FACILITIES
After approval of the preliminary plans, the plans and specifications (including all working drawings) are prepared by the architect and reviewed by the Executive Director for Plant Services and Development as to accuracy and adequacy, then submitted to the Superintendent for final approval.
Legal References
- O.C.G.A. 20-02-0260 — Capital outlay funds generally (Lexis)
- O.C.G.A. 20-02-0520 — Acquiring and disposing of school sites; building, repairing, renting, and furnishing schoolhouses (Lexis)
- O.C.G.A. 25-02-0001 — Safety Fire Commissioner (Lexis)
- O.C.G.A. 30-03-0001 — Handicapped Persons - purpose and intent of chapter (Lexis)
- O.C.G.A. 50-37-0003 — Guaranteed Energy Savings Contracts (Lexis)
- Rule 160-5-4-.18 — Bidding Requirements for State-Funded School Capital Outlay Projects
- Rule 160-5-4-.16 — Educational Facility Site, Construction, and Reimbursement
- Rule 160-5-4-.15 — Processing of Plans and Specifications for Public School Construction
- Rule 160-5-4-.10 — Approval of Plans and Specifications
- Rule 160-5-4-.08 — School Size
- Rule 160-5-4-.05 — Regular Advance and Low-Wealth Funding
- Rule 160-5-4-.22 — Guaranteed Energy Savings Performance Contracts for Public School Facilities