Preliminary AE Report

AID 1436184 · View on Simbli

Agenda Item

ii. E-SPLOST V Project: 344-35 Approval of Additional Scope of Work and Related Budget Adjustment for Midvale Elementary School Major Building System Replacement (in the amount of $2,350,000)

Summary: Presented by: Mr. Richard Boyd, Interim Chief Operating Officer, Division of Operations
Request: It is requested that the Board of Education approve additional scope of work for E-SPLOST V Project 34435: Midvale ES to include replacing the HVAC system.

It is also requested that the Board of Education approve a related budget adjustment in the amount of $2,350,000 to cover the cost of the additional scope of work.
Why: To provide the Midvale ES facility with further needed improvements related to safety, security, and health. The additional scope of work was recommended by the project’s design professionals and/or requested by DCSD Facilities to fulfill program wide initiatives. The requested budget addition is based on the opinions of probable costs provided by the project’s design professionals.
Details: On March 15, 2021, the Board approved the award of RFQu No. 21-752-016 for Professional Architectural and Engineering Services for DeKalb High School of Technology and Midvale Elementary School to BRPH.

The E-SPLOST V Project 34435: Midvale ES currently has a scope of work that includes “Fire Sprinkler installation, accessibility improvements to restrooms and stage…”.

It is requested that the scope of work be expanded to include HVAC system replacement…”

It is also requested that the budget of E-SPLOST V Project 34435: Midvale ES be increased by $2,350,000 to cover the additional cost of the increased scope of work. This budget would be transferred from E-SPLOST V project 60235: Program Contingency.
Financial impact: A budget transfer of $2,350,000. from E-SPLOST V Project 60235: Program Contingency (cost code: SP5MANG. 60235.PRGCONTIN) to E-SPLOST V Project 34435: Midvale ES (cost code: SP5FACCON. 34435.GENERALCONTRACTOR).
Contact: Mr. Richard Boyd, Interim Chief Operating Officer, Division of Operations, 678.676.1483
Mr. Hans Williams, Director of Planning and E-SPLOST Programming, Division of Operations, 678.676.1588
Effective: Upon board approval.
Status: Approved by General Counsel.
MIDVALE ELEMENTARY SCHOOL
             DeKalb County School District


           Facility Assesment Report
                              JUNE 9, 2021
BRPH| SITE VIST ASSESMENT REPORT                                                                                                                                  DATE | 06/09/2021




Table of Contents
                                                      01. Executive Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
                                                               List of Scope Items. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
                                                               Civil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
                                                               Structural . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
                                                               Architectural . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
                                                               Mechanical. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
                                                               Plumbing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
                                                               Electrical . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4

                                                      02. Existing Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
                                                               Floor Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
                                                               Roof Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6

                                                      03. Photograpghs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
                                                               Civil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
                                                               Structural . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
                                                               Architectural . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
                                                               Electrical . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
                                                               Mechanical & Plumbing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24




DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                                                                                                                        2
BRPH| SITE VIST ASSESMENT REPORT                                                                                DATE | 06/09/2021




01. Executive Summary

The following Report summarizes BRPH’s initial response to DeKalb County School Districts (DCSD) proposal for
school facility conditions improvements to Midvale Elementary School, located at 3863 Midvale Road, Tucker GA.
Per the initial DCSD RFQ 21-752-016; dated November 5, 2020 and an Owner email dated May 26, 2021, the project
scope included the following:
       • Plumbing and site improvements.
       • ADA restroom upgrades - Including finishes
       • ADA improvements - Light duty elevator and platform lift.
       • Fire sprinkler installation
       • Ceiling tile replacement in the corridors.
       • Fire alarm system
       • Chiller replacement
       • HVAC replacement
       • Leaks by the dock
       • New intercom system*
       • New Marquee*
       • Replace cafeteria flooring*
       • Roofing replacement **
       • Window replacement **
       • Brick exterior repairs **
       • Adult restroom addition at ground level **

On Tuesday May 18th the BRPH design team and Dekalb County performed a site visit to review the scope at the
school facilty. Additional deficiencies discovered during the May 18th walk-through are listed below and throughout the
document and shown italicized:
       • Damaged brick & mortar
       • Rusted signage hangers
       • Non-ADA compliant signage
       • Water damaged soffits
       • Roof deficiencies (*** New Roof & tapered insulation highly recommended)
       • No guardrail at roof edge (***Highly recommend installing guardrails along with New Roof)
       • Rusted / damaged door frames
       • Broken / single pane windows (do not comply with current Energy Code)
       • Damaged / rusted fencing at Utility Yard
       • Non-functioning oversized louver at Interior Courtyard
       • Non-ADA compliant exit stair railings
The following is a summary of observations relative to the scope provided including addtional recomendations for
DCSD’s consideration.

Civil Summary:
         All existing sidewalk and ADA items should be a priority. They are a life safety code and potentially hazardous.
         These include settled areas of concrete or where surfaces are greater than 1/2” elevation difference. The
         drainage and Erosion issues can be considered medium priority. These could eventually lead to bigger concerns
         such as washing out steps and sidewalks or possibly leaking into the building or undermining the footings. This
         could also be a safety hazard if storm water runs across pedestrian areas.

Structural Summary:
        Structural items observed, such as spalling concrete, are not critical and can be easily corrected.

DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                                                                      3
BRPH| SITE VIST ASSESMENT REPORT                                                                                DATE | 06/09/2021




Executive Summary - continued:

Architectural Summary
        Several of the items noted in the original scope as well as deficiencies discovered during the site visit should be
corrected as soon as possible:
       • Recommend replacing roof, tapered insulation and installing Safety Railings.
       • Recommend installing an exterior ADA Ramp to connect the upper level to the Gym level.
       • Recommend installing an Elevator to connect the upper level to the Gym level.
       • Recommend installing new Adult Restrooms at the Lower Level for Teacher access (none exist currently).
       • Recommend removing all existing windows and installing new Aluminum Storefront windows that meet the
           current Enercy code.
       • Recommend pointing and tucking all exterior brick.
       • New Corridor ceiling & Light Fixtures; see Plumbing section for new Fire Sprinkler system information. The
           installation of a new sprinkler system may have unintended consequences that could affect the HVAC system
           operations, wall ratings and door grilles.

Mechanical Summary/ Recommendations:
     • Replace all boiler and accessories serving the hot water portion of the system. The new boiler should be
         water-tube type, per Owner guidelines. A new hot water pump should be added to the system to provide
         redundancy for reliability. The air-cooled chiller should be replaced. While the age of this unit is low,
         persistent problems warrant replacement.
     • Unit ventilators and roof mounted units should remain.
     • New non-ducted split systems should be added at the kitchen office and dry storage areas.
     • All older fans and heaters should be replaced. The systems serving the storage spaces adjacent to the Art
         Rm. should be replaced or modified.
     • The control system should be upgraded to the current software version. Any new HVAC system components
         would be provided with current controls

Electrical Summary
       • All Electrical items are strongly recommended to be addressed in a prompt manner.

Plumbing Summary
      • Bottle filling stations at drinking fountains should be added in select locations as requested by the Owner
          such as the cafeteria area.
      • A new fire sprinkler system should be provided. This may lead to redesign of the corridor wall assembly to
          accommodate smoke partition walls. Likely extra steps this would lead to would be sealing transfer louvers
          at classroom door transoms, adding relief roof hoods over classrooms, and adding transfer openings above
          ceilings between classrooms to allow for free air transfer.




DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                                                                      4
BRPH| SITE VIST ASSESMENT REPORT                                                                                                                                                                                           DATE | 06/09/2021




02. EXISTING CONDITIONS - FLOOR PLAN



                                                     Existing Floor Plan: Locations of scope and recomendations

  MIDVALE ELEMENTARY FACILITY                                               3836 MIDVALE RD. TUCKER, GA 30084 (678)874-3400                              FACILITY# 644-2062-1430.01           10 ACRES




                            2011                                                      2010
                            1968                                                      1966
                            10,042 SF                                                 45,335 SF
                                                                                                                                                                                                   GYM
                                                                                                                                                                                                    1
                                                                                                                                                                                                    PHY-ED
                                             16             DN     15          14          13                       DN   12         11         10                9                                  5478
                                             ART                   5TH         SP ED       5TH                           5TH        4TH        EIP               4TH
                                             16                    15          14          13                            12         11      10                    9                      R
                                             K-3RD                 SP-ED       SP-ED       4TH-5TH                       4TH-5TH    4TH-5TH K-3RD                 4TH-5TH
                               STORAGE 768                         768         768         768                           768        768     768                   768                    R
                                                         UP                                                       UP


                               STORAGE

                                                     BOOK RM
                                                                                                                                                                                  2020
                                                                                                                                                                                  2003
                                                                                                                                                                                  5,478 SF




                                                                                                                                                                                                                                                MIDVALE ELEMENTARY FACILITY
                                                                   117          114        113                                      111          110              109
                                                                   K            K          K                                        4TH          4TH              3RD
                                                                    117         114         113                                     111          110                  109
                                                              DN                                                    DN              4TH-5TH      4TH-5TH              K-3RD
                                                                    K-3RD       K-3RD       K-3RD
                                   120                              768         768         768                                     768          768                  768
                                   PRE-K
                                   120                                                                                                                                DN
                                   K-3RD
                                   741

                              121                                              116                                             STAGE                    MECH RM
                              REG SP ED                                        K                                                                        132.1
                              121                                              116                                                                      MECH RM
                              SP-ED                                            K-3RD                                                                    1000
                              741                                              768                                                                                                2010
                              122                                                                                                                           COOLER FREEZER        1966
                              REG SP ED                                                                                                                                           45,335 SF
                              122
                              SP-ED
                              741                                                                                                                                          DOCK



                              123
                              REG SP ED                                                                                   CAFETERIA             DISH WASH
                                                                                                                                                                OFFICE

                              123                                                                                         131
                              SP-ED                                                                                       CAFETERIA
                              741
                              124                                                                                         5373
                                                      107          105
                              REG SP ED               2ND          1ST                      1ST
                              124                     107          105                      103
                              SP-ED                   K-3RD        K-3RD                    K-3RD                                                STORAGE
                              741                     768          768                      768                                                  132.2
                                                                                                                                                 STOR-NI
                               125                                                                                                               300
                               REG SP ED
                               125
                                                                                                                                    A/C
                               SP-ED                                                                                                          WORK RM
                               741                                                                                                        R
                                                                    106        104         102         101                         PRIN
                                                                    2ND        1ST         1ST         ADMIN                              R                  CLINIC                                                        ROOM LABEL LEGEND
                                                                    106        104          102        101                     V              LOUNGE                                                                       POSTED ROOM NUMBER
                                                                    K-3RD      K-3RD        K-3RD      ADMIN                                                                                                               ROOM/SPACE NAME
                             2011                                   768        768          768        768                                                                                                                 DOE SPACE NUMBER
                             1968
                                                                                                                                                                                                                           DOE SPACE TYPE
                             10,042 SF
                                                                                                                                                                                                                           SQUARE FOOTAGE



  GROUND & MAIN LEVEL FLOOR PLAN      NOT TO SCALE                                                             Page 1 of 1                                                                               UPDATED: 7/14/2017 BY: AM




                                                                                                              LEGEND



              Site Improvements

              Restroom Improvements

              Exterior Improvements

              Door Hardware & Signage Improvements




DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                                                                                                                                                                                             5
BRPH| SITE VIST ASSESMENT REPORT                                                                 DATE | 06/09/2021




02. EXISTING CONDITIONS - ROOF PLAN



                                   Existing Roof Aerial: Locations of scope and recomendations




                                                            LEGEND



             Roofing Improvements.




DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                                                       6
BRPH| SITE VISIT ASSESSMENT REPORT                                                         DATE | 06/09/2021

C 01
               North of service area, east side of building



               Missing fencing/railing. Lack of ADA access to lower level of
               building/playfields/gym.


               Provide switch back ADA ramp with landings and handrails not
               to exceed 1:12.


C02
               North of service area, east side of building



               Sidewalk settling, not ADA compliant



               Replace section of sidewalk to be ADA compliant.




C03
               North of service area, east side of building



               Drainage and erosion issues down slope.


               Remove concrete, pipe trench drain to bottom of slope, daylight with
               rock dissipation protection. Provide backfill entire area up to cheekwall
               and grass/plant.


C04
              Northeast of school, facing east wall of building



              Drainage issue


              Remove and replace sidewalk sections with positive slope away from
              sidewalk and buildings.



C05
              East island of service area, facing Gleneagles Drive



              Sidewalk and curb and gutter settling, not ADA compliant


               Replace section of sidewalk and curb and gutter to be ADA
               compliant.



C06
              South of service area



               Cracked/broken concrete paving



               Replace section of concrete paving


DEKALB COUNTY SCHOOL DISTRICT | DEKALB
                                MIDVALEHIGH SCHOOL OFSCHOOL
                                         ELEMENTARY  TECHNOLOGY                                           7
BRPH| SITE VISIT ASSESSMENT REPORT                                               DATE | 06/09/2021

C07
               South of building, west of entry drive



                Sidewalk cracked/settling, not ADA compliant



                Replace section of sidewalk to be ADA compliant.



C08
                In front of entry doors at southwest building corner



                 Trench drain clogged



                 Flush trench drain and pipes of debris and sediment




C09
               South of building, west of entry drive off Midvale Road



               Sidewalk and water vault top differential settling



               Replace section of sidewalk and/or adjust water vault top to be
               ADA compliant.




DEKALB COUNTY SCHOOL DISTRICT | DEKALB
                                MIDVALEHIGH SCHOOL OFSCHOOL
                                         ELEMENTARY  TECHNOLOGY                                 8
BRPH| SITE VISIT ASSESSMENT REPORT                                              DATE | 06/09/2021




  S01

                    Rear Wall (north side)


                    Spalling of concrete at an exterior concrete column


                    Remove loose concrete and cover with epoxy/grout

  S02

                    Rear Wall (north side)

                    Spalled concrete at a steel embed plate at an exterior
                    concrete column
                    Remove the loose concrete, clean the steel and coat
                    with epoxy/grout

   S03
                    Rear Wall (north side)


                    Exposed/Rusting concrete column reinforcing bar is
                    causing the concrete to spall
                    Remove the loose concrete, clean the reinforcing bars
                    and patch/cover with epoxy/grout

  S04
                    Rear Wall (north side)


                    Exterior concrete column reinforcing is too close to the
                    face of the concrete allowing the steel to rust and spall
                    the concrete
                    Remove the loose concrete, clean the reinforcing bars
                    and patch/cover with epoxy grout




DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ES
                                                                                           9
BRPH| SITE VIST ASSESMENT REPORT                                               DATE | 06/09/2021

  S 05
                     Rear Wall (north side)




                     Horizonal wall reinforcing (dur-0-wal) rusting and
                     pushing the mortar out of the joint

                     Remove the loose mortar, clean the reinforcing and
                     cover with a new mortar in the joint



  S06
                     Rear Wall (north side)


                     Concrete column ties (reinforcing) were placed too
                     close to the surface of the concrete allowing the steel
                     to rusting and spalling the concrete
                     Remove the loose concrete, clean the reinforcing and
                     cover with epoxy/grout

  S07
                     Rear Wall (north side)


                     The horizonal wall reinforcing (dur-0-wal) is rusting,
                     pushing the mortar out of the joint
                     Remove loose mortar, clean the reinforcing and cover
                     with a new mortar in the joint

  S08
                     Rear Wall (north side)


                     Spalling of concrete in an exterior concrete column


                     Remove loose concrete and cover with epoxy/grout




DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ES
                                                                                           10
BRPH| SITE VIST ASSESMENT REPORT
                                                                                 DATE | 06/09/2021

  S 09
                     Rear Wall (north side)


                     The concrete column ties (reinforcing) were placed too
                     close to the surface of the concrete allowing the steel
                     to rusting and spalling the concrete
                     Remove the loose concrete, clean the reinforcing and
                     cover with epoxy/grout

  S10
                     Rear Wall (north side)


                     Horizonal wall reinforcing (dur-0-wal) is rusting, pushed
                     the mortar out of the joint
                     Clean the steel, cover with new mortar in joint



  S11
                     Elevated Classroom Wall @ Roof


                     Minor settlement cracks in brick veneer


                     Monitor the previously made repair


  S12
                     Elevated Classroom Wall @ Roof


                     Minor settlement cracks in brick veneer


                     Monitor the previously made repair


  S13
                     Rusting Connection between building structure and
                     precast concrete entrance feature
                     Rusting of metal


                     Clean and paint with a rust preventive paint




DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ES                                                    11
BRPH| SITE VIST ASSESMENT REPORT
                                                                                DATE | 06/09/2021

  S14
                     Elevated Classroom Wall @ Roof


                     Cracking of brick veneer at wall corner


                     Monitor previously made repair

  S15
                     Northwest Corner of Building


                     Column reinforcing is too close to the face of the
                     concrete allowing the steel to rust and spall the
                     concrete
                     Remove the loose concrete, clean the reinforcing bars
                     and patch/cover with epoxy/grout

  S16
                     Southwest Corner


                     Concrete Cracking at the intersection of a concrete
                     column and concrete beam
                     Clean the joint and fill with epoxy/grout


  S17
                     Front Wall (south side)


                     The reinforcing bars are positioned too close to the
                     surface of the beam allowing the reinforcing to rust and
                     spall the concrete
                     Remove the loose concrete, clean the rusting
                     reinforcing bars and cover with epoxy/grout

 S18
                    Rear Classroom hallway at the concrete retaining wall


                    Mortar at bed joint has deteriorated


                    Clear the joint of loose mortar and replace the mortar
                    in the joint

DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ES
                                                                                             12
BRPH| SITE VIST ASSESMENT REPORT                                        DATE | 06/09/2021

A01
               Front of school, signage.


               Steel hanging system is rusted.


               Recommend repairing and paint steel members.


A02
               Building Exterior, sample photo.


               Spalling concrete, damaged brick.

               Repair concrete columns, pressure wash brick, point &
               re-tuck brick throughout building exterior.


A03
               Building Exterior, Right of main Entry; roof overhang.


               Water damaged soffit.

               Recommend removing damaged stucco and re-applying a
               soffit finish and proper drip edge along roof overhang.


A04
               Building Exterior, Left of main Entry; roof overhang.


               Water damaged soffit & brick.

               Recommend removing damaged stucco and re-applying
               a soffit finish and proper drip edge along roof overhang.


A05
               Exterior of main Mechanical Room.


               Damaged brick and door frame.


               Repoint brick; Replace Door & Louver frame.


A06
               Exit to the right of main Mechanical Room.


               Damage Brick.

               Remove brick, repair roofing, replace brick or consider
               alternate exterior material.

DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                             13
BRPH| SITE VIST ASSESMENT REPORT                                               DATE | 06/09/2021

A07
               Exit to the right of main Mechanical Room.


               Damage Brick.


               Remove brick, repair roofing, replace brick.


A08
               Rear Exterior.


               Damaged brick; spalling concrete columns.

               Repair concrete columns, pressure wash brick, point &
               re-tuck brick throughout.


A09
               Sample Exterior Window.


               Single pane (non-energy efficient) & damaged windows.

               Recommend replacing all windows w/ double-pane win-
               dows; replace flashing all around at opening, typical.


A10
               Rear, Exterior.


               Single pane (non-energy efficient) & damaged windows.


               Replace sill; after window replacement.


A11
               Rear, Exterior Gym-level exit.

               Spalling concrete, damaged brick. No ADA-compliant gym
               level access.

               Repair concrete; clean brick; re-point all brick. Install new
               elevator and stair lobby.


A12
               Left of Main Entrance, Side, Exterior (Sample Location)

               Single pane (non-energy efficient) & damaged windows.
               Damaged vent grilles.

               Recommend replacing all windows w/ double-pane win-
               dows; replace flashing all around at opening, typical.

DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                                    14
BRPH| SITE VIST ASSESMENT REPORT                                              DATE | 06/09/2021

A13
               Building Exterior, Left of main Entry; roof overhang.


               Water damaged roof overhang; missing guardrail at roof.


               Clean & repair soffit; install code-compliant railing at roof.


A14
               Roof, sample photo.

               Evidence of water ponding after rain; poor roof drainage,
               non-sloped roofing areas & damaged roofing; no railings.

               Recommend removing existing roof and re-roof to include
               proper tapered insulation; install guardrails at roof edges.


A15
               Roof, sample photo.

               Water is ponding after rain; poor roof drainage, non-
               sloped roofing areas & damaged roofing.

               Recommend removing existing roof and re-roof to include
               proper tapered insulation.


A16
               Roof, sample photo.

               Water is ponding around roof drain; poor roof drainage,
               non-sloped roofing areas & damaged roofing.

               Recommend removing existing roof and re-roof to include
               proper tapered insulation and new roof drains.


A17
               Roof, sample photo.


               Damaged roofing, base flashing & sealant is deteriorated.

               Remove existing roof and re-roof to include proper ta-
               pered insulation, new flashing (complete roof system).


A18
               Roof, sample photo.

               Water is ponding around roof drain; poor roof drainage,
               non-sloped roofing areas & damaged roofing.

               Recommend removing existing roof and re-roof to include
               proper tapered insulation and new roof drains.

DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                                   15
BRPH| SITE VIST ASSESMENT REPORT                                            DATE | 06/09/2021

A19
               Roof, sample photo.


               Water damaged brick & grout at coping / gutter.

               Recommendation to pressure wash brick, point & re-tuck
               brick throughout; reflash parapets & replace coping.


A20
               Roof, sample photo.

               Dirty / damaged / non-sloping roof, ponding areas; deteri-
               orating bonding adhesive.

               Recommend removing existing roof and re-roof to include
               proper tapered insulation.


A21
               Roof, sample photo.


               Roof drain is clogged, water is ponding.

               Recommend removing existing roof and re-roof to include
               proper tapered insulation and new roof drains.


A22
               Roof, sample photo.


               Overgrown trees, dirty / damaged / non-sloping roofing.

               Recommend removing existing roof and re-roof to include
               proper tapered insulation. Trim adjacent tree limbs.


A23
               Roof gutter, sample photo.


               Dirt collected in gutter, clogging downspouts.


               Install gutter guards.


A24
               Roof area, west portion of building.


               Damaged roofing; missing edge coping & fall protection.

               Recommend removing existing roof and re-roof to include
               proper tapered insulation; install fall protection.

DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                                 16
BRPH| SITE VIST ASSESMENT REPORT                                           DATE | 06/09/2021

A25
               Front of school.

               ADA curb cut missing flared sides; curb transition is too
               abrput.

               Remove portion of sidewalk and install ADA-compliant
               flared sides.


A26
               East exterior, to the right of main Mech. Room.

               Damaged sidewalk; no guardrail at elevation drop be-
               tween sidewalk and utility yard.

               Repair sidewalk and install guardrail at portions of wall
               exceeding 30” high.


A27
               East exterior, to the right of main Mech. Room.


               Damaged sidewalk, no ADA-access to lower level.

               Repair sidewalk, install new ADA-compliant ramp to con-
               nect all levels of the school.


A28
               East exterior, Loading area / Utility Yard.


               Rusted / damaged fencing.

               Recommend installing new aluminum, louvered fencing all
               around mechanical equipment.


A29
               East exterior, Loading area / Utility Yard.


               Rusted / damaged fencing.

               Recommend installing new aluminum, louvered fencing
               all around mechanical equipment.


A30
               Front - Main School Building Entrance.


               Doors & openings are not ADA compiant.


               Install set of power-assist double doors.

DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                                17
BRPH| SITE VIST ASSESMENT REPORT                                         DATE | 06/09/2021

A31
               Women’s RR @ Workroom.


               Door way too narrow, not ADA-compliant.


               Create larger door opening to be ADA-compliant.


A32
               Women’s RR @ Workroom.


               Vanity and Toilet room do not meet ADA req’s.

               Demolish interior walls & doors and reconfigure Restroom
               to meet ADA dimensions & clearances.


A33
               Women’s RR @ Workroom.


               Vanity and Toilet room do not meet ADA req’s.

               Demolish interior walls & doors, reconfigure to meet ADA
               dimensions & clearances.


A34
               Typical Special Education shared RR


               Toilet rooms do not meet ADA req’s; missing Lavatory.

               Demolish interior walls & doors, reconfigure to meet ADA
               dimensions & clearances.


A35
               Typical Special Education shared RR


               Toilet rooms do not meet ADA req’s; missing Lavatory.

               Demolish interior walls & doors, reconfigure to meet ADA
               dimensions & clearances.


A36
               Typical Special Education shared RR


               Toilet rooms do not meet ADA req’s; missing Lavatory.v

               Demolish interior walls & doors, reconfigure to meet ADA
               dimensions & clearances.

DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                              18
BRPH| SITE VIST ASSESMENT REPORT                                             DATE | 06/09/2021

A37
               Children’s gang RR entrance, sample photo.


               Non-ADA compliant threshold.

               Remove threshold completely or install a shallower
               threshold to be ADA-compliant.


A38
               Cafeteria entry, pair of doors.


               Non ADA-compliant door clearance & hardware.


               Update door hardware & remove center mullion.


A39
               Cafetorium, stage area.


               No ADA access to stage.

               Install either a lift or ADA-compliant ramp up to the stage
               height.


A40
               Clinic millwork.

               Non ADA-compliant millwork, no knee clearance under
               sink.

               Install new millwork with ADA-compliant knee clearance
               at sink.


A41
               Teach Workroom millwork.

               Non ADA-compliant millwork; no knee clearance under
               sink & counter is too low.

               Install new millwork with ADA-compliant knee clearance
               at sink.


A42
               Teach Workroom millwork.

               Non ADA-compliant millwork; no knee clearance under
               sink & counter is too low.

               Install new millwork with ADA-compliant knee clearance
               at sink.

DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                                  19
BRPH| SITE VIST ASSESMENT REPORT                                          DATE | 06/09/2021

A43
               West Corridor to Courtyard wall.


               Non-functioning oversized louver.

               Consider replacing with windows to bring in natural into
               interior corridor.


A44
               Courtyard to West Corridor wall.


               Non-functioning oversized louver.

               Consider replacing with windows to bring in natural into
               interior corridor.


A45
               Sample exit stair.


               Guardrail at stair runs does not meet IBC 2018.


               Rebuild railings to meet current codes.


A46
               South corridor, Unisex Restroom.


               Non ADA-compliant Restroom.

               Demolish side walls and expand to accomodate an
               ADA-compliant single use Restroom.


A47
               Ground level, left / rear Stair exit.


               Non ADA-compliant landing clearance & door width.

               Consider expanding Vestibule to provide appropriate 5’
               wide minimum landing and ADA-compliant pair of doors.


A48
               Sample photo of Children’s gang Restroom.


               No pipe protection at exposed plumbing piping.


               Install pipe at exposed plumbing piping locations.

DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                               20
BRPH| SITE VIST ASSESMENT REPORT                                          DATE | 06/09/2021

A49
               Staff RR, along Center Corridor - sample photo.


               Non-ADA compliant clearances at sink & doorway.


               Remove partition and loose furniture.


A50
               Main Mechanical room.


               Missing fire sealant in rated wall.


               Install fire stopping around gaps at rated wall.


A51
               Main Mechanical room.


               Storage of loose items; fire hazard.


               Remove miscellaneous loose items.


A52
               Main Mechanical room.


               Broken and non-ADA compliant door hardware.


               Install new ADA-compliant door hardware.


A53
               Sample Hallway.


               No sprinkler system.

               Install sprinkler sytem; will require new ceilings & new
               LED light fixtures.


A54
               Cafeteria flooring.

               Broken / damage & discolored VCT flooring; Owner com-
               plaints of constant replacement needs.

               Recomend replacing flooring with LVT planks.

DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                               21
BRPH| SITE VIST ASSESMENT REPORT                                        DATE | 06/09/2021

A55
               Kitchen Staff RR - Women’s.

               Broken / damage & discolored VCT flooring; Owner com-
               plaints of constant replacement needs.

               Recomend replacing flooring with LVT planks.


A56
               Kitchen Staff RR - Men’s.


               Missing fire sealant in rated wall.


               Install fire stopping around gaps at rated wall.


A57
               Sample room signage.


               Non ADA-compliant signage.

               Remove existing signage and replace with ADA-compliant
               and DCSD guideline-compliant signage throughout.


A58
               Sample Expansion joint (EJ) location.


               Chipped / broken flooring and / or sealant joint.


               Replace EJ cover.




DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                             22
BRPH| SITE VIST ASSESMENT REPORT                                                              DATE | 06/09/2021

   E01
                  Existing Generator

                  Top of generator is damaged.


                  Recommend replacing generator top.

   E02

                  Interior Lighting

                  Existing lighting is fluorescent.


                  Recommend replacing all lighting to LED.

   E03
                  Existing Electrical Sub-panels and Transfers

                  Existing panels are original to building and past their useful
                  life expectancy.

                  Recommend replacing original sub-panels with new.

   E04

                  Existing Intercom System

                  Existing system is outdated and does not meet current
                                                                                   NO PHOTO
                  DeKalb County specifications.

                  Recommend replacing existing intercom system.




DEKALB COUNTY SCHOOL DISTRICT | DEKALB HIGH SCHOOL OF TECHNOLOGY                                                  23
HVAC System Description

The building is served by a chilled water cooling and hot water heating system. Insulated piping
links the central plant components with air handling units serving most areas of the original
building. The piping system is in a two-pipe configuration, allowing either heating or cooling
only. The unit ventilators have a service life of approx. 10 years remaining.

The central plant consists of a hot water boiler, hot water pump, (2) chilled water pumps, and
water system accessories such as air separators and expansion tanks in the mechanical room and
an air-cooled chiller in the adjacent mechanical yard. The boiler is older with an approx. service
life left of five years. There is only one hot water pump, leaving no redundancy in case of failure.
The chiller was manufactured in 2014 but was relocated from another facility. This unit is
currently experiencing issues with refrigerant leaks.

Classrooms are served by unit ventilators located in each classroom. These units are designed to
allow cooling to be provided by bringing in cool outdoor air during Winter months when hot
water is flowing through the piping system. This system feature is accommodated by transfer
openings above classroom doors, allowing the classroom air into the corridor and out of the
building through the large common relief louver open to the courtyard.

The common areas such as the administration and cafeteria are served by roof mounted packaged
units. This equipment has a remaining service life of approx. five years.

Exhaust requirements are met by fans located throughout the facility – mostly on the roof.
Heaters are located in select smaller spaces such as toilets and storage areas. Most fans and
heaters have been replaced. However, a few are at the end of their service life.

The storage rooms adjacent to the Art Room appear to be unheated. The systems in these areas
should be replaced.

Non-ducted split systems are typically provided to air-condition kitchen offices and dry storage
rooms. These spaces do not currently have dedicated A/C systems.

HVAC System Recommendations

   1. Replace all boiler and accessories serving the hot water portion of the system. The new
      boiler should be water-tube type, per Owner guidelines. A new hot water pump should be
      added to the system to provide redundancy for reliability. The air-cooled chiller should be
      replaced. While the age of this unit is low, persistent problems warrant replacement.
   2. Unit ventilators and roof mounted units should remain.
   3. New non-ducted split systems should be added at the kitchen office and dry storage areas.




                 MBA Consulting Engineers • 225 Reformation Pkwy., Suite 200, Canton, Ga 30114 •
                                    770-751-0773 • www.mathesonball.com
Midvale Elementary Building System Assessment                                                        25

   4. All older fans and heaters should be replaced. The systems serving the storage spaces
      adjacent to the Art Rm. should be replaced or modified.
   5. The control system should be upgraded to the current software version. Any new HVAC
      system components would be provided with current controls.
   6. If a fire sprinkler system is added throughout the school, the air transfer openings into the
      corridors will likely be removed. This would require small transfer openings between
      classrooms and adding roof mounted relief openings for proper unit ventilator operation
      in cooler months.


Plumbing / Fire Protection Systems Description / Condition

Toilet fixtures are in generally good condition. ADA fixtures are provided throughout the
building. However, access to these is restricted due to existing architectural elements in certain
spaces – see the architectural assessment.

Refrigerated drinking fountains are provided. Additional bottle filling stations should be
provided.

The water heaters have an average remaining life of seven years.

No sprinkler system coverage is currently provided.


Plumbing / Fire Protection Systems Recommendations

Bottle filling stations at drinking fountains should be added in select locations as requested by
the Owner such as the cafeteria area.

A new fire sprinkler system should be provided. This may lead to redesign of the corridor wall
assembly to accommodate smoke partition walls. Likely extra steps this would lead to would be
sealing transfer louvers at classroom door transoms, adding relief roof hoods over classrooms,
and adding transfer openings above ceilings between classrooms to allow for free air transfer.




                MBA Consulting Engineers • 225 Reformation Parkway, Suite 200, Canton, GA 30114 •
                                     770-751-0773 • www.mathesonball.com
BRPH| SITE VIST ASSESMENT REPORT                                            DATE | 06/09/2021




 M01
                Main Mechanical Room.


                Hydronic Boiler.


                Recommend replacement.


 M02
               Main Mechanical Room.


               Chiller – manufactured in 2014 – has refrigerant leaks.


               Recommend replacement due to maintenance issues.


 M03
               Roof.


               Remaining service life of 5 years or less.


               Recommend replacing within 5 years.


M04
               Kitchen.

               Cabinet ventilator – less than 5 years of service life re-
               maining.

               Recommend replacing.



 M05
               Storage adjacent to Art Rm.


               Cabinet heater - abandoned.


               Recommend replacement.




DEKALB COUNTY SCHOOL DISTRICT | MIDVALE ELEMENTARY SCHOOL                                 26
BRPH| SITE VISIT ASSESSMENT REPORT                                    DATE | 06/09/2021

 M06
               Storage adjacent to Art Rm.


               Intake Louver.


               Recommend modification & new fan.


 M07
               Main Corridor.


               Existing Transfer Transom.

               Recommend lavatories without enclosures that provide
               protected knee space required by ADA.