4. Flow Test for Dresden ES Site

AID 1603663 · View on Simbli

Agenda Item

x. Request to Georgia Department of Education for Site Approval for the New Dresden Elementary School Facility

Summary: Presented by: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations
Request: It is requested that the Board of Education approve the application to the Georgia Department of Education for site approval of the rebuild of the Dresden Elementary School Facility.
Why: A formal request for site approval is required by the Georgia Department of Education to construct new school facilities, including rebuilding existing ones.
Details: The Georgia Department of Education requires that all school facilities being built or rebuilt undergo a formal process of review of the geographic, environmental, and development conditions of the site on which new school facilities will be constructed. Once this review process has been completed, a formal request for site approval by the local school system is necessary for the Georgia Department of Education to consider the site application for approval.
Financial impact: There is no financial impact of submitting a site application to the Georgia Department of Education.
Contact: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations, 678-676-1475

Mr. Hans Williams, Dir. Planning & E-SPLOST Programming, Division of Operations, 678-676-1588
Effective: Upon Board Approval
Status: Approved by General Counsel
                                                                                                INVOICE NO
K.E.G. PLUMBING & MECHANICAL, INC.                                                                    14590
3148 ATLANTA HWY
DALLAS, GA 30132
PH: 770-445-2224


     CUST     Dekalb County Schools System                 SITE     DCSD: Dresden Elementary
              1780 Montreal Road                                    2449 Dresden Dr
              Tucker, GA 30084                                      Chamblee, GA 30341

 ACCOUNT NO         INVOICE DATE         TERMS           DUE DATE                                       PAGE
 DEKAL              12/30/2023           Net 30          1/29/2024                                           1

           ORDER   8685, PO

   DESCRIPTION     Flow Test conducted previously
                   Update from flow test, no flow found to hydrants, investigate and resolve, locator
                   necessary, vault in front right

   RESOLUTION      Arrived onsite 12/4/23 and conducted initial flow test on 4 hydrants and all failed due
                   to no flow, additional work is necessary to determine cause.

                   Arrived onsite 12/19/23 to address the fire hydrants. Determined the fire backflow was
                   off on the city side, called watershed out and found the valve was off in the street.
                   Checked the fire device, no sign of water being used, left it on. Will return.

                   Arrived onsite 12/20/23 checked flow to all hydrants. All four opened full and shut off.
                   Checked the backflow, made sure that both shut off and holding. Cleaned area.

                   Returned and conducted officail flow test and all hydrants passed, job is complete.

                   Testing fees is based on 4 hydrants and failing on first flow test, then resolving the
                   issue and retesting.
 ITEM NO                      QUANTITY     DESCRIPTION                             UNIT PRICE      EXTENDED
 DEKALB1TECH                        3      Dekalb Labor 1 Technician                 95.00           285.00*
 DCSDHYDRANTT                       8      DCSD Hydrant Flow Test                   250.00         2,000.00*
 EST
 DEKALB1TECH                       2.5     Dekalb Labor 1 Technician                  95.00         237.50*

A finance charge of 1.5% per month (18% annual
percentage rate) will be charged on all invoices over 30                    TOTAL AMOUNT           2,522.50
days old.

* means item is non-taxable