Quote #1244

AID 1574707 · View on Simbli

Agenda Item

i. Approval to Utilize the Sourcewell Contract for Stertil-Koni USA Inc. To Acquire Eight (8) Surface Mount Drive-On Lifts (Not to exceed $2,500,000)

Summary: Presented by: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations
Request: It is requested that the Board of Education approve the purchase and installation of eight (8) surface mounted drive-on vehicle lifts, from Stertil-Koni Inc., utilizing the Sourcewell Contract No. RFP 013020 for an amount not to exceed $2,500,000.
Why: This request is to purchase and install eight (8) surface-mount drive-on vehicle lifts. Under this contract, the vendor will furnish equipment, labor, and materials needed to perform the work.
Details: This contract will allow the Fleet Department to replace eight (8) older lifts, ensuring technicians have safe, efficient, and serviceable equipment to maintain, service, and repair district school buses.
Financial impact: The total budget for these services is allocated from the cost code (100.2600.543013.00011.7520.9990.8013.040.0000) under the Operations’ Division General Fund Budget in the amount not to exceed $2,500,000.
Contact: Mr. Erick Hofstetter, Chief Operating Officer, Division of Operations, 678.676.1470

Mr. Cedric Burse, Director of Fleet and Special Transportation, Division of Operations, 678.676.1475
Status: Approved by General Counsel
                                                                                                          Quote




Stertil-Koni USA, Inc.                                                     Quote #             1244
200 Log Canoe Circle                                                       Date                10/25/2023
Stevensville, MD 21666                                                     Expires             11/24/2023
T: 410.643.9001                                                            RSM                 Brian Myles
F: 410.643.8901


Billing Address        DeKalb County School District           Shipping Address         DeKalb County School District
                       Cedric Burse                                                     Cedric Burse
                       1780 Montreal Rd                                                 1780 Montreal Rd
                       Tucker, GA                                                       Tucker, GA
                       30084                                                            30084
                       Cedric_burse@dekalbschoolsga.org                                 Cedric_burse@dekalbschoolsga.org
                       (678) 676-1384                                                   (678) 676-1384



Sourcewell Contract #: 013020-SKI
 Item                                                                     Qty         Price   Discount       Total



ECOLIFT installation                                                    8.00 $14,000.00         0.00% $112,000.00

Professional installation by Heavy Duty Lift & Equipment


ECO60-13                                                                8.00 $236,304.00       33.50% $1,257,137.2
                                                                                                                 8
Inground Scissor ECOLIFT with 60,000 lbs capacity and 13 ft.
(156'') travel range


89930001                                                                8.00      $7,158.00    33.50%     $38,080.56

Optional detachable wired remote control for ECO60 / ECO90 /
DIA64 / DIA70 / DIA96 / DIA105 (Includes remote control, 35 ft
cable, military style quick disconnect)


89020029                                                                8.00      $1,911.00    33.50%     $10,166.52

Additional bridge bracket, price each


89020040                                                                8.00      $1,856.00    33.50%      $9,873.92

12" cover plate, price each


89020080                                                                8.00      $2,588.00    33.50%     $13,768.16




                                                                                                    1/3
23.5" cover plate, price each


Miscellaneous Non Taxable                                                     8.00 $104,454.00      0.00% $835,632.00

Removal of existing in ground lift and
construction of new vaults for ECO 60-13
in ground lifts including Air and Electrical
Service to the new control console for
each lift. More details at the bottom of the
quote.




                                                                                             Subtotal:     $2,946,168.00
                                                                                             Discount:     ($669,509.56)
                                                                                                  Tax:             $0.00
Comments                                                                                     Shipping:       $20,000.00
Sourcewell Member Account # 12268                                                                Total     $2,296,658.44


-Owner to provide staging areas required for the work to be performed,-including
equipment, materials, hauling & disposal containers, and adjacent bays each side
as maybe necessary while the work is being performed
-Price does not include any water removal, or well pointing
-All work performed will meet or exceed local building codes
-Utility services, re: electric & water required for work by owner
-Price assumes existing slab thickness to be no more than 8-10 inches thick
-Owner is responsible for any below slab locating of underground facilities and the
cost of relocating any underground facilities if found to be in conflict with the work
-Owner is responsible to have lift pits cleaned and degreased, including the
evacuation of all fluids in reservoirs and hydraulic lines, before work can begin
-All labor and materials for the above stated work is included in price unless
otherwise noted
-Price above as stated does not include any contaminated soil or concrete,
remediation, removal, disposal, inadequate substrate or unforeseen obstacles
-Any hidden or discovered work beyond what is described above or found during
the performance of above stated work will be priced separately via change order
-Price does not include any concrete coatings, sealants, or paint other than listed
in scope




Subcontract:



Local Distributor:

Heavy Duty Lift & Equipment, Inc.
Ian Merrow




                                                                                                         2/3
ian@heavydutylift.com
404.353.6921



Terms and Conditions

1. Product availability and proposed delivery date provided ARO
2. Purchase Orders MUST be issued to Stertil-Koni USA, Inc., not the Local Distributor
3. Please submit Purchase Orders to orders@stertil-koni.com
4. Customer is responsible for paying sales tax, if any, when applicable.




                                                                                         3/3