a. Atlanta Soundworks, Inc. (ASW) Budget Increase Not To Exceed $28,953.25 Approval
Summary: Presented by: Ms. Portia Kirkland, Director of Communication, Division of Community Empowerment, Innovation and Partnerships
Request: It is requested that the Board of Education approve expanding the expenditure limit with Atlanta Soundworks, Inc. for an additional $26,173.29 (over the $49,000 allowed) to purchase DSTV control room furniture and equipment. This is part of Phase 1 of the Communications Infrastructure System Upgrade in collaboration with IT. (The dollar amount above was estimated before the Board changed the minimum of $99,999.00 to 49,999.00 per vendor). A competitive selection process was utilized before selecting Atlanta Soundworks. It is important to note that ASW designed the original infrastructure of the production room. It's essential to keep the integrity of the original wiring diagrams.
FY total:
09/12/2022 - $47,219.04; Robotic Cameras
11/22/22 add-on - $28,953.25; Control Room Rewire & Furniture
TOTAL: $76,172.29
**$26,173.29 is additional requested over the $49,999 allowed.
Why: RATIONALE:
The Communications Department is pleased to present a proposal to the Board of Education to replace the BOE video control room console furniture. The existing furniture is antiquated and no longer practical for the space. In addition, there are cables that are no longer being used and should be removed to omit any hazards and for a more manageable workspace. Finally, the main program and preview displays need to be upgraded to 4K.
This upgrade includes audio/visual equipment, including hardware, furniture and cables, data infrastructure, and all other equipment needed for the audio/visual broadcasting of board meetings, daily business meetings, training classes, community meetings, and other special projects such as graduations & local school events. This project also includes upgrading lighting for the boardroom and auditorium.
Details: ASW will replace the existing production furniture with a new console bay that can support up to three to four staff members and/or contractors (director, graphics, tech director, etc.). ASW will replace the audio engineer desk. ASW will provide and install a workstation desk for editing. ASW will also install a small lighting console desk near the tall rack and a new main console. ASW will rewire all equipment that is still in use in the main rack and/or the new small rack. ASW will remove wires that are no longer in use and clean up wiring where feasible. ASW will provide and install two (2) 65" HDTV for programming and previewing video content. The two new displays will replace the existing displays currently mounted on the wall. DCSD is responsible for disposing of or repurposing the old displays. ASW will provide and install two video recorders in the console turret racks. Furthermore, ASW will install a second camera controller to control cameras in the cabinet room. All cameras may be controlled by RS422 (if IP control is not deemed sufficiently stable). DCSD will provide displays (2), for the main console desk, lighting console (single (1) VGA based), and the broadcast-rated display (desk mount 4K monitor).
Financial impact: The total of $28,953.25 will be paid under the Communication budget code 100.2210.573000.00011.7800.8010.026.0000.
Contact: Ms. Portia Kirkland / Director of Communications - 678-427-4898
Mr. John Kegler / Video Production Manager - 404-434-2210
Effective: Upon BOE approval
Status: Approved by legal
PROPOSAL
Control Room Furniture Revamp
DeKalb County School District
1701 Mountain Industrial Boulevard
Stone Mountain,, GA 30083
678.676.1200
Presented By:
Atlanta Soundworks, Inc.
580 Marksmen Court
Fayetteville, GA 30214
(770) 716-7400
www.aswav.com
Revision:
October 4, 2022
www.aswav.com
SCOPE OF WORK
INTRODUCTION
ASW is pleased to present a proposal to DeKalb County School District (DCSD) for the replacement of the BoE video control room
console furniture. The existing furniture is antiquated and no longer practical for the space. In addition, there are cables that are no
longer being used and should be removed for a cleaner more manageable workspace. Finally, the main program and preview displays
need upgrading to 4K.
SOLUTION
ASW will replace the existing production furniture with a new console bay that can support up to three to four personnel (director,
graphics, tech director, etc.). ASW will replace the audio engineer desk. ASW will provide and install a workstation desk for editing.
ASW will provide and install a small lighting console desk at the location near the tall rack and new main console. ASW will rewire all
equipment that is still in use in the main rack and/or new small rack. ASW will remove wire no longer in use and clean up wiring where
feasible. ASW will provide and install two (2) 65" HDTV for program and preview video content. The two new displays will replace the
existing displays currently mounted on the wall. DCSD is responsible for disposing or repurposing the old displays. ASW will provide
and install two video recorders in the console turret racks. ASW will provide and install a second camera controller to control cameras
in the cabinet room. All cameras may be controlled by RS422 (if IP control is not deemed sufficiently stable). DCSD will provide
displays (2), for the main console desk,lighting console (single (1) VGA based) and broadcast rated display (desk mount 4K monitor).
STATEMENT OF WORK / DIVISION OF RESPONSIBILITIES
ASW will install new equipment as specified and pull new cables to device locations and terminate to devices as required. ASW will
interconnect new equipment as required to result in a fully functioning system.
ASW will de-install existing equipment that is being replaced and return to DCSD.
Installation on site will be conducted during normal business hours (8:00 am – 5:00 pm), unless otherwise agreed. DCSD must provide
continuous uninterrupted access to the space by ASW personnel during the installation period. Following the completion of the
systems installation, ASW will provide qualified personnel to fully commission the system on site. Where applicable, ASW will test and
verify complete system functionality as well as configure the system for optimum performance.
All AC power provisions to support the new system(s) are the responsibility of DCSD.
Any data network provisions required to support or interface with the proposed systems are the responsibility of DCSD. ASW will
coordinate with IT personnel as needed.
A 90-day warranty, including parts and labor, will be provided beginning at the date of customer acceptance or first beneficial use of
the system, whichever is earlier. The warranty does not apply to legacy or customer supplied equipment. Refer to item 8 of the
integration contract for additional details.
Additional servicing and support of purchased equipment beyond the standard warranty can be provided at a special annually
contracted rate.
Other terms and conditions are described in the included Agreement.
Control Room Furniture Revamp
Page 1 of 1
Project No : 22-0219 Rev. 1 10/4/2022
BILL OF MATERIALS
Control Room
AV System
1 Marco ED3072
Edit Desk, Straing 72"W x30" D (2) (Black)
1 Marco EC
12 RU Equipment Counter Cut Out
2 Marco MA-9112-S-28"-BL
LCD Monitor Arm, Single
1 Marco MV-2824-06
MaxView 6 Bay Low Profile Console (Black)
3 Marco MV-CE
Rear Counter Extension
2 Marco MV-RB-04-19
MaxView Sloped Rack Turrent (4RU)
1 Marco MV-RB-06-19
6RU Sloped Rack Turret
2 LG 65UR640S0UD
65" Class HDR 4K UHD Smart Digital Signage IPS LED TV
2 Chief LTM1U
Large fusion micro-adjustable tilt wall mount
1 Datavideo RMC-300A
Control up to 24 PTZ cameras via IP or 8 PTZ cameras via serial and 16 PTZ
cameras via IP.
2 Blackmagic Design BMD-CONVCMIC/SH03G/WPSU
Micro Converter SDI to HDMI 3G PSU
2 Blackmagic Design BMD-HYPERD/ST/DCHP
HyperDeck Studio HD Plus
1 FeelWorld LUT215
[OFE] - 4K HDMI/SDI Broadcast Studio
* Price Includes Accessories 10/4/2022
Control Room Furniture Revamp
Page 1 of 2
Project No : 22-0219 Rev. 1 10/4/2022
BILL OF MATERIALS
2 LG 34WL550-B
[OFE] - 34" 21:9 UltraWide FreeSync HDR10 IPS Monitor
1 Samsung LF24T350FHNXZA
[OFE] - 24" 16:9 FreeSync 75 Hz IPS Monitor
1 ODYSSEY DJ Werk Station 3T
Light Workstation
1 Cables, Connectors, & Misc. Hardware
Allowance for miscellaneous cables, connectors, and hardware required for
complete installation.
1 Rack Allowance
Allowance for AV Equipment Rack & Accessories
1 Incoming Freight
ASW inbound shipping costs
1 ASW Tech Services
General Labor, Engineering & Programming, Project Management, Training, Travel
AV System Total $28,953.25
Control Room Total $28,953.25
* Price Includes Accessories 10/4/2022
Control Room Furniture Revamp
Page 2 of 2
Project No : 22-0219 Rev. 1 10/4/2022
PROJECT SUMMARY
Subtotal: $28,953.25
Grand Total: $28,953.25
Control Room Furniture Revamp
Project No : 22-0219 Rev. 1 10/4/2022 Page 1 of 1
CONTRACT
October 4, 2022
DeKalb County School District Control Room Furniture
1701 Mountain Industrial Boulevard
Revamp
Stone Mountain,, GA 30083
678.676.1200
This Agreement is by and between Atlanta Soundworks, Inc. located at 580 Marksmen Ct., Fayetteville, GA 30214, hereinafter
called the “Company” and DeKalb County School District hereinafter called the “Client.” The Company and Client
agree as follows:
1. Company Performance: Company shall furnish all equipment and perform the work necessary to install the components in
the Bill of Materials and as described in the Scope of Work. The Company agrees to perform the work at the cost listed in the
Proposal. No verbal communication will override the Scope of Work unless agreed to by both parties in writing.
2. Responsibility of Others: Unless otherwise noted in the Scope of Work, the Client shall be responsible for all electrical work
such as, but not limited to, AC power, conduit systems, and outlet boxes. Floor track or trenching a floor is not included
unless noted. Client is responsible for all custom millwork and any other adaptations to Client furnishings or décor, unless
specifically noted in the Scope of Work. All finishes will be supplied as standard manufacturer's finish. All other work
necessary to the completion of the project and not specifically defined in the Scope of Work as being furnished by the
Company shall be the responsibility of the Client.
3. Existing Equipment: Existing Owner-furnished equipment (OFE) is to be reused or installed only as defined in the Scope of
Work. Existing equipment being replaced and removed from service will be uninstalled and returned to Client.
4. Installation: Client hereby grants Company or its agent the right to install the equipment and will provide access to the
premises for the installation specified.
5. Commencement: The work to be performed under the terms of this Agreement shall be commenced on a date agreed to by
both parties, after receipt of the signed Agreement and down payment.
6. General: Company reserves the right to defer the date of delivery, or to cancel the contract, or to reduce the volume of the
goods ordered by Client (without liability to Client) if Company is prevented from or delayed in the carrying on of Company’s
business due to circumstances beyond Company’s reasonable control, such as, but not limited to “Acts of God,” delays in
material delivery, accessibility to the facility, and delays of work by others where such work is necessary for the completion of
the project. If additional costs to the Company are incurred as a result of these conditions, the Company may choose to
recover those costs through a change order.
7. Restocking: The Company may charge a restocking fee for any returns according to the manufacturer’s policy. All returns
must be approved in writing with an RMA # before the Company will accept equipment for return and a change order will
accompany any RMA.
8. Warranty: The Company will provide a 90-day limited installation warranty against defects in material and workmanship from
the date of system completion or first beneficial use, whichever comes first, for all equipment furnished and installed by
Company. All equipment, labor, and freight for warranty work are included. Some components will have a manufacturer’s
warranty which extends beyond the Company warranty. It is the responsibility of Client to complete and submit any warranty
Control Room Furniture Revamp
Page 1 of 2
Project No : 22-0219 Rev. 1 10/4/2022
CONTRACT
registration information directly to the appropriate manufacturer. Client misuse, abuse and “Acts of God” are not covered.
This warranty is in effect only if the product remains at the place of original installation. De-installation and re-installation of
equipment will void this limited warranty at the Company’s discretion.
9. Training: The Company will provide post-sale training support as described in the Scope of Work.
10. Deliverables: The Company will provide Operations Manuals and As-built drawings within 2 weeks after final payment is
made. ASW will provide equipment and warranty information to the customer as part of the deliverables.
11. Sales Tax: N/A
12. Time for Acceptance: The terms of this Agreement will be valid for fifteen (15) days following the publish date of this
Agreement set forth above. If not accepted within that time, the offer of such terms may be revoked without notice to Client.
If this Agreement is signed by the Client and the Company, it shall be valid, remain in force and not be revoked.
13. Pricing: Pricing is valid for thirty (30) days following the publish date of this Agreement for equipment manufactured in the
USA. Unfortunately, due to ongoing government tariff negotiations, equipment pricing cannot be guaranteed
beyond the publish date of this Agreement for equipment manufactured outside the USA. With respect to these
conditions, if additional costs to the Company are incurred as a result of manufacturers’ price increases, the Company may
choose to recover these costs through a change order. Company will endeavor to minimize any impact to the Client.
14. Shipping: Freight costs are included in the Proposal - FOB to a single destination. Expedited delivery and/or compound
routing options are available at additional cost.
15. Payment: The Agreement sum is a fixed price inclusive of all materials, installation labor, technical services, freight, and taxes
for the successful delivery of the project as described in the Scope of Work. Payment shall be made according to the
following schedule. Standard payment terms are NET 15 from invoice date. When applicable, an initial payment may be
required (NET DUE). Payment made by credit card is subject to a 3.5% processing fee.
Payment Schedule % Amount Due Date
Down Payment 50 $14,476.63
Project Completion 50 $14,476.62
Client: DeKalb County School District Date:
Company: Atlanta Soundworks, Inc. Date:
Control Room Furniture Revamp
Page 2 of 2
Project No : 22-0219 Rev. 1 10/4/2022