RFQu 24-752-032 CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations

AID 1701589 · View on Simbli

Agenda Item

ii. Contract Award – CM@Risk -E-SPLOST V Project: RFQu No. 24-752-032 - Rock Chapel Elementary School HVAC System Replacement and Renovations Project Award -The Evergreen Corporation dba Evergreen Construction - Pre-Construction Phase Fee (Not to exceed $100,000)

Summary: Presented by: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations
Request: It is requested that the DeKalb County Board of Education approve the award of RFQu No. 24-752-032 for CM@Risk (“Construction Management Services”) for the Rock Chapel Elementary School HVAC System Replacement and Renovations project to The Evergreen Corporation dba Evergreen Construction.

The Evergreen Corporation dba Evergreen Construction is selected as the most responsive and responsible Offeror whose proposal is the most advantageous to the Board based on the evaluation factors set forth in the Request for Qualifications (RFQu) solicitation document.

Additionally, it is requested that the Board approve a not-to-exceed amount of $100,000, for the Pre-Construction Phase Fee associated with this contract. Additional packages will be presented to the Board of Education for approval as indicated below:


Early release package possibly presented Fall/Winter 2024
Final Guaranteed Maximum Price (GMP) will be presented Winter 2024-2025.

Additional sub packages may be presented to the Board of Education for approval as needed.
Why: To approve the award of the construction management services contract for the Rock Chapel HVAC System Replacement and Renovations project in accordance with the Dekalb County School District (“DCSD”) voter-approved E-SPLOST V program will provide a safe and healthy learning environment.

The approval of this contract award meets Strategic Goal Area 6: Organizational Excellence.
Details: Specific details related to the scope of work for this Request for Qualifications can be found on the DCSD solicitation website at http://www.dekalbschoolsga.org/solicitations/.

The RFQu was issued on May 23, 2024, and five (5) statements of qualifications were received on June 27, 2024, for the Rock Chapel Elementary School HVAC System Replacement and Renovations project. All five (5) were deemed responsive. The qualifications for the five (5) responsive submittals were evaluated by a selection committee and two (2) firms were shortlisted and invited to further discuss their qualifications during an interview. Interviews were conducted on August 12, 2024. This recommendation is based on the final scoring of the interview and presentation process.

The Evergreen Corporation dba Evergreen Construction will be responsible for the construction management services as set forth in the proposal documents. The DeKalb County School District’s Standard Form of Construction Management Contract will be used. The award of this contract will allow for the commencement of the pre-construction phase of the construction management services for this project. The Evergreen Corporation dba Evergreen Construction is located at 245 Peachtree Center Ave NE, Suite 2500, Atlanta, Georgia 30303. 3200 Cobb Galleria Parkway, Suite 240, Atlanta, Georgia 30339
Financial impact: The total budget of $100,000 for the Pre-Construction fee and reimbursable expenses associated with the contract agreement for the Rock Chapel Elementary School HVAC System Replacement and Renovations project will be allocated from cost code SP5FACCON.36635.PRECCONST under the voter-approved E-SPLOST V program.
Contact: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations, 678-676-1447
Mr. Richard Boyd, Director of Design and Construction, Division of Operations, 678-676-1483
Effective: Upon Board Approval and a fully executed contract.
Status: Approved by the Office of Legal Affairs
DeKalb County School District                                                                RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                          Project No. 366-35
May 23, 2024                                                                                         Page 1 of 22


                                     DeKalb County Board of Education
                                     Operations Division
                                     Sam A. Moss Service Center
                                     1780 Montreal Road
                                     Tucker, GA 30084-6705

                                  Request for Qualifications (RFQu) No. 24-752-032
                                                          for
                                        Construction Management at Risk
                                         Rock Chapel Elementary School
Project:                        HVAC System Replacement and Renovations
DCSD Project Nos.:              366-35
Owner:                          DeKalb County Board of Education (the “Board”)
Solicitation Timeline Summary
              EVENT                           DATE(S)              TIME                        LOCATION

  Solicitation Opens                        May 23, 2024                            http://dekalbschoolsga.ionwave.net
  Mandatory Pre-Submittal
                                            June 6, 2024         10:00 AM                      Via Teams
  Conference
                                                                                  Rock Chapel Elementary School
  Mandatory Site Visit                      June 7, 2024         9:00 AM
                                                                             1130 Rock Chapel Road, Lithonia, GA 30058
  Final Questions Due                       June 12, 2024        2:00 PM         dcsd-op-bidquestion@dekalbschoolsga.org

  Final Addendum                            June 19, 2024        2:00 PM            http://dekalbschoolsga.ionwave.net
  Statement of Qualifications
                                            June 27, 2024        2:00 PM           http://dekalbschoolsga.ionwave.net
  Due Date & Time
                                                                                 Public Acknowledgement of RFQu will be
  Public Acknowledgement                     July 1, 2024                         posted to the DCSD website by close of
                                                                                                 business.
  Selection Committee
                                           July 8-12, 2024
  Evaluation

  Shortlist Finalist Notified                    N/A

  Interviews Conducted                           N/A
  Anticipated Board Review
                                          September 9, 2024
  and Approval

  Anticipated Notice of Award            September 16, 2024

  Anticipated Notice to
                                           October 1, 2024
  Proceed
DeKalb County School District                                                          RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                    Project No. 366-35
May 23, 2024                                                                                   Page 2 of 22

                              Request for Qualifications and
                                 Evaluation Procedures

                        Construction Management at Risk Services
                      Negotiated Fee / Guaranteed Maximum Price


Qualifications will be received electronically on the DeKalb County School District website at
https://dekalbschoolsga.ionwave.net for CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR
Rock Chapel HVAC System Replacement and Renovations, until 2:00 p.m. EST, Thursday, June 27,
2024. Qualifications received after the specified time will not be considered. All potential respondents must
register as a vendor at http://dekalbschoolsga.ionwave.net. NOTE: A virtual mandatory pre-submittal
conference will be held on Thursday, June 6, 2024, 10:00 a.m., EST, via TEAMS. Attendees must provide
the following information by 5:00 p.m., EST on Wednesday, June 5, 2024:

    1.   Individual Name and Title
    2.   Company Name
    3.   Telephone Number
    4.   Email Address

This information must be sent to dcsd-op-solicitation@dekalbschoolsga.org. A meeting link will be sent to all
registered attendees no later than 9:30 a.m., EST on Thursday, June 6, 2024.

This document shall serve to provide interested parties with specific information as to the Procedures for
Selection of Construction Management at Risk Services for the DeKalb County School District.
DeKalb County School District                                                                                        RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                                                  Project No. 366-35
May 23, 2024                                                                                                                 Page 3 of 22

 Table of Contents

 Section           Description                                                                                                        PAGE

                   Request for Qualifications:

 1.0               Project Description ............................................................................................... 4
 2.0               Scope of Services ................................................................................................ 4
 3.0               Requirements of Construction Manager............................................................... 5
 4.0               Statement of Qualifications .................................................................................. 6
 5.0               Initial Screening Criteria ....................................................................................... 9
 6.0               Interview and Presentation .................................................................................. 12
 7.0               Selection Process ................................................................................................ 15
 8.0               Schedule .............................................................................................................. 16
 9.0               General Instructions ............................................................................................. 17
 10.0              Terms and Conditions .......................................................................................... 18
                   RFQu Advertisement ........................................................................................... 22
                   Exhibit A

 Attachments (separate file from RFQu)
 Attachment A      Construction Manager Checklist and Certification
 Attachment B1     Corporate Certificate
 Attachment B2     Partnership Certificate
 Attachment B3     Entity Certificate
 Attachment D      Offeror’s and Individuals’ Affidavit of Noncollusion
 Attachment E      Conflict of Interest Disclosure Affidavit
 Attachment F      Consent to Release Information
 Attachment J      Immigration and Security Certification
 Attachment L      No Submittal Response
 Attachment M      Standard Form of Construction Management Contract


 Exhibits (separate file from RFQu)
 Exhibit A – Proposal Evaluation Form
     DeKalb County School District                                                           RFQu No. 24-752-032
     CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                     Project No. 366-35
     May 23, 2024                                                                                    Page 4 of 22

                      REQUEST FOR CONSTRUCTION MANAGER QUALIFICATIONS

     PROJECT NAME: Rock Chapel Elementary School HVAC System Replacement
     and Renovations

     PROJECT LOCATION: 1130 Rock Chapel Road, Lithonia GA. 30058
     RFQu NUMBER: 24-752-032

      1.0    PROJECT DESCRIPTION

              1.1     DeKalb County School District, Georgia is interested in entering into a contract with a
                      qualified firm to perform Construction Management at Risk Services as outlined in the
                      contract to be entered into, the form of said contract being attached hereto for HVAC
                      System Replacement and Renovations listed below in the Scope of Services. The CM
                      is responsible for the successful, timely, and economical completion of the construction
                      Project.
              1.2     The Contract(s) shall be subject to the limitations and restrictions of Georgia
                      Code.
              1.3     DCSD has determined that the stipulated fee for the Pre-Construction Phase
                      Services for this project will be a maximum fee of $100,000.00. This fee is all
                      inclusive and incorporates all services provided during the pre-construction
                      phase for this project.

      2.0     SCOPE OF SERVICES
     HVAC System Replacement and Renovations
     The project is known as Rock Chapel ES HVAC System Replacement and Renovations. The anticipated
     scope of this project is the replacement of major building systems and renovations at Rock Chapel ES
     located at 1130 Rock Chapel Road, Lithonia, GA 30058.

A.   Replacement of major building systems and site improvements including but not limited to:
     •      HVAC System (s)
     •      Door and hardware replacement
     •      Fire Alarm Upgrades
     •      Security Vestibule
     •      Electrical Service
     •      Plumbing Fixture Replacement
     •      Site Utilities
     •      Replace ceilings
     •      LED Lighting
     •      Site Accessibility
     •      Kitchen HVAC
     •      Kitchen Hood Replacement
     •      Miscellaneous flooring replacement and painting

B.   Pre-Construction Phase Services shall include but are not limited to: attending any and all design and
     preconstruction conferences, assisting and cooperating with the Design Professional with respect to the
     design of the Project, reviewing and commenting on design documents, constructability review, advertising
     DeKalb County School District                                                               RFQu No. 24-752-032
     CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                         Project No. 366-35
     May 23, 2024                                                                                        Page 5 of 22

     & conducting pre-bid conference, providing cost estimates & GMP development, preparing construction
     schedule and incorporating design schedule into a single project schedule, refining general requirements
     and general conditions, and documenting “as-is” conditions (including offsite utilities from which
     connections are to be made).
C.   Construction Phase Services include, but are not limited to, furnishing, and paying for all management,
     supervision, financing, labor, materials, tools, fuel, supplies, utilities, equipment, and services of every kind
     and type necessary to diligently, timely and fully perform and complete the construction of the entire
     Project in a good and workmanlike manner in accordance with the Construction Documents.
      A Guaranteed Maximum Price for the Rock Chapel Elementary School HVAC System Replacement and
      Renovations will be agreed upon and approved by the Board of Education and may include early release
      packages. The estimated construction budget for this project will be $12,000,000 and subject to change.
      The Construction Management Firm is to provide all construction management services to deliver to
      the owner a safe, finished, and fully functioning middle vestibule within the estimated construction budget.

      Target Schedule:
      Possible Early Release Package Release for HVAC
      and Electrical: Fall 2024
      Final GMP Approval: Winter 2024-2025
      Construction: Spring 2025 – Summer 2027
      3.0     REQUIREMENTS OF CONSTRUCTION MANAGER (CM)

               3.1     Firms must meet the following requirements:

                       3.1.1    Requirements of the Request for Qualifications (RFQu).

                       3.1.2    It is preferable that the CM has experience providing construction management
                                at risk for K-12 public school programs.

                       3.1.3    CM’s must be authorized to do business in the State of Georgia and must
                                possess professional service registrations, and general construction licenses
                                in accordance with applicable statutes, regulations, and rules.

                       3.1.4    CM's must be knowledgeable of the requirements of Georgia Code.

                       3.1.5    CM's must be able to demonstrate financial strength appropriate to the scale of
                                Project to be managed.

                       3.1.6    Statements of Qualifications must be submitted to the School District on or before
                                the time and date and at the place indicated in the RFQu.

                       3.1.7    Statements of Qualifications shall be submitted electronically in accordance with
                                the requirements contained in the RFQu and should be limited to not more than
                                30 (8.5-inch x 11 inch) pages printed on one side, including covers and dividers,
                                and excluding financial information. Oversize pages will be counted as two
                                pages. Submissions in excess of 30 pages will not be disqualified; however,
                                clarity, conciseness, and brevity of this document will be part of the evaluation
                                criteria.
                       3.1.8    Statements of Qualification which have not been received by the DeKalb County
DeKalb County School District                                                          RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                    Project No. 366-35
May 23, 2024                                                                                   Page 6 of 22

                         School District on or before the scheduled receipt time as set forth in the RFQu
                         will not be considered.

                3.1.9    The selected Construction Manager will be required to meet the insurance
                         requirements of DCSD.

                3.1.10 A pre-negotiation meeting and negotiation meeting will be conducted on the
                         date and at the place to be specified at a later date. If agreement is not reached
                         on this date, DCSD will terminate negotiations and proceed to the next highest
                         ranked firm. We will proceed with the number two ranked firm in the event that
                         negotiations are being terminated with the number one ranked firm. At the school
                         district's sole option, the negotiation cutoff date may be extended.

                3.1.11 Costs of participating in the selection process, including presentations to the
                         Selection Committee, are solely those of the CM; DCSD will assume no
                         responsibility for any costs.

                3.1.12 DCSD reserves the right to waive informalities and to terminate the selection
                         process.


       4.0     STATEMENT OF QUALIFICATIONS
               Required Information and Format

       Electronic statements of qualifications shall be submitted to the website
       https://dekalbschoolsga.ionwave.net and include the following:

                    1) Letter of Introduction - To be included with Technical Proposal under “Response
                       Attachments”.
                    2) Table of Contents - To be included with Technical Proposal under “Response
                       Attachments”.
                    3) Compliance - To be included with Technical Proposal under “Response
                       Attachments”.
                    4) Successful Related Building Experience – To be included with Technical Proposal
                       under “Response Attachments”.
                    5) Proposed Project Staff and their Functions - To be included with Technical
                       Proposal under “Response Attachments”.
                    6) Project Approach - To be included with Technical Proposal under “Response
                       Attachments”.
                    6) Current Workload - To be included with Technical Proposal under “Response
                       Attachments”.
        4.1     Letter of introduction and interest signed by an officer or partner of the responding firm.
                Letter shall include specific reason(s) why firm would be the best choice for the project
                listed. Letter shall include name of entity submitting, contact name, phone number, e-
                mail address, fax number and address of firm submitting.
        4.2     Table of Contents
DeKalb County School District                                                            RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                      Project No. 366-35
May 23, 2024                                                                                     Page 7 of 22

        4.3     Compliance Information
                This is a compliance section and carries no evaluation points. Firms must meet
                minimum criteria as specified to receive further consideration. Submittals shall
                include the following:
                4.3.1   The CM must be properly certified by the Georgia Secretary of State to do
                        business in Georgia at the time of submission.

                        4.3.1.1 State the legal name of the entity submitting and if CM submitting is a
                                corporation, joint venture, or partnership. Note: It is understood that if
                                selected for this project the stated entity name will be used in all legal
                                contracting documents derived from this selection.

                        4.3.1.2 Provide a copy of certification for proper incorporation or registration from
                                Georgia Secretary of State. In the alternative, joint ventures and
                                partnerships should provide a copy of their joint venture or partnership
                                agreement and certification from the Georgia Secretary of State
                                establishing that each joint venture partner or partner is authorized to do
                                business in Georgia.

                4.3.2   The CM must be properly registered, licensed, and certified at the time of
                        submission:

                        4.3.2.1 Provide copy of current Georgia Professional Registration Certificate for
                                general contractor.

                        4.3.2.2 If CM is a joint venture, provide copy of the joint venture agreement and
                                either:

                                     a. Copy of current Georgia Professional Registration Certificate of
                                        the joint venture; or

                                     b. A copy of the current Georgia Professional Registration Certificate of
                                          one of the joint venture partners.

                4.3.3   The CM must have been in continuous business for a minimum of five
                        years. Note: If CM is a joint venture, at least one of the companies
                        comprising the joint venture or partnership must have been in continuous
                        business for a minimum of five years.

                        4.3.3.1 State number of years in business. If the CM is a joint venture, state both
                                the number of years that the joint venture has been in business, as well
                                as the number of years that each joint venture partners has been in
                                business.
                        4.3.3.2 State the location, address, and telephone number of CM’s offices. If the
                                CM is a joint venture or partnership, identify the location, address, and
                                telephone number of the principal place of business of the joint venture
                                or partnership designated with the Georgia Division of Corporations.
                        4.3.3.3 Submit the names of owners, officers, or principals in charge.
DeKalb County School District                                                                 RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                           Project No. 366-35
May 23, 2024                                                                                          Page 8 of 22

                  4.3.4    The CM must identify any existing or potential conflicts of interest and disclose
                           any representation of parties or other relationships that might be considered a
                           conflict of interest with regard to this selection. "Conflict" or "conflict of interest"
                           means a situation in which regard for a private interest tends to lead to disregard
                           of a public duty or interest.

                           4.3.4.1 If any conflicts of interest issues are identified, provide a detailed plan
                                    of action on how any existing or potential conflicts of interest will be
                                    mitigated in the case your firm is recommended for this project. DCSD
                                    at its sole discretion shall determine the adequacy of the plan and
                                    whether the conflict will disqualify the firm from consideration for the
                                    RFQu. If DCSD determines that the firm will be disqualified due to the
                                    conflict, the firm’s proposal will not be evaluated or considered by the
                                    Selection Committee

                 4.3.5    Financial Capabilities and Cost Control Measures (Y/N):
                          The CM must demonstrate they have the necessary financial resources to complete
                          the project, their capabilities to control costs and their history of working proactively to
                          avoid litigation with Owners.
4.3.5.1 Financial Statement: Include a copy of their most current audited financial statement. If the CM
is a joint venture or partnership all firms comprising the submitting entity will be required to submit the
previously requested documentation:
                                   4.3.5.2 Bonding Capacity: Evidence of sufficient bonding capacity to
                                          bond $12,000,000.00. The CM must submit a letter from their
                                          insurer stating their current bonding capacity for a single job and
                                          their aggregate capacity. (The firm will be required to bond on the
                                          guaranteed maximum price for the Project).
                4.3.6     Litigation/Insurance Claims/Convictions (Y/N)

                          4.3.6.1 Submit all litigation of any kind involving Construction Manager, its officers,
                                  or directors with a project owner where the total amount in controversy
                                  exceeds $100,000.00 within the last five years. If the CM is a joint
                                  venture or partnership submit litigation involving all firms comprising
                                  the submitting entity. State the court and location of the litigation.

                          4.3.6.2 Insurance Claims: State the number of claims, total worker’s compensation
                                  dollars incurred for those claims, and loss cost per man hour for the
                                  last five projects your firm has completed. This information should
                                  include all claims including, but limited to, the firm’s personnel, and sub-
                                  contractors and/or sub-consultants. In addition, firms shall include
                                  information about their safety programs.
                          4.3.6.3 Convictions: Include a statement as to whether or not the CM (and in the
                                  case of a joint venture, each of the partners in the joint venture) or any of
                                  its officers has been convicted or entered a guilty plea (or plea of nolo
                                  contendere) in any court within the two (2) years prior to the date of
                                  application of a violation of any State or Federal statue concerning
                                  competitive bidding or competitive proposals or the restraint of trade.
DeKalb County School District                                                         RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                   Project No. 366-35
May 23, 2024                                                                                  Page 9 of 22

5.0             INITIAL SCREENING CRITERIA

                5.1    Individual Review: Proposal Evaluation Committee (“PEC”) members shall use the
                       Proposal Evaluation Form (Exhibit A) for the RFQu to document their review and
                       evaluation of each Proposal in accordance with the criteria listed below, within
                       their respective areas of experience and knowledge.

                       5.1.1 Successful Related Building Experience (30 points):
                             Past experience, including examples of renovations, refurbishment,
                             repairs, and new construction projects completed by the firm.
                             Consideration will be given to the successful completion of previous
                             projects comparable in design, scope, and complexity. This will include
                             e valuating the firm’s performance and quality of work on previous
                             projects.

                               5.1.1.1 List the projects which best illustrate the experience of the firm
                                       which utilized the current staff which is being assigned to this
                                       Project. (List no more than 10 projects and do not list projects
                                       which were not completed by your firm or completed more
                                       than ten years ago). Include the following for each project:

                                       a. Name and location of the project.
                                       b. The nature of the firm's responsibility on the project.
                                       c. Project owner's representative name, address,
                                            telephone, and facsimile number.
                                       d. Project user's representative name, address and
                                            telephone number.
                                       e. Date project was completed. Provide comparison of
                                            original schedule completion to actual completion date.
                                       f. Size of project (construction gross square feet).
                                       g. Cost of project (construction cost). Provide comparison of
                                          original contract amount with final contract amount
                                       h. Work for which firm's staff was responsible.
                                       i. Firm's project manager and other key professionals
                                          involved on the project and who of that staff would be
                                          assigned to the Project covered by this RFQu.

                       5.1.2   Proposed Project Staff and their Functions (25 points):
                               The quality, experience and quantity of staff and their functions will be
                               evaluated by the Committee.

                               5.1.2.1 The firm shall name the actual staff to be assigned to this
                                       Project, describe their ability, and experience, and indicate the
                                       function of each within their organization and their proposed role
                                       on this Project. It is the intent that the proposed staff shall be
                                       assigned to this Project unless otherwise approved by Owner.
                                       The staff shall be present at the time of the interview.

                               5.1.2.2 Organization Chart: Develop an organization chart as it
                                       relates to the Project indicating key personnel and their
                                       relationship.
DeKalb County School District                                                        RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                  Project No. 366-35
May 23, 2024                                                                                Page 10 of 22

                               5.1.2.3 Give brief resumes of key persons to be assigned to the
                                       Project including, but not limited to, the following:

                                       a. Name and title.
                                       b. How many years with this firm? For sub-consultants, list
                                          prior projects your firm has worked with sub-consultant.
                                       c. How many years with other firms?
                                       d. Experience including types of projects, size of projects (dollar
                                          value and square footage of project), and specific project
                                          involvement.
                                       e. Education.
                                       f. Active registrations (if any).
                                       g. If submitting as a joint venture or partnership, include the
                                          assigned staff for the joint venture or partnership and
                                          indicate which of the joint ventures or partners employs the
                                          staff member.
                      5.1.3   Project Approach (20 points):
                              5.1.3.1 The firm shall provide information regarding its knowledge of
                              working on active school campuses, local codes and ordinances, local
                              subcontractors, and suppliers as an indication of its ability to deliver
                              quality workmanship in an effective and timely manner.


                              5.1.3.2 The firm shall demonstrate verbally and graphically its plan for
                                      performing the Project, documenting the services to be provided
                                      and showing the interrelationships of all parties, including the
                                      District’s consultants, departments (IT, FF&E, Transportation,
                                      Nutrition, etc.) local authorities, architects, and Program Manager,
                                      to name a few. As part of its services, the firm shall indicate
                                      knowledge and experience in the evaluation of building systems,
                                      construction techniques, and the recommendation of materials to
                                      create the optimum value in meeting the design and budget
                                      requirements.
                              5.1.3.3 Schedule: The anticipated construction Notice to Proceed is
                                      October 2024 with a Substantial Completion of Date of June 2027.
                                      Use the dates shown and develop a Preliminary Schedule that you
                                      plan on using to construct this project.
                              5.1.3.4 QA/QC: Describe your experience and technical expertise your firm
                                      will employ with regard to safety, cost and quality assurance and
                                      quality control.

                   5.1.4       Current Workload (10 points):

                               As part of the evaluation criteria, the Committee will review the firms and
                               their sub-consultants’ current workload. If the submitting firm is a joint
                               venture, the Committee will review the current workload of each of the
                               firms comprising the submitting entity. A maximum of ten points will be
                               awarded based on an evaluation of the firm’s total workload and capacity
                               to perform the work.
DeKalb County School District                                                          RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                    Project No. 366-35
May 23, 2024                                                                                  Page 11 of 22

                               5.1.4.1 Firms and their sub-consultant(s) shall provide a list of
                                       outstanding projects, client names, status of completion,
                                       anticipated completion date, and dollars committed on open
                                       project workload. Furthermore, if the submitting firm is a joint
                                       venture, they shall also include projects for each firm
                                       comprising the joint venture.
                                        Definition of sub-consultant as it relates to this selection
                                        process: An individual and/or firm contracted or to be
                                        contracted by the submitting entity to provide services related
                                        to or part of those which this will be required as part of this
                                        selection process.

                       5.1.5 Equitable Distribution (Maximum 15 points):
                              In an effort to consider the equitable distribution of work, the Selection
                              Process Facilitator shall evaluate data showing dollar amounts of contracts
                              and projects awarded by DCSD to the submitting firm(s). The dollar amount
                              of projects awarded will reflect the estimated construction value listed on
                              the RFQu awarded to each firm. The projects taken into account in the
                              calculation will be those awarded by DCSD within two years from this RFQu
                              bid opening. For those projects already under contract, the awarded
                              amount will be replaced by the GMP and/or Bid amount(s) contracted, not
                              including change orders. For projects recommended but not yet awarded,
                              the contract value will reflect the estimated fee based on the budget listed
                              within the RFQu for which the firm was selected. In the case of submittals
                              received by joint ventures, the projects awarded to each of the firms
                              comprising the joint venture will be included in the calculation of the projects
                              awarded by DCSD. Furthermore, this calculation will include all projects
                              awarded to the submitting firm, either as a joint venture or as a separate
                              entity, whereby the submitting firm(s) was one of the entities included in the
                              award and/or contract.

                              5.1.5.1 The chart below will be used to award a maximum of 15 points
                                      based on dollar amount of projects currently under contract, as
                                      well as those awarded by DCSD, but not yet under contract and
                                      those recommended but not yet awarded. This single score will be
                                      allocated to each firm by the Selection Process Facilitator and
                                      added to the cumulative score the committee members.

                             Contract Value Awarded/ Recommended by DCSD                   Point Value
                            0 to $5,000,000                                                 15 points
                            $5,000,001 to $10,000,000                                       13 points
                            $10,000,001 to $20,000,000                                      11 points
                            $20,000,001 to $30,000,000                                       9 points
                            $30,000,001 to $50,000,000                                       7 points
                            Greater than $50,000,000                                         0 points

                5.2    Group Review. The PEC members shall meet and discuss the Proposals. The
                       goal of this review is to allow each PEC member the opportunity to fully discuss
                       the Proposals and to identify any information in the proposals deemed by
DeKalb County School District                                                          RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                    Project No. 366-35
May 23, 2024                                                                                  Page 12 of 22

                       the PEC member to be significant to the evaluation. At the conclusion of
                       this meeting, each PEC member shall render his or her final scores for each
                       proposal and submit his or her Proposal Evaluation Form to the Selection
                       Process Facilitator.

                       5.2.1   The Selection Process Facilitator shall combine the evaluation scores
                               submitted by all PEC members and shall determine the five (5) highest
                               scoring firms (unless otherwise determined) based on the total
                               evaluation scores received. In the event of a tied score for fifth place, all
                               such tied firms shall be included in the short list.

                       5.2.2    Short List Recommendation. The Selection Process Facilitator shall
                               forward the PEC’s short list recommendation to the Chief Operations
                               Officer (“the COO”). The COO, in his or her sole discretion, can either
                               accept the short list recommendation or reject the short list
                               recommendation. If the COO accepts the recommendation, the selection
                               process proceeds as noted below. If the COO rejects the short list
                               recommendation, he or she, in his or her sole discretion, can proceed
                               in any of the following methods: directing the Selection Process
                               Facilitator to recommence the selection process at whatever stage
                               the COO deems appropriate (including the Individual Review stage or
                               the Group Review stage); pursuing the project by any other alternative
                               method permitted under Georgia law; or abandoning the project all
                               together. If the COO elects to pursue the project by an alternative method
                               or abandon the project, DCSD shall provide public notice of this decision.
                       5.2.3   in any of the following methods: directing the Selection Process
                               Facilitator to recommence the selection process at whatever stage
                               the COO deems appropriate (including the Individual Review stage or
                               the Group Review stage); pursuing the project by any other alternative
                               method permitted under Georgia law; or abandoning the project all
                               together. If the COO elects to pursue the project by an alternative method
                               or abandon the project, DCSD shall provide public notice of this decision.

                       5.2.4   Notice of Short List. Once the PEC’s short list recommendation has been
                               accepted by the COO, the Selection Process Facilitator will notify all
                               submitting firms of whether or not they appear on the short list and shall
                               provide public notice of the short-listed firms.

                       5.2.5   The short-listed firms shall then be invited for interviews before the PEC,
                               which will be scheduled within three (3) business days of notification.

        6.0     INTERVIEW AND PRESENTATION

                6.1    At the time of its scheduled interview, each short-listed firm shall provide
                       additional information about its firm and operations as may be required by DCSD.
                       This additional information shall include, but is not limited to, the following:

                       6.1.1. References (10 points):
                               The CM must demonstrate a positive relationship with prior clients on
                               similar projects.
DeKalb County School District                                                        RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                  Project No. 366-35
May 23, 2024                                                                                Page 13 of 22


                               6.1.1.1 The CM shall submit written recommendations from previous
                                       owners and discuss their strategy to provide a positive working
                                       relationship with DCSD. This strategy must include actual
                                       examples of how the CM has demonstrated their cooperation
                                       with other Owners. DCSD reserves the option of contacting any
                                       of the references provided to confirm information provided.

                               6.1.1.2 DCSD staff will provide input on a firm’s past work
                                       performance, this information includes but is not limited to the
                                       number of warranty requests and responsiveness, contract and
                                       process compliance, and information from the DCSD contractor
                                       evaluation process if available.

                       6.1.2   Overall Approach, Methodology and Knowledge of the Site (35 points):

                               6.1.2.1 The firm shall provide information regarding its knowledge of
                                       working on active school campuses, local codes and
                                       ordinances, local subcontractors, and suppliers as an
                                       indication of its ability to deliver quality workmanship in an
                                       effective and timely manner.

                               6.1.2.2 The firm shall demonstrate verbally and graphically its plan for
                                       performing the Project, documenting the services to be provided
                                       and showing the interrelationship of all parties. As part of its
                                       services, the firm shall indicate knowledge and experience in
                                       the evaluation of building systems, construction techniques
                                       and the recommendation of materials to create an optimum
                                       value in meeting the design and budget requirements.

                                      Note: The services to be provided on the Project will include, but
                                      they are not limited to, the Pre-construction, Construction, and
                                      Post Construction Phases.
                       6.1.3 Project Team (15 points):
                             The firm shall express the general and specific project related
                             experience and capability of in-house staff and subconsultants and
                             their functions as it relates to this project.

                               6.1.3.1 Organization Chart: Develop an organization chart as it
                                       relates to the Project indicating key personnel and their
                                       relationship. It shall be understood that it is the intent of the
                                       District to insist that those key personnel indicated as the
                                       project team in this RFQU response actually executes the
                                       Project.

                               6.1.3.2 If a joint venture, or prime subcontractor arrangement of two (or
                                       more) firms, indicate how the work shall be distributed between
                                       the associated firms. Describe how the organizational structure
                                       will ensure orderly communications, distribution of information,
                                       effective coordination of activities and accountability.
DeKalb County School District                                                          RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                    Project No. 366-35
May 23, 2024                                                                                  Page 14 of 22

                       6.1.4   Cost Control (20 points):

                               6.1.4.1 Describe how you develop cost estimates, and how they are
                                       updated, providing specific examples of successful
                                       recommendations implemented and cost containment strategies
                                       utilized to maintain project budgets without sacrificing quality.
                                       Describe your preconstruction bidding process and explain the
                                       benefits to the Owner.

                               6.1.4.2 The firm shall provide a comparison of any representative
                                       current projects demonstrating their ability to hold to original
                                       budgets.

                               6.1.4.3 Provide a list of onsite staff that you propose for this project and
                                       the number of hours that each staff member will work on the
                                       project during the construction phase.
                       6.1.5   Project Scheduling (20 points):

                               6.1.5.1 As part of the project approach, the firm shall propose a
                                       process for scheduling multiple projects and effectively
                                       managing and executing the work in the optimum time.
                                       Provide a sample schedule and describe any major
                                       milestones for achieving the schedule and any other
                                       recommendations that may directly impact the schedule.

                               6.1.5.2 The firm shall describe any representative current projects and
                                       the projected versus the actual schedule for each.

                6.2    Interview
                       6.2.1   The short-listed firms shall be invited for interviews before the PEC. At the
                               time of its scheduled interview, each short-listed firm shall provide
                               additional information about its firm and operations as may be required by
                               DCSD. This additional information shall be identified in the RFQu.

                       6.2.2   The PEC shall schedule a separate interview for each short-listed firm.
                               As part of its interview, and at the Selection Process Facilitator’s
                               discretion, each firm shall make a short oral presentation.

                       6.2.3   After the PEC has interviewed all the short-listed firms, the PEC shall
                               reconvene for the PEC members to discuss the interviews and review
                               each presentation. At the end of this discussion, PEC members shall
                               use the Presentation Evaluation Forms to record their evaluation of
                               each short-listed firm, and then submit the Presentation Evaluation
                               Forms to the Selection Process Facilitator.

                       6.2.4   The Selection Process Facilitator shall combine the evaluation scores
                               submitted by all PEC members and determine the PEC’s ranking of the
                               short-listed firms based upon the total scores assigned to each firm for
                               the presentation stage. If the ranking results in a tied score for the
                               number one or number two ranked firms, additional information shall be
DeKalb County School District                                                         RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                   Project No. 366-35
May 23, 2024                                                                                 Page 15 of 22

                               requested from the tied firms and presented to the committee. The
                               committee will score the firms based on the responses to the additional
                               information.
                6.3    Submittal of recommended highest ranked firm. The Selection Process
                       Facilitator shall submit the highest ranked firm recommended by the PEC to the
                       COO for approval. The COO, in his or her sole discretion, shall either accept the
                       results of the PEC’s ranking recommendation and forward it to the Board of
                       Education for approval or reject the results of the ranking recommendation. If the
                       COO accepts the ranking recommendation, the approval and negotiation
                       process continue as noted below. If the COO rejects the results of the ranking
                       recommendation, he or she, in his or her sole discretion, shall proceed with any
                       of the following methods: directing the PEC Selection Process Facilitator to
                       recommence the selection and ranking process at whatever stage the COO
                       deems appropriate (including the Individual Review stage, the Group Review
                       stage, or the Interview process); pursuing the project by any other alternative
                       method permitted under Georgia law; or abandoning the project all together. If the
                       COO elects to pursue the project through an alternative method or abandon the
                       project all together, DCSD shall provide public notice of that decision.

                .      Upon the COO’s approval of the PEC’s recommendation, an agenda item shall
                       be prepared and put on the next available agenda for the Board of Education review
                       and approval.

        7.0     SELECTION PROCESS:

                7.1    The Proposal Evaluation Committee (“PEC”) shall be established by the COO.
                       The COO, or his designee, shall approve the members of the PEC, to include the
                       following:

                       7.1.1   At least three (3) DCSD staff persons with expertise in facilities
                               design, construction, operation, and/or maintenance, property,
                               surveying and environmental, as recommended by the Chief Operations
                               Officer from their respective divisions, for the purpose of evaluating
                               and scoring only those elements of the responses that relate to facilities
                               design, construction, operation, and maintenance proposals, and on an
                               as needed basis, those that include property, surveying and
                               environmental.
                       7.1.2   At least one (1) member of the SPLOST CIP staff with expertise in facilities
                               design, construction, operation, and/or maintenance, property,
                               surveying and environmental, as recommended by the Chief Operations
                               Officer, for the purpose of evaluating and scoring only those elements
                               of the responses that relate to facilities design, construction, operation,
                               and maintenance proposals.
                       7.1.3   Such other staff person(s) as deemed appropriate by the COO, or
                               his designee, in order to ensure that the PEC includes persons with
                               experience and knowledge in the contractual services being sought, for
                               the purpose of evaluating and scoring only those elements of the
                               responses that relate to the person(s)’ area of experience and
                               knowledge.
DeKalb County School District                                                           RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                     Project No. 366-35
May 23, 2024                                                                                   Page 16 of 22

                         7.1.4   Membership of the PEC may include representation from other public
                                 or private entities or others deemed appropriate as recommended by
                                 the Chief Operations Officer. The recommendation may be based on
                                 project complexity, project cost and staff capacity.

        7.2     All voting members of the PEC are required to comply with the provisions of Board
                Policy DJE and the provisions of the Code of Ethics for Public Officers and Employees.
                No member shall solicit or knowingly accept any gift, gratuity, loan, special discount,
                entertainment, transportation, lodging, meals, favor or promise of future employment,
                based upon any understanding that the vote, official action, or judgment of the member
                would be influenced thereby. The Chief Operations Officer, or his designee, shall select
                a Procurement representative who shall serve as the Selection Process Facilitator to
                monitor the selection process, ensure compliance with all applicable procedural
                requirements, limiting discussion which facilitates the procurement process, the facts of
                the procurement and documentation on file, and will maintain objectivity at all times.

        7.3     The Selection Process Facilitator shall be responsible for ensuring that each member is
                provided information on the project, directs discussion as necessary and determines when
                the committee may need to vote on any compliance related issues.

        7.4     The final rankings as approved by the Board of Education will rank all proposers from
                highest to lowest scores based on the selection criteria described in the RFQu.

 8.0    SCHEDULE

        8.1     Pre-submittal conference attendance (mandatory).
                A virtual mandatory pre-submittal conference will be held on Thursday, June 6, 2024,
                10:00 a.m., EST, via TEAMS. Attendees must provide the following information by 5:00
                p.m., EST on Wednesday, June 5, 2024:
                   1.   Individual Name and Title
                   2.   Company Name
                   3.   Telephone Number
                   4.   Email Address
               This information must be sent to dcsd-op-solicitation@dekalbschoolsga.org. A meeting link
               will be sent to all registered attendees no later than 9:30 a.m., EST on Thursday, June 6,
               2024. The RFQu will be reviewed, and questions will be addressed.

        8.2     Site visit attendance (MANDATORY)
                There will be a mandatory site visit at 9:00 AM EST on Friday, June 7, 2024, at the following
                sites:
                    • Rock Chapel Elementary School, 1130 Rock Chapel Road, Lithonia GA 30058

                Details will be provided during the pre-submittal conference.

        8.3     Statements of Qualifications will be received electronically on the DeKalb County School
                District website at https://dekalbschoolsga.ionwave.net for CONSTRUCTION
                MANAGEMENT AT RISK SERVICES FOR Rock Chapel Elementary School HVAC
                System Replacement and Renovations, until 2:00 p.m. EST, Thursday, June 27,
                2024. Qualifications received after the specified time will not be considered. All potential
DeKalb County School District                                                         RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                   Project No. 366-35
May 23, 2024                                                                                 Page 17 of 22

                respondents must register as a vendor at http://dekalbschoolsga.ionwave.net. Based on
                evaluations of Statements of Qualifications, a maximum of five firms may be interviewed
                at times and location to be determined at a later time. The order of presentation will
                be determined at DCSD’s sole discretion, and the firms so notified.
        8.4     The dates and times identified in this RFQu are subject to change. All changes will
                be posted to the DeKalb County School District solicitation website via addendum as it
                becomes available for all phases of this project.
 9.0    GENERAL INSTRUCTIONS

        9.1         Submit electronically in accordance with the requirements contained in the Request for
                    Qualifications (RFQu).
        9.2         The response shall contain manual signature of an authorized representative of the
                    responding firm.
        9.3         Submittals received after the specified date and time will not be considered.
        9.4         Firms responding to the RFQu shall be available for presentations and interviews
                    to the DCSD PEC Selection Committee.
        9.5         The contents of the proposal of a successful firm may become part of its
                    contractual obligations.
        9.6         Excluding items 5.1.5 and 5.2, Proposals shall respond to each item noted in sections
                    4.0 and 5.0 in the order noted. Identify responses with the same paragraph notation
                    as contained in this RFQu.
        9.7         Proposals shall be typed. All corrections made by the proposer prior to the opening
                    shall be initialed and dated by the proposer. No changes or corrections will be allowed
                    after proposals have been opened.
        9.8         Questions: Any questions concerning the RFQu should be submitted electronically via
                    email to the Procurement Manager at dcsd-op-bidquestion@dekalbschoolsga.org.
                    Questions submitted to any other email address will not be considered. The
                    deadline for receipt of vendor questions is Wednesday, June 12, 2024, at 2:00 p.m.
                    EST. Questions received after the deadline time will not be considered. Questions
                    received by the deadline time will be answered in writing and posted to the DCSD
                    solicitation website http://dekalbschoolsga.ionwave.net no later than Wednesday,
                    June 19, 2024, by 2:00 p.m. EST. No response other than written by the
                    Procurement Manager, will be binding upon DCSD. All supplemental instructions will
                    be in the form of written Addenda to the RFQu.

        9.9         Selection committee members, school board members and school board
                    personnel are not to be contacted prior to the Board of Education’s decision to
                    approve or reject the final recommendation presented to it by the Chief Operations
                    Officer. At the discretion of DCSD, failure to comply with this requirement
                    will be grounds for disqualification.

        9.10        Specifically, this NO-CONTACT PERIOD shall commence on the initial date of the
                    advertisement for Request for Qualifications and continue through and include the
                    date the DeKalb County Board of Education makes its determination to approve or
                    reject the final recommendations.
        9.11        The assigned contact persons for this RFQu are Belinda Quillet, Senior Procurement
                    Manager and Tijauna Naylor-Simth, Procurement Manager. Mrs. Quillet can be
DeKalb County School District                                                            RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                      Project No. 366-35
May 23, 2024                                                                                    Page 18 of 22

                   reached at (678) 676-1373 or by email at dcsd-op-bidquestion@dekalbschoolsga.org.
                   Dr. Naylor-Smith can be reached at (678) 676-1313 or by email at
                   tijauna_naylor_smith@dekalbschoolsga.org. Prospective Respondents must limit
                   their contact regarding this RFQu to the assigned contact persons.
        9.12       Failure to meet any of these requirements may disqualify your firm from
                   consideration.

 10.0   TERMS AND CONDITIONS:
        10.1.       DCSD reserves the right to accept or reject any or all proposals in the best interest
                    of DCSD. DeKalb County School District reserves the right to waive any formalities
                    in the selection process.
        10.2        It is mutually understood and agreed that the nature, amount, and frequency of the
                    Services shall be determined solely by Owner and that Owner does not represent or
                    guarantee unto firm that any specific amount of services will be requested or required
                    of firm pursuant to this RFQu.

        10.3       Proposals which do not comply with these instructions or that do not include the
                   requested data may not be considered.

        10.4       The successful firm shall not discriminate against any person in accordance with
                   Federal, State or Local law.

        10.5       It is the sole responsibility of the submitting firm to ensure proposals are received
                   at the proper place on or before the time and date required, and in the format stated.
        10.6       By responding to this RFQu, the offeror certifies that the proposing company and/or
                   its principals have not been suspended, excluded, disqualified, debarred, proposed
                   for debarment, declared ineligible or voluntarily excluded from participation in any
                   transaction by any Federal or State department or agency and that the bidder
                   complies with all applicable orders, rules and regulations related thereto. Further, by
                   responding to this RFQu, the offeror certifies that all lower tier participating individuals
                   and/or company(s) and all respective principals of lower tier participants have not
                   been suspended, excluded, disqualified, debarred, proposed for debarment, declared
                   ineligible or voluntarily excluded from participation in any transaction by any Federal
                   or State department or agency and that the bidder complies with all applicable orders,
                   rules and regulations related thereto.
        10.7       DeKalb County School District, Georgia, does not discriminate in admission or
                   access to, or treatment or employment in its programs and activities, on the basis
                   of race, color, religion, age, sex, national origin, marital status, disability, genetic
                   information, sexual orientation, gender identity or expression, or any other reason
                   prohibited by law.
        10.8       Any person who is adversely affected by a decision of the DeKalb County School
                   District concerning this procurement, shall adhere to the following Protest
                   Procedures:

                   10.8.1      Protests. A bidder may file a written protest challenging DCSD’s
                               compliance with applicable procurement procedures subject to the
                               bidder’s compliance with the provisions outlined below. Any such written
                               protest will be resolved in accordance with these provisions.
DeKalb County School District                                                           RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                     Project No. 366-35
May 23, 2024                                                                                   Page 19 of 22

                   10.8.2     Types of Challenges. Any bidder interested in and capable of responding
                              to a competitive solicitation may file a protest with respect to the competitive
                              solicitation process including, but not limited to, a challenge to
                              specifications or any events or facts arising during the solicitation process.
                              Any bidder submitting a timely bid/proposal in response to a competitive
                              solicitation may file a protest with respect to DCSD’s intended or actual
                              contract award including, but not limited to, events or facts arising during
                              the evaluation and/or negotiation process.


                   10.8.3     Form of Protest. At a minimum, the written protest must include the
                              following:
                              a.       the name and address of the protestor;
                              b.       appropriate identification of the solicitation;
                              c.       a statement of reasons for the protest;
                              d.       supporting exhibits, evidence, or documents to substantiate any
                                       claims unless not available within the filing time (in which case
                                       the offeror must proceed to file the protest during the filing period
                                       identified below but state the expected availability of the
                                       material); and
                              e.       the desired remedy.
                              DCSD, at its discretion, may deem issues not raised in the initial
                              protest as waived with prejudice by the protesting offeror.

                   10.8.4     Filing Protests. A protest is considered to be properly filed when it is in
                              writing, signed by a company officer authorized to sign contracts on behalf
                              of the offeror, and is received by the Design and Construction Department.
                              The protest may be sent by any of the following means:
                                                MAIL: Attention: Mr. Erick Hofstetter
                                                Chief Operating Officer
                                                DeKalb County School District
                                                Sam A. Moss Service Center
                                                1780 Montreal Road
                                                Tucker, Georgia 30084
                             EMAIL:             dcsd-op-solicitation@dekalbschoolsga.org

                   10.8.5     Type of Protests. A challenge to the competitive solicitation process
                              must be filed within two (2) business days prior to the closing date and
                              time of the solicitation as identified on the RFQu.
                              A challenge to an intended or actual contract award must be filed within
                              ten (10) calendar days of the date the Notice of Intent to Award (NOIA) is
                              posted by DCSD. In the event DCSD does not post a NOIA, the protest
                              must be filed within ten (10 calendar days of the date the Notice of Award
                              (NOA) is posted.

                              If a protest is not filed by the applicable deadline, such failure shall
                              be deemed as a waiver with prejudice of any grounds the bidder may
                              have for protest.
DeKalb County School District                                                         RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                   Project No. 366-35
May 23, 2024                                                                                 Page 20 of 22

                   10.8.6     Stay of Procurement During Protest Review. When a protest
                              challenging the competitive solicitation process has been timely filed at
                              least two (2) business days prior to the closing date and time, the
                              solicitation shall not close until a final decision resolving the protest has
                              been issued, unless the Design and Construction Department makes a
                              written determination that the closing of the solicitation without delay is
                              necessary to protect the interests of DCSD.

                              When a protest challenging an intended contract award has been timely
                              filed, DCSD shall not proceed to actual contract award unless the Design
                              and Construction Department makes a written determination that the
                              issuance of a contract or performance of the contract without delay is
                              necessary to protect the interests of DCSD. If it is determined that it is
                              necessary to proceed with contract performance without delay, the
                              bidder/offeror with this contingent contract may proceed with performance
                              and receive payment for work performed in strict accordance with the
                              terms of the contract. The provisions of this paragraph are not applicable
                              to a protest pertaining to events or facts arising during the solicitation
                              process.

                   10.8.7     Protest Resolution. The Design and Construction Department shall
                              review and issue a written decision on the protest within seven (7)
                              business days. This decision shall be deemed final. Available remedies for
                              sustained protests are as follows:

                              10.8.7.1 If a protest is sustained prior to the closing date and time of the
                                       solicitation, available remedies may include, but are not limited to,
                                       the following: modification of the solicitation document including,
                                       but not limited to, specifications and terms and conditions;
                                       extension of the solicitation closing date and time (as appropriate);
                                       and cancellation of the solicitation.

                              10.8.7.2 If a protest of the intended/actual contract award is sustained,
                                         available remedies may include but are not limited to, the
                                         following: revision or cancellation of the NOIA/NOA, re-evaluation
                                         and re-award, or re-solicitation with appropriate changes to the
                                         new solicitation.
                   10.8.8     Costs. In no event shall a bidder be entitled to recover any costs incurred
                              in connection with the solicitation or protest process, including, but not
                              limited to, the costs of preparing a bid/proposal, the costs of participating
                              in the protest process, or any attorney fees.


       10.9        By making a submission, it is understood and agreed that the submitting entity
                   consents to DCSD contacting any parties referenced in the entities response
                   including, but not limited to, all project owners and references herein.

        10.10      Submitters acknowledge and agree that the contracting entity will be the CM name
                   identified in the response to 4.3.1.1
DeKalb County School District                                                         RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                   Project No. 366-35
May 23, 2024                                                                                 Page 21 of 22


        10.11      Attachment M, is the most current version of DCSD’ standard contract form for
                   Construction Management Services. By submitting a response to this RFQu,
                   submitters acknowledge and agree that they have reviewed this standard form and
                   have no objection to it. Further, if selected by DCSD, Submitters acknowledge and
                   agree that they will execute this standard form contract, subject to DCSD right to
                   make revisions and modifications thereto prior to execution, where DCSD has
                   determined, in its sole discretion that such revisions or modifications are in DCSD best
                   interest.
DeKalb County School District                                                            RFQu No. 24-752-032
CM at Risk for Rock Chapel ES HVAC System Replacement and Renovations                      Project No. 366-35
May 23, 2024                                                                                    Page 22 of 22


                                              NOTICE
                                 CONSTRUCTION MANAGEMENT AT RISK
                                  ROCK CHAPEL ELEMENTARY SCHOOL
                             HVAC SYSTEM REPLACEMENT AND RENOVATIONS

DeKalb County Board of Education announces that Construction Management at Risk are required for the project
listed below.

PROJECT AND NUMBER:                              Construction Management at Risk Services for
                                                 Rock Chapel Elementary School HVAC System Replacement
                                                 and Renovations – Project No. 366-35
                                                 RFQu No. 24-752-032

SERVICES TO BE PROVIDED:                         Construction Management at Risk Services for Rock Chapel
                                                 Elementary School HVAC System Replacement and Renovations


 VIRTUAL PRE-SUBMITTAL MEETING:                  June 06, 2024, 10:00 a.m. EST, via Teams
                                                 Attendees must provide the following information by
                                                 Wednesday, June 5, 2024, 5:00 p.m. EST:
                                                 1. Individual Name and Title
                                                 2. Company Name
                                                 3. Telephone Number
                                                 4. Email Address
                                                 Information must be sent to dcsd-op-
                                                 solicitation@dekalbschoolsga.org
                                                 A meeting link will be sent to all registered attendees.
                                                 Attendance is mandatory.

 DCSD CONTACT:                                    Belinda Quillet, Senior Procurement Manager
                                                  Dr. Tijauna Naylor Smith, Procurement Manager

 QUALIFICATIONS ARE TO BE SENT TO:                http://dekalbschoolsga.ionwave.net

 QUALIFICATIONS DUE DATE AND TIME:                June 27, 2024, 2:00 p.m. EST


 Requirements: Interested firms are required to comply with all requirements of the Request for Qualification
 (RFQu). A copy of the RFQu and any and all clarifications issued shall be obtained from the DeKalb County
 School District web site http://dekalbschoolsga.ionwave.net. Furthermore, all Notices concerning this solicitation
 and award shall be posted to the aforementioned web site. These Notices shall include but are not limited to
 short list meeting dates and times, presentation meeting dates and times, intended decision and decision
 information.

                             End of RFQu Document Consisting of 22 Pages

                                         (See Attachments Package)