1. Application for New Site or Tear Down Rebuild of Educational Facility – Sequoyah Site

AID 1603650 · View on Simbli

Agenda Item

ix. Request to Georgia Department of Education for Site Approval for the new Middle and High School Facility at the Sequoyah Site

Summary: Presented by: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations
Request: It is requested that the Board of Education approve the application to the Georgia Department of Education for site approval of the new Middle and High School Facility at the Sequoyah Site.
Why: A formal request for site approval is required by the Georgia Department of Education for the construction of new school facilities, including rebuilding existing school facilities.
Details: The Georgia Department of Education requires that all school facilities being built or rebuilt undergo a formal process of review of the geographic, environmental, and development conditions of the site on which new school facilities will be constructed. Once this review process has been completed, a formal request for site approval by the local school system is necessary for the Georgia Department of Education to consider the site application for approval.
Financial impact: There is no financial impact of submitting a site application to the Georgia Department of Education.
Contact: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations, 678-676-1475

Mr. Hans Williams, Dir. Planning & E-SPLOST Programming, Division of Operations, 678-676-1588
Effective: Upon Board Approval
Status: Approved by General Counsel
                                     Georgia Department of Education
                                      New Site or Tear Down Rebuild
                                           Educational Facility
                                               Application


School System:   DeKalb County                                             *Superintendent: Dr. Devon Q. Horton
System Code:     644
                      Mailing Address                                          Supt. Email:       supt@dekalbschoolsga.org
Address:          1701 Mountain Industrial Boulevard                         Contact Person: Mr. Erick Hofstetter
Address:                                                                     Phone Number: (678) 676-1475
City:             Stone Mountain                                             Contact Email: erick_hofstetter@dekalbschoolsga.org
Zip Code:         30083                                                      Area Consultant: John Ramage

                  * For State and Commission Charter School, the Principal will sign for Superintendent.


Application for: Tear Down Old Facility and Build New Facility
   If Other Explain


I. Location of Proposed Site
Address of Proposed Site (if available and/or legal definition of the property):

3456 Aztec Road, Doraville, GA 30340

 Parcel Number - 18 296 05 004
Acreage in the proposed Site:          33.46                                             Clear Title Obtainable? Yes
Acreage in 100 year flood plain:       2.05
Does this acreage meet the minimum requirements: No                                      This property will be Owned        by
**Please attach a rationale and request by the local                                     the school system
school board for requesting a variance                                                          OR
to the minimum size requirement if the answer                                            This property will be Select        by
above is "NO"                                                                            (WHO)                 Owned
                                                                                         and used for:




Georgia Department of Education                                          1                                    November 17, 2022
II. Purposed educational facility to be located on this site

Name of the Proposed Facility : Sequoyah Middle & High School
Proposed Grades: 6-12                                  Approximate Number of Students: 2,800
Number of Instructional Units Proposed : 158
Is this the maximum size planned for this facility? Yes
Is this facility being designed for future expansion? No
                                                      No
IF expanded, Maximum Number of instructional units proposed in the future?

Estimate date the facility is to be completed and occupied: July 2026
Date: 7/1/2026
Comments:


III. Utilities available on the proposed site
                      Currently              Date
                      Available?                                            Other Relevant Factors
      Utility                               Available?

a. Electricity      Yes                Current               Voltage: 480            Phase: 3

b. Natural Gas      Yes                Current               Line Size 3"            Line Pressure 5 lbs

c. Telephone        Yes                Current

d. Cable            Yes                Current
e. Water*
                 Public      Yes                             Line Size 3"            Line Pressure
                                                                                     Attach FLOW TEST results
                                                                                     *(see note below)
                 Private     Select                          Line Size               Line Pressure
                                                                                     Attach FLOW TEST results
                                                                                     *(see note below)
f. Sewage*
                 Public      Yes
                 Private     Select




 Georgia Department of Education                         2                                       November 17, 2022
IV. Miscellaneous Site Information
 (For each item choose the appropriate response. If other is selected, please enter appropriate response)

                                               Choose One                           If Other

a. Property Zoned                           Residential

b. Adjacent development or existing
                                    Residential
community design
c. Traffic conditions around site           Light

d. Topography                               Gently Sloping
                                            Flat
e. Grading for building                     Moderate

f. Rock excavation                          Unlikely
                                            Not Excessive
g. Area available for parking               Adequate

h. Vehicular access to site                 Excellent

i. Area available for athletic and          Adequate
recreation area development




Georgia Department of Education                           3                                         November 17, 2022
V. System Request for Site Approval
After having considered the findings from all studies completed and evaluating the
potential sites available for this facility, the DeKalb                   Board of Education
requests approval of the proposed site identified on this form by official board action
on                . (Date of Board Action)
An initial investigation has been conducted, a Phase I Environmental Site Assessment has
been conducted, and a Risk Hazard Analysis has been completed. Costs associated with
the development of this site, including grading, obtaining utilities, and road
improvements have been evaluated.


________________________________                                 ___________________
Signature of Board Chairperson*                                  Date


________________________________                                 __________________
Signature of School Superintendent**                             Date

* For State and Commission Charter Schools, the charter board chair will sign this blank
** For State and Commission Charter Schools, the principal will sign in this blank


________________________________                                 __________________
Signature of Consultant,                                         Date
Facilities Services Unit


________________________________                                 __________________
Signature of Representative,                                     Date
Local Sewer Department


________________________________                                 __________________
Signature of Representative,                                     Date
Local Building Code Official
        (If required)




Georgia Department of Education                           4                                November 17, 2022
VI. Attachments

The following documents must be submitted to the Facilities Services Unit of the Georgia Department of
Education to evaluate you system's request for approval of a proposed educational facility site:

• Preliminary site approval form with sections I-V completed;

• A copy of the letter of assurance from the Flood Plain Management Coordinator of the Georgia
  Department of Natural Resources stating that this proposed educational facility site is not in a flood
  plain or Coastal High Hazard Area;

• A copy of the rough plat of the proposed educational facility site

• A copy of the Flow Test results taken at the potable water hydrant nearest to the educational facility
  site;

• A copy of the Phase I - Environmental Site Assessment;

• A copy of the Risk Hazard Analysis;

• A copy of the letter to the Georgia Department of Transportation or local roads commissioner
  requesting a road study for this site be conducted;

The Facilities Services Unit of the Georgia Department of Education is authorized to
request any additional information on any criteria (Section) when such information is
needed to complete the evaluation of the proposed site.

Comments:




This section below is for the use by the Department of Education Facilities Services.
Based on our visual inspection of the site and/or evaluation of the documentation submitted by the
school system, the decision of the GaDoe Facilities Services is:

              ❑ This educational facility is recommended for approval without mitigations

              ❑ This educational facility and documentation submitted by the school system
                are approved with mitigations. See attachments

              ❑ This site is not recommended for approval.




Signature of Director, Facilities Services Unit                                     Date




 Georgia Department of Education                      5                                      November 17, 2022