  "source_url": "https://www.dekalbschoolsga.org/divisions/access-and-opportunity/sap/sap-survey",
  "schema_note": "Each row in `detail` mirrors the 11-column DCSD master table. parse_confidence='full' rows had all 11 cells; 'reconstructed' rows were recovered by expanding colspans or inserting a blank for a single dropped column (Scenario 1 Refinements); 'partial' rows had two or more columns dropped and need manual review. raw_cells preserves the original cell sequence in every case.",
  "detail": [
    {
      "school": "Austin ES",
      "cluster": "Dunwoody",
      "raw_cells": [
        "Austin ES",
        "Dunwoody",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Dunwoody ES",
      "cluster": "Dunwoody",
      "raw_cells": [
        "Dunwoody ES",
        "Dunwoody",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Chesnut ES",
      "cluster": "Dunwoody",
      "raw_cells": [
        "Chesnut ES",
        "Dunwoody",
        "Capacity expansion project",
        "Chesnut ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (11.9 acres). This will allow for the consolidation of small elementary facilities in the area.",
        "Concerns around existing overcrowding, importance of keeping neighborhoods together, concerns that larger schools lead to larger class sizes.",
        "Class size and facility size are completely independent. If builds are expanded to accommodate more students, more staff will be allocated to support those students",
        "Proposed capacity expansion project",
        "",
        "Unchanged",
        "Proposed capacity expansion project",
        "Closure of Kingsley is dependent on this project"
      ],
      "raw_cell_count": 11,
      "round1_action": "Capacity expansion project",
      "round1_rationale": "Chesnut ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (11.9 acres). This will allow for the consolidation of small elementary facilities in the area.",
      "survey_feedback": "Concerns around existing overcrowding, importance of keeping neighborhoods together, concerns that larger schools lead to larger class sizes.",
      "round1_refinements": "Class size and facility size are completely independent. If builds are expanded to accommodate more students, more staff will be allocated to support those students",
      "round2_action": "Proposed capacity expansion project",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Proposed capacity expansion project",
      "phasing_consideration": "Closure of Kingsley is dependent on this project",
      "parse_confidence": "full"
    },
    {
      "school": "Hightower ES",
      "cluster": "Dunwoody",
      "raw_cells": [
        "Hightower ES",
        "Dunwoody",
        "Capacity expansion project",
        "Hightower ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (11.8 acres). This will allow for the consolidation of small elementary facilities in the area.",
        "Importance of keeping neighborhoods together, concerns that larger schools lead to larger class sizes.",
        "Class size and facility size are completely independent. If builds are expanded to accommodate more students, more staff will be allocated to support those students",
        "Proposed capacity expansion project",
        "",
        "Unchanged",
        "Due to the age of this facility and the complication of expanding the current building, this school is proposed to be rebuilt on its current site.",
        "Near-term. Students may be able to stay on campus while the school is rebuilt on-site."
      ],
      "raw_cell_count": 11,
      "round1_action": "Capacity expansion project",
      "round1_rationale": "Hightower ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (11.8 acres). This will allow for the consolidation of small elementary facilities in the area.",
      "survey_feedback": "Importance of keeping neighborhoods together, concerns that larger schools lead to larger class sizes.",
      "round1_refinements": "Class size and facility size are completely independent. If builds are expanded to accommodate more students, more staff will be allocated to support those students",
      "round2_action": "Proposed capacity expansion project",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Due to the age of this facility and the complication of expanding the current building, this school is proposed to be rebuilt on its current site.",
      "phasing_consideration": "Near-term. Students may be able to stay on campus while the school is rebuilt on-site.",
      "parse_confidence": "full"
    },
    {
      "school": "Kingsley ES",
      "cluster": "Dunwoody",
      "raw_cells": [
        "Kingsley ES",
        "Dunwoody",
        "Close or Repurpose",
        "Kingsley is proposed to be closed or repurposed due to forecasted low enrollment (392 in 2030) along with poor facility condition (79% FCA score), small capacity (504), and excess capacity in the area.",
        "Resistance to closure, support for maintaining small school communities",
        "Closure of this facility is dependent on additional capacity at Chesnut",
        "Proposed to close or be repurposed",
        "",
        "Close or Repurpose",
        "Medium-term solutions have been identified for the HVAC issues.",
        "Medium Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Kingsley is proposed to be closed or repurposed due to forecasted low enrollment (392 in 2030) along with poor facility condition (79% FCA score), small capacity (504), and excess capacity in the area.",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities",
      "round1_refinements": "Closure of this facility is dependent on additional capacity at Chesnut",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Close or Repurpose",
      "capital_project_consideration": "Medium-term solutions have been identified for the HVAC issues.",
      "phasing_consideration": "Medium Term",
      "parse_confidence": "full"
    },
    {
      "school": "Vanderlyn ES",
      "cluster": "Dunwoody",
      "raw_cells": [
        "Vanderlyn ES",
        "Dunwoody",
        "Close or Repurpose",
        "Vanderlyn is proposed to close due to small capacity (552) along with needs for site expansion at Dunwoody HS and excess capacity in the area.",
        "Resistance to closure, support for maintaining small school communities",
        "The facility can be used as is to support Dunwoody HS, ideas include 9th grade academy, Career Tech / Vocational spaces.",
        "Proposed to convert to High School Annex",
        "",
        "The facility can be used as is to support Dunwoody HS, ideas include 9th grade academy, Career Tech / Vocational spaces.",
        "Minor fixture replacement / upgrades",
        "Students would likey need to split between Austin, Dunwoody, and Kingsley in the short term."
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Vanderlyn is proposed to close due to small capacity (552) along with needs for site expansion at Dunwoody HS and excess capacity in the area.",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities",
      "round1_refinements": "The facility can be used as is to support Dunwoody HS, ideas include 9th grade academy, Career Tech / Vocational spaces.",
      "round2_action": "Proposed to convert to High School Annex",
      "map_symbol": "",
      "round2_rationale": "The facility can be used as is to support Dunwoody HS, ideas include 9th grade academy, Career Tech / Vocational spaces.",
      "capital_project_consideration": "Minor fixture replacement / upgrades",
      "phasing_consideration": "Students would likey need to split between Austin, Dunwoody, and Kingsley in the short term.",
      "parse_confidence": "full"
    },
    {
      "school": "Peachtree MS",
      "cluster": "Dunwoody",
      "raw_cells": [
        "Peachtree MS",
        "Dunwoody",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Dunwoody HS",
      "cluster": "Dunwoody",
      "raw_cells": [
        "Dunwoody HS",
        "Dunwoody",
        "No change in school use",
        "",
        "Concerns around overcrowding without a capacity expansion project listed",
        "Vanderlyn would support the Dunwoody HS program to expand capacity",
        "No change in school use",
        "",
        "The intent is for the Dunwoody HS to use the facility at Vanderlyn ES to expand capacity, ideas include: 9th grade academy, CTE program areas.",
        "",
        "This is dependent on Vanderlyn closing and distributing the students to other area schools"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "Concerns around overcrowding without a capacity expansion project listed",
      "round1_refinements": "Vanderlyn would support the Dunwoody HS program to expand capacity",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "The intent is for the Dunwoody HS to use the facility at Vanderlyn ES to expand capacity, ideas include: 9th grade academy, CTE program areas.",
      "capital_project_consideration": "",
      "phasing_consideration": "This is dependent on Vanderlyn closing and distributing the students to other area schools",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Ashford Park ES",
      "cluster": "Chamblee",
      "raw_cells": [
        "Ashford Park ES",
        "Chamblee",
        "Close or Repurpose",
        "Ashford Park ES is proposed to be closed or repurposed because the facility is significantly smaller than the district’s desired minimum size of 600 seats (capacity 480), and the site (7.02 acres) cannot be expanded to meet future needs. The facility is not large enough to support an efficient elementary school program.",
        "Resistance to closure, support for maintaining small school communities, strong desire to stay in the Chamblee cluster, open to alternative grade bands.",
        "This intent is to use the Ashford Park facility to serve students in some way, the site is not adequate for a PK-5 elementary school.",
        "Proposed to convert to other student center (examples: ELC, Special Ed.)",
        "",
        "There is need for capacity in the area, but purchasing additional property may be cost prohibitive.",
        "Minor fixture replacement / upgrades",
        "Once Dresden opens in the fall of 2027, convert Ashford Park to a K-3 campus, students would attend Montgomery / Nancy Creek / Huntley Hills for grades 4-5. Long-term: Use for Early Learning Center or swing space."
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Ashford Park ES is proposed to be closed or repurposed because the facility is significantly smaller than the district’s desired minimum size of 600 seats (capacity 480), and the site (7.02 acres) cannot be expanded to meet future needs. The facility is not large enough to support an efficient elementary school program.",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities, strong desire to stay in the Chamblee cluster, open to alternative grade bands.",
      "round1_refinements": "This intent is to use the Ashford Park facility to serve students in some way, the site is not adequate for a PK-5 elementary school.",
      "round2_action": "Proposed to convert to other student center (examples: ELC, Special Ed.)",
      "map_symbol": "",
      "round2_rationale": "There is need for capacity in the area, but purchasing additional property may be cost prohibitive.",
      "capital_project_consideration": "Minor fixture replacement / upgrades",
      "phasing_consideration": "Once Dresden opens in the fall of 2027, convert Ashford Park to a K-3 campus, students would attend Montgomery / Nancy Creek / Huntley Hills for grades 4-5. Long-term: Use for Early Learning Center or swing space.",
      "parse_confidence": "full"
    },
    {
      "school": "Doraville United ES",
      "cluster": "Chamblee",
      "raw_cells": [
        "Doraville United ES",
        "Chamblee",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Huntley Hills ES",
      "cluster": "Chamblee",
      "raw_cells": [
        "Huntley Hills ES",
        "Chamblee",
        "Capacity Expansion",
        "Huntley Hills ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (10.5 acres). This will allow for the consolidation of small elementary facilities in the area.",
        "support for maintaining small school communities",
        "",
        "Proposed capacity expansion project",
        "",
        "Unchanged",
        "Proposed capacity expansion project",
        "Once Dresden opens in the fall of 2027, convert Huntley Hills, Ashford Park, and Nancy Creek to PK-3 buildings which will feed into Montgomery as a 4-5. Long-term, convert back to a PK-5 after capacity expansion is complete."
      ],
      "raw_cell_count": 11,
      "round1_action": "Capacity Expansion",
      "round1_rationale": "Huntley Hills ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (10.5 acres). This will allow for the consolidation of small elementary facilities in the area.",
      "survey_feedback": "support for maintaining small school communities",
      "round1_refinements": "",
      "round2_action": "Proposed capacity expansion project",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Proposed capacity expansion project",
      "phasing_consideration": "Once Dresden opens in the fall of 2027, convert Huntley Hills, Ashford Park, and Nancy Creek to PK-3 buildings which will feed into Montgomery as a 4-5. Long-term, convert back to a PK-5 after capacity expansion is complete.",
      "parse_confidence": "full"
    },
    {
      "school": "Montgomery ES",
      "cluster": "Chamblee",
      "raw_cells": [
        "Montgomery ES",
        "Chamblee",
        "Capacity Expansion",
        "Montgomery ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (12.15 acres). This will allow for the consolidation of small elementary facilities in the area.",
        "support for maintaining small school communities",
        "",
        "Proposed capacity expansion project",
        "",
        "Unchanged",
        "Proposed capacity expansion project"
      ],
      "raw_cell_count": 10,
      "round1_action": "Capacity Expansion",
      "round1_rationale": "Montgomery ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (12.15 acres). This will allow for the consolidation of small elementary facilities in the area.",
      "survey_feedback": "support for maintaining small school communities",
      "round1_refinements": "",
      "round2_action": "Proposed capacity expansion project",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Proposed capacity expansion project",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Nancy Creek ES",
      "cluster": "Chamblee",
      "raw_cells": [
        "Nancy Creek ES",
        "Chamblee",
        "Not addressed in Scenario 1",
        "",
        "",
        "",
        "No change in school use (Swing Space)",
        "",
        "The Cary Reynolds ES community will be included in the redistricting process for Dresden ES. The Nancy Creek ES facility is proposed to provide capacity to area schools.",
        ""
      ],
      "raw_cell_count": 10,
      "round1_action": "Not addressed in Scenario 1",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use (Swing Space)",
      "map_symbol": "",
      "round2_rationale": "The Cary Reynolds ES community will be included in the redistricting process for Dresden ES. The Nancy Creek ES facility is proposed to provide capacity to area schools.",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Chamblee MS",
      "cluster": "Chamblee",
      "raw_cells": [
        "Chamblee MS",
        "Chamblee",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Chamblee HS",
      "cluster": "Chamblee",
      "raw_cells": [
        "Chamblee HS",
        "Chamblee",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Dresden ES",
      "cluster": "Cross Keys",
      "raw_cells": [
        "Dresden ES",
        "Cross Keys",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "Currently under construction (Opens 2027)",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "Currently under construction (Opens 2027)",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "John Lewis ES",
      "cluster": "Cross Keys",
      "raw_cells": [
        "John Lewis ES",
        "Cross Keys",
        "No change in school use",
        "",
        "",
        "",
        "Proposed to convert to PK-8",
        "",
        "John Lewis ES is proposed to convert to a K-8 to create middle school capacity for Cross Keys HS.",
        "Minor fixture replacement",
        "Medium-Term, align with Sequoyah HS opening in fall of 2029"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to convert to PK-8",
      "map_symbol": "",
      "round2_rationale": "John Lewis ES is proposed to convert to a K-8 to create middle school capacity for Cross Keys HS.",
      "capital_project_consideration": "Minor fixture replacement",
      "phasing_consideration": "Medium-Term, align with Sequoyah HS opening in fall of 2029",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Montclair ES",
      "cluster": "Cross Keys",
      "raw_cells": [
        "Montclair ES",
        "Cross Keys",
        "No change in school use",
        "",
        "",
        "",
        "Proposed capacity expansion and Proposed conversion to PK-8",
        "",
        "Montclair ES is proposed to convert to a K-8 to create middle school capacity for Cross Keys HS.",
        "Proposed capacity expansion and Proposed conversion to PK-8",
        "Medium-Term, align with Sequoyah HS opening in fall of 2029"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed capacity expansion and Proposed conversion to PK-8",
      "map_symbol": "",
      "round2_rationale": "Montclair ES is proposed to convert to a K-8 to create middle school capacity for Cross Keys HS.",
      "capital_project_consideration": "Proposed capacity expansion and Proposed conversion to PK-8",
      "phasing_consideration": "Medium-Term, align with Sequoyah HS opening in fall of 2029",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Oakcliff Theme ES",
      "cluster": "Cross Keys",
      "raw_cells": [
        "Oakcliff Theme ES",
        "Cross Keys",
        "Capacity Expansion",
        "Oakcliff ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (9.4 acres). This will allow for the consolidation of small elementary facilities in the area.",
        "support for maintaining small school communities",
        "After Dresden opens, this would be a regular (non-theme) elementary school.",
        "Proposed capacity expansion project",
        "",
        "After Dresden opens, would be a regular (non-theme) elementary school. Additional capacity is needed to accommodate students from the Pleasantdale and Evansdale areas which are very likely to feed into Sequoyah with the area around Oakcliff Theme.",
        "Proposed capacity expansion project",
        "Medium-Term, align with Sequoyah HS opening in fall of 2029"
      ],
      "raw_cell_count": 11,
      "round1_action": "Capacity Expansion",
      "round1_rationale": "Oakcliff ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (9.4 acres). This will allow for the consolidation of small elementary facilities in the area.",
      "survey_feedback": "support for maintaining small school communities",
      "round1_refinements": "After Dresden opens, this would be a regular (non-theme) elementary school.",
      "round2_action": "Proposed capacity expansion project",
      "map_symbol": "",
      "round2_rationale": "After Dresden opens, would be a regular (non-theme) elementary school. Additional capacity is needed to accommodate students from the Pleasantdale and Evansdale areas which are very likely to feed into Sequoyah with the area around Oakcliff Theme.",
      "capital_project_consideration": "Proposed capacity expansion project",
      "phasing_consideration": "Medium-Term, align with Sequoyah HS opening in fall of 2029",
      "parse_confidence": "full"
    },
    {
      "school": "Woodward ES",
      "cluster": "Cross Keys",
      "raw_cells": [
        "Woodward ES",
        "Cross Keys",
        "No change in school use",
        "",
        "",
        "",
        "Proposed capacity expansion and Proposed conversion to PK-8",
        "",
        "Wooward ES is proposed to convert to a K-8 to create middle school capacity for Cross Keys HS.",
        "Proposed capacity expansion and Proposed conversion to PK-8",
        "Medium-Term, align with Sequoyah HS opening in fall of 2029"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed capacity expansion and Proposed conversion to PK-8",
      "map_symbol": "",
      "round2_rationale": "Wooward ES is proposed to convert to a K-8 to create middle school capacity for Cross Keys HS.",
      "capital_project_consideration": "Proposed capacity expansion and Proposed conversion to PK-8",
      "phasing_consideration": "Medium-Term, align with Sequoyah HS opening in fall of 2029",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Sequoyah MS",
      "cluster": "Cross Keys",
      "raw_cells": [
        "Sequoyah MS",
        "Cross Keys",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "Currently under construction (Opens 2027)",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "Currently under construction (Opens 2027)",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Cross Keys HS",
      "cluster": "Cross Keys",
      "raw_cells": [
        "Cross Keys HS",
        "Cross Keys",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "Currently being modernized (Completion 2027)",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "Currently being modernized (Completion 2027)",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Sequoyah HS",
      "cluster": "Cross Keys",
      "raw_cells": [
        "Sequoyah HS",
        "Cross Keys",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "Currently under construction (Opens 2029)",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "Currently under construction (Opens 2029)",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Briarlake ES",
      "cluster": "Lakeside",
      "raw_cells": [
        "Briarlake ES",
        "Lakeside",
        "Capacity Expansion",
        "Briarlake ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (11.11 acres). This will allow for the consolidation of small elementary facilities in the area.",
        "Concerns around losing the \"small school\" community feel.",
        "With the exception of Pleasantdale ES (capacity 984) the elementary schools in the Lakeside cluster are well utilized, but they are too small. Scenario 1 selected schools with the largest sites that were well positioned within the cluster.",
        "Proposed capacity expansion project",
        "",
        "Unchanged",
        "Proposed capacity expansion project",
        "Medium-Long Term. Expansion programs may need to be spread out over multiple SPLOST's"
      ],
      "raw_cell_count": 11,
      "round1_action": "Capacity Expansion",
      "round1_rationale": "Briarlake ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (11.11 acres). This will allow for the consolidation of small elementary facilities in the area.",
      "survey_feedback": "Concerns around losing the \"small school\" community feel.",
      "round1_refinements": "With the exception of Pleasantdale ES (capacity 984) the elementary schools in the Lakeside cluster are well utilized, but they are too small. Scenario 1 selected schools with the largest sites that were well positioned within the cluster.",
      "round2_action": "Proposed capacity expansion project",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Proposed capacity expansion project",
      "phasing_consideration": "Medium-Long Term. Expansion programs may need to be spread out over multiple SPLOST's",
      "parse_confidence": "full"
    },
    {
      "school": "Evansdale ES",
      "cluster": "Lakeside",
      "raw_cells": [
        "Evansdale ES",
        "Lakeside",
        "Close or Repurpose",
        "Evansdale ES is proposed to be closed or repurposed due to low building adequacy (69%) and the need to move towards larger more adequate schools in the area. Site size: 10.11",
        "Resistance to closure, support for maintaining small school communities, concerns around increased traffic on sites with additions",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "Medium-Long Term. Dependent on capacity expansion at Briarlake, Hawthorne, and Sagamore Hills."
      ],
      "raw_cell_count": 10,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Evansdale ES is proposed to be closed or repurposed due to low building adequacy (69%) and the need to move towards larger more adequate schools in the area. Site size: 10.11",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities, concerns around increased traffic on sites with additions",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "Medium-Long Term. Dependent on capacity expansion at Briarlake, Hawthorne, and Sagamore Hills.",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Hawthorne ES",
      "cluster": "Lakeside",
      "raw_cells": [
        "Hawthorne ES",
        "Lakeside",
        "Capacity Expansion",
        "Hawthorne ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (12.25 acres). This will allow for the consolidation of small elementary facilities in the area.",
        "Concerns around losing the \"small school\" community feel.",
        "Proposed capacity expansion project",
        "",
        "Unchanged",
        "Proposed capacity expansion project",
        "Medium-Long Term. Expansion programs may need to be spread out over multiple SPLOST's"
      ],
      "raw_cell_count": 10,
      "round1_action": "Capacity Expansion",
      "round1_rationale": "Hawthorne ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (12.25 acres). This will allow for the consolidation of small elementary facilities in the area.",
      "survey_feedback": "Concerns around losing the \"small school\" community feel.",
      "round1_refinements": "",
      "round2_action": "Proposed capacity expansion project",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Proposed capacity expansion project",
      "phasing_consideration": "Medium-Long Term. Expansion programs may need to be spread out over multiple SPLOST's",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Henderson Mill ES",
      "cluster": "Lakeside",
      "raw_cells": [
        "Henderson Mill ES",
        "Lakeside",
        "Close or Repurpose",
        "Henderson Mill ES is proposed to be closed or repurposed due to low building adequacy (69%) and the need to move towards larger more adequate schools in the area. Site size: 9.2",
        "Resistance to closure, support for maintaining small school communities, concerns around increased traffic on sites with additions",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "Medium-Long Term. Dependent on capacity expansion at Briarlake, Hawthorne, and Sagamore Hills."
      ],
      "raw_cell_count": 10,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Henderson Mill ES is proposed to be closed or repurposed due to low building adequacy (69%) and the need to move towards larger more adequate schools in the area. Site size: 9.2",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities, concerns around increased traffic on sites with additions",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "Medium-Long Term. Dependent on capacity expansion at Briarlake, Hawthorne, and Sagamore Hills.",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Oak Grove ES",
      "cluster": "Lakeside",
      "raw_cells": [
        "Oak Grove ES",
        "Lakeside",
        "Close or Repurpose",
        "Oak Grove ES is proposed to be closed or repurposed due to low building adequacy (71%) and the need to move towards larger more adequate schools in the area. Site size: 8.57",
        "Resistance to closure, support for maintaining small school communities, concerns around increased traffic on sites with additions",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "Medium-Long Term. Dependent on capacity expansion at Briarlake, Hawthorne, and Sagamore Hills."
      ],
      "raw_cell_count": 10,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Oak Grove ES is proposed to be closed or repurposed due to low building adequacy (71%) and the need to move towards larger more adequate schools in the area. Site size: 8.57",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities, concerns around increased traffic on sites with additions",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "Medium-Long Term. Dependent on capacity expansion at Briarlake, Hawthorne, and Sagamore Hills.",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Pleasantdale ES",
      "cluster": "Lakeside",
      "raw_cells": [
        "Pleasantdale ES",
        "Lakeside",
        "No change in school use",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 10,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Sagamore Hills ES",
      "cluster": "Lakeside",
      "raw_cells": [
        "Sagamore Hills ES",
        "Lakeside",
        "Capacity Expansion",
        "Sagamore Hills ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (9.7 acres). This will allow for the consolidation of small elementary facilities in the area.",
        "Concerns around losing the \"small school\" community feel.",
        "Proposed capacity expansion project",
        "",
        "Unchanged",
        "Proposed capacity expansion project",
        "Medium-Long Term. Expansion programs may need to be spread out over multiple SPLOST's"
      ],
      "raw_cell_count": 10,
      "round1_action": "Capacity Expansion",
      "round1_rationale": "Sagamore Hills ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (9.7 acres). This will allow for the consolidation of small elementary facilities in the area.",
      "survey_feedback": "Concerns around losing the \"small school\" community feel.",
      "round1_refinements": "",
      "round2_action": "Proposed capacity expansion project",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Proposed capacity expansion project",
      "phasing_consideration": "Medium-Long Term. Expansion programs may need to be spread out over multiple SPLOST's",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Henderson MS",
      "cluster": "Lakeside",
      "raw_cells": [
        "Henderson MS",
        "Lakeside",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Lakeside HS",
      "cluster": "Lakeside",
      "raw_cells": [
        "Lakeside HS",
        "Lakeside",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Coralwood",
      "cluster": "Lakeside",
      "raw_cells": [
        "Coralwood",
        "Lakeside",
        "Not addressed in Scenario 1",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "Not addressed in Scenario 1",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Kittredge Magnet",
      "cluster": "Lakeside",
      "raw_cells": [
        "Kittredge Magnet",
        "Lakeside",
        "Not addressed in Scenario 1",
        "",
        "If a better facility in the in the same general are is not available, improvements to the current building should be considered. It is important to maintain continuity in to Chamblee HS.",
        "",
        "Proposed to move to a more adequate facility",
        "",
        "Kittredge Magnet is in need of a more adequate facility. In this iteration, there are several middle school facilities that are available (Freedom MS, Redan MS, Salem MS, and Columbia MS)",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "Not addressed in Scenario 1",
      "round1_rationale": "",
      "survey_feedback": "If a better facility in the in the same general are is not available, improvements to the current building should be considered. It is important to maintain continuity in to Chamblee HS.",
      "round1_refinements": "",
      "round2_action": "Proposed to move to a more adequate facility",
      "map_symbol": "",
      "round2_rationale": "Kittredge Magnet is in need of a more adequate facility. In this iteration, there are several middle school facilities that are available (Freedom MS, Redan MS, Salem MS, and Columbia MS)",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Margaret Harris",
      "cluster": "Lakeside",
      "raw_cells": [
        "Margaret Harris",
        "Lakeside",
        "Not addressed in Scenario 1",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "Not addressed in Scenario 1",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Warren Tech",
      "cluster": "Lakeside",
      "raw_cells": [
        "Warren Tech",
        "Lakeside",
        "Not addressed in Scenario 1",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "Not addressed in Scenario 1",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Avondale ES",
      "cluster": "Druid Hills",
      "raw_cells": [
        "Avondale ES",
        "Druid Hills",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Briar Vista ES",
      "cluster": "Druid Hills",
      "raw_cells": [
        "Briar Vista ES",
        "Druid Hills",
        "Capacity Expansion",
        "Briar Vista ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (10.8 acres). This will allow for the consolidation of small elementary facilities in the area.",
        "Generally open to consolidation concepts",
        "",
        "Proposed capacity expansion project",
        "",
        "Unchanged",
        "Proposed capacity expansion project",
        "Long Term. Expansion programs may need to be spread out over multiple SPLOST's. This one does not have any closures that are dependent on it."
      ],
      "raw_cell_count": 11,
      "round1_action": "Capacity Expansion",
      "round1_rationale": "Briar Vista ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (10.8 acres). This will allow for the consolidation of small elementary facilities in the area.",
      "survey_feedback": "Generally open to consolidation concepts",
      "round1_refinements": "",
      "round2_action": "Proposed capacity expansion project",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Proposed capacity expansion project",
      "phasing_consideration": "Long Term. Expansion programs may need to be spread out over multiple SPLOST's. This one does not have any closures that are dependent on it.",
      "parse_confidence": "full"
    },
    {
      "school": "Fernbank ES",
      "cluster": "Druid Hills",
      "raw_cells": [
        "Fernbank ES",
        "Druid Hills",
        "No change in school use",
        "",
        "No change in school use",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "No change in school use",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "full"
    },
    {
      "school": "Laurel Ridge ES",
      "cluster": "Druid Hills",
      "raw_cells": [
        "Laurel Ridge ES",
        "Druid Hills",
        "Capacity Expansion",
        "Laurel Ridge ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (10.13 acres). This will allow for the consolidation of small elementary facilities in the area.",
        "Concerns around losing the \"small school\" community feel. Need assurances that additional resources will actually come with larger schools.",
        "",
        "Proposed capacity expansion project",
        "",
        "Unchanged",
        "Proposed capacity expansion project",
        "Medium-Long Term. Expansion programs may need to be spread out over multiple SPLOST's"
      ],
      "raw_cell_count": 11,
      "round1_action": "Capacity Expansion",
      "round1_rationale": "Laurel Ridge ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (10.13 acres). This will allow for the consolidation of small elementary facilities in the area.",
      "survey_feedback": "Concerns around losing the \"small school\" community feel. Need assurances that additional resources will actually come with larger schools.",
      "round1_refinements": "",
      "round2_action": "Proposed capacity expansion project",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Proposed capacity expansion project",
      "phasing_consideration": "Medium-Long Term. Expansion programs may need to be spread out over multiple SPLOST's",
      "parse_confidence": "full"
    },
    {
      "school": "McLendon ES",
      "cluster": "Druid Hills",
      "raw_cells": [
        "McLendon ES",
        "Druid Hills",
        "Close or Repurpose",
        "McClendon is proposed to close due to low forecasted enrollment (335 in 2030), low building adequacy score (75%), and close proximity to excess capacity in the area",
        "Resistance to closure, support for maintaining small school communities, support for converting consolidated small schools into ELC's.",
        "",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "Medium-Long Term. Dependent on capacity expansion at Laurel Ridge ES."
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "McClendon is proposed to close due to low forecasted enrollment (335 in 2030), low building adequacy score (75%), and close proximity to excess capacity in the area",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities, support for converting consolidated small schools into ELC's.",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "Medium-Long Term. Dependent on capacity expansion at Laurel Ridge ES.",
      "parse_confidence": "full"
    },
    {
      "school": "Robert Shaw Theme ES",
      "cluster": "Druid Hills",
      "raw_cells": [
        "Robert Shaw Theme ES",
        "Druid Hills",
        "Close or Repurpose",
        "Robert Shaw Theme is proposed to be closed or repurposed due to forecasted low enrollment (272 in 2030) and low building adequacy (79%).",
        "Resistance to closure, support for maintaining small school communities, desire for the program to stay together if it can move somewhere else.",
        "",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "Medium-Long Term."
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Robert Shaw Theme is proposed to be closed or repurposed due to forecasted low enrollment (272 in 2030) and low building adequacy (79%).",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities, desire for the program to stay together if it can move somewhere else.",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "Medium-Long Term.",
      "parse_confidence": "full"
    },
    {
      "school": "Druid Hills MS",
      "cluster": "Druid Hills",
      "raw_cells": [
        "Druid Hills MS",
        "Druid Hills",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Druid Hills HS",
      "cluster": "Druid Hills",
      "raw_cells": [
        "Druid Hills HS",
        "Druid Hills",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "Board approved modernization",
        "Proposed Capital Improvement Project",
        "Near-Term, Board as approved the design."
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "Board approved modernization",
      "capital_project_consideration": "Proposed Capital Improvement Project",
      "phasing_consideration": "Near-Term, Board as approved the design.",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Fernbank Science Center",
      "cluster": "Druid Hills",
      "raw_cells": [
        "Fernbank Science Center",
        "Druid Hills",
        "Not addressed in Scenario 1",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "Not addressed in Scenario 1",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "DSA",
      "cluster": "Druid Hills",
      "raw_cells": [
        "DSA",
        "Druid Hills",
        "Not addressed in Scenario 1",
        "",
        "",
        "",
        "Proposed to move to a more adequate facility",
        "",
        "DSA is in need of a more adequate facility right sized for the program",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "Not addressed in Scenario 1",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to move to a more adequate facility",
      "map_symbol": "",
      "round2_rationale": "DSA is in need of a more adequate facility right sized for the program",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "DAA",
      "cluster": "Druid Hills",
      "raw_cells": [
        "DAA",
        "Druid Hills",
        "Not addressed in Scenario 1",
        "",
        "",
        "",
        "Proposed to move to a more adequate facility",
        "",
        "DAA is in need of a more adequate facility",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "Not addressed in Scenario 1",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to move to a more adequate facility",
      "map_symbol": "",
      "round2_rationale": "DAA is in need of a more adequate facility",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Allgood ES",
      "cluster": "Clarkston",
      "raw_cells": [
        "Allgood ES",
        "Clarkston",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Donaire ES",
      "cluster": "Clarkston",
      "raw_cells": [
        "Donaire ES",
        "Clarkston",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Indian Creek ES",
      "cluster": "Clarkston",
      "raw_cells": [
        "Indian Creek ES",
        "Clarkston",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Jolly ES",
      "cluster": "Clarkston",
      "raw_cells": [
        "Jolly ES",
        "Clarkston",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Freedom MS",
      "cluster": "Clarkston",
      "raw_cells": [
        "Freedom MS",
        "Clarkston",
        "No change in school use",
        "",
        "Concerns around distance between Clarkston HS and Freedom MS.",
        "",
        "Proposed to become available",
        "",
        "This facility is proposed to be replaced with a new middle school on the Clarkston HS site and would become available for another school or program(s).",
        "",
        "This would require the construction of a new middle school at Clarkston which is a near-term project."
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "Concerns around distance between Clarkston HS and Freedom MS.",
      "round1_refinements": "",
      "round2_action": "Proposed to become available",
      "map_symbol": "",
      "round2_rationale": "This facility is proposed to be replaced with a new middle school on the Clarkston HS site and would become available for another school or program(s).",
      "capital_project_consideration": "",
      "phasing_consideration": "This would require the construction of a new middle school at Clarkston which is a near-term project.",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Clarkston HS",
      "cluster": "Clarkston",
      "raw_cells": [
        "Clarkston HS",
        "Clarkston",
        "No change in school use",
        "",
        "",
        "Proposed capacity expansion project",
        "",
        "The distance between Clarkston HS and Freedom MS is significant and a new middle school at Clarkston is a strong desire of the community that is in alignment with the long term vision of the District",
        "Construction of a middle school on the Clarkston site Modernization of Clarkston High School",
        "Near-term, construct the middle school Medium-Long term, modernize Clarkston HS"
      ],
      "raw_cell_count": 10,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed capacity expansion project",
      "map_symbol": "",
      "round2_rationale": "The distance between Clarkston HS and Freedom MS is significant and a new middle school at Clarkston is a strong desire of the community that is in alignment with the long term vision of the District",
      "capital_project_consideration": "Construction of a middle school on the Clarkston site Modernization of Clarkston High School",
      "phasing_consideration": "Near-term, construct the middle school Medium-Long term, modernize Clarkston HS",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Brockett ES",
      "cluster": "Tucker",
      "raw_cells": [
        "Brockett ES",
        "Tucker",
        "Close or Repurpose",
        "Brockett ES is proposed to be closed or repurposed due to low forecasted enrollment (367 in 2030) along with low building adequacy (70%), and excess capacity in the area.",
        "Resistance to closure, support for maintaining small school communities.",
        "",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "Medium-Long Term. Dependent on capacity expansion at Livsey ES."
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Brockett ES is proposed to be closed or repurposed due to low forecasted enrollment (367 in 2030) along with low building adequacy (70%), and excess capacity in the area.",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities.",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "Medium-Long Term. Dependent on capacity expansion at Livsey ES.",
      "parse_confidence": "full"
    },
    {
      "school": "Idlewood ES",
      "cluster": "Tucker",
      "raw_cells": [
        "Idlewood ES",
        "Tucker",
        "No change in school use",
        "",
        "No change in school use",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "No change in school use",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Livsey ES",
      "cluster": "Tucker",
      "raw_cells": [
        "Livsey ES",
        "Tucker",
        "Capacity Expansion",
        "Livsey ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (9.7 acres). This will allow for the consolidation of small elementary facilities in the area.",
        "Requests for clarity around site expansion and traffic concerns.",
        "Livsey does have a larger site than Midvale.",
        "Proposed capacity expansion project",
        "",
        "Unchanged",
        "Proposed capacity expansion project",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "Capacity Expansion",
      "round1_rationale": "Livsey ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (9.7 acres). This will allow for the consolidation of small elementary facilities in the area.",
      "survey_feedback": "Requests for clarity around site expansion and traffic concerns.",
      "round1_refinements": "Livsey does have a larger site than Midvale.",
      "round2_action": "Proposed capacity expansion project",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Proposed capacity expansion project",
      "phasing_consideration": "",
      "parse_confidence": "full"
    },
    {
      "school": "Midvale ES",
      "cluster": "Tucker",
      "raw_cells": [
        "Midvale ES",
        "Tucker",
        "Close or Repurpose",
        "Midvale ES is proposed to be closed or repurposed due to low building adequacy (71%) and the need to move towards larger more adequate schools in the area. Site size: 9.10",
        "Resistance to closure, support for maintaining small school communities. Concerns about the IB program at Midvale.",
        "Midvale could be used for something else.",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "Medium-Long Term. Dependent on capacity expansion at Livsey ES."
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Midvale ES is proposed to be closed or repurposed due to low building adequacy (71%) and the need to move towards larger more adequate schools in the area. Site size: 9.10",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities. Concerns about the IB program at Midvale.",
      "round1_refinements": "Midvale could be used for something else.",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "Medium-Long Term. Dependent on capacity expansion at Livsey ES.",
      "parse_confidence": "full"
    },
    {
      "school": "Smoke Rise ES",
      "cluster": "Tucker",
      "raw_cells": [
        "Smoke Rise ES",
        "Tucker",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Tucker MS",
      "cluster": "Tucker",
      "raw_cells": [
        "Tucker MS",
        "Tucker",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Tucker HS",
      "cluster": "Tucker",
      "raw_cells": [
        "Tucker HS",
        "Tucker",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Oakcliff Theme ES",
      "cluster": "Cross Keys",
      "raw_cells": [
        "Oakcliff Theme ES",
        "Cross Keys",
        "Capacity Expansion",
        "Oakcliff ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (9.4 acres). This will allow for the consolidation of small elementary facilities in the area.",
        "support for maintaining small school communities",
        "After Dresden opens, this will be needed as a regular (non-theme) elementary school.",
        "Proposed capacity expansion project",
        "",
        "After Dresden opens, this will be needed as a regular (non-theme) elementary school. Additional capacity is needed to accommodate students from the Pleasantdale and Evansdale areas which are very likely to feed into Sequoyah with the area around Oakcliff Theme.",
        "Proposed capacity expansion project",
        "Medium-Term, align with Sequoyah HS opening in fall of 2029"
      ],
      "raw_cell_count": 11,
      "round1_action": "Capacity Expansion",
      "round1_rationale": "Oakcliff ES is proposed for a capacity expansion project due to area forecasted enrollment and a site that supports expansion (9.4 acres). This will allow for the consolidation of small elementary facilities in the area.",
      "survey_feedback": "support for maintaining small school communities",
      "round1_refinements": "After Dresden opens, this will be needed as a regular (non-theme) elementary school.",
      "round2_action": "Proposed capacity expansion project",
      "map_symbol": "",
      "round2_rationale": "After Dresden opens, this will be needed as a regular (non-theme) elementary school. Additional capacity is needed to accommodate students from the Pleasantdale and Evansdale areas which are very likely to feed into Sequoyah with the area around Oakcliff Theme.",
      "capital_project_consideration": "Proposed capacity expansion project",
      "phasing_consideration": "Medium-Term, align with Sequoyah HS opening in fall of 2029",
      "parse_confidence": "full"
    },
    {
      "school": "E. L. Miller ES",
      "cluster": "Redan",
      "raw_cells": [
        "E. L. Miller ES",
        "Redan",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Marbut Theme ES",
      "cluster": "Redan",
      "raw_cells": [
        "Marbut Theme ES",
        "Redan",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Redan ES",
      "cluster": "Redan",
      "raw_cells": [
        "Redan ES",
        "Redan",
        "Close or Repurpose",
        "Redan ES is proposed to be closed or repurposed due to low forecasted enrollment (542 in 2030) along with excess capacity in the area from cascading use.",
        "Resistance to closure, strong perception that small schools = small class sizes",
        "",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "Near-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Redan ES is proposed to be closed or repurposed due to low forecasted enrollment (542 in 2030) along with excess capacity in the area from cascading use.",
      "survey_feedback": "Resistance to closure, strong perception that small schools = small class sizes",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "Near-Term",
      "parse_confidence": "full"
    },
    {
      "school": "Shadow Rock ES",
      "cluster": "",
      "raw_cells": [
        "Shadow Rock ES",
        "",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Redan MS",
      "cluster": "Redan",
      "raw_cells": [
        "Redan MS",
        "Redan",
        "No change in school use",
        "",
        "",
        "Enrollment would increase through the consolidation on Lithonia HS, boundaries would change also impacting middle schools",
        "Proposed to become available",
        "",
        "Students would consolidate into Redan HS converted into a middle school making this facility available.",
        "",
        "Medium-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "Enrollment would increase through the consolidation on Lithonia HS, boundaries would change also impacting middle schools",
      "round2_action": "Proposed to become available",
      "map_symbol": "",
      "round2_rationale": "Students would consolidate into Redan HS converted into a middle school making this facility available.",
      "capital_project_consideration": "",
      "phasing_consideration": "Medium-Term",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Redan HS",
      "cluster": "Redan",
      "raw_cells": [
        "Redan HS",
        "Redan",
        "No change in school use",
        "",
        "",
        "Enrollment would increase through the consolidation on Lithonia HS, boundaries would change",
        "Proposed to convert to a 6-12 school",
        "",
        "Because enrollment is projected to remain low and Lithonia HS would stay open, Redan HS is proposed to convert to a 6-12 to increase utilization. This makes Redan MS available for another school or program",
        "",
        "Near-Medium Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "Enrollment would increase through the consolidation on Lithonia HS, boundaries would change",
      "round2_action": "Proposed to convert to a 6-12 school",
      "map_symbol": "",
      "round2_rationale": "Because enrollment is projected to remain low and Lithonia HS would stay open, Redan HS is proposed to convert to a 6-12 to increase utilization. This makes Redan MS available for another school or program",
      "capital_project_consideration": "",
      "phasing_consideration": "Near-Medium Term",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Eagle Woods",
      "cluster": "Redan",
      "raw_cells": [
        "Eagle Woods",
        "Redan",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Shadow Rock Center",
      "cluster": "Redan",
      "raw_cells": [
        "Shadow Rock Center",
        "Redan",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Hambrick ES",
      "cluster": "Stone Mountain",
      "raw_cells": [
        "Hambrick ES",
        "Stone Mountain",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Rockbridge ES",
      "cluster": "Stone Mountain",
      "raw_cells": [
        "Rockbridge ES",
        "Stone Mountain",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Stone Mill ES",
      "cluster": "Stone Mountain",
      "raw_cells": [
        "Stone Mill ES",
        "Stone Mountain",
        "Close or Repurpose",
        "Stone Mill ES is proposed to be closed or repurposed due excess capacity in the area from cascading use.",
        "Strong perception that small schools = small class sizes, concerns around longer travel times",
        "",
        "Propose to close or be repurposed",
        "",
        "Unchanged",
        "",
        "Medium-Term, dependent on finding a destination for middle grades for the theme program."
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Stone Mill ES is proposed to be closed or repurposed due excess capacity in the area from cascading use.",
      "survey_feedback": "Strong perception that small schools = small class sizes, concerns around longer travel times",
      "round1_refinements": "",
      "round2_action": "Propose to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "Medium-Term, dependent on finding a destination for middle grades for the theme program.",
      "parse_confidence": "full"
    },
    {
      "school": "Stone Mountain ES",
      "cluster": "Stone Mountain",
      "raw_cells": [
        "Stone Mountain ES",
        "Stone Mountain",
        "Close or Repurpose",
        "Stone Mountain ES is proposed to be closed or repurposed due excess capacity in the area from cascading use.",
        "Strong perception that small schools = small class sizes, concerns around longer travel times",
        "",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "Medium-Term, dependent on finding a destination for middle grades for the theme program."
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Stone Mountain ES is proposed to be closed or repurposed due excess capacity in the area from cascading use.",
      "survey_feedback": "Strong perception that small schools = small class sizes, concerns around longer travel times",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "Medium-Term, dependent on finding a destination for middle grades for the theme program.",
      "parse_confidence": "full"
    },
    {
      "school": "Stone Mountain MS",
      "cluster": "Stone Mountain",
      "raw_cells": [
        "Stone Mountain MS",
        "Stone Mountain",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Stone Mountain HS",
      "cluster": "Stone Mountain",
      "raw_cells": [
        "Stone Mountain HS",
        "Stone Mountain",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Champion Theme MS",
      "cluster": "Stone Mountain",
      "raw_cells": [
        "Champion Theme MS",
        "Stone Mountain",
        "Convert to ES",
        "Champion Theme MS is proposed to convert to an elementary school due to low building adequacy (66%), it makes a more adequate elementary facility. This will allow for the consolidation of multiple smaller elementary facilities. The program will be relocated to another location to be determined.",
        "Concerns around long travel times, desire to keep communities together, requests for clarity around where the program would go.",
        "",
        "Proposed to convert to elementary school",
        "",
        "Unchanged",
        "Minor fixture replacement",
        "Medium-Term, dependent on finding a destination for middle grades for the theme program."
      ],
      "raw_cell_count": 11,
      "round1_action": "Convert to ES",
      "round1_rationale": "Champion Theme MS is proposed to convert to an elementary school due to low building adequacy (66%), it makes a more adequate elementary facility. This will allow for the consolidation of multiple smaller elementary facilities. The program will be relocated to another location to be determined.",
      "survey_feedback": "Concerns around long travel times, desire to keep communities together, requests for clarity around where the program would go.",
      "round1_refinements": "",
      "round2_action": "Proposed to convert to elementary school",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Minor fixture replacement",
      "phasing_consideration": "Medium-Term, dependent on finding a destination for middle grades for the theme program.",
      "parse_confidence": "full"
    },
    {
      "school": "DECA",
      "cluster": "Stone Mountain",
      "raw_cells": [
        "DECA",
        "Stone Mountain",
        "No change in school use",
        "",
        "",
        "",
        "Proposed to move to a more adequate facility",
        "",
        "DECA is in need of a more adequate facility right sized for the program",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to move to a more adequate facility",
      "map_symbol": "",
      "round2_rationale": "DECA is in need of a more adequate facility right sized for the program",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "DeKalb Alternative",
      "cluster": "Stone Mountain",
      "raw_cells": [
        "DeKalb Alternative",
        "Stone Mountain",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Elizabeth Andrews",
      "cluster": "Stone Mountain",
      "raw_cells": [
        "Elizabeth Andrews",
        "Stone Mountain",
        "No change in school use",
        "",
        "",
        "",
        "Proposed to move to a more adequate facility",
        "",
        "Elizabeth Andrews is in need of a more adequate facility right sized for the program",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to move to a more adequate facility",
      "map_symbol": "",
      "round2_rationale": "Elizabeth Andrews is in need of a more adequate facility right sized for the program",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Pine Ridge ES",
      "cluster": "Stephenson",
      "raw_cells": [
        "Pine Ridge ES",
        "Stephenson",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Princeton ES",
      "cluster": "Stephenson",
      "raw_cells": [
        "Princeton ES",
        "Stephenson",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Rock Chapel ES",
      "cluster": "Stephenson",
      "raw_cells": [
        "Rock Chapel ES",
        "Stephenson",
        "Close or Repurpose",
        "Rock Chapel ES is proposed to close due to excess capacity in the area.",
        "Concerns around long travel times, resistance to closure, desire to keep communities together",
        "Lithonia MS cascading to an elementary school adds capacity to the area allowing for the consolidation of Rock Chapel ES.",
        "No change in school use",
        "",
        "Because Stoneview is staying open and Lithonia MS is not cascading to bring additional capacity to the area, Rock Chapel ES is proposed to remain open",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Rock Chapel ES is proposed to close due to excess capacity in the area.",
      "survey_feedback": "Concerns around long travel times, resistance to closure, desire to keep communities together",
      "round1_refinements": "Lithonia MS cascading to an elementary school adds capacity to the area allowing for the consolidation of Rock Chapel ES.",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "Because Stoneview is staying open and Lithonia MS is not cascading to bring additional capacity to the area, Rock Chapel ES is proposed to remain open",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "full"
    },
    {
      "school": "Wynbrooke Theme ES",
      "cluster": "Stephenson",
      "raw_cells": [
        "Wynbrooke Theme ES",
        "Stephenson",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Stephenson MS",
      "cluster": "Stephenson",
      "raw_cells": [
        "Stephenson MS",
        "Stephenson",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Stephenson HS",
      "cluster": "Stephenson",
      "raw_cells": [
        "Stephenson HS",
        "Stephenson",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "Capital Improvement Project",
        "Medium-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "Capital Improvement Project",
      "phasing_consideration": "Medium-Term",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Redan ES",
      "cluster": "Lithonia",
      "raw_cells": [
        "Redan ES",
        "Lithonia",
        "Close or Repurpose",
        "Redan ES is proposed to be closed or repurposed due to low forecasted enrollment (542 in 2030) along with excess capacity in the area from cascading use.",
        "Resistance to closure, strong perception that small schools = small class sizes",
        "",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "Near-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Redan ES is proposed to be closed or repurposed due to low forecasted enrollment (542 in 2030) along with excess capacity in the area from cascading use.",
      "survey_feedback": "Resistance to closure, strong perception that small schools = small class sizes",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "Near-Term",
      "parse_confidence": "full"
    },
    {
      "school": "Stoneview ES",
      "cluster": "Lithonia",
      "raw_cells": [
        "Stoneview ES",
        "Lithonia",
        "Repurpose",
        "Stoneview is proposed to be repurposed due to cascading use. The planned building improvements can still happen. A possible reuse for the building may be an early childhood center.",
        "Stoneview was promised a rebuild, this location needs to be preserved as a PK-5 elementary school",
        "Stoneview could still be used, perhaps as an early childhood center. The cascading use of Lithonia HS to a middle school and Lithonia MS to an elementary means that the capacity at Stoneview is not needed.",
        "No change in school use",
        "",
        "Based on community feedback, Stoneview ES is proposed to remain open as a PK-5 elementary school with is SPLOST-VI capital improvement project.",
        "SPLOST-VI capital improvement project",
        "Near-Term, already funded"
      ],
      "raw_cell_count": 11,
      "round1_action": "Repurpose",
      "round1_rationale": "Stoneview is proposed to be repurposed due to cascading use. The planned building improvements can still happen. A possible reuse for the building may be an early childhood center.",
      "survey_feedback": "Stoneview was promised a rebuild, this location needs to be preserved as a PK-5 elementary school",
      "round1_refinements": "Stoneview could still be used, perhaps as an early childhood center. The cascading use of Lithonia HS to a middle school and Lithonia MS to an elementary means that the capacity at Stoneview is not needed.",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "Based on community feedback, Stoneview ES is proposed to remain open as a PK-5 elementary school with is SPLOST-VI capital improvement project.",
      "capital_project_consideration": "SPLOST-VI capital improvement project",
      "phasing_consideration": "Near-Term, already funded",
      "parse_confidence": "full"
    },
    {
      "school": "Lithonia MS",
      "cluster": "Lithonia",
      "raw_cells": [
        "Lithonia MS",
        "Lithonia",
        "Convert to ES",
        "Lithonia MS is proposed to convert to an elementary school due to the cascading use of Lithonia HS (converting to a middle school). This will allow for the consolidation of smaller elementary facilities.",
        "Resistance to consolidations in general, perception on north vs. south inequity",
        "",
        "No change in school use",
        "",
        "Based on community feedback and the importance of maintaining high school clusters in this area, Lithonia MS is proposed to remain a 6-8 middle school.",
        "Capital Improvement Project",
        "Medium-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "Convert to ES",
      "round1_rationale": "Lithonia MS is proposed to convert to an elementary school due to the cascading use of Lithonia HS (converting to a middle school). This will allow for the consolidation of smaller elementary facilities.",
      "survey_feedback": "Resistance to consolidations in general, perception on north vs. south inequity",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "Based on community feedback and the importance of maintaining high school clusters in this area, Lithonia MS is proposed to remain a 6-8 middle school.",
      "capital_project_consideration": "Capital Improvement Project",
      "phasing_consideration": "Medium-Term",
      "parse_confidence": "full"
    },
    {
      "school": "Lithonia HS",
      "cluster": "Lithonia",
      "raw_cells": [
        "Lithonia HS",
        "Lithonia",
        "Convert to MS",
        "Lithonia HS is proposed to convert to a middle school due to additional high school capacity in close the area.",
        "Strong perception of north vs. south inequity. Resistance to consolidation",
        "",
        "No change in school use",
        "",
        "Based on community feedback and the importance of maintaining high school clusters in this area, Lithonia HS is proposed to remain a 9-12 high school.",
        "Capital Improvement Project",
        "Medium-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "Convert to MS",
      "round1_rationale": "Lithonia HS is proposed to convert to a middle school due to additional high school capacity in close the area.",
      "survey_feedback": "Strong perception of north vs. south inequity. Resistance to consolidation",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "Based on community feedback and the importance of maintaining high school clusters in this area, Lithonia HS is proposed to remain a 9-12 high school.",
      "capital_project_consideration": "Capital Improvement Project",
      "phasing_consideration": "Medium-Term",
      "parse_confidence": "full"
    },
    {
      "school": "Bouie Theme ES",
      "cluster": "MLK",
      "raw_cells": [
        "Bouie Theme ES",
        "MLK",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Browns Mill ES",
      "cluster": "MLK",
      "raw_cells": [
        "Browns Mill ES",
        "MLK",
        "Close or Repurpose",
        "Browns Mill is proposed to be closed or repurposed due to forecasted low enrollment (385 in 2030) along with excess capacity in the area.",
        "Resistance to closure, strong desire to keep communities intact, perception of north vs. south inequity",
        "",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "Near-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Browns Mill is proposed to be closed or repurposed due to forecasted low enrollment (385 in 2030) along with excess capacity in the area.",
      "survey_feedback": "Resistance to closure, strong desire to keep communities intact, perception of north vs. south inequity",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "Near-Term",
      "parse_confidence": "full"
    },
    {
      "school": "Fairington ES",
      "cluster": "MLK",
      "raw_cells": [
        "Fairington ES",
        "MLK",
        "No change in school use",
        "",
        "",
        "",
        "Proposed to close or be repurposed",
        "",
        "Because Stoneview is staying open and Miller Grove MS will be bringing more capacity as an elementary to the area (a high percentage of Fairington students reside near Miller Grove MS, Fairington is proposed to close or be repurposed. This also resolves a split feeder.",
        "",
        "Near-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Because Stoneview is staying open and Miller Grove MS will be bringing more capacity as an elementary to the area (a high percentage of Fairington students reside near Miller Grove MS, Fairington is proposed to close or be repurposed. This also resolves a split feeder.",
      "capital_project_consideration": "",
      "phasing_consideration": "Near-Term",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Flat Rock ES",
      "cluster": "MLK",
      "raw_cells": [
        "Flat Rock ES",
        "MLK",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Murphey Candler ES",
      "cluster": "MLK",
      "raw_cells": [
        "Murphey Candler ES",
        "MLK",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Salem MS",
      "cluster": "MLK",
      "raw_cells": [
        "Salem MS",
        "MLK",
        "No change in school use",
        "",
        "",
        "Enrollment would increase through the consolidation of Lithonia HS, boundaries would change also impacting middle schools",
        "Proposed to become available",
        "",
        "Students would consolidate into MLK HS converted into a middle school making this facility available.",
        "",
        "Medium-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "Enrollment would increase through the consolidation of Lithonia HS, boundaries would change also impacting middle schools",
      "round2_action": "Proposed to become available",
      "map_symbol": "",
      "round2_rationale": "Students would consolidate into MLK HS converted into a middle school making this facility available.",
      "capital_project_consideration": "",
      "phasing_consideration": "Medium-Term",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "MLK HS",
      "cluster": "MLK",
      "raw_cells": [
        "MLK HS",
        "MLK",
        "No change in school use",
        "",
        "",
        "Enrollment would increase through the consolidation of Lithonia HS, boundaries would change",
        "Proposed to convert to a 6-12 school",
        "",
        "Because enrollment is projected to remain low and Lithonia HS would stay open, MLK HS is proposed to convert to a 6-12 to increase utilization. This would make Salem MS available for another school or program.",
        "Capital Improvement Project",
        "Near-Medium-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "Enrollment would increase through the consolidation of Lithonia HS, boundaries would change",
      "round2_action": "Proposed to convert to a 6-12 school",
      "map_symbol": "",
      "round2_rationale": "Because enrollment is projected to remain low and Lithonia HS would stay open, MLK HS is proposed to convert to a 6-12 to increase utilization. This would make Salem MS available for another school or program.",
      "capital_project_consideration": "Capital Improvement Project",
      "phasing_consideration": "Near-Medium-Term",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Arabia Mountain HS",
      "cluster": "MLK",
      "raw_cells": [
        "Arabia Mountain HS",
        "MLK",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Panola Way ES",
      "cluster": "Miller Grove",
      "raw_cells": [
        "Panola Way ES",
        "Miller Grove",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Woodridge ES",
      "cluster": "Miller Grove",
      "raw_cells": [
        "Woodridge ES",
        "Miller Grove",
        "Close or Repurpose",
        "Woodridge ES is proposed to be closed or repurposed due to low forecasted enrollment (374 in 2030) along with low building adequacy (73%) and excess capacity in the area from cascading use.",
        "Resistance to closure, strong perception that small schools = small class sizes, concerns around longer travel times",
        "",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "Medium Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Woodridge ES is proposed to be closed or repurposed due to low forecasted enrollment (374 in 2030) along with low building adequacy (73%) and excess capacity in the area from cascading use.",
      "survey_feedback": "Resistance to closure, strong perception that small schools = small class sizes, concerns around longer travel times",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "Medium Term",
      "parse_confidence": "full"
    },
    {
      "school": "Miller Grove MS",
      "cluster": "Miller Grove",
      "raw_cells": [
        "Miller Grove MS",
        "Miller Grove",
        "Convert to ES",
        "Miller Grove MS is proposed to convert to an elementary school due to the cascading use of Lithonia HS (converting to a middle school). This will allow for the consolidation of smaller elementary facilities.",
        "Strong perception that small schools = small class sizes, concerns around longer travel times",
        "",
        "Proposed to convert to an elementary school",
        "",
        "Unchanged",
        "Minor fixture replacement",
        "Near-Medium Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "Convert to ES",
      "round1_rationale": "Miller Grove MS is proposed to convert to an elementary school due to the cascading use of Lithonia HS (converting to a middle school). This will allow for the consolidation of smaller elementary facilities.",
      "survey_feedback": "Strong perception that small schools = small class sizes, concerns around longer travel times",
      "round1_refinements": "",
      "round2_action": "Proposed to convert to an elementary school",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Minor fixture replacement",
      "phasing_consideration": "Near-Medium Term",
      "parse_confidence": "full"
    },
    {
      "school": "Miller Grove HS",
      "cluster": "Miller Grove",
      "raw_cells": [
        "Miller Grove HS",
        "Miller Grove",
        "No change in school use",
        "",
        "",
        "",
        "Proposed to convert to a 6-12 school",
        "",
        "Because enrollment is projected to remain low and Lithonia HS would stay open, Miller Grove HS is proposed to convert to a 6-12 to increase utilization.",
        "Capital Improvement Project",
        "Near-Medium Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to convert to a 6-12 school",
      "map_symbol": "",
      "round2_rationale": "Because enrollment is projected to remain low and Lithonia HS would stay open, Miller Grove HS is proposed to convert to a 6-12 to increase utilization.",
      "capital_project_consideration": "Capital Improvement Project",
      "phasing_consideration": "Near-Medium Term",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Bethune MS",
      "cluster": "Towers",
      "raw_cells": [
        "Bethune MS",
        "Towers",
        "Convert to ES",
        "Bethune MS is proposed to convert to an elementary school due to the cascading use of Towers HS (converting to a middle school). This will allow for the consolidation of smaller elementary facilities.",
        "Concerns around long travel times, resistance to closure, desire to keep communities together",
        "",
        "Proposed to convert to an elementary school",
        "",
        "Unchanged",
        "Minor fixture replacement",
        "Near-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "Convert to ES",
      "round1_rationale": "Bethune MS is proposed to convert to an elementary school due to the cascading use of Towers HS (converting to a middle school). This will allow for the consolidation of smaller elementary facilities.",
      "survey_feedback": "Concerns around long travel times, resistance to closure, desire to keep communities together",
      "round1_refinements": "",
      "round2_action": "Proposed to convert to an elementary school",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Minor fixture replacement",
      "phasing_consideration": "Near-Term",
      "parse_confidence": "full"
    },
    {
      "school": "Marbut Theme ES",
      "cluster": "Redan",
      "raw_cells": [
        "Marbut Theme ES",
        "Redan",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Redan MS",
      "cluster": "Redan",
      "raw_cells": [
        "Redan MS",
        "Redan",
        "No change in school use",
        "",
        "",
        "Enrollment would increase through the consolidation of Lithonia HS, boundaries would change also impacting middle schools",
        "Proposed to become available",
        "",
        "Students would consolidate into Redan HS converted into a middle school making this facility available.",
        "",
        "Medium-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "Enrollment would increase through the consolidation of Lithonia HS, boundaries would change also impacting middle schools",
      "round2_action": "Proposed to become available",
      "map_symbol": "",
      "round2_rationale": "Students would consolidate into Redan HS converted into a middle school making this facility available.",
      "capital_project_consideration": "",
      "phasing_consideration": "Medium-Term",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Redan HS",
      "cluster": "Redan",
      "raw_cells": [
        "Redan HS",
        "Redan",
        "No change in school use",
        "",
        "",
        "Enrollment would increase through the consolidation of Lithonia HS, boundaries would change",
        "Proposed to convert to a 6-12 school",
        "",
        "Because enrollment is projected to remain low and Lithonia HS would stay open, Redan HS is proposed to convert to a 6-12 to increase utilization. This makes Redan MS available for another school or program",
        "",
        "Near-Medium Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "Enrollment would increase through the consolidation of Lithonia HS, boundaries would change",
      "round2_action": "Proposed to convert to a 6-12 school",
      "map_symbol": "",
      "round2_rationale": "Because enrollment is projected to remain low and Lithonia HS would stay open, Redan HS is proposed to convert to a 6-12 to increase utilization. This makes Redan MS available for another school or program",
      "capital_project_consideration": "",
      "phasing_consideration": "Near-Medium Term",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Princeton ES",
      "cluster": "Stephenson",
      "raw_cells": [
        "Princeton ES",
        "Stephenson",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Rock Chapel ES",
      "cluster": "Stephenson",
      "raw_cells": [
        "Rock Chapel ES",
        "Stephenson",
        "Close or Repurpose",
        "Rock Chapel ES is proposed to close due to excess capacity in the area.",
        "Concerns around long travel times, resistance to closure, desire to keep communities together",
        "Lithonia MS cascading to an elementary school adds capacity to the area allowing for the consolidation of Rock Chapel ES.",
        "No change in school use",
        "",
        "Because Stoneview is staying open and Lithonia MS is not cascading to bring additional capacity to the area, Rock Chapel ES is proposed to remain open",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Rock Chapel ES is proposed to close due to excess capacity in the area.",
      "survey_feedback": "Concerns around long travel times, resistance to closure, desire to keep communities together",
      "round1_refinements": "Lithonia MS cascading to an elementary school adds capacity to the area allowing for the consolidation of Rock Chapel ES.",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "Because Stoneview is staying open and Lithonia MS is not cascading to bring additional capacity to the area, Rock Chapel ES is proposed to remain open",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "full"
    },
    {
      "school": "Cedar Grove ES",
      "cluster": "Cedar Grove",
      "raw_cells": [
        "Cedar Grove ES",
        "Cedar Grove",
        "Close or Repurpose",
        "Cedar Grove ES is proposed to be closed or repurposed because of excess capacity in the area.",
        "Resistance to closure, support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
        "",
        "Proposed to convert to a middle school",
        "",
        "Cedar Grove ES is on the same site with Cedar Grove HS. Converting the elementary to a middle school effectively creates a 6-12 campus with separation",
        "",
        "These actions are not dependent on any major capital projects and can be implemented in the near to Medium-term."
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Cedar Grove ES is proposed to be closed or repurposed because of excess capacity in the area.",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
      "round1_refinements": "",
      "round2_action": "Proposed to convert to a middle school",
      "map_symbol": "",
      "round2_rationale": "Cedar Grove ES is on the same site with Cedar Grove HS. Converting the elementary to a middle school effectively creates a 6-12 campus with separation",
      "capital_project_consideration": "",
      "phasing_consideration": "These actions are not dependent on any major capital projects and can be implemented in the near to Medium-term.",
      "parse_confidence": "full"
    },
    {
      "school": "Oak View ES",
      "cluster": "Cedar Grove",
      "raw_cells": [
        "Oak View ES",
        "Cedar Grove",
        "No change in school use",
        "",
        "",
        "Proposed to close or be repurposed",
        "",
        "This facility would no longer be needed with the conversion of Cedar Grove MS to an elementary school",
        ""
      ],
      "raw_cell_count": 9,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "This facility would no longer be needed with the conversion of Cedar Grove MS to an elementary school",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Cedar Grove MS",
      "cluster": "Cedar Grove",
      "raw_cells": [
        "Cedar Grove MS",
        "Cedar Grove",
        "Close or Repurpose",
        "Cedar Grove MS is proposed to be closed or repurposed due to the cascading use of Cedar Grove HS converting to a MS along with forecasted low enrollment (580 in 2030).",
        "Strong perception that small schools = small class sizes, concerns around longer travel times",
        "",
        "Proposed to convert to an elementary school",
        "",
        "By moving the middle school component in this cluster to the high school campus, Cedar Grove MS would convert to an elementary school serving all elementary students in the cluster.",
        "Minor fixture replacement"
      ],
      "raw_cell_count": 10,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Cedar Grove MS is proposed to be closed or repurposed due to the cascading use of Cedar Grove HS converting to a MS along with forecasted low enrollment (580 in 2030).",
      "survey_feedback": "Strong perception that small schools = small class sizes, concerns around longer travel times",
      "round1_refinements": "",
      "round2_action": "Proposed to convert to an elementary school",
      "map_symbol": "",
      "round2_rationale": "By moving the middle school component in this cluster to the high school campus, Cedar Grove MS would convert to an elementary school serving all elementary students in the cluster.",
      "capital_project_consideration": "Minor fixture replacement",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Cedar Grove HS",
      "cluster": "Cedar Grove",
      "raw_cells": [
        "Cedar Grove HS",
        "Cedar Grove",
        "Convert to MS",
        "Cedar Grove HS is proposed to convert to a middle school due to a low building adequacy score (71%) and low forecasted enrollment (890).",
        "Strong desire to maintain Cedar Grove as a cluster.",
        "",
        "No change in school use",
        "",
        "Effectively creates a 6-12 campus with a parking lot for separation between the middle (Cedar Grove ES) and the high school.",
        "Proposed Capital Improvement Project",
        "Medium-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "Convert to MS",
      "round1_rationale": "Cedar Grove HS is proposed to convert to a middle school due to a low building adequacy score (71%) and low forecasted enrollment (890).",
      "survey_feedback": "Strong desire to maintain Cedar Grove as a cluster.",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "Effectively creates a 6-12 campus with a parking lot for separation between the middle (Cedar Grove ES) and the high school.",
      "capital_project_consideration": "Proposed Capital Improvement Project",
      "phasing_consideration": "Medium-Term",
      "parse_confidence": "full"
    },
    {
      "school": "DHST-S",
      "cluster": "Cedar Grove",
      "raw_cells": [
        "DHST-S",
        "Cedar Grove",
        "Not addressed in Scenario 1",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "Not addressed in Scenario 1",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Barack Obama EMST",
      "cluster": "McNair",
      "raw_cells": [
        "Barack Obama EMST",
        "McNair",
        "No change in school use",
        "",
        "Resistance to closure, support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Flat Shoals ES",
      "cluster": "McNair",
      "raw_cells": [
        "Flat Shoals ES",
        "McNair",
        "Close or Repurpose",
        "Flat Shoals ES is proposed to be closed or repurposed due to low forecasted enrollment (315 in 2030) along with excess capacity in the area from cascading use.",
        "",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "These actions are not dependent on any major capital projects and can be implemented in the near to Medium-term."
      ],
      "raw_cell_count": 10,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Flat Shoals ES is proposed to be closed or repurposed due to low forecasted enrollment (315 in 2030) along with excess capacity in the area from cascading use.",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "These actions are not dependent on any major capital projects and can be implemented in the near to Medium-term.",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Kelley Lake ES",
      "cluster": "McNair",
      "raw_cells": [
        "Kelley Lake ES",
        "McNair",
        "Close or Repurpose",
        "Kelley Lake ES is proposed to be closed or repurposed due to low forecasted enrollment (293 in 2030) along with low building adequacy (72%), and excess capacity in the area from cascading use.",
        "",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        ""
      ],
      "raw_cell_count": 9,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Kelley Lake ES is proposed to be closed or repurposed due to low forecasted enrollment (293 in 2030) along with low building adequacy (72%), and excess capacity in the area from cascading use.",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "McNair DLA",
      "cluster": "McNair",
      "raw_cells": [
        "McNair DLA",
        "McNair",
        "Close or Repurpose",
        "McNair DLA is proposed to be closed or repurposed due to low forecasted enrollment (371 in 2030) along with excess capacity in the area from cascading use.",
        "",
        "Proposed to convert to an ELC",
        "",
        "This would provide a better facility for the ELC and also give it room to expand to serve more students in the area.",
        "Minor fixture replacement"
      ],
      "raw_cell_count": 9,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "McNair DLA is proposed to be closed or repurposed due to low forecasted enrollment (371 in 2030) along with excess capacity in the area from cascading use.",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to convert to an ELC",
      "map_symbol": "",
      "round2_rationale": "This would provide a better facility for the ELC and also give it room to expand to serve more students in the area.",
      "capital_project_consideration": "Minor fixture replacement",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "McNair MS",
      "cluster": "McNair",
      "raw_cells": [
        "McNair MS",
        "McNair",
        "Convert to ES",
        "McNair MS is proposed to convert to an elementary school due to the cascading use of Cedar Grove HS (converting to a middle school). This will allow for the consolidation of smaller elementary facilities.",
        "support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
        "",
        "Proposed to convert to an elementary school",
        "",
        "Unchanged",
        "Minor fixture replacement"
      ],
      "raw_cell_count": 10,
      "round1_action": "Convert to ES",
      "round1_rationale": "McNair MS is proposed to convert to an elementary school due to the cascading use of Cedar Grove HS (converting to a middle school). This will allow for the consolidation of smaller elementary facilities.",
      "survey_feedback": "support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
      "round1_refinements": "",
      "round2_action": "Proposed to convert to an elementary school",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Minor fixture replacement",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "McNair HS",
      "cluster": "McNair",
      "raw_cells": [
        "McNair HS",
        "McNair",
        "No change in school use",
        "",
        "Strong desire to maintain McNair as a cluster.",
        "",
        "Proposed to convert to a 6-12 school",
        "",
        "McNair HS has the capacity to consolidate McNair MS. The building can be segmented in a way to reduce contact between middle and high school populations.",
        "Proposed Capital Improvement Project",
        "Medium-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "Strong desire to maintain McNair as a cluster.",
      "round1_refinements": "",
      "round2_action": "Proposed to convert to a 6-12 school",
      "map_symbol": "",
      "round2_rationale": "McNair HS has the capacity to consolidate McNair MS. The building can be segmented in a way to reduce contact between middle and high school populations.",
      "capital_project_consideration": "Proposed Capital Improvement Project",
      "phasing_consideration": "Medium-Term",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "ELC",
      "cluster": "McNair",
      "raw_cells": [
        "ELC",
        "McNair",
        "Not addressed in Scenario 1",
        "",
        "",
        "",
        "Proposed to close or be repurposed",
        "",
        "Program would move to McNair DLA",
        "",
        "Medium-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "Not addressed in Scenario 1",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Program would move to McNair DLA",
      "capital_project_consideration": "",
      "phasing_consideration": "Medium-Term",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Columbia ES",
      "cluster": "Columbia",
      "raw_cells": [
        "Columbia ES",
        "Columbia",
        "Close or Repurpose",
        "Columbia ES is proposed to be closed or repurposed due to low enrollment (310 in 2030) along with excess capacity in the area.",
        "Resistance to closure, support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
        "",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "These actions are not dependent on any major capital projects and can be implemented in the near to Medium-term."
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Columbia ES is proposed to be closed or repurposed due to low enrollment (310 in 2030) along with excess capacity in the area.",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "These actions are not dependent on any major capital projects and can be implemented in the near to Medium-term.",
      "parse_confidence": "full"
    },
    {
      "school": "Snapfinger ES",
      "cluster": "Columbia",
      "raw_cells": [
        "Snapfinger ES",
        "Columbia",
        "No change in school use",
        "",
        "",
        "No change in school use",
        "",
        "",
        ""
      ],
      "raw_cell_count": 9,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Toney ES",
      "cluster": "Columbia",
      "raw_cells": [
        "Toney ES",
        "Columbia",
        "Close or Repurpose",
        "Toney ES is proposed to be closed or repurposed due to forecasted low-enrollment (166 in 2030) along with excess capacity in the area",
        "",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        ""
      ],
      "raw_cell_count": 9,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Toney ES is proposed to be closed or repurposed due to forecasted low-enrollment (166 in 2030) along with excess capacity in the area",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Columbia MS",
      "cluster": "Columbia",
      "raw_cells": [
        "Columbia MS",
        "Columbia",
        "No change in school use",
        "",
        "",
        "",
        "Proposed to become available",
        "",
        "Students would consolidate into Towers HS converted into a middle school making this facility available.",
        ""
      ],
      "raw_cell_count": 10,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to become available",
      "map_symbol": "",
      "round2_rationale": "Students would consolidate into Towers HS converted into a middle school making this facility available.",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Columbia HS",
      "cluster": "Columbia",
      "raw_cells": [
        "Columbia HS",
        "Columbia",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "Columbia is newer and more adequate than Towers HS.",
        "Proposed Capital Improvement Project",
        "Near-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "Columbia is newer and more adequate than Towers HS.",
      "capital_project_consideration": "Proposed Capital Improvement Project",
      "phasing_consideration": "Near-Term",
      "parse_confidence": "full"
    },
    {
      "school": "Canby Lane ES",
      "cluster": "Towers",
      "raw_cells": [
        "Canby Lane ES",
        "Towers",
        "Close or Repurpose",
        "Canby Lane ES is proposed to be closed or repurposed due to low forecasted enrollment (377 in 2030) along with excess capacity in the area from cascading use.",
        "Resistance to closure, support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
        "",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        "",
        "These actions are not dependent on any major capital projects and can be implemented in the near to Medium-term."
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Canby Lane ES is proposed to be closed or repurposed due to low forecasted enrollment (377 in 2030) along with excess capacity in the area from cascading use.",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "These actions are not dependent on any major capital projects and can be implemented in the near to Medium-term.",
      "parse_confidence": "full"
    },
    {
      "school": "Peachcrest ES",
      "cluster": "Towers",
      "raw_cells": [
        "Peachcrest ES",
        "Towers",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        ""
      ],
      "raw_cell_count": 10,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Rowland ES",
      "cluster": "Towers",
      "raw_cells": [
        "Rowland ES",
        "Towers",
        "Close or Repurpose",
        "Rowland ES is proposed to be closed or repurposed due to low forecasted enrollment (382 in 2030) along with excess capacity in the area from cascading use.",
        "Resistance to closure, support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
        "",
        "Proposed to close or be repurposed",
        "",
        "Unchanged",
        ""
      ],
      "raw_cell_count": 10,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Rowland ES is proposed to be closed or repurposed due to low forecasted enrollment (382 in 2030) along with excess capacity in the area from cascading use.",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Bethune MS",
      "cluster": "Towers",
      "raw_cells": [
        "Bethune MS",
        "Towers",
        "Convert to ES",
        "Bethune MS is proposed to convert to an elementary school due to the cascading use of Towers HS (converting to a middle school). This will allow for the consolidation of smaller elementary facilities.",
        "Resistance to closure, support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
        "",
        "Proposed to convert to an elementary school",
        "",
        "Unchanged",
        "Minor fixture replacement",
        "Near-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "Convert to ES",
      "round1_rationale": "Bethune MS is proposed to convert to an elementary school due to the cascading use of Towers HS (converting to a middle school). This will allow for the consolidation of smaller elementary facilities.",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
      "round1_refinements": "",
      "round2_action": "Proposed to convert to an elementary school",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Minor fixture replacement",
      "phasing_consideration": "Near-Term",
      "parse_confidence": "full"
    },
    {
      "school": "Towers HS",
      "cluster": "Towers",
      "raw_cells": [
        "Towers HS",
        "Towers",
        "Convert to MS",
        "Towers HS is proposed to convert to a middle school due to a low building adequacy score (71%), low forecasted enrollment (63%), and additional high school capacity in the area.",
        "Some resistance to closure, but more understanding of the demographic realities.",
        "",
        "Proposed to convert to a middle school",
        "",
        "Unchanged",
        "Towers HS is proposed for a Capital Improvement Project. This can be tailored to address the new proposed use as a middle school",
        "Near-Medium Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "Convert to MS",
      "round1_rationale": "Towers HS is proposed to convert to a middle school due to a low building adequacy score (71%), low forecasted enrollment (63%), and additional high school capacity in the area.",
      "survey_feedback": "Some resistance to closure, but more understanding of the demographic realities.",
      "round1_refinements": "",
      "round2_action": "Proposed to convert to a middle school",
      "map_symbol": "",
      "round2_rationale": "Unchanged",
      "capital_project_consideration": "Towers HS is proposed for a Capital Improvement Project. This can be tailored to address the new proposed use as a middle school",
      "phasing_consideration": "Near-Medium Term",
      "parse_confidence": "full"
    },
    {
      "school": "Wadsworth Magnet",
      "cluster": "Towers",
      "raw_cells": [
        "Wadsworth Magnet",
        "Towers",
        "Not addressed in Scenario 1",
        "",
        "",
        "",
        "Proposed to move to a more adequate facility",
        "",
        "The Wadsworth facility is currently adequate for the program, but if a better facility becomes available Wadsworth may be a candidate to move. There are also likely high level programmatic discussions that will occur in future iterations.",
        "",
        "TBD"
      ],
      "raw_cell_count": 11,
      "round1_action": "Not addressed in Scenario 1",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "Proposed to move to a more adequate facility",
      "map_symbol": "",
      "round2_rationale": "The Wadsworth facility is currently adequate for the program, but if a better facility becomes available Wadsworth may be a candidate to move. There are also likely high level programmatic discussions that will occur in future iterations.",
      "capital_project_consideration": "",
      "phasing_consideration": "TBD",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "International Student Center",
      "cluster": "Towers",
      "raw_cells": [
        "International Student Center",
        "Towers",
        "Not addressed in Scenario 1",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "Not addressed in Scenario 1",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Rainbow ES",
      "cluster": "Southwest DeKalb",
      "raw_cells": [
        "Rainbow ES",
        "Southwest DeKalb",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Bob Mathis ES",
      "cluster": "Southwest DeKalb",
      "raw_cells": [
        "Bob Mathis ES",
        "Southwest DeKalb",
        "Close or Repurpose",
        "Bob Mathis is proposed to be closed or repurposed due to small size (480 seats), excess capacity in the area, and low forecasted enrollment (441 in 2030). The diagnostics center could remain at Bob Mathis making it a similar standalone program like Coralwood, or it could move to a different location.",
        "Strong support for maintaining the diagnostics center that is currently at Bob Mathis",
        "",
        "Proposed to convert to an ELC",
        "",
        "This preserves the diagnostic center and also provides additional PK space to serve students in the area.",
        "Minor fixture replacement",
        "Near-Term"
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Bob Mathis is proposed to be closed or repurposed due to small size (480 seats), excess capacity in the area, and low forecasted enrollment (441 in 2030). The diagnostics center could remain at Bob Mathis making it a similar standalone program like Coralwood, or it could move to a different location.",
      "survey_feedback": "Strong support for maintaining the diagnostics center that is currently at Bob Mathis",
      "round1_refinements": "",
      "round2_action": "Proposed to convert to an ELC",
      "map_symbol": "",
      "round2_rationale": "This preserves the diagnostic center and also provides additional PK space to serve students in the area.",
      "capital_project_consideration": "Minor fixture replacement",
      "phasing_consideration": "Near-Term",
      "parse_confidence": "full"
    },
    {
      "school": "Chapel Hill ES",
      "cluster": "Southwest DeKalb",
      "raw_cells": [
        "Chapel Hill ES",
        "Southwest DeKalb",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Narvie Harris Theme ES",
      "cluster": "Southwest DeKalb",
      "raw_cells": [
        "Narvie Harris Theme ES",
        "Southwest DeKalb",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Chapel Hill MS",
      "cluster": "Southwest DeKalb",
      "raw_cells": [
        "Chapel Hill MS",
        "Southwest DeKalb",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Southwest DeKalb HS",
      "cluster": "Southwest DeKalb",
      "raw_cells": [
        "Southwest DeKalb HS",
        "Southwest DeKalb",
        "No change in school use",
        "",
        "",
        "",
        "No change in school use",
        "",
        "",
        "",
        ""
      ],
      "raw_cell_count": 11,
      "round1_action": "No change in school use",
      "round1_rationale": "",
      "survey_feedback": "",
      "round1_refinements": "",
      "round2_action": "No change in school use",
      "map_symbol": "",
      "round2_rationale": "",
      "capital_project_consideration": "",
      "phasing_consideration": "",
      "parse_confidence": "reconstructed"
    },
    {
      "school": "Woodridge ES",
      "cluster": "Miller Grove",
      "raw_cells": [
        "Woodridge ES",
        "Miller Grove",
        "Close or Repurpose",
        "Woodridge ES is proposed to be closed or repurposed due to low forecasted enrollment (374 in 2030) along with low building adequacy (73%) and excess capacity in the area from cascading use.",
        "Resistance to closure, support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
        "",
        "Proposed to close or be repurposed",
        "",
        "Woodridge students are in the Miller Grove cluster, but could be served by capacity from the converted Bethune MS.",
        "",
        "These actions are not dependent on any major capital projects and can be implemented in the near to Medium-term."
      ],
      "raw_cell_count": 11,
      "round1_action": "Close or Repurpose",
      "round1_rationale": "Woodridge ES is proposed to be closed or repurposed due to low forecasted enrollment (374 in 2030) along with low building adequacy (73%) and excess capacity in the area from cascading use.",
      "survey_feedback": "Resistance to closure, support for maintaining small school communities, concerns around a disproportionate amount of consolidations in the south and investment in the north.",
      "round1_refinements": "",
      "round2_action": "Proposed to close or be repurposed",
      "map_symbol": "",
      "round2_rationale": "Woodridge students are in the Miller Grove cluster, but could be served by capacity from the converted Bethune MS.",
      "capital_project_consideration": "",
      "phasing_consideration": "These actions are not dependent on any major capital projects and can be implemented in the near to Medium-term.",
      "parse_confidence": "full"
    }
  ],
  "closure_list": [
    {
      "school": "Brockett ES",
      "cluster": "Tucker",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Browns Mill ES",
      "cluster": "MLK",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Canby Lane ES",
      "cluster": "Towers",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Columbia ES",
      "cluster": "Columbia",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Evansdale ES",
      "cluster": "Tucker",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Flat Shoals ES",
      "cluster": "McNair",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Henderson Mill ES",
      "cluster": "Lakeside",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Kelly Lake ES",
      "cluster": "McNair",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Kingsley ES",
      "cluster": "Dunwoody",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "McLendon ES",
      "cluster": "Druid Hills",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Midvale ES",
      "cluster": "Tucker",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Oak Grove ES",
      "cluster": "Lakeside",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Redan ES",
      "cluster": "Lithonia",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Robert Shaw Theme ES",
      "cluster": "Druid Hills",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Rowland ES",
      "cluster": "Towers",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Stone Mill ES",
      "cluster": "Stone Mountain",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Stone Mountain ES",
      "cluster": "Stone Mountain",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Toney ES",
      "cluster": "Columbia",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Woodridge ES",
      "cluster": "Miller Grove",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Rock Chapel ES",
      "cluster": "Stephenson",
      "round2_action": "Not Closing"
    },
    {
      "school": "Stoneview ES",
      "cluster": "Lithonia",
      "round2_action": "Not Closing"
    },
    {
      "school": "Cedar Grove MS",
      "cluster": "Cedar Grove",
      "round2_action": "Convert to ES"
    },
    {
      "school": "Cedar Grove ES",
      "cluster": "Cedar Grove",
      "round2_action": "Convert to MS"
    },
    {
      "school": "Vanderlyn ES",
      "cluster": "Dunwoody",
      "round2_action": "Proposed to convert to high school annex"
    },
    {
      "school": "McNair DLA",
      "cluster": "McNair",
      "round2_action": "Proposed to convert to ELC"
    },
    {
      "school": "Ashford Park ES",
      "cluster": "Chamblee",
      "round2_action": "Proposed to convert to ELC"
    },
    {
      "school": "Bob Mathis ES",
      "cluster": "MLK",
      "round2_action": "Proposed to convert to ELC"
    },
    {
      "school": "3 New Closures",
      "cluster": "",
      "round2_action": ""
    },
    {
      "school": "Early Learning Center (ELC)",
      "cluster": "McNair",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Fairington ES",
      "cluster": "MLK",
      "round2_action": "Proposed to close or be repurposed"
    },
    {
      "school": "Oakview ES",
      "cluster": "Cedar Grove",
      "round2_action": "Proposed to close or be repurposed"
    }
  ],
  "captured_at": "2026-04-24"
}