IFB GA040820

AID 1624396 · View on Simbli

Agenda Item

xii. Approval to Utilize the Indefinite Quantity Construction (EZIQC) Services Georgia Statewide Contract (Not to exceed $15,000,000)

Summary: Presented by: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations
Request: It is requested that the Board of Education authorize the District to approve the following contractors utilizing the Georgia statewide contract to provide services for repairs, alterations and minor construction projects: Albion Scaccia Enterprises, LLC, (99999-SPD-S20200901-0001); Bayne Development Group, LLC, (99999-SPD-S20200901-00024); Brown & Root Industrial Services, LLC, (99999-SPD-S20160216-010);; Crown Retail Services (99999-SPD-S20200901-0004);; F.H. Paschen, S.N. Nielsen & Associates (99999-SPD-S20200901-0007); HCR Construction, Inc., (99999-SPD-S20200901-0009); HITT Construction, Inc., ( 99999-SPD-S2020090100010); JOC Construction (99999-SPD-S20200901-00013); Lichty Commercial Construction, Inc., (99999-SPD-S20200901-00023); Osprey Management LLC, (99999-SPD-S20200901-00014); Paryani Construction (99999-SPD-S20200901-00020); Place Services, Inc., (99999-SPDS20200901-00016); Prime Contractors (99999-SPD-S20200901-00015); and Ward Humphrey Incorporated (99999-SPD-S20200901-00027) in accordance with the State of Georgia Indefinite Quantity Construction (EZIQC) statewide contract through June 30, 2025, for an amount not to exceed $15,000,000.
Why: This request is to establish a pool of pre-qualified general contractors to support the Facilities Department in addressing the issues identified in the state-issued corrective action plan to complete repairs, maintenance, and minor construction projects at competitively solicited prices utilizing the State of Georgia Indefinite Quantity Construction Services contract. Under this contract, the contractor will furnish management, labor, materials, equipment, and incidental design support needed to perform the work.
Details: The use of this contact will provide access to fourteen (14) general contractors to assist the Facilities Department in addressing maintenance and repair issues in various facilities throughout the district. This contract will not be used for construction projects that exceed $100,000. However, it may be used for nonconstruction projects that exceed $100,000. The Board will be notified of all projects that exceed $100,000.
Financial impact: The total budget for these services is allocated from the cost code (100.2600.543013.00011.7520.9990.8013.040.0000) and
(100.2600.543009.00011.7520.9990.8013.040.0000) under the Operations Division General Fund Budget in the amount not to exceed $15,000,000.
Contact: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations, 678.676.1475

Mr. Bobby Moncrief, Director of Facilities, Division of Operations, 678.676.1478
Effective: Upon Board Approval
Status: Approved by General Counsel
  Invitation for Bid (IFB) DOCUMENTS
       Contractor – Open Market

            IFB# GA-040820
            State of Georgia

Indefinite Quantity Construction Contract




                February 2020
         INDEFINITE QUANTITY CONSTRUCTION CONTRACT
                             (IQCC)
                       IFB# GA-040820
                       Solicitation Table
                             Area A
                      North Georgia Area
Solicitation Trade /             Geographic         Bid Due Date        Estimated        Maximum
Solicitation Number                Area               and Time         Annual Value    Contract Term
                                   Area A
General Construction /                               4:30 PM CT
                                  Northern                               $2,000,000       4 Years
GA-A01-040820                                        04/08/2020
                                 Georgia Area
                                   Area A
General Construction /                               4:30 PM CT
                                  Northern           04/08/2020          $2,000,000       4 Years
GA-A02-040820
                                 Georgia Area
                                   Area A
General Construction /                               4:30 PM CT
                                  Northern           04/08/2020          $2,000,000       4 Years
GA-A03-040820
                                 Georgia Area
                                   Area A
General Construction /                               4:30 PM CT
                                  Northern           04/08/2020          $2,000,000       4 Years
GA-A04-040820
                                 Georgia Area
                                   Area A
General Construction /                               4:30 PM CT
                                  Northern           04/08/2020          $2,000,000       4 Years
GA-A05-040820
                                 Georgia Area
                                   Area A
General Construction /                               4:30 PM CT
                                  Northern           04/08/2020          $2,000,000       4 Years
GA-A06-040820
                                 Georgia Area
                                   Area A
General Construction /                               4:30 PM CT
                                  Northern           04/08/2020          $2,000,000       4 Years
GA-A07-040820
                                 Georgia Area
                                   Area A
General Construction /                               4:30 PM CT
                                  Northern           04/08/2020          $2,000,000       4 Years
GA-A08-040820
                                 Georgia Area
                                   Area A
General Construction /                               4:30 PM CT
                                  Northern           04/08/2020          $2,000,000       4 Years
GA-A09-040820
                                 Georgia Area
                                   Area A
General Construction /                               4:30 PM CT
                                  Northern           04/08/2020          $2,000,000       4 Years
GA-A10-040820
                                 Georgia Area
                       See Section Three (3) for Map and list of geographical areas.
         INDEFINITE QUANTITY CONSTRUCTION CONTRACT
                              (IQCC)
                         IFB# GA-040820
                        Solicitation Table
                              Area B
                    East Central Georgia Area
Solicitation Trade /             Geographic         Bid Due Date        Estimated        Maximum
Solicitation Number                Area               and Time         Annual Value    Contract Term
                                   Area B
General Construction /                               4:30 PM CT
                                 East Central                            $2,000,000       4 Years
GA-B01-040820                                        04/08/2020
                                 Georgia Area
                                   Area B
General Construction /                               4:30 PM CT
                                 East Central        04/08/2020          $2,000,000       4 Years
GA-B02-040820
                                 Georgia Area
                                   Area B
General Construction /                               4:30 PM CT
                                 East Central        04/08/2020          $2,000,000       4 Years
GA-B03-040820
                                 Georgia Area
                                   Area B
General Construction /                               4:30 PM CT
                                 East Central        04/08/2020          $2,000,000       4 Years
GA-B04-040820
                                 Georgia Area
                                   Area B
General Construction /                               4:30 PM CT
                                 East Central        04/08/2020          $2,000,000       4 Years
GA-B05-040820
                                 Georgia Area
                                   Area B
General Construction /                               4:30 PM CT
                                 East Central        04/08/2020          $2,000,000       4 Years
GA-B06-040820
                                 Georgia Area
                                   Area B
General Construction /                               4:30 PM CT
                                 East Central        04/08/2020          $2,000,000       4 Years
GA-B07-040820
                                 Georgia Area
                                   Area B
General Construction /                               4:30 PM CT
                                 East Central        04/08/2020          $2,000,000       4 Years
GA-B08-040820
                                 Georgia Area
                                   Area B
General Construction /                               4:30 PM CT
                                 East Central        04/08/2020          $2,000,000       4 Years
GA-B09-040820
                                 Georgia Area
                                   Area B
General Construction /                               4:30 PM CT
                                 East Central        04/08/2020          $2,000,000       4 Years
GA-B10-040820
                                 Georgia Area
                       See Section Three (3) for Map and list of geographical areas.
         INDEFINITE QUANTITY CONSTRUCTION CONTRACT
                              (IQCC)
                        IFB# GA-040820
                        Solicitation Table
                              Area C
                     Southwest Georgia Area
Solicitation Trade /             Geographic         Bid Due Date        Estimated        Maximum
Solicitation Number                Area               and Time         Annual Value    Contract Term
                                    Area C
General Construction /                               4:30 PM CT
                                  Southwest                              $2,000,000       4 Years
GA-C01-040820                                        04/08/2020
                                 Georgia Area
                                    Area C
General Construction /                               4:30 PM CT
                                  Southwest          04/08/2020          $2,000,000       4 Years
GA-C02-040820
                                 Georgia Area
                                    Area C
General Construction /                               4:30 PM CT
                                  Southwest          04/08/2020          $2,000,000       4 Years
GA-C03-040820
                                 Georgia Area
                                    Area C
General Construction /                               4:30 PM CT
                                  Southwest          04/08/2020          $2,000,000       4 Years
GA-C04-040820
                                 Georgia Area
                                    Area C
General Construction /                               4:30 PM CT
                                  Southwest          04/08/2020          $2,000,000       4 Years
GA-C05-040820
                                 Georgia Area
                                    Area C
General Construction /                               4:30 PM CT
                                  Southwest          04/08/2020          $2,000,000       4 Years
GA-C06-040820
                                 Georgia Area
                                    Area C
General Construction /                               4:30 PM CT
                                  Southwest          04/08/2020          $2,000,000       4 Years
GA-C07-040820
                                 Georgia Area
                                    Area C
General Construction /                               4:30 PM CT
                                  Southwest          04/08/2020          $2,000,000       4 Years
GA-C08-040820
                                 Georgia Area
                                    Area C
General Construction /                               4:30 PM CT
                                  Southwest          04/08/2020          $2,000,000       4 Years
GA-C09-040820
                                 Georgia Area
                                    Area C
General Construction /                               4:30 PM CT
                                  Southwest          04/08/2020          $2,000,000       4 Years
GA-C10-040820
                                 Georgia Area
                       See Section Three (3) for Map and list of geographical areas.
         INDEFINITE QUANTITY CONSTRUCTION CONTRACT
                              (IQCC)
                        IFB# GA-040820
                        Solicitation Table
                              Area D
                     Southeast Georgia Area
Solicitation Trade /             Geographic         Bid Due Date        Estimated        Maximum
Solicitation Number                Area               and Time         Annual Value    Contract Term
                                   Area D
General Construction /                               4:30 PM CT
                                  Southeast                              $2,000,000       4 Years
GA-D01-040820                                        04/08/2020
                                 Georgia Area
                                   Area D
General Construction /                               4:30 PM CT
                                  Southeast          04/08/2020          $2,000,000       4 Years
GA-D02-040820
                                 Georgia Area
                                   Area D
General Construction /                               4:30 PM CT
                                  Southeast          04/08/2020          $2,000,000       4 Years
GA-D03-040820
                                 Georgia Area
                                   Area D
General Construction /                               4:30 PM CT
                                  Southeast          04/08/2020          $2,000,000       4 Years
GA-D04-040820
                                 Georgia Area
                                   Area D
General Construction /                               4:30 PM CT
                                  Southeast          04/08/2020          $2,000,000       4 Years
GA-D05-040820
                                 Georgia Area
                                   Area D
General Construction /                               4:30 PM CT
                                  Southeast          04/08/2020          $2,000,000       4 Years
GA-D06-040820
                                 Georgia Area
                                   Area D
General Construction /                               4:30 PM CT
                                  Southeast          04/08/2020          $2,000,000       4 Years
GA-D07-040820
                                 Georgia Area
                                   Area D
General Construction /                               4:30 PM CT
                                  Southeast          04/08/2020          $2,000,000       4 Years
GA-D08-040820
                                 Georgia Area
                                   Area D
General Construction /                               4:30 PM CT
                                  Southeast          04/08/2020          $2,000,000       4 Years
GA-D09-040820
                                 Georgia Area
                                   Area D
General Construction /                               4:30 PM CT
                                  Southeast          04/08/2020          $2,000,000       4 Years
GA-D10-040820
                                 Georgia Area
                       See Section Three (3) for Map and list of geographical areas.
         INDEFINITE QUANTITY CONSTRUCTION CONTRACT
                              (IQCC)
                        IFB# GA-040820
                        Solicitation Table
                      Statewide Contracts
(Bidders who respond and win an award in all four geographical areas will be eligible for a Statewide
                                           Contract.)

Solicitation Trade /             Geographic         Bid Due Date        Estimated        Maximum
Solicitation Number                Area               and Time         Annual Value    Contract Term
General Construction /                               4:30 PM CT
                                  Statewide                              $2,000,000       4 Years
GA-ST01-040820                                       04/08/2020
General Construction /                               4:30 PM CT
                                  Statewide          04/08/2020          $2,000,000       4 Years
GA-ST02-040820
General Construction /                               4:30 PM CT
                                  Statewide          04/08/2020          $2,000,000       4 Years
GA-ST03-040820
General Construction /                               4:30 PM CT
                                  Statewide          04/08/2020          $2,000,000       4 Years
GA-ST04-040820
General Construction /                               4:30 PM CT
                                  Statewide          04/08/2020          $2,000,000       4 Years
GA-ST05-040820
General Construction /                               4:30 PM CT
                                  Statewide          04/08/2020          $2,000,000       4 Years
GA-ST06-040820
General Construction /                               4:30 PM CT
                                  Statewide          04/08/2020          $2,000,000       4 Years
GA-ST07-040820
General Construction /                               4:30 PM CT
                                  Statewide          04/08/2020          $2,000,000       4 Years
GA-ST08-040820
General Construction /                               4:30 PM CT
                                  Statewide          04/08/2020          $2,000,000       4 Years
GA-ST09-040820
General Construction /                               4:30 PM CT
                                  Statewide          04/08/2020          $2,000,000       4 Years
GA-ST10-040820
                       See Section Three (3) for Map and list of geographical areas.
                       Bids for all contracts covered by this solicitation are due by
                                        4:30 PM CT on April 8, 2020

 Sourcewell (formerly known as the National Joint Powers Alliance or NJPA), issues this Invitation for
 Bid (IFB) to provide Indefinite Quantity Construction Contracting (IQCC) services to all Sourcewell
 Members including government agencies, education agencies such as colleges and universities, and
 non-profits agencies in the State of Georgia. Each contract will have an initial term of one year and
 bilateral option provision for three additional one- year terms. The Estimated Annual Value per
 contract is $2,000,000.00. One additional one-year renewal-extension may be offered by Sourcewell
 to Vendor beyond the original four-year term if Sourcewell determines such action to be in the best
 interests of Sourcewell and its Members.

This IFB consist of four Books:
      Book 1:   Project Information and Instructions to Bidders
      Book 2:   IQCC Standard Terms and Conditions; General Terms and Conditions
      Book 3:   Construction Task Catalog®
      Book 4:   Technical Specifications

IQCC is a contracting procurement system that provides facility owner’s access to contractors to provide
construction, repair and renovation services over an extended period of time.

Interested bidders are required to attend a pre-bid seminar that will be conducted for the purpose of
discussing the IQCC procurement system, the contract documents, and reviewing the Sourcewell
Procurement Portal system for responding to the IFB. Attendance at one of the below seminars is a
mandatory condition of bidding.
March 16, 2020 @ 9:00 AM ET                           March 16, 2020 @ 2:00 PM ET
Hampton Inn                                           Gwinnett Technical College-Lawrenceville Campus
875 West 1st St. NW                                   Building 100, Room 401 – Parking Lots A & B
Rome, GA 30161                                        5150 Sugarloaf Parkway
                                                      Lawrenceville, GA 30043

March 17, 2020 @ 2:00 PM ET                           March 18, 2020 @ 9:00 AM ET
Courtyard Augusta                                     Courtyard Macon
1045 Stevens Creek Road                               3990 Sheraton Drive
Augusta, GA 30907                                     Macon, GA 31210

March 18, 2020 @ 2:00 PM ET                           March 19, 2020 @ 9:00 AM ET
Hampton Inn – Columbus North                          Courtyard by Marriott
7390 Bear Lane                                        3019 Kensington Court
Columbus, GA 31909                                    Albany, GA 31721

March 19, 2020 @ 2:00 PM ET                           March 20, 2020 @ 9:00 AM ET
Hampton Inn - Valdosta Conference Center              Hilton Garden Inn - Airport
2 Meeting Place Drive                                 80 Clyde E. Martin Drive
Valdosta, GA 31601                                    Savannah, GA 31408
Interested bidders can pre-register for the pre-bid seminar by visiting the Sourcewell Procurement
Portal at https://proportal.sourcewell-mn.gov.

An electronic copy of the IFB Documents, including the instructions for submitting a bid, may be
obtained by visiting the Sourcewell Procurement Portal at https://proportal.sourcewell-mn.gov and
selecting the desired solicitation from the open solicitations list. All Bidders must have a Sourcewell
Procurement Portal account and be registered as a Plan Taker for this Bid opportunity, which will enable
the Bidder to download the Bid Documents, to receive email notifications of the issuance of addenda, to
download all documents, and to submit a bid online.

Bids are due no later than 4:30 p.m. Central Time on April 8, 2020. Late bids will be rejected.

Questions related to this bid must be submitted through the Sourcewell Procurement Portal only by
clicking on the “Submit a Question” button for this specific bid opportunity.
                    BOOK 1
Project Information, and Instructions to Bidders

               IFB# GA-040820

                State of Georgia
   Indefinite Quantity Construction Contract




                   February 2020
This page intentionally left blank
Table of Contents
SECTION ONE - PROJECT INFORMATION ...................................................................................................... 1
   1.    DEFINITIONS ...................................................................................................................................... 1
   2.    ABOUT SOURCEWELL ........................................................................................................................ 2
   3.    DEFINED GOALS OF THE IFB .............................................................................................................. 3
   4.    IQCC OVERVIEW ................................................................................................................................ 3
   5.    GEOGRAPHIC AREAS .......................................................................................................................... 5
   6.    THE IFB DOCUMENTS ........................................................................................................................ 5
   7.    QUALIFICATION OF BIDDERS ............................................................................................................. 5
   8.    AWARD .............................................................................................................................................. 6
   9.    ASSIGNMENT OF WORK .................................................................................................................... 7
   10. ORDER OF PRECEDENCE OF THE COMPONENTS OF THE CONTRACT DOCUMENTS ......................... 8
SECTION TWO – INSTRUCTIONS TO BIDDERS ............................................................................................... 9
   1.    GENERAL INFORMATION ................................................................................................................... 9
   2.    SOLICITATION OF IFB ......................................................................................................................... 9
   3.    ADVERTISING OF SOLICITATION ........................................................................................................ 9
   4.    QUESTIONS ...................................................................................................................................... 10
   5.    PRE-BID SEMINAR ............................................................................................................................ 10
   6.    ADDENDA TO THE IFB DOCUMENTS ............................................................................................... 10
   7.    BID SUBMISSION PROCESS .............................................................................................................. 10
   8.    BID TRANSMITTAL ........................................................................................................................... 11
   9.    CONTRACTOR’S MANAGEMENT PLAN ............................................................................................ 12
   10. BID PRICING ..................................................................................................................................... 12
   11. MODIFICATION OR WITHDRAWAL OF A SUBMITTED BID ............................................................... 13
   12. BIDDERS RESPONSIVENESS AND RESPONSIBILITY ........................................................................... 14
   13. CERTIFICATION ................................................................................................................................ 14
   14. PROTESTS......................................................................................................................................... 14
   15. PUBLIC RECORD ............................................................................................................................... 15
   16. PREVAILING WAGE RATES AND PARTICIPATION REQUIREMENTS .................................................. 15
  17. MARKETING REQUIREMENT ............................................................................................................ 15
  18. MEMBER SIGN-UP PROCEEDURE .................................................................................................... 16
  19. FEES ................................................................................................................................................. 16
  20. TAXES ............................................................................................................................................... 17
  21. PHYSICAL PRESENCE ........................................................................................................................ 17
SECTION THREE – GEOGRAPHIC MAP OF SOURCEWELL CONTRACT AREA ................................................ 18
SECTION FOUR – SAMPLE INDEFINITE QUANTITY CONSTRUCTION CONTRACT......................................... 22




                                     (The remainder of this page is intentionally left blank)
                     SECTION ONE - PROJECT INFORMATION
1. DEFINITIONS
   1.1. Sourcewell: Sourcewell, formerly known as the National Joint Powers Alliance or NJPA, is a local
        government unit and public agency of the State of Minnesota pursuant to the Minnesota
        Constitution and enabling law Minnesota Statutes Section 123A.21. It has the authority to
        develop and offer, among other services, cooperative purchasing and joint purchasing services
        to its membership. Eligible membership and participation include states, cities, counties, all
        government agencies, both public and non-public educational agencies, colleges, universities,
        and certain non-profit organizations.
   1.2. Joint Exercise of Powers: Sourcewell cooperatively shares those contracts with its Members
        nationwide through various joint exercise of powers laws established in Minnesota and
        applicable laws in other states. The Minnesota joint exercise of powers law, Minnesota Statutes
        Section 471.59, states “Two or more governmental units . . . may jointly or cooperatively
        exercise any power common to the contracting parties ....” Similar joint exercise of powers laws
        may exist within each state of the United States. The Minnesota law allows Sourcewell to serve
        Member agencies located in all other states. Municipal agencies nationally have the ability to
        participate in cooperative purchasing activities as a result of specific laws of their own state.
        These laws can be found on the website at www.sourcewell-mn.gov/compliance-legal.
   1.3. Sourcewell Members:
        1.3.1. Potential Sourcewell Members: A Potential Sourcewell Member is defined as any public
                 or private educational entity, including colleges and universities, school districts or
                 boards, and any governmental unit including a city, county, town, political subdivision of
                 Minnesota or another state, and any agency of the State of Minnesota or the United
                 States, any instrumentality of a governmental unit, and certain non-profits (Minnesota
                 Statutes Section 471.59, subdivision 1). Membership in Sourcewell is required to
                 participate in any Sourcewell Contract. Any current or potential Member of Sourcewell
                 that is in compliance with the terms and conditions of membership, has the option and
                 freedom to access any of the procurement contracts of Sourcewell.
        1.3.2. Sourcewell Member: A Sourcewell Member is defined as an entity that has an executed
                 membership agreement with Sourcewell.
   1.4. Purchase Order: Purchase Orders for construction and services may be executed between
        Sourcewell or Sourcewell Members and the Contractor pursuant to this IFB and the resulting
        contracts.
        1.4.1. Governing Law: Purchase Orders, as identified above, will be construed in accordance
               with, and governed by, the laws of a competent jurisdiction with respect to the Sourcewell
               Member. Each and every provision of law and clause required by law to be included in the
               Purchase Order will be read and enforced as though it were a part of the contract. In the
               event a legally required provision is not included, parties may amend the Contract to make
               such inclusion or correction. The venue for any litigation arising out of disputes related to
               Purchase Order(s) will be a court of competent jurisdiction to the Sourcewell Member issuing
               the Purchase Order.




 February 2020                    Book 1 - Section One –– Project Information                             1
        1.4.2. Additional Terms and Conditions: Additional terms and conditions to a Purchase Order
               may be proposed by Sourcewell, Sourcewell Members, or Contractors. Acceptance of
               these additional terms and conditions must be agreed to by the parties to the Purchase
               Order. The purpose of these additional terms and conditions is to, among other things,
               formally introduce job or industry specific requirements of law such as prevailing wage
               legislation. Additional terms and conditions can include specific policy requirements and
               standard business practices of the issuing Sourcewell Member.
   1.5. Adjustment Factors: Adjustment Factors are the Contractor's competitively proposed price
         adjustments to the Unit Prices as published in the Construction Task Catalog, Book 3.
         Adjustment Factors are expressed as an increase or decrease from the published Unit Prices.
   1.6. Construction Task Catalog (CTC): A comprehensive listing of specific construction related Tasks,
         together with a specific unit of measurement and a Unit Price.
   1.7. Contract: The written contract between the Contractor and Sourcewell covering the eligible
         Work that can be performed; and other Contract Documents incorporated in or referenced in
         the Contract and made part thereof as if provided therein.

2. ABOUT SOURCEWELL
   2.1. Sourcewell is a local government unit and public agency pursuant to the Minnesota Constitution
        and enabling law Minnesota Statutes Section 123A.21 with the authority to develop and offer,
        among other services, cooperative and joint purchasing services to its membership. Eligible
        membership and participation include states, cities, counties, all government agencies, both
        public and non-public educational agencies, colleges, universities, and certain non-profit
        organizations.
   2.2. Under the authority of Minnesota state laws and enabling legislation, Sourcewell facilitates a
        competitive solicitation and construction contracting process jointly and on behalf of the needs
        of itself and the needs of current and potential member agencies. This process results in
        construction contracts with various vendors of products, equipment, and services which
        Sourcewell Member agencies desire to procure. These contracts are created in compliance with
        applicable Minnesota laws. A complete listing of Sourcewell cooperative procurement contracts
        can be found at www.sourcewell-mn.gov/cooperative-purchasing/contracts-vendor-search.
   2.3. Sourcewell is governed by a Board of Directors made up of publicly elected officials and it
        authorizes all solicitations.
        2.3.1. Subject to Approval of the Sourcewell Chief Procurement Officer as Ratified by the
                Board of Directors: Sourcewell contracts are awarded by the action of the Sourcewell
                Chief Procurement Officer and ratified by the Board of Directors. This action is based on
                the open and competitive solicitation process facilitated by Sourcewell. The evaluation
                and resulting recommendation is presented to the Chief Procurement Officer by the
                Sourcewell Bid Review Committee and ratified by the Board of Directors.
   2.4. Sourcewell currently serves over 50,000 members. Both membership and utilization of
        Sourcewell contracts continue to expand, due in part to the increasing acceptance of
        cooperative and joint purchasing throughout the government and education communities
        nationally.




 February 2020                   Book 1 - Section One –– Project Information                            2
3. DEFINED GOALS OF THE IFB
   3.1. The goal of this IFB is to establish a group of indefinite quantity construction contracts (IQCC)
        that Sourcewell and Sourcewell Members may access to complete repair, maintenance and
        minor new construction Projects at competitively solicited prices. The Contractors will perform
        an ongoing series of individual Projects for Sourcewell Members at different locations primarily
        within the designated Geographic Area.
   3.2. A benefit to the bidder is that one bid package may be prepared to compete on multiple
        contract opportunities. The resulting awarded contracts will be available to Sourcewell
        members that are comprised of government, education, and non-profit entities throughout the
        geographic area. Contracts awarded through Sourcewell ensure fair and open competition to
        help members in their procurement process; however, Sourcewell members are responsible to
        ensure that their applicable laws are satisfied. Post contract award, members may issue
        Purchase Orders to the contractor without the necessity of preparing their own IFB. This saves
        Sourcewell members time and allows for more economical and efficient purchasing.

4. IQCC OVERVIEW
   4.1. IQCC is a competitively solicited indefinite quantity construction contract awarded to
        Contractors to accomplish the repair, alteration, modernization, rehabilitation, and minor new
        construction of infrastructure, buildings, structures, or other real property. The Estimated
        Annual Value is based on the anticipated estimated annual use and the contract term is one
        year with bilateral option terms. The IFB Documents include a Construction Task Catalog (CTC)
        containing repair and construction Tasks with preset Unit Prices. All Unit Prices are based on
        local labor, material and equipment prices for the direct cost of construction. Once contracts are
        awarded, Sourcewell Members will order Work from the CTC by issuing a Purchase Order against
        the contract.
  4.2. Bidders will offer price adjustments (Adjustment Factors) to be applied to the CTC Unit
        Prices. The Adjustment Factors represent either an increase to (such as 1.1000) or a decrease
        from (such as 0.9800) the preset Unit Prices. The amount to be paid for the Work ordered
        will be determined by: multiplying the preset Unit Prices by the appropriate quantities and by
        the appropriate Adjustment Factor. The CTC and the Contractor's Adjustment Factors will be
        incorporated into the awarded contract.
   4.3. Under IQCC, the Contractor furnishes management, labor, materials, equipment and incidental
        design support needed to perform the Work.
   4.4. As Projects are identified, the Contractor will jointly scope the Work with the Sourcewell
        Member. The Sourcewell Member will prepare a Detailed Scope of Work and issue a Request for
        Proposals to the Contractor. The Contractor will then prepare a Proposal Package for the Project
        including a Price Proposal, Schedule, list of identified subcontractors, and other requested
        documentation such as cut sheets for materials. If the Proposal Package is found to be
        reasonable, the Sourcewell Member will issue a Purchase Order. The Purchase Order will
        reference the Detailed Scope of Work and set forth the Purchase Order Completion Time, and
        the Purchase Order Price. The Contractor must perform the Detailed Scope of Work within the
        Purchase Order Completion Time for the Purchase Order Price. Extra Work, credits, and
        deletions will be contained in Supplemental Purchase Orders calculated in the same manner.


 February 2020                   Book 1 - Section One –– Project Information                                3
  4.5. Sourcewell, through a formal selection process, awarded a professional service agreement to
       The Gordian Group (Gordian) for its IQCC program. The system includes Gordian’s proprietary
       ezIQC, eGordian and Bid Safe IQCC applications (IQCC Applications), and construction cost data
       (Construction Task Catalog), which will be used by the Contractor to prepare and submit Price
       Proposals, subcontractor lists, and other requirements specified by Sourcewell and Sourcewell
       Members. The Contractor’s use, in whole or in part, of Gordian’s IQCC Applications and
       Construction Task Catalog and other proprietary materials provided by Gordian for any purpose
       other than to execute work under this Contract for Sourcewell and Sourcewell Members is
       strictly prohibited unless otherwise stated in writing by Gordian. The Contractor hereby agrees
       to abide by the terms of the following Gordian IQCC System License:

        IQCC System License
        Gordian hereby grants to the Contractor, and the Contractor hereby accepts from Gordian for
        the term of this Contract or Gordian’s contract with Sourcewell, whichever is shorter, a non-
        exclusive right, privilege, and license to Gordian’s proprietary IQCC System and related
        proprietary materials (collectively referred to as “Proprietary Information”) to be used for the
        sole purpose of executing Contractor’s responsibilities to Sourcewell and Sourcewell Members
        under this Contract (“Limited Purpose”). The Contractor hereby agrees that Proprietary
        Information will include, but is not limited to Gordian‘s IQCC Applications and support
        documentation, Construction Task Catalog, training materials, marketing materials and any
        other proprietary materials provided to Contractor by Gordian. In the event this Contract
        expires or terminates as provided herein, or the Gordian’s contract with Sourcewell expires or
        terminates, this IQCC System License will terminate and the Contractor will return all Proprietary
        Information in its possession to Gordian.
        Contractor acknowledges that Gordian will retain exclusive ownership of all proprietary rights to
        the Proprietary Information, including all U.S. and international intellectual property and other
        rights such as patents, trademarks, copyrights and trade secrets. Contractor will have no right or
        interest in any portion of the Proprietary Information except the right to use the Proprietary
        Information for the Limited Purpose set forth herein. Except in furtherance of the Limited
        Purpose, Contractor must not distribute, disclose, copy, reproduce, display, publish, transmit,
        assign, sublicense, transfer, provide access to, use or sell, directly or indirectly (including in
        electronic form), any portion of the Proprietary Information.
        Contractor acknowledges and agrees to respect the copyrights, trademarks, trade secrets, and
        other proprietary rights of Gordian in the Proprietary Information during and after the term of
        this Contract , and must at all times maintain complete confidentiality with regard to the
        Proprietary Information provided to Contractor, subject to federal, state and local laws related
        to public disclosure. Contractor further acknowledges that a breach of any of the terms of this
        Contract by Contractor will result in irreparable harm to Gordian for which monetary damages
        would be an inadequate remedy, and Gordian will be entitled to injunctive relief (without the
        necessity of posting a bond) as well as all other monetary remedies available at law or in equity.
        In the event that it becomes necessary for either party to this IQCC System License to enforce
        the provisions of this Contract or to obtain redress for the breach or violation of any of its
        provisions, whether by litigation, arbitration or other proceedings, the prevailing party will be
        entitled to recover from the other party all costs and expenses associated with such
        proceedings, including reasonable attorney’s fees.




February 2020                    Book 1 - Section One –– Project Information                             4
          In the event of a conflict in terms and conditions between this IQCC System License and any
          other terms and conditions of this Contract or any Order, Purchase Order or similar purchasing
          document (Purchase Order) issued by Sourcewell or a Sourcewell Member, this IQCC System
          License will take precedence.

   4.6. The Sourcewell Member (or the Sourcewell Member Designated Representative), with the
        assistance of Gordian, will identify Projects and develop a draft scope of the work. The
        Contractor and Gordian will then assist the Sourcewell Member in developing a final scope of
        work. The Sourcewell Member will then issue a Detailed Scope of Work and a Request for
        Proposals to the Contractor. The Contractor will then utilize Gordian’s IQCC System to prepare a
        Price Proposal for the Purchase Order including a Schedule, list of identified subcontractors, and
        other requested documentation such as cut sheets for materials. Gordian will assist the
        Sourcewell Member with Price Proposal review, and if the Price Proposal is found to be
        reasonable, the Sourcewell Member will issue a Purchase Order to Contractor. The Purchase
        Order will reference the Detailed Scope of Work and set forth the Purchase Order Completion
        Time, and the Purchase Order Price. The Contractor will perform the Detailed Scope of Work
        within the Purchase Order Completion Time for the Purchase Order Price. Extra Work, credits,
        and deletions will be contained in Supplemental Purchase Orders calculated in the same
        manner.
   4.7. The Contractor must, within two (2) business days of receipt of a Purchase Order from a
        Sourcewell Member, provide notification to Sourcewell of each Purchase Order by forwarding a
        copy of the Purchase Order via email to PO@ezIQC.com or via facsimile to (864) 233-9100.
   4.8. The Contractor must, within two (2) business days of sending an Invoice to a Sourcewell
        Member, provide notification to Sourcewell of each Invoice by forwarding a copy of the Invoice
        via email to Invoice@ezIQC.com or via facsimile to (864) 233-9100.

5. GEOGRAPHIC AREAS
   5.1. Sourcewell solicits bids for the Geographic Area as shown on Section Three. This solicitation is
        for the Geographic Area(s) as specified in this IFB. Sourcewell uses the Geographical Area for
        bidding purposes. Contractors may perform work for Sourcewell Members located outside the
        defined Geographical Area upon award.

6. THE IFB DOCUMENTS
   6.1.   The IFB Documents consist of four Books:
          Book 1: Project Information, and Instructions to Bidders
          Book 2: IQCC Standard Terms and Conditions; General Terms and Conditions
          Book 3: Construction Task Catalog
          Book 4: Technical Specifications

7. QUALIFICATION OF BIDDERS
   7.1. Only bids from firms normally engaged in performing the type of work specified within the IFB
        Documents will be considered. Bidder must have adequate organization, facilities, equipment,
        and personnel to ensure prompt and efficient service to a Sourcewell Member (as solely
        determined by Sourcewell).

 February 2020                    Book 1 - Section One –– Project Information                              5
   7.2. In determining a Bidder's responsibility and ability to perform the Contract, Sourcewell has the
        right to investigate and request information concerning the financial condition, experience
        record, personnel, equipment, facilities, principal business location and organization of the
        Bidder, the Bidder's record with environmental regulations, and the claims/litigation history of
        the Bidder.
   7.3. Bidder must have a fully functioning office within the Geographical Area it is bidding.

8. AWARD
   8.1. Contract Awards will be made by the Sourcewell Chief Procurement Officer and ratified by the
        Board of Director based on the recommendation of the Sourcewell Bid Evaluation Committee
        jointly and on behalf of its current and future Sourcewell Members.
   8.2. It is the intent of Sourcewell to award each Contract to the lowest, responsive, responsible
        Bidder(s) based on the Combined Adjustment Factor as shown on the Bid, provided however, no
        Bidder will be awarded more than one Contract. In the event a Bidder submits the lowest bid on
        more than one Solicitation, Sourcewell may determine which Contract will be awarded to which
        Bidder based on the combination of bids resulting in the lowest overall cost to the Sourcewell
        Members. Sourcewell will have the right to waive any informality or irregularity in any Bidder’s
        Response received and to accept the Bidder’s Response(s), which in its judgment, is (are) in the
        best interests of Sourcewell and Sourcewell Members. Sourcewell reserves the right to reject all
        Bid Responses and advertise again if, in Sourcewell’s opinion, the received bids do not meet or
        exceed the minimum needs and expectations of the Sourcewell current and qualifying
        members. Sourcewell reserves the right to award additional Contracts from this solicitation for a
        period of 180 Days (or longer, if mutually agreeable to both the Bidder and Sourcewell).
   8.3. Bidders who respond in all four geographical areas will be eligible for Statewide Contract
        Awards. The ranking of Bidders eligible for Statewide Awards will be determined by averaging
        the bidder’s combined adjustment factor across all four geographical areas. Statewide Contract
        Awardees will not be awarded individual contracts within the areas submitted, however
        awarded Statewide Awarded contractors will be allowed to conduct work across all four
        geographical areas using the corresponding adjustment factors submitted for each geographical
        area.
   8.4. Additionally, the Bidder is required to submit a Management Plan, see Article 9, Section Two
        Instructions to Bidders. The Bidder’s Management Plan will provide Sourcewell information to
        gauge the responsibility of the Bidder.
   8.5. A Bidder will not be awarded more than one same scope Contract within any Geographic Area.
   8.6. Competitive Range Determination - if a wide margin is found in the Adjustment Factors
        submitted in response to the solicitation; being too high or too low, then the Sourcewell Bid
        Evaluation Committee may establish a Competitive Range for the solicitation. If it is determined
        that a Bidder’s Combined Adjustment Factor is too far outside the Competitive Range then the
        Bidder can be removed from consideration. The Bidder shall be notified that they were
        determined to be outside the Competitive Range after award of the contracts.
   8.7. Unbalancing of Bids – A Bid may be removed from consideration if it is determined that the
        Bidder has mathematically unbalanced their Bid to gain a competitive advantage. The Bid will be
        considered to be unbalanced if any Adjustment Factor is found to not cover the contractor’s
        reasonable actual cost. Those costs would include a reasonable prorated share of their


 February 2020                   Book 1 - Section One –– Project Information                               6
        anticipated profit, overhead cost, and other indirect costs that the bidder anticipates for the
        performance of the work as determined by the Sourcewell Bid Review Committee.
   8.8. The Other Than Normal Working Hours Adjustment factors (non-secured and secured) must be
        equal to or greater than the corresponding Normal Working Hours Adjustment Factors (non-
        secured and secured).
   8.9. The Non Pre-priced adjustment Factor without Administrative Fees must be between 1.0500
        and 1.2000.

9. ASSIGNMENT OF WORK
   9.1. The assignment of the Work is at the sole discretion of the Sourcewell Member. The
         Contractor's Adjustment Factors, performance history, and ability to perform the Work will be
         considered in determining the distribution of the Work.
   9.2. BidSafe: Sourcewell may issue a Request for Quotation (RFQ) to two or more Contractors for a
         Work Order. Selection of the Contractor and award of the Work Order will be in compliance
         with established Sourcewell procedures.
   9.3. Sourcewell reserves the right to utilize Bid Safe on a Work Order by Work Order basis.
   9.4. Sourcewell will consider several factors when determining the applicability of Bid Safe to a Work
         Order including, but not limited to, the following:
         9.4.1. Estimated Work Order Amount;
         9.4.2. Scope documentation, including but not limited A/E design;
         9.4.3. Nature and complexity of the Work;
         9.4.4. Contractors’ abilities to self-perform the Work;
         9.4.5. Contractors’ proven capabilities on similar Work;
         9.4.6. Schedule; and;
         9.4.7. Other appropriate criteria as deemed in the best interest of the Sourcewell Member.
   9.5. The Detailed Scope of Work will be developed by the Sourcewell Member personnel and
         included with the RFQ.
   9.6. Sourcewell may conduct one or more site visits with all contractors designated to Receive the
         RFQ.
   9.7. All contractors that receive the RFQ will have the opportunity to submit requests for
         information. Should Sourcewell choose to respond to any or all of the requests for information,
         the responses, and any changes to the RFQ, will be provided in an addendum to all contractors
         designated to receive the RFQ.
   9.8. The Contractor will utilize the Bid Safe application in the eGordian software to provide a Not to
         Exceed Offer (NTE Offer), along with any additional requested documentation, in response to
         the RFQ.
   9.9. Sourcewell will issue a Request for Proposal to the Contractor submitting the NTE Offer that
         provides the best value to the Sourcewell Member based on, but not limited to, price and any
         technical factors considered.
   9.10. The NTE Offer is valid for 120 Days from the date of opening unless stated otherwise in the
         Detailed Scope of Work.
   9.11. The Contractor that receives a Request for Proposal will submit a Price Proposal to Sourcewell.
         Provided that any necessary Price Proposal modifications are completed in a timely and
         thorough manner, Sourcewell will deliver a Work Order Proposal Package for the Sourcewell
         Member's consideration.

 February 2020                   Book 1 - Section One –– Project Information                              7
   9.12. The Work Order Amount shall be equal to the lessor of the NTE Offer and the Price Proposal
         amount.
   9.13. Where the NTE Offer is less than the Price Proposal, the difference between the NTE Offer and
         Price Proposal shall be deemed a discount offered by the Contractor. The discount amount shall
         be a percent-based discount that will be calculated by the following equation:
         9.13.1. Percent Discount = (Price Proposal Amount – NTE Offer) ÷ Price Proposal Amount The
               discount shall be applied to subsequent Work Orders (additions or deletions) required to
               complete the Work, provided the Work Order contains materials, equipment and tasks
               that are similar in nature to the original Detailed Scope of Work.
   9.14. If Sourcewell exercises its right to award a Work Order utilizing Bid Safe, collaboration between
         Contractors is specifically prohibited. Contractor collaboration undermines competition, and
         evidence of such will be considered a material breach of this Contract and grounds for
         termination for cause.


10. ORDER OF PRECEDENCE OF THE COMPONENTS OF THE CONTRACT DOCUMENTS
   10.1. The order of precedents of the Contract Documents shall be as follows:
     • Purchase Order which may include Plans, Drawings and supplemental Technical
         Specifications
     • Standard Specifications of the Sourcewell Member, the city, state or federal
         government, if any
     • Sourcewell Contract
     • Addenda to this IFB, if any
     • Book 2 – IQCC Standard Terms and Conditions
     • Book 2 – General Terms and Conditions
     • Book 3 – Construction Task Catalog
     • Book 4 – Technical Specifications
     • Book 1 – Instruction to bidders




                           (Balance of this page intentionally left blank)




 February 2020                   Book 1 - Section One –– Project Information                             8
                 SECTION TWO – INSTRUCTIONS TO BIDDERS

1. GENERAL INFORMATION
   1.1. The following instructions are given for the purpose of guiding Bidders in properly preparing
        their bids. Such instructions are part of the IFB Documents, and strict compliance is required
        with all the provisions contained in the instructions.
   1.2. Examination of IFB Documents
        1.2.1. It is the responsibility of each Bidder before submitting a Bid, to:
            1.2.1.1. Examine the IFB Documents thoroughly,
            1.2.1.2. Take into account federal, state and local laws, regulations, ordinances, and
                       applicable procurement codes that may affect costs, progress, performance, and
                       furnishing of the Work, or award,
            1.2.1.3. Study and carefully correlate Bidder’s observations with the IFB Documents, and
            1.2.1.4. Carefully review the IFB Documents and notify Sourcewell of all conflicts, errors or
                       discrepancies in the IFB Documents of which Bidder knows or reasonably should
                       have known.
   1.3. The submission of a Bid shall constitute an incontrovertible representation by Bidder that Bidder
        has complied with the above requirements and that without exception, the Bid is premised
        upon performing and furnishing the Work required by the IFB Documents and that the IFB
        Documents are sufficient in scope and detail to indicate and convey understanding of all terms
        and conditions for performance and furnishing of the Work.
   1.4. Bidders should include all relevant information in its submittal. Sourcewell cannot consider
        information that is not provided in the submittal. Sourcewell reserves the right to verify
        Bidder’s information and may request clarification from a Bidder.

2. SOLICITATION OF IFB
   2.1. Bids will be received in an electronical format only, through the Sourcewell Procurement Portal
        at https://proportal.sourcewell-mn.gov , until the deadline for receipt stated in this IFB. Bids
        will be for the provision of Indefinite Quantity Construction Contract services for both
        Sourcewell and Sourcewell Members, and all government and education agencies to include
        colleges and universities, and certain non-profit agencies.
   2.2. Complete IFB Documents will be made available through the Sourcewell Procurement Portal
        (https://proportal.sourcewell-mn.gov). Paper, oral, facsimile, telephone, or other electronic
        submissions (other than through the Sourcewell Procurement Portal) are invalid and will not
        receive consideration.

3. ADVERTISING OF SOLICITATION
   3.1. As required by law, Sourcewell must advertise this solicitation. It will be posted on Sourcewell’s
        website, and posted to other third party websites deemed appropriate by Sourcewell. This
        advertisement is also submitted for posting at individual state levels.


 February 2020                  Book 1 - Section Two –– Instructions to Bidders                            9
   3.2. In addition, Sourcewell shall advertise in one or more publications distributed in the
        geographic area, including, but not limited to, newspapers and other publications consistent
        with state law regarding notice of this invitation for bid.

4. QUESTIONS
   4.1. Questions related to this bid are to be submitted through the Sourcewell Procurement Portal
        only by clicking on the “Submit a Question” button for this specific bid opportunity. All questions
        must be submitted prior to April 1, 2020, at 4:30 PM Central Time. Sourcewell urges potential
        bidders to communicate all concerns during the response period to avoid misunderstandings.
   4.2. If question is deemed by Sourcewell to have a material impact on the IFB, the response to the
        Question will become an Addendum to these IFB Documents.

5. PRE-BID SEMINAR
   5.1. A Pre-bid seminar will be held at the places and times listed in this Invitation for Bid for the
        purpose of discussing the IQCC procurement system, the IFB Documents, and reviewing the
        Sourcewell Procurement Portal system for responding to the IFB. Attendance at one of the Pre-
        Bid Seminar(s) is mandatory to be deemed responsive.

6. ADDENDA TO THE IFB DOCUMENTS
   6.1.   Addenda are written instruments issued by Sourcewell that modify or interpret these IFB
          Documents. All Addenda issued by Sourcewell will become a part of the IFB Documents.
          Addenda will be delivered to all potential bidders through the Sourcewell Procurement Portal.
          Sourcewell accepts no liability in connection with the delivery of said materials. No Addenda
          will be issued later than five (5) Days prior to the deadline for receipt of bids, except an
          Addendum withdrawing the request for bids or one that includes postponement of the date of
          receipt of bids.
   6.2.   Bidders must acknowledge receipt of any addenda when submitting their Bid through the
          Sourcewell Procurement Portal by checking a box for each addendum and any applicable
          attachment. It is the responsibility of the Bidder to have received all Addenda that are issued.
          Bidders should check the Sourcewell Procurement Portal prior to submitting their Bid and up
          until Bid closing time and date in the event additional addenda are issued. If a Bidder submits
          its bid prior to the Bid closing time and date and an addendum is issued, the Bidding System
          automatically WITHDRAWS the Bid submission and the bid status will change to an
          INCOMPLETE STATUS. The Bidder can view this status change in the “MY BIDS” section of the
          Bidder’s Sourcewell Procurement Portal Account. The Bidder is solely responsible to:
          6.2.1. Make any required adjustments to their Bid; and
          6.2.2. Acknowledge addenda; and
          6.2.3. Ensure the re-submitted Bid is RECEIVED by the Bidding System no later than the stated
                  bid closing time and date.

7. BID SUBMISSION PROCESS
   7.1.   PREPARATION OF THE BID RESPONSE


 February 2020                  Book 1 - Section Two –– Instructions to Bidders                         10
          7.1.1. Bids will be submitted as follows:
               7.1.1.1. All Bidders must have a Sourcewell Procurement Portal account and register as a
                          Plan Taker for this Bid opportunity. Registering as a Plan Taker will enable the
                          Bidder to download the Bid Documents, receive Addenda email notifications,
                          download all documents and submit the Bid electronically online.
               7.1.1.2. ONLY ELECTRONIC BID SUBMISSIONS through the Sourcewell Procurement Portal
                          will accepted. Bidders are cautioned that the timing of their Bid submission is
                          based on when the Bid is RECEIVED by the Sourcewell Procurement Portal
                          system, and not when a Bid is submitted by a Bidder. Bid transmission can be
                          delayed due to file transfer size, transmission speed, etc. For those reasons, it is
                          recommended the Bidder allow sufficient time to upload their Bid Submission
                          and attachment(s) (if applicable) and to resolve any issues that may arise.
               7.1.1.3. The closing time and date will be determined by the Sourcewell Procurement
                          Portal web clock.
          7.1.2. The bid documents must be submitted with all required content as set out in the
                 Sourcewell Procurement Portal. Failure to properly complete or upload the required bid
                 documents may result in rejection of the bid and cause the bid to be deemed non-
                 responsive.
          7.1.3. Mistakes may be corrected prior to bid due date through the Sourcewell Procurement
                 Portal. Corrections and/or modifications received after the closing time and date will
                 not be accepted. The Bidder is solely responsible to ensure the corrected or modified
                 bid has been received by the Sourcewell Procurement Portal system no later than the
                 stated IFB closing time and date.
          7.1.4. It is the responsibility of all Bidders to examine the entire IFB package, to seek
                 clarification of any item or requirement that may not be clear and to check all responses
                 for accuracy before submitting a bid. Negligence in preparing a bid confers no right of
                 withdrawal after the deadline for submission of bids.

8. BID TRANSMITTAL
   8.1. Sourcewell has contracted with bids&tenders to provide technical support for the Sourcewell
        Procurement Portal. Bidders should contact bids&tenders support at
        support@bidsandtenders.ca, at least 24 hours prior to the Bid closing time and date, if problems
        are encountered in the bid submission process.
   8.2. Bidders are solely responsible for ensuring all required documentation is submitted through the
        Sourcewell Procurement Portal no later than the date and time listed in this IFB. Sourcewell is
        not responsible for late receipt of bids. Late bids will not be considered. The Sourcewell
        Procurement Portal System will send a confirmation email to the Bidder when the bid has been
        successfully submitted. If the Bidder does not receive a confirmation email, contact
        bids&tenders support at support@bidsandtenders.ca.




 February 2020                   Book 1 - Section Two –– Instructions to Bidders                           11
 9. CONTRACTOR’S MANAGEMENT PLAN
   9.1. The Bidder is required to answer questions pertaining to its plan for management of the
        contract. All Management Plan questions will be found within the specifications tab of the
        IFB. The Contractor's Management Plan questions must be answered in order to submit a bid.
   9.2. In addition to the bid documents and other required submittals, the Contractor's Management
        Plan will be used by Sourcewell to determine the responsibility of the Bidder to perform the
        contract. Therefore, the Bidder should take great care in the preparation of the Management
        Plan answers. These answers will become part of the complete submitted bid.
   9.3. The Bidder may be determined non-responsive for failure to submit the Management Plan
        questions and/or declared non-responsible for failure to adequately address all points in the
        questions to the satisfaction of Sourcewell.
   9.4. Management Team:
        9.4.1. The Bidder is required to submit its Management Team for the contract as an uploaded
               document. The document should be titled "MANAGEMENT TEAM FOR EXECUTION OF
               IQCC." The Contractor's Management Team must be submitted as part of the Bidder's
               bid documents in the document upload section and must provide the following elements.
        9.4.2. Provide an organizational chart.
        9.4.3. Describe the responsibilities and duties of each position by indicating who will manage
               the overall contract, attend Joint Scope Meetings, prepare Proposal Packages, negotiate
               with Subcontractors, supervise construction, and perform administration tasks.
        9.4.4. Provide resumes for your key personnel you intend to assign to this contract.
   9.5. Provide a current list of the number and classification of your full time employees.

10. BID PRICING
   10.1. Each Bidder must submit five (5) Adjustment Factors to be applied to every task in the CTC. The
         bid shall be an adjustment “decrease from” (e.g. 0.9800) or “increase to” (e.g. 1.1000) the Unit
         Prices listed in the CTC.
   10.2. The Bidder's Adjustment Factors shall include all of the Bidder's direct and indirect costs
         including, but not limited to, its costs for overhead, profit, bond premiums above the
         reimbursable amount, insurance, mobilization, Purchase Order Proposal development, and all
         contingencies in connection therewith. See pages 00-1 – 00-6 of Book 3 – the CTC for a complete
         explanation of what is included in the Unit Prices and what is not.
   10.3. The first Adjustment Factor is to be applied to Work to be accomplished during Normal Working
         Hours: Work performed from 7:00am until 4:00pm Monday to Friday, except holidays, and
         performed in Non-Secure Areas.
   10.4. The second Adjustment Factor is to be applied to Work to be accomplished during Other Than
         Normal Working Hours: Work performed from 4:00pm to 7:00am Monday to Friday, and any
         time Saturday, Sunday and Holidays and performed in Non -Secure Areas.
   10.5. The third Adjustment Factor is to be applied to Work to be accomplished during Normal
         Working Hours: Work performed from 7:00am until 4:00pm Monday to Friday, except holidays
         and performed in Secure Areas.




 February 2020                 Book 1 - Section Two –– Instructions to Bidders                        12
   10.6. The fourth Adjustment Factor is to be applied to Work to be accomplished during Other Than
         Normal Working Hours: Work performed from 4:00pm to 7:00am Monday to Friday, and any
         time Saturday, Sunday and Holidays and performed in Secure Areas.
   10.7. The fifth Adjustment Factor is for work tasks not identified in the Construction Task Catalog.
         IQCC includes a provision for establishing of prices for Work requirements which are within the
         general scope of IQCC but were not included in the CTC at the time of Contract award, see
         Book 2 Section One, Article 8. These Tasks are referred to as "Non Pre-priced Tasks (NPP)". NPP
         Tasks may require new specifications and drawings and may subsequently be incorporated into
         the CTC. The bidders will offer an Adjustment Factor to be applied to the actual material,
         equipment, and labor cost for NPP work Tasks. The NPP Adjustment Factor shall not be less
         than 1.0500 and not higher than 1.2000, excluding Administrative Fees.
   10.8. Adjustment Factors must be specified to the fourth decimal place. For example:

                             1        .      1       0       0       0


                            Or

                             0       .       9       8       0       0


   10.9. For bid evaluation purposes only, the following weighting of the Adjustment factors shall be
         used to determine the Combined Adjustment Factor:


                 Adjustment Factors                                                Weight
      NORMAL WORKING HOURS - NON-SECURE                                             60%
                   AREAS

      OTHER THAN NORMAL WORKING HOURS -                                             10%
               NON-SECURE AREAS
                                                                                    10%
     NORMAL WORKING HOURS - SECURE AREAS

      OTHER THAN NORMAL WORKING HOURS -                                             10%
                 SECURE AREAS
                                                                                    10%
                   NON PRE-PRICED




11. MODIFICATION OR WITHDRAWAL OF A SUBMITTED BID
   11.1. A submitted bid may not be modified, withdrawn or cancelled by the Bidder for a period of one
         hundred and eight (180) Days following the time and date designated for the receipt of bids.
         Prior to the deadline for submission of bids, any bid submitted may be modified or withdrawn
         through the Sourcewell Procurement Portal.


 February 2020                   Book 1 - Section Two –– Instructions to Bidders                        13
12. BIDDERS RESPONSIVENESS AND RESPONSIBILITY
    12.1. In accordance with accepted standards for competitive sealed bid processes, awards will be
          made to responsive and responsible Bidders whose bids are determined in writing to be the
          most advantageous to Sourcewell and its Members. To qualify for evaluation, a bid must be
          responsive which means it shall have been submitted on time and materially satisfy all
          mandatory requirements identified in this document. A bid must reasonably and substantially
          conform to all the terms and conditions in the solicitation to be considered responsive.
          Deviations or exceptions stipulated in Bidder’s response, while possibly necessary in the view of
          the Bidder, may result in disqualification. Language to the effect that the Bidder does not
          consider this solicitation to be part of a contractual obligation will result in that bid being
          disqualified by Sourcewell.

13. CERTIFICATION
    13.1. By submitting a bid, the Bidder certifies:
          13.1.1. The submission of the offer did not involve collusion or any other anti-competitive
                  practices;
          13.1.2. It shall not discriminate against any employee or applicant for employment in violation
                  of federal and state laws (see Federal Executive Order 11246);
          13.1.3. It has not given, offered to give, nor intends to give at any time hereafter any economic
                  opportunity, future employment, gift, loan, gratuity, special discount, trip, favor or
                  service to a public servant in connection with the submitted offer (see Gratuities); and
          13.1.4. It agrees to promote and offer to Sourcewell Members only those products and/or
                  services as previously stated, allowed and deemed a resultant of the Contract(s) as
                  Sourcewell Contract items or services. This clause shall include any future product or
                  service additions as allowed through contract additions.

14. PROTESTS
    14.1. Any protest made under this IFB by a Proposer must be in writing, addressed to Sourcewell’s
          Executive Director, and delivered to the Sourcewell office located at 202 12th Street NE, P.O.
          Box 219, Staples, MN 56479. The protest must be received no later than ten (10) calendar days’
          following Sourcewell’s notice of contract award(s) or non-award and must be time stamped by
          Sourcewell no later than 4:30 p.m., Central Time. A protest must include the following items:
          14.1.1. The name, address and telephone number of the protester;
          14.1.2. The original signature of the protester or its representative;
          14.1.3. Identification of the solicitation by IFB number;
          14.1.4. A precise statement of the relevant facts;
          14.1.5. Identification of the issues to be resolved;
          14.1.6. Identification of the legal or factual basis;
          14.1.7. Any additional supporting documentation; and
          14.1.8. Protest bond in the amount of $20,000.00
          Protests that do not address these elements will not be reviewed.




  February 2020                  Book 1 - Section Two –– Instructions to Bidders                         14
15. PUBLIC RECORD
    15.1. All bids submitted to this invitation shall become the property of the Sourcewell and will
          become a matter of public record, available for review subsequent to the award notification.
          Bids may be viewed by appointment at the Sourcewell offices Monday through Friday from 8:30
          a.m. to 3:30 p.m. Central Time.

16. PREVAILING WAGE RATES AND PARTICIPATION REQUIREMENTS
    16.1. This clause is applicable to states in which prevailing wage rates are established by law. The
          Contractor shall pay prevailing wages to all workers in accordance with the applicable laws. The
          wage rates used for the CTC were the prevailing wage rates, if any; in effect at the time these
          IFB Documents were issued. In the performance of the Work, however, Contractor shall be fully
          responsible for paying the generally prevailing hourly rate of wages in effect, as determined by
          the State Department of Labor and/or Commerce, at the time the Work is performed. If the
          State Department of Labor and/or Commerce revises the prevailing rate of hourly wages to be
          paid for the Work prior to completion of the Project, the revised rate shall apply to this Contract
          from the effective date of such revision, however such revision shall not entitle Contractor to
          any increased compensation under the terms of the Contract.
    16.2. If other wage rates are required by law, the Contractor shall pay such wages to all workers in
          accordance with the applicable laws. If the Purchase Order is performed in whole or in part
          using federal funding, then the Davis Bacon Wages for that area will apply.
    16.3. Contractors shall meet any goals or requirements established by the Sourcewell Member
          ordering the Work, and/or satisfy the intent of said goals or requirements, with regard to small,
          local, minority, women, veteran or disadvantaged business enterprises. Additional participation
          goals may be incorporated into the detailed scope of work.

17. MARKETING REQUIREMENT
    17.1. Bidder must express a willingness and ability to take ownership and promote the services to
          be provided. Contractor must agree to work in cooperation with Sourcewell to develop a
          marketing strategy and provide avenues to equally market and drive sales through the Contract
          and program to all Sourcewell Members and Potential Sourcewell Members. Bidder agrees to
          actively market in cooperation with Sourcewell all available services to current Sourcewell
          Members, as well as Potential Sourcewell Members.
    17.2. If bidder is awarded a contract based on this solicitation your sales force will be a primary driver
          of everyone’s success. Bidders needs to be aware that:
          17.2.1. The use of a Sourcewell Contract will save their customer (Sourcewell’s Member)
                   the time and effort of soliciting its own individual IFB;
          17.2.2. The use of the Sourcewell Contract will save time and effort of responding to
                   individual Invitations for Bid IFB; and
          17.2.3. The use of the Sourcewell Contract will guaranty that Sourcewell Members have the
                   ability to choose you.
    17.3. An award of a contract resulting from this IFB is an opportunity for the awarded contactor to
          pursue commerce with and deliver value to Sourcewell and Sourcewell Members, but it is not a


  February 2020                   Book 1 - Section Two –– Instructions to Bidders                           15
           guarantee of work. As such the Bidder will demonstrate in the Management Plan specific
           marketing strategies, personnel and the qualifications of those personnel to market IQCC and
           the frequency and duration of marketing efforts. Sourcewell reserves the right to deem a
           Bidder non-responsive or to waive an award based on a Bidder’s unwillingness to participate in
           such a marketing effort or by submitting an unsatisfactory marketing strategy as part of the
           overall management plan. Further marketing requirements will be found in Book Two Section
           One, Article 9 of this IFB.

18. MEMBER SIGN-UP PROCEEDURE
    18.1. Bidder agrees to cooperate and participate in the Sourcewell Membership process as part of
          connecting Sourcewell Members to Sourcewell contracts. The process to sign up new Sourcewell
          Members to purchase under this Contract will be defined during the award phase.

19. FEES
    19.1. The bidder shall include the Sourcewell Administrative Fee in calculating the Contractor’s
          Adjustment Factors.
    19.2. Sourcewell’s Administrative Fee will be calculated at the rate of 7.5% of the total Purchase
          Order Price charged to the Sourcewell Member.
    19.3. Sourcewell’s Administrative Fee shall be remitted by the Contractor to Sourcewell, or its
          designated contract administrator, within thirty (30) days of the submission of an invoice to a
          Sourcewell Member by Contractor. The Contractor shall be assessed a one percent (1%) per
          month late fee for any Administrative Fees not paid by the due date set forth herein.
    19.4. Sourcewell designates The Gordian Group, Inc., (Gordian) as its contract administrator. The
          Sourcewell Administrative Fee payments shall be made payable to The Gordian Group and sent
          to the following address:

                                     The Gordian Group, Inc.
                                     PO Box 79341
                                     Baltimore, MD 21279-0341

    19.5. Sourcewell or Gordian may request records from the Contractor for all purchases through this
          Contract and payment of all Administrative Fees. If a discrepancy exists between the purchasing
          activity and the Administrative Fees paid, Sourcewell or Gordian will provide written notification
          to the Contractor of the discrepancy and allow the Contractor ten (10) days from the date of
          notification to resolve the discrepancy. In the event the Contractor does not resolve the
          discrepancy to the satisfaction of Sourcewell or Gordian, Sourcewell or Gordian reserve the right
          to engage a third party to conduct an independent audit of the Contractor's records and, in the
          event Contractor is not in compliance with this Contract, Contractor shall, in addition to any
          Administrative Fees due, reimburse the appropriate party for the cost and expense related to
          such audit.
    19.6. Sourcewell and Contractor hereby acknowledge that The Gordian Group, Inc., as Sourcewell’s
          designated contract administrator, is a third-party beneficiary of Section 20, including all
          subsections therein. In the event any court action is brought to enforce payment of the




  February 2020                  Book 1 - Section Two –– Instructions to Bidders                         16
          Administrative Fees set forth above by any party or third-party beneficiary of this Contract, the
          prevailing party shall be entitled to an award of reasonable attorneys’ fees and collection costs.

20. TAXES
    20.1. The Contractor shall pay all sales, consumer, use and other similar taxes required by law for
          which an exemption does not exist. If the Contractor is required to pay sales tax on non-exempt
          material, equipment, services or other items purchased in connection with a Purchase Order,
          the Member will reimburse the Contractor for such tax, without mark-up, provided the
          Contractor submits the appropriate documentation therefor.

21. PHYSICAL PRESENCE
    21.1. The Bidder must have a fully staffed and functioning office located within the geographic area in
          which they are bidding.



                           (The remainder of this page is intentionally left blank)




  February 2020                  Book 1 - Section Two –– Instructions to Bidders                           17
        SECTION THREE – GEOGRAPHIC MAP OF SOURCEWELL
                        CONTRACT AREA




February 2020   Book 1 – Section Three – Geographic Map of Sourcewell Contract Area   18
                             Area A Northern Counties
Banks                    Dawson                 Habersham                    Pike
Bartow                   DeKalb                 Hall                         Polk
Butts                    Douglas                Haralson                     Rabun
Carroll                  Fannin                 Hart                         Rockdale
Catoosa                  Fayette                Heard                        Spalding
Chattooga                Floyd                  Henry                        Towns
Cherokee                 Forsyth                Lamar                        Troup
Clayton                  Franklin               Lumpkin                      Union
Cobb                     Fulton                 Meriwether                   Upson

Coweta                   Gilmer                 Murray                       Walker
Coweta                   Gordon                 Paulding                     White
Dade                     Gwinnett               Pickens                      Whitfield



                           Area B East Central Counties
Athens                   Hancock                McDuffie                     Screven

Baldwin                  Houston                Monroe                       Taliaferro
Barrow                   Jackson                Morgan                       Twiggs
Bibb                     Jasper                 Newton                       Walton
Burke                    Jefferson              Oconee                       Warren
Columbia                 Jefferson              Oglethorpe                   Washington
Crawford                 Jenkins                Peach                        Wilkes
Elbert                   Jones                  Pulaski                      Wilkinson
Glascock                 Lincoln                Putnam
Greene                   Madison                Richmond




February 2020   Book 1 – Section Three – Geographic Map of Sourcewell Contract Area       19
                            Area C Southwest Counties
Baker                    Dougherty              Mitchell                     Talbot
Calhoun                  Early                  Muscogee                     Taylor

Chattahoochee            Grady                  Quitman                      Terrell
Clay                     Harris                 Randolph                     Thomas
Colquitt                 Lee                    Schley                       Webster

Crisp                    Macon                  Seminole                     Worth
Decatur                  Marion                 Stewart
Dooly                    Miller                 Sumter



                            Area D Southeast Counties
Appling                  Candler                Glynn                        Pierce
Atkinson                 Charlton               Irwin                        Tattnall
Bacon                    Chatham                Jeff Davis                   Telfair
Ben Hill                 Clinch                 Johnson                      Tift
Berrien                  Coffee                 Lanier                       Toombs
Bleckley                 Cook                   Laurens                      Turner
Brantley                 Dodge                  Liberty                      Ware
Brooks                   Echols                 Long                         Wayne
Bryan                    Effington              Lowndes                      Wheeler
Bulloch                  Emanuel                McIntosh                     Wilcox
Camden                   Evans                  Montgomery




February 2020   Book 1 – Section Three – Geographic Map of Sourcewell Contract Area     20
                        (This page is intentionally left blank)




February 2020   Book 1 – Section Three – Geographic Map of Sourcewell Contract Area   21
     SECTION FOUR – SAMPLE INDEFINITE QUANTITY CONSTRUCTION
                            CONTRACT


IFB NUMBER:
GEOGRAPHIC AREA:

This Contract dated                             , by and between Sourcewell (Formerly NJPA) and
                                                . at the following address,
                                                 hereinafter referred to as the CONTRACTOR.

WITNESSETH: Sourcewell and CONTRACTOR for the consideration hereafter agree as follows:


ARTICLE 1. CONTRACT DOCUMENTS
A.    Contract Documents: This Contract; the IFB Documents; (Book 1 - Project Information, Instructions to
      Bidders and Execution Documents; Book 2 - IQCC Standard Terms and Conditions and General
      Conditions; Book 3 - Construction Task Catalog (CTC); Book 4 - Technical Specifications) and Addenda
      thereto; all payment and performance bonds (if any), material and workmanship bonds (if any); wage
      rate decisions and certified payroll records (if any); Notice of Award; all modifications issued thereto,
      including Supplemental Purchase Orders/Change Orders and written interpretations and all
      Purchase Orders and accompanying documents (Requests for Proposals, Detailed Scopes of Work,
      Purchase Order Proposals, etc.) issued hereunder.
B.    The terms and conditions of a Purchase Order issued by a Sourcewell Member in connection with any
      Project, including supplemental technical specifications referenced therein, shall govern.
C.    The Contractor shall, within two (2) business days of receipt of a Purchase Order from a Sourcewell
      Member, provide notification to Sourcewell or their designated representative of each Purchase Order
      by forwarding a copy of the Purchase Order via email to PO@EZIQC.com or via facsimile to (864) 233-
      9100.
D.    The Contractor shall, within two (2) business days of sending an Invoice to a Sourcewell Member, provide
      notification to Sourcewell or their designated representative of each Invoice by forwarding a copy of the
      Invoice via email to Invoice@EZIQC.com or via facsimile to (864) 233-9100.

ARTICLE 2. SCOPE OF WORK
A.    The Contractor shall provide the services required to develop each Purchase Order in accordance with
      the procedures for developing Purchase Orders set forth in the IQCC Standard Terms and Conditions and
      the Contract Documents.
B.    Each Purchase Order developed in accordance with this Contract will be issued by an individual
     Sourcewell                                                                                    Page 2 of 4

     Sourcewell Member. The Purchase Order will require the Contractor to perform the Detailed Scope of
     Work within the Purchase Order Completion Time for the Purchase Order Price.
C.   It is anticipated that the Contractor will perform Work primarily in the Geographic Area set forth above.
     However, the parties may agree that the Contractor can perform Work in a different Geographic Area at
     its current Adjustment Factors.

ARTICLE 3. THE CONTRACT PRICE
A.   This Contract is an indefinite-quantity contract for construction work and services. The Estimated
     Annual Value of this Contract is $2,000,000. This is only an estimate and may increase or decrease at
     the discretion of Sourcewell.
B.   The Contractor shall perform any or all Tasks in the Construction Task Catalog for the Unit Price
     appearing therein multiplied by the following Adjustment Factors:


     TO BE ENTERED BY SOURCEWELL:
     a.    Normal Working Hours – Non Secure Areas: Work performed from 7:00am until 4:00pm Monday
           to Friday, except holidays. Contractor shall perform Tasks during Normal Working Hours for the
           Unit Price set forth in the CTC multiplied by the Adjustment Factor of:

                                                               .
                                        (Specify to four (4) decimal places)

     b.    Other Than Normal Working Hours – Non Secure Areas : Work performed from 4:00pm to
           7:00am Monday to Friday, and any time Saturday, Sunday and Holidays. Contractor shall perform
           Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied
           by the Adjustment Factor of:
                                                               .
                                        (Specify to four (4) decimal places)


     c.    Normal Working Hours – Secure Areas: Work performed from 7:00am until 4:00pm Monday to
           Friday, except holidays. Contractor shall perform Tasks during Normal Working Hours for the Unit
           Price set forth in the CTC multiplied by the Adjustment Factor of:

                                                               .
                                        (Specify to four (4) decimal places)

     d.    Other Than Normal Working Hours – Secure Areas: Work performed from 4:00pm to 7:00am
           Monday to Friday, and any time Saturday, Sunday and Holidays. Contractor shall perform Tasks
           during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the
           Adjustment Factor of:
                                                               .
                                        (Specify to four (4) decimal places)
     Sourcewell                                                                                       Page 3 of 4



     e.    Non Pre-priced Adjustment Factor: To be applied to Work deemed not to be included in the
           CTC but within the general scope of the work:

                                                                .
                                         (Specify to four (4) decimal places)


ARTICLE 4. TERM OF THE CONTRACT
A.   This Contract has an initial term of one (1) year and a bilateral option provision for three (3) additional
     terms. The total term of the Contract cannot exceed four (4) years. One additional one-year renewal-
     extension may be offered by Sourcewell to Contractor beyond the original four-year term if Sourcewell
     deems such action to be in the best interests of Sourcewell and its Members. The Contractor may
     withdraw from the Contract on each anniversary of the award, provided that the Contractor gives 60
     Days written notice of its intent to withdraw. Sourcewell may, for any reason, terminate this Contract
     at any time.


B.   All Purchase Orders issued during a term of this Contract shall be valid and in effect notwithstanding
     that the Detailed Scope of Work may be performed, payments may be made, and the guarantee period
     may continue, after such term has expired. All terms and conditions of the Contract apply to each
     Purchase Order.

ARTICLE 5. SOFTWARE LICENSING
A.   Sourcewell selected The Gordian Group’s (Gordian) software, data and services (IQCC System) for their
     IQCC program. The system includes Gordian’s proprietary ezIQC, eGordian and Bid Safe IQCC applications
     (IQCC Applications) and construction cost data (Construction Task Catalog), which shall be used by the
     Contractor to prepare and submit Price Proposals, subcontractor lists, and other requirements specified by
     Sourcewell and Sourcewell Members. The Contractor’s use, in whole or in part, of Gordian’s IQCC
     Applications and Construction Task Catalog and other proprietary materials provided by Gordian for any
     purpose other than to execute work under this Contract for Sourcewell and Sourcewell Members is strictly
     prohibited unless otherwise stated in writing by Gordian. The Contractor hereby agrees to abide by the
     terms of the following IQCC System License:

ARTICLE 6. IQCC SYSTEM LICENSE
A.   Gordian hereby grants to the Contractor, and the Contractor hereby accepts from Gordian for the term
     of this Contract or Gordian’s contract with Sourcewell, whichever is shorter, a non-exclusive right,
     privilege, and license to Gordian’s proprietary IQCC System and related proprietary materials
     (collectively referred to as “Proprietary Information”) to be used for the sole purpose of executing
     Contractor’s responsibilities to Sourcewell and Sourcewell Members under this Contract (“Limited
     Purpose”). The Contractor hereby agrees that Proprietary Information shall include, but is not limited to,
     Gordian‘s IQCC Applications and support documentation, Construction Task Catalog, training materials,
     marketing materials and any other proprietary materials provided to Contractor by Gordian. In the event
     this Contract expires or terminates as provided herein, or the Gordian’s contract with Sourcewell expires
     or terminates, this IQCC System License shall terminate and the Contractor shall return all Proprietary
     Information in its possession to Gordian.
     Sourcewell                                                                                         Page 4 of 4

B.   Contractor acknowledges that Gordian shall retain exclusive ownership of all proprietary rights to the
     Proprietary Information, including all U.S. and international intellectual property and other rights such
     as patents, trademarks, copyrights and trade secrets. Contractor shall have no right or interest in any
     portion of the Proprietary Information except the right to use the Proprietary Information for the
     Limited Purpose set forth herein. Except in furtherance of the Limited Purpose, Contractor shall not
     distribute, disclose, copy, reproduce, display, publish, transmit, assign, sublicense, transfer, provide
     access to, use or sell, directly or indirectly (including in electronic form), any portion of the Proprietary
     Information.
C.   Contractor acknowledges and agrees to respect the copyrights, trademarks, trade secrets, and other
     proprietary rights of Gordian in the Proprietary Information during and after the term of this Contract,
     and shall at all times maintain complete confidentiality with regard to the Proprietary Information
     provided to Contractor, subject to federal, state and local laws related to public disclosure. Contractor
     further acknowledges that a breach of any of the terms of this Contract by Contractor will result in




     irreparable harm to Gordian for which monetary damages would be an inadequate remedy, and Gordian
     shall be entitled to injunctive relief (without the necessity of posting a bond) as well as all other
     monetary remedies available at law or in equity. In the event that it becomes necessary for either party
     to this IQCC System License to enforce the provisions of this Contract or to obtain redress for the breach
     or violation of any of its provisions, whether by litigation, arbitration or other proceedings, the prevailing
     party shall be entitled to recover from the other party all costs and expenses associated with such
     proceedings, including reasonable attorney’s fees.
D.   In the event of a conflict in terms and conditions between this IQCC System License and any other terms
     and conditions of this Contract or any Purchase Order, Order or similar purchasing document (Purchase
     Order) issued by Sourcewell or a Sourcewell Member, this IQCC System License shall take precedence.


     IN WITNESS WHEREOF, the parties hereto have executed this Contract the day and year first above
     written.

     By:                                            Sourcewell


                                                    Authorized Signature


                                                    Print Name


                                                    Contractor

                                                    Authorized Signature


                                                    Print Name

                    Contract Number:                                        (assigned by Sourcewell)