RFP 24-752-022 for GC Services for Clarkston HS Capital Improvements -1

AID 1687743 · View on Simbli

Agenda Item

i. E-SPLOST V Project: RFP No. 24-752-022 for General Contractor Services Clarkston High School Capital Improvement Centennial Contractors Enterprises, Inc. (Not to exceed $2,091,200) ~ Updated 8.9.2024

Summary: Presented by: Erick Hofstetter, Chief Operating Officer, Division of Operations
Request: It is requested that the Board of Education approve a budget reallocation in the amount of $2,091,200 from Program Contingency which will allow the proper funds to be allocated to the necessary project cost code for the capital improvement at Clarkston High School.

Additionally, it is requested that the Board of Education approve the award of RFP No. 24-752-022 to Centennial Contractors Enterprises, Inc., the most responsive and responsible offeror whose proposal is the most advantageous to the Board based on the evaluation factors, for general contractor services for Clarkston High School for the lump sum amount of $2,091,200.
Why: To approve the award of a lump sum construction contract for capital improvements at Clarkston High School.
Details: Specific details related to the scope of work for this Request for Proposal can be found on the DeKalb County School District’s solicitation website at https://dekalbschoolsga.ionwave.net/

The RFP was issued on March 28, 2024, and notification of the upcoming bid was sent via email to more than 180 vendors from the DCSD vendor list, 1,392 vendors through the State of Georgia Procurement Registry. The solicitation was advertised in the Champion and posted on the DCSD website. Seventeen (17) people attended the virtual mandatory pre-proposal meeting on April 11, 2024, representing thirteen (13) general contractor firms. Two (2) proposals were received on May 23, 2024, for the Clarkston High School Capital Improvements Project. Both proposals were deemed responsive and were evaluated by a selection committee.

Centennial Contractors Enterprise, Inc., will be responsible for the general contracting work as outlined in the proposal documents. The DeKalb County School District’s Standard Firm Fixed Price Contract will be used. The award of this contract will allow for the commencement of the construction of this project. Centennial Contractors Enterprises, Inc. is located at 3200 Cobb Galleria Parkway, Suite 210, Atlanta, Georgia 30339.
Financial impact: The total contract amount for the Clarkston High School Capital Improvements project in the amount of $2,091,200 will be allocated from the construction cost code SP5NEWFAC.21335.GENERALCONTRACTOR under the voter-approved E-SPLOST V program. A budget reallocation of $2,091,200 from program contingency is required to fund this project.
Contact: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations, 678.676.1447
Mr. Richard Boyd, Director of Design and Construction, Division of Operations, 678.676.1483
Effective: Upon Board Approval
Status: Approved by the Office of Legal Affairs
DeKalb County School District                                                               RFP No. 24-752-022
Clarkston High School Capital Improvements                                                     Project # 213-35
March 28, 2024                                                                                     Page 1 of 46

                                         DeKalb County Board of Education
                                         Operations Division
                                         Sam A. Moss Service Center
                                         1780 Montreal Road
                                         Tucker, GA 30084-6705



                                Request for Proposals (RFP) No. 24-752-022
                                                       for
                                    GENERAL CONTRACTOR SERVICES

Project:                   CLARKSTON HIGH SCHOOL CAPITAL IMPROVEMENT

DCSD Project No.:          213-35

Owner:                     DeKalb County Board of Education (the “Board”)

Solicitation Timeline Summary (Subject to Change)
           EVENT                          DATE(S)             TIME                        LOCATION

  Solicitation Opens                 March 28, 2024                            http://dekalbschoolsga.ionwave.net
  Virtual Mandatory Pre-
                                     April 11, 2024          10:00 AM                     Via Teams
  Proposal Conference
                                                                                   618 N. Indian Creek Drive
  Mandatory Site Visit               April 12, 2024          10:00 AM
                                                                                     Clarkston, GA 30021

  Final Questions Due                 April 17, 2024         2:00 PM        dcsd-op-bidquestion@dekalbschoolsga.org

  Final Addendum                      April 24, 2024         2:00 PM           http://dekalbschoolsga.ionwave.net

  Proposal Due Date & Time            May 2, 2024            2:00 PM          http://dekalbschoolsga.ionwave.net

                                      May 6, 2024
  Public Acknowledgement                                     5:00 PM           http://dekalbschoolsga.ionwave.net

  Selection Committee
                                     May 6-10, 2024
  Evaluation
  Anticipated Board Review
                                      July 8, 2024
  and Approval

  Anticipated Notice of Award         Jully 22, 2024

  Anticipated Notice to
                                      August 2024
  Proceed
DeKalb County School District                                                                                                         RFP No. 24-752-022
Clarkston High School Capital Improvements                                                                                               Project # 213-35
March 28, 2024                                                                                                                               Page 2 of 46

   TABLE OF CONTENTS

           I. ADVERTISEMENT FOR SEALED PROPOSALS GENERAL CONTRACTOR ........................................... 3
           II. DEFINITIONS ............................................................................................................................................. 4
           III. GENERAL CONDITIONS .......................................................................................................................... 5
           IV. INSTRUCTIONS TO PROPOSERS .......................................................................................................... 9
           V. INSTRUCTIONS FOR SUBMITTING PROPOSALS ................................................................................ 17
           VI. QUALIFICATIONS FOR SELECTION AND THE SELECTION PROCESS ............................................ 24
           VII. PROTEST PROCESS ............................................................................................................................ 25

   Owner’s Standard Forms (included with RFP):
   Attachment A         General Contractor Checklist and Certification (2 pages)
   Attachment B1        Corporate Certificate (1 page)
   Attachment B2        Partnership Certificate (1 page)
   Attachment B3        Entity Certificate (1 page)
   Attachment C         Subcontractor Listing (1 page)
   Attachment D         Offeror’s and Individuals’ Affidavit of Non-collusion (2 pages)
   Attachment E         Conflict of Interest Disclosure Form (2 pages)
   Attachment F         Consent to Release Information (1 page)
   Attachment G         Vendor Reference Form (1 page)
   Attachment H         Bid Bond (1 page)
   Attachment I         Fixed Price for Construction Proposal (5 pages)
   Attachment J         Immigration and Security Certification (2 pages)
   Attachment K         No Submittal Response Form (1 page)

   Owner’s Project Specific Information (separate file from RFP)
   Appendix A    Owner’s Criteria and Narrative Scope of Work (2 pages)
   Appendix B    Special Conditions (5 pages)
   Appendix C    Master Project Schedule (1 page)
   Appendix D    DeKalb County School District 2023-2024 Calendar (2 pages)
   Appendix E    Fixed Price Construction Contract (44 pages)
   Appendix F    Subcontractor Affidavit of Non-collusion (1 page)
   Appendix G    Performance Bond (3 pages)
   Appendix H    Payment Bond (4 pages)
   Appendix I    Affidavit for Payment (2 pages)

   Plans and Specifications
   Available by request: 100% Construction Documents prepared by Goodwin Mills and Cawood, LLC dated
   03/21/2024. tijauna_naylor_smith@dekalbschoolsga.org
DeKalb County School District                                                                 RFP No. 24-752-022
Clarkston High School Capital Improvements                                                       Project # 213-35
March 28, 2024                                                                                       Page 3 of 46

                                     I.
                    ADVERTISEMENT FOR SEALED PROPOSALS
                            GENERAL CONTRACTOR
Proposals will be received electronically on the DeKalb County School District (“Owner”) website at
https://dekalbschoolsga.ionwave.net until 2:00 p.m. local time on Thursday, May 2, 2024, for General Contractor
services for RFP No. 24-752-022, for Clarkston High School Capital Improvements. The Owner shall not consider
late proposals.

Scope of Services
To provide General Contractor services for the construction (Site, Bldg. and Systems) of the Owner’s Construction
Project at Clarkston High School as specified per the Proposal Documents.

Request for Proposal (“RFP”) documents will be available Thursday, March 28, 2024, and may be obtained from the
DeKalb County Board of Education website at https://dekalbschoolsga.ionwave.net. Plans and Specifications are
available electronically in PDF format and can be emailed to prospective Respondents free of charge by submitting a
request to tijauna_naylor_smith@dekalbschoolsga.org.

VRTUAL MANDATORY PRE-PROPOSAL CONFERENCE
A virtual mandatory Pre-Proposal Conference will be held via Microsoft Teams at 10:00 a.m. EST on Thursday,
April 11, 2024. Prospective bidders must provide the following information by 5:00 PM, EST on Wednesday, April
10, 2024:

    1.   Individual Name and Title
    2.   Company Name
    3.   Telephone Number
    4.   Email Address

This information must be sent to dcsd-op-solicitation@dekalbschoolsga.org. A meeting link will be sent to all those
providing the above information no later than 9:30 AM, EST on Thursday, April 11, 2024.
There will be a mandatory site visit at 10:00 AM, EST on Friday, April 12, 2024. Attendance is mandatory.

Schedule for Selection (dates are subject to change)
Virtual Mandatory Pre-Proposal Conference*                   April 11, 2024 @ 10:00am
Mandatory Site Visit                                         April 12, 2024 @ 10:00am
Final Questions Due                                          April 17, 2024 not later than 2:00 pm
Final Addendum Issued (if necessary)                         April 24, 2024 not later than 2:00 pm
Proposals Due                                                May 2, 2024 not later than 2:00 pm
Public Acknowledgement                                       May 6, 2024 not later than 5:00 pm
Anticipated Board Review and Approval                        July 8, 2024

*OPEN TO PUBLIC ATTENDANCE*
Meeting will be held via Microsoft Teams. Please refer “Virtual Mandatory Pre-Proposal Conference” for instructions
to receive meeting link.

Except as expressly provided in, or permitted by, the Proposal Documents, from the date of issuance of the
RFP until final Owner action of approval of contract award, the Contractor submitting a Proposal shall not
initiate any communication or discussion concerning the Project, the RFP or the Contractor’s Proposal or any
part thereof with any employee, agent, or representative of the Owner. Any violation of this restriction may
result in the rejection of the Contractor’s Proposal. The Owner reserves the right to reject any or all proposals,
and to waive technicalities and informalities.
DeKalb County School District                                                                       RFP No. 24-752-022
Clarkston High School Capital Improvements                                                             Project # 213-35
March 28, 2024                                                                                             Page 4 of 46

                                                      II.
                                                 DEFINITIONS

    A. Proposal Documents means the Advertisement for Proposals, the Instructions to Proposers, the Bid Form,
       the form of Bid Bond, the form of Subcontractor Listing, the form of Corporate Certificate, the form of
       Partnership Certificate, the form of Entity Certificate, the form of Offer’s and Individuals’ Affidavit of Non-
       collusion, the Form of Fixed Price Construction Contract (with exhibits), the form of Performance Bond, the
       form of Payment Bond, the Wage Rate Determination (if applicable), the Special Conditions, the Plans and
       Specifications, all other proposed contract documents, and any Addenda issued prior to Bid opening.

    B. Definitions contained in the proposed contract documents shall be applicable to the Proposal Documents.

    C. Addenda are written or graphic instruments issued by the Architect prior to Proposal opening which modify or
       interpret the Bidding Documents by additions, deletions, clarifications, corrections, or revisions.

    D. A Proposal is a complete and properly executed proposal to do the Work in accordance with the Contract for
       the sums stipulated in the Proposal supported by data required by the Proposal Documents, submitted in
       accordance with the Proposal Documents.

    E. The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the
       Proposal Documents as the base to which Work may be added, or from which Work may be deleted, for sums
       stated in the Alternates, if any.

    F. An Alternate Bid is an amount stated in the Bid to be added to, or deducted from, the amount of the Base Bid
       if the corresponding change in the Work, as described in the Proposal Documents (“Alternate”), is accepted.

    G. A Unit Price is an amount stated in the Bid as a price per unit of measurement for specified materials,
       equipment or services or a portion of the Work as described in the Bidding Documents.

    H. A Proposer is a person or entity who submits a Proposal.

    I.   A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion
         of the Work.

    J. The Owner for whom the work will be executed is the DeKalb County Board of Education, 1701 Mountain
       Industrial Boulevard, Stone Mountain, GA 30083.

    K. The Owner has selected as Architect the Architect listed in the Advertisement for Proposals, who has prepared
       plans and specifications and who will administer the Contract for construction. If the Owner’s design
       professional for the Project is an engineer rather than an architect, then the term “Architect” as used
       throughout these Instructions to Proposers shall mean “Engineer”.
DeKalb County School District                                                                      RFP No. 24-752-022
Clarkston High School Capital Improvements                                                            Project # 213-35
March 28, 2024                                                                                            Page 5 of 46

                                              III.
                                      GENERAL CONDITIONS
A.      Respondent Performance
        The successful Respondent is required to perform and fulfill all the undertakings, covenants, terms, conditions,
        and agreements of this RFP document and any negotiated contract(s). Failure of the Respondent to fully
        perform these obligations may result in cancellation of the award and contract.

        DCSD will look to the Respondent and his/her identified personnel to coordinate and deliver the services
        described in this RFP. The obligations of the contract shall not be delegated to subcontractors or assigned
        to any third party.

B.      Non-Discrimination
        DCSD does not discriminate on the basis of race, color, religion, sex, national origin, age, or disability in any
        of its employment practices, education programs, services, or activities.

        DCSD supports an open, fair, and impartial free-market system which maximizes competition and seeks to
        include all responsible businesses and to provide ample opportunities for business growth and development.
        Minority businesses are encouraged and given the opportunity to bid on various projects; however, all
        responses will be evaluated on the same criteria. It is not the intention or desire of DCSD to restrict or impede
        competition, nor to increase the cost of the work.

C.      Drug-Free Workplace
        By submission of a response to this RFP, the Respondent certifies that he/she and his/her employees shall
        not engage in the unlawful manufacture, sale, distribution, dispensation, possession, or use of controlled
        substance or drugs during the performance of the contract.

D.      Smoke-Free Workplace
        By submission of a response to this RFP, the Respondent certifies that he/she and his/her employees shall
        not use tobacco products on DCSD property at any time during the performance of this contract.

E.      Costs Incurred
        DCSD is not liable for any costs incurred by a Respondent in preparing and/or submitting a response to this
        RFP or for any interview if requested. Any and all costs incurred by the Respondent in preparing and/or
        submitting a response to this RFP and interviewing with DCSD (if requested) shall be the sole responsibility
        of the Respondent and shall not be reimbursed by DCSD.

F.      Insurance
        A Certificate of Insurance and/or ACORD form is required with solicitation submittal. Provision of
        Certificate of Insurance is a mandatory requirement (include with Required Forms). Proposals submitted with
        certificates of insurance will be considered conditionally responsive to the insurance and indemnification
        requirement. Final award of this RFP will be contingent upon receipt within five (5) business days of request
        for insurance documentation complete with the following requirements. In the event the awarded Respondent
        cannot produce insurance coverage acceptable to the DCSD within the time provided, DCSD reserves the
        right to award this solicitation to the next highest ranked firm. Please refer to Exhibit “D” of the Contract for
        required Insurance.

G.      Indemnification
        The Contractor shall indemnify and hold the Owner harmless from any and all claims, liability, damages, loss,
        liens, costs and expenses of every type whatsoever including, without limitation, attorneys' fees and expenses,
        arising out of or in connection with the Contractor's performance of this Contract and the Work, to the extent
DeKalb County School District                                                                      RFP No. 24-752-022
Clarkston High School Capital Improvements                                                            Project # 213-35
March 28, 2024                                                                                            Page 6 of 46

        caused by the Contractor, or anyone for whose acts the Contractor is or may be responsible or liable,
        regardless of whether such liability, claim, damage, loss, cost or expense is caused in part by the Owner. The
        Contractor shall not indemnify or hold harmless the Owner against claims for damages, losses, or expenses,
        including attorneys’ fees, caused by or resulting from the sole negligence of the Owner, or its officers, agents
        or employees; provided, however, this indemnification obligation shall not be limited by any limitation on
        amount or type of damages, compensation, or benefits payable by or for the Contractor or its subcontractors,
        sub-subcontractors, or suppliers under workers’ compensation acts, disability benefit acts or other employee
        benefit acts.

H.      Interviews
        DCSD reserves the right to require Respondents to participate in one or more interviews with DCSD staff.
        Respondents must be prepared to discuss the salient points of their proposal within three (3) normal working
        days of being asked to participate in interviews. There are to be no presentations, individually or collectively,
        without such invitation.

I.      Contract Terms
        Appendix E is DeKalb County School District’s Standard Form of Contract for Fixed Price Construction
        Services between the DeKalb County Board of Education and the General Contractor; Version 05.2022, which
        specifically outlines the contractual responsibilities. All responders should thoroughly review the
        documents prior to submitting a proposal. Any proposed revisions to the terms or language of these
        documents must be submitted in writing during the question-and-answer period of the solicitation.
        All requests must be submitted in writing prior to the close of the final questions. Request for revisions
        will be reviewed and approved or rejected by legal and legal rulings are final. If submitted or proposed
        thereafter, such proposed revisions to the terms or language of these documents shall not be considered by
        the Owner and the Service Contractor’s Proposal shall be rejected. No alterations can be made in the contract
        after award by the DeKalb County School District.

J.      Permits and Applicable Law
        Respondents shall at their own expense obtain all necessary permits, certifications, and licenses and shall
        comply with all applicable local, state, and federal laws, ordinances, rules, and regulations necessary to fully
        execute the requirements stated herein. Respondents shall maintain all such permits, licenses, certifications,
        and compliances in a current status throughout the course of the contract. Respondents shall submit copies
        of permits, licenses, and certifications evidencing proof of the aforementioned immediately upon request of
        DCSD. Respondents shall be in compliance with registration with the Georgia Secretary of State’s office as
        applicable.

K.      Non-Collusion
        Respondents shall fully certify that they, as individuals or as officials of a business entity, have not entered
        into any agreement, participated in collusion, or otherwise taken any action in restraint of free and competitive
        responses to this RFP. Further, Respondents guarantee that their response is not made in conjunction with
        or on behalf of another party and that they have not been directly or indirectly induced in any manner or taken
        any action to result in a restriction of trade or in an unfair advantage.

L.      Conflict of Interest
        Respondents shall disclose with their proposal the name of any officer, director, or agent who also is a DCSD
        employee or DeKalb County Board of Education member. Respondents shall also disclose the name of any
        DCSD employee or board member who owns, directly or indirectly, an interest in five percent or more in the
        Respondent’s company or any of its branches. Respondents shall certify that their response to this RFP is
        impartial, at arms-length, and free of any conflict of interest, unfair advantage, or personal benefit to any
        DCSD official.
DeKalb County School District                                                                      RFP No. 24-752-022
Clarkston High School Capital Improvements                                                            Project # 213-35
March 28, 2024                                                                                            Page 7 of 46

M.      Confidentiality and Non-Disclosure
        Information made available to Respondents by DCSD shall be used only for purposes related to responding
        to this RFP and shall not be used for any other purpose without the express written permission of DCSD.

        Respondents to this RFP unequivocally agree to assume responsibility for protecting and safeguarding the
        confidentiality of DCSD records that are not public information. Such information may include but is not limited
        to student and human resource file contents.

N.      Business License
        Respondents shall submit with their proposal, a copy of their valid company business license. If the
        Respondent is a Georgia corporation, Respondent shall submit a valid county or city business license. If the
        Respondent is not a Georgia corporation, Respondent shall submit a certificate of authority to transact
        business in the state of Georgia and a copy of their valid business license issued by their home jurisdiction.
        If Respondent holds a professional certification which is licensed by the state of Georgia, Respondent shall
        submit a copy of their valid professional license. Any license submitted in response to this requirement shall
        be maintained by the Respondent for the duration of the contract. Provision of copy of a business license and
        General Contractor license is a mandatory requirement (include with Required Forms).

O.      Rights Reserved
        DCSD reserves the right to accept or reject any and/or all parts of responsive proposals received and/or to
        reject all proposals submitted. DCSD reserves the right to award any resulting contract in the manner that is
        in the best interest of and most advantageous to DCSD. DCSD reserves the right to waive any technicalities
        or minor irregularities in responses received and to award the contract in the most beneficial manner for
        DCSD. The decision of DCSD shall be final.

        DCSD reserves the right to request and negotiate a “best and final” response from Respondents.

P.      Taxes
        Purchases made by DCSD are not subject to federal, state, or local sales tax. A Sales Tax Exemption
        Certificate will be furnished upon request.

Q.      Conditional Proposals
        Proposals that are conditional and/or in any way qualify or vary the terms of these instructions, conditions,
        and specifications shall be considered non-responsive and disqualified.

R.      Respondent Failure
        In the event services to be furnished by the successful Respondent should for any reason fail to conform to
        the scope of work contained herein, DCSD reserves the right to reject the services and further reserves the
        right to terminate the contract.

        Failure of the successful Respondent to perform contracted services may also result in the removal of that
        Respondent from doing business with DCSD for a period of not less than one year.

S.      Georgia Open Records Act
        Without regard to any designation made by the person or entity making a submission, DeKalb County School
        District considers all information submitted in response to this invitation or request to be a public record that
        may be disclosed upon request pursuant to the Georgia Open Records Act, O.C.G.A. 50-18-70 et seq., without
        consulting or contracting the person or entity making the submission, unless a court order is presented with
        the submission. You may wish to consult an attorney or obtain legal advice prior to making a submission.
DeKalb County School District                                                                  RFP No. 24-752-022
Clarkston High School Capital Improvements                                                        Project # 213-35
March 28, 2024                                                                                        Page 8 of 46

T.      No Assignment of Award
        The successful Respondent may not assign the award or contract to or subcontract with another party
        without the express written permission of DCSD.

U.      The Laws of the State of Georgia
        This RFP and subsequent agreements are subject to the laws of the State of Georgia.

V.      Proposal Duration
        Proposals submitted in response to this RFP must be valid for a period of ninety (90) days from proposal
        submission deadline, as indicated by submission of the Fixed Price Proposal Fee Form.
DeKalb County School District                                                                  RFP No. 24-752-022
Clarkston High School Capital Improvements                                                        Project # 213-35
March 28, 2024                                                                                        Page 9 of 46
                                          IV.
                              INSTRUCTIONS TO PROPOSERS

1.      INTRODUCTORY:

        To be considered, Proposals must be made in accordance with the following instructions and must be
        received electronically on the DeKalb County School District website at https://dekalbschoolsga.ionwave.net
        not later than the date and time set forth in the "Advertisement for Sealed Proposals – General Contractor”
        or any extension thereof made by Addendum.

        The Owner reserves the right to reject any or all Proposals and to waive any technicalities and
        informalities.

2.      OWNER:

        The Owner for whom the GC Services and the Work will be executed is:

                  DeKalb County Board of Education
                  1701 Mountain Industrial Boulevard
                  Stone Mountain, Georgia 30083

3.      ARCHITECT:

        The Architect is:

                  Goodwin Mills and Cawood, LLC.
                  6120 Powers Ferry Rd. NW., Suite 200
                  Atlanta, Georgia 30339

4.      VIRTUAL MANDATORY PRE-PROPOSAL CONFERENCE & SITE VISIT
        A virtual mandatory Pre-Proposal Conference will be held via Microsoft Teams at 10:00 a.m. EST on
        Thursday, April 11, 2024. Prospective bidders must provide the following information by 5:00 PM, EST on
        Wednesday, April 10, 2024:

             1.   Individual Name and Title
             2.   Company Name
             3.   Telephone Number
             4.   Email Address

        This information must be sent to dcsd-op-solicitation@dekalbschoolsga.org. A meeting link will be sent to all
        those providing the above information no later than 9:30 AM, EST on Thursday, April 11, 2024.

        There will be a mandatory site visit at 10:00 AM, EST on Friday, April 12, 2024. Attendance is mandatory.


5.      PROPOSALS:

        Proposals are to be submitted electronically at http://www.dekalbschoolsga.ionwave.net.

        The following steps must be completed to successfully submit a proposal electronically:
             • Respondents are required to register using the IONWAVE portal and obtain a username and
DeKalb County School District                                                                   RFP No. 24-752-022
Clarkston High School Capital Improvements                                                         Project # 213-35
March 28, 2024                                                                                       Page 10 of 46
                 password.
             •   Respondents will be required to upload all required documents identified under the Response
                 Attachments tab.
             •   After uploading all required documents, Respondents will need to click "Submit Response" under
                 the Response Submission tab.
             •   Once all of the required documents have been successfully uploaded, “Submitted” in green will
                 appear next to Response Status.
             •   Proposal has not been successfully submitted if you see the following message next to Response
                 Status: NOT SUBMITTED – To complete your response, you must click ‘Submit Response’ in the
                 Response Submission tab.

        The GC is fully responsible for timely submission. Proposals received after the set specified time will not be
        considered by the Owner.

6.      DOCUMENTS:

        Proposal Documents may be obtained by bona fide GC firms from the DeKalb County School District website
        at: http://www.dekalbschoolsga.ionwave.net.

        Plans and Specifications are available electronically in PDF format and can be emailed to prospective
        Respondents free of charge by submitting a request to tijauna_naylor_smith@dekalbschoolsga.org.

        GC firms shall use complete sets of Proposal Documents in preparing Proposals. The Owner will not be
        responsible for errors or misinterpretations resulting from the use of incomplete sets of Proposal Documents.
        The GC firms submitting Proposals are responsible for the review of the Proposal Documents, including
        without limitation the Owner’s Standard Forms and Preliminary Design Information.

        In making copies of the Proposal Documents available, the Owner does so only for the purpose of obtaining
        Proposals for the Project and does not confer a license or grant permission for any other use of the Proposal
        Documents.

7.       RFP ADDENDA:

        Addenda, if any, will be posted on the DCSD website and it is the responsibility of all Proposers and
        Subcontractors to check the website for issued addenda. Addenda will also be e-mailed to all who are known
        by the issuing office to have attended the Pre-Proposal Conference. Copies of Addenda will be made
        available for inspection wherever Proposal Documents are on file for that purpose. No Addenda will be issued
        later than 72 hours prior to the time for Proposal opening, except for Addenda withdrawing the Request for
        Proposals or Addenda which include a postponement of the date through which Proposals may be submitted.
        Each GC firm shall ascertain prior to submitting a Proposal that the GC firm has received all Addenda issued,
        if any, and the GC firm shall acknowledge their receipt in the Proposal. Failure of a GC firm to receive or
        acknowledge any Addendum shall not relieve the GC firm of any obligation under the Proposal. All Addenda
        shall become part of the Contract Documents.



8.       SCOPE OF WORK:

        Scope will consist of the following:
        • Security Vestibule
        • Elevator Addition
        • Restroom Addition in ADA Classroom
DeKalb County School District                                                                      RFP No. 24-752-022
Clarkston High School Capital Improvements                                                            Project # 213-35
March 28, 2024                                                                                          Page 11 of 46
        •   Athletic Storage Building
        •   Stage Lift

        The Contractor shall supply materials, labor, tools, plant, supplies, equipment, transportation,
        superintendence, temporary construction of every nature, and other services and facilities necessary to
        complete the construction of the described facilities, including, but not limited to, incidental work described in
        the Contract Documents.

9.       INTERPRETATIONS:

        The GC firm shall carefully study and compare the Proposal Documents with each other, and with other work
        being bid or offered concurrently or presently under construction to the extent that it relates to the GC Services
        for which the Proposal is submitted, shall examine the site of the Project and the local conditions, and shall
        at once report to the Owner any errors, inconsistencies or ambiguities in the Proposal Documents. If a GC
        is in doubt as to the meaning of any part of the Proposal Documents, or otherwise has questions or requires
        clarification or interpretation of the Proposal Documents, he or she shall request an interpretation from the
        Owner. Requests for such interpretations shall be made in writing addressed to Mr. Eric Hofstetter, Chief
        Operating Officer, Sam A. Moss Service Center, 1780 Montreal Road, Tucker, Georgia 30084, not later than
        six (6) business days prior to the time for receiving Proposals, and failure of the successful GC to request
        such interpretation shall not relieve him or her as a GC of the obligation to execute the GC Services in
        accordance with a later interpretation by the Owner, without additional charge to the Owner. Interpretations,
        corrections, and changes of the Proposal Documents will be made by Addendum. No oral interpretations will
        be made to GC as to meaning of Proposal Documents. Any purported interpretations, corrections and
        changes of the Proposal Document made in any manner other than Addendum will not be binding, and GC
        shall not rely upon them. Any communication, or attempted communication, by a GC or its agents concerning
        this Request for Proposals by any means or method other than that provided for in this Request for Proposals
        shall be inappropriate. In the event of such inappropriate communication, or attempted communication, the
        Owner shall have the right to reject such offending Offeror’s Proposal.

10.     SUBSTITUTIONS

        Unless otherwise indicated in the Proposal Documents, the materials, products, and equipment described in
        the Proposal Documents establish a standard of required function, dimension, appearance, and quality to be
        met by any proposed substitution.

        No substitution will be considered prior to receipt of Proposals unless written request for approval has been
        received by the Owner no later than April 17, 2024 by 2:00 PM EST. All substitution requests shall be sent
        to dcsd-op-bidquestion@dekalbschoolsga.org. Such requests shall include the name of the specified
        product, material or equipment, and the specification section or other reference to the Proposal Documents
        as appropriate. The request shall provide a complete description of the proposed substitution including
        drawings, performance and test data, and other information necessary for an evaluation. The request for
        approval shall explain fully the difference, if any, between the proposed product and the one or more named
        in the specifications, including difference in cost. A statement setting forth changes in other materials,
        equipment or other portions of the Work including changes in the work of other contracts that incorporation
        of the proposed substitution would require shall be included in the request. The burden of proof of the merit
        of the proposed substitution is upon the proposer. The Owner’s decision of approval or disapproval of a
        proposed substitution shall be final.

        If the Owner approves a proposed substitution prior to the date for receipt of Proposals, such approval will be
        set forth in an Addendum. GC firms shall not rely upon approvals made in any other manner.
        No substitutions will be considered after the Contract award unless specifically provided in the Contract
        Documents.
DeKalb County School District                                                                        RFP No. 24-752-022
Clarkston High School Capital Improvements                                                              Project # 213-35
March 28, 2024                                                                                            Page 12 of 46

11.      WITHDRAWAL OF PROPOSALS:

        Except as may be otherwise expressly provided by law, a GC’s Proposal cannot be withdrawn after it has
        been electronically submitted at http://www.dekalbschoolsga.ionwave.net, for a period of ninety (90) calendar
        days after the date fixed for receiving said Proposals, and all Proposals are subject to acceptance by the
        Owner during said period, and each Offeror so agrees by submitting a Proposal.


12.     BACKGROUND CHECKS:

        A criminal background check must be performed on all contractors, consultants, subcontractors, volunteers,
        and vendors (hereinafter jointly referred to as "Individuals") who provide services on DCSD premises,
        supervise services on DCSD premises, or has contact with students. These Individuals shall undergo the
        same criminal background check, within the last 365 days, as required by DCSD employees. Such
        background checks will be performed by DCSD at the expense of the Individual at a cost of $45.00 per
        individual. Additionally, any charges against the Individual, may be deemed unacceptable in DCSD’s sole
        discretion regardless of whether dismissed, expunged, sealed, removed from the record, treated as a “first
        offender” or dead docketed. Upon receipt and evaluation of DCSD’s background check results, DCSD may
        demand that the Individual have no contact with DCSD students, parents, or provide services to DCSD
        premises. Any failure of the contractor to obtain a criminal records background check through DCSD, as
        stated herein, may result in termination of any resulting contract between contractor and DCSD.

13.      IRREGULARITIES:

        The Owner, at its sole option, may accept or reject Proposals that contain irregularities of any kind, or
        Proposals that do not comply fully with the Proposal Documents.

14.      CONTRACT AWARD:

        Subject to the Owner’s right to reject any or all Proposals, it is the intent of the Owner to award a contract, at
        the sole option of the Owner, in due course and after a reasonable Proposal evaluation period, on a fixed
        price basis and within the funds available, to the responsible and responsive GC whose Proposal is
        determined to be the most advantageous to the Owner, provided that the Proposal otherwise fulfills the
        requirements of the Proposal Documents. The Owner shall have the right to waive informalities or
        irregularities in a Proposal received and to accept the Proposal that, in the Owner’s judgment, is in
        the Owner’s best interest. Proposals will be evaluated on a combination of factors. These factors, and
        their relative importance, are:

                       1. Proposed Project Staff                                             15 Points
                           Resumes of key staff assigned to Project                             10
                           Location of Office                                                    2
                           Organizational Chart as it relates to Project                         3

                       2. Project Approach                                                   20 Points
                           Knowledge of working on active                                        5
                           campuses/codes/ordinances
                           Approach                                                              5
                           Schedule                                                              5
                          QA/QC                                                                  5

                       3. Successful Building Experience                                     15 Points
DeKalb County School District                                                                      RFP No. 24-752-022
Clarkston High School Capital Improvements                                                            Project # 213-35
March 28, 2024                                                                                          Page 13 of 46

                       4. Current Workload                                                   15 Points

                       5. Proposed Fixed Price                                              35 Points
                                                                                           100 Points
                           *Equitable Distribution                                    15 Points(maximum)

       NOTE: All information identified above in items #1 – 5 is required for this Proposal to be considered.
       *The chart included in Section V. Instructions for Submitting Proposals will be used to award a
       maximum of 15 points based on dollar amount of projects currently under contract, as well as those awarded
       by DCSD, but not yet under contract and those recommended but not yet awarded. This single score will be
       allocated to each firm by the Selection Process Facilitator and added to the cumulative score of the committee
       members.
       Upon approval of the General Contractor (GC) by the DeKalb County Board of Education, the District will issue
       a Notice of Award (NOA) in writing, to the GC. The selected GC shall submit all required documentation,
       payment and performance bonds on the exact forms provided by the Owner in the RFP, insurance
       certifications, executed contract, etc. within five (5) days of NOA issuance. The GC shall submit the Builder’s
       Risk policy required by the RFP and contract. The Contractual Schedule included in the RFP and in the
       contract will be reduced by any days that exceed the total of five (5) business days identified in Section 12.0.
       Notice to Proceed (NTP) with the final executed contract and a revised schedule, if appropriate, shall be issued
       to the GC upon receipt of all documents.
       After evaluation of the Proposals received in response to the RFP, DeKalb County School District may
       interview two or more proposers deemed fully qualified, responsive, responsible, and suitable on the basis of
       initial responses, and with professional competence to provide the required services. DCSD is under no
       obligation to perform interviews for this RFP.
       At the conclusion of the interviews, if they are held, and on the basis of evaluation factors set forth in Section
       III and the information provided and developed in the selection process to this point, DeKalb County School
       District Selection Committee shall rank, in the order of preference and begin negotiations with the firm whose
       proposal is determined to be most advantageous to the Owner. If a contract satisfactory and advantageous
       to DeKalb County School District cannot be negotiated, then the Owner reserves the right to automatically,
       without notification, terminate such negotiations and enter into negotiations with the second most qualified
       firm. Failing accord with the second most qualified firm, DCSD shall terminate negotiations and enter into
       negotiations with the third most qualified firm. Should DCSD be unable to negotiate a contract at a fair and
       reasonable price with any of the top three selected firms, the selection committee shall select additional firms
       in order of their rankings, and DCSD shall continue negotiations until an agreement is reached.


15.      GC’S QUALIFICATIONS:

        The Owner, before Contract award, will require GC to document that they are “responsible” to the satisfaction
        of the Owner. They will thus be required to show that they have the necessary facilities, technical ability,
        licenses, and financial resources to execute the Services and the Work in a satisfactory manner, and within
        the time specified; that they have had experience in the Services and Work of a similar nature; and that they
        have past history and references which will verify their qualifications for executing the Services and the Work.
        The Owner shall have the right to make such additional inquiry as it deems necessary to determine the ability
        of the GC to perform the Services and the Work in a prompt and efficient matter in accordance with the
        Contract Documents. The failure of a GC to promptly supply information in connection with the Owner’s
        inquiry shall be grounds for a determination that such GC is not responsive, not responsible, or both. In
        determining the qualifications and responsibility of the GC, the Owner may take into consideration any and
        all relevant facts and circumstances available to it including, but not limited to, the GC’s experience, capacity,
        facilities, previous work standing with DCSD, financial standing, skill, available supervisory personnel,
DeKalb County School District                                                                       RFP No. 24-752-022
Clarkston High School Capital Improvements                                                             Project # 213-35
March 28, 2024                                                                                           Page 14 of 46
        available labor, current volume of work being performed for DCSD at the time of this procurement process,
        quality and efficiency of construction plant and equipment proposed to be utilized on the Project. The Owner
        shall have the right to reject the Proposal of any GC failing to show to the satisfaction of the Owner the GC
        could perform the Services and the Work in a prompt and efficient manner in accordance with the Contract
        Documents. GCs may be afforded an opportunity for discussion, negotiation, and revision of Proposals for
        the purpose of obtaining best and final offers. In the event the Owner deems it necessary or appropriate,
        responsible GCs found by the Owner to have submitted Proposals reasonably susceptible of being selected
        for award shall be given an opportunity to participate in such discussions, negotiations, and revisions.

        The successful GC will also be required to submit appropriate entity and authority certificates acceptable to
        Owner as a part of this RFP.

16.      OWNER’S CONSTRUCTION MANAGEMENT CONTRACT FORM:

        Included and made a part of this RFP is the Owner’s Standard Form of Fixed Price Construction Contract
        (the “Agreement” or the “Contract”). GCs are responsible for the review of this document in the preparation
        of their Proposals. The successful GC shall comply with all insurance requirements set forth in the Agreement
        and any other Contract Documents, and the GC’s attention is directed to the insurance exhibit to the
        Agreement. These insurance requirements shall be considered in the preparation of the GC’s Proposal.

17.     COMMENCEMENT, PROSECUTION, AND COMPLETION:

        The GC will be required to commence its services under the Owner’s form of Agreement immediately after
        its receipt of a written Notice-to-Proceed from the Owner and to prosecute the effort with competence,
        faithfulness and energy.

18.     BID BOND:

         The GC’s Proposal shall be accompanied by a Bid Bond in the exact form set forth herein. The Bid Bond
         shall be in an amount not less than 5% of the Fixed Price Proposal. The amount stated in the Bid Bond
         shall be included as an exact dollar figure written in numeric and word form. Failure to do so shall
         result in your proposal being deemed non-responsive. A Bid Bond submitted using an AIA
         document is unacceptable and shall result in your proposal being deemed non-responsive. The
         attorney-in-fact who executes the Bid Bond on behalf of the surety shall affix to the Bid Bond a certified and
         current power of attorney. The surety must be satisfactory to the Owner and must be licensed to do business
         in Georgia as approved by the State Insurance Commissioner’s Office. No other form of bid security will be
         accepted. The Owner shall have the right to retain the Bid Bond of all GCs until either (a) the Agreement
         has been executed and a satisfactory Payment Bond and Performance Bond have been furnished, or (b)
         ninety (90) days after Proposal opening, or (c) all Proposals have been rejected. Except as otherwise
         expressly allowed by law, no Proposal may be withdrawn for a period of ninety (90) days following the closing
         time and date for receipt of Proposals, and all Proposals are subject to acceptance by the Owner during said
         period, and each GC so agrees by submitting a Proposal.


19.     AFFIDAVIT:

        As a part of the response to this RFP, the GC shall submit with its proposal an affidavit in the form of the
        Offeror’s and Individuals’ Affidavit of Non-collusion included in the Proposal Documents as Attachment D. If
        the proposing GC is a partnership, all of the partners and any officer, agent, or other person who intend to
        represent or act for them in proposing for or procuring the Contract for the Project shall also sign the affidavit.
        If the proposing GC is a corporation or other entity, all officers, agents, or other persons who intend to act for
        or represent the corporation or other entity in proposing for or procuring the Contract for the Project shall also
DeKalb County School District                                                                       RFP No. 24-752-022
Clarkston High School Capital Improvements                                                             Project # 213-35
March 28, 2024                                                                                           Page 15 of 46
        sign the affidavit.

        The Subcontractor’s Affidavit of Non-collusion is included with the Proposal Documents as Appendix F. Not
        later than simultaneously with the execution of the Contract, the successful Offeror shall deliver to the Owner
        the completed and executed Subcontractor’s Affidavit of Non-collusion in accordance with O.C.G.A. § 36-91-
        21(e). The GC awarded the contract shall require every Subcontractor from whom the GC received a bid or
        proposal to complete and sign the Subcontractor’s Affidavit of Non-collusion.


20.     CONFLICT OF INTEREST:

        If any officer, director, or agent of the GC is also an employee of the DeKalb County Board of Education, then
        the GC shall clearly identify it in your Proposal including the name of the individuals(s) and the position he or
        she holds in the organization. Further, the GC shall disclose the name(s) of any DeKalb County Board of
        Education employee(s) who owns, directly or indirectly, any interest in your organization or any of its affiliates,
        excluding stock in a publicly traded organization if such person owns an interest of ten percent (10%) or less.
        The GC shall complete and have notarized a Conflict of Interest Form and include it in the Proposal.

21.     EXISTING CONDITIONS:

        The GC is responsible to visit, examine and inspect the site of the proposed Project, obtain first-hand
        knowledge of existing conditions, the conformation of the ground, the character, quality and quantity of the
        products needed preliminary to and during the prosecution of the Work, the general and local conditions and
        all other matters which can in any way affect the Services or the Work to be done under the Agreement, and
        become thoroughly familiar with all conditions under which the Work is to be performed and correlate all the
        GC’s observations and any other facts or conditions that are known to or reasonably knowable by the GC with
        the requirements of the Proposal Documents, including the proposed Contract Documents.

22.     SUBSURFACE INVESTIGATIONS:

        If soil and subsurface investigations were conducted at the site of the proposed Project, a copy of the report
        is included in this RFP as an Appendix. Such information is provided for the purpose of disclosure only, and
        shall not relieve the GC from its obligation to investigate the soil and subsurface conditions. The Owner does
        not guarantee the accuracy or completeness of the data and shall not be responsible therefore. The GC shall
        not rely on such subsurface information and shall make its own investigation of subsurface conditions. The
        Owner will not be responsible in any way for additional compensation because of the reliance on or
        assumptions based on the soil investigation data furnished with the Proposal Documents.

23.     CONSENT TO RELEASE INFORMATION:
        By submitting a Proposal, the GC (and in the case of a joint venture, each partner in the joint venture)
        authorizes the Owner, and the Owner’s agents, attorneys and other representatives, to contact each and
        every reference, person or entity identified in the Proposal. The GC (and in the case of a joint venture, each
        partner in the joint venture) agrees that any information concerning the GC (and in the case of a joint venture,
        each partner in the joint venture) in possession of any identified reference, person or entity may be fully
        disclosed, and made available, to the Owner and its agents, attorneys and other representatives. The
        enclosed Consent to Release Information must be executed by the GC (and in the case of a joint venture, by
        each partner in the joint venture) and submitted to the Owner with the Proposal.


24.     PERFORMANCE AND PAYMENT BONDS:
        Performance and Payment Bonds from a surety satisfactory to DCSD must be furnished by the awarded GC
        in an amount not less than 100 percent (100%) of the contract price if the contract price is $100,000 or more.
DeKalb County School District                                                                       RFP No. 24-752-022
Clarkston High School Capital Improvements                                                             Project # 213-35
March 28, 2024                                                                                           Page 16 of 46


            1. Bonding Capacity/Current Workload: The GC must submit a letter from their insurer or surety
               stating their (a.) current bonding capacity for a single job and their (b.) aggregate capacity, (c.) current
               value of work under contract and (d.) current value of bonded work. Failure to do so shall result in
               your proposal being deemed non-responsive.


25.     COMMUNICATIONS WITH DCSD STAFF:
        It is intended that this proposal be adequate for any vendor to respond to the DeKalb County School District
        requirements. However, should proposers have questions, all questions should be submitted electronically
        via email to the Procurement Manager at dcsd-op-bidquestion@dekalbschoolsga.org. Questions submitted
        to any other email address will not be considered. The deadline for receipt of vendor questions is
        Wednesday April 17, 2024, at 2:00 p.m. Questions received after the deadline time will not be considered.
        Questions received by the deadline time will be answered in writing and posted to the website
        http://www.dekalbschoolsga.ionwave.net no later than Wednesday, April 24, 2024 at 2:00 p.m.

        No response other than written, by the Procurement Manager, will be binding upon DCSD.

        The assigned contact persons for this RFP are Belinda Quillet, Senior Procurement Manager and Tijauna
        Naylor Smith, Procurement Manager, for the Operations Division. Mrs. Quillet can be reached at (678) 676-
        1373 or by email at dcsd-op-bidquestion@dekalbschoolsga.org. Mrs. Tijauna Naylor-Smith can be reached
        at 678-676-1313 or by email at tijauna_naylor_smith@dekalbschoolsga.org. Prospective Respondents
        must limit their contact regarding this RFP to the assigned contact persons.

        Except with the consent of the proposal contact person, all proposers, including any persons affiliated with or
        in any way related to proposers, are strictly prohibited for contacting DeKalb County School District on any
        matter having to do in any respect with this RFP, other than as provided herein. Any and all contacts with
        such persons associated with DeKalb County School District shall be in writing, in appropriate circumstances
        or cases, as directed by the contact person above. Except as expressly provided in, or permitted by, the RFP
        documents, for the date of issuance of the Request for Proposals until final DeKalb County Board of Education
        action of approval of contract award, the proposer submitting a bid shall not initiate any communication or
        discussion concerning this procurement with any employee, agent, representative or member of the Board of
        Education for DeKalb County School District. Any violation of this restriction may result in the rejection of the
        proposal response.

        Except as expressly provided in, or permitted by, the Proposal Documents, from the date of issuance
        of the RFP until final Board action of approval of contract award, the Contractor submitting a Proposal
        shall not initiate any communication or discussion concerning the Project, the RFP or the Contractor’s
        Proposal or any part thereof with any employee, agent, or representative of the Board or Architect.
        Any violation of this restriction may result in the rejection of the Contractor’s Proposal.
DeKalb County School District                                                                      RFP No. 24-752-022
Clarkston High School Capital Improvements                                                            Project # 213-35
March 28, 2024                                                                                          Page 17 of 46
                                                         V.
                        INSTRUCTIONS FOR SUBMITTING PROPOSALS
A.      SUBMISSION OF PROPOSALS:

              Electronic proposals shall be submitted to the website https://dekalbschoolsga.ionwave.net and include
              the following:

                      1) Letter of Introduction - To be included with Technical Proposal under “Response
                         Attachments”.
                      2) Table of Contents - To be included with Technical Proposal under “Response
                         Attachments”.
                      3) Compliance - To be included with Technical Proposal under “Response Attachments”.
                      4) Proposed Project Staff - To be included with Technical Proposal under “Response
                         Attachments”.
                      5) Project Approach - To be included with Technical Proposal under “Response
                         Attachments”.
                      6) Experience - To be included with Technical Proposal under “Response Attachments”.
                      7) Current Workload - To be included with Technical Proposal under “Response
                         Attachments”.
                      8) Fixed Price Proposal - To be uploaded individually under “Response Attachments”.

B.      The Offeror’s sealed proposal shall be submitted in the following order and format:

            1. Letter of introduction and interest signed by an officer or partner of responding firm. Letter shall
               include specific reason(s) why firm would be the best choice for the services listed. Letter shall
               include name of entity submitting, contact name, phone number, e-mail address, fax number and
               address of firm submitting.

            2. Table of Contents

            3. Compliance Information

                 This is a compliance section and carries no evaluation points. Firms must meet minimum
                 criteria as specified to receive further consideration. Proposals shall include the
                 following:
                     3.1 The GC must be properly certified by the Georgia Secretary of State to do business in
                         Georgia at the time of submission.
                          3.1.1    State the legal name of entity submitting and if Firm submitting is a corporation,
                                   joint venture, or partnership. Note: It is understood that if selected for this project
                                   the stated entity name will be used in all legal contracting documents derived from
                                   this selection.
                          3.1.2    Provide a copy of certification for proper incorporation or registration from Georgia
                                   Secretary of State. In the alternative, joint ventures and partnerships should
                                   provide a copy of their joint venture or partnership agreement and certification from
                                   the Georgia Secretary of State establishing that each joint venture partner or
                                   partner is authorized to do business in Georgia.
DeKalb County School District                                                                    RFP No. 24-752-022
Clarkston High School Capital Improvements                                                          Project # 213-35
March 28, 2024                                                                                        Page 18 of 46
                      3.2 The GC must be properly registered, licensed, and certified at the time of submission:
                          3.2.1 Provide copy of current Georgia Professional Registration Certificate for general
                                contractor.
                          3.2.2 If GC is a joint venture, provide copy of the joint venture agreement and either:
                                        a. Copy of current Georgia Professional Registration Certificate of the
                                           joint venture; or
                                        b. A copy of the current Georgia Professional Registration Certificate of
                                           one of the joint venture partners.
                     3.3 Financial Information (Y/N):

                         3.3.1    The Firm’s financial capability is to be expressed in the financial statement
                                  (audited financial information current within the past twelve months, such
                                  as a balance sheet and statement of operations) and should indicate the
                                  resources and the necessary working capital to assure financial stability
                                  through the completion of the projects. A certified audit is preferred;
                                  however, the Firm’s most recent tax return and balance sheet will be
                                  accepted.

                         3.3.2    Bonding Capacity: The GC must submit a letter from their insurer or surety stating
                                  their current bonding capacity for a single job and their aggregate capacity, current
                                  value of work under contract and current value of bonded work. (The firm will be
                                  required to bond 100% of the cost of the Project).

                         3.3.3    Compliance Letter: Provide a compliance letter from a bonding company
                                  indicating the bonding company’s A.M. Best financial rating and whether the
                                  bonding company will provide separate Payment and Performance Bonds, each
                                  in the amount of 100% of the Contract Price, on the exact forms provided by the
                                  Owner for your services as GC. Upon award, GC must submit Payment and
                                  Performance Bonds on the exact forms provided by the Owner.

                     3.4. Litigation/Capacity/Convictions Information (Y/N):

                         3.4.1    Identify and briefly discuss any instances in the past five (5) years where your
                                  contract was terminated, with or without cause. Provide Owner name, project
                                  name and Owner Project Representative Name and Number. For joint ventures
                                  responding to this RFP, provide the above information as it pertains, to the joint
                                  venture and for each partner or entity creating said joint venture. If there is no
                                  failure or failures to complete a contract, please include a statement that the Firm
                                  has never failed to complete a contract or contracts or have defaulted or have
                                  been declared in default on any contract.

                         3.4.2    Capacity: Based on your current workforce and staffing in addition to the number
                                  of projects your firm currently has under contract or in negotiation, please
                                  demonstrate your firm’s capacity to complete this project. Describe any claims,
                                  mediation, litigation, arbitration or other form of dispute resolution filed by or
                                  against your company regarding K-12 projects (and, in the case of a joint venture,
                                  by or against any partner in the joint venture) in the past five (5) years, including
                                  case name, number, location of court or arbitration. This list shall also disclose
                                  any failure or failures to complete a contract, or contracts, and any instances of
                                  having defaulted or having been declared to be in default, on any contract(s).
DeKalb County School District                                                                     RFP No. 24-752-022
Clarkston High School Capital Improvements                                                           Project # 213-35
March 28, 2024                                                                                         Page 19 of 46
                         3.4.3     Convictions: Include a statement as to whether or not the GC (and in the case of
                                   a joint venture, each of the partners in the joint venture) or any of its officers has
                                   been convicted or entered a guilty plea (or plea of nolo contendere) in any court
                                   within the two (2) years prior to the date of application of a violation of any State
                                   or Federal statute concerning competitive bidding or competitive proposals
                                   or the restraint of trade.

            EVALUATION CRITERIA

            4. Proposed Project Staff (15 points):
               The quality, experience and quantity of staff and their functions will be evaluated by the Committee.

                The firm shall name the actual key personnel to be assigned to this Project, describe their ability and
                experience, and indicate the function of each within their organization and their proposed role on this
                Project. It is the intent that the proposed staff shall be assigned to this Project unless otherwise
                approved by Owner. All proposed key staff members must be present at the time of interview unless
                prior written approval is received from the Owner.

                     4.1 Give brief resumes of key personnel (project manager, superintendent, and controls
                         specialist at a minimum) to be assigned to the Project including, but not limited to, the
                         following:
                         a. Name and title.
                         b. Job assignment for other projects.
                         c. How many years with this firm. For sub-consultants, list prior projects your firm has
                            worked with sub-consultant.
                         d. How many years with other firms.
                         e. Experience including types of projects, size of projects (dollar value and square
                            footage of project), and specific project involvement.
                         f.   Education.
                         g. Active registrations (if any).
                         h. Proliance experience (if any).

                     4.2 Provide the location of the office(s) that will be providing the required services.

                     4.3 Organization Chart: Develop an organization chart as it relates to this Project indicating
                         key personnel and their relationship.

            5. Project Approach (20 points):
                     5.1 The firm shall provide information regarding its knowledge of working on active school
                         campuses, local codes and ordinances, local subcontractors and suppliers as an indication
                         of its ability to deliver quality workmanship in an effective and timely manner.
                     5.2 The firm shall demonstrate verbally and graphically its plan for performing the Project,
                         documenting the services to be provided and showing the interrelationships of all parties,
                         including the District’s consultants, departments (IT, FF&E, Transportation, Nutrition, etc.)
                         local authorities, architects, and Program Manager, to name a few. As part of its services,
                         the firm shall indicate knowledge and experience in the evaluation of building systems,
                         construction techniques, and the recommendation of materials to create the optimum value
                         in meeting the design and budget requirements.
DeKalb County School District                                                                     RFP No. 24-752-022
Clarkston High School Capital Improvements                                                           Project # 213-35
March 28, 2024                                                                                         Page 20 of 46
                     5.3 Schedule: The Project Master Schedule has been included in this RFP identifying the start
                         and finish dates for construction. Use the dates shown and develop a Preliminary Schedule
                         that you plan on using to construct this project.

                     5.4 QA/QC: Describe your experience and technical expertise your firm will employ with regard
                         to safety, cost and quality assurance and quality control.

            6. Successful Building Experience (15 points)
                Please list past experience, including examples of renovations, refurbishments, repairs and new
                construction projects completed by the firm. Consideration will be given to the successful completion
                of previous projects comparable in design, scope and complexity. This will include evaluating the
                firm’s performance and quality of work on previous projects.
                List the projects which best illustrate the experience of the firm which utilized the current staff which
                is being assigned to this Project. (List no more than 10 projects and do not list projects which were
                not completed by your firm or completed more than ten years ago). Include the following for each
                project:
                          a. Name and location of the project.
                           b. Project owner's representative name, address, telephone and facsimile number.
                           c. Project user's representative name, address and telephone number.
                           d. Date project was completed. Provide comparison of original schedule completion to
                              actual completion date.
                           e. Size of project (construction gross square feet).
                           f.   Cost of project (construction cost). Provide comparison of original contract amount
                                with final contract amount
                           g. Work for which firm and firm's staff was responsible.
                           h. Firm's project manager, superintendent, and other key professionals involved on the
                              project and who of that staff would be assigned to the Project covered by this RFP.
            7. Current Workload (15 points)
                     7.1 As part of the evaluation criteria, the Committee will review the firms and their sub-
                         consultant’s current workload. If the submitting firm is a joint venture, the Committee will
                         review the current workload of each of the firms comprising the submitting entity.
                     7.2 Firms and their sub-consultant(s) shall provide a list of projects in construction or closeout,
                         client names, percent complete on the project, anticipated completion date, and dollars
                         committed on open project workload. Furthermore, if the submitting firm is a joint venture
                         they shall also include projects for each firm comprising the joint venture.
                     7.3 Definition of sub-consultant as it relates to this selection process: An individual and/or firm
                         contracted or to be contracted by the submitting entity to provide services related to or part
                         of those which this will be required as part of this selection process.

            8. Proposed Fixed Price (35 points) (Use Owner’s “Bid Form” included in this Request for
               Proposal.)
                     8.1      Indicate your proposed Fixed Price for the Services and Work as required by the
                              Proposal Documents and the Owner’s Agreement. Provide this Fixed Price on the “Bid
                              Form” attached to this RFP.
                           a. Indicate any breakdown of the proposed Fixed Price required by the attached “Bid
                              Form.”
DeKalb County School District                                                                        RFP No. 24-752-022
Clarkston High School Capital Improvements                                                              Project # 213-35
March 28, 2024                                                                                            Page 21 of 46
                           b. Indicate any alternates to the proposed Fixed Price required by the attached “Bid
                              Form.”
                           c. Acknowledge receipt of addendum, if any.
                           d. All blanks shall be filled in, and shall be filled in by typewriter or manually and legibly in
                              ink. Where so indicated on the Owner’s forms, amounts and sums shall be expressed
                              in both words and numerals, and in case of a discrepancy between the two, the amount
                              of sum written in words shall govern. Interlineations, alterations and erasures must be
                              initialed by the signer of the Proposal.
                     8.2       The “Bid Form” provided by the District provides a space at the bottom of the first page
                               for Contractors to add or deduct from their Base Bid at any time up to the official
                               submittal date and time. This space is identified as “Voluntary Deduct/ Add to the Base
                               Bid.” The deduct/add amount cannot exceed 25% of the Base Bid; if it does, the Bidder
                               will be disqualified from the procurement.

            9. Equitable Distribution (Maximum 15 points):
                     9.1 In an effort to consider the equitable distribution of work, the Selection Process Facilitator
                         shall evaluate data showing dollar amounts of contracts and projects awarded by DCSD to
                         the submitting firm(s). The dollar amount of projects awarded will reflect the estimated
                         construction value listed on the RFP awarded to each firm. The projects taken into account
                         in the calculation will be those awarded by DCSD within two years from this RFP bid
                         opening. For those projects already under contract, the awarded amount will be replaced
                         by the GMP and/or Bid amount(s) contracted, not including change orders. For projects
                         recommended but not yet awarded, the contract value will reflect the estimated fee based
                         on the budget listed within the RFP for which the firm was selected. In the case of submittals
                         received by joint ventures, the projects awarded to each of the firms comprising the joint
                         venture will be included in the calculation of the projects awarded by DCSD. Furthermore,
                         this calculation will include all projects awarded to the submitting firm, either as a joint
                         venture or as a separate entity, whereby the submitting firm(s) was one of the entities
                         included in the award and/or contract.

                     9.2 The chart below will be used to award a maximum of 15 points based on dollar amount of
                         projects currently under contract, as well as those awarded by DCSD, but not yet under
                         contract and those recommended but not yet awarded. This single score will be allocated
                         to each firm by the Selection Process Facilitator and added to the cumulative score the
                         committee members.


                                  Contract Value Awarded/ Recommended by DCSD                         Point Value
                                  0 to $5,000,000                                                      15 points
                                  $5,000,001 to $10,000,000                                            13 points
                                  $10,000,001 to $20,000,000                                           11 points
                                  $20,000,001 to $30,000,000                                            9 points
                                  $30,000,001 to $50,000,000                                            7 points
                                  Greater than $50,000,000                                              0 points

THE INFORMATION FOR THE FOLLOWING TWO SECTIONS IS NOT TO BE INCLUDED WITH THE TECHNICAL
PROPOSAL.
DeKalb County School District                                                                       RFP No. 24-752-022
Clarkston High School Capital Improvements                                                             Project # 213-35
March 28, 2024                                                                                           Page 22 of 46
C.       INTERVIEWS AND PRESENTATION

         After evaluation of the Proposals received in response to the RFP, DeKalb County School District may
         interview two or more proposers deemed fully qualified, responsive, responsible and suitable on the basis of
         initial responses, and with professional competence to provide the required services.

         At the time of its scheduled interview, each short listed firm shall provide additional information about is firm
         and operations as may be required by DCSD. This additional information shall include, but is not limited to,
         the following:

             1. Overall Approach, Methodology and Knowledge of the Site (35 points)

                  1.1.     The firm shall provide information regarding its knowledge of working on active school
                           campuses, local codes and ordinances as an indication of its ability to deliver quality
                           workmanship in an effective and timely manner.

                  1.2.     The firm shall demonstrate verbally and its plan for performing the services outlined in the
                           RFP, documenting the services to be provided and showing the interrelationship of all
                           parties.

             2. Project Team (10 points)

                  2.1.     The firm shall express the general and specific project related experience and capability
                           of in-house staff and sub-consultants and their functions as it relates to the project.

                  2.2.     The firm shall develop an organization chart as it relates to the Project indicating key
                           personnel and their relationship. It shall be understood that it is the intent of the
                           District to insist that the staff presented at the time of the interview as those key
                           personnel indicated as the project team in the RFP actually executes the Project.


             3. Project Scheduling (25 points)

                 As part of the project approach, the firm shall propose a schedule for effectively managing and
                 executing the work in the optimum time. Provide a schedule and describe any major milestones for
                 achieving the schedule and any other recommendations that may directly impact the schedule.

             4. Cost Control/Value Engineering (25 points)

                  4.1.     Describe how you develop cost estimates, and how they are updated, providing specific
                           examples of successful recommendations implemented and cost containment strategies
                           utilized to maintain project budgets without sacrificing quality.

                  4.2.     The firm shall provide a comparison of any representative current projects demonstrating
                           their ability to hold to original budgets.

                  4.3.     The firm shall provide suggestions for potential savings to the project that will maintain the
                           design intent and still maintain exceptional quality.
DeKalb County School District                                                                  RFP No. 24-752-022
Clarkston High School Capital Improvements                                                        Project # 213-35
March 28, 2024                                                                                      Page 23 of 46
             5. References (5 points)

                 The GC must demonstrate a positive relationship with prior clients on similar projects.

                 5.1.    The GC shall submit written recommendations from previous owners and discuss their
                         strategy to provide a positive working relationship with DCSD. This strategy must include
                         actual examples of how the GC has demonstrated their cooperation with other Owners.
                         DCSD reserves the option of contacting any of the references provided to confirm
                         information provided.

                 5.2.    If applicable, DCSD staff will provide input on a firm’s past work performance, this
                         information includes but is not limited to the number of warranty requests and
                         responsiveness, contract and process compliance, and information from the DCSD
                         contractor evaluation process if available.
DeKalb County School District                                                                        RFP No. 24-752-022
Clarkston High School Capital Improvements                                                              Project # 213-35
March 28, 2024                                                                                            Page 24 of 46


                                                          VI.

 QUALIFICATIONS FOR SELECTION AND THE SELECTION PROCESS

A.      QUALIFICATIONS FOR SELECTION OF GENERAL CONTRACTOR

        The evaluation of the Proposals will be based upon consideration of the demonstrated qualifications and
        capabilities of the GC based on the identified evaluation factors and their relative weight, which will result in
        an award that is in the best interest of the DeKalb County Board of Education.

B.      SELECTION PROCESS

         A Selection Committee will perform Proposal evaluations and, following completion of the evaluations and
         subject to the Owner’s right to reject any or all Proposals, the responsible and responsive GC whose Proposal
         is determined to be the most advantageous to the Owner will be selected to perform the GC Services and
         Work for the Clarkston High School Capital Improvements project. The evaluation factors that will be
         employed, and their relative importance, are identified at Part IV, Section 14, above.

         Offerors may be afforded an opportunity for discussion, negotiation and revision of Proposals for the purpose
         of obtaining best and final offers. In the event the Owner deems it necessary or appropriate, responsible
         Offerors found by the Owner to have submitted Proposals reasonably susceptible of being selected for award
         shall be given an opportunity to participate in such discussions, negotiations and revisions.

        The Owner reserves the right to reject any or all Proposals, before or after opening, for any reason whatsoever
        including, but not limited to, any failure of any Proposal to be accompanied by a proper Bid Bond or by other
        data required by the Proposal Documents, any incompleteness or irregularity of any Proposal received, any
        evidence of collusion with the intent to defraud or other illegal practices on the part of the GC, failure to comply
        with the requirements of the Proposal Documents, or exceeding the funds available. The Owner also reserves
        the right to waive any technicalities or informalities, and to award the Contract in the best interests of the
        Owner.
DeKalb County School District                                                                     RFP No. 24-752-022
Clarkston High School Capital Improvements                                                           Project # 213-35
March 28, 2024                                                                                         Page 25 of 46


                                               VII.
                                         PROTEST PROCESS

    This section describes the mandatory administrative procedure whereby Offerors submitting sealed competitive
    bids/proposals (hereinafter referred to as “bidders”) to DCSD directly related to design and construction, for
    proposals worth $100,000 or more may challenge the solicitation process, and whereby bidders/Offerors on sealed
    competitive bids directly related to Facilities Management for proposals worth $100,000 or more, may challenge
    contract awards.


    1. Protests. A bidder may file a written protest challenging DCSD’s compliance with applicable procurement
       procedures subject to the bidder’s compliance with the provisions outlined below. Any such written protest
       will be resolved in accordance with these provisions.

    2. Types of Challenges. Any bidder interested in and capable of responding to a competitive solicitation may
       file a protest with respect to the competitive solicitation process including, but not limited to, a challenge to
       specifications or any events or facts arising during the solicitation process. Any bidder submitting a timely
       bid/proposal in response to a competitive solicitation may file a protest with respect to DCSD’s intended or
       actual contract award including, but not limited to, events or facts arising during the evaluation and/or
       negotiation process.

    3. Form of protest. At a minimum, the written protest must include the following:
               a. the name and address of the protestor;
               b. appropriate identification of the solicitation;
               c. a statement of reasons for the protest;
               d. supporting exhibits, evidence, or documents to substantiate any claims unless not available
                   within the filing time (in which case the Offeror must proceed to file the protest during the
                   filing period identified below but state the expected availability of the material); and
               e. the desired remedy.

        DCSD, at its discretion, may deem issues not raised in the initial protest as waived with prejudice
        by the protesting Offeror.

    4. Filing Protests. A protest is considered to be properly filed when it is in writing, signed by a company officer
       authorized to sign contracts on behalf of the Offeror, and is received by the Design and Construction
       Department. The protest may be sent by any of the following means:

                 MAIL: Attention:            Mr. Erick Hofstetter
                                             Chief Operating Officer
                                             DeKalb County School District
                                             Sam A. Moss Service Center
                                             1780 Montreal Road
                                             Tucker, Georgia 30084

                 EMAIL:                      dcsd-op-solicitation@dekalbschoolsga.org
DeKalb County School District                                                                       RFP No. 24-752-022
Clarkston High School Capital Improvements                                                             Project # 213-35
March 28, 2024                                                                                           Page 26 of 46
The Offeror must observe the following deadlines when filing a protest:
  Type of Protest                                                Protest Filing Deadline
  Challenge to Competitive Solicitation Process                  Two (2) business days prior to the closing date and time
                                                                 of the solicitation as identified on the Invitation to Bid.
  Challenge to an Intended or Actual Contract                    In the event DCSD posts a Notice of Intent to Award
  Award                                                          (“NOIA”), the protest must be filed within ten (10) calendar
                                                                 days of the date the NOIA is posted.
                                                                 In the event DCSD does not post a NOIA, the protest
                                                                 must be filed within ten (10) calendar days of the date the
                                                                 Notice of Award (“NOA”) is posted.

If a bidder fails to file a protest by the applicable deadline, such failure shall be deemed as a waiver with
prejudice of any grounds the bidder may have for protest.

    5. Stay of procurement during protest review. When a protest challenging the competitive solicitation process
       has been timely filed at least two (2) business days prior to the closing date and time, the solicitation shall not
       close until a final decision resolving the protest has been issued, unless the facilities management department
       makes a written determination that the closing of the solicitation without delay is necessary to protect the
       interests of DCSD.

        When a protest challenging an intended contract award has been timely filed, DCSD shall not proceed to
        actual contract award unless the Design and Construction Department makes a written determination that the
        issuance of a contract or performance of the contract without delay is necessary to protect the interests of
        DCSD. If it is determined that it is necessary to proceed with contract performance without delay, the
        bidder/Offeror with this contingent contract may proceed with performance and receive payment for work
        performed in strict accordance with the terms of the contract. The provisions of this paragraph are not
        applicable to a protest pertaining to events or facts arising during the solicitation process.

    6. Protest Resolution. The Design and Construction Department shall review and issue a written decision on
       the protest within seven (7) business days. This decision shall be deemed final. Available remedies for
       sustained protests are as follows:

             ▪   If a protest is sustained prior to the closing date and time of the solicitation, available remedies may
                 include, but are not limited to, the following: modification of the solicitation document including, but
                 not limited to, specifications and terms and conditions; extension of the solicitation closing date and
                 time (as appropriate); and cancellation of the solicitation.

             ▪   If a protest of the intended/actual contract award is sustained, available remedies may include but
                 are not limited to, the following: revision or cancellation of the NOIA/NOA, re-evaluation and re-
                 award, or re-solicitation with appropriate changes to the new solicitation.

    7. Costs. In no event shall a bidder be entitled to recover any costs incurred in connection with the solicitation
       or protest process, including, but not limited to, the costs of preparing a bid/proposal, the costs of participating
       in the protest process, or any attorney fees.


                            (END OF RFP – SEE APPENDICES AND ATTACHMENTS)
DeKalb County School District                                                            RFP No. 24-752-022
Clarkston High School Capital Improvements                                                  Project # 213-35
March 28, 2024                                                                                Page 27 of 46
    ATTACHMENT A: GENERAL CONTRACTOR CHECKLIST AND CERTIFICATION

The undersigned, hereby acknowledges having received Request for Proposal (RFP) No. 24-752-022 for Project
No. 213-35; GC Services for Clarkston High School Capital Improvements containing a full set of documents:

   Owner’s Project Specific Information
   Appendix A     Owner’s Preliminary Program Narrative (2 pages)
   Appendix B      Special Conditions (5 pages)
   Appendix C      Master Project Schedule (1 page)
   Appendix D      DeKalb County School District 2024-2025 Calendar (2 pages)
   Appendix E      Fixed Price Construction Contract (44 pages)
   Appendix F      Subcontractor Affidavit of Non-collusion (1 page)
   Appendix G      Performance Bond (3 pages)
   Appendix H      Payment Bond (4 pages)
   Appendix I      Affidavit for Payment (2 pages)



IMPORTANT NOTICE: The omission of any of the required items listed below shall cause the bid
submission to be declared non-responsive and to be rejected.

                                                                                                   Check Box to
                                                                                    Include with     Confirm
   Owner’s Standard Forms:                                                            Proposal      Inclusion
   Attachment A   Contractor’s RFP Checklist (2 pages)                                  YES            
   Attachment B1 Corporate Certificate (1 page)                                     B1 or B2 or        
   Attachment B2 Partnership Certificate (1 page)                                     B3 as            
   Attachment B3 Entity Certificate (1 page)                                        applicable         
   Attachment C   Subcontractor Listing (1 page)                                       YES             
   Attachment D   Offeror’s and Individuals’ Affidavit of Non-collusion (2 pages)      YES             
   Attachment E   Conflict of Interest Disclosure Form (2 pages)                       YES             
   Attachment F   Form of Consent to Release Information (1 page)                      YES             
   Attachment G   Vendor References Form (1 page)                                      YES             
   Attachment H   Bid Bond (1 page)                                                    YES             
   Attachment I   Fixed Price for Construction Proposal (4 pages)                      YES             
   Attachment J   Immigration and Security Certification (2 Pages)                     YES             
   Attachment K   No Submittal Response Form (1 page)                                  N/A

                                             (CONTINUED ON NEXT PAGE)
DeKalb County School District                                                                      RFP No. 24-752-022
Clarkston High School Capital Improvements                                                            Project # 213-35
March 28, 2024                                                                                          Page 28 of 46


                                                                                                               Check Box to
                                                                                            Include with         Confirm
    Other Requirements:                                                                       Proposal          Inclusion
    Sample Certificate of Insurance, per General Conditions Item F.                             YES                
    Copy of Business and GC License, per General Conditions Item N.                             YES                
    Acknowledgement of ALL addenda (if any) below.                                              YES                



Indicate Addenda(s) Nos. _____________________________ received (none unless indicated here). The General
Contractor is responsible for reading and understanding all sections of this RFP, and affirms that the General Contractor
shall be bound by all of the terms and conditions contained in this RFP.

Further, the undersigned, being duly sworn, states on oath that no disclosures of ownership have been withheld from
the Board, that the information provided herein is current, and General Contractor and its officers and employees have
not entered into any agreement with any other General Contractor or prospective General Contractor or with any other
person, firm or corporation relating to any prices or other terms named in this RFP or any other RFP, nor has it entered
into any agreement or arrangement under which a person, firm or corporation is to refrain from responding to this RFP.

Name of General Contractor:

Signature:                                                         Printed Name:

Title:                                                             Date:

Sworn to and subscribed before me this ___ day of _______________, 2_____.

Notary Public:                                                                     My commission expires: __/__/__.

(SEAL)



THE DEKALB COUNTY SCHOOL DISTRICT RESERVES THE RIGHT TO REJECT ANY AND ALL PROPOSALS
AND TO WAIVE INFORMALITIES.
DeKalb County School District                                                     RFP No. 24-752-022
Clarkston High School Capital Improvements                                           Project # 213-35
March 28, 2024                                                                         Page 29 of 46
                        ATTACHMENT B1: CORPORATE CERTIFICATE
                                    (Proposals)



STATE OF _______________________
COUNTY OF _____________________




          I, ________________________________, certify that I am the Secretary of the

corporation       named         as       offeror   in    the     foregoing       proposal;      that

_____________________________________ who signed said proposal on behalf of the offeror

was then _______________________ of said corporation; that said proposal was duly signed for

and in behalf of said corporation by authority of its Board of Directors, and is within the scope of

its corporate powers; and that said corporation is organized under the laws of the State of

____________________.




_____________________________________
[signature]



_____________________________________
[typed name]



Subscribed and sworn to
before me this ___ day of
_______________, 2_____.


(SEAL)



_____________________
Notary Public

My Commission Expires:
___/___/___
DeKalb County School District                                                          RFP No. 24-752-022
Clarkston High School Capital Improvements                                                Project # 213-35
March 28, 2024                                                                              Page 30 of 46
                          ATTACHMENT B2: PARTNERSHIP CERTIFICATE
                                       Proposals


STATE OF __________________________
COUNTY OF ________________________



          On       this   ____   day   of    ______________,       20______,     personally    appeared

_____________________________, who executed the above proposal, and being first duly

sworn, deposes and says that he or she is a general partner in the firm of

_____________________________ and that said firm consists of himself or herself and

____________________________________________ and that he or she executed the

foregoing proposal on behalf of said firm for the uses and purposes stated therein, and that no

one except the above named members of the firm have any financial interest whatsoever in said

proposed contract.



____________________________________
[Affiant’s Signature]



_________________________________                        __________________________________
Partner                                                  Partner

_________________________________                        __________________________________
Partner                                                  Partner

Subscribed and sworn to
before me this ___ day of
_______________, 2____.

(seal)

_______________________
Notary Public

My Commission Expires:
___/___/___


NOTE: If only one partner signs, a Power of Attorney executed by all other partners authorizing him or her
to act in the name of the partnership must be attached; otherwise, all partners must sign.
DeKalb County School District                                                     RFP No. 24-752-022
Clarkston High School Capital Improvements                                           Project # 213-35
March 28, 2024                                                                         Page 31 of 46
                            ATTACHMENT B3: ENTITY CERTIFICATE
                                      Proposals



STATE OF _______________________
COUNTY OF _____________________




          I, ________________________________, certify that I am the Secretary of the entity

named as offeror in the foregoing proposal; that _____________________________________

who signed said proposal in behalf of the offeror was then _______________________ of said

entity; that said proposal was duly signed for and on behalf of said entity by due authority, and is

within the scope of its legal powers; and that said entity is a ________________________

organized under the laws of the State of ____________________.




_____________________________________
[signature]



_____________________________________
[typed name]



Subscribed and sworn to
before me this ___ day of
_______________, 2____.


(SEAL)



_____________________
Notary Public

My Commission Expires:
___/___/___
DeKalb County School District                                                    RFP No. 24-752-022
Clarkston High School Capital Improvements                                          Project # 213-35
March 28, 2024                                                                        Page 32 of 46
                         ATTACHMENT C: SUBCONTRACTOR LISTING
                                             (Proposals)

TO:     DEKALB COUNTY BOARD OF EDUCATION                                        RFP No. 24-752-022
hereinafter called “Owner”                                                       Project No. 213-35

       Pursuant to proposal requirements for the Projects known as GC Services for Clarkston High
School Capital Improvements

the undersigned proposes to use the following subcontractors for principal portions of the
Project:

                                      SUBCONTRACTOR NAME                       ADDRESS
   PORTION OF THE WORK                  CONTACT PERSON                    TELEPHONE NUMBER




Use Additional Sheets If Necessary
Provide Signature Identical To That           OFFEROR: ___________________________________
Shown On The Proposal Form                                [typed proper name of Offeror]

                                              By:     ______________________________________
                                                            [signature]

                                                      ______________________________________
                                                            [name and title]
DeKalb County School District                                                               RFP No. 24-752-022
Clarkston High School Capital Improvements                                                     Project # 213-35
March 28, 2024                                                                                   Page 33 of 46
  ATTACHMENT D: OFFEROR’S and INDIVIDUALS’ AFFIDAVIT OF NON-COLLUSION
                 (This affidavit to be executed in accordance with O.C.G.A. § 36-91-21(e))

STATE OF ______________________

COUNTY OF ____________________


      COMES NOW,
_________________________________________________________(“Offeror”),
                                       [name of Offeror]

appearing by and through __________________________________ , it’s _________________________
                              [insert name of individual with                [title]
                              authority to bind Offeror]

(averring both individually and in his or her representative capacity on behalf of Offeror) (the “Individual And

Representative Affiant”), and
_____________________________________________________________
                              [in these blanks insert the names of all those required to give the oath
                               under O.C.G.A. § 36-91-21(e)]

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

(collectively, the “Individual Affiants”), and each of the Individual And Representative Affiant and the
Individual Affiants, after first being duly sworn, deposes and says that:

        1. He, she or it, as applicable, has not directly or indirectly violated subsection (d) of the Official

Code of Georgia Annotated Section 36-91-21, which subsection provides as follows:

                 (d)     Whenever a public works construction contract for any governmental entity subject
        to the requirements of this chapter is to be let out by competitive sealed bid or proposal, no person,
        by himself or herself or otherwise, shall prevent or attempt to prevent competition in such bidding
        or proposals by any means whatever. No person who desires to procure such work for himself or
        herself or for another shall prevent or endeavor to prevent anyone from making a bid or proposal
        therefor by any means whatever, nor shall such person so desiring the work cause or induce
        another to withdraw a bid or proposal for the work.

        2. If the Offeror is a partnership, then the Individual And Representative Affiant, together with the

Individual Affiants, constitute all of the partners and any officer, agent or other person who may have

represented or acted for them in bidding or proposing for or procuring the contract for the DeKalb County
DeKalb County School District                                                              RFP No. 24-752-022
Clarkston High School Capital Improvements                                                    Project # 213-35
March 28, 2024                                                                                  Page 34 of 46
Board of Education Project No. 213-35 for GC Services for Clarkston High School Capital Improvements
(the “Project”).

         3. If the Offeror is a corporation or other entity, then the Individual And Representative Affiant,

together with the Individual Affiants, constitute all officers, agents, or other persons who may have acted

for or represented the corporation or other entity in bidding for or procuring the contract for the Project.

         Further, the Individual And Representative Affiant and the Individual Affiants sayeth not.

This _______ day of _______________, 2____

_____________________________________
      [insert name of Offeror]

and      ___________________________________________
         [insert name of Individual And Representative Affiant]


By: ___________________________________, both individually and on behalf of Offeror as its
       [signature]

_________________________________
      [insert title]


Individual Affiants’ signatures and names:

x_____________________________________                      x____________________________________
Name:                                                       Name:

x_____________________________________                      x____________________________________
Name:                                                       Name:

x_____________________________________                      x____________________________________
Name:                                                       Name:

x_____________________________________                      x____________________________________
Name:                                                       Name:

x_____________________________________                      x____________________________________
Name:                                                       Name:

x_____________________________________                      x____________________________________
Name:                                                       Name:


Sworn to and subscribed before me this ___ day of _______________, 2____.

Notary Public: _____________________ My commission expires: __/__/__.

(SEAL)
DeKalb County School District                                                    RFP No. 24-752-022
Clarkston High School Capital Improvements                                          Project # 213-35
March 28, 2024                                                                        Page 35 of 46
          ATTACHMENT E: CONFLICT OF INTEREST DISCLOSURE AFFIDAVIT


I HEREBY CERTIFY, UNDER OATH, that
   1. I (Printed Name), ______________________________________ am the (Title)
      _________________________________________________ and I am the duly authorized
      representative of the firm of (Firm Name) _______________________
      _____________________________________________ (the “Firm”) for purposes of this
      Affidavit, whose address is (Firm Address) _________________________
      ________________________, and I possess the legal authority to make this Affidavit on
      behalf of myself and the Firm, as follows:

   2. The following employee(s), officer(s) or agent(s) of the Firm (collectively, “Firm
      Representative”) is/are related, by blood or marriage, to an employee, agent or Board
      Member of the DeKalb County Board of Education (collectively, “Owner
      Representative”), as indicated below:

        Firm Representative                  Owner Representative   Relation
        ________________                     __________________     __________________
        ________________                     __________________     __________________
        ________________                     __________________     __________________
        ________________                     __________________     __________________
        ________________                     __________________     __________________

   3. Except as listed below under “EXCEPTIONS”, neither the Firm nor any Firm
      Representative have any conflicts of interest, whether real or potential, due to kinship,
      ownership, other clients, other contracts, interests, or otherwise concerning the DeKalb
      County Board of Education, the Project or any Owner Representative:

        EXCEPTIONS (fully disclose and completely explain)




                                         [Continued on Next Page]
DeKalb County School District                                                     RFP No. 24-752-022
Clarkston High School Capital Improvements                                           Project # 213-35
March 28, 2024                                                                         Page 36 of 46
   4. This disclosure is made without prior understanding, agreement, or connection with any
      corporation, firm or person submitting a bid, proposal or qualification statement for the same
      contract or project, and is in all respects without collusion or fraud.

Wherefore, the foregoing disclosure is fully complete and true, and may be relied upon by the
DeKalb County Board of Education:

Signature:               ____________________________________________

Printed Name:            ____________________________________________

Firm Name:               ____________________________________________

Date:                    ____________________________________________

Sworn to and described before me this ________ day of _______________________

Personally known:                ____________________________________________

OR Produced Identification: ____________________________________________

Type of Identification:          ____________________________________________

Notary Public – State of         ____________________________________________

My Commission Expires            ____________________________________________

Affix Notary Seal Here:
DeKalb County School District                                                     RFP No. 24-752-022
Clarkston High School Capital Improvements                                           Project # 213-35
March 28, 2024                                                                         Page 37 of 46
                   ATTACHMENT F: CONSENT TO RELEASE INFORMATION
       The undersigned, having submitted a competitive sealed Proposal to the DeKalb
County Board of Education in respect of a local government entity public works
construction project (or being a partner in a joint venture that has submitted such
proposal), hereby authorizes any person or entity having in its possession, custody or
control any information regarding the undersigned to fully disclose and make available
such information to the DeKalb County Board of Education, its agents, attorneys and
other representatives.
        This ___ day of _______________, 2_____.

        _____________________________________________________
        [Printed name of person or entity consenting to release of information]


        By: ___________________________________

        Printed name: ___________________________

        Printed Title: ____________________________
DeKalb County School District                                                              RFP No. 24-752-022
Clarkston High School Capital Improvements                                                    Project # 213-35
March 28, 2024                                                                                  Page 38 of 46


                            ATTACHMENT G: VENDOR REFERENCE FORM

        VENDOR REFERENCES FOR:                             ____________________________________
                                                                                   Insert Company Name

        References must be completed by ALL Vendors. It is the vendor’s responsibility to provide COMPLETE and
        ACCURATE reference information on the form below; completing ALL fields. Failure to do so can result in
        DCSD being unable to verify vendor’s past work, which may affect DCSD’s determination that the vendor is
        responsive and responsible. DCSD reserves the right to consider past experience with vendor.

        1. __________________________________________________________________________________
           Company

            __________________________________________________________________________________
            Address, City, State, Zip Code

            ___________________________________            _______________________________________
            Telephone Number                                                     Fax Number

            ___________________________________            _______________________________________
            Name of Contact Person                         E-Mail Address



        2. __________________________________________________________________________________
           Company

            __________________________________________________________________________________
            Address, City, State, Zip Code

            ___________________________________            _______________________________________
            Telephone Number                                                     Fax Number

            ___________________________________            _______________________________________
            Name of Contact Person                         E-Mail Address



        3. __________________________________________________________________________________
           Company

            __________________________________________________________________________________
            Address, City, State, Zip Code

            ___________________________________            _______________________________________
            Telephone Number                                                     Fax Number

            ___________________________________            _______________________________________
            Name of Contact Person                         E-Mail Address
DeKalb County School District                                                                                 RFP No. 24-752-022
Clarkston High School Capital Improvements                                                                       Project # 213-35
March 28, 2024                                                                                                     Page 39 of 46
                                              ATTACHMENT H: BID BOND

         KNOW ALL PERSONS BY THESE PRESENTS, that we, _______________________,
                                                                                                 [insert proper name of Surety]
a corporation duly organized and existing under the laws of the State of ________________,

as surety (“Surety”), and _______________________________________________________
                                                              [Insert proper name and address of Bidder]
as principal (“Bidder”), enter into, execute this bond (“Bid Bond”), and firmly bind ourselves,

our heirs, administrators, executors and successors, jointly and severally, in favor of the

DeKalb County Board of Education, as obligee (“Owner”), in the penal sum of:

_____________________________________________ dollars ($____________________),
                       [Insert penal sum, written in words and in numerals, which shall equal 5% of the Base Bid]


as of the ____ day of _________________ 20___.


WHEREAS, the Bidder has submitted a bid for construction of the DCSD Project No. 213-35, GC
Services for Clarkston High School Capital Improvements (RFP No. 24-752-022) Project in
DeKalb County, Georgia; and

       WHEREAS, the Owner has required the Bidder to furnish this Bid Bond containing the
terms and conditions set forth herein as a condition to submission of the bid;

       NOW THEREFORE, the Surety and the Bidder, for themselves, their heirs, administrators,
executors and successors, both joint and severally, agree that if the Owner accepts the bid of the
Bidder and within ninety (90) days of the bid opening delivers to the Bidder a Notice of Award,
and the Bidder, within ten (10) calendar days after receipt of such Notice of Award, has not
executed a contract with the Owner in accordance with the terms of such bid and furnished such
bonds as are specified in the bidding documents with good and sufficient surety for the faithful
performance of such contract and for the prompt payment of labor and materials furnished in the
prosecution thereof, then the Surety and the Bidder shall pay to the Owner the full penal sum
hereof as liquidated damages and not as a penalty.

         SIGNED AND SEALED this ____ day of __________________, 2_____.

BIDDER                                                                   SURETY


_____________________________[SEAL]                                      ____________________________[SEAL]
[Typed Name]                                                             [Typed Name]



BY:_______________________________                                       BY:_______________________________
         [Signature]                                                               [Signature]


__________________________________                                       __________________________________
[Printed Name, Title and Address]                                        [Printed Name, Title and Address]
DeKalb County School District                                                   RFP No. 24-752-022
Clarkston High School Capital Improvements                                         Project # 213-35
March 28, 2024                                                                       Page 40 of 46
                 ATTACHMENT I: General Contractor Fixed Price Proposal

                                                  BID FORM

DeKalb County Board of Education
Sam A. Moss Service Center
1780 Montreal Road
Tucker, Georgia 30084

The “Bid Form” provided by the District provides a space in section B below for
Contractors to add or deduct from their Base Bid at any time up to the official submittal
date and time. This space is identified as “Voluntary Deduct/ Add to the Base Bid.” The
deduct/add amount cannot exceed 25% of the Base Bid; if it does, the Bidder will be
disqualified from the procurement.

No changes to the “Bid Form” are permitted. Any changes to the “Bid Form” can result in
the bidder being disqualified from the procurement.

        In compliance with the Request for Sealed Proposals, the undersigned Contractor,

                         ____________________________________________,
                                             [legal name of Contractor]


                         ____________________________________________

                         ____________________________________________,
                                              [address of Contractor]
                         ____________________________________________,
                                         [telephone number of Contractor]

having carefully examined the proposed Standard Form of Fixed Price Construction Contract (the
“Agreement” or the “Contract”) and the Owner’s other Proposal Documents included or referenced
in the Request for Proposals, any Addenda thereto, for DCSD Project No. 213-35 GC Services
for Clarkston High School Capital Improvements (RFP No. 24-752-022), proposes and agrees, if
this proposal is accepted, to enter into the Agreement with the Owner and to perform the Work
including all services, supervision, labor, coordination, equipment and material in conformance
with the Contract Documents, in the time and for the Contract Price set forth below, and submits
the following proposed Fixed Price, schedule and other matters set forth below:

a.      The proposed Fixed Price amount to insert in as the Contract Price in Section 6.1 of the
        Agreement:

        1.   General Conditions                            $
        2.   Site Work                                     $
        3.   Concrete                                      $
        4.   Masonry                                       $
        5.   Metals                                        $
        6.   Carpentry                                     $
        7.   Thermal and Moisture Protection               $
        8.   Doors and Windows                             $
        9.   Finishes and Accessories                      $
DeKalb County School District                                                     RFP No. 24-752-022
Clarkston High School Capital Improvements                                           Project # 213-35
March 28, 2024                                                                         Page 41 of 46
        10. Specialties                                       $
        11. Equipment                                         $
        12. Furnishings                                       $
        13. Special Construction                              $
        14. Conveying Systems                                 $
        15. Mechanical                                        $
        16. Electrical                                        $
        Total Base Bid                                        $

        _________________________________________                                           dollars
                                 Total Base Bid written in words

b.      Voluntary Deduct/Add to Base Bid

        _________________________________________________________________dollars
                                             (written in words)
        ($___________________________), shall be added / deducted (circle which one) from
        the Base Bid.

c.      Alternates to your Base Bid

        None
d.      Unit Prices and Allowances: The undersigned Contractor further agrees to the
        following unit prices. The unit prices are amounts to be used for work that will be added
        to or deleted from the Contract by Change Order in the event such additional work may
        be required. The quantities shown (in parenthesis) on the following schedule shall be in
        the Base Bid as an Allowance at the rates that the Contractor proposes.

        Unit prices are complete for labor, equipment, material, the hauling in of needed material
        and the hauling off and disposal of excess and unsuitable material, installation, applicable
        taxes, overhead and profit and all other incidental costs. Units will be measured in place.
        OWNER reserves the right to accept or reject these unit prices or require the Work to be
        performed on a time and material basis with complete daily breakdowns and logs
        submitted.

        None.



      The Contractor understands that the Owner reserves the right to reject any or all
Proposals, and to waive any technicalities and informalities.

       The Contractor agrees that this Proposal may not be withdrawn for a period of ninety (90)
calendar days after the date and time fixed for receiving said Proposals.


        The person signing this bid form must be legally authorized to bind the company.
DeKalb County School District                                                     RFP No. 24-752-022
Clarkston High School Capital Improvements                                           Project # 213-35
March 28, 2024                                                                         Page 42 of 46

                                             Respectfully submitted,

                                             ______________________________________
                                                    [typed name of Contractor]

                                             By: __________________________________[seal]
                                                    [signature]

                                             __________________________________________
                                                    [typed name and title]

                                             __________________________________________
                                                    [address of Contractor]

                                             (_____)____________________________________
                                                    [business telephone number]

                                             __________________________________________
                                                    [date of execution]
DeKalb County School District                                                                    RFP No. 24-752-022
Clarkston High School Capital Improvements                                                          Project # 213-35
March 28, 2024                                                                                        Page 43 of 46
[If the Contractor is a joint venture, utilize this page of this proposal form for signatures.]

         By submission of this Proposal, the Contractor certifies that this Proposal has been
derived independently, without consultation, communication or agreement as to any matter
relating to this Proposal with any other Contractor or with any competitor. The Contractor hereby
certifies that this Proposal is made without prior understanding, agreement or connection with any
corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. If successful in its Proposal, the Contractor will timely submit to
the Owner the Offeror’s and Individuals’ Affidavit of Non-collusion and the Subcontractor’s
Affidavit of Non-collusion in the form, manner and number, required by the Request for Proposals
and applicable laws. The Contractor agrees to abide by all conditions of the Request for Proposal.

Respectfully submitted ________________________________________________________,
                                                         [typed name of Joint Venture]



                                             By: _________________________________
                                                         [typed name of Joint Venture partner]

                                             By: __________________________________[seal]
                                                         [signature]

                                             __________________________________________
                                                         [typed name and title]

                                             __________________________________________
                                                         [address of Joint Venture partner]

                                             (_____)____________________________________
                                                         [business telephone number]

                                             __________________________________________
                                                         [date of execution]




                                             By: __________________________________
                                                         [typed name of Joint Venture partner]

                                             By: __________________________________[seal]
                                                         [signature]

                                             __________________________________________
                                                         [typed name and title]

                                             __________________________________________
                                                         [address of Joint Venture partner]

                                             (_____)____________________________________
                                                         [business telephone number]

                                             __________________________________________
                                                         [date of execution]
DeKalb County School District                                                            RFP No. 24-752-022
Clarkston High School Capital Improvements                                                  Project # 213-35
March 28, 2024                                                                                Page 44 of 46


             ATTACHMENT J: IMMIGRATION AND SECURITY CERTIFICATION

        If you are providing service, performing work or delivering goods to the DeKalb County
        Board of Education/DeKalb County School District including, but not limited to schools,
        warehouses and central offices, the applicable Georgia Security and Immigration
        Compliance documents found here must be completed, signed, notarized and submitted with
        your bid/proposal. Failure to provide this document with your bid/proposal will result in the
        disqualification of the bid/proposal.

        1) Offeror/Bidder (the "Offeror") shall at all times comply with the Georgia Security and
        Immigration Compliance Act, as amended, O.C.G.A. § 13-10-90 et. seq.

        2)       In order to insure compliance with the Immigration Reform and Control Act of 1986
        (IRCA), D.L. 99-603 and the Georgia Security and Immigration Compliance Act, as amended by
        the Illegal Immigration Reform Act of 2011, O.C.G.A. § 13-10-90 et. seq. (collectively the “Act”),
        the Offeror MUST INITIAL the statement applicable to Offeror below:

                (a)      ________ (Initial here): Offeror declares under penalties of perjury that,
                Offeror has registered at https://e-verify.uscis.gov/enroll/ to verify information of
                all new employees in order to comply with the Act; is authorized to use and uses
                the federal authorization program under the federal work authorization user
                identification number issued on the date of authorization below; will continue to
                use the authorization program throughout the contract period; Offeror further
                warrants and agrees Offeror shall execute and return any and all affidavits required
                by the Act and the rules and regulations issued by the Georgia Department of Labor
                as set forth at Rule 300-10-1-.01 et. seq. [Offerors who initial (a) must attach
                and return a signed, notarized Contractor Affidavit and Agreement with the
                Contract if awarded];
        or

                (b) ________ (Initial here): Offeror warrants that he/she does not employ any
                other persons, and he/she does not intend to hire any employees or to perform the
                Contract. [Offerors who initial (b) must attach and return a signed, notarized
                Affidavit of Exception with the Contract if awarded];

                         or
                (c)      _______ (Initial here) Offeror is an individual who is licensed pursuant
                to Title 26 or Title 43 or by the State Bar of Georgia and is in good standing
                when such contract is for services to be rendered by such individual and thus
                does not have to provide an affidavit.

        3) _____ (Initial here) Offeror will not employ or contract with any subcontractor in
           connection with a covered contract unless the subcontractor is registered, authorized
           to use, and uses the federal work authorization program; and provides Offeror with all
           affidavits required by the Act and the rules and regulations issued by the Georgia
           Department of Labor as set forth at Rule 300-10-1-.01 et. seq.

        4) _____(Initial here) Offeror agrees that, if Offeror employs or contracts with any sub-
        contractor in connection with the covered contract under the Act and DOL Rules 300-10-
        1-.01, et seq that Offeror will secure from each sub-contractor at the time of the contract
        the sub-contractor’s name and address, the employee-number applicable to the sub-
DeKalb County School District                                                           RFP No. 24-752-022
Clarkston High School Capital Improvements                                                 Project # 213-35
March 28, 2024                                                                               Page 45 of 46
        contractor, the date the authorization to use the federal work authorization program was
        granted to sub-contractor; the subcontractor’s attestation of the subcontractor’s compliance
        with the Act and Georgia Department of Labor Rule 300-10-1-.01, et seq.; and the
        subcontractor’s agreement not to contract with sub-subcontractors unless the sub-
        subcontractor is registered, authorized to use, and uses the federal work authorization
        program; and provides subcontractor with all affidavits required by the Act and the rules
        and regulations issued by the Georgia Department of Labor as set forth at Rule 300-10-1-
        .01 et. seq.

    5) ______(Initial here) Offeror agrees to provide the DeKalb County School District with
       all affidavits of compliance as required by O.C.G.A. § 13-10-90 et seq. and Georgia
       Department of Labor Rules 300-10-1-.01, et seq within five (5) business days of receipt.


 _________________________________                        ______________________________
    Signature                                             Date

  ____________________________________                    _______________________________
     EEV/Basic Pilot Program                              Date of Authorization
     User Identification Number


      Firm Name: __________________________________________________________


      Street/Mailing Address: ________________________________________________

      City, State, Zip Code: __________________________________________________

      Telephone Number: ___________________________________________________

      Email Address: _______________________________________________________

      SUBSCRIBED AND SWORN
      BEFORE ME ON THIS THE
      ______ DAY OF_____________________, 20____


      Notary Public
      My Commission Expires:
DeKalb County School District                                                                   RFP No. 24-752-022
Clarkston High School Capital Improvements                                                         Project # 213-35
March 28, 2024                                                                                       Page 46 of 46
                      ATTACHMENT K: NO SUBMITTAL RESPONSE FORM

RFP Number: 24-752-022                                                                            Project No.: 213-35
Title: GC Services for Clarkston High School Capital Improvements
If your company will not be submitting a proposal in response to this Request for Proposal, please complete this form
and return or fax, prior to the RFP due date established within to:
                               DeKalb County Board of Education (the “Board”)
                              Sam A. Moss Service Center - Procurement Services
                                      Attention: Procurement Manager
                                             1780 Montreal Road
                                         Tucker, Georgia 30084-6705
                                 Email: belinda_quillet@dekalbschoolsga.org


This information will assist Procurement Services in the preparation of future RFPs.

Company Name: ______________________________________________________________

Contact: ____________________________________________________________________

Address: ____________________________________________________________________

Telephone: _________________________________ Fax: ____________________________

Email:_______________________________________________________________________

Please check reason for a “no submittal.”

_____      Specifications ‘too tight,” geared toward one brand or manufacturer (explain below)
_____      Insufficient time to respond
_____      Specifications unclear (explain below)
_____      We do not offer this service or an equivalent
_____      Our schedule does not permit us to perform
_____      Unable to meet specifications
_____      Unable to meet bond requirements
_____      Unable to hold prices respondent throughout the term of the contract period
_____      Unable to meet insurance requirements
_____      Other________________________________________________________________
Explanation:__________________________________________________________________
____________________________________________________________________________



                       If submitting this form, only this form needs to be returned.