted in the
Allowance Log.
02.02. Exclusions:
a. Lowering of the water table or permanent dewatering.
b. Removal or relocation of site utilities not shown on drawings.
c. Removal and relocation of telecommunications lines.
d. Meters for water, sewer, gas, and electric are excluded and assumed to be provided by the
utility provider.
Page 2 of 6
M-33
ATTACHMENT 3
DRESDEN ELEMENTARY SCHOOL
ASSUMPTIONS & CLARIFICATIONS – 30% CD
March 7, 2024
MASONRY
04.01 Inclusions:
a. Cooling Tower screen wall included as 10’0” high with a brick finish.
04.02 Exclusions:
a. Exterior skin finishes at CMU wall between Phase 1 & Phase 2, along column line 1.E & 1.A.5.
METALS
05.01. Inclusions:
a. For steel bracing of CMU, we have assumed all CMU walls in structural drawings attach to
deck and the remaining walls on architectural drawings terminate above ceiling.
05.02. Exclusions:
a. AISC certification of fabricator or erector.
b. Aluminum cladding at canopies.
c. Architecturally exposed structural steel (AESS) finishing.
WOODS AND PLASTICS
06.01. Inclusions:
a. Millwork included as plastic laminate except at Science Lab (1203) which is wood veneer. We
have included the millwork package as noted in the Allowance Log.
06.02. Exclusions:
a. AWI fabricator and installer.
b. FSC certification.
MOISTURE PROTECTION
07.01. Inclusions:
a. Hard coat stucco at the underside of “bridge”.
b. It is assumed that sunshade will be part of the storefront system.
c. Metal wood slat ceiling at the underside of the canopies.
07.02. Exclusions:
a. Intumescent and/or Spray Fireproofing.
b. Illuminated acoustic ceiling panels/sound-absorbing ceiling units.
c. The designated purple panels are to be reselected with one of the other specified colors.
d. EIFS.
Page 3 of 6
M-34
ATTACHMENT 3
DRESDEN ELEMENTARY SCHOOL
ASSUMPTIONS & CLARIFICATIONS – 30% CD
March 7, 2024
DOORS FRAMES & HARDWARE
08.01 Inclusions:
a. The door schedule is still in design. We have included the door and hardware package as noted
in the Allowance Log.
b. Includes ballistic glazing system at the Vestibule interior storefront system (WG-3), the Lobby
exterior storefront system (W1-C) and the Gymnasium storefront doors (W2-QQ). (Reference
attached sheets A-0-110 and A-0-111, dated 02/29/2024)
c. Includes ballistic film up to 7’-0” above grade at window marks W1-Z, W2-PP, W2-X, W2-UU
and W-5. (Reference attached sheets A-0-110 and A-0-111, dated 02/29/2024)
08.02 Exclusions:
a. Permanent cores to be purchased by Winter and installed by Owner.
FINISHES
09.01 Inclusions:
a. Where CMU walls are shown in Architectural plans, and not shown on the structural plans, it
is assumed that the CMU will terminate above ceiling and will have framing and drywall to
the deck, per details 6, 7, & 9/S006.
b. It is assumed that K-13 is only required at Gymnasium (1351).
c. Interior paint at the corridor elevations has been included as noted in the Allowance Log.
d. Art Mural Wall noted on A-2-111C at Courtyard has been included as noted in the Allowance
Log.
SPECIALTIES
10.01 Inclusions:
a. Full building signage package included in Allowance Log.
b. The monument sign has been included in Allowance Log.
c. Toilet Partitions & Dividers were assumed to be floor-mounted plastic partitions.
d. Lockers:
a. Custodial Staff Lockers – 12” x 15” x 72” (Metal Single Tier): ten (10) each.
b. Kitchen Staff Lockers – 12” x 12” x 36” (Metal Double Tier): six (6) each.
e. The stage curtain has been included as noted in the Allowance Log.
f. Electrical hand dryers at single user administrative restrooms have been included as noted
in the Allowance Log.
10.02 Exclusions:
a. Electrical hand dryers at student/group restrooms.
b. Visual display equipment or smart boards.
Page 4 of 6
M-35
ATTACHMENT 3
DRESDEN ELEMENTARY SCHOOL
ASSUMPTIONS & CLARIFICATIONS – 30% CD
March 7, 2024
EQUIPMENT
11.01 Inclusions:
a. Kiln.
b. It is assumed that the electric clothes dryer will be GE model GFD55ESSNWW to match the
specified clothes washing machine specification.
c. Includes $20,000 for relocation of existing playground equipment.
11.02 Exclusions:
a. Theater equipment.
b. Projection screens.
c. Loading dock equipment.
d. Televisions.
FURNISHINGS
12.01 Inclusions:
a. Entrance mats included as non-recessed.
b. Motorized shade at the Reading Room.
12.02 Exclusions:
a. Five (5) year manufacturer’s special warranty on manufactured wood-veneer faced casework
from specification 12 32 13. One (1) year standard material and workmanship warranty is
included.
b. Window blinds at curtain walls or stairwells.
CONVEYENCE
14.01. Inclusions:
a. One 3500-pound capacity, traction passenger elevator with LVT flooring.
MECHANICAL
15.01. Inclusions:
a. Includes PVC above grade and accounts for covering 50% of piping with plenum wrap. Cast
iron above grade is not included and is listed as an add alternate.
15.02. Exclusions:
a. Fire pump.
b. Cast iron piping.
Page 5 of 6
M-36
ATTACHMENT 3
DRESDEN ELEMENTARY SCHOOL
ASSUMPTIONS & CLARIFICATIONS – 30% CD
March 7, 2024
ELECTRICAL/LOW VOLTAGE
16.01. Inclusions:
a. Pathways/raceways for all low voltage systems, as shown on the current design documents.
b. 200kw Generac Industrial gaseous engine-driven generator, turbocharged/aftercooled 6-
cylinder 14.2L engine.
c. Power to the monument sign has been included in the monument sign allowance.
d. All underground and concealed conduit included as ¾” minimum.
e. Eight (8) fixtures located between grid lines 1.G and 1.G.7 at Level 0 Corridor are assumed to
be Type M.
f. The intercom system has been included as noted in the Allowance Log.
16.02. Exclusions:
a. Low voltage systems (video surveillance systems, access control, voice data systems) are
assumed to be supplied and installed by Owner.
b. It is assumed that all required low voltage systems for the Modular Classrooms will be
furnished and installed by Owner.
c. All fiber optic headend and loop system work by Owner.
Page 6 of 6
M-37
ATTACHMENT 3
1.0 1.0.1 1.0.3 1.0.5 1.1 1.2 1.2.9 1.3 1.3.1
1.A www.brph.com Copyright © 2023
Architects Engineers, Inc.
2727 Paces Ferry Road | Bldg 1 | Suite 1800
Atlanta | Georgia | 30339
T 770-933-9242 | F 770-933-9246
BALLISTIC GLAZING TO 7'-0" Offices in Melbourne, Orlando, Boca Raton,
Atlanta, Lynnwood, Charleston and Huntsville
E BALLISTIC FILM TO 7'-0" Board of Professional Engineers License
No.PEF003227
1.A.5 These plans are protected by Federal Copyright
protection. Unauthorized use may result in an
infringement action.
NOT FOR CONSTRUCTION
1.B.2 DOCUMENT HISTORY
2/29/24 80% CONSTRUCTION DRAWINGS
1.C
1.C.5
UP
1.C.7 IRR OFFICE
0102.2
IRR OFFICE
0102.1
1.D STAIR
1
1.D.2 IRR COLLAB
0102
1.D.5
D
PRE-K
0101
IT STORAGE SENSORY ROOM
TOILET 0104 0102.3
0101.2
1.D.9
VESTIBULE ELECTRICAL IDF
MDF 0106 0106.1
-
0101.1
0103
NEW ELEMENTARY SCHOOL AT DRESDEN
MUSIC STORAGE
0108.1
1.E
DEKALB COUNTY SCHOOL DISTRICT
TOILET
0101.3
MUSIC
4 PRE-K
0105 0108
A-1-200
332' - 1 3/4"
1.F
Window Mark W1-C
Ballistic Glazing
CHAMBLEE, GA 30341
AP OFFICE CONFERENCE
2449 DRESDEN DR.
0110
1.G
0110.1
CORRIDOR TEACHER'S BREAKROOM
C
0100 0112
A-613
11
MOTHER'S ROOM STAFF TOILET
0112.1 0112.2
1.G.7
BOYS RESTROOM
0114
1.G.9
CUSTODIAL OFFICE
0109.1
1.H MAIN CUSTODIAL PANTRY
GIRLS RESTROOM
0116
0109 0107
15' - 4"
17' - 6 1/2"
CUSTODIAL CORRIDOR
CUSTODIAL SUPPLY 0113.1 STORAGE
1.H.6
0109.2 0118
STAFF TOILET CUSTODIAL
0111 0113
0.9
1.K
ELEVATOR LOBBY
0115
STAGE
0121.2
UP DN
STAIR
5
B 1.M LOCKERS / LAUNDRY UP
0003
CAFETERIA UP
STAFF TOILET STAIR
DISH WASH 0121
0003.1 DW 0004
4
1.M.5
OFFICE SERVING
0002 0005
SERVING
"
-4
0006
'
23
KITCHEN
0001
EMERGENCY ELECTRICAL
0013
DRY GOODS STORAGE
2.A.05
COOLER
0009 0007
2
0
"
-8
20
ELECTRICAL (MAIN)
2.A.1 2.3
2"
6'
C D
1-
'-
0012
A-
9
E
11
CAN WASH
0010
2.2.9 ARCH/ENGR OF RECORD
ERIC WILSON, AIA
96
2.A.4
'-5
GA RA# 8459
F
1/2
H
"
69
DESIGNED BY
'-
B
FREEZER MECHANICAL
2.2
33
0008 0011 Designer
/4"
DRAWN BY
2.C
6'
Author
-8
G
"
A
PROJECT NUMBER
2.C.3 C09003.001
18
2.1.2
'-0
DATE
"
2.1 A 02/29/2024
2.D
TITLE
2.0.8 KEY PLAN LEVEL 0 -
ES/C09003001_A_2023_CENTRAL.rvt
Autodesk Docs://C09003.001 Dresden
23
'-
2.0
0"
2.0.7
NORTH
OVERALL PLAN
2.E 0 8' 16' 32' 48'
3/4/2024 2:46:23 PM
DRAWING NO.
LEVEL 0 - OVERALL PLAN
A-0-110
1/16" = 1'-0"
1 1/16" = 1'-0"
12/15/21
1 2 3 4 5 6
C 2022
M-38
ATTACHMENT 3 Window Mark WG-3
1.0 1.0.1 1.1.3 Ballistic Glazing
1.A.05 1.0.3 1.0.5 1.1 1.2 1.4 1.6 1.7 1.7.2 1.7.4
1.A
1.2.3 1.2.9 1.3 1.3.1 1.3.6 1.4.2 1.4.3 1.5 1.5.4 1.5.9 1.6.5 1.6.8 1.7.1 1.7.3 1.7.8 1.7.9 1.8 1.8.3 1.8.4 1.9 1.10 BALLISTIC GLAZING TO 7'-0" www.brph.com Copyright © 2023
63' - 8 1/2" 129' - 4 1/4" 38' - 7 3/4" Architects Engineers, Inc.
2727 Paces Ferry Road | Bldg 1 | Suite 1800
1
BALLISTIC FILM TO 7'-0" Atlanta | Georgia | 30339
T 770-933-9242 | F 770-933-9246
A-1-200 Offices in Melbourne, Orlando, Boca Raton,
1.A.8 OFFICE CONFERENCE
Atlanta, Lynnwood, Charleston and Huntsville
1101.7 1101.6 Board of Professional Engineers License
E No.PEF003227
1.A.5 These plans are protected by Federal Copyright
protection. Unauthorized use may result in an
infringement action.
SECURE VESTIBULE
1000
READING ROOM
NOT FOR CONSTRUCTION
1.B
1101
MEDIA / DISTRIBUTION CONFERENCE
1101.4 1017
ADMIN OFFICE ADMIN OFFICE
1015 1013 LOBBY Window Mark W2-UU DOCUMENT HISTORY
1.B.2 ADMIN OFFICE
1001 WAITING PUBLIC TOILET 2.A.08 Ballistic Film 2/29/24 80% CONSTRUCTION DRAWINGS
1011 1002 1021
COUNSELOR OFFICE
STAFF TOILET
STORAGE
1019.1
WORKROOM
1019
1022
2.A 2.A.1
63' - 1 1/2"
1.B.6
STAFF TOILET
1101.8
1019.3
5' - 7 3/8"
WORKROOM STAFF TOILET STORAGE
1101.2 RECORDS 1206.1 IT STORAGE 1024
2.A.8
TESTING
3
STORAGE (SECURE) 1014.1
0
1019.2
20
1.C
1012 PARENT CENTER
2.A.4
1101.3
1-
1023
A-
CLINIC COUNSELOR OFFICE
RETRACTABLE GLASS DOORS 1003 1026
IT OFFICE
1014 STORAGE (SECURE)
UP
MAKER SPACE
1101.1
BOOK STORAGE
1202
BOOK STORAGE
1204
1012.1
2.B 2.C.2
1.C.5
2.C.3
STORAGE
1206.2 PC OFFICE PC STORAGE
CONFERENCE
PRINCIPAL IT SUPPORT CUSTODIAL 1023.1 1023.2
2.C
1028
1.C.7
1206 1208 1210
STAIR STUDENT TOILET
10' - 2"
59
1 TOILET 1003.1
'-
STORAGE
1.D
1201.2
10
"
1003.2
ELECTRICAL
2.C.9
BOYS RESTROOM 1205 STAIR
1.D.2 1102 VESTIBULE
1201.1
SCIENCE LAB
1203
2
UP 2.D
KINDERGARTEN IDF
27' - 8 1/2"
D 1103 1207
ART
1.D.5
ART GALLERY
1209
KINDERGARTEN 1211
1201
TOILET GIRLS RESTROOM ART STORAGE
SCI STORAGE
1103.2 1104 1209.2
1203.1
1.D.9 VESTIBULE ELECTRICAL IDF
KILN
1209.1
1103.1 1106 1106.1
NEW ELEMENTARY SCHOOL AT DRESDEN
TOILET
-
2.13
1201.3
GYM OFFICE
1351.2
STAFF TOILET
1.E TOILET 1351.1
4
DEKALB COUNTY SCHOOL DISTRICT
8"
1103.3
/12
A-611
91
302' - 5 1/4"
11
'-
83
2.12
KINDERGARTEN KINDERGARTEN
INT GYM STORAGE
1105 1108
1351.3
STAIR
Window Mark W2-X 3
/4"
TOILET Ballistic Film
31
EXT GYM STORAGE
1108.2
'-
84
1351.4
UP
VESTIBULE 2.11
1108.1
1.F KINDERGARTEN TOILET
MECHANICAL
1107 1108.3
1110
2.10
CHAMBLEE, GA 30341
2449 DRESDEN DR.
EXT STORAGE
1.G
1351.4
TOILET
1107.2
2.9
VESTIBULE
1107.1 TOILET
Window Mark W2-QQ
1107.3 Ballistic Glazing
/4"
KINDERGARTEN
4
21
1112
C
'-
29
A-1-200
Window Mark W1-Z
2.8.7
141300-1
147_120_90-1
nakladka_koniczyna_v8-1
142102-2
nakladka_koniczyna_v8-2
147_120_90-2
KINDERGARTEN Ballistic Film
1.G.7 1109
2.8.3
WK_PROSTA_3_ST-1
2.8
BOYS RESTROOM
47
2
00
1114
59
'-
1.G.9
-2
'
10
-1
1
34
3/4
A-
11
'-
"
/4"
73
/4"
1.H GIRLS RESTROOM
A-SF-R
SPECIAL EDUCATION
1304
Window Mark W5
0.9 KINDERGARTEN
1111
1116
STUDENT CHANGING ROOM Ballistic Film
6
2.7
12
1304.1
'
LAUNDRY
-0
CORRIDOR
1/2
1302
24
1300
"
1.H.6
'-
8"
SPECIAL EDUCATION
TOILET IDF
1303
1111.3 1126.1
W
TOILET SPEECH SPEECH
VESTIBULE
D
1111.2 1122 1124 TOILET
1111.1
1.K ELECTRICAL
1303.3
ELEVATOR LOBBY 1126
1115 MECHANICAL
1128
2.6
VESTIBULE
1303.1
UP
STAIR
2.5.4
TOILET
5
1303.2
SPECIAL EDUCATION
1121
2.5
B
1.M
CAFETERIA
0121
OPEN TO
STAIR
4 2.4.1
BELOW
2.4
2.3
2.A.05 2.2.9
2.A.1
2.2 C D
E
ARCH/ENGR OF RECORD
2.A.4 ERIC WILSON, AIA
GA RA# 8459
H F
2.B
DESIGNED BY
B
6'
BRPH
-8
"
2.C 2.1
DRAWN BY
BRPH
G
A
PROJECT NUMBER
2.C.3 C09003.001
23
2.C.9
DATE
'-
0"
02/29/2024
A
2.D TITLE
KEY PLAN LEVEL 1 -
ES/C09003001_A_2023_CENTRAL.rvt
Autodesk Docs://C09003.001 Dresden
2.0 OVERALL PLAN
2.E NORTH
0 8' 16' 32' 48'
3/4/2024 2:46:38 PM
DRAWING NO.
LEVEL 1 - OVERALL PLAN
A-0-111
1/16" = 1'-0"
1 1/16" = 1'-0"
12/15/21
1 2 3 4 5 6
C 2022
M-39
ATTACHMENT 3
March
February 23,7,2024
2024
Printed on Thu Feb 22, 2024 at 11:27 am EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
RFI LOG
# Subject Status Responsible Received Assignee Date Initiated RFI Due Date Closed Date Ball In Court Location Schedule Cost Cost
Contractor From Manager Impact Code Impact
Ramroop, Whitney
PRECON-1 Electrical Specifications Closed None 02/01/2024 02/02/2024 02/20/24
Whitney ... Ramroop
Whitney Ramroop Sent Thu Feb 1, 2024 at 11:19 am EST
Q:
Please provide electrical specifications.
Whitney Ramroop (The Winter Construction Company) Responded Tue Feb 20, 2024 at 01:38 pm EST
A: Electrical specifications were provided on 2/2/2024.
(2024-01-17)Dresden Electrical Specs(303pgs).pdf
Ramroop, Whitney Ramroop,
PRECON-2 Finish Schedule Open None 02/01/2024 02/02/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Thu Feb 1, 2024 at 11:42 am EST
Q: Please provide a finish schedule.
Dresden Finish Schedule.xlsx
Ramroop, Whitney Yes
PRECON-3 Stage Curtain Scope Clarification Closed None 02/01/2024 02/02/2024 02/01/24
Whitney ... Ramroop (Unknown)
Whitney Ramroop Sent Thu Feb 1, 2024 at 11:50 am EST
Q:
Please confirm stage curtain is by others.
Ramroop, Whitney Ramroop,
PRECON-4 Metal Panel Specification Clarification Open None 02/01/2024 02/02/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Thu Feb 1, 2024 at 11:53 am EST
Q:
Please provide a metal panel spec.
Ramroop, Whitney Ramroop,
PRECON-5 Playground Equipment Specification Open None 02/01/2024 02/02/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Thu Feb 1, 2024 at 11:58 am EST
Q:
Please provide a playground equipment spec, if applicable.
Whitney Ramroop (The Winter Construction Company) Responded Thu Feb 1, 2024 at 12:00 pm EST
A: See attached specs and pricing sent 1/29/24.
Play Specs with Pricing.xlsx
Ramroop, Whitney Ramroop,
PRECON-6 Column 1.0-1.D Size Clarification Open None 02/01/2024 02/02/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Thu Feb 1, 2024 at 12:07 pm EST
Q:
Please provide sizing for column 1.0-1.D.
Ramroop, Whitney
PRECON-7 Electrical Panel Clarification Closed None 02/01/2024 02/09/2024 02/01/24
Whitney ... Ramroop
Whitney Ramroop Sent Thu Feb 1, 2024 at 12:18 pm EST
Q:
Please clarify which panels are new.
Page 1 of 8
M-40
ATTACHMENT 3
March
February 23,7,2024
2024
Printed on Thu Feb 22, 2024 at 11:27 am EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
# Subject Status Responsible Received Assignee Date Initiated RFI Due Date Closed Date Ball In Court Location Schedule Cost Cost
Contractor From Manager Impact Code Impact
Ramroop, Whitney Ramroop,
PRECON-8 Panel LA2 & LB2 Schedule Clarification Open None 02/01/2024 02/09/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Thu Feb 1, 2024 at 12:26 pm EST
Q:
Missing panel schedules for LA2 and LB2.
Ramroop, Whitney
PRECON-9 Wall Types on A-1-110A Clarification Closed None 02/01/2024 02/09/2024 02/01/24
Whitney ... Ramroop
Whitney Ramroop Sent Thu Feb 1, 2024 at 12:32 pm EST
Q:
Missing all partition callouts on 1/A-1-110A.
Whitney Ramroop (The Winter Construction Company) Responded Thu Feb 1, 2024 at 12:37 pm EST
Exterior walls and corridor are 8" demising.
A:
Admin etc. walls are 6" to 10' then 3-5/8" stud with 1/2" gyp both sides to floor above.
Chase walls are 6" CMU.
Ramroop, Whitney
PRECON-10 12" CMU Partition Location Clarification Closed None 02/01/2024 02/09/2024 02/01/24
Whitney ... Ramroop
Whitney Ramroop Sent Thu Feb 1, 2024 at 12:41 pm EST
Provide locations for each 12" CMU partition type:
• 0-M12T
Q:
• 0-M12D
• M12D
• M12
Whitney Ramroop (The Winter Construction Company) Responded Thu Feb 1, 2024 at 12:44 pm EST
A:
Between Gym and Classroom building on line 2.8.9.
Ramroop, Whitney
PRECON-11 Wall Types on A-1-111B Clarification Closed None 02/01/2024 02/09/2024 02/01/24
Whitney ... Ramroop
Whitney Ramroop Sent Thu Feb 1, 2024 at 12:47 pm EST
Q:
Missing all partition callouts on A-1-111B.
Whitney Ramroop (The Winter Construction Company) Responded Thu Feb 1, 2024 at 12:48 pm EST
Exterior walls and corridor are 8" demising.
A:
Admin etc. walls are 6" to 10' then 3-5/8" stud with 1/2" gyp both sides to floor above.
Chase walls are 6" CMU.
Ramroop, Whitney
PRECON-12 Wall Types on A-2-111A Clarification Closed None 02/01/2024 02/09/2024 02/01/24
Whitney ... Ramroop
Whitney Ramroop Sent Thu Feb 1, 2024 at 12:56 pm EST
Q:
Missing all partition callouts on 1/A-2-111A.
Whitney Ramroop (The Winter Construction Company) Responded Thu Feb 1, 2024 at 12:57 pm EST
Exterior walls and corridor are 8" demising.
A:
Admin etc. walls are 6" to 10' then 3-5/8" stud with 1/2" gyp both sides to floor above.
Chase walls are 6" CMU.
Page 2 of 8
M-41
ATTACHMENT 3
March
February 23,7,2024
Printed on Thu Feb 22, 2024 at 11:27 am EST
2024
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
# Subject Status Responsible Received Assignee Date Initiated RFI Due Date Closed Date Ball In Court Location Schedule Cost Cost
Contractor From Manager Impact Code Impact
Ramroop, Whitney
PRECON-13 Wall Types on A-2-111B Clarification Closed None 02/01/2024 02/09/2024 02/01/24
Whitney ... Ramroop
Whitney Ramroop Sent Thu Feb 1, 2024 at 12:58 pm EST
Q:
Missing all partition callouts on A-2-111B.
Whitney Ramroop (The Winter Construction Company) Responded Thu Feb 1, 2024 at 12:59 pm EST
Exterior walls and corridor are 8" demising.
A:
Admin etc. walls are 6" to 10' then 3-5/8" stud with 1/2" gyp both sides to floor above.
Chase walls are 6" CMU.
Wall Types on A-2-112A, A-2-112B & Ramroop, Whitney
PRECON-14 Closed None 02/01/2024 02/09/2024 02/01/24
A-2-113A Clarification Whitney ... Ramroop
Whitney Ramroop Sent Thu Feb 1, 2024 at 02:02 pm EST
Q:
Missing all partition callouts on phase 2 level 2 and 3 plans: A-2-112A, A-2-112B & A-2-113A.
Whitney Ramroop (The Winter Construction Company) Responded Thu Feb 1, 2024 at 02:03 pm EST
Exterior walls and corridor are 8" demising.
A:
Admin etc. walls are 6" to 10' then 3-5/8" stud with 1/2" gyp both sides to floor above.
Chase walls are 6" CMU.
Ramroop, Whitney
PRECON-15 Cooling Tower Location Clarification Closed None 02/01/2024 02/09/2024 02/01/24
Whitney ... Ramroop
Whitney Ramroop Sent Thu Feb 1, 2024 at 02:07 pm EST
Q:
Please provide cooling tower location. If it is to be located per M-010 and M-1-111A the 36" diameter screen wall per 2/S203 will clash with retaining wall B, generator drive, and generator pad shown on C200.
Whitney Ramroop (The Winter Construction Company) Responded Thu Feb 1, 2024 at 02:08 pm EST
A:
The cooling tower will be located near where shown on M-010. No round screen wall.
Ramroop, Whitney Ramroop,
PRECON-16 Missing Electrical Panels Clarification Open None 02/01/2024 02/09/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Thu Feb 1, 2024 at 02:11 pm EST
Q:
Please provide missing electrical panels information.
Electrical Drawings Missing Portion of Area D Ramroop, Whitney
PRECON-17 Closed None 02/01/2024 02/09/2024 02/05/24
Clarification Whitney ... Ramroop
Whitney Ramroop Sent Thu Feb 1, 2024 at 02:13 pm EST
Q:
It appears that a portion of Area D is missing from the electrical drawings from CL 1.3-1.6.
Whitney Ramroop (The Winter Construction Company) Responded Mon Feb 5, 2024 at 12:32 pm EST
BRPH provided drawing sheets EL-2-121A, EL-2-122A, EP-2-111A and EP-2-112A via email on 2/5. See attachments.
A:
RFI - RFI-017-0 AREA D - RFI-017-0 AREA D.pdf
DRESDEN ELEC AREA D 30pct replot.pdf
Ramroop, Whitney Ramroop,
PRECON-18 Incomplete Door Schedule Open None 02/01/2024 02/09/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Thu Feb 1, 2024 at 02:15 pm EST
Q:
When can we expect a completed door schedule?
Page 3 of 8
M-42
ATTACHMENT 3
March
February 23,7,2024
2024
Printed on Thu Feb 22, 2024 at 11:27 am EST
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
# Subject Status Responsible Received Assignee Date Initiated RFI Due Date Closed Date Ball In Court Location Schedule Cost Cost
Contractor From Manager Impact Code Impact
Ramroop, Whitney
PRECON-19 Phase 1 Demo Clarification Closed None 02/01/2024 02/09/2024 02/06/24
Whitney ... Ramroop
Whitney Ramroop Sent Thu Feb 1, 2024 at 02:18 pm EST
Q:
Please clarify the extent of the existing school building to be demolished during phase 1 - the Architectural and Civil plans show different extents.
Whitney Ramroop (The Winter Construction Company) Responded Tue Feb 6, 2024 at 03:36 pm EST
BRPH provided the below response via email on 2/6:
A:
Follow the architectural.
Ramroop, Whitney
PRECON-20 Ballistic Glass Spec Closed None 02/02/2024 02/16/2024 02/06/24
Whitney ... Ramroop
Whitney Ramroop Sent Fri Feb 2, 2024 at 01:19 pm EST
Q:
Is there a spec for the ballistic glass?
Whitney Ramroop (The Winter Construction Company) Responded Tue Feb 6, 2024 at 03:37 pm EST
BRPH provided the below response via email on 2/6:
A:
Level 3 ballistic glass in standard storefront.
Ramroop, Whitney Ramroop,
PRECON-21 Fire Alarm Manufacturer Clarification Open None 02/02/2024 02/16/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Fri Feb 2, 2024 at 01:21 pm EST
Q:
There are three manufacturers listed for fire alarm. Please confirm DeKalb County Schools does not require it to be Simplex.
Ramroop, Whitney
PRECON-22 Division 1 Specifications Request Closed None 02/02/2024 02/16/2024 02/06/24
Whitney ... Ramroop
Whitney Ramroop Sent Fri Feb 2, 2024 at 01:22 pm EST
Q:
Will there be any Division 1 specifications?
Whitney Ramroop (The Winter Construction Company) Responded Tue Feb 6, 2024 at 03:38 pm EST
BRPH provided the below response via email on 2/6:
A:
At 100%
Ramroop, Whitney Ramroop,
PRECON-23 Dumpster Enclosure Scope Clarification Open None 02/02/2024 02/16/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Fri Feb 2, 2024 at 01:23 pm EST
Q:
Assuming we will need a dumpster enclosure, please provide narrative.
Whitney Ramroop (The Winter Construction Company) Responded Tue Feb 6, 2024 at 03:41 pm EST
BRPH provided the below response via email on 2/6:
A:
Arch to provide CMU/brick enclosure.
Ramroop, Whitney
PRECON-24 Paving Limits Clarfication Closed None 02/02/2024 02/16/2024 02/06/24
Whitney ... Ramroop
Q: Whitney Ramroop Sent Fri Feb 2, 2024 at 01:25 pm EST
Page 4 of 8
M-43
ATTACHMENT 3
March
February 23,7,2024
Printed on Thu Feb 22, 2024 at 11:27 am EST
2024
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
# Subject Status Responsible Received Assignee Date Initiated RFI Due Date Closed Date Ball In Court Location Schedule Cost Cost
Contractor From Manager Impact Code Impact
Please clarify the limits of LD and HD paving.
Whitney Ramroop (The Winter Construction Company) Responded Tue Feb 6, 2024 at 04:03 pm EST
A: BRPH provided drawing sheet C-105 via email on 2/6. See attachments.
2024-02-06 Dresden ES Paving Exhibit.pdf
Ramroop, Whitney Ramroop,
PRECON-25 Security/Access Control Requirements Open None 02/02/2024 02/16/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Fri Feb 2, 2024 at 01:27 pm EST
Q:
Please confirm if there are any security/access control requirements.
Ramroop, Whitney
PRECON-26 Can Wash Area Slab Depression Conflict Closed None 02/02/2024 02/16/2024 02/06/24
Whitney ... Ramroop
Whitney Ramroop Sent Fri Feb 2, 2024 at 01:28 pm EST
Q:
Slab depressions for the can wash area do not match between Structural and Foodservice drawings, and no depressions are shown on the Architecturals. Please clarify.
Whitney Ramroop (The Winter Construction Company) Responded Tue Feb 6, 2024 at 04:06 pm EST
BRPH provided the below response via email on 2/6:
A:
There will be a depression with drain.
Generator & Utility Transformer Location Ramroop, Whitney Ramroop,
PRECON-27 Open None 02/02/2024 02/16/2024
Conflict Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Fri Feb 2, 2024 at 01:30 pm EST
Q:
Generator and utility transformer locations vary between Civil and Electrical drawings. Please clarify.
Ramroop, Whitney Ramroop,
PRECON-28 Cable Tray Height Conflict Open None 02/02/2024 02/16/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Fri Feb 2, 2024 at 01:31 pm EST
Q:
Technology drawings call out 9'4" to the bottom of the cable tray as typical, but RCP has 9'4" typical ceiling height. Please clarify.
Ramroop, Whitney
PRECON-29 Site Walls A-D Material Clarification Closed None 02/02/2024 02/16/2024 02/06/24
Whitney ... Ramroop
Whitney Ramroop Sent Fri Feb 2, 2024 at 01:35 pm EST
Q:
Confirm all site walls A-D are to be cast in place concrete and not modular. DD plan set had details for a modular block wall that was replaced with CIP concrete wall in detail 12/C701.
Whitney Ramroop (The Winter Construction Company) Responded Tue Feb 6, 2024 at 03:35 pm EST
BRPH provided the below response via email on 2/6:
A:
We can work through this but for now we were assuming CIP would be more feasible due to constraints of backfilling geo-grid for modular.
Ramroop, Whitney
PRECON-30 Cafeteria Wall Type Clarification Closed None 02/02/2024 02/16/2024 02/06/24
Whitney ... Ramroop
Whitney Ramroop Sent Fri Feb 2, 2024 at 01:38 pm EST
Q: Confirm that the cafeteria walls are also to be 12" CMU per structural drawings. RFI 2.04 response indicated only 12" CMU walls are at the gymnasium. Also, clarify which partitions are to be 0-M12T, 0-M12D, M12D, and/or
M12 per partition plan A-801.
A: Whitney Ramroop (The Winter Construction Company) Responded Tue Feb 6, 2024 at 04:09 pm EST
Page 5 of 8
M-44
March
February
Printed on Thu Feb 22, 2024 at 11:27 am EST
23,7,2024
2024
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
# Subject Status Responsible Received Assignee Date Initiated RFI Due Date Closed Date Ball In Court Location Schedule Cost Cost
Contractor From Manager Impact Code Impact
BRPH provided the below response via email on 2/6:
Cafe is 12" also.
Ramroop, Whitney Ramroop,
PRECON-31 Gymnasium Wall Type Clarification Open None 02/02/2024 02/16/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Fri Feb 2, 2024 at 01:40 pm EST
Q:
Confirm all walls at the gymnasium are to be 12" CMU per structural drawings, RFI 2.04 response only indicated one wall at gridline 2.8.9 is to be 12" CMU.
Whitney Ramroop (The Winter Construction Company) Responded Tue Feb 6, 2024 at 04:08 pm EST
BRPH provided the below response via email on 2/6:
A:
Line at 2.A.1 is double width 16" wall, 2.8.9 is 12" all the way up, 2.D and 2.13 are 12" to 10' then framing above.
Ramroop, Whitney Ramroop,
PRECON-32 Generator Gas Line Not Indicted Open None 02/02/2024 02/16/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Fri Feb 2, 2024 at 02:57 pm EST
Q:
Gas line to generator not shown. Please provide.
Ramroop, Whitney
PRECON-33 Metal Shelving Clarification Closed None 02/02/2024 02/16/2024 02/06/24
Whitney ... Ramroop
Whitney Ramroop Sent Fri Feb 2, 2024 at 02:58 pm EST
Q:
Please provide locations needing metal shelving.
Whitney Ramroop (The Winter Construction Company) Responded Tue Feb 6, 2024 at 04:12 pm EST
BRPH provided the below response via email on 2/6:
A:
All Storage Rooms, same as Indian Creek.
Locker Specification and Location Ramroop, Whitney
PRECON-34 Closed None 02/02/2024 02/16/2024 02/06/24
Clarification Whitney ... Ramroop
Whitney Ramroop Sent Fri Feb 2, 2024 at 02:59 pm EST
Q:
Please provide information on locations and quantity of lockers.
Whitney Ramroop (The Winter Construction Company) Responded Tue Feb 6, 2024 at 03:44 pm EST
BRPH provided the below response via email on 2/6:
A:
Cafe Locker Room - 12 lockers.
Monument Marquis Location & Basis of Ramroop, Whitney Ramroop, Yes
PRECON-35 Open None 02/09/2024 02/23/2024
Design Whitney ... Ramroop Whitney ... (Unknown)
Whitney Ramroop Sent Fri Feb 9, 2024 at 03:20 pm EST
Q: 5/E-504 indicates a monument marquis sign electrical requirements. The Civil, Architectural and Electrical site plans do not indicate the location of the monument sign or design intent. Please provide locations and
moment sign details.
Closed Cell Synthetic Rubber Joint Filler Ramroop, Whitney Ramroop,
PRECON-36 Open None 02/09/2024 02/23/2024
Specification Whitney ... Ramroop Whitney ...
Page 6 of 8
M-45
ATTACHMENT 3
March
February
Printed on Thu Feb 22, 2024 at 11:27 am EST
23,7,2024
2024
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
# Subject Status Responsible Received Assignee Date Initiated RFI Due Date Closed Date Ball In Court Location Schedule Cost Cost
Contractor From Manager Impact Code Impact
Whitney Ramroop Sent Fri Feb 9, 2024 at 03:21 pm EST
Q:
Please provide a spec for the "closed cell synthetic rubber joint filler" that is indicated on A-801, A-802 and A-803.
Ramroop, Whitney Ramroop,
PRECON-37 UL Listed Head of Wall Detail Open None 02/09/2024 02/23/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Fri Feb 9, 2024 at 03:22 pm EST
Q:
Please provide a UL listed head of wall detail for all required wall types/assemblies.
Ramroop, Whitney Ramroop,
PRECON-38 Canopy Design Conflict Open None 02/09/2024 02/23/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Fri Feb 9, 2024 at 03:24 pm EST
Q:
Detail 5/A-1-310 shows “aluminum canopy”. Detail 2/S-1-111A shows “canopy consisting of steel beams and 1-1/2" roof decking”. Please advise.
Architectural Millwork Manufacturer Ramroop, Whitney
PRECON-39 Closed None 02/09/2024 02/23/2024 02/12/24
Clarification Whitney ... Ramroop
Whitney Ramroop Sent Fri Feb 9, 2024 at 03:25 pm EST
Q:
The specs call for only Campbell Rhea & Leonard Peterson (Section 12 32 13), but the schedule on the plans calls for TMI (Sheets A-1-400s).
Whitney Ramroop (The Winter Construction Company) Responded Mon Feb 12, 2024 at 08:37 am EST
BRPH provided the below response via email on 2/12:
A:
TMI is acceptable also. Will update specs.
Ramroop, Whitney
PRECON-40 Architectural Millwork Finish Clarification Closed None 02/09/2024 02/23/2024 02/09/24
Whitney ... Ramroop
Whitney Ramroop Sent Fri Feb 9, 2024 at 03:27 pm EST
Q:
The specs call for wood veneer face cabinets (Section 12 32 13), but the cut sections on the drawings call for plastic laminate on all surfaces (sheet A-526).
Whitney Ramroop (The Winter Construction Company) Responded Fri Feb 9, 2024 at 03:29 pm EST
BRPH provided the below response via email on 2/9:
A:
Wood veneer
Ramroop, Whitney
PRECON-41 Elevator Cab Floor Finish Clarification Closed None 02/12/2024 02/23/2024 02/16/24
Whitney ... Ramroop
Whitney Ramroop Sent Mon Feb 12, 2024 at 08:21 am EST
Q: Spec section 14 21 23 is incomplete and refers to multiple flooring finishes (resilient sheet flooring, carpet, stone tile and ceramic tile) for the elevator cab. Please specify the floor finish material. Additionally, if the flooring
is to be resilient flooring, please provide spec section 09 65 16 "Resilient Sheet Flooring".
Whitney Ramroop (The Winter Construction Company) Responded Fri Feb 16, 2024 at 03:28 pm EST
BRPH provided the below response via email on 2/16:
A:
LVT
Ramroop, Whitney Ramroop,
PRECON-42 Kiln Key Note Clarification Open None 02/12/2024 02/23/2024
Whitney ... Ramroop Whitney ...
Q: Whitney Ramroop Sent Mon Feb 12, 2024 at 08:22 am EST
Page 7 of 8
M-46
ATTACHMENT 3
March
February 23,7,2024
Printed on Thu Feb 22, 2024 at 11:27 am EST
2024
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
# Subject Status Responsible Received Assignee Date Initiated RFI Due Date Closed Date Ball In Court Location Schedule Cost Cost
Contractor From Manager Impact Code Impact
2/EP-2-111A & 1/EP-2-111B indicate keynote 3 at the kiln location. Keynote 3 is not provided on the "Key Notes" legend. Please confirm what keynote 3 indicates.
Whitney Ramroop (The Winter Construction Company) Responded Fri Feb 16, 2024 at 03:31 pm EST
BRPH provided the below response via email on 2/16:
A:
The referenced note will describe the 208 Volt, 40A/3phase wall receptacle that will serve the kiln. The NEMA configuration of this receptacle has not yet been determined.
Ramroop, Whitney Ramroop,
PRECON-43 Sound Absorbing Wall & Ceiling Units Open None 02/16/2024 02/23/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Fri Feb 16, 2024 at 03:23 pm EST
Q: Spec section 09 84 33 and 09 84 36 contain the sound-absorbing wall and ceiling units however the drawings do not indicate locations, layout or sizing of wall and ceiling units. Please provide updated RCP and interior
elevations for all locations requiring this material.
Whitney Ramroop (The Winter Construction Company) Responded Fri Feb 16, 2024 at 03:24 pm EST
A:
See attached PDFs - Locations Cafeteria, Gym, Learning Stair, Music Room
Ramroop, Whitney Ramroop,
PRECON-44 PT-3 Specification Conflict Open None 02/19/2024 03/01/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Mon Feb 19, 2024 at 08:14 am EST
Q:
Sheet A-617 indicates that PT-3 is to be an epoxy paint finish. Spec Section 09 91 23 for interior paint only includes latex paint. Please confirm that PT-3 is to be a latex paint per the specs.
Ramroop, Whitney Ramroop,
PRECON-45 Window Shade Motorization Clarification Open None 02/19/2024 03/01/2024
Whitney ... Ramroop Whitney ...
Whitney Ramroop Sent Mon Feb 19, 2024 at 01:52 pm EST
Q:
Per spec section 12 21 13 there is a note that all motorized shades are to connect to "building electrical system". Please confirm that there are no motorized shades.
Page 8 of 8
M-47
ATTACHMENT 4
&K&, &K&( &K&L &K&' &K&M
QRST UVWXYZV [\RV\ ]^_^`a " ?7 #7 ??# " ?7 #7 ??# " ?7 #7 ??# " ?7 #7 ??# "
%"0"3."23/349334520 9)7 345/ 67"384%9 6:78;% "0"3."23/3493345
%0 !0!2 345/ 67"384%9 6:78;% 0 !0!2
%"2) 202) 6<4/ 67"384%9 :;#1 8<% "2) 202)
%"2) "= 7 ! 4:/ 67"384%9 8>?48<%9 "2) "= 7 !
%1845322884 "" 3 87/ 67"384%9 6>?48<%9 1845322884 "" 3
%.4323@83.A#BB2@9""2884 7/ 6>?48<%9 8>?48<%9 .4323@83.A#BB2@9""2884
%0 !0!2 "07 ! 6<4/ 6;?48<%9 :;#1 8<% 0 !0!2 "07 !
%4:C0" <8/ 6;?48<%9 8438<% ,KC0"
%"#BB2@9+00335"2.84 67/ 6;?48<%9 :>38<% "#BB2@9+00335"2.84
%1845324:C0"2884 4:/ 63?48<%9 8438<% 184532,KC0"2884
%)7 #34/34518 84 :/ % 8438<% 6N )7 #34/34518 84
%3:C0" ;>/ 88#B28<% :;#1 8<% OKC0"
%3:C0 4 521584" 1345 3 4:/ 88#B28<% :4?148<% OKC0 4 521584" 1345 3
%849"#BB2@9+"2.84 67/ :<?148<% 87?148<% 849"#BB2@9+"2.84
%1845323:C0"2884 4:/ 8>?148<% :;#1 8<% 184532OKC0"2884
%72! 345/ 6;?48<%9 6:78;% 72!
%0 !0!2 72! 6D:;3/ 8378<% 6:78;% 0 !0!2 72!
%7 898E584 :/ 8378<%F % 6N 7 898E584
%2G351545890 B93584 :/ % 68#B28;%F 6 2G351545890 B93584
N
%2G358490 B93584 :/ % 6:78;%F 6 2G358490 B93584
N
%-#8 :/ % :3"387% -#&
%/3/ :/ % 87 @8<% 6N /3/
%5215129! B15 :/ % 867287% 6N 5215129! B15
%324345 .32 :/ % 84787% 6N 324345 .32
%0 4/85843/#82 :/ % :8?1487% 6N 0 4/85843/#82
%1545890 B93584036H189/84 :/ % :3"387% 6N 1545890 B9358403*H189/84
%-#4 :/ % 68?48;% -#,
%/3/ :/ % 6338>% N6 /3/
%5215129! B15 :/ % :7?148>% N6 5215129! B15
%324345 .32 :/ % 85?198>% 6N 324345 .32
%0 4/85843/#82 :/ % 4:3B8>% N6 0 4/85843/#82
%1545890 B93584038H189/84 :/ % 68?48;% 6 1545890 B9358403&H189/84
N
%1 72! ;4>/ 6;?48<%9 66"38>% 1 72!
%853"2.84 +2328518I3/5085 :/ % 4:?48<%9 6N 853"2.84 +2328518I3/5085
% .= 95 353 0 B9353036J 4:/ 8<7287% :8787% .= 95 353 0 B935303*H189/84
%32445 .32!24 +2322123J 7/ 65787% 84787% 32445 .32!24 +2322123345P24 599
%"3/853/0 43843+293@52 8:/ :8?1987% 4:?1987% "3/853/0 43843+293@52
% .= 95 353 0 B9353038J 4:/ 8558>% 66"38>% .= 95 353 0 B935303&H189/84
%)7 #7 "7 ! 4>/ 8>38<% 67#B28<% )7 #7 "7 !
%.4323@83.A#BB2@9+)7 #3J 46/ 8>38<% :3#B28<% .4323@83.A#BB2@9+)7 #34/345
%0 4 521584 5835233/ 6/ 67#B28<% 67#B28<% 0 4 521584 5835233/
%72! 8:5/ 6;?48<%9 :3 @8<% 72!
%H189/84 32850853@83.A#BB2@9 <:/ 6;?48<%9 65#B28<% H189/84 32850853@83.A#BB2@9
%7 /19209 2 3285 4:/ 6>#B28<% 8378<% 7 /19209 2 3285
0122345 6 7893543 )7 0-"
2 23 99 12 0 !"#!$%&'3&( "0"3."23/349334520 9)7
028589 3 #)$%*%+%, !-12!0 !0!2 07 #
M-48
ATTACHMENT 4
&J&+ &J&( &J&K &J&' &J&L
OPQR STUVWXT YZPTZ [\]\^_ " E7 #7 EE# " E7 #7 EE# " E7 #7 EE# " E7 #7 EE# "
%4."85124332855084532 2. % 23745% M6 4."85124332855084532
%"3 32851 13.5084532 2. % 463745% 6M "3 32851 13.5084532
%8189.84 32855084532 2. % 29 :45% 6M 8189.84 32855084532
%07 !01!10# ;<;. 2=#7245% 4> :45% 07 !01!10#
%"1?11 241!0 !0!1 ;4<. 2=#7245% 25545% "1?11 J&1!0 !0!1
%14525@3153. >. 2=#7245% ;>#7245% 14525@3153.
%18A9237 >. ;<#7245% 44#7245% 18A9237
%!00018A93:83- >. 43#7245% 4=#7245% !00018A93:83-
%#18A93:83- ;2. 32#7245% ;3745% #18A93:83-
%285843.!83*20 ;22. ;5745% 25545% 285843.!83*20
%"1?11 4<0!10# ;<;. 2=#7245% 4> :45% "1?11 &'0!10#
%14525@3153. >. 2=#7245% ;>#7245% 14525@3153.
%18A9237 ;2. ;<#7245% 4=#7245% 18A9237
%!00018A93:83- >. 32#7245% 2<745% !00018A93:83-
%#18A93:83- ;2. 26745% 42745% #18A93:83-
%-85/ 323.!834<--89923B1823C ;32. 4;745% 4> :45% -85/ 323.!83&'--89923B1823537*2/3N
%#0#"7100# "# >=>. ;5545% 44346% #0#"7100# "#
%4.*/ 94345 2. % 44745%D 6M 4.*/ 9&+&(
%99823454> >. ;5545%D ;9545% 99823&(&K
%!/4 8:84 823454> 3. 4> :45%D 4= :45% !/4 8:84 823&(&K
%084532823454> 6. 43"345%D 23E44>% 084532823&(&K
%3212823454> 5. ;634>%D 4;34>% 3212823&(&K
%7284 823454> >. 26#724>%D ;;#724>% 7284 823&(&K
%4.*/ 9454> 2. % 4;74>%D 6M 4.*/ 9&(&K
%998234>4< 5. ;354>%D ;654>% 99823&K&'
%!/4 8:84 8234>4< 4. 45 :4>%D 4< :4>% !/4 8:84 823&K&'
%0845328234>4< 9. 44"34>%D 2>E44<% 084532823&K&'
%32128234>4< 5. ;<34<%D 4234<% 3212823&K&'
%7284 8234>4< 5. 2<#724<%D ;2#724<% 7284 823&K&'
%4.*/ 94>4< 2. % 4974<%D 6M 4.*/ 9&K&'
%525*/ 94<46 5198/3. 2. % 23#1 4<%D 6M 525*/ 9&'&L 5198/3.
%32128234<46 5198/3. >. ;>346%D 44346% 3212823&'&L 5198/3.
%0 !0!1 64<. 49745% ;4#7246% 0 !0!1
%,#;#1!0F >>. 49745% ;5#1 45% ,#N#1!0F
%2 840 45294.853"3 98584 >. 49745% 23E1445% 2 840 45294.853"3 98584
%853- 2 >2. 25E1445% ;5#1 45% 853- 2
%,#;87"#0#71!#C =<. 25E1445% ;9545% ,#N87"#0#71!##!1
%084532G3!289327 898H584 ;2. 25E1445% ;6E1445% 084532G3!289327 898H584
%357 .19209 2 485 ;>. ;9E1445% ;2E1945% 357 .19209 2 485
%7 0 443584 >. ;;E1945% ;6E1945% 7 0 443584
%14 5998237284932509 2 485 >. ;;E1945% ;6E1945% 14 5998237284932509 2 485
%395351.3450 7935399823454> 2. % ;9545% 6M 395351.3450 7935399823&(&K
%,#4"7I81",#; 3;;. 26545% 32"34>% ,#&"7I81",#N
%853- 2 42. 26545% 2; :45% 853- 2
0122345 6 7893543 )7 0,"
2 23 99 12 0 !"#!$%&'3&( "0"3-"23.34933452/ 9)7
028589 3 #)$%&%*%+ !,01!0 !0!1 07 #
M-49
ATTACHMENT 4
&F&* &F&( &F&G &F&' &F&H
JKLM NOPQRSO TUKOU VWXWYZ " @7 #7 @@# " @7 #7 @@# " @7 #7 @@# " @7 #7 @@# "
%+3253 3. 45546% 43546% +3253
%/35#53345 57. 48546% 78 946% /3I#53345
%/35"3 98584 #533453:1823. 47. 48546% 43 946% /3I"3 98584 #533453:1823.
%14 599/ 284 5;8584 / 9<189.84 57. 4= 946% 57"346% 14 599/ 284 5;8584 / 9<189.84
%5215123 >7. 55"346% 457243% 5215123
%/35"3 98584#533453:1823. 57. 4?"346% 78@443% /3I"3 98584#533453:1823.
%0714 599584 >7. 57@443% 58#A243% 0714 599584
%7 1 / >7. 57343% 5=743% 7 1 /
%<189.84 844."214 87. 73743% 4>#1 43% <189.84 844."214
%9395214 599 47. 48#1 43% 433A43% 9395214 599
%848/3 =3. 48#1 43% 75"343% 848/3
%14/85 47. 74"343% ?7"343% 14/85
%84914 A3584 3. 74"343% 78"343% 84914 A3584
%,#?"7B<1",#4 485. 44"343% 7?34>% ,#*"7B<1",#&
%+3253 3. 44"343% ?7"343% +3253
%395351.345084532<2343 6. 44"343% 4C"343% 395351.345084532<23&G
%2 840 4529 3. 4C"343% 7=@44=% 2 840 4529
%/34#53345 47. ?7"343% 4C@44=% /3큡
%853- 2 47. 7=@44=% 7634=% 853- 2
%/34"3 98584#533453:1823. ?7. 4C@44=% 54724=% /3&"3 98584#533453:1823.
%5215123 >7. 4=34=% 73@144=% 5215123
%7 1 / >7. 5>#A24=% 4C@194=% 7 1 /
%<189.84 84D"214 87. 73@144=% ?73A4=% <189.84 84D"214
%848/3 =3. ?73A4=% 73@44>% 848/3
%14/85 47. 73@44>% 7?34>% 14/85
%84914 A3584 3. 73@44>% 54@44>% 84914 A3584
%,#6)7"7D7"#0#E 67. 5334>% 54#A24>% ,#()7"7D7"#
%2 840 4529 3. 5334>% 4434>% 2 840 4529
%395351.3453212<234> 3. 5334>% 4434>% 395351.3453212<23&H
%)#53345 ?. 4434>% 4334>% )#53345
%7 .19209 2 7 "84435 3. 4434>% 75724>% 7 .19209 2 7 "84435
%)"3 98584 57. 4334>% 55724>% )"3 98584
%7 .19209 2 3 99 3. 75724>% 78724>% 7 .19209 2 3 99
%14 5999 214.:18A345 57. 78724>% 44724>% 14 5999 214.:18A345
%984 3. 44724>% 4C724>% 984
%853848/3 3. 4C724>% 73#A24>% 853848/3
%84914 A3584 3. 73#A24>% 54#A24>% 84914 A3584
%!0 !0!1 47. 54#A24>% 5774>% !0 !0!1
%09 3 15 47. 54#A24>% 5774>% 09 3 15
0122345 6 7893543 )7 0,"
2 23 99 12 0 !"#!$%&'3&( "0"3-"23.34933452/ 9)7
028589 3 #)$%*%+%* !,01!0 !0!1 07 #
M-50
ATTACHMENT 5
Dresden Elementary GMP
GMP Estimate Summary
Classification: Bid Card
ESTIMATE DATE : March 5, 2024
PRICING PLANS : 30% CD
Unit Cost Per Unit Cost Per Unit Cost Per
Item of Work Sitework - Phase 1 Unit Cost Per Acre Sitework - Phase 2 Unit Cost Per Acre Classrooms - Phase 1 Classrooms - Phase 2 Modulars Unit Cost Per Classroom GMP Total
SF SF SF
3.6 Acre 5 Acre 77,220 SF 61,080 SF 20 Classroom 138,300 GBA SF
01.00-General Requirements $ - $ - $ 32,182 $0.42 /SF $ 32,182 $0.53 /SF $ - $ 64,365 $ 0.47
01B.1200-Final Clean $ - $ - $ 38,765 $0.51 /SF $ 38,765 $0.64 /SF $ - $ 77,529 $ 0.56
02.00-General Allowances $ - $ 516,863 $103,373 /Acre $ 206,745 $2.68 /SF $ 217,082 $3.56 /SF $ - $ 940,691 $ 6.80
02A.2000-Demolition $ 113,205 $31,446 /Acre $ 208,011 $41,603 /Acre $ - $ - $ - $ 321,216 $ 2.32
02A.2030-Abatement $ - $ - $ 77,529 $1.01 /SF $ 77,529 $1.27 /SF $ - $ 155,059 $ 1.12
02B.2100-Sitework Package $ 2,843,568 $789,881 /Acre $ 2,327,433 $465,487 /Acre $ 10,199 $0.14 /SF $ 7,811 $0.13 /SF $ 191,239 $9,562 /Classroom $ 5,380,251 $ 38.90
02D.2450-Shoring & Underpinning $ 431,162 $119,768 /Acre $ - $ - $ - $ - $ 431,162 $ 3.12
02E.2500-Paving / Curb & Gutter $ 319,138 $88,650 /Acre $ 541,525 $108,306 /Acre $ - $ - $ - $ 860,663 $ 6.22
02E.2510-Site Concrete $ 467,308 $129,808 /Acre $ 452,270 $90,454 /Acre $ - $ - $ 9,304 $466 /Classroom $ 928,881 $ 6.72
02F.2640-Site Fencing $ 185,008 $51,391 /Acre $ 137,109 $27,422 /Acre $ - $ - $ - $ 322,117 $ 2.33
02G.2700-Landscaping & Irrigation $ - $ 147,867 $29,574 /Acre $ - $ - $ - $ 147,867 $ 1.07
03A.3000-Concrete Frame (Turnkey) $ - $ - $ 1,919,551 $24.86 /SF $ 836,020 $13.69 /SF $ - $ 2,755,571 $ 19.92
04A.4000-Masonry $ 104,108 $28,919 /Acre $ 23,726 $4,746 /Acre $ 3,963,373 $51.33 /SF $ 3,302,614 $54.08 /SF $ - $ 7,393,821 $ 53.46
05A.5000-Structural & Miscellaneous Steel (Turnkey) $ 105,547 $29,319 /Acre $ 109,187 $21,838 /Acre $ 2,594,858 $33.61 /SF $ 2,578,976 $42.23 /SF $ - $ 5,388,568 $ 38.96
06A.6010-Rough Carpentry $ - $ - $ 172,498 $2.24 /SF $ 160,562 $2.63 /SF $ - $ 333,060 $ 2.41
06B.6100-Architectural Millwork $ - $ - $ 318,284 $4.13 /SF $ 203,644 $3.34 /SF $ - $ 521,928 $ 3.77
07A.7000-Waterproofing & Caulking $ - $ - $ 118,677 $1.54 /SF $ 150,087 $2.46 /SF $ - $ 268,764 $ 1.94
07C.7220-Roofing $ - $ - $ 694,037 $8.99 /SF $ 682,498 $11.18 /SF $ - $ 1,376,535 $ 9.95
07C.7230-Metal Wall Panels/Metal Roofing $ - $ - $ 511,860 $6.63 /SF $ 491,847 $8.06 /SF $ - $ 1,003,707 $ 7.26
08A.8000-Doors / Frames / Hardware $ - $ - $ 376,674 $4.88 /SF $ 183,663 $3.01 /SF $ - $ 560,337 $ 4.05
08A.8040-Overhead Doors & Grilles $ - $ - $ - $ 12,022 $0.20 /SF $ - $ 12,022 $ 0.09
08A.8090-Doors & Hardware (Install) $ - $ - $ 51,091 $0.67 /SF $ 33,325 $0.55 /SF $ - $ 84,416 $ 0.61
08B.8210-Glass & Glazing $ - $ - $ 1,439,858 $18.65 /SF $ 1,227,228 $20.10 /SF $ - $ 2,667,087 $ 19.28
09B.9100-Drywall / Metal Framing $ 23,726 $6,591 /Acre $ 23,726 $4,746 /Acre $ 684,728 $8.87 /SF $ 700,074 $11.47 /SF $ - $ 1,432,254 $ 10.36
09D.9150-Flooring $ - $ - $ 738,647 $9.57 /SF $ 662,624 $10.85 /SF $ - $ 1,401,270 $ 10.13
09E.9500-Painting / Wallcovering $ 18,313 $5,088 /Acre $ 21,499 $4,300 /Acre $ 254,925 $3.31 /SF $ 220,349 $3.61 /SF $ - $ 515,086 $ 3.72
09E.9520-Acoustic Room Treatments $ - $ - $ 72,288 $0.94 /SF $ 112,800 $1.85 /SF $ - $ 185,089 $ 1.34
10A.1002-Visual Display Boards $ - $ - $ 54,065 $0.71 /SF $ 42,480 $0.70 /SF $ - $ 96,545 $ 0.70
10A.1004-Toilet Partitions / Accessories $ - $ - $ 127,576 $1.66 /SF $ 90,086 $1.48 /SF $ - $ 217,662 $ 1.57
10A.1012-Canopies / Awnings $ - $ - $ 87,691 $1.14 /SF $ - $ - $ 87,691 $ 0.63
10A.1014-Signage $ 77,529 $21,536 /Acre $ - $ 71,466 $0.93 /SF $ 56,152 $0.92 /SF $ - $ 205,147 $ 1.48
10A.1018-Flag Poles $ - $ - $ - $ 4,472 $0.08 /SF $ - $ 4,472 $ 0.03
10A.1022-Lockers $ - $ - $ 12,208 $0.16 /SF $ - $ - $ 12,208 $ 0.09
10A.1024-Fire Extinguishers / Cabinets $ - $ - $ 6,578 $0.09 /SF $ 5,168 $0.09 /SF $ - $ 11,745 $ 0.08
11A.1110-Stage Equipment $ - $ - $ 31,012 $0.41 /SF $ - $ - $ 31,012 $ 0.22
11A.1136-Food Service Equipment $ - $ - $ 826,518 $10.71 /SF $ - $ - $ 826,518 $ 5.98
11A.1142-Athletic Equipment $ - $ 342,217 $68,444 /Acre $ - $ 54,000 $0.89 /SF $ - $ 396,217 $ 2.86
11A.1150-Commercial Laundry Equipment $ - $ - $ - $ 5,169 $0.09 /SF $ - $ 5,169 $ 0.04
11A.1190-Misc. Equipment $ - $ - $ - $ 10,337 $0.17 /SF $ - $ 10,337 $ 0.07
12A.1220-Manufactured Casework $ - $ - $ 308,620 $4.00 /SF $ 382,915 $6.27 /SF $ - $ 691,535 $ 5.00
12A.1230-Window Treatments $ - $ - $ 102,470 $1.33 /SF $ 90,392 $1.48 /SF $ - $ 192,862 $ 1.39
12A.1250-Entrance Mats $ - $ - $ 8,787 $0.12 /SF $ 8,787 $0.15 /SF $ - $ 17,573 $ 0.13
13A.1340-Special Construction $ - $ - $ - $ - $ 1,893,450 $94,673 /Classroom $ 1,893,450 $ 13.69
14A.1400-Elevators $ - $ - $ 142,447 $1.85 /SF $ - $ - $ 142,447 $ 1.03
15A.1500-Plumbing $ - $ - $ 2,318,025 $30.02 /SF $ 1,230,350 $20.15 /SF $ 62,024 $3,102 /Classroom $ 3,610,399 $ 26.11
15B.1525-HVAC $ - $ - $ 3,291,509 $42.63 /SF $ 2,586,188 $42.35 /SF $ - $ 5,877,697 $ 42.50
15C.1560-Fire Protection $ - $ - $ 324,449 $4.21 /SF $ 264,671 $4.34 /SF $ 12,405 $621 /Classroom $ 601,525 $ 4.35
Page 1 of 2
M-51
ATTACHMENT 5
Dresden Elementary GMP
GMP Estimate Summary
Classification: Bid Card
ESTIMATE DATE : March 5, 2024
PRICING PLANS : 30% CD
Unit Cost Per Unit Cost Per Unit Cost Per
Item of Work Sitework - Phase 1 Unit Cost Per Acre Sitework - Phase 2 Unit Cost Per Acre Classrooms - Phase 1 Classrooms - Phase 2 Modulars Unit Cost Per Classroom GMP Total
SF SF SF
16A.1600-Electrical $ 48,585 $13,496 /Acre $ - $ 5,696,933 $73.78 /SF $ 3,374,998 $55.26 /SF $ 359,385 $17,970 /Classroom $ 9,479,901 $ 68.55
Subtotal Direct Costs $ 4,737,198 $1,315,889 /Acre $ 4,851,432 $970,287 /Acre $ 27,687,124 $358.55 /SF $ 20,137,867 $329.70 /SF $ 2,527,806 $126,391 /Classroom $ 59,941,427 $433.42 /SF
General Conditions LSUM $ 351,654 $97,682 /Acre $ 360,134 $72,027 /Acre $ 2,055,286 $26.62 /SF $ 1,494,886 $24.48 /SF $ 187,646 $9,383 /Classroom $ 4,449,606 $32.18 /SF
Escalation - Phase 2 @ 4% $ 78,821 $21,895 /Acre $ 80,722 $16,145 /Acre $ 460,682 $5.97 /SF $ 335,071 $5.49 /SF $ 42,060 $2,103 /Classroom $ 997,356 $7.22 /SF
Contractor Contingency $ 137,479 $38,189 /Acre $ 140,795 $28,159 /Acre $ 803,514 $10.41 /SF $ 584,426 $9.57 /SF $ 73,360 $3,669 /Classroom $ 1,739,574 $12.58 /SF
Impact Fees/Permit Review LSUM $ 11,064 $3,074 /Acre $ 11,331 $2,267 /Acre $ 64,666 $0.84 /SF $ 47,034 $0.78 /SF $ 5,904 $296 /Classroom $ 140,000 $1.02 /SF
Builder's Risk Insurance LSUM $ 12,013 $3,337 /Acre $ 12,302 $2,461 /Acre $ 70,209 $0.91 /SF $ 51,066 $0.84 /SF $ 6,410 $321 /Classroom $ 152,000 $1.10 /SF
General Liability Insurance $ 57,158 $15,878 /Acre $ 58,536 $11,708 /Acre $ 334,066 $4.33 /SF $ 242,978 $3.98 /SF $ 30,500 $1,525 /Classroom $ 723,238 $5.23 /SF
Payment & Performance Bond $ 54,300 $15,084 /Acre $ 55,609 $11,122 /Acre $ 317,362 $4.11 /SF $ 230,829 $3.78 /SF $ 28,975 $1,449 /Classroom $ 687,076 $4.97 /SF
Preconstruction Expense LSUM $ 790 $220 /Acre $ 809 $161.88 /Acre $ 4,619 $0.06 /SF $ 3,360 $0.06 /SF $ 422 $22 /Classroom $ 10,000 $0.08 /SF
License Fee $ 5,716 $1,588 /Acre $ 5,854 $1,171 /Acre $ 33,407 $0.44 /SF $ 24,298 $0.40 /SF $ 3,050 $153 /Classroom $ 72,324 $0.53 /SF
Subtotal Indirect Costs $ 708,996 $196,944 /Acre $ 726,093 $145,219 /Acre $ 4,143,812 $53.67 /SF $ 3,013,947 $49.35 /SF $ 378,326 $18,917 /Classroom $ 8,971,173 $64.87 /SF
General Contractor's Fee $ 269,587 $74,886 /Acre $ 276,087 $55,218 /Acre $ 1,575,631 $20.41 /SF $ 1,146,015 $18.77 /SF $ 143,854 $7,193 /Classroom $ 3,411,174 $24.67 /SF
GRAND TOTAL $ 5,715,780 $1,587,717 /Acre $ 5,853,612 $1,170,723 /Acre $ 33,406,567 $432.62 /SF $ 24,297,828 $397.81 /SF $ 3,049,986 $152,500 /Classroom $ 72,323,774 $522.95 /SF
THIS PROJECT AS COMPARED TO A TYPICAL GROUND-UP ELEMENTARY SCHOOL:
Modular classrooms required due to occupied campus: $ 3,056,900
Ballistic Glazing as required by DCSD $ 355,950
Unforeseen conditions allowance requirement including rock, unsuitable soils, etc. $ 1,414,392
Impact fees/permit $ 140,000
Extended general conditions required due to occupied campus / extended schedule $ 2,000,000
Cost escalation allowance required due to two-phase project / extended schedule $ 994,776
Subcontractor cost premium due to remobilization costs required from multi-phase schedule $ 600,000
Moving and storage expenses of DCDS FFE $ 452,000
Abatement of the existing buildings $ 169,500
Demolition of existing buildings $ 350,300
Shoring required in phase 1 to protect existing structure of remaining building $ 472,284
Logistics / life safety premiums required due to occupied campus $ 120,000
Sitework design premiums due to multi-phase requirements; multiple detention structures, etc. $ 115,000
Right of Way road modifications allowance $ 500,000
Total cost implications due to occupied, multi-phase construction requirement: $ 10,741,102
Resultant comparison construction cost to a typical ground-up elementary school: $ 61,582,673
Resultant Cost per SF $445 /SF
Comparative market rate elementary school project in the Atlanta and surrounding areas: $425 - $450 /SF
Page 2 of 2
M-52
ATTACHMENT 6
New Dresden Elementary School
General Conditions
#24-016
March 7, 2024
Phase 1 - Enabling Work & Modulars Phase 2 - Building Phase 1 Phase 3 - Building Phase 2
Project Staffing $ 557,641 Project Staffing $ 1,338,339 Project Staffing $ 1,338,339
Position Time % Position Time % Position Time %
Project Director 5% Project Director 15% Project Director 15%
Senior Project Manager 25% Senior Project Manager 25% Senior Project Manager 25%
Project Manager 100% Project Manager 100% Project Manager 100%
Assistant Project Manager 50% Assistant Project Manager 100% Assistant Project Manager 100%
Project Engineer 100% Project Engineer 100% Project Engineer 100%
Project Administrator 50% Project Administrator 50% Project Administrator 50%
General Superintendent General Superintendent 15% General Superintendent 15%
Project Superintendent 100% Project Superintendent 100% Project Superintendent 100%
Assistant Superintendent Assistant Superintendent 100% Assistant Superintendent 100%
Project Staff Expenses $ 45,122 Project Staff Expenses $ 108,293 Project Staff Expenses $ 108,293
Vehicles Vehicles Vehicles
Fuel Fuel Fuel
Cell Phones Cell Phones Cell Phones
Preconstruction Services $ 10,000 Preconstruction Services $ - Preconstruction Services $ -
Preconstruction Fee Preconstruction Fee Preconstruction Fee
Field Office Expenses & Consumables $ 90,925 Field Office Expenses & Consumables $ 218,220 Field Office Expenses & Consumables $ 218,220
Printer, Internet Printer, Internet Printer, Internet
Trailer Trailer Trailer
Trailer Equipment Trailer Equipment Trailer Equipment
Drinking Water Drinking Water Drinking Water
Office Supplies Office Supplies Office Supplies
First Aid First Aid First Aid
Fire Extinguishers Fire Extinguishers Fire Extinguishers
GCs Total for Phase 1: $ 703,689 GCs Total for Phase 2: $ 1,664,852 GCs Total for Phase 3: $ 1,664,852
Phase 4 - Modular Removal & Gym Demo Closeout
Project Staffing $ 223,057 Project Staffing $ 111,528
Position Time % Position Time %
Project Director 5% Project Director
Senior Project Manager 20% Senior Project Manager 15%
Project Manager 100% Project Manager 75%
Assistant Project Manager 100% Assistant Project Manager 100%
Project Engineer 100% Project Engineer 100%
Project Administrator 50% Project Administrator 50%
General Superintendent 5% General Superintendent
Project Superintendent 100% Project Superintendent
Assistant Superintendent 100% Assistant Superintendent 100%
Project Staff Expenses $ 18,049 Project Staff Expenses $ 9,024
Vehicles Vehicles
Fuel Fuel
Cell Phones Cell Phones
Preconstruction Services $ - Preconstruction Services $ -
Preconstruction Fee Preconstruction Fee
Field Office Expenses & Consumables $ 36,370 Field Office Expenses & Consumables $ 18,185
Printer, Internet Printer, Internet
Trailer Trailer
Trailer Equipment Trailer Equipment
Drinking Water Drinking Water
Office Supplies Office Supplies
First Aid First Aid
Fire Extinguishers Fire Extinguishers
GCs Total for Phase 4: $ 277,475 GCs Total for Closeout: $ 138,738
M-53
ATTACHMENT 7
List of Subcontractors and Major Suppliers
New Dresden Elementary School Project
#24-016
March 7, 2024
Cost Code Trade Subcontractor
Multivista
01.00 Preconstruction Survey 3284 Medlock Bridge Road
Peachtree Corners, GA 30092
Atlas Demolition
02A.2000 Building Demolition 85 Spring Place Road
Cartersville, GA 30121
Winter Environmental
02A.2030 Abatement 3550 Green Pointe Parkway Northwest
Norcross, GA 30092
Cherokee Grading & Utility Contractors, Inc.
02B.2100 Sitework 4390 Earney Road
Woodstock, GA 30188
Berkel & Co. Contractors Inc.
02D.2450 Shoring 7300 Marks Lane
Austrell, GA 30168
The Tomal Corporation DBA Wildcat Striping Sealing and Paving
02E.2500 Paving & Striping 4983 New Peachtree Road
Chamblee, GA 30341
Upstate Curb, Inc.
02E.2500 Concrete Curbs 136 Shady Grove Road
Homer, GA 30547
Wheeler Services, Inc.
02E.2510 Site Concrete 3539 Trotter Drive
Alpharetta, GA 30004
C&C Fence Company
02F.2640 Site Fencing 2680 Georgia 42
McDonough, GA 30253
Lawn Tech Landscaping, Inc.
02G.2700 Landscape & Irrigation 10866 Forrest Road
Grantville, GA 30220
Wheeler Services, Inc.
03A.3000 Concrete 3539 Trotter Drive
Alpharetta, GA 30004
B&M Masonry, Inc.
04A.4000 Masonry 104 Gann Road Southwest
Marietta, GA 30008
SES Group Inc.
05A.5000 Structural Steel 702 Commerce Court
Prattville, AL 36066
Georgia Specialty Metal Supply LLC
05A.5000 Ornamental Metals 105 Greencastle Road, Suite B
Tyrone, GA 30290
Mark Products of Georgia
06B.6100 Architectural Millwork 125 Kilrain Court
Roswell, GA 30076
Chambless Construction Specialties Inc.
07A.7000 Waterproofing & Caulking 1698 Sands Place, Suite A
Marietta, GA 30067
Summers Roofing Co Inc.
07C.7220 Roofing 135 Mauldin Drive
Alpharetta, GA 30004
M-54
ATTACHMENT 7
Cost Code Trade Subcontractor
Abrams Architectural Products, Inc.
07C.7230 Architectural Metal Panels 7260 Delta Circle
Austell, GA 30168
Kelley Bros.
08A.8000 Doors , Frames & Hardware (Supply) 3200 Engineering Parkway
Alpharetta, GA 30004
D.H. Pace Company, Inc.
08A.8040 Overhead Doors 5105 Avalon Ridge Parkway
Peachtree Corners, GA 30071
Builders of Metro Atlanta, LLC DBA BMA Doors
08A.8090 Doors & Hardware (Install) 2897 N Druid Hills Road NE, Suite 126
Atlanta, GA 30329
Glass Stream, Inc.
08B.8210 Glass & Glazing 3675 Kennesaw North Industrial Pkwy
Kennesaw, GA 30144
Accutrak Systems, Inc.
09E.9520 Sound Absorbing Panels/Units 6910 Oak Ridge Commerce Way
Austell, GA 30168
Astro Interior Contracting, Inc.
09B.9100 Drywall & Metal Framing 5517 Oakdale Road E
Mableton, GA 30126
DCO Inc.
09D.9150 Flooring 950 Battery Avenue Southeast, Suite 3000
Atlanta, GA 30339
RAM Enterprises
09D.9150 Gymnasium Flooring 2540 East Fifth Street
Montgomery, AL 36107
Baker Paint & Contracting
09E.9500 Painting 4205 1st Avenue, Suite 300
Tucker, GA 30084
Mason Hall and Company
10A.1002 Dry Erase & Tack Boards 500 Discovery Place
Mableton, GA 30126
Mason Hall and Company
10A.1004 Toilet Partitions 500 Discovery Place
Mableton, GA 30127
Mitchell Metals, LLC
10A.1012 Canopies 1761 McCoba Drive SE, Suite B
Smyrna, GA 30080
ASI Signage Innovations
10A.1014 Building Signage 621 North Avenue Northeast
Atlanta, GA 30308
Flagsource Southeast
10A.1018 Flagpoles 201 Creekstone Ridge
Woodstock, GA 30188
Georgia Institutional Furnishings
10A.1022 Lockers 103 Gardener Park
Peachtree City, GA 30269
West Georgia Fire Extinguisher Inc.
10A.1024 Fire Extinguishers & Cabinets 770 Kingsbridge Road
Carrollton, GA 30117
Boelter
11A.1136 Food Service Equipment 3445 Breckinridge Blvd
Duluth, GA 30096
Playworx Playsets LLC
11A.1142 Athletic & Playground Equipment 2550 Sandy Plains Road, Suite 225
Marietta, GA 30066
M-55
ATTACHMENT 7
Cost Code Trade Subcontractor
H.E. Hodge Co, Inc.
12A.1220 Manufactured Casework 1281 Riverfall Lane E
Lawrenceville, GA 30043
Georgia Blind Co.
12A.1230 Window Coverings 120 Howell Place
Tyrone, GA 30290
Mobile Modular
13A.1340 Modular Classrooms 11450 East Mission Boulevard
Mira Loma, CA 91752
TK Elevator Corporation
14A.1400 Elevators 3005 Chastain Meadows Parkway
Atlanta, GA 30342
Quality Construction and Plumbing
15A.1500 Plumbing 2487 Canton Road
Marietta, GA 30066
Fire Sprinkler of Atlanta
15C.1560 Fire Protection 4405 International Boulevard Northwest
Norcross, GA 30093
Conditioned Air Systems, Inc.
15B.1525 HVAC 2410 Hilton Way
Gainesville, GA 30501
All State Electrical
16A.1600 Electrical (Fire Alarm & Lightning Protection) 6110 Northbelt Parkway Northwest, Suite D
Norcross, GA 30071
M-56
ATTACHMENT 8
Alternates Log
New Dresden Elementary School Project
#24-016
March 7, 2024
PENDING ALTERNATE / VE
Discipline Items Amount
Architectural Remove Sunshades $ (66,756)
Architectural Include Alternate Color Accent Wall Panel in Lieu of Purple $ (34,931)
Architectural Include Sunshades Per 30% CD Plans in Lieu of Including with Glazing System $ 191,347
Architectural TPO Roofing in lieu of PVC Roofing $ (73,119)
Architectural VCT Flooring in Lieu of LVT Flooring $ (153,300)
Architectural Remove Flooring Pattern Premiums $ (4,928)
Architectural Mannington Active Line LVT in Lieu of Mannington Color Anchor LVT $ (84,556)
Include Alternate Flooring Material Manufacturer (CPT - Shaw Diffuse, CPT - Walk Off Shaw Welcome II,
Architectural $ (300,000)
LVT - No Pattern Armstrong Parallel 20 mil 18x18, and LVT - Pattern Armstrong Parallel 20 mil 18x18
Architectural Remove Painting Cut-lines for Patterned Areas $ (7,958)
Include an Alternate Blind Manufacturer (ADH Nordicscreen Plus BW Roller Shades & Royal Windows, Inc.
Architectural 1" Mini Blinds) $ (76,242)
Architectural Reduce Flex Corridor(s) Millwork by 50% $ (35,588)
Plumbing Include Cast Iron Piping Above Grade $ 204,535
HVAC Include Phase 1 Mechanical Warranty for One (1) Year after Completion of Phase 2 $ 182,865
Electrical Include STE Lighting Package (VE on Fixture Types A & B) $ (298,388)
ACCEPTED VE
Discipline Items Amount
Civil Sited Building on Existing Building Footprint to Reduce Exposure to Rock N/A
Civil Remove Select Items from the Unsiutable Soil Conditions Allowance $ (862,847)
Architectural Eliminated 4-story Protected Building Designation by Classifying the Lower Level as a Basement N/A
Architectural Remove Brick at Phase /Phase 2 Tie-in $ (38,298)
Architectural Remove Metal Wood Slats Under Canopies $ (91,077)
Architectural Reduce exterior Metal Panel, Increase Exterior Brick $ (221,738)
Architectural Reduce Sunshade Scope $ (31,208)
Architectural Reduced Glazing Scope N/A
M-57
ATTACHMENT 8
PENDING ALTERNATE / VE
Discipline Items Amount
Remove Ballistic Glazing at Courtyard, Include Ballistic Film at Locations Clarified on Assumptions and
$ (297,128)
Architectural Clarifications
Architectural Reduce Operable Wall at Media Center and Changed to Manual Operartion N/A
Architectural Reduced Learning Stair Scope N/A
Architectural Reduce Finishes N/A
Architectural Reduced Paint N/A
Structural Delete AESS Allowance $ (54,750)
HVAC Remove Phase 1 Mechanical Warranty for One (1) Year After Completion of Phase 2 $ (182,865)
TOTAL ACCEPTED VE SAVINGS $ (1,779,911)
M-58
EXHIBIT N
DATE (MM/DD/YYYY)
CERTIFICATE OF LIABILITY INSURANCE 02/20/2024
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER CONTACT Charlene Todd
NAME:
The James B. Oswald Company PHONE (216) 367-8787 FAX (216) 241-4520
(A/C, No, Ext): (A/C, No):
1100 Superior Avenue East E-MAIL ctodd@oswaldcompanies.com
ADDRESS:
Suite 1500 INSURER(S) AFFORDING COVERAGE NAIC #
Cleveland OH 44114 INSURER A : Zurich American Insurance Company 16535
INSURED INSURER B : Steadfast Insurance Company 26387
The Winter Construction Company INSURER C :
5616 Peachtree Road; Suite 100 INSURER D :
INSURER E :
Atlanta GA 30341 INSURER F :
COVERAGES CERTIFICATE NUMBER: 23/24 Winter Cons $10M REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR ADDL SUBR POLICY EFF POLICY EXP
LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) LIMITS
COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 5,000,000
DAMAGE TO RENTED 300,000
CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $
Underground MED EXP (Any one person) $ 10,000
A XCU Y Y GLO-0184333-07 03/01/2023 03/01/2024 PERSONAL & ADV INJURY $ 5,000,000
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 10,000,000
PRO- 10,000,000
POLICY JECT LOC PRODUCTS - COMP/OP AGG $
OTHER: $
AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 5,000,000
(Ea accident)
ANY AUTO BODILY INJURY (Per person) $
A OWNED SCHEDULED Y Y BAP-0183848-07 03/01/2023 03/01/2024 BODILY INJURY (Per accident) $
AUTOS ONLY AUTOS
HIRED NON-OWNED PROPERTY DAMAGE $
AUTOS ONLY AUTOS ONLY (Per accident)
$
UMBRELLA LIAB OCCUR EACH OCCURRENCE $ 10,000,000
A EXCESS LIAB CLAIMS-MADE Y Y AUC-0184151-07 03/01/2023 03/01/2024 AGGREGATE $ 10,000,000
DED RETENTION $ 0 $
WORKERS COMPENSATION PER OTH- Ohio Stop Gap
AND EMPLOYERS' LIABILITY STATUTE ER
Y/N
ANY PROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $ 1,000,000
A OFFICER/MEMBER EXCLUDED? N N/A Y WC-0184334-08 03/01/2023 03/01/2024
(Mandatory in NH) E.L. DISEASE - EA EMPLOYEE $ 1,000,000
If yes, describe under
DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ 1,000,000
Aggregate $15,000,000
Pollution / Professional
B (Inclds Transportation,Asbestos & Lead) EOC 0532629-05 03/01/2023 03/01/2024 Each Accident/Condition $15,000,000
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
Project: #24-016, New Dresden Elementary School
DeKalb County School District, the DeKalb County School Board, a body corporate, the DeKalb County Public School System and all Authorities, Boards,
Bureaus, Commissions, Divisions, Departments and offices thereof and individual members, officers and employees thereof in their official capacity, and/or
while acting on behalf of the DeKalb County School Board, and BRPH Architects Engineers, Inc. have automatic additional insured status under the general
(for ongoing operations, products and completed operations), auto & umbrella liability policies when in written contract with the insured. Coverage is primary
& non-contributory. Waiver of subrogation applies in favor of the Additional Insureds under the general, auto and umbrella liability policies, and workers
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
The School District and Dekalb County Board of Education ACCORDANCE WITH THE POLICY PROVISIONS.
Sam A. Moss Service Center
AUTHORIZED REPRESENTATIVE
1780 Montreal Road
Tucker GA 30084
© 1988-2015 ACORD CORPORATION. All rights reserved.
ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD
EXHIBIT N
AGENCY CUSTOMER ID: 00011076
LOC #:
ADDITIONAL REMARKS SCHEDULE Page of
AGENCY NAMED INSURED
The James B. Oswald Company Independence Excavating Inc
POLICY NUMBER
CARRIER NAIC CODE
EFFECTIVE DATE:
ADDITIONAL REMARKS
THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM,
FORM NUMBER: 25 FORM TITLE: Certificate of Liability Insurance
compensation policies - when required in written contract. 30 Day Notice of Cancellation applies.
ACORD 101 (2008/01) © 2008 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
N-2
EXHIBIT O
March 7, 2024
DeKalb County School District | 2023-2024 CALENDAR
(Approved by the Board of Education on December 13, 2021)
July ‘23 January ‘24
S M T W Th F S S M T W Th F S
1 1 2 3 4 5 6 Po
2 3 4 5 6 7 8 7 8 9 10 11 12 13
First Day of 2nd Semester
15 Dr. M. L. King, Jr. Day
9 10 11 12 13 14 15 14 15 16 17 18 19 20
16 17 18 19 20 21 22 21 22 23 24 25 26 27
23 24 25 26 27 28 29 28 29 30 31
30 31
August ‘23 February ‘24
S M T W Th F S S M T W Th F S 16 February Break (Students)
1 2 3 4 5 1 2 3 Teachers’ Workday
6 7 8 9 10 11 12 4 5 6 7 8 9 10
13 14 15 16 17 18 19 11 12 13 14 15 16 17
20 21 22 23 24 25 26 18 19 20 21 22 23 24
27 28 29 30 31 25 26 27 28 29
September ‘23 March ‘24
S M T W Th F S S M T W Th F S
1 2 1 2
3 4 5 6 7 8 9 3 4 5 6 7 8 8
10 11 12 13 14 15 16
10 11 12 13 14 15 16
17 18 19 20 21 22 23
17 18 19 20 21 22 23
24 25 26 27 28 29 30
24 25 26 27 28 29 30
31
6 Fall Break (Students) October ‘23 April ‘24
Teachers’ Workday S M T W Th F S S M T W Th F S
1 2 3 4 5 6 7 1 2 3 4 5 6
1-5 Spring Break
8 9 10 11 12 13 14 7 8 9 10 11 12 13
15 16 17 18 19 20 21 14 15 16 17 18 19 20
22 23 24 25 26 27 28 21 22 23 24 25 26 27
29 30 31 28 29 30
November ‘23 May ‘24
S M T W Th F S S M T W Th F S
Post Planning
1 2 3 4 1 2 3 4
5 6 7 8 9 10 11 5 6 7 8 9 10 11
20-24 Thanksgiving Break
12 13 14 15 16 17 18
12 13 14 15 16 17 18
19 20 21 22 23 24 25
19 20 21 22 23 24 25
26 27 28 29 30 31
26 27 28 29 30
15 Last Day of 1st Semester December ‘23 June ‘24 19 Juneteenth
S M T W Th F S S M T W Th F S First/Last Day of Semester
1 2 1 (School Closed)
3 4 5 6 7 8 9 2 3 4 5 6 7 8
Teachers’
Professional Development Day
10 11 12 13 14 15 16 9 10 11 12 13 14 15
(School Closed)
17 18 19 20 21 22 23 16 17 18 19 20 21 22
Independent Learner Day/
24 25 26 27 28 29 30 23 24 25 26 27 28 29
31 30
O-1
EXHIBIT O
March 7, 2024
DEKALB COUNTY SCHOOL DISTRICT | 2024-2025 CALENDAR
(Approved by the Board of Education on January 8, 2024)
JULY ‘24 JANUARY ‘25
S M T W Th F S 4 Independence Day S M T W Th F S 1-2 Winter Break
1 2 3 4 5 6 3 Virtual Teachers’ Workday
1 2 3 4
7 8 9 10 11 12 13
29-31 Pre-Planning Days 6 Post/Pre-Planning Day
5 6 7 8 9 10 11 7 First Day of 2nd Semester
14 15 16 17 18 19 20 12 13 14 15 16 17 18 20 Dr. M.L. King, Jr. Day
21 22 23 24 25 26 27 19 20 21 22 23 24 25
28 29 30 31 26 27 28 29 30 31
18 Instructional Days
AUGUST ‘24 1-2 Pre-Planning Days FEBRUARY ‘25 17 Virtual Teachers’
S M T W Th F S S M T W Th F S
Workday
1 2 3
5 First Day of School 1
18-21 February Break
4 5 6 7 8 9 10 2 3 4 5 6 7 8
11 12 13 14 15 16 17 9 10 11 12 13 14 15
18 19 20 21 22 23 24 16 17 18 19 20 21 22
25 26 27 28 29 30 31 20 Instructional Days 23 24 25 26 27 28 15 Instructional Days
SEPTEMBER ‘24 2 Labor Day MARCH ‘25 7 Independent Learner
S M T W Th F S Day/Professional
S M T W Th F S
1 Development Day
1 2 3 4 5 6 7
8 9 10 11 12 13 14 2 3 4 5 6 7 8
15 16 17 18 19 20 21 9 10 11 12 13 14 15
22 23 24 25 26 27 28 16 17 18 19 20 21 22
29 30 20 Instructional Days 23 24 25 26 27 28 29
30 31 21 Instructional Days
OCTOBER ‘24 14 Columbus Day/ I APRIL ‘25 7-11 Spring Break
S M T W Th F S Indigenous Peoples Day S M T W Th F S
1 2 3 4 5 1 2 3 4 5
6 7 8 9 10 11 12
15-18 Fall Break 6 7 8 9 10 11 12
13 14 15 16 17 18 19 13 14 15 16 17 18 19
20 21 22 23 24 25 26 20 21 22 23 24 25 26
18 Instructional Days
27 28 29 30 31 27 28 29 30 17 Instructional Days
NOVEMBER ‘24 5 Independent Learner MAY ‘25 26 Memorial Day
S M T W Th F S Day/Professional S M T W Th F S 29 Last Day of School
1 2 Development Day 1 2 3 30 Post Planning Day
3 4 5 6 7 8 9 4 5 6 7 8 9 10
25-29 Thanksgiving Break
11 12 13 14 15 16 17
10 11 12 13 14 15 16
18 19 20 21 22 23 24
17 18 19 20 21 22 23
25 26 27 28 29 30 31
24 25 26 27 28 29 30 20 Instructional Days
16 Instructional Days
DECEMBER ‘24 20 Last Day of 1st Semester JUNE ‘25 19 Juneteenth
S M T W Th F S S M T W Th F S Virtual Teachers’ Workday/ Schools
23-31 Winter Break Closed
1 2 3 4 5 6 7 1 2 3 4 5 6 7
First/Last Day of Semester
8 9 10 11 12 13 14 8 9 10 11 12 13 14 Holiday/Break Schools Closed
15 16 17 18 19 20 21 15 Instructional Days 15 16 17 18 19 20 21 Teachers’ Workday/Professional
22 23 24 25 26 27 28 22 23 24 25 26 27 28 Development Day Schools Closed
Independent Learner Day/Professional
29 30 31 29 30
Development Day
89 Instructional Days Total 91 Instructional Days Total
Calendar Template © calendarlabs.com
O-2
EXHIBIT O
March 7, 2024
DEKALB COUNTY SCHOOL DISTRICT | 2025-2026 CALENDAR
(Approved by the Board of Education on January 8, 2024)
JULY ‘25 JANUARY ‘26
S M T W Th F S S M T W Th F S 1-2 Winter Break
1 2 3 4 5 1 2 3
5 Post/Pre-Planning Day
4 Independence Day 6 First Day of 2nd Semester
6 7 8 9 10 11 12 4 5 6 7 8 9 10
19 Dr. M.L. King, Jr. Day
13 14 15 16 17 18 19 11 12 13 14 15 16 17
28-31 Pre-Planning Days
20 21 22 23 24 25 26 18 19 20 21 22 23 24
27 28 29 30 31 25 26 27 28 29 30 31
18 Instructional Days
AUGUST ‘25 FEBRUARY ‘26
1 Pre-Planning Day 16 Virtual Teachers’
S M T W Th F S S M T W Th F S
Workday
1 2 1 2 3 4 5 6 7
4 First Day of School
3 4 5 6 7 8 9 8 9 10 11 12 13 14
17-20 February Break
10 11 12 13 14 15 16 15 16 17 18 19 20 21
17 18 19 20 21 22 23 22 23 24 25 26 27 28
24 25 26 27 28 29 30 20 Instructional Days 15 Instructional Days
31
SEPTEMBER ‘25 MARCH ‘26
S M T W Th F S 1 Labor Day S M T W Th F S 13 Independent Learner/
1 2 3 4 5 6 1 2 3 4 5 6 7 Professional Development
8 9 10 11 12 13 14 Day
7 8 9 10 11 12 13
14 15 16 17 18 19 20 15 16 17 18 19 20 21
21 22 23 24 25 26 27 22 23 24 25 26 27 28
29 30 31
28 29 30 21 Instructional Days 22 Instructional Days
OCTOBER ‘25 APRIL ‘26 6-10 Spring Break
S M T W Th F S
13 Virtual Teachers’ S M T W Th F S
1 2 3 4
Workday 1 2 3 4
5 6 7 8 9 10 11 5 6 7 8 9 10 11
14-17 Fall Break
12 13 14 15 16 17 18 12 13 14 15 16 17 18
19 20 21 22 23 24 25
19 20 21 22 23 24 25
26 27 28 29 30 31 18 Instructional Days 26 27 28 29 30 17 Instructional Days
NOVEMBER ‘25 4 Independent Learner/ MAY ‘26 25 Memorial Day
S M T W Th F S Professional Development S M T W Th F S 28 Last Day of School
1 Day 1 2 29 Post Planning Day
2 3 4 5 6 7 8 3 4 5 6 7 8 9
24-28 Thanksgiving Break
10 11 12 13 14 15 16
9 10 11 12 13 14 15
17 18 19 20 21 22 23
16 17 18 19 20 21 22
24 25 26 27 28 29 30
23 24 25 26 27 28 29
31
19 Instructional Days
30 15 Instructional Days
DECEMBER ‘25 19 Last Day of Semester JUNE ‘26 19 Juneteenth
S M T W Th F S S M T W Th F S Virtual Teachers’ Workday/ Schools
Closed
1 2 3 4 5 6 22-31 Winter Break 1 2 3 4 5 6
First/Last Day of Semester
7 8 9 10 11 12 13 7 8 9 10 11 12 13 Holiday/Break Schools Closed
14 15 16 17 18 19 20 14 15 16 17 18 19 20 Teachers’ Workday/Professional
21 22 23 24 25 26 27 15 Instructional Days 21 22 23 24 25 26 27 Development Day Schools Closed
Independent Learner Day/Professional
28 29 30 31 28 29 30
Development Day
89 Instructional Days Total 91 Instructional Days Total
Calendar Template © calendarlabs.com
O-3