Agenda Item
d. Contract ~ Change Order No. 1 ~ Winter Construction ~ General Contractor (GC) Services ~ CIP Project 21836 (Not to Exceed $1,300,000) and Amendment No. 2 ~ BRPH ~ AE Services ~ Dresden Elementary School Parking Lot (Not to Exceed $62,250) Not to Collectively Exceed $1,362,250
Summary: Presented by: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations,
Mr. Darrell Stallings, Chief of Capital Improvements, Division of Capital Improvements
Request: It is requested that the DeKalb County Board of Education (“the Board”) approve:
Change Order No. 1 to Winter Construction for General Contractor Services, Not to exceed $1,300,000.
Amendment No. 2 to BRPH for Architectural & Engineering Services, Not to exceed $62,250.
Total not to exceed $1,362,250.
Why: Approval of Change Order No. 1 and Amendment No. 2 will provide funds for Capital Improvement Project 21836 - Dresden Elementary School Project - Parking Lot.
Details: On August 31, 2023, the Board of Education approved the award of a Construction Management at Risk (CM@R) contract to Winter Construction Company for the completion of the New Elementary School at Dresden Project and for Pre-Construction Services in the amount of $10,000.00.
On Monday, May 6, 2024, the Board of Education established a Guaranteed Maximum Price of $72,323,774 for the construction of the New Elementary School at Dresden SPLOST VI project per the terms set forth in the Construction Manager at Risk contract previously awarded to The Winter Construction Company.
On Monday, February 13, 2023, the Board of Education approved the award of RFQu 23-752-008 for Architectural and Engineering Services for Dresden Elementary School Replacement to BRPH Architects Engineers Inc., for the lump sum amount of $2,280,000.
The initial scope of work for this project included construction management services for the Dresden Elementary School that is divided into four (4) phases. Phase 1 is for mobilization, site work, and material laydown. Phase 2 is a demolition to sections of the existing building, erect building in Phase 1, east loop paving, striping, and curbing at the Dresden Elementary School site.
The Change Order No. 1 and Amendment No. 2 will provide a shared permanent asphalt parking lot for Dresden Elementary School and St. Pius Catholic High School. This permanent lot will be located on the property owned by the Catholic Education of North Georgia Inc. The Design Professional (BRPH), CM@R (Winter), Program Manager (HPM), St. Pius Catholic High School, City of Chamblee and the County officials alongside the District have collaborated to develop a parking lot design that will directly benefit the District and the St. Pius Catholic High School.
Some of the benefits of Change Order no. 1 and Amendment No. 2 have been listed below:
Reduces congestion during arrival and dismissal times
Provides flexible parking while parts of the campus are inaccessible
Minimizes disruption to surrounding neighborhoods from overflow parking
Supports staff, visitors, and events during all phases of construction
Can be removed or repurposed once construction is complete.
Change Order No. 1 and Amendment No. 2, which is not included in the initial scope, cover the approved additional scope for the DeKalb County School District requested items and will be the full design and construction administration of the project.
Financial impact: The total budget for CIP 21836 Dresden Elementary School Parking Lot is as follows:
Change Order No. 1 - Not to exceed amount of $1,300,000.00 - allocated from cost code (SP6CIP.21836.GENCONTR.1055).
Amendment No. 2 is - Not to exceed amount of $62,250.00- allocated from cost code (SP5FACCON.36235.ARCHITECT).
Contact: Mr. Darrell Stallings, Chief of Capital Improvements, Division of Capital Improvements
Mr. Hans Williams, Dir. Planning & E-SPLOST Programming, Division of Operations, 678.676.1588
Mr. Artis Johnson, Program Director, Division of Operations, 404.790.8985
Effective: Upon Board Approval
Status: Approved by the Office of Legal Affairs
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
New Dresden Elementary School - Current Drawings
Drawing No. Drawing Title Revision Drawing Date Received Date Set
General
G-001 COVER SHEET 3 09/25/2025 09/25/2025 ASI 04 (09/25/25)
G-001 PH 2 PHASE 2 - COVER SHEET 0 04/11/2025 04/23/2025 ASI 02 (04/23/25)
G-002 SHEET INDEX 3 09/25/2025 09/25/2025 ASI 04 (09/25/25)
G-002 PH 2 PHASE 2 - SHEET INDEX 0 04/11/2025 04/23/2025 ASI 02 (04/23/25)
G-003 ABBREVIATIONS, SYMBOLS, GENERAL NOTES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
G-104 CODE SUMMARY 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
G-105 ACCESSIBILITY INFORMATION 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
G-106 SCHEDULE OF SPACES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
G-107 ACTION LETTER PZ2024-1278 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Architectural
A-0-100 ARCHITECTURE - FULL SITE PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-0-110 LEVEL 0 - OVERALL PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-0-111 LEVEL 1 - OVERALL PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-0-112 LEVEL 2 - OVERALL PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-0-113 LEVEL 3 - OVERALL PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-0-114 SECTION REFERENCE PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-0-120 LEVEL 0 - OVERALL RCP 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-0-121 LEVEL 1 - OVERALL RCP 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-0-122 LEVEL 2 - OVERALL RCP 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-0-123 LEVEL 3 - OVERALL RCP 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-0-124 OVERALL RCP CONTROL JOINTS 0 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-0-130 OVERALL ROOF PLAN 3 05/15/2025 07/07/2025 Dresden ES Permit Set (03/22/24)
A-1-101 PHASE 1 - ARCHITECTURAL SITE PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-110 PHASE 1 - KEY PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-110A PHASE 1 - LEVEL 0 ZONE PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-110B PHASE 1 - LEVEL 0 ZONE PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-111A PHASE 1 - LEVEL 1 ZONE PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-111B PHASE 1 - LEVEL 1 ZONE PLANS 3 08/14/2025 08/21/2025 ASI 03 (08/17/25)
A-1-112A PHASE 1 - LEVEL 2 ZONE PLANS 3 09/25/2025 09/25/2025 ASI 04 (09/25/25)
A-1-112B PHASE 1 - LEVEL 2 ZONE PLANS 3 08/14/2025 08/21/2025 ASI 03 (08/17/25)
A-1-113 PHASE 1 - LEVEL 3 ZONE PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-120 PHASE 1 - RCP KEY PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-120A PHASE 1 - RCP LEVEL 0 ZONE PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Page 1 of 15
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
A-1-120B PHASE 1 - RCP LEVEL 0 ZONE PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-121A PHASE 1 - RCP LEVEL 1 ZONE PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-121B PHASE 1 - RCP LEVEL 1 ZONE PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-122A PHASE 1 - RCP LEVEL 2 ZONE PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-122B PHASE 1 - RCP LEVEL 2 ZONE PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-123 PHASE 1 - RCP LEVEL 3 ZONE PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-200A COMPLETE BUILDING ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-200B COMPLETE BUILDING ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-201 PHASE 1 - EXTERIOR ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-202 PHASE 1 - EXTERIOR ELEVATIONS 3 09/25/2025 09/25/2025 ASI 04 (09/25/25)
A-1-203 PHASE 1 - EXTERIOR ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-301 PHASE 1 - BUILDING SECTIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-302 PHASE 1 - BUILDING SECTIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-310 PHASE 1 - WALL SECTIONS 3 09/25/2025 09/25/2025 ASI 04 (09/25/25)
A-1-311 PHASE 1 - WALL SECTIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-312 PHASE 1 - WALL SECTIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-313 PHASE 1 - WALL SECTIONS 3 09/25/2025 09/25/2025 ASI 04 (09/25/25)
A-1-401 PHASE 1 - ENLARGED PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-402 PHASE 1 - ENLARGED PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-403 PHASE 1 - ENLARGED PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-404 PHASE 1 - ENLARGED PLANS 3 04/11/2025 07/08/2025 ASI 02 (04/23/25)
A-1-405 PHASE 1 - ENLARGED PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-407 PHASE 1 - ENLARGED TOILET PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-408 PHASE 1 - ENLARGED TOILET PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-410 PHASE 1 - VERTICAL CIRCULATION 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-411 PHASE 1 - VERTICAL CIRCULATION 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-412 PHASE 1 - VERTICAL CIRCULATION 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-500A PHASE 1 - LEVEL 0 ZONE FINISH PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-500B PHASE 1 - LEVEL 0 ZONE FINISH PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-501A PHASE 1 - LEVEL 1 ZONE FINISH PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-501B PHASE 1 - LEVEL 1 ZONE FINISH PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-502A PHASE 1 - LEVEL 2 ZONE FINISH PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-502B PHASE 1 - LEVEL 2 ZONE FINISH PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-503 PHASE 1 - LEVEL 3 ZONE FINISH PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-510 PHASE 1 - INTERIOR ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-511 PHASE 1 - INTERIOR ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-512 PHASE 1 - INTERIOR ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-513 PHASE 1 - INTERIOR ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Page 2 of 15
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
A-1-514 PHASE 1 - INTERIOR ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-515 PHASE 1 - INTERIOR ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-516 PHASE 1 - INTERIOR ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-517 PHASE 1 - INTERIOR ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-518 PHASE 1 - INTERIOR ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-519 PHASE 1 - INTERIOR ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-520A PHASE 1 - LEVEL 0 ZONE FURNITURE PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-520B PHASE 1 - LEVEL 0 ZONE FURNITURE PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-521A PHASE 1 - LEVEL 1 ZONE FURNITURE PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-521B PHASE 1 - LEVEL 1 ZONE FURNITURE PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-522A PHASE 1 - LEVEL 2 ZONE FURNITURE PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-522B PHASE 1 - LEVEL 2 ZONE FURNITURE PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-1-523 PHASE 1 - LEVEL 3 ZONE FURNITURE PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-102 PHASE 2 - ARCHITECTURAL SITE PLAN 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-110 PHASE 2 - KEY PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-111A PHASE 2 - LEVEL 1 ZONE PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-111B PHASE 2 - LEVEL 1 ZONE PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-111C PHASE 2 - LEVEL 1 ZONE PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-112A PHASE 2 - LEVEL 2 ZONE PLANS 2 08/14/2025 08/21/2025 ASI 03 (08/17/25)
A-2-112B PHASE 2 - LEVEL 2 ZONE PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-113A PHASE 2 - LEVEL 3 ZONE PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-120 PHASE 2 - RCP KEY PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-121A PHASE 2- RCP LEVEL 1 ZONE PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-121B PHASE 2- RCP LEVEL 1 ZONE PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-122A PHASE 2- RCP LEVEL 2 ZONE PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-122B PHASE 2- RCP LEVEL 2 ZONE PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-123 PHASE 2- RCP LEVEL 3 ZONE PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-201 PHASE 2 - EXTERIOR ELEVATIONS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-202 PHASE 2 - EXTERIOR ELEVATIONS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-203 PHASE 2 - EXTERIOR ELEVATIONS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-301 PHASE 2 - BUILDING SECTIONS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-302 PHASE 2 - BUILDING SECTIONS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-310 PHASE 2 - WALL SECTIONS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-311 PHASE 2 - WALL SECTIONS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-312 PHASE 2 - WALL SECTIONS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-401 PHASE 2 - ENLARGED PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-402 PHASE 2 - ENLARGED PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-403 PHASE 2 - ENLARGED PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Page 3 of 15
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
A-2-404 PHASE 2 - ENLARGED PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-405 PHASE 2 - ENLARGED PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-406 PHASE 2 - ENLARGED PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-407 PHASE 2 - ENLARGED PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-408 PHASE 2 - ENLARGED PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-409 PHASE 2 - ENLARGED TOILET PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-410 PHASE 2 - VERTICAL CIRCULATION 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-411 PHASE 2 - VERTICAL CIRCULATION 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-501A PHASE 2 - LEVEL 1 ZONE FINISH PLAN 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-501B PHASE 2 - LEVEL 1 ZONE FINISH PLAN 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-502A PHASE 2 - LEVEL 2 ZONE FINISH PLAN 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-502B PHASE 2 - LEVEL 2 ZONE FINISH PLAN 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-503 PHASE 2 - LEVEL 3 ZONE FINISH PLAN 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-510 PHASE 2 - INTERIOR ELEVATIONS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-511 PHASE 2 - INTERIOR ELEVATIONS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-512 PHASE 2 - INTERIOR ELEVATIONS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-513 PHASE 2 - INTERIOR ELEVATION 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-514 PHASE 2 - INTERIOR ELEVATION 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-515 PHASE 2 - INTERIOR ELEVATION 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-516 PHASE 2 - INTERIOR ELEVATION 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-517 PHASE 2 - INTERIOR ELEVATION 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-531A PHASE 2 - LEVEL 1 ZONE FURNITURE PLAN 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-531B PHASE 2 - LEVEL 1 ZONE FURNITURE PLAN 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-532A PHASE 2 - LEVE 2 ZONE FURNITURE PLAN 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-532B PHASE 2 - LEVEL 2 ZONE FURNITURE PLAN 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-2-533 PHASE 2 - LEVEL 3 ZONE FURNITURE PLAN 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-521 MILLWORK DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-522 MILLWORK DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-530 INTERIOR SIGNAGE DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-531 INTERIOR DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-532 INTERIOR DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-601 DOOR SCHEDULE 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-602 DOOR DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-610 EXTERIOR STOREFRONT ELEVATIONS 3 09/25/2025 09/25/2025 ASI 04 (09/25/25)
A-611 EXTERIOR STOREFRONT ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-612 EXTERIOR STOREFRONT ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-613 INTERIOR STOREFRONT ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-614 WINDOW DETAILS 3 09/25/2025 09/25/2025 ASI 04 (09/25/25)
Page 4 of 15
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
A-616 ROOM FINISH SCHEDULE - PHASE 1 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-617 ROOM FINISH SCHEDULE - PHASE 2 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-618 FINISH LEGEND 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-619 FF&E SCHEDULES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-701 PLAN DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-702 PLAN DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-703 PLAN DETAILS @ VESTIBULES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-704 PLAN DETAILS @ VESTIBULES 3 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-705 PLAN DETAILS @ COURT YARD PARTITION 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-710 SECTION DETAILS 3 09/25/2025 09/25/2025 ASI 04 (09/25/25)
A-711 SECTION DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-712 SECTION DETAILS 3 09/25/2025 09/25/2025 ASI 04 (09/25/25)
A-713 SECTION DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-714 SECTION DETAILS 3 09/25/2025 09/25/2025 ASI 04 (09/25/25)
A-720 ROOF DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-801 WALL TYPES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-802 WALL TYPES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
A-803 WALL TYPES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
AD-101 DEMO FLOOR PLAN - PHASE 1 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Civil
C-000 COVER SHEET 2 01/09/2026 Changes to Approved (01/09/26)
C-001 BOUNDARY & TOPOGRAPHIC SURVEY 2 01/09/2026 Changes to Approved (01/09/26)
C-002 BOUNDARY & TOPOGRAPHIC SURVEY 2 01/09/2026 Changes to Approved (01/09/26)
C-005 DCI ACTION LETTER 1 01/09/2026 Changes to Approved (01/09/26)
C-006 LOGISTICS PLAN 1 01/09/2026 Changes to Approved (01/09/26)
C-007 LOGISTICS PLAN 1 01/09/2026 Changes to Approved (01/09/26)
C-100 OVERALL PLAN 2 01/09/2026 Changes to Approved (01/09/26)
C-150 DEMOLITION & REMOVAL PLAN 2 01/09/2026 Changes to Approved (01/09/26)
C-150a DEMOLITION & REMOVAL PLAN 0 01/09/2026 Changes to Approved (01/09/26)
C-155 DEMOLITION & REMOVAL PLAN 2 01/09/2026 Changes to Approved (01/09/26)
C-200 SITE PLAN-SITE LAYOUT 2 01/09/2026 Changes to Approved (01/09/26)
C-200a SITE PLAN-SITE LAYOUT 0 01/09/2026 Changes to Approved (01/09/26)
C-200b SITE PLAN-SITE LAYOUT 0 01/09/2026 Changes to Approved (01/09/26)
C-205 SITE PLAN-SITE LAYOUT 3 01/09/2026 Changes to Approved (01/09/26)
Dresden ES LDP City Stamped Set
C206 LAYOUT PLAN WITHIN R.O.W. 1 02/06/2025 02/19/2025
(02/14/25)
C-206 LAYOUT PLAN WITHIN R.O.W. 0 01/09/2026 Changes to Approved (01/09/26)
C-210 WALL ELEVATIONS 4 01/09/2026 Changes to Approved (01/09/26)
Page 5 of 15
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
C-300 GRADING PLAN 4 01/09/2026 Changes to Approved (01/09/26)
C-300a GRADING PLAN 0 01/09/2026 Changes to Approved (01/09/26)
C-300b GRADING PLAN 0 01/09/2026 Changes to Approved (01/09/26)
C-305 GRADING PLAN 4 01/09/2026 Changes to Approved (01/09/26)
C-306 COURTYARD ENLARGEMENT GRADING PLAN 2 01/09/2026 Changes to Approved (01/09/26)
C-310 DRAINAGE PLAN 4 01/09/2026 Changes to Approved (01/09/26)
C-310a DRAINAGE PLAN 0 01/09/2026 Changes to Approved (01/09/26)
C-315 DRAINAGE PLAN 3 01/09/2026 Changes to Approved (01/09/26)
C-316 COURTYARD ENLARGEMENT STORM PLAN 2 01/09/2026 Changes to Approved (01/09/26)
C-320 PIPE PROFILES 4 01/09/2026 Changes to Approved (01/09/26)
C-400 NPDES NOTES 2 01/09/2026 Changes to Approved (01/09/26)
C-405 NPDES NOTES 2 01/09/2026 Changes to Approved (01/09/26)
C-410 ES&PC - PHS1 INITIAL PLAN 2 01/09/2026 Changes to Approved (01/09/26)
C-410a ES&PC - INITAL PLAN 0 01/09/2026 Changes to Approved (01/09/26)
C-415 ES&PC - PHS1 INTERMEDIATE PLAN 2 01/09/2026 Changes to Approved (01/09/26)
C-415a ES&PC - INTERMEDIATE PLAN A 0 01/09/2026 Changes to Approved (01/09/26)
C415b ES&PC - INTERMEDIATE PLAN B 0 01/09/2026 Changes to Approved (01/09/26)
C-420 ES&PC - PHS1 FINAL PLAN 2 01/09/2026 Changes to Approved (01/09/26)
C-420a ES&PC - FINAL PLAN A 0 01/09/2026 Changes to Approved (01/09/26)
C420b ES&PC - FINAL PLAN B 0 01/09/2026 Changes to Approved (01/09/26)
C-425 ES&PC -PHS2 INITIAL PLAN 2 01/09/2026 Changes to Approved (01/09/26)
C-430 ES&PC - PHS2 INTERMEDIATE PLAN 2 01/09/2026 Changes to Approved (01/09/26)
C-435 ES&PC - FINAL PLAN 2 01/09/2026 Changes to Approved (01/09/26)
C-440 ES&PC DETAILS & CALCULATIONS 2 01/09/2026 Changes to Approved (01/09/26)
C-500 UTILITY PLAN 2 01/09/2026 Changes to Approved (01/09/26)
C-510 UTILITY PROFILES 3 01/09/2026 Changes to Approved (01/09/26)
Dresden ES LDP City Stamped Set
C600 TREE PROTECTION PLAN 1 02/06/2025 02/19/2025
(02/14/25)
C-600 TREE PROTECTION PLAN 1 01/09/2026 Changes to Approved (01/09/26)
Dresden ES LDP City Stamped Set
C610 LANDSCAPE PLAN 1 02/06/2025 04/07/2025
(02/14/25)
C-610 LANDSCAPE PLAN 1 01/09/2026 Changes to Approved (01/09/26)
C-700 SITE WORK CONSTRUCTION DETAILS 2 01/09/2026 Changes to Approved (01/09/26)
C-701 SITE WORK CONSTRUCTION DETAILS 2 01/09/2026 Changes to Approved (01/09/26)
C-702 SITE WORK CONSTRUCTION DETAILS 2 01/09/2026 Changes to Approved (01/09/26)
C-710 DEKALB COUNTY STANDARD CONSTRUCTION DETAILS 2 01/09/2026 Changes to Approved (01/09/26)
C-711 DEKALB COUNTY STANDARD CONSTRUCTION DETAILS 2 01/09/2026 Changes to Approved (01/09/26)
C-712 G.D.O.T. STANDARD CONSTRUCTION DETAILS 2 01/09/2026 Changes to Approved (01/09/26)
Page 6 of 15
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
Electrical
E-001 ELECTRICAL LEGEND & ABBREVIATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-401 ENLARGED KITCHEN PLANS - ELECTRICAL 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-402 ENLARGED FLOOR PLANS - ELECTRICAL 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-403 ENLARGED FLOOR PLANS - ELECTRICAL 3 08/05/2025 08/17/2025 ASI 03 (08/17/25)
E-404 ENLARGED FLOOR PLANS - ELECTRICAL 2 08/05/2025 08/17/2025 ASI 03 (08/17/25)
E-501 ELECTRICAL GROUNDING DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-502 LIGHTNING PROTECTION DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-503 ELECTRICAL POWER DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-504 ELECTRICAL POWER DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-505 ELECTRICAL LIGHTING DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-601 ONE LINE DIAGRAM 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-701 ELECTRICAL SCHEDULES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-702 PANEL SCHEDULES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-703 PANEL SCHEDULES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-704 PANEL SCHEDULES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-705 PANEL SCHEDULES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-706 PANEL SCHEDULES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
E-707 PANEL SCHEDULES 3 08/05/2025 08/17/2025 ASI 03 (08/17/25)
E-708 PANEL SCHEDULES 3 08/05/2025 08/17/2025 ASI 03 (08/17/25)
EG-1-110 PHASE 1-LEVEL 0-PLAN-GROUNDING 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EG-2-110 PHASE 2-LEVEL 1-PLAN-GROUNDING 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EL-1-120A PHASE 1- LEVEL 0-RCP-ZONES A/B-LIGHTING 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EL-1-120B PHASE 1-LEVEL 0-RCP-ZONE C- LIGHTING 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EL-1-121A PHASE 1-LEVEL 1-RCP-ZONES A/B-LIGHTING 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EL-1-121B PHASE 1-LEVEL 1-RCP-ZONE C-LIGHTING 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EL-1-122A PHASE 1-LEVEL 2-RCP-ZONES A/B-LIGHTING 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EL-1-122B PHASE 1-LEVEL 2-RCP-ZONE C- LIGHTING 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EL-1-123 PHASE 1-LEVEL 3 -RCP-LIGHTING 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EL-2-121A PHASE 2- LEVEL 1- RCP- ZONES D/E- LIGHTING 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EL-2-121B PHASE 2-LEVEL 1-RCP-ZONES F/G-LIGHTING 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EL-2-122A PHASE 2-LEVEL 2- RCP- ZONES D/E- LIGHTING 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EL-2-122B PHASE 2-LEVEL 2-RCP-ZONES F/G -LIGHTING 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EL-2-123A PHASE 2-LEVEL 3-RCP-ZONES F/G-LIGHTING 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
ELP-1-111 PHASE 1-ROOF PLAN-LIGHTNING PROTECTION 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
ELP-2-111 PHASE 2-ROOF PLAN-LIGHTNING PROTECTION 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EP-1-110A PHASE 1-LEVEL 0 PLAN-ZONES A/B- POWER 3 08/05/2025 08/17/2025 ASI 03 (08/17/25)
EP-1-110B PHASE 1-LEVEL 0 PLAN-ZONE C- POWER 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Page 7 of 15
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
EP-1-111A PHASE 1-LEVEL 1 PLAN-ZONES A/B- POWER 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EP-1-111B PHASE 1-LEVEL 1 PLAN-ZONE C- POWER 3 08/05/2025 08/17/2025 ASI 03 (08/17/25)
EP-1-112A PHASE 1-LEVEL 2 PLAN-ZONES A/B- POWER 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EP-1-112B PHASE 1-LEVEL 2 PLAN-ZONE C- POWER 3 08/05/2025 08/17/2025 ASI 03 (08/17/25)
EP-1-113A PHASE 1-LEVEL 3 PLAN-ZONE A- POWER 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EP-1-130 PHASE 1-ROOF PLAN-POWER 3 08/05/2025 08/17/2025 ASI 03 (08/17/25)
EP-2-111A PHASE 2-LEVEL 1 PLAN-ZONES D/E- POWER 2 08/05/2025 08/17/2025 ASI 03 (08/17/25)
EP-2-111B PHASE 2-LEVEL 1 PLAN-ZONES F/G- POWER 2 08/05/2025 08/17/2025 ASI 03 (08/17/25)
EP-2-111C PHASE 2-LEVEL 1 PLAN-ZONE H- POWER 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EP-2-112A PHASE 2-LEVEL 2 PLAN-ZONES D/E- POWER 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EP-2-112B PHASE 2-LEVEL 2 PLAN-ZONES F/G- POWER 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EP-2-113A PHASE 2-LEVEL 3 PLAN-ZONES F/G- POWER 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
EP-2-130 PHASE 2-ROOF PLAN-POWER 2 08/05/2025 08/17/2025 ASI 03 (08/17/25)
ES-0-100 SITE PLAN - ELECTRICAL PHASING 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
ES-0-101 SITE PLAN - ELECTRICAL 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Fire Alarm
FA-1-110A PHASE 1- LEVEL 0 PLAN- ZONES A/B- FIRE ALARM 3 08/06/2025 08/17/2025 ASI 03 (08/17/25)
FA-1-110B PHASE 1- LEVEL 0 PLAN- ZONE C- FIRE ALARM 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
FA-1-111A PHASE 1- LEVEL 1 PLAN- ZONES A/B- FIRE ALARM 3 08/06/2025 08/17/2025 ASI 03 (08/17/25)
FA-1-111B PHASE 1- LEVEL 1 PLAN- ZONE C- FIRE ALARM 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
FA-1-112A PHASE 1- LEVEL 2 PLAN- ZONES A/B- FIRE ALARM 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
FA-1-112B PHASE 1- LEVEL 2 PLAN- ZONE C- FIRE ALARM 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
FA-1-113 PHASE 1- LEVEL 3 PLAN- ZONE A- FIRE ALARM 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
FA-1-120 PHASE 1- ROOF PLAN- FIRE ALARM 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
FA-2-111A PHASE 2- LEVEL 1 PLAN- ZONES D/E- FIRE ALARM 2 08/06/2025 08/17/2025 ASI 03 (08/17/25)
FA-2-111B PHASE 2- LEVEL 1 PLAN- ZONES F/G- FIRE ALARM 2 08/06/2025 08/17/2025 ASI 03 (08/17/25)
FA-2-112A PHASE 2- LEVEL 2 PLAN- ZONES D/E- FIRE ALARM 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
FA-2-112B PHASE 2- LEVEL 2 PLAN- ZONES F/G- FIRE ALARM 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
FA-2-113 PHASE 2- LEVEL 3 PLAN- ZONES F/G- FIRE ALARM 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
FA-2-120 PHASE 2- ROOF PLAN- FIRE ALARM 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
FA-501 FIRE ALARM DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Fire Protection
FX-001 NOTES - FIRE PROTECTION 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-101 PH 1 LEVELS 0 & 1 COMPOSITE PLANS - FP 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-101 PH 2 LEVELS 0 & 1 COMPOSITE PLANS - FP 0 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-102 PH 1 LEVELS 2 & 3 COMPOSITE PLANS - FP 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-102 PH 2 LEVELS 2 & 3 COMPOSITE PLANS - FP 0 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-103 PH 1 PHASE 1 - LEVEL 0 - FIRE PROT. ZONE PLANS 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
Page 8 of 15
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
FX-103 PH 2 PHASE 2 - LEVEL 1 - FIRE PROT. ZONE PLANS 0 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-104 PH 1 PHASE 1 - LEVEL 0 - FIRE PROT. ZONE PLANS 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-104 PH 2 PHASE 2 - LEVEL 1 - FIRE PROT. ZONE PLANS 0 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-105 PH 1 PHASE 1 - LEVEL 1 - FIRE PROT. ZONE PLANS 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-105 PH 2 PHASE 2 - LEVEL 2 - FIRE PROT. ZONE PLANS 0 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-106 PH 1 PHASE 1 - LEVEL 1 - FIRE PROT. ZONE PLANS 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-106 PH 2 PHASE 2 - LEVEL 2 - FIRE PROT. ZONE PLANS 0 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-107 PH 1 PHASE 1 - LEVEL 2 - FIRE PROT. ZONE PLANS 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-107 PH 2 PHASE 2 - LEVEL 2 - FIRE PROT. ZONE PLANS 0 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-108 PH 1 PHASE 1 - LEVEL 2 - FIRE PROT. ZONE PLANS 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-108 PH 2 PHASE 2 - LEVEL 3 - FIRE PROT. ZONE PLANS 0 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-109 PH 1 PHASE 1 - LEVEL 3 - FIRE PROT. ZONE PLANS 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-109 PH 2 PHASE 2 - LEVEL 3 - FIRE PROT. ZONE PLANS 0 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-401 PH 1 STAIR SECTIONS - FIRE PROTECTION 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-401 PH 2 STAIR SECTIONS - FIRE PROTECTION 0 01/14/2025 04/25/2025 ASI 02 (04/23/25)
FX-501 DETAILS - FIRE PROTECTION 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
Kitchen
K-000 FOODSERVICE COVER PAGE 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-101 FOODSERVICE EQUIPMENT PLAN AND SCHEDULE 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-102 FS MECHANICAL CONNECTION PLAN 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-103 FS ELECTRICAL CONNECTION PLAN 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-104 FS SPECIAL CONDITIONS PLAN 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-104D FS SPECIAL CONDITIONS DETAILS 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-105 FS MECH & PLUMBING LOAD SCHEDULE 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-106 FS ELECTRICAL UTILITY LOAD SCHEDULE 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-107 FS ELEVATIONS 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-108 FS ELEVATIONS 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-201 FS VENTILATION DRAWING 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-202 FS VENTILATION DRAWING 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-203 FS VENTILATION DRAWING 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-204 FS VENTILATION DRAWING 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-205 FS VENTILATION DRAWING 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-206 FS VENTILATION DRAWING 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-207 FS VENTILATION DRAWING 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-208 FS VENTILATION DRAWING 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
K-209 FS WALK-IN DRAWING 2 01/14/2025 04/25/2025 ASI 02 (04/23/25)
Life Safety
LS-100 LIFE SAFETY PLAN - COMPOSITE 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Page 9 of 15
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
LS-101 LIFE SAFETY PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
LS-102 LIFE SAFETY PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
LS-200 LIFE SAFETY PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
LS-201 LIFE SAFETY PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
LS-202 LIFE SAFETY PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
LS-203 LIFE SAFETY PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Mechanical
M-001 LEGENDS & GENERAL NOTES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-1-110A PHASE 1 LEVEL 0 ZONE HVAC PLANS 3 08/06/2025 08/17/2025 ASI 03 (08/17/25)
M-1-110B PHASE 1 LEVEL 0 ZONE HVAC PLANS 3 08/06/2025 08/17/2025 ASI 03 (08/17/25)
M-1-111A PHASE 1 LEVEL 1 ZONE HVAC PLANS 3 08/06/2025 08/17/2025 ASI 03 (08/17/25)
M-1-111B PHASE 1 LEVEL 1 ZONE HVAC PLANS 3 08/06/2025 08/17/2025 ASI 03 (08/17/25)
M-1-112A PHASE 1 LEVEL 2 ZONE HVAC PLANS 3 08/06/2025 08/17/2025 ASI 03 (08/17/25)
M-1-112B PHASE 1 LEVEL 2 ZONE HVAC PLANS 3 08/06/2025 08/17/2025 ASI 03 (08/17/25)
M-1-113 PHASE 1 LEVEL 3 ZONE HVAC PLANS 3 08/06/2025 08/17/2025 ASI 03 (08/17/25)
M-1-131 PHASE 1 ROOF PLANS 3 08/06/2025 08/17/2025 ASI 03 (08/17/25)
M-2-111A PHASE 2 LEVEL 1 ZONE HVAC PLANS 2 08/06/2025 08/17/2025 ASI 03 (08/17/25)
M-2-111B PHASE 2 LEVEL 1 ZONE HVAC PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-2-112A PHASE 2 LEVEL 2 ZONE HVAC PLANS 2 08/06/2025 08/17/2025 ASI 03 (08/17/25)
M-2-112B PHASE 2 LEVEL 2 ZONE HVAC PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-2-113 PHASE 2 LEVEL3 ZONE HVAC PLANS 2 08/06/2025 08/17/2025 ASI 03 (08/17/25)
M-2-131 PHASE 2 ROOF PLANS 2 08/06/2025 08/17/2025 ASI 03 (08/17/25)
M-010 OVERALL HVAC PLAN - LEVEL 0 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-011 OVERALL HVAC PLAN - LEVEL 1 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-012 OVERALL HVAC PLAN - LEVEL 2 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-013 OVERALL HVAC PLAN - LEVEL 3 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-401 PHASE 1 ENLARGED MECH. PLAN 3 08/06/2025 08/17/2025 ASI 03 (08/17/25)
M-501 MECHANICAL DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-502 MECHANICAL DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-503 PHASE 1 FOOD SERVICE SHEET 1 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-504 PHASE 1 FOOD SERVICE SHEET 2 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-505 PHASE 1 FOOD SERVICE SHEET 3 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-506 PHASE 1 FOOD SERVICE SHEET 4 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-507 PHASE 1 FOOD SERVICE SHEET 5 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-508 PHASE 1 FOOD SERVICE SHEET 6 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-509 PHASE 1 FOOD SERVICE SHEET 7 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-510 PHASE 1 FOOD SERVICE SHEET 8 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-601 MECHANICAL SCHEDULES 3 08/06/2025 08/17/2025 ASI 03 (08/17/25)
Page 10 of 15
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
M-602 MECHANICAL SCHEDULES 3 08/06/2025 08/17/2025 ASI 03 (08/17/25)
M-701 HVAC CONTROLS NOTES, SYMBOLS AND SCHEDULES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-702 SYSTEM ARCHITECTURE 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-703 WATER SIDE CONTROL DIAGRAMS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-704 AIR SIDE CONTROL DIAGRAMS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
M-705 CONTROL DIAGRAMS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
MD-101 HVAC DEMOLITION FLOOR PLAN 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Plumbing
P-0-001 ABBREVIATIONS, LEGEND AND GENERAL NOTES 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-100 PHASE 1 - PLUMBING SITE PLAN 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-110 PHASE 1 - PLUMBING KEY PLANS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-111A PHASE 1 - LEVEL 0 - PLUMBING ZONE PLANS 3 08/11/2025 08/17/2025 ASI 03 (08/17/25)
P-1-111B PHASE 1 - LEVEL 0 - PLUMBING ZONE PLANS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-112A PHASE 1 - LEVEL 0 - PLUMBING ZONE PLANS 3 08/11/2025 08/17/2025 ASI 03 (08/17/25)
P-1-112B PHASE 1 - LEVEL 0 - PLUMBING ZONE PLANS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-113A PHASE 1 - LEVEL 1 - PLUMBING ZONE PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
P-1-113B PHASE 1 - LEVEL 1 - PLUMBING ZONE PLANS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-114A PHASE 1 - LEVEL 2 - PLUMBING ZONE PLANS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-114B PHASE 1 - LEVEL 2 - PLUMBING ZONE PLANS 1 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-115A PHASE 1 - LEVEL 3 - PLUMBING ZONE PLANS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-115B PHASE 1 - LEVEL 3 - PLUMBING ZONE PLANS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-116A PHASE 1 - ROOF - PLUMBING ZONE PLANS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-401 PLUMBING ENLARGED PLAN 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-402 PLUMBING ENLARGED PLAN 3 07/10/2025 07/10/2025 ASI 02 (04/23/25)
P-1-403 PLUMBING ENLARGED PLANS 3 08/11/2025 08/17/2025 ASI 03 (08/17/25)
P-1-404 PLUMBING ENLARGED PLANS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-405 PLUMBING ENLARGED PLANS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-406 PLUMBING ENLARGED PLANS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-407 PLUMBING ENLARGED PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
P-1-408 PLUMBING ENLARGED PLANS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-409 PLUMBING ENLARGED PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
P-1-501 PLUMBING DETAILS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-502 PLUMBING DETAILS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-503 PLUMBING DETAILS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-601 PLUMBING SCHEDULES 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-602 PLUMBING SCHEDULES 3 08/11/2025 08/17/2025 ASI 03 (08/17/25)
P-1-901 SANITARY ISOMETRICS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
P-1-902 SANITARY ISOMETRICS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Page 11 of 15
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
P-1-903 SANITARY ISOMETRICS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-904 GREASE ISOMETRICS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-905 STORM DRAINAGE ISOMETRICS 3 08/11/2025 08/17/2025 ASI 03 (08/17/25)
P-1-906 DOMESTIC WATER ISOMETRICS 3 07/10/2025 07/10/2025 ASI 02 (04/23/25)
P-1-907 DOMESTIC WATER ISOMETRICS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
P-1-908 DOMESTIC WATER ISOMETRICS 2 04/11/2025 04/11/2025 ASI 02 (04/23/25)
P-1-909 DOMESTIC WATER ISOMETRICS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-910 DOMESTIC WATER ISOMETRICS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-911 DOMESTIC WATER ISOMETRICS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
P-1-912 NATURAL GAS ISOMETRICS 3 08/11/2025 08/17/2025 ASI 03 (08/17/25)
P-2-100 PHASE 2 - PLUMBING SITE PLAN 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-110 PHASE 2 - PLUMBING KEY PLANS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-111A PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-111B PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-112A PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-112B PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-112C PHASE 2 - LEVEL 1 - PLUMBING ZONE PLANS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-113A PHASE 2 - LEVEL 2 - PLUMBING ZONE PLANS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-113B PHASE 2 - LEVEL 2 - PLUMBING ZONE PLANS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-114A PHASE 2 - LEVEL 3 - PLUMBING ZONE PLANS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-114B PHASE 2 - LEVEL 3 - PLUMBING ZONE PLANS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-115A PHASE 2 - ROOF - PLUMBING ZONE PLANS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-401 PLUMBING ENLARGED PLANS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-402 PLUMBING ENLARGED PLANS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-403 PLUMBING ENLARGED PLANS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-901 SANITARY ISOMETRICS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-902 SANITARY ISOMETRICS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-903 STORM ISOMETRICS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-904 STORM ISOMETRICS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-905 DOMESTIC WATER ISOMETRICS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-906 DOMESTIC WATER ISOMETRICS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-907 DOMESTIC WATER ISOMETRICS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
P-2-908 NATURAL GAS ISOMETRICS 1 10/30/2024 04/23/2025 ASI 02 (04/23/25)
PD-101 DEMO FLOOR PLANS 2 01/14/2025 04/23/2025 ASI 02 (04/23/25)
Structural
S-001 GENERAL NOTES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-1-110A PHASE 1 -LEVEL 0 FOUND. PLAN - ZONE A,B 3 04/11/2025 06/30/2025 ASI 02 (04/23/25)
S-1-110B PHASE 1 -LEVEL 0 FOUND. PLAN - ZONE C 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Page 12 of 15
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
S-1-111A PHASE 1 -LEVEL 1 PLAN -ZONE A,B 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-1-111B PHASE 1 -LEVEL 1 PLAN -ZONE C 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-1-112A PHASE 1 -LEVEL 2 PLAN -ZONE A,B 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-1-112B PHASE 1 -LEVEL 2 PLAN -ZONE C 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-1-113A PHASE 1 -LEVEL 3 PLAN -ZONE A,B 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-1-113B PHASE 1 -LEVEL 3 -ZONE C 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-1-114A PHASE 1 -ROOF PLAN -ZONE A 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-002 GENERAL NOTES 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-2-111A PHASE 2 -LEVEL 1 FOUND. PLAN - ZONE D,E 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-2-111B PHASE 2 -LEVEL 1 FOUND. PLAN - ZONE F,G 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-2-112A PHASE 2 -LEVEL 2 PLAN -ZONE D,E 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-2-112B PHASE 2 -LEVEL 2 PLAN -ZONE F,G 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-2-113A PHASE 2 -LEVEL 3 -ZONE D,E 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-2-113B PHASE 2 - LEVEL 3 PLAN - ZONE F,G 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-2-114B PHASE 2 - ROOF PLAN - ZONE F,G 2 05/01/2025 05/01/2025 ASI 02 (04/23/25)
S-003 3D VIEWS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-004 TYPICAL DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-005 TYPICAL DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-006 TYPICAL DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-007 TYPICAL DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-008 TYPICAL DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-009 TYPICAL DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-010 TYPICAL DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-201 FOUNDATION SECTIONS AND DETAILS 3 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-202 FOUNDATION SECTIONS AND DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-203 FOUNDATION SECTIONS AND DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-204 FOUNDATION SECTIONS AND DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-205 FOUNDATION SECTIONS AND DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-301 PHASE 1 COLUMN SCHEDULE 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-302 PHASE 2 COLUMN SCHEDULE 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-401 BRACED FRAME ELEVATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-501 FRAMING SECTIONS AND DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-502 FRAMING SECTIONS AND DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-503 FRAMING SECTIONS AND DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-504 FRAMING SECTIONS AND DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-505 FRAMING SECTIONS AND DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-506 FRAMING SECTIONS AND DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-507 FRAMING SECTIONS AND DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Page 13 of 15
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
S-510 FRAMING SECTIONS AND DETAILS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-511 FRAMING SECTIONS AND DETAILS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-512 FRAMING SECTIONS AND DETAILS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-513 FRAMING SECTIONS AND DETAILS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-514 FRAMING SECTIONS AND DETAILS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-515 FRAMING SECTIONS AND DETAILS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-516 FRAMING SECTIONS AND DETAILS 0 05/01/2025 05/01/2025 ASI 02 (04/23/25)
S-520 PH 1 -LOGGIA CANOPY FRAM'G PLAN & DET'S 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-521 PH2 -NORTH CANOPY FRAM'G PLANS & DET'S 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
S-522 PH2 -EAST CANOPY FRAM'G PLANS AND DET'S 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Technology
T-0-100 SITE PLAN - TELECOM PHASING 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
T-0-101 SITE PLAN - TELECOM 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
T-001 COMMUNICATIONS LEGEND & ABBREVIATIONS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
T-1-100 PHASE 1- LEVEL 0 PLAN- CABLE TRAY 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
T-1-101 PHASE 1- LEVEL 1 PLAN- CABLE TRAY 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
T-1-102 PHASE 1- LEVEL 2 PLAN- CABLE TRAY 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
T-1-103 PHASE 1- LEVEL 3 PLAN- CABLE TRAY 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
T-1-110A PHASE 1- LEVEL 0 PLAN- ZONES A/B- TELECOM 3 10/09/2025 10/09/2025 ASI 05 (10/09/25)
T-1-110B PHASE 1- LEVEL 0 PLAN- ZONE C- TELECOM 3 10/09/2025 10/09/2025 ASI 05 (10/09/25)
T-1-111A PHASE 1- LEVEL 1 PLAN- ZONES A/B- TELECOM 3 10/09/2025 10/09/2025 ASI 05 (10/09/25)
T-1-111B PHASE 1- LEVEL 1 PLAN- ZONE C- TELECOM 3 10/09/2025 10/09/2025 ASI 05 (10/09/25)
T-1-112A PHASE 1- LEVEL 2 PLAN- ZONES A/B- TELECOM 3 10/09/2025 10/09/2025 ASI 05 (10/09/25)
T-1-112B PHASE 1- LEVEL 2 PLAN- ZONE C- TELECOM 3 10/09/2025 10/09/2025 ASI 05 (10/09/25)
T-1-113 PHASE 1- LEVEL 3 PLAN- ZONE A- TELECOM 3 10/09/2025 10/09/2025 ASI 05 (10/09/25)
T-2-101 PHASE 2- LEVEL 1 PLAN- CABLE TRAY 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
T-2-102 PHASE 2- LEVEL 2 PLAN- CABLE TRAY 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
T-2-103 PHASE 2- LEVEL 3 PLAN- CABLE TRAY 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
T-2-111A PHASE 2- LEVEL 1 PLAN- ZONES D/E- TELECOM 2 10/09/2025 10/09/2025 ASI 05 (10/09/25)
T-2-111B PHASE 2- LEVEL 1 PLAN- ZONES F/G- TELECOM 2 10/09/2025 10/09/2025 ASI 05 (10/09/25)
T-2-111C PHASE 2- LEVEL 1 PLAN- ZONE H- TELECOM 2 10/09/2025 10/09/2025 ASI 05 (10/09/25)
T-2-112A PHASE 2- LEVEL 2 PLAN- ZONES D/E- TELECOM 2 10/09/2025 10/09/2025 ASI 05 (10/09/25)
T-2-112B PHASE 2- LEVEL 2 PLAN- ZONES F/G- TELECOM 2 10/09/2025 10/09/2025 ASI 05 (10/09/25)
T-2-113 PHASE 2- LEVEL 3 PLAN- ZONES F/G- TELECOM 2 10/09/2025 10/09/2025 ASI 05 (10/09/25)
T-401 PHASE 1 ENLARGED TELECOM PLANS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
T-402 PHASE 2 ENLARGED TELECOM PLANS 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
T-501 TELECOM DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
T-502 TELECOM DETAILS 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Page 14 of 15
Printed on Wed Mar 25, 2026 at 04:37 pm EDT
Job #: 24016 New Dresden Elementary School
2449 Dresden Dr
Chamblee, Georgia 30341
The Winter Construction Company
Drawing No. Drawing Title Revision Drawing Date Received Date Set
T-601 ONE LINE DIAGRAM 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
T-602 ONE LINE DIAGRAM 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
TG-1-100 PHASE 1- LEVEL 0 PLAN - COMM GROUND 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
TG-1-101 PHASE 1- LEVEL 1 PLAN - COMM GROUND 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
TG-1-102 PHASE 1- LEVEL 2 PLAN - COMM GROUND 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
TG-1-103 PHASE 1- LEVEL 3 PLAN - COMM GROUND 2 04/11/2025 04/23/2025 ASI 02 (04/23/25)
TG-2-101 PHASE 2- LEVEL 1 PLAN- COMM GROUND 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
TG-2-102 PHASE 2- LEVEL 2 PLAN- COMM GROUND 1 04/11/2025 04/23/2025 ASI 02 (04/23/25)
Page 15 of 15