Dresden ES - Drawing Log 20260325

AID 2018283 · View on Simbli

Agenda Item

d. Contract ~ Change Order No. 1 ~ Winter Construction ~ General Contractor (GC) Services ~ CIP Project 21836 (Not to Exceed $1,300,000) and Amendment No. 2 ~ BRPH ~ AE Services ~ Dresden Elementary School Parking Lot (Not to Exceed $62,250) Not to Collectively Exceed $1,362,250

Summary: Presented by: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations,
Mr. Darrell Stallings, Chief of Capital Improvements, Division of Capital Improvements
Request: It is requested that the DeKalb County Board of Education (“the Board”) approve:

Change Order No. 1 to Winter Construction for General Contractor Services, Not to exceed $1,300,000.
Amendment No. 2 to BRPH for Architectural & Engineering Services, Not to exceed $62,250.
Total not to exceed $1,362,250.
Why: Approval of Change Order No. 1 and Amendment No. 2 will provide funds for Capital Improvement Project 21836 - Dresden Elementary School Project - Parking Lot.
Details: On August 31, 2023, the Board of Education approved the award of a Construction Management at Risk (CM@R) contract to Winter Construction Company for the completion of the New Elementary School at Dresden Project and for Pre-Construction Services in the amount of $10,000.00.

On Monday, May 6, 2024, the Board of Education established a Guaranteed Maximum Price of $72,323,774 for the construction of the New Elementary School at Dresden SPLOST VI project per the terms set forth in the Construction Manager at Risk contract previously awarded to The Winter Construction Company.

On Monday, February 13, 2023, the Board of Education approved the award of RFQu 23-752-008 for Architectural and Engineering Services for Dresden Elementary School Replacement to BRPH Architects Engineers Inc., for the lump sum amount of $2,280,000.

The initial scope of work for this project included construction management services for the Dresden Elementary School that is divided into four (4) phases. Phase 1 is for mobilization, site work, and material laydown. Phase 2 is a demolition to sections of the existing building, erect building in Phase 1, east loop paving, striping, and curbing at the Dresden Elementary School site.


The Change Order No. 1 and Amendment No. 2 will provide a shared permanent asphalt parking lot for Dresden Elementary School and St. Pius Catholic High School. This permanent lot will be located on the property owned by the Catholic Education of North Georgia Inc. The Design Professional (BRPH), CM@R (Winter), Program Manager (HPM), St. Pius Catholic High School, City of Chamblee and the County officials alongside the District have collaborated to develop a parking lot design that will directly benefit the District and the St. Pius Catholic High School.
Some of the benefits of Change Order no. 1 and Amendment No. 2 have been listed below:

Reduces congestion during arrival and dismissal times
Provides flexible parking while parts of the campus are inaccessible
Minimizes disruption to surrounding neighborhoods from overflow parking
Supports staff, visitors, and events during all phases of construction
Can be removed or repurposed once construction is complete.

Change Order No. 1 and Amendment No. 2, which is not included in the initial scope, cover the approved additional scope for the DeKalb County School District requested items and will be the full design and construction administration of the project.
Financial impact: The total budget for CIP 21836 Dresden Elementary School Parking Lot is as follows:

Change Order No. 1 - Not to exceed amount of $1,300,000.00 - allocated from cost code (SP6CIP.21836.GENCONTR.1055).
Amendment No. 2 is - Not to exceed amount of $62,250.00- allocated from cost code (SP5FACCON.36235.ARCHITECT).
Contact: Mr. Darrell Stallings, Chief of Capital Improvements, Division of Capital Improvements
Mr. Hans Williams, Dir. Planning & E-SPLOST Programming, Division of Operations, 678.676.1588
Mr. Artis Johnson, Program Director, Division of Operations, 404.790.8985
Effective: Upon Board Approval
Status: Approved by the Office of Legal Affairs
                                                                                                                       Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                       Job #: 24016 New Dresden Elementary School
                                                                                                                                                  2449 Dresden Dr
                                                                                                                                         Chamblee, Georgia 30341
The Winter Construction Company




New Dresden Elementary School - Current Drawings


    Drawing No.                                           Drawing Title                  Revision       Drawing Date   Received Date                   Set
General
G-001             COVER SHEET                                                                       3    09/25/2025      09/25/2025    ASI 04 (09/25/25)
G-001 PH 2        PHASE 2 - COVER SHEET                                                             0    04/11/2025      04/23/2025    ASI 02 (04/23/25)
G-002             SHEET INDEX                                                                       3    09/25/2025      09/25/2025    ASI 04 (09/25/25)
G-002 PH 2        PHASE 2 - SHEET INDEX                                                             0    04/11/2025      04/23/2025    ASI 02 (04/23/25)
G-003             ABBREVIATIONS, SYMBOLS, GENERAL NOTES                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
G-104             CODE SUMMARY                                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
G-105             ACCESSIBILITY INFORMATION                                                         2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
G-106             SCHEDULE OF SPACES                                                                2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
G-107             ACTION LETTER PZ2024-1278                                                         1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
Architectural
A-0-100           ARCHITECTURE - FULL SITE PLAN                                                     2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-0-110           LEVEL 0 - OVERALL PLAN                                                            2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-0-111           LEVEL 1 - OVERALL PLAN                                                            2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-0-112           LEVEL 2 - OVERALL PLAN                                                            2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-0-113           LEVEL 3 - OVERALL PLAN                                                            2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-0-114           SECTION REFERENCE PLAN                                                            2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-0-120           LEVEL 0 - OVERALL RCP                                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-0-121           LEVEL 1 - OVERALL RCP                                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-0-122           LEVEL 2 - OVERALL RCP                                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-0-123           LEVEL 3 - OVERALL RCP                                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-0-124           OVERALL RCP CONTROL JOINTS                                                        0    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-0-130           OVERALL ROOF PLAN                                                                 3    05/15/2025      07/07/2025    Dresden ES Permit Set (03/22/24)
A-1-101           PHASE 1 - ARCHITECTURAL SITE PLAN                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-110           PHASE 1 - KEY PLANS                                                               2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-110A          PHASE 1 - LEVEL 0 ZONE PLAN                                                       2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-110B          PHASE 1 - LEVEL 0 ZONE PLAN                                                       2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-111A          PHASE 1 - LEVEL 1 ZONE PLANS                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-111B          PHASE 1 - LEVEL 1 ZONE PLANS                                                      3    08/14/2025      08/21/2025    ASI 03 (08/17/25)
A-1-112A          PHASE 1 - LEVEL 2 ZONE PLANS                                                      3    09/25/2025      09/25/2025    ASI 04 (09/25/25)
A-1-112B          PHASE 1 - LEVEL 2 ZONE PLANS                                                      3    08/14/2025      08/21/2025    ASI 03 (08/17/25)
A-1-113           PHASE 1 - LEVEL 3 ZONE PLANS                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-120           PHASE 1 - RCP KEY PLANS                                                           2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-120A          PHASE 1 - RCP LEVEL 0 ZONE PLANS                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)

                                                                          Page 1 of 15
                                                                                                                    Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                    Job #: 24016 New Dresden Elementary School
                                                                                                                                               2449 Dresden Dr
                                                                                                                                      Chamblee, Georgia 30341
The Winter Construction Company




    Drawing No.                                        Drawing Title                  Revision       Drawing Date   Received Date                   Set
A-1-120B          PHASE 1 - RCP LEVEL 0 ZONE PLANS                                               2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-121A          PHASE 1 - RCP LEVEL 1 ZONE PLANS                                               2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-121B          PHASE 1 - RCP LEVEL 1 ZONE PLANS                                               2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-122A          PHASE 1 - RCP LEVEL 2 ZONE PLANS                                               2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-122B          PHASE 1 - RCP LEVEL 2 ZONE PLANS                                               2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-123           PHASE 1 - RCP LEVEL 3 ZONE PLANS                                               2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-200A          COMPLETE BUILDING ELEVATIONS                                                   2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-200B          COMPLETE BUILDING ELEVATIONS                                                   2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-201           PHASE 1 - EXTERIOR ELEVATIONS                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-202           PHASE 1 - EXTERIOR ELEVATIONS                                                  3    09/25/2025      09/25/2025    ASI 04 (09/25/25)
A-1-203           PHASE 1 - EXTERIOR ELEVATIONS                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-301           PHASE 1 - BUILDING SECTIONS                                                    2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-302           PHASE 1 - BUILDING SECTIONS                                                    2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-310           PHASE 1 - WALL SECTIONS                                                        3    09/25/2025      09/25/2025    ASI 04 (09/25/25)
A-1-311           PHASE 1 - WALL SECTIONS                                                        2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-312           PHASE 1 - WALL SECTIONS                                                        2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-313           PHASE 1 - WALL SECTIONS                                                        3    09/25/2025      09/25/2025    ASI 04 (09/25/25)
A-1-401           PHASE 1 - ENLARGED PLANS                                                       2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-402           PHASE 1 - ENLARGED PLANS                                                       2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-403           PHASE 1 - ENLARGED PLANS                                                       2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-404           PHASE 1 - ENLARGED PLANS                                                       3    04/11/2025      07/08/2025    ASI 02 (04/23/25)
A-1-405           PHASE 1 - ENLARGED PLANS                                                       2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-407           PHASE 1 - ENLARGED TOILET PLANS                                                2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-408           PHASE 1 - ENLARGED TOILET PLANS                                                2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-410           PHASE 1 - VERTICAL CIRCULATION                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-411           PHASE 1 - VERTICAL CIRCULATION                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-412           PHASE 1 - VERTICAL CIRCULATION                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-500A          PHASE 1 - LEVEL 0 ZONE FINISH PLAN                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-500B          PHASE 1 - LEVEL 0 ZONE FINISH PLAN                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-501A          PHASE 1 - LEVEL 1 ZONE FINISH PLAN                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-501B          PHASE 1 - LEVEL 1 ZONE FINISH PLAN                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-502A          PHASE 1 - LEVEL 2 ZONE FINISH PLAN                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-502B          PHASE 1 - LEVEL 2 ZONE FINISH PLAN                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-503           PHASE 1 - LEVEL 3 ZONE FINISH PLAN                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-510           PHASE 1 - INTERIOR ELEVATIONS                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-511           PHASE 1 - INTERIOR ELEVATIONS                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-512           PHASE 1 - INTERIOR ELEVATIONS                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-513           PHASE 1 - INTERIOR ELEVATIONS                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
                                                                       Page 2 of 15
                                                                                                                       Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                       Job #: 24016 New Dresden Elementary School
                                                                                                                                                  2449 Dresden Dr
                                                                                                                                         Chamblee, Georgia 30341
The Winter Construction Company




    Drawing No.                                           Drawing Title                  Revision       Drawing Date   Received Date                   Set
A-1-514           PHASE 1 - INTERIOR ELEVATIONS                                                     2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-515           PHASE 1 - INTERIOR ELEVATIONS                                                     2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-516           PHASE 1 - INTERIOR ELEVATIONS                                                     2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-517           PHASE 1 - INTERIOR ELEVATIONS                                                     2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-518           PHASE 1 - INTERIOR ELEVATIONS                                                     2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-519           PHASE 1 - INTERIOR ELEVATIONS                                                     2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-520A          PHASE 1 - LEVEL 0 ZONE FURNITURE PLAN                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-520B          PHASE 1 - LEVEL 0 ZONE FURNITURE PLAN                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-521A          PHASE 1 - LEVEL 1 ZONE FURNITURE PLAN                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-521B          PHASE 1 - LEVEL 1 ZONE FURNITURE PLAN                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-522A          PHASE 1 - LEVEL 2 ZONE FURNITURE PLAN                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-522B          PHASE 1 - LEVEL 2 ZONE FURNITURE PLAN                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-1-523           PHASE 1 - LEVEL 3 ZONE FURNITURE PLAN                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-102           PHASE 2 - ARCHITECTURAL SITE PLAN                                                 1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-110           PHASE 2 - KEY PLANS                                                               1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-111A          PHASE 2 - LEVEL 1 ZONE PLANS                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-111B          PHASE 2 - LEVEL 1 ZONE PLANS                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-111C          PHASE 2 - LEVEL 1 ZONE PLANS                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-112A          PHASE 2 - LEVEL 2 ZONE PLANS                                                      2    08/14/2025      08/21/2025    ASI 03 (08/17/25)
A-2-112B          PHASE 2 - LEVEL 2 ZONE PLANS                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-113A          PHASE 2 - LEVEL 3 ZONE PLANS                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-120           PHASE 2 - RCP KEY PLANS                                                           1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-121A          PHASE 2- RCP LEVEL 1 ZONE PLANS                                                   1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-121B          PHASE 2- RCP LEVEL 1 ZONE PLANS                                                   1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-122A          PHASE 2- RCP LEVEL 2 ZONE PLANS                                                   1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-122B          PHASE 2- RCP LEVEL 2 ZONE PLANS                                                   1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-123           PHASE 2- RCP LEVEL 3 ZONE PLANS                                                   1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-201           PHASE 2 - EXTERIOR ELEVATIONS                                                     1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-202           PHASE 2 - EXTERIOR ELEVATIONS                                                     1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-203           PHASE 2 - EXTERIOR ELEVATIONS                                                     1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-301           PHASE 2 - BUILDING SECTIONS                                                       1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-302           PHASE 2 - BUILDING SECTIONS                                                       1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-310           PHASE 2 - WALL SECTIONS                                                           1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-311           PHASE 2 - WALL SECTIONS                                                           1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-312           PHASE 2 - WALL SECTIONS                                                           1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-401           PHASE 2 - ENLARGED PLANS                                                          1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-402           PHASE 2 - ENLARGED PLANS                                                          1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-403           PHASE 2 - ENLARGED PLANS                                                          1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
                                                                          Page 3 of 15
                                                                                                                       Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                       Job #: 24016 New Dresden Elementary School
                                                                                                                                                  2449 Dresden Dr
                                                                                                                                         Chamblee, Georgia 30341
The Winter Construction Company




    Drawing No.                                           Drawing Title                  Revision       Drawing Date   Received Date                   Set
A-2-404           PHASE 2 - ENLARGED PLANS                                                          1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-405           PHASE 2 - ENLARGED PLANS                                                          1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-406           PHASE 2 - ENLARGED PLANS                                                          1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-407           PHASE 2 - ENLARGED PLANS                                                          1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-408           PHASE 2 - ENLARGED PLANS                                                          1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-409           PHASE 2 - ENLARGED TOILET PLANS                                                   1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-410           PHASE 2 - VERTICAL CIRCULATION                                                    1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-411           PHASE 2 - VERTICAL CIRCULATION                                                    1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-501A          PHASE 2 - LEVEL 1 ZONE FINISH PLAN                                                1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-501B          PHASE 2 - LEVEL 1 ZONE FINISH PLAN                                                1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-502A          PHASE 2 - LEVEL 2 ZONE FINISH PLAN                                                1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-502B          PHASE 2 - LEVEL 2 ZONE FINISH PLAN                                                1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-503           PHASE 2 - LEVEL 3 ZONE FINISH PLAN                                                1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-510           PHASE 2 - INTERIOR ELEVATIONS                                                     1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-511           PHASE 2 - INTERIOR ELEVATIONS                                                     1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-512           PHASE 2 - INTERIOR ELEVATIONS                                                     1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-513           PHASE 2 - INTERIOR ELEVATION                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-514           PHASE 2 - INTERIOR ELEVATION                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-515           PHASE 2 - INTERIOR ELEVATION                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-516           PHASE 2 - INTERIOR ELEVATION                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-517           PHASE 2 - INTERIOR ELEVATION                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-531A          PHASE 2 - LEVEL 1 ZONE FURNITURE PLAN                                             1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-531B          PHASE 2 - LEVEL 1 ZONE FURNITURE PLAN                                             1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-532A          PHASE 2 - LEVE 2 ZONE FURNITURE PLAN                                              1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-532B          PHASE 2 - LEVEL 2 ZONE FURNITURE PLAN                                             1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-2-533           PHASE 2 - LEVEL 3 ZONE FURNITURE PLAN                                             1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-521             MILLWORK DETAILS                                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-522             MILLWORK DETAILS                                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-530             INTERIOR SIGNAGE DETAILS                                                          2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-531             INTERIOR DETAILS                                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-532             INTERIOR DETAILS                                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-601             DOOR SCHEDULE                                                                     2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-602             DOOR DETAILS                                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-610             EXTERIOR STOREFRONT ELEVATIONS                                                    3    09/25/2025      09/25/2025    ASI 04 (09/25/25)
A-611             EXTERIOR STOREFRONT ELEVATIONS                                                    2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-612             EXTERIOR STOREFRONT ELEVATIONS                                                    2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-613             INTERIOR STOREFRONT ELEVATIONS                                                    2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-614             WINDOW DETAILS                                                                    3    09/25/2025      09/25/2025    ASI 04 (09/25/25)
                                                                          Page 4 of 15
                                                                                                                         Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                         Job #: 24016 New Dresden Elementary School
                                                                                                                                                    2449 Dresden Dr
                                                                                                                                           Chamblee, Georgia 30341
The Winter Construction Company




        Drawing No.                                         Drawing Title                  Revision       Drawing Date   Received Date                   Set
A-616                 ROOM FINISH SCHEDULE - PHASE 1                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-617                 ROOM FINISH SCHEDULE - PHASE 2                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-618                 FINISH LEGEND                                                                   2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-619                 FF&E SCHEDULES                                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-701                 PLAN DETAILS                                                                    2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-702                 PLAN DETAILS                                                                    2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-703                 PLAN DETAILS @ VESTIBULES                                                       2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-704                 PLAN DETAILS @ VESTIBULES                                                       3    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-705                 PLAN DETAILS @ COURT YARD PARTITION                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-710                 SECTION DETAILS                                                                 3    09/25/2025      09/25/2025    ASI 04 (09/25/25)
A-711                 SECTION DETAILS                                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-712                 SECTION DETAILS                                                                 3    09/25/2025      09/25/2025    ASI 04 (09/25/25)
A-713                 SECTION DETAILS                                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-714                 SECTION DETAILS                                                                 3    09/25/2025      09/25/2025    ASI 04 (09/25/25)
A-720                 ROOF DETAILS                                                                    2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-801                 WALL TYPES                                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-802                 WALL TYPES                                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
A-803                 WALL TYPES                                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
AD-101                DEMO FLOOR PLAN - PHASE 1                                                       2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
Civil
C-000                 COVER SHEET                                                                     2    01/09/2026                    Changes to Approved (01/09/26)
C-001                 BOUNDARY & TOPOGRAPHIC SURVEY                                                   2    01/09/2026                    Changes to Approved (01/09/26)
C-002                 BOUNDARY & TOPOGRAPHIC SURVEY                                                   2    01/09/2026                    Changes to Approved (01/09/26)
C-005                 DCI ACTION LETTER                                                               1    01/09/2026                    Changes to Approved (01/09/26)
C-006                 LOGISTICS PLAN                                                                  1    01/09/2026                    Changes to Approved (01/09/26)
C-007                 LOGISTICS PLAN                                                                  1    01/09/2026                    Changes to Approved (01/09/26)
C-100                 OVERALL PLAN                                                                    2    01/09/2026                    Changes to Approved (01/09/26)
C-150                 DEMOLITION & REMOVAL PLAN                                                       2    01/09/2026                    Changes to Approved (01/09/26)
C-150a                DEMOLITION & REMOVAL PLAN                                                       0    01/09/2026                    Changes to Approved (01/09/26)
C-155                 DEMOLITION & REMOVAL PLAN                                                       2    01/09/2026                    Changes to Approved (01/09/26)
C-200                 SITE PLAN-SITE LAYOUT                                                           2    01/09/2026                    Changes to Approved (01/09/26)
C-200a                SITE PLAN-SITE LAYOUT                                                           0    01/09/2026                    Changes to Approved (01/09/26)
C-200b                SITE PLAN-SITE LAYOUT                                                           0    01/09/2026                    Changes to Approved (01/09/26)
C-205                 SITE PLAN-SITE LAYOUT                                                           3    01/09/2026                    Changes to Approved (01/09/26)
                                                                                                                                         Dresden ES LDP City Stamped Set
C206                  LAYOUT PLAN WITHIN R.O.W.                                                       1    02/06/2025      02/19/2025
                                                                                                                                         (02/14/25)
C-206                 LAYOUT PLAN WITHIN R.O.W.                                                       0    01/09/2026                    Changes to Approved (01/09/26)
C-210                 WALL ELEVATIONS                                                                 4    01/09/2026                    Changes to Approved (01/09/26)

                                                                            Page 5 of 15
                                                                                                                                Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                                Job #: 24016 New Dresden Elementary School
                                                                                                                                                           2449 Dresden Dr
                                                                                                                                                  Chamblee, Georgia 30341
The Winter Construction Company




       Drawing No.                                                 Drawing Title                  Revision       Drawing Date   Received Date                  Set
C-300                GRADING PLAN                                                                            4    01/09/2026                    Changes to Approved (01/09/26)
C-300a               GRADING PLAN                                                                            0    01/09/2026                    Changes to Approved (01/09/26)
C-300b               GRADING PLAN                                                                            0    01/09/2026                    Changes to Approved (01/09/26)
C-305                GRADING PLAN                                                                            4    01/09/2026                    Changes to Approved (01/09/26)
C-306                COURTYARD ENLARGEMENT GRADING PLAN                                                      2    01/09/2026                    Changes to Approved (01/09/26)
C-310                DRAINAGE PLAN                                                                           4    01/09/2026                    Changes to Approved (01/09/26)
C-310a               DRAINAGE PLAN                                                                           0    01/09/2026                    Changes to Approved (01/09/26)
C-315                DRAINAGE PLAN                                                                           3    01/09/2026                    Changes to Approved (01/09/26)
C-316                COURTYARD ENLARGEMENT STORM PLAN                                                        2    01/09/2026                    Changes to Approved (01/09/26)
C-320                PIPE PROFILES                                                                           4    01/09/2026                    Changes to Approved (01/09/26)
C-400                NPDES NOTES                                                                             2    01/09/2026                    Changes to Approved (01/09/26)
C-405                NPDES NOTES                                                                             2    01/09/2026                    Changes to Approved (01/09/26)
C-410                ES&PC - PHS1 INITIAL PLAN                                                               2    01/09/2026                    Changes to Approved (01/09/26)
C-410a               ES&PC - INITAL PLAN                                                                     0    01/09/2026                    Changes to Approved (01/09/26)
C-415                ES&PC - PHS1 INTERMEDIATE PLAN                                                          2    01/09/2026                    Changes to Approved (01/09/26)
C-415a               ES&PC - INTERMEDIATE PLAN A                                                             0    01/09/2026                    Changes to Approved (01/09/26)
C415b                ES&PC - INTERMEDIATE PLAN B                                                             0    01/09/2026                    Changes to Approved (01/09/26)
C-420                ES&PC - PHS1 FINAL PLAN                                                                 2    01/09/2026                    Changes to Approved (01/09/26)
C-420a               ES&PC - FINAL PLAN A                                                                    0    01/09/2026                    Changes to Approved (01/09/26)
C420b                ES&PC - FINAL PLAN B                                                                    0    01/09/2026                    Changes to Approved (01/09/26)
C-425                ES&PC -PHS2 INITIAL PLAN                                                                2    01/09/2026                    Changes to Approved (01/09/26)
C-430                ES&PC - PHS2 INTERMEDIATE PLAN                                                          2    01/09/2026                    Changes to Approved (01/09/26)
C-435                ES&PC - FINAL PLAN                                                                      2    01/09/2026                    Changes to Approved (01/09/26)
C-440                ES&PC DETAILS & CALCULATIONS                                                            2    01/09/2026                    Changes to Approved (01/09/26)
C-500                UTILITY PLAN                                                                            2    01/09/2026                    Changes to Approved (01/09/26)
C-510                UTILITY PROFILES                                                                        3    01/09/2026                    Changes to Approved (01/09/26)
                                                                                                                                                Dresden ES LDP City Stamped Set
C600                 TREE PROTECTION PLAN                                                                    1    02/06/2025      02/19/2025
                                                                                                                                                (02/14/25)
C-600                TREE PROTECTION PLAN                                                                    1    01/09/2026                    Changes to Approved (01/09/26)
                                                                                                                                                Dresden ES LDP City Stamped Set
C610                 LANDSCAPE PLAN                                                                          1    02/06/2025      04/07/2025
                                                                                                                                                (02/14/25)
C-610                LANDSCAPE PLAN                                                                          1    01/09/2026                    Changes to Approved (01/09/26)
C-700                SITE WORK CONSTRUCTION DETAILS                                                          2    01/09/2026                    Changes to Approved (01/09/26)
C-701                SITE WORK CONSTRUCTION DETAILS                                                          2    01/09/2026                    Changes to Approved (01/09/26)
C-702                SITE WORK CONSTRUCTION DETAILS                                                          2    01/09/2026                    Changes to Approved (01/09/26)
C-710                DEKALB COUNTY STANDARD CONSTRUCTION DETAILS                                             2    01/09/2026                    Changes to Approved (01/09/26)
C-711                DEKALB COUNTY STANDARD CONSTRUCTION DETAILS                                             2    01/09/2026                    Changes to Approved (01/09/26)
C-712                G.D.O.T. STANDARD CONSTRUCTION DETAILS                                                  2    01/09/2026                    Changes to Approved (01/09/26)


                                                                                   Page 6 of 15
                                                                                                                             Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                             Job #: 24016 New Dresden Elementary School
                                                                                                                                                        2449 Dresden Dr
                                                                                                                                               Chamblee, Georgia 30341
The Winter Construction Company




     Drawing No.                                                Drawing Title                  Revision       Drawing Date   Received Date                   Set
Electrical
E-001              ELECTRICAL LEGEND & ABBREVIATIONS                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-401              ENLARGED KITCHEN PLANS - ELECTRICAL                                                    2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-402              ENLARGED FLOOR PLANS - ELECTRICAL                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-403              ENLARGED FLOOR PLANS - ELECTRICAL                                                      3    08/05/2025      08/17/2025    ASI 03 (08/17/25)
E-404              ENLARGED FLOOR PLANS - ELECTRICAL                                                      2    08/05/2025      08/17/2025    ASI 03 (08/17/25)
E-501              ELECTRICAL GROUNDING DETAILS                                                           2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-502              LIGHTNING PROTECTION DETAILS                                                           2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-503              ELECTRICAL POWER DETAILS                                                               2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-504              ELECTRICAL POWER DETAILS                                                               2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-505              ELECTRICAL LIGHTING DETAILS                                                            2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-601              ONE LINE DIAGRAM                                                                       2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-701              ELECTRICAL SCHEDULES                                                                   2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-702              PANEL SCHEDULES                                                                        2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-703              PANEL SCHEDULES                                                                        2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-704              PANEL SCHEDULES                                                                        2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-705              PANEL SCHEDULES                                                                        2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-706              PANEL SCHEDULES                                                                        2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
E-707              PANEL SCHEDULES                                                                        3    08/05/2025      08/17/2025    ASI 03 (08/17/25)
E-708              PANEL SCHEDULES                                                                        3    08/05/2025      08/17/2025    ASI 03 (08/17/25)
EG-1-110           PHASE 1-LEVEL 0-PLAN-GROUNDING                                                         2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EG-2-110           PHASE 2-LEVEL 1-PLAN-GROUNDING                                                         1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EL-1-120A          PHASE 1- LEVEL 0-RCP-ZONES A/B-LIGHTING                                                2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EL-1-120B          PHASE 1-LEVEL 0-RCP-ZONE C- LIGHTING                                                   2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EL-1-121A          PHASE 1-LEVEL 1-RCP-ZONES A/B-LIGHTING                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EL-1-121B          PHASE 1-LEVEL 1-RCP-ZONE C-LIGHTING                                                    2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EL-1-122A          PHASE 1-LEVEL 2-RCP-ZONES A/B-LIGHTING                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EL-1-122B          PHASE 1-LEVEL 2-RCP-ZONE C- LIGHTING                                                   2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EL-1-123           PHASE 1-LEVEL 3 -RCP-LIGHTING                                                          2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EL-2-121A          PHASE 2- LEVEL 1- RCP- ZONES D/E- LIGHTING                                             1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EL-2-121B          PHASE 2-LEVEL 1-RCP-ZONES F/G-LIGHTING                                                 1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EL-2-122A          PHASE 2-LEVEL 2- RCP- ZONES D/E- LIGHTING                                              1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EL-2-122B          PHASE 2-LEVEL 2-RCP-ZONES F/G -LIGHTING                                                1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EL-2-123A          PHASE 2-LEVEL 3-RCP-ZONES F/G-LIGHTING                                                 1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
ELP-1-111          PHASE 1-ROOF PLAN-LIGHTNING PROTECTION                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
ELP-2-111          PHASE 2-ROOF PLAN-LIGHTNING PROTECTION                                                 1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EP-1-110A          PHASE 1-LEVEL 0 PLAN-ZONES A/B- POWER                                                  3    08/05/2025      08/17/2025    ASI 03 (08/17/25)
EP-1-110B          PHASE 1-LEVEL 0 PLAN-ZONE C- POWER                                                     2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
                                                                                Page 7 of 15
                                                                                                                              Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                              Job #: 24016 New Dresden Elementary School
                                                                                                                                                         2449 Dresden Dr
                                                                                                                                                Chamblee, Georgia 30341
The Winter Construction Company




    Drawing No.                                                  Drawing Title                  Revision       Drawing Date   Received Date                   Set
EP-1-111A         PHASE 1-LEVEL 1 PLAN-ZONES A/B- POWER                                                    2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EP-1-111B         PHASE 1-LEVEL 1 PLAN-ZONE C- POWER                                                       3    08/05/2025      08/17/2025    ASI 03 (08/17/25)
EP-1-112A         PHASE 1-LEVEL 2 PLAN-ZONES A/B- POWER                                                    2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EP-1-112B         PHASE 1-LEVEL 2 PLAN-ZONE C- POWER                                                       3    08/05/2025      08/17/2025    ASI 03 (08/17/25)
EP-1-113A         PHASE 1-LEVEL 3 PLAN-ZONE A- POWER                                                       2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EP-1-130          PHASE 1-ROOF PLAN-POWER                                                                  3    08/05/2025      08/17/2025    ASI 03 (08/17/25)
EP-2-111A         PHASE 2-LEVEL 1 PLAN-ZONES D/E- POWER                                                    2    08/05/2025      08/17/2025    ASI 03 (08/17/25)
EP-2-111B         PHASE 2-LEVEL 1 PLAN-ZONES F/G- POWER                                                    2    08/05/2025      08/17/2025    ASI 03 (08/17/25)
EP-2-111C         PHASE 2-LEVEL 1 PLAN-ZONE H- POWER                                                       1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EP-2-112A         PHASE 2-LEVEL 2 PLAN-ZONES D/E- POWER                                                    1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EP-2-112B         PHASE 2-LEVEL 2 PLAN-ZONES F/G- POWER                                                    1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EP-2-113A         PHASE 2-LEVEL 3 PLAN-ZONES F/G- POWER                                                    1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
EP-2-130          PHASE 2-ROOF PLAN-POWER                                                                  2    08/05/2025      08/17/2025    ASI 03 (08/17/25)
ES-0-100          SITE PLAN - ELECTRICAL PHASING                                                           2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
ES-0-101          SITE PLAN - ELECTRICAL                                                                   2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
Fire Alarm
FA-1-110A         PHASE 1- LEVEL 0 PLAN- ZONES A/B- FIRE ALARM                                             3    08/06/2025      08/17/2025    ASI 03 (08/17/25)
FA-1-110B         PHASE 1- LEVEL 0 PLAN- ZONE C- FIRE ALARM                                                2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
FA-1-111A         PHASE 1- LEVEL 1 PLAN- ZONES A/B- FIRE ALARM                                             3    08/06/2025      08/17/2025    ASI 03 (08/17/25)
FA-1-111B         PHASE 1- LEVEL 1 PLAN- ZONE C- FIRE ALARM                                                2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
FA-1-112A         PHASE 1- LEVEL 2 PLAN- ZONES A/B- FIRE ALARM                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
FA-1-112B         PHASE 1- LEVEL 2 PLAN- ZONE C- FIRE ALARM                                                2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
FA-1-113          PHASE 1- LEVEL 3 PLAN- ZONE A- FIRE ALARM                                                2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
FA-1-120          PHASE 1- ROOF PLAN- FIRE ALARM                                                           2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
FA-2-111A         PHASE 2- LEVEL 1 PLAN- ZONES D/E- FIRE ALARM                                             2    08/06/2025      08/17/2025    ASI 03 (08/17/25)
FA-2-111B         PHASE 2- LEVEL 1 PLAN- ZONES F/G- FIRE ALARM                                             2    08/06/2025      08/17/2025    ASI 03 (08/17/25)
FA-2-112A         PHASE 2- LEVEL 2 PLAN- ZONES D/E- FIRE ALARM                                             1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
FA-2-112B         PHASE 2- LEVEL 2 PLAN- ZONES F/G- FIRE ALARM                                             1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
FA-2-113          PHASE 2- LEVEL 3 PLAN- ZONES F/G- FIRE ALARM                                             1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
FA-2-120          PHASE 2- ROOF PLAN- FIRE ALARM                                                           1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
FA-501            FIRE ALARM DETAILS                                                                       2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
Fire Protection
FX-001            NOTES - FIRE PROTECTION                                                                  2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-101 PH 1       LEVELS 0 & 1 COMPOSITE PLANS - FP                                                        2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-101 PH 2       LEVELS 0 & 1 COMPOSITE PLANS - FP                                                        0    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-102 PH 1       LEVELS 2 & 3 COMPOSITE PLANS - FP                                                        2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-102 PH 2       LEVELS 2 & 3 COMPOSITE PLANS - FP                                                        0    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-103 PH 1       PHASE 1 - LEVEL 0 - FIRE PROT. ZONE PLANS                                                2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
                                                                                 Page 8 of 15
                                                                                                                           Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                           Job #: 24016 New Dresden Elementary School
                                                                                                                                                      2449 Dresden Dr
                                                                                                                                             Chamblee, Georgia 30341
The Winter Construction Company




    Drawing No.                                               Drawing Title                  Revision       Drawing Date   Received Date                   Set
FX-103 PH 2       PHASE 2 - LEVEL 1 - FIRE PROT. ZONE PLANS                                             0    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-104 PH 1       PHASE 1 - LEVEL 0 - FIRE PROT. ZONE PLANS                                             2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-104 PH 2       PHASE 2 - LEVEL 1 - FIRE PROT. ZONE PLANS                                             0    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-105 PH 1       PHASE 1 - LEVEL 1 - FIRE PROT. ZONE PLANS                                             2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-105 PH 2       PHASE 2 - LEVEL 2 - FIRE PROT. ZONE PLANS                                             0    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-106 PH 1       PHASE 1 - LEVEL 1 - FIRE PROT. ZONE PLANS                                             2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-106 PH 2       PHASE 2 - LEVEL 2 - FIRE PROT. ZONE PLANS                                             0    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-107 PH 1       PHASE 1 - LEVEL 2 - FIRE PROT. ZONE PLANS                                             2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-107 PH 2       PHASE 2 - LEVEL 2 - FIRE PROT. ZONE PLANS                                             0    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-108 PH 1       PHASE 1 - LEVEL 2 - FIRE PROT. ZONE PLANS                                             2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-108 PH 2       PHASE 2 - LEVEL 3 - FIRE PROT. ZONE PLANS                                             0    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-109 PH 1       PHASE 1 - LEVEL 3 - FIRE PROT. ZONE PLANS                                             2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-109 PH 2       PHASE 2 - LEVEL 3 - FIRE PROT. ZONE PLANS                                             0    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-401 PH 1       STAIR SECTIONS - FIRE PROTECTION                                                      2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-401 PH 2       STAIR SECTIONS - FIRE PROTECTION                                                      0    01/14/2025      04/25/2025    ASI 02 (04/23/25)
FX-501            DETAILS - FIRE PROTECTION                                                             2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
Kitchen
K-000             FOODSERVICE COVER PAGE                                                                2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-101             FOODSERVICE EQUIPMENT PLAN AND SCHEDULE                                               2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-102             FS MECHANICAL CONNECTION PLAN                                                         2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-103             FS ELECTRICAL CONNECTION PLAN                                                         2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-104             FS SPECIAL CONDITIONS PLAN                                                            2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-104D            FS SPECIAL CONDITIONS DETAILS                                                         2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-105             FS MECH & PLUMBING LOAD SCHEDULE                                                      2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-106             FS ELECTRICAL UTILITY LOAD SCHEDULE                                                   2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-107             FS ELEVATIONS                                                                         2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-108             FS ELEVATIONS                                                                         2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-201             FS VENTILATION DRAWING                                                                2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-202             FS VENTILATION DRAWING                                                                2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-203             FS VENTILATION DRAWING                                                                2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-204             FS VENTILATION DRAWING                                                                2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-205             FS VENTILATION DRAWING                                                                2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-206             FS VENTILATION DRAWING                                                                2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-207             FS VENTILATION DRAWING                                                                2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-208             FS VENTILATION DRAWING                                                                2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
K-209             FS WALK-IN DRAWING                                                                    2    01/14/2025      04/25/2025    ASI 02 (04/23/25)
Life Safety
LS-100            LIFE SAFETY PLAN - COMPOSITE                                                          2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
                                                                              Page 9 of 15
                                                                                                                  Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                  Job #: 24016 New Dresden Elementary School
                                                                                                                                             2449 Dresden Dr
                                                                                                                                    Chamblee, Georgia 30341
The Winter Construction Company




    Drawing No.                                     Drawing Title                   Revision       Drawing Date   Received Date                   Set
LS-101            LIFE SAFETY PLAN                                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
LS-102            LIFE SAFETY PLAN                                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
LS-200            LIFE SAFETY PLAN                                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
LS-201            LIFE SAFETY PLAN                                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
LS-202            LIFE SAFETY PLAN                                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
LS-203            LIFE SAFETY PLAN                                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
Mechanical
M-001             LEGENDS & GENERAL NOTES                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-1-110A          PHASE 1 LEVEL 0 ZONE HVAC PLANS                                              3    08/06/2025      08/17/2025    ASI 03 (08/17/25)
M-1-110B          PHASE 1 LEVEL 0 ZONE HVAC PLANS                                              3    08/06/2025      08/17/2025    ASI 03 (08/17/25)
M-1-111A          PHASE 1 LEVEL 1 ZONE HVAC PLANS                                              3    08/06/2025      08/17/2025    ASI 03 (08/17/25)
M-1-111B          PHASE 1 LEVEL 1 ZONE HVAC PLANS                                              3    08/06/2025      08/17/2025    ASI 03 (08/17/25)
M-1-112A          PHASE 1 LEVEL 2 ZONE HVAC PLANS                                              3    08/06/2025      08/17/2025    ASI 03 (08/17/25)
M-1-112B          PHASE 1 LEVEL 2 ZONE HVAC PLANS                                              3    08/06/2025      08/17/2025    ASI 03 (08/17/25)
M-1-113           PHASE 1 LEVEL 3 ZONE HVAC PLANS                                              3    08/06/2025      08/17/2025    ASI 03 (08/17/25)
M-1-131           PHASE 1 ROOF PLANS                                                           3    08/06/2025      08/17/2025    ASI 03 (08/17/25)
M-2-111A          PHASE 2 LEVEL 1 ZONE HVAC PLANS                                              2    08/06/2025      08/17/2025    ASI 03 (08/17/25)
M-2-111B          PHASE 2 LEVEL 1 ZONE HVAC PLANS                                              1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-2-112A          PHASE 2 LEVEL 2 ZONE HVAC PLANS                                              2    08/06/2025      08/17/2025    ASI 03 (08/17/25)
M-2-112B          PHASE 2 LEVEL 2 ZONE HVAC PLANS                                              1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-2-113           PHASE 2 LEVEL3 ZONE HVAC PLANS                                               2    08/06/2025      08/17/2025    ASI 03 (08/17/25)
M-2-131           PHASE 2 ROOF PLANS                                                           2    08/06/2025      08/17/2025    ASI 03 (08/17/25)
M-010             OVERALL HVAC PLAN - LEVEL 0                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-011             OVERALL HVAC PLAN - LEVEL 1                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-012             OVERALL HVAC PLAN - LEVEL 2                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-013             OVERALL HVAC PLAN - LEVEL 3                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-401             PHASE 1 ENLARGED MECH. PLAN                                                  3    08/06/2025      08/17/2025    ASI 03 (08/17/25)
M-501             MECHANICAL DETAILS                                                           2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-502             MECHANICAL DETAILS                                                           2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-503             PHASE 1 FOOD SERVICE SHEET 1                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-504             PHASE 1 FOOD SERVICE SHEET 2                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-505             PHASE 1 FOOD SERVICE SHEET 3                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-506             PHASE 1 FOOD SERVICE SHEET 4                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-507             PHASE 1 FOOD SERVICE SHEET 5                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-508             PHASE 1 FOOD SERVICE SHEET 6                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-509             PHASE 1 FOOD SERVICE SHEET 7                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-510             PHASE 1 FOOD SERVICE SHEET 8                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-601             MECHANICAL SCHEDULES                                                         3    08/06/2025      08/17/2025    ASI 03 (08/17/25)
                                                                    Page 10 of 15
                                                                                                                             Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                             Job #: 24016 New Dresden Elementary School
                                                                                                                                                        2449 Dresden Dr
                                                                                                                                               Chamblee, Georgia 30341
The Winter Construction Company




    Drawing No.                                                Drawing Title                   Revision       Drawing Date   Received Date                   Set
M-602             MECHANICAL SCHEDULES                                                                    3    08/06/2025      08/17/2025    ASI 03 (08/17/25)
M-701             HVAC CONTROLS NOTES, SYMBOLS AND SCHEDULES                                              2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-702             SYSTEM ARCHITECTURE                                                                     2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-703             WATER SIDE CONTROL DIAGRAMS                                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-704             AIR SIDE CONTROL DIAGRAMS                                                               2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
M-705             CONTROL DIAGRAMS                                                                        2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
MD-101            HVAC DEMOLITION FLOOR PLAN                                                              2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
Plumbing
P-0-001           ABBREVIATIONS, LEGEND AND GENERAL NOTES                                                 2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-100           PHASE 1 - PLUMBING SITE PLAN                                                            2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-110           PHASE 1 - PLUMBING KEY PLANS                                                            2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-111A          PHASE 1 - LEVEL 0 - PLUMBING ZONE PLANS                                                 3    08/11/2025      08/17/2025    ASI 03 (08/17/25)
P-1-111B          PHASE 1 - LEVEL 0 - PLUMBING ZONE PLANS                                                 2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-112A          PHASE 1 - LEVEL 0 - PLUMBING ZONE PLANS                                                 3    08/11/2025      08/17/2025    ASI 03 (08/17/25)
P-1-112B          PHASE 1 - LEVEL 0 - PLUMBING ZONE PLANS                                                 2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-113A          PHASE 1 - LEVEL 1 - PLUMBING ZONE PLANS                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
P-1-113B          PHASE 1 - LEVEL 1 - PLUMBING ZONE PLANS                                                 2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-114A          PHASE 1 - LEVEL 2 - PLUMBING ZONE PLANS                                                 2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-114B          PHASE 1 - LEVEL 2 - PLUMBING ZONE PLANS                                                 1    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-115A          PHASE 1 - LEVEL 3 - PLUMBING ZONE PLANS                                                 2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-115B          PHASE 1 - LEVEL 3 - PLUMBING ZONE PLANS                                                 2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-116A          PHASE 1 - ROOF - PLUMBING ZONE PLANS                                                    2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-401           PLUMBING ENLARGED PLAN                                                                  2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-402           PLUMBING ENLARGED PLAN                                                                  3    07/10/2025      07/10/2025    ASI 02 (04/23/25)
P-1-403           PLUMBING ENLARGED PLANS                                                                 3    08/11/2025      08/17/2025    ASI 03 (08/17/25)
P-1-404           PLUMBING ENLARGED PLANS                                                                 2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-405           PLUMBING ENLARGED PLANS                                                                 2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-406           PLUMBING ENLARGED PLANS                                                                 2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-407           PLUMBING ENLARGED PLANS                                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
P-1-408           PLUMBING ENLARGED PLANS                                                                 2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-409           PLUMBING ENLARGED PLANS                                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
P-1-501           PLUMBING DETAILS                                                                        2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-502           PLUMBING DETAILS                                                                        2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-503           PLUMBING DETAILS                                                                        2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-601           PLUMBING SCHEDULES                                                                      2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-602           PLUMBING SCHEDULES                                                                      3    08/11/2025      08/17/2025    ASI 03 (08/17/25)
P-1-901           SANITARY ISOMETRICS                                                                     2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
P-1-902           SANITARY ISOMETRICS                                                                     2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
                                                                               Page 11 of 15
                                                                                                                          Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                          Job #: 24016 New Dresden Elementary School
                                                                                                                                                     2449 Dresden Dr
                                                                                                                                            Chamblee, Georgia 30341
The Winter Construction Company




    Drawing No.                                             Drawing Title                   Revision       Drawing Date   Received Date                   Set
P-1-903           SANITARY ISOMETRICS                                                                  2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-904           GREASE ISOMETRICS                                                                    2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-905           STORM DRAINAGE ISOMETRICS                                                            3    08/11/2025      08/17/2025    ASI 03 (08/17/25)
P-1-906           DOMESTIC WATER ISOMETRICS                                                            3    07/10/2025      07/10/2025    ASI 02 (04/23/25)
P-1-907           DOMESTIC WATER ISOMETRICS                                                            2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
P-1-908           DOMESTIC WATER ISOMETRICS                                                            2    04/11/2025      04/11/2025    ASI 02 (04/23/25)
P-1-909           DOMESTIC WATER ISOMETRICS                                                            2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-910           DOMESTIC WATER ISOMETRICS                                                            2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-911           DOMESTIC WATER ISOMETRICS                                                            2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
P-1-912           NATURAL GAS ISOMETRICS                                                               3    08/11/2025      08/17/2025    ASI 03 (08/17/25)
P-2-100           PHASE 2 - PLUMBING SITE PLAN                                                         1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-110           PHASE 2 - PLUMBING KEY PLANS                                                         1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-111A          PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS                                              1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-111B          PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS                                              1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-112A          PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS                                              1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-112B          PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS                                              1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-112C          PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS                                              1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-113A          PHASE 2 - LEVEL 2 - PLUMBING ZONE PLANS                                              1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-113B          PHASE 2 - LEVEL 2 - PLUMBING ZONE PLANS                                              1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-114A          PHASE 2 - LEVEL 3 - PLUMBING ZONE PLANS                                              1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-114B          PHASE 2 - LEVEL 3 - PLUMBING ZONE PLANS                                              1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-115A          PHASE 2 - ROOF - PLUMBING ZONE PLANS                                                 1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-401           PLUMBING ENLARGED PLANS                                                              1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-402           PLUMBING ENLARGED PLANS                                                              1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-403           PLUMBING ENLARGED PLANS                                                              1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-901           SANITARY ISOMETRICS                                                                  1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-902           SANITARY ISOMETRICS                                                                  1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-903           STORM ISOMETRICS                                                                     1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-904           STORM ISOMETRICS                                                                     1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-905           DOMESTIC WATER ISOMETRICS                                                            1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-906           DOMESTIC WATER ISOMETRICS                                                            1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-907           DOMESTIC WATER ISOMETRICS                                                            1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
P-2-908           NATURAL GAS ISOMETRICS                                                               1    10/30/2024      04/23/2025    ASI 02 (04/23/25)
PD-101            DEMO FLOOR PLANS                                                                     2    01/14/2025      04/23/2025    ASI 02 (04/23/25)
Structural
S-001             GENERAL NOTES                                                                        2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-1-110A          PHASE 1 -LEVEL 0 FOUND. PLAN - ZONE A,B                                              3    04/11/2025      06/30/2025    ASI 02 (04/23/25)
S-1-110B          PHASE 1 -LEVEL 0 FOUND. PLAN - ZONE C                                                2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
                                                                            Page 12 of 15
                                                                                                                          Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                          Job #: 24016 New Dresden Elementary School
                                                                                                                                                     2449 Dresden Dr
                                                                                                                                            Chamblee, Georgia 30341
The Winter Construction Company




    Drawing No.                                             Drawing Title                   Revision       Drawing Date   Received Date                   Set
S-1-111A          PHASE 1 -LEVEL 1 PLAN -ZONE A,B                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-1-111B          PHASE 1 -LEVEL 1 PLAN -ZONE C                                                        2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-1-112A          PHASE 1 -LEVEL 2 PLAN -ZONE A,B                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-1-112B          PHASE 1 -LEVEL 2 PLAN -ZONE C                                                        2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-1-113A          PHASE 1 -LEVEL 3 PLAN -ZONE A,B                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-1-113B          PHASE 1 -LEVEL 3 -ZONE C                                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-1-114A          PHASE 1 -ROOF PLAN -ZONE A                                                           2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-002             GENERAL NOTES                                                                        2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-2-111A          PHASE 2 -LEVEL 1 FOUND. PLAN - ZONE D,E                                              1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-2-111B          PHASE 2 -LEVEL 1 FOUND. PLAN - ZONE F,G                                              1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-2-112A          PHASE 2 -LEVEL 2 PLAN -ZONE D,E                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-2-112B          PHASE 2 -LEVEL 2 PLAN -ZONE F,G                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-2-113A          PHASE 2 -LEVEL 3 -ZONE D,E                                                           1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-2-113B          PHASE 2 - LEVEL 3 PLAN - ZONE F,G                                                    1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-2-114B          PHASE 2 - ROOF PLAN - ZONE F,G                                                       2    05/01/2025      05/01/2025    ASI 02 (04/23/25)
S-003             3D VIEWS                                                                             2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-004             TYPICAL DETAILS                                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-005             TYPICAL DETAILS                                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-006             TYPICAL DETAILS                                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-007             TYPICAL DETAILS                                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-008             TYPICAL DETAILS                                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-009             TYPICAL DETAILS                                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-010             TYPICAL DETAILS                                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-201             FOUNDATION SECTIONS AND DETAILS                                                      3    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-202             FOUNDATION SECTIONS AND DETAILS                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-203             FOUNDATION SECTIONS AND DETAILS                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-204             FOUNDATION SECTIONS AND DETAILS                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-205             FOUNDATION SECTIONS AND DETAILS                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-301             PHASE 1 COLUMN SCHEDULE                                                              2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-302             PHASE 2 COLUMN SCHEDULE                                                              1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-401             BRACED FRAME ELEVATIONS                                                              2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-501             FRAMING SECTIONS AND DETAILS                                                         2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-502             FRAMING SECTIONS AND DETAILS                                                         2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-503             FRAMING SECTIONS AND DETAILS                                                         2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-504             FRAMING SECTIONS AND DETAILS                                                         2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-505             FRAMING SECTIONS AND DETAILS                                                         2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-506             FRAMING SECTIONS AND DETAILS                                                         2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-507             FRAMING SECTIONS AND DETAILS                                                         2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
                                                                            Page 13 of 15
                                                                                                                            Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                            Job #: 24016 New Dresden Elementary School
                                                                                                                                                       2449 Dresden Dr
                                                                                                                                              Chamblee, Georgia 30341
The Winter Construction Company




    Drawing No.                                               Drawing Title                   Revision       Drawing Date   Received Date                   Set
S-510             FRAMING SECTIONS AND DETAILS                                                           1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-511             FRAMING SECTIONS AND DETAILS                                                           1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-512             FRAMING SECTIONS AND DETAILS                                                           1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-513             FRAMING SECTIONS AND DETAILS                                                           1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-514             FRAMING SECTIONS AND DETAILS                                                           1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-515             FRAMING SECTIONS AND DETAILS                                                           1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-516             FRAMING SECTIONS AND DETAILS                                                           0    05/01/2025      05/01/2025    ASI 02 (04/23/25)
S-520             PH 1 -LOGGIA CANOPY FRAM'G PLAN & DET'S                                                2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-521             PH2 -NORTH CANOPY FRAM'G PLANS & DET'S                                                 1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
S-522             PH2 -EAST CANOPY FRAM'G PLANS AND DET'S                                                1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
Technology
T-0-100           SITE PLAN - TELECOM PHASING                                                            2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
T-0-101           SITE PLAN - TELECOM                                                                    2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
T-001             COMMUNICATIONS LEGEND & ABBREVIATIONS                                                  2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
T-1-100           PHASE 1- LEVEL 0 PLAN- CABLE TRAY                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
T-1-101           PHASE 1- LEVEL 1 PLAN- CABLE TRAY                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
T-1-102           PHASE 1- LEVEL 2 PLAN- CABLE TRAY                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
T-1-103           PHASE 1- LEVEL 3 PLAN- CABLE TRAY                                                      2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
T-1-110A          PHASE 1- LEVEL 0 PLAN- ZONES A/B- TELECOM                                              3    10/09/2025      10/09/2025    ASI 05 (10/09/25)
T-1-110B          PHASE 1- LEVEL 0 PLAN- ZONE C- TELECOM                                                 3    10/09/2025      10/09/2025    ASI 05 (10/09/25)
T-1-111A          PHASE 1- LEVEL 1 PLAN- ZONES A/B- TELECOM                                              3    10/09/2025      10/09/2025    ASI 05 (10/09/25)
T-1-111B          PHASE 1- LEVEL 1 PLAN- ZONE C- TELECOM                                                 3    10/09/2025      10/09/2025    ASI 05 (10/09/25)
T-1-112A          PHASE 1- LEVEL 2 PLAN- ZONES A/B- TELECOM                                              3    10/09/2025      10/09/2025    ASI 05 (10/09/25)
T-1-112B          PHASE 1- LEVEL 2 PLAN- ZONE C- TELECOM                                                 3    10/09/2025      10/09/2025    ASI 05 (10/09/25)
T-1-113           PHASE 1- LEVEL 3 PLAN- ZONE A- TELECOM                                                 3    10/09/2025      10/09/2025    ASI 05 (10/09/25)
T-2-101           PHASE 2- LEVEL 1 PLAN- CABLE TRAY                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
T-2-102           PHASE 2- LEVEL 2 PLAN- CABLE TRAY                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
T-2-103           PHASE 2- LEVEL 3 PLAN- CABLE TRAY                                                      1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
T-2-111A          PHASE 2- LEVEL 1 PLAN- ZONES D/E- TELECOM                                              2    10/09/2025      10/09/2025    ASI 05 (10/09/25)
T-2-111B          PHASE 2- LEVEL 1 PLAN- ZONES F/G- TELECOM                                              2    10/09/2025      10/09/2025    ASI 05 (10/09/25)
T-2-111C          PHASE 2- LEVEL 1 PLAN- ZONE H- TELECOM                                                 2    10/09/2025      10/09/2025    ASI 05 (10/09/25)
T-2-112A          PHASE 2- LEVEL 2 PLAN- ZONES D/E- TELECOM                                              2    10/09/2025      10/09/2025    ASI 05 (10/09/25)
T-2-112B          PHASE 2- LEVEL 2 PLAN- ZONES F/G- TELECOM                                              2    10/09/2025      10/09/2025    ASI 05 (10/09/25)
T-2-113           PHASE 2- LEVEL 3 PLAN- ZONES F/G- TELECOM                                              2    10/09/2025      10/09/2025    ASI 05 (10/09/25)
T-401             PHASE 1 ENLARGED TELECOM PLANS                                                         2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
T-402             PHASE 2 ENLARGED TELECOM PLANS                                                         1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
T-501             TELECOM DETAILS                                                                        2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
T-502             TELECOM DETAILS                                                                        2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
                                                                              Page 14 of 15
                                                                                                                      Printed on Wed Mar 25, 2026 at 04:37 pm EDT

                                                                                                                      Job #: 24016 New Dresden Elementary School
                                                                                                                                                 2449 Dresden Dr
                                                                                                                                        Chamblee, Georgia 30341
The Winter Construction Company




    Drawing No.                                         Drawing Title                   Revision       Drawing Date   Received Date                   Set
T-601             ONE LINE DIAGRAM                                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
T-602             ONE LINE DIAGRAM                                                                 2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
TG-1-100          PHASE 1- LEVEL 0 PLAN - COMM GROUND                                              2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
TG-1-101          PHASE 1- LEVEL 1 PLAN - COMM GROUND                                              2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
TG-1-102          PHASE 1- LEVEL 2 PLAN - COMM GROUND                                              2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
TG-1-103          PHASE 1- LEVEL 3 PLAN - COMM GROUND                                              2    04/11/2025      04/23/2025    ASI 02 (04/23/25)
TG-2-101          PHASE 2- LEVEL 1 PLAN- COMM GROUND                                               1    04/11/2025      04/23/2025    ASI 02 (04/23/25)
TG-2-102          PHASE 2- LEVEL 2 PLAN- COMM GROUND                                               1    04/11/2025      04/23/2025    ASI 02 (04/23/25)




                                                                        Page 15 of 15