Regulation FHA-R: Board Inspection and Acceptance

FHA-R · Regulation · Adopted 09/11/2000

FACILITIES

Before a new building or additions is accepted, a final inspection is made. The gas, water, and light meters are checked by the contractor and all bills paid before the Board accepts the building.

The final payment is withheld until the architect certifies that the facility has been constructed according to the plans and specifications.

An annual inspection is made one year after final acceptance of the building. All workmanship and materials found to be faulty are corrected during this one-year warranty period.

Legal References