RFQu 22-752-030 - AE Services for HVAC Replacement

AID 1404789 · View on Simbli

Agenda Item

i. ESSER III Project: RFQu No. 22-752-030 Professional Architectural and Engineering Services for HVAC Replacement at Bob Mathis ES, Briarlake ES, Chapel Hill ES, Early Learning Center, Edward L. Bouie ES, Marbut ES, Martin Luther King Jr. HS, Montclair ES, Panola Way ES, Pine Ridge ES, Shadow Rock ES, Stephenson HS, and Tucker MS to Corgan Associates, Inc. for a Lump Sum Amount of $1,163,339.00, Stanley, Love-Stanley PC for a Lump Sum Amount of $1,047,876.00, and Epsten Group, Inc. for a Lump Sum Amount of $695,273.00

Summary: Presented by: Mr. Richard Boyd, Interim Chief Operations Officer, Division of Operations
Request: It is requested that the Board of Education approve three (3) awards for RFQu 22-752-030 for Architectural and Engineering Services for HVAC Replacement to the most responsive and responsible Offerors whose submittals are the most advantageous to the district. The awards are as follows:

Bob Mathis Elementary School, Chapel Hill Elementary School, Edward L. Bouie Elementary School, Martin Luther King Jr. High School, and Panola Way Elementary School to Corgan Associates, Inc. for the lump sum amount of $1,163,339.

Marbut Elementary School, Pine Ridge Elementary School, Shadow Rock Elementary School, and Stephenson High School to Stanley, Love-Stanley PC for the lump sum amount of $1,047,876.

Briarlake Elementary School, Early Learning Center, Montclair Elementary School, and Tucker Middle School to Epsten Group, Inc. for the lump sum amount of $695,273.
Why: To approve the award of lump sum design contracts for the Architectural and Engineering Services for a HVAC replacement at Bob Mathis Elementary School, Briarlake Elementary School, Chapel Hill Elementary School, Early Learning Center, Edward L. Bouie Elementary School, Marbut Elementary School, Martin Luther King Jr. High School, Montclair Elementary School, Panola Way Elementary School, Pine Ridge Elementary School, Shadow Rock Elementary School, Stephenson High School, and Tucker Middle School.
Details: The scope of work for this project includes A/E services for HVAC replacements at Bob Mathis Elementary School, Briarlake Elementary School, Chapel Hill Elementary School, Early Learning Center, Edward L. Bouie Elementary School, Marbut Elementary School, Martin Luther King Jr. High School, Montclair Elementary School, Panola Way Elementary School, Pine Ridge Elementary School, Shadow Rock Elementary School, Stephenson High School, and Tucker Middle School. Additional project information can be found on the DeKalb County School District’s solicitation website at https://dekalbschoolsga.ionwave.net/.

The RFQu was issued on April 28, 2022, and notification of the RFQu was sent via email to over 60 vendors from the DCSD vendor list, 1,585 vendors through the State of GA Procurement Registry, and 232 vendors through DemandStar. The solicitation was advertised in the Champion and posted on the DCSD website. Twenty-Four (24) people attended the virtual mandatory pre-submittal conference on May 5, 2022, representing sixteen (16) architectural/engineering firms. On May 24, 2022, submittals were received from eleven (11) firms.

This recommendation is based on the review and evaluation of the eleven (11) responsive submittals received. Corgan Associates, Inc, located at 1201 Peachtree Street NE, Suite 1740 Atlanta, GA 30361, Stanley, Love-Stanley PC located at 1056 Spring Street, NW Atlanta, GA 30309, and Epsten Group, Inc. located at 101 Marietta Street NW, Suite 2600 Atlanta, GA 30303 submitted the most responsive and responsible submittals and will be responsible for the architectural and engineering design work as set forth in the proposal documents. The DeKalb County School District’s Standard Form of Contract for Architectural Services will be used for this project.
Financial impact: The total budget of $139,000.00 for Architectural/Engineering Services for Bob Mathis Elementary School HVAC Replacement will be allocated from cost code (CARE3HVAC.30521.ARCHITECT.0475).

The total budget of $107,937.00 for Architectural/Engineering Services for Briarlake Elementary School HVAC Replacement will be allocated from cost code (CARE3HVAC.30521.ARCHITECT.3051).

The total budget of $138,862.00 for Architectural/Engineering Services for Chapel Hill Elementary School HVAC Replacement will be allocated from cost code (CARE3HVAC.30521.ARCHITECT.1053).

The total budget of $137,394.00 for Architectural/Engineering Services for Early Learning Center HVAC Replacement will be allocated from cost code (CARE3HVAC.30521.ARCHITECT.6014).

The total budget of $183,948.00 for Architectural/Engineering Services for Edward L. Bouie Elementary School HVAC Replacement will be allocated from cost code (CARE3HVAC.30521.ARCHITECT.0297).

The total budget of $183,699.00 for Architectural/Engineering Services for Marbut Elementary School HVAC Replacement will be allocated from cost code (CARE3HVAC.30521.ARCHITECT.0197).

The total budget of $528,026.00 for Architectural/Engineering Services for Martin Luther King Jr. High School HVAC Replacement will be allocated from cost code (CARE3ROOF.30521.ARCHITECT.0103).

The total budget of $144,005.00 for Architectural/Engineering Services for Montclair Elementary School HVAC Replacement will be allocated from cost code (CARE3HVAC.30521.ARCHITECT.4062).

The total budget of $173,137.00 for Architectural/Engineering Services for Panola Way Elementary School HVAC Replacement will be allocated from cost code (CARE3HVAC.30521.ARCHITECT.0188).

The total budget of $175,092.00 for Architectural/Engineering Services for Pine Ridge Elementary School HVAC Replacement will be allocated from cost code (CARE3HVAC.30521.ARCHITECT.0190).

The total budget of $203,398.00 for Architectural/Engineering Services for Shadow Rock Elementary School HVAC Replacement will be allocated from cost code (CARE3HVAC.30521.ARCHITECT.0293).

The total budget of $485,687.00 for Architectural/Engineering Services for Stephenson High School HVAC Replacement will be allocated from cost code (CARE3HVAC.30521.ARCHITECT.0497).

The total budget of $305,938.00 for Architectural/Engineering Services for Tucker Middle School HVAC Replacement will be allocated from cost code (CARE3HVAC.30521.ARCHITECT.0605).
Contact: Mr. Richard Boyd, Interim Chief Operations Officer, Division of Operations, 678.676.1483
Effective: Upon board approval
Status: Approved by General Counsel
DeKalb County School District                                                            RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                           Project Nos. N/A
April 28, 2022                                                                                  Page 1 of 28

  J                               DeKalb County Board of Education
                                  Operations Division
                                  Sam A. Moss Service Center
                                  1780 Montreal Road
                                  Tucker, GA 30084-6705

                    REQUEST FOR QUALIFICATIONS (RFQu) No. 22-752-030
                                         for
               PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR
                                  HVAC REPLACEMENT

Project:                   A/E Services for HVAC Replacement at Bob Mathis ES, Briarlake ES, Chapel Hill ES,
                           Early Learning Center, Edward L. Bouie ES, Marbut ES, Martin Luther King Jr. HS,
                           Montclair ES, Panola Way ES, Pine Ridge ES, Shadow Rock ES, Stephenson HS,
                           and Tucker MS

DCSD Project No.:          N/A

Owner:                     DeKalb County Board of Education (the “Board”)

Solicitation Timeline Summary (Subject to Change)
             EVENT                         DATE(S)             TIME                        LOCATION
  Solicitation Opens                     April 28, 2022                        http://dekalbschoolsga.ionwave.net
  Virtual Mandatory Pre-
                                         May 5, 2022        11 :00 AM                      Via ZOOM
  Submittal Conference

  Optional Site Visit                   Upon Request           TBA                        Various Sites


  Final Questions Due                    May 11, 2022        2:00 PM        dcsd-op-bidquestion@dekalbschoolsga.org

  Final Addendum                         May 18, 2022        2:00 PM         http://www.dekalbschoolsga.ionwave.net
  Statement of Qualifications
                                         May 24, 2022        2:00 PM           http://dekalbschoolsga.ionwave.net
  Due Date & Time

  Public Acknowledgement                 May 26, 2022        5:00 PM           http://dekalbschoolsga.ionwave.net

  Shortlist Finalist Notified                                            Public Notice of Short List will be posted to the
                                         June 6, 2022
  (If Interviews are Conducted)                                               DCSD website by close of business
  Interviews Conducted
                                         June 13, 2022
  (If Requested)
  Anticipated Board Review and
                                           July 2022
  Approval
  Anticipated Notice of Award              July 2022

  Anticipated Notice to Proceed          August 2022
DeKalb County School District                                                         RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                        Project Nos. N/A
April 28, 2022                                                                               Page 2 of 28

                                      Request for Qualifications
          PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR
                             HVAC REPLACEMENT

Qualifications will be received electronically on the DeKalb County School District website at
https://dekalbschoolsga.ionwave.net for ARCHITECTURAL AND ENGINEERING SERVICES FOR HVAC
REPLACEMENT, until 2:00 p.m. EST, Tuesday, May 24, 2022. Qualifications received after the specified
time will not be considered.           All potential respondents must register as a vendor at
http://dekalbschoolsga.ionwave.net. NOTE: A virtual mandatory pre-submittal conference will be held on
Thursday, May 5, 2022, 11:00 a.m., EST, via ZOOM. Attendees must provide the following information by
5:00 p.m., EST on Wednesday, May 4, 2022:

    1.   Individual Name and Title
    2.   Company Name
    3.   Telephone Number
    4.   Email Address

This information must be sent to dcsd-op-solicitation@dekalbschoolsga.org. A meeting link will be sent to all
registered attendees no later than 10:30 a.m., EST on Thursday, May 5, 2022.

This document shall serve to provide interested parties with specific information as to the Procedures for
Selection of Professional Architectural and Engineering Services for the DeKalb County School District.
DeKalb County School District                                                                                           RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                                                          Project Nos. N/A
April 28, 2022                                                                                                                 Page 3 of 28

 Table of Contents
 Section           Description                                                                                                           PAGE

                   Request for Qualifications:

 1.0               Project Description................................................................................................... 7
 2.0               General Scope of Work ........................................................................................... 9
 3.0               Requirements ........................................................................................................... 13
 4.0               Statement of Qualifications...................................................................................... 14
 5.0               Initial Screening Criteria .......................................................................................... 16
 6.0               Interview and Presentation ...................................................................................... 20
 7.0               Selection Process .................................................................................................... 21
 8.0               Schedule .................................................................................................................. 23
 9.0               General Instructions................................................................................................. 23
 10.0              Terms and Conditions.............................................................................................. 24
                   RFQu Advertisement ............................................................................................... 28
                   Exhibit A

 Attachments(separate file from RFQu)
 Attachment A      A/E Checklist and Certification
 Attachment B1     Corporate Certificate
 Attachment B2     Partnership Certificate
 Attachment B3     Entity Certificate
 Attachment C1     Design Fee Form – Bob Mathis Elementary School
 Attachment C2     Design Fee Form – Briarlake Elementary School
 Attachment C3     Design Fee Form – Chapel Hill Elementary School
 Attachment C4     Design Fee Form – Early Learning Center
 Attachment C5     Design Fee Form – Edward L. Bouie Elementary School
 Attachment C6     Design Fee Form – Marbut Elementary School
 Attachment C7     Design Fee Form – Martin Luther King Jr., High School
 Attachment C8     Design Fee Form – Montclair Elementary School
 Attachment C9     Design Fee Form – Panola Way Elementary School
 Attachment C10    Design Fee Form – Pine Ridge Elementary School
 Attachment C11    Design Fee Form – Shadow Rock Elementary School
 Attachment C12    Design Fee Form – Stephenson High School
 Attachment C13    Design Fee Form – Tucker Middle School
 Attachment D      Offeror’s and Individuals’ Affidavit of Noncollusion
 Attachment E      Conflict of Interest Disclosure Affidavit
 Attachment F      Consent to Release Information
 Attachment G      Immigration and Security Certification
 Attachment H      No Submittal Response
DeKalb County School District                                                    RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                   Project Nos. N/A
April 28, 2022                                                                          Page 4 of 28

 Appendices(separate file from RFQu)

 Appendix A        NOT APPLICABLE
 Appendix B        Design Review-Minimum Submittal Requirements (SCL >$2M)
 Appendix C1       DCSD Elementary School Educational Specifications
 Appendix C2       DCSD Middle School Educational Specifications
 Appendix C3       DCSD High School Educational Specifications
 Appendix D        DCSD Design Guidelines for Facility Construction
 Appendix E1       Comprehensive Facility Assessment Report – Bob Mathis Elementary School
 Appendix E2       Comprehensive Facility Assessment Report – Briarlake Elementary School
 Appendix E3       Comprehensive Facility Assessment Report – Chapel Hill Elementary School
 Appendix E4       Comprehensive Facility Assessment Report – Early Learning Center
 Appendix E5       Comprehensive Facility Assessment Report – Edward L. Bouie Elementary School
 Appendix E6       Comprehensive Facility Assessment Report – Marbut Elementary School
 Appendix E7       Comprehensive Facility Assessment Report – Martin Luther King Jr., High School
 Appendix E8       Comprehensive Facility Assessment Report – Montclair Elementary School
 Appendix E9       Comprehensive Facility Assessment Report – Panola Way Elementary School
 Appendix E10      Comprehensive Facility Assessment Report – Pine Ridge Elementary School
 Appendix E11      Comprehensive Facility Assessment Report – Shadow Rock Elementary School
 Appendix E12      Comprehensive Facility Assessment Report – Stephenson High School
 Appendix E13      Comprehensive Facility Assessment Report – Tucker Middle School
 Appendix F1       Aerial Image – Bob Mathis Elementary School
 Appendix F2       Aerial Image – Briarlake Elementary School
 Appendix F3       Aerial Image – Chapel Hill Elementary School
 Appendix F4       Aerial Image – Early Learning Center
 Appendix F5       Aerial Image – Edward L. Bouie Elementary School
 Appendix F6       Aerial Image – Marbut Elementary School
 Appendix F7       Aerial Image – Martin Luther King Jr., High School
 Appendix F8       Aerial Image – Montclair Elementary School
 Appendix F9       Aerial Image – Panola Way Elementary School
 Appendix F10      Aerial Image – Pine Ridge Elementary School
 Appendix F11      Aerial Image – Shadow Rock Elementary School
 Appendix F12      Aerial Image – Stephenson High School
 Appendix F13      Aerial Image – Tucker Middle School
 Appendix G1       Floor Plan – Bob Mathis Elementary School
 Appendix G2       Floor Plan – Briarlake Elementary School
 Appendix G3       Floor Plan – Chapel Hill Elementary School
 Appendix G4       Floor Plan – Early Learning Center
 Appendix G5       Floor Plan – Edward L. Bouie Elementary School
 Appendix G6       Floor Plan – Marbut Elementary School
 Appendix G7       Floor Plan – Martin Luther King Jr., High School
 Appendix G8       Floor Plan – Montclair Elementary School
 Appendix G9       Floor Plan – Panola Way Elementary School
 Appendix G10      Floor Plan – Pine Ridge Elementary School
 Appendix G11      Floor Plan – Shadow Rock Elementary School
 Appendix G12      Floor Plan – Stephenson High School
 Appendix G13      Floor Plan – Tucker Middle School
DeKalb County School District                                                       RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                      Project Nos. N/A
April 28, 2022                                                                             Page 5 of 28

 Appendix H1       Owner’s Master Schedule – Bob Mathis Elementary School
 Appendix H2       Owner’s Master Schedule – Briarlake Elementary School
 Appendix H3       Owner’s Master Schedule – Chapel Hill Elementary School
 Appendix H4       Owner’s Master Schedule – Early Learning Center
 Appendix H5       Owner’s Master Schedule – Edward L. Bouie Elementary School
 Appendix H6       Owner’s Master Schedule – Marbut Elementary School
 Appendix H7       Owner’s Master Schedule – Martin Luther King Jr., High School
 Appendix H8       Owner’s Master Schedule – Montclair Elementary School
 Appendix H9       Owner’s Master Schedule – Panola Way Elementary School
 Appendix H10      Owner’s Master Schedule – Pine Ridge Elementary School
 Appendix H11      Owner’s Master Schedule – Shadow Rock Elementary School
 Appendix H12      Owner’s Master Schedule – Stephenson High School
 Appendix H13      Owner’s Master Schedule – Tucker Middle School
 Appendix I        Standard Form of Contract for Architectural Services
 Appendix J        Acknowledgement of Conflict of Interest Policy and Disclosures
 Appendix K        2022-2023 and 2023-2024 School Calendar
DeKalb County School District                                                              RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                             Project Nos. N/A
April 28, 2022                                                                                    Page 6 of 28

                              REQUEST FOR QUALIFICATIONS
                      PROFESSIONAL ARCHITECTURAL AND ENGINEERING
                            SERVICES FOR HVAC REPLACEMENT
BACKGROUND

DeKalb County School District currently enrolls about 102,000 students (October 2015) in 137
schools/programs: 104 neighborhood schools, 23 choice and specialty schools/programs (magnet, theme,
special needs, etc.), and 10 DCSD-sponsored charter schools (that are operated by others). The District
owns 159 facilities: 127 school facilities, 5 support facilities, 5 stadiums, 14 vacant facilities or sites, and 8
properties leased to charter schools or other organizations. With over 15 million in building gross square
footage, and 15,400 employees, DeKalb is the third largest system in the State of Georgia (in terms of
students), with the largest number of school facilities in the State.

PURPOSE

The purpose of this RFQu is to solicit proposals from qualified Architect/Engineer firms to provide professional
design services. This solicitation is specifically for the design of HVAC replacements at the elementary,
middle, and high schools specified in this solicitation. Final documents will become the property of DCSD.

The anticipated construction delivery method for this project is Design/Bid/Build, Design/Propose/Build or
CM at Risk, depending upon the Stated Cost Limitation. The selected Architect/Engineer(s) shall provide
professional services for the project as described below in Section 2 of this RFQu.

The Stated Cost Limitation (SCL) for each site is listed below. DCSD has determined that the stipulated fee
the Architect will receive for each site scope will be 7.5% of the Stated Cost Limitation for each site and the
maximum fee for each site is listed below. The fee for each site is all inclusive and incorporates all
reimbursable expenses for each site.

Group A

    •    Bob Mathis Elementary School: SCL - $1,858,212 and Maximum Fee - $139,366
    •    Chapel Hill Elementary School: SCL - $1,851,491 and Maximum Fee - $138,862
    •    Edward L. Bouie Elementary School: SCL - $2,452,644 and Maximum Fee - $183,948
    •    Martin Luther King Jr., High School: SCL - $7,040,352 and Maximum Fee - $528,026
    •    Panola Way Elementary School: SCL - $2,308,487 and Maximum Fee - $173,137
    •    Total – SCL: $15,511,186 and Maximum Fee: $1,163,339

 Group B

     •    Marbut Elementary School: SCL - $2,449,323 and Maximum Fee - $183,699
     •    Pine Ridge Elementary School: SCL - $2,334,566 and Maximum Fee - $175,092
     •    Shadow Rock Elementary School: SCL - $2,711,969 and Maximum Fee - $203,398
     •    Stephenson High School: SCL - $6,475,828 and Maximum Fee - $485,687
     •    Total – SCL: $13,971,686 and Maximum Fee: $1,047,876
DeKalb County School District                                                            RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                           Project Nos. N/A
April 28, 2022                                                                                  Page 7 of 28

 Group C

      •    Briarlake Elementary School: SCL - $1,439,156 and Maximum Fee - $107,937
      •    Early Learning Center: SCL - $1,831,919 and Maximum Fee - $137,394
      •    Montclair Elementary School: SCL - $1,920,062 and Maximum Fee - $144,005
      •    Tucker Middle School: SCL - $4,079,171 and Maximum Fee - $305,938
      •    Total – SCL: $9,270,308 and Maximum Fee - $695,273

1.0       PROJECT DESCRIPTION
          The Bob Mathis Elementary School campus consists of three buildings located on 10 acres at 3505
          Boring Road in Decatur, Georgia. The original campus was constructed in 1975 and a classroom
          addition along with a gymnasium building was constructed in 2003. In addition to these buildings, the
          campus contains a covered walkway, playground, and softball field. The current size is approximately
          69,401 SF. At a minimum the project should meet the DCSD Elementary School Educational
          Specifications (Appendix C1) and the DCSD Design Guidelines for Facility Construction,
          (Appendix D).

          The Briarlake Elementary School campus consists of two buildings located on 11.1 acres at 3590
          Lavista Road in Decatur, Georgia. The original campus was constructed in 1957, additions to the
          main school building were constructed in 1963 and 2007, and a gymnasium building was constructed
          in 2003. In addition to these buildings, the campus contains a storage building, covered walkway,
          hard surface play area, playfields, and playground. The current size is approximately 53,750 SF. At
          a minimum the project should meet the DCSD Elementary School Educational Specifications
          (Appendix C1) and the DCSD Design Guidelines for Facility Construction, (Appendix D).

          The Chapel Hill Elementary School campus consists of two buildings located on 11.4 acres at 3536
          Radcliffe Boulevard in Decatur, Georgia. The original campus was constructed in 1967, additions to
          the main building were constructed in 1969, 1970, and 1987, and a gymnasium building was
          constructed in 2000. In addition to the main building, the campus contains a hard surface play area
          and playfield. The current size is approximately 69,150 SF. At a minimum the project should meet
          the DCSD Elementary School Educational Specifications (Appendix C1) and the DCSD Design
          Guidelines for Facility Construction, (Appendix D).

          The Early Learning Center campus consists of two buildings located at 797 Fayetteville Road in
          Atlanta, Georgia. The original campus was constructed in 1958, additions to the main school building
          were constructed in 1969 and 2004, and a gymnasium building was constructed in 2003. In addition
          to these buildings, the campus contains a storage building, covered walkway, and playing field. The
          current size is approximately 68,564 SF. At a minimum the project should meet the DCSD
          Elementary School Educational Specifications (Appendix C1) and the DCSD Design Guidelines
          for Facility Construction, (Appendix D).

          The E.L. Bouie Elementary School campus consists of two buildings located on 35.9 acres at 5100
          Rock Springs Road in Lithonia, Georgia. The original campus was constructed in 1996, a gymnasium
          building was constructed in 2003, and an addition to the gymnasium was constructed in 2009. In
          addition to the buildings, the campus contains a storage building, covered walkway, hard surface
          play area, and playing field. The current size is approximately 91,767 SF. At a minimum the project
          should meet the DCSD Elementary School Educational Specifications (Appendix C1) and the
          DCSD Design Guidelines for Facility Construction, (Appendix D).
DeKalb County School District                                                             RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                            Project Nos. N/A
April 28, 2022                                                                                   Page 8 of 28

       The Marbut Elementary School campus consists of two buildings located on 47.1 acres at 5776
       Marbut Road in Lithonia, Georgia. The original campus was constructed in 1994 and a gymnasium
       building was constructed in 1996. In addition to the buildings, the campus contains a covered
       walkway, playgrounds, playing field, and hard surface play area. The current size is approximately
       91,670 SF. At a minimum the project should meet the DCSD Elementary School Educational
       Specifications (Appendix C1) and the DCSD Design Guidelines for Facility Construction,
       (Appendix D).

       The Martin Luther King Jr. High School campus consists of one main school building located on
       117.6 acres at 3991 Snapfinger Road in Lithonia, Georgia. The original campus was constructed in
       2001 and there has been one addition to the main school building in 2014. In addition to the main
       school building, the campus contains a storage building, baseball field, softball field, dugouts, football
       field, tennis courts, and track. The current size is approximately 263,645 SF. At a minimum the
       project should meet the DCSD High School Educational Specifications (Appendix C3) and the
       DCSD Design Guidelines for Facility Construction, (Appendix D).

       The Montclair Elementary School campus consists of two buildings located on 12.1 acres at 1680
       Clairmont Place NE in Atlanta, Georgia. The original campus was constructed in 1967, additions to
       the main school building were constructed in 1971 and 2003, and a gymnasium building was
       constructed in 2003. In addition to the buildings, the campus contains covered walkways, hard
       surface play areas, playing field and playground. The current size is approximately 71,711 SF. At a
       minimum the project should meet the DCSD Elementary School Educational Specifications
       (Appendix C1) and the DCSD Design Guidelines for Facility Construction, (Appendix D).

       The Panola Way Elementary School campus consists of two buildings located on 14.6 acres at 2170
       Panola Way Court in Lithonia, Georgia. The original campus was constructed in 1987, an addition to
       the main school building was constructed in 2004, and a gymnasium building was constructed in
       2003. In addition to the buildings, the campus contains a covered walkway, playground, and playing
       field. The current size is approximately 86,218 SF. At a minimum the project should meet the DCSD
       Elementary School Educational Specifications (Appendix C1) and the DCSD Design Guidelines
       for Facility Construction, (Appendix D).

       The Pine Ridge Elementary School campus consists of two buildings located on 13.6 acres at 750
       Pine Ridge Drive in Stone Mountain, Georgia. The original campus was constructed in 1988, a
       classroom addition was constructed in 2004, and a gymnasium building was constructed in 2003. In
       addition to these buildings, the campus contains a storage building, covered walkway, playground,
       playing field, and hard surface play area. The current size is approximately 87,408 SF. At a minimum
       the project should meet the DCSD Elementary School Educational Specifications (Appendix C1)
       and the DCSD Design Guidelines for Facility Construction, (Appendix D).

       The Shadow Rock Elementary School / Shadow Rock Center campus consists of two buildings
       located on 15.2 acres at 1040 Kingway Drive in Lithonia, Georgia. The main school building was
       constructed in 1991 and a gymnasium building was constructed in 2003. In addition to these
       buildings, the campus contains covered walkways, storage buildings, playground, and playing field.
       The current size is approximately 118,576 SF. At a minimum the project should meet the DCSD
       Elementary School Educational Specifications (Appendix C1) and the DCSD Design Guidelines
       for Facility Construction, (Appendix D).
DeKalb County School District                                                            RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                           Project Nos. N/A
April 28, 2022                                                                                  Page 9 of 28

       The Stephenson High School campus consists of one main school building located on 39.8 acres at
       701 Stephenson Road in Stone Mountain, Georgia. The original campus was constructed in 1994
       and an addition to the main school building was constructed in 2005. In addition to the main school
       building, the campus contains a football storage/concession building, greenhouses, storage
       buildings, baseball field, softball field, football field, tennis courts, and track. The current size is
       approximately 245,441 SF. At a minimum the project should meet the DCSD High School
       Educational Specifications (Appendix C3) and the DCSD Design Guidelines for Facility
       Construction, (Appendix D).

       The Tucker Middle School campus consists of one main building located at 2160 Idlewood Road in
       Tucker, Georgia. The original campus was constructed in 2004 and there have been no additions or
       major renovations to the main school building. In addition to the main building, the campus contains
       a covered walkway, softball field, football field, track, and tennis court. The current size is
       approximately 152,350 SF. At a minimum the project should meet the DCSD Middle School
       Educational Specifications (Appendix C2) and the DCSD Design Guidelines for Facility
       Construction, (Appendix D).

2.0    GENERAL SCOPE OF WORK
       The anticipated scope of this project is to include but is not limited to the design of the following for
       each site:

             •   Replacement of HVAC system throughout the entire building.

       This is not intended to be an all‐inclusive list of the scope of work. The selected Architect/Engineer
       shall confirm and obtain DCSD approval of full scope of work prior to the start of design. A formal
       Notice to Proceed (NTP) shall be provided by the Owner or its designated representative prior to
       proceeding with each design milestone. The Architect/Engineer will be responsible for confirming
       the need for these elements and for making recommendations if an element is deemed unnecessary
       or if a more pressing element is discovered.

       For more details on what is expected of the Architect, see the General Services section below.

       2.1       General Services
                 The following generally highlights the services that the Architect and its subconsultants will
                 be required to perform:

             A. Design Services
                1. Prior to starting Schematic Design, the Architect will perform a preliminary consultation
                   with the Owner including, but not limited to, reviewing the Owner’s policies, concepts,
                   objectives, design criteria, schedule, budget, and operational needs for these projects.
                   The Architect will submit within 10 days of NTP, a written report with their proposed
                   recommendations, solutions to problems, etc.

                 2. The Architect will prepare and submit a Design Schedule that fits within the parameters
                    of Appendix H: Owner’s Master Schedule.

                 3. The Architect will prepare and submit schematic design documents per the requirements
                    of Appendix B: Design Review- Minimum Submittal Requirements and the Architect’s
                    Detailed Design Schedule.
DeKalb County School District                                                               RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                              Project Nos. N/A
April 28, 2022                                                                                    Page 10 of 28


               4. The Architect will prepare and submit a construction estimate based on the Schematic
                  Design documents. This estimate will be compared with the stated cost limitation (SCL)
                  for this project. If the estimate is more than 5% over the SCL, then the Architect will
                  prepare new schematic design documents and prepare a recovery schedule.

               5. The design scope shall be based upon a construction Stated Cost Limitation (SCL) of
                  $1,858,212 for Bob Mathis Elementary School
                  $1,439,156 for Briarlake Elementary School
                  $1,851,491 for Chapel Hill Elementary School
                  $1,831,919 for Early Learning Center
                  $2,452,644 for Edward L. Bouie Elementary School
                  $2,449,323 for Marbut Elementary School
                  $7,040,352 for Martin Luther King Jr., High School
                  $1,920,062 for Montclair Elementary School
                  $2,308,487 for Panola Way Elementary School
                  $2,334,566 for Pine Ridge Elementary School
                  $2,711,969 for Shadow Rock Elementary School
                  $6,475,828 for Stephenson High School
                  $4,079,171 for Tucker Middle School

               6. The Architect will submit documents as outlined below for review by DCSD and the
                  Program Manager.

               7. Once Schematic Design Documents are reviewed and approved and upon written
                  direction to proceed, the Architect will proceed with the 30% Construction Document
                  phase per Appendix B: Design Review- Minimum Submittal Requirements and the
                  Architect’s Detailed Design Schedule.

               8. The process used for Schematic Design Phase as outlined in items #3 – 7 above will be
                  performed for the 80% and 100% CD Phases.

               9. The Architect will submit to DCSD and the Project Manager reports, drawings,
                  specifications, and estimates for review according to the chart below:

                                                         Reports      Drawings       Specifications      Estimates
             Preliminary Consultation                      ✓
             Schematic Design                             ✓             ✓               ✓                 ✓
             Design Development Phase                     ✓             ✓               ✓                 ✓
             Construction Documents – 30%                 ✓             ✓               ✓                 ✓
             Construction Documents – 80%                 ✓             ✓               ✓                 ✓
             Construction Documents – 100%                ✓             ✓               ✓                 ✓
             Others as required                            ✓              ✓                ✓                 ✓

               This information will be submitted to the GaDOE for review, comment, and approval.

           10. The Architect will visit each school site. All areas of the existing facility will be made available
               to the Architect and it is expected that the Architect will study these areas to fully understand
DeKalb County School District                                                           RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                          Project Nos. N/A
April 28, 2022                                                                                Page 11 of 28

               any and all accessible existing conditions. The Architect shall investigate and document any
               limitations to be resolved during the design process.

           11. Coordination with DCSD’s Technology Department is critical during the Design Phase.
               DCSD’s Technology Department will design the Technology components and the
               Architect/Engineer will incorporate this design into the contract documents. The DCSD
               Technology Department will be responsible for the installation of the IT equipment, cabling
               and wiring. The General Contractor (GC) will be responsible for the supporting infrastructure
               (conduit, boxes, etc.).

           12. Provide complete construction contract documents with professional seals and signatures in
               accordance with the requirements of the Georgia Department of Education Facilities
               Services Unit.

           13. Assure that the construction contract documents are in conformance with generally accepted
               architectural and engineering practices and comply fully with all applicable DCSD and
               GaDOE criteria, along with all federal, state, and local codes and laws.

           14. Provide full and complete specifications including Division 1- General Conditions, reflecting
               current DCSD and GaDOE requirements. Specify materials and equipment that are readily
               available, in order to avoid delivery concerns during construction.

           15. Provide phasing plans, as appropriate, for construction. Include submission to and approval
               by DCSD and the Fire Marshal for the phased exiting of the facility.

           16. Provide design for on-site swing space (modular) as appropriate for the improvement
               activities; i.e. phasing.

           17. Provide design drawings and specifications for demolition of areas, as appropriate.

           18. Provide design drawings and specifications for security system (cameras, alarm, card
               access, motion detectors, recording devices, etc.), and MIS conduit/raceways, as needed.
               Equipment and cabling design and installation will be provided by approved DCSD vendors,
               as appropriate.

           19. Coordinate entrance design with and obtain approval from the agencies having jurisdiction
               as appropriate. Provide renderings when exterior modifications to the building are made.

           20. Coordinate and design all utility connections (gas, electrical, plumbing, sewer) with local
               utility provider and obtain necessary approvals. Deposits will be paid for by the District. The
               Architect will coordinate this effort.

           21. Represent DeKalb County School District by presenting necessary oral and/or graphic
               presentations to state and county agencies, or any other group having interest in the projects
               per the direction of DCSD.

           22. Complete all forms and documents in formats required by GaDOE and any other state or
               county agency.
DeKalb County School District                                                           RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                          Project Nos. N/A
April 28, 2022                                                                                Page 12 of 28

           23. Each design phase submittal must include a detailed cost estimate confirming that the cost
               of the design is below the construction SCL for the respective project. Design estimates
               will be reviewed by the program manager. If the estimate shows a cost more than 5%
               greater than the SCL, the Architect must redesign the project to be below the
               construction SCL at no additional cost to the owner. The Architect will also be
               required to develop a recovery schedule to complete the design in the original
               timeframe.

           24. DCSD has adopted and implemented Trimble Proliance Capital Program Management
               System (PCM) as the District’s project management software. All Contractors with a project
               construction values exceeding a SCL of $1 million will be required to use Proliance for that
               project and the Architect of Record will have to be versed in Proliance in order to review and
               comment on the contractor’s schedule. For construction contracts with values under $1
               million, the Architect will be responsible for posting all project documents from the GC into
               PCM.
           25. The Architect shall also comply with all activities and terms as outlined in the Standard Form
               of Contract for Architectural Services (State Capital Outlay Projects) between the DeKalb
               County Board of Education and the Architect. (See Appendix I).

           26. Provide the selected GC with three (3) copies of the construction contract documents
               (specifications and drawings) at the Preconstruction Conference.

           27. The Architect will develop the list of required shop drawings, product data, samples, etc. and
               issue it to the selected GC. The selected GC will take the list and incorporate it into their
               project construction schedule.

           28. The Architect is responsible for providing and submitting all permit packages to the proper
               authorities. The Architect is responsible for pursuing the issuance of the permits until the
               permit is ready to be issued to the contractor or until the contractor receives a Notice to
               Proceed (NTP). Once the NTP is received, the Architect will hold a formal meeting to transfer
               the permit responsibilities to the contractor. The Architect is still responsible for assisting
               the contractor and for responding to any questions or issues documented by the permitting
               authorities.

           29. The Architect will update DCSD’s state inventory plans at the end of construction.

           30. The Architect will perform Contact Administration for these projects.
           31. The Architect will provide FF&E services as appropriate for this project as outlined in the
               Standard Form of Contract for Architectural Services.

       B. Proliance Program Management Software
          DCSD has adopted and implemented Trimble Proliance Capital Program Management System
          (PCM) as the District’s project management software. DCSD will issue one license to the
          successful Architect and expects the Architect to participate in the management of these projects
          within the PCM guidelines. This management will be performed in conjunction with DCSD and
          the Program Manager. This includes but is not limited to:
DeKalb County School District                                                          RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                         Project Nos. N/A
April 28, 2022                                                                               Page 13 of 28

           1. General
                 • All documentation will be processed through PCM
                 • All meeting minutes will be produced and issued through PCM
                 • All questions and answers will be processed through PCM
                 • All invoicing – architect’s, contractor’s, vendors’, etc. will be processed through PCM

           2. Schematic Design Phases
                 • All drawings will be posted in PCM as one package for each phase (one file for SD)
                 • The detailed estimate will be posted in PCM for each phase
                 • All reports will be posted individually in PCM

           3.   Construction Document Submittals (50%, 100%)
                  • All drawings for the 50% CD submittals will be posted in PCM as one package
                  • The detailed estimate will be posted in PCM for the 50% submittals
                  • All reports will be posted individually in PCM
                  • A detailed estimate is not required at 100% drawings
                  • Each individual drawing will be posted to PCM (as individual files) at the 100%
                       drawing submittal

           4. Contract Administration
                 • RFIs will be processed in PCM
                 • Submittals will be processed in PCM
                 • Shop drawings will be processed in PCM
                 • Samples (color boards, brick, etc.) will be processed outside PCM, but will be
                     tracked by a transmittal inside PCM
                 • Invoices will be processed in PCM

 3.0   REQUIREMENTS

        3.1     Firms must meet the following requirements:
                3.1.1 Requirements of the Request for Qualifications (RFQu).

                3.1.2   It is preferable that the Firm has experience providing A / E services for K-12
                        public school programs.

                3.1.3   Firm must be authorized to do business in the State of Georgia and must
                        possess professional service registrations in accordance with applicable
                        statutes, regulations, and rules.

                3.1.4   Firms must be knowledgeable of the requirements of Georgia Code.

                3.1.5   Firms must be able to demonstrate financial strength appropriate to the scale
                        of Project to be managed.

                3.1.6   Statements of Qualifications must be submitted electronically to the School District
                        on or before the time and date indicated in the RFQu.

                3.1.7   Statements of Qualifications should be limited to not more than 30 electronic
                        pages. Submissions in excess of 30 electronic pages will not be disqualified;
DeKalb County School District                                                            RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                           Project Nos. N/A
April 28, 2022                                                                                 Page 14 of 28

                        however, clarity, conciseness, and brevity of this document will be part of the
                        evaluation criteria.

                3.1.8   Statements of Qualification which have not been received by the DeKalb
                        County School District on or before the scheduled receipt time as set forth in
                        the RFQu will not be considered.

                3.1.9   The selected firm and its sub consultants, will be required to meet the
                        insurance requirements of DCSD.

                3.1.10 Costs of participating in the selection process, including presentations to the
                        Selection Committee, are solely those of the firm; DCSD will assume no
                        responsibility for any costs.

                3.1.11 DCSD reserves the right to waive informalities and to terminate the selection
                        process.


     4.0       STATEMENT OF QUALIFICATIONS
               Required Information and Format

                Statements of Qualifications must provide the required information in the following order
                and format:

        4.1     Letter of introduction and interest signed by an officer or partner of the responding firm.
                Letter shall include specific reason(s) why firm would be the best choice for the project
                listed. Letter shall include name of entity submitting, contact name, phone number, e-
                mail address, fax number and address of firm submitting.
        4.2     Table of Contents
        4.3     Compliance Information
                This is a compliance section and carries no evaluation points. Firms must meet
                minimum criteria as specified to receive further consideration. Submittals shall
                include the following:
                4.3.1   The Firm must be properly certified by the Georgia Secretary of State to do
                        business in Georgia at the time of submission.

                        4.3.1.1 State the legal name of the entity submitting and if Firm submitting is a
                                 corporation, joint venture, or partnership. Note: It is understood that if
                                 selected for this project the stated entity name will be used in all legal
                                 contracting documents derived from this selection.

                        4.3.1.2 Provide a copy of certification for proper incorporation or registration from
                                 Georgia Secretary of State. In the alternative, joint ventures and
                                 partnerships should provide a copy of their joint venture or partnership
                                 agreement and certification from the Georgia Secretary of State
                                 establishing that each joint venture partner or partner is authorized to do
                                 business in Georgia.
DeKalb County School District                                                           RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                          Project Nos. N/A
April 28, 2022                                                                                Page 15 of 28

                4.3.2   The Firm must be properly registered, licensed, and certified at the time of
                        submission:

                        4.3.2.1 Firms and sub consultants must be property licensed. Provide copy of
                                current Georgia Professional Registration for Architect/Engineer.

                        4.3.2.2 If Firm is a joint venture, provide copy of the joint venture agreement and
                                either:

                                     a. Copy of current Georgia Professional Registration of the joint
                                        venture; or

                                     b. A copy of the current Georgia Professional Registration of one
                                        of the joint venture partners.

                4.3.3   The Firm must have been in continuous business for a minimum of five
                        years. Note: If Firm is a joint venture, at least one of the companies
                        comprising the joint venture or partnership must have been in continuous
                        business for a minimum of five years.

                        4.3.3.1 State number of years in business. If the Firm is a joint venture, state
                                both the number of years that the joint venture has been in
                                business, as well as the number of years that each joint venture
                                partners has been in business.

                        4.3.3.2 State the location, address, and telephone number of Firm’s
                                offices. If the Firm is a joint venture or partnership,
                                identify the location, address, and telephone number of the
                                principal place of business of the joint venture or
                                partnership designated with the Georgia Division of
                                Corporations.

                        4.3.3.3 Submit the names of owners, officers or principals in charge.

                4.3.4   The Firm must identify any existing or potential conflicts of interest, and
                        disclose any representation of parties or other relationships that might be
                        considered a conflict of interest with regard to this selection. "Conflict" or
                        "conflict of interest" means a situation in which regard for a private interest tends
                        to lead to disregard of a public duty or interest.

                        4.3.4.1 If any conflicts of interest issues are identified, provide a detailed plan
                                of action on how any existing or potential conflicts of interest will be
                                mitigated in the case your firm is recommended for this project.
                                DCSD at its sole discretion shall determine the adequacy of the plan
                                and whether the conflict will disqualify the firm from consideration for
                                the RFQu. If DCSD determines that the firm will be disqualified due to
                                the conflict, the firm’s proposal will not be evaluated or considered by
                                the Selection Committee.

                4.3.5   The Firm must demonstrate they have the necessary financial resources
                        to complete the project and show their history of working proactively to avoid
                        litigation with Owners.
DeKalb County School District                                                            RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                           Project Nos. N/A
April 28, 2022                                                                                 Page 16 of 28


                        4.3.5.1 Financial Statement: The Firm’s financial capability is to be expressed
                                in the financial statement (audited financial current within the past
                                twelve months, such as a balance sheet and statement of operations)
                                and should indicate the resources and the necessary working capital to
                                assure financial stability through the completion of the project. A
                                certified audit is preferred; however, the Firm’s most recent tax return
                                and balance sheet will be accepted. If the Firm is a joint venture or
                                partnership all firms comprising the submitting entity will be required to
                                submit the previously requested documentation.

                        4.3.5.2 Insurance Capacity: Firms must provide evidence that they have all
                                insurance coverage’s as specified in A/E contract included with this
                                RFQu (See Appendix I).

                        4.3.5.3 Litigation: Submit all litigation of any kind involving firm, its officers or
                                directors with a project owner where the total amount in controversy
                                exceeds $100,000.00 within the last five years. If the firm is a joint
                                venture or partnership submit litigation involving all firms comprising the
                                submitting entity. State the court and location of the litigation.

                        4.3.5.4 Insurance Claims: Submit all Errors & Omissions and/or Professional
                                Liability claims filed against the firms’ policy in the last two years for the
                                proposal submittal date. The information should include amount and
                                nature of the claim(s).

     5.0        INITIAL SCREENING CRITERIA

        5.1     Individual Review: Proposal Evaluation Committee (“PEC”) members shall use the
                Proposal Evaluation Form (Exhibit A) for the RFQu to document their review and
                evaluation of each Proposal in accordance with the criteria listed below, within their
                respective areas of experience and knowledge.

                5.1.1    Related Experience (30 points):
                               Major consideration will be given to the successful completion of
                               previous projects comparable in design, scope and complexity. This
                               will include e valuating the firm’s performance and quality of work on
                               previous projects.

                        5.1.1.1 List the projects which best illustrate the experience of the firm which
                                 utilized the current staff which is being assigned to this Project. (List no
                                 more than 10 projects and do not list projects which were not
                                 completed by your firm or completed more than ten years ago).
                                 Include the following for each project:

                                         a. Name and location of the project.
                                         b. The nature of the firm's responsibility on the project.
                                         c. Project owner's representative name, address,
                                              telephone and facsimile number.
                                         d. Project user's representative name, address and
                                              telephone number.
DeKalb County School District                                                         RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                        Project Nos. N/A
April 28, 2022                                                                              Page 17 of 28

                                         e.   Date project construction was completed.
                                         f.   Size of project (construction gross square feet).
                                         g.   Cost of project (construction cost).
                                         h.   Work for which firm's staff was responsible.
                                         i.   Present status of the project.
                                         j.   Firm's key professionals involved on the project and who
                                              of that staff would be assigned to the Project covered by
                                              this RFQu.


                5.1.2   Proposed Project Staff and their Functions (30 points):
                        The quality, experience and quantity of staff and their functions will be evaluated
                        by the Committee. The Committee will also evaluate the firm’s capabilities to
                        provide service.

                        5.1.2.1 Organization Chart: Develop an organization chart as it relates to the
                                Project indicating key personnel, their relationship, and all consultants
                                to be used on this project.

                        5.1.2.2 The firm shall name the actual staff to be assigned to this Project,
                                describe their ability and experience, and indicate the function of each
                                within their organization and their proposed role on this Project. It is
                                the intent that the proposed staff shall be assigned to this Project
                                unless otherwise approved by Owner. The staff shall be present at
                                the time of interview.

                        5.1.2.3 Give brief resumes of key persons to be assigned to the Project
                                including, but not limited to, the following:
                                         a. Name and title.
                                         b. Job assignment for other projects.
                                         c. How many years with this firm. For sub-consultants, list prior
                                             projects your firm has worked with sub-consultant.
                                         d. How many years with other firms.
                                         e. Experience including types of projects, size of projects (dollar
                                             value and square footage of project), and specific project
                                             involvement.
                                         f. Education.
                                         g. Active registrations (if any).
                                         h. If submitting as a joint venture or partnership, include the
                                             assigned staff for the joint venture or partnership and
                                             indicate which of the joint ventures or partners employs the
                                             staff member.

                 5.1.3 Workload (15 points):
                             As part of the evaluation criteria, the Committee will review the firms and
                             their sub-consultants current workload. If the submitting firm is a joint
                             venture, the Committee will review the current workload of each of the
                             firms comprising the submitting entity. A maximum of ten points will be
                             awarded based on an evaluation of the firm’s total workload and capacity
                             to perform the work.

                        5.1.3.1 Firms and their sub-consultant(s) shall provide a list of outstanding
                                projects, client names, status of completion, anticipated completion
                                date, and dollars committed on open project workload. Furthermore, if
DeKalb County School District                                                            RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                           Project Nos. N/A
April 28, 2022                                                                                 Page 18 of 28

                                 the submitting firm is a joint venture they shall also include projects for
                                 each firm comprising the joint venture.

                                 Definition of sub-consultant as it relates to this selection process: An
                                 individual and/or firm contracted or to be contracted by the submitting
                                 entity to provide services related to or part of those which this will be
                                 required as part of this selection process.

                5.1.4     Equitable Distribution (10 points):
                        In an effort to consider the equitable distribution of work, the Committee shall
                        evaluate data showing dollar amounts of contracts and projects awarded by DCSD
                        to the submitting firm(s). In the case of submittals received by joint ventures the
                        contracts and projects awarded to each of the firms comprising the joint venture will
                        be included in the calculation of the projects currently under contract and those
                        awarded by DCSD. Furthermore, this calculation will include all contracts and
                        projects awarded to the submitting firm either as a joint venture or as a separate
                        entity, whereby the submitting firm(s) was one of the entities included in the award
                        and contract. The chart below will be used to award a maximum of 10 points based
                        on the combined dollar amount of projects currently under contract, as well as those
                        awarded by DCSD, but not yet under contract. For those projects already under
                        contract, the contract amount will reflect the dollar amount of the contract value, not
                        including amendments. The projects taken into account in the calculation will be
                        those awarded by the Owner within two (2) years prior to this solicitation opening.
                        For projects recommended but not yet awarded, the contract value will reflect the
                        estimated fee based on the budget listed within the RFQu for which the firm was
                        selected. This single score will be allocated to each firm by the Selection Process
                        Facilitator and added to the cumulative score of the committee members.

                               Contract Value Awarded/ Recommended by DCSD                  Point Value
                                                 Up to $100,000                              10 points
                                              $100,001 to $500,000                           8 points
                                             $500,001 to $1,000,000                          6 points
                                            $1,000,000 to $2,000,000                         4 points
                                            Greater than $2,000,000                          0 points



                5.1.5 DESIGN FEE (O POINTS):
                       Design fee is NOT included in the Selection Criteria.

                         5.1.5.1 Indicate your proposed Design Fee for the Services and Work as required
                                 by the Proposal Documents and the Owner’s Agreement. Use Owner’s
                                 Design Fee Form (Attachment C) included in this Request for
                                 Qualifications.

                         5.1.5.2 Indicate any breakdown of the proposed Design Fee as required by the
                                 attached form.

                         5.1.5.3 Acknowledge receipt of addendum, if any.
DeKalb County School District                                                              RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                             Project Nos. N/A
April 28, 2022                                                                                   Page 19 of 28

                        5.1.5.4 All blanks shall be filled in and shall be typed or manually and legibly filled
                                in with ink. Interlineations, alterations and erasures must be initialed by
                                the signer of the Proposal.


                5.1.6   References (15 points):
                        The Firm must demonstrate a positive relationship with prior clients on similar
                        projects.

                        5.1.6.1 The firm shall submit a minimum of three (3) written recommendations
                                from previous owners and discuss their strategy to provide a positive
                                working relationship with DCSD. This strategy must include actual
                                examples of how the firm has demonstrated their cooperation with other
                                Owners. DCSD reserves the option of contacting any of the references
                                provided to confirm information provided.

                        5.1.6.2 DCSD staff will provide input on a firm’s past work performance, this
                                information includes but is not limited to the number of warranty
                                requests and responsiveness, contract and process compliance, and
                                information from the DCSD contractor evaluation process if available.

        5.2     Group Review. The PEC members shall meet and discuss the Proposals. The goal of
                this review is to allow each PEC member the opportunity to fully discuss the Proposals
                and to identify any information in the proposals deemed by the PEC member to be
                significant to the evaluation. At the conclusion of this meeting, each PEC member shall
                render his or her final scores for each proposal and submit his or her Proposal Evaluation
                Form to the Selection Process Facilitator.

                5.2.1   The Selection Process Facilitator shall combine the evaluation scores submitted
                        by all PEC members and shall determine the five (5) highest scoring firms (unless
                        otherwise determined) based on the total evaluation scores received. In the event
                        of a tied score for fifth place, all such tied firms shall be included in the short list.

                5.2.2   Short List Recommendation. The Selection Process Facilitator shall forward the
                        PEC’s short list recommendation to the I n t e r i m Chief Operating Officer
                        (“the Interim COO”). The Interim COO, in his or her sole discretion, can either
                        accept the short list recommendation or reject the short list recommendation. If
                        the Interim COO accepts the recommendation, the selection process proceeds as
                        noted below. If the Interim COO rejects the short list recommendation, he or she,
                        in his or her sole discretion, can proceed in any of the following methods:
                        directing the Selection Process Facilitator to recommence the selection process
                        at whatever stage the Interim COO deems appropriate (including the Individual
                        Review stage or the Group Review stage); pursuing the project by any other
                        alternative method permitted under Georgia law; or abandoning the project all
                        together. If the Interim COO elects to pursue the project by an alternative method
                        or abandon the project, DCSD shall provide public notice of this decision.

                5.2.3   Notice of Short List. Once the PEC’s short list recommendation has been accepted
                        by the Interim COO, the Selection Process Facilitator will notify all submitting firms
                        of whether or not they appear on the short list and shall provide public notice of the
                        short listed firms.

                5.2.4   The short listed firms shall then be invited for interviews before the PEC, which
                        will be scheduled within three (3) business days of notification.
DeKalb County School District                                                           RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                          Project Nos. N/A
April 28, 2022                                                                                Page 20 of 28


     6.0        INTERVIEWS AND PRESENTATION

        6.1     At the time of its scheduled interview, each short listed firm shall provide additional
                information about its firm and operations as may be required by DCSD. This additional
                information shall include, but is not limited to, the following:

                6.1.2   Overall Approach, Methodology (30 points):

                        6.1.2.1 The firm shall provide information regarding its knowledge of local
                                codes and ordinances, as an indication of its ability to deliver quality
                                workmanship in an effective and timely manner.

                        6.1.2.2 The firm shall demonstrate verbally and graphically its plan for performing
                                the Architectural/Engineering Services, documenting the services to be
                                provided and showing the interrelationship of all parties.

                        6.1.2.3 The firm shall present their quality assurance program. The program shall
                                 illustrate how they will assure professional quality, technical accuracy, and
                                 coordination of all services require under their contract.
                6.1.3   Project Team (25 points):
                        The firm shall express the general and specific project related experience and
                        capability of in-house staff and sub consultants and their functions as it relates to
                        this project.

                        6.1.3.1 Organization Chart: Develop an organization chart as it relates to
                                the Project indicating key personnel and their relationship. It shall be
                                understood that it is the intent of the District to insist that those key
                                personnel indicated as the project team in this RFQu response
                                actually executes the Project.

                        6.1.3.2 If a joint venture, or prime subcontractor arrangement of two (or more)
                                firms, indicate how the work shall be distributed between the associated
                                firms. Describe how the organizational structure will ensure orderly
                                communications, distribution of information, effective coordination of
                                activities and accountability.
                6.1.4   Cost Control (25 points):
                        6.1.4.1 Describe how you develop cost estimates, and how they are updated,
                                providing specific examples of successful recommendations
                                implemented and cost containment strategies utilized to maintain
                                project budgets without sacrificing quality. Describe and explain the
                                benefits to the Owner.

                6.1.5   Project Scheduling (20 points):

                        6.1.5.1 As part of the project approach, the firm shall propose a process for
                                scheduling multiple projects and effectively managing and executing the
                                work in the optimum time. Provide a sample schedule and describe
                                any major milestones for achieving the schedule and any other
                                recommendations that may directly impact the schedule.
DeKalb County School District                                                           RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                          Project Nos. N/A
April 28, 2022                                                                                Page 21 of 28


                        6.1.5.2 The firm shall describe any representative current projects and the
                                projected versus the actual schedule for each.
        6.2     Interview

                6.2.1   The short-listed firms shall be invited for interviews before the PEC. At the time of
                        its scheduled interview, each short-listed firm shall provide additional information
                        about its firm and operations as may be required by DCSD. This additional
                        information shall be identified in the RFQu.

                6.2.2   The PEC shall schedule a separate interview for each short-listed firm. As part
                        of its interview, and at the Selection Process Facilitator’s discretion, each firm
                        shall make a short oral presentation.

                6.2.3   After the PEC has interviewed all the short-listed firms, the PEC shall reconvene
                        for the PEC members to discuss the interviews and review each presentation. At
                        the end of this discussion, PEC members shall use the Presentation
                        Evaluation Forms to record their evaluation of each short listed firm, and then
                        submit the Presentation Evaluation Forms to the Selection Process Facilitator.

                6.2.4   The Selection Process Facilitator shall combine the evaluation scores submitted
                        by all PEC members and determine the PEC’s ranking of the short-listed firms
                        based upon the total scores assigned to each firm for the presentation stage.
                        If the ranking results in a tied score for the number one or number two ranked
                        firms, additional information shall be requested from the tied firms and presented
                        to the committee. The committee will score the firms based on the responses to
                        the additional information

        6.3     Submittal of recommended highest ranked firm. The Selection Process Facilitator shall
                submit the highest ranked firm recommended by the PEC to the Interim COO for
                approval. The Interim COO, in his or her sole discretion, shall either accept the results of
                the PEC’s ranking recommendation and forward it to the Board of Education for approval
                or reject the results of the ranking recommendation. If the Interim COO accepts the
                ranking recommendation, the approval process continues as noted below. If the Interim
                COO rejects the results of the ranking recommendation, he or she, in his or her sole
                discretion, shall proceed with any of the following methods: directing the PEC Selection
                Process Facilitator to recommence the selection and ranking process at whatever stage
                the Interim COO deems appropriate (including the Individual Review stage, the Group
                Review stage, or the Interview process); pursuing the project by any other alternative
                method permitted under Georgia law; or abandoning the project all together. If the Interim
                COO elects to pursue the project through an alternative method or abandon the project all
                together, DCSD shall provide public notice of that decision.

        .       Upon the Interim COO’s approval of the PEC’s recommendation, an agenda item shall
                be prepared and put on the next available agenda for the Board of Education review and
                approval.

     7.0        SELECTION PROCESS:

        7.1     The Proposal Evaluation Committee (“PEC”) shall be established by the COO. The
                Interim COO, or his designee, shall approve the members of the PEC, to include the
DeKalb County School District                                                          RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                         Project Nos. N/A
April 28, 2022                                                                               Page 22 of 28

                following:

                7.1.1   At least three (3) DCSD staff persons with expertise in facilities design,
                        construction, operation, and/or maintenance, property, surveying and
                        environmental, as recommended by the Interim Chief Operating Officer from their
                        respective divisions, for the purpose of evaluating and scoring only those
                        elements of the responses that relate to facilities design, construction, operation,
                        and maintenance proposals, and on an as needed basis, those that include
                        property, surveying and environmental.

                7.1.2   At least one (1) member of the SPLOST CIP staff with expertise in facilities design,
                        construction, operation, and/or maintenance, property, surveying and
                        environmental, as recommended by the Interim Chief Operating Officer, for the
                        purpose of evaluating and scoring only those elements of the responses that
                        relate to facilities design, construction, operation, and maintenance proposals.

                7.1.3   Such other staff person(s) as deemed appropriate by the Interim COO, or
                        his designee, in order to ensure that the PEC includes persons with experience
                        and knowledge in the contractual services being sought, for the purpose of
                        evaluating and scoring only those elements of the responses that relate to the
                        person(s)’ area of experience and knowledge.

                7.1.4   Membership of the PEC may include representation from other public or
                        private entities or others deemed appropriate as recommended by the Interim
                        Chief Operating Officer. The recommendation may be based on project
                        complexity, project cost and staff capacity.

                7.1.5   All voting members of the PEC are required to comply with the provisions of
                        Board Policy DJE and the provisions of the Code of Ethics for Public Officers and
                        Employees. No member shall solicit or knowingly accept any gift, gratuity, loan,
                        special discount, entertainment, transportation, lodging, meals, favor or promise
                        of future employment, based upon any understanding that the vote, official action,
                        or judgment of the member would be influenced thereby.

   7.2    The Interim Chief Operating Officer, or his designee, shall select a Procurement representative
          who shall serve as the Selection Process Facilitator to monitor the selection process, ensure
          compliance with all applicable procedural requirements, limiting discussion which facilitates the
          procurement process, the facts of the procurement and documentation on file, and will maintain
          objectivity at all times.

   7.3    The Selection Process Facilitator shall be responsible for ensuring that each member is provided
          information on the project, directs discussion as necessary and determines when the committee
          may need to vote on any compliance related issues.

   7.4    The final rankings as approved by the Board of Education will rank all proposers from
          highest to lowest scores based on the selection criteria described in the RFQu.

   7.5    Group A sites as listed on page 6 of the RFQu will be awarded to the proposer with the highest
          score. Group B sites as listed on page 6 of the RFQu will be awarded to the proposer with the
          second highest score. Group C sites as listed on page 7 of the RFQu will be awarded to the
          proposer with the third highest score.
DeKalb County School District                                                           RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                          Project Nos. N/A
April 28, 2022                                                                                Page 23 of 28

 8.0     SCHEDULE

   8.1     Virtual Pre-submittal conference attendance (mandatory). It is the firm’s responsibility to
           become fully informed as to the nature and extent of the services required. The virtual pre-
           submittal conference will be held at 11:00 a.m., EST, Thursday, May 5, 2022 via ZOOM. The
           RFQu will be reviewed and questions will be addressed.

   8.2     Statements of Qualifications must be received electronically at the DeKalb County School
           District website https://dekalbschoolsga.ionwave.net not later than date and time set forth in the
           “Advertisement for RFQu for Professional Architectural and Engineering Services for Toney
           Elementary School Major Building System Replacement”. Based on evaluations of Statements
           of Qualifications, a maximum of five firms may be interviewed, at times and location to be
           determined at a later time. The order of presentation will be determined at DCSD’s sole
           discretion and the firms so notified.
   8.3     The dates and times identified in this RFQu are subject to change. All changes will be
           posted to the DeKalb County School District solicitation website via addendum as it
           becomes available for all phases of this project.

 9.0     GENERAL INSTRUCTIONS

         9.1         Firms are required to register as a supplier using the IONWAVE portal and obtain a
                     username and password.

         9.2         The response shall contain manual signature of an authorized representative of the
                     responding firm.

         9.3         Responses received after the receipt time noted in the RFQu will not be accepted.

         9.4         Firms responding to the RFQu shall be available for presentations and interviews
                     to the DCSD PEC Selection Committee.

         9.5         The contents of the proposal of a successful firm may become part of its
                     contractual obligations.

         9.6         Excluding items 5.1.4 and 5.2, Proposals shall respond to each item noted in sections
                     4.0 and 5.0 in the order noted. Identify responses with the same paragraph notation
                     as contained in this RFQu.

         9.7         Submittals shall be typed. All corrections made by the proposer prior to the opening
                     shall be initialed and dated by the proposer. No changes or corrections will be allowed
                     after proposals have been unsealed.

         9.8         Questions: Any questions concerning the RFQu should be submitted electronically via
                     email to the Procurement Manager at dcsd-op-bidquestion@dekalbschoolsga.org.
                     Questions submitted to any other email address will not be considered. The
                     deadline for receipt of vendor questions is Wednesday, May 11, 2022 at 2:00 p.m.
                     EST. Questions received after the deadline time will not be considered. Questions
                     received by the deadline time will be answered in writing and posted to the DCSD
                     solicitation website http://dekalbschoolsga.ionwave.net no later than Wednesday,
                     May 18, 2022 by 2:00 p.m. EST. No response other than written by the Procurement
                     Manager, will be binding upon DCSD. All supplemental instructions will be in the form
DeKalb County School District                                                         RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                        Project Nos. N/A
April 28, 2022                                                                              Page 24 of 28

                    of written Addenda to the RFQu.

                    9.8.1   Selection committee members, school board members and school board
                            personnel are not to be contacted prior to the Board of Education’s decision
                            to approve or reject the final recommendation presented to it by the Interim
                            Chief Operating Officer. At the discretion of DCSD, failure to comply
                            with this requirement will be grounds for disqualification.

                    9.8.2   Specifically, this NO-CONTACT PERIOD shall commence on the initial date
                            of the advertisement for Request for Qualifications and continue through and
                            include the date the DeKalb County Board of Education makes its
                            determination to approve or reject the final recommendations.

        9.9.        Failure to meet any of these requirements may disqualify your firm from
                    consideration.


 10.0   TERMS AND CONDITIONS:

        10.1.        DCSD reserves the right to accept or reject any or all proposals in the best interest
                     of DCSD. DeKalb County School District reserves the right to waive any formalities
                     in the selection process.

        10.2         It is mutually understood and agreed that the nature, amount, and frequency of the
                     Services shall be determined solely by Owner and that Owner does not represent or
                     guarantee unto firm that any specific amount of services will be requested or required
                     of firm pursuant to this RFQu.

        10.3        Proposals which do not comply with these instructions or that do not include the
                    requested data may not be considered.

        10.4        The successful firm shall not discriminate against any person in accordance with
                    Federal, State or Local law.

        10.5        It is the sole responsibility of the submitting firm to ensure proposals are received
                    on or before the time and date required, and in the format stated.
        10.6        By submission of a response to this RFQu, the Respondent certifies that he/she and
                    his/her employees shall not engage in the unlawful manufacture, sale, distribution,
                    dispensation, possession, or use of controlled substance or drugs during the
                    performance of the contract.
        10.7        By submission of a response to this RFQu, the Respondent certifies that he/she and
                    his/her employees shall not use tobacco products on DCSD property at any time
                    during the performance of this contract.
        10.8        Respondents shall fully certify that they, as individuals or as officials of a business
                    entity, have not entered into any agreement, participated in collusion, or otherwise
                    taken any action in restraint of free and competitive responses to this RFQu. Further,
                    Respondents guarantee that their response is not made in conjunction with or on
                    behalf of another party and that they have not been directly or indirectly induced in
                    any manner or taken any action to result in a restriction of trade or in an unfair
                    advantage
DeKalb County School District                                                             RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                            Project Nos. N/A
April 28, 2022                                                                                  Page 25 of 28


        10.9        By responding to this RFQu, the offeror certifies that the proposing company and/or
                    its principals have not been suspended, excluded, disqualified, debarred, proposed
                    for debarment, declared ineligible or voluntarily excluded from participation in any
                    transaction by any Federal or State department or agency and that the bidder
                    complies with all applicable orders, rules and regulations related thereto.Further, by
                    responding to this RFQu, the offeror certifies that all lower tier participating individuals
                    and/or company(s) and all respective principals of lower tier participants have not
                    been suspended, excluded, disqualified, debarred, proposed for debarment, declared
                    ineligible or voluntarily excluded from participation in any transaction by any Federal
                    or State department or agency and that the bidder complies with all applicable orders,
                    rules and regulations related thereto.

        10.10       DeKalb County School District, Georgia, does not discriminate in admission or
                    access to, or treatment or employment in its programs and activities, on the basis
                    of race, color, religion, age, sex, national origin, marital status, disability, genetic
                    information, sexual orientation, gender identity or expression, or any other reason
                    prohibited by law.

        10.11       Any person who is adversely affected by a decision of the DeKalb County School
                    District concerning this procurement, shall adhere to the following Protest
                    Procedures:

                    10.11.1     Protests. A bidder may file a written protest challenging DCSD’s
                                compliance with applicable procurement procedures subject to the
                                bidder’s compliance with the provisions outlined below. Any such written
                                protest will be resolved in accordance with these provisions.

                    10.11.2     Types of Challenges. Any bidder interested in and capable of responding
                                to a competitive solicitation may file a protest with respect to the competitive
                                solicitation process including, but not limited to, a challenge to
                                specifications or any events or facts arising during the solicitation process.
                                Any bidder submitting a timely bid/proposal in response to a competitive
                                solicitation may file a protest with respect to DCSD’s intended or actual
                                contract award including, but not limited to, events or facts arising during
                                the evaluation and/or negotiation process.

                    10.11.3     Form of Protest. At a minimum, the written protest must include the
                                following:
                                a.       the name and address of the protestor;
                                b.       appropriate identification of the solicitation;
                                c.       a statement of reasons for the protest;
                                d.       supporting exhibits, evidence, or documents to substantiate any
                                         claims unless not available within the filing time (in which case
                                         the offeror must proceed to file the protest during the filing period
                                         identified below but state the expected availability of the
                                         material); and
                                e.       the desired remedy.
                                DCSD, at its discretion, may deem issues not raised in the initial
                                protest as waived with prejudice by the protesting offeror.
DeKalb County School District                                                         RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                        Project Nos. N/A
April 28, 2022                                                                              Page 26 of 28


                    10.11.4   Filing Protests. A protest is considered to be properly filed when it is in
                              writing, signed by a company officer authorized to sign contracts on behalf
                              of the offeror, and is received by the Design and Construction Department.
                              The protest may be sent by any of the following means:
                              MAIL: Attention: Mr. Richard H. Boyd
                                               Interim Chief Operating Officer
                                               DeKalb County School District
                                               Sam A. Moss Service Center
                                               1780 Montreal Road
                                               Tucker, Georgia 30084

                              FAX:             (678) 676-1475


                    10.11.5   Type of Protests. A challenge to the competitive solicitation process
                              must be filed within two (2) business days prior to the closing date and
                              time of the solicitation as identified on the RFQu.
                              A challenge to an intended or actual contract award must be filed within
                              ten (10) calendar days of the date the Notice of Intent to Award (NOIA) is
                              posted by DCSD. In the event DCSD does not post a NOIA, the protest
                              must be filed within ten (10 calendar days of the date the Notice of Award
                              (NOA) is posted.

                              If a protest is not filed by the applicable deadline, such failure shall
                              be deemed as a waiver with prejudice of any grounds the bidder may
                              have for protest.

                    10.11.6   Stay of Procurement During Protest Review. When a protest
                              challenging the competitive solicitation process has been timely filed at
                              least two (2) business days prior to the closing date and time, the
                              solicitation shall not close until a final decision resolving the protest has
                              been issued, unless the Facilities Management Department makes a
                              written determination that the closing of the solicitation without delay is
                              necessary to protect the interests of DCSD.

                              When a protest challenging an intended contract award has been timely
                              filed, DCSD shall not proceed to actual contract award unless the Design
                              and Construction Department makes a written determination that the
                              issuance of a contract or performance of the contract without delay is
                              necessary to protect the interests of DCSD. If it is determined that it is
                              necessary to proceed with contract performance without delay, the
                              bidder/offeror with this contingent contract may proceed with performance
                              and receive payment for work performed in strict accordance with the
                              terms of the contract. The provisions of this paragraph are not applicable
                              to a protest pertaining to events or facts arising during the solicitation
                              process.
DeKalb County School District                                                          RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                         Project Nos. N/A
April 28, 2022                                                                               Page 27 of 28

                    10.11.7    Protest Resolution. The Facilities Management Department shall review
                               and issue a written decision on the protest within seven (7) business days.
                               This decision shall be deemed final. Available remedies for sustained
                               protests are as follows:

                               10.11.7.1If a protest is sustained prior to the closing date and time of the
                                        solicitation, available remedies may include, but are not limited to,
                                        the following: modification of the solicitation document including,
                                        but not limited to, specifications and terms and conditions;
                                        extension of the solicitation closing date and time (as appropriate);
                                        and cancellation of the solicitation.

                               10.11.7.2 If a protest of the intended/actual contract award is sustained
                                        available remedies may include but are not limited to, the
                                        following: revision or cancellation of the NOIA/NOA, re-evaluation
                                        and re-award, or re-solicitation with appropriate changes to the
                                        new solicitation.

                    10.11.8    Costs. In no event shall a bidder be entitled to recover any costs incurred
                               in connection with the solicitation or protest process, including, but not
                               limited to, the costs of preparing a bid/proposal, the costs of participating
                               in the protest process, or any attorney fees.

        10.12       By making a submission, it is understood and agreed that the submitting entity
                    consents to DCSD contacting any parties referenced in the entities response
                    including, but not limited to, all project owners and references herein.

        10.13       Submitters acknowledge and agree that the contracting entity will be the Firm name
                    identified in the response to 4.3.1.1.

        10.14       Appendix I, is the most current version of the DCSD Standard Form of Contract
                    for Architectural Services. By submitting a response to this RFQu, submitters
                    acknowledge and agree that they have reviewed the contract and have no objection
                    to it. All responders should thoroughly review the documents prior to
                    submitting a proposal. Any proposed revisions to the terms or language of
                    these documents must be submitted in writing during the question and answer
                    period of the solicitation. All request must be submitted in writing prior to the
                    close of the final questions. Request for revisions will be reviewed and approved
                    or rejected by legal and legal rulings are final. If submitted or proposed thereafter,
                    such proposed revisions to the terms or language of these documents shall not be
                    considered by the Owner and the Architect/Engineer submittal shall be rejected. No
                    alterations can be made in the contract after award by DCSD.
DeKalb County School District                                                          RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                         Project Nos. N/A
April 28, 2022                                                                               Page 28 of 28


                                               NOTICE
                       FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES
                                        FOR HVAC REPLACEMENT

DeKalb County Board of Education announces that Professional Architectural and Engineering Services are required for the
project listed below.

PROJECT AND NUMBER:                             A/E Services for HVAC Replacement at Bob Mathis ES, Briarlake ES,
                                                Chapel Hill ES, Early Learning Center, Edward L. Bouie ES, Marbut ES,
                                                Martin Luther King Jr., HS, Montclair ES, Panola Way ES, Pine Ridge ES,
                                                Shadow Rock ES, Stephenson HS, and Tucker MS - RFQu No. 22-752-
                                                030

SERVICES TO BE PROVIDED:                        Professional Architectural and Engineering Design Services for HVAC
                                                Replacement at multiple sites.


 VIRTUAL PRE-SUBMITTAL MEETING:                 May 5, 2022, 11:00 a.m. EST, via ZOOM
                                                Attendees must provide the following information by Wednesday,
                                                May 4, 2022, 5:00 p.m. EST:
                                                1. Individual Name and Title
                                                2. Company Name
                                                3. Telephone Number
                                                4. Email Address
                                                Information must be sent to dcsd-op-solicitation@dekalbschoolsga.org
                                                A meeting link will be sent to all registered attendees.
                                                Attendance is mandatory.

 DCSD CONTACT:                                    Belinda Quillet, Procurement Manager
                                                  Angela Arlene-Myrick, Procurement Specialist

 SUBMIT QUALIFICATIONS TO:                        http://dekalbschoolsga.ionwave.net

 QUALIFICATIONS DUE DATE AND TIME:                May 24, 2022, 2:00 p.m. EST


 Requirements: Interested firms are required to comply with all requirements of the Request for Qualification (RFQu). A
 copy of the RFQu and any and all clarifications issued shall be obtained from the DeKalb County School District web site
 http://dekalbschoolsga.ionwave.net. Furthermore, all Notices concerning this solicitation and award shall be posted to
 the aforementioned web site. These Notices shall include, but are not limited to short list meeting dates and times,
 presentation meeting dates and times, intended decision and decision information.


                                 End of RFQu Document Consisting of 28 Pages

                                   (See Attachments and Appendices Package)
DeKalb County School District                                                              RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                              Project No. N/A
April 28, 2022                                                                                      Page 1 of 2

     ATTACHMENT A: ARCHITECT/ENGINEER CHECKLIST AND CERTIFICATION

        The undersigned, hereby acknowledges having received Request for Qualifications (RFQu) No. 22-752-
        030 for Professional A/E Services for HVAC Replacement at Bob Mathis ES, Briarlake ES, Chapel Hill
        ES, Early Learning Center, Edward L. Bouie ES, Marbut ES, Martin Luther King Jr, HS, Montclair ES,
        Panola Way ES, Pine Ridge ES, Shadow Rock ES, Stephenson HS, and Tucker MS containing a full set
        of documents:

IMPORTANT NOTICE: The omission of any of the required items listed below shall cause the bid
submission to be declared non-responsive and to be rejected.

                                                                                                        Check Box to
                                                                                       Include with       Confirm
   Owner’s Standard Forms:                                                               Proposal        Inclusion
   Attachment A     Architect/Engineer Checklist and Certification (2 pages)               YES              
   Attachment B1      Corporate Certificate (1 page)                                                        
   Attachment B2      Partnership Certificate (1 page)                                 B1 or B2 or B3
                                                                                                            
                                                                                        as applicable
   Attachment B3      Entity Certificate (1 page)                                                           
   Attachment C1      Design Fee Form – Bob Mathis ES (5 pages)                            YES              
   Attachment C2      Design Fee Form – Briarlake ES (5 pages)                             YES              
   Attachment C3      Design Fee Form – Chapel Hill ES (5 pages)                           YES              
   Attachment C4      Design Fee Form – Early Learning Center (5 pages)                    YES              
   Attachment C5      Design Fee Form – Edward L. Bouie ES (5 pages)                       YES              
   Attachment C6      Design Fee Form – Marbut ES (5 pages)                                YES              
   Attachment C7      Design Fee Form – Martin Luther King Jr., HS (5 pages)               YES              
   Attachment C8      Design Fee Form – Montclair ES (5 pages)                             YES              
   Attachment C9      Design Fee Form – Panola Way ES (5 pages)                            YES              
   Attachment C10     Design Fee Form – Pine Ridge ES (5 pages)                            YES              
   Attachment C11     Design Fee Form – Shadow Rock ES (5 pages)                           YES              
   Attachment C12     Design Fee Form – Stephenson HS (5 pages)                            YES              
   Attachment C13     Design Fee Form – Tucker MS (5 pages)                                YES              
   Attachment D       Offeror’s and Individuals’ Affidavit of Noncollusion (2 pages)       YES              
   Attachment E       Conflict of Interest Disclosure Affidavit (2 pages)                  YES              
   Attachment F       Consent to Release Information (1 page)                              YES              
   Attachment G       Immigration and Security Certification (2 pages)                     YES              
   Attachment H       No Submittal Response Form (1 page)                                   N/A




                                                                                       Include with     Check Box to
   Other Requirements:                                                                   Proposal         Confirm
                                                                                                         Inclusion
   Copy of Business License and Certificates                                               YES              
   Certificate of Insurance                                                                YES              
DeKalb County School District                                                                 RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                                 Project No. N/A
April 28, 2022                                                                                         Page 2 of 2


Indicate Addenda(s) Nos. _____________________________ received (none unless indicated here). The
Architect/Engineer is responsible for reading and understanding all sections of this RFQu and affirms that the
Architect/Engineer shall be bound by all of the terms and conditions contained in this RFQu.

Further, the undersigned, being duly sworn, states on oath that no disclosures of ownership have been withheld from
the Board, that the information provided herein is current, and Architect/Engineer and its officers and employees have
not entered into any agreement with any other Architect/Engineer or prospective Architect/Engineer or with any other
person, firm or corporation relating to any prices or other terms named in this RFQu or any other RFQu, nor has it
entered into any agreement or arrangement under which a person, firm or corporation is to refrain from responding to
this RFQu.



Name of Architect/Engineer:

Signature:        ____________________________                 Printed Name:     ____________________________

Title:            ____________________________                 Date:             ____________________________

Sworn to and subscribed before me this ___ day of _______________, 2_____.

Notary Public: _____________________________ My commission expires: __/__/__.


(SEAL)




         THE DEKALB COUNTY SCHOOL DISTRICT RESERVES THE RIGHT TO REJECT ANY AND ALL
         PROPOSALS AND TO WAIVE INFORMALITIES.
DeKalb County School District                                                   RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                   Project No. N/A
April 28, 2022                                                                          Page 1 of 1

                       ATTACHMENT B1: CORPORATE CERTIFICATE



STATE OF _______________________
COUNTY OF _____________________




          I, ________________________________, certify that I am the Secretary of the

corporation named as offeror in the foregoing proposal; that ____________________________

who signed said proposal on behalf of the offeror was then _______________________ of said

corporation; that said proposal was duly signed for and in behalf of said corporation by authority

of its Board of Directors, and is within the scope of its corporate powers; and that said

corporation is organized under the laws of the State of ____________________.




_____________________________________
[signature]



_____________________________________
[typed name]



Subscribed and sworn to
before me this ___ day of
_______________, 2_____.


(SEAL)



_____________________
Notary Public

My Commission Expires:
___/___/___
DeKalb County School District                                                                RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                                Project No. N/A
April 28, 2022                                                                                       Page 1 of 1

                                   ATTACHMENT B2: PARTNERSHIP CERTIFICATE


       STATE OF __________________________
       COUNTY OF ________________________


       On this           day of                       , 20                     , personally appeared
                                                      , who executed the above proposal, and being first duly sworn,
       deposes and says that he or she is a general partner in the firm of
       and that said firm consists of himself or herself and                                                and that
       he or she executed the foregoing proposal on behalf of said firm for the uses and purposes stated therein,
       and that no one except the above named members of the firm have any financial interest whatsoever in said
       proposed contract.


       ____________________________________
       [Affiant’s Signature]


       _________________________________                     __________________________________
       Partner                                               Partner

       _________________________________                     __________________________________
       Partner                                               Partner

       Subscribed and sworn to
       before me this ___ day of
       _______________, 2____.

       (seal)

       _______________________
       Notary Public

       My Commission Expires:
       ___/___/___

       NOTE: If only one partner signs, a Power of Attorney executed by all other partners authorizing him or her to
       act in the name of the partnership must be attached; otherwise, all partners must sign.
DeKalb County School District                                                   RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                   Project No. N/A
April 28, 2022                                                                          Page 1 of 1

                            ATTACHMENT B3: ENTITY CERTIFICATE



STATE OF _______________________

COUNTY OF _____________________



          I, ________________________________, certify that I am the Secretary of the entity

named as offeror in the foregoing proposal; that _____________________________________

who signed said proposal in behalf of the offeror was then _______________________ of said

entity; that said proposal was duly signed for and on behalf of said entity by due authority, and is

within the scope of its legal powers; and that said entity is a ________________________

organized under the laws of the State of ____________________.




_____________________________________
[signature]



_____________________________________
[typed name]



Subscribed and sworn to
before me this ___ day of
_______________, 2____.


(SEAL)



_____________________
Notary Public

My Commission Expires:
___/___/___
                  Revised ATTACHMENT C1: DESIGN FEE PROPOSAL FORM

Project Name: A/E Services for Bob Mathis Elementary School                                 RFQu No.: 22-752-030
                                                                                                  Project No.: N/A
                                                                                      RFQu Due Date: May 24, 2022

DeKalb County Board of Education
Sam A. Moss Service Center
1780 Montreal Road
Tucker, Georgia 30084


Board of Education:

         In compliance with DCSD’s Request for Qualifications, the undersigned Architect,

                           ____________________________________________
                                          [legal name of Architect]

                           ____________________________________________

                           ____________________________________________
                                           [address of Architect]

                           ____________________________________________
                                       [telephone number of Architect]

                           ____________________________________________
                                         [email address of Architect]

having carefully examined the site of the Project and the Owner’s Criteria, and having carefully examined the proposed
Standard Form of Contract for Architectural Services (State Capital Outlay Projects) between the DeKalb County Board
of Education and the Architect, as supplemented by the Special Supplementary Conditions (Appendix I and the Owner’s
standard forms and other documents included in the Request for Qualifications and any Addenda thereto for A/E
Services for Bob Mathis Elementary School HVAC Replacement proposes and agrees, if this proposal is accepted,
to enter into a contract with the Owner in the exact form provided in the Request for Qualifications and to perform the
Design Services and Work in conformance with the Contract Documents, in the time stated therein, for the Contract
Price set forth below, and submits the following proposed compensations and fees and other matters set forth below:

    a.       DCSD has determined that the maximum stipulated fee the Architect will receive for this project scope
             will be $139,366. This fee is all inclusive and incorporates all reimbursable expenses for this project.

    b.       The Proposed Design Fee will NOT be considered for the Selection Criteria.

    c.       Below provide your proposed breakdown of the stated fee per the requirements of the Agreement and
             the Design Review- Minimal Submittal Requirements (Appendix B) with the milestones provided for A/E
             Services for Bob Mathis Elementary School HVAC Replacement:




                                                      1
Project Name: A/E Services for Bob Mathis Elementary School                      RFQu No. 22-752-030
DeKalb County Board of Education                                                        Project No. N/A
Page 2 of 5                                                                RFQu Due Date: May 24, 2022


                       A. Preliminary Consultation/Examination Report         $___________________

                       B. Schematic Design Phase                               $___________________
                            • Provide three (3) potential schemes
                            • Provide schematic design drawings per Appendix B
                            • Provide project specifications per Appendix B
                            • Provide cost estimate per Appendix B
                            • Space and functional program Appendix B
                            • Life cycle analysis
                            • Other items identified in Appendix B

                       C. Design Development Phase                             $
                           • Provide design development drawings per Appendix B
                           • Provide project specifications per Appendix B
                           • Provide detailed cost estimate per Appendix B
                           • Geotechnical & surveys per Appendix B
                           • Final life cycle analysis
                           • Submittal to GaDOE
                           • Other items identified in Appendix B

                       D. Construction Document Phase:
                           30% complete CD phase                              $___________________
                            • 30% complete drawings
                            • Detailed project manual
                            • Detailed cost estimate

                             80% Complete CD Phase                            $___________________
                              • Construction documents per Appendix B
                              • Detailed project manual
                              • Detailed cost estimate
                              • Fire Marshal review
                              • Submittal to GaDOE

                             100% Complete CD Phase                           $
                             • Construction documents per Appendix B
                             • Detailed project manual
                             • Submittal for permitting
                             • Fire Marshal review
                             • Submittal to GaDOE

                         E. Sub-Consultants                                   $ Included in Fee

                         F. FF&E Services                                     $ N/A
                         G. Reimbursable Expenses                             $ Included in Fee
                         H. Construction Administration Fee                   $____________________
                            (Minimum of 15% of Fee Required)

                           TOTAL LUMP SUM                                     $ 139,366


                                                  2
Project Name: A/E Services for Bob Mathis Elementary School                                  RFQu No. 22-752-030
DeKalb County Board of Education                                                                    Project No. N/A
Page 3 of 5                                                                            RFQu Due Date: May 24, 2022




         d.     The hourly rates as required in Section 11.2. of the Agreement (Appendix I) in the following manner
                are indicated below. (These hourly rates will be added to the contract for this project):

                         Title/Position                        Hourly Rate
                         Principal:                            $ 210 per hour
                         Director:                             $ 155 per hour
                         Project Architect:                    $ 110 per hour
                         Project Manager:                      $ 110 per hour
                         Project Coordinator:                  $ 100 per hour
                         Interior Designer:                    $ 110 per hour
                         Project Captain:                      $ 90 per hour
                         Technical Staff:                      $ 110 per hour
                         Contract Administrator:               $ 85 per hour
                         Clerical:                             $ 50 per hour
                         Estimator:                            $ 85 per hour
                         Scheduler:                            $ 90 per hour
                         Designer:                             $ 85 per hour
                         CADD:                                 $ 65 per hour
                         Civil Engineer                        $ 110 per hour
                         Junior Civil Engineer                 $ 75 per hour
                         Structural Engineer                   $ 115 per hour
                         Junior Structural Engineer            $ 90 per hour
                         Mechanical Engineer                   $ 117 per hour
                         Junior Mechanical Engineer            $ 90 per hour
                         Electrical Engineer                   $ 117 per hour
                         Junior Electrical Engineer            $ 90 per hour
                         Fire Protection Engineer              $ 115 per hour
                         Junior Fire Protection Engineer       $ 90 per hour
                         FF&E Coordinator                      $ 80 per hour
                         Others as appropriate                 $       per hour


         e.     The undersigned Architect hereby acknowledges receipt of the following Addenda:
                [insert the number and date of each Addendum; if none, insert "None"]

                __________________________________________________________________

         f.     The Architect understands that the Owner reserves the right to reject any or all Proposals, and to
                waive any technicalities or informalities.

         g.     The Architect agrees that this Proposal may not be withdrawn for a period of one hundred and twenty
                (120) calendar days after the date and time fixed for receiving said Proposals.

         h.     The undersigned Architect agrees that if it is notified in writing by mail, telegraph, facsimile or hand-
                delivery of the acceptance of this Proposal, via Notice of Award or otherwise, within one hundred
                and twenty (120) calendar days after the date and time fixed for receiving said Proposals, the
                undersigned Architect will execute, within three (3) business days of the date of the notice, a contract
                for the Design Services and the Work in accordance with the Request for Qualifications in the exact
                form provided therein for the Contract Price as agreed upon by the Owner and Architect.

         i.     The undersigned Architect agrees to commence the Design Services under the Owner’s form of

                                                     3
Project Name: A/E Services for Bob Mathis Elementary School                                          RFQu No. 22-752-030
DeKalb County Board of Education                                                                            Project No. N/A
Page 4 of 5                                                                                    RFQu Due Date: May 24, 2022


                     contract after its receipt of a written Notice to Proceed from the Owner.

         By submission of the Proposal, Architect represents and warrants that:
                (1) Architect has read and understands the Proposal Documents and the Proposal is made in
                    accordance therewith;

                (2) Architect has read and understands the bidding or proposal documents or contract documents for
                    other portions of the Project, if any, being bid or offered concurrently or presently under construction,
                    to the extent that such documentation relates to the Design Services or the Work for which the
                    Proposal is submitted;

                (3) Architect has visited, examined and inspected the site of the Project, obtained first-hand knowledge
                    of existing conditions, the conformation of the ground, the character, quality and quantity of the
                    products needed preliminary to and during the prosecution of the Work, the general and local
                    conditions and all other matters which can in any way affect the Work to be done under the Contract,
                    and become thoroughly familiar with all conditions under which the Work is to be performed and has
                    correlated all the Architect’s personal observations and any other facts or conditions that are known
                    to or reasonably knowable by the Architect with the requirements of the Proposal Documents,
                    including without limitation the proposed Contract Documents;

                (4) the Proposal is based upon furnishing all of the Design Services and the Work, and other things
                    required by the Proposal Documents; and

                (5) all facts stated in the Proposal are true and correct.

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in al l respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

                                                  Respectfully submitted,

                                                  ______________________________________
                                                                [typed name of Architect]

                                                  By: __________________________________[seal]
                                                                [signature]

                                                  __________________________________________
                                                                [typed name and title]

                                                  __________________________________________
                                                                [address of Architect]

                                                  (_____)____________________________________
                                                                 [business telephone number]

                                                  __________________________________________
                                                                [date of execution]

              [If the Architect is a joint venture, utilize the following page of this proposal form for signatures.]

                                                            4
Project Name: A/E Services for Bob Mathis Elementary School                                   RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 5 of 5                                                                             RFQu Due Date: May 24, 2022




                                           (For Joint Venture Proposals)

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

Respectfully submitted ________________________________________________________,
                                                       [typed name of Joint Venture]

                                              By: _________________________________
                                                            [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                            [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]



                                              By: __________________________________
                                                            [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                            [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]




                                                       5
                  Revised ATTACHMENT C2: DESIGN FEE PROPOSAL FORM

Project Name: A/E Services for Briarlake Elementary School                                  RFQu No.: 22-752-030
                                                                                                  Project No.: N/A
                                                                                      RFQu Due Date: May 24, 2022

DeKalb County Board of Education
Sam A. Moss Service Center
1780 Montreal Road
Tucker, Georgia 30084


Board of Education:

         In compliance with DCSD’s Request for Qualifications, the undersigned Architect,

                           ____________________________________________
                                          [legal name of Architect]

                           ____________________________________________

                           ____________________________________________
                                           [address of Architect]

                           ____________________________________________
                                       [telephone number of Architect]

                           ____________________________________________
                                         [email address of Architect]

having carefully examined the site of the Project and the Owner’s Criteria, and having carefully examined the proposed
Standard Form of Contract for Architectural Services (State Capital Outlay Projects) between the DeKalb County Board
of Education and the Architect, as supplemented by the Special Supplementary Conditions (Appendix I and the Owner’s
standard forms and other documents included in the Request for Qualifications and any Addenda thereto for A/E
Services for Briarlake Elementary School HVAC Replacement proposes and agrees, if this proposal is accepted,
to enter into a contract with the Owner in the exact form provided in the Request for Qualifications and to perform the
Design Services and Work in conformance with the Contract Documents, in the time stated therein, for the Contract
Price set forth below, and submits the following proposed compensations and fees and other matters set forth below:

    a.       DCSD has determined that the maximum stipulated fee the Architect will receive for this project scope
             will be $107,937. This fee is all inclusive and incorporates all reimbursable expenses for this project.

    b.       The Proposed Design Fee will NOT be considered for the Selection Criteria.

    c.       Below provide your proposed breakdown of the stated fee per the requirements of the Agreement and
             the Design Review- Minimal Submittal Requirements (Appendix B) with the milestones provided for A/E
             Services for Briarlake Elementary School HVAC Replacement:




                                                      1
Project Name: A/E Services for Briarlake Elementary School                       RFQu No. 22-752-030
DeKalb County Board of Education                                                        Project No. N/A
Page 2 of 5                                                                RFQu Due Date: May 24, 2022


                       A. Preliminary Consultation/Examination Report         $___________________

                       B. Schematic Design Phase                               $___________________
                            • Provide three (3) potential schemes
                            • Provide schematic design drawings per Appendix B
                            • Provide project specifications per Appendix B
                            • Provide cost estimate per Appendix B
                            • Space and functional program Appendix B
                            • Life cycle analysis
                            • Other items identified in Appendix B

                       C. Design Development Phase                             $
                           • Provide design development drawings per Appendix B
                           • Provide project specifications per Appendix B
                           • Provide detailed cost estimate per Appendix B
                           • Geotechnical & surveys per Appendix B
                           • Final life cycle analysis
                           • Submittal to GaDOE
                           • Other items identified in Appendix B

                       D. Construction Document Phase:
                           30% complete CD phase                              $___________________
                            • 30% complete drawings
                            • Detailed project manual
                            • Detailed cost estimate

                             80% Complete CD Phase                            $___________________
                              • Construction documents per Appendix B
                              • Detailed project manual
                              • Detailed cost estimate
                              • Fire Marshal review
                              • Submittal to GaDOE

                              100% Complete CD Phase                          $
                              • Construction documents per Appendix B
                              • Detailed project manual
                              • Submittal for permitting
                              • Fire Marshal review
                              • Submittal to GaDOE

                          E. Sub-Consultants                                  $ Included in Fee

                          F. FF&E Services                                    $ N/A
                          G. Reimbursable Expenses                            $ Included in Fee
                          H. Construction Administration Fee                  $____________________
                             (Minimum of 15% of Fee Required)

                            TOTAL LUMP SUM                                    $ 107,937


                                                   2
Project Name: A/E Services for Briarlake Elementary School                                    RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 3 of 5                                                                             RFQu Due Date: May 24, 2022




         d.      The hourly rates as required in Section 11.2. of the Agreement (Appendix I) in the following manner
                 are indicated below. (These hourly rates will be added to the contract for this project):

                          Title/Position                        Hourly Rate
                          Principal:                            $ 210 per hour
                          Director:                             $ 155 per hour
                          Project Architect:                    $ 110 per hour
                          Project Manager:                      $ 110 per hour
                          Project Coordinator:                  $ 100 per hour
                          Interior Designer:                    $ 110 per hour
                          Project Captain:                      $ 90 per hour
                          Technical Staff:                      $ 110 per hour
                          Contract Administrator:               $ 85 per hour
                          Clerical:                             $ 50 per hour
                          Estimator:                            $ 85 per hour
                          Scheduler:                            $ 90 per hour
                          Designer:                             $ 85 per hour
                          CADD:                                 $ 65 per hour
                          Civil Engineer                        $ 110 per hour
                          Junior Civil Engineer                 $ 75 per hour
                          Structural Engineer                   $ 115 per hour
                          Junior Structural Engineer            $ 90 per hour
                          Mechanical Engineer                   $ 117 per hour
                          Junior Mechanical Engineer            $ 90 per hour
                          Electrical Engineer                   $ 117 per hour
                          Junior Electrical Engineer            $ 90 per hour
                          Fire Protection Engineer              $ 115 per hour
                          Junior Fire Protection Engineer       $ 90 per hour
                          FF&E Coordinator                      $ 80 per hour
                          Others as appropriate                 $       per hour


         e.      The undersigned Architect hereby acknowledges receipt of the following Addenda:
                 [insert the number and date of each Addendum; if none, insert "None"]

                 __________________________________________________________________

         f.      The Architect understands that the Owner reserves the right to reject any or all Proposals, and to
                 waive any technicalities or informalities.

         g.      The Architect agrees that this Proposal may not be withdrawn for a period of one hundred and twenty
                 (120) calendar days after the date and time fixed for receiving said Proposals.

         h.      The undersigned Architect agrees that if it is notified in writing by mail, telegraph, facsimile or hand-
                 delivery of the acceptance of this Proposal, via Notice of Award or otherwise, within one hundred
                 and twenty (120) calendar days after the date and time fixed for receiving said Proposals, the
                 undersigned Architect will execute, within three (3) business days of the date of the notice, a contract
                 for the Design Services and the Work in accordance with the Request for Qualifications in the exact
                 form provided therein for the Contract Price as agreed upon by the Owner and Architect.

         i.      The undersigned Architect agrees to commence the Design Services under the Owner’s form of

                                                      3
Project Name: A/E Services for Briarlake Elementary School                                           RFQu No. 22-752-030
DeKalb County Board of Education                                                                            Project No. N/A
Page 4 of 5                                                                                    RFQu Due Date: May 24, 2022


                     contract after its receipt of a written Notice to Proceed from the Owner.

         By submission of the Proposal, Architect represents and warrants that:
                (1) Architect has read and understands the Proposal Documents and the Proposal is made in
                    accordance therewith;

                (2) Architect has read and understands the bidding or proposal documents or contract documents for
                    other portions of the Project, if any, being bid or offered concurrently or presently under construction,
                    to the extent that such documentation relates to the Design Services or the Work for which the
                    Proposal is submitted;

                (3) Architect has visited, examined and inspected the site of the Project, obtained first-hand knowledge
                    of existing conditions, the conformation of the ground, the character, quality and quantity of the
                    products needed preliminary to and during the prosecution of the Work, the general and local
                    conditions and all other matters which can in any way affect the Work to be done under the Contract,
                    and become thoroughly familiar with all conditions under which the Work is to be performed and has
                    correlated all the Architect’s personal observations and any other facts or conditions that are known
                    to or reasonably knowable by the Architect with the requirements of the Proposal Documents,
                    including without limitation the proposed Contract Documents;

                (4) the Proposal is based upon furnishing all of the Design Services and the Work, and other things
                    required by the Proposal Documents; and

                (5) all facts stated in the Proposal are true and correct.

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in al l respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

                                                  Respectfully submitted,

                                                  ______________________________________
                                                                [typed name of Architect]

                                                  By: __________________________________[seal]
                                                                [signature]

                                                  __________________________________________
                                                                [typed name and title]

                                                  __________________________________________
                                                                [address of Architect]

                                                  (_____)____________________________________
                                                                 [business telephone number]

                                                  __________________________________________
                                                                [date of execution]

              [If the Architect is a joint venture, utilize the following page of this proposal form for signatures.]

                                                            4
Project Name: A/E Services for Briarlake Elementary School                                    RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 5 of 5                                                                             RFQu Due Date: May 24, 2022




                                           (For Joint Venture Proposals)

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

Respectfully submitted ________________________________________________________,
                                                       [typed name of Joint Venture]

                                              By: _________________________________
                                                            [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                            [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]



                                              By: __________________________________
                                                            [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                            [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]




                                                       5
                  Revised ATTACHMENT C3: DESIGN FEE PROPOSAL FORM

Project Name: A/E Services for Chapel Hill Elementary School                                 RFQu No.: 22-752-030
                                                                                                   Project No.: N/A
                                                                                       RFQu Due Date: May 24, 2022

DeKalb County Board of Education
Sam A. Moss Service Center
1780 Montreal Road
Tucker, Georgia 30084


Board of Education:

         In compliance with DCSD’s Request for Qualifications, the undersigned Architect,

                           ____________________________________________
                                          [legal name of Architect]

                           ____________________________________________

                           ____________________________________________
                                            [address of Architect]

                           ____________________________________________
                                        [telephone number of Architect]

                           ____________________________________________
                                         [email address of Architect]

having carefully examined the site of the Project and the Owner’s Criteria, and having carefully examined the proposed
Standard Form of Contract for Architectural Services (State Capital Outlay Projects) between the DeKalb County Board
of Education and the Architect, as supplemented by the Special Supplementary Conditions (Appendix I and the Owner’s
standard forms and other documents included in the Request for Qualifications and any Addenda thereto for A/E
Services for Chapel Hill Elementary School HVAC Replacement proposes and agrees, if this proposal is accepted,
to enter into a contract with the Owner in the exact form provided in the Request for Qualifications and to perform the
Design Services and Work in conformance with the Contract Documents, in the time stated therein, for the Contract
Price set forth below, and submits the following proposed compensations and fees and other matters set forth below:

    a.       DCSD has determined that the maximum stipulated fee the Architect will receive for this project scope
             will be $138,862. This fee is all inclusive and incorporates all reimbursable expenses for this project.

    b.       The Proposed Design Fee will NOT be considered for the Selection Criteria.
    c.       Below provide your proposed breakdown of the stated fee per the requirements of the Agreement and
             the Design Review- Minimal Submittal Requirements (Appendix B) with the milestones provided for A/E
             Services for Chapel Hill Elementary School HVAC Replacement:




                                                      1
Project Name: A/E Services for Chapel Hill Elementary School                      RFQu No. 22-752-030
DeKalb County Board of Education                                                         Project No. N/A
Page 2 of 5                                                                 RFQu Due Date: May 24, 2022


                       A. Preliminary Consultation/Examination Report          $___________________

                        B. Schematic Design Phase                               $___________________
                             • Provide three (3) potential schemes
                             • Provide schematic design drawings per Appendix B
                             • Provide project specifications per Appendix B
                             • Provide cost estimate per Appendix B
                             • Space and functional program Appendix B
                             • Life cycle analysis
                             • Other items identified in Appendix B

                        C. Design Development Phase                             $
                            • Provide design development drawings per Appendix B
                            • Provide project specifications per Appendix B
                            • Provide detailed cost estimate per Appendix B
                            • Geotechnical & surveys per Appendix B
                            • Final life cycle analysis
                            • Submittal to GaDOE
                            • Other items identified in Appendix B

                        D. Construction Document Phase:
                            30% complete CD phase                              $___________________
                             • 30% complete drawings
                             • Detailed project manual
                             • Detailed cost estimate

                             80% Complete CD Phase                             $___________________
                              • Construction documents per Appendix B
                              • Detailed project manual
                              • Detailed cost estimate
                              • Fire Marshal review
                              • Submittal to GaDOE

                              100% Complete CD Phase                           $
                              • Construction documents per Appendix B
                              • Detailed project manual
                              • Submittal for permitting
                              • Fire Marshal review
                              • Submittal to GaDOE

                          E. Sub-Consultants                                   $ Included in Fee

                          F. FF&E Services                                     $ N/A
                          G. Reimbursable Expenses                             $ Included in Fee
                          H. Construction Administration Fee                   $____________________
                             (Minimum of 15% of Fee Required)

                            TOTAL LUMP SUM                                     $ 138,862


                                                   2
Project Name: A/E Services for Chapel Hill Elementary School                                   RFQu No. 22-752-030
DeKalb County Board of Education                                                                      Project No. N/A
Page 3 of 5                                                                              RFQu Due Date: May 24, 2022




         d.      The hourly rates as required in Section 11.2. of the Agreement (Appendix I) in the following manner
                 are indicated below. (These hourly rates will be added to the contract for this project):

                          Title/Position                        Hourly Rate
                          Principal:                            $ 210 per hour
                          Director:                             $ 155 per hour
                          Project Architect:                    $ 110 per hour
                          Project Manager:                      $ 110 per hour
                          Project Coordinator:                  $ 100 per hour
                          Interior Designer:                    $ 110 per hour
                          Project Captain:                      $ 90 per hour
                          Technical Staff:                      $ 110 per hour
                          Contract Administrator:               $ 85 per hour
                          Clerical:                             $ 50 per hour
                          Estimator:                            $ 85 per hour
                          Scheduler:                            $ 90 per hour
                          Designer:                             $ 85 per hour
                          CADD:                                 $ 65 per hour
                          Civil Engineer                        $ 110 per hour
                          Junior Civil Engineer                 $ 75 per hour
                          Structural Engineer                   $ 115 per hour
                          Junior Structural Engineer            $ 90 per hour
                          Mechanical Engineer                   $ 117 per hour
                          Junior Mechanical Engineer            $ 90 per hour
                          Electrical Engineer                   $ 117 per hour
                          Junior Electrical Engineer            $ 90 per hour
                          Fire Protection Engineer              $ 115 per hour
                          Junior Fire Protection Engineer       $ 90 per hour
                          FF&E Coordinator                      $ 80 per hour
                          Others as appropriate                 $       per hour


         e.      The undersigned Architect hereby acknowledges receipt of the following Addenda:
                 [insert the number and date of each Addendum; if none, insert "None"]

                 __________________________________________________________________

         f.      The Architect understands that the Owner reserves the right to reject any or all Proposals, and to
                 waive any technicalities or informalities.

         g.      The Architect agrees that this Proposal may not be withdrawn for a period of one hundred and twenty
                 (120) calendar days after the date and time fixed for receiving said Proposals.

         h.      The undersigned Architect agrees that if it is notified in writing by mail, telegraph, facsimile or hand-
                 delivery of the acceptance of this Proposal, via Notice of Award or otherwise, within one hundred
                 and twenty (120) calendar days after the date and time fixed for receiving said Proposals, the
                 undersigned Architect will execute, within three (3) business days of the date of the notice, a contract
                 for the Design Services and the Work in accordance with the Request for Qualifications in the exact
                 form provided therein for the Contract Price as agreed upon by the Owner and Architect.

         i.      The undersigned Architect agrees to commence the Design Services under the Owner’s form of

                                                      3
Project Name: A/E Services for Chapel Hill Elementary School                                         RFQu No. 22-752-030
DeKalb County Board of Education                                                                            Project No. N/A
Page 4 of 5                                                                                    RFQu Due Date: May 24, 2022


                     contract after its receipt of a written Notice to Proceed from the Owner.

         By submission of the Proposal, Architect represents and warrants that:
                (1) Architect has read and understands the Proposal Documents and the Proposal is made in
                    accordance therewith;

                (2) Architect has read and understands the bidding or proposal documents or contract documents for
                    other portions of the Project, if any, being bid or offered concurrently or presently under construction,
                    to the extent that such documentation relates to the Design Services or the Work for which the
                    Proposal is submitted;

                (3) Architect has visited, examined and inspected the site of the Project, obtained first-hand knowledge
                    of existing conditions, the conformation of the ground, the character, quality and quantity of the
                    products needed preliminary to and during the prosecution of the Work, the general and local
                    conditions and all other matters which can in any way affect the Work to be done under the Contract,
                    and become thoroughly familiar with all conditions under which the Work is to be performed and has
                    correlated all the Architect’s personal observations and any other facts or conditions that are known
                    to or reasonably knowable by the Architect with the requirements of the Proposal Documents,
                    including without limitation the proposed Contract Documents;

                (4) the Proposal is based upon furnishing all of the Design Services and the Work, and other things
                    required by the Proposal Documents; and

                (5) all facts stated in the Proposal are true and correct.

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

                                                  Respectfully submitted,

                                                  ______________________________________
                                                                [typed name of Architect]

                                                  By: __________________________________[seal]
                                                                 [signature]

                                                  __________________________________________
                                                                [typed name and title]

                                                  __________________________________________
                                                                [address of Architect]

                                                  (_____)____________________________________
                                                                 [business telephone number]

                                                  __________________________________________
                                                                [date of execution]

              [If the Architect is a joint venture, utilize the following page of this proposal form for signatures.]

                                                            4
Project Name: A/E Services for Chapel Hill Elementary School                                  RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 5 of 5                                                                             RFQu Due Date: May 24, 2022




                                            (For Joint Venture Proposals)

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

Respectfully submitted ________________________________________________________,
                                                       [typed name of Joint Venture]

                                              By: _________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]



                                              By: __________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]




                                                       5
                  Revised ATTACHMENT C4: DESIGN FEE PROPOSAL FORM

Project Name: A/E Services for Early Learning Center                                        RFQu No.: 22-752-030
                                                                                                  Project No.: N/A
                                                                                      RFQu Due Date: May 24, 2022

DeKalb County Board of Education
Sam A. Moss Service Center
1780 Montreal Road
Tucker, Georgia 30084


Board of Education:

         In compliance with DCSD’s Request for Qualifications, the undersigned Architect,

                           ____________________________________________
                                          [legal name of Architect]

                           ____________________________________________

                           ____________________________________________
                                            [address of Architect]

                           ____________________________________________
                                        [telephone number of Architect]

                           ____________________________________________
                                         [email address of Architect]

having carefully examined the site of the Project and the Owner’s Criteria, and having carefully examined the proposed
Standard Form of Contract for Architectural Services (State Capital Outlay Projects) between the DeKalb County Board
of Education and the Architect, as supplemented by the Special Supplementary Conditions (Appendix I and the Owner’s
standard forms and other documents included in the Request for Qualifications and any Addenda thereto for A/E
Services for Early Learning Center HVAC Replacement proposes and agrees, if this proposal is accepted, to enter
into a contract with the Owner in the exact form provided in the Request for Qualifications and to perform the Design
Services and Work in conformance with the Contract Documents, in the time stated therein, for the Contract Price set
forth below, and submits the following proposed compensations and fees and other matters set forth below:

    a.       DCSD has determined that the maximum stipulated fee the Architect will receive for this project scope
             will be $137,394. This fee is all inclusive and incorporates all reimbursable expenses for this project.

    b.       The Proposed Design Fee will NOT be considered for the Selection Criteria.
    c.       Below provide your proposed breakdown of the stated fee per the requirements of the Agreement and
             the Design Review- Minimal Submittal Requirements (Appendix B) with the milestones provided for A/E
             Services for Early Learning Center HVAC Replacement:




                                                     1
Project Name: A/E Services for Early Learning Center                              RFQu No. 22-752-030
DeKalb County Board of Education                                                         Project No. N/A
Page 2 of 5                                                                 RFQu Due Date: May 24, 2022


                        A. Preliminary Consultation/Examination Report         $___________________

                        B. Schematic Design Phase                               $___________________
                             • Provide three (3) potential schemes
                             • Provide schematic design drawings per Appendix B
                             • Provide project specifications per Appendix B
                             • Provide cost estimate per Appendix B
                             • Space and functional program Appendix B
                             • Life cycle analysis
                             • Other items identified in Appendix B

                        C. Design Development Phase                             $
                            • Provide design development drawings per Appendix B
                            • Provide project specifications per Appendix B
                            • Provide detailed cost estimate per Appendix B
                            • Geotechnical & surveys per Appendix B
                            • Final life cycle analysis
                            • Submittal to GaDOE
                            • Other items identified in Appendix B

                        D. Construction Document Phase:
                            30% complete CD phase                              $___________________
                             • 30% complete drawings
                             • Detailed project manual
                             • Detailed cost estimate

                             80% Complete CD Phase                             $___________________
                              • Construction documents per Appendix B
                              • Detailed project manual
                              • Detailed cost estimate
                              • Fire Marshal review
                              • Submittal to GaDOE

                              100% Complete CD Phase                           $
                              • Construction documents per Appendix B
                              • Detailed project manual
                              • Submittal for permitting
                              • Fire Marshal review
                              • Submittal to GaDOE

                          E. Sub-Consultants                                   $ Included in Fee

                          F. FF&E Services                                     $ N/A
                          G. Reimbursable Expenses                             $ Included in Fee
                          H. Construction Administration Fee                   $____________________
                             (Minimum of 15% of Fee Required)

                            TOTAL LUMP SUM                                     $ 137,394


                                                   2
Project Name: A/E Services for Early Learning Center                                           RFQu No. 22-752-030
DeKalb County Board of Education                                                                      Project No. N/A
Page 3 of 5                                                                              RFQu Due Date: May 24, 2022




         d.      The hourly rates as required in Section 11.2. of the Agreement (Appendix I) in the following manner
                 are indicated below. (These hourly rates will be added to the contract for this project):

                          Title/Position                        Hourly Rate
                          Principal:                            $ 210 per hour
                          Director:                             $ 155 per hour
                          Project Architect:                    $ 110 per hour
                          Project Manager:                      $ 110 per hour
                          Project Coordinator:                  $ 100 per hour
                          Interior Designer:                    $ 110 per hour
                          Project Captain:                      $ 90 per hour
                          Technical Staff:                      $ 110 per hour
                          Contract Administrator:               $ 85 per hour
                          Clerical:                             $ 50 per hour
                          Estimator:                            $ 85 per hour
                          Scheduler:                            $ 90 per hour
                          Designer:                             $ 85 per hour
                          CADD:                                 $ 65 per hour
                          Civil Engineer                        $ 110 per hour
                          Junior Civil Engineer                 $ 75 per hour
                          Structural Engineer                   $ 115 per hour
                          Junior Structural Engineer            $ 90 per hour
                          Mechanical Engineer                   $ 117 per hour
                          Junior Mechanical Engineer            $ 90 per hour
                          Electrical Engineer                   $ 117 per hour
                          Junior Electrical Engineer            $ 90 per hour
                          Fire Protection Engineer              $ 115 per hour
                          Junior Fire Protection Engineer       $ 90 per hour
                          FF&E Coordinator                      $ 80 per hour
                          Others as appropriate                 $       per hour


         e.      The undersigned Architect hereby acknowledges receipt of the following Addenda:
                 [insert the number and date of each Addendum; if none, insert "None"]

                 __________________________________________________________________

         f.      The Architect understands that the Owner reserves the right to reject any or all Proposals, and to
                 waive any technicalities or informalities.

         g.      The Architect agrees that this Proposal may not be withdrawn for a period of one hundred and twenty
                 (120) calendar days after the date and time fixed for receiving said Proposals.

         h.      The undersigned Architect agrees that if it is notified in writing by mail, telegraph, facsimile or hand-
                 delivery of the acceptance of this Proposal, via Notice of Award or otherwise, within one hundred
                 and twenty (120) calendar days after the date and time fixed for receiving said Proposals, the
                 undersigned Architect will execute, within three (3) business days of the date of the notice, a contract
                 for the Design Services and the Work in accordance with the Request for Qualifications in the exact
                 form provided therein for the Contract Price as agreed upon by the Owner and Architect.

         i.      The undersigned Architect agrees to commence the Design Services under the Owner’s form of

                                                      3
Project Name: A/E Services for Early Learning Center                                                 RFQu No. 22-752-030
DeKalb County Board of Education                                                                            Project No. N/A
Page 4 of 5                                                                                    RFQu Due Date: May 24, 2022


                     contract after its receipt of a written Notice to Proceed from the Owner.

         By submission of the Proposal, Architect represents and warrants that:
                (1) Architect has read and understands the Proposal Documents and the Proposal is made in
                    accordance therewith;

                (2) Architect has read and understands the bidding or proposal documents or contract documents for
                    other portions of the Project, if any, being bid or offered concurrently or presently under construction,
                    to the extent that such documentation relates to the Design Services or the Work for which the
                    Proposal is submitted;

                (3) Architect has visited, examined and inspected the site of the Project, obtained first-hand knowledge
                    of existing conditions, the conformation of the ground, the character, quality and quantity of the
                    products needed preliminary to and during the prosecution of the Work, the general and local
                    conditions and all other matters which can in any way affect the Work to be done under the Contract,
                    and become thoroughly familiar with all conditions under which the Work is to be performed and has
                    correlated all the Architect’s personal observations and any other facts or conditions that are known
                    to or reasonably knowable by the Architect with the requirements of the Proposal Documents,
                    including without limitation the proposed Contract Documents;

                (4) the Proposal is based upon furnishing all of the Design Services and the Work, and other things
                    required by the Proposal Documents; and

                (5) all facts stated in the Proposal are true and correct.

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

                                                  Respectfully submitted,

                                                  ______________________________________
                                                                [typed name of Architect]

                                                  By: __________________________________[seal]
                                                                 [signature]

                                                  __________________________________________
                                                                [typed name and title]

                                                  __________________________________________
                                                                [address of Architect]

                                                  (_____)____________________________________
                                                                 [business telephone number]

                                                  __________________________________________
                                                                [date of execution]

              [If the Architect is a joint venture, utilize the following page of this proposal form for signatures.]

                                                            4
Project Name: A/E Services for Early Learning Center                                          RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 5 of 5                                                                             RFQu Due Date: May 24, 2022




                                            (For Joint Venture Proposals)

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

Respectfully submitted ________________________________________________________,
                                                       [typed name of Joint Venture]

                                              By: _________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]



                                              By: __________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]




                                                       5
                  Revised ATTACHMENT C5: DESIGN FEE PROPOSAL FORM

Project Name: A/E Services for Edward L. Bouie Elementary School                            RFQu No.: 22-752-030
                                                                                                  Project No.: N/A
                                                                                      RFQu Due Date: May 24, 2022

DeKalb County Board of Education
Sam A. Moss Service Center
1780 Montreal Road
Tucker, Georgia 30084


Board of Education:

         In compliance with DCSD’s Request for Qualifications, the undersigned Architect,

                           ____________________________________________
                                          [legal name of Architect]

                           ____________________________________________

                           ____________________________________________
                                            [address of Architect]

                           ____________________________________________
                                        [telephone number of Architect]

                           ____________________________________________
                                         [email address of Architect]

having carefully examined the site of the Project and the Owner’s Criteria, and having carefully examined the proposed
Standard Form of Contract for Architectural Services (State Capital Outlay Projects) between the DeKalb County Board
of Education and the Architect, as supplemented by the Special Supplementary Conditions (Appendix I and the Owner’s
standard forms and other documents included in the Request for Qualifications and any Addenda thereto for A/E
Services for Edward L. Bouie Elementary School HVAC Replacement proposes and agrees, if this proposal is
accepted, to enter into a contract with the Owner in the exact form provided in the Request for Qualifications and to
perform the Design Services and Work in conformance with the Contract Documents, in the time stated therein, for the
Contract Price set forth below, and submits the following proposed compensations and fees and other matters set forth
below:

    a.       DCSD has determined that the maximum stipulated fee the Architect will receive for this project scope
             will be $183,948. This fee is all inclusive and incorporates all reimbursable expenses for this project.

    b.       The Proposed Design Fee will NOT be considered for the Selection Criteria.

    c.       Below provide your proposed breakdown of the stated fee per the requirements of the Agreement and
             the Design Review- Minimal Submittal Requirements (Appendix B) with the milestones provided for A/E
             Services for Edward L. Bouie Elementary School HVAC Replacement:




                                                     1
Project Name: A/E Services for Edward L. Bouie Elementary School                 RFQu No. 22-752-030
DeKalb County Board of Education                                                        Project No. N/A
Page 2 of 5                                                                RFQu Due Date: May 24, 2022


                       A. Preliminary Consultation/Examination Report         $___________________

                       B. Schematic Design Phase                               $___________________
                            • Provide three (3) potential schemes
                            • Provide schematic design drawings per Appendix B
                            • Provide project specifications per Appendix B
                            • Provide cost estimate per Appendix B
                            • Space and functional program Appendix B
                            • Life cycle analysis
                            • Other items identified in Appendix B

                       C. Design Development Phase                             $
                           • Provide design development drawings per Appendix B
                           • Provide project specifications per Appendix B
                           • Provide detailed cost estimate per Appendix B
                           • Geotechnical & surveys per Appendix B
                           • Final life cycle analysis
                           • Submittal to GaDOE
                           • Other items identified in Appendix B

                       D. Construction Document Phase:
                           30% complete CD phase                              $___________________
                            • 30% complete drawings
                            • Detailed project manual
                            • Detailed cost estimate

                             80% Complete CD Phase                            $___________________
                              • Construction documents per Appendix B
                              • Detailed project manual
                              • Detailed cost estimate
                              • Fire Marshal review
                              • Submittal to GaDOE

                             100% Complete CD Phase                           $
                             • Construction documents per Appendix B
                             • Detailed project manual
                             • Submittal for permitting
                             • Fire Marshal review
                             • Submittal to GaDOE

                         E. Sub-Consultants                                   $ Included in Fee

                         F. FF&E Services                                     $ N/A
                         G. Reimbursable Expenses                             $ Included in Fee
                         H. Construction Administration Fee                   $____________________
                            (Minimum of 15% of Fee Required)

                           TOTAL LUMP SUM                                     $ 183,948


                                                  2
Project Name: A/E Services for Edward L. Bouie Elementary School                               RFQu No. 22-752-030
DeKalb County Board of Education                                                                      Project No. N/A
Page 3 of 5                                                                              RFQu Due Date: May 24, 2022




         d.      The hourly rates as required in Section 11.2. of the Agreement (Appendix I) in the following manner
                 are indicated below. (These hourly rates will be added to the contract for this project):

                          Title/Position                        Hourly Rate
                          Principal:                            $ 210 per hour
                          Director:                             $ 155 per hour
                          Project Architect:                    $ 110 per hour
                          Project Manager:                      $ 110 per hour
                          Project Coordinator:                  $ 100 per hour
                          Interior Designer:                    $ 110 per hour
                          Project Captain:                      $ 90 per hour
                          Technical Staff:                      $ 110 per hour
                          Contract Administrator:               $ 85 per hour
                          Clerical:                             $ 50 per hour
                          Estimator:                            $ 85 per hour
                          Scheduler:                            $ 90 per hour
                          Designer:                             $ 85 per hour
                          CADD:                                 $ 65 per hour
                          Civil Engineer                        $ 110 per hour
                          Junior Civil Engineer                 $ 75 per hour
                          Structural Engineer                   $ 115 per hour
                          Junior Structural Engineer            $ 90 per hour
                          Mechanical Engineer                   $ 117 per hour
                          Junior Mechanical Engineer            $ 90 per hour
                          Electrical Engineer                   $ 117 per hour
                          Junior Electrical Engineer            $ 90 per hour
                          Fire Protection Engineer              $ 115 per hour
                          Junior Fire Protection Engineer       $ 90 per hour
                          FF&E Coordinator                      $ 80 per hour
                          Others as appropriate                 $       per hour


         e.      The undersigned Architect hereby acknowledges receipt of the following Addenda:
                 [insert the number and date of each Addendum; if none, insert "None"]

                 __________________________________________________________________

         f.      The Architect understands that the Owner reserves the right to reject any or all Proposals, and to
                 waive any technicalities or informalities.

         g.      The Architect agrees that this Proposal may not be withdrawn for a period of one hundred and twenty
                 (120) calendar days after the date and time fixed for receiving said Proposals.

         h.      The undersigned Architect agrees that if it is notified in writing by mail, telegraph, facsimile or hand-
                 delivery of the acceptance of this Proposal, via Notice of Award or otherwise, within one hundred
                 and twenty (120) calendar days after the date and time fixed for receiving said Proposals, the
                 undersigned Architect will execute, within three (3) business days of the date of the notice, a contract
                 for the Design Services and the Work in accordance with the Request for Qualifications in the exact
                 form provided therein for the Contract Price as agreed upon by the Owner and Architect.

         i.      The undersigned Architect agrees to commence the Design Services under the Owner’s form of

                                                      3
Project Name: A/E Services for Edward L. Bouie Elementary School                                     RFQu No. 22-752-030
DeKalb County Board of Education                                                                            Project No. N/A
Page 4 of 5                                                                                    RFQu Due Date: May 24, 2022


                     contract after its receipt of a written Notice to Proceed from the Owner.

         By submission of the Proposal, Architect represents and warrants that:
                (1) Architect has read and understands the Proposal Documents and the Proposal is made in
                    accordance therewith;

                (2) Architect has read and understands the bidding or proposal documents or contract documents for
                    other portions of the Project, if any, being bid or offered concurrently or presently under construction,
                    to the extent that such documentation relates to the Design Services or the Work for which the
                    Proposal is submitted;

                (3) Architect has visited, examined and inspected the site of the Project, obtained first-hand knowledge
                    of existing conditions, the conformation of the ground, the character, quality and quantity of the
                    products needed preliminary to and during the prosecution of the Work, the general and local
                    conditions and all other matters which can in any way affect the Work to be done under the Contract,
                    and become thoroughly familiar with all conditions under which the Work is to be performed and has
                    correlated all the Architect’s personal observations and any other facts or conditions that are known
                    to or reasonably knowable by the Architect with the requirements of the Proposal Documents,
                    including without limitation the proposed Contract Documents;

                (4) the Proposal is based upon furnishing all of the Design Services and the Work, and other things
                    required by the Proposal Documents; and

                (5) all facts stated in the Proposal are true and correct.

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

                                                  Respectfully submitted,

                                                  ______________________________________
                                                                [typed name of Architect]

                                                  By: __________________________________[seal]
                                                                 [signature]

                                                  __________________________________________
                                                                [typed name and title]

                                                  __________________________________________
                                                                [address of Architect]

                                                  (_____)____________________________________
                                                                 [business telephone number]

                                                  __________________________________________
                                                                [date of execution]

              [If the Architect is a joint venture, utilize the following page of this proposal form for signatures.]

                                                            4
Project Name: A/E Services for Edward L. Bouie Elementary School                              RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 5 of 5                                                                             RFQu Due Date: May 24, 2022




                                            (For Joint Venture Proposals)

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

Respectfully submitted ________________________________________________________,
                                                       [typed name of Joint Venture]

                                              By: _________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]



                                              By: __________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]




                                                       5
                  Revised ATTACHMENT C6: DESIGN FEE PROPOSAL FORM

Project Name: A/E Services for Marbut Elementary School                                     RFQu No.: 22-752-030
                                                                                                  Project No.: N/A
                                                                                      RFQu Due Date: May 24, 2022

DeKalb County Board of Education
Sam A. Moss Service Center
1780 Montreal Road
Tucker, Georgia 30084


Board of Education:

         In compliance with DCSD’s Request for Qualifications, the undersigned Architect,

                           ____________________________________________
                                          [legal name of Architect]

                           ____________________________________________

                           ____________________________________________
                                            [address of Architect]

                           ____________________________________________
                                        [telephone number of Architect]

                           ____________________________________________
                                         [email address of Architect]

having carefully examined the site of the Project and the Owner’s Criteria, and having carefully examined the proposed
Standard Form of Contract for Architectural Services (State Capital Outlay Projects) between the DeKalb County Board
of Education and the Architect, as supplemented by the Special Supplementary Conditions (Appendix I and the Owner’s
standard forms and other documents included in the Request for Qualifications and any Addenda thereto for A/E
Services for Marbut Elementary School HVAC Replacement proposes and agrees, if this proposal is accepted, to
enter into a contract with the Owner in the exact form provided in the Request for Qualifications and to perform the
Design Services and Work in conformance with the Contract Documents, in the time stated therein, for the Contract
Price set forth below, and submits the following proposed compensations and fees and other matters set forth below:

    a.       DCSD has determined that the maximum stipulated fee the Architect will receive for this project scope
             will be $183,699. This fee is all inclusive and incorporates all reimbursable expenses for this project.

    b.       The Proposed Design Fee will NOT be considered for the Selection Criteria.
    c.       Below provide your proposed breakdown of the stated fee per the requirements of the Agreement and
             the Design Review- Minimal Submittal Requirements (Appendix B) with the milestones provided for A/E
             Services for Marbut Elementary School HVAC Replacement:




                                                     1
Project Name: A/E Services for Marbut Elementary School                          RFQu No. 22-752-030
DeKalb County Board of Education                                                        Project No. N/A
Page 2 of 5                                                                RFQu Due Date: May 24, 2022


                       A. Preliminary Consultation/Examination Report         $___________________

                       B. Schematic Design Phase                               $___________________
                            • Provide three (3) potential schemes
                            • Provide schematic design drawings per Appendix B
                            • Provide project specifications per Appendix B
                            • Provide cost estimate per Appendix B
                            • Space and functional program Appendix B
                            • Life cycle analysis
                            • Other items identified in Appendix B

                       C. Design Development Phase                             $
                           • Provide design development drawings per Appendix B
                           • Provide project specifications per Appendix B
                           • Provide detailed cost estimate per Appendix B
                           • Geotechnical & surveys per Appendix B
                           • Final life cycle analysis
                           • Submittal to GaDOE
                           • Other items identified in Appendix B

                       D. Construction Document Phase:
                           30% complete CD phase                              $___________________
                            • 30% complete drawings
                            • Detailed project manual
                            • Detailed cost estimate

                             80% Complete CD Phase                            $___________________
                              • Construction documents per Appendix B
                              • Detailed project manual
                              • Detailed cost estimate
                              • Fire Marshal review
                              • Submittal to GaDOE

                             100% Complete CD Phase                           $
                             • Construction documents per Appendix B
                             • Detailed project manual
                             • Submittal for permitting
                             • Fire Marshal review
                             • Submittal to GaDOE

                         E. Sub-Consultants                                   $ Included in Fee

                         F. FF&E Services                                     $ N/A
                         G. Reimbursable Expenses                             $ Included in Fee
                         H. Construction Administration Fee                   $____________________
                            (Minimum of 15% of Fee Required)

                           TOTAL LUMP SUM                                     $ 183,699


                                                  2
Project Name: A/E Services for Marbut Elementary School                                        RFQu No. 22-752-030
DeKalb County Board of Education                                                                      Project No. N/A
Page 3 of 5                                                                              RFQu Due Date: May 24, 2022




         d.      The hourly rates as required in Section 11.2. of the Agreement (Appendix I) in the following manner
                 are indicated below. (These hourly rates will be added to the contract for this project):

                          Title/Position                        Hourly Rate
                          Principal:                            $ 210 per hour
                          Director:                             $ 155 per hour
                          Project Architect:                    $ 110 per hour
                          Project Manager:                      $ 110 per hour
                          Project Coordinator:                  $ 100 per hour
                          Interior Designer:                    $ 110 per hour
                          Project Captain:                      $ 90 per hour
                          Technical Staff:                      $ 110 per hour
                          Contract Administrator:               $ 85 per hour
                          Clerical:                             $ 50 per hour
                          Estimator:                            $ 85 per hour
                          Scheduler:                            $ 90 per hour
                          Designer:                             $ 85 per hour
                          CADD:                                 $ 65 per hour
                          Civil Engineer                        $ 110 per hour
                          Junior Civil Engineer                 $ 75 per hour
                          Structural Engineer                   $ 115 per hour
                          Junior Structural Engineer            $ 90 per hour
                          Mechanical Engineer                   $ 117 per hour
                          Junior Mechanical Engineer            $ 90 per hour
                          Electrical Engineer                   $ 117 per hour
                          Junior Electrical Engineer            $ 90 per hour
                          Fire Protection Engineer              $ 115 per hour
                          Junior Fire Protection Engineer       $ 90 per hour
                          FF&E Coordinator                      $ 80 per hour
                          Others as appropriate                 $       per hour


         e.      The undersigned Architect hereby acknowledges receipt of the following Addenda:
                 [insert the number and date of each Addendum; if none, insert "None"]

                 __________________________________________________________________

         f.      The Architect understands that the Owner reserves the right to reject any or all Proposals, and to
                 waive any technicalities or informalities.

         g.      The Architect agrees that this Proposal may not be withdrawn for a period of one hundred and twenty
                 (120) calendar days after the date and time fixed for receiving said Proposals.

         h.      The undersigned Architect agrees that if it is notified in writing by mail, telegraph, facsimile or hand-
                 delivery of the acceptance of this Proposal, via Notice of Award or otherwise, within one hundred
                 and twenty (120) calendar days after the date and time fixed for receiving said Proposals, the
                 undersigned Architect will execute, within three (3) business days of the date of the notice, a contract
                 for the Design Services and the Work in accordance with the Request for Qualifications in the exact
                 form provided therein for the Contract Price as agreed upon by the Owner and Architect.

         i.      The undersigned Architect agrees to commence the Design Services under the Owner’s form of

                                                      3
Project Name: A/E Services for Marbut Elementary School                                              RFQu No. 22-752-030
DeKalb County Board of Education                                                                            Project No. N/A
Page 4 of 5                                                                                    RFQu Due Date: May 24, 2022


                     contract after its receipt of a written Notice to Proceed from the Owner.

         By submission of the Proposal, Architect represents and warrants that:
                (1) Architect has read and understands the Proposal Documents and the Proposal is made in
                    accordance therewith;

                (2) Architect has read and understands the bidding or proposal documents or contract documents for
                    other portions of the Project, if any, being bid or offered concurrently or presently under construction,
                    to the extent that such documentation relates to the Design Services or the Work for which the
                    Proposal is submitted;

                (3) Architect has visited, examined and inspected the site of the Project, obtained first-hand knowledge
                    of existing conditions, the conformation of the ground, the character, quality and quantity of the
                    products needed preliminary to and during the prosecution of the Work, the general and local
                    conditions and all other matters which can in any way affect the Work to be done under the Contract,
                    and become thoroughly familiar with all conditions under which the Work is to be performed and has
                    correlated all the Architect’s personal observations and any other facts or conditions that are known
                    to or reasonably knowable by the Architect with the requirements of the Proposal Documents,
                    including without limitation the proposed Contract Documents;

                (4) the Proposal is based upon furnishing all of the Design Services and the Work, and other things
                    required by the Proposal Documents; and

                (5) all facts stated in the Proposal are true and correct.

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

                                                  Respectfully submitted,

                                                  ______________________________________
                                                                [typed name of Architect]

                                                  By: __________________________________[seal]
                                                                 [signature]

                                                  __________________________________________
                                                                [typed name and title]

                                                  __________________________________________
                                                                [address of Architect]

                                                  (_____)____________________________________
                                                                 [business telephone number]

                                                  __________________________________________
                                                                [date of execution]

              [If the Architect is a joint venture, utilize the following page of this proposal form for signatures.]

                                                            4
Project Name: A/E Services for Marbut Elementary School                                       RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 5 of 5                                                                             RFQu Due Date: May 24, 2022




                                            (For Joint Venture Proposals)

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

Respectfully submitted ________________________________________________________,
                                                       [typed name of Joint Venture]

                                              By: _________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]



                                              By: __________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]




                                                       5
                  Revised ATTACHMENT C7: DESIGN FEE PROPOSAL FORM

Project Name: A/E Services for Martin Luther King Jr., High School                          RFQu No.: 22-752-030
                                                                                                  Project No.: N/A
                                                                                      RFQu Due Date: May 24, 2022

DeKalb County Board of Education
Sam A. Moss Service Center
1780 Montreal Road
Tucker, Georgia 30084


Board of Education:

         In compliance with DCSD’s Request for Qualifications, the undersigned Architect,

                           ____________________________________________
                                          [legal name of Architect]

                           ____________________________________________

                           ____________________________________________
                                            [address of Architect]

                           ____________________________________________
                                        [telephone number of Architect]

                           ____________________________________________
                                         [email address of Architect]

having carefully examined the site of the Project and the Owner’s Criteria, and having carefully examined the proposed
Standard Form of Contract for Architectural Services (State Capital Outlay Projects) between the DeKalb County Board
of Education and the Architect, as supplemented by the Special Supplementary Conditions (Appendix I and the Owner’s
standard forms and other documents included in the Request for Qualifications and any Addenda thereto for A/E
Services for Martin Luther King Jr., High School HVAC Replacement proposes and agrees, if this proposal is
accepted, to enter into a contract with the Owner in the exact form provided in the Request for Qualifications and to
perform the Design Services and Work in conformance with the Contract Documents, in the time stated therein, for the
Contract Price set forth below, and submits the following proposed compensations and fees and other matters set forth
below:

    a.       DCSD has determined that the maximum stipulated fee the Architect will receive for this project scope
             will be $528,026. This fee is all inclusive and incorporates all reimbursable expenses for this project.

    b.       The Proposed Design Fee will NOT be considered for the Selection Criteria.

    c.       Below provide your proposed breakdown of the stated fee per the requirements of the Agreement and
             the Design Review- Minimal Submittal Requirements (Appendix B) with the milestones provided for A/E
             Services for Martin Luther King Jr., High School HVAC Replacement:




                                                     1
Project Name: A/E Services for Martin Luther King Jr., High School                RFQu No. 22-752-030
DeKalb County Board of Education                                                         Project No. N/A
Page 2 of 5                                                                 RFQu Due Date: May 24, 2022


                        A. Preliminary Consultation/Examination Report         $___________________

                        B. Schematic Design Phase                               $___________________
                             • Provide three (3) potential schemes
                             • Provide schematic design drawings per Appendix B
                             • Provide project specifications per Appendix B
                             • Provide cost estimate per Appendix B
                             • Space and functional program Appendix B
                             • Life cycle analysis
                             • Other items identified in Appendix B

                        C. Design Development Phase                             $
                            • Provide design development drawings per Appendix B
                            • Provide project specifications per Appendix B
                            • Provide detailed cost estimate per Appendix B
                            • Geotechnical & surveys per Appendix B
                            • Final life cycle analysis
                            • Submittal to GaDOE
                            • Other items identified in Appendix B

                        D. Construction Document Phase:
                            30% complete CD phase                              $___________________
                             • 30% complete drawings
                             • Detailed project manual
                             • Detailed cost estimate

                              80% Complete CD Phase                            $___________________
                               • Construction documents per Appendix B
                               • Detailed project manual
                               • Detailed cost estimate
                               • Fire Marshal review
                               • Submittal to GaDOE

                               100% Complete CD Phase                          $
                               • Construction documents per Appendix B
                               • Detailed project manual
                               • Submittal for permitting
                               • Fire Marshal review
                               • Submittal to GaDOE

                          E. Sub-Consultants                                   $ Included in Fee

                          F. FF&E Services                                     $ N/A
                          G. Reimbursable Expenses                             $ Included in Fee
                          H. Construction Administration Fee                   $____________________
                             (Minimum of 15% of Fee Required)

                             TOTAL LUMP SUM                                    $ 528,026


                                                    2
Project Name: A/E Services for Martin Luther King Jr., High School                             RFQu No. 22-752-030
DeKalb County Board of Education                                                                      Project No. N/A
Page 3 of 5                                                                              RFQu Due Date: May 24, 2022




         d.      The hourly rates as required in Section 11.2. of the Agreement (Appendix I) in the following manner
                 are indicated below. (These hourly rates will be added to the contract for this project):

                          Title/Position                        Hourly Rate
                          Principal:                            $ 210 per hour
                          Director:                             $ 155 per hour
                          Project Architect:                    $ 110 per hour
                          Project Manager:                      $ 110 per hour
                          Project Coordinator:                  $ 100 per hour
                          Interior Designer:                    $ 110 per hour
                          Project Captain:                      $ 90 per hour
                          Technical Staff:                      $ 110 per hour
                          Contract Administrator:               $ 85 per hour
                          Clerical:                             $ 50 per hour
                          Estimator:                            $ 85 per hour
                          Scheduler:                            $ 90 per hour
                          Designer:                             $ 85 per hour
                          CADD:                                 $ 65 per hour
                          Civil Engineer                        $ 110 per hour
                          Junior Civil Engineer                 $ 75 per hour
                          Structural Engineer                   $ 115 per hour
                          Junior Structural Engineer            $ 90 per hour
                          Mechanical Engineer                   $ 117 per hour
                          Junior Mechanical Engineer            $ 90 per hour
                          Electrical Engineer                   $ 117 per hour
                          Junior Electrical Engineer            $ 90 per hour
                          Fire Protection Engineer              $ 115 per hour
                          Junior Fire Protection Engineer       $ 90 per hour
                          FF&E Coordinator                      $ 80 per hour
                          Others as appropriate                 $       per hour


         e.      The undersigned Architect hereby acknowledges receipt of the following Addenda:
                 [insert the number and date of each Addendum; if none, insert "None"]

                 __________________________________________________________________

         f.      The Architect understands that the Owner reserves the right to reject any or all Proposals, and to
                 waive any technicalities or informalities.

         g.      The Architect agrees that this Proposal may not be withdrawn for a period of one hundred and twenty
                 (120) calendar days after the date and time fixed for receiving said Proposals.

         h.      The undersigned Architect agrees that if it is notified in writing by mail, telegraph, facsimile or hand-
                 delivery of the acceptance of this Proposal, via Notice of Award or otherwise, within one hundred
                 and twenty (120) calendar days after the date and time fixed for receiving said Proposals, the
                 undersigned Architect will execute, within three (3) business days of the date of the notice, a contract
                 for the Design Services and the Work in accordance with the Request for Qualifications in the exact
                 form provided therein for the Contract Price as agreed upon by the Owner and Architect.

         i.      The undersigned Architect agrees to commence the Design Services under the Owner’s form of

                                                      3
Project Name: A/E Services for Martin Luther King Jr., High School                                   RFQu No. 22-752-030
DeKalb County Board of Education                                                                            Project No. N/A
Page 4 of 5                                                                                    RFQu Due Date: May 24, 2022


                     contract after its receipt of a written Notice to Proceed from the Owner.

         By submission of the Proposal, Architect represents and warrants that:
                (1) Architect has read and understands the Proposal Documents and the Proposal is made in
                    accordance therewith;

                (2) Architect has read and understands the bidding or proposal documents or contract documents for
                    other portions of the Project, if any, being bid or offered concurrently or presently under construction,
                    to the extent that such documentation relates to the Design Services or the Work for which the
                    Proposal is submitted;

                (3) Architect has visited, examined and inspected the site of the Project, obtained first-hand knowledge
                    of existing conditions, the conformation of the ground, the character, quality and quantity of the
                    products needed preliminary to and during the prosecution of the Work, the general and local
                    conditions and all other matters which can in any way affect the Work to be done under the Contract,
                    and become thoroughly familiar with all conditions under which the Work is to be performed and has
                    correlated all the Architect’s personal observations and any other facts or conditions that are known
                    to or reasonably knowable by the Architect with the requirements of the Proposal Documents,
                    including without limitation the proposed Contract Documents;

                (4) the Proposal is based upon furnishing all of the Design Services and the Work, and other things
                    required by the Proposal Documents; and

                (5) all facts stated in the Proposal are true and correct.

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

                                                  Respectfully submitted,

                                                  ______________________________________
                                                                [typed name of Architect]

                                                  By: __________________________________[seal]
                                                                 [signature]

                                                  __________________________________________
                                                                [typed name and title]

                                                  __________________________________________
                                                                [address of Architect]

                                                  (_____)____________________________________
                                                                 [business telephone number]

                                                  __________________________________________
                                                                [date of execution]

              [If the Architect is a joint venture, utilize the following page of this proposal form for signatures.]

                                                            4
Project Name: A/E Services for Martin Luther King Jr., High School                            RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 5 of 5                                                                             RFQu Due Date: May 24, 2022




                                            (For Joint Venture Proposals)

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

Respectfully submitted ________________________________________________________,
                                                       [typed name of Joint Venture]

                                              By: _________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]



                                              By: __________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]




                                                       5
                  Revised ATTACHMENT C8: DESIGN FEE PROPOSAL FORM

Project Name: A/E Services for Montclair Elementary School                                   RFQu No.: 22-752-030
                                                                                                   Project No.: N/A
                                                                                       RFQu Due Date: May 24, 2022

DeKalb County Board of Education
Sam A. Moss Service Center
1780 Montreal Road
Tucker, Georgia 30084


Board of Education:

         In compliance with DCSD’s Request for Qualifications, the undersigned Architect,

                           ____________________________________________
                                          [legal name of Architect]

                           ____________________________________________

                           ____________________________________________
                                            [address of Architect]

                           ____________________________________________
                                        [telephone number of Architect]

                           ____________________________________________
                                         [email address of Architect]

having carefully examined the site of the Project and the Owner’s Criteria, and having carefully examined the proposed
Standard Form of Contract for Architectural Services (State Capital Outlay Projects) between the DeKalb County Board
of Education and the Architect, as supplemented by the Special Supplementary Conditions (Appendix I and the Owner’s
standard forms and other documents included in the Request for Qualifications and any Addenda thereto for A/E
Services for Montclair Elementary School HVAC Replacement proposes and agrees, if this proposal is accepted,
to enter into a contract with the Owner in the exact form provided in the Request for Qualifications and to perform the
Design Services and Work in conformance with the Contract Documents, in the time stated therein, for the Contract
Price set forth below, and submits the following proposed compensations and fees and other matters set forth below:

    a.       DCSD has determined that the maximum stipulated fee the Architect will receive for this project scope
             will be $144,005. This fee is all inclusive and incorporates all reimbursable expenses for this project.

    b.       The Proposed Design Fee will NOT be considered for the Selection Criteria.
    c.       Below provide your proposed breakdown of the stated fee per the requirements of the Agreement and
             the Design Review- Minimal Submittal Requirements (Appendix B) with the milestones provided for A/E
             Services for Montclair Elementary School HVAC Replacement:




                                                      1
Project Name: A/E Services for Montclair Elementary School                       RFQu No. 22-752-030
DeKalb County Board of Education                                                        Project No. N/A
Page 2 of 5                                                                RFQu Due Date: May 24, 2022


                       A. Preliminary Consultation/Examination Report         $___________________

                       B. Schematic Design Phase                               $___________________
                            • Provide three (3) potential schemes
                            • Provide schematic design drawings per Appendix B
                            • Provide project specifications per Appendix B
                            • Provide cost estimate per Appendix B
                            • Space and functional program Appendix B
                            • Life cycle analysis
                            • Other items identified in Appendix B

                       C. Design Development Phase                             $
                           • Provide design development drawings per Appendix B
                           • Provide project specifications per Appendix B
                           • Provide detailed cost estimate per Appendix B
                           • Geotechnical & surveys per Appendix B
                           • Final life cycle analysis
                           • Submittal to GaDOE
                           • Other items identified in Appendix B

                       D. Construction Document Phase:
                           30% complete CD phase                              $___________________
                            • 30% complete drawings
                            • Detailed project manual
                            • Detailed cost estimate

                             80% Complete CD Phase                            $___________________
                              • Construction documents per Appendix B
                              • Detailed project manual
                              • Detailed cost estimate
                              • Fire Marshal review
                              • Submittal to GaDOE

                              100% Complete CD Phase                          $
                              • Construction documents per Appendix B
                              • Detailed project manual
                              • Submittal for permitting
                              • Fire Marshal review
                              • Submittal to GaDOE

                         E. Sub-Consultants                                   $ Included in Fee

                         F. FF&E Services                                     $ N/A
                         G. Reimbursable Expenses                             $ Included in Fee
                         H. Construction Administration Fee                   $____________________
                            (Minimum of 15% of Fee Required)

                            TOTAL LUMP SUM                                    $ 144,005


                                                   2
Project Name: A/E Services for Montclair Elementary School                                     RFQu No. 22-752-030
DeKalb County Board of Education                                                                      Project No. N/A
Page 3 of 5                                                                              RFQu Due Date: May 24, 2022




         d.      The hourly rates as required in Section 11.2. of the Agreement (Appendix I) in the following manner
                 are indicated below. (These hourly rates will be added to the contract for this project):

                          Title/Position                        Hourly Rate
                          Principal:                            $ 210 per hour
                          Director:                             $ 155 per hour
                          Project Architect:                    $ 110 per hour
                          Project Manager:                      $ 110 per hour
                          Project Coordinator:                  $ 100 per hour
                          Interior Designer:                    $ 110 per hour
                          Project Captain:                      $ 90 per hour
                          Technical Staff:                      $ 110 per hour
                          Contract Administrator:               $ 85 per hour
                          Clerical:                             $ 50 per hour
                          Estimator:                            $ 85 per hour
                          Scheduler:                            $ 90 per hour
                          Designer:                             $ 85 per hour
                          CADD:                                 $ 65 per hour
                          Civil Engineer                        $ 110 per hour
                          Junior Civil Engineer                 $ 75 per hour
                          Structural Engineer                   $ 115 per hour
                          Junior Structural Engineer            $ 90 per hour
                          Mechanical Engineer                   $ 117 per hour
                          Junior Mechanical Engineer            $ 90 per hour
                          Electrical Engineer                   $ 117 per hour
                          Junior Electrical Engineer            $ 90 per hour
                          Fire Protection Engineer              $ 115 per hour
                          Junior Fire Protection Engineer       $ 90 per hour
                          FF&E Coordinator                      $ 80 per hour
                          Others as appropriate                 $       per hour


         e.      The undersigned Architect hereby acknowledges receipt of the following Addenda:
                 [insert the number and date of each Addendum; if none, insert "None"]

                 __________________________________________________________________

         f.      The Architect understands that the Owner reserves the right to reject any or all Proposals, and to
                 waive any technicalities or informalities.

         g.      The Architect agrees that this Proposal may not be withdrawn for a period of one hundred and twenty
                 (120) calendar days after the date and time fixed for receiving said Proposals.

         h.      The undersigned Architect agrees that if it is notified in writing by mail, telegraph, facsimile or hand-
                 delivery of the acceptance of this Proposal, via Notice of Award or otherwise, within one hundred
                 and twenty (120) calendar days after the date and time fixed for receiving said Proposals, the
                 undersigned Architect will execute, within three (3) business days of the date of the notice, a contract
                 for the Design Services and the Work in accordance with the Request for Qualifications in the exact
                 form provided therein for the Contract Price as agreed upon by the Owner and Architect.

         i.      The undersigned Architect agrees to commence the Design Services under the Owner’s form of

                                                      3
Project Name: A/E Services for Montclair Elementary School                                           RFQu No. 22-752-030
DeKalb County Board of Education                                                                            Project No. N/A
Page 4 of 5                                                                                    RFQu Due Date: May 24, 2022


                     contract after its receipt of a written Notice to Proceed from the Owner.

         By submission of the Proposal, Architect represents and warrants that:
                (1) Architect has read and understands the Proposal Documents and the Proposal is made in
                    accordance therewith;

                (2) Architect has read and understands the bidding or proposal documents or contract documents for
                    other portions of the Project, if any, being bid or offered concurrently or presently under construction,
                    to the extent that such documentation relates to the Design Services or the Work for which the
                    Proposal is submitted;

                (3) Architect has visited, examined and inspected the site of the Project, obtained first-hand knowledge
                    of existing conditions, the conformation of the ground, the character, quality and quantity of the
                    products needed preliminary to and during the prosecution of the Work, the general and local
                    conditions and all other matters which can in any way affect the Work to be done under the Contract,
                    and become thoroughly familiar with all conditions under which the Work is to be performed and has
                    correlated all the Architect’s personal observations and any other facts or conditions that are known
                    to or reasonably knowable by the Architect with the requirements of the Proposal Documents,
                    including without limitation the proposed Contract Documents;

                (4) the Proposal is based upon furnishing all of the Design Services and the Work, and other things
                    required by the Proposal Documents; and

                (5) all facts stated in the Proposal are true and correct.

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

                                                  Respectfully submitted,

                                                  ______________________________________
                                                                [typed name of Architect]

                                                  By: __________________________________[seal]
                                                                 [signature]

                                                  __________________________________________
                                                                [typed name and title]

                                                  __________________________________________
                                                                [address of Architect]

                                                  (_____)____________________________________
                                                                 [business telephone number]

                                                  __________________________________________
                                                                [date of execution]

              [If the Architect is a joint venture, utilize the following page of this proposal form for signatures.]

                                                            4
Project Name: A/E Services for Montclair Elementary School                                    RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 5 of 5                                                                             RFQu Due Date: May 24, 2022




                                            (For Joint Venture Proposals)

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

Respectfully submitted ________________________________________________________,
                                                       [typed name of Joint Venture]

                                              By: _________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]



                                              By: __________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]




                                                       5
                  Revised ATTACHMENT C9: DESIGN FEE PROPOSAL FORM

Project Name: A/E Services for Panola Way Elementary School                                  RFQu No.: 22-752-030
                                                                                                   Project No.: N/A
                                                                                       RFQu Due Date: May 24, 2022

DeKalb County Board of Education
Sam A. Moss Service Center
1780 Montreal Road
Tucker, Georgia 30084


Board of Education:

         In compliance with DCSD’s Request for Qualifications, the undersigned Architect,

                           ____________________________________________
                                          [legal name of Architect]

                           ____________________________________________

                           ____________________________________________
                                            [address of Architect]

                           ____________________________________________
                                        [telephone number of Architect]

                           ____________________________________________
                                         [email address of Architect]

having carefully examined the site of the Project and the Owner’s Criteria, and having carefully examined the proposed
Standard Form of Contract for Architectural Services (State Capital Outlay Projects) between the DeKalb County Board
of Education and the Architect, as supplemented by the Special Supplementary Conditions (Appendix I and the Owner’s
standard forms and other documents included in the Request for Qualifications and any Addenda thereto for A/E
Services for Panola Way Elementary School HVAC Replacement proposes and agrees, if this proposal is accepted,
to enter into a contract with the Owner in the exact form provided in the Request for Qualifications and to perform the
Design Services and Work in conformance with the Contract Documents, in the time stated therein, for the Contract
Price set forth below, and submits the following proposed compensations and fees and other matters set forth below:

    a.       DCSD has determined that the maximum stipulated fee the Architect will receive for this project scope
             will be $173,137. This fee is all inclusive and incorporates all reimbursable expenses for this project.

    b.       The Proposed Design Fee will NOT be considered for the Selection Criteria.
    c.       Below provide your proposed breakdown of the stated fee per the requirements of the Agreement and
             the Design Review- Minimal Submittal Requirements (Appendix B) with the milestones provided for A/E
             Services for Panola Way Elementary School HVAC Replacement:




                                                      1
Project Name: A/E Services for Panola Way Elementary School                      RFQu No. 22-752-030
DeKalb County Board of Education                                                        Project No. N/A
Page 2 of 5                                                                RFQu Due Date: May 24, 2022


                       A. Preliminary Consultation/Examination Report         $___________________

                       B. Schematic Design Phase                               $___________________
                            • Provide three (3) potential schemes
                            • Provide schematic design drawings per Appendix B
                            • Provide project specifications per Appendix B
                            • Provide cost estimate per Appendix B
                            • Space and functional program Appendix B
                            • Life cycle analysis
                            • Other items identified in Appendix B

                       C. Design Development Phase                             $
                           • Provide design development drawings per Appendix B
                           • Provide project specifications per Appendix B
                           • Provide detailed cost estimate per Appendix B
                           • Geotechnical & surveys per Appendix B
                           • Final life cycle analysis
                           • Submittal to GaDOE
                           • Other items identified in Appendix B

                       D. Construction Document Phase:
                           30% complete CD phase                              $___________________
                            • 30% complete drawings
                            • Detailed project manual
                            • Detailed cost estimate

                            80% Complete CD Phase                             $___________________
                             • Construction documents per Appendix B
                             • Detailed project manual
                             • Detailed cost estimate
                             • Fire Marshal review
                             • Submittal to GaDOE

                             100% Complete CD Phase                           $
                             • Construction documents per Appendix B
                             • Detailed project manual
                             • Submittal for permitting
                             • Fire Marshal review
                             • Submittal to GaDOE

                         E. Sub-Consultants                                   $ Included in Fee

                         F. FF&E Services                                     $ N/A
                         G. Reimbursable Expenses                             $ Included in Fee
                         H. Construction Administration Fee                   $____________________
                            (Minimum of 15% of Fee Required)

                           TOTAL LUMP SUM                                     $ 173,137


                                                 2
Project Name: A/E Services for Panola Way Elementary School                                   RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 3 of 5                                                                             RFQu Due Date: May 24, 2022




         d.     The hourly rates as required in Section 11.2. of the Agreement (Appendix I) in the following manner
                are indicated below. (These hourly rates will be added to the contract for this project):

                         Title/Position                        Hourly Rate
                         Principal:                            $ 210 per hour
                         Director:                             $ 155 per hour
                         Project Architect:                    $ 110 per hour
                         Project Manager:                      $ 110 per hour
                         Project Coordinator:                  $ 100 per hour
                         Interior Designer:                    $ 110 per hour
                         Project Captain:                      $ 90 per hour
                         Technical Staff:                      $ 110 per hour
                         Contract Administrator:               $ 85 per hour
                         Clerical:                             $ 50 per hour
                         Estimator:                            $ 85 per hour
                         Scheduler:                            $ 90 per hour
                         Designer:                             $ 85 per hour
                         CADD:                                 $ 65 per hour
                         Civil Engineer                        $ 110 per hour
                         Junior Civil Engineer                 $ 75 per hour
                         Structural Engineer                   $ 115 per hour
                         Junior Structural Engineer            $ 90 per hour
                         Mechanical Engineer                   $ 117 per hour
                         Junior Mechanical Engineer            $ 90 per hour
                         Electrical Engineer                   $ 117 per hour
                         Junior Electrical Engineer            $ 90 per hour
                         Fire Protection Engineer              $ 115 per hour
                         Junior Fire Protection Engineer       $ 90 per hour
                         FF&E Coordinator                      $ 80 per hour
                         Others as appropriate                 $       per hour


         e.     The undersigned Architect hereby acknowledges receipt of the following Addenda:
                [insert the number and date of each Addendum; if none, insert "None"]

                __________________________________________________________________

         f.     The Architect understands that the Owner reserves the right to reject any or all Proposals, and to
                waive any technicalities or informalities.

         g.     The Architect agrees that this Proposal may not be withdrawn for a period of one hundred and twenty
                (120) calendar days after the date and time fixed for receiving said Proposals.

         h.     The undersigned Architect agrees that if it is notified in writing by mail, telegraph, facsimile or hand-
                delivery of the acceptance of this Proposal, via Notice of Award or otherwise, within one hundred
                and twenty (120) calendar days after the date and time fixed for receiving said Proposals, the
                undersigned Architect will execute, within three (3) business days of the date of the notice, a contract
                for the Design Services and the Work in accordance with the Request for Qualifications in the exact
                form provided therein for the Contract Price as agreed upon by the Owner and Architect.

         i.     The undersigned Architect agrees to commence the Design Services under the Owner’s form of

                                                     3
Project Name: A/E Services for Panola Way Elementary School                                          RFQu No. 22-752-030
DeKalb County Board of Education                                                                            Project No. N/A
Page 4 of 5                                                                                    RFQu Due Date: May 24, 2022


                     contract after its receipt of a written Notice to Proceed from the Owner.

         By submission of the Proposal, Architect represents and warrants that:
                (1) Architect has read and understands the Proposal Documents and the Proposal is made in
                    accordance therewith;

                (2) Architect has read and understands the bidding or proposal documents or contract documents for
                    other portions of the Project, if any, being bid or offered concurrently or presently under construction,
                    to the extent that such documentation relates to the Design Services or the Work for which the
                    Proposal is submitted;

                (3) Architect has visited, examined and inspected the site of the Project, obtained first-hand knowledge
                    of existing conditions, the conformation of the ground, the character, quality and quantity of the
                    products needed preliminary to and during the prosecution of the Work, the general and local
                    conditions and all other matters which can in any way affect the Work to be done under the Contract,
                    and become thoroughly familiar with all conditions under which the Work is to be performed and has
                    correlated all the Architect’s personal observations and any other facts or conditions that are known
                    to or reasonably knowable by the Architect with the requirements of the Proposal Documents,
                    including without limitation the proposed Contract Documents;

                (4) the Proposal is based upon furnishing all of the Design Services and the Work, and other things
                    required by the Proposal Documents; and

                (5) all facts stated in the Proposal are true and correct.

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

                                                  Respectfully submitted,

                                                  ______________________________________
                                                                [typed name of Architect]

                                                  By: __________________________________[seal]
                                                                 [signature]

                                                  __________________________________________
                                                                [typed name and title]

                                                  __________________________________________
                                                                [address of Architect]

                                                  (_____)____________________________________
                                                                 [business telephone number]

                                                  __________________________________________
                                                                [date of execution]

              [If the Architect is a joint venture, utilize the following page of this proposal form for signatures.]

                                                            4
Project Name: A/E Services for Panola Way Elementary School                                   RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 5 of 5                                                                             RFQu Due Date: May 24, 2022




                                            (For Joint Venture Proposals)

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

Respectfully submitted ________________________________________________________,
                                                       [typed name of Joint Venture]

                                              By: _________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]



                                              By: __________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]




                                                       5
                  Revised ATTACHMENT C10: DESIGN FEE PROPOSAL FORM

Project Name: A/E Services for Pine Ridge Elementary School                                  RFQu No.: 22-752-030
                                                                                                   Project No.: N/A
                                                                                       RFQu Due Date: May 24, 2022

DeKalb County Board of Education
Sam A. Moss Service Center
1780 Montreal Road
Tucker, Georgia 30084


Board of Education:

         In compliance with DCSD’s Request for Qualifications, the undersigned Architect,

                           ____________________________________________
                                          [legal name of Architect]

                           ____________________________________________

                           ____________________________________________
                                            [address of Architect]

                           ____________________________________________
                                        [telephone number of Architect]

                           ____________________________________________
                                         [email address of Architect]

having carefully examined the site of the Project and the Owner’s Criteria, and having carefully examined the proposed
Standard Form of Contract for Architectural Services (State Capital Outlay Projects) between the DeKalb County Board
of Education and the Architect, as supplemented by the Special Supplementary Conditions (Appendix I and the Owner’s
standard forms and other documents included in the Request for Qualifications and any Addenda thereto for A/E
Services for Pine Ridge Elementary School HVAC Replacement proposes and agrees, if this proposal is accepted,
to enter into a contract with the Owner in the exact form provided in the Request for Qualifications and to perform the
Design Services and Work in conformance with the Contract Documents, in the time stated therein, for the Contract
Price set forth below, and submits the following proposed compensations and fees and other matters set forth below:

    a.       DCSD has determined that the maximum stipulated fee the Architect will receive for this project scope
             will be $175,092. This fee is all inclusive and incorporates all reimbursable expenses for this project.

    b.       The Proposed Design Fee will NOT be considered for the Selection Criteria.
    c.       Below provide your proposed breakdown of the stated fee per the requirements of the Agreement and
             the Design Review- Minimal Submittal Requirements (Appendix B) with the milestones provided for A/E
             Services for Pine Ridge Elementary School HVAC Replacement:




                                                      1
Project Name: A/E Services for Pine Ridge Elementary School                      RFQu No. 22-752-030
DeKalb County Board of Education                                                        Project No. N/A
Page 2 of 5                                                                RFQu Due Date: May 24, 2022


                       A. Preliminary Consultation/Examination Report         $___________________

                       B. Schematic Design Phase                               $___________________
                            • Provide three (3) potential schemes
                            • Provide schematic design drawings per Appendix B
                            • Provide project specifications per Appendix B
                            • Provide cost estimate per Appendix B
                            • Space and functional program Appendix B
                            • Life cycle analysis
                            • Other items identified in Appendix B

                       C. Design Development Phase                             $
                           • Provide design development drawings per Appendix B
                           • Provide project specifications per Appendix B
                           • Provide detailed cost estimate per Appendix B
                           • Geotechnical & surveys per Appendix B
                           • Final life cycle analysis
                           • Submittal to GaDOE
                           • Other items identified in Appendix B

                       D. Construction Document Phase:
                           30% complete CD phase                              $___________________
                            • 30% complete drawings
                            • Detailed project manual
                            • Detailed cost estimate

                             80% Complete CD Phase                            $___________________
                              • Construction documents per Appendix B
                              • Detailed project manual
                              • Detailed cost estimate
                              • Fire Marshal review
                              • Submittal to GaDOE

                             100% Complete CD Phase                           $
                             • Construction documents per Appendix B
                             • Detailed project manual
                             • Submittal for permitting
                             • Fire Marshal review
                             • Submittal to GaDOE

                         E. Sub-Consultants                                   $ Included in Fee

                         F. FF&E Services                                     $ N/A
                         G. Reimbursable Expenses                             $ Included in Fee
                         H. Construction Administration Fee                   $____________________
                            (Minimum of 15% of Fee Required)

                            TOTAL LUMP SUM                                    $ 175,092


                                                  2
Project Name: A/E Services for Pine Ridge Elementary School                                    RFQu No. 22-752-030
DeKalb County Board of Education                                                                      Project No. N/A
Page 3 of 5                                                                              RFQu Due Date: May 24, 2022




         d.      The hourly rates as required in Section 11.2. of the Agreement (Appendix I) in the following manner
                 are indicated below. (These hourly rates will be added to the contract for this project):

                          Title/Position                        Hourly Rate
                          Principal:                            $ 210 per hour
                          Director:                             $ 155 per hour
                          Project Architect:                    $ 110 per hour
                          Project Manager:                      $ 110 per hour
                          Project Coordinator:                  $ 100 per hour
                          Interior Designer:                    $ 110 per hour
                          Project Captain:                      $ 90 per hour
                          Technical Staff:                      $ 110 per hour
                          Contract Administrator:               $ 85 per hour
                          Clerical:                             $ 50 per hour
                          Estimator:                            $ 85 per hour
                          Scheduler:                            $ 90 per hour
                          Designer:                             $ 85 per hour
                          CADD:                                 $ 65 per hour
                          Civil Engineer                        $ 110 per hour
                          Junior Civil Engineer                 $ 75 per hour
                          Structural Engineer                   $ 115 per hour
                          Junior Structural Engineer            $ 90 per hour
                          Mechanical Engineer                   $ 117 per hour
                          Junior Mechanical Engineer            $ 90 per hour
                          Electrical Engineer                   $ 117 per hour
                          Junior Electrical Engineer            $ 90 per hour
                          Fire Protection Engineer              $ 115 per hour
                          Junior Fire Protection Engineer       $ 90 per hour
                          FF&E Coordinator                      $ 80 per hour
                          Others as appropriate                 $       per hour


         e.      The undersigned Architect hereby acknowledges receipt of the following Addenda:
                 [insert the number and date of each Addendum; if none, insert "None"]

                 __________________________________________________________________

         f.      The Architect understands that the Owner reserves the right to reject any or all Proposals, and to
                 waive any technicalities or informalities.

         g.      The Architect agrees that this Proposal may not be withdrawn for a period of one hundred and twenty
                 (120) calendar days after the date and time fixed for receiving said Proposals.

         h.      The undersigned Architect agrees that if it is notified in writing by mail, telegraph, facsimile or hand-
                 delivery of the acceptance of this Proposal, via Notice of Award or otherwise, within one hundred
                 and twenty (120) calendar days after the date and time fixed for receiving said Proposals, the
                 undersigned Architect will execute, within three (3) business days of the date of the notice, a contract
                 for the Design Services and the Work in accordance with the Request for Qualifications in the exact
                 form provided therein for the Contract Price as agreed upon by the Owner and Architect.

         i.      The undersigned Architect agrees to commence the Design Services under the Owner’s form of

                                                      3
Project Name: A/E Services for Pine Ridge Elementary School                                          RFQu No. 22-752-030
DeKalb County Board of Education                                                                            Project No. N/A
Page 4 of 5                                                                                    RFQu Due Date: May 24, 2022


                     contract after its receipt of a written Notice to Proceed from the Owner.

         By submission of the Proposal, Architect represents and warrants that:
                (1) Architect has read and understands the Proposal Documents and the Proposal is made in
                    accordance therewith;

                (2) Architect has read and understands the bidding or proposal documents or contract documents for
                    other portions of the Project, if any, being bid or offered concurrently or presently under construction,
                    to the extent that such documentation relates to the Design Services or the Work for which the
                    Proposal is submitted;

                (3) Architect has visited, examined and inspected the site of the Project, obtained first-hand knowledge
                    of existing conditions, the conformation of the ground, the character, quality and quantity of the
                    products needed preliminary to and during the prosecution of the Work, the general and local
                    conditions and all other matters which can in any way affect the Work to be done under the Contract,
                    and become thoroughly familiar with all conditions under which the Work is to be performed and has
                    correlated all the Architect’s personal observations and any other facts or conditions that are known
                    to or reasonably knowable by the Architect with the requirements of the Proposal Documents,
                    including without limitation the proposed Contract Documents;

                (4) the Proposal is based upon furnishing all of the Design Services and the Work, and other things
                    required by the Proposal Documents; and

                (5) all facts stated in the Proposal are true and correct.

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

                                                  Respectfully submitted,

                                                  ______________________________________
                                                                [typed name of Architect]

                                                  By: __________________________________[seal]
                                                                 [signature]

                                                  __________________________________________
                                                                [typed name and title]

                                                  __________________________________________
                                                                [address of Architect]

                                                  (_____)____________________________________
                                                                 [business telephone number]

                                                  __________________________________________
                                                                [date of execution]

              [If the Architect is a joint venture, utilize the following page of this proposal form for signatures.]

                                                            4
Project Name: A/E Services for Pine Ridge Elementary School                                   RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 5 of 5                                                                             RFQu Due Date: May 24, 2022




                                            (For Joint Venture Proposals)

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

Respectfully submitted ________________________________________________________,
                                                       [typed name of Joint Venture]

                                              By: _________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]



                                              By: __________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]




                                                       5
                  Revised ATTACHMENT C11: DESIGN FEE PROPOSAL FORM

Project Name: A/E Services for Shadow Rock Elementary School                                RFQu No.: 22-752-030
                                                                                                  Project No.: N/A
                                                                                      RFQu Due Date: May 24, 2022

DeKalb County Board of Education
Sam A. Moss Service Center
1780 Montreal Road
Tucker, Georgia 30084


Board of Education:

         In compliance with DCSD’s Request for Qualifications, the undersigned Architect,

                           ____________________________________________
                                          [legal name of Architect]

                           ____________________________________________

                           ____________________________________________
                                            [address of Architect]

                           ____________________________________________
                                        [telephone number of Architect]

                           ____________________________________________
                                         [email address of Architect]

having carefully examined the site of the Project and the Owner’s Criteria, and having carefully examined the proposed
Standard Form of Contract for Architectural Services (State Capital Outlay Projects) between the DeKalb County Board
of Education and the Architect, as supplemented by the Special Supplementary Conditions (Appendix I and the Owner’s
standard forms and other documents included in the Request for Qualifications and any Addenda thereto for A/E
Services for Shadow Rock Elementary School HVAC Replacement proposes and agrees, if this proposal is
accepted, to enter into a contract with the Owner in the exact form provided in the Request for Qualifications and to
perform the Design Services and Work in conformance with the Contract Documents, in the time stated therein, for the
Contract Price set forth below, and submits the following proposed compensations and fees and other matters set forth
below:

    a.       DCSD has determined that the maximum stipulated fee the Architect will receive for this project scope
             will be $203,398. This fee is all inclusive and incorporates all reimbursable expenses for this project.

    b.       The Proposed Design Fee will NOT be considered for the Selection Criteria.

    c.       Below provide your proposed breakdown of the stated fee per the requirements of the Agreement and
             the Design Review- Minimal Submittal Requirements (Appendix B) with the milestones provided for A/E
             Services for Shadow Rock Elementary School HVAC Replacement:




                                                     1
Project Name: A/E Services for Shadow Rock Elementary School                    RFQu No. 22-752-030
DeKalb County Board of Education                                                       Project No. N/A
Page 2 of 5                                                               RFQu Due Date: May 24, 2022


                      A. Preliminary Consultation/Examination Report         $___________________

                      B. Schematic Design Phase                               $___________________
                           • Provide three (3) potential schemes
                           • Provide schematic design drawings per Appendix B
                           • Provide project specifications per Appendix B
                           • Provide cost estimate per Appendix B
                           • Space and functional program Appendix B
                           • Life cycle analysis
                           • Other items identified in Appendix B

                      C. Design Development Phase                             $
                          • Provide design development drawings per Appendix B
                          • Provide project specifications per Appendix B
                          • Provide detailed cost estimate per Appendix B
                          • Geotechnical & surveys per Appendix B
                          • Final life cycle analysis
                          • Submittal to GaDOE
                          • Other items identified in Appendix B

                      D. Construction Document Phase:
                          30% complete CD phase                              $___________________
                           • 30% complete drawings
                           • Detailed project manual
                           • Detailed cost estimate

                            80% Complete CD Phase                            $___________________
                             • Construction documents per Appendix B
                             • Detailed project manual
                             • Detailed cost estimate
                             • Fire Marshal review
                             • Submittal to GaDOE

                             100% Complete CD Phase                          $
                             • Construction documents per Appendix B
                             • Detailed project manual
                             • Submittal for permitting
                             • Fire Marshal review
                             • Submittal to GaDOE

                        E. Sub-Consultants                                   $ Included in Fee

                        F. FF&E Services                                     $ N/A
                        G. Reimbursable Expenses                             $ Included in Fee
                        H. Construction Administration Fee                   $____________________
                           (Minimum of 15% of Fee Required)

                           TOTAL LUMP SUM                                    $ 203,398


                                                 2
Project Name: A/E Services for Shadow Rock Elementary School                                  RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 3 of 5                                                                             RFQu Due Date: May 24, 2022




         d.     The hourly rates as required in Section 11.2. of the Agreement (Appendix I) in the following manner
                are indicated below. (These hourly rates will be added to the contract for this project):

                         Title/Position                        Hourly Rate
                         Principal:                            $ 210 per hour
                         Director:                             $ 155 per hour
                         Project Architect:                    $ 110 per hour
                         Project Manager:                      $ 110 per hour
                         Project Coordinator:                  $ 100 per hour
                         Interior Designer:                    $ 110 per hour
                         Project Captain:                      $ 90 per hour
                         Technical Staff:                      $ 110 per hour
                         Contract Administrator:               $ 85 per hour
                         Clerical:                             $ 50 per hour
                         Estimator:                            $ 85 per hour
                         Scheduler:                            $ 90 per hour
                         Designer:                             $ 85 per hour
                         CADD:                                 $ 65 per hour
                         Civil Engineer                        $ 110 per hour
                         Junior Civil Engineer                 $ 75 per hour
                         Structural Engineer                   $ 115 per hour
                         Junior Structural Engineer            $ 90 per hour
                         Mechanical Engineer                   $ 117 per hour
                         Junior Mechanical Engineer            $ 90 per hour
                         Electrical Engineer                   $ 117 per hour
                         Junior Electrical Engineer            $ 90 per hour
                         Fire Protection Engineer              $ 115 per hour
                         Junior Fire Protection Engineer       $ 90 per hour
                         FF&E Coordinator                      $ 80 per hour
                         Others as appropriate                 $       per hour


         e.     The undersigned Architect hereby acknowledges receipt of the following Addenda:
                [insert the number and date of each Addendum; if none, insert "None"]

                __________________________________________________________________

         f.     The Architect understands that the Owner reserves the right to reject any or all Proposals, and to
                waive any technicalities or informalities.

         g.     The Architect agrees that this Proposal may not be withdrawn for a period of one hundred and twenty
                (120) calendar days after the date and time fixed for receiving said Proposals.

         h.     The undersigned Architect agrees that if it is notified in writing by mail, telegraph, facsimile or hand-
                delivery of the acceptance of this Proposal, via Notice of Award or otherwise, within one hundred
                and twenty (120) calendar days after the date and time fixed for receiving said Proposals, the
                undersigned Architect will execute, within three (3) business days of the date of the notice, a contract
                for the Design Services and the Work in accordance with the Request for Qualifications in the exact
                form provided therein for the Contract Price as agreed upon by the Owner and Architect.

         i.     The undersigned Architect agrees to commence the Design Services under the Owner’s form of

                                                     3
Project Name: A/E Services for Shadow Rock Elementary School                                         RFQu No. 22-752-030
DeKalb County Board of Education                                                                            Project No. N/A
Page 4 of 5                                                                                    RFQu Due Date: May 24, 2022


                     contract after its receipt of a written Notice to Proceed from the Owner.

         By submission of the Proposal, Architect represents and warrants that:
                (1) Architect has read and understands the Proposal Documents and the Proposal is made in
                    accordance therewith;

                (2) Architect has read and understands the bidding or proposal documents or contract documents for
                    other portions of the Project, if any, being bid or offered concurrently or presently under construction,
                    to the extent that such documentation relates to the Design Services or the Work for which the
                    Proposal is submitted;

                (3) Architect has visited, examined and inspected the site of the Project, obtained first-hand knowledge
                    of existing conditions, the conformation of the ground, the character, quality and quantity of the
                    products needed preliminary to and during the prosecution of the Work, the general and local
                    conditions and all other matters which can in any way affect the Work to be done under the Contract,
                    and become thoroughly familiar with all conditions under which the Work is to be performed and has
                    correlated all the Architect’s personal observations and any other facts or conditions that are known
                    to or reasonably knowable by the Architect with the requirements of the Proposal Documents,
                    including without limitation the proposed Contract Documents;

                (4) the Proposal is based upon furnishing all of the Design Services and the Work, and other things
                    required by the Proposal Documents; and

                (5) all facts stated in the Proposal are true and correct.

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

                                                  Respectfully submitted,

                                                  ______________________________________
                                                                [typed name of Architect]

                                                  By: __________________________________[seal]
                                                                 [signature]

                                                  __________________________________________
                                                                [typed name and title]

                                                  __________________________________________
                                                                [address of Architect]

                                                  (_____)____________________________________
                                                                 [business telephone number]

                                                  __________________________________________
                                                                [date of execution]

              [If the Architect is a joint venture, utilize the following page of this proposal form for signatures.]

                                                            4
Project Name: A/E Services for Shadow Rock Elementary School                                  RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 5 of 5                                                                             RFQu Due Date: May 24, 2022




                                            (For Joint Venture Proposals)

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

Respectfully submitted ________________________________________________________,
                                                       [typed name of Joint Venture]

                                              By: _________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]



                                              By: __________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]




                                                       5
                  Revised ATTACHMENT C12: DESIGN FEE PROPOSAL FORM

Project Name: A/E Services for Stephenson High School                                       RFQu No.: 22-752-030
                                                                                                  Project No.: N/A
                                                                                      RFQu Due Date: May 24, 2022

DeKalb County Board of Education
Sam A. Moss Service Center
1780 Montreal Road
Tucker, Georgia 30084


Board of Education:

         In compliance with DCSD’s Request for Qualifications, the undersigned Architect,

                           ____________________________________________
                                          [legal name of Architect]

                           ____________________________________________

                           ____________________________________________
                                            [address of Architect]

                           ____________________________________________
                                        [telephone number of Architect]

                           ____________________________________________
                                         [email address of Architect]

having carefully examined the site of the Project and the Owner’s Criteria, and having carefully examined the proposed
Standard Form of Contract for Architectural Services (State Capital Outlay Projects) between the DeKalb County Board
of Education and the Architect, as supplemented by the Special Supplementary Conditions (Appendix I and the Owner’s
standard forms and other documents included in the Request for Qualifications and any Addenda thereto for A/E
Services for Stephenson High School HVAC Replacement proposes and agrees, if this proposal is accepted, to
enter into a contract with the Owner in the exact form provided in the Request for Qualifications and to perform the
Design Services and Work in conformance with the Contract Documents, in the time stated therein, for the Contract
Price set forth below, and submits the following proposed compensations and fees and other matters set forth below:

    a.       DCSD has determined that the maximum stipulated fee the Architect will receive for this project scope
             will be $485,687. This fee is all inclusive and incorporates all reimbursable expenses for this project.

    b.       The Proposed Design Fee will NOT be considered for the Selection Criteria.
    c.       Below provide your proposed breakdown of the stated fee per the requirements of the Agreement and
             the Design Review- Minimal Submittal Requirements (Appendix B) with the milestones provided for A/E
             Services for Stephenson High School HVAC Replacement:




                                                     1
Project Name: A/E Services for Stephenson High School                            RFQu No. 22-752-030
DeKalb County Board of Education                                                        Project No. N/A
Page 2 of 5                                                                RFQu Due Date: May 24, 2022


                       A. Preliminary Consultation/Examination Report         $___________________

                       B. Schematic Design Phase                               $___________________
                            • Provide three (3) potential schemes
                            • Provide schematic design drawings per Appendix B
                            • Provide project specifications per Appendix B
                            • Provide cost estimate per Appendix B
                            • Space and functional program Appendix B
                            • Life cycle analysis
                            • Other items identified in Appendix B

                       C. Design Development Phase                             $
                           • Provide design development drawings per Appendix B
                           • Provide project specifications per Appendix B
                           • Provide detailed cost estimate per Appendix B
                           • Geotechnical & surveys per Appendix B
                           • Final life cycle analysis
                           • Submittal to GaDOE
                           • Other items identified in Appendix B

                       D. Construction Document Phase:
                           30% complete CD phase                              $___________________
                            • 30% complete drawings
                            • Detailed project manual
                            • Detailed cost estimate

                            80% Complete CD Phase                             $___________________
                             • Construction documents per Appendix B
                             • Detailed project manual
                             • Detailed cost estimate
                             • Fire Marshal review
                             • Submittal to GaDOE

                             100% Complete CD Phase                           $
                             • Construction documents per Appendix B
                             • Detailed project manual
                             • Submittal for permitting
                             • Fire Marshal review
                             • Submittal to GaDOE

                         E. Sub-Consultants                                   $ Included in Fee

                         F. FF&E Services                                     $ N/A
                         G. Reimbursable Expenses                             $ Included in Fee
                         H. Construction Administration Fee                   $____________________
                            (Minimum of 15% of Fee Required)

                           TOTAL LUMP SUM                                     $ 485,687


                                                  2
Project Name: A/E Services for Stephenson High School                                         RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 3 of 5                                                                             RFQu Due Date: May 24, 2022




         d.     The hourly rates as required in Section 11.2. of the Agreement (Appendix I) in the following manner
                are indicated below. (These hourly rates will be added to the contract for this project):

                         Title/Position                        Hourly Rate
                         Principal:                            $ 210 per hour
                         Director:                             $ 155 per hour
                         Project Architect:                    $ 110 per hour
                         Project Manager:                      $ 110 per hour
                         Project Coordinator:                  $ 100 per hour
                         Interior Designer:                    $ 110 per hour
                         Project Captain:                      $ 90 per hour
                         Technical Staff:                      $ 110 per hour
                         Contract Administrator:               $ 85 per hour
                         Clerical:                             $ 50 per hour
                         Estimator:                            $ 85 per hour
                         Scheduler:                            $ 90 per hour
                         Designer:                             $ 85 per hour
                         CADD:                                 $ 65 per hour
                         Civil Engineer                        $ 110 per hour
                         Junior Civil Engineer                 $ 75 per hour
                         Structural Engineer                   $ 115 per hour
                         Junior Structural Engineer            $ 90 per hour
                         Mechanical Engineer                   $ 117 per hour
                         Junior Mechanical Engineer            $ 90 per hour
                         Electrical Engineer                   $ 117 per hour
                         Junior Electrical Engineer            $ 90 per hour
                         Fire Protection Engineer              $ 115 per hour
                         Junior Fire Protection Engineer       $ 90 per hour
                         FF&E Coordinator                      $ 80 per hour
                         Others as appropriate                 $       per hour


         e.     The undersigned Architect hereby acknowledges receipt of the following Addenda:
                [insert the number and date of each Addendum; if none, insert "None"]

                __________________________________________________________________

         f.     The Architect understands that the Owner reserves the right to reject any or all Proposals, and to
                waive any technicalities or informalities.

         g.     The Architect agrees that this Proposal may not be withdrawn for a period of one hundred and twenty
                (120) calendar days after the date and time fixed for receiving said Proposals.

         h.     The undersigned Architect agrees that if it is notified in writing by mail, telegraph, facsimile or hand-
                delivery of the acceptance of this Proposal, via Notice of Award or otherwise, within one hundred
                and twenty (120) calendar days after the date and time fixed for receiving said Proposals, the
                undersigned Architect will execute, within three (3) business days of the date of the notice, a contract
                for the Design Services and the Work in accordance with the Request for Qualifications in the exact
                form provided therein for the Contract Price as agreed upon by the Owner and Architect.

         i.     The undersigned Architect agrees to commence the Design Services under the Owner’s form of

                                                     3
Project Name: A/E Services for Stephenson High School                                                RFQu No. 22-752-030
DeKalb County Board of Education                                                                            Project No. N/A
Page 4 of 5                                                                                    RFQu Due Date: May 24, 2022


                     contract after its receipt of a written Notice to Proceed from the Owner.

         By submission of the Proposal, Architect represents and warrants that:
                (1) Architect has read and understands the Proposal Documents and the Proposal is made in
                    accordance therewith;

                (2) Architect has read and understands the bidding or proposal documents or contract documents for
                    other portions of the Project, if any, being bid or offered concurrently or presently under construction,
                    to the extent that such documentation relates to the Design Services or the Work for which the
                    Proposal is submitted;

                (3) Architect has visited, examined and inspected the site of the Project, obtained first-hand knowledge
                    of existing conditions, the conformation of the ground, the character, quality and quantity of the
                    products needed preliminary to and during the prosecution of the Work, the general and local
                    conditions and all other matters which can in any way affect the Work to be done under the Contract,
                    and become thoroughly familiar with all conditions under which the Work is to be performed and has
                    correlated all the Architect’s personal observations and any other facts or conditions that are known
                    to or reasonably knowable by the Architect with the requirements of the Proposal Documents,
                    including without limitation the proposed Contract Documents;

                (4) the Proposal is based upon furnishing all of the Design Services and the Work, and other things
                    required by the Proposal Documents; and

                (5) all facts stated in the Proposal are true and correct.

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

                                                  Respectfully submitted,

                                                  ______________________________________
                                                                [typed name of Architect]

                                                  By: __________________________________[seal]
                                                                 [signature]

                                                  __________________________________________
                                                                [typed name and title]

                                                  __________________________________________
                                                                [address of Architect]

                                                  (_____)____________________________________
                                                                 [business telephone number]

                                                  __________________________________________
                                                                [date of execution]

              [If the Architect is a joint venture, utilize the following page of this proposal form for signatures.]

                                                            4
Project Name: A/E Services for Stephenson High School                                         RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 5 of 5                                                                             RFQu Due Date: May 24, 2022




                                            (For Joint Venture Proposals)

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

Respectfully submitted ________________________________________________________,
                                                       [typed name of Joint Venture]

                                              By: _________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]



                                              By: __________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]




                                                       5
                  Revised ATTACHMENT C13: DESIGN FEE PROPOSAL FORM

Project Name: A/E Services for Tucker Middle School                                         RFQu No.: 22-752-030
                                                                                                  Project No.: N/A
                                                                                      RFQu Due Date: May 24, 2022

DeKalb County Board of Education
Sam A. Moss Service Center
1780 Montreal Road
Tucker, Georgia 30084


Board of Education:

         In compliance with DCSD’s Request for Qualifications, the undersigned Architect,

                           ____________________________________________
                                          [legal name of Architect]

                           ____________________________________________

                           ____________________________________________
                                            [address of Architect]

                           ____________________________________________
                                        [telephone number of Architect]

                           ____________________________________________
                                         [email address of Architect]

having carefully examined the site of the Project and the Owner’s Criteria, and having carefully examined the proposed
Standard Form of Contract for Architectural Services (State Capital Outlay Projects) between the DeKalb County Board
of Education and the Architect, as supplemented by the Special Supplementary Conditions (Appendix I and the Owner’s
standard forms and other documents included in the Request for Qualifications and any Addenda thereto for A/E
Services for Tucker Middle School HVAC Replacement proposes and agrees, if this proposal is accepted, to enter
into a contract with the Owner in the exact form provided in the Request for Qualifications and to perform the Design
Services and Work in conformance with the Contract Documents, in the time stated therein, for the Contract Price set
forth below, and submits the following proposed compensations and fees and other matters set forth below:

    a.       DCSD has determined that the maximum stipulated fee the Architect will receive for this project scope
             will be $305,938. This fee is all inclusive and incorporates all reimbursable expenses for this project.

    b.       The Proposed Design Fee will NOT be considered for the Selection Criteria.
    c.       Below provide your proposed breakdown of the stated fee per the requirements of the Agreement and
             the Design Review- Minimal Submittal Requirements (Appendix B) with the milestones provided for A/E
             Services for Tucker Middle School HVAC Replacement:




                                                     1
Project Name: A/E Services for Tucker Middle School                              RFQu No. 22-752-030
DeKalb County Board of Education                                                        Project No. N/A
Page 2 of 5                                                                RFQu Due Date: May 24, 2022


                       A. Preliminary Consultation/Examination Report         $___________________

                       B. Schematic Design Phase                               $___________________
                            • Provide three (3) potential schemes
                            • Provide schematic design drawings per Appendix B
                            • Provide project specifications per Appendix B
                            • Provide cost estimate per Appendix B
                            • Space and functional program Appendix B
                            • Life cycle analysis
                            • Other items identified in Appendix B

                       C. Design Development Phase                             $
                           • Provide design development drawings per Appendix B
                           • Provide project specifications per Appendix B
                           • Provide detailed cost estimate per Appendix B
                           • Geotechnical & surveys per Appendix B
                           • Final life cycle analysis
                           • Submittal to GaDOE
                           • Other items identified in Appendix B

                       D. Construction Document Phase:
                           30% complete CD phase                              $___________________
                            • 30% complete drawings
                            • Detailed project manual
                            • Detailed cost estimate

                             80% Complete CD Phase                            $___________________
                              • Construction documents per Appendix B
                              • Detailed project manual
                              • Detailed cost estimate
                              • Fire Marshal review
                              • Submittal to GaDOE

                              100% Complete CD Phase                          $
                              • Construction documents per Appendix B
                              • Detailed project manual
                              • Submittal for permitting
                              • Fire Marshal review
                              • Submittal to GaDOE

                         E. Sub-Consultants                                   $ Included in Fee

                         F. FF&E Services                                     $ N/A
                         G. Reimbursable Expenses                             $ Included in Fee
                         H. Construction Administration Fee                   $____________________
                            (Minimum of 15% of Fee Required)

                            TOTAL LUMP SUM                                    $ 305,938


                                                      2
Project Name: A/E Services for Tucker Middle School                                            RFQu No. 22-752-030
DeKalb County Board of Education                                                                      Project No. N/A
Page 3 of 5                                                                              RFQu Due Date: May 24, 2022




         d.      The hourly rates as required in Section 11.2. of the Agreement (Appendix I) in the following manner
                 are indicated below. (These hourly rates will be added to the contract for this project):

                          Title/Position                        Hourly Rate
                          Principal:                            $ 210 per hour
                          Director:                             $ 155 per hour
                          Project Architect:                    $ 110 per hour
                          Project Manager:                      $ 110 per hour
                          Project Coordinator:                  $ 100 per hour
                          Interior Designer:                    $ 110 per hour
                          Project Captain:                      $ 90 per hour
                          Technical Staff:                      $ 110 per hour
                          Contract Administrator:               $ 85 per hour
                          Clerical:                             $ 50 per hour
                          Estimator:                            $ 85 per hour
                          Scheduler:                            $ 90 per hour
                          Designer:                             $ 85 per hour
                          CADD:                                 $ 65 per hour
                          Civil Engineer                        $ 110 per hour
                          Junior Civil Engineer                 $ 75 per hour
                          Structural Engineer                   $ 115 per hour
                          Junior Structural Engineer            $ 90 per hour
                          Mechanical Engineer                   $ 117 per hour
                          Junior Mechanical Engineer            $ 90 per hour
                          Electrical Engineer                   $ 117 per hour
                          Junior Electrical Engineer            $ 90 per hour
                          Fire Protection Engineer              $ 115 per hour
                          Junior Fire Protection Engineer       $ 90 per hour
                          FF&E Coordinator                      $ 80 per hour
                          Others as appropriate                 $       per hour


         e.      The undersigned Architect hereby acknowledges receipt of the following Addenda:
                 [insert the number and date of each Addendum; if none, insert "None"]

                 __________________________________________________________________

         f.      The Architect understands that the Owner reserves the right to reject any or all Proposals, and to
                 waive any technicalities or informalities.

         g.      The Architect agrees that this Proposal may not be withdrawn for a period of one hundred and twenty
                 (120) calendar days after the date and time fixed for receiving said Proposals.

         h.      The undersigned Architect agrees that if it is notified in writing by mail, telegraph, facsimile or hand-
                 delivery of the acceptance of this Proposal, via Notice of Award or otherwise, within one hundred
                 and twenty (120) calendar days after the date and time fixed for receiving said Proposals, the
                 undersigned Architect will execute, within three (3) business days of the date of the notice, a contract
                 for the Design Services and the Work in accordance with the Request for Qualifications in the exact
                 form provided therein for the Contract Price as agreed upon by the Owner and Architect.

         i.      The undersigned Architect agrees to commence the Design Services under the Owner’s form of

                                                      3
Project Name: A/E Services for Tucker Middle School                                                  RFQu No. 22-752-030
DeKalb County Board of Education                                                                            Project No. N/A
Page 4 of 5                                                                                    RFQu Due Date: May 24, 2022


                     contract after its receipt of a written Notice to Proceed from the Owner.

         By submission of the Proposal, Architect represents and warrants that:
                (1) Architect has read and understands the Proposal Documents and the Proposal is made in
                    accordance therewith;

                (2) Architect has read and understands the bidding or proposal documents or contract documents for
                    other portions of the Project, if any, being bid or offered concurrently or presently under construction,
                    to the extent that such documentation relates to the Design Services or the Work for which the
                    Proposal is submitted;

                (3) Architect has visited, examined and inspected the site of the Project, obtained first-hand knowledge
                    of existing conditions, the conformation of the ground, the character, quality and quantity of the
                    products needed preliminary to and during the prosecution of the Work, the general and local
                    conditions and all other matters which can in any way affect the Work to be done under the Contract,
                    and become thoroughly familiar with all conditions under which the Work is to be performed and has
                    correlated all the Architect’s personal observations and any other facts or conditions that are known
                    to or reasonably knowable by the Architect with the requirements of the Proposal Documents,
                    including without limitation the proposed Contract Documents;

                (4) the Proposal is based upon furnishing all of the Design Services and the Work, and other things
                    required by the Proposal Documents; and

                (5) all facts stated in the Proposal are true and correct.

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

                                                  Respectfully submitted,

                                                  ______________________________________
                                                                [typed name of Architect]

                                                  By: __________________________________[seal]
                                                                 [signature]

                                                  __________________________________________
                                                                [typed name and title]

                                                  __________________________________________
                                                                [address of Architect]

                                                  (_____)____________________________________
                                                                 [business telephone number]

                                                  __________________________________________
                                                                [date of execution]

              [If the Architect is a joint venture, utilize the following page of this proposal form for signatures.]

                                                            4
Project Name: A/E Services for Tucker Middle School                                           RFQu No. 22-752-030
DeKalb County Board of Education                                                                     Project No. N/A
Page 5 of 5                                                                             RFQu Due Date: May 24, 2022




                                            (For Joint Venture Proposals)

          By submission of this Proposal, the Architect certifies that this Proposal has been derived independently,
without consultation, communication or agreement as to any matter relating to this Proposal with any other Architect
or with any competitor. The Architect hereby certifies that this Proposal is made without prior understanding, agreement
or connection with any corporation, firm or person submitting a proposal for the same Project and is in all respects fair
and without collusion or fraud. The Architect agrees to abide by all conditions of the Request for Proposal.

Respectfully submitted ________________________________________________________,
                                                       [typed name of Joint Venture]

                                              By: _________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]



                                              By: __________________________________
                                                             [typed name of Joint Venture partner]

                                              By: __________________________________[seal]
                                                             [signature]

                                              __________________________________________
                                                            [typed name and title]

                                              __________________________________________
                                                            [address of Joint Venture partner]

                                              (_____)____________________________________
                                                             [business telephone number]

                                              __________________________________________
                                                            [date of execution]




                                                       5
DeKalb County School District                                                              RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                              Project No. N/A
April 28, 2022                                                                                      Page 1 of 2

  ATTACHMENT D: OFFEROR’S and INDIVIDUALS’ AFFIDAVIT OF NONCOLLUSION
                 (This affidavit to be executed in accordance with O.C.G.A. § 36-91-21(e))

STATE OF ______________________

COUNTY OF ____________________


        COMES NOW, ________________________________________________________ (“Of f eror”),
                                        [Name of Offeror]

appearing by and through __________________________________, its _________________________
                              [insert name of individual with                [title]
                              authority to bind Offeror]

(averring both individually and in his or her representative capacity on behalf of Of feror) (the “Individual
and Representative Af f iant”), and
_____________________________________________________________
[in these blanks insert the names of all those required to give the oath under O.C.G.A. § 36-91-21(e)]

_____________________________________________________ _______________________________

____________________________________________________________________ ________________

____________________________________________________________________________________

_____________________________________________________ _______________________________

____________________________________________________________________________________

____________________________________________________________________________________

 (collectively, the “Individual Af f iants”), and each of the Individual And Representative Af f iant and the
Individual Af f iants, af ter f irst being duly sworn, deposes and says that:

        1. He, she or it, as applicable, has not directly or indirectly violated subsection (d) of the Of f icial

Code of Georgia Annotated Section 36-91-21, which subsection provides as f ollows:

                 (d)      Whenever a public works construction contract f or any governmental entity subject
        to the requirements of this chapter is to be let out by competitive sealed bid or proposal, no person,
        by himself or herself or otherwise, shall prevent or attempt to prevent competition in such bidding
        or proposals by any means whatever. No perso n who desires to procure such work f or himself or
        herself or f or another shall prevent or endeavor to prevent anyone f rom making a bid or proposal
        theref or by any means whatever, nor shall such person so desiring the work cause or induce
        another to withdraw a bid or proposal f or the work.

        2. If the Of f eror is a partnership, then the Individual and Representative Af f iant, together with the

Individual Af f iants, constitute all of the partners and any of f icer, agent or other person who may have

represented or acted f or them in bidding or proposing f or or procuring the contract f or the DeKalb County


Board of Education A/E Services f or HVAC Replacement at Bob Mathis Elementary School, Briarlake
Elementary School, Chapel Hill Elementary School, Early Learning Center, Edward L. Bouie Elementary
School, Marbut Elementary School, Martin Luther King Jr., High School, Montclair Elementary School,
DeKalb County School District                                                               RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                               Project No. N/A
April 28, 2022                                                                                       Page 2 of 2

Panola Way Elementary School, Pine Ridge Elementary School, Shado w Rock Elementary School,
Stephenson High School, and Tucker Middle School (the “Project”).

        3. If the Of f eror is a corporation or other entity, then the Individual And Representative Af f iant,

together with the Individual Af f iants, constitute all of ficers, agents, or other persons who may have acted

f or or represented the corporation or other entity in bidding f or or procuring the contract f or the Project.

        Further, the Individual And Representative Af f iant and the Individual Af f iants sayeth not.

This _______ day of _______________, 2____

_____________________________________
       [insert name of Offeror]

and

___________________________________________
       [insert name of Individual And Representative Affiant]


By: ___________________________________, both individually and on behalf of Of f eror as its
       [signature]

_________________________________
       [insert title]


Individual Af f iants’ signatures and names:

x_____________________________________                       x____________________________________
Name:                                                        Name:

x_____________________________________                       x____________________________________
Name:                                                        Name:

x_____________________________________                       x____________________________________
Name:                                                        Name:

x_____________________________________                       x____________________________________
Name:                                                        Name:

x_____________________________________                       x____________________________________
Name:                                                        Name:

x_____________________________________                       x____________________________________
Name:                                                        Name:

Sworn to and subscribed bef ore me this ___ day of _______________, 2____.

Notary Public: _____________________ My commission expires: __/__/__.

        (SEAL)
DeKalb County School District                                                 RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                 Project No. N/A
April 28, 2022                                                                        Page 1 of 2

         ATTACHMENT E: CONFLICT OF INTEREST DISCLOSURE AFFIDAVIT


I HEREBY CERTIFY, UNDER OATH, that
   1. I (Printed Name), ______________________________________ am the (Title)
      _________________________________________________ and I am the duly authorized
      representative of the firm of (Firm Name) ______________________________________
      _____________________________________________ (the “Firm”) for purposes of this
      Affidavit, whose address is (Firm Address) _________________________
      ________________________, and I possess the legal authority to make this Affidavit on
      behalf of myself and the Firm, as follows:

  2. The following employee(s), officer(s) or agent(s) of the Firm (collectively, “Firm
     Representative”) is/are related, by blood or marriage, to an employee, agent or Board
     Member of the DeKalb County Board of Education (collectively, “Owner
     Representative”), as indicated below:

       Firm Representative           Owner Representative          Relation
       ________________              __________________            __________________
       ________________              __________________            __________________
       ________________              __________________            __________________
       ________________              __________________            __________________
       ________________              __________________            __________________

  3. Except as listed below under “EXCEPTIONS”, neither the Firm nor any Firm
     Representative have any conflicts of interest, whether real or potential, due to kinship,
     ownership, other clients, other contracts, interests, or otherwise concerning the DeKalb
     County Board of Education, the Project or any Owner Representative:

       EXCEPTIONS (fully disclose and completely explain)




                                    [Continued on Next Page]
DeKalb County School District                                                  RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                  Project No. N/A
April 28, 2022                                                                         Page 2 of 2

  4. This disclosure is made without prior understanding, agreement, or connection with any
     corporation, firm or person submitting a bid, proposal or qualification statement for the same
     contract or project, and is in all respects without collusion or fraud.

Wherefore, the foregoing disclosure is fully complete and true, and may be relied upon by the
DeKalb County Board of Education:

Signature:            ____________________________________________

Printed Name:         ____________________________________________

Firm Name:            ____________________________________________

Date:                 ____________________________________________

Sworn to and described before me this ________ day of _______________________

Personally known:             ____________________________________________

OR Produced Identification: ____________________________________________

Type of Identification:       ____________________________________________

Notary Public – State of      ____________________________________________

My Commission Expires         ____________________________________________

Affix Notary Seal Here:
DeKalb County School District                                                          RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                          Project No. N/A
April 28, 2022                                                                                 Page 1 of 1

                   ATTACHMENT F: CONSENT TO RELEASE INFORMATION
        The undersigned, having submitted a competitive sealed Proposal to the DeKalb County Board of
Education in respect of a local government entity public works construction project (or being a partner in a
joint venture that has submitted such proposal), hereby authorizes any person or entity having in its
possession, custody or control any information regarding the undersigned to fully disclose and make
available such information to the DeKalb County Board of Education, its agents, attorneys and other
representatives.

        This ___ day of _______________, 2_____.

        _____________________________________________________
        [Printed name of person or entity consenting to release of information]


        By: ___________________________________

        Printed name: ___________________________

        Printed Title: ____________________________
DeKalb County School District                                                                   RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                                   Project No. N/A
April 28, 2022                                                                                          Page 1 of 2

                ATTACHMENT G: IMMIGRATION AND SECURITY CERTIFICATION

       If you are providing service, performing work or delivering goods to the DeKalb County Board of
       Education/DeKalb County School District including, but not limited to schools, warehouses and
       central offices, the applicable Georgia Security and Immigration Compliance documents found here
       must be completed, signed, notarized and submitted with your bid/proposal. Failure to provide this
       document with your bid/proposal will result in the disqualification of the bid/proposal.

       1) Offeror/Bidder shall at all times comply with the Georgia Security and Immigration Compliance Act, as
       amended, O.C.G.A. § 13-10-90 et. seq.

       2) In order to insure compliance with the Immigration Reform and Control Act of 1986 (IRCA), D.L. 99-603
       and the Georgia Security and Immigration Compliance Act, as amended by the Illegal Immigration Reform
       Act of 2011, O.C.G.A. § 13-10-90 et. seq. (collectively the “Act”), the Offeror MUST INITIAL the statement
       applicable to Offeror below:

                (a)                (Initial here): Offeror declares under penalties of perjury that, Offeror
                has registered at https://e-verify.uscis.gov/enroll/ to verify information of all new employees
                in order to comply with the Act; is authorized to use and uses the federal authorization
                program under the federal work authorization user identification number issued on the date
                of authorization below; will continue to use the authorization program throughout the
                contract period; Offeror further warrants and agrees Offeror shall execute and return any
                and all affidavits required by the Act and the rules and regulations issued by the Georgia
                Department of Labor as set forth at Rule 300-10-1-.01 et. seq. [Offerors who initial (a)
                must attach and return a signed, notarized Contractor Affidavit and Agreement with
                the Contract if awarded];

                         or

                (b) ________ (Initial here): Offeror/Bidder warrants that he/she does not employ any
                other persons, and he/she does not intend to hire any employees or to perform the
                Contract. [Offerors/Bidders who initial (b) must attach and return a signed, notarized
                Affidavit of Exception with the Contract if awarded];

                           or
                (c)        _______ (Initial here) Offeror/Bidder is an individual who is licensed pursuant to
                Title 26 or Title 43 or by the State Bar of Georgia and is in good standing when such contract
                is for services to be rendered by such individual and thus does not have to provide an
                affidavit.

   _   3) _____ (Initial here) Offeror/Bidder will not employ or contract with any subcontrator in connection
       with a covered contract unless the subcontractor is registered, authorized to use, and uses the
       federal work authorization program; and provides Offeror/Bidder with all affidavits required by the
       Act and the rules and regulations issued by the Georgia Department of Labor as set forth at Rule
       300-10-1-.01 et. seq.

       4) _____(Initial here) Offeror/Bidder agrees that, if Offeror/Bidder employs or contracts with any
       sub-contractor in connection with the covered contract under the Act and DOL Rules 300-10-1-.01,
DeKalb County School District                                                                RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                                Project No. N/A
April 28, 2022                                                                                       Page 2 of 2

       et seq that Offeror/Bidder will secure from each sub-contractor at the time of the contract the sub-
       contractor’s name and address, the employee-number applicable to the sub-contractor, the date the
       authorization to use the federal work authorization program was granted to sub-contractor; the
       subcontractor’s attestation of the subcontractor’s compliance with the Act and Georgia Department
       of Labor Rule 300-10-1-.01, et seq.; and the subcontractor’s agreement not to contract with sub-
       subcontractors unless the sub-subcontractor is registered, authorized to use, and uses the federal
       work authorization program; and provides subcontractor with all affidavits required by the Act and
       the rules and regulations issued by the Georgia Department of Labor as set forth at Rule 300-10-1-
       .01 et. seq.

   5) ______(Initial here) Offeror/Bidder agrees to provide the DeKalb County School District with all
      affidavits of compliance as required by O.C.G.A. § 13-10-90 et seq. and Georgia Department of
      Labor Rules 300-10-1-.01, et seq within five (5) business days of receipt.


        _________________________________                    ______________________________
              Signature                                                    Date

         ____________________________________                _______________________________
             EEV/Basic Pilot Program                                Date of Authorization
             User Identification Number


     Firm Name: __________________________________________________________

     Street/Mailing Address: ________________________________________________

     City, State, Zip Code: __________________________________________________

     Telephone Number: ___________________________________________________

     Email Address: _______________________________________________________

     SUBSCRIBED AND SWORN
     BEFORE ME ON THIS THE

     ______ DAY OF_____________________, 20____


                         Notary Public

     My Commission Expires:
DeKalb County School District                                                                  RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                                  Project No. N/A
April 28, 2022                                                                                          Page 1 of 1

                           ATTACHMENT H: NO SUBMITTAL RESPONSE FORM
RFQu Number: 22-752-030                                                              DCSD Project No.: N/A
Title: A/E Services for HVAC Replacement at Bob Mathis ES, Briarlake ES, Chapel Hill ES, Early Learning
Center, Edward L. Bouie ES, Marbut ES, Martin Luther King Jr., HS, Montclair ES, Panola Way ES, Pine Ridge
ES, Shadow Rock ES, Stephenson HS, and Tucker MS

If your company will not be submitting a proposal in response to this Request for Qualifications, please complete this
form and return or fax, prior to the RFQu due date established within to :

                               DeKalb County Board of Education (the “Board”)
                              Sam A. Moss Service Center - Procurement Services
                                      Attention: Procurement Manager
                                             1780 Montreal Road
                                         Tucker, Georgia 30084-6705
                                             Fax (678) 676-1475
This information will assist Procurement Services in the preparation of future RFQu’s.

Company Name: ______________________________________________________________

Contact: ____________________________________________________________________

Address: ____________________________________________________________________

Telephone: _________________________________ Fax: ____________________________

Email:_______________________________________________________________________

Please check reason for a “no submittal.”

_____      Specifications ‘too tight,” geared toward one brand or manufacturer (explain below)
_____      Insufficient time to respond
_____      Specifications unclear (explain below)
_____      We do not offer this service or an equivalent
_____      Our schedule does not permit us to perform
_____      Unable to meet specifications
_____      Unable to meet bond requirements
_____      Unable to hold prices respondent throughout the term of the contract period
_____      Unable to meet insurance requirements
_____      Other________________________________________________________________

Explanation:__________________________________________________________________
____________________________________________________________________________
                       If submitting this form, only this form needs to be returned.
                  Appendix B - Design Review– Minimum Submittal Requirements
                                               (Stated Cost Limitation Value > $2M)


Preliminary Consultation
The purpose of the Preliminary Consultation is to confirm the existing conditions and requirements and to develop a plan for the
work.
 1. Review Scope as provided within the RFQu
 2. Review Facility Assessment Report
 3. Review As-built Documentation/Building Space Survey
 4. Code Review
 5. Utilities Review
 6. Program/Planning Work Sessions
 7. Preliminary Presentation
 8. Final Submission


Schematic Design - Minimum Submittal Requirements:
The purpose of the Schematic Design is to confirm that the design solution meets the client’s functional needs as defined in the
Program for the project. Reviewers focus on site use, layout, adjacency requirements, room sizes, and similar issues.


1.   Site plans showing:
         a) Adjacent building structures
         b) Easements and infrastructure/utilities
         c) Topographical features and existing plantings
         d) Vehicular and pedestrian site access and flow
         e) Landscape/ hardscape plan
         f) Grading plan
         g) Draft of storm meter management plan (as needed)
         h) Preliminary site logistics plan
         i) Tree protection plan
 2. Floor plans showing:
         a) Double line room layouts with door swings
         b) Public, private and service circulation
         c) Vertical circulation through the facility
         d) Program room numbers and corresponding program areas on the plans special features
         e) Wall ratings and types
 3. Elevations:
         a) Identify major elements for facility character



Version 1.28.14                                                                                                   Page 1 of 11
                  Appendix B - Design Review– Minimum Submittal Requirements
                                                 (Stated Cost Limitation Value > $2M)

         b) Graphical identification of proposed materials with shades and shadows to illustrate depth and volume as well as the
            contextual relationships to the Owner’s site as appropriate.
 4. Cost information showing:
         a) Preliminary cost comparisons between schemes, if applicable
         b) Cost of special features or phasing premiums
5.   A statement of probable construction cost. At a minimum, the cost estimate must address the systems shown below. A
     breakdown into sub-component systems is encouraged but not required. Each component or sub-component must identify
     the unit, unit cost, cost per square foot, and the percentage of the total construction cost:
         a) General conditions, profit and overhead
         b) Site work
         c) Foundations
         d) Superstructures
         e) Exterior closures
         f) Roofing
         g) Interior construction and finishes
         h) Conveying
         i) Special construction
         j) Fire protection
         k) Plumbing
         l) HVAC
         m) Electrical
         n) Controls
         o) Communications and security
 6. Specifications and Other Information:
         a) Include the proposed table of contents
         b) Provide an outline specification or narrative indicating materials, types of construction, proposed mechanical
            systems, plumbing systems, fire protection, security systems, and proposed electrical and life cycle analysis
            investigations
 7. A written narrative of the energy and life cycle analysis investigation.
 8. An updated project schedule
 9. Any special phasing or sequencing
 10. Any testing / analysis
 11. Any LEED or sustainable design considerations
 12. An updated Space and Functional Program specifically identifying any modifications.
 13. Life Cycle Cost Analysis.




Version 1.28.14                                                                                                    Page 2 of 11
                  Appendix B - Design Review– Minimum Submittal Requirements
                                               (Stated Cost Limitation Value > $2M)

Design Development - Minimum Submittal Requirements
In the Design Development Phase, reviewers are looking at methods of construction, materials, building support systems, and
choice of products. Design Development requirements are in addition to Schematic Design Requirements.
1.   All comments from the Schematic Design Review Process must be incorporated into the Design Development design
     review submittal or a written narrative explaining in detail why specific comments were not incorporated must be included.
2.   Civil Discipline
     a) Site Grading and Drainage Plan: Show developed drainage concepts, include existing and new contours, drainage
           structures (numbered for general reference), and spot grade elevations.
     b)   Site Utilities Plan: Indicate the plan relationships of existing and proposed utilities. Vertical relationship of the utilities
          will be noted by plan notations and profiles. Site plan including grading and site utilities, utility connection points, and a
          storm water management design.
     c)   Planting Plan: Illustrate the center points at desired spacing of major plantings. A key will explain the proposed form
          and design characteristics of the plants (large shade tree, flowering ornamental tree, low evergreen shrub, etc.). An
          existing tree to remain will have an “o” for its center point. A proposed tree will have an “x” for its center point or
          appropriate legend indicators.
     d)   Design Details: Show the design or detailing to be used in the site development. These details will clarify the
          relationship of vertical and horizontal surfaces, steps, walls, and pavements, etc., including edge conditions at adjacent
          surfaces.


3.   Architectural Discipline
     a) Site Layout and Materials Plan: Illustrate the design forms and materials to be used. Major dimensions will be
          indicated. All appearance-related design issues should be addressed, resolved, and shown. LEED and sustainable
          design and construction should be considered.
     b)   Dimensioned floor plans indicating structural bay sizes and overall building dimensions. Floor Plan should show
          dimensions of major elements and final partition locations, including all openings.
     c)   Exterior and core wall sections showing final dimensional relationships, materials, and component relationships.
     d)   Floor Plan showing all fixed and loose equipment
     e)   Large-scale plans and sections
     f)   Room finish schedule identifying all finishes.
     g)   Interior and exterior finish and color schedule (exposed finished mechanical and electrical items will be clearly
          addressed)
     h)   Building sections.
     i)   Door and hardware schedule showing door, frame, and fire ratings, if any.
     j)   Window schedule showing types and sizes.
     k)   Preliminary development of details.
     l)   Reflected ceiling plan including ceiling grid, light fixtures, and all devices that penetrate or are mounted upon finished
          ceiling.
     m) Interior movable furniture, office equipment, demountable partitions and system furniture, layouts for all departments
        and floors, including proposed building signage system.
     n)   Gross and net area calculations by department to determine compliance with Program of Requirements.
     o)   A thorough outline technical specification, including selected acceptable manufacturers.

Version 1.28.14                                                                                                          Page 3 of 11
                  Appendix B - Design Review– Minimum Submittal Requirements
                                              (Stated Cost Limitation Value > $2M)

4.   Structural Discipline
       a) Foundation drawings.
       b)    Floor plan with all structural members located and sized.
       c)    Footing, beam, column, and connection schedules.
       d)    Final floor elevations.
5.   Plumbing and Mechanical Disciplines
       a) Heating and cooling load calculations for each individual space, including cooling requirements for heat loads
           generated by office equipment, personal computers, etc.
       b)    Mechanical equipment schedule indicating size and capacity.
       c)    Plumbing Fixtures Schedule.
       d)    Floor plans showing mechanical equipment and plumbing fixtures. All equipment and fixtures should be shown and
             located.
       e)    Floor plans that show main ductwork distribution, branch ductwork, and plumbing piping. All ductwork and piping
             should be located and sized to coordinate with structural framing system.
       f)    All ceiling-mounted devices should be located.
       g)    Legend showing all symbols used on drawings.
6.   Electrical Disciplines
       a) Floor plans locating all power-consuming equipment with a description of the equipment load characteristics.
       b)    Estimate total electric load, confirm Design Manual required excess capacity.
       c)    Floor plans showing all major electrical equipment (switchgear, distribution panels, emergency generator, transfer
             switches, UPS system, etc.), which will be dimensioned and drawn to scale.
       d)    Site plan showing preliminary site lighting design with pole and fixture type designations.
       e)    Floor plans showing lighting layout, power, telecommunications, and office automation devices and switches with
             preliminary circuiting.
       f)    Estimate interior electrical loads for systems furniture, receptacles, lighting, food service equipment and any other
             special use areas, etc.
       g)    Preliminary Distribution Panel Schedules.
7.   Cost Information Showing:
       a) Relocation costs (temporary and permanent)
       b)    Contingencies
       c)    Temporary services
       d)    Confirm scope and budget
       e)    Proposed V/E items
8.   Other Deliverables
       a) Schedule of Spaces: Provide a comparative schedule of spaces arranged in tabular form, listing the building’s
            various spaces and showing the original square footage allotted in the approved Program for each space. Any
            deviations from the approved Space and Functional Program, involving square footage or otherwise, must be clearly
            indicated.
       b)    Survey and geotechnical information are required as part of the Design Development Documents.


Version 1.28.14                                                                                                      Page 4 of 11
                     Appendix B - Design Review– Minimum Submittal Requirements
                                                     (Stated Cost Limitation Value > $2M)

          c)     Project Specification Manual complete with all Division 01: “General Requirements” sections and technical
                 sections. General Requirements sections unique to the project, such as including temporary facilities and
                 Supplementary Conditions, must be fully developed. With each technical specification section, for each product or
                 material specified, include a photocopy of a cut sheet of the basis of design components and at least two acceptable
                 components specified.
          d)     Final Life Cycle Cost Analysis.
          e)     Detailed Cost Estimate building on the estimate previously developed in Schematic Design
          f)     Information provided outside the initial scope of services and based on subsequent written authorization must be
                 clearly noted.
          g)     Final site logistics plan showing access, laydown area, traffic re-routing, pedestrian access and flow, fencing,
                 construction parking, etc.


30% Construction Document – Minimal Submittal Requirements
30% Percent Completed Construction Documents deliverables are to include, at a minimum, all Design Development information
plus the following:
1.   All comments from the Design Development review process must be incorporated into the 30% Construction Document
     design review submittal or a written narrative explaining in detail why specific comments were not incorporated must be
     included.
2.   Cover Sheet(s)
     a) Name and address of Owner, Architect, Project Number
     b)        Vicinity map
     c)        Location map
     d)        Index to all drawings
3.   Site Plan
     e) Abbreviation and symbol glossary
     f)        A certified plot plan (sealed by a licensed land surveyor)
     g)        A grading plan 1’-0” or 2’-0” increments with appropriate sections
     h)        Sediment control and storm water management plans and profiles
     i)        Local governing utility standards included in all utility details
     j)        Standard details must be modified to suit project conditions. All non-applicable information must be deleted.
     k)        Existing and proposed electrical, gas, sewer, water, storm drainage, telephone and TV cable utilities must be identified.
     l)        Utility designs must show plan, profile, and all fittings and details required by code and local government standards.
4.   Landscape
     a) An overall site plan showing plantings, irrigation and drainage system, site lighting, and all site development features
5.   Architectural
     a) A basic floor plan of the entire facility showing minimal detail with a grid or column reference system showing overall
          building layout dimensions, core spaces, Owner-numbered or named rooms, room square footage, floor opening
          penetrations, etc. Fire ratings of all partitions, fire doors, etc., should be clearly denoted.
     b)        A dimensioned floor plan locating all interior partitions and exterior wall partitions from the grid or column reference
               system. Floor plan should include room workstation designations, interior and exterior door and window designations.


Version 1.28.14                                                                                                          Page 5 of 11
                  Appendix B - Design Review– Minimum Submittal Requirements
                                               (Stated Cost Limitation Value > $2M)

     c)   Room wall elevations for all non-typical walls.
     d)   Casework floor plan complete with schedule, details, and elevations.
     e)   Interior and exterior window, door and frame schedule, complete with elevations and details for all head, jamb, and sill
          conditions.
     f)   Interior and exterior finish and color schedule (exposed finished mechanical and electrical items will be clearly
          addressed).
     g)   Details to illustrate transitions between finish materials and construction types. Major building sections in at least two
          directions. A sufficient number of details to clearly indicate the method of construction for all building components and
          include, but not be limited to: walls, floors, roofing assemblies, waterproofing systems, insulating systems, interior and
          exterior finishes, architectural details, interior stairs and elevators.
     h)   Final locations of major equipment must be shown on the floor plan with associated floor loadings being shown on the
          structural drawings.
     i)   Partition-type schedule and section details for all interior, exterior, and floor wall conditions.
     j)   Roof plan showing all roofing material, roof drains, overflows, access hatches, roof walk pads, roof drainage slopes
          and elevations, scuppers, skylights, and mechanical and plumbing penetrations. Details must be provided for all edge,
          parapet, and flashing conditions.
     k)   All exterior building elevations showing finish materials, exterior door and window openings and designations, lights,
          louvers, grilles, signage, speakers, and other devices.
     l)   All structural members included in, or enclosed by the architectural details must be closely coordinated and the size
          verified by the structural engineer. Details must indicate the framing and furring method wherever appropriate.
     m) A reflected ceiling plan showing all grid, access doors, drapery tracks, light fixtures, grills, diffusers, sprinkler heads,
        security devices, fire alarm devices, intercom system, exit devices and acoustic treatment. Ceiling heights and type
        should be indicated on the reflected ceiling plan.
     n)   All mechanical/electrical elements included in or enclosed by the architectural details must be closely coordinated and
          the size verified by the design engineer. Details must indicate the framing and furring method wherever appropriate.
     o)   Code Analysis Information such as: fire resistance plans and building code construction type and occupancy
          information
6.   Structural
     a) A dimensioned foundation plan showing and locating in plan and in elevation all footing, foundations, foundation piers,
          caissons, grade beams, reinforcement with all layouts for masonry, and anchor bolts.
     b)   A dimensioned floor plan for each floor, showing all beams, beam sizes, duct and piping penetrations, construction
          joints, expansion joints, edge conditions, imbedded anchors and frames thickened slabs, recessed slabs stair
          penetrations, elevator shafts, floor loading, top of structure elevation and reinforcement.
     c)   Footing, column, grade beam, caissons, piers, reinforcement, and beam schedules.
     d)   Dimensioned to scale details showing all conditions, connections, and structural sizes.
     e)   Shear walls clearly shown on plan and schedule if symbol code is used.
     f)   Abbreviation and symbol glossary.
     g)   Fastener/connection schedule.
     h)   Elevations of all footings, elevations to top of all beams, columns, recesses, and floors.
     i)   Roof beam plan, elevator hoist beams.
7.   Mechanical

Version 1.28.14                                                                                                         Page 6 of 11
                  Appendix B - Design Review– Minimum Submittal Requirements
                                              (Stated Cost Limitation Value > $2M)

     a)   Abbreviation and symbol glossary.
     b)   Mechanical equipment schedule.
     c)   Exterior louver schedule, as coordinated with architectural louvers.
     d)   Floor plans indicating ductwork with sizes, ductwork mechanical devices, beams for floor above with ductwork
          penetrations.
     e)   HVAC plan showing final location of all ceiling-mounted mechanical devices, which include but are not limited to:
          diffusers, return air grilles, and thermostats.
     f)   Floor plans should indicate housekeeping pads and weight of concentrated loads.
8.   Plumbing
     a) Fixture/connection schedule
     b)   Abbreviations/symbol glossary
     c)   Floor plans indicating domestic hot and cold water, storm, waste, vent, and gas piping plans, including all valves,
          unions, fixtures, pipe sizes, and riser diagrams, etc.
     d)   Areas of concentrated plumbing equipment (hot water heaters, circulating pumps, etc.) must be enlarged from the
          basic floor plan to not less than ¼-inch = 1’-0” detail in both plan and section views.
9.   Electrical
     a) Lighting fixture schedule finalized
     b)   Lighting control schedule, switches, emergency lighting
     c)   Power riser diagram for interior lighting systems
     d)   Abbreviations and symbol glossary
     e)   Panel schedules with panel locations shown on the floor plan started
     f)   Fan/motor control schedule/diagram
     g)   Power riser diagram and main distribution panel layout in large enough scale so each run can be clearly seen.
     h)   Floor plan indicating wire management wiring for power, receptacles, voice, video and data communications, including
          circuiting and connections to systems furniture, etc. started
     i)   Separate plans for power, voice, and data must be provided
     j)   HVAC plan indicating above-ceiling wiring and circuits for lighting/electrical switches, security, fire alarm, emergency
          exit lighting and intercom controls, etc. started
     k)   Main service entrance connection diagram as verified and coordinated with the governing power utility; locations of
          services entrances and transformers must be verified with the Architect
10. Statement of Probable Construction Cost
    a) The cost information reported at the conclusion of the 30% Completed Construction Document Stage must be based
         upon supportive cost information from the updated detailed cost estimate prepared from the Design Development
         Documents Stage. The detailed estimate must account for the refined information of quantity or product information
         adjustments required in the development of the details to construct the design and incorporate the Constructability
         Review comments.
11. Quality Assurance/Quality Control Coordination
    a) All drawing submittal packages are expected to be thoroughly reviewed and coordinated between disciplines utilizing
        a structured review process in an attempt to minimize changes during construction due to the errors and omissions of
        the design team. If, during construction, excessive changes due to errors and omissions of the design team are
        required, the Owner reserves the right to seek reparation for said changes.

Version 1.28.14                                                                                                      Page 7 of 11
                  Appendix B - Design Review– Minimum Submittal Requirements
                                               (Stated Cost Limitation Value > $2M)

80% Complete Construction Documents - Minimum Submittal Requirements
80% Percent Completed Construction Documents deliverables are to include, at a minimum, all 30% Submittal information plus
the following:
1.   All comments from the 30% Construction Document Review Process must be incorporated into the 80% Construction
     Document design review submittal or a written narrative explaining in detail why specific comments were not incorporated.

2.   Civil
     a) All civil documents should be 100% complete.

3.   Landscape
     a) Details and sections of all site development features, sidewalks, curbs, paving stones, bollards, ramps, exterior stairs,
         lawn areas showing seeding methods, etc.
     b)   All landscape conditions should be thoroughly detailed.
     c)   A symbol glossary
     d)   Planting schedule
     e)   Seeding schedule
     f)   Modify standard details to suit project conditions and delete all non-applicable information
4.   Architectural
     a) Interior signage locations must be shown on the floor plan complete with details and schedules.
     b)   Casework floor plan complete with schedule, details, and elevations
     c)   Interior and exterior window, door and frame schedule, complete with elevations and details for all head, jamb, and sill
          conditions
     d)   Completion of all wall sections, enlarged toilet plans, enlarged floor plans, wall elevations, finish/color floor plans,
          finish/color boards (both interior and exterior)
     e)   Completion of FF&E plans, and vertical circulation plans and sections
     f)   Completion of all final roofing and waterproofing details
5.   Mechanical
     a) Floor plan indicating the sprinkler and standpipe riser systems, including all required pumps and control devices.
     b)   Fire damper schedule and location of dampers on each floor.
     c)   Ductwork sound attenuation schedule.
     d)   Vibration isolation schedule.
     e)   Terminal control box schedule with electrical and air volume requirements.
     f)   Chilled water, condenser, refrigerant, fuel oil, steam and gas riser piping floor plans and riser diagrams, and
          schematics, including pipe sizes. Piping schematics must be in large enough scale to clearly indicate all control
          devices, valves, unions, and miscellaneous appurtenances.
     g)   Areas of concentrated mechanical equipment must be enlarged from the basic floor plan to not less than ¼-inch = 1’-
          0”, illustrating detailed ductwork and equipment within the mechanical room in both plan and section views; coil access
          and filter access are to be shown to scale as verification of clearance.
     h)   Access doors – both wall and ceiling, must be called out at each applicable location as coordinated with the
          architectural drawings (rated where applicable).



Version 1.28.14                                                                                                         Page 8 of 11
                  Appendix B - Design Review– Minimum Submittal Requirements
                                               (Stated Cost Limitation Value > $2M)

     i)   Duct/piping penetrations of all walls, floors, roofs, beams, columns, and foundations must be coordinated with and
          verified by the structural engineer. Code complying fire-stopping must be detailed for penetrations through fire-rated
          assemblies.
     j)   Locate on the floor plans all controls system equipment and provide a panel and device schedule, indicator and panel
          graphics complete with sequence of operation and control system program diagram.
6.   Plumbing
     a) Piping and insulation jacket dimensions are to be coordinated with architectural finishes and casework; all exposed
         piping is to be verified with the Architect.
     b)   Plan drawing of all water and sanitary branch piping for installation of interior equipment and fixtures.
     c)   Typical piping riser schematics for all gravity flow piping systems.
     d)   Access panels, doors, and provisions in both walls and ceilings are to be shown on floor plans for all valves, cleanouts,
          and caps, etc.
     e)   Connections to existing and new building utilities must be clearly shown. Requirements of governing utilities must be
          determined and clearly detailed and shown. Connection details and elevations must be checked and coordinated with
          applicable civil drawings.
     f)   Design details
     g)   Piping penetrations of all walls, floors, roofs, beams, columns, and foundations must be coordinated with and verified
          by the structural engineer. Code complying fire-stopping must be detailed for penetrations through fire-rated
          assemblies.
7.   Electrical
     a) Lighting fixture schedule completed
     b)   Lighting control schedule, switches, emergency lighting completed
     c)   Panel schedules with panel locations shown on the floor plan completed
     d)   Floor plan showing location of all fire alarm device/panel schedule, indicator graphics, riser diagram including activated
          hardware and pull stations. Confirm activated hardware with hardware schedule.
     e)   Floor plan showing location of all intercom devices, panel schedule and location, and program riser diagram.
     f)   Floor plan showing location of all security devices, panel schedule and locations, and riser diagram.
     g)   Floor plan showing location of all intercom and TV outlets and devices.
     h)   Telephone board schedule and riser diagram coordinated to equipment size requirements and connection provisions
          with the governing telephone utility and Owner requirements.
     i)   TV terminal/splitter and riser diagram coordinated as to equipment size requirements and connection provisions to
          antenna and cable TV system.
     j)   Floor plan indicating wire management wiring for power, receptacles, voice, video and data communications, including
          circuiting and connections to systems furniture, etc. completed
     k)   Floor plan indicating power connections to all mechanical equipment.
     l)   Power and lighting plans indicating above-ceiling wiring and circuits for lighting/electrical switches, security, fire alarm,
          emergency exit lighting and intercom controls, etc. completed
     m) Areas of concentrated electrical equipment, and electric vault rooms in particular, must be enlarged from the basic floor
        plan to not less than ¼-inch = 1’-0” and must be shown in plan and elevation.
     n)   Sheet notes must be applicable to each sheet. Standard notes and details must be modified to specific conditions.


Version 1.28.14                                                                                                         Page 9 of 11
                  Appendix B - Design Review– Minimum Submittal Requirements
                                             (Stated Cost Limitation Value > $2M)

     o)   Access to systems must be verified. Doors, panels or other provisions must be called out in all wall and ceiling
          locations for junction boxes, controls, or any other device requiring access.
     p)   Raceway penetrations of all walls, floors, roofs, beams, columns, and foundations must be coordinated with and
          verified by the structural engineer. Code complying fire-stopping must be detailed for penetrations through fire-rated
          assemblies.
     q)   A dimensioned floor plan showing wire management system with openings located for voice data, video and electrical
          and outlet locations. This is more typically done by the electrical engineer
8.   Statement of Probable Construction Cost
     a) The cost information reported at the conclusion of the 80% Completed Construction Document Stage must be based
          upon supportive cost information from the updated detailed cost estimate prepared from the 30% Completed
          Documents Stage. The detailed estimate must account for the refined information of quantity or product information
          adjustments required in the development of the details to construct the design and incorporate the Constructability
          Review comments.
9.   Quality Assurance/Quality Control Coordination
     a) All drawing submittal packages are expected to be thoroughly reviewed and coordinated between disciplines utilizing
         a structured review process in an attempt to minimize changes during construction due to the errors and omissions of
         the design team. If, during construction, excessive changes due to errors and omissions of the design team are
         required, the Owner reserves the right to seek reparation for said changes.
10. Other Deliverables
     a)   Commissioning final plan
     b)   Updated project schedule


100% Complete Construction Documents - Minimum Submittal Requirements
1.   Submittal for 100% complete documents will be the same as the 80% submittal requirements with all appropriate 80%
     review comments from the Owner incorporated within the drawings and specifications.
2.   All comments from the 80% Construction Document Review Process must be incorporated into the 100% Construction
     Document design review submittal or a written narrative explaining in detail why specific comments were not incorporated.


Review, Comment and Approval Submissions to DCSD:
1.   Schematic Design Phase (Preliminary Design Submittal for GaDOE)
2.   Design Development Phase
3.   30% Construction Documents Phase (Check Set Submittal for GaDOE)
4.   80% Construction Documents Phase
5.   100% Construction Documents Phase (Final Submittal for GaDOE)


Building Permit
1.   Submit for Building Permit
2.   Submit for L.D. Permit
3.   Incorporate Permit Review Comments



Version 1.28.14                                                                                                   Page 10 of 11
                  Appendix B - Design Review– Minimum Submittal Requirements
                                   (Stated Cost Limitation Value > $2M)

Bid Negotiations
1.   Bid Period
2.   Pre-Bid Conference
3.   Negotiations & Award
4.   Begin Construction


Phasing (as appropriate)
(List Phasing as appropriate




Version 1.28.14                                                            Page 11 of 11
APPENDIX C1




    DeKalb County School District
    Educational Specifications




                  Elementary School Grades Pre‐K to 5
                                      Version: 5/25/2018
                                              Elementary School Grades Pre‐K to 5
                                                  Educational Specifications

                                                                                    Proposed Spaces
    ES                 Space Summary                              58 IU 900 FTE                     76 IU 1200 FTE
                                                               IU            Total SF            IU            Total SF
1        Core Academics                                        50                 47,295         66             62,720
2        Special Education                                     4                  3,860           5             4,860
3        Performing & Visual Arts                              2                  2,280           3             3,270
4        Media Center (sized for FTE+300)                      1                  5,235           1             6,215
5        Physical Education                                    1                  5,175           1             8,290
6        Cafeteria & Kitchen (sized for FTE+300)               0                  9,100           0             11,027
7        Administration & Guidance                             0                  5,745           0             6,950
8        Building Services                                     0                  8,190           0             10,600
                                                  Subtotal     58                 86,880         76            113,932
         Circulation, common areas etc. at +/‐35%                                 31,571                        40,394
                                                     Total     58                118,631         76            154,326
9        Outdoor Spaces
10       Parking

         IU : Instructional Unit   FTE: Full Time Equivalent   SF: Square Feet


                           PLEASE SEE NOTE ON THE INTENDED USE OF THIS DOCUMENT ON THE NEXT PAGE.




DeKalb County School District
Operations Division, Design Construction Department                     1 of 8                                            VERSION: 5/25/2018
                                         Elementary School Grades Pre‐K to 5
                                             Educational Specifications


       NOTE: This document outlines the DeKalb County School District's intended designs for 900‐seat
       and 1200‐seat elementary schools. These Educational Specifications address core size standards
       (i.e., physical education, kitchen, cafeteria, and media center), the program or distribution of
       classroom types (i.e., general classrooms, special education spaces, , etc.), the size of the
       classrooms and other spaces, provision of outdoor facilities, and parking requirements, etc. for a
       new elementary school. Please note that these educational specifications are for the
       construction of a new elementary school. For other improvements, such as an addition to an
       existing elementary school, these educational specifications will provide general guidance or
       “targets” to the architects of record for these type of projects.




DeKalb County School District
Operations Division, Design Construction Department       2 of 8                                      VERSION: 5/25/2018
                                         Elementary School Grades Pre‐K to 5
                                             Educational Specifications


                                                                                    Proposed Spaces
                     Core Academics
  1                                                          58 IU 900 FTE                          76 IU 1200 FTE
                                                      IU Quantity     SF            Total     IU Quantity    SF      Total
1.1  Pre‐K Classroom                                            1       880            880              2      880    1,760
1.1a Kindergarten Classroom                             9       9       880          7,920     12      12      880   10,560
1.1b Duplex Toilets (shared vestibule, 2 toilets)               5       150            750              6      150      900
1.2  First Grade Classroom                              8       8       880          7,040     11      11      880    9,680
1.3  Second and Third Grade Classroom                  15      15       750         11,250     22      22      750   16,500
1.4  Fourth and Fifth Grade Classroom‐ Standard         8       8       750          6,000     10      10      750    7,500
1.4a Fourth and Fifth Grade Classroom ‐Enlarged         5       5       800          4,000      6       6      800    4,800
1.5  Science Lab                                        1       1     1,000          1,000      1       1    1,000    1,000
1.5a Science Prep Room / Storage                                1       100            100              1      120      120
1.6  Other Classrooms: Discovery, Math, World           4       4       800          3,200      4       4      800    3,200
     Languages, ESOL, etc.
1.7  Flexible Space ‐ Standard                                   3            300      900              4     300     1,200
1.7a Flexible Space ‐ Medium                                     3            450    1,350              4     450     1,800
1.7b Flexible Space ‐ Large                                      3            600    1,800              4     600     2,400
1.8  Book room / IT device storage                               2            320      640              2     340       680
1.8a IT device storage                                           3            155      465              4     155       620
                            Core Academic Subtotal    50                            47,295    66                     62,720




DeKalb County School District
Operations Division, Design Construction Department                  3 of 8                                             VERSION: 5/25/2018
                                           Elementary School Grades Pre‐K to 5
                                               Educational Specifications

                                                                                 Proposed Spaces
  2                  Special Education                          58 IU 900 FTE                    76 IU 1200 FTE
                                                          IU Quantity       SF    Total    IU Quantity       SF   Total
2.1    Special Ed Classroom                                2        2      780    1,560     3        3     780    2,340
2.1a   Duplex Toilets (shared vestibule, 2 toilets)                 1      220      220              2     220      440
2.2    Special Ed Classroom                                2        2      900    1,800     2        2     900    1,800
2.3    Single toilet with changing room                             1      130      130              1     130      130
2.4    Speech Therapy                                               1      150      150              1     150      150
                             Special Education Subtotal    4                      3,860     5                     4,860
       Special Needs 6‐8

                                                                                 Proposed Spaces
  3               Visual & Performing Arts                      58 IU 900 FTE                    76 IU 1200 FTE
                                                          IU Quantity       SF    Total    IU Quantity       SF   Total
3.1    Music Room                                          1        1      950      950     1        1     950      950
3.1b   Storage                                                      1      150      150              1     150      150
3.6    Art Lab                                             1        1      950      950     2        2     950    1,900
3.6a   Visual Arts Storage                                          1      160      160              1     200      200
3.6b   Kiln Room                                                    1       70       70              1       70      70
                     Visual & Performing Arts Subtotal     2                      2,280     3                     3,270




DeKalb County School District
Operations Division, Design Construction Department                  4 of 8                                         VERSION: 5/25/2018
                                          Elementary School Grades Pre‐K to 5
                                              Educational Specifications

                                                                               Proposed Spaces
  4          Media Center (sized for FTE+300)            58 IU 900 FTE                         76 IU 1200 FTE
                                                   IU Quantity       SF         Total    IU Quantity       SF   Total
4.1  Reading Room                                   1        1    3,350         3,350     1        1    4,100   4,100
4.1a Office                                                  1      270           270              1      165     165
4.1b Conference                                              1      200           200              1      300     300
4.1c Secure Storage                                          1      400           400              1      150     150
4.1d Maker Space ‐ "Sand Box"                                1      300           300              1      800     800
4.1f Workroom / Storage                                      1      310           310              1      300     300
4.1g Media Distribution/ Video Production Studio             1      405           405              1      400     400
                             Media Center Subtotal  1                           5,235     1                     6,215
     DCSD Standard SF Target = 1.09 x GaDOE Minimum

                                                                               Proposed Spaces
  5                 Physical Education                        58 IU 900 FTE                    76 IU 1200 FTE
                                                        IU Quantity       SF    Total    IU Quantity       SF   Total
5.1    Gymnasium                                         1        1    4,640    4,640     1        1    4,640   4,640
5.1a   Auxiliary Gym                                              0                 0              1    2,800   2,800
5.1b   Storage                                                    2      175      350              4      140     560
5.1c   Office / Bathroom: PE teachers                             1      185      185              2      145     290
                          Physical Education Subtotal    1                      5,175     1                     8,290




DeKalb County School District
Operations Division, Design Construction Department                5 of 8                                         VERSION: 5/25/2018
                                         Elementary School Grades Pre‐K to 5
                                             Educational Specifications

                                                                              Proposed Spaces
                   Cafeteria & Kitchen
  6                                                            58 IU 900 FTE                     76 IU 1200 FTE
                   (sized for FTE+300)
                                                        IU Quantity         SF     Total   IU Quantity       SF    Total
6.1    Cafeteria/Student Seating Area                             1     4,150     4,150              1    5,080    5,080
6.1a   Table & Chair Storage, PTA closet                          1       220       220              1      320      320
6.1b   Stage                                                      1     1,175     1,175              1    1,207    1,207
6.1c   Storage / Controls                                         1       175       175              1      225      225
6.2    Kitchen                                                    1       830       830              1      950      950
6.2a   Serving Lines                                              2       425       850              3      425    1,275
6.2b   Dry Goods Storage                                          1       375       375              1      450      450
6.2c   Cooler                                                     1       160       160              1      240      240
6.2d   Freezer                                                    1       250       250              1      340      340
6.2e   Dish Wash Area                                             1       235       235              1      235      235
6.2f   Kitchen Mgr. Office                                        1       125       125              1      125      125
6.2g   Restroom / Locker room/ Laundry                            1       280       280              1      290      290
6.2h   Exterior Can Wash                                          1        50        50              1       50       50
6.2i   Internal Circulation                                       1       225       225              1      240      240
                          Cafeteria & Kitchen Subtotal   0                        9,100     0                     11,027
       DCSD Standard SF Target = Cafeteria :1.2 x GaDOE Minimum; Kitchen: 1.15 x GaDOE Minimum




DeKalb County School District
Operations Division, Design Construction Department               6 of 8                                             VERSION: 5/25/2018
                                         Elementary School Grades Pre‐K to 5
                                             Educational Specifications

                                                                             Proposed Spaces
  7            Administration & Counseling                  58 IU 900 FTE                    76 IU 1200 FTE
                                                      IU Quantity       SF    Total    IU Quantity       SF   Total
7.01 Reception Lobby                                            1      510      510              1     510      510
7.01a Administration Corridor                                   1      420      420              1     420      420
7.02 Principal's Office with closet, restroom                   1      325      325              1     330      330
7.03 Conference Room                                            1      300      300              1     300      300
7.04 Office (Bookkeeper, Specialist, ITT)                       3      160      480              3     160      480
7.05 Mail/Work/Copy Room                                        1      320      320              1     340      340
7.05a Administrative Storage                                    1      165      165              1     185      185
7.05b Records / Vault Storage                                   1      155      155              1     175      175
7.06 Testing Workroom with secure storage                       1      250      250              1     250      250
7.07 Health Clinic with supply closet, rest room                1      500      500              1     320      320
7.08 Satellite Admin. Suite: Ass't Principal Off.               2      155      310              3     155      465
7.08a Conference Room                                           2      200      400              3     200      600
7.09 Counselor's Office                                         2      160      320              3     165      495
7.09a Lobby / Waiting                                           1      150      150              1     100      100
7.09b Counseling conference room                                1      250      250              1     250      250
7.09c Storage                                                   1       70       70              1       90      90
7.10 Teacher Planning Room /restrooms                           1      820      820              2     820    1,640
               Administration & Counseling Subtotal    0                      5,745     0                     6,950




DeKalb County School District
Operations Division, Design Construction Department              7 of 8                                         VERSION: 5/25/2018
                                            Elementary School Grades Pre‐K to 5
                                                Educational Specifications
                                                                                    Proposed Spaces
  8                   Building Services                          58 IU 900 FTE                          76 IU 1200 FTE
                                                           IU Quantity       SF       Total       IU Quantity       SF      Total
8.1    Battery Restrooms                                             6      665       3,990                 8     665      5,320
8.2    Visitor/staff toilet rooms                                    8       55         440               10        55       550
8.3    Main Custodial Room                                           1      225         225                 2     250        500
8.3a   Branch Custodial Rooms                                        3      100         300                 4     100        400
8.3b   Main Custodial Supply                                         1      200         200                 1     225        225
8.3c   Custodian Office / restroom                                   1      150         150                 1     150        150
8.4    General Building Storage                                      3      150         450                 4     150        600
8.4a   Exterior equipment storage                                    1      200         200                 1     200        200
8.5    Main Mechanical Plant                                         1      630         630                 1     700        700
8.6    Main Electrical Room                                          1      210         210                 1     225        225
8.6a   Branch Electrical Room                                        7      120         840                 9     120      1,080
8.7    Main Dist. Frame MDF                                          1      235         235                 1     250        250
8.7a   Intermediate Dist. Frame IDF                                  4       80         320                 5       80       400
                             Building Services Subtotal   0                         8,190     0                          10,600

                                                                                    Proposed Spaces
  9                      Outdoor Spaces                         58 IU 900 FTE                           76 IU 1200 FTE
                                                          IU Quantity       SF        Total       IU Quantity       SF     Total
9.1    Science Terrace                                              1    1,000                              1    1,000
9.2    Art Terrace                                                  1    1,000                              1    1,000
9.3    Play ground: Separate structures for Pre‐K to                1                                       1
       2nd, 3rd to 5th
9.4    Play court: 65'x 125'                                        1       8,125                           1    8,125
9.5    Play field: 1.5 acre minimum; 2 acres target                 1                                       1



  10                        Parking

       2 spaces per IU                                                                 116                                   152
DeKalb County School District
Operations Division, Design Construction Department                     8 of 8                                                VERSION: 5/25/2018
APPENDIX C2




    DeKalb County School District
    Educational Specifications




                      Middle School Grades 6 to 8
                                  Version: 3/30/2018
                                                            Middle School Grades 6 to 8
                                                            Educational Specifications

                                                                                        Proposed Spaces
 MS             Space Summary 6-8                              74 IU 1200 FTE              92 IU 1500 FTE            109 IU 1800 FTE
                                                            IU            Total SF      IU            Total SF    IU            Total SF
1     Core Academics                                        56             59,600       70             75,350    84              90,950
2     Special Education                                      6              5,900        8              7,700    10               9,850
3     Performing & Visual Arts                               5              9,240        6             10,840      6             10,920
4     CTAE                                                   3              7,200        3              7,200      3              7,200
5     Media Center (sized for FTE+300)                       1              7,110        1              8,130      1              9,480
6     Physical Education                                     3             26,770        4             28,120      5             31,670
7     Cafeteria & Kitchen (sized for FTE+300)                0             12,095        0             14,095      0             15,670
8     Administration & Guidance                              0              7,260        0              7,560      0              8,160
9     Building Services                                      0              5,790        0              7,630      0              9,470
                                              Subtotal      74            140,965       92            166,625    109            193,370
      Circulation, common areas etc. at 35%                                49,338                      58,319                    67,680
                                                 Total      74            190,303       92            224,944    109            261,050
10    Outdoor Spaces
11    Parking

      IU : Instructional Unit   FTE: Full Time Equivalent    SF: Square Feet


       NOTE: This document outlines the DeKalb County School District's intended designs for 1,200-seat, 1500-seat, and 1,800-seat
      middle schools. These Educational Specifications address core size standards (i.e., physical education, kitchen, cafeteria, and
      media center), the program or distribution of classroom types (i.e., general classrooms, special education spaces, career tech
      labs, etc.), the size of the classrooms and other spaces, provision of athletic facilities, and parking requirements, etc. for a new
      middle school. Please note that these educational specifications are for the construction of a new middle school. For other
      improvements, such as an addition to an existing middle school, these educational specifications will provide general
      guidance or “targets” to the architects of record for these type of projects.



DeKalb County School District
Operations Division, Design Construction Department                            1 of 8                                       VERSION: 3/30/2018
                                                           Middle School Grades 6 to 8
                                                           Educational Specifications


                                                                                             Proposed Spaces
                     Core Academics
  1                                                         74 IU 1200 FTE                   92 IU 1500 FTE                   109 IU 1800 FTE
                                                      IU Quantity    SF       Total    IU Quantity SF           Total   IU Quantity    SF     Total
1.1    6th to 8th Grade Classroom                      36      36      850    30,600    45      45      850    38,250    54      54      850 45,900
1.2    Science Lab                                     12      12    1,200    14,400    15      15    1,200    18,000    18      18    1,200 21,600
1.2a   Science Prep Room / Storage                              6      350     2,100             8      350     2,800             9      350   3,150
1.3    World Language Classroom                         3       3      850     2,550     4       4      850     3,400     5       5      850   4,250
1.4    Connections Classroom                            4       4      850     3,400     5       5      850     4,250     6       6      850   5,100
1.5    In-School Suspension                             1       1      850       850     1       1      850       850     1       1      850     850
1.6    Teacher/Team Planning/Small Group                        6      400     2,400             8      400     3,200            10      400   4,000
1.7    Flexible Learning Area / "Break-out" Space              12      200     2,400            15      200     3,000            18      200   3,600

1.8    Instructional Materials/ Secured Storage                 6     150        900             8      200     1,600            10      250     2,500
                         Core Academic 6-8 Subtotal   56                      59,600   70                      75,350   84                      90,950


                                                                                            Proposed Spaces
  2                  Special Education                      74 IU 1200 FTE                   92 IU 1500 FTE                   109 IU 1800 FTE
                                                      IU Quantity       SF     Total   IU Quantity       SF     Total   IU Quantity       SF     Total
2.1 Special Ed Classroom                               5        5      850     4,250    7        7      850     5,950    8        8      850     6,800
2.1a In Program Bathroom (assisted toileting area)              1      100       100             2      100       200             3      100       300
2.2 Home Living Center / Life Skills / Independent     1        1    1,200     1,200    1        1    1,200     1,200    2        2    1,200     2,400
     Living
2.3 Small Group / Tutor / Resource Room                         1     150        150             1      150       150             1      150       150
2.4 Storage / Equipment /Book Room                              1     200        200             1      200       200             1      200       200
                    Special Education 6-8 Subtotal     6                       5,900    8                       7,700   10                       9,850
     Special Needs 6-8




DeKalb County School District
Operations Division, Design Construction Department                          2 of 8                                                   VERSION: 3/30/2018
                                                             Middle School Grades 6 to 8
                                                             Educational Specifications

                                                                                                  Proposed Spaces
  3              Visual & Performing Arts                       74 IU 1200 FTE                     92 IU 1500 FTE                    109 IU 1800 FTE
                                                        IU   Quantity       SF     Total   IU   Quantity       SF    Total   IU   Quantity       SF     Total
3.1    Band classroom                                    1          1    2,200     2,200    1          1    2,200    2,200    1          1    2,200     2,200
3.1a   Office                                                       1      150       150               1      150      150               1      150       150
3.1b   Storage                                                      1      200       200               1      200      200               1      200       200
3.2    Orchestra classroom                              1           1    1,700     1,700   1           1    1,700    1,700   1           1    1,700     1,700
3.2a   Office                                                       1      150       150               1      150      150               1      150       150
3.2b   Storage                                                      1      200       200               1      200      200               1      200       200
3.3    Choir classroom                                  1           1    1,400     1,400   1           1    1,400    1,400   1           1    1,400     1,400
3.3a   Office                                                       1      150       150               1      150      150               1      150       150
3.3b   Storage                                                      1      100       100               1      100      100               1      100       100
3.4    Keyboarding Classroom                            1           1      850       850   1           1      850      850   1           1      850       850
3.5    Music Practice Room                                          3       80       240               3       80      240               4       80       320
3.6    Visual Arts Classroom                            1           1    1,600     1,600   2           2    1,600    3,200   2           2    1,600     3,200
3.6a   Visual Arts Storage                                          1      200       200               1      200      200               1      200       200
3.6b   Kiln Room                                                    1      100       100               1      100      100               1      100       100
                Visual & Performing Arts 6-8 Subtotal   5                          9,240   6                        10,840   6                         10,920




DeKalb County School District
Operations Division, Design Construction Department                              3 of 8                                                     VERSION: 3/30/2018
                                                            Middle School Grades 6 to 8
                                                            Educational Specifications

                                                                                               Proposed Spaces
  4    Career, Technology & Agriculture Education             74 IU 1200 FTE                    92 IU 1500 FTE                 109 IU 1800 FTE
                                                        IU Quantity       SF      Total   IU Quantity       SF   Total   IU Quantity       SF    Total
4.1    Business and Computer Science Lab            l
                                                        1         1    1,500     1,500    1        1    1,500    1,500   1         1    1,500    1,500
4.1a  Office                                                      1      150       150             1      150      150             1      150      150
4.1b  Storage                                                     1      150       150             1      150      150             1      150      150
4.2 Family and Consumer Science Lab                     1         1    2,200     2,200    1        1    2,200    2,200   1         1    2,200    2,200
4.2a  Storage                                                     1      200       200             1      200      200             1      200      200
4.3 Engineering and Technology Lab                      1         1    2,300     2,300    1        1    2,300    2,300   1         1    2,300    2,300
4.3a  Office                                                      1      150       150             1      150      150             1      150      150
4.3b  Workroom                                                    1      350       350             1      350      350             1      350      350
4.3c  Storage                                                     1      200       200             1      200      200             1      200      200
                             CTAE 6-8 Subtotal          3                        7,200    3                      7,200   3                       7,200


                                                                                               Proposed Spaces
  5    Media Center             (sized for FTE+300)        74 IU 1200 FTE                       92 IU 1500 FTE                 109 IU 1800 FTE
                                                     IU Quantity       SF        Total    IU Quantity       SF   Total   IU Quantity       SF    Total
5.1    Reading Room                                   1        1    3,100        3,100     1        1    3,800   3,800    1        1    4,750    4,750
5.1a   Office                                                  2      150          300              2      150     300             2      150      300
5.1b   Conference (seat 12)                                    1      200          200              1      200     200             2      200      400
5.1c   A. V. Production & Storage                              1      900          900              1    1,000   1,000             1    1,100    1,100
5.1d   Small Group Project Rooms / Tutoring                    3      120          360              4      120     480             4      120      480
5.1e   Projects Laboratory / Maker Space                       1    1,150        1,150              1    1,150   1,150             1    1,150    1,150
5.1f   Workroom / Storage                                      1      900          900              1      900     900             1      900      900
5.1g   Secure Storage                                          1      200          200              1      300     300             1      400      400
                           Media Center 6-8 Subtotal  1                          7,110     1                     8,130    1                      9,480
       DCSD Standard SF Target = 1.25 x GaDOE Minimum




DeKalb County School District
Operations Division, Design Construction Department                            4 of 8                                                  VERSION: 3/30/2018
                                                           Middle School Grades 6 to 8
                                                           Educational Specifications

                                                                                              Proposed Spaces
  6                 Physical Education                        74 IU 1200 FTE                   92 IU 1500 FTE                  109 IU 1800 FTE
                                                        IU Quantity       SF     Total   IU Quantity       SF    Total   IU Quantity       SF   Total
6.1    Gymnasium with bleachers                          1        1 11,000      11,000    1        1 11,000     11,000    1        1 11,000 11,000
6.1a   Auxiliary Gym                                              1    6,500     6,500             1    6,500    6,500             1    6,500   6,500
6.1b   Locker Rooms                                               2      900     1,800             2      950    1,900             2    1,000   2,000
6.1c   Student restrooms and showers                              2      300       600             2      350      700             2      400     800
6.1d   Office / Bathroom: PE teachers                             2      300       600             2      300      600             3      300     900
6.1e   Storage                                                    3      500     1,500             3      600    1,800             3      700   2,100
6.1f   Laundry                                                    1      170       170             1      170      170             1      170     170
6.2    Weight Room                                                1    1,000     1,000             1    1,000    1,000             1    1,000   1,000
6.3    Multipurpose Room                                          1    1,900     1,900             1    1,900    1,900             2    1,900   3,800
6.4    Health Classroom                                  2        2      850     1,700    3        3      850    2,550    4        4      850   3,400
                      Physical Education 6-8 Subtotal    3                      26,770    4                     28,120    5                    31,670




DeKalb County School District
Operations Division, Design Construction Department                            5 of 8                                                 VERSION: 3/30/2018
                                                         Middle School Grades 6 to 8
                                                         Educational Specifications

                                                                                               Proposed Spaces
           Cafeteria & Kitchen        (sized for
  7                                                           74 IU 1200 FTE                    92 IU 1500 FTE                  109 IU 1800 FTE
                        FTE+300)
                                                       IU Quantity         SF     Total   IU Quantity       SF    Total   IU Quantity       SF   Total
7.1    Cafeteria/Student Seating Area                             1    6,050      6,050             1    7,300    7,300             1    8,500   8,500
7.1a   Table & Chair Storage                                      1      500        500             1      600      600             1      700     700
7.2    Kitchen                                                    1    2,000      2,000             1    2,100    2,100             1    2,200   2,200
7.2a   Serving Area                                               1      900        900             1    1,000    1,000             1    1,100   1,100
7.2b   Dry Goods Storage                                          1      225        225             1      350      350             1      350     350
7.2c   Cooler/Freezer                                             1      800        800             1      975      975             1    1,000   1,000
7.2d   Dish Wash Area                                             1      250        250             1      400      400             1      450     450
7.2e   Kitchen Mgr. Office                                        1      150        150             1      150      150             1      150     150
7.2f   Restroom / Locker room                                     1      200        200             1      200      200             1      200     200
7.2g   Exterior Can Wash                                          1       20         20             1       20       20             1       20      20
7.3    Stage                                                      1    1,000      1,000             1    1,000    1,000             1    1,000   1,000
                     Cafeteria & Kitchen 6-8 Subtotal   0                       12,095     0                     14,095    0                    15,670
       DCSD Standard SF Target = Cafeteria :1.3 x GaDOE Minimum; Kitchen: 1.15 x GaDOE Minimum




DeKalb County School District
Operations Division, Design Construction Department                        6 of 8                                                      VERSION: 3/30/2018
                                                          Middle School Grades 6 to 8
                                                          Educational Specifications

                                                                                             Proposed Spaces
  8            Administration & Counseling                  74 IU 1200 FTE                    92 IU 1500 FTE                 109 IU 1800 FTE
                                                      IU Quantity       SF      Total   IU Quantity       SF   Total   IU Quantity       SF    Total
8.01 Reception Lobby                                            1      500       500              1      500    500              1      500     500
8.02 Principal's Office with conference                         1      460       460              1      460    460              1      460     460
     space,closet, restroom
8.03 Assistant Principal Office                                 3     300        900             3      300     900              4      300    1,200
8.04 Conference Room                                            2     300        600             2      300     600              2      300      600
8.05 Office (Bookkeeper, Secretary, Attendance)                 3     150        450             3      150     450              3      150      450

8.06 Mail/Work/Copy Room                                        1     500        500             1      500     500              1      500     500
8.07 Administrative Storage (Supplies,General                   2     200        400             2      200     400              2      200     400
     Storage)
8.08 Faculty Lounge with two restrooms                          1     900        900             1      900     900              1      900     900
8.09 Health Clinic with supply closet and rest room             1     500        500             1      500     500              1      500     500

8.10 Records /Testing Vault Storage                             1     150        150             1      150      150             1      150      150
8.11 Guidance Counselor's Office                                5     150        750             5      150      750             5      150      750
8.11a Reception / Waiting for Counseling                        1     100        100             1      100      100             1      100      100
8.12 SRO Office                                                 1     150        150             1      150      150             1      150      150
8.13 Flex Offices                                               6     150        900             8      150    1,200            10      150    1,500
          Administration & Counseling 6-8 Subtotal                                                             7,560                           8,160
                                                      0                        7,260




DeKalb County School District
Operations Division, Design Construction Department                          7 of 8                                                  VERSION: 3/30/2018
                                                            Middle School Grades 6 to 8
                                                            Educational Specifications

                                                                                               Proposed Spaces
  9                   Building Services                        74 IU 1200 FTE                   92 IU 1500 FTE                 109 IU 1800 FTE
                                                         IU Quantity       SF     Total   IU Quantity       SF   Total   IU Quantity       SF        Total
9.1    Battery Restrooms                                           6      650     3,900             8      650   5,200           10       650       6,500
9.2    Custodial Closet                                            7       70       490             9       70     630           11        70         770
9.3    Storage                                                     7      200     1,400             9      200   1,800           11       200       2,200
                      Building Services 6-8 Subtotal    IU                      5,790                            7,630                           9,470


                                                                                               Proposed Spaces
  10                  Outdoor Spaces                          74 IU 1200 FTE                    92 IU 1500 FTE                 109 IU 1800 FTE
                                                        IU Quantity       SF  Total       IU Quantity       SF  Total    IU Quantity       SF  Total
10.1 Outdoor Classroom                                            1    1,000  1,000                 1    1,000  1,000              1    1,000  1,000
10.2 Art patio                                                    1    1,000  1,000                 1    1,000  1,000              1    1,000  1,000
10.3 Turf Practice Field for football, soccer; 6 lane             1 145,000 145,000                 1 145,000 145,000              1 145,000 145,000
     track


  11                       Parking

       Target : 3 spaces per IU
       Minimum: 2.5 spaces per IU




DeKalb County School District
Operations Division, Design Construction Department                             8 of 8                                                VERSION: 3/30/2018
APPENDIX C3




                                                     HIGH




                                                                HIGH SCHOOL DESIGN PROGRAM




 DEKALB COUNTY SCHOOL DISTRICT ‐ FEBRUARY 15, 2013          VERSION 1.1




 DCSD 2020 VISION ‐ DESIGN PROGRAM AND GUIDELINES
                                                             HIGH SCHOOL DESIGN PROGRAM
                                                                        INDEX

      Section No.                                  Educational Area                       Pg. No.


      INSTRUCTIONAL AREAS
      Section 01       CLASSROOM TYPE I                                                             2
                          Classrooms: ( English, Foreign Languages, Math, SS)
                          Computer Labs
      Section 02       CLASSROOM TYPE II (Science)                                                  4
      Section 03       MEDIA CENTER                                                                 7
      Section 04       ART                                                                      10
      Section 05       MUSIC                                                                    14
                          Instrumental (Band / Orchestra)
                          Choral (Choral / Keyboarding)
      Section 06       DRAMA                                                                    19
      Section 07       HEALTH & PHYSICAL EDUCATION                                              21
                          Health
                          PE (Incl. Health Lab)
      Section 08       SPECIAL EDUCATION (Severe and Profound)                                  29
      Section 09       AUDITORIUM                                                               33
                          Auditorium
                          Mechanical Mezzanine (Level 3 / Bldg. C)
      SUPPORT AREAS
      Section 10       ADMINISTRATION                                                           38
                       Main Administration Suite
                       Faculty Workrooms
                       Satellite Administration Suites
      Section 11       COUNSELING                                                               42
      Section 12       SCHOOL NUTRITION                                                         45
                         Kitchen
                         Cafeteria
      Section 13       BUILDING SERVICES                                                        50
      Section 14       OUTDOOR AREAS                                                            55
                         14.1 Outdoor Spaces
                         14.2 Site Facilities (Playfields)
                         14.3 Stadium
      OTHER PROGRAMS
      Section 15       BASIC CAREER TECHNOLOGY                                                  63
                         15.1 Business & Computer Science
                         15.2 Engineering & Technology
                         15.3 Family & Consumer Science
                         15.4 Junior ROTC
      Section 16       CAREER TECHNOLOGY OPTIONAL PROGRAMS                                      79
                         16.1 Culinary Arts
                         16.2 Health Science


      APPENDIXES
      Appendix A - Square Footage Summary                                                       88
      Appendix B - Furnishings & Equipment                                                     100
      Appendix C - Space Layout Drawings                                                       124
      Appendix D - Space Relationship Diagrams                                                 125




DeKalb County School District                                               1 of 121                    February 15, 2013 v1.1
                                                               Section 01 - CLASSROOM TYPE 1

                                                                             General Description
 Classroom Type 1 is comprised of the high school interdisciplinary classrooms: English/Language Arts, Mathematics, Social Studies, World Language and In School
 Suspension. All Classroom Type I spaces are physically the same in size and contain the same basic equipment to increase flexibility in useage; with the exception of the
 Computer Labs. School administrators may choose to utilize and assign adjacent classrooms by department so that all classrooms of the same subject matter are adjacent in a
 single area. Classrooms are used for large and small group activities including group projects, demonstrations, teacher presentations, student presentation, research,
 individualized and small group computer assisted instruction. Key Adjacency: Locate classrooms in close proximity to the Media Center. Locate computer labs together
 adjacent to classrooms.

                                                                                Activity / Space
 Space No.                                Room Name                                        NSF             Qty         TSF                              Adjacency
 CR1 1          Classrooms (English, Foreign Language, Math, ISS)                                    800    42           33600
 CR1 2          Computer Labs                                                                    1000       1              1000
                                                                                     Total Area SF                       34600


                                                                                    Equipment
 The following items are to be specified in the base contract unless noted otherwise.
 Item           Room Location                                                        Size (WxH)            #/RM
 MB             CR1 1, CR1 2                                                               4' x 4'          2     Locate at opposite ends of IB on teaching wall.
 IB             CR1 1, CR1 2                                                               8' x 4'          1     OP. Center on teaching wall.
 TB             CR1 1, CR1 2                                                               4' x 4'          1     Locate adjacent to MB on teaching wall.
 TB             CR1 1, CR1 2                                                              12' x 4'          1     Locate above computer stations.
 CLK            CR1 1                                                                                       1     Locate opposite to teaching wall.
 WHS            CR1 1 (Foreign Language)                                                                    1
 CMP            CR1 1                                                                                             OP - Reference Instructional Technology Plan.
 CMP            CR1 2                                                                                             OP - Reference Instructional Technology Plan.
 MB - Marker Board                                   CLK - Electronic Wall Clock     IB - Interactive Board                        WHS - Wireless Headphone System
 TB - Tack Board                                           OP - Owner Provided       CMP - Computers (student)
                                                                                        Finishes

 Walls:       a All spaces                      Provide paint finish. Refer to Design Guidelines for sheen. Water base, zero VOC paints are preferred.
              b All spaces                      All walls to extend to underside of deck. Walls to be constructed of CMU.

 Floors:      a All spaces                      Provide vinyl composition tile w/ 4 " rubber base in all spaces.
 Ceilings:    a All spaces                      Provide 2x2 standard acoustical ceiling tile in all classrooms. Provide 2x4 fluorescent fixtures

                                                                                    Casework
 Space No.              Room Name                                      Unit Type        Unit Length        Qty Size(wxdxh)         Notes
 CR1 1          Classrooms                          Teachers Cabinet (lockable)                             1         3'x2'x7'     Locate opposite exterior wall
                                                      Storage Cabinet (lockable)                            1         3'x2'x7'     Locate at window wall
                                                           Book Cases (shelves)            18 LF            6       36"x12"x30"    Locate at window wall
 CR1 2          Computer Labs                       Teachers Cabinet (lockable)                             1         3'x2'x7'     Locate opposite exterior wall
                                                      Storage Cabinet (lockable)                            1         3'x2'x7'     Locate at window wall
                                                           Book Cases (shelves)            18 LF            6       36"x12"x30"    Locate at window wall
                                                                                        Utilities
 Electrical     Location
 Power:         Classroom Computer Area:
                CR1 1                           Provide 4 x 4 junction box, single gang plaster ring, temporary cover plate, and 3/4 "C stubbed into corridor with bussing, above
                                                ceiling.

                CR1 1                           Provide three (3) quadraplex receptacles (w/ data).




DeKalb County School District                                                       2 of 121                                                             February 15, 2013 v1.1
                  CR1 2                           Reference Instructional Technology Required Specifications in the Design Guidelines.
 Data:            CR1 1, CR1 2                    Reference Instructional Technology Required Specifications in the Design Guidelines.
                  Teaching Wall:
 Clock:           CR1 1, CR1 2
 Intercom:        CR1 1, CR1 2
 Data:            CR1 1, CR1 2                    Provide receptacle and voice/data outlet for Interative Board.
 DVD:             CR1 1, CR1 2                    Provide receptacle and TV/RGB outlet for DVD Player.
 TV:              CR1 1, CR1 2                    Provide one (1) television outlet.
 Projector:       CR1 1, CR1 2                    Provide ceiling mounted receptacle and data outlet for projector.


 Other:           CR1 1, CR1 2                    Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                  CR1 1, CR1 2                    Technology Infrastructure: Reference Instructional Technology requirements.


 *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
                                                                                         Plumbing
              1   n/a
                                                                                          HVAC
              1   Refer to Design Guidelines for system requirements.
              2   Mount IDF cabinets in 5x5 room or place in storage room with proper ventilation heating and cooling.
                                                                                        Acoustics
              1   Provide acoustical separation in compliance with ANSI standards for schools.
                                                                                       General Notes
              1   Provide locks on all doors.
              2   Interactive Board placement to be coordinated with light fixtures and manufacturers requirements. Contractor to provide wiring per electrical drawings and secure
                  to structure as required.

              3   Provide exterior window for each classroom, where possible.
              4   Interactive Board / Components (Shelf, Projector etc.): Provided and installed by Owner. GC to provide power and data as required for operation of Interactive
                  Board
              5   Computers / Computer Desks: Provided and installed by Owner. GC to provide power and data as required for operation of computers and computer equipment
                  per Instructional Technology requirements.
              6   Refer to Design Guidelines for door hardware requirements.




DeKalb County School District                                                            3 of 121                                                      February 15, 2013 v1.1
                                                   Section 02 - CLASSROOM TYPE 2 - Science Lab

                                                                             General Description
   Classroom Type 2, Science Lab, provides students the opportunity to become active participants of scientific processes through a variety of "hands-on" experiences.
   Students participate in large and small group activities (discussion, lab demonstrations, field experiences etc.), conduct experiments, utilize computer technology, and listen
   to and observe demos by instructors. Key Adjacency: Science Lab Storage rooms are shared between two lab areas. Locate Science Labs together in close proximity to
   general classrooms.

                                                                                Activity / Space
   Space No.                               Room Name                                       NSF             Qty         TSF                              Adjacency
   SC 1           Science Labs                                                                   1600       14           22400
   SC 2           Science Prep/Storage                                                               200     7             1400
                                                                                     Total Area SF                       23800


                                                                                    Equipment
   The following items are to be specified in the base contract unless noted otherwise.
   Item           Room Location                                                      Size (WxH)            #/RM
                  Labs:
   MB             SC 1                                                                    4' x 4'            2    Locate at opposite ends of IB on teaching wall.
   IB             SC 1                                                                    8' x 4'            1    OP. Center on teaching wall.
   TB             SC 1                                                                    4' x 4'            1    Locate adjacent to MB on teaching wall.
   TB             SC 1                                                                    12' x 4'           1    Locate above computer stations.
   FH             SC 1                                                                 48"w x 30"d           1    Provide base cabinets below fume hood.
   CLK            SC 1                                                                                       1    Locate at teaching wall.
   EW             SC 1                                                                                       1    Locate at Teacher Demo Station. Integral w/demo station.
   FE             SC 1                                                                                       1
   SG             SC 1                                                                                       1    Locate adjacent to Fume Hood.
   CMP            SC 1                                                                                            OP - Reference Instructional Technology Plan.
   PTD            SC 1                                                                                       1    1 per student workstation @ sink area
   SD             SC 1                                                                                       1    1 per student workstation @ sink area
   DG             SC 1                                                                                       1    1 per student workstation
                  Prep Rooms:
   FH             SC 2                                                               48"w x 30"d             1
   AC             SC 2                                                               43"x18"x65"             1
   EW/ES          SC 2                                                                                       1    Stainless steel drench shower.
   MFC            SC 2                                                               32"x32"x65"             1
   FE             SC 2                                                                                       1
   DW             SC 2                                                                                       1
   RF             SC 2                                                               Full Size               1    Provide one (1) refrigerator per prep room.
   MB - Marker Board                                                                 MFC - Metal Flammable Cabinet                 SG - Safety Goggle Cabinet
   TB - Tack Board                                              FH - Fume Hood       AC - Acid Cabinet                             EW/ES - Eye Wash, Emergency Shower
   CLK - Elec. Wall Clock                            RF- Residential Refrigerator    EW-Eye Wash (combined w/sink)                 DG - Dual gas jets
   IB - Interactive Board                            CMP - Computers (student)       OP - Owner Provided                           DW - Dish Washer
                                                                                     SD - Soap Dispensers                          PTD - Paper Towel Dispenser
                                                                                     Finishes
   Walls:      a All spaces                      Provide paint finish. Refer to Design Guidelines for sheen. Water base, zero VOC paints are preferred.




DeKalb County School District                                                       4 of 121                                                              February 15, 2013 v1.1
                b All spaces                          All walls to extend to underside of deck. Walls to be constructed of CMU.

   Floors:      a All spaces                          Provide vinyl composition tile w/ 4 " rubber base in all spaces.

   Ceilings:    a All spaces                          Provide 2x2 standard acoustical ceiling tile in all classrooms.
                b All spaces                          Provide 2x4 fluorescent fixtures in all spaces.

   Counters: a                                        Flat Black Epoxy countertops at casework

   Stations:    a                                     Flat Black Epoxy countertops at seven (7) student lab tables, and one (1) teacher demo station.
                                                                                           Casework
   Space No.               Room Name                              Unit Type                  Unit Length     Qty        Size(wxdxh) Notes
   SC 1             Labs                              Teacher Cabinet                                         1           3'x2'x7'
                                                      Base Cabinet, Upper Cabinet,              40 LF         7                       Student Workstations w/single bowl sink. (One of
                                                      Work Counter                                                                    seven stations, ADA.)
                                                      Base Cabinet                                            1                       Provide below Fume Hood.
                                                      Teacher Demo Station                      12 LF         1                       Teacher Demo Station w/ single bowl sink. (ADA
                                                                                                                                      Height)

   SC 2             Prep Storage *                    Wall 1:
                                                      Teacher Cabinet                                         1           3'x2'x7'
                                                      Upper Cabinet                            15 LF
                                                      Base Cabinets
                                                      Wall 2:
                                                      Shelves                                  15 LF                    90"wx12"d     Wall mounted, 2 tier above base cabinets. *
                                                      Base Cabinets
                    * All cabinetry to be lockable.
                                                                                           Utilities
   Electrical       Location                          Lighting & Communications
   Power:           SC 1 - T. Demo Station            Provide conduit stub up for connection to millwork mounted receptacle.
                    SC 1, SC 2 - Casework             Provide three (3) quadraplex outlets above counter @ each sink area.
                    Classroom Computer Area:
                    SC 1 - Computers                  Provide 4 x 4 junction box, single gang plaster ring, temporary cover plate, and 3/4 "C stubbed into corridor with bussing, above
                                                      ceiling.

                    SC 1 - Computers                  Provide three (3) quadraplex receptacles (w/ data).
   Data:            SC 1 - Computers                  Provide two (2) data outlets.
                    Teaching Wall:
   Hood:            SC 1                              Provide junction box for connection to fume hood.
   Clock:           SC 1                              Provide receptacle for clock.
   Intercom:        SC 1                              Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.
   Data:            SC 1                              Provide receptacle and voice/data outlet for Interative Board.
   DVD:             SC 1                              Provide receptacle and TV/RGB outlet for DVD Player.
   TV:              SC 1                              Provide one (1) television outlet.
   Projector:       SC 1                              Provide ceiling mounted receptacle and data outlet for projector


   Other:           SC 1, SC 2                        Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                    SC 1, SC 2                        Technology Infrastructure: Reference Instructional Technology requirements in the Design Guideline.


   *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
                                                                                           Plumbing




DeKalb County School District                                                              5 of 121                                                        February 15, 2013 v1.1
         1   SC 2               Provide plumbing for eye wash, and emergency shower stations w/ drains.
         2   SC 1               Provide gas connections, cold and hot water at workstations and teacher demo table.
         3   SC 1, SC 2         Provide acid resistant piping in lab and prep room areas .
         4   SC 1               Lab sinks are integral with laboratory provided casework.
         5   SC 1               Provide one (1) single sink per each student workstation (total 6);and one (1) single sink at teacher demo table.
         6   SC 2               Provide one (1) single sink per each lab prep room.
                                                                     HVAC
         1   SC 1, SC 2         Provide fume hood. See Design Guidelines for requirements.
         2   SC 2               Provide exhaust fan purge button adjacent to fume hood.
         3   SC 1, SC 2         Provide limited-range temperature control.
         4   SC 1, SC 2         Refer to Design Guidelines for system requirements.
                                                                  Acoustics
         1   None
                                                                General Notes
         1                      Provide locks on all doors.
         2                      Provide classroom work spaces with valved gas, water and electrical supplies that are controlled through a key control with
                                emergency stop for each work area. The gas soleroid valve for the laboratory gas system should be normally closed and

                                Interactive Board/Components (shelf, projectors etc.) are provided and installed by Owner. GC to provide power and data as
         3
                                required for operation of Interactive Board.

                                Computers/Computer Desk are provided and installed by Owner. GC to provide power and data as required for operation of
         4                      computers and computer equipment per Instructional Technology requirements.




DeKalb County School District                                      6 of 121                                                        February 15, 2013 v1.1
                                                                   Section 03 - MEDIA CENTER

                                                                             General Description

    The Media Center serves the entire school population by providing appropriate materials to support and enrich the curriculum. Media Center Activities include individual
    as well as large and small group instruction, reading, browsing, listening and viewing areas. Establish a prominent and visible main entrance to facilitate security and way
    finding for users. Provide direct line of sight from the distrubution desk to all student computer areas, for monitoring/supervision purposes. Appropriately located
    electrical/data outlets throughout the Reading Room to facilitate small group study in various parts of the space. The space should accommodate two full class sizes in two
    distinct areas of the library; as well as an average class size in the computer area. Provide soft seating options near the periodical area. Natural lighting is a desired
    amenity; with the option of darkening the space for projection screen/ interactive board presentations. Key Adjacency: The Media Center should be located centrally
    within the school with ease of access from all classroom wings.

                                                                                Activity / Space
    Space No.                               Room Name                                        NSF             Qty            TSF                             Adjacency
    MC 1          Main Reading Room                                                                5300            1            5300
    MC 2          Conference Room ( 12 person)                                                        250          1              250                         MC 1
    MC 3          Offices                                                                             150          2              300            MC 1 (Distribution Desk), MC 6
    MC 4          Audio/Visual Non-Print Storage                                                      500          1              500                         MC 1
    MC 5          Media Production Distribution                                                       400          1              400                      MC 1, MC 4
    MC 6          Workroom                                                                            350          1              350                         MC 1
    MC 6 a        Toilet (internal to Workroom)                                                         50         1               50                         MC 6
    MC 7          Reading Room                                                                        300          1              300                      MC 1, MC 2
                                                                                     Total Area SF                              7450


                                                                                   Equipment
    The following items are to be specified in the base contract unless noted otherwise.
    Item          Room Location                                                      Size (WxH)              #/RM
    MB            MC 1                                                                      4' x 4'            2       Locate at opposite ends of IB on teaching wall.
    IB            MC 2                                                                      8' x 4'            1       OP. Center on presentation wall.
    TB                                                                                      4' x 4'            1       Locate adjacent to MB on teaching wall.
    TB            MC 1 (computer area)                                                     12' x 4'            1       Locate above computer stations.
    IB            MC 2                                                                     3'-6" x 4'          1       OP. Installed by Owner.
    PIB           MC 4                                                                                                 OP. Portable Interactive Board.
    TB            MC 3, MC 5, MC 6, MC 7                                                    4' x 4'            1
    MB            MC 2, MC 3, MC 5, MC 6, MC 7                                              4' x 4'            1
    C/BKT         MC 3                                                                                         1
    CMPR          MC 1                                                                                         1
    DS            MC 1                                                                                                 Provide book theft detection system at main entry door.
    CAM           MC 1
    IE                                                                                                                 OP - refer to Instructional Technology requirements.
    PS            MC 1                                                                     84" x 84"           1
    PTD           MC 6                                                                                         1       Provide @ sink area.
    SD            MC 6                                                                                         1       Provide @ sink area.
    CLK           MC 1                                                                                         1
    WS            MC 1
    LC            MC 4                                                                                                 OP - refer to Instructional Technology requirements.
    MC            MC 4                                                                                                 OP - refer to Instructional Technology requirements.
    CMP           MC 1                                                                                                 OP - refer to Instructional Technology requirements.
    CMP           MC 1, MC 4                                                                                           OP - refer to Instructional Technology requirements.
    MB - Marker Board                            CLK- Electronic Wall Clock          CMPR - Ceiling Mtd. Projector                      CMP - Computers (student)



DeKalb County School District                                                       7 of 121                                                                February 15, 2013 v1.1
    TB - Tack Board                                                                    PS - Projection Screen (recessed)          C/BKT - Component Bracket (wall mtd)
    IB - Interactive Board                                                             WS - Window Shades (manual)                OP - Owner Provided
    PIB - Interactive Board                                                            LC - Laptop Carts                          MC - Multi Media Carts
                                                                                       PTD - Paper Towel Dispenser                SD - Soap Dispensers
                                                                                      Finishes
    Walls:      a All Spaces                      Provide paint finish. Refer to Design Guideline for sheen. Water base, low VOC paints are preferred.
                b All spaces                      All walls to extend to underside of deck. Walls to be constructed of CMU.

    Floors:     a MC 1, 2, 7                      Provide carpet w/ 4" rubber base.
                b MC 3, 4, 5, 6                   Provide vinyl composition tile w/ 4 " rubber base in all spaces.
                c MC 6 a                          Provide ceramic tile (CT) w/ ceramic base. *

    Ceilings:   a All Spaces                      Provide 2x2 standard acoustical ceiling tile and 2x4 fluorescent fixtures in all spaces, w/ the exception of the following.

                b All Spaces                      Provide minimum 10'-0" ceiling height w/ exception of the following.
                c MC 1                            May provide a combination of lighting solutions and ceiling plane configurations/heights if design solutions meet adequate
                                                  levels of lighting for reading, audio visual, and acoustic purposes.

                d MC 1                            Provide projection screen pocket for retractable projection screen.
                                                                                     Casework
    Space No.                Room Name                         Unit Type                 Unit Length     Qty     Size(wxdxh)      Notes
    MC 2           Conference Room                Storage Cabinet (lockable)                               2          3'x2'x7'
                                                  Built-in Open Shelving Unit *                            3         30"x12"x7'   Provide shelving between STC cabinets.
    MC 3           Office                         Built-in Storage Shelves                   8 LF          2         4'x12"x7'
    MC 4           Audio/Visual NPS               Storage Cabinet (lockable)                               2          4'x2'x7'
                                                  Built-in Open Shelving Unit *                            8         30"x12"x7'   Provide shelving between STC cabinets.
    MC 5           Media Production Dist.         Storage Cabinet (lockable)                               2          3'x2'x7'
                                                  Built-in Open Shelving Unit *                            4         30"x12"x7'   Provide shelving between STC cabinets.
                                                  Base Cabinet                              13 LF
                                                  Upper Cabinet                             13 LF
                                                  Work Counter                              13 LF
    MC 6           Workroom                       Coat Closet (Lockable)                                   1          3'x2'x7'
                                                  Base Cabinet, Upper Cabinet               20 LF                                 Provide double bowl sink
    * Note: Built-in Open Shelving Unit ( 3 shelves - fixed)
                                                                                      Furniture
    Space No.                Room Name                         Unit Type                                 Qty     Size(wxdxh)      Notes
    MC 1           Main Reading Room              Book Shelves (Tall)                                      82    36"x12"x82"      # 9 Unit
                                                  Book Shelves (Short)                                     27    36"x12"x42"      # 15 Unit
                                                  Lighted Lockable Display Case                            2    4'x24"x7'
                                                  Rectangular Tables                                       15   30" x 60"         Seats 6 persons.
                                                  Round Tables                                             9    4' diameter       Seats 4 persons.
                                                  Computer Workstation Desks                               16   24" x 36"
                                                  Computer Workstation Chairs                              25
                                                  Circulation Desk-ADA*                                    1
                                                  Circulation Desk Chair                                   1
                                                  Book Truck                                               1
                                                  Atlas Stand                                              1
                                                  Dictionary Stand                                         1
                                                  Copy Machine Stand                                       1
                                                  Mobile Display book truck                                1
    MC 7           Reading Room                   Book Shelves                                             16    36"x12"x 42      # 15 Unit


DeKalb County School District                                                         8 of 121                                                         February 15, 2013 v1.1
                                                   Round Tables                                             2      4' diameter    Seats 4 persons
                     * (Circulation Desk w/modular removable book return unit & depressible shelf.)
                                                                                       Utilities
    Electrical       Location                      Lighting & Communications
                                                   Provide electrical outlets @ 12' max spacing w/ not less than one (1) duplex receptacle per wall, or as required by code. This
    Power:           All Spaces                    is in addition to Instructional Technology Requirements.
                     All Spaces                    See Instructional Technology Guidelines for specific requirements.
    Power:           MC 1                          Provide receptacle for clock.
                     MC 1                          Provide receptacle & TV/RGB outlet for DVD Player.
                     MC 1 - Circ. Desk             Provide two (2) quadraplex outlets, and two (2) data outlets.
                     Classroom Computer Area:
                     MC 1 - Computers              Provide four (4) floor mounted receptacles.
                     MC 6 - Computers              Provide two (2) quadraplex outlets, and one (1) data outlet.
                     Offices:
                     MC 3 - Offices                Provide one (1) duplex receptacle, one (1) quadraplex receptacle, one (1) data outlet adjacent to desk; duplicate on wall
                                                   opposite desk.
    Data:            MC 3 - Offices                Provide two (2) data outlets.
    Intercom:        MC 2, MC 7                    Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system
    Data:            MC 2                          Provide receptacle & voice/data outlet for Interactive Board.
    Lighting:        MC 1                          Provide combination of large pendant fixtures, downlights and fluorescent indirect/direct lighting.
                                                   Coordinate ceiling mounted projector placement with light fixtures and manufacturers requirements.
                                                   Provide downlight fixtures at gyp board ceiling areas.
    Security         MC 1                          Security Camera (clg. Mounted): Provide junction box and raceway.
    TV:              MC 1                          Provide one (1) television outlet. Provide 18"x18"x4" deep junction box 8" AFF. Provide 2 - 2 " conduit in wall to above
                                                   ceiling and stub out in corridor above ceiling.

    Other:           MEDIA CENTER                  Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                     MEDIA CENTER                  Technology Infrastructure: Reference Instructional Technology requirements in the Design Guideline.
    *Instructional Technology outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
                                                                                      Plumbing
                 1   MC 6                          Provide one (1) double bowl sink.
                 2   MC 6 a                        Provide one (1) floor-mounted flush valve WC and one (1) lavatory per toilet room. Room shall be ADA compliant.

                                                                                        HVAC
                 1   All spaces                    Provide limited-range individual temperature control in all areas.
                 2   MC 1                          Provide humidity sensor(s).
                 3   Media Center                  Refer to Design Guidelines Division 15 - Mechanical for requirements.
                                                                                     Acoustics
                 1                                 Refer to Design Guidelines.
                                                                                   General Notes




DeKalb County School District                                                         9 of 121                                                           February 15, 2013 v1.1
                                                                             Section 04 - ART

                                                                             General Description

    The Art classroom provides instruction for techniques and processes required to create and produce a variety of 2 and 3 dimensional media; including ceramics, sculpture,
    printmaking, photography, film making, computer art, fiber arts and art criticism. Art education provides students opportunities to see, analyze and research art history, as
    they develop and practice creative, expressive and critical thinking. An essential feature of the program is to expose students to a wide variety of media, techniques, and
    processes in a structured learning situation; to enable every student to become artistically literate, creative and a lifelong participant in the fine arts. Key Adjacency:
    Locate on the First Floor with direct access to the Art Partio.

                                                                                Activity / Space
    Space No.                               Room Name                                        NSF             Qty         TSF                                Adjacency
    ART 1         Art Lab ( 2-D - Drawing, Painting)                                               1600        1             1600            First Floor / Direct access to Art Patio
    ART 2         Office ( 1 person)                                                                   150     1               150                            ART 1
    ART 3         Storage                                                                              170     1               170                            ART 1
    ART 4         Art Lab ( 3-D - Ceramics, Sculpture)                                             1600        1             1600            First Floor / Direct access to Art Patio
    ART 5         Kiln Room (1 kiln)                                                                   150     1               150                            ART 4
    ART 6         Office ( 2 person)                                                                   150     1               150                            ART 4
    ART 7         Storage                                                                                      1               170                            ART 4
                                                                                      Total Area SF                          3990


                                                                                     Equipment
    The following items are to be specified in the base contract unless noted otherwise.
    Item          Room Location                                                       Size (WxH)             #/RM
    MB            ART 1                                                                     4' x 4'            2    Locate at opposite ends of IB on teaching wall.
    IB            ART 1                                                                     8' x 4'            1    OP. Center on teaching wall.
    TB            ART 1                                                                     4' x 4'            1    Locate adjacent to MB on teaching wall.
    TB            ART 1                                                                     12' x 4'           1    Locate above computer stations.
    DC            ART 1, ART 4                                                             36x12x74            1
    SHLV          ART 5                                                                    36x12x72            6    Provide free standing floor-ceiling shelving, 2 units
    KN            ART 5                                                                                        1    Provide digital kiln w/ shelves and stilts.
    SK2           ART 1                                                                                        2
    SK2           ART 4                                                                                        3
    PTD           ART 4                                                                                        1    Provide one (1) per sink.
    SD            ART 4                                                                                        1    Provide one (1) per sink.
    SR            ART 4                                                                                        1    OP
    DSH           ART 1, ART 4
    CLK           ART 1, ART 4                                                                                 1
    DR            ART 1, ART 4                                                                                 1    OP
    TB            ART 1, ART 4                                                              4' x 4'            1
    MB            ART 1, ART 4                                                              4' x 4'            2
    CMPR          ART 1, ART 4                                                                                 1    OP
    PS            ART 1, ART 4                                                                                 1    OP
    C/BKT         ART 1, ART 4                                                                                 1
    IB            ART 1, ART 4                                                             3'-6" x 4'          1    OP. Installed by Owner on Teaching Wall.
    CMP           ART 1, ART 4                                                                                      OP - Refer to Instructional Technology requirements.
    MB - Marker Board                                             SR - Slab Roller    CMPR - Ceiling Mtd. Projector                    DC - Display Case w/ Spotlights
    TB - Tack Board                                     DSH - Darkening Shades        OP - Owner Provided                              SHLV - Shelving (stainless steel)
    CLK - Electronic Wall Clock                           SK2 - Double bowl sink      PS - Projection Screen                           IB - Interactive Board



DeKalb County School District                                                        10 of 121                                                               February 15, 2013 v1.1
    KN - Kiln (digital)                                                  CMP - Computers (student)              C/BKT-Component Bracket (wall mtd.)
                                                                         PTD - Paper Towel Dispenser            SD - Soap Dispensers
                                                                         Finishes
    Walls:       a All spaces       Provide paint finish. Refer to Design Guidelines for sheen. Water base, zero VOC paints are preferred.
                 b All spaces       All walls to extend to underside of deck. Walls to be constructed of CMU.
    Floors:      a ART 1, 3, 4, 5   Provide vinyl composition tile (VCT), w/ 4" rubber base.
                 b ART 2, ART 6     Provide carpet w/ 4" rubber base.

    Base:        a All spaces       Provide rubber base all spaces.

    Ceilings:    a All Spaces       Provide 2x2 standard acoustical ceiling tile (ACT) in all spaces.
                 b All Spaces       Provide 2x4 fluorescent fixtures.
                 c All Spaces       Provide minimum 9'-4" ceiling height in all other spaces.
                 d ART 1, ART 4     Provide minimum 10'-0" ceiling height in art labs.




DeKalb County School District                                           11 of 121                                                  February 15, 2013 v1.1
                                                                                     Casework
    Space No.                Room Name                        Unit Type                  Unit Length     Qty    Size (wxdxh)      Notes
    ART 1, 4         2 D, 3 D - Art Labs          Upper Cabinet                             20 LF         6        30"x12"x30"
                                                  Work Counter                              20 LF                     24" d       Epoxy resin counter top.
                                                  Built-in shelving                                       1           12" d       Provide overhead shelving (open) between
                                                                                                                                  Teacher Cabinet and Upper Cabinet casework
                                                                                                                                  units.

                                                  Teacher Cabinet                                         1          3'x2'x7'     Lockable
                                                  Storage Cabinet                                         1          3'x2'x7'     Lockable
                                                  Drying Racks (Vertical)                                 1        43"x24"x36"    GC to coordinate racks w/ casework.
                                                  Drying Racks (Horizontal)                               1        53"x24"x36"    GC to coordinate racks w/ casework.
    ART 4            3 D - Art Lab                Base Cabinet Types:                       20 LF
                                                  Sink Cabinet (Handicap Unit )                           3        30"x24"x30"    Provide double bowl sink, ADA compliant
                                                  Base Cabinet (2 door)                                   1        30"x24"x30"
                                                  Base Cabinet (3 drawer)                                 2        16"x24"x30"


                                                  Sink Cabinet (Handicap Unit )                           2        30"x24"x30"    Provide double bowl sink, ADA compliant
                                                  Base Cabinet (2 door)                                   2        30"x24"x30"
                                                  Base Cabinet (3 drawer)                                 2        16"x24"x30"
    ART 5            Kiln Room                    Built-in shelving ?                                     2          12" d ?      Provide floor-ceiling shelving, 2 units
                                                                                      Utilities
    Electrical       Location                     Lighting & Communications
                                                  Provide non-fused disconnect for kiln. Provide outlets as required for kiln and ventilation system, in addition to rough-in for
    Power:           ART 5 - Kiln Room            future second kiln and ventilation system. Coordinate exact connection type with kiln vendor prior to rough-in.
                     Classroom Computer Area:
                     ART 1, 4 - Computer          Provide 4 x 4 junction box, single gang plaster ring, temporary cover plate, and 3/4 "C stubbed into corridor with bussing,
                                                  above ceiling.
                     ART 1, 4 - Computer          Provide three (3) quadraplex outlets, and one (1) data outlet.

                     Offices:
    Power:           ART 2 - Office               Provide one (1) duplex receptacle, one (1) quadraplex receptacle, one (1) data outlet adjacent to desk; duplicate on wall
                                                  opposite desk.

    Data:            ART 2 - Office               Provide two (2) data outlets.
    Intercom:        ART 1, 2, 4, 6               Provide push button 4 x 4 box, single gang plaster ring and 3/4"C stubbed into ceiling for intercom system.
                     Teaching Wall:
    Clock:           ART 1, ART 4                 Provide receptacle for clock.
    TV:              ART 1, ART 4                 Provide receptacle and TV/RGB outlet for DVD Player.
    Data:            ART 1, ART 4                 Provide receptacle and voice data outlet for Interactive Board.
    Lighting:        ART 1, ART 4                 Coordinate ceiling mounted projector placement with light fixtures and manufacturers requirements.

                                                  Intercom / Fire Alarm / Motion Sensor: Refer to Design Guideline Division 16 for lighting and other electrical systems
    Other:           ART 1 thru 6                 requirements.
                                                  Refer to Instructional Technology Required Specifications in the Design Guideline Appendix for technology infrastructure,
                     ART 1 thru 6                 power, data, cabling, and voice/data requirements.
    *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
                                                                                     Plumbing
                 1   ART 1                        Provide multiple double bowl sink locations, w/solids interceptor; allowing space for basket removal. Provide two (2) double
                                                  sinks. One (1) sink to be ADA accessible.

                 2   ART 4                        Provide multiple double bowl sink locations, w/solids interceptor; allowing space for basket removal. Provide three (3) double
                                                  sinks. One (1) sink to be ADA accessible.




DeKalb County School District                                                       12 of 121                                                          February 15, 2013 v1.1
                                                                                 HVAC
          1   All spaces:                   Provide limited-range individual temperature control in all areas. Refer to Design Guidelines for HVAC system requirements.
          2   ART 4                         Exhaust for kiln provided by Owner. Installation by General Contractor. GC to provide wall sleeve and cap for exhaust outlet.
                                            Confirm size with manufacturer prior to installation.

          3   ART 4                         Provide exhaust vent for enameling kiln and soldering area; to be on a 12 hour manual timer. ?
          4   General                       Refer to Design Guidelines for system requirements.
                                                                              Acoustics
          1   All spaces                    Refer to Design Guidelines. Provide acoustical separation in compliance with ANSI standards for schools.
                                                                           General Notes
          1   Casework: Provide above counter GFCI outlets.
          2   Windows / Daylighting: Provide exterior windows for each classroom w/access to exterior art patio. Provide daylighting control / shading to avoid direct
              sunlight into classrooms.

          3   Refer to Design Guidelines for window system and glazing requirements.
          4   Interactive Board / Components (Shelf, Projector etc.): Provided and installed by Owner. GC to provide power and data as required for operation of
              Interactive Board.

          5   Computers / Computer Desks: Provided and installed by Owner. GC to provide power and data as required for operation of computers and computer
              equipment per Instructional Technology requirements.




DeKalb County School District                                                 13 of 121                                                       February 15, 2013 v1.1
                                                                           Section 05 - MUSIC

                                                                             General Description

    The Music curriculum offers Exploratory Music, Band, Orchestra, Chorus and Keyboard. The music curriculum provide students opportunities to express themselves by
    performing, describing, creating, and responding to music. Music classes are taught in classrooms that are specifically designed for music instruction. Key Adjacency:
    Locate Music Suite within close proximity to the Stage and Auditorium facilities, on the ground level.


                                                                                Activity / Space
    Space No.                               Room Name                                       NSF             Qty         TSF                             Adjacency
                  Intrumental Music (IM) - Band / Orchestra:
    IM 1          Band Room                                                                       2200        1             2200             Toilet Facilities, Exterior Access
    IM 2          Storage - Uniform                                                                   400     1               400                            IM 1
    IM 3          Storage - Band Equipment                                                            400     1               400                            IM 1
    IM 4          Practice Rooms                                                                      100     2               200                            IM 1
    IM 5          Office (Band Director)                                                              150     1               150                            IM 1
    IM 6          Music Library                                                                       150     1               150
    IM 7          Orchestra Room                                                                  2000        1             2000
    IM 8          Storage - Orchestra Equipment                                                       400     1               400                            IM 7
    IM 9          Band/Music Corridor (internal circulation)                                          140     1               140
                                                                                     IM Subtotal                            6040
                  Choral Music (CM) - Choral / Keyboarding:
    CM 1          Chorus Classroom                                                                1800        1             1800                        IM 1, IM 7
    CM 2          Chorus Equipment Storage                                                            200     1               200                          CM 1
    CM 3          Office (Choral)                                                                     150     1               150                          CM 1
    CM 4          Keyboard Classroom                                                                  800     1               800
    CM 5          Music Library                                                                       150     1               150                          CM 4
    CM 6          Practice Rooms                                                                      100     2               200                          CM 4
    CM 7          Storage - Uniform                                                                   200     1               200                 IM 9, Auditorium Stage
                                                                                     CM Subtotal                            3500


                                                                                     Total Area SF                          9540


                                                                                   Equipment
    The following items are to be specified in the base contract unless noted otherwise.
    Item          Room Location                                                      Size (WxH)             #/RM
    MB            IM 1, 7 / CM 1, 4                                                        4' x 4'            2    Locate at opposite ends of IB on teaching wall.
    IB            IM 1, 7 / CM 1, 4                                                        8' x 4'            1    OP. Center on teaching wall.
    TB            IM 1, 7 / CM 1, 4                                                        4' x 4'            1    Locate adjacent to MB on teaching wall.
    TB            IM 1, 7 / CM 1, 4                                                        12' x 4'           1    Locate above computer stations.
    MBWL          IM 1, 7 / CM 1, 4                                                        4' x 12'           1
    TB            IM 1, 7 / CM 1, 4                                                        4' x 4'            2
    TB            IM 5, IM 6 / CM 3                                                        4' x 4'            1
    CMP           CM 4                                                                                             OP - Refer to Instructional Technology requirements.
    IB            CM 4                                                                                        1    OP - Refer to Instructional Technology requirements.
    CLK           IM 1, 7 / CM 1, 4                                                                           1
    PR            CM 1                                                                                       set
    ISC           IM 1                                                                     Variety                 Coordinate size/quantity w/ Owners requirements



DeKalb County School District                                                      14 of 121                                                             February 15, 2013 v1.1
    ISC      IM 2                  29x29x 84   3
    ISC      IM 2                  27x29x 84   2
    ISC      IM 2                  27x29x 84   3
    ISC      IM 4 a                48x29x 84   1
    ISC      IM 4 b                48x29x 84   3
    ISC      IM 8                  29x29x 84   2
    WF       CM 1                              1




DeKalb County School District   15 of 121          February 15, 2013 v1.1
    AP             IM 1, 7 / CM 1,4, 6                                                                         Provide on all walls as design allows.
    TB - Tack Board                                AP - Acoustical Panels              OP - Owner Provided                        IB - Interactive (Smart) Board
    CLK - Electronic Wall Clock                    PR - Portable Risers                CMP - Computers (student)                  C/BKT-Component Bracket (wall mtd)
    MBWL - Marker Board w/ lines                                                       WF - Water Fountain (see FF&E)             ISC-Instrument Storage Cabinets (Wenger)
    Note: Coordinate size and quantity of Instrument Storage Cabinets w/ Owners requirements.
                                                                                      Finishes
    Walls:       a Provide paint finish. Refer to Design Guidelines for sheen. Water base, zero VOC paints are preferred. All walls to extend to underside of deck. All walls to
                   be constructed of CMU. Do not field paint acoustical panels.

    Floors:      a Provide carpet in all spaces w/ 4" rubber base

    Ceilings:    a Provide 2x2 standard acoustical ceiling tile in all spaces.
                 b Provide 2x4 fluorescent fixtures in all spaces with exception of IM 2, Uniform Storage.
                 c Sound transmission between music suite and other spaces. Reference Design Guideline Division 1, Acoustical Standards.
                 d IM2 open to structure. (OPS) Provide strip fluorescent fixture suspended from structure.
                 e Provide min 14' - 0" ceiling height Chorus Classroom, CM 1.
                 f Provide min 18' - 0" ceiling height in Band Room IM 1, and Orchestra Room IM 7.
                 g Provide min 10' - 0" ceiling height in all other spaces.
                                                                                     Casework
    Space No.              Room Name                           Unit Type                                 Qty Size (wxdxh)         Notes
    IM 1           Band Rehearsal Room             Teachers Cabinet (lockable)                             1         3'x2'x7'
                                                   Storage Cabinet (lockable)                              1         3'x2'x7'
                                                   Built-in Book Shelves                    36 LF         12         3'x1'x26"
                                                   Instrument Storage Cabinets                             4
    IM 2           Storage - Uniform               Shelf and Coat Rod
    IM 3           Equipment Storage               Instrument Storage Cabinets                            20
    IM 6           Music Library                   Bookshelves                                             6
    IM 7           Orchestra                       Teachers Cabinet (lockable)                             1         3'x2'x7'
                                                   Storage Cabinet (lockable)                              1         3'x2'x7'
                                                   Built-in Book Shelves                     9 LF          3         3'x2'x7'     w/ adjustable shelves
    CM 1           Chorus Classroom                Teachers Cabinet (lockable)                             1         3'x2'x7'
                                                   Storage Cabinet (lockable)                              1         3'x2'x7'
                                                   Built-in Book Shelves                    24 LF          8         3'x2'x7'     w/ adjustable shelves
    CM 2           Storage Room                    Built-in Book Shelves                    24 LF          8         3'x2'x7'     w/ adjustable shelves


    CM 4           Keyboard Classroom              Teachers Cabinet (lockable)                             1         3'x2'x7'
                                                   Storage Cabinet (lockable)                              1         3'x2'x7'
                                                   Book Shelves                                            2
    CM 5           Music Library                   Book Shelves                                           13
                                                                                       Utilities
    Electrical     Location                        Lighting & Communications
    Power:         General                         Provide electrical outlets @ 12' max spacing w/ not less than one (1) duplex outlet per wall.
                   Teaching Wall:
    Power:         IM 1, IM 7 / CM 1, 4            Provide receptacle for clock.
                   IM 5 - Office                   Provide one (1) duplex receptacle, one (1) quadraplex receptacle, one (1) data outlet adjacent to desk; duplicate on wall
                                                   opposite desk.

    Intercom:      IM 1, 5, 6, 7 / CM 1, 4         Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.
    Data:          IM 1, IM 7 / CM 1, 4            Provide receptacle and voice/data outlet for Interactive Board.
                   IM 5 - Office                   Provide two (2) data outlets.


DeKalb County School District                                                       16 of 121                                                           February 15, 2013 v1.1
    DVD:             CM 4                          Provide receptacle and TV/RGB outlet for DVD Player.
    TV:              CM 4                          Provide one (1) television outlet
    Projector:       IM 1, IM 7 / CM 1, 4          Provide ceiling mounted receptacle and data outlet for projector


    Other:           MUSIC SUITE                   Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                     MUSIC SUITE                   Technology Infrastructure: Reference Instructional Technology requirements.


    *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
                                                                                       Plumbing
                 1   Provide plumbing as required for dual drinking fountain.




DeKalb County School District                                                          17 of 121                                                        February 15, 2013 v1.1
                                                                                   HVAC
          1   All spaces:                 Provide limited-range individual temperature control in all areas. Refer to Design Guidelines for HVAC system requirements.
          2   MC 1                        Provide humidity sensor(s). Refer to Design Guidelines for system requirements.
          3   General                     Refer to Design Guidelines for system requirements.
                                                                              Acoustics
          1   IM 1,4,7 / CM 1,4, 6          Provide wall-mounted acoustical panels(factory finished) w/concealed attachment. Coordinate w/locations of receptacle
                                            appliances.

          2   IM 1, IM 7, CM 1, 4           Provide doors without grilled louvers. Provide sound seals at all classroom doors.
          3   IM 1, IM 7, CM 1, 4           Avoid parallell walls within classrooms to limit echo; or provide wall mounted acoustical panels.
          4   IM 1, IM 7, CM 1, 4           Provide CMU sand filled partition between adjacent music classrooms.
          5   IM 1, IM 7, CM 1, 4           Extend wall acoustic treatment to top of structure.
          6   IM 1, IM 7, CM 1, 4           Provide sound batt insultation above walls and ceiling tile.
                                            Sound transmission between music suite and other spaces, including corridors, and rooms above and below the Music
              IM 1, IM 7, CM 1, 4
          7                                 Classroom should meet ANSI standards.
                                                                           General Notes
          1   Provide interior window between IM 1, and Office (Band Director), IM 5.
          2   Provide interior window between IM 6, and IM 7.
          3   Refer to Design Guidelines for window system and glazing requirements.
          4   Refer to Design Guidelines Division 8 for door width requirements.
          5   Provide double doors to IM 1, IM 7 and CM 1 and CM 4.
          6   Provide single 42" doors for access into Music Practice and Storage Rooms to facilitate movement of large instruments.
          7   Need interior windows in IM 4 and CM 6 to music classrooms.




DeKalb County School District                                                 18 of 121                                                         February 15, 2013 v1.1
                                                                           Section 06 - DRAMA
                                  (Base on Arabia Mountain HS & Tucker HS. May substitute Black Box Theater design per Owner.)
                                                                     General Description
    The nature of drama instruction calls for traditional classroom activities as well as group and paired learning activities which require space in which to form these types of
    groupings. Students engage in role-play and simulation which also requires performance space. The drama classroom meets the needs of a full instructional unit; and
    serves as a classroom for drama instruction, training on the use of theatrical equipment and after school rehearsals. Key Adjacency: Locate near the Music Suite and
    the Auditorium.

                                                                                 Activity / Space
    Space No.                                 Room Name                                      NSF            Qty         TSF                             Adjacency
    DR 1               Classroom                                                                     1520     1             1520
                                                                                       Total Area SF                        1520


                                                                                      Equipment
    The following items are to be specified in the base contract unless noted otherwise.
    Item               Room Location                                                   Size (WxH)           #/RM
    CLK                DR 1                                                                                   1
    OPS                DR 1                                                                                   1    Provide suspended ceiling mounted shelf for IB projector
    MP                 DR 1                                                                                   1    OP. Installed by Owner.
    MB                 DR 1                                                                  4'x4'            2    Locate @ both sides of IB, at teaching wall.
    TB                 DR 1                                                                  4'x4'            2    Locate on walls perpendicular to teaching wall.
    IB                 DR 1                                                                5'- 6" x 4'        1    OP. Installed by Owner on Teaching Wall.
    CMP                DR 1                                                                                        OP - Refer to Instructional Technology requirements.
    TB - Tack Board                                 MP - Metal Platform (portable)     OPS - Overhead Projector Shelf               C/BKT-Component Bracket (wall mtd)
    MB - Marker Board                                                                  IB - Interactive Board                       CMP - Computers (student)
    CLK - Electronic Wall Clock
                                                                                       Finishes
    Walls:           a All spaces                 Provide paint finish. Refer to Design Guidelines for sheen. Water base, zero VOC paints are preferred.
                     b All spaces                 All walls to extend to underside of deck. Walls to be constructed of CMU.
    Floors:          a All spaces                 Provide vinyl composition tile w/ 4 " rubber base in all spaces.
    Ceilings:        a All spaces                 Provide 2x2 standard acoustical ceiling tile in all classrooms.
                     b All spaces                 Provide 2x4 fluorescent fixtures
                                                                                      Casework
    Space No.                 Room Name                                                  Unit Length         Qty     Size (wxdxh) Notes
    DR 1               Classroom                      Teachers Cabinet (lockable)                             1        3'x2'x7'     Locate at teaching wall
                                                                     Book Shelves                             6      36"x12"x30"    Locate opposite teaching wall
                                                                                       Utilities
    Electrical         Location                        Lighting & Communications
    Power:
    Intercom:          DR 1 - Teaching Wall       Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.

    Data:              DR 1 - Teaching Wall       Provide receptacle and voice/data outlet for Interative Board.

    DVD:               DR 1 - Teaching Wall       Provide receptacle and TV/RGB outlet for DVD Player.

    TV:                DR 1 - Teaching Wall       Provide one (1) television outlet
    Projector:         DR 1 - Teaching Wall       Provide ceiling mounted receptacle and data outlet for projector
                                                                                      Plumbing
                 1     n/a
                                                                                        HVAC
                 1     All Spaces                 Provide limited-range temperature control.
                 2     General                    Refer to Design Guidelines for system requirements.



DeKalb County School District                                                         19 of 121                                                          February 15, 2013 v1.1
                                                               Acoustics
          1   All Spaces        Classrooms and other core learning spaces must achieve minimum STC rating of 35.
          2   All Spaces        Refer to Design Guidelines.
                                                              General Notes
          1                     Provide locks on all doors.




DeKalb County School District                                  20 of 121                                           February 15, 2013 v1.1
                                                      Section 07 - HEALTH & PHYSICAL EDUCATION

                                                                            General Description

    The Physical Education curriculum provides students opportunities fo participate in PE programs geared to their needs and abilities, to develop physical fitness,
    sportsmanship and safe practices. Students are involved in individual, dual and team games, self-testing activities, health/wellness instruction, conditioning exercises,
    coeducational activities and lifetime skills. The gym is also used for intramural, extramural, school and community functions and assemblies. Total required gym seating
    capacity for ___ Bleacher seating capacity for 1600. Key Adjacency: Separate from academic areas with access to playfields, and parking facilities.

    Bleacher seating capacity = 1600 / Total Gymnasium seating capacity = ______?
                                                                               Activity / Space
    Space No.                                Room Name                                    NSF          Qty        TSF                              Adjacency
    PE 1            Gymnasium:
                a        Main Gym                                                             16000      1           16000
                b        Mezzanine Track ( 5 lane )                                             6200     1            6200    Above bleachers at Mezzanine level
                c        Visitors Locker Room                                                    250     1              250
    PE 2            Boy's:
                a        P.E. Locker Room                                                        900     1              900   PE 2 b, PE 2 c
                b        Showers                                                                 300     1              300
                c        Toilet                                                                  300     1              300   PE 2 b
                d        Janitor Closet                                                           40     1               40   PE 2 b
                e        Athletic Locker Room                                                   1800     1            1800    PE 2 b, PE 2 c
                f        Locker Room Common Area (internal circulation)                          500     1              500   PE 2 a, PE 2 f
    PE 3            Girl's:
                a        P.E. Locker Room                                                        800     1              800   PE 3 b, PE 3 c
                b        Showers                                                                 600     1              600   ( 6 regular stalls / 2 ADA stalls )
                c        Toilet                                                                    0     1                0   PE 3 b
                d        Janitor Closet                                                           40     1               40   PE 3 b
                e        Athletic Locker Room                                                   1080     1            1080    PE 3 b, PE 3 c
                f        Locker Room Common Area (internal circulation)                          500     1              500
    PE 4            Coach / Support Areas:
                a        Coach Workroom                                                          400     2              800   PE 4 b
                b        Coach Office (incl./ toilet, shower)                                    290     6            1740
                c        Laundry                                                                 300     1              300
                d        PE Office (Boy's & Girl's) incl. closet                                 400     2              800
                e        Training Room ( incl. /1 toilet, shower )                               400     2              800
    PE 5            Storage:                                                                             1                0
                a Storage - athletic (outdoor)                                                   350     1              350
                b Storage - athletic                                                             875     1              875
                c Storage - physical education                                                   424     1              424
                d Storage - athletic                                                             794     1              794
                                                                                       PE Subtotal                   36193
    PE 6            Wellness:
                a        Health Service Lab                                                     1187     1            1187
                b        Health Classroom                                                        823     2            1646    PE 6 c
                c        Multi-Purpose Room                                                     2706     1            2706    PE 6 a
                         Multi-Purpose Room Storage Closet                                       239     1              239   Access thru PE 6 c
                                                                                       Health Subtotal                5778




DeKalb County School District                                                     21 of 121                                                         February 15, 2013 v1.1
                                                                             Total Area SF                 41971


                                                                           Equipment
    The following items are to be specified in the                   125
    Item           Room Location                                           Size (WxHxD)      #/RM
    MB             PE 6 a, PE 6 b                                                4' x 4'      2     Locate at opposite ends of IB on teaching wall.
    IB             PE 6 a, PE 6 b                                                8' x 4'      1     OP. Center on teaching wall.
    TB             PE 6 a, PE 6 b                                                4' x 4'      1     Locate adjacent to MB on teaching wall.
    TB             PE 6 a, PE 6 b                                               12' x 4'      1     Locate above computer stations.
    TB             PE 4a, PE 4b, PE 4c, PE 4d, PE 6a, PE 6b, PE 6c               4' x 4'      1




DeKalb County School District                                              22 of 121                                                     February 15, 2013 v1.1
    TB        PE 4a                                                 4' x 8'      1
    MB        PE 4a, PE 4b, PE 4c, PE 4d, PE 6a, PE 6b, PE 6c       4' x 4'      1
    MB        PE 4a                                                 4' x 8'      1
    IB        PE 6 b                                                             1   OP Portable
    WP        PE 1b                                                             15   Provide @ column corners.
    CMP       PE 6 b                                                             4
    SC        PE 2b, 3b, 4e                                                      1
    FEN       PE 5 a, PE 5 b, PE 5 d                                             1   Security/demarcation fencing for storage areas.
    FEN *     PE 2 e, PE 3 e                                                         Fence divider from top of lockers to bottom of ACT ceiling
    HD        PE 4 d                                                             1
    SP        PE 1 a                                                             4
    CLK       PE 6 a, PE 6 b, PE 6 c                                             1
    FEC       PE 1b (3), PE 5a, PE 4c                                            1
    DDF       PE 2f, PE 3f, PE 6a, PE 1 a (2)                                    1   Locate @ Girls/ Boys corridor adj. to locker room.
    MSK       PE 2d, PE 3d                                                       1
    MI        PE 2c, PE 3c, PE 4e                                  48" x 36"     1   3' - 4" to bottom
    SK        PE 2c, PE 3c, PE 4b, PE 4e                                         1
    SKI       PE 4 c
    MH        PE 2d, 3d                                                          1
    SD        PE 2c, PE 3c, PE 4b, PE 4e                                             Wall mounted.
    PTD       PE 2c, PE 3c, PE 4b, PE 4e                                             Wall mounted.
    REF       PE 4 e
    SS        PE 2b, PE 3b, PE 4 b, PE 4e (1)                                    2
    SE        PE 1a                                                                  Goals, Nets, Poles etc.
    FP        PE 1a                                                              1   Fabric Partition
    MS        PE 4c                                                36x24x88      5
    MS        PE 5c                                                36x24x88     17
    MS        PE 5d                                                36x24x88     28
    MS        PE 5a                                                36x24x88     35
    MS        PE 5b                                                36x24x88     28
    W/D       PE 4c                                                              1
    WHPL      PE 4e                                                              1   OP. Provided by Athletic Dept.
    IM        PE 4e                                                              1   OP. Provided by Athletic Dept., or 3rd party
    EE        PE 6a                                                                  OP. Provided by Tech Education
    SB        PE 1a                                                              2   OP
    BG        PE 1a                                                              6   Mount to structure.
    GPA       PE 1a                                                              1
    BL        PE 1a                                                             600 Ref. General Note section.
    Lockers
    PEL       PE 2a                                               12"x12"x12"   163 Boys PE locker quantity
    ATL       PE 2e                                                             137 Boys Athletic locker quantity
    PEL       PE 3a                                               12"x12"x12"   171 Girls PE locker quantity
    ATL       PE 3e                                                             85   Girls Athletic locker quantity




DeKalb County School District                                   23 of 121                                                  February 15, 2013 v1.1
    CL             PE 4b                                                            24"x22"x72"         4    Coach office locker quantity - single tier
    PEL            PE 4d                                                            12"x12"x72"         4    Boy's PE Office locker
    PEL            PE 4b, PE 4d                                                     12"x12"x72"         4    Girl's PE Office locker
    PEL            PE 1c                                                            12"x12"x72"         4    Visitors Locker Room
    MB - Marker Board                         MSK - Mop Sink                       BL - Bleachers (Folding)                    SE - Sports Equipment
    TB - Tack Board                           MH - Mop Holder                      BG - Basketball Goal (retractable)          FP - Fabric Partition Court System
    CLK - Electronic Wall Clock               SK - Sink                            W/D - Washer, Dryer (individual)            DDF - Dual Drinking Fountain
    IB - Interactive Board                    SKI - Sink (industrial)              REF - Refrigerator w/ice maker              MS - Metal Shelving
    PEL - PE Lockers                          WP - Wall Pads                       WHPL - Whirlpool                            SB - Electronic Score Board Equipment
    ATL - Athletic Lockers                    MI - Mirrors                         IM - Ice Machine                            GPA - Gym PA System
    CL - Coach Lockers                        EE - Exercise Equipment              SC - Curtain Rod / Shower Curtain           CMP - Computers (student)
    FEC - Fire Extinguisher Cabinet           OP - Owner Provided                  SS - Shower Seat                            FEN - Fencing (Chain Link Partitions)
                                              HD - Heart Defibrillator             SD - Soap Dispenser                         FEN * - Fencing (Chain Link Partitions)
                                                                                   PTD - Paper Towel Dispenser                 SP - Speakers (ceiling mounted)
                                                                                  Finishes
                                              Provide paint finish. Refer to Design Guidelines for sheen. Water base, zero VOC paints are preferred. All wals to extend to
    Walls:      a All Spaces                  underside of deck. Walls to be constructed of CMU.
                b PE 1c, PE 1g, PE 4e, PE     Epoxy paint on CMU @ locker room, toilet, shower areas.
                  2b,c,d,PE 2a,3a, PE 2e,
                  3e, PE 4b

    Floors:     a PE 1a                       Provide Wood Flooring / VCT. Provide VCT in corridor around perimeter of Main Gym.
                b PE 1b                       Provide Fluid Applied Synthetic Sports Flooring w/ striping.
                c PE 5a, PE 6c                Provide heavy duty Rubber Sports Flooring. Provide VCT in PE 6c storage closet.
                d PE 1c, PE 1g, PE 2a, 3a,    Provide Epoxy Floor Coating.
                  PE 2e, 3e, PE 4c
                e PE 2d, 3d, PE5a, 5b, 5c,    Sealed Concrete
                  5d
                f PE 4a, 4b, 4d, 4e, PE 6b    Provide vinyl composition tile (VCT), w/ 4" rubber base.

                g PE 2b,2c, PE 3b,3c, PE      Provide ceramic tile (CT) w/ ceramic base in toilet/shower areas.
                  4b, PE 4e

    Base:       a All spaces *                Provide rubber base all spaces, with exception of ceramic tiled areas.

    Ceilings:   a All Spaces:                 Provide 2x2 standard acoustical ceiling tile (ACT) in all spaces, w/ following exceptions.
                b All Spaces:                 Provide 2x4 fluorescent fixtures with the exception of the following:
                c PE2b, 3b PE 4 b, 4 e        Provide downlights at GYB soffit areas.
                d PE 1 a                      Exposed structure, open to above.
                e PE 1 a                      Provide large pendant fixtures.
                f PE 2d, 3d, 1c, 4c, PE 5a,   Open to structure (OTS) - janitor closets, locker rooms
                  5b, 5c, 5d
                g PE 4d                       Open to structure (OTS) - closet only.
                h PE 1a, PE 5c, PE 6?         Provide surface mounted fluorescent fixtures.
                i PE2b, 3b PE 4 b, 4 e        Provide Gypsum Board (WR GWB) in shower areas only.
                                                                                 Casework
    Space No.                Room Name                    Unit Type                    Unit Length    Qty      Size (wxdxh) Notes
    PE 4e          Training                   Upper Cabinet                               9 LF          4
                                              Work Counter
                                              Base Cabinet                                              3
                                              Base Cabinet                                              1                      w/ single bowl sink
    PE 1b          Mezzanine Track            Wood Cap (42" Metal Guard Rail)


DeKalb County School District                                                   24 of 121                                                            February 15, 2013 v1.1
    PE 1c    Visitor's Locker Room    Bench               1
    PE 4e    Training Room - Toilet   Bench               1
    PE 2a    PE Locker Room           Bench               3




DeKalb County School District                 25 of 121       February 15, 2013 v1.1
    PE 3a         PE Locker Room                  Bench                                                   4
    PE 2e, 3e     Athletic Locker Room            Bench                                                   3
    PE 4b         Coach's Office -Toilet          Bench                                                   1
    PE 4d         PE Office                       Shelf and Coat Rod                                      1
    PE 1a         Main Gym                        Wall Pads                                              13
    PE 6c         Multipurpose                    Wall Pads                                              22                      Provide around room perimeter. (3 walls)
    PE 1b         Mezz Track                      Wall Pads                                              15                      Provide @ columns and corners.
    PE 6a         Health Service Lab              Wall Pads                                              18
    PE 6a         Health Service Lab              Mirror Panels                                           7                      Provide at Teaching Wall.
    PE 6c         Multipurpose                    Mirror Panels                                           5
    PE 1a         Main Gym                        Acoustical Panels                                                              Ref. Acoustics section below.
    PE 6b         Health Classroom                Teacher Cabinet (Lockable)                              1
    PE 6b         Health Classroom                Book shelves                                            6       36x12x26
    PE 6b         Health Classroom                Storage Cabinet (Lockable)                              1


                  Provide benches as part of locker manufacturers package.
                                                                                       Utilities
    Electrical    Location                        Lighting & Communications
    Power:        General                         Provide electrical outlets @ 12' max spacing w/ not less than one (1) duplex outlet per wall.
    Power:        PE 6a, 6b                       Provide receptacle for clock @ Teaching Wall.
                  Hall of Fame/Corridor, PE       Provide junction box with cover for connection to bleachers by supplier. Install bleacher controller and fuse panel on corridor
                  1a                              side of partition.

                  PE 1a, 1b - Mezzanine           Provide annunciation devices (speaker/strobe)w/ wire guards.
                  PE 1a                           Provide safety disconnect swith for goal hoist motor if not provided integral to equipment
                  PE 1a                           Provide junction boxes for power, data, intercom and scoreboard connections to scorer's table. Provide interconnecting
                                                  cabling to meet requirements of owner provided systems. Locate boxes to coordinate w/ bleachers.


                  PE1a                            Coordinate exact locations of wall receptacle with wall pads.
                  PE 4b, PE 4d - Office           Provide one (1) duplex receptacle, one (1) quadraplex receptacle, one (1) data outlet adjacent to desk; duplicate on wall
                                                  opposite desk.

                  PE 4c                           Provide safety switch for washer and for dryer.
    Detector:     PE 6a                           Provide junction box and raceway for alarm motion detectors.
    Intercom:     PE 4a, 4b, PE2a, 2e, PE
                                                  Coordinate exact locations of wall receptacle with wall pads.
                  3a, 3e, PE 4d, PE 6a, 6b

                  PE 4b, 4e, 4d, PE 6b            Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.

    Fire Alarm:   PE 5a, PE 5d                    Provide wall mounted horn or strobe, as required.
    Projector:    PE 6a, 6b                       Provide ceiling mounted receptacle and data outlet for projector
    Teaching Wall @ Teachers Desk:
    Data:         PE 6a, 6b                       Provide receptacle and voice/data outlet for Interactive Board.
                  PE 4b, PE 4d - Office           Provide two (2) data outlets.
    DVD:          PE 6b                           Provide receptacle and TV/RGB outlet for DVD Player.
    TV:                                           Provide one (1) television outlet


    Other:        HEALTH & PE                     Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                  HEALTH & PE                     Technology Infrastructure: Reference Instructional Technology requirements in the Design Guideline.


    *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
                                                                                      Plumbing

DeKalb County School District                                                         26 of 121                                                        February 15, 2013 v1.1
          1   PE 4e                       Provide single bowl sink
          2   PE 4c                       Provide deep industrial sink and floor drain for washer.
                                                                               HVAC
          1   PE 4c                       Provide dryer exhaust.
          2   General                     Refer to Design Guidelines for system requirements.
                                                                            Acoustics
          1   Main Gym: Provide wrapped acoustical panels at upper level of gymnasium.




DeKalb County School District                                               27 of 121                February 15, 2013 v1.1
                                                                              General Notes
          1   Casework: Provide above counter GFCI outlets.
          2   Exercise/Gym Equipment: Tech Education to provide exercise and other required equipment.
          3   Main Gym Roof: Provide painted Structural Truss
          4   Mezzanine Track: Provide painted steel railing at mezzanine.
          5   Main Gym, Volleyball: Provide flush metal sleeve in court floor for insertion of volleyball net pole. (Typical of 2 for each court.)
          6   Main Gym, Volleyball: Provide court striping (2" wide stipe typical).
          7   Main Gym, Basketball: Provide court striping (2" wide stipe typical. 8" boundary stripe.)
          8   Main Gym, Basketball: Provide ceiling mounted retractable basketball goal assembly above court.
          9   Main Gym, Bleacher Capacity: Provide sixteen hundred (1600) folding electric operated gymnasium bleachers. Specifications to match DCSD standards.

         10   Main Gym: Total Seat Count = 1600
         11   Mezzanine Track: Provide 42" metal guardrail with wood cap - 3/4 " vertical steel pickets @ 3.75" spacing. Gate and locking mechanisms to match DCSS
              standards.
         12   Mezzanine Track: Provide wire guards for Gymnasium lighting and exit signs.
         13   Provide interior window between PE 4d and PE 1.




DeKalb County School District                                                   28 of 121                                                            February 15, 2013 v1.1
                                                            Section 8 - SPECIAL EDUCATION
                                                                   (Severe & Profound)
                                                                           General Description

      Classrooms for Special Education provide services to students with varying disabilities in the least restrictive environment. Disabilities served include Autism (AU),
      Behavioral Disorders (BD), Learning Disabilities (LD), Hearing Impaired (HI), Language Impaired (LI), Mild Intellectual Disabilities (MI), Visually Impaired (VI),
      Traumatic Brain Injury (TBI) and Other Health Impairments (OI). Classrooms are configured according to standards established for regular classrooms, but for
      smaller numbers of students that can be self-contained (inter-related classroom.) Key Adjacency: Locate adjacent to other general classrooms, near exits.


                                                                              Activity / Space
      Space No.                           Room Name                                  NSF             Qty         TSF                               Adjacency
                    Special Needs Suite (SPED 1 thru SPED 2)
      SPED 1        Suite Classroom (w/o kitchenette)                                          800     1               800                             SPED 1a
      SPED 1a       Suite Classroom (w/ kitchenette)                                           800     1               800                             SPED 1
      SPED 2        Adaptive Toilet (shared)                                                   150     1               150             Shared bet. SPED 1 & SPED 1a
      SPED 3        Office (Intinerant)                                                        150     1               150                    SPED 1 & SPED 1a
      SPED 4        Classrooms (General)                                                       800     6             4800             General Education Classroom Wing
                                                                               Total Area SF                         6700


                                                                                 Equipment
      The following items are to be specified in the base contract unless noted otherwise.
      Item          Room Location                                              Size (WxH)            #/RM
      MB            SPED 1, SPED 1 a                                                4' x 4'            2    Locate at opposite ends of IB on teaching wall.
      IB            SPED 1, SPED 1 a                                                8' x 4'            1    OP. Center on teaching wall.
      TB            SPED 1, SPED 1 a                                                4' x 4'            1    Locate adjacent to MB on teaching wall.
      TB            SPED 1, SPED 1 a                                                12' x 4'           1    Locate above computer stations.
      MB            SPED 1, 1a, SPED 4                                              4' x 4'            2    Locate opposite to teaching wall.
      TB            SPED 1, 1a, SPED 4, SPED 3                                      4' x 4'            1    Locate opposite to teaching wall.
      IB            SPED 1, SPED 1a                                              5'- 6" x 4'-0"        1    OP. Installed by Owner on Teaching Wall.
      SK            SPED 1a                                                                            1
      PTD           SPED 1a                                                                            1    Provide @ kitchenette sink area.
      SD            SPED 1a                                                                            1    Provide @ kitchenette sink area.
      STR           SPED 1a                                                                            1    Locate opposite to teaching wall.
      EH            SPED 1a                                                                            1
      REF           SPED 1a                                                    3'x31"x5'-8"            1    Locate opposite to teaching wall.
      CLK           SPED 1, SPED 1a, SPED 2                                                            1
      W/D           SPED 2                                                                             1
      CS            SPED 2                                                     3' w x 2' d             1    Locate adjacent to wall-hung lavatory. Mtg. height 18".
      TDD           SPED 2                                                                             1    Mounting height 4'-0" to slot.
      TH            SPED 2                                                                             1    Mounting height 2'-5" to center of roll.
      GB            SPED 2                                                                            1 pr. Floor mounted. Locate to either side of water closet.
      GB            SPED 2                                                                             1    Mounting height 2'-10".
      MI            SPED 2                                                        18" x 36"            1    Mounting height 6' - 2" to top
      SD            SPED 2                                                                             1    Mounting height 3' - 4" to top
      SC            SPED 2                                                                             1    Mounting height 5'-0".
      SS            SPED 2                                                                             1    Mounting height 18" inside shower.
      TEL           SPED 1a                                                                            1    OP
      CMP           SPED 1, SPED 1 a, SPED 4                                                                OP - Refer to Instructional Technology requirements.



DeKalb County School District                                                    29 of 121                                                                February 15, 2013 v1.1
      MB - Marker Board                                           88    TDD -Towel Dispenser Disposal            W/D - Washer, Dryer (stackable)
      TB - Tack Board                                            100    TH - Toilet Tissue Dispenser             REF - Refrigerator w/ice maker ??
      IB - Interactive Board (NIC)                               124    GB - Grab Bars (ambulatory)              SC - Curtain Rod & Shower Curtain
      OP - Owner Provided                                        125    CMP - Computers (student)                C/BKT - Component Bracket (wall mtd)
      WR - Waste Receptacles         SK - Sink                          CLK - Electronic Wall Clock              EH - Exhaust Hood
      TEL - Telephone                                                   SD - Soap Dispenser                      PTD - Paper Towel Dispenser
                                     OPS - Overhead Projector Shelf
                                                                            Finishes
      Walls:      a All spaces       Provide paint finish. Refer to Design Guidelines for sheen. Water base, zero VOC paints are preferred.
                  b All spaces       All walls to extend to underside of deck. Walls to be constructed of CMU.




DeKalb County School District                                             30 of 121                                                      February 15, 2013 v1.1
      Floors:      a SPED 1a, 3             Provide vinyl composition tile w/ 4" rubber base.
                   b SPED 1a                Provide vct in kitchenette portion of classroom only.
                   c SPED 1a, 1             Provide carpet w/ rubbber base in classrooms.
                   d SPED 2                 Provide ceramic tile (CT) w/ ceramic base

      Ceilings:    a Provide 2x2 standard acoustical ceiling tile in all spaces.
                   b Provide 2x4 fluorescent fixtures in all spaces.
                   c Provide minimum 9'-0" ceiling height in SPEC 3, SPED 2.
                   d Provide minimum 10'-0" ceiling height in all other spaces.

      Counters: a SPED 1a

      Stations:    a Flat Black Epoxy countertops at student and teacher demo station
                                                                                   Casework
      Space No.         Room Name                       Unit Type                  Unit Length      Qty   Size (wxdxh) Notes
      SPED 1          Suite CR              Teachers Cabinet (lockable)                             1           3'x2'x7'    Locate opposite exterior wall
                                            Storage Cabinet (lockable)                              1           3'x2'x7'    Locate at window wall
                                            Cubbies                                   8 LF          4         13"x12"x12"   Locate at window wall
                                            Book Case                                               1         30"x12"x30"   Locate at window wall adj. to cubbies.
      SPED 1a         Suite CR              Teachers Cabinet (lockable)                             1           3'x2'x7'    Locate at window wall
                                            Storage Cabinet (lockable)                              2           3'x2'x7'    Locate opposite exterior wall
                                            Cubbies (12" deep?) *                     8 LF          14        13"x12"x12"   Locate at window wall. Double stack.
                                            Book Case                                               1         30"x12"x30"   Locate at window wall adj. to cubbies.


                                            Upper Cabinet                            16 LF          6                       Provide cut-out for contractor furnished
                                            Work Counter                             13 LF                                  stove-top and refrigerator.
                                            Base Cabinet                             13 LF          4
                                            Base Cabinet                                            1                       w/ double bowl sink


      SPED 4         Classroom              Teachers Cabinet (lockable)                             1           3'x2'x7'    Locate opposite exterior wall
                                            Storage Cabinet (lockable)                              1           3'x2'x7'
                                            Book Cases                                              6         36"x12"x30"
      SPED 2         Toilet (shared)        Work Table (Freestanding)                               1
                                                                                                                            Provide a freestanding work table to support a
                                                                                                                            sitting person. Provide washer/dryer.

                                            Adjustable Shelves                        9 LF          3          3'w x 2'd
                     * Cubbie Openings 13" w x 12"d x 12"h
                     * All casework plastic laminate unless otherwise noted.
                                                                                     Utilities
      Electrical     Location               Lighting & Communications
      Power:         SPED 1, 1a, 4          Provide receptacle for clock.
                     SPED 3 - Office        Provide one (1) duplex receptacle, one (1) quadraplex receptacle, one (1) data outlet adjacent to desk; duplicate on wall
                                            opposite desk.

                     Classroom Computer Area:
                     SPED 4                 Provide three (3) quadraplex receptacles, and two (2) data outlets @ ____ " AFF.
                     Teaching Wall:
      Intercom:      SPED 1, 1a, 4, 3       Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.
      Data:          SPED 1, 1a, 4          Provide receptacle and voice/data outlet for Interactive Board.
                     SPED 3 - Office        Provide two (2) data outlets.
      DVD:           SPED 1, 1a, 4          Provide receptacle and TV/RGB outlet for DVD Player.


DeKalb County School District                                                      31 of 121                                                        February 15, 2013 v1.1
      TV:              SPED 1, 1a, 4        Provide one (1) television outlet.
      Projector:       SPED 1,1a,4,3        Provide ceiling mounted receptacle and data outlet for projector.


      Other:           SPEC ED              Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                       SPEC ED              Technology Infrastructure: Reference Instructional Technology requirements.


      *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
                                                                                   Plumbing
                   1   SPED 2               Provide one (1) ADA shower, one (1) single sink.
                   2   SPED 2
                                            Adaptive Toilet: Provide adaptive sink, grab bar, wheelchair accessible shower, changing station, shelves on wall.

                   3   SPED 1a              Provide one (1) double bowl sink.
                                                                                     HVAC
                   1   General              Refer to Design Guidelines for system requirements.
                   2   SPED 1a              Provide exhaust hood over cooking area equipment.
                                                                                  Acoustics
                   1                        Classrooms and other core learining spaces must achieve minimum STC rating of 35.
                   2                        Refer to Design Guidelines for system requirements.
                                                                                 General Notes
                   1   Refer to Design Guidelines for hardware.
                   2   Interactive (Smart) Board placement to be coordinated with light fixtures and manufacturers requirements. Contractor to provide wiring per
                       electrical drawings and secure to structure as required.
                   3   Provide exterior window for each classroom, where possible.

                   4   SPED 3: Provide interior window in Office, adjacent to Spec Ed Suite Classrooms SPED 1a and SPED 1.
                   5   Interactive Board / Components (Shelf, Projector etc.): Provided and installed by Owner. GC to provide power and data as required for operation
                       of Interactive Board.
                   6   Computers / Computer Desks: Provided and installed by Owner. GC to provide power and data as required for operation of computers and
                       computer equipment per Instructional Technology requirements.




DeKalb County School District                                                     32 of 121                                                       February 15, 2013 v1.1
                                                                     Section 09 - AUDITORIUM

                                                                             General Description

  The Auditorium is a multi-purpose instructional space shared by the entire school and community; suitable for performing arts instruction, performances in music, dance and
  drama. This space must provide adequated seating for school and community assemblies, large classes and musical/theatrical production. Proper lighting, sound and
  acoustic treatments should be incorporated into the design. The Auditorium should support flexible scheduling allowing for large and small groups rehearsing, performing,
  listening and viewing. The use of the Auditorium provides students with opportunities to apply skills needed for the management of various performing arts formats and
  technologies such as directing, producing, stage management and operation of theatre lights and sound. Key Adjacency: Locate on the ground level in close proximity to a
  main entrance. Locate near the Music Suite and the Drama department.


  Auditorium Seating Capacity: 600 seats, plus required wheelchair spaces per ADA.
                                                                                Activity / Space
  Space No.                                 Room Name                                         NSF           Qty         TSF                               Adjacency
  AUD 1            Auditorium:
  AUD 1 a          Auditorium & Pit                                                                 6000     1              6000                           AUD 9 a
  AUD 1 b          Auditorium Entrance Vestibules                                                       0    2                  0                          AUD 1 a
  AUD 1 c          Auditorium Spiral Access Stair Room                                                  0    1                  0                          AUD 1 a
  AUD 1 d          Suspended Catwalk                                                                    0    1                  0                          AUD 1 a
  AUD 2            Costume Room                                                                       250    1                250                           AUD 4
  AUD 3            Storage Room                                                                       200    1                200                           AUD 4
  AUD 4            Stage                                                                            1700     1              1700                       AUD 1 a, AUD 5
  AUD 5            Scene Shop & Storage                                                             1000     1              1000           AUD 4 / w/ direct access to outdoors
  AUD 6            Dressing Room (Boy's & Girl's)                                                     250    2                500                           AUD 4
  AUD 7            Toilet Room (single toilet)                                                         70    1                 70                           AUD 6
  AUD 8            Mechanical Mezzanine:
  AUD 8 a          Auditorium Control Room                                                            200    1                200             AUD 1a / @ rear of auditorium
  AUD 8 b          Dim Panel Room                                                                       0    1                  0                      Enter via AUD 8a
  AUD 9            Auditorium / Gym Support Spaces (shared):
  AUD 9 a          Lobby (Hall of Fame) / Corridor                                                      0    1                  0                          AUD 1b
  AUD 9 b          Concessions                                                                        300    1                300                      AUD 1b, AUD 9a
  AUD 9 c          Concession Storage Closet (internal to Concessions)                                 50    1                 50                  Enter via 9b, Concessions
  AUD 9 d          Ticketing                                                                          150    1                150                      AUD 1b, AUD 9a
  AUD 9 e          Womens Toilet ( 6 regular stalls / 1 ADA stall)                                    420    1                420                      AUD 1b, AUD 9a
  AUD 9 f          Mens Toilet ( 2 stalls, 4 urinals, 1 ADA stall)                                    420    1                420                      AUD 1b, AUD 9a
  AUD 9 g          IDF Room                                                                             0    1                  0
                                                                                         Total Area SF                     11260


                                                                                   Equipment
  The following items are to be specified in the base contract unless noted otherwise.
  Item             Room Location                                                         Size (WxH)         #/RM
  AWP              AUD 1a                                                                    Varies                Locate at rear of Auditorium.
  AC               AUD 1a                                                                    Varies                (See Finishes section below)
  CW               AUD 1a                                                                    Varies          1     (See General Notes section below)
  AS               AUD 1a                                                                                   600    Auditorium Seating Total
  SHD              AUD 4                                                                                     3     Provide smoke hatch doors
  FE               AUD 1a                                                                                    2     Locate fire extinguisher cabinets on side walls.
  HCL              AUD 1a                                                                                    1




DeKalb County School District                                                      33 of 121                                                             February 15, 2013 v1.1
  DRL                 AUD 6                                                                             5     Provide lockers as part of locker manufacturers package.
  CD                  AUD 5                                                                             1
  CD                  AUD 4                                                                             1
  MD                  AUD 9 b, AUD 9 d
  STR                 AUD 1c                                                                            1     Provide pre-manufactured steel spiral stair w/locking gate.
  TDD                 AUD 7                                                                             1
  TH                  AUD 7
  GB                  AUD 7
  MI                  AUD 7                                                              18" x 36"      1
  WR                  AUD 7                                                                             1     OP
  MI                  AUD 6                                                             60" x 36"       2
  MI                  AUD 9e, 9f                                                        48" x 36 "      2
  SK                  AUD 6, AUD 9b                                                                     1
  WMP                 AUD 1a                                                                            1     Mount at rear wall of Auditorium.
  RP                  AUD 1a                                                                            1     Provide dropdown projection device mounted to structure.
  PS                  AUD 4                                                                                   Locate at midpoint of stage.
  REF                 AUD 9 b                                                                           1
  IM                  AUD 9 b                                                                           1     OP. Provided by 3rd party.
  DDF                 AUD 9 a                                                                           1
  REF                 AUD 9 b                                                                           1
  MS                  AUD 3, AUD 5, AUD 9 c
  CLK                 AUD 9 a
  REF - Refrigerator w/ice maker              DDF - Dual Drinking Fountain          AS - Auditorium Seating                     AWP - Acoustical Wall Panels
  STR - Spiral Stair                          MI - Mirrors                          CD - Overhead Coiling Door                  AC - Acoustical Clouds
  CW - Suspended Catwalk                      TH - Toilet Tissue Dispenser          MD - Motorized Door                         HCL - Handicapped Chair Lift
  SHD- Smoke Hatch Doors                      MI - Mirrors                          IM - Ice Machine                            TDD -Towel Dispenser
  RP - Clg. Mtd. Retractable Projector        GB - Grab Bars                        REF - Refrigerator w/ice maker              MS - Metal Shelving
  WMP - Wall Mounted Projector                SK - Sink                             WR - Waste Receptacles                      CLK - Electronic Wall Clock
  PS - Projection Screen                      FE - Fire Extinguisher                SD - Soap Dispenser                         PTD - Paper Towel Dispenser
                                                                                   Finishes
  Walls:            a All Spaces                Provide paint finish. Refer to Design Guidelines for sheen. Water base, zero VOC paints are preferred.
                    b AUD 1a                    Painted GWB
                    c AUD 1a                    Stain Grade Paneling w/ reveals.
  Floors:       a AUD 1a                        Heavy Duty Rubber Flooring                                    Provide at upper & lower seating areas
                b AUD 1a                        Carpet                                                        Provide at Auditorium aisles
                c AUD 1b                        Carpet                                                        Provide at auditorium entrance vestibules
                d AUD 8a                        Carpet                                                        Media Booth
                e AUD 4                         Black painted masonite.                                       Provide at stage platform
                f AUD 5, 1c, 3, 8a, 8c          Sealed Concrete                                               Provide at Scene shop
                g AUD 2, 6, 9b, 9c, 9d, 9g      Provide vinyl composition tile (VCT).
                h AUD 9e, 9f, AUD 7             Provide ceramic tile (CT) w/ ceramic base *
                i     AUD 9a                    Epoxy Terrazzo

  Base:         a All spaces *                  Provide rubber base all spaces, with exception of ceramic tiled areas.

  Ceilings:     a All Spaces:                   Provide 2x2 standard acoustical ceiling tile (ACT) in all spaces except those listed below.
                b AUD 1a, AUD 4                 Open to structure.




DeKalb County School District                                                    34 of 121                                                        February 15, 2013 v1.1
               c AUD 1a                 Provide gypsum board acoustical clouds at ceiling plane, mounted to structure.
                                                                          Casework
  Space No.              Room Name                  Unit Type                 Unit Length      Qty     Size (wxdxh)     Notes
  AUD 5          Stage                  Wood Nosing                                           200 sf                    Provide rounded wood nosing at front edge of
                                                                                                                        stage.

  AUD 1a         Auditorium             Wood Cap                                                                        Provide at top of Auditoriium wall, at upper level
                                                                                                                        seating areas.

  AUD 1a         Auditorium             Acoustical Wall Panels                                                          Locate at rear wall of Auditorium.


  AUD 6          Dressing               Wall 1:
                                        Counter Top                                11 LF                                 w/ single bowl sink.
                                        Base Cabinet                               9 LF
                                        Wall 2:
                                        Counter Top (open beneath)                 25 LF
  AUD 1b         Vestibule              Display Cases                                           2                       Provide display cases per vestibule.


  AUD 9 b        Concessions            Wall 1:
                                        Upper Cabinet                              13 LF
                                        Work Counter                                                                    Leave space for refrigerator.
                                        Base Cabinet                               10 LF                                w/ single bowl sink
                                        Wall 2:
                                        Upper Cabinet                              10 LF
                                        Work Counter
                                        Base Cabinet
                                        Wall 3:
                                        Base Cabinet                               18 LF                                Provide built in counter top w/base cabinets @
                                                                                                                        motorized door.
                                        Wall 4:
                                        Built-in shelves (3 tier)                  15 LF        3                       Provide base cabinets w/ built-in wall mounted
                                                                                                                        shelves ( 5' long) above.
                                        Base Cabinet                                3 LF
  AUD 9 d        Ticketing              Upper Cabinet                              23 LF                                Provide plastic laminate countertop w/ base &
                                                                                                                        wall cabinets.

                                        Base Cabinet                               23 LF
                                        Work Counter                               10 LF                                Provide built in counter top w/base cabinets @
                                                                                                                        motorized door.

                                        Base Cabinet                               4 LF


  AUD 9 a        Lobby (Hall of Fame)   Lighted Trophy Cases                                    10                      Corridor
  AUD 1a         Auditorium             Stain Grade Wood Paneling
                                                                           Utilities
  Electrical     Location               Lighting & Communications
  Power:         AUD 9d                 Install raise/lower switch furnished with motor operated door. Provide safety disconnect switch for motor if not provided integral
                                        w/ equipment.


                 AUD 9a, Hall of        Provide junction box with cover for connection to bleachers by supplier. Install bleacher controller and fuse panel on corridor
                 Fame/Corridor          side of partition.
                 AUD 1d                 Mount electrical receptacles to catwalk.
                 AUD 8b                 Provide Dimming panel HDP, EMER transfer system panel, Dimming panel TDP, XFMR T-TDP.
                 AUD 1a, AUD 5          Provide junction box and raceway for alarm motion detectors.



DeKalb County School District                                            35 of 121                                                         February 15, 2013 v1.1
                   AUD 5                          Provide keyed up/down switch for operation of motorized projector device.
                   AUD 1a, AUD 4                  Provide annunciation devices (speaker/strobe)w/ wire guards at walls of stage.
                   AUD 5, AUD 9d                  Install raise/lower switch furnished with motor operated door and connect as directed by equipment supplier. Provide safety
                                                  disconnect switch for motor if not provided integral with equipment.

                   AUD 9g                         Provide sleeves w/bushings stubbed into corridor, above ceiling. Provide painted fire rated plywood backboard.
                   AUD 1a, AUD 9a                 Provide receptacle for clock.
  Intercom:        AUD 4                          Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.

  Data:            AUD 9b                         Provide receptacle and voice/data outlet above counter.
  Lighting         AUD 6                          Provide vanity light fixture above counter. Mount above mirror in dressing room.
                   AUD 1a                         Provide surface mounted stair lights (Linear Strip fixture) at side walls adj. to stairway, @ upper level seating area.


                   AUD 1a                         Provide pendant fixtures @ lower level seating area.
                   AUD 1a                         Auditorium: Coordinate construction of acoustical gypsum board "clouds" with placement of theatrical lighting systems.


                   AUD 3, 4, 5, 1a                Provide surface mounted fluorescent fixtures.
                   AUD 4, AUD 1d                  Provide theatrical fixtures.
                   AUD 8b                         Provide transformers and circuit breaker boxes to serve specified auditorium fixtures, in Dim Panel Room.
                   AUD 8a                         Provide toggle switch to control LED fixtures.
                   AUD 8a                         Provide dimming system master control switch.


  Other:           AUDITORIUM                     Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                   AUDITORIUM                     Technology Infrastructure: Reference to Instructional Technology requirements.
  *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
                                                                                    Plumbing
              1    AUD 6, AUD 9b                  Provide single bowl sink
              2    AUD 9b                         Provide concession sink
              3    AUD 9e, 9f                     Provide toilet accessories as required.
                                                                                       HVAC
              1    AUD 1a                         Paint auditorium return air grille to match adjacent Auditorium wall.
              2    AUD 4                          Provide roof mounted smoke hatch doors over stage.
              3    AUD 9a                         Provide mechanical mezzanine above main corridor.
              4    All Spaces                     Provide limited-range temperature control.
              5    General                        Refer to Design Guidelines for system requirements.
                                                                                    Acoustics
              1    AUD 1a                         Provide acoustical wall panels.
              2    AUD 1a                         Provide acoustical cloud panels (suspended) at Auditorium ceiling.
                                                                                 General Notes
              1    Auditorium: Provide motorized drop down projection device.
              2    Auditorium: Provide windows in media booth, located at rear wall of Auditorium.
              3    Casework: Provide above counter GFCI outlets, at AUD 7, dressing rooms.
              4    Scene Shop: Provide one (1) overhead coiling door at building exterior.
              5    Stage: Provide one (1) overhead coiling door between Stage and Scene Shop.
              6    Stage: Provide depressed stage to receive painted MDF flooring.
              7    Auditorium: Coordinate construction of acoustical gypsum board "clouds" with placement of theatrical lighting systems.
              8    Catwalk: Suspend catwalk from structure. Provide attachment for theatrical lighting welded to structural "T". Coordinate w/ theatre consultant.
              9    Media Booth: Provide min. 10'-0" width for projector slot.




DeKalb County School District                                                       36 of 121                                                         February 15, 2013 v1.1
                                                                  Section 10 - ADMINISTRATION

                                                                             General Description
   The Administrative Suite provides support to the instructional program, assistance to teachers, staff and students, and serves as an information and public relations center
   to the community. It is the main welcome/administrative center for parents, community, and visitors. The reception/guest waiting area is the sole sign-in security check point
   for all visitors. Highly accessed Administrative functions such as the highly as the Clinic and Attendance office may be located near the core Administrative Suite, with direct
   corridor access to assist with the control of student traffic to and from these areas. Key Adjacency: Locate at Main Entrance of school with full view of building front.

                                                                                 Activity / Space
   Space No.                                   Room Name                                     NSF         Qty         TSF                             Adjacency
                    MAIN ADMINISTRATION SUITE (1st floor-Main Entry)
   ADM 1            Reception Lobby                                              10                600      1              600
   ADM 2            Principal's Office (incl./ clos                              14                330      1              330              Provide 2 exit routes / ADM 3
   ADM 2 a          Closet                                                                          20      1               20                         ADM 2
   ADM 2 b          Toilet                                                                          50      1               50                         ADM 2
   ADM 3            Conference Room                                              19                420      1              420
   ADM 4            Attendance Office                                            21                150      1              150           ADM 7 w/ direct access to corridor
   ADM 5            Book Keeper Office                                                             150      1              150
   ADM 6            Vault/Records Rm.                                                              150      1              150                         ADM 5
   ADM 7            Clinic                                                       29                250      1              250           ADM 4 w/ direct access to corridor
   ADM 7 a          Toilet (internal to Clinic)                                  33                 50      1               50                         ADM 7
   ADM 8            Toilet Rooms (Staff)                                                            50      2              100             ADM 9 w/ access from lounge
   ADM 9            Lounge                                                                         200      1              200
   ADM 10           Mail Room                                                                      250      1              250                        ADM 11
   ADM 11           Workroom                                                     38                250      1              250
   ADM 12           Intercom Equipment Alcove                                                        0      1                0          Locate on staff side of reception desk
   ADM 13           Admin Suite Corridor (internal circulation)                                      0      1                0
   ADM 17           Testing Room                                                                   385      1              385
   ADM 18              Test Storage                                              42                100      1              100
   ADM 19              Data Room                                                 45                145      1              145
                                                                                       Suite Subtotal                    3600
                    WORKROOMS: (Provide 1 per floor)
   ADM 14           Faculty Workroom                                            50                 450      5            2250
   ADM 14 a         Toilet (internal to Workroom                                 55                 50      10             500              Two (2) toilets per workroom
                                                                                       Workroom Subtotal                 2750
   ADM 15           SATELLITE ADMINISTRATION SUITES: (Provide 1 per floor)
   ADM 15 a         Assistant Principal Office                                                     150      3              450
   ADM 15 b         Administrative Assistant Office                                                150      3              450
   ADM 15 c         Conference Room                                             63                 350      3            1050
                                                                                       Satellite Subtotal                1950
                    MISCELLANEOUS OFFICES:
   ADM 16           Coach Office (Soccer)                                                          150      1              150
                    Plant Engineer Office                                                          150      1              150        Locate adjacent to Main Mechanical Rm.
                    Security Resource Officer (SR                               79                 150      1              150                 Locate adjacent to exit.
                    Asst. Principal Office (2nd fl.)                                               150      1              150
                    Office (Golf & Tennis)                                                         150      1              150
                                                                                       Total Area SF                     9050
   Note: See Section 13 for IT Office (CTSS), BS 13



DeKalb County School District                                                       37 of 121                                                        February 15, 2013 v1.1
                                                                                     Equipment
   The following items are to be specified in the ba                              100
   Item              Room Location                                              124      Size (WxH)        #/RM
   TB                ADM 14                                                     125           4' x 4'        2
   TB                ADM 1, ADM 2, ADM 4, ADM 5, ADM 7, ADM 10                                4' x 4'        1
   TB                ADM 1, ADM 11                                                            8' x 4'        1
   MB                ADM 3, ADM 4, ADM 10                                                     4' x 4'        1
   MB                ADM 11                                                                   8' x 4'        1
   IB                ADM 3                                                                                   1    OP. Installed by Owner on Teaching Wall.
   C/BKT             ADM 1                                                                                   ?
   REF               ADM 9                                                                                   1    Full size refrigerator.
   IE                ADM 12                                                                                  1    OP
   TCC               ADM 1                                                                                   1    OP
   PM                ADM 1                                                                                   2    OP
   SM                ADM 1                                                                                   2
   SM                ADM 2                                                                                   1
   VM                ADM 9                                                                                   2    OP
   DS                ADM 6                                                                                   1
   CLK               ADM 1                                                                                   1
   ITEL              ADM 1, ADM 2                                                                            1    OP
   FEC               ADM 13                                                                                  1
   CMP               ADM 1, 7, 9, 10, 11, 14, All Offices                                                         OP - refer to Instructional Technology requirements
   CP                ADM 11                                                                                  2    OP
   AMD               ADM 1
   PTD               ADM 7, ADM 9, ADM 11
   SD                ADM 7, ADM 9, ADM 11
   MB - Marker Board                                IE - Intercom Equipment              DS - Drop Safe                              REF - Refrigerator w/ice maker
   TB - Tack Board                                  SM - Surveillance Monitor            TCC - Time Control Clock                    VM - Vending Machines
   SC - Storage Cabinet                             FEC - Fire Extinguisher Cab.         ITEL - Intercom Telephone                   CMP - Computers (Admin.)
   OPS - Overhead Projector Shelf                   CLK - Electronic Wall Clock          AMD - Alarm Motion Detector                 C/BKT-Component Bracket (wall mtd)
   IB - Interactive Board                           TEL -Telephone                       OP - Owner Provided                         TV/Bkt - Wall Mounted TV Bracket
                                                    CP - Copier (floor model)            PM - Plasma Screen Monitor                  Video/Bkt-Recorder bracket (wall mtd.)
                                                                                         SD - Soap Dispenser                         PTD - Paper Towel Dispenser
                                                                                        Finishes
   Walls:         a All Spaces                      Provide paint finish. Refer to Design Guidelines for sheen. Water base, zero VOC paints are preferred.


   Floors:        a All Spaces                      Provide carpet w/ rubbber base in all spaces w/the exception of the following.
                  b ADM 7, 9, 11, 13                Provide vinyl composition tile (VCT), w/ 4" rubber base.
                  c ADM 2b, ADM 7a, ADM 8,          Provide ceramic tile (CT) w/ ceramic base. *

   Ceilings:     a All Spaces:                      Provide 2x2 standard acoustical ceiling tile in all spaces.
                 b All Spaces:                      Provide 2x4 fluorescent fixtures in all spaces.
                                                                                        Casework
   Space No.                 Room Name                                                     Unit Length      Qty     Size (wxdxh) Notes
   ADM 1             Reception Lobby                Work Counter                              22 LF                                  Work Counter w/ solid surface top shelf, L-
                                                                                                                                     shaped w/ lockable base cabinets. (Built-in
                                                                                                                                     reception desk w/ lower lockable cabinets.)


   ADM 2 a           Principal's Closet             Storage Cabinet (lockable)                               1         3'x2'x7'


DeKalb County School District                                                        38 of 121                                                         February 15, 2013 v1.1
   ADM 3        Conference Room            Base Cabinet, Work Counter               11 LF                                Provide built-in base cabinets w/ built-in
                                                                                                                         adjustable shelves above.

                                           Built-in Adjustable Shelves                            4         12" d
   ADM 4        Asst. Principal's Office   Storage Cabinets                                       2
   ADM 5        Book Keeper's Office       Built-in Storage Shelves                   8 LF                  12" d        Mounting Height to bottom of shelving, 4' - 6"
                                                                                                                         AFF. (Leave space for 4-drawer high, vertical file
                                                                                                                         below.)

   ADM 6        Vault/Records Rm.          Built-in Storage Shelves                 12 LF                   12" d        Mounting Height to bottom of shelving, 4' - 6"
                                                                                                                         AFF. (Leave space for 4-drawer high, vertical file
                                                                                                                         below.)

                                                                                      6 LF                  12" d        Provide 6 shelving units, approximately 3 W x 2
                                                                                                                         H openings per unit.

   ADM 7        Clinic                     Upper Cabinet                              8 LF
                                           Work Counter
                                           Base Cabinet                                                                  Provide single bowl sink
   ADM 9        Lounge                     Base Cabinet                               8 LF                               Provide single bowl sink. Leave open space for
                                                                                                                         refrigerator.
                                           Upper Cabinet                            11 LF
                                           Work Counter
   ADM 10       Mail Room                  Work Counter                             31 LF
                                           Base Cabinet                                                                  Provide double bowl sink.
                                           Built-in Shelving                        10 LF         3       27"x12"x30"    Provide shelving units above base cabinet.


                                           Mail Slots                                 8 LF                               Provide 150, (2-3/4"w x 6" h) vertical slot mail
                                                                                                                         boxes for faculty. Locate on top of base cabinet.


   ADM 11       Workroom                   Upper Cabinet                            18 LF
                                           Work Counter
                                           Base Cabinet                                                                  Provide single bowl sink
   ADM 12       Intercom Equip. Alcove     Upper Cabinet                              8 LF
                                           Base Cabinet
   ADM 14       Faculty Workroom           Upper Cabinet                            20 LF
                                           Work Counter
                                           Base Cabinet                                                                  Provide single bowl sink
   AUD 15 a     Asst. Principal Office     Storage Cabinet                                        1        3'x2'x7'
   AUD 15 b     Secretarial Suite          Storage Cabinet                                        1        3'x2'x7'
                                                                             Utilities
   Electrical   Location                   Lighting & Communications
   Power:       ADM 1                      Provide receptacle for clock.
                ADM 1                      Supply reception desk devices from wall mounted junction boxes.
                ADM 2                      Provide receptacle and TV/RGB outlet for DVD Player.
                ADM 2, 4, 5, 15a, 15b      Provide one (1) duplex receptacle, one (1) quadraplex receptacle, one (1) data outlet adjacent to desk; duplicate on wall
                                           opposite desk.

                ADM 9                      Provide power/data for one (1) computer.
                ADM 11                     Provide power for floor model copiers.
                ADM 12                     Intercom FAAP
                Teaching Wall:
                ADM 15a, 15b,              Provide two (2) quadraplex outlets, and one (1) data outlet.
   Intercom:                               Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.
                ADM 4, 5, 7, 9, 10, 11,


DeKalb County School District                                              39 of 121                                                         February 15, 2013 v1.1
                          , , , ,      ,    ,
                    15a, 15b
   Security:        ADM 1                          Provide junction box and raceway for alarm motion detectors.
   Telephone:       ADM 1, ADM 2                   Intercom Administrative Telephone. Coordinate exact location w/ intercom system.
   Data:            ADM 3, ADM 11                  Provide receptacle and voice/data outlet for Interactive Board.
                    ADM 2, 4, 5, 15a, 15b          Provide two (2) data outlets.
   Lighting:        ADM 1                          Provide pendant fixtures.
                    ADM 1                          Provide override control for time clock control, and lighting fixtures. Switch shall override automatic control for no more than 2
                                                   hours and the area being controlled shall be annunciated.



   Other:           ADMINISTRATION                 Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                    ADMINISTRATION                 Technology Infrastructure: Reference Instructional Technology requirements.


   *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
                                                                                     Plumbing
                1   ADM 7, 9, 11, 14               Provide single bowl sink
                2   ADM 10                         Provide double bowl sink
                                                                                       HVAC
                4   All Spaces                     Provide limited-range temperature control.
                5   General                        Refer to Design Guidelines for system requirements.
                                                                                    Acoustics
                1                                  Refer to Design Guidelines for system requirements.
                                                                                   General Notes
                1   Casework: Provide above counter GFCI outlets.
                2   Intercom Equipment Alcove: Location for Built-in Central PA System
                3   Reception-Surveillance Monitors: Mount above built-in book shelves
                4   Toilet Accessories: Provide standard accessories for single toilets. (Waste Receptacles NIC)
                5   Provide an alcove to house intercom equipment adjacent to and secured behind the reception desk.




DeKalb County School District                                                       40 of 121                                                         February 15, 2013 v1.1
                                                                        Section 11 - COUNSELING

                                                                                  General Description
    The Counseling suite provides guidance and counseling as an integral part of the instructional program designed to promote the social and emotional cognitive
    development of each student. Activities include, but are not limited to, individual, and small group counseling, crisis counseling, staff and parent conferences, staff
    development, and coordination of special school events. Key Adjacency: Centrally locate, in close proximity to the main corridor and main entrance to school. Locate
    adjacent to and separate from the Administrative Suite.

                                                                                    Activity / Space
    Space No.                                  Room Name                                     NSF             Qty         TSF                             Adjacency
    CSG 1          Counselor Lobby                                                                     500    1                500
    CSG 2          Head Counselor Office                                                               150    1                150
    CSG 3          Registrar Office                                                                    174    1                174
    CSG 4          Counselor Offices                                                                   174    2                348
    CSG 5          AP Office (Instruction)                                                             150    1                150                        CSG 12
    CSG 6          Vault / Records Room                                                                150    1                150
    CSG 7          Conference Room ( 10 person)                                                        350    1                350                         CSG 1
    CSG 7a         Closet                                                                               20    1                 20                         CSG 7
    CSG 8          Career Center                                                                       150    1                150                         CSG 1
    CSG 9          Toilet Room                                                                          50    1                 50
    CSG 10         Counseling Suite Corridor ( internal circulation)                                     0    1                  0
    CSG 11         Graduation Specialist Office                                                        150    1                150
    CSG 12         Testing Room (new addition)                                                           0    1                  0


                                                                                        Total Area SF                        2192


                                                                                      Equipment
    The following items are to be specified in the base contract unless noted otherwise.
    Item                                                                                Size (WxH)           #/RM
    TB             CSG 1, 2, 3, 4, 5, 8, 11      #                                           4' x 4'          1
    MB             CSG 2, 3, 4, 5, 7, 11         #                                           4' x 4'          1
    SM             CSG 2, CSG 3, CSG 4                                                                        16
                   CSG 7                         #                                                            1     OP
    CLK            CSG 1                         #                                                            1
    CP             CSG 10                        #                                                            1     OP
    VF             CSG 6                                                                 18"x27"x52"          16    OP
    CMP            CSG 1, 8, 12, All Offices                                                                        OP - refer to Instructional Technology requirements
    PTR            CSG 8                                                                                      1     OP
    PTD            CSG 7                         #                                                            1
    SD             CSG 7                         #                                                            1
    MB - Marker Board                                SM - Surveillance Monitors         CLK - Electronic Wall Clock                  VF - Vertical Files (4 dwr.)
    TB - Tack Board                                  OP - Owner Provided                CMP - Computers (Admin.)                     C/BKT-Component Bracket (wall mtd)
    IB - Interactive Board                           CP - Copier (floor model)          PTR - Printer                                OPS - Overhead Projector Shelf
                                                                                        SD - Soap Dispenser                          PTD - Paper Towel Dispenser
                                                                                       Finishes
    Walls:      a All Spaces:                        Provide paint finish. Refer to Design Guideline for sheen. Water base, low VOC paints are preferred.

    Floors:     a All Spaces:                      Provide carpet w/ rubbber base in all spaces with the exception of the following.
                b CSG 9                          # Provide ceramic tile (CT) w/ ceramic base. *
                                                 #


DeKalb County School District                                                         41 of 121                                                           February 15, 2013 v1.1
    Ceilings:   a All Spaces:              # Provide 2x2 standard acoustical ceiling tile (ACT) in all spaces.
                                                                                Casework
    Space No.             Unit Type        #                                        Unit Length     Qty     Size (wxdxh) Notes
    CSG 1         Base Cabinet, Work Counter                                           9 LF                              Work Counter w/ solid surface top shelf, L-
                                                                                                                         shaped w/ lockable base cabinets.

    CSG 3         Base Cabinet, Work Counter                                           9 LF                              Built-in base cabinets and counter top.
                                                                                                                         Built-in 12" deep shelving overhead
    CSG 6         Vault / Records Room                                                 26 LF                             Built-in 12" deep open shelving on 3 walls.




DeKalb County School District                                                  42 of 121                                                     February 15, 2013 v1.1
                                                                                                                                     Mounting Height to bottom of shelving, 4' - 6"
                                                                                                                                     AFF. (Leave space for 4-drawer high, Vertical
                                                                                                                                     file below.)

    CSG 7            Base Cabinet, Upper Cabinet, Work Counter                                  13 LF                                Provide double bowl sink.
    CSG 7a           Shelf and Coat Rod                                                          7 LF
    CSG 8            Base Cabinet, Upper Cabinet, Work Counter                                  19 LF                                Provide two (2) built-in upper cabinets on either
                                                                                                                                     side w/open bookshelves in between; on two
                                                                                                                                     walls of space.

                                                                                          Utilities
    Electrical       Location                        Lighting & Communications
    Power:           CSG 2, 3, 4, 5 - Office         Provide one (1) duplex receptacle, one (1) quadraplex receptacle, one (1) data outlet adjacent to desk; duplicate on wall
                                                     opposite desk.

                     Teaching Wall:
                     CSG 1                           Provide receptacle for clock.
                     CSG 1, 2, 3, 4, 5, 7, 11        Provide two (2) quadraplex outlets, and one (1) data outlet.
    Intercom:        CSG 1, 2, 3, 4, 5, 7, 11        Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.
    Data:            CSG 7 - Conference              Provide receptacle and voice/data outlet for Interactive Board.
                     CSG 2, 3, 4, 5, 11 - Office     Provide two (2) data outlets.
    TV:              CSG 2, 3, 4, 5, 11 - Office     Provide one (1) television outlet with one (1) duplex outlet, and one (1) data outlet.


    Other:           COUNSELING                      Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                     COUNSELING                      Technology Infrastructure: Reference Instructional Technology requirements.


    *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
                                                                                        Plumbing
                 1   Provide double bowl sink.
                                                                                            HVAC
                 1   All Spaces                    Provide limited-range temperature control.
                 2   General                       Refer to Design Guidelines for system requirements.
                                                                                        Acoustics
                 1                                 Refer to Design Guidelines for system requirements.
                                                                                     General Notes
                 1   Casework: Provide above counter GFCI outlets.
                 2   Toilet Accessories: Provide standard accessories for single toilets.




DeKalb County School District                                                          43 of 121                                                          February 15, 2013 v1.1
                                                               Section 12 - SCHOOL NUTRITION

                                                                            General Description
    The Nutrition program provides breakfast and lunch each day for students, teachers, administrators and visitors to the school. Multiple Lunch seatings occur between
    10:00 am to 1:00 pm to feed the school population. The Cafetorium also serves as the school auditorium/multi functional space; with a stage for presentations and other
    large school functions. (i.e. Recognition Honors and Awards programs, school stage productions, district/community meetings, open house curriculum nights.) Key
    Adjacency: Within close proximity to the Main entrance lobby of the school located on a major corridor. Note: Minimum space requirements to accommodate 1600 FTE
    (84 IU's) enrollment.

    Overall cafetorium student seating capacity = 1600 FTE / 3 periods
                                                                               Activity / Space
    Space No.                               Room Name                                      NSF          Qty        TSF                              Adjacency
                  Kitchen Area:
    KIT 1         Preparation Kitchen                                                      1600           1            1600
    KIT 2         Cooler (walk-in)                                                          200           1              200
    KIT 3         Freezer (walk-in)                                                         400           1              400                           KIT 2
    KIT 4         Dry Storage                                                               500           1              500                           KIT 3
    KIT 5         Office                                                                    150           1              150                           KIT 1
    KIT 6         Staff Area:
    KIT 6 a       Locker / Laundry Room                                                     150           1              150
    KIT 6 b       Toilet                                                                    50            1               50                          KIT 6 b
    KIT 7         Servery                                                                  1200           1            1200                           KIT 1
    KIT 8         Dish Wash                                                                 350           1              350                       KIT 1, CAF 1
    KIT 9         Can Wash Room (exterior )                                                 60            1               60
                                                                                     Kitchen Subtotal                  4660
                  Cafeteria:
    CAF 1         Cafeteria (Student Dining)                                               7800           1            7800                            KIT 7
    CAF 2         Storage (Table & Chair)                                                   100           2              200                          CAF 1
    CAF 3         Vending Area                                                               0            1                  0                        CAF 1
                                                                                     Cafeteria Subtotal                8000


                                                                                     Total Area SF                    12660



    The following items are to be specified in the base contract unless noted otherwise.
    Item          Room Location                                                      Size (wxdxh)    #/RM
    TB            KIT 5                                                                    4' x 4'        1   (See Casework Section below)
    CLK           CAF 1                                                                                   3   Double face.
    PS            CAF 1                                                                                   1   Provide recessed pocket.
    OPS           CAF 1                                                                                   1
    C/BKT         CAF 1                                                                                   1
    BCH           KIT 6 a                                                                                     (See Casework Section below)
    SL            KIT 6 a                                                            12"x36"x12"          7   Staff Lockers - 2 tier
    MP            CAF 1                                                                                   1
    DRB           KIT 1                                                                                       Locate at entry door to Kitchen. (exterior)
    MD            KIT 7
    CMR           KIT 1                                                                                       Locate at entry to Cafeteria
    CST           KIT 7                                                              28"x28"x36"          6
    VM            CAF 3                                                                                   5   OP



DeKalb County School District                                                     44 of 121                                                          February 15, 2013 v1.1
    DDF      CAF 1                          1
    ACU      KIT 1                          1   Locate at entry door to Kitchen. (exterior)
    ACU      KIT 2, KIT 3                   1   Locate at entry doors to cooler and freezer.
    HSK      KIT 7                          2
    HSK      KIT 1, KIT 8                   1
    HSK      KIT 8                          1




DeKalb County School District   45 of 121                                              February 15, 2013 v1.1
    FSK            KIT 1                                                                 138"x30"x35"       2    Locate at vegetable prep table
    FSK            KIT 1                                                                  72"x24"x35"       1    Locate at prep table
    FSK            KIT 1                                                                 72"x30"x35"        1    Locate at prep table
    PSK            KIT 8                                                                 167"x30"x35"       3
    FEC            KIT 7, CAF 1                                                                             1
    FE             CAF 1                                                                                    2
    EH             KIT 1                                                                                    1
    CH             KIT 8                                                                                    1
    MS             KIT 2                                                                                    14   Provide walk-in shelving units as specified.
    MS             KIT 3                                                                                    18   Provide walk-in shelving units as specified.
    MS             KIT 4                                                                                    24   Provide storage shelving units.
    CR             KIT 4                                                                                    1    As specified.
    DR             KIT 4                                                                                    1    As specified.
    W/D            KIT 6a                                                                                  Set
    IM             KIT 1                                                                 30"x33"x76"        1
    HRL            KIT 7                                                                                         As specified.
    HR             KIT 1                                                                                    1
    CMP            KIT 5                                                                                         OP - Refer to Instructional Technology requirements
    TB - Tack Board                               CMR -Security Camera                   FSK - Floor Sink                          HRL - Hand Railing
    SL - Staff Lockers                            CST - Cashier Stand                    PSK - Pot & Pan Floor Sink                HR - Hose Reel
    BCH - Bench (Locker Rm.)                      VM - Vending Machines                  HSK - Hand Sink                           CLK - Electronic Wall Clock
    W/D - Washer, Dryer                           DRB - Door Bell                        EH - Exhaust Hood                         DDF - Dual Drinking Fountain
    IM - Ice Maker w/ bin                         FE - Fire Extinguisher                 CH - Condensate Hood                      OPS - Overhead Projector Shelf
    MD - Motorized Door                           DR - Dunnage Rack                      CR - Can Rack                             C/BKT-Component Bracket (wall mtd)
    ACU - Air curtain, unheated                   MS - Metal Shelving                    FEC - Fire Extinguisher Cabinet           PS - Motorized Projection Screen
                                                  OP - Owner Provided                    CMP - Computers (Admin.)                  MP- Motorized Projection (Drop Down)
    * Reference Design Guidelines for complete list of Preparation Kitchen, Servery and Dishwash equipment.
    * Reference Design Guidelines for complete list of toilet and laundry accessories.
    * Provide all necessary utilities for equipment listed above and in Design Guidelines.
                                                                                     Finishes
    Walls:       a All Spaces                     Provide paint finish. Refer to Design Guideline for sheen. Water base, low VOC paints are preferred.
                 b All spaces                     All walls to extend to underside of deck. Walls to be constructed of CMU.
    Floors:      a KIT 1, 4, 5, 6a, 7, 8          Provide quarry tile.
                 b KIT 2, KIT 3, KIT 9            Sealed Concrete w/ rubber base.
                 c KIT 6b,                        Provide ceramic tile (CT) w/ ceramic base.
                 d CAF 1,2,3                      Provide vinyl composition tile (VCT), w/ rubber base.

    Ceilings:    a All Spaces:                    Provide 2x2 standard acoustical ceiling tile (ACT) in all spaces, w/ exceptions listed below.
                 b CAF 2                          Open to structure (OTS) - storage closets. Provide fluorescent strip lighting suspended from structure.
                 c CAF 1                          Open to stucture (OTS) w/combination gypsum board soffit @ perimeter of space w/ can lighting.
                                                                                    Casework
    Space No.                Room Name                        Unit Type                   Unit Length     Qty      Size (wxdxh) Notes
    KIT 6a         Locker / Laundry Rm.           Bench                                                     2


                                                                                      Utilities
    Electrical     Location                       Lighting & Communications
    Power          CAF 1                          Provide receptacle for clock.
                   KIT 1, CAF 1                   Provide junction box and raceway for alarm motion detectors at kitchen side of entry door.
                   KIT 1                          Provide doorbell system for kitchen area.


DeKalb County School District                                                      46 of 121                                                            February 15, 2013 v1.1
             KIT 5              Provide one (1) duplex power outlet, and one (1) voice data outlet at each desk area.




DeKalb County School District                                   47 of 121                                               February 15, 2013 v1.1
                     KIT 7                        Install raise/lower switch furnished with motor operated door and connect as directed by equipment supplier. Provide safety
                                                  disconnect switch for motor if not provided integral w/equipment.

                     Front of Cafeteria:
    Projector:       CAF 1                        Provide ceiling mounted receptacle and data outlet for projector.
                     CAF 1                        Provide keyed up/down switch for operation of motorized projector screen.
                     CAF 1                        Provide two (2) quadraplex receptacles, and two (2) data outlets for presentation purposes.
    Cashier:         KIT 1                        Provide dual channel power pole to house both power and communications cabling.
    Intercom:        KIT 7, KIT 8                 Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system
                     CAF 1                        Provide annunciation devices (speaker/strobe)
    Data:            By Space:                    See utilities as listed by space.
    Lighting:        All Spaces:                  Provide 2x4 recessed fluorescent lights in all spaces with exceptions listed below.
                     CAF 1                        Provide linear fluorescent strip fixtures.
                     CAF 1                        Provide recessed lighting.
                     CAF 2                        Provide 4' fluorescent strip fixture w/ wire guard.
    Security:        KIT 1 - Entries              Provide security cameras.
    DVD:             PE 6b                        Provide receptacle and TV/RGB outlet for DVD Player.
    TV:                                           Provide one (1) television outlet


    Other:           NUTRITION                    Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                     NUTRITION                    Technology Infrastructure: Reference Instructional Technology requirements.


    *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
                                                                                       Plumbing
                 1   KIT 1, KIT 7, KIT 8          Provide hand sinks, wall mounted. (1 of 2 hand sinks in KIT 1, to be ADA.)
                 2   KIT 1                        Provide floor sink at vegetable prep table.
                 3   KIT 1                        Provide prep table with sink.
                 4   KIT 8                        Provide pot & pan sink.
                 5   KIT 9                        Provide freeze proof mixing faucet with hot and cold water, hose outlet and floor drain.
                 6   KIT 1                        Provide floor drain near ice dispenser
                 7   KIT 1                        Provide hose reel w/spray.
                 8   KIT 1 (cooking area)         Provide one (1) floor drain each at the kettle and skillet equipment cooking areas.
                 9   KIT 1 (cooking area)         Provide one (1) hub drain at kettle assembly area .
             10      KIT 1 (cooking area)         Provide one (1) hub drain at gas convection steamer.
                                                                                         HVAC
                 1   KIT 6 a                      Provide dryer exhaust.
                 2   KIT 1                        Provide exhaust hood over cooking area equipment.
                 3   KIT 8                        Provide condensate hood over dishwasher equipment.
                                                                                       Acoustics
                 1   General:                     Refer to Design Guidelines for system treatment.
                 2   KIT 1, CAF 1                 Extend CMU walls to structural deck around cafeteria and kitchen.
                                                                                   General Notes
                 1   KIT 5                        Provide interior window in office.
                 2   KIT 7                        Provide hand railing at cashier entrance/exit locations.




DeKalb County School District                                                          48 of 121                                                    February 15, 2013 v1.1
                                                              Section 13 - BUILDING SERVICES

                                                                            General Description

    Building Services (building infrastructure) spaces support the instructional programs by providing a comfortable, healthy, safe and attractive environment where students
    can learn and others can work with minimal distractions. These areas include custodial, main building storage, mechanical / electrical equipment, data / telephone
    equipment and restroom facilities essential components needed to maintain the school infrastructure and operations.


                                                                               Activity / Space
    Space No.                                Room Name                                    NSF         Qty        TSF                             Adjacency
                  Storage:
    BS 1          Book Storage                                                                  600     3            1800
    BS2           Laptop Cart Storage Room                                                                                   Locate 1 per floor (50 carts per school)
    BS2           General Building Storage                                                      250     6            1500    Locate adjacent to each B/G Restroom
                  Custodial: (Maintenance Rooms)
    BS 3          Maintenance Rooms (Custodial)
                a Maintenance Room                                                               70     1               70
                b Maintenance Room                                                               70     2              140
                c Maintenance Room (exterior)                                                   180     1              180
    BS 4          Branch Custodial Closets                                                                                   Locate 2 per floor or 1 per CR wing
                a Janitor Closet (w/ hot water heater)                                           40     8              320
                b Janitor Closet - cafeteria corridor                                             0     0                0
                c Janitor                                                                         0     0                0
                d Janitor - cr wing - triangle                                                    0     0                0
                e Janitor - cr wing - triangle                                                    0     0                0
                f Janitor - cr wing - triangle                                                    0     0                0
                g Janitor                                                                         0     0                0
                h Janitor                                                                         0     0                0
                  Building Mechanical & Electrical Services:
    BS 5          Main Mechanical Rooms
                a Main Mechanical Room                                                          875     2            1750
                b Main Mechanical Room                                                            0     0                0
                  Branch Mechanical Rooms
                a Cafeteria - Mechanical Room                                                   300     1              300
                b Elevator - Mechanical Equipment Room                                           80     1               80
                c Elevator - Mechanical Equipment Room                                           70     1               70
                d Gym - Mechanical Equipment Room                                               200     1              200
    BS 7        a Mechanical Attic                                                                0     1                0
                b Mezz. Access Rooms                                                            200     1              200
                b Mess. Access Rooms                                                             75     1               75
                c Mechanical Yard (outdoor)                                                       0     1                0
    BS 8          Emergency Generator Room                                                      350     1              350
    BS 9          Main Electrical Rooms
                a Main Electrical Room                                                          250     4            1000
                b Main Electrical Room                                                            0     0                0
                c Main Electrical Room                                                            0     0                0
                  IDF                                                                             0     0                0   Access from BS 9c
    BS 10         Branch Electrical Rooms



DeKalb County School District                                                    49 of 121                                                       February 15, 2013 v1.1
                a Elec. Room                                                                      75    7               525
                b Elec. Room                                                                       0    0                 0
                c Elec. Room                                                                       0    0                 0
                d Elec. Room                                                                       0    0                 0
                e Elec. Room                                                                       0    0                 0
                f Elec. Room - next to computer lab                                                0    0                 0
                g Elec. Room                                                                       0    0                 0
    BS 11         Main Distribution Frame (MDF) Room                                               0    0                 0
    BS 12         Intermediate Distribution Frame (IDF) Room
                a IDF - 2nd cafeteria                                                             75    5               375
                b Data Room                                                                        0    0                 0
                c Data Room                                                                        0    0                 0
                d Data Room - next to computer lab                                                 0    0                 0
                e IDF                                                                              0    0                 0
                  MIS
    BS 13         IT Office (CTSS)                                                             150      1               150
    BS 14         IT Server Room                                                               150      1               150
                  Restrooms:
    BS 15         Boy's - Student Restrooms @ classroom wings                                  350      6              2100
    BS 16         Girl's - Student Restrooms @ classroom wings                                 350      6              2100
    BS 17         Cafeteria - Girls's Restroom                                                 250      1               250
    BS 18         Cafeteria - Boy's Restroom                                                   250      1               250
                  Miscellaneous:
    BS 19         Corridors                                                                        0    0                 0
    Note:         Loading Dock / Compactor Area (outdoor)                                          0    0                 0           (See Section 14.1 - Outdoor Spaces)


                                                                                     Total Area SF                   13935
                  Miscellaneous Restrooms (See referenced sections):
                  Media Center - Toilet                                                                                        See Section 03
                  Gym-Boy's Restrooms                                                                                          See Section 07
                  Gym-Girl's Restrooms                                                                                         See Section 07
                  Special Ed Suite - Toilet                                                                                    See Section 08
                  Auditorium - Women's Toilet                                                                                  See Section 09
                  Auditorium - Men's Toilet                                                                                    See Section 09
                  Auditorium - Single Toilet                                                                                   See Section 09
                  Staff - Workroom Toilets @ classroom wings                                                                   See Section 10
                  Staff Toilets - Admin. Suite                                                                                 See Section 10
                  Principal's Toilets - Admin. Suite                                                                           See Section 10
                  Toilet Room - Counseling Suite                                                                               See Section 11
                  Toilet Room - Counseling Suite                                                                               See Section 11
                  Cafeteria - Staff Toilet                                                                                     See Section 12
                  CT:Health Science - Toilet                                                                                   See Section 16.2
                                                                                   Equipment
    The following items are to be specified in the base contract unless noted otherwise.
    Item          Room Location                                                      Size (WxH)        #/RM
    RS            BS 19                                                                                       Quantity as required.
    FEC           BS 19                                                                                       As required per code.



DeKalb County School District                                                      50 of 121                                                       February 15, 2013 v1.1
    ML       BS 19                                    See note below.
    DDF      BS 19                                    As required per code.
    MSK      BS 4                                 1
    SF       BS 2 a, BS 2 b
    MS       BS 1, BS 2, BS 3, BS 4
    CLK      BS 19                                    Double faced.
    MB       BS3, BS 4                            1
    WR       BS 19                                    OP
    PM       BS 19
    CMP      BS 13                                1
    CW       BS 19




DeKalb County School District         51 of 121                               February 15, 2013 v1.1
    RS - Room Signage                               ML - Metal Lockers                   CLK - Electronic Wall Clock                MB - Mop and Broom Holder
    FEC - Fire Extinguisher Cabinets                MS - Metal Shelving                  WR - Waste Receptacles                     PM - Plasma Screen Monitors
    OP - Owner Provided                             CMP - Computer (Admin.)              CW - Clearstory                            MSK - Mop Sink
                                                                                                                                    DDF - Dual Drinking Fountain
    Note: Metal Lockers: Provide 2-tier double locker w/built-in combination locks and cant strip (typ.)
                                                                                        Finishes
    Walls:           a All Spaces                   Provide paint finish. Refer to Design Guideline for sheen. Water base, low VOC paints are preferred.

    Floors:          a BS 13                        Carpet
                     b BS 2, BS 3a-c, BS 4 - 10,    Sealed Concrete
                       BS 12 a - g

                     c BS 1, BS 14, BS 19           Provide vinyl composition tile (VCT) w/ 4" rubber base.
                     d BS 15, 16, 17, 18            Provide ceramic tile (CT) w/ ceramic base *

    Base:            a All spaces *                 Provide rubber base all spaces, with exception of ceramic tiled areas.

    Ceilings:        a All Spaces:                  Provide 2x2 standard acoustical ceiling tile (ACT) in all spaces except those listed below.
                     b BS 3, 5, 8,9,10,12           Provide exposed structure. (Open to structure.)
                     c All Spaces:                  Provide 2x4 fluorescent fixtures in all spaces, with the exception of the following.
                     d BS 3, 5, 8,9,10,12           Provide surface mounted fluorescent strip fixtures.
                                                                                       Casework
    Space No.                  Room Name                        Unit Type                  Unit Length      Qty Size (wxdxh)        Notes
    BS 20 a,b,c        Corridor - CR wing           Bulletin Board Display Case                               2        4'w x3"d     Provide display cases w/ lockable glass door.


    BS 20 g            Corridor - Gym Hall          Trophy Cases (Lighted)                    40 LF         10        4'w x78"h
                                                                                         Utilities
    Electrical         Location                     Lighting & Communications
    Power:             BS 3 a-c                     Provide one (1) duplex outlet. At all other areas provide all necessary power required by mechanical and electrical
                                                    equipment.
                       BS 6b, BS 10                 Provide duct detectors in branch electrical rooms.
                       BS 15,16,17,18               Provide receptacle for lavatories. Coordinate exact location w/equipment provided. Receptacle to be installed behind sink
                                                    access panel.

                       BS 14                        Provide six (6) quadaplex receptacles, two (2) data outlets, and two (2) special purpose receptacles.
    Fire Alarm:        BS 2a, 2b                    Provide wall mounted horn or strobe, as required.
                       BS 19                        Provide receptacle for clock.
    Intercom:          BS 13                        Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.
    Data:              BS 6b                        Provide data outlet.


    Other:             BUILDING SERVICES            Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                       BUILDING SERVICES            Technology Infrastructure: Reference Instructional Technology requirements.


    *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
    Plumbing
                 1     BS 15,16,17,18               Provide number of fixtures in restrooms as required by code for population served. Provide one (1) wall hydrant in each multi-
                                                    fixture restroom. All toilets rooms shall be ADA compliant.

                 2     BS 3, BS 4                   Provide floor sinks in main and branch custodial closets w/hot and cold water.
                 3     General:                     Provide electric water coolers distributed throughout building as required by code for population served.
    HVAC
                 1     Refer to Design Guidelines for HVAC system requirements.
                 2     Provide limited range temperature control in BS 6b, Elevator-Mechanical Equipment Room.
                 3     Provide dedicated control in MDF and IDF rooms.



DeKalb County School District                                                         52 of 121                                                          February 15, 2013 v1.1
                                                                            Acoustics
          1
              Provide full height CMU walls around equipment rooms and sound isolation mounts for equipment subject to vibration to achieve sound containment.

                                                                         General Notes
          1   In BS3, Custodial Maintenance Rooms shall accommodate the storage and recharging of custodial equipment including the propane and battery powered
              equipment. Electrical service for recharging as well as any code required fire zone isolation and ventilation shall be provided. Charging and storage
              provisions are required on each level of a multi-level facility.




DeKalb County School District                                              53 of 121                                                      February 15, 2013 v1.1
                                                                     Section 14.1 - OUTDOOR SPACES

                                                                                     General Description
    Outdoor Areas (Outdoor Spaces and Site Facilities) include topics such as landscaping, site circulation for cars and buses, parking accommodations, emergency
    access around the building, building service, the location of portable classroom units. Requirements for these areas and others are discussed in Division 2 - Site of the
    Design Guidelines.

                                                                                       Activity / Space
    Space No.                                     Room Name                                        NSF       Qty            TSF                               Adjacency
    OS 1                 Outdoor Educational Spaces                                                              1                 0
    OS 2                 Outdoor Art Work Space                                                                  1                 0    Art Labs
    OS 3                 Loading Dock / Compactor Area                                                           1                 0    Kitchen - Main Exit
                                                                                              Outdoor Subtotal                     0
                                                                                             Equipment
    The following items are to be specified in the base contract unless noted otherwise.
    Item                 Room Location                                                        Size (WxH)     #/RM
    BOL                  OS 3                                                                  As Required             Provide adjacent to compactor to define area.


    BOL - Bollards w/ cable railing
                                                                                              Finishes
    Walls:           a

    Floors:          a OS 2                                                                                            Provide concrete plaza area.
    Ceilings:        a
                                                                                             Casework
    Space No.                   Room Name                                        Unit Type                       Qty    Size(wxdxh)     Notes
                 1       n/a


                                                                                              Utilities
    Electrical           Location                           Lighting & Communications
                         OS 1, OS 2, OS 3
                         OS 3
    Other:               OUTDOOR SPACES
                         OUTDOOR SPACES                Technology Infrastructure: Reference Instructional Technology requirements.


    *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
    Plumbing
                 1                                     Provide hose bib at outdoor artwork space, OS 2.


    HVAC
                 1       n/a
                                                                                             Acoustics
                 1       n/a
                                                                                        General Notes
                 1       Provide concrete plaza area adjacent to art lab area.




DeKalb County School District                                                                54 of 121                                                        February 15, 2013 v1.1
                                                                 Section 14.2 - SITE FACILITIES

                                                                             General Description
    Outdoor Areas (Outdoor Spaces and Site Facilities) include topics such as landscaping, site circulation for cars and buses, parking accommodations, emergency
    access around the building, building service, the location of portable classroom units. Requirements for these areas and others are discussed in Division 2 - Site of the
    Design Guidelines.

                                                                                Activity / Space
    Space No.                               Room Name                                      NSF         Qty           TSF                            Adjacency
    SF 1          Softball Field                                                                          1                  0
    SF 2          Baseball Field                                                                          1                  0
    SF 3          Softball Dugout                                             10                 180      1                180
    SF 4          Baseball Dugout                                             14                 180      1                  0
    SF 5          Football Field / combines with track                                                    1                  0
    SF 6          Track - 8 Lane                                                                          1                  0
    SF 7          Multi-Purpose Practice Field                                19                          1                  0          (Field includes soccer & lacrosse)
    SF 8          Tennis Courts                                               21                          2                  0
    SF 9          Track Shot and Discus Areas                                                             1                  0   Now in the end zones of the footabell field.
    SF 10         Concessions / Press Box combo *                                                600      1                600   Shared between softball & baseball fields.
    SF 10 a       Storage                                                     29
    SF 10 b       Equipment Storage                                           33
    SF 11         Batting Cage (Baseball Field) *                                                         1                  0
    SF 12         Maintenance Storage Facility                                                            1                  0
    SF 13         Outdoor Sports Storage                                                                  1                  0
                                                                              38                                           780
    * Provide SF 10 and SF 11 only if replacing existing.
                                                                                     Equipment
    The following items are to be specified in the base contract unless noted otherwise.
    Item          Room Location                                               42      Size (WxH)         #/RM
    SB            SF 1, SF 2                                                  45                          1     OP
    BC            SF 1, SF 2                                                                              1
    BF            SF 1, SF 2                                                                              1
                  SF 1, SF 2, SF 5, SF 7, SF 8                                50
    AB            SF 3, SF 4                                                  55                          1
    SK            SF 10                                                                                   1
    IM            SF 10                                                                                   1
    REF           SF 10                                                                                   1
    CD            SF 10                                                                                   1
    CLK           SF 10                                                       63                          1
    FEN
    BL            SF 1 ( Homeside and Visitor )                                                           2     Seats 100 persons homeside, 100 persons visitor side
    BL            SF 2 ( Homeside and Visitor )                                                           2     Seats 100 persons homeside, 100 persons visitor side
    BL            SF 5 ( Homeside and Visitor )                                                           2     Seats 100 persons homeside, 100 persons visitor side
    BL            SF 7 ( Homeside and Visitor )                               79                          2     Seats 100 persons homeside, 100 persons visitor side
    BL            SF 8 ( Homeside and Visitor )                                                           2     Seats 100 persons homeside, 100 persons visitor side
    DF            SF 1, SF 2, SF 5, SF 7, SF 8                                                            1
    SB - Score Boards                                     FEN - Fencing & Gates       REF - Refrigerator w/ice maker             DF - Drinking fountain (Horse trough)
    BL - Bleechers (aluminum)                                            SK - Sink    IM - Ice Machine                           CD - Overhead Coiling Door



DeKalb County School District                                                        55 of 121                                                       February 15, 2013 v1.1
    WS - Wind Screens                                                                 88     AB - Aluminum Bench (pre-fab)
    BC - Batting Cage                                                                100
                                                                                            Finishes
    Walls:           a SF 3, SF 4                                                    125
                     b SF 10



    Floors:          a SF 1, 2, 5, 7 ?                 Turf on fields to be synthetic or irrigated, no sprinklers. Need hydration on all fields.
                     b SF 10                           Provide sealed concrete floor in SF 10 concessions.



    Ceilings:        a SF 10                           Provide plywood painted ceiling in SF 10 concessions.


                                                                                           Casework
    Space No.                  Room Name                            Unit Type                                   Qty    Size(wxdxh)       Notes
    SF 10              Concessions                     Upper Cabinet (single door)                                                       w/ 1 adjustable shelf.
                                                       Countertop                                                                        Continuous at all base cabinets.
                                                       Base Cabinet
                                                       Base Cabinet (double door)                                                        w/ sink (double bowl).
                                                                                            Utilities
    Electrical         Location                        Lighting & Communications
    Power:             SF 2, SF 3                      Provide electrical service at batting cages.
                       SF 10                           Provide electrical outlets @ 12' max spacing w/not less than one (1) duplex outlet per wall. In concessions, provide 110 V
                                                       and/or 220 V outlets to operate (1) refrigerator, one (1) ice machine, one (1) microwave.

                       SF 10
                       SF 3, SF 4                      Provide four (4) multiple duplex outlets. Locate one at each end of dugout, and two (2) on back wall of dugout.
    Intercom:
    Data:
    Other:             SITE FACILITIES                 Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                       SITE FACILITIES                 Technology Infrastructure: Reference Instructional Technology requirements.


    *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
    Plumbing
                 1     Provide hot and cold water in Concessions.
                 2     Provide stainless steel double sink in SF 10 concessions w/ hot and cold water.
                 3     Provide water spigot at the baseball and softball dugout SF 3 and SF 4.
                 4     Provide floor drain in SF 10 concessions.


    HVAC
                 1     Refer to Design Guidelines for system requirements.
                 2     Provide surface mounted heater and ventilation fan with thermostatic control in SF 10 concessions.
                                                                                           Acoustics
                 1     n/a
                                                                                        General Notes
                 1     Provide athletic fencing to secure all playfields




DeKalb County School District                                                              56 of 121                                                         February 15, 2013 v1.1
                                                                       Section 14.3 - STADIUM

                                                                             General Description
    Based on Fulton County stadium model (Bethany Road HS), by request of DeKalb CIT.




                                                                                Activity / Space
    Space No.                                Room Name                                     NSF           Qty         TSF                             Adjacency
                   Home Side:
    STAD 1         Ticket Booth                                                                     95     1                95
    STAD 2         Concessions                                                                     490     1               490
    STAD 3         Public Toilets                                                                  280     2               560
    STAD 4         Referee's Room ( w/ Toilet and Shower)                                          470     1               470
    STAD 5         Custodial Service Room                                                           90     1                90
    STAD 6         Electrical Room                                                                 150     1               150
    STAD 7         Bleacher Seats ( 2,500 seats each @ 24" wide)                             24,866        1           24866
    STAD 8         Press Box                                                                       600     1               600
                   Visitor Side:
    STAD 9         Ticket Booth                                                                     95     1                95
    STAD 10        Concessions                                                                     340     1               340
    STAD 11        Public Toilets                                                                  280     2               560
    STAD 12        Custodial Service Room                                                           45     1                45
    STAD 13        Electrical Room                                                                 145     1               145
    STAD 14        Bleacher Seats ( 1200 seats each @ 24" wide)                                9,800       1             9800
    STAD 15        Track - 8 Lane                                                                    0     1                 0                  See Design Guidelines
    STAD 16        Public Address Storage in Press Box                                              25     1                25
    STAD 17        Outdoor Equipment Storage                                                   1,130       1             1130
                                                                                     Total Area SF                     39461
    Reference Section 14.2 for athletic playfields.
                                                                                   Equipment
    The following items are to be specified in the base contract unless noted otherwise.
                   Room Location                                                     Size (WxH)          #/RM
    IM             STAD 2, STAD 10                                                                         1
    PT             STAD 2, STAD 3, STAD 4, STAD 10, STAD 11                                                1
    MS             STAD 5, STAD 12, STAD 17                                                3'x7'           5    Shelving units are 12" deep.
    SD             STAD 3, STAD 4                                                                          1    Locate at each lavatory.
    ED             STAD 3, STAD 11                                                                         1
    JTH            STAD 3, STAD 11                                                                         1    Locate at each WC.
    MI             STAD 3, STAD 4, STAD 11                                                                 1    Locate at each lavatory.
    ND             STAD 3, STAD 11                                                                         1    Locate at each women's stall.
    WR             STAD 4                                                                                  1
    TH             STAD 4                                                                                  1
    RH             STAD 4                                                                                  1
    CR             STAD 4                                                                                  1
    SH             STAD 4                                                                                  1
    MBS            STAD 5, STAD 12                                                                         1
    MBS            STAD 17                                                                                 3



DeKalb County School District                                                      57 of 121                                                          February 15, 2013 v1.1
    JB       STAD 17                                6'w    1   Anchor to floor, for tools.
    SK       STAD 2, STAD 10                               1
    SSK      STAD 5, STAD 12                               1
    USK      STAD 1, STAD 2, STAD 9, STAD 10               1




DeKalb County School District                  58 of 121                                     February 15, 2013 v1.1
    EH                 STAD 1, STAD 2, STAD 9, STAD 10                                                          1
    LDR                STAD 8, STAD 17                                                                          1     Provide roof access ladder.
    AB                 STAD 7                                                                                         Seat 2,500.
    AB                 STAD 14                                                                                        Seat 1,200.
    WB                 STAD 17                                                                                  1
    WS                 STAD 3, STAD 11, STAD 17                                                                 1
    JB - Steel Job Box                                 PT - Paper Towel Dispenser           JTH - Jumbo Toilet Tissue Holder           SK - Sink (double bowl)
    ED - Electric Hand Dryer                           SD - Soap Dispenser                  ND - Napkin Disposal                       SSK - Slop sink
    MI - Mirror                                        MBS - Mop/Broom Strip                NDD - Napkin Disposal Cab.                 USK - Utility sink
    WR - Wall mtd. Wast receptacles                    SH - Soap Dish                       IM - Ice Maker                             WS - Water Spigot
    MS - Metal Shelves                                 TH - Toilet Tissue Holder            AB - Aluminum Bench                        EH - Electric Heating Unit
                                                       CR - Shower Curtain Rod              WB - Work Bench                            LDR - Ladder
    * See General Notes for additional information on built-in equipment.
                                                                                           Finishes
    Walls:           a Provide paint finish. Refer to Design Guidelines for sheen. Water base, low VOC paints are preferred.

    Floors:          a Provide sealed concrete floor in all areas except those listed below.

    Ceilings:        a Provide plywood painted ceiling in all exterior buildings.
                     b Provide 2x2 standard acoustical ceiling tile in all STAD 8.
                                                                                          Casework
    Space No.                  Room Name                           Unit Type                    Unit Length    Qty     Size (wxdxh) Notes
    STAD 2, 10         Concessions                     Sink Cabinet                             Wx24x30"        1                      All cabinets to be lockable.
                                                                                            Utilities
    Electrical         Location                        Lighting & Communications
    Power:             STAD 2, STAD 10                 Provide electrical outlets @ 12' max spacing w/not less than one (1) duplex outlets per wall. In concessions, provide 110V
                       (Concession cooking             and/or 220V outlets to operate one (1) refrigerator, one (1) ice machine, one (1) microwave, one (1) drink cooler, one (1) hot
                       area.)                          dog machine, and one (1) pop corn machine.
                       STAD 6                          Provide necessary power requirements for fully controlled stadium lighting (MUSCO) and security lighting with controls
                                                       located in the home electrical room.
                       STAD 8                          Provide three (3) duplex outlets, om addition to basic requirements, at each partitioned room. Provide necessary power
                                                       requirements for public address system.
    Data:              STAD 8                          Provide one (1) dual data outlet in each partitioned room. Provide necessary data/power for CCTV capability.
    Telephone:         STAD 8                          Provide one (1) telephone outlet for land line in each partitioned room and connection to school phone system in public
                                                       address partitioned room.

    Other:             STADIUM                         Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                       STADIUM                         Technology Infrastructure: Reference Instructional Technology requirements.


    *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
    Plumbing
                 1     STAD 3, 11, 17                  Provide water spigot.
                 2     STAD 2, STAD 10                 Provide stainless steel double bowl sink w/ hot and cold water.
                 3     STAD 2, STAD 10                 Provide floor drain.
                 4     STAD 5, STAD 12                 Provide slop sink with hot and cold water spigot with bucket holder.
                 5     STAD 17                         Provide one (1) utility sink with hot and cold water spigot.
    HVAC
                 1     STAD 2, STAD 10                 Provide ventilation fan with thermostat control.
                 2     STAD 1, 2, 9, 10                Provide one (1) electric heating unit.
                 3     STAD 8                          Provide heating and air conditioning. Winterize by drainage or some other means.
                                                                                          Acoustics
                 1     None


DeKalb County School District                                                            59 of 121                                                          February 15, 2013 v1.1
                                                                 General Notes
          1   STAD 2             Provide adjacent fenced area where possible for cook area.
          2   STAD 8             Partition Home Side Press Box accordingly: Home Team Room 12' x 18'; Visiting Team Room 12'x18'; Clock Official Room
                                 12'x6'; Public Address Room 12'x12'. Each room to have door access. Provide sliding windows 4' high with each 4'x4' sliding
                                 unit panel, and provide 12' writing ledge below windows. Also provide one (1) ladder affixed to wall in home team room
                                 leading to roof hatch for access to roof for filming.

                                 Provide loft, 10'w x 35' l x 9' h, with wall mounted ladder access and hatch in the floor. In addition, provide 10' work bench
              STAD 17
          3                      with installed vise and lateral locking drawers, anchor to the floor.
          4   STAD 2, STAD 10    Provide lockable serving room and lockable bulk storage room.
          5   STAD 1, 9, 2, 10   Provide 12' wide interior and counter at window.
          6   STAD 7, STAD 14    Provide aluminum benches.




DeKalb County School District                                      60 of 121                                                         February 15, 2013 v1.1
                                                 Section 15.1 - BUSINESS & COMPUTER SCIENCE

                                                                             General Description
    Business & Consumer Science programs prepare students to become productive members of the business community and to enter a post-high school institution after
    graduation. Students develop competencies in finance, legal operations of business, administrative support, information management, international business,
    entrepreneurship, and management. Activities in the lab include XXXX. Georgia Performance Standards for these programs are located at www.georgiastandards.com.
    Key Adjacency: Career Technology Labs.

                                                                                Activity / Space
    Space No.                               Room Name                                          NSF           Qty         TSF                               Adjacency
    BCS 1         Business Lab                                                                       1800      4             7200
    BCS 1 a       Supply Closet                                                                        200     4                 800                        BCS 1 b
    BCS 1 b       Office                                                                               150     4                 600                         BCS 1
    BCS 2         Business Classroom                                                                 1600      1             1600                            BCS 1
                                                                                        Total Area SF                       10200


                                                                                     Equipment
    The following items are to be specified in the base contract unless noted otherwise.
    Item          Room Location                                                         Size (WxH)           #/RM
    MB            BCS 1, BCS 2                                                              4' x 4'            2    Locate at opposite ends of IB on teaching wall.
    IB            BCS 1, BCS 2                                                              8' x 4'            1    OP. Center on teaching wall.
    TB            BCS 1, BCS 2                                                              4' x 4'            1    Locate adjacent to MB on teaching wall.
    TB            BCS 1, BCS 2                                                              12' x 4'           1    Locate above computer stations.
    MB            BCS 1, BCS 2                                                              4' x 4'            2
    TB            BCS 1, BCS 2                                                              4' x 4'            2
    IB            BCS 1, BCS 2                                                                                 1    OP. Installed by Owner on Teaching Wall
    CLK           BCS 1                                                                                        1    Locate at teaching wall.
    SHLV          BCS 1a                                                                   4'wx12" d           8
    OPS           BCS 1                                                                                        1    Ceiling mount.
    CMP           BCS 1, BCS 2                                                                                      OP - Refer to Instructional Technology requirements.
    CMP           BCS 1, BCS 2                                                                                28
    MB - Marker Board                            TC - Teacher Cabinet                   OPS - Overhead Projector Shelf                 CMP - Computers (student)
                                                                                        OP - Owner Provided                            C/BKT-Component Bracket (wall mtd)
    CLK - Electronic Wall Clock                                                         TEL -Telephone                                 SHLV - Shelving (metal)


    *Note: Locate Computers @ perimeter of room at counters; and in middle of room at desks.
                                                                                       Finishes
    Walls:      a All spaces                   Provide paint finish. Refer to Design Guidelines for sheen. Water base, zero VOC paints are preferred.
                b All spaces                   All walls to extend to underside of deck. Walls to be constructed of CMU.
    Floors:     a BCS 1, 1a, BCS 2             Provide vinyl composition tile w/ 4 " rubber base in all spaces.
                b BCS 1b                       Provide carpet tile w/4" rubber base.

    Ceilings:   a All Spaces:                  Provide 2x2 standard acoustical ceiling tile.
                b All Spaces:
                                                                                       Casework
    Space No.              Room Name                                     Unit Type       Unit Length          Qty Size (wxdxh)         Notes
                                                     Teachers Cabinet (lockable)                               1       3'x2'x7'
    BCS 1         Business Lab                         Storage Cabinet (lockable)                              1       3'x2'x7'        Teaching Wall
                                                                                88                             2         4'x4'         Locate at teaching wall, flanking IB.



DeKalb County School District                                                        61 of 121                                                              February 15, 2013 v1.1
                                100               1    4'x4'     Locate at teaching wall.
                                124       61 LF
                                125                              Locate on 3 walls @ perimeter of room.
    BCS 1b   Office             131               1   3'x2'x7'




DeKalb County School District         62 of 121                                      February 15, 2013 v1.1
                                                  Marker Board                                           2           4'x4'      (Built into systems furniture.)
                                                  Tack Board                                             1           4'x4'      (Built into systems furniture.)
    BCS 2            Business Classroom           Teachers Cabinet (lockable)                            1          3'x2'x7'
                                                  Storage Cabinet (lockable)                             1          3'x2'x7'
                                                  Base Cabinet                             98 LF
                                                  Upper Cabinet                            52 LF
                                                  Computer Counter-top                                        Refer to Instructional Technology requirements.
                                                                                       Utilities
    Electrical       Location                     Lighting & Communications
    Power:           Classroom Computer Area:
                     BCS 1                        Provide 4 x 4 junction box, single gang plaster ring, temporary cover plate, and 3/4 "C stubbed into corridor with bussing,
                                                  above ceiling.

                     BCS 1                        Provide three (3) quadraplex receptacles, and two (2) data outlets @ ____ " AFF.
                     BCS 1                        Provide power poles as required based on furniture plans.
                     BCS 1b - Office              Provide one (1) duplex receptacle, one (1) quadraplex receptacle, one (1) data outlet adjacent to desk; duplicate on wall
                                                  opposite desk.

                     Teaching Wall:
    Clock            BCS 1, BCS 2                 Provide receptacle for clock.
    Intercom:        BCS 1, BCS 2                 Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.
    Data:            BCS 1, BCS 2                 Provide receptacle and voice/data outlet for Interactive Board.
                     BCS 1b - Office              Provide two (2) data outlets.
                     BCS 1, BCS 2                 Provide sufficient data outlets to support 34 computers. (1 of 34 to be Voice Over Internet Protocol - VOIP.)
    DVD:             BCS 1, BCS 2                 Provide receptacle and TV/RGB outlet for DVD Player.
    TV:              BCS 1, BCS 2                 Provide one (1) television outlet
    Projector:       BCS 1, BCS 2                 Provide ceiling mounted receptacle and data outlet for projector
    Security:        BCS 1                        Provide junction box and raceway for alarm motion detectors.


    Other:           BUS. & COMPUTER              Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                     BUS. & COMPUTER              Technology Infrastructure: Reference MIS Required Specifications in the Design Guideline.


    *MIS Required Specifications outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
    Plumbing
                 1   n/a
    HVAC
                 1   Refer to Design Guidelines for system requirements.
                                                                                      Acoustics
                 1   Classrooms and other core learning spaces must achieve minimum STC rating of 35.
                 2   Refer to Design Guidelines for system requirements.
                                                                                  General Notes




DeKalb County School District                                                         63 of 121                                                        February 15, 2013 v1.1
                                                      Section 15.2 - ENGINEERING & TECHNOLOGY

                                                                           General Description

   Engineering & Technology program comprised of the (1) Engineering Lab and (2) Engineering, Graphics & Design Lab programs, provides students the opportunity to
   develop technological literacy through an activity-based study of past, present, and future technological systems and their resources, processes and impact on society.
   Technology education utilizes computer and educational technology in the delivery of content related to systems of communication, energy/power transportation,
   production, and bio-related technologies. Activities in the lab include XXXXXXXXXXXXXX. Georgia Performance Standards for these programs are located at
   www.georgiastandards.com. Key Adjacency: Career Technology Labs.

                                                                              Activity / Space
   Space No.                                 Room Name                                   NSF             Qty         TSF                               Adjacency
                  Engineering:
   ETECH 1        Engineering & Technology Lab                                                 3000        1             3000      (Incl. Training & Instructional areas.)
   ETECH 1a       Office                                                                           150     1               150
   ETECH 1b       Storage Room                                                                     150     1               150     Clean supplies
   ETECH 1c       Supply Room                                                                      150     1               150     New request - dirty supplies
   ETECH 1d       Robotics /CNC - need requirements                                                250     1               250
   ETECH 2        Prototyping Lab - need requirements                                          1800        1             1800
                                                                                    Engineering Subtotal                 5500
                  Engineering, Graphics, and Design
   ETECH 2a       Supply Storage                                                                   200     1               200
   ETECH 3        Engineering, Graphics & Design Lab (CAD)                                     1800        1             1800
   ETECH 3a       Office                                                                           150     1               150
   ETECH 4        Rapid Prototyping Room                                                                   1                 0     Has 5 machines, need data & power
                                                                                    E.G.D. Subtotal                      2150


                                                                                    Total Area SF                        7650


                                                                                   Equipment
   The following items are to be specified in the b                           45
   Item           Room Location                                                     Size (WxH)           #/RM
   MB             ETECH 1, ETECH 2, ETECH 3                                              4' x 4'           2    Locate at opposite ends of IB on teaching wall.
                  ETECH 1, ETECH 2, ETECH 3                                              8' x 4'           1    OP. Center on teaching wall.
   TB             ETECH 1, ETECH 2, ETECH 3                                              4' x 4'           1    Locate adjacent to MB on teaching wall.
   TB             ETECH 1, ETECH 2, ETECH 3                                             12' x 4'           1    Locate above computer stations.
   MB             ETECH 1, ETECH 3                                                       4' x 4'           2
   MB             ETECH 2                                                                8' x 4'           1
   TB             ETECH 1, ETECH 3, ETECH 3a                                             4' x 4'           1
   IB             ETECH 1, ETECH 3                                                                         1    OP. Installed by Owner on Teaching Wall.
   CLK            ETECH 1, ETECH 3                                                                         1    Locate at teaching wall.
   FE             ETECH 1, ETECH 2                                                                         1
   PCR            ETECH 1                                                                                  6    Ceiling Mounted. (Training area of lab.)
   PCR            ETECH 2                                                                                  3    Ceiling Mounted.
   MC             ETECH 1, ETECH 2, ETECH 3                                                                1    Ceiling Mounted.
   PP             ETECH 1                                                                                 11    Instructional area of lab.
   PP             ETECH 3                                                                                 12
   MS             ETECH 1a                                                                                 4
   SHLV           ETECH 2a                                                              3' x 7'            4    OP. Freestanding metal tower units w/ adjust. shelving.



DeKalb County School District                                                      64 of 121                                                            February 15, 2013 v1.1
   SHLV      ETECH 1b               3' x 7'   7   OP. Freestanding metal tower units w/ adjust. shelving.
   PS        ETECH 1d                         1
   CD        ETECH 2                          1
   EW        ETECH 2                          1   OP. Wall mounted.




DeKalb County School District   65 of 121                                             February 15, 2013 v1.1
   FAC             ETECH 1, ETECH 2                                            131                         1
   GC              ETECH 2, ETECH 3                                                                        1
   FC              ETECH 2                                                                                 1
   SK              ETECH 2, ETECH 3                                                                        1
   PTD             ETECH 2, ETECH 3                                                                        1
   SD              ETECH 2, ETECH 3                                                                        1
   MSK             ETECH 2, ETECH 3                                                                        1    New Request for deep utilitarian sink.
   TD              ETECH 2                                                                                 1
   SD              ETECH 2                                                                                 1
   AC              ETECH 2 ?                                                                               1    OP. Installed by General Contractor
   DC              ETECH 2 ?                                                                                    OP. Installed by General Contractor
   SS              ETECH 1b                                                                                6
   SS              ETECH 2                                                                                17
   OPS             ETECH 1                                                                                 1    Ceiling mount.
   Video/Bkt       ETECH 1                                                                                 1
   CMPD            ETECH 1 (Training area), ETECH 3                                                             OP - Refer to Instructional Technology requirements.
   CMP             ETECH 1 (Instructional area)                                                                 OP - Refer to Instructional Technology requirements.
   MB - Marker Board                              MC-Medicine Cabinet (NIC?)           OPS - Overhead Projector Shelf             IB - Interactive Board
   TB - Tack Board                                PCR - Power Cord Reel                CLK - Electronic Wall Clock                CMP - Computers (student)
   TC - Teacher Cabinet                           FE - Fire Extinguisher               EW-Eye Wash (combined w/sink)              CMPD - Cpmputer Desks
   SC - Storage Cabinet                           DC - Dust Collector                  OP - Owner Provided                        SHLV-Shelving (metal tower units) - 12"d
   PP - Power Poles                               AC - Air Compressor                  SK - Sink (porcelain)-Hand?                C/BKT-Component Bracket (wall mtd)
   MS - Metal Shelving (industrial)               PS - Platform Stage (wooden)         MSK - Mop Sink - Custodial?                TV/Bkt - Wall Mounted TV Bracket
                                                  SS - Safety Switch                   TD - Towel Dispenser (paper)               Video/Bkt-Recorder bracket (wall mtd.)
   FAC - First Aid Kit                            FC - Flammable Cabinet               SD - Soap Dispenser                        CD - Overhead Coiling Door
                                                  MS - Metal Shelves                   GC - Goggle Cabinet
                                                                                       PTD - Paper Towel Dispenser                SD - Soap Dispensers

   NOTES:       a ETECH 1b, ETECH 2               Refer to Design Guidelines for list of required lab equipment for the Materials & Processing Lab and Storage Room, as
                                                  provided by the DeKalb Career Technology department.
                b Air Compressor / Dust           Architect to locate equipment in self-contained room apart from, but adjacent to lab.
                  Collector

                                                                                      Finishes
   Walls:       a All spaces                  Provide paint finish. Refer to Design Guidelines for sheen. Water base, zero VOC paints are preferred.
                b All spaces                  All walls to extend to underside of deck. Walls to be constructed of CMU.
   Floors:      a All spaces:                     Provide vinyl composition tile w/ 4 " rubber base in all spaces, w/ the exception of the following.

   Ceilings:    a All spaces:                     Provide 2x2 standard acoustical ceiling tile.
                b All spaces:                     Provide 2x4 fluorescent fixtures in all spaces, with the exception of the following.
                c ETECH 1d                        Provide 2x4 fluorescent fixtures and track lighting in ETEC 1d, Video Studio.
                                                                                     Casework
   Space No.                Room Name                         Unit Type                  Unit Length      Qty     Size (wxdxh) Notes


   ETECH 1         Engr. & Tech. Lab              Computer Work Counter                                                           Training Area: Provide work counter around
                                                                                                                                  perimeter of room to support 14 Computers.


   ETECH 1a        Office                         Storage Cabinet (lockable)                               1        3'x2'x7'
   ETECH 3a        Office                         Storage Cabinet (lockable)                               1        3'x2'x7'
   ETECH 1c        Control Room                   Work Counter                                             1



DeKalb County School District                                                        66 of 121                                                          February 15, 2013 v1.1
   ETECH 1d   Video Room        Video Desk               1
   ETECH 3    CAD Lab           Book Case                4   Low, 3 shelf units.




DeKalb County School District                67 of 121                             February 15, 2013 v1.1
                                                                                       Utilities
   Electrical       Location                      Lighting & Communications
   Power:           ETECH 1a, 3a - Offices        Provide one (1) duplex receptacle, one (1) quadraplex receptacle, one (1) data outlet adjacent to desk; duplicate on wall
                                                  opposite desk.

                    ETECH 2
                                                  Provide required power and data for lab equipment as specified in the equipment list. Refer to Design Guidelines.

                    ETECH 2                       Provide ceiling hung cord reel for power.
                    ETECH 2, ETECH 1b             Provide fused disconnect switch at equipment areas.
                    ETECH 1c                      Provide two (2) quadraplex receptacle outlets, and two (2) voice/data outlets above work countertop.
                                                  Provide one (1) duplex receptacle outlet, and one (1) voice/data outlet @ wall opposite work counter.
                                                  Provided electrical outlets @ 4' max. spacing w/ not less than two (2) per wall.
                    ETECH 1d
                                                  Provide two (2) quadraplex receptacle outlets, and two voice/data outlets above work countertop adjacent to video desk.

                                                  Provide one (1) duplex receptacle outlet, and one (1) voice/data outlet at wall opposite video desk area.

                    Classroom Computer Area:
                    ETECH 1 (Instruct'l. Area)    Provide power and data drops for thirty (28) computers.
                    ETECH 1 (Training Area)       Provide power and data drops for fourteen (15) computers.
                    ETECH 1                       Provide power poles.
                    Teaching Wall:
   Clock:           ETECH 1, 2, 3                 Provide receptacle for clock.
   Intercom:        ETECH 1, 1a, 3, 3a            Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.
   Data:            ETECH 1                       Provide receptacle and voice/data outlet for Interactive Board.
                    ETECH 1a, 3a - Offices        Provide two (2) data outlets.
   DVD:             ETECH 1                       Provide receptacle and TV/RGB outlet for DVD Player.
   TV:              ETECH 1                       Provide one (1) television outlet
   Projector:       ETECH 1                       Provide ceiling mounted receptacle and data outlet for projector.


   Other:           ENGR. & TECH.                 Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                    ENGR. & TECH.                 Technology Infrastructure: Reference Instructional Technology requirements.


   *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
   Plumbing
                1   ETECH 2                       Provide single bowl sink adjacent to eye wash.
                2   ETECH 2                       Air Compressor system provided by Owner. Installation by General Contractor.
                3   ETECH 2                       Provide sanitary and vent piping for floor drains as required.
                4   ETECH 2                       Provide cold / hot water lines and sanitary piping for eye wash station. Provide air admittance valve.
                5   ETECH 1, 2, 3                 Provide cold / hot water / sanitary and vent piping for sink.
   HVAC
                1   General                       Refer to Design Guidelines for system requirements.
                2   ETECH 2                       Dust collection system provided by Owner. Installation by General Contractor. GC to provide wall sleeve and cap for exhaust
                                                  outlet. Confirm size with manufacturer prior to installation.

                                                                                      Acoustics
                1                                 Classrooms and other core learining spaces must achieve minimum STC rating of 35.
                2                                 Refer to Design Guidelines for system requirements.
                                                                                  General Notes
                1   Provide locks on all doors.
                2   Provide interior window between ETECH 2, Materials & Processing Lab and ETECH 1, Engr. & Technology Lab.



DeKalb County School District                                                         68 of 121                                                     February 15, 2013 v1.1
          3   Provide interior window between ETECH 1c (Control Room) and ETECH 1d (Video Room). Window dimensions: 6'w x 3" h>
          4   Provide a raised platform ( + 6" ) at rear of room at ETECH 1d.
          5   Provide or install the suspended shelf (celing mounted) for the Interactive board projector in ETECH 1,2,3.




DeKalb County School District                                                   69 of 121                                         February 15, 2013 v1.1
                                                    Section 15.3 - FAMILY & CONSUMER SCIENCE

                                                                             General Description

    The Family & Consumer Science program offers a unique focus on the inter-relationships between families and work; and prepares students for family life, work life, and
    careers. The lab is organized into several kitchen areas (student demo areas) resembling and including standard appliances as provided in a home environment, for
    "hands on" instruction; in addition to a classroom lecture space in view of the teacher demo area. Reference Georgia Performance Standards for these programs located
    at www.georgiastandards.com. Key Adjacency: Located adjacent to other Career Technology Labs on ground level in close proximity to exits for convenient installation
    of large equipment, and delivery of supplies.

                                                                                Activity / Space
    Space No.                               Room Name                                        NSF             Qty         TSF                             Adjacency
    FCS 1         Lab                                                                              1800        1             1800
    FCS 2         Classroom                                                                              0     0                 0                         FCS 1
    FCS 3         Office                                                                               150     1               150                         FCS 1
    FCS 4         Storage Room                                                                         150     1               150                         FCS 1
                                                                                      Total Area SF                          2100


                                                                                     Equipment
    The following items are to be specified in the base contract unless noted otherwise.
    Item          Room Location                                                       Size (WxH)             #/RM
    MB            FCS 1, FCS 2                                                               4' x 4'           2    Locate at opposite ends of IB on teaching wall.
    IB            FCS 1, FCS 2                                                               8' x 4'           1    OP. Center on teaching wall.
    TB            FCS 1, FCS 2                                                               4' x 4'           1    Locate adjacent to MB on teaching wall.
    TB            FCS 1, FCS 2                                                              12' x 4'           1    Locate above computer stations.
    MB            FCS 2                                                                      4' x 4'           2
    MB            FCS 1                                                                                        1
    TB            FCS 1                                                                      4' x 4'           1
    IB            FCS 2                                                                                        1    OP. Installed by Owner on Teaching Wall.
    CLK           FCS 2                                                                                        1    Locate at teaching wall.
    SK2           FCS 1                                                                                        4    Student Kitchen Demo areas.
    SK1           FCS 1                                                                                        1    Teacher Demo Workstation
    PTD           FCS 1                                                                                        3
                  FCS 1                                                                                        3
    EH            FCS 1                                                                                        4    Student Kitchen Demo areas.
    EH            FCS 1                                                                                        1    Teacher Demo Workstation
    CT            FCS 1                                                                                        1    Teacher Demo Workstation
    RGE           FCS 1                                                                                        4    Student Kitchen Demo areas.
    REF           FCS 1                                                                                        2
    TRC           FCS 1                                                                                        1
    DW            FCS 1                                                                                        2    Student Kitchen Demo areas.
    DR            FCS 4                                                                                        1
    WA            FCS 4                                                                                        1
    FE            FCS 1                                                                                        1
    FE            FCS 4                                                                                        1
    SHLV          FCS 4                                                                    3'w x 15"d          8    Freestanding metal shelving.
    OPS           FCS 1                                                                                        1    Ceiling mount.
    CMP           FCS 2                                                                                             OP - refer to Instructional Technology requirements.
    TB - Tack Board                                         FE - Fire Extinguisher    SH - Shelves                                   TRC - Trash Compactor



DeKalb County School District                                                        70 of 121                                                           February 15, 2013 v1.1
    MB - Marker Board              CLK - Electronic Wall Clock   DR - Dryer
    TC - Teacher Cabinet           AMD - Alarm Motion Detector   WA - Washer
    CT - Demo Table w/ Cook Top    CMP - Computers (student)     IB - Interactive Board
    REF - Refrigerator             OP - Owner Provided           OPS - Overhead Projector Shelf
    RGE - Elec./Gas Range, ADA     PTD - Paper Towel Dispenser   C/BKT-Component Bracket (wall mtd)
                                   SD - Soap Dispenser




DeKalb County School District     71 of 121                                          February 15, 2013 v1.1
                                                                                          Finishes
    Walls:           a All spaces                 Provide paint finish. Refer to Design Guidelines for sheen. Water base, zero VOC paints are preferred.
                     b All spaces                 All walls to extend to underside of deck. Walls to be constructed of CMU.
    Floors:          a FCS 1, FCS 2, FCS 3          Provide vinyl composition tile w/ 4 " rubber base in all spaces, w/ the exception of the following.
                     b FCS 1                        Provide quarry tile w/ coved bull nose quarry tile base.

    Ceilings:        a All spaces:                  Provide 2x2 standard acoustical ceiling tile.
                     b All spaces:                  Provide 2x4 fluorescent fixtures.
                                                                                         Casework
    Space No.                  Room Name                        Unit Type                   Unit Length    Qty Notes
    FCS 1              Lab                          Teacher Cabinet                                            1        3'x2'x7'
                                                    Storage Cabinet                                            1        3'x2'x7'
                                                    Base Cabinet                              76 LF            1
                                                                                                                                    Provide four (4) double bowl sinks and one (1)
                                                    Upper Cabinet                             74 LF            1                    Teacher Demo workstation w/single bowl sink
                                                                                                                                    and cooktop with hood.
                                                    Work Counter                                               1
    FCS 2              Classroom                    Teacher Cabinet                                            1        3'x2'x7'
                                                    Book Shelves                                               4      3' w x 12"d   Low units @ window wall.
                                                                                          Utilities
    Electrical         Location                     Lighting & Communications
                       Student & Teacher Demo Areas:
                                                    Provide one (1) junction box for kitchen hood. Coordinate exact location with equipment provided at Student Kitchen Demo
    Power:             FCS 1                        Areas & Teacher Demo Workstation.
                       FCS 1, FCS 2                 Provide all necessary power and data for equipment listed above.
                       FCS 1                        Provide ___(?) quadraplex receptacle outlets, above work counters at Student Kitchen Demo Area, Base Cabinet.

                       FCS 3 - Office               Provide one (1) quadraplex receptacle (w/data) adj to desk area and one (1) quadraplex receptacle (w/data) on rear wall.


                       Classroom Computer Area:
                       FCS 2                        Refer to Instructional Technology requirements.
                       Teaching Wall:
    Clock:             FCS 2                        Provide receptacle for clock.
    Intercom:          FCS 2, FCS 3                 Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.
    Security:          FCS 2                        Provide junction box and raceway for alarm motion detector.
    Data:              FCS 2                        Provide receptacle and voice/data outlet for Interactive Board.
                       FCS 3 - Office               Provide one (1) data outlet adj to each quadraplex receptacle at desk and rear wall.
    DVD:               FCS 2                        Provide receptacle and TV/RGB outlet for DVD Player.
    TV:                FCS 2                        Provide one (1) television outlet.
    Projector:         FCS 2                        Provide ceiling mounted receptacle and data outlet for projector.


    Other:             FAMILY & CONSUMER            Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                       FAMILY & CONSUMER            Technology Infrastructure: Reference Instructional Technology requirements.


    *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
                                                                                         Plumbing
                 1     FCS 1                        Provide four (4) double bowl sinks at Studen Kitchen Demo areas at perimeter of lab.
                 2     FCS 1                        Provide one (1)single bowl at stand alone Teacher Demo Workstation.
                 3     FCS 1                        Provide all necessary plumbing requirements for equipment listed above.
                 4     FCS 1                        Provide two (2) floor drains. (One (1) @ each kitchenette area.)
                 5     FCS 4                        Provide one (1) floor drain.


DeKalb County School District                                                            72 of 121                                                        February 15, 2013 v1.1
    HVAC
           1   FCS 1                         Provide exhaust hood at each stove in lab area.
           2   FCS 4                         Provide dryer exhaust.
               * Refer to Design Guidelines for HVAC system requirements.
                                                                              Acoustics
           1   n/a
                                                                           General Notes
           1   Provide locks on all doors.
           2   Provide interior window between FCS 3 (Office) and FCS 1.




DeKalb County School District                                                73 of 121         February 15, 2013 v1.1
                                                                        Section 15.4 - JROTC

                                                                            General Description

    The purpose of Junior ROTC (JROTC) is to instill the concepts of leadership, scholarship, and citizenship in students through classroom instruction, uniforms inspection,
    and close order drill. Students learn and practice leadership skills by directing other students during classroom sessions. The Arms Room stores drill and air rifles used
    for extracurricular activities. (Color Guard, Drill Team, Rifle Team). Uniform Storage provides all student uniform materials, normally for 125% of the student load, to
    ensure all cadets are in uniform. Classroom design supports three levels of JROTC classes taught simultaneously; enabling each classroom period (100 students per
    class period) to function independently while remaining part of the whole unit. Provide capability to separate the two required classrooms by an operable partition
    providing the opportunity for all students to assemble in a single space. Key Adjacency: ____________?

                                                                                Activity / Space
    Space No.                               Room Name                                         NSF             Qty         TSF                             Adjacency
    JROTC 1        Classroom                                                                        1500       1              1500    JROTC 3
    JROTC 2        Office                                                                               150    1                150   JROTC 1
    JROTC 3        Classroom                                                                        1500       1              1500    JROTC 1
    JROTC 4        Cadet Office                                                                         150    1                150
    JROTC 5        Office                                                                               200    1                200   JROTC 3
    JROTC 6        Arms Room (Weapons Storage)                                                          100    1                100
    JROTC 7        Materials Storage                                                                    200    1                200   JROTC 4
    JROTC 8        Uniform Storage (incl. 2 dressing stalls)                                            400    1                400   JROTC 1, JROTC 3
                                                                                       Total Area SF                          4200
                                                                                   Equipment
    The following items are to be specified in the base contract unless noted otherwise.
    Item           Room Location                                                       Size (WxH)             #/RM
    MB             FCS 1, FCS 2                                                              4' x 4'           2     Locate at opposite ends of IB on teaching wall.
    IB             FCS 1, FCS 2                                                              8' x 4'           1     OP. Center on teaching wall.
    TB             FCS 1, FCS 2                                                              4' x 4'           1     Locate adjacent to MB on teaching wall.
    TB             FCS 1, FCS 2                                                              12' x 4'          1     Locate above computer stations.
    MB                                                                                       4' x 4'
    TB                                                                                       4' x 4'
    IB             JROTC 1, JROTC 3                                                                            1     OP. Installed by Owner on Teaching Wall.
                   JROTC 1, JROTC 3                                                                            1     Locate at teaching wall.
    CTR            JROTC 8                                                                                     ?
    DB             JROTC 8                                                                                     2
    FEC            JROTC 8                                                                                     1
    UCR            JROTC 8                                                                                           OP
    SHLV           JROTC 7                                                                 3'w x 15" d         18 Freestanding metal shelving.
    FCV            JROTC 7                                                                 2"w x 30" d         4
    GTC            JROTC 1, JROTC 3                                                                            1     OP
    CMP            JROTC 1, JROTC 3                                                                                  OP - refer to Instructional Technology requirements.
    TB - Tack Board                                             CTR - Curtain Rod      SHLV - Shelving (metal)                        CMP - Computers (student)
    MB - Marker Board                                        DB - Dressing Bench       CLK - Electronic Wall Clock                    C/BKT-Component Bracket (wall mtd)
    IB - Interactive Board                                                             GTC - Glass Trophy Case                        FCV - File Cabinets (vert.)
                                                                                       UCR - Uniform Clothes Rack                     FEC - Fire Extinguisher Cabinet
                                                                                    Finishes
    Walls:       a All spaces                  Provide paint finish. Refer to Design Guidelines for sheen. Water base, zero VOC paints are preferred.
                 b All spaces                  All walls to extend to underside of deck. Walls to be constructed of CMU.
    Floors:      a JROTC 1, 3, 6, 7, 8         Provide vinyl composition tile w/ 4 " rubber base in all spaces, w/ the exception of the following.
                 b JROTC 2, 4, 5               Provide carpet tile w/4" rubber base.


DeKalb County School District                                                      74 of 121                                                               February 15, 2013 v1.1
    Ceilings:   a All Spaces    Provide 2x2 standard acoustical ceiling tile in all spaces, with the exeption of JROTC 8.
                b All Spaces    Provide 2x4 fluorescent fixtures in all spaces, with the exception of JROTC 8.




DeKalb County School District                                      75 of 121                                                February 15, 2013 v1.1
                     c All Spaces                    Provide minimum 10'-0" ceiling height in all spaces, with the exception of JROTC 8.
                     d JROTC 8                       Open to structure (OTS)
                     e JROTC 8                       Provide surface mounted fluorescent fixtures.
                                                                                         Casework
    Space No.                  Room Name                         Unit Type                  Unit Length    Qty    Size (wxdxh) Notes
    JROTC 8                                          Built-in shelves (Adjustable)             54 LF       14          4'x12"x8'   Shelf unit dimensions.
                                                                                                                                   L-shaped configuration. 4 shelves high

    JROTC 8            Uniform Storage               Dressing Benches                                       2                      Dressing Benches w/mounted robe hook.
    JROTC 8            Uniform Storage               Uniform Clothes Rack
    JROTC 1, 3         Classroom                     Teachers Cabinet                                                  3'x2'x7'




                                                                                          Utilities
    Electrical         Location                      Lighting & Communications
    Power:             Classroom Computer Area:
                       JROTC 1, JROTC 3              Provide power and data drops for four (4) student computers, wall mounted.
                       JROTC 1, JROTC 3              Provide 4 x 4 junction box, single gang plaster ring, temporary cover plate, and 3/4 "C stubbed into corridor with bussing,
                                                     above ceiling.

                       JROTC 1, JROTC 3              Provide three (3) quadraplex receptacles, and one (1) data outlets @ ____ " AFF.
                       JROTC 2, 5 - Office           Provide one (1) duplex receptacle, one (1) quadraplex receptacle, one (1) data outlet adjacent to desk; duplicate on wall
                                                     opposite desk.

                       Teaching Wall:
    Clock:             JROTC 1, JROTC 3              Provide receptacle for clock.
    Intercom:          JROTC 1, 2, 3, 4, 5           Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.
    Data:              JROTC 1, JROTC 3              Provide receptacle and voice/data outlet for Interactive Board.
                       JROTC 2, 5 - Office           Provide two (2) data outlets.
    DVD:               JROTC 1, JROTC 3              Provide receptacle and TV/RGB outlet for DVD Player.
    TV:                JROTC 1, JROTC 3              Provide one (1) television outlet
    Projector:         JROTC 1, JROTC 3              Provide ceiling mounted receptacle and data outlet for projector.


    Other:             JROTC                         Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                       JROTC                         Technology Infrastructure: Reference Instructional Technology requirements.


    *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
    Plumbing
                 1     None.
    HVAC
                 1     Refer to Design Guidelines for HVAC system requirements.
                                                                                         Acoustics
                 1     n/a
                                                                                     General Notes
                 1     Provide locks on all doors.
                 2     Provide interior window in offices, JROTC 2 and JROTC 4.




DeKalb County School District                                                            76 of 121                                                     February 15, 2013 v1.1
                                                                Section 16.1 - CULINARY ARTS

                                                                            General Description

    The Culinary Arts program prepares students for employment in food industry careers such as; food production and services, food science, nutrition, and hospitality.
    Included in the course of study are skills in such areas as career planning, food safety and sanitation, accident and injury prevention, kitchen basics, use and care of
    commercial utensils and equipment, preparation of commercial food items, the art of service, controlling costs, food management functions, and customer relations. In
    addition to classroom and laboratory work, students will participate in work-based learing experiences. Successful students will receive a Prostart certificate from the
    National Restaurant Association. Students must meet demanding criteria in order to be places in an internship or apprenticeship. Georgia Performance Standards for
    these programs are located at www.georgiastandards.com. Reference for room layout, equipment and casework configuration. Key Adjacency: XXXXXXXXXX?

                                                                               Activity / Space
    Space No.                               Room Name                                       NSF             Qty         TSF                             Adjacency
    CA 1           Lab                                                                            2150       1              2150
    CA 2           Classroom                                                                            0    1                    0                       CA 1
    CA 3           Office                                                                             150    1                150                         CA 1
    CA 4           Pantry                                                                             220    1                220                         CA 1
    CA 5           Linen Storage                                                                      100    1                100                         CA 1
                                                                                      Total Area SF                         2620


                                                                                  Equipment
    The following items are to be specified in the base contract unless noted otherwise.
    Item           Room Location                                                      Size (WxH)            #/RM
    MB             CA 1, CA 2                                                              4' x 4'           2     Locate at opposite ends of IB on teaching wall.
    IB             CA 1, CA 2                                                              8' x 4'           1     OP. Center on teaching wall.
    TB             CA 1, CA 2                                                              4' x 4'           1     Locate adjacent to MB on teaching wall.
    TB             CA 1, CA 2                                                              12' x 4'          1     Locate above computer stations.
    MB             CA 2                                                                    4' x 4'           2
    TB             CA 1, CA 2                                                              4' x 4'           1
    IB             CA 2                                                                                      1     OP. Installed by Owner on Teaching Wall.
    CLK            CA 2                                                                                      1     Locate at teaching wall.
    DR             CA 5                                                                                      1
    WA             CA 5                                                                                      1
                   CA 4                                                                                      1
    MS             CA 4                                                                                      7
    PDP            CA 1                                                                                      8
    OPS            CA 2                                                                                      1     Ceiling mount.
    CMP                                                                                                            OP - refer to Instructional Technology requirements.
    AMD            CA 2                                                                                      1
    FE             CA 1                                                                                      2
    IM             CA 1                                                                                      1
    FSS            CA 1, CA 2
    EH             CA 1                                                                                      1
    HSK            CA 1                                                                                      3
    PTD            CA 1                                                                                            As required.
    SD             CA 1                                                                                            As required.
    PPS            CA 1                                                                                      1
    FS             CA 1                                                                                      2
    HR             CA 1                                                                                      1     Wall mount.



DeKalb County School District                                                     77 of 121                                                              February 15, 2013 v1.1
    TB - Tack Board                           IM - Ice Maker                   FE - Fire Extinguisher           IB - Interactive Board
    MB - Marker Board                                                          HSK - Hand Sink (wall mount)     EH - Exhaust Hood
    OPS - Overhead Projector Shelf                                             PPS - Pot & Pan Sink             AMD - Alarm Motion Detector
    CLK - Electronic Wall Clock                                                FS - Floor Sink                  PDP - Pull down reel power cord
    FSS - Fire Suppression System                                              OPS - Overhead Projector Shelf   C/BKT-Component Bracket (wall mtd)
    MS - Metal Shelving (industrial)                                           CMP - Computers (student)        Video/Bkt-Recorder bracket (wall mtd.)


    * Reference Design Guidelines for complete list of prostart kitchen equipment.




DeKalb County School District                                               78 of 121                                                February 15, 2013 v1.1
                                                                                          Finishes
    Walls:           a Provide paint finish. Refer to Design Guideline for sheen. Water base, low VOC paints are preferred.

    Floors:          a CA 2, 3, 4, 5                  Provide vinyl composition tile w/ 4 " rubber base.
                     b CA 1                           Provide 6" x 6" quarry tile w/ coved bull nose quarry tile base.

    Ceilings:        a CA 2, CA 3, CA 5               Provide 2x2 standard acoustical ceiling tile (ACT).
                     b CA 1, CA 4                     Provide 2x2 stainless steel ceiling tile.
                     c All Spaces                     Provide 2x4 fluorescent fixtures in all spaces.
                     d CA 3, CA 4, CA 5               Provide minimum 9'-4" ceiling height.
                     e CA 1, CA 2                     Provide minimum 10'-0" ceiling height in lab and classroom areas.
                                                                                         Casework
    Space No.                   Room Name                         Unit Type                   Unit Length    Qty Size (wxdxh)       Notes
    CA 2               Classroom                      Teachers Cabinet (lockable)                                1       3'x2'x7'
    CA 4               Pantry                         Base Cabinet                                18 LF                             Provide lockable base cabinet.
                                                      Upper Cabinet                               18 LF                             Provide lockable upper cabinet.
                                                      Work Counter                                18 LF
    CA 5               Linen Storage                  Base Cabinet                                11 LF                             Provide lockable base cabinet.
                                                      Upper Cabinet                               11 LF                             Provide lockable upper cabinet.
                                                      Work Counter                                11 LF
                                                                                           Utilities
    Electrical         Location                       Lighting & Communications
    Power:             CA 1                           Provide junction box for kitchen exhaust hood.
                       CA 3 - Office
                                                      Provide one (1) quadraplex receptacle (w/data) adj to desk area and one (1) quadraplex receptacle (w/data) on rear wall.

                       Teaching Wall:
    Clock:             CA 2                           Provide receptacle for clock.
    Intercom:          CA 2, CA 3                     Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.
    Security:                                         Provide junction box and raceway for alarm motion detectors , ceiling mounted.
    Data:              CA 2                           Provide receptacle and voice/data outlet for Interactive Board.
                       CA 3 - Office                  Provide one (1) data outlet adj to each quadraplex receptacle at desk and rear wall.
    DVD:               CA 2                           Provide receptacle and TV/RGB outlet for DVD Player.
    Projector:         CA 2                           Provide ceiling mounted receptacle and data outlet for projector.
    Fire Alarm:        CA 4                           Provide ceiling mounted horn or strobe.


    Other:             CULINARY ARTS                  Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                       CULINARY ARTS                  Technology Infrastructure: Reference Instructional Technology requirements.


    *Instructional Technology requirements outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
    Plumbing
                 1     Provide all necessary plumpbing for equipment listed in GDOE and DeKalb Design Guidelines.
                 2     Provide sanitary and vent piping for floor drains as required in CA 1 (4), and CA5 (1).
    HVAC
                 1     Refer to Design Guidelines for HVAC system requirements.
                 2     Provide all necessary HVAC for equipment listed in GDOE guidelines.
                 3     Provide dryer exhaust in CA 5.
                 4     Provide exhaust hood over cooking area equipment in CA 1.
                 5     Provide condensate hood over potwasher equipment in CA 1.
                                                                                         Acoustics

DeKalb County School District                                                           79 of 121                                                       February 15, 2013 v1.1
          1   Refer to Design Guidelines for HVAC system requirements.
                                                                         General Notes
          1   Provide locks on all doors.
          2   Provide interior window in office, CA 3.
          3   Coordinate all kitchen equipment locations.




DeKalb County School District                                             80 of 121      February 15, 2013 v1.1
                                                               Section 16.2 - HEALTH SCIENCE

                                                                            General Description
    Health Science prepares students for professional careers in Pharmacy, Nursing, EMT, Medical Lab Technology, Medical Information Technology, Public Health, and
    Dental Technology. Health Science students study the various systems within the human body, disease, health care programs, and medical ethics. Georgia Performance
    Standards for these programs are located at www.georgiastandards.com. Reference for room layout, equipment and casework configuration. Key Adjacency: Physical
    Education and Science Labs.

                                                                               Activity / Space
    Space No.                               Room Name                                       NSF             Qty         TSF                             Adjacency
    HS 1           Lab (incl. Nurses Station)                                                     2080       1              2080
    HS 1 a         Patient Cot Areas                                                                    0    3                  0                         HS 1
    HS 2           Classroom                                                                            0    1                  0                         HS 1
    HS 3           Office                                                                             150    1                150                         HS 1
    HS 4           Toilet                                                                             100    1                100                         HS 1
    HS 5           Kitchen / Laundry                                                                  150    1                150                         HS 1
                                                                                      Total Area SF                         2480


                                                                                  Equipment
    The following items are to be specified in the base contract unless noted otherwise.
    Item           Room Location                                                      Size (WxH)            #/RM
    MB             HS 1, HS 2                                                              4' x 4'           2     Locate at opposite ends of IB on teaching wall.
    IB             HS 1, HS 2                                                              8' x 4'           1     OP. Center on teaching wall.
    TB             HS 1, HS 2                                                              4' x 4'           1     Locate adjacent to MB on teaching wall.
    TB             HS 1, HS 2                                                              12' x 4'          1     Locate above computer stations.
    TB             HS 1, HS 2                                                              4' x 4'           1
    MB             HS 1, HS 2                                                              4' x 4'           1
    IB             HS 2                                                                                      1     OP. Installed by Owner on Teaching Wall.
    CLK            HS 2                                                                                      1     Locate at teaching wall.
    TH             HS 4                                                                                      1
    GB             HS 4                                                                                      1
    ND             HS 4                                                                                      1
                   HS 4                                                                                      1
    SC             HS 4                                                                                      1
    SS             HS 4                                                                                      1
    MI             HS 4                                                                                      1
    DR             HS 5                                                                                      1
    WA             HS 5                                                                                      1
    REF            HS 5                                                                                      1
    DW             HS 5                                                                                      1
    RGE            HS 5                                                                                      1
    EH             HS 5                                                                                      1
    FE             HS 5                                                                                      1
    SK             HS 4                                                                                      1
    SK             HS 5                                                                                      1
    HSK            HS 1a                                                                                     3
    HSK            HS 1                                                                                      3
    USK            HS 5                                                                                      1



DeKalb County School District                                                     81 of 121                                                              February 15, 2013 v1.1
    TDD       HS 4                          1
    SD        HS 4                          1
    PTC       HS 1a                         3
    PCT       HS 1a                         3
    OPS       HS 2                          1   Ceiling mount.




DeKalb County School District   82 of 121                        February 15, 2013 v1.1
    AMD            HS 2                                                                               1   Ceiling mount.
    CMP            HS 2                                                                                   OP - refer to Instructional Technology requirements.
    TB - Tack Board                           DR - Dryer                           TH - Toilet Tissue Dispenser             CMP - Computers (Student)
    MB - Marker Board                         WA - Washer                          GB - Grab Bars                           REF - Refrigerator (w/ ice maker)
    BC - Book Cases                           FE - Fire Extinguisher               ND - Napkin Disposal Cabinet             C/BKT-Component Bracket (wall mtd)
    CLK - Electronic Wall Clock               PTC - Patient Cot                    NDD - Napkin Disposal Cab.               Video/Bkt-Recorder bracket (wall mtd.)
    IB - Interactive Board                    PCT - Patient Curtain/Track          TDD -Towel Dispenser Disposal            OP - Owner Provided
    SK - Sink                                 DW - Dish Washer                     SS - Shower Seat                         SC - Curtain Rod & Shower Curtain
    HSK - Hand Sink (wall mount)              RGE - Elec./Gas Range, ADA           MI - Mirrors 18 " w x 36" h              SD - Surface mtd. Soap dispenser
    USK - Utility Sink                        EH - Exhaust Hood                    AMD - Alarm Motion Detector              PTD - Paper Towel Dispenser
                                                                                                                            SD - Soap Dispenser
    * Reference Design Guidelines for complete list of kitchen/laundry equipment.                                           OPS - Overhead Projection Screen
                                                                                  Finishes
    Walls:       a All Spaces                 Provide paint finish. Refer to Design Guideline for sheen. Water base, low VOC paints are preferred.
                 b All spaces                 All walls to extend to underside of deck. Walls to be constructed of CMU.
    Floors:      a All Spaces                 Provide vinyl composition tile w/ 4 " rubber base in all spaces w/ the following exceptions.
                 b HS 3                       Provide carpet w/ 4" rubber base.
                 c HS 4                       Provide ceramic tile (CT) w/ ceramic base.

    Ceilings:    a All Spaces                 Provide 2x2 standard acoustical ceiling tile (ACT).
                 b All Spaces                 Provide 2x4 fluorescent fixtures.
                 c HS 1a                      Provide minimum 8'-0" ceiling height.
                 d HS 3, HS 4, HS 5           Provide minimum 9'-4" ceiling height.
                 e HS 1, HS 2                 Provide minimum 10'-0" ceiling height in lab and classroom areas if adjoined if adjoined.
                                                                                  Casework
    Space No.                Room Name                     Unit Type                  Unit Length   Qty     Size (wxdxh) Notes
    HS 1           Lab                        Work Counter (w/sinks):                                 1
                                              Base Cabinet (lockable)                   22 LF                               Provide upper and base cabinets w/ two (2)
                                              Upper Cabinet (lockable)                  22 LF                               single bowl sinks.

    HS 1           Lab                        Nurses Station:                                         1                     Provide L-shaped reception desk (w/ solid
                                              Base Cabinet (lockable)                    8 LF                               surface counter top. Provide cabinets w/ one (1)
                                                                                                                            single bowl sink and solid surface work counter.
                                              Upper Cabinet (lockable)                   8 LF
    HS 2           Classroom                  Teachers Cabinet (lockable)                             1      3'x2'x7'
                                              Book Cases                                              6     3'x12"x30"
    HS 4           Toilet                     Built-in shelves (wooden)                  3 LF         1    36"x12"x44"      Locate in alcove adjacent to shower area.
                                              ( 3 shelf unit )                                                              Mounting height, 3"-4" AFF.

    HS 5           Kitchen / Laundry          Base Cabinet (lockable)                   12 LF                               (1) utility sink.
                                                                                  Utilities
    Electrical     Location                   Lighting & Communications
    Power:         HS 5                       Provide junction box for kitchen exhaust hood.
                   HS 3 - Office
                                              Provide one (1) quadraplex receptacle (w/data) adj to desk area and one (1) quadraplex receptacle (w/data) on rear wall.

                   Classroom Computer Area:
                   HS 2                       Refer to Instructional Technology requirements and Design Guidelines.
                   Teaching Wall:
    Clock:         HS 2                       Provide receptacle for clock.
    Intercom:      HS 2, HS 3                 Provide push button 4 x 4 box, single gang plaster ring and 3/4 "C stubbed into ceiling for intercom system.
    Security:      HS 2                       Provide junction box and raceway for alarm motion detectors , ceiling mounted.



DeKalb County School District                                                  83 of 121                                                        February 15, 2013 v1.1
    Data:        HS 2            Provide receptacle and voice/data outlet for Interactive Board.
                 HS 3 - Office   Provide one (1) data outlet adj to each quadraplex receptacle at desk and rear wall.
    DVD:         HS 2            Provide receptacle and TV/RGB outlet for DVD Player.
    TV:                          Provide one (1) television outlet.
    Projector:   HS 2            Provide ceiling mounted receptacle and data outlet for projector.




DeKalb County School District                                     84 of 121                                             February 15, 2013 v1.1
    Other:         HEALTH SCIENCES                Intercom / Fire Alarm / Motion Sensor: Reference Division 16 - Electrical in the Design Guideline.
                   HEALTH SCIENCES                Technology Infrastructure: Reference Instructional Technology requirements.


    *Instructional Technology outline technology infrastructure (i.e. power, data, cabling, voice/data) requirements for rooms within the school.
    Plumbing
               1   Provide all necessary plumbing for equipment listed in GDOE guidelines….or…DeKalb Design Guidelines.
               2   HS 1                           Provide domestic CW, HW, and sanitary piping and vent for three (3) sinks listed below.
                                                  Work Counter: Provide two (2) single bowl sinks.
                                                  Nurses Station: Provide one (1) single bowl sink.
               3   HS 1a
                                                  Patient Cot Areas: Provide one (1) single bowl sink per each cot area. Provide domestic CW,HW,sanitary piping.
               4   HS 4                           Provide domestic CW, HW, and sanitary piping for shower; and sanitary piping for floor drain.
               5   HS 5                           Provide domestic CW, HW, and sanitary piping and vent for one (1) kitchen sink.
                                                  Provide domestic CW, HW, and sanitary piping and vent for one (1) utility sink.
                                                  Provide CW for ice maker in refrigerator, shut -off valve and backflow preventer.
                                                  Provide HW for dishwasher, shut -off valve and backflow preventer.
                                                  Provide domestic CW, HW, and sanitary piping and vent for one (1) washer.
                                                  Provide domestic CW, HW, and sanitary piping for shower; and sanitary piping for floor drain.
    HVAC
               1   Refer to Design Guidelines for HVAC system requirements.
               2   Provide all necessary HVAC for equipment listed in GDOE guidelines.
               3   Provide dryer exhaust in HS 5.
               4   Provide exhaust hood over cooking range in HS 5.
                                                                                    Acoustics
               1   Refer to Design Guidelines for system requirements.
                                                                                 General Notes
               1   Provide locks on all doors.
               2   Provide interior window in office, HS 3.




DeKalb County School District                                                      85 of 121                                                        February 15, 2013 v1.1
                                                 APPENDIX A

                                HIGH SCHOOL - Square Footage Summary


                                                                 2

                                                                4
                                                                7
                                                               10
                                                               14

                                                               19
                                                               21

                                                               29
                                                               33


                                                               38 Duplicate?




                                                               42
                                                               45


                                                               50 Duplicate?
                                                               55




                                                               63




                                                               79




DeKalb County School District                      86 of 121                   February 15, 2013 v1.1
                                                APPENDIX A - REAL INVENTORY NUMBERS (need to populate) 9.25.11

         HIGH SCHOOL - Square Footage Allocations (4/14/11 / 5/30/11) 07.28.11 ed spec meetings, 09/4/11 - finished, Rev. 9.26.11, 10.11.11, 10.24
Activity / Space                                                                     DOE Minumum                State Inventory Plans (THS)                         Proposed
Space No.                                       Room Name                  80 IU's      84 IU's    TSF               NSF      Qty               TSF          NSF      Qty           TSF
GENERAL CLASSROOMS                                                       1525 FTE     1600 FTE             2           FTE 1525 (80 IU's)                      FTE 1600 (84 IU's)
                                                                                          A               B      C             D            E            F             G            H
Section 01         Classroom Type I - (Eng./World Lang./Math/SS + ISS)     80 IU's      84 IU's                                                               FTE 1600 (84 IU's)
CR1 1              English                                                   12           12               4         700      12                8400         800       12               9600
CR1 1              World Language                                            5            5                7         700       5                3500         800       5                4000
CR1 1              Mathematics                                               12           11              10         700      13                9100         800       11               8800
CR1 1              Social Studies                                            12           11              14         700       9                6300         800       11               8800
CR1 1              In School Suspension                                      3            3              600         700       1                700          800       3                2400
CR1 2              Computer Labs                                             1            1          1000            940       3                2820         1000      1                1000
                   Total NSF                                                 45           43              19                                30820                                    34600
Section 02         Classroom Type II - (Science)                                                          21
CR2 1              Science Labs                                                                      1200            1117     12            13404            1600      14            22400
CR2 2              Prep/Storage Room                                                                       0         370       6                2220         200       7                1400
                   Total NSF                                                 12           14              29                                15624                                    23800
EDUCATIONAL COMMON SPACES                                                                                 33
Section 03         MEDIA CENTER
MC 1               Main Reading Room                                                                                 3011      1                3011         5300      1                5300
MC 2               Conference Room                                                                                   328       1                328          250       1                  250
MC 3               Offices                                                                                38 Duplicate?        2       #VALUE!               150       2                  300
MC 4               Audio / Visual Non-Print Storage                                                                  536       1                536          500       1                  500
MC 5               Media Production / Distribution                                                                   395       1                395          400       1                  400
MC 6               Workroom                                                                                          336       1                336          350       1                  350
MC 6 a             Toilet                                                                                 42          50       1                 50           50       1                  50
MC 7               Reading Room                                                                           45         321       1                321          300       1                  300
                   Total NSF                                                 1            1          7125                              #VALUE!                                          7450
Section 04         ART
                   Art Lab (2-D)                                                                          50 Duplicate?        1       #VALUE!               1600      1                1600
ART 2              Office (1 Person)                                                                      55         198       1                198          150       1                  150
ART 3              Storage                                                                                           165       1                165          170       1                  170
ART 4              Art Lab (3-D)                                                                                     1412      1                1412         1600      1                1600
ART 5              Kiln Room                                                                                         165       1                165          150       1                  150
ART 6              Office (2 Person)                                                                                 198       1                198          150       1                  150
                   Total NSF                                                 1            2               63                           #VALUE!                                          3820
Section 05         MUSIC
                   INSTRUMENTAL (Band / Orchestra)
IM 1               Band Room                                                                                         2219      1                2219         2200      1                2200
IM 2               Storage - Uniform                                                                                 307       1                307          400       1                  400
IM 3               Storage - Band Equipment                                                               79         443       1                443          400       1                  400
IM 4               Practice Rooms                                                                                    144       2                288          100       2                  200
IM 5               Office (Band Director)                                                                            139       1                139          150       1                  150
IM 6               Music Library                                                                                     138       1                138          150       1                  150
IM 7               Orchestra Room                                                                                    821       1                821          2000      1                2000
IM 8               Storage - Orchestra Equipment                                                          88         443       1                443          400       1                  400
IM 9               Band/Music Corridor (internal circulation)                                            100         139       1                139          140       1                  140
                     Instrumental Subtotal                                   1            2              124 SubTotal NSF                       4937                                    6040
                   CHORAL (Choral / Key Boarding)                                                        125
CM 1               Chorus Classroom                                                                                  1414      1                1414         1800      1                1800
CM 2               Chorus Equipment Storage                                                                          114       1                114          200       1                  200
CM 3               Office                                                                                            105       1                105          150       1                  150
CM 4               Keyboard Classroom                                                                                731       1                731          800       1                  800
CM 5               Music Library                                                                                     207       1                207          150       1                  150
CM 6               Practice Rooms                                                                                    183       2                366          100       2                  200
CM 7               Storage - Uniform                                                                                  60       1                 60          200       1                  200
                      Choral Subtotal                                        1            2          1800 SubTotal NSF                          2997                                    3500


                   Total NSF                                                 2            4          1924                                       7934                                    9540




DeKalb County School District                                                87 of 121                                                                February 15, 2013 v1.1
                                                  APPENDIX A - REAL INVENTORY NUMBERS (need to populate) 9.25.11

         HIGH SCHOOL - Square Footage Allocations (4/14/11 / 5/30/11) 07.28.11 ed spec meetings, 09/4/11 - finished, Rev. 9.26.11, 10.11.11, 10.24
Activity / Space                                                                                  DOE Minumum               State Inventory Plans (THS)                        Proposed
Space No.                                        Room Name                              80 IU's      84 IU's    TSF             NSF      Qty               TSF          NSF      Qty           TSF
GENERAL CLASSROOMS                                                                    1525 FTE     1600 FTE            2          FTE 1525 (80 IU's)                      FTE 1600 (84 IU's)
                                                                                                       A               B    C             D            E            F             G            H
Section 06         DRAMA
DR 1               Classroom                                                                                                    1537      1                1537         1520      1                1520
                   Total NSF                                                              1            1          1500                                     1537                                    1520
Section 07         PHYSICAL EDUCATION
                   Gymnasium:
PE 1               a. Main Gym                                                                                               16721        1            16721        16000         1             16000
                   b. Mezzanine Track                                                                                           6223      1                6223         6200      1                6200
                   c. Visitors Locker Room                                                                                      278       1                278          250       1                  250
                   Boy's:
PE 2               a. P.E. Locker Room                                                                                          894       1                894          900       1                  900
                   b. Showers                                                                                                   146       1                146          300       1                  300
                   c. Toilet                                                                                                    240       1                240          300       1                  300
                   d. Janitor Closet                                                                                             37       1                 37           40       1                  40
                   e. Athletic Locker Room                                                                                      1810      1                1810         1800      1                1800
                   f. Locker Room Common Area (internal circulation)                                                            640       1                640          500       1                  500
                   Girls:
PE 3               a. P.E. Locker Room                                                                                          756       1                756          800       1                  800
                   b. Showers                                                                                                   634       1                634          600       1                  600
                   c. Toilet (incl. in shower area)                                                                                0      1                  0             0      1                   0
                   d. Janitor Closet                                                                                             37       1                 37           40       1                  40
                   e. Athletic Locker Room                                                                                      1089      1                1089         1080      1                1080
                   f. Locker Room Common Area (internal circulation)                                                            450       1                450          500       1                  500
                   Coach / Support Areas:
PE 4               a. Coach Workroom                                                                                            439       2                878          400       2                  800
                   b. Coach Office (incl./toilet & shower 92 sf)                                                                292       6                1752         290       6                1740
                   c. Laundry                                                                                                   289       1                289          300       1                  300
                   d. PE Office (Boy's & Girl's) incl. 45 sf closet                                                             449       2                898          400       2                  800
                   e. Training Room (Boy's & Girl's)(incl./ 1 toilet & shower 92 sf                                             374       2                748          400       2                  800
PE 5               Storage:
                   a. Storage - athletic (outdoor)                                                                              350       1                350          350       1                  350
                   b. Storage - athletic                                                                                        875       1                875          875       1                  875
                   c. Storage - physical education                                                                              424       2                848          424       1                  424
                   d. Storage - athletic                                                                                        794       1                794          794       1                  794
                      PE Subtotal                                                         1            1         25000 SubTotal NSF                    37387                                    36193
PE 6               Wellness:
                   a. Health Service Lab                                                                                        1187      1                1187         1187      1                1187
                   b. Health Classroom                                                                                          823       2                1646         823       2                1646
                   c. Multi-Purpose Room                                                                                        2706      1                2706         2706      1                2706
                      Multi-Purpose Room Storage Closet                                                                         239       1                239          239       1                  239
                      Health Subtotal                                                     2            2              600                                  5778                                    5778


                   Total NSF                                                              3            3         25600                                 43165                                    41971
OTHER ESSENTIAL CLASSROOMS
Section 08         SPECIAL EDUCATION (Severe and Profound)
                   Special Needs Suite (SPED 1 thru SPED 3):
SPED 1             Suite Classrooms (w/o kitchenette)                                                                           543       1                543          800       1                  800
SPED 1 a           Suite Classrooms (w/ kitchenette)                                                                            543       1                543          800       1                  800
SPED 2             Adaptive Toilet (shared)                                                                                     147       1                147          150       1                  150
SPED 3             Office (Itinerant)                                                                                           129       1                129          150       1                  150
SPED 4             Classrooms (Incl. General & Vision Resource Rm.)                                                             700       4                2800         800       6                4800
                   Total NSF                                                              6            6              600                                  4162                                    6700
SUPPORT SPACES




DeKalb County School District                                                             88 of 121                                                              February 15, 2013 v1.1
                                                  APPENDIX A - REAL INVENTORY NUMBERS (need to populate) 9.25.11

          HIGH SCHOOL - Square Footage Allocations (4/14/11 / 5/30/11) 07.28.11 ed spec meetings, 09/4/11 - finished, Rev. 9.26.11, 10.11.11, 10.24
Activity / Space                                                                    DOE Minumum                State Inventory Plans (THS)                         Proposed
Space No.                                         Room Name               80 IU's      84 IU's    TSF               NSF      Qty               TSF          NSF      Qty           TSF
GENERAL CLASSROOMS                                                      1525 FTE     1600 FTE           2             FTE 1525 (80 IU's)                      FTE 1600 (84 IU's)
                                                                                         A              B       C             D            E            F             G            H
Section 09         AUDITORIUM
                   Auditorium:
AUD 1              a. Auditorium & Pit                                                                              5949      1                5949         6000      1                6000
                   b. Auditorium Entrance Vestibules                                                                   0      2                  0             0      2                   0
                   c. Auditorium Spiral Access Stair Room                                                              0      1                  0             0      1                   0
                   d. Suspended Catwalk                                                                                0      1                  0             0      1                   0
AUD 2              Costume Room                                                                                     254       1                254          250       1                  250
AUD 3              Storage Room                                                                                     231       1                231          200       1                  200
AUD 4              Stage                                                                                            1690      1                1690         1700      1                1700
AUD 5              Scene Shop & Storage                                                                             969       1                969          1000      1                1000
AUD 6              Dressing Room (Boy's & Girls)                                                                    248       2                496          250       2                  500
AUD 7              Toilet Room (shared)                                                                              72       1                 72           70       1                  70
                   Mechanical Mezzanine:
AUD 8              a. Auditorium Control Room                                                                       250       1                250          200       1                  200
                   b. Dim Panel Room                                                                                   0      1                  0             0      1                   0
                   Auditorium / Gym Support Spaces (shared):
AUD 9              a. Lobby (Hall of Fame) / Corridor                                                                  0      1                  0             0      1                   0
                   b. Concessions                                                                                   255       1                255          300       1                  300
                   c. Concession Storage Closet                                                                      60       1                 60           50       1                  50
                   d. Ticketing                                                                                     349       1                349          150       1                  150
                   e. Women's Toilet                                                                                409       1                409          420       1                  420
                   f. Men's Toilet                                                                                  424       1                424          420       1                  420
                   g. IDF Room                                                                                         0      1                  0             0      1                   0


                   Total NSF                                                0            0         15000                                   11408                                    11260
Section 10         ADMINISTRATION
                   Main Administration Suite (1st floor-Main Entry)
ADM 1              Reception Lobby                                                                                  730       1                730          600       1                  600
ADM 2              Principal's Office                                                                               358       1                358          330       1                  330
ADM 2 a            Closet                                                                                            21       1                 21           20       1                  20
ADM 2 b            Toilet                                                                                            49       1                 49           50       1                  50
ADM 3              Conference Room                                                                                  428       1                428          420       1                  420
ADM 4              Attendance Office                                                                                176       1                176          150       1                  150
ADM 5              Book Keeper Office                                                                               196       1                196          150       1                  150
ADM 6              Vault/Records Rm.                                                                                 76       1                 76          150       1                  150
ADM 7              Clinic                                                                                           239       1                239          250       1                  250
ADM 7 a            Toilet                                                                                            49       1                 49           50       1                  50
ADM 8              Toilet Rooms (Staff)                                                                              50       2                100           50       2                  100
ADM 9              Lounge                                                                                           223       1                223          200       1                  200
ADM 10             Mail Room                                                                                        270       1                270          250       1                  250
ADM 11             Workroom                                                                                         274       1                274          250       1                  250
ADM 12             Intercom Equipment Alcove (incl. in workroom)                                                       0      1                  0             0      1                   0
ADM 13             Admin Suite Corridor (int. circ.)                                                                   0      1                  0             0      1                   0
ADM 17             Testing Room                                                                                                                             385       1                  385
ADM 18                Test Storage                                                                                                                          100       1                  100
ADM 19                Data Room                                                                                                                             145       1                  145
                                                                                                            SubTotal NSF                       3189                                    3600
                   Workrooms:
ADM 14             Faculty Workroom                                                                                 448       4                1792         450       4                1800
ADM 14 a           Toilet                                                                                            50       8                400           50       8                  400
ADM 14             Faculty Workroom (Security Resurce Officer)                                                      426       1                426          450       1                  450
ADM 14 a           Toilet (Security Resource Officer)                                                                50       2                100           50       2                  100
ADM 15             Satellite Administration Suites:
ADM 15 a           Assistant Principal Office (2nd fl.)                                                             115       1                115          150       1                  150
ADM 15 b           Administrative Assistant Office                                                                  657       1                657          150       1                  150


DeKalb County School District                                               89 of 121                                                                February 15, 2013 v1.1
                                                   APPENDIX A - REAL INVENTORY NUMBERS (need to populate) 9.25.11

         HIGH SCHOOL - Square Footage Allocations (4/14/11 / 5/30/11) 07.28.11 ed spec meetings, 09/4/11 - finished, Rev. 9.26.11, 10.11.11, 10.24
Activity / Space                                                                     DOE Minumum             State Inventory Plans (THS)                      Proposed
Space No.                                         Room Name                80 IU's      84 IU's    TSF           NSF     Qty               TSF          NSF     Qty           TSF
GENERAL CLASSROOMS                                                       1525 FTE     1600 FTE           2        FTE 1525 (80 IU's)                     FTE 1600 (84 IU's)
                                                                                          A              B   C            D            E            F            G            H
ADM 15 c           Conference Room                                                                               383      1                383          350      1                  350
ADM 15 a           Assistant Principal Office (3rd fl.)                                                          361      1                361          150      1                  150




DeKalb County School District                                                90 of 121                                                           February 15, 2013 v1.1
                                                      APPENDIX A - REAL INVENTORY NUMBERS (need to populate) 9.25.11

          HIGH SCHOOL - Square Footage Allocations (4/14/11 / 5/30/11) 07.28.11 ed spec meetings, 09/4/11 - finished, Rev. 9.26.11, 10.11.11, 10.24
Activity / Space                                                                        DOE Minumum                State Inventory Plans (THS)                         Proposed
Space No.                                         Room Name                   80 IU's      84 IU's    TSF               NSF      Qty               TSF          NSF      Qty           TSF
GENERAL CLASSROOMS                                                          1525 FTE     1600 FTE           2             FTE 1525 (80 IU's)                      FTE 1600 (84 IU's)
                                                                                             A              B       C             D            E            F             G            H
ADM 15 b           Administrative Assistant Office                                                                      319       1                319          150       1                  150
ADM 15 c           Conference Room                                                                                         0      1                  0          350       1                  350
ADM 15 a           Assistant Principal Office (4th fl.)                                                                 124       1                124          150       1                  150
ADM 15 b           Administrative Assistant Office                                                                      131       1                131          150       1                  150
ADM 15 c           Conference Room                                                                                      423       1                423          350       1                  350
                   Miscellaneous Offices:
ADM 16             Coach Office (Soccer)                                                                                118       1                118          150       1                  150
                   Plant Engineer Office                                                                                113       1                113          150       1                  150
                   Security Resource Officer (SRO)                                                                      118       1                118          150       1                  150
                   Asst. Principal Office (2nd fl.)                                                                     122       1                122          150       1                  150
                   Office (Golf & Tennis)                                                                               140       1                140          150       1                  150
                                                                                                                SubTotal NSF                       5842                                    5450


                   Total NSF                                                    0            0          4000                                       9031                                    9050
Section 11         COUNSELING
CSG 1              Counselor Lobby                                                                                      578       1                578          500       1                  500
CSG 2              Head Counselor Office                                                                                180       1                180          150       1                  150
CSG 3              Registrar Office                                                                                     174       1                174          174       1                  174
CSG 4              Counselor Offices                                                                                    174       2                348          174       2                  348
CSG 5              AP Office                                                                                            180       1                180          150       1                  150
CSG 6              Vault / Records Room                                                                                 150       1                150          150       1                  150
CSG 7              Conference Room (incl . Closet)                                                                      201       1                201          350       1                  350
CSG 7 a            Closet                                                                                                76       1                 76           20       1                  20
CSG 8              Career Center (open area)                                                                            162       1                162          150       1                  150
CSG 9              Toilet Room                                                                                           46       1                 46           50       1                  50
CSG 10             Counseling Suite Corridor (internal circulation)                                                        0      1                  0             0      1                   0
CSG 11             Graduation Specialist (relocated from Administration)                                                154       1                154          150       1                  150
CSG 12             Testing Room                                                                                                                                           1                   0
                   Total NSF                                                                                                                       2249                                    2192
Section 12         SCHOOL NUTRITION
                   Kitchen Area:
KIT 1              Preparation Kitchen                                                                                  1823      1                1823         1600      1                1600
KIT 2              Cooler (Walk-in)                                                                                        0      1                  0          200       1                  200
KIT 3              Freezer (walk-in)                                                                                       0      1                  0          400       1                  400
KIT 4              Dry Storage                                                                                          474       1                474          500       1                  500
KIT 5              Office                                                                                               146       1                146          150       1                  150
KIT 6              Staff Area:
KIT 6 a            Locker / Laundry Room                                                                                151       1                151          150       1                  150
KIT 6 b            Toilet                                                                                                47       1                 47           50       1                  50
KIT 7              Servery                                                                                              3178      1                3178         1200      1                1200
KIT 8              Dish Wash                                                                                            289       1                289          350       1                  350
KIT 9              Can Wash Room (exterior)                                                                              67       1                 67           60       1                  60
                      Kitchen Subtotal                                          0            0          4000 SubTotal NSF                          6175                                    4660
                   Cafeteria:
CAF 1              Cafeteria (Student Dining)                                                                           7292      1                7292         7800      1                7800
CAF 2              Storage (Table /Chair)                                                                                85       2                170          100       2                  200
CAF 3              Vending Area (incl. in Cafeteria)                                                                       0      1                  0             0      1                   0
                      Cafeteria Subtotal                                        0            0          7619 SubTotal NSF                          7462                                    8000


                   Total NSF                                                    0            0         11619                                   13637                                    12660
BUILDING - MECHANICAL, ELECTRICAL, TOILETS, STORAGE
Section 13         BUILDING SERVICES (J.M. List)
                   Storage:
BS 1               Book Storage                                                                                         406       1                406          600       3                1800




DeKalb County School District                                                   91 of 121                                                                February 15, 2013 v1.1
                                                     APPENDIX A - REAL INVENTORY NUMBERS (need to populate) 9.25.11

         HIGH SCHOOL - Square Footage Allocations (4/14/11 / 5/30/11) 07.28.11 ed spec meetings, 09/4/11 - finished, Rev. 9.26.11, 10.11.11, 10.24
Activity / Space                                                                       DOE Minumum             State Inventory Plans (THS)                       Proposed
Space No.                                            Room Name               80 IU's      84 IU's    TSF           NSF      Qty               TSF          NSF     Qty           TSF
GENERAL CLASSROOMS                                                         1525 FTE     1600 FTE           2         FTE 1525 (80 IU's)                     FTE 1600 (84 IU's)
                                                                                            A              B   C             D            E            F            G            H
BS 2               General Building Storage (new)                                                                     0      1                  0          250      6                1500
                   Custodial (Maintenance Rooms):
BS 3               a. Maintenance Room                                                                              82       1                 82           70      1                  70
                   b. Maintenance Room                                                                              62       2                124           70      2                  140
                   c. Maintenance Room (exterior)                                                                  182       1                182          180      1                  180
                   Branch Custodial Closets:
BS 4               a. Janitor Closet                                                                                37       1                 37           40      8                  320
                   b. Janitor Closet-cafeteria corridor                                                             70       1                 70            0      0                   0
                   c. Janitor                                                                                       49       1                 49            0      0                   0
                   d. Janitor - cr wing - triangle                                                                  24       1                 24            0      0                   0
                   e. Janitor - cr wing - triangle                                                                  24       1                 24            0      0                   0
                   f. Janitor - cr wing - triangle                                                                  24       1                 24            0      0                   0
                   g. Janitor                                                                                       49       1                 49            0      0                   0
                   h. Janitor                                                                                       37       1                 37            0      0                   0
                   Building Mechanical & Electrical Services:
                   Main Mechanical Rooms
BS 5               a. Main Mechanical Room                                                                         1058      1                1058         875      2                1750
                   b. Main Mechanical Room                                                                         684       1                684            0      0                   0
BS 6               Branch Mechanical Rooms
                   a. Cafeteria - Mechanical Room                                                                  334       1                334          300      1                  300
                   b. Elevator - Mechanical Equipment Room                                                          82       1                 82           80      1                  80
                   c. Gym - Mechanical Room                                                                         64       1                 64           70      1                  70
                   d. Gym - Mechanical Room (Boiler Room)                                                          224       1                224          200      1                  200
BS 7               a. Mechanical Attic                                                                                0      1                  0            0      1                   0
                   b. Mezzanine Access Rooms                                                                       198       1                198          200      1                  200
                   b. Mezzanine Access Rooms                                                                        75       1                 75           75      1                  75
                   c. Mechanical Yard (outdoor)                                                                       0      1                  0            0      1                   0
BS 8               Emergency Generator Room                                                                        368       1                368          350      1                  350
                   Main Electrical Rooms
BS 9               a. Main Electrical Room                                                                         260       1                260          250      4                1000
                   b. Main Electrical Room                                                                         229       1                229            0      0                   0
                   c. Main Electrical Room (224 + IDF 48)                                                          224       1                224            0      0                   0
                      Data Room                                                                                     48       1                 48            0      0                   0
BS 10              Branch Electrical Rooms
                   a. Electrical Room                                                                               63       1                 63           75      7                  525
                   b. Electrical Room                                                                               90       1                 90            0      0                   0
                   c. Electrical Room                                                                               83       1                 83            0      0                   0
                   d. Electrical Room                                                                               75       1                 75            0      0                   0
                   e. Electrical Room                                                                               75       1                 75            0      0                   0
                   f. Electrical Room                                                                               75       1                 75            0      0                   0
                   g. Electrical Room                                                                               63       1                 63            0      0                   0
BS 11              Main Distribution Frame (MDF) Room                                                              136       1                136            0      0                   0
BS 12              Intermediate Distribution Frame (IDF) Room
                   a. Data Room                                                                                     75       1                 75           75      5                  375
                   b. Data Room                                                                                     75       1                 75            0      0                   0
                   c. Data Room                                                                                     75       1                 75            0      0                   0
                   d. Data Room                                                                                     75       1                 75            0      0                   0
                   e. Data Room                                                                                     75       1                 75            0      0                   0
                   MIS:
BS 13              IT Office (CTSS)                                                                                140       1                140          150      1                  150
BS 14              IT Server Room                                                                                  136       1                136          150      1                  150
                   Restrooms:
BS 15              Boy's - Student Restrooms @ classroom wings                                                     303       6                1818         350      6                2100
BS 16              Girl's - Student Restrooms @ classroom wings                                                    303       6                1818         350      6                2100
BS 17              Cafeteria - Girl's Restroom                                                                     244       1                244          250      1                  250


DeKalb County School District                                                  92 of 121                                                            February 15, 2013 v1.1
                                                APPENDIX A - REAL INVENTORY NUMBERS (need to populate) 9.25.11

            HIGH SCHOOL - Square Footage Allocations (4/14/11 / 5/30/11) 07.28.11 ed spec meetings, 09/4/11 - finished, Rev. 9.26.11, 10.11.11, 10.24
Activity / Space                                                                  DOE Minumum             State Inventory Plans (THS)                        Proposed
Space No.                                       Room Name               80 IU's      84 IU's    TSF           NSF      Qty               TSF          NSF      Qty           TSF
GENERAL CLASSROOMS                                                    1525 FTE     1600 FTE           2         FTE 1525 (80 IU's)                      FTE 1600 (84 IU's)
                                                                                       A              B   C             D            E            F             G             H
BS 18              Cafeteria - Boy's Restroom                                                                 238       1                238          250       1                  250
                   Miscellaneous:
BS 19              Corridors (See Section D, Public Commons)                                                     0      1                  0             0      0                   0
Note:              Loading Dock / Compactor Area (outdoor)                                                                                                      0                   0


Total NSF                                                                                                                            10385                                    13935


CAREER TECHNOLOGY & OPTIONAL PROGRAMS
Section 15         BASIC CAREER TECHNOLOGY
Section 15.1       BUSINESS & COMPUTER SCIENCE
BCS 1              Business Lab                                                                               1744      4                6976         1800      4                 7200
                   a. Supply Closet                                                                           225       4                900          200       4                  800
                   b. Office                                                                                  114       4                456          150       4                  600
BCS 2              Business Classroom ( 2 CR's combined)                                                      1410      1                1410         1600      1                 1600
                   Total NSF                                              5            4          1800                                   9742                                 10200
Section 15.2       ENGINEERING & TECHNOLOGY
ETEC 1             Engineering & Technology Lab                                                               1844      1                1844         3000      1                 3000
                   a. Office                                                                                  118       1                118          150       1                  150
                   b. Storage Room                                                                            137       1                137          150       1                  150
                   c. Control Room                                                                            121       1                121          150       1                  150
                   d. Video Room                                                                              250       1                250          250       1                  250
ETEC 2             Materials & Processing Lab                                                                 1238      1                1238         1800      1                 1800
                   a. Supply Storage                                                                          148       1                148          200       1                  200
ETEC 3             Engineering, Drawing & Design Lab (CAD)                                                    1280      1                1280         1800      1                 1800
                   a. Office                                                                                  160       1                160          150       1                  150
ETEC 4             Rapid Prototyping Room                                                                                                                       1                   0
                   Total NSF                                              1            1          3600                                   5296                                     7650
Section 15.3       FAMILY & CONSUMER SCIENCES
FCS 1              Lab                                                                                        1806      1                1806         1800      1                 1800
FCS 2              Classroom (incl. in lab)                                                                      0      1                  0             0      0                   0
FCS 3              Office                                                                                     114       1                114          150       1                  150
FCS 4              Storage Room                                                                               168       1                168          150       1                  150
                   Total NSF                                              1            1          2100                                   2088                                     2100
Section 15.4       JUNIOR ROTC
JROTC 1            Classroom                                                                                  1528      1                1528         1500      1                 1500
JROTC 2            Office                                                                                     108       1                108          150       1                  150
JROTC 3            Classroom                                                                                  1619      1                1619         1500      1                 1500
JROTC 4            Cadet Office                                                                               424       1                424          150       1                  150
JROTC 5            Office                                                                                     287       1                287          200       1                  200
JROTC 6            Arms Room (Weapons Storage)                                                                122       1                122          100       1                  100
JROTC 7            Materials Storage                                                                          447       1                447          200       1                  200
JROTC 8            Unitform Storage                                                                           1365      1                1365         400       1                  400
                   Total NSF                                              1            2          2800                                   5900                                     4200


                   Grand Total NSF                                        8            8         10300                               23026                                    24150

        A          Sub-Total Basic Programs: (Net SF)                     79           82       77779                           #VALUE!                                      202648
Section 16         OPTIONAL PROGRAMS (CT)
Section 16.1       Culinary Classroom
CA 1               Lab                                                                                        2151      1                2151         2150      1                 2150
CA 2               Classroom (incl. in Lab)                                                                      0      1                  0             0      1                   0
CA 3               Office                                                                                     108       1                108          150       1                  150
CA 4               Pantry                                                                                     223       1                223          220       1                  220
CA 5               Linen Storage                                                                              111       1                111          100       1                  100
                   Total NSF                                              1            1          2430                                   2593                                     2620


DeKalb County School District                                             93 of 121                                                            February 15, 2013 v1.1
                                                  APPENDIX A - REAL INVENTORY NUMBERS (need to populate) 9.25.11

             HIGH SCHOOL - Square Footage Allocations (4/14/11 / 5/30/11) 07.28.11 ed spec meetings, 09/4/11 - finished, Rev. 9.26.11, 10.11.11, 10.24
Activity / Space                                                                            DOE Minumum                State Inventory Plans (THS)                         Proposed
Space No.                                         Room Name                       80 IU's       84 IU's   TSF               NSF      Qty               TSF          NSF      Qty           TSF
GENERAL CLASSROOMS                                                              1525 FTE     1600 FTE           2             FTE 1525 (80 IU's)                      FTE 1600 (84 IU's)
                                                                                                  A             B       C             D            E            F             G            H
Section 16.2       Health Science
HS 1               Lab                                                                                                      2084      1                2084         2080      1                2080
HS 1 a             Patient Cot Areas                                                                                           0      3                  0             0      3                   0
HS 2               Classroom (incl. in Lab)                                                                                    0      1                  0             0      1                   0
HS 3               Office                                                                                                   108       1                108          150       1                  150
HS 4               Toilet                                                                                                   101       1                 101         100       1                 100
HS 5               Kitchen / Laundry                                                                                        156       1                 156         150       1                 150
                   Total NSF                                                        1             1         1995                                       2449                                    2480
         B         Sub-Total Optional Programs: (Net SF)                            2             2         4425                                       5042                                    5100
         C         Tota (A+B): Basic + Optional Programs (Net SF)                   81            84       82204                               #VALUE!                                     207748
         D         Public Commons:
                   Entrance Vestibule                                                                                                                    0                                        0
                   Main Lobby                                                                                                                            0                                        0
                   Corridors                                                                                                                             0                                        0
                   Stairs                                                                                                                                0                                        0
                   Elevator                                                                                                                              0                                        0
                                                                                                                    Subtotal NSF                         0                                        0


                   Walls and Circulation @ .345 Net Building Area                                                                             #VALUE!                                       96400
         E         GRAND TOTAL (C x Grossing Factor 1.345%): Total Building Gross Sq. Footage                                                 #VALUE!                                      279421
Section 14         OUTDOOR AREAS
Section 14.1       OUTDOOR SPACES
OS 1               Outdoor Educational Spaces                                                                                  0      1                  0             0      0                   0
OS 2               Outdoor Art Work Space                                                                                      0      1                  0             0      0                   0
OS 3               Loading Dock / Trash Compactor Area                                                                         0      1                  0             0      0                   0
                   Total NSF                                                                                                                             0                                        0


Section 14.2       SITE FACILITIES
SF 1               Softball Field                                                                                              0      1                  0             0      0                   0
SF 2               Baseball Field                                                                                              0      1                  0             0      0                   0
SF 3               Softball Dugout                                                                                             0      1                  0             0      0                   0
SF 4               Baseball Dugout                                                                                             0      1                  0             0      0                   0
SF 5               Football Field (combines with track                                                                         0      1                  0             0      0                   0
SF 6               Track - 8 lane                                                                                              0      1                  0             0      0                   0
SF 7               Multi-purpose Practice Field                                                                                0      1                  0             0      0                   0
SF 8               Tennis Courts                                                                                               0      2                  0             0      0                   0
SF 9               Track Shot and Discus Areas                                                                                 0      1                  0             0      0                   0
SF 10              Concessions / Press Box combo *                                                                             0      2                  0             0      0                   0
SF 11              Batting Cage *                                                                                              0      1                  0             0      0                   0
SF 12              Maintenance Storage Facility                                                                                0      1                  0             0      0                   0
SF 13              Outdoor Sports Storage                                                                                      0      1                  0             0      0                   0
                   Total NSF                                                                                                                             0                                        0


Section 14.3       STADIUM: (Home Side)
STAD 1             Ticket Booth                                                                                                0      1                  0             0      0                   0
STAD 2             Concessions                                                                                                 0      1                  0             0      0                   0
STAD 3             Public Toilets                                                                                              0      2                  0             0      0                   0
STAD 4             Referee's Room (w/toilet & shower)                                                                          0      1                  0             0      0                   0
STAD 5             Custodial Service Room                                                                                      0      1                  0             0      0                   0
STAD 6             Electrical Room                                                                                             0      1                  0             0      0                   0
STAD 7             Bleacher Seats                                                                                              0      1                  0             0      0                   0
STAD 8             Press Box                                                                                                   0      1                  0             0      0                   0
                   STADIUM: (Visitors Side)
STAD 9             Ticket Booth                                                                                                0      1                  0             0      0                   0
STAD 10            Concessions                                                                                                 0      1                  0             0      0                   0



DeKalb County School District                                                       94 of 121                                                                February 15, 2013 v1.1
                                               APPENDIX A - REAL INVENTORY NUMBERS (need to populate) 9.25.11

          HIGH SCHOOL - Square Footage Allocations (4/14/11 / 5/30/11) 07.28.11 ed spec meetings, 09/4/11 - finished, Rev. 9.26.11, 10.11.11, 10.24
Activity / Space                                                                 DOE Minumum                State Inventory Plans (THS)                       Proposed
Space No.                                     Room Name                80 IU's      84 IU's    TSF               NSF     Qty               TSF          NSF     Qty           TSF
GENERAL CLASSROOMS                                                   1525 FTE     1600 FTE           2            FTE 1525 (80 IU's)                     FTE 1600 (84 IU's)
                                                                                      A              B       C            D            E            F            G            H
STAD 11            Public Toilets                                                                                  0      2                  0            0      0                  0
STAD 12            Referee's Room (w/toilet & shower)                                                              0      1                  0            0      0                  0
STAD 13            Custodial Service Room                                                                          0      1                  0            0      0                  0
STAD 14            Electrical Room                                                                                 0      1                  0            0      0                  0
STAD 15            Bleacher Seats                                                                                  0      1                  0            0      0                  0
STAD 16            Press Box                                                                                       0      1                  0            0      0                  0
                                                                                                         Subtotal NSF                        0                                      0


                   Total NSF                                                                                                                 0                                      0




DeKalb County School District                                            95 of 121                                                               February 15, 2013 v1.1
                                                      APPENDIX B

                      HIGH SCHOOL - Furnishings, Fixtures & Equipment (Provided by DCS)


                                                                      2

                                                                      4
                                                                      7
                                                                     10
                                                                     14

                                                                     19
                                                                     21

                                                                     29
                                                                     33


                                                                     38 Duplicate?




                                                                     42
                                                                     45


                                                                     50 Duplicate?
                                                                     55




                                                                     63




                                                                     79




DeKalb County School District                          96 of 121                          February 15, 2013 v1.1
                                                           SECTION 01 CLASSROOM TYPE I - FURNITURE & EQUIPMENT

                                                                                                       ROOM NAME                                                                         SIZE                          NOTES




                                                                                                                                                                                                   m
                                                                                                                                                                                                   oo
                                                                                                                                                                                                 sr
                                                                                                                                          om
                                                                                                                         m




                                                                                                                                                                                               as
                                                                                                                                                           m
                                                                                                                       oo
                                                                   m




                                                                                                                                                                                             Cl
                                                                                                                                        Ro




                                                                                                                                                      oo
                                                                 oo




                                                                                                                     sr




                                                                                                                                                                                               n
                                                                                                                                                                        b
                                                                                                                                         g




                                                                                                                                                      sr
                                                                                                                   as
                                                               sr




                                                                                                                                                                                           sio
                                                                                                                                                                      La
                                                                                                                                     tin




                                                                                                                                                     as
                                                                                                  ab
                                                             as




                                                                                                                Cl




                                                                                                                                                                                        en
                                                                                                                                  es




                                                                                                                                                                        g
                                                                                                                                                  Cl
                                                                                               rL
                                                          Cl




                                                                                                               ge




                                                                                                                                                                     in




                                                                                                                                                                                     sp
                                                                                                                                /T




                                                                                                                                               rt s




                                                                                                                                                                 ri t
                                                                                             te
                                                         ies




                                                                                                             ua




                                                                                                                                                                                  Su
                                                                                             pu




                                                                                                                             b




                                                                                                                                                               rW
                                                                                                                                             eA
                                                                                                           ng
                                                     ud




                                                                                                                           La




                                                                                                                                                                                 ol
                                                                                            m




                                                                                                                                                             te
                                                                                                         La
                                                   St




                                                                                                                                             ag
                                                                                         Co




                                                                                                                            g




                                                                                                                                                                                  o
                                                                                                                                                           pu
                                                                                                                         in




                                                                                                                                                                               ch
                                                                                                                                           gu
                                                     l




                                                                                                        ld
                                                 cia




                                                                                                                      ad
                                                                                  th




                                                                                                                                                        m




                                                                                                                                                                             -S
                                                                                                     or




                                                                                                                                         n
                                                                                Ma




                                                                                                                                                      Co
                                                                                                                    Re
                                              So




                                                                                                                                      La
                                                                                                    W




                                                                                                                                                                            In
                                                                2
               DEKALB - FF&E                                                                                                                                                      W    L     D
                                                                                                                                                                                   Dimensions
               Classroom:                                        4
               Teacher Desk                   1                  7                  1               1               1                  1              1                     1
               Task Chair                     1                 10                  1               1               1                  1              1                     1
               File Cabinet                                     14
               Student Chair                  6                  2              32                  4               30                6               28                                                2 - 6 Chairs / 2 - 4 Chairs ??
               Student Combo Desk             28                28                                  30                                30                                    15
               Student Table                                    19              16                                                                    16                                                14 - 16 Student Tables
               Cot and/or Couch                                 21
               Coat Rack
               Round Table                    1*                1*                                                  4                 1*                                                                Round Table Optional *
               Administrative:                                      29
  FURNITURE




               Administrative Desk                                  33
               Credenza / Return
               Task Chair
               Guest Chair
               File Cabinet                                     38 Duplicate?
               Book Case
               Rd. Table

                                                                    42
                                                                    45



                                                                    50 Duplicate?
                                                                    55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet *          2                 63                  1               2               2                                 1                     1

               Walkie Talkie Radios
               Trash Receptacle               1                     1               1               1               1                  1              1                     1
               Podium Lecturn                 1                                                                                        1
               Counter Top Refrigerator                         79
               Refrigerator
  EQUIPMENT




               Microwave Oven
               Coffee Maker
               Vending Machine (Drink)
               Vending Machine (Snack)                          88
               Laminator w/ Cabinet                            100
               LCD TV 20"                                      124
               Overhead Projector                              125

               DEKALB - MIS
               Teacher Computer Workstation   1                1                1                   1                                  1              1                     1
               Student Computer Workstation   4                2                28                  4                                  6              28                                                2-4 or 20-6, Student Workstations
               Computer Headphones                                                                  30
               Computer Microphones                                                                 30
               Computer Station Earphones                                                                                              X
               Laptop Mobile Carts                                                  X                                                                 X
  TECHNOLOGY




               Printer/Scanner Workstation                                          1                               1                                 1
               Intercom System
               Interactive Board              1*               1*                   1*              1*              1*                1*              1*                    1*                          Includes ceiling mtd. LCD Projector *
               Telephone
               Large Paper Cutter
               Copier Machine




DeKalb County School District                                                                                97 of 121                                                                                  February 15, 2013 v1.1
                                                   SECTION 02 CLASSROOM TYPE II (Science) - FURNITURE & EQUIPMENT

                                                                                              ROOM NAME              SIZE                     NOTES




                                                                                                ry
                                                           b
                                                          La




                                                                                             to
                                                                                           ra
                                                          al




                                                                                         bo
                                                        er
                                                      en




                                                                                       La
                                                    /G




                                                                                       ry
                                                                                    ist
                                                      y
                                                   og




                                                                             em
                                                ol




                                                                           Ch
                                              Bi




                                                           2
               DEKALB - FF&E                                                                                     W    L     D
                                                                                                                  Dimensions
               Classroom:                                       4
               Teacher Desk                   1                 7              1
               Task Chair                     1                10              1
               File Cabinet                                    14
               Student Chair                  30               30          30
               Student Chair
               Student Combo Desk                              19
               Cot and/or Couch                                21
               Coat Rack
               Round Table
               Administrative:                                 29
  FURNITURE




               Administrative Desk                             33
               Credenza / Return
               Task Chair
               Guest Chair
               File Cabinet                                    38 Duplicate?
               Book Case
               Rd. Table

                                                               42
                                                               45



                                                               50 Duplicate?
                                                               55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet*                            63

               Walkie Talkie Radios
               Trash Receptacle               1                1               1
               Podium Lecturn
               Counter Top Refrigerator                        79
               Refrigerator
  EQUIPMENT




               Microwave Oven
               Coffee Maker
               Vending Machine (Drink)
               Vending Machine (Snack)                      88
               Laminator w/ Cabinet                        100
               LCD TV 20"                                  124
               Overhead Projector                          125

               DEKALB - MIS
               Teacher Computer Workstation   1            1                   1
               Student Computer Workstation   2            2                   2
               Printer/Scanner Workstation
               Intercom System
               Interactive Board              1*          1*                   1*                                               Includes ceiling mtd. LCD Projector *
               Telephone
  TECHNOLOGY




               Large Paper Cutter
               Copier Machine




DeKalb County School District                                                                        98 of 121                  February 15, 2013 v1.1
                                                               SECTION 03 MEDIA CENTER - FURNITURE & EQUIPMENT

                                                                                               ROOM NAME                                           SIZE                       NOTES




                                                                                                           io
                                                                                                          ud
                                                                                                        St




                                                                                                                                           e
                                                                                                       n




                                                                                                                                        ag
                                                                                                   tio




                                                                                                                                         r
                                                                                                    u




                                                                                                                                      to
                                                                                                rib




                                                                                                                                   tS
                                                                                            ist




                                                                                                                                ri n
                                                                                          /D
                                                            m




                                                                                                                              -P
                                                           o




                                                                                                           m




                                                                                                                              n
                                                                                          n
                                                        Ro




                                                                                                           o




                                                                                                                           No
                                                                                       io




                                                                                                        Ro
                                                                                     ct
                                                      ng




                                                                                                                        al
                                                                                     du




                                                                                                     ce




                                                                                                                         su
                                                        i




                                                                                                                                        om
                                                     ad




                                                                                     o




                                                                                                   en




                                                                                                                      Vi
                                                                                  Pr
                                                   Re




                                                                                                                                         o
                                                                                                  er




                                                                                                                    o-




                                                                                                                                      kr
                                                                                 o
                                                in




                                                                                                nf




                                                                                                                  di
                                                                               de




                                                                                                                                   or
                                              Ma




                                                                                              Co




                                                                                                                Au




                                                                                                                                  W
                                                                            Vi
                                                                2
               DEKALB - FF&E                                                                                                                   W    L     D
                                                                                                                                                Dimensions
               Classroom:                                        4
               Teacher Desk                                      7            1
               Task Chair                                       10            1
               File Cabinet                                     14
               Student Chair
               Student Combo Desk
               Student Table                                    19
               Cot and/or Couch                                 21
               Coat Rack
               Round Table
               Administrative:                                     29
               Administrative Desk                              33
               Credenza / Return                                 1
               Task Chair                                        1
  FURNITURE




               Guest Chair                                       2           12                                                                               4 - 12 Chairs
               File Cabinet                                     38 Duplicate?
               Book Case
               Rd. Table
               Library Clerk Desk                                                                                                 1
               Library Clerk Chair                                 42                                                             1
               Private Office/Reception:                           45
               Guest Chairs                                                                                                       4
               Lounge Chair
               Rd. Conference Table                             50uplicate?
               Conference Table                                 55                            1
               Conference Credenza                                                            1*                                                              Conference Credenza Optional *
               Conference Chairs                                                              14                                                              10 - 14 Chairs
               Rectangular Work Table
               Sq. Work Table                                                 3                                 1                 3                           Provide work table.
               Round Work Table                                 63
               Side Chairs                                                                                      4

               Bookcase                                            1
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *                             79
               Letter File Cabinet *                             1

               Walkie Talkie Radios
               Trash Receptacle                                  1                            1
               Podium Lecturn                                   88
               Counter Top Refrigerator                        100
               Refrigerator                                    124
  EQUIPMENT




               Microwave Oven                                  125
               Coffee Maker
               Copy Machine w/Stand           1                                                                                                               Provided by DCS Instruction
               Book Trucks                    X                                                                                                               Provided by DCS Instruction
               TV / DVD (wall mounted)        1                                                                                                               Provided by DCS Instruction
               Laminator w/ Cabinet
               LCD TV 20"
               Overhead Projector

               DEKALB - MIS
               Computer Workstation           1*               1              2                                                   2                           Provide computer at Circ. Desk*
               Student Computer Workstation   15                                              1
               Laptop Mobile Carts
  TECHNOLOGY




               Printer/Scanner Workstation    2                1                                                                  1                           1 B&W Printer, 1 Color Printer
               Intercom System                                                                1*
               Interactive Board              1*                                                                                                              Includes ceiling mtd. LCD Projector *
               Telephone
               Large Paper Cutter
               Copier Machine




DeKalb County School District                                                                           99 of 121                                             February 15, 2013 v1.1
                                                                     SECTION 04 ART - FURNITURE & EQUIPMENT

                                                                               ROOM NAME                          SIZE                     NOTES




                                                       ab
                                                        L
                                                     ts
                                                   Ar
                                                  al
                                                su
                                              Vi




                                                            2
               DEKALB - FF&E                                                                                  W    L     D
                                                                                                               Dimensions
               Classroom:                                    4
               Teacher Desk                   1              7
               Task Chair                     1             10
               File Cabinet                                 14
               Student Chair                  32
               Student Combo Desk
               Student Table                                19
               Cot and/or Couch                             21
               Coat Rack
               Student Art Table              14
               Teacher Work Table             1              29
  FURNITURE




               Round Table                                   33
               Administrative:
               Administrative Desk
               Credenza / Return
               Task Chair                                    38 Duplicate?
               Guest Chair
               File Cabinet
               Book Case
               Rd. Table                                     42
                                                             45



                                                             50 Duplicate?
                                                             55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet *                        63

               Trash Receptacle               1
               Art Easel                      15
               Drying Rack                    1
               Clay Storage Bins              X             79
               Tote Tray Cabinets             X                                                                              Provided by DCS Instruction
  EQUIPMENT




               Damp Cabinets                  X                                                                              Provided by DCS Instruction
               Flat Work Storage Cabinet      X                                                                              Provided by DCS Instruction
               Exhaust Fan                    X                                                                              Provided by DCS Instruction
               Digital Video Camera           X              88                                                              Provided by DCS Instruction
               Laminator w/ Cabinet                         100
               LCD TV 20"                                   124
               Overhead Projector                           125

               DEKALB - MIS
               Teacher Computer Workstation   1
               Student Computer Workstation   2
               Computer Headphones
               Computer Microphones
               Laptop Mobile Carts
               Printer/Scanner Workstation    1
  TECHNOLOGY




               Intercom System
               Interactive Board              1*                                                                             Includes ceiling mtd. LCD Projector *
               Telephone
               Large Paper Cutter
               Copier Machine




DeKalb County School District                                                     100 of 121                                 February 15, 2013 v1.1
                                                                         SECTION 05 MUSIC - FURNITURE & EQUIPMENT

                                                                                                        ROOM NAME                        SIZE                     NOTES




                                                                                                                                 )
                                                                                                                              om
                                                                                                                            Ro
                                                                                                                          d
                                                                                                                       an
                                                                                                                     (B



                                                                                                                  om
                                                                                                    e
                                                                                                fic
                                                        si c




                                                                                                                Ro
                                                                                             Of
                                                      Mu




                                                                                                            tra
                                                                                             r's
                                                      al




                                                                                          he




                                                                                                         es
                                                    er




                                                                                                      ch
                                                                                       ac
                                                 n
                                              Ge




                                                                               Te




                                                                                                   Or
                                                                2
               DEKALB - FF&E                                                                                                         W    L     D
                                                                                                                                      Dimensions
               Classroom:                                        4
               Teacher Desk                   1                  7                 1                    1
               Task Chair                     1                 10                 1                    1
               File Cabinet                                     14
               Student Chair                  100              150                                  150                                             Posture Chairs
               Adjustable Stool                                50 *                                 50 *                                            Adjustable Stools Optional *
               Student Combo Desk                               19
               Student Table                                    21
               Cot and/or Couch
               Coat Rack
               Round Table                                         29
  FURNITURE




               Administrative:                                     33
               Administrative Desk            1                                                         1
               Credenza / Return
               Task Chair                     1                                                         1
               Guest Chair                                         38 Duplicate?
               File Cabinet                   1
               Book Case                      1
               Rd. Table
                                                                   42
                                                                   45



                                                                   50 Duplicate?
                                                                   55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet *          2                 63                 1                    1

               Walkie Talkie Radios
               Trash Receptacle               1
               Director Stand                 1
               Director Chair                                   79                                      1                                           DCS Instruction
               Podium Lecturn
               Standing Risers                X                                                                                                     DCS Instruction
               Seated Risers                  X                                                                                                     DCS Instruction
               Music Stands/ Director Stand   X                  X                                      X                                           DCS Instruction
  EQUIPMENT




               Acoustic Piano w/dust cover    X                 88                                                                                  DCS Instruction.
               Piano                                           100                                      2                                           DCS Instruction.
               VCR/Stereo w/surround Sound                     124                                      X
               MIDI Keyboard                  X                125                                                                                  DCS Instruction
               Special Music Equipment        X                                                                                                     DCS Instruction
               Sound System                   X                                                                                                     DCS Instruction
               Mixer, Microphones             X                                                                                                     DCS Instruction
               Portable Music Storage Rack    X                                                                                                     DCS Instruction
               Portable Equipment Cabinet     X                                                                                                     DCS Instruction
               Overhead Projector

               DEKALB - MIS
               Teacher Computer Workstation   X                1                                        1
               Student Computer Workstation   X
               Printer/Scanner Workstation
  TECHNOLOGY




               Intercom System
               Interactive Board              1*                                                                                                    Includes ceiling mtd. LCD Projector *
               Telephone
               Large Paper Cutter
               Copier Machine




DeKalb County School District                                                                                       101 of 121                      February 15, 2013 v1.1
                                                    SECTION 06 DRAMA - FURNITURE & EQUIPMENT - No info available

                                                                          ROOM NAME                                SIZE                   NOTES




                                                      m
                                                    oo
                                                  sr
                                                as
                                              Cl




                                                          2
               DEKALB - FF&E                                                                                 W    L     D
                                                                                                              Dimensions
               Classroom:                                   4
               Teacher Desk                                7
               Task Chair                                 10
               File Cabinet                                14
               Student Chair (18")
               Student Combo Desk
               Student Table                               19
               Cot and/or Couch                            21
               Coat Rack
               Round Table
               Administrative:                             29
  FURNITURE




               Administrative Desk            1           33
               Credenza or Return
               Task Chair                     1
               Guest Chair                    2
               File Cabinet                   1           38 Duplicate?
               Book Case                      1


                                                          42
                                                          45


                                                          50uplicate?
                                                          55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet*                       63

               Walkie Talkie Radios
               Trash Receptacle               1
               Solid Waste Compactor
               Counter Top Refrigerator                   79
               Refrigerator
  EQUIPMENT




               Microwave Oven
               Coffee Maker
               Vending Machine (Drink)
               Vending Machine (Snack)                     88
               Laminator w/ Cabinet                       100
               LCD TV 20"                                 124
               Overhead Projector                         125

               DEKALB - MIS
               Computer Workstation           1
               Student Computer Workstation
               Printer/Scanner Workstation    1*                                                                            Teacher Printer Workstation *
               Security Camera
               Microfiche Reader / Printer
               Fax Machine
  TECHNOLOGY




               Intercom System
               Interactive Board
               Cable TV Connection
               Telephone
               Large Paper Cutter
               Copier Machine (small)




DeKalb County School District                                                102 of 121                                     February 15, 2013 v1.1
                                              SECTION 07 HEALTH & PHYSICAL EDUCATION - FURNITURE & EQUIPMENT

                                                                                     ROOM NAME            SIZE                        NOTES




                                                                          e
                                                                      fic
                                                                    Of
                                                                  h
                                                               ac
                                                            Co

                                                             b
                                                          La
                                                         ic

                                                        h
                                                   et

                                                    alt
                                                hl
                                                  He
                                              At




                                                  2
               DEKALB - FF&E                                                                          W    L     D
                                                                                                       Dimensions
               Classroom:                                               4
               Teacher Desk                           1               7
               Task Chair                             1              10
               File Cabinet                           1                14
               Student Chair                          35                4                                            2 - 4 Chairs
               Student Combo Desk
               Student Tables                         16             19                                              14 - 16 Chairs
               Cot and/or Couch                                        21
               Coat Rack
               Round Table
               Administrative:                                         29
  FURNITURE




               Administrative Desk            1                      33
               Credenza or Return
               Task Chair                     1
               Guest Chair                    8
               File Cabinet                   1         1            38 Duplicate?
               Book Case                      1                       2
               Small Table
               Round Table                                           1*                                              Table Optional *
                                                                     42
                                                                     45


                                                                     50uplicate?
                                                                     55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet*                                  63

               Walkie Talkie Radios
               Trash Receptacle               1         1               1
               Counter Top Refrigerator
               Refrigerator                                          79
               Microwave Oven
  EQUIPMENT




               Coffee Maker
               Vending Machine (Drink)
               Vending Machine (Snack)
               Laminator w/ Cabinet                                 88
               LCD TV 20"                                          100
               Overhead Projector                                  124
                                                                   125

               DEKALB - MIS
               Teacher Computer Workstation   1         1          1
               Student Computer Workstation             2
               Printer/Scanner Workstation    1                    X
               Security Camera                1                    X                                                 Provided by DCS Security
               Microfiche Reader / Printer
               Fax Machine
  TECHNOLOGY




               Intercom System
               Interactive Board                        1*                                                           Includes ceiling mtd. LCD Projector *
               Cable TV Connection
               Telephone
               Large Paper Cutter
               Copier Machine (small)




DeKalb County School District                                                           103 of 121                   February 15, 2013 v1.1
                                                          SECTION 08 SPECIAL EDUCATION - FURNITURE & EQUIPMENT

                                                                                           ROOM NAME                                     SIZE                       NOTES




                                                                            )




                                                                                                                                 m
                                                                         ed




                                                                                                                               oo
                                                                  lat




                                                                                                                             sr
                                                                re




                                                                                                           m



                                                                                                                          as
                                                                                                                                                    * Self Contained (Orthopedically




                                                              er




                                                                                                        oo




                                                                                                                        Cl
                                                            nt




                                                                                                        yR
                                                          (I




                                                                                                                        ed
                                                                                                                                                    Impaired or Intellectual Disabilities)




                                                                                                      ap
                                                          ed




                                                                                                                     ift
                                                                                                    er



                                                                                                                   /G
                                                       ain




                                                                                                  Th
                                                     nt




                                                                                                                   ed
                                                                                               ch
                                                   Co




                                                                                                                ct
                                                                                      ce



                                                                                             ee




                                                                                                             pa
                                                                                   ffi
                                                lf




                                                                                           Sp
                                              Se




                                                                                                        Im
                                                                                Of
                                                                2
               DEKALB - FF&E                                                                                                         W    L     D
                                                                                                                                      Dimensions
               Classroom:                                        4
               Teacher Desk                   1                  7              1          1             1
               Task Chair                     1                 10              1          1             1
               File Cabinet                                     14
               Student Chair                  6                 16                         8            24                                          2-6 / 2-4 / 4-16 /4-8 Chairs
               Student Combo Desk             15                12
               Student Table                  1                 19                                      10
               Kidney Table                                     21                         1
               Coat Rack
               Round Table                                          3
               Administrative:                                      29
  FURNITURE




               Administrative Desk                                  33
               Credenza / Return
               Task Chair
               Guest Chair
               File Cabinet                                     38 Duplicate?
               Book Case
               Rd. Table

                                                                42
                                                                45


                                                                50 Duplicate?
                                                                55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet *                            63              1          1             1

               Walkie Talkie Radios
               Trash Receptacle               1                     1                      1             1
               Podium Lecturn
               Counter Top Refrigerator                         79
               Refrigerator
  EQUIPMENT




               Microwave Oven
               Coffee Maker
               Vending Machine (Drink)
               Vending Machine (Snack)                          88
               Laminator w/ Cabinet                            100
               LCD TV 20"                                      124
               Overhead Projector                              125



               DEKALB - MIS
               Teacher Computer Workstation   1                1                           1             1
               Student Computer Workstation   4                4                           4             4                                          2-4 or 2-6, Student Workstations
               Computer Headphones
               Computer Microphones
               Computer Station Earphones
  TECHNOLOGY




               Laptop Mobile Carts
               Printer/Scanner Workstation                     1                           1             1
               Intercom System
               Interactive Board              1*               1*                                                                                   Includes ceiling mtd. LCD Projector *
               Telephone
               Large Paper Cutter
               Copier Machine




DeKalb County School District                                                                       104 of 121                                      February 15, 2013 v1.1
                                              SECTION 09 AUDITORIUM - FURNITURE & EQUIPMENT - No info available

                                                                     ROOM NAME                               SIZE               NOTES




                                                     2
               DEKALB - FF&E                                                                             W    L     D
                                                                                                          Dimensions
               Teacher:                               4
               Teacher Desk                           7
               Task Chair                            10
               File Cabinet                          14
               Student Chair (18")
               Student Combo Desk
               Student Tables                        19
               Cot and/or Couch                      21
               Coat Rack
               Round Table
               Administrative:                       29
  FURNITURE




               Administrative Desk                   33
               Credenza or Return
               Task Chair
               Guest Chair
               File Cabinet                          38 Duplicate?
               Book Case
               Roll & Fold Student Tables
               Round Faculty Tables
                                                     42
                                                     45


                                                     50uplicate?
                                                     55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet*                  63

               Walkie Talkie Radios
               Trash Receptacle
               Solid Waste Compactor
               Counter Top Refrigerator              79
               Refrigerator
  EQUIPMENT




               Microwave Oven
               Coffee Maker
               Vending Machine (Drink)
               Vending Machine (Snack)               88
               Laminator w/ Cabinet                 100
               LCD TV 20"                           124
               Overhead Projector                   125

               DEKALB - MIS
               Computer Workstation
               Student Computer Workstation
               Printer/Scanner Workstation
               Security Camera
               Microfiche Reader / Printer
               Fax Machine
  TECHNOLOGY




               Intercom System
               Interactive Board
               Cable TV Connection
               Telephone
               Large Paper Cutter
               Copier Machine (small)




DeKalb County School District                                            105 of 121                                     February 15, 2013 v1.1
                                                     SECTION 10 ADMINISTRATION - FURNITURE & EQUIPMENT

                                                                           ROOM NAME                          SIZE                        NOTES




                                                                                      e
                                                                                   fic
                                                                                 Of




                                                                              ve
                                                                                e




                                                             ite SRO
                                                                             m
                                                                            fic




                                                                           co
                                                                          oo




                                               Lo oom d )
                                                                         ice
                                                                         Of




                                                             Eq m
                                                                        Al
                                                                    sR




                                                          r W n)

                                                         om roo
                                                                      ea
                                                                        /
                                                                      e




                                                                       f
                                                                    l's




                                                                    p.
                                                                   Of




                                                   mi room
                                                      cip rea

                                                                  fic




                                                                   ai
                                                                   L
                                                                rd
                                                                pa




                                                                ui
                                                                 k
                                                                  (




                                                               (M
                                                               Of




                                                               er




                                                               or
                                                               A




                                                             co
                                               Bo inci

                                                            ep




                                                            m

                                                            m
                                                             k
                                                            n

                                                          als




                                                          Su
                                                          Re




                                                          or
                                                          io




                                                         oo

                                                         oo
                                                         Ke
                                                          r




                                                       tR

                                                        ge
                                                      fW




                                                       he
                                                       .P
                                                       pt




                                                        n
                                                       t/




                                                    il R

                                                      kr
                                                      ic




                                                     rc
                                                   ok




                                                   un
                                            ce




                                                   ile




                                                   ac
                                                   st




                                                   ul




                                                  or
                                                  in




                                                  af
                                                  in




                                                 te
                                               Ma
                                               Ad
                                          Re




                                               As




                                               Va




                                               To




                                               Te
                                               Pr




                                               Cl

                                               St




                                               W




                                               In
                                               2
              DEKALB - FF&E                                                                               W    L     D
                                                                                                           Dimensions
              Classroom:                               4
              Teacher Desk                             7                  1    1
              Task Chair                              10                  1    1
              File Cabinet                            14                  1
              Student Chair                                               6                                              4 - 6 Chairs
              Cot and/or Couch                                            1
              Coat Rack                               19                  X
              Round Table                             21
              Administrative:
              Administrative Desk                                                  1
              Credenza / Return                       29                           1
              Task Chair                              33                           1
              Guest Chair                                                      2   1
              File Cabinet                                                         1
              Book Case                                                        1   1
              Rd. Table                               38 Duplicate?                1
              Private Office/Reception:
              Reception Chair             1
              Guest Chairs                12
              File Cabinets               2           42
  FURNITURE




              End Table                   2           45                                    4                            2-4 Tables
              Magazine Table              1
              Sofa                        1                                                 1                            * Sofa Optional
              Executive Desk w/ Bridge    1           50uplicate?
              Executive Desk                          55 1
              Executive Credenza          1                1
              Hutch w/Doors               1                1
              Tack Board / Task Light     1                1
              Swivel High Back Chair      1
              Swivel Mid Back Chair                   63   1
              Office Guest Chairs                4         4                                                             2 - 4 Chairs
              Dining Guest Chairs                                                           15                           10 -15 Chairs
              Guest Chairs                                                                           24                  12 - 24 Chairs
              Lounge Chair                                                                  4                            2 - 4 Chairs
              Rd. Conference Table               1    79   1                                                             For Office
              Rd. Dining Table                                                              3                            2-3 Tables
              Conference Table                         1
              Conference Credenza                      1
              Conference Chairs                       15
              Rectangular Work Table                  88                                         1
              Sq. Work Table                         100                                             4                   2-4 Tables
              Round Work Table                       124                                             3                   1-3 Tables
              Side Chairs                            125                                         4                       2 - 4 Chairs

              Bookcase                           1         1
  STORAGE




              Lateral File Cabinet               1         2
              Legal File Cabinet *                                    6                                                  2 - 6 / * Lockable and Fire Proof
              Letter File Cabinet*                                    6   10   1                                         2 - 6 / * Lockable and Fire Proof

              Walkie Talkie Radios               1
              Trash Receptacle                   1         1              1    1   1        4    2   2
              Counter Top Refrigerator                                    1
              Refrigerator                                                                  1
  EQUIPMENT




              Microwave Oven                                                                1
              Coffee Maker                                                                  1
              Vending Machine (Drink)                                                       1
              Vending Machine (Snack)                                                       1
              Laminator w/ Cabinet                                                                   1
              LCD TV 20"                                                                             1
              Overhead Projector                                                                     1
              Large Paper Cutter                                                                 1
              Copier Machine                                                                     1   1
              Scantron Machine                                                                   1

              DEKALB - MIS
              Computer Workstation        1      1         1              1                          6                   2-6 Workstations


DeKalb County School District                                                  106 of 121                                February 15, 2013 v1.1
               Printer/Scanner Workstation   1   1         1   1                3
  TECHNOLOGY
               Intercom System               1
               Interactive Board                 1*   1*                            Includes ceiling mtd. LCD Projector *
               Surveillane Equipment                               X
               Security Cameras                                    X
               Telephone                              1




DeKalb County School District                                      107 of 121       February 15, 2013 v1.1
                                                            SECTION 11 COUNSELING - FURNITURE & EQUIPMENT

                                                                                    ROOM NAME                   SIZE                       NOTES




                                                                                        )
                                                                                     by
                                                                                  ob
                                                                               (L
                                                                            ea
                                                                          Ar
                                                         an ting




                                                          Ce om
                                                                        e




                                                          sR e
                                                                     fic




                                                                      c

                                                                   m

                                                                 Ro
                                                                  ffi
                                                                  ai

                                                                 Of




                                                                 er
                                                                 o
                                                               W




                                                              rO




                                                              nt
                                                               o

                                                C a n ce
                                                             ce
                                                             n




                                                            o
                                                          io




                                                           l



                                                          e
                                                        se

                                                       rd
                                                       pt




                                                       er

                                                       er
                                                      nd



                                                    un

                                                    co
                                              ce




                                                    nf

                                                    re
                                                   te



                                                Co




                                                Co
                                            Re




                                                Re
                                                At


                                                2
              DEKALB - FF&E                                                                                 W    L     D
                                                                                                             Dimensions
              Classroom:                                     4
              Teacher Desk                                   7
              Task Chair                                    10
              File Cabinet                                  14
              Student Chair
              Cot and/or Couch
              Coat Rack                                     19
              Administrative:                               21
              Administrative Desk           1      1        1    1
              Credenza or Return            1                    1
              Task Chair                    1      1     29      1
              Guest Chair                   8      16    33      4        2        12                                      4-8 Chairs / 4-16 Chairs/2-4 Chairs
              File Cabinet                  1      2      2
              Book Case                     1      1      1      1                 3                                       1-3 Bookcases
              Small Table                   1                                                                              Small Table Optional *
              Round Table                                   38uplicate?                                                    Round Table Optional *
              Private Office/Reception:
              Reception Chair
              Guest Chairs
              File Cabinets                              42
  FURNITURE




              End Table                                  45
              Display Rack                  1                                      4                                       2-4 Display Racks
              Sofa
              Executive Desk w/ Bridge                   50uplicate?
              Executive Desk                             55
              Executive Credenza
              Hutch w/Doors
              Tack Board / Task Light                            1
              Swivel High Back Chair
              Swivel Mid Back Chair                      63
              Office Guest Chairs
              Dining Guest Chairs
              Guest Chairs                                                    10                                           4 - 10 Side Guest Chairs Optional *
              Lounge Chair
              Rd. Conference Table                       79
              Rd. Dining Table
              Conference Table                                                1
              Conference Credenza                                             1
              Conference Chairs                                               14                                           8 - 14 Chairs
              Rectangular Work Table                     88
              Sq. Work Table                            100           1*                                                   Work Table Optional *
              Round Work Table                          124                        3*                                      1-3 Round or Square Tables *
              Side Chairs                               125

              Bookcase
  STORAGE




              Lateral File Cabinet
              Legal File Cabinet *                                        6                                                3 - 6 / * Lockable and Fire Proof
              Letter File Cabinet*                                        6                                                3 - 6 / * Lockable and Fire Proof

              Walkie Talkie Radios
              Trash Receptacle              1      1    1        1            1    1
              Counter Top Refrigerator
              Refrigerator
  EQUIPMENT




              Microwave Oven
              Coffee Maker
              Vending Machine (Drink)
              Vending Machine (Snack)
              Laminator w/ Cabinet
              LCD TV 20"
              Overhead Projector

              DEKALB - MIS
              Computer Workstation          1      1    1        1                 2*                                      2-4 Computer Workstations
              Printer/Scanner Workstation   1      1    1        1                 1
              Microfiche Reader / Printer                                 1
  OGY




              Fax Machine                                                 1


DeKalb County School District                                                           108 of 121                         February 15, 2013 v1.1
  TECHNOLO
             Intercom System
             Interactive Board            1*                Includes ceiling mtd. LCD Projector *
             Cable TV Connection          1
             Telephone
             Large Paper Cutter
             Copier Machine (small)   1




DeKalb County School District                  109 of 121   February 15, 2013 v1.1
                                                          SECTION 12 SCHOOL NUTRITION - FURNITURE & EQUIPMENT

                                                                                ROOM NAME                       SIZE                      NOTES




                                                             r
                                                          ge
                                                           na
                                                         Ma
                                                      ia
                                                   ter
                                                fe
                                              Ca




                                                                2
               DEKALB - FF&E                                                                                W    L     D
                                                                                                             Dimensions
               Classroom:                                         4
               Teacher Desk                                      7
               Task Chair                                       10
               File Cabinet                                      14
               Student Chair, (18")                               X                                                        1/3 anticipated school enrollment *
               Student Combo Desk
               Student Tables                                    19
               Cot and/or Couch                                  21
               Coat Rack
               Round Table
               Administrative:                                   29
  FURNITURE




               Administrative Desk            1                 33
               Credenza or Return
               Task Chair                     1
               Guest Chair                    2                                                                            2 - 4 Chairs
               File Cabinet                   1                 38 Duplicate?
               Book Case                      1
               Roll & Fold Student Tables                       30*                                                        25-30 Roll & Fold Student Tables*
               Round Faculty Tables                             10*                                                        4-10 Faculty Tables *
                                                                 42
                                                                 45


                                                                50uplicate?
                                                                55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet*                             63

               Walkie Talkie Radios
               Trash Receptacle               1                 8*                                                         5-8, 55 Gallon Trash Receptacles *
               Solid Waste Compactor                             1
               Counter Top Refrigerator                         79
               Refrigerator
  EQUIPMENT




               Microwave Oven
               Coffee Maker
               Vending Machine (Drink)
               Vending Machine (Snack)                           88
               Laminator w/ Cabinet                             100
               LCD TV 20"                                       124
               Overhead Projector                               125

               DEKALB - MIS
               Computer Workstation           1
               Student Computer Workstation
               Printer/Scanner Workstation    1                                                                            Teacher Printer Workstation
               Security Camera
               Microfiche Reader / Printer
               Fax Machine
  TECHNOLOGY




               Intercom System
               Interactive Board
               Cable TV Connection
               Telephone
               Large Paper Cutter
               Copier Machine (small)




DeKalb County School District                                                      110 of 121                              February 15, 2013 v1.1
                                                            SECTION 13 BUILDING SERVICES - FURNITURE & EQUIPMENT

                                                                                  ROOM NAME                        SIZE                     NOTES




                                                             S)
                                                          TS
                                                       (C
                                                        e
                                                    fic
                                                  Of
                                              IT




                                                                  2
               DEKALB - FF&E                                                                                   W    L     D
                                                                                                                Dimensions
               Classroom:                                           4
               Teacher Desk                                        7
               Task Chair                                         10
               File Cabinet                                        14
               Student Chair (18")
               Student Combo Desk
               Student Tables                                      19
               Cot and/or Couch                                    21
               Coat Rack
               Round Table
               Administrative:                                     29
  FURNITURE




               Administrative Desk            1                   33
               Credenza or Return
               Task Chair                     1
               Guest Chair                    2
               File Cabinet                   1                   38 Duplicate?
               Book Case                      1
               Roll & Fold Student Tables
               Round Faculty Tables
                                                                  42
                                                                  45


                                                                  50uplicate?
                                                                  55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet*                               63

               Walkie Talkie Radios
               Trash Receptacle               1
               Solid Waste Compactor
               Counter Top Refrigerator                           79
               Refrigerator
  EQUIPMENT




               Microwave Oven
               Coffee Maker
               Vending Machine (Drink)
               Vending Machine (Snack)                             88
               Laminator w/ Cabinet                               100
               LCD TV 20"                                         124
               Overhead Projector                                 125

               DEKALB - MIS
               Computer Workstation           1
               Student Computer Workstation
               Printer/Scanner Workstation    1*                                                                              Teacher Printer Workstation *
               Security Camera
               Microfiche Reader / Printer
               Fax Machine
  TECHNOLOGY




               Intercom System
               Interactive Board
               Cable TV Connection
               Telephone
               Large Paper Cutter
               Copier Machine (small)




DeKalb County School District                                                        111 of 121                               February 15, 2013 v1.1
                                              SECTION 14 OUTDOOR SPACES - FURNITURE & EQUIPMENT - No info available

                                                                       ROOM NAME                               SIZE               NOTES




                                                       2
               DEKALB - FF&E                                                                               W    L     D
                                                                                                            Dimensions
               Classroom:                                4
               Teacher Desk                             7
               Task Chair                              10
               File Cabinet                             14
               Student Chair (18")
               Student Tables
               Cot and/or Couch                         19
               Coat Rack
  FURNITURE




                                                        21
               Round Table
               Administrative:
               Administrative Desk                     29
               Credenza or Return                       33
               Task Chair
               Guest Chair
               File Cabinet
               Book Case                               38uplicate?
               Roll & Fold Student Tables
               Round Faculty Tables

                                                       42
                                                       45


                                                       50uplicate?
                                                       55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet*                    63

               Walkie Talkie Radios
               Trash Receptacle
               Solid Waste Compactor
               Counter Top Refrigerator                79
               Refrigerator
  EQUIPMENT




               Microwave Oven
               Coffee Maker
               Vending Machine (Drink)
               Vending Machine (Snack)                  88
               Laminator w/ Cabinet                    100
               LCD TV 20"                              124
               Overhead Projector                      125

               DEKALB - MIS
               Computer Workstation
               Student Computer Workstation
               Printer/Scanner Workstation
               Security Camera
               Microfiche Reader / Printer
               Fax Machine
  TECHNOLOGY




               Intercom System
               Interactive Board
               Cable TV Connection
               Telephone
               Large Paper Cutter
               Copier Machine (small)




DeKalb County School District                                              112 of 121                                     February 15, 2013 v1.1
                                              SECTION 15.1 BUSINESS & COMPUTER SCIENCE - FURNITURE & EQUIPMENT

                                                                              ROOM NAME                    SIZE                     NOTES




                                                     e
                                                 fic
                                              Of




                                                          2
               DEKALB - FF&E                                                                           W    L     D
                                                                                                        Dimensions
               Classroom:                                  4
               Teacher Desk                                7
               Task Chair                                 10
               File Cabinet                               14
               Student Chair                              28
               Student Combo Desk
               Student Table                              19                                                          14 - 16 Student Tables
               Cot and/or Couch                           21
               Coat Rack
               Round Table
               Administrative:                                29
  FURNITURE




               Administrative Desk            1               33
               Credenza / Return
               Task Chair                     1
               Guest Chair                    2
               File Cabinet                               38 Duplicate?
               Book Case
               Rd. Table

                                                              42
                                                              45



                                                              50 Duplicate?
                                                              55

               Bookcase                                       2
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet *          1           63

               Walkie Talkie Radios
               Trash Receptacle                               1
               Podium Lecturn
               Counter Top Refrigerator                   79
               Refrigerator
  EQUIPMENT




               Microwave Oven
               Coffee Maker
               Vending Machine (Drink)
               Vending Machine (Snack)                    88
               Laminator w/ Cabinet                      100
               LCD TV 20"                                124
               Overhead Projector                        125

               DEKALB - MIS
               Teacher Computer Workstation              1
               Student Computer Workstation              28
               Laptop Mobile Carts
               TV & DVD/VCR Player                       1                                                            Wall mounted TV-DVD/VCR Player
               Digital Camera, Scanner                   1
               Printer/Scanner Workstation               2
  TECHNOLOGY




               Intercom System
               Interactive Board                         1*                                                           Includes LCD Projector *
               Telephone                      1          1
               Large Paper Cutter
               Copier Machine




DeKalb County School District                                                    113 of 121                           February 15, 2013 v1.1
                                                SECTION 15.2 ENGINEERING & TECHNOLOGY - FURNITURE & EQUIPMENT

                                                                              ROOM NAME                    SIZE                     NOTES




                                                     e
                                                 fic
                                              Of




                                                          2
               DEKALB - FF&E                                                                           W    L     D
                                                                                                        Dimensions
               Classroom:                                  4
               Teacher Desk                                7
               Task Chair                                 10
               File Cabinet                               14
               Student Chair                              28
               Student Combo Desk
               Student Table                              19
               Cot and/or Couch                           21
               Coat Rack
               Round Table
               Administrative:                                29
  FURNITURE




               Administrative Desk            1               33
               Credenza / Return
               Task Chair                     1
               Guest Chair                    2
               File Cabinet                               38 Duplicate?
               Book Case                                       2
               Rd. Table

                                                              42
                                                              45



                                                              50 Duplicate?
                                                              55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet *          1           63

               Walkie Talkie Radios
               Trash Receptacle                               1
               Podium Lecturn
               Counter Top Refrigerator                   79
               Refrigerator
  EQUIPMENT




               Microwave Oven
               Coffee Maker
               Vending Machine (Drink)
               Vending Machine (Snack)                    88
               Laminator w/ Cabinet                      100
               LCD TV 20"                                124
               Overhead Projector                        125

               DEKALB - MIS
               Teacher Computer Workstation              1
               Student Computer Workstation              30
               Laptop Mobile Carts
               TV & DVD/VCR Player
               Scanner                                    1
               Color Jet Printer                          1
  TECHNOLOGY




               Color Laser Printer                        1
               "D" Size CAD Printer                       1
               Networking                                X?
               Intercom System
               Interactive Board                         1*                                                           Includes LCD Projector *
               Telephone
               Large Paper Cutter
               Copier Machine




DeKalb County School District                                                    114 of 121                           February 15, 2013 v1.1
                                               SECTION 15.3 FAMILY & CONSUMER SCIENCE - FURNITURE & EQUIPMENT

                                                                              ROOM NAME                    SIZE                     NOTES




                                                     e
                                                 fic
                                              Of




                                                          2
               DEKALB - FF&E                                                                           W    L     D
                                                                                                        Dimensions
               Classroom:                                  4
               Teacher Desk                                7
               Task Chair                                 10
               File Cabinet                               14
               Student Chair                              28
               Student Combo Desk
               Student Table                              19
               Cot and/or Couch                           21
               Coat Rack
               Round Table
               Administrative:                                29
  FURNITURE




               Administrative Desk            1               33
               Credenza / Return
               Task Chair                     1
               Guest Chair                    2
               File Cabinet                               38 Duplicate?
               Book Case                                   2
               Rd. Table

                                                              42
                                                              45



                                                              50 Duplicate?
                                                              55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet *          1           63

               Walkie Talkie Radios
               Trash Receptacle                               1
               Podium Lecturn
               Counter Top Refrigerator                   79
               Refrigerator
  EQUIPMENT




               Microwave Oven
               Coffee Maker
               Vending Machine (Drink)
               Vending Machine (Snack)                    88
               Laminator w/ Cabinet                      100
               LCD TV 20"                                124
               Overhead Projector                        125

               DEKALB - MIS
               Teacher Computer Workstation              1
               Student Computer Workstation
               Computer Headphones
               Computer Microphones
               Computer Station Earphones
               Laptop Mobile Carts
  TECHNOLOGY




               TV & DVD/VCR Player                       1
               Intercom System
               Interactive Board                         1*                                                           Includes ceiling mtd. LCD Projector *
               Telephone                                 1
               Large Paper Cutter
               Copier Machine




DeKalb County School District                                                    115 of 121                           February 15, 2013 v1.1
                                                  SECTION 15.4 INFORMATION TECHNOLOGY - FURNITURE & EQUIPMENT

                                                                              ROOM NAME                     SIZE                     NOTES




                                                     e
                                                 fic
                                              Of




                                                          2
               DEKALB - FF&E                                                                            W    L     D
                                                                                                         Dimensions
               Classroom:                                  4
               Teacher Desk                                7
               Task Chair                                 10
               File Cabinet                               14
               Student Chair                              28
               Student Combo Desk
               Student Table                              19
               Cot and/or Couch                           21
               Coat Rack
               Round Table
               Administrative:                                29
  FURNITURE




               Administrative Desk            1               33
               Credenza / Return
               Task Chair                     1
               Guest Chair                    2
               File Cabinet                               38 Duplicate?
               Book Case                                   2
               Rd. Table

                                                              42
                                                              45



                                                              50 Duplicate?
                                                              55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet *          1           63

               Walkie Talkie Radios
               Trash Receptacle                               1
               Podium Lecturn
               Counter Top Refrigerator                   79
               Refrigerator
  EQUIPMENT




               Microwave Oven
               Coffee Maker
               Vending Machine (Drink)
               Vending Machine (Snack)                    88
               Laminator w/ Cabinet                      100
               LCD TV 20"                                124
               Overhead Projector                        125

               DEKALB - MIS
               Teacher Computer Workstation              1
               Student Computer Workstation              28
               Printer/Scanner Workstation               3*                                                            2-Printer / 1-Scanner Workstation*
               Digital Camera                            1
               Dedicated Server                          X
  TECHNOLOGY




               Laptop Mobile Carts
               TV & DVD/VCR Player                       1
               Intercom System
               Interactive Board                         1*                                                            Includes ceiling mtd. LCD Projector *
               Telephone
               Large Paper Cutter
               Copier Machine




DeKalb County School District                                                    116 of 121                            February 15, 2013 v1.1
                                                                   SECTION 15.5 JROTC - FURNITURE & EQUIPMENT

                                                                               ROOM NAME                            SIZE                      NOTES




                                                     e
                                                 fic
                                              Of




                                                          2
               DEKALB - FF&E                                                                                    W    L     D
                                                                                                                 Dimensions
               Classroom:                                  4
               Teacher Desk                                7
               Task Chair                                 10
               File Cabinet                               14
               Student Chair
               Student Combo Desk                        150*                                                                  50-150 Student Combo Desks *
               Student Table                               19
               Cot and/or Couch                            21
               Coat Rack
               Round Table
               Administrative:                                29
  FURNITURE




               Administrative Desk            3               33
               Credenza / Return
               Task Chair                     3
               Guest Chair                    6
               File Cabinet                               38 Duplicate?
               Book Case                                  6*                                                                   3-6 Book Cases *
               Rd. Table

                                                              42
                                                              45



                                                              50 Duplicate?
                                                              55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet *          3           63                                                                   3-6 File Cabinets *

               Walkie Talkie Radios
               Trash Receptacle
               Podium Lecturn
               Counter Top Refrigerator                   79
               Refrigerator
  EQUIPMENT




               Microwave Oven
               Coffee Maker
               Glass Trophy Case                           X                                                                   Provided by Career Technology
               Fire Arms                                  88                                                                   Provided by Career Technology
               Uniforms                                  100                                                                   Provided by Career Technology
               LCD TV 20"                                124
               Overhead Projector                        125

               DEKALB - MIS
               Teacher Computer Workstation              2
               Student Computer Workstation              2
               Printer/Scanner Workstation
               Digital Camera
               Dedicated Server
               Laptop Mobile Carts
  TECHNOLOGY




               TV & DVD/VCR Player                       1
               Intercom System
               Interactive Board                         1*                                                                    Includes ceiling mtd. LCD Projector *
               Telephone
               Large Paper Cutter
               Copier Machine




DeKalb County School District                                                     117 of 121                                   February 15, 2013 v1.1
                                                         SECTION 16.1 CULINARY ARTS - FURNITURE & EQUIPMENT

                                                                          ROOM NAME                               SIZE                     NOTES




                                                     e
                                                 fic
                                              Of




                                                          2
               DEKALB - FF&E                                                                                  W    L     D
                                                                                                               Dimensions
               Teacher:                                    4
               Teacher Desk                                7
               Task Chair                                 10
               File Cabinet                               14
               Student Chair
               Student Combo Desk
               Student Table                              19
               Cot and/or Couch                           21
               Coat Rack
               Round Table
               Administrative:                               29
               Administrative Desk            1              33
               Credenza / Return
  FURNITURE




               Task Chair                     1
               Guest Chair                    2
               File Cabinet                               38 Duplicate?
               Book Case                                   2
               Rd. Table
               Kitchen Equipment: ?
                                                          42
                                                          45


                                                          50uplicate?
                                                          55




               Bookcase                                   63
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet *          1              2

               Walkie Talkie Radios                       79
               Trash Receptacle                            1
               Podium Lecturn
  EQUIPMENT




               Counter Top Refrigerator
               Refrigerator
               Microwave Oven                             88
               Coffee Maker                              100
               LCD TV 20"                                124
               Overhead Projector                        125

               DEKALB - MIS
               Teacher Computer Workstation              ?
               Student Computer Workstation              ?
               Printer/Scanner Workstation
               Digital Camera
               Dedicated Server
               Laptop Mobile Carts
  TECHNOLOGY




               TV & DVD/VCR Player                       ?
               Intercom System
               Interactive Board                         ?                                                                   Includes ceiling mtd. LCD Projector *
               Telephone
               Large Paper Cutter
               Copier Machine




DeKalb County School District                                                118 of 121                                      February 15, 2013 v1.1
                                                         SECTION 16.2 HEALTH SCIENCE - FURNITURE & EQUIPMENT

                                                                               ROOM NAME                           SIZE                     NOTES




                                                     e
                                                 fic
                                              Of




                                                           2
               DEKALB - FF&E                                                                                   W    L     D
                                                                                                                Dimensions
               Teacher:                                     4
               Teacher Desk                                 7
               Task Chair                                  10
               File Cabinet                                14
               Student Chair                               28
               Student Combo Desk
               Student Table                               19
               Cot and/or Couch                            21
               Coat Rack
               Administrative:
               Administrative Desk            1
  FURNITURE




                                                               29
               Credenza / Return                               33
               Task Chair                     1
               Guest Chair                    2
               File Cabinet
               Book Case                                   38 Duplicate?
               Rd. Table


                                                               42
                                                               45



                                                               50 Duplicate?
                                                               55

               Bookcase
  STORAGE




               Lateral File Cabinet
               Legal File Cabinet *
               Letter File Cabinet *          1            63

               Walkie Talkie Radios
               Trash Receptacle                                1
               Podium Lecturn
  EQUIPMENT




               Counter Top Refrigerator                    79
               Refrigerator
               Microwave Oven
               Coffee Maker
               LCD TV 20"
               Overhead Projector                          88
                                                          100
               DEKALB - MIS                               124
               Teacher Computer Workstation               125
               Student Computer Workstation               10
               Printer/Scanner Workstation                1
               Digital Camera                             X
               Dedicated Server
               Laptop Mobile Carts
               TV & DVD/VCR Player                        1
               Intercom System
  TECHNOLOGY




               Interactive Board                          1*                                                                  Includes ceiling mtd. LCD Projector *
               Telephone
               Large Paper Cutter
               Copier Machine




DeKalb County School District                                                     119 of 121                                  February 15, 2013 v1.1
                                                          APPENDIX C

                                       HIGH SCHOOL - Space Layout Drawings
             Sheet #     Sheet Title
                 C-1     Classroom: 9th -12th Grade - Plan & Elevation Drawing (32 Students)
                 C-2     Science Lab: 9th -12th Grade - Plan Drawing (32 Students)
                                                                             4
                 C-3     Art Lab: 9th -12th Grade                           107
                 C-4     xxxxxxxxxxxx                                       14

                                                                           19
                                                                           21

                                                                           29
                                                                           33


                                                                           38 Duplicate?




                                                                           42
                                                                           45


                                                                           50 Duplicate?
                                                                           55




                                                                           63




                                                                           79




DeKalb County School District                              120 of 121                          September 18, 2012 Draft
                                                      APPENDIX D

                                   HIGH SCHOOL - Space Relationship Diagrams
             Sheet #     Sheet Title
                 D-1     xxxxxxxxxxxx                                 2
                 D-2     xxxxxxxxxxxx                                 4
                 D-3     xxxxxxxxxxxx                                 7
                                                                     10
                 D-4     xxxxxxxxxxxx                                14

                                                                     19
                                                                     21

                                                                     29
                                                                     33


                                                                     38 Duplicate?




                                                                     42
                                                                     45


                                                                     50 Duplicate?
                                                                     55




                                                                     63




                                                                     79




DeKalb County School District                         121 of 121                     September 18, 2012 Draft
                         Design Guidelines for Facility
                                        Construction
                                                VERSION 2018.04.04

                Department of Design and Construction
                                   Operations Division
                                            Sam Moss Service Center
                                                1780 Montreal Road
                                                  Tucker, GA 30084
                                                                 1
DCSD Design Guidelines
VERSION 2018.04.04
                       These Design Guideline requirements reflect DeKalb County
                     School District’s (DCSD) experience in building and operating
                     schools. They are provided to assist Design Professionals in
preparing contract documents for new schools, additions, and renovation projects.
The aim is to balance the need for instructional functionality with aesthetics,
accessibility, operability, sustainability, and security so that all students, staff, and
community members feel welcome and safe.

The Design Guideline requirements are organized in sixteen (16) divisions similar to the Master Format
industry standard specification divisions. Technical specifications for each DCSD project shall be
prepared by and be the legal responsibility of the Design Professional of Record. This document serves
as a guideline to the project designer of minimum performance standards and expectations the District
has for school construction. They are not intended to be complete technical specifications. The Design
Professional shall be responsible for incorporating these requirements into the appropriate contract
documents. Any deviation from these guidelines must be approved in writing by DCSD staff.

All requirements noted shall be assumed to apply to every school type, unless specifically noted. DCSD
or its designee shall be solely responsible for establishing and maintaining the DeKalb County School
District Design Guidelines.

Design Professionals shall coordinate use of these Design Guideline requirements with related
documents and regulations, including, but not limited to:

       Georgia Department of Education (GaDOE) Architectural Review Documents: GaDOE requires
        that Construction Documents for DCSD projects comply with GaDOE standards and be
        submitted for formal review. These standards and review requirements are posted on the
        GADOE Facilities Services Resources website: http://www.GaDOE.org/Finance‐and‐Business‐
        Operations/Facilities‐Services/Pages/Facilities‐Services‐Resources.aspx. Drawing submittals
        require coordination with the current GADOE “Curriculum and Space Needs” form for each
        project. These forms will be provided by GADOE through the DCSD Program Manager.
       Georgia Department of Education (GDOE) Grants Administration Documents: At projects where
        GADOE will provide funding, additional documentation is required. These documents are also
        posted on the GADOE Facilities Services Resources website.


The following DeKalb County School District (DCSD) guiding documents are posted on the DCSD website
(www.dekalbschoolsga.org):

       Local Five‐Year Facilities Plan
       DeKalb County School District (DCSD) Educational Specifications: Educational Specifications
        provide descriptions of typical programmed spaces for each of the three main types of schools:
        Elementary, Middle and High. These Design Guidelines describes construction requirements
        applicable to all types of schools.



                                                                                                         2
DCSD Design Guidelines
VERSION 2018.04.04
DIVISION 1 – GENERAL

01.01 Facility Planning
    1. Grades to be Housed: Typical new schools in the DeKalb County School District shall be designed
        to house the following grade levels:
             a. Elementary: Kindergarten (K), First (1st), Second (2nd), Third (3rd), Fourth (4th) and
                 Fifth (5th) grades.
             b. Middle: Sixth (6th), Seventh (7th) and Eighth (8th) Grades.
             c. High: Ninth (9th), Tenth (10th), Eleventh (11th) and Twelfth (12th) Grades.

    2. Building Capacity: The District’s Planning Department will determine the Full Time Equivalent
       (FTE) Capacity for new schools in the DeKalb County School District.

    3. Building Core: The “core” consists of ancillary spaces that support the classroom instructional
       spaces. These include the Cafeteria, Kitchen and Media Center. The GADOE has issued rules
       setting forth minimum floor areas for such spaces, based upon FTE. Thus, provision for
       expansion must begin with planning for a “core” large enough to support the largest practical
       FTE contemplated for a given site. Typical new schools in the DeKalb County School District shall
       be designed with the following core capacity:
           a. Elementary Future FTE: plan for minimum 40% increase
           b. Middle Future FTE: plan for minimum 30% increase
           c. High Future FTE: plan for minimum 25% increase

    4. Future Expansion: Any new design for DCSD facilities should be configured with future growth in
       mind, to allow for expansion with a minimum amount of alteration of the original structure or
       site. For new buildings or major additions, indicate area for future expansion on the
       architectural site plan.

01.02 Room Numbers
DeKalb County School District requires incorporation of a single room numbering system for all
drawings, schedules and signage installed on the building, including: All architectural submittal drawings
    1. GADOE Inventory Drawings
    2. Door and Finish Schedules
    3. HVAC Equipment, Automated Temperature Controls and Energy Systems
    4. Signage on the building

To achieve this, the Architect shall develop a logical building and room numbering system at the
Schematic Planning stage. The sequence of room numbers shall be assigned based on ease of locating
rooms in the completed building. In order to direct students, staff and visitors, the sequence shall start
at the Main Entrance and progress in a logical sequence throughout the building. Random numbering of
rooms is not acceptable.

Room numbers shall be all numeric as required for GADOE Inventory. Major room numbers at multi‐
story buildings shall be 4 digits starting with the floor level, and progress around the building in
sequence (Room number 1211 indicates 1st floor, 2nd wing or Corridor, 11th room). Small spaces within
major rooms or suites shall be identified with the major room number plus numeric suffix (# 1211.1).
                                                                                                         3
DCSD Design Guidelines
VERSION 2018.04.04
Where possible use whole thousands for wings or corridors (1200) and use postal odd‐even progressive
numbers down corridors (odd on right (1211), even on left (1212). All spaces must be numbered
including corridors, stairs, elevators, and service rooms. Stairs, elevator and service rooms may be
numbered as a suffix of the corridor leading to them. One story buildings shall be similar, but may use 3
digits when identification of the story is not needed. Room numbers at additions shall extend existing
Inventory Drawing numbers without repeats.

Architect shall present building and room numbering system to DCSD for review and approval before
incorporating them into the construction documents. After room numbers are approved they shall not
be casually altered without specific approval of DCSD Facilities Services Department. See Division 10 ‐
Room Signage.

01.03 GADOE Inventory Drawings
For all new buildings and additions, the Architect shall prepare Inventory Drawings. These documents
are required by the GADOE for the Local Facility Plan, and are used by DCSD for convenient reference.
Inventory Drawing standards include:
Deliver the Inventory Drawings to DCSD, formatted and saved in AutoCAD 2010.
The following layer list should be used:




    1.      Building walls shall be drawn in a simplified 2‐D drawing format using Auto CAD and show
            only the net exposed surface of walls. (i.e., no hatching or interior chases)
    2.      Show windows as a single Cyan Line without spandrels or sills.
    3.      Show doors and swing as single lines similar to walls without thresholds or heads.
    4.      Eliminate unnecessary detail features which may interfere with the readability of text at the
            prescribed sheet size.
    5.      Identify all spaces, including corridors, stairs, elevators, and service rooms, with room name,
            room number and net area.
    6.      Standard sheet size = 11” x 17” without border
    7.      Do not use more than one sheet per floor level.


                                                                                                            4
DCSD Design Guidelines
VERSION 2018.04.04
    8.      All text must be readable without magnification when printed on 11” x 17 sheet. Use
            following Fonts and colors to better distinguish room identification:


                         Font styles:
                          Georgia




    9.      Net Room Areas shall be calculated based on the inside face of walls.
    10.     Gross building areas shall be calculated to the exterior surface of exterior walls. Do not
            include overhangs.
    11.     Provide separate area calculations for mechanical mezzanines and canopies.
    12.     Text shall be individually positioned for each space for best readability.
    13.     Additions shall be identified with a yellow phantom line border and a title box showing
            GADOE Building Number, Year when first occupied, and Gross Area.
    14.     Refer to typical existing Inventory Drawings for required Schedules, Tables and overall
            Format.

01.04 Fire Evacuation Plans
For all new buildings and additions, the Design Professional shall prepare evacuation plans in accordance
with DeKalb County Fire Marshal regulations. Upon construction completion, these plans will be
mounted on interior walls throughout the facility to direct building occupants to exits.
    1. For phased projects, intermediate evacuation plans are required for each phase.
    2. Plans shall show simplified floor plan in black, with exit routes in red, on white background.
    3. Deliver the Fire Evacuation Plans to DCSD in .pdf format at 11” X 17”.
    4. To properly mount the plans, the Design professional shall specify a protective acrylic frame,
         and locate mounting locations for contractor to install.

01.05 Proprietary Specifications
    1. Technical Specifications shall generally be performance‐based and include a minimum of 3
        acceptable manufacturers actively bidding in Georgia. These shall be reviewed by DCSD or its
        designee in order to confirm acceptability.
    2. It is the desire of DeKalb County School District to utilize proprietary specifications for items for
        which there are less than three acceptable manufacturers or for items for which new purchases
        must be of the same manufacturer as existing to achieve system wide compatibility and
        economical use of funds in the maintenance of the systems. The current list of approved items is
        in the appendix to this document.
    3. The DCSD designee will furnish a letter of justification for each project, which must be submitted
        with final documents to the Georgia Department of Education. The Design Professional shall
        verify that the latest and most current document is used in Contract Documents.


                                                                                                          5
DCSD Design Guidelines
VERSION 2018.04.04
01.06 Applicable Codes and Building Standards

The Design Professional is responsible for ensuring that all designs for
DCSD projects comply with all applicable building codes. We depend on
the expertise of our design professionals to support and protect our
community.
ADA and DCSD
   1. All new school construction for DCSD must be designed and constructed in full compliance with
       all requirements of the current edition Americans with Disabilities Act (ADA) and the Georgia
       Accessibility Code. For major additions and renovations, areas of non‐compliance throughout
       the entire existing building should be assessed by the design professional, even if outside the
       scope of work. A brief synopsis of this information, along with proposed future solutions,
       should be included in the designer’s preliminary report.
   2. For remodeling, enlarging a toilet stall for ADA‐compliance will often result in fewer fixtures
       available at the school, which has adverse effects. Any proposed reduction to the overall
       number of water closets, urinals, or lavatories must be approved early in the project in writing
       by the DCSD Design Manager.

    3. Frequently overlooked items related to ADA compliance include:
            At least one bench in each locker room shall provide back support
            All electric water coolers (not just those in corridors) or other items that project from
              the wall must be recessed or otherwise protected for compliance.
            Provide contrast nosings at all stair treads.
            The number of accessible parking spaces to be provided is determined by the aggregate
              total of all spaces provided on the school site.
            Renovations to an existing restroom shall include proper location of all toilet
              accessories.
            Provide stable, accessible route (concrete walkway preferred) to all play areas and play
              equipment.

01.07 Acoustic Standards
The Design Professional shall be responsible for incorporating
appropriate acoustic design measures into the Construction Documents.
Follow GADOE guidelines and current industry standards such as
ASHRAE and ANSI Standard S12.60 guidelines regarding acoustic design
of classrooms. Building areas requiring special acoustic attention
include but are not limited to stage area, auditorium, gymnasium,
cafeteria and music areas.
Design considerations include:
     Sound quality: controlling excessive reverberation, eliminating or minimizing echoes, and
        shaping rooms to create uniform sound field in audience areas.
                                                                                                          6
DCSD Design Guidelines
VERSION 2018.04.04
       Minimizing impact of equipment noise and vibration when locating mechanical equipment:
        Maximum noise emissions of equipment shall be specified. To avoid vibration transfer, provide
        adequate isolation of all equipment with moving parts from the building structure.
       Addressing noise intrusion from plumbing and impact noise from lockers, basketball backboards,
        etc. into acoustically sensitive rooms.
       Speech privacy shall be provided at offices, conference rooms and speech therapy rooms.
       Provide sound attenuation in corridors (“Commons”) in student queuing areas leading to
        Cafeteria and Gymnasium entrances.




01.07 Close‐out Process
Close‐out procedures shall be incorporated into the project from the start of design. The Design
Professional shall coordinate with the Capital Improvements Program team to establish expectations
regarding documentation.
    1. Provide Operation and Maintenance Manual Notebooks for all systems and equipment no later
        than (30) days prior to Project Substantial Completion Date.
    2. Provide keys, valve schedules, attic stock materials, instruction confirmations and as‐built
        drawings no later than the Project Substantial Completion Date. Deliver keys directly to Owner.
    3. Provide all required warranties, inspection reports, governing certificates and other remaining
        required items within thirty (30) days following the project Substantial Completion Date.
        Provide all warranties in a separate 3‐ring binder with warranties organized by CSI designation.
    4. Provide itemized list of Kitchen equipment with brand, model and serial number for each piece
        along with cost.
    5. Technical Specifications shall address requirements for training sessions for owner orientation
        and instruction for all building equipment and systems. Minimally, these shall include:
            a. Providing a training schedule spreadsheet for distribution to Owner at least one week
                before training.
            b. Providing a video record of all trainings for future reference.

01.08 DCSD: An Environmentally Conscious School System
DeKalb County School Board Policy EBL adopted in 2008, defines the District’s goal to “establish and
maintain an environmentally conscious school system.” This policy is available for viewing on our
website, www.dekalbschoolsga.org. It is the District’s policy to promote healthy and sustainable
educational environments through the design, construction, operations, and maintenance of its
facilities. Architects, engineers, and contractors should review, discuss, and work with the District to
establish the goals in this respect for each project at the beginning of the design and construction phase.

DeKalb County School District recognizes the environmental impact of its buildings and the importance
of green design and green building practices. Architects and engineers are encouraged to incorporate
energy performance in the design process and design energy efficient buildings to achieve high
performance buildings that will lower the schools overall operating and maintenance costs.




DIVISION 2 ‐ SITE
                                                                                                         7
DCSD Design Guidelines
VERSION 2018.04.04
02.01 Site Design: Circulation
    1. For new facilities and major renovations, the Design Professional shall develop a master plan
        which provides for the programmed needs defined by DeKalb County School District including
        considerations for future expansion to the core capacity. In addition, classroom areas should be
        configured so as to allow for expansion with a minimum amount of alteration of the original
        structure or site.
    2. For additions to existing facilities, the Design Professional shall provide DCSD with an overall as‐
        built site plan showing entire extent of site, including all existing and new structures, paving, and
        site improvements.
    3. Every school site shall be designed with a minimum of two (2) vehicular entrances in and out,
        preferably from two separate streets.
    4. Site traffic circulation shall be designed with separate car and bus traffic routes that should not
        conflict. Layout shall not require driving service vehicles through parking lots to access the
        service areas; provide direct access to service area from bus loop or other main site circulation
        driveway.
    5. Provide walkway access from adjacent streets, parking, bus loading and sports facilities.
        Walkways at high traffic areas shall be sized and located to avoid trampling of adjacent lawns
        and landscaping especially at building entrances and at heavily traveled routes to play areas.
    6. Provide gates or bollards to restrict vehicular access onto entrance and other major walkways.
        Review specific requirements for traffic gates with DCSD. Consider gates at drives leading to
        athletic areas, bus parking, marching band practice areas and entrances.

    7. Future Portable Classrooms:
           a. For new buildings, site design shall include pre‐planned level areas for the future
               location of portable classroom units, in the following minimum quantities:
                     i. Elementary:            12 classrooms
                    ii. Middle:                12 classrooms
                   iii. High:                  24 classrooms

            b. Design of the site shall identify area(s) for placement of portable classroom units
               without impacting parking, play fields and other required amenities. Portable areas shall
               be adjacent to classroom wings if site constraints and conditions permit. Coordinate
               portable location with future building expansion areas to avoid relocation of portables
               when the building is expanded. Building service utilities (electricity, gas, water) shall not
               be located under the footprint of future portable locations. Avoid locating site drainage
               lines and inlet structures under and within portable building sites. A fire hydrant must
               be located within 400’ of all portable classroom building sites.
            c. Portables should be located as close to the school building as permitted by code.
               Architect shall verify separation requirements with the permitting authority and with
               DCSD Facility Services Department during the preliminary design phase of each school.
               Portables are typically located a minimum of 17’ apart, face to face, to accommodate
               required stairs, ramps and sidewalks.
            d. DCSD uses several different sizes/configurations of portable classrooms. All portable
               classrooms must be accessible, per ADA requirements. Portables are built to a Type V‐B
               construction classification and are designed and approved for educational occupancy.
            e. Soil bearing capacity in the portable area shall be 3,000 psf minimum.
                                                                                                           8
DCSD Design Guidelines
VERSION 2018.04.04
           f.   The building electrical service shall be sized to accommodate the additional portable
                loads. A “spare” breaker shall be installed to power a future distribution panel near the
                portable site(s) to provide electrical service to the portables. Conduits of sufficient size,
                as required to serve the remote future portable classroom distribution panel, shall be
                installed from the main electrical distribution panel and capped until needed. Intercom,
                security and other systems shall be expandable for the number of additional portable
                classrooms noted above.

   8. Auto Parking and Student Drop‐off / Pick‐up
         a. The total number of automobile parking spaces provided shall be the number required
             by local zoning code, or the following, whichever is greater:
                   i. Elementary = 2 parking spaces per Instructional Unit
                  ii. Middle = 3 parking spaces per Instructional Unit
                 iii. High = 6.6 parking spaces per Instructional Unit. Where space permits, provide
                      an area without intermediate curbs within the paved parking area for marching
                      band practice, approximately the size of a football field.
         b. Appropriate number of accessible parking spaces will be provided, in accordance with
             ADA requirements and the Georgia Accessibility Code. Consider placement of a portion
             of the required number of accessible (HC) parking spaces directly adjacent to main
             entrance building, so that users do not have to traverse traffic lanes to enter building.
         c. Clearly define crosswalks (painted and/or raised) from parking areas to all building
             entrances.
         d. Provide a designated separate automobile drive and drop‐off / pick‐up area with
             appropriate stacking space for waiting cars. Consider using speed humps at automobile
             drives to reduce speeding. Review location of proposed speed humps which may impact
             bus traffic with DCSD Director of Transportation.

   9. School Bus Parking, Drives and Loading / Unloading Areas
         a. For all new schools, provide covered main bus loading area and covered handicapped‐
              accessible special education bus loading adjacent to appropriate building entrance.
              Consider locating special education bus loading area as close to special education
              classrooms as practicable. Access to and from the Special Education bus area shall be
              approximately level without extensive ramps or lifts.
         b. Provide curbside bus loading‐unloading adjacent to High School Stadiums with
              appropriate turning radius and grades. Paint auto parking overlay at bus staging area for
              additional activity parking.
         c. Bus parking, covered loading‐unloading areas, and driveway layout shall be reviewed
              and approved by DCSD Executive Director of Transportation, to ensure appropriate turn
              radii and grades for bus drives.

   10. Loading Docks
          a. For new schools and / or major kitchen renovations at Elementary and Middle Schools,
              provide 6” curb loading areas adjacent to Kitchen and General Storage / Receiving area
              with 36” curb cut and ramp to grade.
          b. For new schools and / or major kitchen renovations at High Schools, provide standard
              height raised loading dock at adjacent to Kitchen and General Storage / Receiving area.
          c. See Division 16 for delivery doorbell requirements at receiving areas.
                                                                                                            9
DCSD Design Guidelines
VERSION 2018.04.04
02.02 Sitework Details
    1. Paving and Surfacing
            a. Heavy‐duty asphalt paving asphalt paving shall be used in all parking and driveway
                areas. Lighter duty pavement may be considered for automobile parking areas that are
                well isolated from bus or truck traffic.
            b. Asphalt and graded aggregate base thicknesses shall be standardized and so illustrated
                in paving cross‐sections, detailed in civil engineering design drawings. Final asphalt top
                shall be in place before bus run through.
            c. Surfacing at Playgrounds shall be rubber mulch.
    2. Site Signage (Road, Parking, and Drive Entrance)
            a. Appropriate metal signage shall be included in the contract per code and local
                requirements. The position of parking and traffic signage shall be included in the site
                design and Construction Documents. Provide way‐finding signage for major facilities
                such as visitor parking, building entrance, parent and bus drop‐offs, stadium, ball fields,
                etc. Identify restrictions on use of parking spaces such as handicapped, staff, visitors,
                students, etc. Provide signage clearance from curbs to prevent bus “tail swing” from
                damaging signposts. Similar clearance needs to be maintained for bus canopy posts.
                Mount signage on building walls and columns where possible.
            b. Provide space at entrances for standard building identification sign furnished and
                installed by DCSD.
            c. Coordinate signage design with DCSD Executive Director of Transportation.

    3. Marquee Sign
           a. For all new schools, the DCSD standard marquee sign, an electronic screen on a masonry
               base, will be provided. DCSD graphic standards shall be used, and DCSD logo shall be
               included along with school logo. See appendix.
           b. Appropriate location for shall be determined by Design Professional and indicated on
               site plan. General contractor shall provide power and data from building to sign.
    4. Trash Compactor
           a. Trash Compactor basis of design shall be Marathon Equipment Ramjet, Model # RJ‐
               250SC‐30, with the following minimum specifications:
                     i. Power Unit (electrical): Operating Power Available: 3 PHASE/460
                    ii. Plumbing: Connection on both sides
                   iii. Capacity: 30 cubic yards
                   iv. Overall Size, approximate dimensions: Length: 256 “(21’‐4”); Height: 104”(8’‐
                        8”); Width: 98” (8’ ‐ 2”)
                    v. Features: Remote on 13’ cord, pressure gauge on 15’ cord, guides and stops,
                        double door doghouse, fullness package, and auto start.
           b. Compactor/container shall have the capability of being transported from site to site.
           c. Review space required for dumpsters and compactors with DCSD Facilities Services
               Department.

    5. Fences and Gates
          a. Unless otherwise specifically approved by DCSD, all permanent fences and gates shall be
               black vinyl coated chain link construction. Typical fencing shall be 11 Gauge core wire
               and 9 gauge finish thickness. Provide appropriate black vinyl coated post and gates,
               installed in accordance with Chain Link Fabrication Manufacturers Association criteria.
                                                                                                         10
DCSD Design Guidelines
VERSION 2018.04.04
           b. General site fencing shall be 6’‐0” high with appropriately located gates. Storm
               retention areas shall be fenced with the same material per local requirements.
           c. Gates shall be provided at school driveways to limit access during certain time periods.
           d. Perimeter and other fencing shall be installed as needed to provide safety and security
               of the students, teachers and staff. Exact location of fencing will be determined on‐site
               by DCSD in order to preserve natural areas and undisturbed buffers.
           e. Fencing and wind screens at sports fields shall be of the height and locations described
               in the relevant sections of these guidelines. Fences shall be black vinyl coated chain link
               construction of appropriate gauge and mesh for the height required with appropriate
               black vinyl coated post and gates, installed in accordance with Chain Link Fabrication
               Manufacturers Association criteria. Wind Screens shall be forest green.
           f. Provide security fencing around any exterior equipment that is installed at ground level.
               (I.e. Freezer/Cooler, condensing units, generators, etc.)
02.03 Landscaping Notes
    1. Trees/Plants/Ground Cover
           a. In general, use low maintenance ground cover; minimize grass/sod. Landscape designer
               is encouraged to look at alternatives and use the most practical application for each
               area. Use mulch around buildings. Provide raised curb or other devices to restrict
               washing of mulch onto adjacent paved walks and drives. Low maintenance ground
               covers may be used in low‐traffic areas and on slopes as appropriate.
           b. Pine straw mulch for adequate coverage, no more than 4” deep, shall be provided at all
               new tree and shrub plantings.
           c. New landscaping shall be maintained by the Contractor for no less than 60 days, prior to
               a request for inspection and acceptance by DCSD.
           d. Comply with tree ordinances and provide additional buffers as may be directed by the
               municipality or jurisdiction. Review proposed new shrubs and trees with DCSD Facilities
               Services Department.
    2. Lawns and Grasses
           a. All general areas to be grassed shall be hydro‐seeded with Common Bermuda or Fescue
               depending on the planting season. Wood fiber mulch shall be included when hydro‐
               seeding slopes greater than 3:1. Lawns and grass shall be watered and maintained for a
               period of no less than 60 days, prior to a request for inspection and acceptance by
               DCSD. Lawns and grass shall be fully established and receive a minimum of 2 cuts prior
               to inspection.
           b. Provide adequate seedbed preparation – 4″ tilled topsoil or amended organic soil.
           c. Specify rock hounding in two directions to pick up stones greater than 1.5″ diameter.
           d. Areas to be planted with sod vs. seed need to be identified on the drawings. Typically,
               all areas close to the building or inside a perimeter drive should be sod.
           e. Consider the use of “Terra‐mat” or sod on excessive slopes.
           f. Architect/Engineer shall consult with DCSD Facilities Services to obtain approval for
               proposed Lawn specifications prior to issuing final Drawings.

    3. Landscaping Irrigation System for Planting
          a. Landscape plantings shall be designed and installed to eliminate the need for landscape
              planting irrigation. DCSD allows irrigation for playing fields only.
          b. See Division 15 MECHANICAL, Plumbing Fixtures, for Exterior Hose Bib requirements.


                                                                                                       11
DCSD Design Guidelines
VERSION 2018.04.04
02.04 Site Design Notes for School Athletic Facilities
    1. Landscaping Irrigation System
            a. Commercial grade sprinkler irrigation system with 120 V, automatic operation shall be
                provided for the grass playing and practice fields at Middle and High Schools only. Do
                not provide irrigation at Elementary School play fields.
            b. Architect/Engineer shall consult with DCSD Facilities Services and obtain approval for
                proposed irrigation system prior to issuing final drawings.
    2. Stadium Notes
            a. All major renovations to stadiums shall include a synthetic turf, rubber infill system.
                Base system will include single letter logo at midfield; school name in one end zone and
                mascot name in the other; single letter color; and striping and markings for football
                (white), soccer (yellow) – reference marks only the six yard end boxes; men’s and
                women’s lacrosse (red) – reference marks only.
                     i. Acceptable manufacturers are Sprint Turf, Sports Turf, and Matrix Turf.
            b. All major renovations to stadium track and field shall have layouts in accordance with
                competition standards of the Georgia High School Association and the national
                Federation of State High School Associations. Each field shall include the following:
            c. Where possible, field orientation should be with long dimension along north/south axis.
            d. Provide areas for field events including paved areas for pole vault, high jump, long jump
                with sand pit.
            e. Polyurethane surfacing system running track (8 Lanes).
            f. Provide concrete pads for shot put and discus field events.
            g. See Division 11 EQUIPMENT for Athletic Equipment

    3. High school Track and Field : All major renovations to high school track and field shall have
       layouts in accordance with competition standards of the Georgia High School Association and
       the national Federation of State High School Associations.
           a. Track shall be a polyurethane surfacing system similar to Sports Track 300 or Beynon
               Sports Surfaces, BSS‐300. The elastomeric polyurethane shall be red in color with line
               striping and event markings in accordance with current National Federation of State
               High School Associations standards and guidelines. Provide minimum of 6 track lanes; 8
               where space permits.


    4. Middle School Track and Field : Middle school track and field areas shall be constructed to
       appropriate grading and grassing standards but are not required to meet competition standards
       of the Georgia High School Association and the national Federation of State High School
       Associations. Each track and field shall include the following:
           a. Irrigated grass field inside running track.
           b. Slope field to area drains at corners.
           c. Asphalt running track with painted lanes.
                    i. 400 meter track with 6 lanes where space permits.
                   ii. 300 meter track with 5 lanes where space is limited.
           d. Paved H/C access from building.
           e. Paved areas for high jump and long jump with sand pit.
           f. See Division11 EQUIPMENT for Athletic Equipment.


                                                                                                      12
DCSD Design Guidelines
VERSION 2018.04.04
   5. High School Baseball Field: High School baseball Fields shall have layout in accordance with
      competition standards of the Georgia High School Association and the national Federation of
      State High School Associations. Field shall include the following:
          a. Orientation with home plate at southwest and second base at northeast.
          b. Field size: 330’ long at R / L foul lines x 380’ deep at center of outfield, where space
              permits.
          c. Outfield and diamond of natural grass turf with irrigation system
          d. Warning track
          e. Infield playing surface with 80% sand, 20% clay
          f. Pitching mound raised 10” with pitching rubber
                    i. Weather proof water spigot within ground box behind pitcher’s mound.
                   ii. 110‐volt electrical duplex outlet within weatherproof in ground box behind
                       pitcher’s mound.
          g. Fencing 10’ high ; backstop located 60’ behind home plate ‐ height as required for safety
          h. Two concrete block dugouts
          i. Two bullpens (one at each side, inside fence)
          j. One batting cage with 110V electrical outlets for pitching machine (outside fence)
          k. Scoreboard located between center and left field; See Division 11 EQUIPMENT for
              Scoreboard.
          l. Two sets of bleachers, 5 rows high, 10’ deep x 21’ long, anchored to concrete pads; See
              Division 13 SPECIAL CONSTRUCTION for Portable Bleachers.
          m. Field Lighting; See Division 16 ELECTRICAL for Sports Field Lighting.
          n. Shared Baseball / Softball Concession / Restrooms / Storage; See Division11 EQUIPMENT
              for Concession Equipment.

   6. Middle School Baseball Field: Middle school baseball field areas shall be constructed to
      appropriate grading and grassing standards but are not required to meet competition standards
      of the Georgia High School Association and the national Federation of State High School
      Associations. Each field shall include the following:
          a. Orientation with home plate at southwest and second base at northeast.
          b. Field size: 330’ long at R / L foul lines x 380’ deep at center of outfield, where space
              permits.
          c. Grass outfield with irrigation system
          d. Appropriate drainage towards outfield
          e. Skinned earth between bases
          f. Infield playing surface with 80% sand, 20% clay
          g. Pitching mound raised 10” with pitching rubber
          h. Fencing 10’ high; backstop located 60’ behind home plate ‐ height as required for safety
          i. One set of bleachers, 5 rows high, 10’ deep x 21’ long, anchored to concrete pads; See
              Division 13 SPECIAL CONSTRUCTION for Portable Bleachers.

   7. High School Softball Field: High School softball Field shall be designed in accordance with
      competition standards of the Georgia High School Association and the national Federation of
      State High School Associations. Field shall include the following:
          a. Orientation with home plate at southwest and second base at northeast.
          b. Field size: 200’ long at R / L foul lines x 200’ deep at center of outfield
                                                                                                    13
DCSD Design Guidelines
VERSION 2018.04.04
           c.   Outfield of natural grass turf with irrigation system
           d.   Warning track
           e.   Infield playing surface with 80% sand, 20% clay
           f.   Pitching mound level with infield with pitching rubber
                      i. Water spigot within weather proof in ground box behind pitcher’s mound.
                     ii. 110‐volt electrical duplex outlet within weather proof in ground box behind
                         pitcher’s mound.
           g.
           h. Fencing 10’ high; backstop located 25’ behind home plate‐ height as required for safety
           i. Double first base
           j. Two concrete block dugouts
           k. Two bullpens (One at each side, inside fence)
           l. One batting cage with 110V electrical outlets for pitching machine (Outside fence)
           m. Scoreboard located between center and left field; See Division 11 EQUIPMENT for
              Scoreboard
           n. Two sets of bleachers, 5 rows high, 10’ deep x 21’ long, anchored to concrete pads; See
              Division 13 SPECIAL CONSTRUCTION for Portable Bleachers
           o. Field Lighting See Division 16 ELECTRICAL for Sports Field Lighting
           p. Shared Baseball / Softball Concession / Restrooms / Storage; See Division 11
              EQUIPMENT for Concession Equipment

   8. Middle School Softball Field: Middle school softball field shall be constructed to appropriate
      grading and grassing standards but are not required to meet competition standards of the
      Georgia High School Association and the national Federation of State High School Associations.
      Field shall include the following:
          a. Orientation with home plate at south‐southwest and second base at north‐northeast
          b. Field size: 200’ long at R / L foul lines x 200’ deep at center of outfield
          c. Grass infield and outfield with irrigation system
          d. Appropriate drainage towards outfield
          e. Skinned earth between bases
          f. Pitching mound level with infield
          g. Fencing, 8’ high; backstop located 25’ behind home plate, 20’ high

   9. High School Practice Field: High school practice field is intended for physical education
      instruction and used for multiple sports. It shall be constructed to appropriate grading and
      grassing standards but is not required to meet competition standards of the Georgia High School
      Association and the national Federation of State High School Associations. Practice field shall
      include the following:
          a. Orientation with long dimension north and south
          b. 78 yards wide x 120 yards long
          c. Grass turf with irrigation system
          d. Provide netting where necessary to prevent damage from balls entering adjacent areas.
          e. Fixed Football goalpost and movable soccer goals. See Division 11 EQUIPMENT for
               goalpost and goals.

   10. Middle School Practice Field: Middle school practice field is intended for physical education
       instruction and used for multiple sports. If site allows, it shall be constructed to appropriate
                                                                                                          14
DCSD Design Guidelines
VERSION 2018.04.04
        grading and grassing standards but is not required to meet competition standards of the Georgia
        High School Association and the national Federation of State High School Associations. Practice
        field shall include the following:
             a. Orientation with long dimension north and south
             b. 78 yards wide x 120 yards long
             c. Grass turf with irrigation system
             d. Provide netting where necessary to prevent damage from balls entering adjacent areas.
             e. Fixed Football goalpost and movable soccer goals; See Division 11 EQUIPMENT for
                 goalpost and goals.

    11. Elementary School Multi‐purpose Field: Elementary School multi‐purpose field is intended for
        informal outdoor activities and elementary level sports. It shall be constructed to appropriate
        grading and grassing standards. The multi‐purpose field shall include the following:
            a. Approximately 2 acres adjacent to the gym if site configuration will allow.
            b. Well drained grass turf without irrigation system. Ensure that building and site drainage
                and/or detention systems do not impact the play area.

    12. High / Middle School Tennis Courts: For new facilities, provide a minimum of two (2) tennis
        courts at each middle school and a minimum of four (4) at each high school. Tennis courts shall
        have layouts in accordance with competition standards of the Georgia High School Association
        and the national Federation of State High School Associations.
            a. Contrasting light and dark green surface between court and remaining play area
            b. Regulation size with orientation with baselines of courts perpendicular to north‐south
                axis.
            c. Fencing 10’ high, 20’ from baseline, 12’ from sidelines
            d. Windscreens except at bleachers
            e. 110v duplex electrical outlet at each end of the bank of courts.
            f. At high schools, provide one set of bleachers anchored to a concrete pad at west end of
                courts. See Division 13 SPECIAL CONSTRUCTION for Portable Bleachers.



DIVISION 3 CONCRETE

03.01 Concrete Walkways
Sidewalks and plazas shall be concrete.

03.02 Compactor / Dumpster Pads
For new buildings and major renovations to kitchens, concrete pads shall be placed in the service area to
accommodate one compactor for garbage and one dumpster for recycling. At new High Schools, these
pads can be incorporated into the concrete area at the loading dock. Drains must be provided, and shall
be designed in compliance with all applicable codes. Provide heavy duty reinforced concrete slab that
extends a minimum of 40′ in front of the dumpster pad to resist wear from garbage trucks turning their
wheels to maneuver for dumpster pick up.
Dumpster and compactor areas shall be visually shielded, in a manner compatible with the architectural
design of the building.
Dumpster and compactor areas shall be easily accessible by sidewalk so that custodial carts can be used
to transport trash to the dumpster. The top of the dumpster shall be accessible, in a location adjacent to
                                                                                                       15
DCSD Design Guidelines
VERSION 2018.04.04
a loading area or dock so that trash can be thrown into the top of the dumpster. Where the dumpster is
not adjacent to a loading dock, a ramp to the back or sides of the dumpsters shall be provided.


03.300 Cast‐in‐Place Concrete

At DCSD stadiums, any work done to refurbish stadium seating, rest rooms, parking access,
concession area, etc. shall be ADA compliant. Consideration should be given to providing
accessible viewing areas in multiple locations (“Home” and “Visitor”) of stadium seating.
Stadium Seating: Existing structure for stadium bench seating is concrete. For major stadium
renovations, existing conditions shall be fully assessed and analyzed by a structural engineer with
expertise in concrete prior to design of refurbishment of stadium.

03.350 Concrete Finishes

Special attention should be given to proper curing and finishing of any slabs to receive flooring. Follow
flooring manufacturer’s requirements regarding flatness and moisture parameters.



DIVISION 4 MASONRY

04100 Mortar and Grout

Only one mortar color should be used on the exterior masonry at each new school.

04210 Brick Masonry

Brick veneer shall be used as the exterior building material of choice for all DCSD projects.

For new construction, changes in brick types, sizes, color, texture and orientation shall be kept to a
minimum. Color(s) shall be recommended by the Design Professional and must be approved by DCSD
Design and Construction.

For additions and alterations to existing brick exterior walls, care must be taken to properly blend old
and new construction. In most cases, matching of existing brick is impossible. Include instructions to
contractor to salvage old brick for patching that may be required. Designers are encouraged to use
obviously contrasting materials where new construction joins existing. Make changes to veneer at
inside corners wherever possible.

As a natural material, brick can have a considerable variegation of colors. When installing, alternate
bricks from multiple packs to ensure proper color blending and avoid “pooling” of color.

04220 Concrete Unit Masonry

Concrete unit masonry is preferred for the interior wall material for new construction. Bull‐nosed block
shall be used for all outside corners, above the first course. Split‐faced block shall not be used unless
specifically requested by the DCSD.

Concrete unit masonry partitions are required at the following locations, unless specifically approved by
DCSD Design and Construction:

    1. Corridors and other high traffic areas
    2. Gymnasium, Auditorium, Stage, Cafeteria and Kitchen
                                                                                                           16
DCSD Design Guidelines
VERSION 2018.04.04
    3.   Main Mechanical and Electrical Rooms
    4.   Hall restrooms and other high abuse areas
    5.   Locker Rooms
    6.   Mechanical and electrical closets

Concrete unit masonry partitions can be used for Vaults and the adjacent Office used for bookkeeping
(Extend to roof or cap with concrete slab.) Rated gypsum board partitions may be used in lieu of CMU
at Vault and adjacent office area.)


DIVISION 5 METALS

05120 Structural Steel
Structural steel framing systems shall generally be used for new school construction and additions, in
lieu of load‐bearing masonry construction.

05500 Metal Fabrications
       05500 2.3 Steel Ladders OR        05510 Aluminum Ladders
         All areas of all roofs should be easily accessible to maintenance staff with permanently
         installed stairs and/or ladders, designed for interior access when practical. These access
         points must be protected from access by students. Exterior access must be caged /
         locked to prevent theft.
         1. Prefinished aluminum preferred over painted steel.
         2. Interior ladders provided for roof or mezzanine access shall be a ship’s type ladder.
         3. Vertical or exterior ladders from the ground are not acceptable for required access to the
            roof. Limit the use of vertical fixed ladders to small areas projecting above the main roof.
         4. Ladders and stairs shall be equipped with appropriate guard and handrails.

         05500 2.4 Steel Railings OR 05521 Aluminum Railings
         1. For ease of maintenance, factory finishes on all metal handrails, posts, pickets, and
            guardrails are preferred over painted finishes. At a minimum, provide factory‐finished
            handrails (clear aluminum is ideal).
         2. Gates at guard rails between Interior track and bleachers in high school gyms shall be self‐
            storing.



DIVISION 6 WOOD, PLASTICS, AND COMPOSITES

6.01 Plastic Laminate

    1. General use counter tops shall be plastic laminate material. One‐piece countertops with integral
       coved backsplash, bull nosed edges and minimal number of seams shall be specified. Color(s) to
       be selected by the Design Professional and approved by DeKalb County School District. Consider
    2.   Basis of design is Wilsonart.




                                                                                                           17
DCSD Design Guidelines
VERSION 2018.04.04
6.02 Casework: Custom casework shall only be used where manufactured casework will not serve the
intended use. Plastic laminate shall be used as appropriate. Do not specify wood or laminate casework
or shelving in janitor’s closets.


DIVISION 7 THERMAL & MOISTURE PROTECTION

07110 Waterproofing and Damp‐ proofing
   1. Appropriate waterproofing, damp‐proofing and vapor retarders shall be specified by the Design
       Professional.
   2. Avoid parapet wall penetrations.

07210 Insulation and Fireproofing
Appropriate insulation and fireproofing shall be specified by the Design Professional to provide a safe,
energy efficient, comfortable building, and to meet building codes.
Enclose space under first level of all stairs to prevent misuse of space for storage or misconduct.

07520 Membrane Roofing
Modified bitumen,”cool roof” roofing shall be used for low slope roofs. The use of parapets should be
minimized. Insulation value shall be minimum R‐19.

07612 Pre‐formed Metal Roofing
Metal roofing shall be used on high‐slope roofs. Steel is preferred, aluminum is acceptable.

07620 Flashing
   1. Follow manufacturer’s recommendations when specifying through wall flashing and installation
       accessories.
   2. Use copper, stainless or rubberized asphaltic flashing with an adhesive backing for through wall
       flashings at sills, beams and lintels. Avoid PVC products unless they are specifically
       recommended by their manufacturers for through wall flashing applications.
   3. Metal flashing products may be laminated with other materials such as asphalt or waterproof
       papers to reduce galvanic corrosion where necessary.
   4. Specify manufactured mortar nets over the horizontal run of through wall flashing to catch
       mortar dropping and allow water to filtrate easily downward through the net material to the
       flashings and out the weeps.
   5. Provide weeps immediately upon the horizontal leg of the through wall flashing at the exterior
       wall construction element at sills, beams and lintels.

07710 Manufactured Roof Specialties
Internal roof drains should be avoided where possible. Concealed gutters will not be allowed. External
gutters shall be used where possible. Use PVC or cast iron downspouts in areas subject to abuse. If
exposed, protective boots shall be used to prevent downspout conductors from damage. Downspout
transition fittings shall be seamless or welded fittings.

07720 Roof Hatch
Appropriately located roof hatches shall be provided as needed for access to low slope roof areas.



                                                                                                           18
DCSD Design Guidelines
VERSION 2018.04.04
DIVISION 8 DOORS & WINDOWS

08.01 Doors

   1. Door Size Notes
         a. Unless otherwise specified, new doors shall be 36” wide.
         b. Pairs of 36” doors with removable mullions shall be provided at service entrances,
              throughout major circulation corridors and for access into large rooms such as the
              Cafeteria, Stage, Gym and Media Center in order to facilitate delivery of bulky objects.
         c. Single 42” doors shall be provided at Kitchens from the delivery corridor, for access to
              Bulk Storage Room, Serving Area and Cafeteria. Single 42” doors shall be provided for
              access into Music Practice and Storage Rooms to facilitate movement of large
              instruments. Single 42” doors shall be provided for access to all areas with laundry
              equipment. Consider the use of single 42” doors to provide access into Special
              Education Suite (Classrooms and Adaptive Toilet), facilitating movement of wheelchairs.
         d. Overhead roll‐up doors shall be provided as appropriate for access to Shops, Stage
              Scenery Areas, Mechanical Rooms and Storage Rooms to facilitate movement of bulky
              objects. Lock must be accessible from both sides.
         e. Unless otherwise specified, door height at new construction shall be 80” minimum. Door
              height at renovations shall match existing. Height of doors and frames shall be selected
              for best value and efficiency.
         f. Removable mullions shall be non‐keyed type. Vertical rods shall not be used.



   2. Door Stiles and Rails: All aluminum, hollow metal and wood doors shall be constructed with 6”
      stiles, 8” top rails and 10” bottom rails. Doors pairs with exit devices shall have center non‐
      keyed, removable mullions.
   3. Door Materials
           a. Wood doors shall be specified for general interior use. No plastic shall be used.
           b. Metal doors shall be used on the exterior and interior of the building where appropriate
                for greater security.
           c. Provide heavy duty door and hardware at Vaults and Record Rooms.
   4. Door Lights
           a. Provide factory installed small vertical door lights at typical doors to classrooms and
                other frequently used doors. Larger door lights and hollow metal sidelights should be
                used at the following:
                      i. Administration
                     ii. Counseling
                    iii. Media Center
                    iv. Gymnasium
                     v. Cafeteria
                    vi. Teacher Work Room
           b. Provide an observation light at the Kitchen delivery door constructed of security glass
                designed to resist break‐ins.

08.410 Aluminum Curtain wall and Storefront Systems

           a. Aluminum storefront systems shall be used at primary entrances to the building. Hollow
              metal frames shall be used for entrance doors.
                                                                                                    19
DCSD Design Guidelines
VERSION 2018.04.04
             b. In lieu of painted hollow metal frames, consider prefinished aluminum storefront
                 systems for interior window walls.
   5.   Rollup Grilles and Shutters
             a. If used between Serving Lines and Cafeteria:
                       i. Provide electrically operated roll‐up grilles in lieu of solid roll‐up doors to allow
                          for air circulation.
                      ii. Locate key operated control on Serving Line side.
                     iii. Do NOT provide supplemental latches or dead‐bolts. Grilles shall be secured by
                          the weight of the grille.
             b. Consider use of security grilles across corridors to separate building into zones, limiting
                 access to certain parts of the building after hours. If used:
                       i. Provide electrically operated roll‐up grilles at corridor separation zones. These
                          shall be in addition to emergency smoke doors that may be required by code.
                      ii. Locate key operated control on both sides. Provide security latch operated by
                          key, accessible from both sides.
             c. Where required by Educational Specifications, provide manual operated solid roll‐up
                 shutters with security latch operated by turn knob on room side.
   6.   Hardware
             a. Appropriate finish hardware shall be specified by the Design Professional for review and
                 approval by DeKalb County School District. Provide lever handles throughout in
                 accordance with ADA.
             b. See APPENDIX to Design Guidelines – Door Hardware.
   7.   Windows
             a. Architects are encouraged to incorporate windows for natural lighting into as many
                 building spaces as practical. Architect shall provide a cost‐benefit analysis of cost savings
                 provided by proposed window lighting compared to their impact on HVAC installation
                 and operating cost.
             b. All exterior window frames shall be aluminum. Steel window frames are not acceptable
                 at exterior walls. Current DCSD standards do not allow for operable windows.
             c. Minimum Requirements:
                       i. Elementary: Windows are required at all general instruction classrooms.
                      ii. Middle: Windows are desired at all general instruction classrooms when
                          feasible.
                     iii. High: Windows are required at all general instruction classrooms adjoining
                          exterior walls.
                     iv. Interior window frames shall be aluminum storefront or hollow metal and shall
                          be provided at offices where supervision of adjacent areas is required. Do not
                          provide interior windows at Locker Rooms.
                      v. Provide interior window(s) in the Kitchen Manager’s Office to allow observation
                          of workers in the Kitchen and vendors during deliveries.
   8.   Glazing: General exterior glazing shall be insulated, double thickness. Provide tempered /
        laminated glass as required by code. Avoid use of wire glass. Use tinted glass for sun control in
        lieu of blinds at large and inaccessible windows at Clerestories, Lobbies, Corridors, Media
        Centers, Cafeterias, Gymnasiums and similar spaces.


DIVISION 9 FINISHES

                                                                                                            20
DCSD Design Guidelines
VERSION 2018.04.04
09.250 Gypsum Board Systems
Gypsum Board wall systems are acceptable for interior partitions at light duty spaces such as
admin areas, and may be considered for partitions between classrooms and labs. Use of
concrete masonry unit walls is preferred whenever possible.
    1. Exposed layers at walls shall be abuse resistant type. Use fire code type material as required by
       code.
    2. Bull nose corner beads shall be used at typical outside corners. Corner guards, in lieu of bull
       nose corners, may be used at the Administrative and Guidance areas.
    3. Do not use gypsum board wall systems in any wet or damp locations.
    4. At firewalls, rated gypsum board may be used above concrete unit masonry walls starting at 10’‐
       0” above finish floor where the wall will not be susceptible to vandalism or abuse.
    5. Fiberglas reinforced (FRP) panels are unacceptable for use in DCSD projects without express
       consent from Design and Construction.
09.850 Acoustical Systems
    1. Sound batts shall be used to reduce the sound transmission of the wall system as needed.
       Acoustical separation shall meet requirements of

Resilient Tile Flooring
Typical floor finish, except where specialized finishes are called for, shall be Vinyl Composition Tile (VCT).
Size of VCT shall be 12” x 12” x minimum 1/8”. Basis of design is Excelon, Imperial Series by Armstrong.
Color and patterns shall be specified by the Design Professional and approved by DeKalb County School
District. Colors shall be manufacturer’s standard colors, chosen with ease of maintenance in mind. Solid
color floor tile shall be used for accent areas only. Consider use of flexible terrazzo tile similar to
“Fritztile” in corridors, lobbies, and high traffic areas. To add aesthetic interest to the building, the
Design Professional is encouraged to use patterns and color, especially in corridors and lobbies.

Coordinate the sequence for cleaning and waxing VCT floors with DCSD Coordinator of Environmental
Services and Coordinator of Warehouse. Schedule cleaning and waxing of VCT floors at Corridors,
Cafeteria and other designated areas after furniture is delivered. Base shall be 4” black or very dark
color rubber cove base. Provide matching‐color transition strips adjacent to other floor materials.

Carpet
At locations where the Educational Specifications call for carpet, tiles are preferred over roll goods,
particularly in high traffic areas. Specify electrostatic backing to eliminate curling of carpet tiles at the
edges.
Standard of quality, construction and appearance for carpet tiles is based on “Diffuse” and “Disperse” by
Shaw Industries.
Standard of quality, construction and appearance for broadloom carpet is based “Expose” or “Blog” by
Shaw Industries.
Standard of quality, construction and appearance for walk‐off mat is based on Crayon 01957 Vinyl
Cushion Tufted Textile (VCTT) by Tandus Flooring.

Wood Athletic Flooring
High School and Middle School Gym flooring shall be solid maple wood strip athletic flooring system.
Minimum thickness shall be 7/8″, No.2 or better grade maple.
The flooring system shall be specifically made for athletic flooring applications.

                                                                                                           21
DCSD Design Guidelines
VERSION 2018.04.04
Flooring shall include multi‐purpose court markings and custom designed school logo approved by
DCSD.
Provide recessed supports for three volleyball nets at all middle and high school gyms.
Provide event floor covering at wood floors which are also used for auditorium and other assembly
functions.
Flooring for new auditorium stages, dance rooms, and drama rooms shall be wooden sprung floors.

Synthetic Athletic Flooring
Synthetic athletic flooring shall be installed in all new Elementary School Gyms. Product shall be equal to
Mondosport I by Mondo USA or SportGrain Plus by Connor Sports Flooring.

Indoor Track Athletic Flooring
Indoor track flooring shall be polyurethane flooring over Rubberized Base with continuous striping for
three lanes.
Basis of design: Robbins Sports Surfaces ‐ Pulastic ‐ 2000

Weight Room Athletic Flooring
Weight Room Athletic Flooring shall be recycled rubber material formed into tiles, 24”x 24” x min. 3/8”
with interlocking tabs, free‐laid without adhesive.
Basis of design: Mondo Highjolt

Quarry Tile
Dark Red Quarry Tile with deep charcoal gray grout shall be used at Kitchen, Walk‐in Cooler & Freezer,
Dry Storage, Serving Courts, Custodial wet areas. Grout joints shall not be sealed in kitchen floors.

Ceramic Tile
At rest rooms, unglazed Ceramic tile is acceptable for use as flooring. Glazed ceramic tile, minimum 54”
high on all restroom walls, is preferred for use as wainscot material. To add aesthetic interest, consider
accent patterns or strips. Color shall be selected by Design Professional and approved by DeKalb County
School District. Colors of tile and grout shall be selected with ease of maintenance and long term
appearance in mind. Grout must be sealed.

Terrazzo
For new construction, terrazzo may be considered for high traffic areas such as corridors and lobbies.
Consideration must be given to slip prevention at all entrances.

Sealed Concrete
Sealed Concrete flooring is acceptable at service areas such as storage, mechanical and electrical rooms.
Decorative stained concrete shall not be used in occupied areas.


Suspended Ceilings
Unless noted otherwise, 2’ x 2’ ceiling grids with 2’ x 2’ x 5/8” suspended acoustical ceiling tiles shall be
used for all general use areas of the building. Standard ceiling tile shall be square edge, non‐directional,
fissured design, 5/8”.
Basis of design: Cortega 770 by Armstrong.
Basis of design for ceiling tile in wet areas shall be Ceramaguard 607 by Armstrong.
                                                                                                           22
DCSD Design Guidelines
VERSION 2018.04.04
Cafeteria – hard, washable tile needs to be installed around high HVAC vents in cafeterias, similar
material to that used in the kitchen
Suspension System throughout shall be 15/16” exposed tee aluminum system. Basis of design: Prelude
XL by Armstrong.
Ceiling system furnished shall include all industry‐standard accessories required for installation.
Exposed structure and ductwork may be considered in art labs, stages, and drama rooms.
When determining ceiling heights, consider maintenance of lighting and finishes. Maximum height must
be within reach of ladders or lifts readily available to DCSD maintenance staff.

Non‐accessible Ceilings
Use “hard” – painted gypsum board ‐ ceilings in student restrooms and locker rooms. Ceiling access
panels need to be installed to access valves, smoke detectors, etc. Minimum size shall be 24” x 24” if
personnel access is required (i.e. more than hand access to reach a valve).

Sound Attenuation Blanket
Sound attenuation blankets may be used above suspended ceilings in order to obtain acceptable sound
transmission levels. See Acoustical Standards in Division 1 of these Design Guidelines.

Exterior Painting
Exterior painting shall be in accordance with the manufacturer’s recommendations for the paint used
and the material being painted. Color shall be selected by Design Professional and approved by DeKalb
County School District. In general, materials with factory applied paint, coatings, or integral color should
be specified in order to reduce maintenance costs.
Basis of Design: Duron “Weather Shield” one coat, flat White paint for exterior painting.

Interior Painting
Interior painting shall be in accordance with the manufacturer’s recommendations for the paint used
and the material being painted. Semi‐gloss shall be used unless otherwise approved. Color shall be
selected by Design Professional and approved by DeKalb County School District. In general, materials
with factory applied paint, coatings, or integral color should be specified in order to reduce maintenance
costs.
Basis of Design: Pittsburgh Pure Performance Interior walls – color: Antique (Porter Paints) Zero VOC –
semi gloss. Interior metal doors and frames ‐ Advantage Hi Gloss Exterior (Porter Advantage 900 High
Gloss) Low VOC.


DIVISION 10 SPECIALTIES



10100 Visual Display Boards

Display of student work is integral to 21st Century School Design. Flexible systems for hanging
art and academic work should be integrated into classrooms, entrance, and corridors. Visual
Display boards and related accessories shall be included in the Construction Contract. See
Educational Specifications for location, quantity and size.
    1. Marker boards shall be factory laminated 3‐ply construction with porcelain enameled low‐gloss
       face sheet, 3/8” particle board core and aluminum sheet backing, with factory‐applied
                                                                                                          23
DCSD Design Guidelines
VERSION 2018.04.04
       aluminum trim. Basis of Design: Claridge Products and Equipment, Inc.; Series 1 LCS marker
       board.
             A.      Provide aluminum frame with chalk tray and 1” map rail with accessory clips for
                     flags and maps.
             B.      Provide appropriate special screened graphics at math and music rooms.
             C.      Provide manual sliding marker boards at science labs.
    2. Tack boards shall be 1/4” thick, plastic‐impregnated cork sheet, natural cork color, factory
       laminated to ¼” thick particle board backing, with factory applied aluminum trim. Basis of
       Design: Claridge Products and Equipment, Inc.; Series 1 Cork Bulletin Board.


10165 Toilet Partitions

Consideration of privacy and sightlines is important to rest room design. Toilets and urinals shall
not be visible from the corridor through an open doorway. This includes reflection of toilets and
urinals in mirrors. Toilet partitions and urinal screens shall be provided at multi‐person
restrooms in all new and renovated restrooms at all grade levels.
    1. Partitions and screens shall be solid plastic, high density polyethylene. Basis of Design: Scranton
       products. Partition color to be selected from manufacturer’s standard colors.
    2. Continuous hinges shall be used at all stall doors.
    3. Stall doors shall utilize a gap‐free interlocking door‐stile configuration so that there are no sight
       lines into the toilet stall.
    4. Partitions shall be floor mounted and overhead braced. Avoid cross braces which children could
       climb on or swing from.
    5. Hardware shall be heavy duty extruded aluminum or stainless steel.
    6. Wall brackets for partitions and screens shall be extruded aluminum, continuous “double T”
       type.
    7. Floor mounted and overhead braced screens shall be provided between urinals.
    8. Masonry partitions shall not be used.


10350 Flagpole

For new schools, provide 30’ high, ground set aluminum tapered flagpole, with an external halyard, in a
prominent location at the front of the building.




10400 Identifying Devices

Appropriate way finding and room identification signage shall be provided, including Braille
information in accordance with the ADA. All graphics should comply with the DeKalb.
Consideration should be given to providing graphics to ease navigation around the building.
Engaging colors, wall graphics, floor patterns are encouraged.

                                                                                                         24
DCSD Design Guidelines
VERSION 2018.04.04
   1. Provide easy to read directional signage at Lobbies, Corridors, Stairways, Elevators and other
      special components to aid students, staff, and visitors in navigating the building.
   2. Typical Classrooms, Labs and Multi‐purpose rooms shall be identified by room number only, for
      future flexibility in use. Room numbering must comply with those listed in the Georgia DOE’s
      records.
   3. Permanent special purpose rooms and suites (Administration, Counseling, Media Center,
      Gymnasiums, Cafeteria, Staff Dining, Kitchen, Restrooms, Electrical, Mechanical, Custodial, IDF,
      etc.) should be identified by name and number, but not individual rooms within suites that may
      be subject to re‐assignment.
   4. Cafeteria Serving Lines shall be identified with easy to read graphics as well as functional room
      number for identification. Submit graphics to Executive Director of School Nutrition for review
      and approval.


10500 Metal Lockers

   1. Corridor Lockers
      For new buildings and major additions at middle and high schools, provide metal double tier
      lockers in the corridors for student use. Basis of design: List Industries, Inc.
            1.       Provide number of lockers equal to 110% of the “Design” FTE plus corridor space
                     to increase the number of lockers to the “core” capacity.
            2.       Each locker shall be approximately 12” wide x 12” deep x 36” high x double tier
                     (72” total unit height)
            3.       Lockers shall be equipped with Multi‐point automatically locking spring bolt and
                     built‐in key‐controlled, three‐number dialing combination lock with changes made
                     automatic with a control key. Provide A.D.A. compliant keys locks on 1% of all
                     lockers ordered. Provide master locks.
            4.       Utilize welded construction with 16 gauge bodies, 14 gauge doors with stiffeners
                     and 18 gauge backs.
            5.       Door shall have piano hinges, fastened with screws, not welded.
            6.       Doors and frame (body) of lockers shall be painted one color.
            7.       Locker colors may alternate or be different in different parts of the building.
            8.       Specify manufacturers standard paint colors unless use of custom colors is
                     requested and specifically approved by DCSD.
            9.       Utilize a painted metal “Z” base in lieu of raised concrete (or other material),
                     eliminating the need for resilient base finish.
            10.      Extend VCT floor finish below lockers to allow for their future removal.
            11.      Enclose the ends of a bank of lockers with masonry wing walls; enclose tops with
                     gypsum board walls.
            12.      Provide attic stock of additional doors of each color specified for future
                     replacement.


   2. Theater Dressing Room Lockers
      New theater dressing rooms in high school auditorium areas. Each locker shall be approximately
      12” wide x 12” deep x 36” high x double tier (72” total unit height) similar to Student Corridor
      Lockers.
                                                                                                     25
DCSD Design Guidelines
VERSION 2018.04.04
   3. Staff Lockers
             1.     Custodial Staff Lockers
                    Each locker shall be approximately 12” wide x 15” deep x 72” high single tier.
                    Locker Construction shall be similar to Student Corridor Lockers.
             2.     Kitchen Staff Lockers
                    Each locker shall be approximately 12” wide x 12” deep x 36” high x double tier
                    (72” total unit height) similar to Student Corridor Lockers.



   4. Athletic Lockers
          a. Sides and intermediate partitions shall be expanded metal for ventilation.
          b. Lockers shall be equipped with Multi‐point automatically locking spring bolt and pad‐
               lock lug.
          c. Provide three‐number dialing combination pad‐locks with a master key for 110% of
               lockers in five tier units.
          d. Utilize welded construction with 16 (13) gauge bodies, 14 (16) gauge doors with
               stiffeners and 18 gauge backs.
          e. Doors shall have piano hinges, fastened with screws, not welded.
          f. Doors and frame (body) of lockers shall be painted one color selected from
               manufacturers standard paint colors.
          g. Provide additional doors as attic stock for future replacement.
          h. Provide appropriate number of laminated maple locker room benches. At least one
               bench shall have an attached back support OR be located against a wall, per ADA
               requirements.
          i. Physical Education Lockers
               Provide six–tier and double‐tier lockers for new and renovated middle and high schools
               PE Locker Rooms in the quantities indicated in the DCSD Educational Specifications.
                          1. Lockers in six‐tier units shall each be approximately 12” wide x 12” deep x
                               12” high (72” total unit height).
                          2. Lockers in double tier units shall each be 12” wide x 12” deep x 36” high
                               (72” total unit height).
          j. Team Lockers
               Provide single‐tier lockers at each of the Boys and Girls Team Locker Rooms at new or
               renovated high schools. Coordinate quantity with Principal and Athletic Staff at each
               school. Lockers shall be 15” wide x 18” deep x 72” high.
          k. Football Lockers
               Provide athletic style metal lockers at Football Team Room. Lockers shall be 18” wide x
               22”deep x 72” high open front with combination seat and foot locker and 12” Security
               box.
          l. PE Staff Lockers
               Locker Construction shall be similar to Student Corridor Lockers with built‐in
               combination locks. Provide master locks. Provide the following size lockers:
                          1. Middle School PE Staff: single tier lockers 12” wide x 15” deep x 72” high
                               at each Male and Female PE Staff Area.


                                                                                                      26
DCSD Design Guidelines
VERSION 2018.04.04
                           2. High School PE Staff: single tier lockers 15” wide x 21” deep x 72” high at
                              each Male and Female PE Staff Area
10522 Fire Extinguishers

Provide fire extinguishers in sizes and locations as required by code. Provide recessed extinguisher
cabinets with door alarms in all locations that are accessible to students.

FOR FURTHER REVIEW: DCSD Safety Specialist



10530 Prefabricated Canopies

Appropriate aluminum canopies shall be provided at bus and auto drop‐off areas, as well as
cafeteria loading areas as needed. Ideally, pedestrian canopies should provide continuous
protection from the weather, from the building exit to curb, extending over vehicles so that
students can load in safely. Buses and delivery vehicles provide special challenges to design –
the canopies need to provide maximum coverage while maintaining clearance for vehicles.
Height requirements, “tail swing” clearances, and maneuvering space for bus and truck traffic
shall be carefully considered.
    1. Drainage needs to be controlled and piped as necessary to prevent flow across sidewalks.
    2. Include lighting under canopies to provide adequate illumination for evening activities and
       security.
FOR FURTHER REVIEW: DCSD Executive Director of Transportation.



10675 Metal Storage Shelving

Provide adjustable industrial heavy duty metal shelving in all Storage and Custodial Rooms in the
quantities indicated in the DCSD Educational Specifications. Wood or laminate shelving shall not be
used. Typical shelving units shall be 36” wide x 85” high x depth appropriate for the intended use (12”,
18” or 24”). Shelves for book storage shall be 12” deep. Provide 7 shelves per unit (including base and
top) to allow approximately 12” clear vertically per shelf.



10800 Toilet Accessories

   1. Provide surface mounted, heavy duty stainless steel commercial quality restroom and bath
      accessories.
   2. Coordinate toilet paper, paper towel, and soap dispenser requirements with DCSD
      Environmental Services.
   3. Safety glass mirrors: provide one long mirror per restroom, and one lavatory mirror per lavatory.
   4. Electric hand dryers can only be used in administrators and teacher’s restrooms – not student
      restrooms. Architect shall specify type of Hand Dryers subject to review and approved by DCSD
      Facility Services before issuing Project Manual.
   5. The following accessories will be Owner‐Furnished, Contractor‐Installed:
          1)       Soap Dispenser: Gojo Model FMX‐12. Locate soap dispensers adjacent to
                   lavatories.
                                                                                                    27
DCSD Design Guidelines
VERSION 2018.04.04
           2)      Paper Towel Dispenser: Continental 630, White or Stainless


DIVISION 11 EQUIPMENT

11110 Commercial Equipment

Provide a heavy duty commercial grade appliance suited to this application where the project scope
includes a washer/dryer for athletic uniforms.


11310 Residential Appliances

11410 Food Storage Equipment

11512 Library Stack Systems

11531 Laboratory Fume Hood

11662 Gymnasium Equipment

11665 Gymnasium Dividers



11400 Food Service Equipment

Efficient, safe, and sanitary kitchens are of paramount importance to the District’s students and
staff. Designers are encouraged to consult early and often with representatives of the School
Nutrition Department.
   1. Kitchen Equipment shall be incorporated into the Scope of Work for all new school projects.
   2. The Design Professional shall be responsible for employing a qualified professional Kitchen
      Designer to develop appropriate Kitchen Design and Construction Documents.
   3. Drawings, Specifications, and equipment descriptions shall be submitted to DeKalb County
      School Nutrition Department and DCSD Plant Services for review and approval.
   4. All new kitchens shall have all natural gas equipment. Gas‐powered appliances shall have
      electronic ignition only. Standing pilots are not acceptable.
   5. Walk‐in freezer and cooler units shall have digital temperature controls and electronically
      commutated motors (ECM). Outside units shall have scroll compressor with ECM condenser fan
      motor.
   6. See Appendix XXX for list of Basis of Design manufacturers and models. This list is subject to
      change: please verify equipment with School Nutrition Department for each project.

11470 Darkroom Equipment

   1. Light blocking, revolving door for primary pedestrian access is preferred, in addition to a
      secondary pedestrian door with light‐tight gasketing to allow service and ADA access to the
      area.
   2. Ventilation equipment needs to be designed to handle vapor emissions of the darkroom
      chemicals.



                                                                                                     28
DCSD Design Guidelines
VERSION 2018.04.04
    3. Enlarger stations shall be provided, with at least one designed for ADA accessibility.
       Specifications shall be submitted to DCSD Visual Art Coordinator and Facility Services for review
       and approval.



11511 Book Theft Protection Equipment

At corridor exit(s) from the Media Center, provide a complete book theft detection system with alarm,
Radio Frequency Identification (RFID) tags, and RFID detuners/deactivators, to assist in preventing
unauthorized removal of a library’s materials. Basis of Design: Strata EX system by Checkpoint,
distributed by 3M.

    1. Must meet ADA requirements (36” corridor width), with flexible mounting options (direct mount
       or base plate)
    2. Include integrated audio and visual alarms to alert staff when an item containing a secured tag is
       detected.
    3. Include integrated digital display to monitor alarm counts, ingoing and outgoing patron traffic,
       and diagnostics.
    4. Provide option of real‐time access to statistics and aggregated customized reports.
    5. Include configurable alarm settings based on direction of travel (in/out).
    6. Include capacity to provide self‐checkout stations, security gates, and automated check‐in.
    7. Include “3M Digital Library Assistant”, a handheld device that reads RFID tags on books and
       other materials. RFID readers to be located at the circulation desk and self‐service kiosk.
    8. Include pop‐up alarm notification.

11515 Kilns

Provide kiln in dedicated room with proper fire separation and ventilation system, per all applicable
codes.



11521 Projection Screens

    1. Basis of design shall be Da‐Lite Screen Co. Inc.’s “Cosmopolitan Electrol”.
    2. Provide motorized screens at new auditorium and cafetorium stages.
           a. Provide additional drop header to set bottom of screen 2’‐0” above stage floor.
           b. Screen shall be mounted immediately in front of the stage curtain.
           c. Screen shall be designed for rear projection system.
    3. Provide motorized screen at new and renovated Media Centers.
           a. Screens shall be recessed in the ceiling suspended from structure above only if ceiling is
                low enough and daylighting is controlled enough for optimal viewing. Mount on wall or
                provide portable screen if visibility is compromised by ceiling mount.

11610 Theater and Stage Equipment

For new high school construction, the Design Professional is encouraged to employ the services of a
qualified professional Stage Equipment Designer to develop appropriate Design and Construction
Documents for Auditorium, Drama Labs and other performance studios.



                                                                                                        29
DCSD Design Guidelines
VERSION 2018.04.04
Provide lighting, sound systems, curtains, stage monitors, projectors and other equipment appropriate
for the specific program.

Provide a Catwalk at High School Auditoriums for access to front overhead stage lighting above audience
seating. Drop lighting access is unacceptable.

Drawings and Specifications shall be submitted to DeKalb County School District Drama Coordinator and
Facilities Services for review and approval.

See Division 16 ELECTRICAL ‐ Theatrical Lighting Systems

See DIVISION 15 for further details.



11660 Athletic Equipment

The Design Professional shall be responsible for developing appropriate Design and Construction
Documents for Middle and High School Athletic Equipment subject to review and approval by DCSD
Coordinator of Health and PE and by the Supervisor of Interscholastic Athletic Programs.

Provide a heavy duty commercial grade appliance suited to this application where the project scope
includes a washer/dryer for athletic uniforms.

Exterior Equipment:
Basis of design, Gill Athletics
     1. Football Goalpost: # F305, 8’ off‐set, 23’‐4” between 20’ uprights.
     2. Track and Field Equipment at High School Stadiums:
             a. Long Jump / Triple Jump, # 441TS Take‐Off Board System
             b. Pole Vault Box: #500, # 503 Lid (steel)
             c. Shot Put Circle Toe Board: #360
             d. Discus Circle: #367
     3. Soccer Goal: # 477100, Portable Aluminum Soccer Goal with tie downs and wheels for
          portability.
     4. Basketball:
             a. Goals: Heavy‐duty, fixed type with nylon net.
             b. Backboard: Heavy‐duty rectangular steel.
             c. Minimum 4‐1/2” diameter steel pipe with 5’‐0” gooseneck extension.

11662 Gymnasium Equipment
Basketball Equipment
   1. Goal Type: Electrically operated retractable, overhead supported single center post with sway
       bracing, forward folding type for main court and cross courts.
   2. Superstructure: Manufacturer’s standard design for attachment to building structure with
       precision die‐formed fittings.
   3. Hoist operations: Manufacturer’s one HP (minimum) electric winch; self‐locking worm‐gear
       type, capable of holding backstop at any position when raising or lowering. Control by wall
       mounted key switch.



                                                                                                      30
DCSD Design Guidelines
VERSION 2018.04.04
    4. Safety Lock: Manufacturer’s safety lock, inertia sensitive lock type, capable of locking backstop
       in any position at any time in storage or during raising or lowering cycle due to sudden surge in
       speed – typical for all backstops.
    5. Finish on exposed metal components: Manufacturer’s powder coat finish. Color selected by
       Architect from Manufacturer’s standard colors and approved by DCSD Design and Construction
       Department.
    6. Backboards: Rectangular design, ½” thickness tempered glass panel in gasketed extruded
       aluminum frame with bolt‐on padding along bottom edge and up sides 10’ minimum; fired
       vitreous enamel markings conforming to official requirements. 42” high by 72” wide.
    7. Basketball Goals: steel rod rim welded to mounting bracket with enamel finish and nylon
       netting. Provide breakaway type goals for main court backstops. All goals shall be designed to
       absorb shock loads due to slam dunking or hanging on the rim.

Wrestling Equipment
Provide wrestling mats with storage system.

Volleyball and Badminton Equipment
    1. Nets with removable support posts shall be provided.
    2. Gym Floor sleeves for Volleyball and Badminton post:
            a. Sleeve diameter: 3‐1/2” inside diameter.
            b. Cover plate: Chrome plated cover assembly with swivel type hinge and removable key.
            c. Installation: Cast into concrete footing and floor slab for flush mounting with wood
                floor system.

Gymnasium wall and column protection
   1. Bonded foam filled over OSB backing board with fire retardant liner and vinyl coated nylon
      cover.
   2. Panel thickness: Minimum 2 inches.
   3. Wall panel size: 2’‐0” wide by 6’‐0” high.
   4. Column pad size: Custom fabricated to fit around columns; height to match wall panels. For
      elementary school gymnasiums, provide continuous protection at full circumference of room.
   5. Color: As selected by the Architect from Manufacturer’s standard colors and approved by DCSD
      Facilities Services Department.

11664 Scoreboards
Provide complete Scoreboard systems (Basis of design: Electro‐Mech Scoreboard Company) at the
following locations:
     1. High School Main Gym: Provide 2, Model #2770
     2. Middle School Gym: Provide 2 , Model #2330
     3. High School Stadium: Provide 1 , Model #3585
     4. High School Baseball: Provide 1, Model #1580
     5. High School Softball: Provide 1, Model #1580

11681 Playground Equipment
Basis of Design: Kid Builders System by Little Tikes Commercial, Play Power Farmington, Inc.,
    1. All new play structures shall provide accessibility to users with differing physical abilities. Where
         possible, this shall include ramps to provide wheelchair access to some upper platforms. Play
         Equipment installer shall be approved by the equipment manufacturer.
                                                                                                          31
DCSD Design Guidelines
VERSION 2018.04.04
    2. Play equipment will be provided in two separate structures – “pods”, to provide a variety of
       experiences and to allow different classes to play.
           a. Play “Pod”: This unit focuses on imaginative active play and student interaction.
           b. Athletic “Pod”: This unit focuses on developing upper‐body strength and personal
               fitness.
    3. Adequate numbers of play events shall be provided to support the number of students per
       school.
    4. Playground surfacing shall be rubber mulch, with modular plastic curbs. Consider rubberized
       unitary surfacing should budget allow.


11810 Facility Maintenance Equipment

    1. A separate space for floor equipment recharging station/garage shall be provided to keep self‐
       propelled and other custodial equipment from obstructing mechanical rooms. The designated
       area shall be equipped with electrical service sized to meet the demands of the recharging
       equipment. Any appropriate fire separation and ventilation shall be provided.
    2. Commercial duty, residential sized washer and dryer are needed in each building to wash
       custodial mop heads, dust mops and cleaning cloths.

Concession Equipment
   1. Concession facilities shall be provided at the following locations as identified in the Educational
       Specifications:
           a. Middle School Gym
           b. High School Main Gym
           c. High School Auditorium
           d. High School Stadium
           e. High School Baseball / Softball area
   2. Concessions facilities shall include the following utilities and equipment.
           a. Lockable Serving Room with adjacent Lockable Bulk Storage Room.
           b. Standard overhead florescent lighting.
           c. Ventilation fan with thermostatic control.
           d. Heat at exterior locations to protect pipes from freezing.
           e. Counter with serving window.
           f. Lockable base and wall storage cabinets.
           g. Double sink with hot and cold running water.
           h. Ice machine with 75 pound capacity furnished and installed as part of the construction
               contract. Drain pipe shall not be located in pathway.
           i. Floor drain, located near ice machine.
           j. 200 amp electrical service to support 110V/220V outlets for appliances furnished by
               others. Appliances shall be limited to refrigerator, microwave oven, drink cooler, hot
               dog machine, hot dog warmer, popcorn machine and other light duty appliances. Heavy
               duty appliances such as cooking ranges and fryers which require hoods and fire
               protection equipment are specifically prohibited.



DIVISION 12 FURNISHINGS
                                                                                                       32
DCSD Design Guidelines
VERSION 2018.04.04
12.01 Sun Control

   1. Provide blinds at typical classroom and lab exterior windows. Interior blinds shall be 1” aluminum
      horizontal slats. Basis of design shall be Levolor Riviera.
   2. Interior windows, provided as described in the Educational Specifications for supervision
      purposes, shall not have blinds except where specifically approved by DCSD.
   3. Cordless blinds shall be provided in pre‐K, kindergarten, and special education classrooms.
   4. Sun control at large windows and clerestories must be addressed. At high and inaccessible
      windows at Clearstories, Lobbies, Corridors, Media Centers, Cafeterias, Gymnasiums and similar
      spaces.In media centers and cafeterias, sun light must be modulated to prevent glare, and to
      darken the rooms for video/projection presentations. Tinted glass may be used for sun control in
      lieu of blinds


12.02 Manufactured Casework

   1. Manufactured Casework includes but is not limited to:
         a. Classroom and office vertical storage cabinets, base cabinets with counter tops and wall
            cabinets.
         b. Miscellaneous specialty cabinets and shelving, such as storage for props in stage and
            drama areas.



   2. Construction:
         a. Cabinet bodies shall be standard high pressure plastic laminate finish over industrial
             grade particle board.
         b. Cabinet backs shall be minimum ¼” commercial standard CS‐251 tempered hardboard
             or minimum 3/8” high performance 47 lb. density particle board.
         c. Cabinet sub‐base shall be of a separate and continuous ladder‐type platform design,
             leveled and floor mounted prior to cabinet body placement. Material shall be exterior
             grade plywood. No cabinet sides to floor will be allowed. Base front shall be finished
             with 4” high black extruded rubber cove base with pre‐molded corners to match room
             base.
         d. Countertops shall be 1” deeper than base cabinet and 1‐1/2” thick with high pressure
             plastic laminate finish.
         e. Countertops for computers shall be 30” deep and be equipped w/ grommets and wire
             management below.
         f. Countertops without sinks shall have particle board core and water resistive adhesive.
         g. Countertop with sinks shall be constructed with calibrated plywood and non‐soluble
             glue to thickness indicated.
         h. Counter backsplash shall match countertop construction.
         i. Drawer fronts and hinged doors shall be overlay style with higher pressure laminate
             exterior and interior liner and matching 3mm PVC edging.
         j. Shelving behind doors shall be high pressure plastic laminate on particle board core with
             matching 3mm PVC edging. Shelves behind doors up to 27” wide shall be ¾” thick and
             1” thick if over 27” wide up to 36” wide. Open shelving shall be 1” thick. No shelving
             shall exceed 36” unsupported width.


                                                                                                     33
DCSD Design Guidelines
VERSION 2018.04.04
         k. Shelving shall be adjustable and supported by side panels with concealed fasteners
             capable of supporting the specified content.
   3. Hardware:
         a. Hinges shall be adjustable 5‐knuckle, institutional grade, and 2‐3/4” overlay type with
             hospital tip. Anchor hinges with engineered screws (no wood screws)
         b. Hinges shall be stainless steel with satin finish
         c. Pulls for drawers and swing doors shall be ADA compliant one piece semi‐recessed
             molded contour finger pulls
         d. Catches shall be nylon roller or friction type.
         e. Drawer slides shall be heavy duty, side mounted type, equipped with heavy duty ball
             bearing nylon wheels and automatic positive stops.
         f. Locks shall be half mortise design with only round cylinder exposed, five tumbler
             cylinder, keyed separately with master key: satin finish.
         g. Shelf clips shall be heavy duty design to hold shelf in place.
   4. Accessories: Provide accessories appropriate to the cabinet’s function.



   5. Warranty: Provide manufacturer’s standard 5‐year warranty against defects in material and
      workmanship.
   6. Basis of Design Product: LSI Casework, Line L44.

12.03 Science Casework and Laboratory Equipment

   1. Basis of design shall be Kewaunee Scientific Corporation, Signature Series.
   2. Provide modular laboratory casework, including tops, ledges, filler panels, knee space panels,
       supporting structures and miscellaneous items of equipment as specified or scheduled.
       Casework shall minimally include:
           a. Demonstration tables
           b. Student tables
           c. Storage cabinets
   3. Science Casework and related furniture shall be of oak construction. Base cabinets and case
       units shall be lipped style construction having drawer heads and hinged doors with radius edges,
       overlapping cabinet and case openings on all edges. Face frame construction cabinets or cases
       are not acceptable.
   4. Cabinets shall be constructed with flush interiors having no offsets, to maximize drawer and
       cupboard space and for ease of maintenance.
   5. Cabinets shall be assembled using blind mortised and tenoned (or rabbeted) joints, glued and
       screwed together in accordance with best cabinet maker methods. Pinned or doweled
       construction is not acceptable. All exposed joints shall be closely fitted and tight, showing no
       open joints.
   6. All exposed corners shall be rounded.
   7. Counter and table tops shall be 1” thick, chemical resistant, solid monolithic molded modified
       epoxy resins with surface coating; black color.
   8. Hardware shall be stainless steel with satin finish.
   9. Provide manufacturer’s standard 5‐year warranty against defects in material and workmanship.
   10. Equipment shall typically include:
           a. Peg boards
           b. Lockable storage for hazardous materials
                                                                                                      34
DCSD Design Guidelines
VERSION 2018.04.04
            c. Safety eyewash stations. Station must have floor drain.
            d. Fume hoods, equipped with worktop, base cabinet and specified accessories.
            e. Utility service outlet accessory fittings, electrical receptacles and switches shall be listed
               in the Specifications, equipment schedules or shown on Drawings as mounted on the
               laboratory furniture.
            f. Laboratory sinks, cup sinks or drains troughs, overflows, and sink outlets with integral
               tailpieces.

12.04 Darkroom Casework

Provide darkroom enlarger stations with drawer dividers to provide light safe drawers. Darkroom
enlarger station countertops and table tops shall be 1” thick, chemical resistant, solid monolithic molded
modified epoxy resins with surface coating; black color.



12.05 Music Casework

Casework shall be designed for appropriate storage of music instruments, stands, sheet music and
teaching aids. Casework shall be constructed of industrial grade particle board with plastic laminate
finish selected from manufacturer’s standard finishes. Musical instrument storage cabinets and racks
shall be specifically designed and engineered for the storage and protection of the instruments stored,
shall meet specified minimum performance standards, shall be chip and abrasion resistant under normal
usage, and shall protect instruments from damage under normal school use. Each individual
compartment shall have a welded steel grill door with non‐binding, 180 degree, five knuckle safety tip
hinges and a one‐piece finger pull / padlock hasp with integral door stop feature and no moving parts.
Hardware finish shall be white epoxy powder coat. Provide manufacturer’s standard 5‐year warranty
against defects in material and workmanship.

Basis of Design Product: LSI Corporation of America, Inc. 8200 Series or Musical Instrument Storage
System by TMI Systems Design Corporation.

12.06 Library Shelving and Casework

Layout shall be presented to the Director of Media Services with a detailed analysis of sight lines for
security control. Obtain written approval before coordinating related electrical and data outlets.

(media center furnishings currently being updated.)

12.07 Floor Mats and Frames

For new schools and renovations to existing main entries, incorporate flooring designed to increase
safety and decrease dirt infiltration. Consider floor grilles in recessed frames, walk‐off mats, and/or
heavy‐duty carpeting in the vestibule and entrance lobby. As schools often want an entrance mat with
their school logo, consider including with contract, so that it can be properly incorporated into overall
design.



12.08 Auditorium Seating

    1. Basis‐of‐Design Product: Hussey Seating Company; Quattro Chair System


                                                                                                           35
DCSD Design Guidelines
VERSION 2018.04.04
    2. Seating shall be fixed upholstered multiple seating with self‐raising seat mechanisms. All seating
       components shall be provided by a single manufacturer. Seating Layout shall be designed with
       standards spaced laterally in rows so that end standards are in alignment from first to last row,
       regardless of whether aisles converge or are of constant width, and so that sightlines are
       optimized. Seating with integral lighting shall not be used. Provide appropriate accommodations
       for wheelchairs in accordance with ADA.

12.09 Telescoping Bleachers

    1. Provide telescoping bleachers at middle and high school Gymnasiums.
    2. The bleacher system shall consist of motor operated, multi‐tiered, closed deck seating rows
        operating on the telescoping principal, and stacking vertically in minimal floor area when not in
        use.
    3. The structural system shall be engineered to withstand all applicable design loads associated
        with the intended use.
    4. Provide non‐marring rubber tire wheels designed for wood or synthetic floors and sized
        appropriately for the specific bleacher.
    5. Provide self‐storing railings at all exposed bank ends and elevated sections.
    6. Coordinate Bleacher layout with ADA requirements for wheelchair seating.
    7. Decking and steps shall be plywood.
    8. Provide vinyl curtains where necessary to restrict access below bleachers.
    9. Motor Operation:
            a. Provide integral automatic electro‐mechanical propulsion system engineered specifically
                 for the requirements of the bleacher system.
            b. All wiring within the seating bank, as well as all service wiring to the units shall be
                 provided, including remote control panel or pendent control.
            c. Motors shall be three phase and accessible from the front of the bleachers.
            d. Controls: Start, stop, forward and reverse in a single control unit together with
                 appropriate safety limiting features.
    10. Provide manufacturer’s standard 5‐year warranty against defects in material and workmanship.
    11. Basis of Design: Hussey Seating Company; Model MAXAM, Model MXM 26 Series.

12.10 Site Furnishings

    1. Provide a bike rack at all new schools.
    2. Designers are encouraged to design inviting outdoor spaces for the students and the
       community. Consider integrating the design of benches, trash receptacles, and outdoor tables
       with the overall design of the project.

DIVISION 13 SPECIAL CONSTRUCTION

13341 Exterior Bleachers
   1. Provide aluminum bleachers at high school baseball fields, softball fields and tennis courts
       complete with bench seats, and all related appurtenances, fittings and accessories. Attach
       bleachers to a concrete slab extending to walkway system.
           a. 5 rows high, 10’ deep x 21’ long
           b. 42” central aisle with steps
           c. Appropriate guardrails
           d. Access ramps and space(s) for wheelchair shall be provided, per ADA.
           e. Basis of design: Dant Clayton Alum‐A‐Stand.
                                                                                                      36
DCSD Design Guidelines
VERSION 2018.04.04
DIVISION 14 CONVEYING SYSTEMS

14210 Electric Traction Elevator
Provide passenger elevator(s) as needed to comply with A.D.A. requirements.
Elevators should be of practical size with basic, easily maintained finishes.
Elevators in school settings are often (mis)used to carry freight, causing frequent
break‐downs and expensive maintenance, so a heavier‐duty model is desired.
Doors should be sized to accommodate a stretcher in the event of an emergency.
   1. Basis of Design: KONE EcoSpace. Manufacturers that require proprietary tools for maintenance
       are not acceptable.
   2. Provide key controlled access, cab telephone, and tie‐in to fire alarm system.
   3. All controls shall be open access, non‐proprietary controls.
   4. Provide a gearless traction elevator with machine room‐less application.
   5. Provide the appropriate number of elevators with a minimum rated capacity of 3,500 lbs., with
       manufacturer’s recommended speed for the particular installation.
   6. Main power supply shall be 208, three‐Phase, with a separate equipment grounding conductor.
   7. Car lighting power supply shall be 120 Volts, single‐phase, 15 Amp, 60 Hz.
   8. Machine room‐less controller(s) shall be located adjacent to the hoist‐way at the top landing in
       a controller space.
   9. Machine and Governor
           a. The machine shall be AC, gearless, mounted at the top of the hoist‐way.
           b. Provide a tension type generator.
           c. In the hoist way, provide an emergency stop watch in the pit and terminal stopping
               switches.
           d. In addition, components shall include buffers, car and counter weight, positioning
               system, guiderails and attachments, coated steel belts, steel governor rope, and hoist‐
               way entrances.
   10. Car Components
           a. Include car frame, steel cab, emergency car lighting, emergency pulsating lighting, fan,
               handrails, threshold, emergency exit contact, roller guides, platform, and certificate
               frame.
           b. Finishes for the car front and car door shall be stainless steel.
           c. Provide an aluminum egg crate suspended ceiling.
           d. Submit interior cab finishes to the DeKalb County School District for written approval.
   11. Signal Devices and Fixtures
           a. A car operating panel shall be provided which contains all push buttons, key switches,
               and message indicators for elevator operation.
           b. The emergency call button shall be connected to a bell that serves as an emergency
               signal.
           c. Provide buttons with raised numbers and Braille markings, to comply with ADA.
           d. The help button shall initiate two way communications between the car and a location
               inside the building and switching over to another location if the call goes unanswered.
           e. Provide hall fixtures with necessary push buttons and key switches for operations.
           f. Provide elevator car position indicator, car lantern, and chime.

                                                                                                    37
DCSD Design Guidelines
VERSION 2018.04.04
14420 Wheelchair Lifts
New building design should not include mechanical solutions, other than enclosed
elevators, for ADA accessibility. Vertical platform lifts can be considered for
renovations only, if ramps or other ADA acceptable devices are impractical.
Inclined stair lifts shall not be used.

    1. Basis of design: Garaventa
    2. Provide a vertical platform lift with a minimum rated load capacity of 750 lb., a travel speed of 9
       fpm, lifting height as required by the design condition, and a minimum platform size of 37” X 51”
       with a non‐skid surface.
    3. Capacity of the motor shall be not less than 3/4 horse power with instant reversing motor.
    4. Colors selection(s) shall be submitted to DCSD.
    5. Control switches shall be provided at accessible locations on the upper and lower elevations.
    6. Install a runway enclosure to prevent obstructions from entering the underside of the platform
       lift, when the lift is above the lowest elevation. If it is not practical to install a runway enclosure,
       the platform lift shall be equipped with an obstruction panel that will stop the downward travel
       if an obstruction is encountered.
    7. Provide an illuminated emergency stop alarm switch to signal for assistance in the event of an
       emergency.
    8. Provide 42“high gates with a combination mechanical lock and positive opening electric contact
       at the upper and lower levels. Platform panels must be 42” in height.



DIVISION 15 MECHANICAL

Kitchen Hood
    1. Double shell design consisting of an inner exhaust canopy with minimum 86% supply air ratio,
        constructed of heavy gauge stainless steel exterior.
    2. Hood shall be installed per NFPA 96, with 96” clearance from floor to bottom edge of hood.
    3. Hood shall have fire suppression (“Ansul”) system, wired to the main fire alarm panel, installed
        in cabinet on end of hood. Complete electrical and gas shut‐offs shall be located at hood. pe and
        Fittings

Piping and Drains
    1. All mechanical piping and equipment supports exposed to the elements shall be primed,
        painted, and clearly labeled to mark their service.
    2. Victaulic piping shall be Schedule 40 only, and must be installed by factory‐trained installers.
        Couplings shall have rubber stops.
    3. All gas piping used in kitchen shall be hard black piping. Flexible connections are acceptable on
        drops; however, no quick disconnects shall be used.
    4. Vent stacks shall be located sufficiently far away from air intakes of HVAC equipment to prevent
        drawing odors back into the building.


                                                                                                            38
DCSD Design Guidelines
VERSION 2018.04.04
    5. To prevent sewer gas odors from being pulled into roof top units a 25′ separation shall be
        maintained between sewer vents and HVAC fresh air intakes.
    6. Domestic Water pipe shall be Type L copper with lead‐free joints, chrome plated brass or copper
        where exposed.
    7. Domestic water supply lines from street main / meter to the building shall be copper with
        progress fittings (preferred) or Schedule 80 ductile cast iron (no PVC) with thrust blocks and
        tracer wire.
    8. No saddle tees shall be permitted.
    9. Provide T fitting at water supply to Custodial Sinks, Kitchen dish machines, and pot sinks for
        installation of sanitizing chemicals.
    10. Drain and vent pipes from middle and high school science labs to acid dilution tanks shall be acid
        resistant polypropylene or CPVC. All other drain pipes shall be cast or ductile iron to resist
        mechanical cleaning.
    11. In all science lab prep rooms, water taps and electrical service shall be installed for distilled /
        ionized water production equipment.
    12. A grate with a funnel to prevent splashing shall be provided at floor drains that receive
        discharge water from sinks that require an air gap, such as food handling sink in the kitchen.
    13. Provide barrier to rodent infiltration where pipes penetrate from the exterior.
    14. Provide pressure reducing valve (PRV) in boiler room.

Reduced Pressure Zone Assemblies
Reduced Pressure Zone assemblies for back‐flow prevention shall be installed as required by code for all
new facilities and major renovations. Pressure reducing valve and backflow preventer shall be located in
the main meter vault.
Design Professionals please note: even if a project’s scope of work does not involve plumbing, the
DeKalb County code officials may require upgrading existing facilities to meet this requirement in order
to obtain a Building Permit or Certificate of Occupancy for any work done at the facility.

Grease Interceptors
For all new or renovated kitchens, grease interceptors shall be installed on the exterior of the building in
a readily‐accessible location. Design professional must coordinate with DeKalb County Watershed
Management’s Fats, Oils and Grease (FOG) Management program.

Traps
    1. All traps must be located for ease in access for maintenance. Do not conceal in wall.
    2. Trap primers shall be solenoid type, with direct digital control by the energy management
       system. Do NOT use pressure drop primers. PROPRIETARY Standard of Design: ASCO RedHat
       Solenoid Valve 24volt /60 Hz coil, 8210G094.

Plumbing Fixtures

2234.015        American Standard   ”Madera” Elongated Flush Valve Toilet
3043.001        American Standard   ”Madera” 17” ht. Elongated Flush Valve Toilet
C106C           Comfort Seats (JSC) Commercial Elongated Open Front Toilet Seat
6541.511        American Standard   Allbrook Urinal (Waterless urinals shall not be used)
111 XL          Sloan Regal Flushometer ‐ toilet
186 XL          Sloan Regal Flushometer –urinal
                                                                                                         39
DCSD Design Guidelines
VERSION 2018.04.04
V‐500‐AA        Sloan 3/4” x 15” Vacuum Breaker (Retrofit urinals)
0355.012        American Standard       ”Lucerne” Wall‐hung Lavatory
629203C         Watts Grid Drains
B‐0871 T & S    Cast Brass Centerset 4” Faucet (Low flow aerators) (ADA compliant: use on all lavs)
102 E‐Z         Lav Guard 2     Under Sink Pipe Covers
EZS8            Elkay Water Cooler – Lt. Granite (Retrofit)
EZSTL8C         Elkay Bi‐level Water Cooler – Lt. Granite (New)

Sinks:
    1. Kitchen : Prefer T&S Brass Kitchen faucets.
    2. Custodial Sinks: floor type with hot and cold water and hose connection on mixing valve.
    3. Wash fountains / stations: Basis of design: Bradley Co.
    4. Kitchen hand wash sink shall have touch less, low voltage or foot operated faucet controls. Basis
       of design: T&S Brass
    5. Art Room Sinks: stainless steel, deep and wide without dividers, equipped with gooseneck
       faucets, equipped with plaster traps. Basis of design for trap: Zurn solid interceptor Z‐1181.

Hose Bibs:
   1. Interior: Provide a key operated hose bib at each multi stall restroom. Mount on wall below a
       lavatory.
   2. Exterior: Provide freeze‐protected hose bibs in key‐access wall boxes spaced approximately
       200’ around the building perimeter. Provide one bib at each outdoor art lab space.
   3. Exterior Play Fields: Provide freeze‐protected hose bibs in key‐access ground boxes adjacent to
       all play fields.

Water Heaters:
Preferred manufacturers are Rheem and Rudd. Provide hot water at Adult Restrooms, Kitchens,
Custodial sinks, Work Room sinks, Gym, “Lab” (Science, Career Tech, and Art) demonstration and clean‐
up sinks, and all showers. Provide hot water in all clinic areas and at any sinks where adults are providing
diapering and/or toileting assistance for special needs students. Provide hot water at student battery
restroom closest to cafeteria. Provide anti‐scalding devices on all sinks in areas accessible to students.
Provide cold water only at any student lavatories and Classroom sinks not listed above.
Water Fountains:
Provide electric water coolers in locations, quantities and design in compliance with all codes. Provide
“bubbler” water fountains attached to sinks in duplex restrooms in new kindergarten and first grade
elementary school classrooms. Water fountains attached to sinks do NOT count towards Georgia
Department of Education minimum drinking fountain requirements.

Fire Protection
    1. All new school facilities and additions constructed for DCSD shall be protected with an
        automatic fire sprinkler system, per currently adopted Life Safety Code, NFPA 13 and Georgia
        state modifications. Sprinkler system and other fire protection equipment shall be provided in
        accordance with building codes and local requirements.
    2. For additions, consideration should be given to retrofitting a fire suppression system in the
        existing structure to integrate protection of the entire facility.
    3. Coordinate design of sprinkler system with design of built‐in furniture and storage units such as
        music instrument storage units.
                                                                                                         40
DCSD Design Guidelines
VERSION 2018.04.04
   4. Install pressure reducing stations as required if main water pressure fluctuates and exceeds fire
       protection system working pressure.
   5. Smoke detector devices need to be installed in a manner that preserves accessibility for
       maintenance.
   6. Require in the specifications for the subcontractor to program systems a minimum of two times
       in coordination with the Owner’s direction. Prior to each programming, the subcontractor is to
       prepare a draft outline of the program for the Owner’s review.
   7. Adjacent to riser locations, fire protection designer should provide key plan, showing which lines
       serve particular part of building. Plan should be mounted in protective frame for quick
       reference in an emergency.
Heating, Ventilation and Air Conditioning
   1. Due to their ever‐increasing complexity, it is imperative that building mechanical systems
       interface correctly to provide safe and efficient operations for the life of the building. All
       building mechanical and electrical system construction shall be thoroughly checked for proper
       operation. Full commissioning is recommended.

    2. Architect and engineers shall design HVAC system with total life cycle costs in mind, using most
       practical approach for each project. Submit calculations for sizing HVAC units to DCSD for review
       and approval. DCSD maintenance staff shall fully approve all mechanical components.
    3. HVAC shall be provided in classroom areas by water source heat pumps or self‐contained wall
       mounted units (basis of design: Bard Manufacturing).
    4. Water source heat pumps units shall be resettable from temperature sensor or thermostat, not
       from disconnects.
    5. Water source heat pumps shall be extended range type with expansion valves. Cap tubes are
       not acceptable.
    6. Separate packaged units shall provide HVAC at the following spaces:
           a. Auditorium
           b. Administrative Offices
           c. Counseling Offices
           d. Media Center
           e. Cafeteria
           f. Kitchen
           g. Dry Storage
           h. Gyms and P.E. Areas, including coach’s offices
           i. Cafeteria manager’s office
           j. Network Server Rooms
           k. Security Camera End Equipment Room
           l. Other rooms with temperature sensitive equipment (i.e., telephone equipment,
               Stadium Press Box)

Areas Requiring Special Considerations for HVAC
   1. Locker room air conditioning and ventilation shall be designed to address humidity and odor
       control.
   2. Media Center HVAC:
           a. Office and work room and conference rooms shall be placed on independently
                controlled, separate zones.


                                                                                                     41
DCSD Design Guidelines
VERSION 2018.04.04
              b. Active humidity control shall be included in the media center HVAC design. A “moisture
                  miser” or ERU shall be installed in Media Center RTU.
    3.   All corridor, stair and elevator HVAC units shall have ducted return air, taking care to pressurize
         space.
    4.   All computer based electronic equipment that should be located in an air conditioned space. Do
         not locate telephone, MDF, IDF equipment or security camera head‐end racks in Mechanical or
         Electrical Rooms. Locate telephone equipment in a separate room or in a combination room
         with MDF, IDF equipment and security camera head‐end racks, all of which require similar
         constant year‐round temperature control. Heating and cooling for these rooms must be capable
         of maintaining ambient temperatures as required, independently of the operation of the main
         building HVAC systems. Consider designing this system to accommodate additional heat load
         (30% more than current load) created by equipment that may be added to these rooms in the
         future.
    5.   Independently controlled, ductless split cooling systems shall be supplied for main server rooms
         to provide cooling separate from the building system. Power for this system shall be tied to
         emergency panel for generator back up.
    6.   Art Suite Kiln and Dark Room ventilation shall be designed to address the special conditions in
         these spaces. Where possible, locate these spaces on exterior walls for convenient venting. Art
         Suite air shall exhaust directly to the exterior and shall not re‐circulate into the building return
         air system. Acceptable manufacturers: Vent‐A‐Kiln; Barry Blower; ILG

HVAC Ionization
Acceptable manufacturer: Global Plasma Systems

Equipment
Exhaust fans shall be provided per code.
Acceptable manufacturers: Greenheck, Cook, Jennaire, Gaylord, Halton, CaptiveAire
Kitchen Hood shall be a double shell design, constructed of stainless steel, consisting of an inner exhaust
canopy with minimum 86% supply air ratio. (See Division 11)
Cooling Towers must include basin heater; open loop tower with heat exchanger, stainless steel. No
sand filters are allowed. Heat tape shall be provided on all make‐up water lines.
PROPRIETARY manufacturer: Evapco
Water treatment (include 2 year service agreement)
Preferred provider: Superior Water Services, Inc.
All boilers shall be hot water tube type with factory start‐up. Three‐way mixing valve must be installed
on all boiler loops with the actuator supplied by CCI.
Acceptable manufacturers: Ajax; Rite; Apac
Chillers shall be air‐cooled, with factory start‐up and 5‐year service plan included.
PROPRIETARY manufacturer: Carrier Corporation
         Water loop pumps shall be installed in a manner that preserves service access.
Acceptable manufacturers: Bell & Gossett, Flo‐Fab, Patterson, Taco, Inc. and Armstrong
Dehumidification Units
PROPRIETARY manufacturer: Munters Corporation
Energy recovery units shall be provided.
PROPRIETARY manufacturer: Munters Corporation
Heat Exchanger shall be plate and frame type and must be located in a mechanical room; no exterior
installation is allowed.
                                                                                                          42
DCSD Design Guidelines
VERSION 2018.04.04
PROPRIETARY manufacturer: Sondex Inc.
Flow Controls and Balancing Valves for Supply and Return Line Assemblies
Acceptable manufacturers: Flow Design, Inc., Griswold, Bell & Gossett

Automated Temperature Controls and Energy Management System
Proprietary Product: Direct digital control system sole source is STAEFA TALON. Submit listing of control
points for approval by DeKalb County School District.
Building automation system controls shall be Web Control by CCI only.
Media Center shall be equipped with humidity sensors.
See DIVISION 16 ELECTRICAL for non‐revenue metering connected to building automation system.

Roof‐Top Unit Security
All new roof top units (RTU’s) shall be protected by a steel cage constructed of vertical and horizontal
support bars with expanded metal reinforcements. The preferred manufacturer and product is AC
Armor’s Commercial Armor, www.acarmor.net. All RTU Security Cages shall consist of the following:
     1. Custom solutions to fit each individual roof top unit
     2. 1‐inch, 14‐gauge tube steel framing
     3. Fully Mig welded
     4. ¾‐inch square solid steel stem system
     5. #9 expanded metal mesh covering access to copper coils
     6. Fully serviceable access panels
     7. 1/8‐inch threaded tabs
     8. 3/8‐inch theft resistant bolts with access tool to secure unit
     9. 1.25‐inch theft resistant bolts to secure 5‐inch cross anchors
     10. 4‐inch square steel base plates at each leg to ensure proper load distribution with ¼‐inch thick
         roofing pads under each base plate
     11. There shall be no modification to the roofing system or impact to the roofing warranty
     12. Primed and painted for rust prevention

HVAC Security System shall be installed on all new exterior HVAC units. Basis of Design: Warning
Watchdog Alarm System.

DIVISION 16 ELECTRICAL

    1. Electrical Panels: Placement of electrical panels in areas normally accessible to students,
       particularly corridors, is to be avoided whenever possible. Electrical panels and other devices
       located at areas normally accessible to students shall have solid front panels without louvers. If
       ventilation is required by the code, it shall be provided in such a manner as to prevent students
       from inserting small objects into the electrical panel or device. Such panels or devices shall be
       located in special purpose locked rooms if possible.

    2. Electrical Service Expandability: The electrical service for the building and overall site shall be
       designed to accommodate future loads for building expansion and future portable classrooms.
       (See DIVISION 1 – Core Capacity and Future Portable Classrooms). A “spare” breaker shall be
       installed to power a future distribution panel near the portable site(s), to provide electrical
       service to the portables. Conduits of sufficient size, as required to serve the remote future
       portable classroom distribution panel shall be installed from the main electrical distribution
                                                                                                            43
DCSD Design Guidelines
VERSION 2018.04.04
       panel and capped until needed. Intercom, security and other systems shall be expandable for
       the number of additional portable classrooms noted above.

   3. Conductors and Grounding:

           a. Aluminum wiring shall not be used on the building side of the meter. Plenum‐rated low‐
              voltage cabling may be used in lieu of conduit, if cost effective. Provide cable tray or
              hooks at hallways for low voltage cabling.
           b. Plenum rated cabling shall only be used on the interior of buildings where appropriate
              and approved by Codes. Only products that are rated and intended for use outdoors
              shall be used on the exterior of buildings.
           c. Low voltage cable shall be properly suspended throughout with “J” hooks, not allowed
              to rest on ceiling tile or grid.
           d. Conduit shall be run in a manner that preserves service access to all adjacent
              equipment.
           e. Provide junction box at center of room with service loop.
           f. Engineered cable management systems such as Reloc are acceptable.

   4. Overload Devices for Motor Starters: Motors shall be equipped with a solid state overload
      protection device with an adjustable trip point rather than thermal overloads. Phase protection
      devices shall be provided on all HVAC equipment.

   5. Power Outlets
         a. Provide at least one 110 volt duplex outlet on each wall and an average of one per eight
             feet of wall.
         b. Provide at least one 110 volt dedicated duplex outlet for each designated computer
             outlet. (One 4‐plex outlet for each pair of computer outlets)
         c. Provide one 110 volt, 20 AMP GFI duplex outlet adjacent to each sink counter.
         d. Provide special voltage outlets for designated equipment such as large printer/copy
             machines and other special equipment.
         e. Coordinate power connections of appropriate voltage and phase to all electrical
             equipment.
         f. Provide master power switch at Science, Computer, Business and Career Technology
             Education Labs.
         g. Provide power outlets in ceiling for drop down lighting in art lab for still life and figure
             drawing and for small power tools in Engineering Technology lab.
         h. Provide Darkroom outlets at each enlarger station for enlarger and timers.
         i. Floor outlets: Cover plates of carpeted spaces shall be flush with surrounding floor and
             match the selected floor materials/color.

   6. Light Fixtures
          a. LED fixtures shall be used throughout.
          b. The interior lighting design shall minimize fixture types and incorporate standardized
               lamp inventory to the extent practicable.
          c. Light levels shall comply with GADOE standards.
          d. General interior lighting shall be provided by recessed 2’ x 4’ fixtures unless noted
               otherwise. A safety cable should be attached to the fixture, cover reflector and lens.
                                                                                                        44
DCSD Design Guidelines
VERSION 2018.04.04
           e. Basis of Design for LED 2’x4’ Fixture: Columbia Lighting LJT24‐40MLG‐FSA‐EDU.
           f. Provide acrylic lenses as standard; polycarbonate lens are recommended for low ceilings
              in corridors, stairs and locker rooms.
           g. Lighting in gymnasiums, storage areas, mechanical and electrical rooms should have
              metal cage protection.
           h. Lighting in damp locations, such as locker rooms and kitchens, should have vapor
              retardant gasket lenses.
           i. “No hold,” 6 hour mechanical timers shall be used for mechanical space lighting control.
           j. The use of incandescent fixtures or dimming electronic ballasted fixtures shall be limited
              to special situations, such as theatrical lighting.
           k. Typical classrooms, labs, Media Centers, other Instructional spaces and Cafeterias shall
              be equipped with dimmers or multiple switches in order to control light levels.
           l. In halls and cafeterias, lighting shall be controlled by key switches (Leviton Key #555000)
              not toggle switches.
           m. If project includes new lighting mounted at high ceilings such as in gymnasiums and
              cafeterias, a mobile scissor lift shall be provided for the school’s use, with space
              provided for storing the lift.

   7. Motion Sensors: Hallways, classrooms, labs and other instructional spaces shall be equipped
      with motion sensors that will automatically turn the lights off and place the switches in the off
      position when a hallway or room is not occupied. Connect motion sensors to HVAC control
      system. Review characteristics of system and possible additional rooms to be included with
      DCSD Facility Services for review and approval prior to incorporation into the construction
      documents.

   8. Gym Lighting
         a. Gym lighting fixtures shall be standardized for cost efficiency to the extent possible.
         b. Provide multi‐level lighting at all gyms by means of switching, not dimming. High school
             and middle school gyms shall have multi‐level lighting for recreational use and
             competition use at 60 fc, per athletic association requirements.
         c. Gym lighting fixtures shall have fixture, lens and guard safety chains to prevent these
             components from falling when damaged by impact.

   9. Auditorium Lighting
         a. Stage, Drama and Broadcast Video Labs shall be equipped with performance lighting
             which shall be incorporated into the Scope of Work for all new school projects. The
             Design Professional shall be responsible for employing a qualified professional Lighting
             Designer to develop appropriate Design and Construction Documents. General lighting
             in auditorium shall not be positioned over seats; consider wall sconces, or ceiling
             mounted fixtures positioned over aisles. Drawings and Specifications shall be submitted
             to DeKalb County School District Drama Coordinator and Facilities Services for review
             and approval.
         b. Scope of work shall include overhead pipe grid, dimmable theatrical light fixtures, wiring
             and control system.
         c. Provide separate work light system.
         d. High School Auditorium front overhead stage lighting shall be accessible from a catwalk;
             drop light mounting is unacceptable.
                                                                                                          45
DCSD Design Guidelines
VERSION 2018.04.04
           e. Provide aisle lighting at floor level.
           f. See Division 11 EQUIPMENT‐ Theatrical/Stage Equipment for Catwalk access for stage
              lighting.

   10. Exit and Emergency Lighting: Provide exit lights and emergency lighting fixtures required by
       code. Connect all emergency and exit lighting fixtures to the generator. In large areas without
       exterior windows, such as an auditorium, consider adding a small number of emergency lights
       on battery back‐up, to provide light during generator start‐up time. Provide L.E.D. exit lights on
       emergency circuits in quantities and locations in compliance with all applicable codes.

   11. Emergency Electrical System
          a. All new DeKalb County Schools shall be equipped with an automatic emergency
             electrical generation system. New Generator systems shall be included in major
             renovation projects at school sites that do not have generators. Any existing generators
             older than 15 years shall be replaced during major renovation projects.
          b. The system shall include, but shall not be limited to, a natural gas engine and electrical
             generator with vibration control, automatic engine starting system with batteries,
             instrument panel, weather‐protective housing, enunciator panel, exhaust silencer and
             accessories. The generator shall be pad‐mounted on the exterior of the building,
             protected by chain link fence.
          c. Minimum Size:
                    i. Elementary schools: 60 KW, 480/277 volts.
                   ii. Middle and High schools:e 80 KW, 480/277 volts.
          d. The system shall be adequately sized for and be connected to the following:
                    i. Emergency exit and emergency lighting fixtures (battery pack fixtures shall not
                       be used unless noted otherwise)
                   ii. Minimum of one light fixture in each classroom
                 iii. Fire alarm system
                  iv. Intercom system
                   v. Telephone system
                  vi. Security System including cameras, Intrusion alarm, access control, and door
                       power supplies
                 vii. Main server (MDF) room: All outlets; Air conditioning package unit
                viii. Walk – in freezer/cooler (usually 208 volt, 3 phase)
                  ix. One outlet in principal’s office to maintain phone and computer
          e. Some of the electronic loads listed above also need to have a small UPS/surge protector
             to carry the electrical loads from the point of power interruption through start‐up of the
             generator. Specifically, the intercom system, the telephone system switch, and energy
             management system main panel need to be served in this manner. Normal / Emergency
             Generator outlets shall be color coded / placarded in accordance with NEC. Acceptable
             manufacturers: Cummings, Kohler, Generac, Detroit Diesel
          f. Two‐year total service warranty contract shall be standard, with three‐year extension
             included.
          g. For generators with KVA loads equal to or greater than 100 KVA, Georgia Power requires
             the Automatic Transfer Switch (ATS) open transition transfer to have a mechanical
             interlock; reference Georgia Power’s Distribution Bulletin No. 18 – 23, Section 4.2. The
             following actions are required:
                                                                                                        46
DCSD Design Guidelines
VERSION 2018.04.04
           h. Documentation
                   i. DCSD Project Manager shall prepare following Georgia Power documents, and
                      secure signature of DCSD Executive Director of Facilities:
                          1. “Application for Emergency and Standby Generation Installation &
                              Operation”
                          2. “Statement of Responsibility for Operation of Emergency or Standby
                              Generation on the Georgia Power Company Distribution System”
                  ii. DCSD Project Manager shall forward signed forms to the attention of Georgia
                      Power representative.
                 iii. DCSD Project Manager shall notify Georgia Power when ATS is installed.
                 iv. DCSD Project Manager shall schedule Georgia Power to inspect and photograph
                      the mechanical interlock installation.
                  v. Georgia Power representative shall forward both documents (items 1 and 2)
                      along with photographs, to the DCSD Project Manager.

   12. Exterior Lighting Fixtures: Safe lighting of our buildings, parking lots, and walkways to protect
       our building occupants is of paramount importance to DCSD. The designer is responsible for
       coordinating the overall design of the site lighting. Non‐building –mounted lighting for parking
       areas and drives will be provided by the Georgia Power.
           a. Provide adequate exterior lighting at building parking and walkway areas for security to
               employees and building. Fixtures shall be energy efficient, vandal resistant, 277 volt
               metal halide. Building wall packs shall be 250 watt or LED or compact fluorescent;
               parking lot lights shall be 400 watt. Exterior fixtures shall be controlled by building
               automation system with local override and photocells.
           b. All exterior lighting shall be controlled by an energy management system with
               astronomical clock and local override switch.
           c. Divide controls for site lighting into zones that can be operated independently. Submit
               design for zones to DCSD for review and approval.
           d. Local override shall be momentary contact switch tied to building automation system.
           e. Consider outside lighting at Art Patio for evening events.

   13. Sports Field Lighting: The Design Professional shall develop complete drawings and
       specifications to describe sports field lighting similar to those currently installed at existing
       DeKalb County High Schools. Specifications shall be equal or above GHSA spec lighting manual,
       available at www.ghsa.net.

           a. Sports lighting shall be provided at the following fields:
                    i. Football / Track Stadium: 360’x 160’
                   ii. Baseball Field: 330’ x 380” x 330’ plus batting cage area
                  iii. Softball Field: 200’ x 200’ x 200’ plus batting cage area
           b. Sports lighting shall provide environmental light control, with the primary goal to not
              negatively impact the adjacent community with excessive spill light and glare. Design
              lighting system to provide maximum spill and glare control. The specifications shall
              require a photometric report from an independent or certified testing lab certifying that
              the luminous intensity from any one fixture does not exceed the following criteria:
                    i. Football / Track Stadium:          12,000 candelas at 84 degrees above nadir
                   ii. Baseball Field:                    12,000 candelas at 83 degrees above nadir
                                                                                                       47
DCSD Design Guidelines
VERSION 2018.04.04
                   iii. Softball Field:                12,000 candelas at 83 degrees above nadir
           c. Lighting system shall be designed with life cycle costs in mind. It shall be energy efficient
              and cost effective to operate. Maximum energy consumption based on 5,000 hour
              operating cycle:
                     i. Football / Track Stadium:      105.0 kWh or less
                    ii. Baseball Field:                77.0 kWh or less
                   iii. Softball Field:                33.0 kWh or less
           d. The lighting system shall be designed such that the light levels are guaranteed for a
              period of 25 years. Each manufacturer shall provide, along with bid, a recommended
              lamp maintenance schedule required to provide guaranteed light levels for 25 years:
                     i. Football / Track Stadium:      50 foot candles
                    ii. Baseball Field (Infield):      50 foot candles
                   iii. Baseball Field (Outfield):     30 foot candles
                   iv. Softball Field (Infield):       50 foot candles
                    v. Softball Field (Outfield):      30 foot candles
           e. The Design Professional shall develop detailed specifications for measuring the
              uniformity of these basic standards.
           f. Lighting system must be designed to comply with current applicable building codes and
              minimum 100 mph wind speed. Cross arms shall be designed to withstand minimum 150
              mph winds and maintain luminaire aiming alignment. All components shall be designed
              as a system and shall include, but not be limited to:
           g. Galvanized steel poles with climbing steps and safety harness. Poles shall have pre‐cast
              concrete foundation with concrete backfill or concrete anchor bolt type foundation.
              Exposed steel shall be a minimum of 18” above grade; direct buried steel poles will not
              be permitted. Concrete or other single piece poles requiring use of heavy equipment
              that may damage the site will not be permitted.
           h. All exposed components shall be designed of appropriate corrosion resistant materials.
           i. Die‐cast aluminum housing shall be used for luminaire reflector system.
           j. Remote ballast, capacitors, fusing and safety disconnects for luminaries shall be located
              in an aluminum enclosure on each pole approximately 10’ above grade.
           k. Wire harness system shall be designed for trouble‐free installation.
           l. System shall include lightning protection.
           m. All components shall be UL listed.
           n. Momentary power interruption illumination system shall be provided to provide
              coverage during failure of primary system.
           o. Specifications shall describe an appropriate standard for measuring compliance of the
              installed system and requirements for correcting non‐compliance.
           p. Include in the bid one set of replacement lamps rated at 5,000 hours or two sets if rated
              at 3,000 hours. Also include preventative and spot maintenance (parts and labor) for 25
              years. Coordinate details of DeKalb County School District requirements for remote
              controls and incorporate those requirements into the specifications.

   14. Data Cabling System: Provide Data Cabling System for computer network and equipment in
       accordance with the current DCSD Technology Plan. See APPENDIX to Design Guidelines – Data
       Cabling System.



                                                                                                        48
DCSD Design Guidelines
VERSION 2018.04.04
   15. Telephone Cabling System: DCSD will provide the telephone switch and individual phones for
       each required location. Construction contract shall provide telephone cabling and equipment.
       See APPENDIX to Design Guidelines – Telephone Cabling System.

   16. Detection Systems
          a. Security alarm and Security Surveillance Camera Systems will be furnished by DCSD
               under contracts separate from building contracts for new schools and additions.
               Coordination between the separate contractors will be required to maintain occupancy
               schedules.
          b. Designer for Security Surveillance System shall coordinate design of security systems
               with DCSD Director of Safety / Security.
          c. Front desk design at Elementary Schools shall allow 2 Monitors to be mounted out of
               view of visitors.
          d. See APPENDIX to Design Guidelines – Security System for general requirements of
               Security System and the specific Video Surveillance Specification prepared for each
               project.

   17. Master Television Systems
          a. Media centers shall have broadcast capabilities to provide video programming
              throughout the building.
          b. Provide drops in all spaces except storage mechanical, custodial and kitchen areas.
              Coordinate Master TV Systems with DCSD MIS.
          c. Cable TV signal shall be provided to the media center distribution center from the local
              cable TV vendor.
          d. Provide a complete Master Television Cable System for distribution of “In‐House” and
              local “Cable” channels. Provide two sets of audio / video jacks on front panel for direct
              insertion of customer equipment. The system shall be wired to allow tuning selected
              “cable” channels through VCRs for recording or distribution throughout the system and
              direct distribution of cable channels through system demodulators. Receiver / monitors
              shall be furnished to provide direct monitoring of programs.
          e. A one line drawing of the entire Television System shall be included in the submittal
              showing the signal levels in dBmV at the input and output of each device at the head
              end, tap‐off, splitters, and room outlets. The model numbers of all components shall be
              included in the one line drawing. A detailed drawing of the equipment cabinets, their
              components, special panels and equipment layout must be furnished for approval (no
              exceptions).
          f. The television Contractor shall be an authorized distributor for the equipment supplied
              and maintain his own service organization capable of furnishing all warranty service. A
              letter shall be included in the submittal stating the above is valid.
          g. The system shall be designed for 50 db signal‐to‐noise ratio and shall provide a signal
              level of a minimal of +6dbmv and a maximum of +12dbmv at each outlet.
          h. The system shall be designed to allow program originating and distribution from outlets
              throughout the system by the addition of proper equipment.
          i. The Design Professional shall be responsible for specifying appropriate equipment,
              testing and certification.
          j. Acceptable manufacturers: Blonder Tongue; Drake / Dracom; Scientific Atlanta; Jerald


                                                                                                      49
DCSD Design Guidelines
VERSION 2018.04.04
   18. Fire Alarm System: See APPENDIX to Design Guidelines – Fire Alarm System.

   19. Intercom System
   20. Proprietary PRODUCT: Central Control Center: Rauland Telecenter VoIP System
   21. Intercom system shall be incorporated into the Scope of Work for all new school projects, and
       shall include a master clock to control bells.
   22. Provide intercom call‐back system with master station in administrative office and call stations
       in each normally occupied space. Design Professional to submit detailed catalog information to
       DeKalb County School District for approval.

   23. See APPENDIX to Design Guidelines – Intercom System

   24. Public Address System
          a. Sound systems shall be incorporated into the Scope of Work for all new school projects.
               Provide public address systems at the following locations:
                     i. Cafeterias
                    ii. Gymnasiums
                   iii. Auditoriums
                   iv. Drama Labs
                    v. Football Stadiums
          b. Architects shall be responsible for employing qualified professionals to design and
               develop Construction Documents for public address systems. Design of public address
               systems shall be appropriate for the acoustical conditions and volume of each space.
          c. Drawings and Specifications shall be submitted to DCSD Facilities Services Department;
               the Supervisor of Interscholastic Athletic Programs, and to the Coordinators of Health
               and PE, Music and Drama for review and approval.
          d. Features and functions shall include:
                     i. Solid state in‐wall type amplifier
                    ii. Built‐in speakers
                   iii. Microphones designed especially for music pickup, recording and excellent
                        speech reproduction
                   iv. Remote microphone outlets appropriate for the type of space
                    v. Auxiliary input for future program sources
                   vi. Input for school wide intercom program and system announcements
                  vii. Fire alarm override if required.

   25. Delivery Door Bell: Provide a door bell system at the exterior delivery door(s) to alert kitchen
       and/or custodial staff when deliveries have arrived. The appropriate location for the bell will be
       a function of the service area layout. The Design Professional shall propose and obtain approval
       for the bell location(s).

   26. Clocks
   27. Centrally controlled digital clocks and bell system shall be provided in halls, Cafeteria, Media
       Center, main Office, and Gym.
   28. Provide electrical connection in each classroom and other instructional areas for DeKalb County
       School District provided electrically operated wall mounted clocks where required.


                                                                                                       50
DCSD Design Guidelines
VERSION 2018.04.04
                         51
DCSD Design Guidelines
VERSION 2018.04.04
 Revision Date - 09/24/2021




FACILITY CONDITION ASSESSMENT
                  Bob Mathis Elementary School | 2021
                                                                                                                            Facility Condition Assessment
                                                                                                               DeKalb County SD - Bob Mathis Elementary School


 Executive Summary
 Bob Mathis Elementary School is located at 3505 Boring Road in Decatur, GA. It comprises 69,401 gross square feet. At
 the time of the assessment the oldest building was 45 years old.
 The findings contained within this report are the result of an assessment of building systems performed by building
 professionals experienced in disciplines including architecture, mechanical, plumbing and electrical. Only those systems
 that were identified as having either an associated deficiency or life cycle event within a 10-year window is contained within
 this report. The full list of each school's systems that are present along with the associated priorities can be found in the flat
 file data grids submitted to Dekalb County. The projected replacement year of those assets within each system is also
 included within this table.The total current deficiencies for this site, in 2020 construction cost dollars, are estimated at
 $2,919,696. A ten-year need was developed to provide an understanding of the current need as well as the projected
 needs in the near future. For Bob Mathis Elementary School the ten-year need is $11,886,656.
 For planning purposes, the total current deficiencies and the first five years of projected life cycle needs were combined to
 calculate a Facility Condition Index (FCI). A 5-year FCI was calculated by dividing the 5-year need by the total replacement
 cost. Costs associated with new construction are not included in the FCI calculation. After the 5-year FCI was calculated,
 this value was subtracted from 100 to calculate the FCA Score in a similar fashion to report cards.
 The Bob Mathis Elementary School facility has a FCA score of 64.33% which is considered "Poor".

Summary of Findings
The table below summarizes the condition findings at Bob Mathis Elementary School.
Table 1: Facility Condition by Building


                                                                                                         Total 5 Yr Need      Total 10 Yr Need
                                                          Current        5-Year Life   Yrs 6-10 Life    (Yr 1-5 + Current    (Yr 1-10 + Current    Replacement      FCA
Number          Building Name                            Deficiencies    Cycle Cost     Cycle Cost             Defs)                Defs)              Cost         Score
Exterior Site
                Exterior Site                                $380,586       $125,378         $103,230            $505,963               $609,193
Permanent Building(s)
2010            Building 2010                              $2,365,346     $2,292,543       $3,074,603          $4,657,889             $7,732,492      $12,310,790   62.16%
2011            Building 2011                                $142,466     $1,279,642       $1,670,986          $1,422,108             $3,093,094       $5,413,142   73.73%
2020            Building 2020                                  $31,299      $246,155         $174,423            $277,454               $451,878       $1,518,885   81.73%
                Sub Total for Permanent Building(s):       $2,539,111    $3,818,340       $4,920,012           $6,357,451           $11,277,463      $19,242,815
                                       Total for Site:     $2,919,696     $3,943,718       $5,023,241          $6,863,415           $11,886,656       $19,242,815   64.33%

Note 1: Sitework improvements are proportionally incorporated into the building CRV and used to calulate the overall FCA Score.
Note 2: Aerial map including building number, gross SF, and year built of each building on the site is found on Page 3.




 M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                                          2
                                                          Facility Condition Assessment
                                                   DeKalb County SD - Bob Mathis Elementary School


Aerial Images




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                           3
                                                                                         Facility Condition Assessment
                                                                                 DeKalb County SD - Bob Mathis Elementary School


Approach and Methodology
The facility condition assessment includes a visual assessment of building systems that are readily available during a
facility walk-through. The standard process does not reflect invasive, destructive assessment methods that would
require special equipment, testing or scheduled power outages. The assessment was accomplished with a view
toward identifying significant maintenance and repair deficiencies that need correction. For the purposes of this
assessment, deficient conditions captured were limited to those items that did not qualify as routine maintenance
repairs. Copies of previous reports and other documentation that were relevant to the inspection were utilized if made
available in the process. Additionally, feedback from appropriate personnel to provide background information relative
to specific building operations, function, equipment conditions, past improvements and planned upgrades were
incorporated into the results if made available to the teams while on site. Two components of the facility condition
assessment are combined to total the cost for facility need. The two components of the facility condition assessment
are current deficiencies and life cycle forecast.

Current Deficiencies: Deficiencies are items in need of repair or replacement as a result of being broken, obsolete,
deferred maintenance, or beyond useful life. The existing deficiencies that currently require correction are identified
and assigned a priority. An example of a current deficiency might include a broken lighting fixture or an inoperable
roof top air conditioning unit.

Life Cycle Forecast: Life cycle analysis evaluates the ages of a building's systems to forecast system replacement as
they reach the end of serviceable life. Estimated Useful Lives were determined based on a combination of our
(Jacobs) professional experience, RS Means, and from industry standard tables (BOMA, ASHRAE). An example of a
life cycle system replacement is a roof with a 20-year life that has been in place for 15 years and may require
replacement in five years.

All members of the survey team recorded existing conditions, identified problems and deficiencies, and documented
corrective action and quantities. The team took digital photos at each site to better identify significant deficiencies.

Facility Deficiency Priority Levels
Deficiencies were ranked according to five priority levels, with Priority 1 items being the most critical to address:

Priority 1 – Mission Critical Concerns: Deficiencies or conditions that may directly affect the site’s ability to remain
open or deliver the educational curriculum. These deficiencies typically relate to building safety, code compliance,
severely damaged or failing building components, and other items that require near-term correction. An example of a
Priority 1 deficiency is a fire alarm system replacement.

Priority 2 – Indirect Impact to Educational Mission: Items that may progress to a Priority 1 item if not addressed in the
near term. Examples of Priority 2 deficiencies include inadequate roofing that could cause deterioration of integral
building systems, and conditions affecting building envelopes, such as roof and window replacements.

Priority 3 – Short-Term Conditions: Deficiencies that are necessary to the site's mission but may not require
immediate attention. These items should be considered necessary improvements required to maximize facility
efficiency and usefulness. Examples of Priority 3 items include site improvements and plumbing deficiencies.

Priority 4 – Long-Term Requirements: Items or systems that may be considered improvements to the instructional
environment. The improvements may be aesthetic or provide greater functionality. Examples include cabinets,
finishes, paving, removal of abandoned equipment, and educational accommodations associated with special
programs.

Priority 5 – Enhancements: Deficiencies aesthetic in nature or considered enhancements. Typical deficiencies in this
priority include repainting, replacing carpet, improved signage, or other improvements to the facility environment.




M▪A▪P▪P▪S ©, Jacobs 2021                      Revision Date - 09/24/2021                                                      4
                                                                                         Facility Condition Assessment
                                                                                 DeKalb County SD - Bob Mathis Elementary School


Facility Condition Assessment(FCA) Score
Facility Condition Assessment (FCA) Scores are assigned after the Facility Condition Index (FCI) is calculated.
The Facility Condition Index (FCI) is used throughout the facility condition assessment industry as a general
indicator of a building’s health. Since 1991, the facility management industry has used an index called the FCI
to benchmark the relative condition of a group of sites. The FCI is derived by dividing the total repair cost,
including site-related repairs, by the total replacement cost of all buildings. It should be noted that costs in the
New Construction category are not included in the FCI calculation. In an effort to match the report card metrics,
the FCI is subtracted from 100 to assign the FCA Score. A facility with a lower FCA Score has more need, or
higher priority, than a facility with a higher FCA Score.




The replacement value represents the estimated cost of replacing the current building with another building of
like size, based on 2021 estimated cost of construction in the DeKalb County area. The estimated replacement
cost for this facility is $19,242,815. For planning purposes, the total 5-year need at the Bob Mathis Elementary
School is $6,863,415 (Life Cycle Years 1-5 plus the current FCI deficiency cost).

The Bob Mathis Elementary School facility has an FCA Score of 64.33%. which is considered "Poor".




                              Figure 1: 5-Year FCI




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                               5
                                                                                                                  Facility Condition Assessment
                                                                                                      DeKalb County SD - Bob Mathis Elementary School


The following table summarizes this site's current deficiencies by building system and priority.

Table 2: System by Priority (Site & Permanent Buildings)

                                                                                Priority

                  System                     1               2                     3              4                    5              Total            % of Total
Site                                                 $0            $2,506              $281,285        $93,407               $1,938       $379,137         12.99 %

Roofing                                              $0               $0                   $728            $0                   $0             $728         0.02 %

Structural                                           $0               $0                    $0             $0                   $0               $0         0.00 %

Exterior                                             $0          $442,934                $4,855            $0              $252,701       $700,490         23.99 %

Interior                                             $0               $0               $304,800       $676,768              $11,615       $993,184         34.02 %

Mechanical                                           $0           $46,710               $10,869        $92,993              $34,875       $185,447          6.35 %

Electrical                                           $0          $165,304               $67,442        $43,207                  $0        $275,954          9.45 %

Plumbing                                             $0               $0                    $0             $0                   $0               $0         0.00 %

Fire and Life Safety                             $1,449               $0                    $0             $0                   $0            $1,449        0.05 %

Conveyances                                          $0               $0                    $0             $0                   $0               $0         0.00 %

Specialties                                          $0               $0                   $364       $382,944                  $0        $383,307         13.13 %

Total:                                           $1,449          $657,455              $670,343   $1,289,319               $301,130     $2,919,696




The building systems at the site with the most need include:
                                                                            Interior                  -          $993,184
                                                                            Exterior                  -          $700,490
                                                                            Specialties               -          $383,307




M▪A▪P▪P▪S ©, Jacobs 2021                                   Revision Date - 09/24/2021                                                                               6
                                                                                   Facility Condition Assessment
                                                                            DeKalb County SD - Bob Mathis Elementary School



The chart below represents the building systems and associated deficiency costs.




Figure 2: System Deficiencies




M▪A▪P▪P▪S ©, Jacobs 2021                    Revision Date - 09/24/2021                                                   7
                                                                                                          Facility Condition Assessment
                                                                                              DeKalb County SD - Bob Mathis Elementary School


Life Cycle Capital Renewal Forecast
During the facility condition assessment, assessors inspected all major building systems. If an assessor identified a need
for immediate replacement, a deficiency was created with the item's repair costs. The identified deficiency contributes to the
facility's total current repair costs.

However, capital planning scenarios span multiple years, as opposed to being constrained to immediate repairs.
Construction projects may begin several years after the initial facility condition assessment. Therefore, in addition to the
current year repair costs, it is necessary to forecast the facility's future costs using a ten-year life cycle renewal forecast
model.

Life cycle renewal is the projection of future building system costs based upon each individual system’s expected
serviceable life. Building systems and components age over time, eventually break down, reach the end of their useful lives,
and may require replacement. While an item may be in good condition now, it might reach the end of its life before a
planned construction project occurs.

The following tables show ten-year life cycle capital renewal projections. The projections outline costs for major building
systems in which a component is expected to reach the end of its useful life and require capital funding for replacement.



Table 3a: Capital Renewal Forecast (Yrs 1-5)

                                                         Life Cycle Capital Renewal Projections
                                   Year 1           Year 2               Year 3               Year 4              Year 5
System                              2022             2023                 2024                 2025                2026                 Total 1-5
Site                                           $0                 $0                  $0                $25,970                 $0      $25,970

Roofing                                        $0                 $0                  $0                    $0              $99,408     $99,408

Exterior                                       $0             $18,487                 $0                  $823                  $0      $19,310

Interior                                       $0            $139,154                 $0               $330,860             $25,416    $495,430

Mechanical                                     $0        $1,028,632                   $0                    $0             $139,209   $1,167,841

Electrical                                     $0                 $0               $1,499               $59,618        $1,546,810     $1,607,927

Plumbing                                       $0             $14,446             $11,257              $485,359             $16,770    $527,832

Fire and Life Safety                           $0                 $0                  $0                    $0                  $0            $0

Conveyances                                    $0                 $0                  $0                    $0                  $0            $0

Specialties                                    $0                 $0                  $0                    $0                  $0            $0

Total                                          $0        $1,200,719               $12,756              $902,630        $1,827,613     $3,943,718




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                                     8
                                                                                                                 Facility Condition Assessment
                                                                                                        DeKalb County SD - Bob Mathis Elementary School


Table 3b: Capital Renewal Forecast (Yrs 6-10)

                                                                      Life Cycle Capital Renewal Projections
                                                Year 6               Year 7           Year 8            Year 9        Year 10
System                         Total 1-5         2027                 2028             2029              2030          2031            Total 6-10    Total 1-10
Site                            $25,970              $33,918                  $0                  $0             $0             $0      $33,918       $59,888

Roofing                         $99,408                     $0                $0                  $0             $0             $0            $0      $99,408

Exterior                        $19,310                     $0            $36,714          $30,142               $0        $197,822    $264,678      $283,987

Interior                       $495,430             $223,087             $240,235         $154,632               $0        $310,008    $927,962     $1,423,392

Mechanical                   $1,167,841             $515,991                  $0           $10,095               $0         $62,774    $588,860     $1,756,701

Electrical                   $1,607,927                     $0                $0          $203,875               $0         $37,518    $241,393     $1,849,321

Plumbing                       $527,832                  $4,697               $0               $3,196            $0        $569,241    $577,135     $1,104,967

Fire and Life Safety                 $0             $455,625                  $0          $922,995               $0             $0    $1,378,620    $1,378,620

Conveyances                          $0             $110,846                  $0                  $0             $0         $10,089    $120,935      $120,935

Specialties                          $0             $365,600                  $0          $524,141               $0             $0     $889,741      $889,741

Total                        $3,943,718           $1,709,764             $276,949       $1,849,076               $0      $1,187,452   $5,023,241    $8,966,960




Figure 3: Ten Year Capital Renewal Forecast




M▪A▪P▪P▪S ©, Jacobs 2021                                          Revision Date - 09/24/2021                                                                      9
                                                                                                   Facility Condition Assessment
                                                                                            DeKalb County SD - Bob Mathis Elementary School

Summary of High Priority Deficiencies


Priority 1 - Mission Critical Concerns                                                                Cost
  Security Alarm Camera Is Missing                                                                    $1,449

                                                                     Total for Priority 1             $1,449



Priority 2 - Indirect Impact to Educational Mission                                                   Cost
  Existing Sidewalk Is Cracked And Poses A Hazard To Accessibility                                    $2,506

  Aluminum Storefront Exterior Door Replacement                                                      $14,926

  Aluminum Window Replacement                                                                       $337,995

  Metal Exterior Door Replacement                                                                    $66,219

  Wood Exterior Door Replacement                                                                     $23,794

  Exterior Metal Cooling Tower Replacement                                                           $46,710

  Distribution Panel Replacement                                                                     $63,029

  Electrical Transformer Replacement                                                                 $27,606

  Panelboard Replacement                                                                             $38,579

  Switchgear Replacement                                                                             $36,090

                                                                     Total for Priority 2           $657,455




M▪A▪P▪P▪S ©, Jacobs 2021                               Revision Date - 09/24/2021                                                       10
                                                                                                                         Facility Condition Assessment
                                                                                                              DeKalb County SD - Bob Mathis Elementary School



Deficiency Summary
(Items below detail the totals referenced in Table 2)

Site Level Deficiencies
Site
Deficiency                                                                                  Category                     Qty UoM     Priority   Repair Cost    ID
Existing Sidewalk Is Cracked And Poses A Hazard To Accessibility                            Deferred                      30 LF         2           $2,506    7753
                                                                                            Maintenance
             Note:     Crosswalk From ADA Spots (Asphalt) Is Cracked. Included In Site Calculation. Replace And Restripe.
Asphalt Driveway Replacement                                                                Capital Renewal            44,380 SF        3         $268,308    7750
             Note:     Driveway Cracked And Deficient Throughout. Replace.
Curb Ramp Does Not Meet Minimum ADA Compliance Requirements                                 ADA Compliance                 1 Ea.        3           $2,452    7860
             Note:     Curb Ramp East Of 2011 (By Car Drop Off) Concrete Material Is Ok (Not Cracked) But Signage Is Faded. Repaint.
Site Requires Civil/Drainage Study                                                          Deferred                       1 LS         3           $4,248    7752
                                                                                            Maintenance
             Note:     Flooding Occurring At East Entry Of Building 2020 (Gym). Problem Seems To Be Related To Rainwater Runoff Into "Courtyard". Conduct Civil
                       Survey For Further Assessment.
Asphalt Paving Replacement                                                                  Capital Renewal               62 CAR        4          $84,568    7749
             Note:     Asphalt Paving And Striping Needs To Be Replaced And Restriped. Faded And Cracked, Deficient.
Fencing Replacement (8' - 10' high Chain Link Fence)                                        Capital Renewal              120 LF         4           $8,839    7748
             Note:     Chain Link Fence Deficient - Replace At Cooling Tower, Next To Room 126.1.
Paving Restriping                                                                           Deferred                      62 CAR        5           $1,938    7751
                                                                                            Maintenance
             Note:     Asphalt Paving And Striping Needs To Be Replaced And Restriped. Faded And Cracked, Deficient.
                                                                                            Sub Total for System           7 items                $372,859

Electrical
Deficiency                                                                                  Category                     Qty UoM     Priority   Repair Cost    ID
Pole Lighting Repair                                                                        Deferred                       2 Ea.        3           $7,727    7747
                                                                                            Maintenance
             Note:     Pole Lights At North-West Parking Area Are Failing (Flickering Or Off Completely) Repair.
                                                                                            Sub Total for System           1 items                  $7,727
                                                                             Sub Total for School and Site Level           8 items                $380,586

Building: 2010 - Building 2010
Site
Deficiency                                                                                  Category                     Qty UoM     Priority   Repair Cost    ID
Access Is Not ADA Compliant - ADA Compliant Ramp Installation                               ADA Compliance                 1 Ea.        3           $5,899    7757
             Note:     No Ramp Or Lift For Stage Access. Add Ramp.
Exterior Entry Signage At The Building Entry Does Not Meet ADA Requirements                 ADA Compliance                 1 Ea.        3             $126    7754
             Note:     Add ADA Sign
                                                                                            Sub Total for System           2 items                  $6,025

Exterior
Deficiency                                                                                  Category                     Qty UoM     Priority   Repair Cost    ID
Aluminum Storefront Exterior Door Replacement                                               Capital Renewal                4 Door       2          $14,926    7763
             Note:     Old, Deficient. Replace
Aluminum Window Replacement                                                                 Capital Renewal             3,280 SF        2         $327,996    7760
             Note:     Old, Deficient
Aluminum Window Replacement                                                                 Capital Renewal              100 SF         2          $10,000    7761
             Note:     Old, Deficient
Metal Exterior Door Replacement                                                             Capital Renewal               19 Door       2          $66,219    7762
             Note:     Old, Deficient. Replace
Wood Exterior Door Replacement                                                              Capital Renewal                8 Door       2          $23,794    7764
             Note:     Old, Replace
Exterior Entry Door Hardware Is Not ADA Compliant                                           ADA Compliance                 1 Door       3           $2,427    7755
             Note:     There Is A Power-Assist Hardware Door At Front Entry, But It Is Deficient. Repair Or Replace.




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                                            11
                                                                                                                    Facility Condition Assessment
                                                                                                           DeKalb County SD - Bob Mathis Elementary School

Exterior
Deficiency                                                                               Category                    Qty UoM      Priority   Repair Cost    ID
Exterior Cleaning                                                                        Deferred                 44,400 SF            5       $161,668 10721
                                                                                         Maintenance                     Wall
                                                                                        Sub Total for System           7 items                 $607,030

Interior
Deficiency                                                                               Category                    Qty UoM      Priority   Repair Cost    ID
Interior Door Hardware Replacement                                                       Capital Renewal              94 Door          3       $131,203    7775
             Note:    Non-ADA Compliant (Knobs) - Replace.
Interior Door Replacement                                                                Capital Renewal              90 Door          3       $158,704    7773
             Note:    Wood Doors Old, Deficient And Highly Inconsistent Access School. Replace All To Match. Single Type And Finish.
Acoustical Ceiling Tile Replacement                                                      Capital Renewal          41,800 SF            4       $229,823    7767
             Note:    Act System Old, Deficient Throughout All School. Replace.
Carpet Flooring Replacement                                                              Capital Renewal             210 SF            4         $2,500    7768
             Note:    Old, Ripped Room T01.1 Work Room
Ceiling Grid Replacement                                                                 Capital Renewal          41,800 SF            4       $163,651    7766
             Note:    Act System Old, Deficient Throughout All School. Replace.
Vinyl Composition Tile Replacement                                                       Capital Renewal          34,600 SF            4       $276,746    7771
             Note:    Old, Deficient And Patchy. Replace Throughout Building
                                                                                        Sub Total for System           6 items                 $962,627

Mechanical
Deficiency                                                                               Category                    Qty UoM      Priority   Repair Cost    ID
Exterior Metal Cooling Tower Replacement                                                 Capital Renewal               1 Ea.           2        $46,710    7841
             Note:    Damaged, Outside 126-1
Circulation Pump Replacement                                                             Capital Renewal               1 Ea.           3        $10,869    7844
             Note:    Damaged, Outside Room 126.1
Existing Controls Are Obsolete                                                           Capital Renewal          44,400 SF            4        $64,592 10371
Duct Cleaning                                                                            Deferred                 30,000 SF            5        $32,086    7850
                                                                                         Maintenance
Duct Grill Replacement                                                                   Deferred                     30 Ea.           5         $2,789    7852
                                                                                         Maintenance
             Note:    Rusted, Peeling, All
                                                                                        Sub Total for System           5 items                 $157,046

Electrical
Deficiency                                                                               Category                    Qty UoM      Priority   Repair Cost    ID
Distribution Panel Replacement                                                           Capital Renewal               1 Ea.           2        $15,894    7783
             Note:    Old, Mech Room
Distribution Panel Replacement                                                           Capital Renewal               1 Ea.           2        $15,712    7784
             Note:    Old, Book Storage
Distribution Panel Replacement                                                           Capital Renewal               2 Ea.           2        $31,423    7785
             Note:    Old, Lib Storage
Electrical Transformer Replacement                                                       Capital Renewal               1 Ea.           2         $5,189    7779
             Note:    37.5 Kva - Old, Mech Room
Electrical Transformer Replacement                                                       Capital Renewal               1 Ea.           2         $6,851    7780
             Note:    Old, Mech Room
Electrical Transformer Replacement                                                       Capital Renewal               1 Ea.           2         $5,189    7782
             Note:    Old, Book Storage, Elec Room
Electrical Transformer Replacement                                                       Capital Renewal               1 Ea.           2         $5,189    7786
             Note:    Old, Stage And Cafe
Electrical Transformer Replacement                                                       Capital Renewal               1 Ea.           2         $5,189    7787
             Note:    Old, Lib Storage
Panelboard Replacement                                                                   Capital Renewal               1 Ea.           2         $2,616    7788
             Note:    Old, Mech Room
Panelboard Replacement                                                                   Capital Renewal               1 Ea.           2         $5,170    7789
             Note:    Old, Kitchen
Panelboard Replacement                                                                   Capital Renewal               2 Ea.           2         $5,231    7790
             Note:    Old, Stage



M▪A▪P▪P▪S ©, Jacobs 2021                                     Revision Date - 09/24/2021                                                                           12
                                                                                                                       Facility Condition Assessment
                                                                                                             DeKalb County SD - Bob Mathis Elementary School

Electrical
Deficiency                                                                                 Category                     Qty UoM      Priority   Repair Cost     ID
Panelboard Replacement                                                                     Capital Renewal                1 Ea.         2            $8,812   7791
             Note:    Old Lib Storage
Panelboard Replacement                                                                     Capital Renewal                1 Ea.         2            $6,288   7792
             Note:    Old, Elec Room Next To Storage
Panelboard Replacement                                                                     Capital Renewal                1 Ea.         2            $2,616   7795
             Note:    Elec Room Next To Back Storage
Panelboard Replacement                                                                     Capital Renewal                2 Ea.         2            $5,231   7796
             Note:    Lib Storage
Panelboard Replacement                                                                     Capital Renewal                1 Ea.         2            $2,616   7798
             Note:    Lib Storage
Switchgear Replacement                                                                     Capital Renewal                1 Ea.         2           $36,090   7778
             Note:    Old. Replace. Mech Room
Electrical Receptacle Replacement                                                          Capital Renewal               47 Ea.         3            $5,904   7793
             Note:    Multiple Locations
Exterior Mounted Building Lighting Replacement                                             Capital Renewal                1 Ea.         3              $848   7804
             Note:    Replace Light Outside Music Room
Lightning Protection System Installation                                                   Functional Deficiency     44,400 SF          3           $32,598   7801
Canopy Lighting Installation                                                               Functional Deficiency          2 Ea.         4            $3,139   7803
Incandescent Lighting Replacement                                                          Capital Renewal                2 Ea.         4            $1,234   7826
             Note:    Replace Incandescent Fluorescent Lights
Pendant Lighting Replacement                                                               Capital Renewal               18 Ea.         4           $12,060   7824
             Note:    Replace Incandescent Fluorescent Lights
Stage Lighting Replacement                                                                 Capital Renewal               40 Ea.         4           $26,775   7828
             Note:    Old And Not Working
                                                                                          Sub Total for System           24 items                  $247,862

Fire and Life Safety
Deficiency                                                                                 Category                     Qty UoM      Priority   Repair Cost     ID
Security Alarm Camera Is Missing                                                           Functional Deficiency          1 Ea.         1            $1,449   7794
             Note:    Install Camera Outside Cafeteria Loading Dock.
                                                                                          Sub Total for System            1 items                    $1,449

Specialties
Deficiency                                                                                 Category                     Qty UoM      Priority   Repair Cost     ID
Counter Heights Exceed Maximum ADA Height Requirements (Modify Full)                       ADA Compliance                 6 LF          3              $364   7756
             Note:    Non-Compliant Height. Add ADA Compliant Segment.
Metal Gym Locker Replacement                                                               Capital Renewal                5 Ea.         4            $2,282   7777
             Note:    Old, Deficient.
Replace Cabinetry In Classes/Labs                                                          Capital Renewal               46 Room        4          $380,661   7776
             Note:    Most Cabinetry Is Old, Deficient. Replace In Rooms, All Classrooms, All Kitchenette Adjoining Hallways, Room 122 Art, 123 Media Center, Flt
                      Room, Book Storage.
                                                                                          Sub Total for System            3 items                  $383,307
                                                                   Sub Total for Building 2010 - Building 2010           48 items                $2,365,346

Building: 2011 - Building 2011
Site
Deficiency                                                                                 Category                     Qty UoM      Priority   Repair Cost     ID
Exterior Entry Signage At The Building Entry Does Not Meet ADA Requirements                ADA Compliance                 1 Ea.         3              $126   7863
             Note:    East Entry Doors Accessed From Concrete Ramp (Connected To Car Drop Off Area) Should Have A ADA Sign And Power Assist Hardware.
                                                                                          Sub Total for System            1 items                      $126

Exterior
Deficiency                                                                                 Category                     Qty UoM      Priority   Repair Cost     ID
Exterior Cleaning                                                                          Deferred                  19,523 SF          5           $71,087 10722
                                                                                           Maintenance                      Wall
                                                                                          Sub Total for System            1 items                   $71,087




M▪A▪P▪P▪S ©, Jacobs 2021                                      Revision Date - 09/24/2021                                                                             13
                                                                                                                     Facility Condition Assessment
                                                                                                             DeKalb County SD - Bob Mathis Elementary School

Interior
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Entry Door Does Not Have Power Assist Device                                               ADA Compliance              1 Ea.        3          $14,892 10689
             Note:     Should Have A ADA Sign And Power Assist Hardware.
             Location: East Entry Doors Accessed From Concrete Ramp (Connected To Car Drop Off Area)
Interior Wall Repainting                                                                   Deferred                 5,500 SF        5          $11,615    7865
                                                                                           Maintenance                    Wall
             Note:     Hallway Walls - Paint Patchy (2 Tons) Inconsistent. Repaint.
                                                                                          Sub Total for System         2 items                 $26,508

Mechanical
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Existing Controls Are Obsolete                                                             Capital Renewal         19,523 SF        4          $28,401 10372
                                                                                          Sub Total for System         1 items                 $28,401

Electrical
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Electrical Receptacle Replacement                                                          Capital Renewal            16 Ea.        3           $2,010    7877
             Note:     Multiple Locations
Lightning Protection System Installation                                                   Functional Deficiency   19,523 SF        3          $14,334    7880
                                                                                          Sub Total for System         2 items                 $16,344
                                                                     Sub Total for Building 2011 - Building 2011       7 items                $142,466

Building: 2020 - Building 2020
Site
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Exterior Entry Signage At The Building Entry Does Not Meet ADA Requirements                ADA Compliance              1 Ea.        3             $126    7902
             Note:     Add 1 ADA Sign
                                                                                          Sub Total for System         1 items                    $126

Roofing
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Debris In Gutter Removal                                                                   Deferred                  150 LF         3             $728    7978
                                                                                           Maintenance
             Note:     Vegetation And Debris In Gutters. Clean And Remove.
                                                                                          Sub Total for System         1 items                    $728

Exterior
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Exterior Entry Door Hardware Is Not ADA Compliant                                          ADA Compliance              1 Door       3           $2,427    7904
             Note:     Add 1 Power Assist
Exterior Cleaning                                                                          Deferred                 5,478 SF        5          $19,946 10723
                                                                                           Maintenance                    Wall
                                                                                          Sub Total for System         2 items                 $22,374

Interior
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Acoustical Ceiling Tile Replacement                                                        Capital Renewal           300 SF         4           $1,649    7929
             Note:     Old, Replace
Vinyl Composition Tile Replacement                                                         Capital Renewal           300 SF         4           $2,400    7935
             Note:     Old, Replace
                                                                                          Sub Total for System         2 items                  $4,049

Electrical
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Lightning Protection System Installation                                                   Functional Deficiency    5,478 SF        3           $4,022    7938
                                                                                          Sub Total for System         1 items                  $4,022
                                                                     Sub Total for Building 2020 - Building 2020       7 items                 $31,299
                                                                                              Total for Campus        70 items              $2,919,696




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                                        14
                                                                                                                    Facility Condition Assessment
                                                                                                           DeKalb County SD - Bob Mathis Elementary School



Life Cycle Summary Yrs 1-10
(Items below detail the totals referenced in Tables 3a & 3b)

Site Level Life Cycle Items
Site
Uniformat Description                   LC Type Description                                   Priority       Qty UoM       Repair Cost Remaining Life
Fences and Gates                        Fencing - Chain Link (4 Ft)                              3           520 LF           $25,970        4
Fences and Gates                        Fencing - Ornamental, Iron                               3           385 LF           $33,918        6
                                                                                   Sub Total for System        2 items        $59,888

Roofing
Uniformat Description                   LC Type Description                                   Priority       Qty UoM       Repair Cost Remaining Life
Canopy Roofing                          Aluminum panels                                          4          1,800 SF          $99,408        5
                                                                                   Sub Total for System        1 items        $99,408

Electrical
Uniformat Description                   LC Type Description                                   Priority       Qty UoM       Repair Cost Remaining Life
Parking Lot Lighting                    Pole Lighting                                            3            10 Ea.          $69,311        8
                                                                                   Sub Total for System        1 items        $69,311
                                                                                Sub Total for Building -       4 items       $228,607

Building: 2010 - Building 2010
Exterior
Uniformat Description                   LC Type Description                                   Priority       Qty UoM       Repair Cost Remaining Life
Exterior Wall Veneer                    Exterior Painting - Bldg SF basis                        2           444 SF              $823        4
Exterior Entrance Doors                 Wooden Door                                              3             8 Door         $30,142        8
                                                                                   Sub Total for System        2 items        $30,964

Interior
Uniformat Description                   LC Type Description                                   Priority       Qty UoM       Repair Cost Remaining Life
Wall Painting and Coating               Painting/Staining (Bldg SF)                              5         25,752 SF         $122,105        4
Carpeting                               Carpet                                                   4          1,332 SF          $18,931        6
Tile Flooring                           Ceramic Tile                                             4          2,220 SF          $44,031        6
Tile Flooring                           Quarry Tile                                              4          3,552 SF         $109,005        6
Suspended Plaster and                   Painted ceilings                                         5          2,220 SF           $5,507        8
Compartments and Cubicles               Toilet Partitions                                        4            21 Stall        $50,434        8
Acoustical Suspended Ceilings           Ceilings - Acoustical Tiles                              4         41,736 SF         $308,390        10
                                                                                   Sub Total for System        7 items       $658,402

Mechanical
Uniformat Description                   LC Type Description                                   Priority       Qty UoM       Repair Cost Remaining Life
Decentralized Cooling                   Condenser - Inside Air Cooled (3 ton)                    2             1 Ea.           $6,406        2
Decentralized Cooling                   Ductless Split System (2 Ton)                            2             1 Ea.           $4,735        2
Decentralized Cooling                   Heat Pump (5 Ton)                                        5            42 Ea.         $508,360        2
Decentralized Cooling                   Thru-Wall AC (2 Ton)                                     3             1 Ea.           $5,478        2
Air Distribution                        Make-up Air Unit                                         3             1 Ea.           $8,865        2
Facility Hydronic Distribution          2-Pipe System (Cold)                                     3         44,400 SF          $79,190        2
Facility Hydronic Distribution          Pump - 1HP or Less (Ea.)                                 4             2 Ea.           $8,604        2
Facility Hydronic Distribution          Pump - 1HP or Less (Ea.)                                 4             1 Ea.           $4,302        2
Facility Hydronic Distribution          Pump- 25HP (Ea.)                                         4             2 Ea.          $28,689        2
HVAC Air Distribution                   AHU 2,000 CFM Interior                                   2             1 Ea.          $28,939        2
Facility Hydronic Distribution          Pump - 1HP or Less (Ea.)                                 4             1 Ea.           $4,302        2
Exhaust Air                             Roof Exhaust Fan - Small                                 3            10 Ea.          $19,546        2
Exhaust Air                             Roof Exhaust Fan - Large                                 3             1 Ea.           $8,015        2
Exhaust Air                             Kitchen Exhaust Hoods                                    3             1 Ea.          $11,163        2
Heat Generation                         Boiler - Steel Tube (2400 MBH)                           3             1 Ea.          $99,889        2
Heat Generation                         Heat Exchanger - Water to Water                          2             1 Ea.          $32,043        2
Decentralized Heating Equipment         Unit Heater Electric (5 KW)                              3             1 Ea.           $1,296        2
HVAC Air Distribution                   Ductwork (Bldg.SF)                                       3         30,000 SF         $429,992        6
                                  Note: Some evidence of build up
Central Cooling                         Cooling Tower - Metal (130 Tons)                         2             1 Ea.          $62,774        10
                                                                                   Sub Total for System       19 items      $1,352,589


M▪A▪P▪P▪S ©, Jacobs 2021                                              Revision Date - 09/24/2021                                                        15
                                                                                                                                      Facility Condition Assessment
                                                                                                                             DeKalb County SD - Bob Mathis Elementary School

Electrical
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Power Distribution                       Panelboard - 120/208 125A                                                3              1 Ea.           $1,499        3
Audio-Video Systems                      PA Communications No Head Unit (Bldg SF)                                 2          44,400 SF          $33,258        4
                                  Note: Install speakers throughout the hallways
Lighting Fixtures                        Canopy Mounted Fixtures (Ea.)                                            4             16 Ea.          $36,324        5
Lighting Fixtures                        Light Fixtures (Bldg SF)                                                 4          44,400 SF         $887,442        5
Power Distribution                       Power Wiring                                                             3          44,400 SF          $57,474        5
Power Distribution                       Panelboard - 120/208 225A                                                3              3 Ea.          $19,649        8
Lighting Fixtures                        Building Mounted Fixtures (Ea.)                                          4             16 Ea.          $17,184        8
                                                                                                    Sub Total for System         7 items      $1,052,829

Plumbing
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Compressed-Air Systems                   Air Compressor (10 hp)                                                   3              1 Ea.          $13,186        2
Domestic Water Equipment                 Water Heater - Gas - 60 gallon                                           3              2 Ea.           $7,106        3
Plumbing Fixtures                        Classroom Lavatory                                                       4              9 Ea.          $24,424        4
Plumbing Fixtures                        Restroom Lavatory                                                        3             23 Ea.          $66,109        4
Plumbing Fixtures                        Sink - Service / Mop Sink                                                5              2 Ea.           $1,685        4
Plumbing Fixtures                        Toilets                                                                  3             27 Ea.         $144,549        4
Plumbing Fixtures                        Urinals                                                                  3             11 Ea.          $15,763        4
Plumbing Fixtures                        Refrigerated Drinking Fountain                                           4              9 Ea.          $20,975        4
Domestic Water Equipment                 Water Heater - Electric - 40 gallon                                      2              1 Ea.           $3,196        8
                                  Note: 2019
Domestic Water Equipment                 Gas Piping System (BldgSF)                                               2          44,400 SF         $119,497        10
Domestic Water Piping                    Domestic Water Piping System (Bldg.SF)                                   3          44,400 SF         $268,688        10
Sanitary Sewerage Piping                 Sanitary Sewer Piping                                                    2          44,400 SF         $181,056        10
                                                                                                    Sub Total for System        12 items       $866,233

Fire and Life Safety
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Fire Detection and Alarm                 Fire Alarm                                                               1          44,400 SF         $291,491        6
Security System Component                Security Alarm System                                                    1          44,400 SF         $590,496        8
                                                                                                    Sub Total for System         2 items       $881,987

Specialties
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Casework                                 Fixed Cabinetry                                                          4             50 Room        $524,141        8
                                                                                                    Sub Total for System         1 items       $524,141
                                                                               Sub Total for Building 2010 - Building 2010      50 items      $5,367,146

Building: 2011 - Building 2011
Exterior
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Exterior Entrance Doors                  Storefront Doors - Glass/Aluminum                                        3              8 Door         $36,714        7
Exterior Operating Windows               Aluminum - Windows per SF                                                2           1,472 SF         $197,822        10
                                                                                                    Sub Total for System         2 items       $234,536

Interior
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Resilient Flooring                       Vinyl Composition Tile Flooring                                          4          16,399 SF         $139,154        2
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                              4          19,523 SF         $120,813        4
Wall Painting and Coating                Painting/Staining (Bldg SF)                                              5          18,547 SF          $87,942        4
Compartments and Cubicles                Toilet Partitions                                                        4             14 Stall        $31,693        6
Carpeting                                Carpet                                                                   4           1,367 SF          $19,428        6
Acoustical Suspended Ceilings            Ceilings - Acoustical Grid System                                        4          19,523 SF          $94,004        7
Tile Flooring                            Ceramic Tile                                                             4            976 SF           $19,939        7
Interior Swinging Doors                  Wooden Door                                                              3             48 Door        $104,099        7
Interior Door Supplementary Components   Door Hardware                                                            3             50 Door         $88,407        8
                                                                                                    Sub Total for System         9 items       $705,478

Mechanical
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Decentralized Cooling                    Heat Pump (3 Ton)                                                        5             19 Ea.         $168,809        2
Decentralized Heating Equipment          Unit Heater Electric (5 KW)                                              3              5 Ea.           $7,081        5
HVAC Air Distribution                    Roof Top Unit - DX Gas (5 Ton)                                           2              4 Ea.          $69,358        5


M▪A▪P▪P▪S ©, Jacobs 2021                                               Revision Date - 09/24/2021                                                                         16
                                                                                                                               Facility Condition Assessment
                                                                                                                       DeKalb County SD - Bob Mathis Elementary School

Mechanical
Uniformat Description              LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
HVAC Air Distribution              Roof Top Unit - DX Gas (5 Ton)                                           2              1 Ea.          $17,339        5
Air Distribution                   Energy Recovery Unit (10,000 CFM)                                        3              1 Ea.          $29,522        5
Exhaust Air                        Roof Exhaust Fan - Small                                                 3              1 Ea.           $2,135        5
Exhaust Air                        Interior Ceiling Exhaust Fan                                             3              1 Ea.             $531        5
HVAC Air Distribution              Ductwork (Bldg.SF)                                                       3           6,000 SF          $85,998        6
                                                                                              Sub Total for System         8 items       $380,774

Electrical
Uniformat Description              LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Audio-Video Systems                PA Communications No Head Unit (Bldg SF)                                 2          19,523 SF          $14,624        4
                            Note: Install speakers throughout hallways
Lighting Fixtures                  Building Mounted Fixtures (Ea.)                                          4              8 Ea.           $7,633        4
                            Note: Replace light on NE corner of the bldg.
Lighting Fixtures                  Canopy Mounted Fixtures (Ea.)                                            4             12 Ea.          $27,243        5
Lighting Fixtures                  Light Fixtures (Bldg SF)                                                 4          19,523 SF         $390,214        5
Electrical Service                 Transformer (75 KVA)                                                     2              1 Ea.           $8,679        8
Electrical Service                 Transformer (45 KVA)                                                     2              1 Ea.           $7,050        8
Power Distribution                 Distribution Panels (800 Amps)                                           3              1 Ea.          $22,109        8
Power Distribution                 Panelboard - 120/208 225A                                                3              2 Ea.          $13,100        8
Power Distribution                 Panelboard - 120/208 125A                                                3              2 Ea.           $3,475        8
Power Distribution                 Panelboard - 277/480 100A                                                3              1 Ea.           $7,965        8
Power Distribution                 Panelboard - 277/480 400A                                                3              1 Ea.          $16,544        8
Power Distribution                 Panelboard - 277/480 100A                                                3              1 Ea.           $7,965        8
Power Distribution                 Power Wiring                                                             3          19,523 SF          $29,297        10
                                                                                              Sub Total for System        13 items       $555,898

Plumbing
Uniformat Description              LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Domestic Water Equipment           Water Heater - Electric - 66 gallon                                      2              1 Ea.           $4,151        3
Plumbing Fixtures                  Restroom Lavatory                                                        3             20 Ea.          $57,485        4
Plumbing Fixtures                  Sink - Service / Mop Sink                                                5              2 Ea.           $1,685        4
Plumbing Fixtures                  Toilets                                                                  3             18 Ea.          $96,366        4
Plumbing Fixtures                  Urinals                                                                  3              8 Ea.          $11,464        4
Plumbing Fixtures                  Refrigerated Drinking Fountain                                           4              4 Ea.           $9,321        4
Plumbing Fixtures                  Classroom Lavatory                                                       4              6 Ea.          $16,770        5
Domestic Water Equipment           Backflow Preventers - 2 in. (Ea.)                                        5              1 Ea.           $2,349        6
                                                                                              Sub Total for System         8 items       $199,592

Fire and Life Safety
Uniformat Description              LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Fire Detection and Alarm           Fire Alarm                                                               1          19,523 SF         $128,171        6
Security System Component          Security Alarm System                                                    1          19,523 SF         $259,645        8
                                                                                              Sub Total for System         2 items       $387,815

Conveyances
Uniformat Description              LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Elevators                          Hydraulic (Passenger Elev)                                               4              1 Ea.         $110,846        6
Elevators                          Passenger elevator cab finishes                                          4              1 Ea.          $10,089        10
                                                                                              Sub Total for System         2 items       $120,935

Specialties
Uniformat Description              LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Casework                           Fixed Cabinetry                                                          4             37 Room        $365,600        6
                                                                                              Sub Total for System         1 items       $365,600
                                                                         Sub Total for Building 2011 - Building 2011      45 items      $2,950,628

Building: 2020 - Building 2020
Exterior
Uniformat Description              LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Exterior Entrance Doors            Steel - Insulated and Painted                                            3              5 Door         $18,487        2
                                                                                              Sub Total for System         1 items        $18,487




M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                                       17
                                                                                                                                    Facility Condition Assessment
                                                                                                                           DeKalb County SD - Bob Mathis Elementary School

Interior
Uniformat Description                    LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Wall Painting and Coating                Painting/Staining (Bldg SF)                                            5           5,204 SF          $25,416        5
Acoustical Suspended Ceilings            Ceilings - Acoustical Grid System                                      4            219 SF            $1,054        7
Tile Flooring                            Ceramic Tile                                                           4            274 SF            $5,597        7
Interior Swinging Doors                  Wooden Door                                                            3              4 Door          $8,676        7
Interior Door Supplementary Components   Door Hardware                                                          3              4 Door          $6,866        7
Suspended Plaster and                    Painted ceilings                                                       5            274 SF              $679        8
Compartments and Cubicles                Toilet Partitions                                                      4              4 Stall         $9,606        8
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                            4            219 SF            $1,618        10
                                                                                                  Sub Total for System         8 items        $59,512

Mechanical
Uniformat Description                    LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Decentralized Heating Equipment          Unit Heater Electric (5 KW)                                            3              4 Ea.           $5,664        5
Decentralized Cooling                    Thru-Wall AC (2 Ton)                                                   3              1 Ea.           $5,986        5
Exhaust Air                              Interior Ceiling Exhaust Fan                                           3              3 Ea.           $1,592        5
Heating System Supplementary             Controls - Electronic (Bldg.SF)                                        4           5,478 SF          $10,095        8
Components
                                                                                                  Sub Total for System         4 items        $23,337

Electrical
Uniformat Description                    LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Audio-Video Systems                      PA Communications No Head Unit (Bldg SF)                               2           5,478 SF           $4,104        4
Electrical Service                       Exterior Dry Type Transformer (75 KVA)                                 2              1 Ea.          $22,731        5
Lighting Fixtures                        Canopy Mounted Fixtures (Ea.)                                          4              7 Ea.          $15,891        5
Lighting Fixtures                        Light Fixtures (Bldg SF)                                               4           5,478 SF         $109,491        5
Lighting Fixtures                        Building Mounted Fixtures (Ea.)                                        4              4 Ea.           $4,296        8
Power Distribution                       Panelboard - 120/208 225A                                              3              1 Ea.           $6,549        8
Power Distribution                       Power Wiring                                                           3           5,478 SF           $8,221        10
                                                                                                  Sub Total for System         7 items       $171,283

Plumbing
Uniformat Description                    LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Domestic Water Equipment                 Water Heater - Electric - 5 to 10 gallon                               2              1 Ea.           $1,260        2
Plumbing Fixtures                        Restroom Lavatory                                                      3              2 Ea.           $5,749        4
Plumbing Fixtures                        Sink - Service / Mop Sink                                              5              1 Ea.             $842        4
Plumbing Fixtures                        Toilets                                                                3              4 Ea.          $21,415        4
Plumbing Fixtures                        Urinals                                                                3              2 Ea.           $2,866        4
Plumbing Fixtures                        Refrigerated Drinking Fountain                                         4              2 Ea.           $4,661        4
Domestic Water Equipment                 Backflow Preventers - 2 in. (Ea.)                                      5              1 Ea.           $2,349        6
                                                                                                  Sub Total for System         7 items        $39,141

Fire and Life Safety
Uniformat Description                    LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Fire Detection and Alarm                 Fire Alarm                                                             1           5,478 SF          $35,964        6
Security System Component                Security Alarm System                                                  1           5,478 SF          $72,854        8
                                                                                                  Sub Total for System         2 items       $108,818
                                                                             Sub Total for Building 2020 - Building 2020      29 items       $420,579

                                                                               Total for: Bob Mathis Elementary School       128 items      $8,966,960




M▪A▪P▪P▪S ©, Jacobs 2021                                                Revision Date - 09/24/2021                                                                      18
                                                                                             Facility Condition Assessment
                                                                                    DeKalb County SD - Bob Mathis Elementary School



 Supporting Photos




Interior Doors Old, Deficient. Replace                       Many Interior Doors Have Knob Hardware. Not ADA Compliant
                                                             - Replace




Admin Counter Not ADA Compliant In Height. Add Lower         Media Center Casework Old, Deficient. Replace
Segment




Main / Cover Photo. North-East Elevation Of Gymnasium        Replace Both Sections Of The 1200A Switchboard In The Mech
                                                             Room




M▪A▪P▪P▪S ©, Jacobs 2021                            Revision Date - 09/24/2021                                                  19
                                                                                             Facility Condition Assessment
                                                                                    DeKalb County SD - Bob Mathis Elementary School




Replace 75KVA Dry Type Transformer In The Mech Room          Replace Distribution Panelboard In The Mech Room




Replace Panelboard Panel D3 In The Book Storage Electrical   Cooling Tower Is Damaged And Needs To Be Replaced
Room




Cracked Asphalt And Parking Spot Areas Throughout. Replace




M▪A▪P▪P▪S ©, Jacobs 2021                            Revision Date - 09/24/2021                                                  20
 Revision Date - 09/24/2021




FACILITY CONDITION ASSESSMENT
                    Briarlake Elementary School | 2021
                                                                                                                            Facility Condition Assessment
                                                                                                                  DeKalb County SD - Briarlake Elementary School


 Executive Summary
 Briarlake Elementary School is located at 3590 Lavista Road in Decatur, GA. It comprises 53,300 gross square feet. At the
 time of the assessment the oldest building was 63 years old.
 The findings contained within this report are the result of an assessment of building systems performed by building
 professionals experienced in disciplines including architecture, mechanical, plumbing and electrical. Only those systems
 that were identified as having either an associated deficiency or life cycle event within a 10-year window is contained within
 this report. The full list of each school's systems that are present along with the associated priorities can be found in the flat
 file data grids submitted to Dekalb County. The projected replacement year of those assets within each system is also
 included within this table.The total current deficiencies for this site, in 2020 construction cost dollars, are estimated at
 $1,164,465. A ten-year need was developed to provide an understanding of the current need as well as the projected
 needs in the near future. For Briarlake Elementary School the ten-year need is $7,230,339.
 For planning purposes, the total current deficiencies and the first five years of projected life cycle needs were combined to
 calculate a Facility Condition Index (FCI). A 5-year FCI was calculated by dividing the 5-year need by the total replacement
 cost. Costs associated with new construction are not included in the FCI calculation. After the 5-year FCI was calculated,
 this value was subtracted from 100 to calculate the FCA Score in a similar fashion to report cards.
 The Briarlake Elementary School facility has a FCA score of 60.34% which is considered "Poor".

Summary of Findings
The table below summarizes the condition findings at Briarlake Elementary School.
Table 1: Facility Condition by Building


                                                                                                         Total 5 Yr Need      Total 10 Yr Need
                                                          Current        5-Year Life   Yrs 6-10 Life    (Yr 1-5 + Current    (Yr 1-10 + Current    Replacement      FCA
Number          Building Name                            Deficiencies    Cycle Cost     Cycle Cost             Defs)                Defs)              Cost         Score
Exterior Site
                Exterior Site                                  $51,833       $16,277         $318,302             $68,111               $386,413
Permanent Building(s)
2010            Building 2010                                $900,268     $3,519,956         $638,824          $4,420,224             $5,059,047       $9,662,027   54.25%
2011            Building 2011                                $169,042       $464,584         $159,840            $633,626               $793,466       $1,628,961   61.10%
2012            Building 2012                                  $37,746      $482,788         $149,363            $520,534               $669,896       $1,968,617   73.56%
2020            Building 2020                                   $5,575      $213,477         $102,464            $219,053               $321,517       $1,518,885   85.58%
                Sub Total for Permanent Building(s):       $1,112,631     $4,680,804      $1,050,491          $5,793,436             $6,843,926      $14,778,490
                                       Total for Site:     $1,164,465     $4,697,082       $1,368,793          $5,861,546             $7,230,339      $14,778,490   60.34%

Note 1: Sitework improvements are proportionally incorporated into the building CRV and used to calulate the overall FCA Score.
Note 2: Aerial map including building number, gross SF, and year built of each building on the site is found on Page 3.




 M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                                          2
                                                         Facility Condition Assessment
                                                    DeKalb County SD - Briarlake Elementary School


Aerial Images




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                           3
                                                                                         Facility Condition Assessment
                                                                                    DeKalb County SD - Briarlake Elementary School


Approach and Methodology
The facility condition assessment includes a visual assessment of building systems that are readily available during a
facility walk-through. The standard process does not reflect invasive, destructive assessment methods that would
require special equipment, testing or scheduled power outages. The assessment was accomplished with a view
toward identifying significant maintenance and repair deficiencies that need correction. For the purposes of this
assessment, deficient conditions captured were limited to those items that did not qualify as routine maintenance
repairs. Copies of previous reports and other documentation that were relevant to the inspection were utilized if made
available in the process. Additionally, feedback from appropriate personnel to provide background information relative
to specific building operations, function, equipment conditions, past improvements and planned upgrades were
incorporated into the results if made available to the teams while on site. Two components of the facility condition
assessment are combined to total the cost for facility need. The two components of the facility condition assessment
are current deficiencies and life cycle forecast.

Current Deficiencies: Deficiencies are items in need of repair or replacement as a result of being broken, obsolete,
deferred maintenance, or beyond useful life. The existing deficiencies that currently require correction are identified
and assigned a priority. An example of a current deficiency might include a broken lighting fixture or an inoperable
roof top air conditioning unit.

Life Cycle Forecast: Life cycle analysis evaluates the ages of a building's systems to forecast system replacement as
they reach the end of serviceable life. Estimated Useful Lives were determined based on a combination of our
(Jacobs) professional experience, RS Means, and from industry standard tables (BOMA, ASHRAE). An example of a
life cycle system replacement is a roof with a 20-year life that has been in place for 15 years and may require
replacement in five years.

All members of the survey team recorded existing conditions, identified problems and deficiencies, and documented
corrective action and quantities. The team took digital photos at each site to better identify significant deficiencies.

Facility Deficiency Priority Levels
Deficiencies were ranked according to five priority levels, with Priority 1 items being the most critical to address:

Priority 1 – Mission Critical Concerns: Deficiencies or conditions that may directly affect the site’s ability to remain
open or deliver the educational curriculum. These deficiencies typically relate to building safety, code compliance,
severely damaged or failing building components, and other items that require near-term correction. An example of a
Priority 1 deficiency is a fire alarm system replacement.

Priority 2 – Indirect Impact to Educational Mission: Items that may progress to a Priority 1 item if not addressed in the
near term. Examples of Priority 2 deficiencies include inadequate roofing that could cause deterioration of integral
building systems, and conditions affecting building envelopes, such as roof and window replacements.

Priority 3 – Short-Term Conditions: Deficiencies that are necessary to the site's mission but may not require
immediate attention. These items should be considered necessary improvements required to maximize facility
efficiency and usefulness. Examples of Priority 3 items include site improvements and plumbing deficiencies.

Priority 4 – Long-Term Requirements: Items or systems that may be considered improvements to the instructional
environment. The improvements may be aesthetic or provide greater functionality. Examples include cabinets,
finishes, paving, removal of abandoned equipment, and educational accommodations associated with special
programs.

Priority 5 – Enhancements: Deficiencies aesthetic in nature or considered enhancements. Typical deficiencies in this
priority include repainting, replacing carpet, improved signage, or other improvements to the facility environment.




M▪A▪P▪P▪S ©, Jacobs 2021                      Revision Date - 09/24/2021                                                        4
                                                                                         Facility Condition Assessment
                                                                                    DeKalb County SD - Briarlake Elementary School


Facility Condition Assessment(FCA) Score
Facility Condition Assessment (FCA) Scores are assigned after the Facility Condition Index (FCI) is calculated.
The Facility Condition Index (FCI) is used throughout the facility condition assessment industry as a general
indicator of a building’s health. Since 1991, the facility management industry has used an index called the FCI
to benchmark the relative condition of a group of sites. The FCI is derived by dividing the total repair cost,
including site-related repairs, by the total replacement cost of all buildings. It should be noted that costs in the
New Construction category are not included in the FCI calculation. In an effort to match the report card metrics,
the FCI is subtracted from 100 to assign the FCA Score. A facility with a lower FCA Score has more need, or
higher priority, than a facility with a higher FCA Score.




The replacement value represents the estimated cost of replacing the current building with another building of
like size, based on 2021 estimated cost of construction in the DeKalb County area. The estimated replacement
cost for this facility is $14,778,490. For planning purposes, the total 5-year need at the Briarlake Elementary
School is $5,861,546 (Life Cycle Years 1-5 plus the current FCI deficiency cost).

The Briarlake Elementary School facility has an FCA Score of 60.34%. which is considered "Poor".




                              Figure 1: 5-Year FCI




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                 5
                                                                                                                    Facility Condition Assessment
                                                                                                           DeKalb County SD - Briarlake Elementary School


The following table summarizes this site's current deficiencies by building system and priority.

Table 2: System by Priority (Site & Permanent Buildings)

                                                                                Priority

                  System                     1               2                     3              4                      5              Total             % of Total
Site                                                 $0               $0                $32,659        $23,235                 $5,652           $61,546        5.29 %

Roofing                                              $0             $929                 $8,379           $3,417                $121            $12,845        1.10 %

Structural                                           $0               $0                    $0               $0                   $0                $0         0.00 %

Exterior                                             $0          $723,390                $1,667              $0                $4,369       $729,426          62.64 %

Interior                                             $0               $0                $98,117              $0                   $0            $98,117        8.43 %

Mechanical                                           $0               $0               $102,925       $119,748                 $1,165       $223,838          19.22 %

Electrical                                           $0               $0                $38,692              $0                   $0            $38,692        3.32 %

Plumbing                                             $0               $0                    $0               $0                   $0                $0         0.00 %

Fire and Life Safety                                 $0               $0                    $0               $0                   $0                $0         0.00 %

Conveyances                                          $0               $0                    $0               $0                   $0                $0         0.00 %

Specialties                                          $0               $0                    $0               $0                   $0                $0         0.00 %

Total:                                               $0          $724,319              $282,439       $146,400                $11,307     $1,164,465




The building systems at the site with the most need include:
                                                                            Exterior                  -            $729,426
                                                                            Mechanical                -            $223,838
                                                                            Interior                  -             $98,117




M▪A▪P▪P▪S ©, Jacobs 2021                                   Revision Date - 09/24/2021                                                                                  6
                                                                                    Facility Condition Assessment
                                                                               DeKalb County SD - Briarlake Elementary School



The chart below represents the building systems and associated deficiency costs.




Figure 2: System Deficiencies




M▪A▪P▪P▪S ©, Jacobs 2021                    Revision Date - 09/24/2021                                                     7
                                                                                                            Facility Condition Assessment
                                                                                                    DeKalb County SD - Briarlake Elementary School


Life Cycle Capital Renewal Forecast
During the facility condition assessment, assessors inspected all major building systems. If an assessor identified a need
for immediate replacement, a deficiency was created with the item's repair costs. The identified deficiency contributes to the
facility's total current repair costs.

However, capital planning scenarios span multiple years, as opposed to being constrained to immediate repairs.
Construction projects may begin several years after the initial facility condition assessment. Therefore, in addition to the
current year repair costs, it is necessary to forecast the facility's future costs using a ten-year life cycle renewal forecast
model.

Life cycle renewal is the projection of future building system costs based upon each individual system’s expected
serviceable life. Building systems and components age over time, eventually break down, reach the end of their useful lives,
and may require replacement. While an item may be in good condition now, it might reach the end of its life before a
planned construction project occurs.

The following tables show ten-year life cycle capital renewal projections. The projections outline costs for major building
systems in which a component is expected to reach the end of its useful life and require capital funding for replacement.



Table 3a: Capital Renewal Forecast (Yrs 1-5)

                                                           Life Cycle Capital Renewal Projections
                                   Year 1             Year 2               Year 3               Year 4              Year 5
System                              2022               2023                 2024                 2025                2026                 Total 1-5
Site                                            $0                $0                     $0                   $0              $16,277     $16,277

Roofing                                         $0                $0                     $0                   $0             $244,171    $244,171

Exterior                                        $0                $0                     $0                   $0                  $0            $0

Interior                                        $0                $0                     $0                   $0             $331,034    $331,034

Mechanical                                  $59,306               $0                $424,227             $492,590            $224,140   $1,200,264

Electrical                                  $37,548            $9,349                    $0              $138,683        $1,060,942     $1,246,521

Plumbing                                        $0                $0                  $2,194             $690,057             $99,779    $792,030

Fire and Life Safety                            $0                $0                $283,710             $583,074                 $0     $866,784

Conveyances                                     $0                $0                     $0                   $0                  $0            $0

Specialties                                     $0                $0                     $0                   $0                  $0            $0

Total                                       $96,854            $9,349               $710,132         $1,904,405          $1,976,343     $4,697,082




M▪A▪P▪P▪S ©, Jacobs 2021                               Revision Date - 09/24/2021                                                                     8
                                                                                                               Facility Condition Assessment
                                                                                                         DeKalb County SD - Briarlake Elementary School


Table 3b: Capital Renewal Forecast (Yrs 6-10)

                                                                   Life Cycle Capital Renewal Projections
                                                Year 6            Year 7            Year 8           Year 9         Year 10
System                         Total 1-5         2027              2028              2029             2030           2031            Total 6-10    Total 1-10
Site                            $16,277                  $0                   $0             $0               $0         $239,360    $239,360      $255,637

Roofing                        $244,171                  $0                   $0             $0               $0          $51,218     $51,218      $295,389

Exterior                             $0                  $0                   $0             $0               $0         $140,515    $140,515      $140,515

Interior                       $331,034              $41,756                  $0         $62,442         $345,081             $0     $449,279      $780,313

Mechanical                   $1,200,263              $84,193               $4,409       $148,987              $0          $25,260    $262,849     $1,463,113

Electrical                   $1,246,521                  $0                $5,320        $58,720              $0              $0      $64,040     $1,310,562

Plumbing                       $792,030                  $0            $33,930               $0               $0              $0      $33,930      $825,960

Fire and Life Safety           $866,784              $43,674           $83,929               $0               $0              $0     $127,603      $994,387

Conveyances                          $0                  $0                   $0             $0               $0              $0            $0            $0

Specialties                          $0                  $0                   $0             $0               $0              $0            $0            $0

Total                        $4,697,082             $169,622          $127,588          $270,149         $345,081        $456,352   $1,368,793    $6,065,874




Figure 3: Ten Year Capital Renewal Forecast




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                                       9
                                                                                        Facility Condition Assessment
                                                                                   DeKalb County SD - Briarlake Elementary School

Summary of High Priority Deficiencies


Priority 2 - Indirect Impact to Educational Mission                                        Cost
  Modified Membrane Has Holes That Should Be Repaired                                       $929

  Aluminum Window Replacement                                                            $723,390

                                                            Total for Priority 2        $724,319




M▪A▪P▪P▪S ©, Jacobs 2021                          Revision Date - 09/24/2021                                                  10
                                                                                                               Facility Condition Assessment
                                                                                                          DeKalb County SD - Briarlake Elementary School



Deficiency Summary
(Items below detail the totals referenced in Table 2)

Site Level Deficiencies
Site
Deficiency                                                                            Category                 Qty UoM     Priority   Repair Cost    ID
Asphalt Driveway Replacement                                                          Capital Renewal          100 SF         3             $605    8984
             Note:     Potholes And Cracking
             Location: Various Locations
Concrete Walks Replacement                                                            Capital Renewal          125 SF         3           $1,331    8986
             Note:     Cracked
             Location: Various Locations
Playground Equipment Replacement                                                      Capital Renewal            1 Ea.        3          $21,011 10377
Asphalt Paving Resurfacing                                                            Deferred                5,000 SF        4          $19,552    8983
                                                                                      Maintenance
             Note:     Cracked Asphalt
             Location: Kitchen Driveway
Fencing Replacement (8' - 10' high Chain Link Fence)                                  Capital Renewal           50 LF         4           $3,683    8980
             Note:     Damage From Fallen Limbs
             Location: Playground
Backstop Repair                                                                       Deferred                   1 Ea.        5           $1,429    8981
                                                                                      Maintenance
             Note:     Damage From Fall Limbs
             Location: Playground
Paving Restriping                                                                     Deferred                  38 CAR        5           $1,188    8985
                                                                                      Maintenance
             Note:     Faded Striping
             Location: Front Entrance And Lot
Site Marquee Repair                                                                   Deferred                   1 Ea.        5           $3,034    8987
                                                                                      Maintenance
             Note:     Plexiglass Is Old And Faded
             Location: Front Of Site
                                                                                      Sub Total for System       8 items                 $51,833
                                                                        Sub Total for School and Site Level      8 items                 $51,833

Building: 2010 - Building 2010
Site
Deficiency                                                                            Category                 Qty UoM     Priority   Repair Cost    ID
Access Is Not ADA Compliant - ADA Compliant Ramp Installation                         ADA Compliance             1 Ea.        3           $5,899    8997
             Note:     No Ramp Existing To Access Stage
             Location: Stage In Cafeteria
Curb Ramp Does Not Meet Minimum ADA Compliance Requirements                           ADA Compliance             1 Ea.        3           $2,452    8993
             Note:     Outside Ramp Needed At End Of Kindergarten Wing To Access Playground Sidewalk
             Location: South End Of Building 2010
Sidewalk Longitudinal Or Cross Slope Exceeds Maximum Slope Criteria                   ADA Compliance           100 SF         3           $1,362    8994
             Note:     Slope Is Too Steep, Not Compliant
             Location: Front Entrance
                                                                                      Sub Total for System       3 items                  $9,713

Roofing
Deficiency                                                                            Category                 Qty UoM     Priority   Repair Cost    ID
Modified Membrane Has Holes That Should Be Repaired                                   Deferred                  10 Ea.        2             $489    8988
                                                                                      Maintenance
             Note:     Reported Roof Leaks
             Location: Various Locations
Debris In Gutter Removal                                                              Deferred                1,200 LF        3           $5,826    8990
                                                                                      Maintenance
             Note:     Clogged With Leaf Debris
             Location: South End Of Building 2010 Under Trees

M▪A▪P▪P▪S ©, Jacobs 2021                                        Revision Date - 09/24/2021                                                                 11
                                                                                                          Facility Condition Assessment
                                                                                                    DeKalb County SD - Briarlake Elementary School

Roofing
Deficiency                                                                       Category                 Qty UoM     Priority   Repair Cost    ID
Gutter Replacement                                                               Deferred                  20 LF         3             $383    8991
                                                                                 Maintenance
             Note:      Damaged By Truck
             Location: Outside Kitchen
Roof Cleaning                                                                    Deferred                5,000 SF        4           $1,092    8989
                                                                                 Maintenance
             Note:      Leaf Debris
             Location: South End Of Building 2010 Under Trees
Splash Block Installation                                                        Deferred                   2 Ea.        5             $121    8992
                                                                                 Maintenance
             Note:      Broken
             Location: On Roof
                                                                                 Sub Total for System       5 items                  $7,911

Exterior
Deficiency                                                                       Category                 Qty UoM     Priority   Repair Cost    ID
Aluminum Window Replacement                                                      Capital Renewal         5,250 SF        2         $524,993    9000
             Note:      Beyond Useful Life
             Location: All Exterior Windows
Aluminum Window Replacement                                                      Capital Renewal          600 SF         2          $59,999    9001
             Note:      Beyond Useful Life
             Location: All Exterior Windows
Aluminum Window Replacement                                                      Capital Renewal          112 SF         2          $11,200    9002
             Note:      Beyond Useful Life
             Location: All Exterior Windows
Aluminum Window Replacement                                                      Capital Renewal           12 SF         2           $1,200    9003
             Note:      Beyond Useful Life
             Location: All Exterior Windows
Exterior Entry Door Threshold Exceeds The Maximum Threshold Height               ADA Compliance             2 Door       3             $802    8995
             Note:      Power Assist Doors Needed For Front Entrance
             Location: Front Entrance
Exterior Metal Door Repainting                                                   Deferred                   6 Door       3             $648    8999
                                                                                 Maintenance
             Note:      Rusting Through Paint
             Location: Kitchen And Back Entrance
Exterior Cleaning                                                                Deferred                 500 SF         5           $1,821    8998
                                                                                 Maintenance                  Wall
             Note:      Stained From Dirt
             Location: Various Locations
                                                                                 Sub Total for System       7 items                $600,663

Interior
Deficiency                                                                       Category                 Qty UoM     Priority   Repair Cost    ID
Existing Door Hardware Is Not ADA Compliant                                      ADA Compliance            85 Door       3          $88,723    8996
             Note:      All Interior Door Hardware Not Compliant
                                                                                 Sub Total for System       1 items                 $88,723

Mechanical
Deficiency                                                                       Category                 Qty UoM     Priority   Repair Cost    ID
Make Up Air Equipment Replacement                                                Capital Renewal            1 Ea.        3           $8,356    8951
             Note:      Beyond Useful Life
             Location: Roof Above Kitchen
Testing And Balancing                                                            Deferred               34,847 SF        3          $69,786    8952
                                                                                 Maintenance
             Note:      Test
             Location: Building 2010
Existing Controls Are Obsolete                                                   Capital Renewal        34,847 SF        4          $88,367 10378




M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                         12
                                                                                                                        Facility Condition Assessment
                                                                                                                   DeKalb County SD - Briarlake Elementary School

Mechanical
Deficiency                                                                                 Category                     Qty UoM     Priority   Repair Cost    ID
Remove Abandoned Equipment                                                                 Deferred                       1 Ea.        5           $1,165    8953
                                                                                           Maintenance
             Note:      Rtu On Roof Abandoned
             Location: Roof
                                                                                          Sub Total for System            4 items                $167,674

Electrical
Deficiency                                                                                 Category                     Qty UoM     Priority   Repair Cost    ID
Lightning Protection System Installation                                                   Functional Deficiency      34,847 SF        3          $25,584    8956
             Note:      Not Existing
             Location: Building 2010
                                                                                          Sub Total for System            1 items                 $25,584
                                                                     Sub Total for Building 2010 - Building 2010         21 items                $900,268

Building: 2011 - Building 2011
Roofing
Deficiency                                                                                 Category                     Qty UoM     Priority   Repair Cost    ID
Modified Membrane Has Holes That Should Be Repaired                                        Deferred                       6 Ea.        2             $293    9005
                                                                                           Maintenance
             Note:      Reported Roof Leaks
             Location: Various Locations
Debris In Gutter Removal                                                                   Deferred                     250 LF         3           $1,214    9007
                                                                                           Maintenance
             Note:      Clogged With Leaf Debris
             Location: North Side Of Roof Under Trees
Roof Cleaning                                                                              Deferred                    2,000 SF        4             $437    9006
                                                                                           Maintenance
             Note:      Leaf Debris
             Location: North Side Of Roof Under Trees
                                                                                          Sub Total for System            3 items                  $1,944

Exterior
Deficiency                                                                                 Category                     Qty UoM     Priority   Repair Cost    ID
Aluminum Window Replacement                                                                Capital Renewal             1,260 SF        2         $125,998    9009
             Note:      Beyond Useful Life
             Location: All Exterior Windows
Exterior Cleaning                                                                          Deferred                     200 SF         5             $728    9008
                                                                                           Maintenance                      Wall
             Note:      Stained With Dirt
             Location: Various Locations
                                                                                          Sub Total for System            2 items                $126,727

Interior
Deficiency                                                                                 Category                     Qty UoM     Priority   Repair Cost    ID
Existing Door Hardware Is Not ADA Compliant                                                ADA Compliance                 9 Door       3           $9,394    9004
             Note:      All Interior Door Hardware Not Compliant
                                                                                          Sub Total for System            1 items                  $9,394

Mechanical
Deficiency                                                                                 Category                     Qty UoM     Priority   Repair Cost    ID
Testing And Balancing                                                                      Deferred                    5,875 SF        3          $11,766    8959
                                                                                           Maintenance
             Note:      Test
             Location: Building 2011
Existing Controls Are Obsolete                                                             Capital Renewal             5,875 SF        4          $14,898 10379
                                                                                          Sub Total for System            2 items                 $26,664




M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                                       13
                                                                                                                       Facility Condition Assessment
                                                                                                                  DeKalb County SD - Briarlake Elementary School

Electrical
Deficiency                                                                                Category                     Qty UoM     Priority   Repair Cost    ID
Lightning Protection System Installation                                                  Functional Deficiency       5,875 SF        3           $4,313    8961
             Note:      Not Existing
             Location: Building 2011
                                                                                         Sub Total for System            1 items                  $4,313
                                                                    Sub Total for Building 2011 - Building 2011          9 items                $169,042

Building: 2012 - Building 2012
Roofing
Deficiency                                                                                Category                     Qty UoM     Priority   Repair Cost    ID
Modified Membrane Has Holes That Should Be Repaired                                       Deferred                       3 Ea.        2             $147    9010
                                                                                          Maintenance
             Note:      Reported Roof Leaks
             Location: Various Locations
Roof Drain Cleaning                                                                       Deferred                       2 Ea.        3             $131    9012
                                                                                          Maintenance
             Note:      Clogged With Leaves
             Location: All Roof Drains
Roof Cleaning                                                                             Deferred                    6,500 SF        4           $1,420    9011
                                                                                          Maintenance
             Note:      Leave Debris, Floor Plan Has Building Area Being 6500 Sf
             Location: All Of Roof
Splash Block Replacement                                                                  Deferred                       8 Ea.        4             $467    9013
                                                                                          Maintenance
             Note:      Damaged
             Location: On Roof
                                                                                         Sub Total for System            4 items                  $2,165

Exterior
Deficiency                                                                                Category                     Qty UoM     Priority   Repair Cost    ID
Exterior Metal Door Repainting                                                            Deferred                       2 Door       3             $216    9015
                                                                                          Maintenance
             Note:      Rusting Through Paint
             Location: Courtyard Doors
Exterior Cleaning                                                                         Deferred                     300 SF         5           $1,092    9014
                                                                                          Maintenance                      Wall
             Note:      Stained With Dirt
             Location: Various Locations
                                                                                         Sub Total for System            2 items                  $1,308

Mechanical
Deficiency                                                                                Category                     Qty UoM     Priority   Repair Cost    ID
Testing And Balancing                                                                     Deferred                    6,500 SF        3          $13,017    8967
                                                                                          Maintenance
             Note:      Test
             Location: Building 2012
Existing Controls Are Obsolete                                                            Capital Renewal             6,500 SF        4          $16,483 10380
                                                                                         Sub Total for System            2 items                 $29,500

Electrical
Deficiency                                                                                Category                     Qty UoM     Priority   Repair Cost    ID
Lightning Protection System Installation                                                  Functional Deficiency       6,500 SF        3           $4,772    8972
             Note:      Not Existing
             Location: Building 2012
                                                                                         Sub Total for System            1 items                  $4,772
                                                                    Sub Total for Building 2012 - Building 2012          9 items                 $37,746




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                                          14
                                                                                                                     Facility Condition Assessment
                                                                                                                DeKalb County SD - Briarlake Elementary School

Building: 2020 - Building 2020
Roofing
Deficiency                                                                              Category                     Qty UoM     Priority   Repair Cost    ID
Debris In Gutter Removal                                                                Deferred                     170 LF         3             $825    9016
                                                                                        Maintenance
             Note:     Clogged With Leaf Debris
             Location: All Length Of Gutter, Perimeter Of Gym
                                                                                       Sub Total for System            1 items                    $825

Exterior
Deficiency                                                                              Category                     Qty UoM     Priority   Repair Cost    ID
Exterior Cleaning                                                                       Deferred                     200 SF         5             $728    9017
                                                                                        Maintenance                      Wall
             Note:     Stained With Dirt
             Location: Various Locations
                                                                                       Sub Total for System            1 items                    $728

Electrical
Deficiency                                                                              Category                     Qty UoM     Priority   Repair Cost    ID
Lightning Protection System Installation                                                Functional Deficiency       5,478 SF        3           $4,022    8976
             Note:     Not Existing
             Location: Building 2020
                                                                                       Sub Total for System            1 items                  $4,022
                                                                  Sub Total for Building 2020 - Building 2020          3 items                  $5,575
                                                                                           Total for Campus           50 items              $1,164,465




M▪A▪P▪P▪S ©, Jacobs 2021                                        Revision Date - 09/24/2021                                                                       15
                                                                                                                                 Facility Condition Assessment
                                                                                                                         DeKalb County SD - Briarlake Elementary School



Life Cycle Summary Yrs 1-10
(Items below detail the totals referenced in Tables 3a & 3b)

Site Level Life Cycle Items
Site
Uniformat Description                   LC Type Description                                                Priority       Qty UoM      Repair Cost Remaining Life
Parking Lot Pavement                    Gravel                                                                3            69 CAR         $16,277        5
Parking Lot Pavement                    Asphalt                                                               3            57 CAR        $104,487        10
Roadway Pavement                        Asphalt Driveways                                                     3         16,600 SF        $134,873        10
                                                                                                 Sub Total for System       3 items      $255,637

Roofing
Uniformat Description                   LC Type Description                                                Priority       Qty UoM      Repair Cost Remaining Life
Canopy Roofing                          Aluminum panels                                                       4           800 SF          $51,218        10
                                                                                                 Sub Total for System       1 items       $51,218

Electrical
Uniformat Description                   LC Type Description                                                Priority       Qty UoM      Repair Cost Remaining Life
Parking Lot Lighting                    Pole Lighting                                                         3             4 Ea.         $27,725        8
                                                                                                 Sub Total for System       1 items       $27,725
                                                                                           Sub Total for Building -         5 items      $334,579

Building: 2010 - Building 2010
Exterior
Uniformat Description                   LC Type Description                                                Priority       Qty UoM      Repair Cost Remaining Life
Exterior Entrance Doors                 Steel - Insulated and Painted                                         3            23 Door       $107,728        10
                                                                                                 Sub Total for System       1 items      $107,728

Interior
Uniformat Description                   LC Type Description                                                Priority       Qty UoM      Repair Cost Remaining Life
Acoustical Suspended Ceilings           Ceilings - Acoustical Tiles                                           4         34,847 SF        $222,111        5
Wall Painting and Coating               Painting/Staining (Bldg SF)                                           5         3,484 SF          $17,015        5
Compartments and Cubicles               Toilet Partitions                                                     4            19 Stall       $45,630        8
Resilient Flooring                      Vinyl Composition Tile Flooring                                       4         29,620 SF        $309,119        9
                                                                                                 Sub Total for System       4 items      $593,875

Mechanical
Uniformat Description                   LC Type Description                                                Priority       Qty UoM      Repair Cost Remaining Life
Central Cooling                         Cooling Tower - Metal (130 Tons)                                      2             1 Ea.          $48,111       1
                                  Note: 120 tons
Facility Hydronic Distribution          Pump- 10HP (Ea.)                                                      4             1 Ea.         $11,195        1
                                  Note: 7.5 hp
Heat Generation                         Boiler - Steel Tube (4800 MBH)                                        3             1 Ea.        $151,957        3
                                  Note: 3500 mbh
Facility Hydronic Distribution          Pump- 25HP (Ea.)                                                      4             2 Ea.         $29,550        3
                                  Note: 20 hp
HVAC Air Distribution                   VAV Boxes / Terminal Device                                           4            38 Ea.        $151,232        3
Exhaust Air                             Roof Exhaust Fan - Small                                              3             7 Ea.         $14,093        3
Exhaust Air                             Roof Exhaust Fan - Large                                              3             4 Ea.         $33,024        3
Exhaust Air                             Roof Exhaust Fan - Large                                              3             2 Ea.         $16,512        3
Decentralized Heating Equipment         Unit Heater Electric (3 KW)                                           3             5 Ea.          $4,962        4
HVAC Air Distribution                   Ductwork (Bldg.SF)                                                    3         34,847 SF        $470,794        4
HVAC Air Distribution                   Roof Top Unit - DX Gas (5 Ton)                                        2             1 Ea.         $16,834        4
Decentralized Heating Equipment         Radiant Heater - Radiant Panels - Ceiling                             3             2 Ea.          $8,630        5
Decentralized Cooling                   Condenser - Outside Air Cooled (3 Tons)                               2             1 Ea.          $7,000        5
Decentralized Cooling                   Ductless Split System (3 Ton)                                         2             1 Ea.          $5,912        5
Facility Hydronic Distribution          2-Pipe Steam System (Hot)                                             3         34,847 SF        $161,569        5
Exhaust Air                             Kitchen Exhaust Hoods                                                 3             1 Ea.         $12,198        5
Heat Generation                         Heat Exchanger - Water to Water (Flat Plate - 800 GPM)                2             1 Ea.        $145,563        8
                                  Note: 600 gpm
Decentralized Cooling                   Thru-Wall AC (1 Ton)                                                  3             1 Ea.          $3,424        8
                                                                                                 Sub Total for System      18 items     $1,292,561


M▪A▪P▪P▪S ©, Jacobs 2021                                                Revision Date - 09/24/2021                                                                  16
                                                                                                                                  Facility Condition Assessment
                                                                                                                           DeKalb County SD - Briarlake Elementary School

Electrical
Uniformat Description                 LC Type Description                                                   Priority        Qty UoM      Repair Cost Remaining Life
Electrical Service                    Transformer (112.5 KVA)                                                  2              1 Ea.          $9,594        1
Power Distribution                    Distribution Panels (600 Amps)                                           3              1 Ea.         $17,239        1
Power Distribution                    Panelboard - 120/208 100A                                                3              1 Ea.          $2,694        1
                                Note: 120/208 20A, boiler room
Power Distribution                    Panelboard - 120/208 225A                                                3              1 Ea.          $5,325        1
                                Note: 120/208 200A, hallway
Power Distribution                    Panelboard - 120/208 100A                                                3              1 Ea.          $2,694        1
                                Note: 120/208 60A, boiler room
Power Distribution                    Panelboard - 277/480 225A                                                3              1 Ea.          $9,349        2
                                Note: boiler room
Power Distribution                    Panelboard - 120/208 100A                                                3              4 Ea.         $11,775        4
                                Note: stage, hallway
Power Distribution                    Panelboard - 120/208 225A                                                3              1 Ea.          $5,819        4
                                Note: main office
Power Distribution                    Panelboard - 120/208 225A                                                3              1 Ea.          $5,819        4
                                Note: 120/208 200A, kitchen
Audio-Video Systems                   PA Communications No Head Unit (Bldg SF)                                 2          34,847 SF         $26,103        4
Distributed Systems                   PA Communications (Bldg.SF)                                              3          34,847 SF         $38,028        4
Power Distribution                    Power Wiring                                                             3          34,847 SF         $43,795        4
Lighting Fixtures                     Light Fixtures (Bldg SF)                                                 4          34,847 SF        $696,501        5
Power Distribution                    Panelboard - 120/208 225A                                                3              2 Ea.         $13,100        8
Power Distribution                    Panelboard - 120/208 225A                                                3              1 Ea.          $6,549        8
                                Note: 120/208 200A
                                                                                                 Sub Total for System        15 items      $894,384

Plumbing
Uniformat Description                 LC Type Description                                                   Priority        Qty UoM      Repair Cost Remaining Life
Domestic Water Equipment              Gas Piping System (BldgSF)                                               2          34,847 SF         $78,545        4
Domestic Water Piping                 Domestic Water Piping System (Bldg.SF)                                   3          34,847 SF        $176,607        4
Sanitary Sewerage Piping              Sanitary Sewer Piping                                                    2          34,847 SF        $119,008        4
Plumbing Fixtures                     Restroom Lavatory                                                        3             22 Ea.         $63,234        4
Plumbing Fixtures                     Sink - Service / Mop Sink                                                5              3 Ea.          $2,527        4
Plumbing Fixtures                     Toilets                                                                  3             31 Ea.        $165,964        4
Plumbing Fixtures                     Urinals                                                                  3             10 Ea.         $14,330        4
Plumbing Fixtures                     Refrigerated Drinking Fountain                                           4              7 Ea.         $16,313        4
Domestic Water Equipment              Water Heater - Electric - 20 gallon                                      2              1 Ea.          $1,730        5
Plumbing Fixtures                     Classroom Lavatory                                                       4             11 Ea.         $30,746        5
                                                                                                 Sub Total for System        10 items      $669,004

Fire and Life Safety
Uniformat Description                 LC Type Description                                                   Priority        Qty UoM      Repair Cost Remaining Life
Fire Detection and Alarm              Fire Alarm                                                               1          34,847 SF        $209,361        3
Water-Based Fire-Suppression          Fire Sprinkler System (Bldg.SF)                                          1          34,847 SF        $384,156        4
Fire Detection and Alarm              Fire Alarm Panel                                                         1              1 Ea.          $7,710        6
                                                                                                 Sub Total for System         3 items      $601,227
                                                                            Sub Total for Building 2010 - Building 2010      51 items     $4,158,779

Building: 2011 - Building 2011
Exterior
Uniformat Description                 LC Type Description                                                   Priority        Qty UoM      Repair Cost Remaining Life
Exterior Entrance Doors               Steel - Insulated and Painted                                            3              2 Door         $9,367        10
                                                                                                 Sub Total for System         1 items        $9,367

Interior
Uniformat Description                 LC Type Description                                                   Priority        Qty UoM      Repair Cost Remaining Life
Acoustical Suspended Ceilings         Ceilings - Acoustical Tiles                                              4          5,875 SF          $37,447        5
Wall Painting and Coating             Painting/Staining (Bldg SF)                                              5            588 SF           $2,872        5
Carpeting                             Carpet                                                                   4          2,938 SF          $41,756        6
Resilient Flooring                    Vinyl Composition Tile Flooring                                          4          2,350 SF          $24,525        9
                                                                                                 Sub Total for System         4 items      $106,599




M▪A▪P▪P▪S ©, Jacobs 2021                                              Revision Date - 09/24/2021                                                                      17
                                                                                                                                    Facility Condition Assessment
                                                                                                                            DeKalb County SD - Briarlake Elementary School

Mechanical
Uniformat Description                   LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
HVAC Air Distribution                   VAV Boxes / Terminal Device                                              4             7 Ea.         $27,859        3
Facility Hydronic Distribution          2-Pipe Steam System (Hot)                                                3          5,875 SF         $27,239        5
HVAC Air Distribution                   Ductwork (Bldg.SF)                                                       3          5,874 SF         $84,193        6
                                                                                                   Sub Total for System        3 items      $139,291

Electrical
Uniformat Description                   LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Power Distribution                      Panelboard - 120/208 100A                                                3             1 Ea.          $2,944        4
Audio-Video Systems                     PA Communications No Head Unit (Bldg SF)                                 2          5,875 SF          $4,401        4
Lighting Fixtures                       Light Fixtures (Bldg SF)                                                 4          5,875 SF        $117,426        5
Power Distribution                      Power Wiring                                                             3          5,875 SF          $7,605        5
                                                                                                   Sub Total for System        4 items      $132,376

Plumbing
Uniformat Description                   LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Plumbing Fixtures                       Refrigerated Drinking Fountain                                           4             1 Ea.          $2,331        4
Domestic Water Equipment                Gas Piping System (BldgSF)                                               2          5,875 SF         $13,640        5
Domestic Water Piping                   Domestic Water Piping System (Bldg.SF)                                   3          5,875 SF         $30,669        5
Sanitary Sewerage Piping                Sanitary Sewer Piping                                                    2          5,875 SF         $20,666        5
                                                                                                   Sub Total for System        4 items       $67,306

Fire and Life Safety
Uniformat Description                   LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Fire Detection and Alarm                Fire Alarm                                                               1          5,875 SF         $35,297        3
Water-Based Fire-Suppression            Fire Sprinkler System (Bldg.SF)                                          1          5,875 SF         $64,766        4
Security System Component               Security Alarm System                                                    1          5,875 SF         $69,421        4
                                                                                                   Sub Total for System        3 items      $169,485
                                                                              Sub Total for Building 2011 - Building 2011     19 items      $624,424

Building: 2012 - Building 2012
Roofing
Uniformat Description                   LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Low-Slope Roofing                       Modified Bitumen                                                         2          6,500 SF        $244,171        5
                                 Note: floor plan has area being 6500 sf
                                                                                                   Sub Total for System        1 items      $244,171

Interior
Uniformat Description                   LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Acoustical Suspended Ceilings           Ceilings - Acoustical Tiles                                              4          6,500 SF         $41,430        5
Wall Painting and Coating               Painting/Staining (Bldg SF)                                              5           650 SF           $3,174        5
Compartments and Cubicles               Toilet Partitions                                                        4             3 Stall        $7,205        8
                                                                                                   Sub Total for System        3 items       $51,810

Mechanical
Uniformat Description                   LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Exhaust Air                             Roof Exhaust Fan - Small                                                 3             2 Ea.          $4,952        10
Exhaust Air                             Roof Exhaust Fan - Large                                                 3             2 Ea.         $20,308        10
                                                                                                   Sub Total for System        2 items       $25,260

Electrical
Uniformat Description                   LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Lighting Fixtures                       Light Fixtures (Bldg SF)                                                 4          6,500 SF        $129,919        5
Audio-Video Systems                     PA Communications No Head Unit (Bldg SF)                                 2          6,500 SF          $5,320        7
                                                                                                   Sub Total for System        2 items      $135,239

Plumbing
Uniformat Description                   LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Domestic Water Equipment                Water Heater - Electric - 30 gallon                                      2             1 Ea.          $2,194        3
Plumbing Fixtures                       Toilets                                                                  3             4 Ea.         $21,415        4
Plumbing Fixtures                       Urinals                                                                  3             1 Ea.          $1,433        4
Plumbing Fixtures                       Classroom Lavatory                                                       4             2 Ea.          $5,930        7
Plumbing Fixtures                       Restroom Lavatory                                                        3             5 Ea.         $15,704        7
Plumbing Fixtures                       Sink - Service / Mop Sink                                                5             1 Ea.            $920        7
Plumbing Fixtures                       Refrigerated Drinking Fountain                                           4             2 Ea.          $5,093        7
                                                                                                   Sub Total for System        7 items       $52,690


M▪A▪P▪P▪S ©, Jacobs 2021                                              Revision Date - 09/24/2021                                                                       18
                                                                                                                              Facility Condition Assessment
                                                                                                                      DeKalb County SD - Briarlake Elementary School

Fire and Life Safety
Uniformat Description             LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Fire Detection and Alarm          Fire Alarm                                                               1          6,500 SF         $39,052        3
Security System Component         Security Alarm System                                                    1          6,500 SF         $83,929        7
                                                                                             Sub Total for System        2 items      $122,981
                                                                        Sub Total for Building 2012 - Building 2012     17 items      $632,150

Building: 2020 - Building 2020
Exterior
Uniformat Description             LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Exterior Entrance Doors           Steel - Insulated and Painted                                            3             5 Door        $23,419        10
                                                                                             Sub Total for System        1 items       $23,419

Interior
Uniformat Description             LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Acoustical Suspended Ceilings     Ceilings - Acoustical Tiles                                              4          1,096 SF          $6,986        5
Compartments and Cubicles         Toilet Partitions                                                        4             4 Stall        $9,606        8
Resilient Flooring                Vinyl Composition Tile Flooring                                          4          1,096 SF         $11,438        9
                                                                                             Sub Total for System        3 items       $28,029

Mechanical
Uniformat Description             LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Exhaust Air                       Interior Ceiling Exhaust Fan                                             3             3 Ea.          $1,592        5
Decentralized Heating Equipment   Unit Heater Electric (3 KW)                                              3             1 Ea.          $1,085        7
Decentralized Cooling             Thru-Wall AC (1 Ton)                                                     3             1 Ea.          $3,324        7
                                                                                             Sub Total for System        3 items        $6,001

Electrical
Uniformat Description             LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Lighting Fixtures                 Light Fixtures (Bldg SF)                                                 4          5,478 SF        $109,491        5
Audio-Video Systems               PA Communications No Head Unit (Bldg SF)                                 2          5,478 SF          $4,619        8
Distributed Systems               PA Communications (Bldg.SF)                                              3          5,478 SF          $6,728        8
                                                                                             Sub Total for System        3 items      $120,838

Plumbing
Uniformat Description             LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Plumbing Fixtures                 Sink - Service / Mop Sink                                                5             1 Ea.            $842        4
Plumbing Fixtures                 Toilets                                                                  3             4 Ea.         $21,415        4
Plumbing Fixtures                 Urinals                                                                  3             1 Ea.          $1,433        4
Plumbing Fixtures                 Refrigerated Drinking Fountain                                           4             2 Ea.          $4,661        4
Domestic Water Equipment          Water Heater - Electric - 30 gallon                                      2             1 Ea.          $2,328        5
Plumbing Fixtures                 Restroom Lavatory                                                        3             2 Ea.          $6,282        7
                                                                                             Sub Total for System        6 items       $36,960

Fire and Life Safety
Uniformat Description             LC Type Description                                                   Priority       Qty UoM      Repair Cost Remaining Life
Security System Component         Security Alarm System                                                    1          5,478 SF         $64,730        4
Fire Detection and Alarm          Fire Alarm                                                               1          5,478 SF         $35,964        6
                                                                                             Sub Total for System        2 items      $100,694
                                                                        Sub Total for Building 2020 - Building 2020     18 items      $315,941

                                                                            Total for: Briarlake Elementary School     110 items     $6,065,874




M▪A▪P▪P▪S ©, Jacobs 2021                                          Revision Date - 09/24/2021                                                                     19
                                                              Facility Condition Assessment
                                                         DeKalb County SD - Briarlake Elementary School



 Supporting Photos




Clean Leaves Off Roof               Repair Roof




Repair Gutter                       Resurface Driveway




Repair Roof                         Replace Windows




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                               20
                                                         Facility Condition Assessment
                                                    DeKalb County SD - Briarlake Elementary School




Add Ramp At Stairs                  Repaint Doors




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                          21
 Revision Date - 09/24/2021




FACILITY CONDITION ASSESSMENT
                  Chapel Hill Elementary School | 2021
                                                                                                                             Facility Condition Assessment
                                                                                                                 DeKalb County SD - Chapel Hill Elementary School


 Executive Summary
 Chapel Hill Elementary School is located at 3536 Radcliffe Boulevard in Decatur, GA. It comprises 69,150 gross square
 feet. At the time of the assessment the oldest building was 53 years old.
 The findings contained within this report are the result of an assessment of building systems performed by building
 professionals experienced in disciplines including architecture, mechanical, plumbing and electrical. Only those systems
 that were identified as having either an associated deficiency or life cycle event within a 10-year window is contained within
 this report. The full list of each school's systems that are present along with the associated priorities can be found in the flat
 file data grids submitted to Dekalb County. The projected replacement year of those assets within each system is also
 included within this table.The total current deficiencies for this site, in 2020 construction cost dollars, are estimated at
 $5,931,870. A ten-year need was developed to provide an understanding of the current need as well as the projected
 needs in the near future. For Chapel Hill Elementary School the ten-year need is $9,799,228.
 For planning purposes, the total current deficiencies and the first five years of projected life cycle needs were combined to
 calculate a Facility Condition Index (FCI). A 5-year FCI was calculated by dividing the 5-year need by the total replacement
 cost. Costs associated with new construction are not included in the FCI calculation. After the 5-year FCI was calculated,
 this value was subtracted from 100 to calculate the FCA Score in a similar fashion to report cards.
 The Chapel Hill Elementary School facility has a FCA score of 62.39% which is considered "Poor".

Summary of Findings
The table below summarizes the condition findings at Chapel Hill Elementary School.
Table 1: Facility Condition by Building


                                                                                                          Total 5 Yr Need      Total 10 Yr Need
                                                          Current        5-Year Life    Yrs 6-10 Life    (Yr 1-5 + Current    (Yr 1-10 + Current    Replacement      FCA
Number          Building Name                            Deficiencies    Cycle Cost      Cycle Cost             Defs)                Defs)              Cost         Score
Exterior Site
                Exterior Site                                $380,086       $210,332          $198,051            $590,418               $788,469
Permanent Building(s)
2010            Building 2010                              $3,100,262       $539,742          $863,957          $3,640,004             $4,503,961       $8,955,543   59.35%
2011            Building 2011                              $1,322,779       $228,687          $485,984          $1,551,465             $2,037,449       $4,579,669   66.12%
2012            Building 2012                                $436,448              $0         $188,774            $436,448               $625,222       $1,531,362   71.50%
2013            Building 2013                                $672,300       $187,757          $229,565            $860,057             $1,089,622       $2,587,761   66.76%
2020            Building 2020                                  $19,995      $112,856          $621,654            $132,851               $754,506       $1,518,885   91.25%
                Sub Total for Permanent Building(s):       $5,551,784     $1,069,041       $2,389,934          $6,620,825             $9,010,759      $19,173,219
                                       Total for Site:     $5,931,870     $1,279,374        $2,587,985          $7,211,243             $9,799,228      $19,173,219   62.39%

Note 1: Sitework improvements are proportionally incorporated into the building CRV and used to calulate the overall FCA Score.
Note 2: Aerial map including building number, gross SF, and year built of each building on the site is found on Page 3.




 M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                                           2
                                                          Facility Condition Assessment
                                                   DeKalb County SD - Chapel Hill Elementary School


Aerial Images




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                            3
                                                                                         Facility Condition Assessment
                                                                                  DeKalb County SD - Chapel Hill Elementary School


Approach and Methodology
The facility condition assessment includes a visual assessment of building systems that are readily available during a
facility walk-through. The standard process does not reflect invasive, destructive assessment methods that would
require special equipment, testing or scheduled power outages. The assessment was accomplished with a view
toward identifying significant maintenance and repair deficiencies that need correction. For the purposes of this
assessment, deficient conditions captured were limited to those items that did not qualify as routine maintenance
repairs. Copies of previous reports and other documentation that were relevant to the inspection were utilized if made
available in the process. Additionally, feedback from appropriate personnel to provide background information relative
to specific building operations, function, equipment conditions, past improvements and planned upgrades were
incorporated into the results if made available to the teams while on site. Two components of the facility condition
assessment are combined to total the cost for facility need. The two components of the facility condition assessment
are current deficiencies and life cycle forecast.

Current Deficiencies: Deficiencies are items in need of repair or replacement as a result of being broken, obsolete,
deferred maintenance, or beyond useful life. The existing deficiencies that currently require correction are identified
and assigned a priority. An example of a current deficiency might include a broken lighting fixture or an inoperable
roof top air conditioning unit.

Life Cycle Forecast: Life cycle analysis evaluates the ages of a building's systems to forecast system replacement as
they reach the end of serviceable life. Estimated Useful Lives were determined based on a combination of our
(Jacobs) professional experience, RS Means, and from industry standard tables (BOMA, ASHRAE). An example of a
life cycle system replacement is a roof with a 20-year life that has been in place for 15 years and may require
replacement in five years.

All members of the survey team recorded existing conditions, identified problems and deficiencies, and documented
corrective action and quantities. The team took digital photos at each site to better identify significant deficiencies.

Facility Deficiency Priority Levels
Deficiencies were ranked according to five priority levels, with Priority 1 items being the most critical to address:

Priority 1 – Mission Critical Concerns: Deficiencies or conditions that may directly affect the site’s ability to remain
open or deliver the educational curriculum. These deficiencies typically relate to building safety, code compliance,
severely damaged or failing building components, and other items that require near-term correction. An example of a
Priority 1 deficiency is a fire alarm system replacement.

Priority 2 – Indirect Impact to Educational Mission: Items that may progress to a Priority 1 item if not addressed in the
near term. Examples of Priority 2 deficiencies include inadequate roofing that could cause deterioration of integral
building systems, and conditions affecting building envelopes, such as roof and window replacements.

Priority 3 – Short-Term Conditions: Deficiencies that are necessary to the site's mission but may not require
immediate attention. These items should be considered necessary improvements required to maximize facility
efficiency and usefulness. Examples of Priority 3 items include site improvements and plumbing deficiencies.

Priority 4 – Long-Term Requirements: Items or systems that may be considered improvements to the instructional
environment. The improvements may be aesthetic or provide greater functionality. Examples include cabinets,
finishes, paving, removal of abandoned equipment, and educational accommodations associated with special
programs.

Priority 5 – Enhancements: Deficiencies aesthetic in nature or considered enhancements. Typical deficiencies in this
priority include repainting, replacing carpet, improved signage, or other improvements to the facility environment.




M▪A▪P▪P▪S ©, Jacobs 2021                      Revision Date - 09/24/2021                                                        4
                                                                                         Facility Condition Assessment
                                                                                  DeKalb County SD - Chapel Hill Elementary School


Facility Condition Assessment(FCA) Score
Facility Condition Assessment (FCA) Scores are assigned after the Facility Condition Index (FCI) is calculated.
The Facility Condition Index (FCI) is used throughout the facility condition assessment industry as a general
indicator of a building’s health. Since 1991, the facility management industry has used an index called the FCI
to benchmark the relative condition of a group of sites. The FCI is derived by dividing the total repair cost,
including site-related repairs, by the total replacement cost of all buildings. It should be noted that costs in the
New Construction category are not included in the FCI calculation. In an effort to match the report card metrics,
the FCI is subtracted from 100 to assign the FCA Score. A facility with a lower FCA Score has more need, or
higher priority, than a facility with a higher FCA Score.




The replacement value represents the estimated cost of replacing the current building with another building of
like size, based on 2021 estimated cost of construction in the DeKalb County area. The estimated replacement
cost for this facility is $19,173,219. For planning purposes, the total 5-year need at the Chapel Hill Elementary
School is $7,211,243 (Life Cycle Years 1-5 plus the current FCI deficiency cost).

The Chapel Hill Elementary School facility has an FCA Score of 62.39%. which is considered "Poor".




                              Figure 1: 5-Year FCI




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                 5
                                                                                                                     Facility Condition Assessment
                                                                                                           DeKalb County SD - Chapel Hill Elementary School


The following table summarizes this site's current deficiencies by building system and priority.

Table 2: System by Priority (Site & Permanent Buildings)

                                                                                 Priority

                  System                     1                2                     3              4                      5             Total             % of Total
Site                                                  $0               $0               $146,314       $233,772                   $0        $380,086           6.41 %

Roofing                                               $0      $1,655,341                 $10,924           $1,847                 $0      $1,668,112          28.12 %

Structural                                            $0               $0                    $0               $0                  $0                $0         0.00 %

Exterior                                              $0          $207,197                   $0            $9,338              $5,239       $221,774           3.74 %

Interior                                              $0               $0                $37,910       $495,143                   $0        $533,053           8.99 %

Mechanical                                            $0      $1,294,647                $195,800       $161,462                   $0      $1,651,910          27.85 %

Electrical                                            $0          $152,626              $106,073            $267                  $0        $258,966           4.37 %

Plumbing                                              $0            $2,523              $479,910        $19,288                   $0        $501,722           8.46 %

Fire and Life Safety                             $350,079              $0                    $0               $0                  $0        $350,079           5.90 %

Conveyances                                           $0               $0                $26,581              $0                  $0            $26,581        0.45 %

Specialties                                           $0               $0                   $303       $339,285                   $0        $339,588           5.72 %

Total:                                           $350,079     $3,312,335            $1,003,814     $1,260,402                  $5,239     $5,931,870




The building systems at the site with the most need include:
                                                                             Roofing                   -       $1,668,112
                                                                             Mechanical                -       $1,651,910
                                                                             Interior                  -            $533,053




M▪A▪P▪P▪S ©, Jacobs 2021                                    Revision Date - 09/24/2021                                                                                 6
                                                                                    Facility Condition Assessment
                                                                             DeKalb County SD - Chapel Hill Elementary School



The chart below represents the building systems and associated deficiency costs.




Figure 2: System Deficiencies




M▪A▪P▪P▪S ©, Jacobs 2021                    Revision Date - 09/24/2021                                                     7
                                                                                                          Facility Condition Assessment
                                                                                                  DeKalb County SD - Chapel Hill Elementary School


Life Cycle Capital Renewal Forecast
During the facility condition assessment, assessors inspected all major building systems. If an assessor identified a need
for immediate replacement, a deficiency was created with the item's repair costs. The identified deficiency contributes to the
facility's total current repair costs.

However, capital planning scenarios span multiple years, as opposed to being constrained to immediate repairs.
Construction projects may begin several years after the initial facility condition assessment. Therefore, in addition to the
current year repair costs, it is necessary to forecast the facility's future costs using a ten-year life cycle renewal forecast
model.

Life cycle renewal is the projection of future building system costs based upon each individual system’s expected
serviceable life. Building systems and components age over time, eventually break down, reach the end of their useful lives,
and may require replacement. While an item may be in good condition now, it might reach the end of its life before a
planned construction project occurs.

The following tables show ten-year life cycle capital renewal projections. The projections outline costs for major building
systems in which a component is expected to reach the end of its useful life and require capital funding for replacement.



Table 3a: Capital Renewal Forecast (Yrs 1-5)

                                                         Life Cycle Capital Renewal Projections
                                   Year 1           Year 2               Year 3               Year 4                Year 5
System                              2022             2023                 2024                 2025                  2026                 Total 1-5
Site                                           $0                $0                    $0               $24,273                   $0      $24,273

Roofing                                        $0                $0                    $0                   $0               $149,111    $149,111

Exterior                                       $0                $0                    $0                   $0                $68,685     $68,685

Interior                                       $0            $98,647               $13,834               $6,284               $92,744    $211,509

Mechanical                                     $0                $0               $298,033              $42,449               $45,386    $385,867

Electrical                                     $0                $0                    $0               $36,949                   $0      $36,949

Plumbing                                       $0                $0                 $4,055             $383,584               $15,343    $402,982

Fire and Life Safety                           $0                $0                    $0                   $0                    $0            $0

Conveyances                                    $0                $0                    $0                   $0                    $0            $0

Specialties                                    $0                $0                    $0                   $0                    $0            $0

Total                                          $0            $98,647              $315,922             $493,538              $371,268   $1,279,374




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                                       8
                                                                                                                 Facility Condition Assessment
                                                                                                      DeKalb County SD - Chapel Hill Elementary School


Table 3b: Capital Renewal Forecast (Yrs 6-10)

                                                                   Life Cycle Capital Renewal Projections
                                                Year 6            Year 7           Year 8            Year 9           Year 10
System                         Total 1-5         2027              2028             2029              2030             2031               Total 6-10    Total 1-10
Site                            $24,273              $16,739               $0          $181,312                 $0                 $0     $198,051      $222,324

Roofing                        $149,110                  $0                $0          $325,312                 $0                 $0     $325,312      $474,422

Exterior                        $68,685                  $0            $19,335          $12,161                 $0                 $0      $31,496      $100,181

Interior                       $211,509              $39,208               $0           $90,484             $29,798        $426,187       $585,677      $797,186

Mechanical                     $385,867              $78,516               $0           $94,065                 $0          $99,358       $271,940      $657,806

Electrical                      $36,949                  $0                $0           $44,666                 $0                 $0      $44,666       $81,616

Plumbing                       $402,982                  $0                $0           $15,738                 $0              $3,391     $19,129      $422,111

Fire and Life Safety                 $0              $35,964               $0          $919,656                 $0                 $0     $955,620      $955,620

Conveyances                          $0                  $0                $0               $0                  $0                 $0            $0            $0

Specialties                          $0             $156,095               $0               $0                  $0                 $0     $156,095      $156,095

Total                        $1,279,374             $326,522           $19,335       $1,683,394             $29,798        $528,936      $2,587,985    $3,867,359




Figure 3: Ten Year Capital Renewal Forecast




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                                            9
                                                                                              Facility Condition Assessment
                                                                                       DeKalb County SD - Chapel Hill Elementary School

Summary of High Priority Deficiencies


Priority 1 - Mission Critical Concerns                                                           Cost
  Fire Alarm Replacement                                                                       $350,079

                                                                Total for Priority 1          $350,079



Priority 2 - Indirect Impact to Educational Mission                                              Cost
  Built-up Roofing Replacement                                                               $1,655,341

  Aluminum Window Replacement                                                                  $207,197

  Air Cooled Condenser Replacement                                                               $9,376

  Boiler Replacement                                                                            $94,155

  Ductwork Replacement (SF Basis)                                                              $764,301

  Fan Coil (Chilled Water) HVAC Component Replacement                                          $172,111

  Fan Coil Unit Replacement                                                                      $5,191

  Gas Piping Replacement (SF Basis)                                                            $127,512

  Mechanical / HVAC Piping / System Is Beyond Its Useful Life                                  $107,044

  Package Roof Top Unit Replacement                                                             $14,957

  Electrical Transformer Replacement                                                            $26,119

  Panelboard Replacement                                                                       $113,677

  Switchgear Replacement                                                                        $12,829

  Water Heater Replacement                                                                       $2,523

                                                                Total for Priority 2         $3,312,335




M▪A▪P▪P▪S ©, Jacobs 2021                              Revision Date - 09/24/2021                                                    10
                                                                                                                 Facility Condition Assessment
                                                                                                        DeKalb County SD - Chapel Hill Elementary School



Deficiency Summary
(Items below detail the totals referenced in Table 2)

Site Level Deficiencies
Site
Deficiency                                                                            Category                   Qty UoM     Priority   Repair Cost      ID
Asphalt Driveway Replacement                                                          Capital Renewal         20,300 SF         3         $122,728    5184
             Note:    Beyond Useful Life
Asphalt Walks Replacement                                                             Capital Renewal            420 SF         3            $2,287   5186
             Note:    Beyond Useful Life
Concrete Walks Replacement                                                            Capital Renewal          2,000 SF         3           $21,299   5187
             Note:    Cracked
Asphalt Paving Replacement                                                            Capital Renewal             84 CAR        4          $114,576   5182
Asphalt Paving Resurfacing                                                            Deferred                29,400 SF         4          $114,969   5183
                                                                                      Maintenance
             Note:    Beyond Useful Life
Fencing Replacement (Ornamental Fence)                                                Capital Renewal             25 LF         4            $1,845   5181
             Note:    Damaged Trick Tower
Site Drainage Needs Installation Of Drainage Piping                                   Deferred                    40 LF         4            $2,383   5185
                                                                                      Maintenance
             Note:    Connect North Canopy Down Spout To Storm System
                                                                                      Sub Total for System         7 items                $380,086
                                                                        Sub Total for School and Site Level        7 items                $380,086

Building: 2010 - Building 2010
Roofing
Deficiency                                                                            Category                   Qty UoM     Priority   Repair Cost      ID
Built-up Roofing Replacement                                                          Capital Renewal         32,299 SF         2         $839,708    5217
             Note:    Beyond Useful Life
Debris In Gutter Removal                                                              Deferred                   240 LF         3            $1,165   5218
                                                                                      Maintenance
Tapered Insulation Installation To Eliminate Ponding When Re-Roofing                  Deferred                 2,000 SF         3            $8,884   5220
                                                                                      Maintenance
             Note:    Ponding
Splash Block Replacement                                                              Deferred                     6 Ea.        4             $351    5219
                                                                                      Maintenance
             Note:    Crumbling And Eroding
                                                                                      Sub Total for System         4 items                $850,108

Exterior
Deficiency                                                                            Category                   Qty UoM     Priority   Repair Cost      ID
Aluminum Window Replacement                                                           Capital Renewal             72 SF         2            $7,200   5193
             Note:    Beyond Useful Life
Aluminum Window Replacement                                                           Capital Renewal          2,000 SF         2         $199,997    5229
             Note:    Old, Throughout Building
Exterior Painting (Bldg SF)                                                           Capital Renewal          4,845 SF         4            $7,975   5191
Exterior Painting                                                                     Capital Renewal          1,680 SF         5            $2,059   5192
                                                                                                                     Wall
             Note:    Paint Peeling
                                                                                      Sub Total for System         4 items                $217,231

Interior
Deficiency                                                                            Category                   Qty UoM     Priority   Repair Cost      ID
Interior Door Hardware Replacement                                                    Capital Renewal             12 Door       3           $16,749   5199
Interior Door Replacement                                                             Capital Renewal             12 Door       3           $21,161   5198
             Note:    Original Doors Were Not Replaced With Other Doors. 5 Door Frames Need To Be Replaced. Door Replacement Included With 12 Doors To
                      Replace. Corroded And Kitchen
Carpet Flooring Replacement                                                           Capital Renewal          4,845 SF         4           $57,669   5195
             Note:    Beyond Useful Life



M▪A▪P▪P▪S ©, Jacobs 2021                                     Revision Date - 09/24/2021                                                                       11
                                                                                                     Facility Condition Assessment
                                                                                              DeKalb County SD - Chapel Hill Elementary School

Interior
Deficiency                                                                  Category                 Qty UoM     Priority   Repair Cost    ID
Stone/Quarry Flooring Replacement                                           Capital Renewal         4,522 SF        4         $116,221    5196
             Note:      Beyond Useful Life
Toilet Partition Replacement                                                Capital Renewal            6 Stall      4          $11,375    5194
             Note:      Worn Out
Vinyl Composition Tile Replacement                                          Capital Renewal        16,795 SF        4         $134,334    5197
             Note:      Beyond Useful Life
                                                                            Sub Total for System       6 items                $357,508

Mechanical
Deficiency                                                                  Category                 Qty UoM     Priority   Repair Cost    ID
Air Cooled Condenser Replacement                                            Capital Renewal            1 Ea.        2           $9,376    5207
             Note:      Roof
Boiler Replacement                                                          Capital Renewal            1 Ea.        2          $94,155    5205
             Note:      Mech Room
Ductwork Replacement (SF Basis)                                             Capital Renewal        32,299 SF        2         $387,708    5214
             Note:      Throughout
Fan Coil (Chilled Water) HVAC Component Replacement                         Capital Renewal           27 Ea.        2          $86,055    5211
             Note:      Throughout
Fan Coil Unit Replacement                                                   Capital Renewal            1 Ea.        2           $3,339    5209
             Note:      Media Center
Fan Coil Unit Replacement                                                   Capital Renewal            1 Ea.        2           $1,852    5210
             Note:      Stage Storage
Gas Piping Replacement (SF Basis)                                           Capital Renewal        32,299 SF        2          $64,683    5201
             Note:      Throughout
Mechanical / HVAC Piping / System Is Beyond Its Useful Life                 Capital Renewal        32,299 SF        2          $54,300    5213
             Note:      Throughout
Kitchen Exhaust Hood Replacement                                            Capital Renewal            1 Ea.        3          $10,522    5215
             Note:      Kitchen
Kitchen Exhaust Hood Replacement                                            Capital Renewal            1 Ea.        3          $10,522    5216
Replace Water Cooled Condenser                                              Capital Renewal            1 Ea.        3          $47,244    5208
             Note:      Roof
Testing And Balancing                                                       Deferred               32,299 SF        3          $64,683    5212
                                                                            Maintenance
             Note:      Throughout
Existing Controls Are Obsolete                                              Capital Renewal        32,299 SF        4          $81,905    5206
             Note:      Throughout
                                                                            Sub Total for System      13 items                $916,346

Electrical
Deficiency                                                                  Category                 Qty UoM     Priority   Repair Cost    ID
Electrical Transformer Replacement                                          Capital Renewal            1 Ea.        2           $5,565    5222
             Note:      Elec Room
Electrical Transformer Replacement                                          Capital Renewal            2 Ea.        2          $13,703    5223
             Note:      Elec Room
Panelboard Replacement                                                      Capital Renewal            7 Ea.        2          $36,193    5224
             Note:      Elec Room
Panelboard Replacement                                                      Capital Renewal            1 Ea.        2           $8,812    5225
             Note:      Elec Room
Panelboard Replacement                                                      Capital Renewal            3 Ea.        2          $39,179    5226
             Note:      Elec Room
Switchgear Replacement                                                      Capital Renewal            1 Ea.        2          $12,829    5221
             Note:      Old, Main Elec
Canopy Lighting Replacement                                                 Capital Renewal            9 Ea.        3          $17,625    5228
             Note:      Old, Exterior
Interior Power Wiring Replacement                                           Deferred               30,299 SF        3          $33,833    5230
                                                                            Maintenance
             Note:      Old, Throughout Building
                                                                            Sub Total for System       8 items                $167,738

M▪A▪P▪P▪S ©, Jacobs 2021                                      Revision Date - 09/24/2021                                                         12
                                                                                                                    Facility Condition Assessment
                                                                                                            DeKalb County SD - Chapel Hill Elementary School

Plumbing
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Plumbing / Domestic Water Piping System Is Beyond Its Useful Life                         Capital Renewal         32,299 SF        3         $145,440    5202
             Note:    Throughout
Sanitary Sewer Piping Replacement                                                         Capital Renewal         32,299 SF        3          $98,005    5203
             Note:    Throughout
Replace classroom lavatory                                                                Capital Renewal             8 Ea.        4          $19,288    5204
             Note:    Throughout
                                                                                         Sub Total for System         3 items                $262,733

Fire and Life Safety
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Fire Alarm Replacement                                                                    Capital Renewal         32,299 SF        1         $177,585    5227
             Note:    Old, Throughout Building
                                                                                         Sub Total for System         1 items                $177,585

Conveyances
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Platform Lift Needed for Access                                                           ADA Compliance              1 Ea.        3          $26,581    5190
             Note:    None Available
                                                                                         Sub Total for System         1 items                 $26,581

Specialties
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Counter Heights Exceed Maximum ADA Height Requirements (Modify Full)                      ADA Compliance              5 LF         3             $303    5189
             Note:    Non-ADA
Replace Cabinetry In Classes/Labs                                                         Capital Renewal            15 Room       4         $124,129    5200
             Note:    Beyond Useful Life - Cabinets Water Damaged From Ac Mech Unit Condensation Dripping.
                                                                                         Sub Total for System         2 items                $124,432
                                                                    Sub Total for Building 2010 - Building 2010      42 items              $3,100,262

Building: 2011 - Building 2011
Roofing
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Built-up Roofing Replacement                                                              Capital Renewal         16,517 SF        2         $429,408    5236
             Note:    Beyond Useful Life
                                                                                         Sub Total for System         1 items                $429,408

Exterior
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Exterior Painting                                                                         Capital Renewal           893 SF         5           $1,095    5231
                                                                                                                        Wall
             Note:    Paint Peeling
                                                                                         Sub Total for System         1 items                  $1,095

Interior
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Carpet Flooring Replacement                                                               Capital Renewal          1,156 SF        4          $13,760    5232
             Note:    Beyond Useful Life
Stone/Quarry Flooring Replacement                                                         Capital Renewal           826 SF         4          $21,229    5233
             Note:    Beyond Useful Life
Vinyl Composition Tile Replacement                                                        Capital Renewal         12,223 SF        4          $97,765    5234
             Note:    Beyond Useful Life
                                                                                         Sub Total for System         3 items                $132,754

Mechanical
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Ductwork Replacement (SF Basis)                                                           Capital Renewal         16,517 SF        2         $198,265    5245
             Note:    Throughout
Fan Coil (Chilled Water) HVAC Component Replacement                                       Capital Renewal            14 Ea.        2          $44,621    5242
             Note:    Throughout




M▪A▪P▪P▪S ©, Jacobs 2021                                     Revision Date - 09/24/2021                                                                         13
                                                                                                                    Facility Condition Assessment
                                                                                                            DeKalb County SD - Chapel Hill Elementary School

Mechanical
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Gas Piping Replacement (SF Basis)                                                         Capital Renewal         16,517 SF        2          $33,078    5238
             Note:      Throughout
Mechanical / HVAC Piping / System Is Beyond Its Useful Life                               Capital Renewal         16,517 SF        2          $27,768    5244
             Note:      Throughout
Package Roof Top Unit Replacement                                                         Capital Renewal             1 Ea.        2          $14,957    5246
             Note:      Roof
Testing And Balancing                                                                     Deferred                16,517 SF        3          $33,078    5243
                                                                                          Maintenance
             Note:      Throughout
Existing Controls Are Obsolete                                                            Capital Renewal         16,517 SF        4          $41,885    5241
             Note:      Throughout
                                                                                         Sub Total for System         7 items                $393,652

Electrical
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Electrical Transformer Replacement                                                        Capital Renewal             1 Ea.        2           $6,851    5247
             Note:      Old, Elec Room
Panelboard Replacement                                                                    Capital Renewal             4 Ea.        2          $20,682    5248
             Note:      Old, Elec Room
Panelboard Replacement                                                                    Capital Renewal             1 Ea.        2           $8,812    5249
             Note:      Old, Elec Room
Canopy Lighting Replacement                                                               Capital Renewal             1 Ea.        3           $1,958    5251
Interior Power Wiring Replacement                                                         Deferred                16,517 SF        3          $18,443    5253
                                                                                          Maintenance
             Note:      Old, Throughout Building
1 X 4 Interior Fluorescent Light Fixture Replacement                                      Capital Renewal             1 Ea.        4             $267    5252
             Note:      200Sf Old, Elec. Jan
                                                                                         Sub Total for System         6 items                 $57,014

Plumbing
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Water Heater Replacement                                                                  Capital Renewal             1 Ea.        2           $2,523    5237
             Note:      Janitor Closet 117.3
Plumbing / Domestic Water Piping System Is Beyond Its Useful Life                         Capital Renewal         16,517 SF        3          $74,375    5239
             Note:      Throughout
Sanitary Sewer Piping Replacement                                                         Capital Renewal         16,517 SF        3          $50,118    5240
             Note:      Throughout
                                                                                         Sub Total for System         3 items                $127,016

Fire and Life Safety
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Fire Alarm Replacement                                                                    Capital Renewal         16,517 SF        1          $90,813    5250
             Note:      Old, Throughout Building
                                                                                         Sub Total for System         1 items                 $90,813

Specialties
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Replace Cabinetry In Classes/Labs                                                         Capital Renewal            11 Room       4          $91,028    5235
                                                                                         Sub Total for System         1 items                 $91,028
                                                                    Sub Total for Building 2011 - Building 2011      23 items              $1,322,779

Building: 2012 - Building 2012
Roofing
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Built-up Roofing Replacement                                                              Capital Renewal          5,523 SF        2         $143,587    5258
             Note:      Beyond Useful Life
                                                                                         Sub Total for System         1 items                $143,587




M▪A▪P▪P▪S ©, Jacobs 2021                                      Revision Date - 09/24/2021                                                                        14
                                                                                                                   Facility Condition Assessment
                                                                                                            DeKalb County SD - Chapel Hill Elementary School

Exterior
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Exterior Painting (Bldg SF)                                                               Capital Renewal          828 SF         4           $1,363    5254
Exterior Painting                                                                         Capital Renewal         1,008 SF        5           $1,236    5255
                                                                                                                        Wall
             Note:      Paint Peeling
                                                                                         Sub Total for System        2 items                  $2,599

Interior
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Vinyl Composition Tile Replacement                                                        Capital Renewal         4,750 SF        4          $37,993    5256
             Note:      Beyond Useful Life
                                                                                         Sub Total for System        1 items                 $37,993

Mechanical
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Ductwork Replacement (SF Basis)                                                           Capital Renewal         5,523 SF        2          $66,297    5266
             Note:      Throughout
Fan Coil (Chilled Water) HVAC Component Replacement                                       Capital Renewal            4 Ea.        2          $12,749    5263
             Note:      Throughout
Gas Piping Replacement (SF Basis)                                                         Capital Renewal         5,523 SF        2          $11,061    5259
             Note:      Throughout
Mechanical / HVAC Piping / System Is Beyond Its Useful Life                               Capital Renewal         5,523 SF        2           $9,285    5265
             Note:      Throughout
Testing And Balancing                                                                     Deferred                5,523 SF        3          $11,061    5264
                                                                                          Maintenance
             Note:      Throughout
Existing Controls Are Obsolete                                                            Capital Renewal         5,523 SF        4          $14,005    5262
             Note:      Throughout
                                                                                         Sub Total for System        6 items                $124,457

Electrical
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Interior Power Wiring Replacement                                                         Deferred                5,523 SF        3           $6,167    5268
                                                                                          Maintenance
             Note:      Throughout Building, Old
                                                                                         Sub Total for System        1 items                  $6,167

Plumbing
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Plumbing / Domestic Water Piping System Is Beyond Its Useful Life                         Capital Renewal         5,523 SF        3          $24,870    5260
             Note:      Throughout
Sanitary Sewer Piping Replacement                                                         Capital Renewal         5,523 SF        3          $16,758    5261
             Note:      Throughout
                                                                                         Sub Total for System        2 items                 $41,628

Fire and Life Safety
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Fire Alarm Replacement                                                                    Capital Renewal         5,523 SF        1          $30,366    5267
             Note:      Old, Throughout Building
                                                                                         Sub Total for System        1 items                 $30,366

Specialties
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Replace Cabinetry In Classes/Labs                                                         Capital Renewal            6 Room       4          $49,651    5257
                                                                                         Sub Total for System        1 items                 $49,651
                                                                    Sub Total for Building 2012 - Building 2012     15 items                $436,448

Building: 2013 - Building 2013
Roofing
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Built-up Roofing Replacement                                                              Capital Renewal         9,333 SF        2         $242,639    5272




M▪A▪P▪P▪S ©, Jacobs 2021                                      Revision Date - 09/24/2021                                                                       15
                                                                                                                   Facility Condition Assessment
                                                                                                            DeKalb County SD - Chapel Hill Elementary School

Roofing
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
             Note:      Beyond Useful Life
                                                                                         Sub Total for System        1 items                $242,639

Exterior
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Exterior Painting                                                                         Capital Renewal          693 SF         5             $850    5269
                                                                                                                       Wall
             Note:      Paint Peeling
                                                                                         Sub Total for System        1 items                    $850

Interior
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Vinyl Composition Tile Replacement                                                        Capital Renewal          600 SF         4           $4,799    5270
             Note:      Cracked
                                                                                         Sub Total for System        1 items                  $4,799

Mechanical
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Ductwork Replacement (SF Basis)                                                           Capital Renewal         9,333 SF        2         $112,031    5280
             Note:      Throughout
Fan Coil (Chilled Water) HVAC Component Replacement                                       Capital Renewal            9 Ea.        2          $28,685    5277
             Note:      Throughout
Gas Piping Replacement (SF Basis)                                                         Capital Renewal         9,333 SF        2          $18,691    5273
             Note:      Throughout
Mechanical / HVAC Piping / System Is Beyond Its Useful Life                               Capital Renewal         9,333 SF        2          $15,690    5279
             Note:      Throughout
Testing And Balancing                                                                     Deferred                9,333 SF        3          $18,691    5278
                                                                                          Maintenance
             Note:      Throughout
Existing Controls Are Obsolete                                                            Capital Renewal         9,333 SF        4          $23,667    5276
             Note:      Throughout
                                                                                         Sub Total for System        6 items                $217,455

Electrical
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Interior Power Wiring Replacement                                                         Deferred                9,333 SF        3          $10,421    5282
                                                                                          Maintenance
             Note:      Old, Throughout Building
                                                                                         Sub Total for System        1 items                 $10,421

Plumbing
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Plumbing / Domestic Water Piping System Is Beyond Its Useful Life                         Capital Renewal         9,333 SF        3          $42,026    5274
             Note:      Throughout
Sanitary Sewer Piping Replacement                                                         Capital Renewal         9,333 SF        3          $28,319    5275
             Note:      Throughout
                                                                                         Sub Total for System        2 items                 $70,345

Fire and Life Safety
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Fire Alarm Replacement                                                                    Capital Renewal         9,333 SF        1          $51,314    5281
             Note:      Old, Throughout Building
                                                                                         Sub Total for System        1 items                 $51,314

Specialties
Deficiency                                                                                Category                 Qty UoM     Priority   Repair Cost    ID
Replace Cabinetry In Classes/Labs                                                         Capital Renewal            9 Room       4          $74,477    5271
                                                                                         Sub Total for System        1 items                 $74,477
                                                                    Sub Total for Building 2013 - Building 2013     14 items                $672,300




M▪A▪P▪P▪S ©, Jacobs 2021                                      Revision Date - 09/24/2021                                                                       16
                                                                                      Facility Condition Assessment
                                                                               DeKalb County SD - Chapel Hill Elementary School

Building: 2020 - Building 2020
Roofing
Deficiency                                                   Category                 Qty UoM     Priority   Repair Cost    ID
Debris In Gutter Removal                                     Deferred                 180 LF         3             $874    5284
                                                             Maintenance
Roof Cleaning                                                Deferred                6,848 SF        4           $1,496    5283
                                                             Maintenance
             Note:   Weathered
                                                            Sub Total for System        2 items                  $2,370

Electrical
Deficiency                                                   Category                 Qty UoM     Priority   Repair Cost    ID
Canopy Lighting Replacement                                  Capital Renewal            9 Ea.        3          $17,625    5290
             Note:   Old, Exterior
                                                            Sub Total for System        1 items                 $17,625
                                       Sub Total for Building 2020 - Building 2020      3 items                 $19,995
                                                                Total for Campus      104 items              $5,931,870




M▪A▪P▪P▪S ©, Jacobs 2021             Revision Date - 09/24/2021                                                                   17
                                                                                                                  Facility Condition Assessment
                                                                                                         DeKalb County SD - Chapel Hill Elementary School



Life Cycle Summary Yrs 1-10
(Items below detail the totals referenced in Tables 3a & 3b)

Site Level Life Cycle Items
Site
Uniformat Description            LC Type Description                                        Priority       Qty UoM       Repair Cost Remaining Life
Fences and Gates                 Fencing - Chain Link (4 Ft)                                   3           320 LF           $15,982        4
Fences and Gates                 Fencing - Chain Link (8-10 Ft)                                3           100 LF            $8,291        4
Fences and Gates                 Fencing - Ornamental, Iron                                    3           190 LF           $16,739        6
Pedestrian Pavement              Sidewalks - Concrete                                          3         13,440 SF         $181,311        8
                                                                                 Sub Total for System        4 items       $222,324

Roofing
Uniformat Description            LC Type Description                                        Priority       Qty UoM       Repair Cost Remaining Life
Canopy Roofing                   Aluminum panels                                               4          2,700 SF         $149,110        5
                                                                                 Sub Total for System        1 items       $149,110

Electrical
Uniformat Description            LC Type Description                                        Priority       Qty UoM       Repair Cost Remaining Life
Parking Lot Lighting             Pole Lighting                                                 3             6 Ea.          $36,949        4
                                                                                 Sub Total for System        1 items        $36,949
                                                                              Sub Total for Building -       6 items       $408,383

Building: 2010 - Building 2010
Exterior
Uniformat Description            LC Type Description                                        Priority       Qty UoM       Repair Cost Remaining Life
Exterior Entrance Doors          Steel - Insulated and Painted                                 3             7 Door         $28,282        5
Exterior Wall Veneer             Exterior Painting - Bldg SF basis                             2          4,845 SF           $9,808        7
                                                                                 Sub Total for System        2 items        $38,090

Interior
Uniformat Description            LC Type Description                                        Priority       Qty UoM       Repair Cost Remaining Life
Wall Painting and Coating        Painting/Staining (Bldg SF)                                   5          1,292 SF           $5,774        2
Compartments and Cubicles        Toilet Partitions                                             4            12 Stall        $24,135        2
Suspended Plaster and            Painted ceilings                                              5          3,553 SF           $7,602        3
Carpeting                        Carpet                                                        4          4,845 SF          $73,053        8
Wall Painting and Coating        Painting/Staining (Bldg SF)                                   5          1,292 SF           $7,102        9
Acoustical Suspended Ceilings    Ceilings - Acoustical Tiles                                   4         27,131 SF         $200,473        10
                                                                                 Sub Total for System        6 items       $318,141

Mechanical
Uniformat Description            LC Type Description                                        Priority       Qty UoM       Repair Cost Remaining Life
Central Cooling                  Chiller - Outdoor Air Cooled (300 Tons)                       2             1 Ea.         $283,258        3
Facility Hydronic Distribution   Pump- 25HP (Ea.)                                              4             1 Ea.          $14,775        3
Decentralized Cooling            Condenser - Outside Air Cooled (3 Tons)                       2             1 Ea.           $6,796        4
Decentralized Cooling            Fan Coil - DX Cool w/Electric Heat (3 Ton)                    2             1 Ea.           $2,084        4
Decentralized Cooling            Thru-Wall AC (2 Ton)                                          3             1 Ea.           $5,812        4
HVAC Air Distribution            Roof Top Unit - DX Gas (10 Ton)                               2             1 Ea.          $28,865        8
Exhaust Air                      Roof Exhaust Fan - Large                                      3             7 Ea.          $71,077        10
Exhaust Air                      Kitchen Exhaust Hoods                                         3             1 Ea.          $14,141        10
Exhaust Air                      Kitchen Exhaust Hoods                                         3             1 Ea.          $14,141        10
                                                                                 Sub Total for System        9 items       $440,948

Plumbing
Uniformat Description            LC Type Description                                        Priority       Qty UoM       Repair Cost Remaining Life
Domestic Water Equipment         Water Heater - Electric - 40 gallon                           2             1 Ea.           $2,757        3
Plumbing Fixtures                Restroom Lavatory                                             3            12 Ea.          $34,491        4
Plumbing Fixtures                Sink - Service / Mop Sink                                     5             2 Ea.           $1,685        4
Plumbing Fixtures                Toilets                                                       3            20 Ea.         $107,074        4
Plumbing Fixtures                Urinals                                                       3             4 Ea.           $5,732        4
Plumbing Fixtures                Sink - Service / Mop Sink                                     5             1 Ea.             $842        4
Plumbing Fixtures                Sink - Service / Mop Sink                                     5             1 Ea.             $842        4
Plumbing Fixtures                Sink - Service / Mop Sink                                     5             1 Ea.             $842        4

M▪A▪P▪P▪S ©, Jacobs 2021                                         Revision Date - 09/24/2021                                                           18
                                                                                                                                   Facility Condition Assessment
                                                                                                                          DeKalb County SD - Chapel Hill Elementary School

Plumbing
Uniformat Description                 LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Domestic Water Equipment              Water Heater - Gas - 100 Gallon                                          2              1 Ea.           $6,958        5
Plumbing Fixtures                     Refrigerated Drinking Fountain                                           4              6 Ea.          $15,738        8
                                                                                                 Sub Total for System        10 items       $176,961

Fire and Life Safety
Uniformat Description                 LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Security System Component             Security Alarm System                                                    1          32,299 SF         $429,559        8
                                Note: Throughout bldg
                                                                                                 Sub Total for System         1 items       $429,559
                                                                            Sub Total for Building 2010 - Building 2010      28 items      $1,403,699

Building: 2011 - Building 2011
Exterior
Uniformat Description                 LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Exterior Entrance Doors               Steel - Insulated and Painted                                            3              3 Door         $12,121        5
Exterior Wall Veneer                  Exterior Painting - Bldg SF basis                                        2           2,478 SF           $5,017        7
                                                                                                 Sub Total for System         2 items        $17,138

Interior
Uniformat Description                 LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Wall Painting and Coating             Painting/Staining (Bldg SF)                                              5           4,129 SF          $18,454        2
Compartments and Cubicles             Toilet Partitions                                                        4             15 Stall        $30,170        2
Suspended Plaster and                 Painted ceilings                                                         5            826 SF            $1,767        3
Carpeting                             Carpet                                                                   4           1,156 SF          $17,431        8
Wall Painting and Coating             Painting/Staining (Bldg SF)                                              5           4,129 SF          $22,697        9
Acoustical Suspended Ceilings         Ceilings - Acoustical Tiles                                              4          15,691 SF         $115,942        10
                                                                                                 Sub Total for System         6 items       $206,461

Mechanical
Uniformat Description                 LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Exhaust Air                           Roof Exhaust Fan - Large                                                 3              4 Ea.          $35,036        5
                                                                                                 Sub Total for System         1 items        $35,036

Electrical
Uniformat Description                 LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Audio-Video Systems                   PA Communications No Head Unit (Bldg SF)                                 2          16,517 SF          $13,924        8
                                Note: Throughout bldg
                                                                                                 Sub Total for System         1 items        $13,924

Plumbing
Uniformat Description                 LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Plumbing Fixtures                     Restroom Lavatory                                                        3              8 Ea.          $22,994        4
Plumbing Fixtures                     Sink - Service / Mop Sink                                                5              1 Ea.             $842        4
Plumbing Fixtures                     Toilets                                                                  3             16 Ea.          $85,659        4
Plumbing Fixtures                     Urinals                                                                  3              6 Ea.           $8,598        4
Plumbing Fixtures                     Refrigerated Drinking Fountain                                           4              2 Ea.           $4,661        4
Plumbing Fixtures                     Classroom Lavatory                                                       4              3 Ea.           $8,385        5
Domestic Water Equipment              Water Heater - Electric - 40 gallon                                      2              1 Ea.           $3,391        10
                                                                                                 Sub Total for System         7 items       $134,529

Fire and Life Safety
Uniformat Description                 LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Security System Component             Security Alarm System                                                    1          16,517 SF         $219,667        8
                                Note: Throughout bldg
                                                                                                 Sub Total for System         1 items       $219,667

Specialties
Uniformat Description                 LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Casework                              Lockers                                                                  4            147 Ea.          $87,916        6
                                                                                                 Sub Total for System         1 items        $87,916
                                                                            Sub Total for Building 2011 - Building 2011      19 items       $714,670




M▪A▪P▪P▪S ©, Jacobs 2021                                              Revision Date - 09/24/2021                                                                       19
                                                                                                                                 Facility Condition Assessment
                                                                                                                        DeKalb County SD - Chapel Hill Elementary School

Building: 2012 - Building 2012
Exterior
Uniformat Description                 LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Exterior Wall Veneer                  Exterior Painting - Bldg SF basis                                      2            828 SF            $1,676        7
                                                                                               Sub Total for System         1 items         $1,676

Interior
Uniformat Description                 LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Acoustical Suspended Ceilings         Ceilings - Acoustical Tiles                                            4           5,523 SF          $40,809        10
                                                                                               Sub Total for System         1 items        $40,809

Electrical
Uniformat Description                 LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Audio-Video Systems                   PA Communications No Head Unit (Bldg SF)                               2           5,523 SF           $4,657        8
                                Note: Throughout bldg
                                                                                               Sub Total for System         1 items         $4,657

Fire and Life Safety
Uniformat Description                 LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Security System Component             Security Alarm System                                                  1           5,523 SF          $73,452        8
                                Note: Throughout bldg
                                                                                               Sub Total for System         1 items        $73,452

Specialties
Uniformat Description                 LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Casework                              Lockers                                                                4            114 Ea.          $68,179        6
                                                                                               Sub Total for System         1 items        $68,179
                                                                          Sub Total for Building 2012 - Building 2012       5 items       $188,774

Building: 2013 - Building 2013
Exterior
Uniformat Description                 LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Exterior Entrance Doors               Steel - Insulated and Painted                                          3              2 Door          $8,080        5
Exterior Wall Veneer                  Exterior Painting - Bldg SF basis                                      2           1,400 SF           $2,834        7
                                                                                               Sub Total for System         2 items        $10,914

Interior
Uniformat Description                 LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Compartments and Cubicles             Toilet Partitions                                                      4             10 Stall        $20,113        2
Resilient Flooring                    Vinyl Composition Tile Flooring                                        4           8,306 SF          $77,016        5
Tile Flooring                         Quarry Tile                                                            4            840 SF           $25,778        6
Acoustical Suspended Ceilings         Ceilings - Acoustical Tiles                                            4           9,333 SF          $68,962        10
                                                                                               Sub Total for System         4 items       $191,869

Mechanical
Uniformat Description                 LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Exhaust Air                           Roof Exhaust Fan - Large                                               3              1 Ea.           $8,758        5
                                                                                               Sub Total for System         1 items         $8,758

Electrical
Uniformat Description                 LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Audio-Video Systems                   PA Communications No Head Unit (Bldg SF)                               2           9,333 SF           $7,868        8
                                Note: Throughout bldg
                                                                                               Sub Total for System         1 items         $7,868

Plumbing
Uniformat Description                 LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Plumbing Fixtures                     Restroom Lavatory                                                      3              5 Ea.          $14,372        4
Plumbing Fixtures                     Sink - Service / Mop Sink                                              5              1 Ea.             $842        4
Plumbing Fixtures                     Toilets                                                                3              9 Ea.          $48,183        4
Plumbing Fixtures                     Urinals                                                                3              4 Ea.           $5,732        4
Plumbing Fixtures                     Refrigerated Drinking Fountain                                         4              2 Ea.           $4,661        4
                                                                                               Sub Total for System         5 items        $73,789

Fire and Life Safety
Uniformat Description                 LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Security System Component             Security Alarm System                                                  1           9,333 SF         $124,123        8



M▪A▪P▪P▪S ©, Jacobs 2021                                              Revision Date - 09/24/2021                                                                     20
                                                                                                                                    Facility Condition Assessment
                                                                                                                           DeKalb County SD - Chapel Hill Elementary School

Fire and Life Safety
Uniformat Description                    LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
                                  Note: Throughout bldg
                                                                                                  Sub Total for System         1 items       $124,123
                                                                             Sub Total for Building 2013 - Building 2013      14 items       $417,322

Building: 2020 - Building 2020
Roofing
Uniformat Description                    LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Steep Slope Roofing                      Metal (Architectural - Standing Seam)                                  2           6,848 SF         $325,312        8
                                                                                                  Sub Total for System         1 items       $325,312

Exterior
Uniformat Description                    LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Exterior Entrance Doors                  Steel - Insulated and Painted                                          3              5 Door         $20,202        5
Exterior Operating Windows               Aluminum - Windows per SF                                              2             96 SF           $12,161        8
                                                                                                  Sub Total for System         2 items        $32,363

Interior
Uniformat Description                    LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                            4            548 SF            $3,292        3
Suspended Plaster and                    Painted ceilings                                                       5            548 SF            $1,173        3
Interior Door Supplementary Components   Door Hardware                                                          3              4 Door          $6,284        4
Compartments and Cubicles                Toilet Partitions                                                      4              6 Stall        $13,187        5
Resilient Flooring                       Vinyl Composition Tile Flooring                                        4            274 SF            $2,541        5
Acoustical Suspended Ceilings            Ceilings - Acoustical Grid System                                      4            548 SF            $2,561        6
Tile Flooring                            Ceramic Tile                                                           4            548 SF           $10,868        6
                                                                                                  Sub Total for System         7 items        $39,906

Mechanical
Uniformat Description                    LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Decentralized Heating Equipment          Unit Heater Gas (200 MBH)                                              3              4 Ea.          $21,944        4
Decentralized Cooling                    Thru-Wall AC (2 Ton)                                                   3              1 Ea.           $5,812        4
Exhaust Air                              Interior Ceiling Exhaust Fan                                           3              3 Ea.           $1,592        5
HVAC Air Distribution                    Ductwork (Bldg.SF)                                                     3           5,478 SF          $78,516        6
Decentralized Heating Equipment          Radiant Heater - Radiant Panels - Ceiling                              3              2 Ea.           $9,430        8
HVAC Air Distribution                    Roof Top Unit - DX Gas (20 Ton)                                        2              1 Ea.          $55,771        8
                                                                                                  Sub Total for System         6 items       $173,065

Electrical
Uniformat Description                    LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Power Distribution                       Panelboard - 120/208 225A                                              3              1 Ea.           $6,549        8
                                  Note: Elec room
Audio-Video Systems                      PA Communications No Head Unit (Bldg SF)                               2           5,478 SF           $4,619        8
                                  Note: Gym
Electrical Service                       Transformer (45 KVA)                                                   2              1 Ea.           $7,050        8
                                                                                                  Sub Total for System         3 items        $18,217

Plumbing
Uniformat Description                    LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Domestic Water Equipment                 Water Heater - Electric - 5 to 10 gallon                               2              1 Ea.           $1,298        3
Plumbing Fixtures                        Restroom Lavatory                                                      3              2 Ea.           $5,749        4
Plumbing Fixtures                        Sink - Service / Mop Sink                                              5              1 Ea.             $842        4
Plumbing Fixtures                        Toilets                                                                3              4 Ea.          $21,415        4
Plumbing Fixtures                        Urinals                                                                3              2 Ea.           $2,866        4
Plumbing Fixtures                        Refrigerated Drinking Fountain                                         4              2 Ea.           $4,661        4
                                                                                                  Sub Total for System         6 items        $36,830

Fire and Life Safety
Uniformat Description                    LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Fire Detection and Alarm                 Fire Alarm                                                             1           5,478 SF          $35,964        6
                                  Note: Gym
Security System Component                Security Alarm System                                                  1           5,478 SF          $72,854        8




M▪A▪P▪P▪S ©, Jacobs 2021                                                 Revision Date - 09/24/2021                                                                     21
                                                                                                              Facility Condition Assessment
                                                                                                      DeKalb County SD - Chapel Hill Elementary School

Fire and Life Safety
Uniformat Description           LC Type Description                                     Priority        Qty UoM       Repair Cost Remaining Life
                           Note: Gym
                                                                             Sub Total for System         2 items       $108,818
                                                        Sub Total for Building 2020 - Building 2020      27 items       $734,511

                                                          Total for: Chapel Hill Elementary School       99 items      $3,867,359




M▪A▪P▪P▪S ©, Jacobs 2021                              Revision Date - 09/24/2021                                                                   22
                                                                            Facility Condition Assessment
                                                                     DeKalb County SD - Chapel Hill Elementary School



 Supporting Photos




Replace Boiler In Mechanical Room            Remove Compressor When Controls Are Replaced




Replace Kitchen Hood                         Replace Rooftop Unit




Replace Panels And Transformers              Replace Exterior Transformer




M▪A▪P▪P▪S ©, Jacobs 2021            Revision Date - 09/24/2021                                                    23
                                                                                          Facility Condition Assessment
                                                                                  DeKalb County SD - Chapel Hill Elementary School




Damaged Concrete Pad At Trash Compactor Needs             School Marquee Sign Brick Base Is Damaged And Needs
Replacement/Repair                                        Repair




Roof Needs Cleaning                                       Stage Is Not ADA Accessible




Cabinetry Beyond Useful Life Needs Replacement            Principal Expressed Concern For Student Safety Due To The
                                                          Lack Of Padding At The Gym End Walls




M▪A▪P▪P▪S ©, Jacobs 2021                         Revision Date - 09/24/2021                                                    24
 Revision Date - 09/24/2021




FACILITY CONDITION ASSESSMENT
                        Early Learning Academy | 2021
                                                                                                                            Facility Condition Assessment
                                                                                                                        DeKalb County SD - Early Learning Academy


 Executive Summary
 Early Learning Academy is located at 797 Fayetteville Rd in Atlanta, GA. It comprises 68,419 gross square feet. At the
 time of the assessment the oldest building was 62 years old.
 The findings contained within this report are the result of an assessment of building systems performed by building
 professionals experienced in disciplines including architecture, mechanical, plumbing and electrical. Only those systems
 that were identified as having either an associated deficiency or life cycle event within a 10-year window is contained within
 this report. The full list of each school's systems that are present along with the associated priorities can be found in the flat
 file data grids submitted to Dekalb County. The projected replacement year of those assets within each system is also
 included within this table.The total current deficiencies for this site, in 2020 construction cost dollars, are estimated at
 $5,384,865. A ten-year need was developed to provide an understanding of the current need as well as the projected
 needs in the near future. For Early Learning Academy the ten-year need is $9,578,381.
 For planning purposes, the total current deficiencies and the first five years of projected life cycle needs were combined to
 calculate a Facility Condition Index (FCI). A 5-year FCI was calculated by dividing the 5-year need by the total replacement
 cost. Costs associated with new construction are not included in the FCI calculation. After the 5-year FCI was calculated,
 this value was subtracted from 100 to calculate the FCA Score in a similar fashion to report cards.
 The Early Learning Academy facility has a FCA score of 50.35% which is considered "Poor".

Summary of Findings
The table below summarizes the condition findings at Early Learning Academy.
Table 1: Facility Condition by Building


                                                                                                         Total 5 Yr Need      Total 10 Yr Need
                                                          Current        5-Year Life   Yrs 6-10 Life    (Yr 1-5 + Current    (Yr 1-10 + Current    Replacement      FCA
Number          Building Name                            Deficiencies    Cycle Cost     Cycle Cost             Defs)                Defs)              Cost         Score
Exterior Site
                Exterior Site                                   $3,372      $685,547         $158,429            $688,919               $847,349
Permanent Building(s)
2010            Building 2010                              $2,988,124     $1,150,401         $349,232          $4,138,525             $4,487,757       $7,844,624   47.24%
2011            Building 2011                              $1,562,516       $272,227         $556,683          $1,834,743             $2,391,427       $4,588,015   60.01%
2012            Building 2012                                $667,458       $120,976         $629,976            $788,434             $1,418,409       $1,980,850   60.20%
2020            Building 2020                                $163,395       $164,777         $105,268            $328,172               $433,440       $1,254,462   73.84%
                Sub Total for Permanent Building(s):       $5,381,493     $1,708,382      $1,641,159           $7,089,874            $8,731,033      $15,667,951
                                       Total for Site:     $5,384,865     $2,393,929       $1,799,588          $7,778,793             $9,578,381      $15,667,951   50.35%

Note 1: Sitework improvements are proportionally incorporated into the building CRV and used to calulate the overall FCA Score.
Note 2: Aerial map including building number, gross SF, and year built of each building on the site is found on Page 3.




 M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                                          2
                                                         Facility Condition Assessment
                                                        DeKalb County SD - Early Learning Academy


Aerial Images




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                          3
                                                                                         Facility Condition Assessment
                                                                                        DeKalb County SD - Early Learning Academy


Approach and Methodology
The facility condition assessment includes a visual assessment of building systems that are readily available during a
facility walk-through. The standard process does not reflect invasive, destructive assessment methods that would
require special equipment, testing or scheduled power outages. The assessment was accomplished with a view
toward identifying significant maintenance and repair deficiencies that need correction. For the purposes of this
assessment, deficient conditions captured were limited to those items that did not qualify as routine maintenance
repairs. Copies of previous reports and other documentation that were relevant to the inspection were utilized if made
available in the process. Additionally, feedback from appropriate personnel to provide background information relative
to specific building operations, function, equipment conditions, past improvements and planned upgrades were
incorporated into the results if made available to the teams while on site. Two components of the facility condition
assessment are combined to total the cost for facility need. The two components of the facility condition assessment
are current deficiencies and life cycle forecast.

Current Deficiencies: Deficiencies are items in need of repair or replacement as a result of being broken, obsolete,
deferred maintenance, or beyond useful life. The existing deficiencies that currently require correction are identified
and assigned a priority. An example of a current deficiency might include a broken lighting fixture or an inoperable
roof top air conditioning unit.

Life Cycle Forecast: Life cycle analysis evaluates the ages of a building's systems to forecast system replacement as
they reach the end of serviceable life. Estimated Useful Lives were determined based on a combination of our
(Jacobs) professional experience, RS Means, and from industry standard tables (BOMA, ASHRAE). An example of a
life cycle system replacement is a roof with a 20-year life that has been in place for 15 years and may require
replacement in five years.

All members of the survey team recorded existing conditions, identified problems and deficiencies, and documented
corrective action and quantities. The team took digital photos at each site to better identify significant deficiencies.

Facility Deficiency Priority Levels
Deficiencies were ranked according to five priority levels, with Priority 1 items being the most critical to address:

Priority 1 – Mission Critical Concerns: Deficiencies or conditions that may directly affect the site’s ability to remain
open or deliver the educational curriculum. These deficiencies typically relate to building safety, code compliance,
severely damaged or failing building components, and other items that require near-term correction. An example of a
Priority 1 deficiency is a fire alarm system replacement.

Priority 2 – Indirect Impact to Educational Mission: Items that may progress to a Priority 1 item if not addressed in the
near term. Examples of Priority 2 deficiencies include inadequate roofing that could cause deterioration of integral
building systems, and conditions affecting building envelopes, such as roof and window replacements.

Priority 3 – Short-Term Conditions: Deficiencies that are necessary to the site's mission but may not require
immediate attention. These items should be considered necessary improvements required to maximize facility
efficiency and usefulness. Examples of Priority 3 items include site improvements and plumbing deficiencies.

Priority 4 – Long-Term Requirements: Items or systems that may be considered improvements to the instructional
environment. The improvements may be aesthetic or provide greater functionality. Examples include cabinets,
finishes, paving, removal of abandoned equipment, and educational accommodations associated with special
programs.

Priority 5 – Enhancements: Deficiencies aesthetic in nature or considered enhancements. Typical deficiencies in this
priority include repainting, replacing carpet, improved signage, or other improvements to the facility environment.




M▪A▪P▪P▪S ©, Jacobs 2021                      Revision Date - 09/24/2021                                                       4
                                                                                         Facility Condition Assessment
                                                                                        DeKalb County SD - Early Learning Academy


Facility Condition Assessment(FCA) Score
Facility Condition Assessment (FCA) Scores are assigned after the Facility Condition Index (FCI) is calculated.
The Facility Condition Index (FCI) is used throughout the facility condition assessment industry as a general
indicator of a building’s health. Since 1991, the facility management industry has used an index called the FCI
to benchmark the relative condition of a group of sites. The FCI is derived by dividing the total repair cost,
including site-related repairs, by the total replacement cost of all buildings. It should be noted that costs in the
New Construction category are not included in the FCI calculation. In an effort to match the report card metrics,
the FCI is subtracted from 100 to assign the FCA Score. A facility with a lower FCA Score has more need, or
higher priority, than a facility with a higher FCA Score.




The replacement value represents the estimated cost of replacing the current building with another building of
like size, based on 2021 estimated cost of construction in the DeKalb County area. The estimated replacement
cost for this facility is $15,667,951. For planning purposes, the total 5-year need at the Early Learning Academy
is $7,778,793 (Life Cycle Years 1-5 plus the current FCI deficiency cost).

The Early Learning Academy facility has an FCA Score of 50.35%. which is considered "Poor".




                              Figure 1: 5-Year FCI




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                5
                                                                                                                     Facility Condition Assessment
                                                                                                                    DeKalb County SD - Early Learning Academy


The following table summarizes this site's current deficiencies by building system and priority.

Table 2: System by Priority (Site & Permanent Buildings)

                                                                                 Priority

                  System                     1                2                     3              4                      5             Total             % of Total
Site                                                  $0               $0                   $426           $2,946               $0               $3,372        0.06 %

Roofing                                               $0          $280,292               $12,208           $4,998              $363         $297,861           5.53 %

Structural                                            $0               $0                    $0               $0                $0                  $0         0.00 %

Exterior                                              $0             $182                $14,390              $0                $0              $14,572        0.27 %

Interior                                              $0               $0               $419,034       $167,856                 $0          $586,890          10.90 %

Mechanical                                            $0      $1,401,022                $119,461       $176,603                 $0        $1,697,086          31.52 %

Electrical                                          $607           $49,854          $1,389,538                $0                $0        $1,439,999          26.74 %

Plumbing                                              $0            $6,023              $429,818        $33,130                 $0          $468,971           8.71 %

Fire and Life Safety                             $410,643              $0                    $0               $0                $0          $410,643           7.63 %

Conveyances                                           $0               $0                $26,581              $0                $0              $26,581        0.49 %

Specialties                                           $0               $0                   $303       $438,588                 $0          $438,891           8.15 %

Total:                                           $411,250     $1,737,372            $2,411,758         $824,122                $363       $5,384,865




The building systems at the site with the most need include:
                                                                             Mechanical                -       $1,697,086
                                                                             Electrical                -       $1,439,999
                                                                             Interior                  -            $586,890




M▪A▪P▪P▪S ©, Jacobs 2021                                    Revision Date - 09/24/2021                                                                                 6
                                                                                    Facility Condition Assessment
                                                                                   DeKalb County SD - Early Learning Academy



The chart below represents the building systems and associated deficiency costs.




Figure 2: System Deficiencies




M▪A▪P▪P▪S ©, Jacobs 2021                    Revision Date - 09/24/2021                                                    7
                                                                                                          Facility Condition Assessment
                                                                                                        DeKalb County SD - Early Learning Academy


Life Cycle Capital Renewal Forecast
During the facility condition assessment, assessors inspected all major building systems. If an assessor identified a need
for immediate replacement, a deficiency was created with the item's repair costs. The identified deficiency contributes to the
facility's total current repair costs.

However, capital planning scenarios span multiple years, as opposed to being constrained to immediate repairs.
Construction projects may begin several years after the initial facility condition assessment. Therefore, in addition to the
current year repair costs, it is necessary to forecast the facility's future costs using a ten-year life cycle renewal forecast
model.

Life cycle renewal is the projection of future building system costs based upon each individual system’s expected
serviceable life. Building systems and components age over time, eventually break down, reach the end of their useful lives,
and may require replacement. While an item may be in good condition now, it might reach the end of its life before a
planned construction project occurs.

The following tables show ten-year life cycle capital renewal projections. The projections outline costs for major building
systems in which a component is expected to reach the end of its useful life and require capital funding for replacement.



Table 3a: Capital Renewal Forecast (Yrs 1-5)

                                                         Life Cycle Capital Renewal Projections
                                   Year 1           Year 2               Year 3               Year 4               Year 5
System                              2022             2023                 2024                 2025                 2026                 Total 1-5
Site                                           $0                $0                   $0                    $0              $685,547    $685,547

Roofing                                        $0                $0                   $0                    $0               $14,659     $14,659

Exterior                                       $0                $0                   $0                    $0              $141,411    $141,411

Interior                                       $0            $54,965               $3,036               $14,098             $439,649    $511,748

Mechanical                                     $0                $0               $11,498              $384,341             $161,373    $557,212

Electrical                                     $0                $0                   $0                $37,628                  $0      $37,628

Plumbing                                       $0                $0                   $0               $392,618              $53,106    $445,724

Fire and Life Safety                           $0                $0                   $0                    $0                   $0            $0

Conveyances                                    $0                $0                   $0                    $0                   $0            $0

Specialties                                    $0                $0                   $0                    $0                   $0            $0

Total                                          $0            $54,965              $14,533              $828,685         $1,495,745     $2,393,929




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                                      8
                                                                                                                 Facility Condition Assessment
                                                                                                                DeKalb County SD - Early Learning Academy


Table 3b: Capital Renewal Forecast (Yrs 6-10)

                                                                   Life Cycle Capital Renewal Projections
                                                Year 6            Year 7           Year 8            Year 9            Year 10
System                         Total 1-5         2027              2028             2029              2030              2031            Total 6-10    Total 1-10
Site                           $685,547                  $0                $0           $94,434                 $0               $0      $94,434      $779,981

Roofing                         $14,659                  $0                $0               $0                  $0           $22,408     $22,408       $37,067

Exterior                       $141,411                  $0                $0               $0                  $0          $170,229    $170,229      $311,639

Interior                       $511,748              $64,876               $0          $276,112             $93,778          $35,427    $470,193      $981,941

Mechanical                     $557,212             $123,981               $0          $101,214                 $0           $50,068    $275,262      $832,474

Electrical                      $37,628                  $0                $0          $196,409                 $0           $81,472    $277,881      $315,509

Plumbing                       $445,724                  $0                $0               $0                  $0           $24,227     $24,227      $469,951

Fire and Life Safety                 $0                  $0                $0          $107,327                 $0               $0     $107,327      $107,327

Conveyances                          $0                  $0                $0               $0                  $0               $0            $0            $0

Specialties                          $0             $179,420               $0          $178,208                 $0               $0     $357,627      $357,627

Total                        $2,393,929             $368,277               $0          $953,703             $93,778         $383,830   $1,799,588    $4,193,516




Figure 3: Ten Year Capital Renewal Forecast




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                                          9
                                                                                        Facility Condition Assessment
                                                                                       DeKalb County SD - Early Learning Academy

Summary of High Priority Deficiencies


Priority 1 - Mission Critical Concerns                                                     Cost
  Exposed Wiring / Conduit Repair                                                           $607

  Emergency Exit Signage Repair                                                            $2,236

  Emergency Exit Signage Replacement                                                      $14,359

  Fire Alarm Replacement                                                                 $376,179

  Wall Pack Lighting Replacement                                                          $17,870

                                                                Total for Priority 1    $411,250



Priority 2 - Indirect Impact to Educational Mission                                        Cost
  Modified Roof Covering Replacement                                                     $280,292

  Storefront/Curtain Wall Replacement (Bldg SF)                                             $182

  Air Cooled Condenser Replacement                                                        $12,077

  Boiler Replacement                                                                      $94,155

  Ductless Split System AC Replacement                                                     $8,926

  Ductwork Replacement (SF Basis)                                                        $651,694

  Exterior Metal Cooling Tower Replacement                                                $37,255

  Gas Piping Replacement (SF Basis)                                                      $108,726

  Mechanical / HVAC Piping / System Is Beyond Its Useful Life                             $57,591

  Package DX Unit Replacement                                                            $219,051

  Package Roof Top Unit Replacement                                                      $197,244

  Steam Condensate Receiver Replacement                                                   $14,305

  Electrical Receptacle Repair                                                              $109

  Electrical Transformer Replacement                                                       $6,851

  Panelboard Replacement                                                                  $30,064

  Switchgear Replacement                                                                  $12,829

  Water Heater Replacement                                                                 $6,023

                                                                Total for Priority 2   $1,737,372




M▪A▪P▪P▪S ©, Jacobs 2021                              Revision Date - 09/24/2021                                             10
                                                                                                          Facility Condition Assessment
                                                                                                         DeKalb County SD - Early Learning Academy



Deficiency Summary
(Items below detail the totals referenced in Table 2)

Site Level Deficiencies
Site
Deficiency                                                                       Category                 Qty UoM     Priority   Repair Cost   ID
Concrete Walks Replacement                                                       Capital Renewal           40 SF         3             $426 10129
             Note:     Cracked
Fencing Replacement (8' - 10' high Chain Link Fence)                             Capital Renewal           40 LF         4           $2,946 10127
             Note:     Damaged
                                                                                 Sub Total for System       2 items                  $3,372
                                                                   Sub Total for School and Site Level      2 items                  $3,372

Building: 2010 - Building 2010
Roofing
Deficiency                                                                       Category                 Qty UoM     Priority   Repair Cost   ID
Debris In Gutter Removal                                                         Deferred                1,500 LF        3           $7,282 10147
                                                                                 Maintenance
             Note:     Debris
Permanent Roof Access Installation                                               Deferred                   1 Ea.        4           $3,423 10151
                                                                                 Maintenance
             Note:     Missing
Roof Cleaning                                                                    Deferred                4,000 SF        4             $874 10146
                                                                                 Maintenance
             Note:     Debris
Splash Block Replacement                                                         Deferred                   2 Ea.        4             $117 10149
                                                                                 Maintenance
             Note:     Damaged
Splash Block Installation                                                        Deferred                   6 Ea.        5             $363 10148
                                                                                 Maintenance
             Note:     Missing
                                                                                 Sub Total for System       5 items                 $12,059

Exterior
Deficiency                                                                       Category                 Qty UoM     Priority   Repair Cost   ID
Storefront/Curtain Wall Replacement (Bldg SF)                                    Capital Renewal            8 SF         2             $182 10130
             Note:     Infill Panel Damaged
Brick Exterior Repointing                                                        Deferred                 400 SF         3           $2,398 10131
                                                                                 Maintenance                  Wall
             Note:     Weathered Mortar
                                                                                 Sub Total for System       2 items                  $2,580

Interior
Deficiency                                                                       Category                 Qty UoM     Priority   Repair Cost   ID
Existing Door Hardware Is Not ADA Compliant                                      ADA Compliance             1 Door       3           $1,044 10145
             Location: Media Center
Interior Door Hardware Replacement                                               Capital Renewal           91 Door       3         $127,016 10141
             Note:     Beyond Useful Life
Interior Door Replacement                                                        Capital Renewal           91 Door       3         $160,468 10140
             Note:     Beyond Useful Life - Replace Door Frame
Rubber Flooring Replacement                                                      Capital Renewal          343 SF         3           $4,875 10136
             Note:     Beyond Useful Life
Acoustical Ceiling Tile Replacement                                              Capital Renewal         2,500 SF        4          $13,745 10133
             Note:     Worn Out
             Location: Kitchen
Adhered Acoustical Ceiling Tile Replacement                                      Capital Renewal          685 SF         4           $3,766 10134
             Note:     Beyond Useful Life
             Location: Mech Room




M▪A▪P▪P▪S ©, Jacobs 2021                                     Revision Date - 09/24/2021                                                             11
                                                                                                     Facility Condition Assessment
                                                                                                   DeKalb County SD - Early Learning Academy

Interior
Deficiency                                                                  Category                 Qty UoM     Priority   Repair Cost   ID
Ceiling Grid Replacement                                                    Capital Renewal         2,500 SF        4           $9,788 10132
             Note:      Worn Out
             Location: Kitchen
Concrete Flooring Replacement                                               Capital Renewal           10 SF         4             $307 10139
             Note:      Hole Left After Repair
Stone/Quarry Flooring Replacement                                           Capital Renewal         2,398 SF        4          $61,631 10137
             Note:      Beyond Useful Life
Toilet Partition Replacement                                                Capital Renewal           12 Stall      4          $22,750 10135
             Note:      Beyond Useful Life
Vinyl Composition Tile Replacement                                          Capital Renewal         5,100 SF        4          $40,792 10138
             Note:      Beyond Useful Life
                                                                            Sub Total for System      11 items                $446,183

Mechanical
Deficiency                                                                  Category                 Qty UoM     Priority   Repair Cost   ID
Air Cooled Condenser Replacement                                            Capital Renewal            1 Ea.        2           $6,038 10161
             Note:      Beyond Useful Life
             Location: Roof
Boiler Replacement                                                          Capital Renewal            1 Ea.        2          $94,155 10157
             Note:      Beyond Useful Life
             Location: Mech Room
Ductless Split System AC Replacement                                        Capital Renewal            1 Ea.        2           $4,463 10162
             Note:      Beyond Useful Life
             Location: 124 Other
Ductwork Replacement (SF Basis)                                             Capital Renewal        34,256 SF        2         $411,200 10167
             Note:      Beyond Useful Life
             Location: Throughout
Exterior Metal Cooling Tower Replacement                                    Capital Renewal            1 Ea.        2          $37,255 10160
             Note:      Beyond Useful Life
             Location: Roof
Gas Piping Replacement (SF Basis)                                           Capital Renewal        34,256 SF        2          $68,603 10153
             Note:      Beyond Useful Life
Mechanical / HVAC Piping / System Is Beyond Its Useful Life                 Capital Renewal        34,256 SF        2          $57,591 10163
             Note:      Beyond Useful Life
Package Roof Top Unit Replacement                                           Capital Renewal            1 Ea.        2          $14,957 10168
             Note:      Beyond Useful Life
             Location: Roof
Package Roof Top Unit Replacement                                           Capital Renewal            4 Ea.        2          $91,143 10169
             Note:      Beyond Useful Life
             Location: Roof
Steam Condensate Receiver Replacement                                       Capital Renewal            1 Ea.        2          $14,305 10158
             Note:      Beyond Useful Life
Circulation Pump Replacement                                                Capital Renewal            1 Ea.        3          $10,869 10166
             Note:      Beyond Useful Life
             Location: Mech Room
Large Diameter Exhausts/Hoods Replacement                                   Capital Renewal            3 Ea.        3          $22,666 10170
             Note:      Beyond Useful Life
             Location: Roof
Testing And Balancing                                                       Deferred               34,256 SF        3          $68,603 10164
                                                                            Maintenance
             Location: Throughout
Ceiling Exhaust Fan Replacement                                             Capital Renewal            2 Ea.        4             $915 10171
             Note:      Beyond Useful Life
             Location: Restrooms
Circulation Pump Replacement                                                Capital Renewal            2 Ea.        4           $8,110 10165
             Note:      Beyond Useful Life
             Location: Mech Room

M▪A▪P▪P▪S ©, Jacobs 2021                                      Revision Date - 09/24/2021                                                       12
                                                                                                                  Facility Condition Assessment
                                                                                                                 DeKalb County SD - Early Learning Academy

Mechanical
Deficiency                                                                             Category                       Qty UoM    Priority   Repair Cost   ID
Existing Controls Are Obsolete                                                         Capital Renewal          34,256 SF           4          $86,868 10159
             Note:     Beyond Useful Life
             Location: Throughout
                                                                                       Sub Total for System           16 items                $997,740

Electrical
Deficiency                                                                             Category                       Qty UoM    Priority   Repair Cost   ID
Exposed Wiring / Conduit Repair                                                        Code Compliance                 1 Ea.        1             $607 10175
             Note:     Stage Box Has Exposed Wiring Inside. Wires Are Not Supported On The Second Box Is Not Locked
             Location: Stage
Panelboard Replacement                                                                 Capital Renewal                 3 Ea.        2           $7,847 10173
             Note:     Beyond Useful Life
             Location: Kitchen And Mech Room 125
Panelboard Replacement                                                                 Capital Renewal                 1 Ea.        2           $5,170 10174
             Note:     Beyond Useful Life
             Location: Hallway At Classroom 113
Switchgear Replacement                                                                 Capital Renewal                 1 Ea.        2          $12,829 10172
             Note:     Beyond Useful Life
             Location: Mech Room 125
Canopy Lighting Replacement                                                            Capital Renewal                12 Ea.        3          $23,500 10181
             Note:     Beyond Useful Life
             Location: Throughout
Exterior Mounted Building Lighting Replacement                                         Capital Renewal                22 Ea.        3          $18,651 10182
             Note:     Beyond Useful Life
             Location: Throughout
Interior Power Wiring Replacement                                                      Deferred                 24,000 SF           3          $26,799 10184
                                                                                       Maintenance
             Note:     Beyond Useful Life
             Location: Old Building Wiring
Lighting Fixtures Replacement                                                          Capital Renewal          34,256 SF           3         $590,619 10183
             Note:     Beyond Useful Life - Old T8 Lamps
             Location: Throughout
Lightning Protection System Installation                                               Functional Deficiency    34,256 SF           3          $25,150 10180
             Note:     Beyond Useful Life
             Location: Throughout
Public Address System Replacement, Non-main Building                                   Deferred                 34,256 SF           3          $22,798 10176
                                                                                       Maintenance
             Note:     Beyond Useful Life
             Location: Throughout
                                                                                       Sub Total for System           10 items                $733,971

Plumbing
Deficiency                                                                             Category                       Qty UoM    Priority   Repair Cost   ID
Gas Water Heater Replacement                                                           Capital Renewal                 2 Ea.        3          $12,004 10152
             Note:     Beyond Useful Life
             Location: Mech Room
Plumbing / Domestic Water Piping System Is Beyond Its Useful Life                      Capital Renewal          34,256 SF           3         $154,252 10154
             Note:     Beyond Useful Life
             Location: Throughout
Sanitary Sewer Piping Replacement                                                      Capital Renewal          34,256 SF           3         $103,943 10155
             Note:     Beyond Useful Life
             Location: Throughout
Refrigerated Water Cooler Replacement                                                  Capital Renewal                 8 Ea.        4          $16,565 10156
             Note:     Beyond Useful Life
             Location: Corridor
                                                                                       Sub Total for System            4 items                $286,764




M▪A▪P▪P▪S ©, Jacobs 2021                                     Revision Date - 09/24/2021                                                                        13
                                                                                                              Facility Condition Assessment
                                                                                                            DeKalb County SD - Early Learning Academy

Fire and Life Safety
Deficiency                                                                          Category                  Qty UoM     Priority   Repair Cost   ID
Emergency Exit Signage Replacement                                                  Capital Renewal            14 Ea.        1           $8,376 10178
             Note:     Beyond Useful Life
             Location: Throughout
Fire Alarm Replacement                                                              Capital Renewal         34,256 SF        1         $188,345 10177
             Note:     Beyond Useful Life
             Location: Throughout
Wall Pack Lighting Replacement                                                      Capital Renewal             8 Ea.        1           $3,864 10179
             Note:     Beyond Useful Life
             Location: Throughout
                                                                                   Sub Total for System         3 items                $200,585

Conveyances
Deficiency                                                                          Category                  Qty UoM     Priority   Repair Cost   ID
Platform Lift Needed for Access                                                     ADA Compliance              1 Ea.        3          $26,581 10144
             Note:     Missing
             Location: Stage
                                                                                   Sub Total for System         1 items                 $26,581

Specialties
Deficiency                                                                          Category                  Qty UoM     Priority   Repair Cost   ID
Counter Heights Exceed Maximum ADA Height Requirements (Modify Full)                ADA Compliance              5 LF         3             $303 10143
             Note:     No Lower Counter
Replace Cabinetry In Classes/Labs                                                   Capital Renewal            34 Room       4         $281,358 10142
             Note:     Beyond Useful Life
                                                                                   Sub Total for System         2 items                $281,661
                                                              Sub Total for Building 2010 - Building 2010      54 items              $2,988,124

Building: 2011 - Building 2011
Roofing
Deficiency                                                                          Category                  Qty UoM     Priority   Repair Cost   ID
Debris In Gutter Removal                                                            Deferred                  500 LF         3           $2,427 10190
                                                                                    Maintenance
             Note:     Debris
Splash Block Replacement                                                            Deferred                   10 Ea.        4             $584 10191
                                                                                    Maintenance
             Note:     Broken
                                                                                   Sub Total for System         2 items                  $3,012

Exterior
Deficiency                                                                          Category                  Qty UoM     Priority   Repair Cost   ID
Brick Exterior Repointing                                                           Deferred                 2,000 SF        3          $11,992 10185
                                                                                    Maintenance                    Wall
             Note:     Weathered
                                                                                   Sub Total for System         1 items                 $11,992

Interior
Deficiency                                                                          Category                  Qty UoM     Priority   Repair Cost   ID
Interior Door Hardware Replacement                                                  Capital Renewal            40 Door       3          $55,831 10188
             Note:     Beyond Useful Life
Interior Door Replacement                                                           Capital Renewal            38 Door       3          $67,008 10187
             Note:     Beyond Useful Life
Epoxy Flooring Repair Or Replacement                                                Deferred                  801 SF         4           $9,077 10186
                                                                                    Maintenance
             Note:     Beyond Useful Life
                                                                                   Sub Total for System         3 items                $131,917

Mechanical
Deficiency                                                                          Category                  Qty UoM     Priority   Repair Cost   ID
Ductwork Replacement (SF Basis)                                                     Capital Renewal         20,035 SF        2         $240,495 10200
             Note:     Beyond Useful Life
             Location: Throughout

M▪A▪P▪P▪S ©, Jacobs 2021                                 Revision Date - 09/24/2021                                                                     14
                                                                                                       Facility Condition Assessment
                                                                                                     DeKalb County SD - Early Learning Academy

Mechanical
Deficiency                                                                   Category                  Qty UoM     Priority   Repair Cost   ID
Gas Piping Replacement (SF Basis)                                            Capital Renewal         20,035 SF        2          $40,123 10193
             Note:     Beyond Useful Life
             Location: Throughout
Package DX Unit Replacement                                                  Capital Renewal            12 Ea.        2         $128,293 10198
             Note:     Beyond Useful Life Actual Is 4Ton(12)
             Location: Exterior Walls
Package DX Unit Replacement                                                  Capital Renewal             3 Ea.        2          $26,611 10199
             Note:     Beyond Useful Life 2 Ton(3)
             Location: Exterior Walls
Package Roof Top Unit Replacement                                            Capital Renewal             3 Ea.        2          $68,358 10201
             Note:     Beyond Useful Life 7.5 Tons (3Ea)
             Location: Roof
Existing Controls Are Obsolete                                               Capital Renewal         20,035 SF        4          $50,806 10197
             Note:     Beyond Useful Life
             Location: Throughout
                                                                             Sub Total for System        6 items                $554,685

Electrical
Deficiency                                                                   Category                  Qty UoM     Priority   Repair Cost   ID
Electrical Transformer Replacement                                           Capital Renewal             1 Ea.        2           $6,851 10202
             Note:     Beyond Useful Life
             Location: Mech Room 127.2
Panelboard Replacement                                                       Capital Renewal             1 Ea.        2           $1,372 10203
             Note:     Beyond Useful Life
             Location: Room 127.1
Panelboard Replacement                                                       Capital Renewal             1 Ea.        2           $2,616 10204
             Note:     Beyond Useful Life
             Location: Mech Room 127.2
Panelboard Replacement                                                       Capital Renewal             1 Ea.        2          $13,060 10205
             Note:     Beyond Useful Life
             Location: Mech Room 127.2
Canopy Lighting Replacement                                                  Capital Renewal             1 Ea.        3           $1,958 10211
             Note:     Beyond Useful Life
Exterior Mounted Building Lighting Replacement                               Capital Renewal            10 Ea.        3           $8,478 10212
             Note:     Beyond Useful Life
Interior Power Wiring Replacement                                            Deferred                14,000 SF        3          $15,633 10214
                                                                             Maintenance
             Note:     Beyond Useful Life
             Location: Old Building Wiring
Lighting Fixtures Replacement                                                Capital Renewal         20,035 SF        3         $345,430 10213
             Note:     Beyond Useful Life- Old T8 Lamps
Lightning Protection System Installation                                     Functional Deficiency   20,035 SF        3          $14,710 10210
             Note:     Missing
Public Address System Replacement, Non-main Building                         Deferred                20,035 SF        3          $13,334 10206
                                                                             Maintenance
             Note:     Beyond Useful Life
             Location: System Served From Building 2010
                                                                             Sub Total for System       10 items                $423,440

Plumbing
Deficiency                                                                   Category                  Qty UoM     Priority   Repair Cost   ID
Water Heater Replacement                                                     Capital Renewal             1 Ea.        2           $2,008 10192
             Note:     Beyond Useful Life
             Location: Mech Room
Plumbing / Domestic Water Piping System Is Beyond Its Useful Life            Capital Renewal         20,035 SF        3          $90,216 10194
             Note:     Beyond Useful Life
             Location: Throughout



M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                        15
                                                                                                            Facility Condition Assessment
                                                                                                          DeKalb County SD - Early Learning Academy

Plumbing
Deficiency                                                                        Category                  Qty UoM     Priority   Repair Cost   ID
Sanitary Sewer Piping Replacement                                                 Capital Renewal         20,035 SF        3          $60,792 10195
             Note:      Beyond Useful Life
             Location: Throughout
Refrigerated Water Cooler Replacement                                             Capital Renewal             4 Ea.        4           $8,282 10196
             Note:      Beyond Useful Life
             Location: Corridor
                                                                                 Sub Total for System         4 items                $161,298

Fire and Life Safety
Deficiency                                                                        Category                  Qty UoM     Priority   Repair Cost   ID
Emergency Exit Signage Replacement                                                Capital Renewal             5 Ea.        1           $2,991 10208
Fire Alarm Replacement                                                            Capital Renewal         20,035 SF        1         $110,156 10207
             Note:      Beyond Useful Life
Wall Pack Lighting Replacement                                                    Capital Renewal            12 Ea.        1           $5,796 10209
             Note:      Beyond Useful Life
                                                                                 Sub Total for System         3 items                $118,943

Specialties
Deficiency                                                                        Category                  Qty UoM     Priority   Repair Cost   ID
Replace Cabinetry In Classes/Labs                                                 Capital Renewal            19 Room       4         $157,230 10189
             Note:      Beyond Useful Life
                                                                                 Sub Total for System         1 items                $157,230
                                                            Sub Total for Building 2011 - Building 2011      30 items              $1,562,516

Building: 2012 - Building 2012
Roofing
Deficiency                                                                        Category                  Qty UoM     Priority   Repair Cost   ID
Modified Roof Covering Replacement                                                Capital Renewal          8,650 SF        2         $280,292 10216
             Note:      Beyond Useful Life
Debris In Gutter Removal                                                          Deferred                  240 LF         3           $1,165 10217
                                                                                  Maintenance
             Note:      Debris
                                                                                 Sub Total for System         2 items                $281,457

Interior
Deficiency                                                                        Category                  Qty UoM     Priority   Repair Cost   ID
Vinyl Composition Tile Replacement                                                Capital Renewal           750 SF         4           $5,999 10215
             Note:      Water Damaged
                                                                                 Sub Total for System         1 items                  $5,999

Mechanical
Deficiency                                                                        Category                  Qty UoM     Priority   Repair Cost   ID
Air Cooled Condenser Replacement                                                  Capital Renewal             1 Ea.        2           $6,038 10222
             Note:      Beyond Useful Life 1.5 Tons
             Location: Roof
Ductless Split System AC Replacement                                              Capital Renewal             1 Ea.        2           $4,463 10223
             Note:      Beyond Useful Life
             Location: Storage
Package DX Unit Replacement                                                       Capital Renewal             6 Ea.        2          $64,146 10224
             Note:      Beyond Useful Life 4 Tons (6Ea)
             Location: Classrooms
Package Roof Top Unit Replacement                                                 Capital Renewal             1 Ea.        2          $22,786 10226
             Note:      Beyond Useful Life 7.5 Tons
             Location: Roof
Testing And Balancing                                                             Deferred                 8,650 SF        3          $17,323 10225
                                                                                  Maintenance
             Note:      Beyond Useful Life
             Location: Throughout




M▪A▪P▪P▪S ©, Jacobs 2021                                  Revision Date - 09/24/2021                                                                  16
                                                                                                              Facility Condition Assessment
                                                                                                             DeKalb County SD - Early Learning Academy

Mechanical
Deficiency                                                                           Category                 Qty UoM     Priority   Repair Cost   ID
Existing Controls Are Obsolete                                                       Capital Renewal         8,650 SF        4          $21,935 10221
             Note:     Beyond Useful Life
             Location: Throughout
                                                                                    Sub Total for System        6 items                $136,691

Electrical
Deficiency                                                                           Category                 Qty UoM     Priority   Repair Cost   ID
Electrical Receptacle Repair                                                         Educational                1 Ea.        2             $109 10235
                                                                                     Adequacy
             Note:     Missing Cover Plate
             Location: Room 140 - Kiln Room
Canopy Lighting Replacement                                                          Capital Renewal            2 Ea.        3           $3,917 10232
             Note:     Beyond Useful Life
Exterior Mounted Building Lighting Replacement                                       Capital Renewal            7 Ea.        3           $5,935 10233
             Note:     Beyond Useful Life
Lighting Fixtures Replacement                                                        Capital Renewal         8,650 SF        3         $149,137 10234
             Note:     Beyond Useful Life
Lightning Protection System Installation                                             Functional Deficiency   8,650 SF        3           $6,351 10231
             Note:     Missing
Public Address System Replacement, Non-main Building                                 Deferred                8,650 SF        3           $5,757 10227
                                                                                     Maintenance
             Note:     Beyond Useful Life
             Location: System Is Served From Building 2010
                                                                                    Sub Total for System        6 items                $171,205

Plumbing
Deficiency                                                                           Category                 Qty UoM     Priority   Repair Cost   ID
Water Heater Replacement                                                             Capital Renewal            1 Ea.        2           $2,523 10218
             Note:     Beyond Useful Life
             Location: Mech Room
Restroom Group Wash Fountain Replacement                                             Capital Renewal            1 Ea.        3           $8,611 10220
             Note:     Beyond Useful Life
             Location: Restrooms
Refrigerated Water Cooler Replacement                                                Capital Renewal            2 Ea.        4           $4,141 10219
             Note:     Beyond Useful Life
             Location: Corridor
                                                                                    Sub Total for System        3 items                 $15,276

Fire and Life Safety
Deficiency                                                                           Category                 Qty UoM     Priority   Repair Cost   ID
Emergency Exit Signage Replacement                                                   Capital Renewal            5 Ea.        1           $2,991 10229
             Note:     Beyond Useful Life
Fire Alarm Replacement                                                               Capital Renewal         8,650 SF        1          $47,559 10228
             Note:     Beyond Useful Life
Wall Pack Lighting Replacement                                                       Capital Renewal           13 Ea.        1           $6,279 10230
             Note:     Beyond Useful Life
                                                                                    Sub Total for System        3 items                 $56,829
                                                               Sub Total for Building 2012 - Building 2012     21 items                $667,458

Building: 2020 - Building 2020
Roofing
Deficiency                                                                           Category                 Qty UoM     Priority   Repair Cost   ID
Debris In Gutter Removal                                                             Deferred                 180 LF         3             $874 10238
                                                                                     Maintenance
             Note:     Debris And Plants
Roof Drain Cleaning                                                                  Deferred                   7 Ea.        3             $459 10237
                                                                                     Maintenance
             Note:     Clogged
                                                                                    Sub Total for System        2 items                  $1,333


M▪A▪P▪P▪S ©, Jacobs 2021                                     Revision Date - 09/24/2021                                                                 17
                                                                                                              Facility Condition Assessment
                                                                                                             DeKalb County SD - Early Learning Academy

Interior
Deficiency                                                                           Category                 Qty UoM     Priority   Repair Cost   ID
Interior Door Hardware Replacement                                                   Capital Renewal            2 Door       3           $2,792 10236
             Note:     Worn Out
                                                                                    Sub Total for System        1 items                  $2,792

Mechanical
Deficiency                                                                           Category                 Qty UoM     Priority   Repair Cost   ID
Existing Controls Are Obsolete                                                       Capital Renewal         5,478 SF        4           $7,969 10444
                                                                                    Sub Total for System        1 items                  $7,969

Electrical
Deficiency                                                                           Category                 Qty UoM     Priority   Repair Cost   ID
Canopy Lighting Replacement                                                          Capital Renewal            3 Ea.        3           $5,875 10246
             Note:     Beyond Useful Life
Exterior Mounted Building Lighting Replacement                                       Capital Renewal            4 Ea.        3           $3,391 10247
             Note:     Beyond Useful Life
Lighting Fixtures Replacement                                                        Capital Renewal         5,478 SF        3          $94,448 10248
             Note:     Beyond Useful Life - Old T8 Lamps
Lightning Protection System Installation                                             Functional Deficiency   5,478 SF        3           $4,022 10245
             Note:     Missing
Public Address System Replacement, Non-main Building                                 Deferred                5,478 SF        3           $3,646 10241
                                                                                     Maintenance
             Note:     Beyond Useful Life
             Location: System Is Served From Building 2010
                                                                                    Sub Total for System        5 items                $111,382

Plumbing
Deficiency                                                                           Category                 Qty UoM     Priority   Repair Cost   ID
Water Heater Replacement                                                             Capital Renewal            1 Ea.        2           $1,492 10239
             Note:     Beyond Useful Life
             Location: Storage
Refrigerated Water Cooler Replacement                                                Capital Renewal            2 Ea.        4           $4,141 10240
             Note:     Beyond Useful Life
             Location: Lobby
                                                                                    Sub Total for System        2 items                  $5,633

Fire and Life Safety
Deficiency                                                                           Category                 Qty UoM     Priority   Repair Cost   ID
Emergency Exit Signage Repair                                                        Deferred                   4 Ea.        1           $2,236 10243
                                                                                     Maintenance
             Note:     Beyond Useful Life
Fire Alarm Replacement                                                               Capital Renewal         5,478 SF        1          $30,119 10242
             Note:     Beyond Useful Life
Wall Pack Lighting Replacement                                                       Capital Renewal            4 Ea.        1           $1,932 10244
             Note:     Beyond Useful Life
                                                                                    Sub Total for System        3 items                 $34,287
                                                               Sub Total for Building 2020 - Building 2020     14 items                $163,395
                                                                                        Total for Campus      121 items              $5,384,865




M▪A▪P▪P▪S ©, Jacobs 2021                                     Revision Date - 09/24/2021                                                                 18
                                                                                                                  Facility Condition Assessment
                                                                                                                DeKalb County SD - Early Learning Academy



Life Cycle Summary Yrs 1-10
(Items below detail the totals referenced in Tables 3a & 3b)

Site Level Life Cycle Items
Site
Uniformat Description             LC Type Description                                       Priority       Qty UoM        Repair Cost Remaining Life
Parking Lot Pavement              Asphalt                                                      3            99 CAR          $156,544        5
Roadway Pavement                  Concrete Driveways                                           3         38,880 SF          $529,003        5
Pedestrian Pavement               Sidewalks - Concrete                                         3         7,000 SF            $94,434        8
                                                                                 Sub Total for System        3 items        $779,981

Roofing
Uniformat Description             LC Type Description                                       Priority       Qty UoM        Repair Cost Remaining Life
Canopy Roofing                    Aluminum panels                                              4           350 SF            $22,408        10
                                                                                 Sub Total for System        1 items         $22,408

Electrical
Uniformat Description             LC Type Description                                       Priority       Qty UoM        Repair Cost Remaining Life
Parking Lot Lighting              Pole Lighting                                                3             6 Ea.           $41,587        8
                                                                                 Sub Total for System        1 items         $41,587
                                                                              Sub Total for Building -       5 items        $843,976

Building: 2010 - Building 2010
Roofing
Uniformat Description             LC Type Description                                       Priority       Qty UoM        Repair Cost Remaining Life
Low-Slope Roofing                 Single Ply                                                   2           400 SF            $14,659        5
                                                                                 Sub Total for System        1 items         $14,659

Exterior
Uniformat Description             LC Type Description                                       Priority       Qty UoM        Repair Cost Remaining Life
Exterior Entrance Doors           Steel - Insulated and Painted                                3            23 Door          $92,927        5
                                                                                 Sub Total for System        1 items         $92,927

Interior
Uniformat Description             LC Type Description                                       Priority       Qty UoM        Repair Cost Remaining Life
Wall Painting and Coating         Painting/Staining (Bldg SF)                                  5         2,398 SF            $10,717        2
Suspended Plaster and             Painted ceilings                                             5           343 SF               $734        3
Carpeting                         Carpet                                                       4           343 SF             $4,595        4
Acoustical Suspended Ceilings     Ceilings - Acoustical Tiles                                  4         19,183 SF          $122,270        5
Resilient Flooring                Vinyl Composition Tile Flooring                              4         18,841 SF          $174,701        5
Wood Flooring                     Wood Flooring - All Types                                    4         2,398 SF            $56,297        5
Acoustical Suspended Ceilings     Ceilings - Acoustical Tiles                                  4         13,702 SF           $95,433        8
Fluid-Applied Flooring            Epoxy Coating                                                4           685 SF             $9,834        8
Interior Swinging Doors           Metal Door (Steel)                                           3             4 Door          $13,786        8
Wall Painting and Coating         Painting/Staining (Bldg SF)                                  5         2,398 SF            $13,181        9
Acoustical Suspended Ceilings     Ceiling Exposed Metal Structure                              5           343 SF               $375        10
Compartments and Cubicles         Toilet Partitions                                            4            12 Stall         $30,574        10
                                                                                 Sub Total for System       12 items        $532,498

Mechanical
Uniformat Description             LC Type Description                                       Priority       Qty UoM        Repair Cost Remaining Life
Exhaust Air                       Kitchen Exhaust Hoods                                        3             1 Ea.           $11,498        3
Decentralized Cooling             Heat Pump (3 Ton)                                            5            30 Ea.          $282,774        4
Exhaust Air                       Roof Exhaust Fan - Large                                     3            12 Ea.          $105,106        5
Decentralized Heating Equipment   Radiant Heater - Infrared Electric                           3             1 Ea.            $1,212        8
Central Cooling                   Cooling Tower - Metal (100 Tons)                             2             1 Ea.           $50,068        10
                                                                                 Sub Total for System        5 items        $450,657

Electrical
Uniformat Description             LC Type Description                                       Priority       Qty UoM        Repair Cost Remaining Life
Electrical Service                Exterior Dry Type Transformer (112.5 KVA)                    2             1 Ea.           $37,628        4
Electrical Service                Transformer (30 KVA)                                         2             1 Ea.            $6,573        8
Electrical Service                Transformer (75 KVA)                                         2             1 Ea.            $8,679        8



M▪A▪P▪P▪S ©, Jacobs 2021                                          Revision Date - 09/24/2021                                                           19
                                                                                                                              Facility Condition Assessment
                                                                                                                            DeKalb County SD - Early Learning Academy

Electrical
Uniformat Description             LC Type Description                                                  Priority        Qty UoM        Repair Cost Remaining Life
Power Distribution                Panelboard - 120/208 400A                                               3              1 Ea.           $14,698        8
Power Distribution                Panelboard - 120/208 125A                                               3              1 Ea.            $1,738        8
Power Distribution                Panelboard - 120/208 100A                                               3              1 Ea.            $3,314        8
Power Distribution                Panelboard - 120/208 225A                                               3              2 Ea.           $13,100        8
Power Distribution                Panelboard - 277/480 100A                                               3              1 Ea.            $7,965        8
Power Distribution                Panelboard - 277/480 225A                                               3              1 Ea.           $11,163        8
Power Distribution                Power Wiring                                                            3          34,256 SF           $51,406        10
                                                                                            Sub Total for System        10 items        $156,264

Plumbing
Uniformat Description             LC Type Description                                                  Priority        Qty UoM        Repair Cost Remaining Life
Plumbing Fixtures                 Restroom Lavatory                                                       3             16 Ea.           $45,988        4
Plumbing Fixtures                 Sink - Service / Mop Sink                                               5              3 Ea.            $2,527        4
Plumbing Fixtures                 Toilets                                                                 3             27 Ea.          $144,549        4
Plumbing Fixtures                 Urinals                                                                 3              3 Ea.            $4,299        4
Plumbing Fixtures                 Classroom Lavatory                                                      4             14 Ea.           $39,131        5
Domestic Water Equipment          Water Heater - Gas - 100 Gallon                                         2              2 Ea.           $16,132        10
                                                                                            Sub Total for System         6 items        $252,627
                                                                       Sub Total for Building 2010 - Building 2010      35 items       $1,499,633

Building: 2011 - Building 2011
Exterior
Uniformat Description             LC Type Description                                                  Priority        Qty UoM        Repair Cost Remaining Life
Exterior Entrance Doors           Steel - Insulated and Painted                                           3              7 Door          $28,282        5
Exterior Operating Windows        Aluminum - Windows per SF                                               2            675 SF            $90,713        10
                                                                                            Sub Total for System         2 items        $118,995

Interior
Uniformat Description             LC Type Description                                                  Priority        Qty UoM        Repair Cost Remaining Life
Compartments and Cubicles         Toilet Partitions                                                       4             12 Stall         $24,135        2
Wall Painting and Coating         Painting/Staining (Bldg SF)                                             5          2,004 SF             $9,503        4
Acoustical Suspended Ceilings     Ceilings - Acoustical Tiles                                             4          9,617 SF            $61,298        5
Carpeting                         Carpet                                                                  4          4,007 SF            $56,949        6
Tile Flooring                     Quarry Tile                                                             4            200 SF             $6,137        6
Acoustical Suspended Ceilings     Ceilings - Acoustical Tiles                                             4          9,817 SF            $68,374        8
Interior Swinging Doors           Metal Door (Steel)                                                      3              2 Door           $6,892        8
Resilient Flooring                Vinyl Composition Tile Flooring                                         4          5,610 SF            $58,546        9
Acoustical Suspended Ceilings     Ceiling Exposed Metal Structure                                         5            601 SF               $657        10
Resilient Flooring                Rubber Tile Flooring                                                    4            200 SF             $3,821        10
                                                                                            Sub Total for System        10 items        $296,313

Mechanical
Uniformat Description             LC Type Description                                                  Priority        Qty UoM        Repair Cost Remaining Life
Decentralized Cooling             Thru-Wall AC (2 Ton)                                                    3              1 Ea.            $5,812        4
Exhaust Air                       Roof Exhaust Fan - Large                                                3              4 Ea.           $35,036        5
Exhaust Air                       Interior Ceiling Exhaust Fan                                            3              1 Ea.              $531        5
Decentralized Heating Equipment   Radiant Heater - Infrared Electric                                      3              2 Ea.            $2,425        8
                                                                                            Sub Total for System         4 items         $43,803

Electrical
Uniformat Description             LC Type Description                                                  Priority        Qty UoM        Repair Cost Remaining Life
Power Distribution                Panelboard - 120/208 225A                                               3              1 Ea.            $6,549        8
Power Distribution                Panelboard - 277/480 400A                                               3              1 Ea.           $16,544        8
Power Distribution                Panelboard - 277/480 225A                                               3              1 Ea.           $11,163        8
Electrical Service                Transformer (45 KVA)                                                    2              1 Ea.            $7,050        8
Electrical Service                Transformer (75 KVA)                                                    2              1 Ea.            $8,679        8
Power Distribution                Power Wiring                                                            3          20,035 SF           $30,066        10
                                                                                            Sub Total for System         6 items         $80,050

Plumbing
Uniformat Description             LC Type Description                                                  Priority        Qty UoM        Repair Cost Remaining Life
Plumbing Fixtures                 Restroom Lavatory                                                       3              9 Ea.           $25,869        4
Plumbing Fixtures                 Sink - Service / Mop Sink                                               5              1 Ea.              $842        4
Plumbing Fixtures                 Toilets                                                                 3             13 Ea.           $69,598        4


M▪A▪P▪P▪S ©, Jacobs 2021                                          Revision Date - 09/24/2021                                                                       20
                                                                                                                                     Facility Condition Assessment
                                                                                                                                   DeKalb County SD - Early Learning Academy

Plumbing
Uniformat Description                    LC Type Description                                                   Priority       Qty UoM        Repair Cost Remaining Life
Plumbing Fixtures                        Urinals                                                                  3             4 Ea.            $5,732        4
Plumbing Fixtures                        Classroom Lavatory                                                       4             2 Ea.            $5,590        5
Domestic Water Equipment                 Water Heater - Electric - 30 gallon                                      2             1 Ea.            $2,699        10
                                                                                                    Sub Total for System        6 items        $110,329

Specialties
Uniformat Description                    LC Type Description                                                   Priority       Qty UoM        Repair Cost Remaining Life
Casework                                 Lockers                                                                  4           300 Ea.          $179,419        6
                                                                                                    Sub Total for System        1 items        $179,419
                                                                               Sub Total for Building 2011 - Building 2011     29 items        $828,910

Building: 2012 - Building 2012
Exterior
Uniformat Description                    LC Type Description                                                   Priority       Qty UoM        Repair Cost Remaining Life
Exterior Operating Windows               Aluminum - Windows per SF                                                2           270 SF            $36,286        10
Exterior Operating Windows               Aluminum - Windows per SF                                                2             8 SF             $1,075        10
Exterior Entrance Doors                  Steel - Insulated and Painted                                            3             9 Door          $42,155        10
                                                                                                    Sub Total for System        3 items         $79,515

Interior
Uniformat Description                    LC Type Description                                                   Priority       Qty UoM        Repair Cost Remaining Life
Compartments and Cubicles                Toilet Partitions                                                        4            10 Stall         $20,113        2
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                              4          1,730 SF           $11,027        5
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                              4          6,920 SF           $48,197        8
Interior Door Supplementary Components   Door Hardware                                                            3            17 Door          $30,058        8
Resilient Flooring                       Vinyl Composition Tile Flooring                                          4          1,730 SF           $18,054        9
                                                                                                    Sub Total for System        5 items        $127,448

Mechanical
Uniformat Description                    LC Type Description                                                   Priority       Qty UoM        Repair Cost Remaining Life
Exhaust Air                              Roof Exhaust Fan - Large                                                 3             2 Ea.           $17,518        5
Exhaust Air                              Interior Ceiling Exhaust Fan                                             3             3 Ea.            $1,592        5
HVAC Air Distribution                    Ductwork (Bldg.SF)                                                       3          8,650 SF          $123,981        6
Decentralized Heating Equipment          Radiant Heater - Infrared Electric                                       3             3 Ea.            $3,637        8
                                                                                                    Sub Total for System        4 items        $146,727

Electrical
Uniformat Description                    LC Type Description                                                   Priority       Qty UoM        Repair Cost Remaining Life
Power Distribution                       Panelboard - 120/208 225A                                                3             1 Ea.            $6,549        8
Power Distribution                       Panelboard - 120/208 225A                                                3             1 Ea.            $6,549        8
Power Distribution                       Panelboard - 277/480 400A                                                3             1 Ea.           $16,544        8
Power Distribution                       Panelboard - 277/480 100A                                                3             1 Ea.            $7,965        8
                                                                                                    Sub Total for System        4 items         $37,608

Plumbing
Uniformat Description                    LC Type Description                                                   Priority       Qty UoM        Repair Cost Remaining Life
Plumbing Fixtures                        Restroom Lavatory                                                        3             5 Ea.           $14,372        4
Plumbing Fixtures                        Sink - Service / Mop Sink                                                5             1 Ea.              $842        4
Plumbing Fixtures                        Toilets                                                                  3             8 Ea.           $42,829        4
Plumbing Fixtures                        Urinals                                                                  3             3 Ea.            $4,299        4
Plumbing Fixtures                        Classroom Lavatory                                                       4             3 Ea.            $8,385        5
Domestic Water Equipment                 Water Heater - Electric - 40 gallon                                      2             1 Ea.            $3,391        10
                                                                                                    Sub Total for System        6 items         $74,118

Fire and Life Safety
Uniformat Description                    LC Type Description                                                   Priority       Qty UoM        Repair Cost Remaining Life
Water-Based Fire-Suppression             Fire Sprinkler System (Bldg.SF)                                          1          8,650 SF          $107,327        8
                                                                                                    Sub Total for System        1 items        $107,327

Specialties
Uniformat Description                    LC Type Description                                                   Priority       Qty UoM        Repair Cost Remaining Life
Casework                                 Fixed Cabinetry                                                          4            17 Room         $178,208        8
                                                                                                    Sub Total for System        1 items        $178,208
                                                                               Sub Total for Building 2012 - Building 2012     24 items        $750,952




M▪A▪P▪P▪S ©, Jacobs 2021                                                 Revision Date - 09/24/2021                                                                       21
                                                                                                                                     Facility Condition Assessment
                                                                                                                                   DeKalb County SD - Early Learning Academy

Building: 2020 - Building 2020
Exterior
Uniformat Description                    LC Type Description                                                   Priority       Qty UoM        Repair Cost Remaining Life
Exterior Entrance Doors                  Steel - Insulated and Painted                                            3             5 Door          $20,202        5
                                                                                                    Sub Total for System        1 items         $20,202

Interior
Uniformat Description                    LC Type Description                                                   Priority       Qty UoM        Repair Cost Remaining Life
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                              4           383 SF             $2,301        3
Suspended Plaster and                    Painted ceilings                                                         5           383 SF               $869        5
Compartments and Cubicles                Toilet Partitions                                                        4             6 Stall         $13,187        5
Acoustical Suspended Ceilings            Ceilings - Acoustical Grid System                                        4           383 SF             $1,790        6
Interior Door Supplementary Components   Door Hardware                                                            3             2 Door           $3,537        8
Resilient Flooring                       Vinyl Composition Tile Flooring                                          4           383 SF             $3,997        9
                                                                                                    Sub Total for System        6 items         $25,681

Mechanical
Uniformat Description                    LC Type Description                                                   Priority       Qty UoM        Repair Cost Remaining Life
Decentralized Heating Equipment          Unit Heater Gas (200 MBH)                                                3             4 Ea.           $21,944        4
Decentralized Cooling                    Thru-Wall AC (2 Ton)                                                     3             1 Ea.            $5,812        4
HVAC Air Distribution                    Roof Top Unit - DX Gas (25 Ton)                                          2             1 Ea.           $67,999        4
Exhaust Air                              Interior Ceiling Exhaust Fan                                             3             3 Ea.            $1,592        5
Decentralized Heating Equipment          Radiant Heater - Infrared Electric                                       3             1 Ea.            $1,212        8
Decentralized Heating Equipment          Radiant Heater - Radiant Panels - Ceiling                                3             2 Ea.            $9,430        8
HVAC Air Distribution                    Ductwork (Bldg.SF)                                                       3          5,478 SF           $83,298        8
                                                                                                    Sub Total for System        7 items        $191,286

Plumbing
Uniformat Description                    LC Type Description                                                   Priority       Qty UoM        Repair Cost Remaining Life
Plumbing Fixtures                        Restroom Lavatory                                                        3             2 Ea.            $5,749        4
Plumbing Fixtures                        Sink - Service / Mop Sink                                                5             1 Ea.              $842        4
Plumbing Fixtures                        Toilets                                                                  3             4 Ea.           $21,415        4
Plumbing Fixtures                        Urinals                                                                  3             2 Ea.            $2,866        4
Domestic Water Equipment                 Water Heater - Electric - 20 gallon                                      2             1 Ea.            $2,005        10
                                                                                                    Sub Total for System        5 items         $32,877
                                                                               Sub Total for Building 2020 - Building 2020     19 items        $270,045

                                                                                       Total for: Early Learning Academy      112 items       $4,193,517




M▪A▪P▪P▪S ©, Jacobs 2021                                                 Revision Date - 09/24/2021                                                                       22
                                                                                                 Facility Condition Assessment
                                                                                                DeKalb County SD - Early Learning Academy



 Supporting Photos




Existing Intercom System Is Beyond Its Useful Life            Existing Fire Alarm System Is Beyond Its Useful Life




Existing Switch For The Mechanical Room 125 Needs To Be       Existing Fluorescent Lighting Is Beyond Its Useful Life
Replaced




Replace Ductless Split System Outside For Building 2010       Replace Cooling Tower




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                       23
                                                                                            Facility Condition Assessment
                                                                                           DeKalb County SD - Early Learning Academy




Replace Roof Mounted Unit For Building 2012 And 2011         Replace One 10 HP Pump And Condenser Loop Piping
                                                             Throughout Building 2010




Replace Gas Water Heaters In Main Mechanical Room            Replace Gas Boiler In Mechanical Room




Door Hardware At Media Center Entrance Is Non-ADA            Carpet Beyond Useful Life Needs To Be Replaced
Compliant. Door Hardware Needs To Be Replaced To Provide
ADA Accessibility




M▪A▪P▪P▪S ©, Jacobs 2021                            Revision Date - 09/24/2021                                                   24
                                                                                              Facility Condition Assessment
                                                                                            DeKalb County SD - Early Learning Academy




Restroom Partition Assemblies Beyond Useful Life Need To Be   Missing Or Damaged Sealant At Expansion Joint Needs To Be
Replaced                                                      Replaced




Act Ceiling At Kitchen Area Beyond Useful Life Needs To Be    Debris At Roof Area Drains Need To Be Removed
Replaced




                                                              Cracked Masonry Wall At Roof Level Needs Repointing
Cracked Concrete Sidewalks Beyond Useful Life Need To Be
Replaced




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                   25
                                                                                            Facility Condition Assessment
                                                                                           DeKalb County SD - Early Learning Academy




Cracked And/Or Missing Splash Blocks Need Replacement        Cabinetry Beyond Useful Life Needs Replacement




Weathered Standing Seam Metal Roof At Gym Building Needs     Building Main Photo
Pressure Washing




Modify Bitumen Roofing Is Cracked And Beyond Useful Life     Damage Concrete Splash Blocks Need To Be Replaced
And Needs To Be Replaced




M▪A▪P▪P▪S ©, Jacobs 2021                            Revision Date - 09/24/2021                                                   26
                                                                                                      Facility Condition Assessment
                                                                                                    DeKalb County SD - Early Learning Academy




Water Wash-Off At Hill Outside Of Corridor Stairs Infiltrates Into   Epoxy Flooring At Restrooms Beyond Useful Life Needs
Corridor Exterior Wall. Civil Engineering Study Recommended          Replacement
To Address Observation




                                                                     Modify Bitumen Roofing At Building Connectors Is Beyond
Roof Rain Leaders Need Connection Into Underground Storm             Useful Life And Needs Replacement
System




                                                                     Quarry Tile Flooring Beyond Useful Life Needs Replacement
Damaged Downspout Connection Into Storm Drainage System
Needs Replacement




M▪A▪P▪P▪S ©, Jacobs 2021                                  Revision Date - 09/24/2021                                                      27
                                                                                             Facility Condition Assessment
                                                                                            DeKalb County SD - Early Learning Academy




Damaged Roof Gutter Areas Need Replacement                 Linear Drain At Building Entrance Is Bent/Beyond Useful Life
                                                           And Needs Replacement




Debris Over Tpo Roofing Needs To Be Removed. Tpo Roofing   Doors Beyond Useful Life Need To Be Replaced
Also Needs To Be Pressure Washed




Debris At Roof Needs To Be Removed                         Modify Bitumen Roofing Is Weathered And Has Debris. Roof
                                                           Needs To Be Cleaned




M▪A▪P▪P▪S ©, Jacobs 2021                          Revision Date - 09/24/2021                                                      28
                                                                                                Facility Condition Assessment
                                                                                              DeKalb County SD - Early Learning Academy




Missing Section Of Concrete Slab On Grade Needs To Be         Concrete Stormwater Canal Is Cracked And Beyond Useful
Replaced                                                      Life. Concrete Stormwater Canal Needs To Be Replaced




Damaged Metal Edge Flashing Needs To Be Replaced              Add Building Expansion Joint Flashing Sealant Is Missing To
                                                              Prevent Water Infiltration




Sticky Act Ceiling Is Beyond Useful Life And Needs
                                                              Cracks And Gaps In Modify Bitumen Roofing At Edge Need To
Replacement
                                                              Be Filled/Repaired




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                     29
                                                                                             Facility Condition Assessment
                                                                                           DeKalb County SD - Early Learning Academy




VCT Flooring Beyond Useful Life Needs To Be Replaced        Modify Bitumen Roofing Membrane Flashing Beyond Useful
                                                            Life Needs Replacement




Damaged Chain Link Fencing Needs Replacement                Corridor CMU Wall Area Where Water Infiltrates From Outside
                                                            Hill . Civil Engineering Study Recommended To Address
                                                            Observation




Cabinetry Beyond Useful Life Needs Replacement

                                                            Kitchen Area Doors Beyond Useful Life Need Replacement




M▪A▪P▪P▪S ©, Jacobs 2021                           Revision Date - 09/24/2021                                                    30
                                                                                              Facility Condition Assessment
                                                                                            DeKalb County SD - Early Learning Academy




Solid Surface Paneling At Storefront System Is Damaged And   Main Office Counter Is Non-ADA Compliant And Needs To Be
Needs Replacement                                            Retrofitted To Provide ADA Accessibility




Water Damaged VCT Flooring Needs To Be Replaced              Missing Or Damaged Vinyl Flooring Needs To Be Replaced




Wood Doors Beyond Useful Life Need Replacement               Stage Is Non-ADA Compliant And Needs A Lift Installed To
                                                             Provide ADA Accessibility




M▪A▪P▪P▪S ©, Jacobs 2021                            Revision Date - 09/24/2021                                                    31
                                                                                            Facility Condition Assessment
                                                                                           DeKalb County SD - Early Learning Academy




Door Hardware At Gym Building Is Beyond Useful Life And      Debris At Roof Gutter System Needs Removal
Needs Replacement




Structural Frame Supporting Roof Cooling Tower Seems To Be   Weathered And Eroded Exterior Masonry Wall Needs
Corroded Beyond Useful Life And Needs Replacement            Repointing




Cover Photo




M▪A▪P▪P▪S ©, Jacobs 2021                            Revision Date - 09/24/2021                                                   32
 Revision Date - 09/24/2021




FACILITY CONDITION ASSESSMENT
        Edward L. Bouie, Sr. Elementary School | 2021
                                                                                                                             Facility Condition Assessment
                                                                                                       DeKalb County SD - Edward L. Bouie, Sr. Elementary School


 Executive Summary
 Edward L. Bouie, Sr. Elementary School is located at 5100 Rock Springs Road in Lithonia, GA. It comprises 91,602 gross
 square feet. At the time of the assessment the oldest building was 24 years old.
 The findings contained within this report are the result of an assessment of building systems performed by building
 professionals experienced in disciplines including architecture, mechanical, plumbing and electrical. Only those systems
 that were identified as having either an associated deficiency or life cycle event within a 10-year window is contained within
 this report. The full list of each school's systems that are present along with the associated priorities can be found in the flat
 file data grids submitted to Dekalb County. The projected replacement year of those assets within each system is also
 included within this table.The total current deficiencies for this site, in 2020 construction cost dollars, are estimated at
 $2,490,256. A ten-year need was developed to provide an understanding of the current need as well as the projected
 needs in the near future. For Edward L. Bouie, Sr. Elementary School the ten-year need is $12,805,485.
 For planning purposes, the total current deficiencies and the first five years of projected life cycle needs were combined to
 calculate a Facility Condition Index (FCI). A 5-year FCI was calculated by dividing the 5-year need by the total replacement
 cost. Costs associated with new construction are not included in the FCI calculation. After the 5-year FCI was calculated,
 this value was subtracted from 100 to calculate the FCA Score in a similar fashion to report cards.
 The Edward L. Bouie, Sr. Elementary School facility has a FCA score of 65.57% which is considered "Poor".

Summary of Findings
The table below summarizes the condition findings at Edward L. Bouie, Sr. Elementary School.
Table 1: Facility Condition by Building


                                                                                                          Total 5 Yr Need      Total 10 Yr Need
                                                          Current        5-Year Life   Yrs 6-10 Life     (Yr 1-5 + Current    (Yr 1-10 + Current    Replacement      FCA
Number          Building Name                            Deficiencies    Cycle Cost     Cycle Cost              Defs)                Defs)              Cost         Score
Exterior Site
                Exterior Site                                  $94,372      $982,175         $611,819           $1,076,547             $1,688,366
Permanent Building(s)
2010            Building 2010                              $2,395,883     $5,272,453       $3,448,783           $7,668,336           $11,117,119       $25,398,490   69.81%
                Sub Total for Permanent Building(s):       $2,395,883     $5,272,453      $3,448,783           $7,668,336            $11,117,119      $25,398,486
                                       Total for Site:     $2,490,256     $6,254,628       $4,060,601           $8,744,884           $12,805,485       $25,398,486   65.57%

Note 1: Sitework improvements are proportionally incorporated into the building CRV and used to calulate the overall FCA Score.
Note 2: Aerial map including building number, gross SF, and year built of each building on the site is found on Page 3.




 M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                                           2
                                                            Facility Condition Assessment
                                             DeKalb County SD - Edward L. Bouie, Sr. Elementary School


Aerial Images




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                               3
                                                                                         Facility Condition Assessment
                                                                          DeKalb County SD - Edward L. Bouie, Sr. Elementary School


Approach and Methodology
The facility condition assessment includes a visual assessment of building systems that are readily available during a
facility walk-through. The standard process does not reflect invasive, destructive assessment methods that would
require special equipment, testing or scheduled power outages. The assessment was accomplished with a view
toward identifying significant maintenance and repair deficiencies that need correction. For the purposes of this
assessment, deficient conditions captured were limited to those items that did not qualify as routine maintenance
repairs. Copies of previous reports and other documentation that were relevant to the inspection were utilized if made
available in the process. Additionally, feedback from appropriate personnel to provide background information relative
to specific building operations, function, equipment conditions, past improvements and planned upgrades were
incorporated into the results if made available to the teams while on site. Two components of the facility condition
assessment are combined to total the cost for facility need. The two components of the facility condition assessment
are current deficiencies and life cycle forecast.

Current Deficiencies: Deficiencies are items in need of repair or replacement as a result of being broken, obsolete,
deferred maintenance, or beyond useful life. The existing deficiencies that currently require correction are identified
and assigned a priority. An example of a current deficiency might include a broken lighting fixture or an inoperable
roof top air conditioning unit.

Life Cycle Forecast: Life cycle analysis evaluates the ages of a building's systems to forecast system replacement as
they reach the end of serviceable life. Estimated Useful Lives were determined based on a combination of our
(Jacobs) professional experience, RS Means, and from industry standard tables (BOMA, ASHRAE). An example of a
life cycle system replacement is a roof with a 20-year life that has been in place for 15 years and may require
replacement in five years.

All members of the survey team recorded existing conditions, identified problems and deficiencies, and documented
corrective action and quantities. The team took digital photos at each site to better identify significant deficiencies.

Facility Deficiency Priority Levels
Deficiencies were ranked according to five priority levels, with Priority 1 items being the most critical to address:

Priority 1 – Mission Critical Concerns: Deficiencies or conditions that may directly affect the site’s ability to remain
open or deliver the educational curriculum. These deficiencies typically relate to building safety, code compliance,
severely damaged or failing building components, and other items that require near-term correction. An example of a
Priority 1 deficiency is a fire alarm system replacement.

Priority 2 – Indirect Impact to Educational Mission: Items that may progress to a Priority 1 item if not addressed in the
near term. Examples of Priority 2 deficiencies include inadequate roofing that could cause deterioration of integral
building systems, and conditions affecting building envelopes, such as roof and window replacements.

Priority 3 – Short-Term Conditions: Deficiencies that are necessary to the site's mission but may not require
immediate attention. These items should be considered necessary improvements required to maximize facility
efficiency and usefulness. Examples of Priority 3 items include site improvements and plumbing deficiencies.

Priority 4 – Long-Term Requirements: Items or systems that may be considered improvements to the instructional
environment. The improvements may be aesthetic or provide greater functionality. Examples include cabinets,
finishes, paving, removal of abandoned equipment, and educational accommodations associated with special
programs.

Priority 5 – Enhancements: Deficiencies aesthetic in nature or considered enhancements. Typical deficiencies in this
priority include repainting, replacing carpet, improved signage, or other improvements to the facility environment.




M▪A▪P▪P▪S ©, Jacobs 2021                      Revision Date - 09/24/2021                                                         4
                                                                                         Facility Condition Assessment
                                                                         DeKalb County SD - Edward L. Bouie, Sr. Elementary School


Facility Condition Assessment(FCA) Score
Facility Condition Assessment (FCA) Scores are assigned after the Facility Condition Index (FCI) is calculated.
The Facility Condition Index (FCI) is used throughout the facility condition assessment industry as a general
indicator of a building’s health. Since 1991, the facility management industry has used an index called the FCI
to benchmark the relative condition of a group of sites. The FCI is derived by dividing the total repair cost,
including site-related repairs, by the total replacement cost of all buildings. It should be noted that costs in the
New Construction category are not included in the FCI calculation. In an effort to match the report card metrics,
the FCI is subtracted from 100 to assign the FCA Score. A facility with a lower FCA Score has more need, or
higher priority, than a facility with a higher FCA Score.




The replacement value represents the estimated cost of replacing the current building with another building of
like size, based on 2021 estimated cost of construction in the DeKalb County area. The estimated replacement
cost for this facility is $25,398,486. For planning purposes, the total 5-year need at the Edward L. Bouie, Sr.
Elementary School is $8,744,884 (Life Cycle Years 1-5 plus the current FCI deficiency cost).

The Edward L. Bouie, Sr. Elementary School facility has an FCA Score of 65.57%. which is considered "Poor".




                              Figure 1: 5-Year FCI




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                 5
                                                                                                                         Facility Condition Assessment
                                                                                                 DeKalb County SD - Edward L. Bouie, Sr. Elementary School


The following table summarizes this site's current deficiencies by building system and priority.

Table 2: System by Priority (Site & Permanent Buildings)

                                                                               Priority

                  System                     1               2                    3                    4                      5              Total             % of Total
Site                                                 $0              $0               $42,330               $38,112                $13,931           $94,372        3.79 %

Roofing                                              $0           $4,182                  $638                    $0                 $121             $4,941        0.20 %

Structural                                           $0              $0                    $0                     $0                   $0                $0         0.00 %

Exterior                                             $0              $0                    $0                     $0              $333,538       $333,538          13.39 %

Interior                                             $0              $0                 $8,817             $137,551                    $0        $146,368           5.88 %

Mechanical                                           $0              $0               $23,259              $133,260                 $1,581       $158,099           6.35 %

Electrical                                           $0          $39,865          $1,698,316                   $8,193                  $0      $1,746,373          70.13 %

Plumbing                                             $0           $2,008                   $0                     $0                   $0             $2,008        0.08 %

Fire and Life Safety                             $4,556              $0                    $0                     $0                   $0             $4,556        0.18 %

Conveyances                                          $0              $0                    $0                     $0                   $0                $0         0.00 %

Specialties                                          $0              $0                    $0                     $0                   $0                $0         0.00 %

Total:                                           $4,556          $46,054          $1,773,361               $317,115               $349,170     $2,490,256




The building systems at the site with the most need include:
                                                                           Electrical                      -       $1,746,373
                                                                           Exterior                        -            $333,538
                                                                           Mechanical                      -            $158,099




M▪A▪P▪P▪S ©, Jacobs 2021                                   Revision Date - 09/24/2021                                                                                       6
                                                                                    Facility Condition Assessment
                                                                     DeKalb County SD - Edward L. Bouie, Sr. Elementary School



The chart below represents the building systems and associated deficiency costs.




Figure 2: System Deficiencies




M▪A▪P▪P▪S ©, Jacobs 2021                    Revision Date - 09/24/2021                                                      7
                                                                                                             Facility Condition Assessment
                                                                                         DeKalb County SD - Edward L. Bouie, Sr. Elementary School


Life Cycle Capital Renewal Forecast
During the facility condition assessment, assessors inspected all major building systems. If an assessor identified a need
for immediate replacement, a deficiency was created with the item's repair costs. The identified deficiency contributes to the
facility's total current repair costs.

However, capital planning scenarios span multiple years, as opposed to being constrained to immediate repairs.
Construction projects may begin several years after the initial facility condition assessment. Therefore, in addition to the
current year repair costs, it is necessary to forecast the facility's future costs using a ten-year life cycle renewal forecast
model.

Life cycle renewal is the projection of future building system costs based upon each individual system’s expected
serviceable life. Building systems and components age over time, eventually break down, reach the end of their useful lives,
and may require replacement. While an item may be in good condition now, it might reach the end of its life before a
planned construction project occurs.

The following tables show ten-year life cycle capital renewal projections. The projections outline costs for major building
systems in which a component is expected to reach the end of its useful life and require capital funding for replacement.



Table 3a: Capital Renewal Forecast (Yrs 1-5)

                                                         Life Cycle Capital Renewal Projections
                                   Year 1           Year 2               Year 3                  Year 4              Year 5
System                              2022             2023                 2024                    2025                2026                 Total 1-5
Site                                           $0                 $0                   $0                      $0             $982,175    $982,175

Roofing                                        $0                 $0                   $0                      $0                  $0            $0

Exterior                                       $0                 $0                   $0                      $0                  $0            $0

Interior                                       $0             $92,275             $477,218                $347,133            $457,127   $1,373,753

Mechanical                                     $0                 $0              $164,842            $1,408,135              $420,447   $1,993,424

Electrical                                     $0                 $0                   $0                  $95,431            $135,513    $230,944

Plumbing                                       $0                 $0               $27,246                $452,035            $170,630    $649,911

Fire and Life Safety                           $0                 $0              $550,344                     $0                  $0     $550,344

Conveyances                                    $0                 $0                   $0                      $0                  $0            $0

Specialties                                    $0            $474,077                  $0                      $0                  $0     $474,077

Total                                          $0            $566,352         $1,219,650              $2,302,733          $2,165,892     $6,254,628




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                                        8
                                                                                                               Facility Condition Assessment
                                                                                               DeKalb County SD - Edward L. Bouie, Sr. Elementary School


Table 3b: Capital Renewal Forecast (Yrs 6-10)

                                                                   Life Cycle Capital Renewal Projections
                                                Year 6            Year 7           Year 8             Year 9         Year 10
System                         Total 1-5         2027              2028             2029               2030           2031               Total 6-10     Total 1-10
Site                           $982,175                  $0                $0          $393,787                $0                 $0     $393,787      $1,375,962

Roofing                              $0                  $0                $0                  $0              $0         $148,720       $148,720       $148,720

Exterior                             $0                  $0                $0                  $0              $0         $800,432       $800,432       $800,432

Interior                     $1,373,753             $451,671               $0                  $0              $0         $600,357      $1,052,027     $2,425,780

Mechanical                   $1,993,424                  $0                $0          $136,830                $0                 $0     $136,830      $2,130,254

Electrical                     $230,944                  $0                $0          $249,531                $0         $137,463       $386,993       $617,937

Plumbing                       $649,911                  $0                $0               $2,544             $0              $2,699       $5,242      $655,153

Fire and Life Safety           $550,344                  $0                $0        $1,136,569                $0                 $0    $1,136,569     $1,686,913

Conveyances                          $0                  $0                $0                  $0              $0                 $0            $0             $0

Specialties                    $474,077                  $0                $0                  $0              $0                 $0            $0      $474,077

Total                        $6,254,628             $451,671               $0        $1,919,260                $0       $1,689,671      $4,060,601    $10,315,229




Figure 3: Ten Year Capital Renewal Forecast




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                                            9
                                                                                   Facility Condition Assessment
                                                                    DeKalb County SD - Edward L. Bouie, Sr. Elementary School

Summary of High Priority Deficiencies


Priority 1 - Mission Critical Concerns                                                Cost
  Emergency Exit Signage Replacement                                                  $3,590

  Wall Pack Lighting Replacement                                                        $966

                                                      Total for Priority 1            $4,556



Priority 2 - Indirect Impact to Educational Mission                                   Cost
  Gutter Joint Repair                                                                 $4,182

  Electrical Transformer Replacement                                                 $39,865

  Water Heater Replacement                                                            $2,008

                                                      Total for Priority 2           $46,054




M▪A▪P▪P▪S ©, Jacobs 2021                   Revision Date - 09/24/2021                                                    10
                                                                                                                   Facility Condition Assessment
                                                                                               DeKalb County SD - Edward L. Bouie, Sr. Elementary School



Deficiency Summary
(Items below detail the totals referenced in Table 2)

Site Level Deficiencies
Site
Deficiency                                                                              Category                    Qty UoM      Priority   Repair Cost      ID
Parking Or Roadway Curbs Replacement                                                    Capital Renewal              12 LF          3               $309    8199
             Note:     Damaged Curb Near Storage Shed
Playground Equipment Replacement                                                        Capital Renewal               2 Ea.         3             $42,022 10448
Exterior Basketball Goal Replacement                                                    Capital Renewal               6 Ea.         4             $37,531   5837
             Note:     Damaged, West Of Gym
Gate Replacement                                                                        Deferred                      1 Ea.         4               $580    5835
                                                                                        Maintenance
             Note:     Trees Blocking, West Of Gym
Bollard Replacement                                                                     Deferred                      3 Ea.         5              $3,508   5840
                                                                                        Maintenance
             Note:     Damaged, Near West Parking Lot
Paving Restriping                                                                       Deferred                    155 CAR         5              $4,846   5838
                                                                                        Maintenance
             Note:     All Spots Faded.
Sidewalk Requires Cleaning                                                              Deferred                 25,580 SF          5              $5,231   8201
                                                                                        Maintenance
             Note:     All Sidewalks Need To Be Power Washed.
Tree Trimming                                                                           Deferred                      2 Ea.         5               $345    5839
                                                                                        Maintenance
             Note:     Trees Need Trimming By The Stairs That Lead To The Field. Small Trees Blocking Gate From Closing West Of The Playground.
                                                                                        Sub Total for System          8 items                     $94,372
                                                                         Sub Total for School and Site Level          8 items                     $94,372

Building: 2010 - Building 2010
Roofing
Deficiency                                                                              Category                    Qty UoM      Priority   Repair Cost      ID
Gutter Joint Repair                                                                     Deferred                     18 Ea.         2              $4,182   5848
                                                                                        Maintenance
             Note:     Gutter At Room 504, Leaking.
Debris In Gutter Removal                                                                Deferred                     40 LF          3               $194    5847
                                                                                        Maintenance
             Note:     East Side Of Room 504, Debris In Gutter
Tapered Insulation Installation To Eliminate Ponding When Re-Roofing                    Deferred                    100 SF          3               $444    5851
                                                                                        Maintenance
             Note:     Ponding Above Room 253
Splash Block Installation                                                               Deferred                      2 Ea.         5               $121    5849
                                                                                        Maintenance
             Note:     Missing North Side Room 504
                                                                                        Sub Total for System          4 items                      $4,941

Exterior
Deficiency                                                                              Category                    Qty UoM      Priority   Repair Cost      ID
Exterior Cleaning                                                                       Deferred                 91,602 SF          5         $333,538      5841
                                                                                        Maintenance                     Wall
                                                                                        Sub Total for System          1 items                 $333,538

Interior
Deficiency                                                                              Category                    Qty UoM      Priority   Repair Cost      ID
Interior Door Replacement                                                               Capital Renewal               5 Door        3              $8,817   5846
             Note:     Broken Window Frames, Doors Dragging On Floor. Rooms 169, 167, 175, 183, 254.2
Acoustical Ceiling Tile Replacement                                                     Capital Renewal           1,820 SF          4             $10,007   5843
Ceiling Grid Replacement                                                                Capital Renewal           1,820 SF          4              $7,125   5842
             Note:     Damage To Rooms 254, 258, 260, Hallway Outside 238, 241.1




M▪A▪P▪P▪S ©, Jacobs 2021                                         Revision Date - 09/24/2021                                                                        11
                                                                                                                         Facility Condition Assessment
                                                                                                     DeKalb County SD - Edward L. Bouie, Sr. Elementary School

Interior
Deficiency                                                                                   Category                     Qty UoM      Priority   Repair Cost    ID
Toilet Partition Replacement                                                                 Capital Renewal               52 Stall       4          $98,583    5844
             Note:      Beyond Useful Life
             Location: Rooms 254.1, 253.1, 301.1, 301.2, 160.1, 161.1, 232.1, 233.1
Vinyl Composition Tile Replacement                                                           Capital Renewal            2,730 SF          4          $21,836    5845
             Note:      Beyond Useful Life
             Location: Rooms 185, 504, S123 In Kitchen.
                                                                                            Sub Total for System            5 items                 $146,368

Mechanical
Deficiency                                                                                   Category                     Qty UoM      Priority   Repair Cost    ID
HVAC Piping System Repair                                                                    Deferred                     100 LF          3          $23,259    8205
                                                                                             Maintenance
             Note:      Building Engineer Reported Leaks From The Chill Water Line Over Hallways 100 And 200 - Estimated Qty
Existing Controls Are Obsolete                                                               Capital Renewal           91,602 SF          4         $133,260 10449
Duct Grill Replacement                                                                       Deferred                      17 Ea.         5           $1,581    5871
                                                                                             Maintenance
             Note:      Rusted, Various Locations
                                                                                            Sub Total for System            3 items                 $158,099

Electrical
Deficiency                                                                                   Category                     Qty UoM      Priority   Repair Cost    ID
Electrical Transformer Replacement                                                           Capital Renewal                1 Ea.         2           $6,851    5852
             Note:      Room E128 - Old.
Electrical Transformer Replacement                                                           Capital Renewal                1 Ea.         2           $5,189    5853
             Note:      Room E128 - Old.
Electrical Transformer Replacement                                                           Capital Renewal                1 Ea.         2           $5,565    5854
             Note:      Room E128 - Old.
Electrical Transformer Replacement                                                           Capital Renewal                1 Ea.         2           $5,565    5855
             Note:      Room E173 - Old.
Electrical Transformer Replacement                                                           Capital Renewal                1 Ea.         2           $5,565    5856
             Note:      Room E195 - Old.
Electrical Transformer Replacement                                                           Capital Renewal                1 Ea.         2           $5,565    5857
             Note:      Room E213 - Old.
Electrical Transformer Replacement                                                           Capital Renewal                1 Ea.         2           $5,565    5858
             Note:      Room E242 - Old.
Canopy Lighting Replacement                                                                  Capital Renewal               19 Ea.         3          $37,209    5863
             Note:      Multiple Locations
Electrical Receptacle Replacement                                                            Capital Renewal               18 Ea.         3           $2,261    5859
             Note:      Multiple Locations. Burned Out And Broken.
Exterior Mounted Building Lighting Replacement                                               Capital Renewal                9 Ea.         3           $7,630    5864
             Note:      Multiple Locations
Interior Power Wiring Replacement                                                            Deferred                     400 SF          3             $447    8207
                                                                                             Maintenance
             Note:      Teacher's Lounge Power Wiring Needs Replacement.
Lighting Fixtures Replacement                                                                Capital Renewal           91,602 SF          3       $1,579,340    9081
             Note:      Old Lighting In Hallways, Classrooms, Kitchen, Clinic, Offices, Gym Areas, Bathrooms, Media Center, Janitor Closets
Lightning Protection System Installation                                                     Functional Deficiency     91,602 SF          3          $67,253    5862
Mounted Building Lighting Installation                                                       Functional Deficiency          3 Ea.         3           $4,176    8206
             Note:      Install 3 Exterior Building Mounted Lights, One On Each Side Of The Gym (Back And 2 Sides, Not Front)
Remove Abandoned Equipment                                                                   Deferred                       2 Ea.         4           $8,193    5869
                                                                                             Maintenance
             Note:      Multiple Locations
                                                                                            Sub Total for System           15 items               $1,746,373

Plumbing
Deficiency                                                                                   Category                     Qty UoM      Priority   Repair Cost    ID
Water Heater Replacement                                                                     Capital Renewal                1 Ea.         2           $2,008    5870
             Note:      Beyond Useful Life 232.2
                                                                                            Sub Total for System            1 items                   $2,008


M▪A▪P▪P▪S ©, Jacobs 2021                                        Revision Date - 09/24/2021                                                                             12
                                                                                          Facility Condition Assessment
                                                                         DeKalb County SD - Edward L. Bouie, Sr. Elementary School

Fire and Life Safety
Deficiency                                                        Category                Qty UoM    Priority   Repair Cost    ID
Emergency Exit Signage Replacement                                Capital Renewal          6 Ea.        1           $3,590    5860
             Note:   Multiple Locations
Wall Pack Lighting Replacement                                    Capital Renewal          2 Ea.        1             $966    5861
             Note:   Gym
                                                                 Sub Total for System      2 items                  $4,556
                                            Sub Total for Building 2010 - Building 2010   31 items              $2,395,883
                                                                     Total for Campus     39 items              $2,490,256




M▪A▪P▪P▪S ©, Jacobs 2021                  Revision Date - 09/24/2021                                                                 13
                                                                                                                        Facility Condition Assessment
                                                                                                    DeKalb County SD - Edward L. Bouie, Sr. Elementary School



Life Cycle Summary Yrs 1-10
(Items below detail the totals referenced in Tables 3a & 3b)

Site Level Life Cycle Items
Site
Uniformat Description                    LC Type Description                                     Priority        Qty UoM      Repair Cost Remaining Life
Parking Lot Pavement                     Asphalt                                                    3            155 CAR        $245,094        5
Roadway Pavement                         Asphalt Driveways                                          3         105,168 SF        $737,081        5
Fences and Gates                         Fencing - Chain Link (4 Ft)                                3            800 LF          $44,969        8
Fences and Gates                         Fencing - Chain Link (8-10 Ft)                             3             40 LF           $3,732        8
Pedestrian Pavement                      Sidewalks - Concrete                                       3         25,580 SF         $345,086        8
                                                                                      Sub Total for System         5 items     $1,375,962

Roofing
Uniformat Description                    LC Type Description                                     Priority        Qty UoM      Repair Cost Remaining Life
Canopy Roofing                           Steel panels                                               3          2,320 SF         $148,720        10
                                                                                      Sub Total for System         1 items      $148,720

Electrical
Uniformat Description                    LC Type Description                                     Priority        Qty UoM      Repair Cost Remaining Life
Parking Lot Lighting                     Pole Lighting                                              3             10 Ea.         $69,311        8
                                                                                      Sub Total for System         1 items       $69,311
                                                                                   Sub Total for Building -        7 items     $1,593,994

Building: 2010 - Building 2010
Exterior
Uniformat Description                    LC Type Description                                     Priority        Qty UoM      Repair Cost Remaining Life
Exterior Operating Windows               Aluminum - Windows per SF                                  2          1,456 SF         $195,671        10
Exterior Operating Windows               Aluminum - Windows per SF                                  2             90 SF          $12,095        10
Exterior Operating Windows               Aluminum - Windows per SF                                  2            144 SF          $19,352        10
Exterior Operating Windows               Aluminum - Windows per SF                                  2            160 SF          $21,503        10
Exterior Entrance Doors                  Steel - Insulated and Painted                              3             86 Door       $402,809        10
Exterior Entrance Doors                  Steel - Insulated and Painted                              3             29 Door       $135,831        10
Exterior Operating Windows               Aluminum - Windows per SF                                  2             18 SF           $2,419        10
Exterior Operating Windows               Aluminum - Windows per SF                                  2             80 SF          $10,751        10
                                                                                      Sub Total for System         8 items      $800,432

Interior
Uniformat Description                    LC Type Description                                     Priority        Qty UoM      Repair Cost Remaining Life
Wall Coverings                           Vinyl/Fabric Wall Covering                                 4          7,328 SF          $34,441        2
Carpeting                                Carpet                                                     4          4,580 SF          $57,834        2
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                4         78,778 SF         $473,298        3
Suspended Plaster and                    Painted ceilings                                           5          1,832 SF           $3,920        3
Acoustical Suspended Ceilings            Ceilings - Acoustical Grid System                          4         78,778 SF         $347,133        4
Athletic Flooring                        Athletic/Sport Flooring                                    4          5,496 SF          $91,898        5
Resilient Flooring                       Vinyl Composition Tile Flooring                            4         39,389 SF         $365,229        5
Tile Flooring                            Ceramic Tile                                               4          9,160 SF         $181,675        6
Interior Door Supplementary Components   Door Hardware                                              3            162 Door       $269,995        6
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                4          1,832 SF          $13,537        10
Compartments and Cubicles                Toilet Partitions                                          4             52 Stall      $132,487        10
Carpeting                                Carpet                                                     4          4,580 SF          $73,262        10
Interior Swinging Doors                  Metal Door (Steel)                                         3              3 Door        $10,969        10
Interior Swinging Doors                  Metal Door (Steel)                                         3              4 Door        $14,626        10
Interior Swinging Doors                  Wooden Door                                                3            124 Door       $293,859        10
Interior Swinging Doors                  Wooden Door                                                3             26 Door        $61,616        10
                                                                                      Sub Total for System        16 items     $2,425,780

Mechanical
Uniformat Description                    LC Type Description                                     Priority        Qty UoM      Repair Cost Remaining Life
Heat Generation                          Boiler - Steel Tube (1200 MBH)                             2              2 Ea.        $111,539        3
Facility Hydronic Distribution           Pump- 25HP (Ea.)                                           4              2 Ea.         $29,550        3
Facility Hydronic Distribution           Pump- 10HP (Ea.)                                           4              2 Ea.         $23,754        3


M▪A▪P▪P▪S ©, Jacobs 2021                                                 Revision Date - 09/24/2021                                                        14
                                                                                                                  Facility Condition Assessment
                                                                                                DeKalb County SD - Edward L. Bouie, Sr. Elementary School

Mechanical
Uniformat Description                   LC Type Description                                  Priority       Qty UoM      Repair Cost Remaining Life
Decentralized Cooling                   Ductless Split System (2 Ton)                           2             1 Ea.          $5,023        4
Decentralized Cooling                   Thru-Wall AC (2 Ton)                                    3             1 Ea.          $5,812        4
Air Distribution                        Make-up Air Unit                                        3             1 Ea.          $9,405        4
HVAC Air Distribution                   Roof Top Unit - DX Gas (15 Ton)                         2             2 Ea.         $67,138        4
HVAC Air Distribution                   Roof Top Unit - DX Gas (5 Ton)                          2             1 Ea.         $16,834        4
Air Distribution                        Energy Recovery Unit (4,000 CFM)                        3             1 Ea.         $18,176        4
Air Distribution                        Energy Recovery Unit (4,000 CFM)                        3             1 Ea.         $18,176        4
HVAC Air Distribution                   Energy Recovery Unit (2,000 CFM)                        3             1 Ea.         $15,717        4
Air Distribution                        Energy Recovery Unit (1,000 CFM)                        3             1 Ea.         $14,285        4
HVAC Air Distribution                   Ductwork (Bldg.SF)                                      3         91,602 SF      $1,237,570        4
Central Cooling                         Chiller - Outdoor Air Cooled (175 Tons)                 2             1 Ea.        $208,593        5
Facility Hydronic Distribution          2-Pipe System (Cold)                                    3         91,602 SF        $178,528        5
Facility Hydronic Distribution          Pump - 1HP or Less (Ea.)                                4             1 Ea.          $4,701        5
Facility Hydronic Distribution          Pump - 1HP or Less (Ea.)                                4             2 Ea.          $9,402        5
Exhaust Air                             Roof Exhaust Fan - Small                                3             9 Ea.         $19,223        5
Decentralized Heating Equipment         Radiant Heater - Infrared Electric                      3             2 Ea.          $2,425        8
HVAC Air Distribution                   Roof Top Unit - DX Gas (10 Ton)                         2             3 Ea.         $86,594        8
HVAC Air Distribution                   Roof Top Unit - DX Gas (10 Ton)                         2             1 Ea.         $28,865        8
HVAC Air Distribution                   Roof Top Unit - DX Gas (5 Ton)                          2             1 Ea.         $18,947        8
                                                                                   Sub Total for System      22 items    $2,130,254

Electrical
Uniformat Description                   LC Type Description                                  Priority       Qty UoM      Repair Cost Remaining Life
Distributed Systems                     Public Address System Head End Unit                     3             1 Ea.          $7,732        4
Lighting Fixtures                       Building Mounted Fixtures (Ea.)                         4            20 Ea.         $19,084        4
Audio-Video Systems                     PA Communications No Head Unit (Bldg SF)                2         91,602 SF         $68,614        4
Lighting Fixtures                       Canopy Mounted Fixtures (Ea.)                           4             6 Ea.         $13,621        5
Electrical Service                      Switchgear - Main Dist Panel (1600 Amps)                2             2 Ea.        $121,892        5
Transfer Switches                       Automatic Transfer Switch (Amps)                        3           104 Amps         $4,255        8
                                  Note: 1 each
Power Distribution                      Motor Controller (Loads)                                3             5 Ea.         $10,940        8
Power Distribution                      Panelboard - 120/208 125A                               3             1 Ea.          $1,738        8
Power Distribution                      Panelboard - 120/208 225A                               3             2 Ea.         $13,100        8
Power Distribution                      Panelboard - 120/208 225A                               3             1 Ea.          $6,549        8
Power Distribution                      Panelboard - 120/208 225A                               3             2 Ea.         $13,100        8
Power Distribution                      Panelboard - 277/480 225A                               3             1 Ea.         $11,163        8
Power Distribution                      Panelboard - 277/480 225A                               3             1 Ea.         $11,163        8
Power Distribution                      Panelboard - 277/480 225A                               3             1 Ea.         $11,163        8
Power Distribution                      Panelboard - 120/208 225A                               3             2 Ea.         $13,100        8
Power Distribution                      Panelboard - 120/208 225A                               3             2 Ea.         $13,100        8
Power Distribution                      Panelboard - 277/480 225A                               3             1 Ea.         $11,163        8
Power Distribution                      Panelboard - 277/480 225A                               3             1 Ea.         $11,163        8
Power Distribution                      Panelboard - 120/208 225A                               3             2 Ea.         $13,100        8
Power Distribution                      Panelboard - 277/480 225A                               3             1 Ea.         $11,163        8
Power Distribution                      Panelboard - 120/208 225A                               3             2 Ea.         $13,100        8
Power Distribution                      Panelboard - 277/480 225A                               3             1 Ea.         $11,163        8
Power Distribution                      Power Wiring                                            3         91,602 SF        $137,462        10
                                                                                   Sub Total for System      23 items      $548,626

Plumbing
Uniformat Description                   LC Type Description                                  Priority       Qty UoM      Repair Cost Remaining Life
Domestic Water Equipment                Water Heater - Electric - 40 gallon                     2             1 Ea.          $2,757        3
Plumbing Fixtures                       Non-Refrigerated Drinking Fountain                      4            10 Ea.         $24,489        3
Plumbing Fixtures                       Restroom Lavatory                                       3            41 Ea.        $117,846        4
Plumbing Fixtures                       Sink - Service / Mop Sink                               5             5 Ea.          $4,211        4
Plumbing Fixtures                       Toilets                                                 3            53 Ea.        $283,745        4
Plumbing Fixtures                       Urinals                                                 3            16 Ea.         $22,928        4
Plumbing Fixtures                       Refrigerated Drinking Fountain                          4            10 Ea.         $23,305        4
Domestic Water Equipment                Water Heater - Electric - 52 gallon                     2             1 Ea.          $2,925        5
Plumbing Fixtures                       Classroom Lavatory                                      4            60 Ea.        $167,705        5
Domestic Water Equipment                Water Heater - Electric - 30 gallon                     2             1 Ea.          $2,544        8




M▪A▪P▪P▪S ©, Jacobs 2021                                              Revision Date - 09/24/2021                                                      15
                                                                                                                           Facility Condition Assessment
                                                                                                        DeKalb County SD - Edward L. Bouie, Sr. Elementary School

Plumbing
Uniformat Description          LC Type Description                                                   Priority        Qty UoM     Repair Cost Remaining Life
Domestic Water Equipment       Water Heater - Electric - 30 gallon                                      2              1 Ea.         $2,699        10
                                                                                          Sub Total for System        11 items     $655,153

Fire and Life Safety
Uniformat Description          LC Type Description                                                   Priority        Qty UoM     Repair Cost Remaining Life
Fire Detection and Alarm       Fire Alarm                                                               1          91,602 SF       $550,344        3
Water-Based Fire-Suppression   Fire Sprinkler System (Bldg.SF)                                          1          91,602 SF      $1,136,569       8
                                                                                          Sub Total for System         2 items    $1,686,913

Specialties
Uniformat Description          LC Type Description                                                   Priority        Qty UoM     Repair Cost Remaining Life
Casework                       Fixed Cabinetry                                                          4             54 Room      $474,077        2
                                                                                          Sub Total for System         1 items     $474,077
                                                                     Sub Total for Building 2010 - Building 2010      83 items    $8,721,236

                                                          Total for: Edward L. Bouie, Sr. Elementary School           90 items   $10,315,229




M▪A▪P▪P▪S ©, Jacobs 2021                                     Revision Date - 09/24/2021                                                                       16
                                                                                              Facility Condition Assessment
                                                                           DeKalb County SD - Edward L. Bouie, Sr. Elementary School



 Supporting Photos




Repaint Exterior Metal Doors To Hallways Between Rms 208    Pressure Wash Entire Exterior Of Building, Clogged
And 215.1                                                   Downspouts Results In Runoff From Drain Holes. Outside Rm
                                                            222




Pressure Wash Entire Exterior Of School
                                                            Replace VCT In Rm 504, Water Damage, Beyond Useful Life




Cracking In Insulation In Rm 504, Repair
                                                            Cracking In Insulation. Repair In Rm 504




M▪A▪P▪P▪S ©, Jacobs 2021                           Revision Date - 09/24/2021                                                   17
                                                                                                Facility Condition Assessment
                                                                             DeKalb County SD - Edward L. Bouie, Sr. Elementary School




Damaged Wall In Bathroom In Rm 504                           Replace Damaged/Missing VCT In Rm 185 And S123 (In
                                                             Kitchen)




Repair Window Frame In Door, Broken (Rm 169, 175), Repair    Replace Damaged Acoustical Tiles In Hallway Outside Rm
Doors For Scraping Ground (Rm 183, 254.2, 167)               241.1And 238, And Rm 254, 258, 260, 237




Add Tapered Insulation To Eliminate Ponding Above Room 253
                                                             Toilet Partitions Beyond Useful Life, Replace




M▪A▪P▪P▪S ©, Jacobs 2021                           Revision Date - 09/24/2021                                                     18
                                                                Facility Condition Assessment
                                                 DeKalb County SD - Edward L. Bouie, Sr. Elementary School




Front Entrance E.L. Bouie Es




M▪A▪P▪P▪S ©, Jacobs 2021       Revision Date - 09/24/2021                                             19
 Revision Date - 09/24/2021




FACILITY CONDITION ASSESSMENT
                      Marbut Elementary School | 2021
                                                                                                                           Facility Condition Assessment
                                                                                                                   DeKalb County SD - Marbut Elementary School


 Executive Summary
 Marbut Elementary School is located at 5776 Marbut Road in Lithonia, GA. It comprises 91,478 gross square feet. At the
 time of the assessment the oldest building was 24 years old.
 The findings contained within this report are the result of an assessment of building systems performed by building
 professionals experienced in disciplines including architecture, mechanical, plumbing and electrical. Only those systems
 that were identified as having either an associated deficiency or life cycle event within a 10-year window is contained within
 this report. The full list of each school's systems that are present along with the associated priorities can be found in the flat
 file data grids submitted to Dekalb County. The projected replacement year of those assets within each system is also
 included within this table.The total current deficiencies for this site, in 2020 construction cost dollars, are estimated at
 $5,702,592. A ten-year need was developed to provide an understanding of the current need as well as the projected
 needs in the near future. For Marbut Elementary School the ten-year need is $16,662,415.
 For planning purposes, the total current deficiencies and the first five years of projected life cycle needs were combined to
 calculate a Facility Condition Index (FCI). A 5-year FCI was calculated by dividing the 5-year need by the total replacement
 cost. Costs associated with new construction are not included in the FCI calculation. After the 5-year FCI was calculated,
 this value was subtracted from 100 to calculate the FCA Score in a similar fashion to report cards.
 The Marbut Elementary School facility has a FCA score of 50.96% which is considered "Poor".

Summary of Findings
The table below summarizes the condition findings at Marbut Elementary School.
Table 1: Facility Condition by Building


                                                                                                        Total 5 Yr Need      Total 10 Yr Need
                                                          Current       5-Year Life   Yrs 6-10 Life    (Yr 1-5 + Current    (Yr 1-10 + Current    Replacement      FCA
Number          Building Name                            Deficiencies   Cycle Cost     Cycle Cost             Defs)                Defs)              Cost         Score
Exterior Site
                Exterior Site                                $378,857    $1,006,225         $291,394          $1,385,083             $1,676,476
Permanent Building(s)
2010            Building 2010                              $5,152,257    $5,103,056       $3,780,630         $10,255,313           $14,035,943       $23,845,220   56.99%
2020            Building 2020                                $171,478      $625,455         $153,063            $796,933               $949,995       $1,518,885   47.53%
                Sub Total for Permanent Building(s):       $5,323,735    $5,728,511      $3,933,693         $11,052,246            $14,985,938      $25,364,105
                                       Total for Site:     $5,702,592    $6,734,736       $4,225,086         $12,437,328           $16,662,415       $25,364,105   50.96%

Note 1: Sitework improvements are proportionally incorporated into the building CRV and used to calulate the overall FCA Score.
Note 2: Aerial map including building number, gross SF, and year built of each building on the site is found on Page 3.




 M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                                         2
                                                           Facility Condition Assessment
                                                        DeKalb County SD - Marbut Elementary School


Aerial Images




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                            3
                                                                                         Facility Condition Assessment
                                                                                     DeKalb County SD - Marbut Elementary School


Approach and Methodology
The facility condition assessment includes a visual assessment of building systems that are readily available during a
facility walk-through. The standard process does not reflect invasive, destructive assessment methods that would
require special equipment, testing or scheduled power outages. The assessment was accomplished with a view
toward identifying significant maintenance and repair deficiencies that need correction. For the purposes of this
assessment, deficient conditions captured were limited to those items that did not qualify as routine maintenance
repairs. Copies of previous reports and other documentation that were relevant to the inspection were utilized if made
available in the process. Additionally, feedback from appropriate personnel to provide background information relative
to specific building operations, function, equipment conditions, past improvements and planned upgrades were
incorporated into the results if made available to the teams while on site. Two components of the facility condition
assessment are combined to total the cost for facility need. The two components of the facility condition assessment
are current deficiencies and life cycle forecast.

Current Deficiencies: Deficiencies are items in need of repair or replacement as a result of being broken, obsolete,
deferred maintenance, or beyond useful life. The existing deficiencies that currently require correction are identified
and assigned a priority. An example of a current deficiency might include a broken lighting fixture or an inoperable
roof top air conditioning unit.

Life Cycle Forecast: Life cycle analysis evaluates the ages of a building's systems to forecast system replacement as
they reach the end of serviceable life. Estimated Useful Lives were determined based on a combination of our
(Jacobs) professional experience, RS Means, and from industry standard tables (BOMA, ASHRAE). An example of a
life cycle system replacement is a roof with a 20-year life that has been in place for 15 years and may require
replacement in five years.

All members of the survey team recorded existing conditions, identified problems and deficiencies, and documented
corrective action and quantities. The team took digital photos at each site to better identify significant deficiencies.

Facility Deficiency Priority Levels
Deficiencies were ranked according to five priority levels, with Priority 1 items being the most critical to address:

Priority 1 – Mission Critical Concerns: Deficiencies or conditions that may directly affect the site’s ability to remain
open or deliver the educational curriculum. These deficiencies typically relate to building safety, code compliance,
severely damaged or failing building components, and other items that require near-term correction. An example of a
Priority 1 deficiency is a fire alarm system replacement.

Priority 2 – Indirect Impact to Educational Mission: Items that may progress to a Priority 1 item if not addressed in the
near term. Examples of Priority 2 deficiencies include inadequate roofing that could cause deterioration of integral
building systems, and conditions affecting building envelopes, such as roof and window replacements.

Priority 3 – Short-Term Conditions: Deficiencies that are necessary to the site's mission but may not require
immediate attention. These items should be considered necessary improvements required to maximize facility
efficiency and usefulness. Examples of Priority 3 items include site improvements and plumbing deficiencies.

Priority 4 – Long-Term Requirements: Items or systems that may be considered improvements to the instructional
environment. The improvements may be aesthetic or provide greater functionality. Examples include cabinets,
finishes, paving, removal of abandoned equipment, and educational accommodations associated with special
programs.

Priority 5 – Enhancements: Deficiencies aesthetic in nature or considered enhancements. Typical deficiencies in this
priority include repainting, replacing carpet, improved signage, or other improvements to the facility environment.




M▪A▪P▪P▪S ©, Jacobs 2021                      Revision Date - 09/24/2021                                                      4
                                                                                         Facility Condition Assessment
                                                                                     DeKalb County SD - Marbut Elementary School


Facility Condition Assessment(FCA) Score
Facility Condition Assessment (FCA) Scores are assigned after the Facility Condition Index (FCI) is calculated.
The Facility Condition Index (FCI) is used throughout the facility condition assessment industry as a general
indicator of a building’s health. Since 1991, the facility management industry has used an index called the FCI
to benchmark the relative condition of a group of sites. The FCI is derived by dividing the total repair cost,
including site-related repairs, by the total replacement cost of all buildings. It should be noted that costs in the
New Construction category are not included in the FCI calculation. In an effort to match the report card metrics,
the FCI is subtracted from 100 to assign the FCA Score. A facility with a lower FCA Score has more need, or
higher priority, than a facility with a higher FCA Score.




The replacement value represents the estimated cost of replacing the current building with another building of
like size, based on 2021 estimated cost of construction in the DeKalb County area. The estimated replacement
cost for this facility is $25,364,105. For planning purposes, the total 5-year need at the Marbut Elementary
School is $12,437,328 (Life Cycle Years 1-5 plus the current FCI deficiency cost).

The Marbut Elementary School facility has an FCA Score of 50.96%. which is considered "Poor".




                              Figure 1: 5-Year FCI




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                               5
                                                                                                                    Facility Condition Assessment
                                                                                                             DeKalb County SD - Marbut Elementary School


The following table summarizes this site's current deficiencies by building system and priority.

Table 2: System by Priority (Site & Permanent Buildings)

                                                                                 Priority

                  System                     1                2                     3               4                    5              Total             % of Total
Site                                                  $0               $0               $218,462        $140,896               $8,779       $368,137           6.46 %

Roofing                                               $0          $823,904               $12,857            $131                  $0        $836,893          14.68 %

Structural                                            $0               $0                    $0              $0                   $0                $0         0.00 %

Exterior                                              $0               $0                 $9,956         $20,005             $182,058       $212,019           3.72 %

Interior                                              $0               $0                    $0         $107,330                $243        $107,573           1.89 %

Mechanical                                            $0      $2,007,574                $274,782        $135,980                  $0      $2,418,336          42.41 %

Electrical                                            $0               $0                $73,352             $0                   $0            $73,352        1.29 %

Plumbing                                              $0            $7,758              $398,529        $341,103                  $0        $747,390          13.11 %

Fire and Life Safety                             $936,436              $0                    $0              $0                   $0        $936,436          16.42 %

Conveyances                                           $0               $0                    $0              $0                   $0                $0         0.00 %

Specialties                                           $0               $0                 $2,457             $0                   $0             $2,457        0.04 %

Total:                                           $936,436     $2,839,236                $990,395        $745,446             $191,080     $5,702,592




The building systems at the site with the most need include:
                                                                             Mechanical                 -     $2,418,336
                                                                             Fire and Life Safety       -          $936,436
                                                                             Roofing                    -          $836,893




M▪A▪P▪P▪S ©, Jacobs 2021                                    Revision Date - 09/24/2021                                                                                 6
                                                                                      Facility Condition Assessment
                                                                                   DeKalb County SD - Marbut Elementary School



The chart below represents the building systems and associated deficiency costs.




Figure 2: System Deficiencies




M▪A▪P▪P▪S ©, Jacobs 2021                    Revision Date - 09/24/2021                                                      7
                                                                                                          Facility Condition Assessment
                                                                                                  DeKalb County SD - Marbut Elementary School


Life Cycle Capital Renewal Forecast
During the facility condition assessment, assessors inspected all major building systems. If an assessor identified a need
for immediate replacement, a deficiency was created with the item's repair costs. The identified deficiency contributes to the
facility's total current repair costs.

However, capital planning scenarios span multiple years, as opposed to being constrained to immediate repairs.
Construction projects may begin several years after the initial facility condition assessment. Therefore, in addition to the
current year repair costs, it is necessary to forecast the facility's future costs using a ten-year life cycle renewal forecast
model.

Life cycle renewal is the projection of future building system costs based upon each individual system’s expected
serviceable life. Building systems and components age over time, eventually break down, reach the end of their useful lives,
and may require replacement. While an item may be in good condition now, it might reach the end of its life before a
planned construction project occurs.

The following tables show ten-year life cycle capital renewal projections. The projections outline costs for major building
systems in which a component is expected to reach the end of its useful life and require capital funding for replacement.



Table 3a: Capital Renewal Forecast (Yrs 1-5)

                                                         Life Cycle Capital Renewal Projections
                                   Year 1           Year 2               Year 3               Year 4              Year 5
System                              2022             2023                 2024                 2025                2026                 Total 1-5
Site                                           $0                 $0                   $0              $248,706            $656,644    $905,350

Roofing                                        $0                 $0                   $0                   $0             $380,924    $380,924

Exterior                                       $0              $1,502                  $0                   $0             $481,295    $482,797

Interior                                       $0             $11,373         $1,255,011               $726,203             $91,597   $2,084,184

Mechanical                                     $0            $275,008                  $0               $27,899              $5,156    $308,063

Electrical                                     $0                 $0                   $0               $67,740            $183,806    $251,546

Plumbing                                       $0                 $0                   $0                   $0             $199,658    $199,658

Fire and Life Safety                           $0                 $0              $516,687                  $0         $1,046,696     $1,563,383

Conveyances                                    $0                 $0                   $0                   $0                  $0            $0

Specialties                                    $0                 $0                   $0              $558,832                 $0     $558,832

Total                                          $0            $287,883         $1,771,698           $1,629,380          $3,045,775     $6,734,736




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                                     8
                                                                                                                     Facility Condition Assessment
                                                                                                               DeKalb County SD - Marbut Elementary School


Table 3b: Capital Renewal Forecast (Yrs 6-10)

                                                                      Life Cycle Capital Renewal Projections
                                                Year 6               Year 7           Year 8            Year 9            Year 10
System                         Total 1-5         2027                 2028             2029              2030              2031               Total 6-10     Total 1-10
Site                           $905,350                     $0                $0          $291,394                  $0                 $0     $291,394      $1,196,744

Roofing                        $380,924                     $0                $0                  $0                $0                 $0            $0      $380,924

Exterior                       $482,797                     $0                $0          $219,402               $1,848         $24,724       $245,974       $728,770

Interior                     $2,084,184             $558,747                  $0           $32,398                  $0         $132,903       $724,047      $2,808,231

Mechanical                     $308,063              $78,516                  $0               $3,637               $0              $5,978     $88,131       $396,194

Electrical                     $251,546                  $8,250               $0                  $0                $0       $2,358,555      $2,366,805     $2,618,351

Plumbing                       $199,658                     $0           $476,270                 $0                $0          $32,466       $508,736       $708,394

Fire and Life Safety         $1,563,383                     $0                $0                  $0                $0                 $0            $0     $1,563,383

Conveyances                          $0                     $0                $0                  $0                $0                 $0            $0             $0

Specialties                    $558,832                     $0                $0                  $0                $0                 $0            $0      $558,832

Total                        $6,734,736             $645,513             $476,270         $546,830               $1,848      $2,554,626      $4,225,086    $10,959,823




Figure 3: Ten Year Capital Renewal Forecast




M▪A▪P▪P▪S ©, Jacobs 2021                                          Revision Date - 09/24/2021                                                                              9
                                                                                          Facility Condition Assessment
                                                                                       DeKalb County SD - Marbut Elementary School

Summary of High Priority Deficiencies


Priority 1 - Mission Critical Concerns                                                        Cost
  Fire Alarm Panel Replacement                                                               $6,457

  Fire Alarm Replacement                                                                    $30,119

  Fire Sprinkler System Replacement (SF Basis)                                             $842,348

  Security Alarm Replacement                                                                $57,512

                                                                Total for Priority 1       $936,436



Priority 2 - Indirect Impact to Educational Mission                                           Cost
  Asphalt Shingle Roof Covering Replacement                                                 $13,812

  Modified Roof Covering Replacement                                                       $810,092

  Boiler Replacement                                                                        $46,243

  Ductless Split System AC Replacement                                                       $5,100

  Ductwork Replacement (SF Basis)                                                         $1,032,320

  HVAC VAV Box Replacement                                                                 $331,429

  Mechanical / HVAC Piping / System Is Beyond Its Useful Life                              $488,539

  Package DX Unit Replacement                                                              $103,943

  Water Heater Replacement                                                                   $7,758

                                                                Total for Priority 2     $2,839,236




M▪A▪P▪P▪S ©, Jacobs 2021                              Revision Date - 09/24/2021                                               10
                                                                                                                 Facility Condition Assessment
                                                                                                             DeKalb County SD - Marbut Elementary School



Deficiency Summary
(Items below detail the totals referenced in Table 2)

Site Level Deficiencies
Site
Deficiency                                                                           Category                    Qty UoM     Priority   Repair Cost    ID
Asphalt Driveway Replacement                                                         Capital Renewal           25,000 SF        3         $151,142    383
             Note:     Cracked
Concrete Walks Replacement                                                           Capital Renewal             100 SF         3           $1,065    384
             Note:     Cracked Curbs
Playground Equipment Replacement                                                     Capital Renewal               3 Ea.        3          $63,032 10509
Asphalt Paving Resurfacing                                                           Deferred                  25,000 SF        4          $97,762    382
                                                                                     Maintenance
Exterior Basketball Goal Replacement                                                 Capital Renewal               2 Ea.        4          $12,510    381
             Note:     Missing Hoop, Board Damage
Fencing Replacement (8' - 10' high Chain Link Fence)                                 Capital Renewal             400 LF         4          $29,463    378
             Note:     Broken
Gate Replacement                                                                     Deferred                      2 Ea.        4           $1,160    379
                                                                                     Maintenance
             Note:     Broken
             Location: Front And Back Of School
Bollard Replacement                                                                  Deferred                      2 Ea.        5           $2,339    388
                                                                                     Maintenance
             Note:     Light Bollard, Broken
             Location: Driveway
Exterior Basketball Goal Repair                                                      Deferred                      4 Ea.        5           $2,427    380
                                                                                     Maintenance
             Note:     Missing Hoop, Board Damage
Site Signage Repair                                                                  Deferred                      5 Ea.        5             $935    385
                                                                                     Maintenance
             Note:     Faded, Tilting Sign
Site Signage Replacement                                                             Capital Renewal               5 Ea.        5           $1,135    386
             Note:     Faded, Tilting Sign
Small Bench Replacement                                                              Deferred                      1 Ea.        5           $1,943    387
                                                                                     Maintenance
             Note:     Broken
             Location: Playground
                                                                                     Sub Total for System         12 items                $364,914

Roofing
Deficiency                                                                           Category                    Qty UoM     Priority   Repair Cost    ID
Asphalt Shingle Roof Covering Replacement                                            Capital Renewal             800 SF         2          $13,812    2120
             Note:     Shingle Roof At Wood Pavilion At Playground
Roof Cleaning                                                                        Deferred                    600 SF         4             $131    4513
                                                                                     Maintenance
             Note:     Pressure Was Aluminum Covered Walkway Panels.
                                                                                     Sub Total for System          2 items                 $13,943
                                                                       Sub Total for School and Site Level        14 items                $378,857

Building: 2010 - Building 2010
Site
Deficiency                                                                           Category                    Qty UoM     Priority   Repair Cost    ID
Car Accessible Parking Spaces Restiriping                                            ADA Compliance                4 Ea.        3             $427    390
             Note:     Faded
Curb Ramp Does Not Meet Minimum ADA Compliance Requirements                          ADA Compliance                1 Ea.        3           $2,452    391
             Note:     Cracked
             Location: ADA Parking
Van Accessible Parking Spaces Are Not Properly Striped                               ADA Compliance                2 Ea.        3             $344    389



M▪A▪P▪P▪S ©, Jacobs 2021                                     Revision Date - 09/24/2021                                                                      11
                                                                                                                        Facility Condition Assessment
                                                                                                                   DeKalb County SD - Marbut Elementary School

Site
Deficiency                                                                                  Category                     Qty UoM        Priority   Repair Cost    ID
             Note:      Faded
                                                                                           Sub Total for System            3 items                     $3,223

Roofing
Deficiency                                                                                  Category                     Qty UoM        Priority   Repair Cost    ID
Modified Roof Covering Replacement                                                          Capital Renewal           25,000 SF            2         $810,092    4173
             Note:      Beyond Useful Life - Installed 1995
Metal Downspout Replacement                                                                 Deferred                     220 LF            3           $4,894    4174
                                                                                            Maintenance
                                                                                           Sub Total for System            2 items                   $814,987

Exterior
Deficiency                                                                                  Category                     Qty UoM        Priority   Repair Cost    ID
Brick Exterior Repair                                                                       Deferred                     850 SF            3           $9,956    4175
                                                                                            Maintenance                      Wall
             Note:      Damaged Lintels At Windows
CMU Wall Replacement (Bldg SF)                                                              Capital Renewal              946 SF            4          $20,005    4176
             Note:      Eifs Soffits At Secondary Building Entry Is Sagging And Failing
Exterior Cleaning                                                                           Deferred                  50,000 SF            5         $182,058    4177
                                                                                            Maintenance                      Wall
             Note:      Dirt, H20 Staining Throughout
                                                                                           Sub Total for System            3 items                   $212,019

Interior
Deficiency                                                                                  Category                     Qty UoM        Priority   Repair Cost    ID
Interior Ceramic Wall Repair Or Replacement                                                 Capital Renewal              200 SF            4           $2,935    4178
                                                                                                                             Wall
             Note:      Int Ceramic Walls In Gang Toilets And Individual Toilets, Damaged In Various Rooms, Mostly At Cove Base Title
Interior Gypsum Board Wall Repair                                                           Deferred                     200 SF            4           $5,924    4179
                                                                                            Maintenance                      Wall
Terrazzo Flooring Repair                                                                    Deferred                   1,200 SF            4          $26,430    4182
                                                                                            Maintenance
             Note:      Cracks Throughout
Toilet Partition Replacement                                                                Capital Renewal               32 Stall         4          $60,667    4181
             Note:      Toilet Partitions Throughout Facility Are Damaged, Many Of Them Are Constructed Of Painted Plywood
Interior Gypsum Board Wall Repainting                                                       Deferred                     200 SF            5             $243    4180
                                                                                            Maintenance                      Wall
                                                                                           Sub Total for System            5 items                    $96,198

Mechanical
Deficiency                                                                                  Category                     Qty UoM        Priority   Repair Cost    ID
Boiler Replacement                                                                          Capital Renewal                2 Ea.           2          $46,243    2135
             Note:      Beyond Useful Life
             Location: Mech Room 1000
Ductless Split System AC Replacement                                                        Capital Renewal                1 Ea.           2           $5,100    2138
             Note:      Beyond Useful Life
             Location: Data Room
Ductwork Replacement (SF Basis)                                                             Capital Renewal           86,000 SF            2       $1,032,320    2150
HVAC VAV Box Replacement                                                                    Capital Renewal               91 Ea.           2         $331,429    2151
             Note:      Beyond Useful Life
             Location: Building
Mechanical / HVAC Piping / System Is Beyond Its Useful Life                                 Capital Renewal           86,000 SF            2         $144,582    2146
             Note:      Beyond Useful Life
             Location: Building
Mechanical / HVAC Piping / System Is Beyond Its Useful Life                                 Capital Renewal           86,000 SF            2         $343,958    2147
             Note:      Beyond Useful Life
             Location: Building
Package DX Unit Replacement                                                                 Capital Renewal                2 Ea.           2          $39,867    2139
             Note:      Beyond Useful Life
             Location: Roof



M▪A▪P▪P▪S ©, Jacobs 2021                                         Revision Date - 09/24/2021                                                                             12
                                                                                       Facility Condition Assessment
                                                                                   DeKalb County SD - Marbut Elementary School

Mechanical
Deficiency                                                 Category                    Qty UoM     Priority   Repair Cost    ID
Package DX Unit Replacement                                Capital Renewal               2 Ea.        2          $32,002    2140
             Note:      Beyond Useful Life
             Location: Roof
Package DX Unit Replacement                                Capital Renewal               3 Ea.        2          $32,073    2144
             Note:      Beyond Useful Life
             Location: Roof
Circulation Pump Replacement                               Capital Renewal               2 Ea.        3          $27,042    2148
             Note:      Beyond Useful Life
             Location: Mech Room
Circulation Pump Replacement                               Capital Renewal               2 Ea.        3          $21,738    2149
             Note:      Beyond Useful Life
             Location: Mech Room
Energy Recovery Unit Replacement                           Capital Renewal               1 Ea.        3          $12,692    2141
             Note:      Beyond Useful Life
             Location: Roof
Energy Recovery Unit Replacement                           Capital Renewal               1 Ea.        3          $13,964    2142
             Note:      Beyond Useful Life
             Location: Roof
Energy Recovery Unit Replacement                           Capital Renewal               1 Ea.        3          $16,149    2143
             Note:      Beyond Useful Life
             Location: Roof
Testing And Balancing                                      Deferred                  86,000 SF        3         $172,227    2145
                                                           Maintenance
             Location: Building.
Existing Controls Are Obsolete                             Capital Renewal           86,000 SF        4         $125,110    2137
             Note:      Beyond Useful Life
             Location: Building
                                                           Sub Total for System         16 items              $2,396,495

Electrical
Deficiency                                                 Category                    Qty UoM     Priority   Repair Cost    ID
Lightning Protection System Installation                   Functional Deficiency     86,000 SF        3          $63,141    2154
             Note:      Missing
             Location: Roof
                                                           Sub Total for System          1 items                 $63,141

Plumbing
Deficiency                                                 Category                    Qty UoM     Priority   Repair Cost    ID
Water Heater Replacement                                   Capital Renewal               3 Ea.        2           $3,565    2124
             Note:      Beyond Useful Life
             Location: Custodian
Water Heater Replacement                                   Capital Renewal               1 Ea.        2           $4,193    2125
             Note:      Beyond Useful Life
             Location: Hallway RR
Backflow Preventer Replacement                             Capital Renewal               1 Ea.        3           $7,225    2127
             Note:      Beyond Useful Life
             Location: Yard
Backflow Preventer Replacement                             Capital Renewal               1 Ea.        3             $826    2128
             Note:      Beyond Useful Life
             Location: Yard
Backflow Preventer Replacement                             Capital Renewal               1 Ea.        3           $9,016    2136
             Note:      Beyond Useful Life
             Location: Yard
Gas Water Heater Replacement                               Capital Renewal               1 Ea.        3          $12,966    2126
             Note:      Beyond Useful Life
             Location: Kitchen Storage




M▪A▪P▪P▪S ©, Jacobs 2021                     Revision Date - 09/24/2021                                                            13
                                                                                                                      Facility Condition Assessment
                                                                                                                  DeKalb County SD - Marbut Elementary School

Plumbing
Deficiency                                                                                Category                     Qty UoM     Priority   Repair Cost    ID
Toilet Replacement                                                                        Capital Renewal               69 Ea.        3         $328,211    2132
             Note:      Beyond Useful Life
             Location: Class - Restroom
Urinal Replacement                                                                        Capital Renewal               14 Ea.        3          $17,825    2133
             Note:      Beyond Useful Life
             Location: Restroom
Custodial Mop Or Service Sink Replacement                                                 Capital Renewal                4 Ea.        4           $2,993    2131
             Note:      Beyond Useful Life
             Location: Custodian Room
Refrigerated Water Cooler Replacement                                                     Capital Renewal               10 Ea.        4          $20,706    2134
             Note:      Beyond Useful Life
             Location: Hallway
Replace classroom lavatory                                                                Capital Renewal               47 Ea.        4         $113,320    2129
             Note:      Beyond Useful Life
             Location: Classrooms
Restroom Lavatories Plumbing Fixtures Replacement                                         Capital Renewal               76 Ea.        4         $194,087    2130
             Note:      Beyond Useful Life
                                                                                          Sub Total for System          12 items                $714,932

Fire and Life Safety
Deficiency                                                                                Category                     Qty UoM     Priority   Repair Cost    ID
Fire Alarm Panel Replacement                                                              Capital Renewal                1 Ea.        1           $6,457    2153
             Location: Mech Room 1000
Fire Sprinkler System Replacement (SF Basis)                                              Capital Renewal           86,000 SF         1         $842,348    2152
             Note:      Beyond Useful Life
             Location: Building
                                                                                          Sub Total for System           2 items                $848,805

Specialties
Deficiency                                                                                Category                     Qty UoM     Priority   Repair Cost    ID
Counter Heights Exceed Maximum ADA Height Requirements (Modify Full)                      ADA Compliance                 5 LF         3           $2,457    392
             Note:      Room 61 - Reception - No ADA Count
                                                                                          Sub Total for System           1 items                  $2,457
                                                                    Sub Total for Building 2010 - Building 2010         45 items              $5,152,257

Building: 2020 - Building 2020
Roofing
Deficiency                                                                                Category                     Qty UoM     Priority   Repair Cost    ID
Gutter Replacement                                                                        Deferred                    300 LF          3           $5,738    4171
                                                                                          Maintenance
             Note:      All Gutters Damaged
             Location: Gym
Metal Downspout Replacement                                                               Deferred                    100 LF          3           $2,225    4172
                                                                                          Maintenance
             Note:      Downspouts Damaged
                                                                                          Sub Total for System           2 items                  $7,963

Interior
Deficiency                                                                                Category                     Qty UoM     Priority   Repair Cost    ID
Toilet Partition Replacement                                                              Capital Renewal                6 Stall      4          $11,375    4183
             Note:      Toilet Partitions Throughout Facility Are Damaged, Many Of Them Are Constructed Of Painted Plywood
                                                                                          Sub Total for System           1 items                 $11,375

Mechanical
Deficiency                                                                                Category                     Qty UoM     Priority   Repair Cost    ID
Testing And Balancing                                                                     Deferred                   5,478 SF         3          $10,970    2168
                                                                                          Maintenance
Existing Controls Are Obsolete                                                            Capital Renewal            5,478 SF         4           $7,969    2166
             Note:      Beyond Useful Life
             Location: Building

M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                                          14
                                                                                                           Facility Condition Assessment
                                                                                                       DeKalb County SD - Marbut Elementary School

Mechanical
Deficiency                                                                     Category                    Qty UoM     Priority   Repair Cost    ID
Window AC Unit Component Replacement                                           Capital Renewal               1 Ea.        4           $2,901    2167
             Note:     Beyond Useful Life
             Location: Gym Main Office
                                                                              Sub Total for System           3 items                 $21,841

Electrical
Deficiency                                                                     Category                    Qty UoM     Priority   Repair Cost    ID
Exterior Mounted Building Lighting Replacement                                 Capital Renewal               3 Ea.        3           $2,543    2160
             Note:     Beyond Useful Life
             Location: Building
Lightning Protection System Installation                                       Functional Deficiency      5,478 SF        3           $4,022    2159
             Note:     Missing
             Location: Building
Public Address System Replacement, Non-main Building                           Deferred                   5,478 SF        3           $3,646    2155
                                                                               Maintenance
             Note:     Beyond Useful Life
             Location: Building
                                                                              Sub Total for System           3 items                 $10,211

Plumbing
Deficiency                                                                     Category                    Qty UoM     Priority   Repair Cost    ID
Gas Water Heater Replacement                                                   Capital Renewal               1 Ea.        3           $3,434    2161
             Note:     Beyond Useful Life
             Location: Storage
Toilet Replacement                                                             Capital Renewal               4 Ea.        3          $19,027    2164
             Note:     Beyond Useful Life
             Location: Restrooms
Custodial Mop Or Service Sink Replacement                                      Capital Renewal               1 Ea.        4             $748    2163
             Note:     Beyond Useful Life
             Location: Storage
Refrigerated Water Cooler Replacement                                          Capital Renewal               2 Ea.        4           $4,141    2165
             Note:     Beyond Useful Life
             Location: Hallway
Restroom Lavatories Plumbing Fixtures Replacement                              Capital Renewal               2 Ea.        4           $5,108    2162
             Note:     Beyond Useful Life
             Location: Restrooms
                                                                              Sub Total for System           5 items                 $32,457

Fire and Life Safety
Deficiency                                                                     Category                    Qty UoM     Priority   Repair Cost    ID
Fire Alarm Replacement                                                         Capital Renewal            5,478 SF        1          $30,119    2158
             Note:     Beyond Useful Life
             Location: Building
Security Alarm Replacement                                                     Capital Renewal            5,478 SF        1          $57,512    2157
             Note:     Beyond Useful Life
             Location: Building
                                                                              Sub Total for System           2 items                 $87,631
                                                         Sub Total for Building 2020 - Building 2020        16 items                $171,478
                                                                                  Total for Campus          75 items              $5,702,592




M▪A▪P▪P▪S ©, Jacobs 2021                               Revision Date - 09/24/2021                                                                      15
                                                                                                                       Facility Condition Assessment
                                                                                                                 DeKalb County SD - Marbut Elementary School



Life Cycle Summary Yrs 1-10
(Items below detail the totals referenced in Tables 3a & 3b)

Site Level Life Cycle Items
Site
Uniformat Description                    LC Type Description                                     Priority       Qty UoM       Repair Cost Remaining Life
Fences and Gates                         Fencing - Chain Link (8-10 Ft)                             3         3,000 LF          $248,706        4
Parking Lot Pavement                     Asphalt                                                    3           148 CAR         $234,025        5
Roadway Pavement                         Asphalt Driveways                                          3         60,300 SF         $422,619        5
Pedestrian Pavement                      Sidewalks - Concrete                                       3         21,600 SF         $291,394        8
                                                                                      Sub Total for System        4 items     $1,196,744

Roofing
Uniformat Description                    LC Type Description                                     Priority       Qty UoM       Repair Cost Remaining Life
Canopy Roofing                           Aluminum panels                                            4           600 SF           $33,136        5
                                                                                      Sub Total for System        1 items        $33,136

Electrical
Uniformat Description                    LC Type Description                                     Priority       Qty UoM       Repair Cost Remaining Life
Parking Lot Lighting                     Pole Lighting                                              3            11 Ea.          $67,740        4
                                                                                      Sub Total for System        1 items        $67,740
                                                                                   Sub Total for Building -       6 items     $1,297,619

Building: 2010 - Building 2010
Exterior
Uniformat Description                    LC Type Description                                     Priority       Qty UoM       Repair Cost Remaining Life
Exterior Wall Veneer                     Exterior Painting - Bldg SF basis                          2           860 SF            $1,502        2
Exterior Window Wall                     Storefront / Curtain Wall (Bldg SF)                        2         7,224 SF          $190,392        5
Exterior Entrance Doors                  Steel - Insulated and Painted                              3            66 Door        $266,661        5
Exterior Operating Windows               Aluminum - Windows per SF                                  2         1,480 SF          $187,479        8
Exterior Operating Windows               Aluminum - Windows per SF                                  2           136 SF           $17,228        8
Exterior Operating Windows               Aluminum - Windows per SF                                  2            84 SF           $10,641        8
Exterior Operating Windows               Aluminum - Windows per SF                                  2            32 SF            $4,054        8
Exterior Wall Veneer                     Exterior Painting - Bldg SF basis                          2           860 SF            $1,848        9
                                                                                      Sub Total for System        8 items       $679,805

Interior
Uniformat Description                    LC Type Description                                     Priority       Qty UoM       Repair Cost Remaining Life
Fluid-Applied Flooring                   Epoxy Coating                                              4           946 SF           $11,373        2
Acoustical Suspended Ceilings            Ceilings - Acoustical Grid System                          4         73,100 SF         $312,731        3
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                4         73,100 SF         $439,184        3
Suspended Plaster and                    Painted ceilings                                           5         8,600 SF           $18,400        3
Resilient Flooring                       Vinyl Composition Tile Flooring                            4         54,868 SF         $479,552        3
Wall Painting and Coating                Painting/Staining (Bldg SF)                                5         80,840 SF         $383,309        4
Carpeting                                Carpet                                                     4         6,364 SF           $85,256        4
Interior Door Supplementary Components   Door Hardware                                              3           155 Door        $243,499        4
Tile Flooring                            Ceramic Tile                                               4         4,558 SF           $90,400        6
Tile Flooring                            Quarry Tile                                                4         4,558 SF          $139,878        6
Interior Swinging Doors                  Wooden Door                                                3           150 Door        $315,835        6
Wall Coverings                           Vinyl/Fabric Wall Covering                                 4           860 SF            $4,826        8
Interior Swinging Doors                  Metal Door (Steel)                                         3             5 Door         $17,232        8
Tile Wall Finish                         Ceramic Tile wall                                          4         3,440 SF           $36,084        10
Compartments and Cubicles                Toilet Partitions                                          4            32 Stall        $81,531        10
                                                                                      Sub Total for System       15 items     $2,659,093

Mechanical
Uniformat Description                    LC Type Description                                     Priority       Qty UoM       Repair Cost Remaining Life
Central Cooling                          Chiller - Outdoor Air Cooled (300 Tons)                    2             1 Ea.         $275,008        2
Decentralized Heating Equipment          Radiant Heater - Infrared Electric                         3             3 Ea.           $3,637        8
Exhaust Air                              Wall Exhaust Fan                                           3             1 Ea.           $5,978        10
                                                                                      Sub Total for System        3 items       $284,622




M▪A▪P▪P▪S ©, Jacobs 2021                                                 Revision Date - 09/24/2021                                                        16
                                                                                                                                      Facility Condition Assessment
                                                                                                                                DeKalb County SD - Marbut Elementary School

Electrical
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Audio-Video Systems                      PA Communications No Head Unit (Bldg SF)                                 2          86,000 SF          $66,351        5
Distributed Systems                      Public Address System Head End Unit                                      3              1 Ea.           $7,964        5
Power Distribution                       Motor Controller (Loads)                                                 3              4 Ea.           $8,250        6
Electrical Service                       Transformer (45 KVA)                                                     2              5 Ea.          $37,394        10
Electrical Service                       Transformer (75 KVA)                                                     2              3 Ea.          $27,623        10
Power Distribution                       Panelboard - 120/208 225A                                                3             10 Ea.          $69,487        10
Power Distribution                       Panelboard - 120/208 225A                                                3              1 Ea.           $6,948        10
Power Distribution                       Panelboard - 120/208 225A                                                3              5 Ea.          $34,743        10
Power Distribution                       Panelboard - 120/208 225A                                                3              2 Ea.          $13,897        10
Power Distribution                       Panelboard - 277/480 100A                                                3              1 Ea.           $8,451        10
Power Distribution                       Panelboard - 277/480 400A                                                3              2 Ea.          $35,102        10
Power Distribution                       Panelboard - 277/480 225A                                                3              1 Ea.          $11,843        10
Packaged Generator Assemblies            Emergency Generator (50 KW)                                              2              1 Ea.          $54,212        10
Lighting Fixtures                        Light Fixtures (Bldg SF)                                                 4          86,000 SF       $1,992,697        10
Power Distribution                       Panelboard - 277/480 225A                                                3              5 Ea.          $59,210        10
                                                                                                    Sub Total for System        15 items     $2,434,172

Plumbing
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Domestic Water Equipment                 Gas Piping System (BldgSF)                                               2          86,000 SF         $199,658        5
Domestic Water Piping                    Domestic Water Piping System (Bldg.SF)                                   3          86,000 SF         $476,270        7
Domestic Water Equipment                 Water Heater - Electric - 5 to 10 gallon                                 2              3 Ea.           $4,791        10
Domestic Water Equipment                 Water Heater - Electric - 80 gallon                                      2              1 Ea.           $5,635        10
Domestic Water Equipment                 Water Heater - Gas - 200 Gallon                                          2              1 Ea.          $17,425        10
                                                                                                    Sub Total for System         5 items       $703,779

Fire and Life Safety
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Fire Detection and Alarm                 Fire Alarm                                                               1          86,000 SF         $516,687        3
Security System Component                Security Alarm System                                                    1          86,000 SF       $1,046,696        5
                                                                                                    Sub Total for System         2 items     $1,563,383

Specialties
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Casework                                 Fixed Cabinetry                                                          4             60 Room        $558,832        4
                                                                                                    Sub Total for System         1 items       $558,832
                                                                               Sub Total for Building 2010 - Building 2010      49 items     $8,883,686

Building: 2020 - Building 2020
Roofing
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Steep Slope Roofing                      Metal (Architectural - Standing Seam)                                    2          8,000 SF          $347,788        5
                                                                                                    Sub Total for System         1 items       $347,788

Exterior
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Exterior Entrance Doors                  Steel - Insulated and Painted                                            3              6 Door         $24,242        5
Exterior Wall Veneer                     Metal Panel - Bldg SF basis                                              2          5,478 SF           $24,724        10
                                                                                                    Sub Total for System         2 items        $48,966

Interior
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Acoustical Suspended Ceilings            Ceilings - Acoustical Grid System                                        4            500 SF            $2,140        3
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                              4            500 SF            $3,004        3
Interior Door Supplementary Components   Door Hardware                                                            3              9 Door         $14,139        4
Athletic Flooring                        Athletic/Sport Flooring                                                  4          5,478 SF           $91,597        5
Interior Swinging Doors                  Wooden Door                                                              3              6 Door         $12,633        6
Interior Swinging Doors                  Metal Door (Steel)                                                       3              3 Door         $10,339        8
Compartments and Cubicles                Toilet Partitions                                                        4              6 Stall        $15,287        10
                                                                                                    Sub Total for System         7 items       $149,138

Mechanical
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Decentralized Cooling                    Package DX Unit (20 Ton)                                                 2              1 Ea.          $27,899        4



M▪A▪P▪P▪S ©, Jacobs 2021                                                 Revision Date - 09/24/2021                                                                       17
                                                                                                                 Facility Condition Assessment
                                                                                                            DeKalb County SD - Marbut Elementary School

Mechanical
Uniformat Description      LC Type Description                                              Priority       Qty UoM       Repair Cost Remaining Life
Exhaust Air                Wall Exhaust Fan                                                    3             1 Ea.           $5,156        5
HVAC Air Distribution      Ductwork (Bldg.SF)                                                  3          5,478 SF          $78,516        6
                                                                                 Sub Total for System        3 items       $111,572

Electrical
Uniformat Description      LC Type Description                                              Priority       Qty UoM       Repair Cost Remaining Life
Lighting Fixtures          Light Fixtures (Bldg SF)                                            4          5,478 SF         $109,491        5
Power Distribution         Panelboard - 120/208 225A                                           3             1 Ea.           $6,948        10
                                                                                 Sub Total for System        2 items       $116,439

Plumbing
Uniformat Description      LC Type Description                                              Priority       Qty UoM       Repair Cost Remaining Life
Domestic Water Equipment   Water Heater - Gas - 30 gallon                                      2             1 Ea.           $4,615        10
                                                                                 Sub Total for System        1 items         $4,615
                                                            Sub Total for Building 2020 - Building 2020     16 items       $778,518

                                                                  Total for: Marbut Elementary School       71 items    $10,959,822




M▪A▪P▪P▪S ©, Jacobs 2021                               Revision Date - 09/24/2021                                                                     18
                                                                               Facility Condition Assessment
                                                                           DeKalb County SD - Marbut Elementary School



 Supporting Photos




Cracked Terrazzo In Corridor                     Downspout Damaged




Restripe ADA Parking Spaces                      Partitions




Exterior Storefront Frames Are Rusted            Counter Does Not Meet ADA Requirements




M▪A▪P▪P▪S ©, Jacobs 2021                Revision Date - 09/24/2021                                                 19
 Revision Date - 09/24/2021




FACILITY CONDITION ASSESSMENT
              Martin Luther King, Jr. High School | 2021
                                                                                                                           Facility Condition Assessment
                                                                                                         DeKalb County SD - Martin Luther King, Jr. High School


 Executive Summary
 Martin Luther King, Jr. High School is located at 3991 Snapfinger Rd in Lithonia, GA. It comprises 262,945 gross square
 feet. At the time of the assessment the oldest building was 19 years old.
 The findings contained within this report are the result of an assessment of building systems performed by building
 professionals experienced in disciplines including architecture, mechanical, plumbing and electrical. Only those systems
 that were identified as having either an associated deficiency or life cycle event within a 10-year window is contained within
 this report. The full list of each school's systems that are present along with the associated priorities can be found in the flat
 file data grids submitted to Dekalb County. The projected replacement year of those assets within each system is also
 included within this table.The total current deficiencies for this site, in 2020 construction cost dollars, are estimated at
 $8,129,953. A ten-year need was developed to provide an understanding of the current need as well as the projected
 needs in the near future. For Martin Luther King, Jr. High School the ten-year need is $48,047,249.
 For planning purposes, the total current deficiencies and the first five years of projected life cycle needs were combined to
 calculate a Facility Condition Index (FCI). A 5-year FCI was calculated by dividing the 5-year need by the total replacement
 cost. Costs associated with new construction are not included in the FCI calculation. After the 5-year FCI was calculated,
 this value was subtracted from 100 to calculate the FCA Score in a similar fashion to report cards.
 The Martin Luther King, Jr. High School facility has a FCA score of 65.75% which is considered "Poor".

Summary of Findings
The table below summarizes the condition findings at Martin Luther King, Jr. High School.
Table 1: Facility Condition by Building


                                                                                                        Total 5 Yr Need      Total 10 Yr Need
                                                          Current       5-Year Life   Yrs 6-10 Life    (Yr 1-5 + Current    (Yr 1-10 + Current    Replacement      FCA
Number          Building Name                            Deficiencies   Cycle Cost     Cycle Cost             Defs)                Defs)              Cost         Score
Exterior Site
                Exterior Site                                $732,300      $294,078         $751,568          $1,026,378             $1,777,947
Permanent Building(s)
5010            Building 5010                              $7,045,527   $20,687,095      $10,881,799         $27,732,622           $38,614,421       $66,396,660   58.23%
5011            Building 5011                                $352,125    $2,994,757       $4,307,999          $3,346,882             $7,654,881      $27,330,090   87.75%
                Sub Total for Permanent Building(s):       $7,397,653   $23,681,852     $15,189,798         $31,079,504            $46,269,302      $93,726,748
                                       Total for Site:     $8,129,953   $23,975,930      $15,941,366         $32,105,883           $48,047,249       $93,726,748   65.75%

Note 1: Sitework improvements are proportionally incorporated into the building CRV and used to calulate the overall FCA Score.
Note 2: Aerial map including building number, gross SF, and year built of each building on the site is found on Page 3.




 M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                                         2
                                                           Facility Condition Assessment
                                                DeKalb County SD - Martin Luther King, Jr. High School


Aerial Images




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                               3
                                                                                         Facility Condition Assessment
                                                                              DeKalb County SD - Martin Luther King, Jr. High School


Approach and Methodology
The facility condition assessment includes a visual assessment of building systems that are readily available during a
facility walk-through. The standard process does not reflect invasive, destructive assessment methods that would
require special equipment, testing or scheduled power outages. The assessment was accomplished with a view
toward identifying significant maintenance and repair deficiencies that need correction. For the purposes of this
assessment, deficient conditions captured were limited to those items that did not qualify as routine maintenance
repairs. Copies of previous reports and other documentation that were relevant to the inspection were utilized if made
available in the process. Additionally, feedback from appropriate personnel to provide background information relative
to specific building operations, function, equipment conditions, past improvements and planned upgrades were
incorporated into the results if made available to the teams while on site. Two components of the facility condition
assessment are combined to total the cost for facility need. The two components of the facility condition assessment
are current deficiencies and life cycle forecast.

Current Deficiencies: Deficiencies are items in need of repair or replacement as a result of being broken, obsolete,
deferred maintenance, or beyond useful life. The existing deficiencies that currently require correction are identified
and assigned a priority. An example of a current deficiency might include a broken lighting fixture or an inoperable
roof top air conditioning unit.

Life Cycle Forecast: Life cycle analysis evaluates the ages of a building's systems to forecast system replacement as
they reach the end of serviceable life. Estimated Useful Lives were determined based on a combination of our
(Jacobs) professional experience, RS Means, and from industry standard tables (BOMA, ASHRAE). An example of a
life cycle system replacement is a roof with a 20-year life that has been in place for 15 years and may require
replacement in five years.

All members of the survey team recorded existing conditions, identified problems and deficiencies, and documented
corrective action and quantities. The team took digital photos at each site to better identify significant deficiencies.

Facility Deficiency Priority Levels
Deficiencies were ranked according to five priority levels, with Priority 1 items being the most critical to address:

Priority 1 – Mission Critical Concerns: Deficiencies or conditions that may directly affect the site’s ability to remain
open or deliver the educational curriculum. These deficiencies typically relate to building safety, code compliance,
severely damaged or failing building components, and other items that require near-term correction. An example of a
Priority 1 deficiency is a fire alarm system replacement.

Priority 2 – Indirect Impact to Educational Mission: Items that may progress to a Priority 1 item if not addressed in the
near term. Examples of Priority 2 deficiencies include inadequate roofing that could cause deterioration of integral
building systems, and conditions affecting building envelopes, such as roof and window replacements.

Priority 3 – Short-Term Conditions: Deficiencies that are necessary to the site's mission but may not require
immediate attention. These items should be considered necessary improvements required to maximize facility
efficiency and usefulness. Examples of Priority 3 items include site improvements and plumbing deficiencies.

Priority 4 – Long-Term Requirements: Items or systems that may be considered improvements to the instructional
environment. The improvements may be aesthetic or provide greater functionality. Examples include cabinets,
finishes, paving, removal of abandoned equipment, and educational accommodations associated with special
programs.

Priority 5 – Enhancements: Deficiencies aesthetic in nature or considered enhancements. Typical deficiencies in this
priority include repainting, replacing carpet, improved signage, or other improvements to the facility environment.




M▪A▪P▪P▪S ©, Jacobs 2021                      Revision Date - 09/24/2021                                                          4
                                                                                         Facility Condition Assessment
                                                                             DeKalb County SD - Martin Luther King, Jr. High School


Facility Condition Assessment(FCA) Score
Facility Condition Assessment (FCA) Scores are assigned after the Facility Condition Index (FCI) is calculated.
The Facility Condition Index (FCI) is used throughout the facility condition assessment industry as a general
indicator of a building’s health. Since 1991, the facility management industry has used an index called the FCI
to benchmark the relative condition of a group of sites. The FCI is derived by dividing the total repair cost,
including site-related repairs, by the total replacement cost of all buildings. It should be noted that costs in the
New Construction category are not included in the FCI calculation. In an effort to match the report card metrics,
the FCI is subtracted from 100 to assign the FCA Score. A facility with a lower FCA Score has more need, or
higher priority, than a facility with a higher FCA Score.




The replacement value represents the estimated cost of replacing the current building with another building of
like size, based on 2021 estimated cost of construction in the DeKalb County area. The estimated replacement
cost for this facility is $93,726,748. For planning purposes, the total 5-year need at the Martin Luther King, Jr.
High School is $32,105,883 (Life Cycle Years 1-5 plus the current FCI deficiency cost).

The Martin Luther King, Jr. High School facility has an FCA Score of 65.75%. which is considered "Poor".




                              Figure 1: 5-Year FCI




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                  5
                                                                                                                    Facility Condition Assessment
                                                                                                  DeKalb County SD - Martin Luther King, Jr. High School


The following table summarizes this site's current deficiencies by building system and priority.

Table 2: System by Priority (Site & Permanent Buildings)

                                                                                Priority

                  System                     1               2                     3               4                   5              Total             % of Total
Site                                                 $0               $0               $469,990        $256,432              $5,878       $732,300           9.01 %

Roofing                                              $0      $3,015,135                 $14,099               $0                $0      $3,029,234          37.26 %

Structural                                           $0               $0                    $0                $0                $0                $0         0.00 %

Exterior                                             $0          $593,054                   $0                $0            $10,924       $603,978           7.43 %

Interior                                             $0               $0                $53,349        $413,519               $196        $467,064           5.74 %

Mechanical                                           $0            $5,100               $11,055        $666,788                 $0        $682,943           8.40 %

Electrical                                           $0               $0               $945,103        $102,145              $8,199     $1,055,447          12.98 %

Plumbing                                             $0               $0                    $0             $2,554               $0             $2,554        0.03 %

Fire and Life Safety                             $7,654            $8,906                   $0                $0                $0            $16,560        0.20 %

Conveyances                                          $0               $0                $60,358               $0                $0            $60,358        0.74 %

Specialties                                          $0               $0                    $0     $1,479,515                   $0      $1,479,515          18.20 %

Total:                                           $7,654      $3,622,196            $1,553,955      $2,920,953               $25,196     $8,129,953




The building systems at the site with the most need include:
                                                                            Roofing                    -       $3,029,234
                                                                            Specialties                -       $1,479,515
                                                                            Electrical                 -       $1,055,447




M▪A▪P▪P▪S ©, Jacobs 2021                                   Revision Date - 09/24/2021                                                                                6
                                                                                    Facility Condition Assessment
                                                                         DeKalb County SD - Martin Luther King, Jr. High School



The chart below represents the building systems and associated deficiency costs.




Figure 2: System Deficiencies




M▪A▪P▪P▪S ©, Jacobs 2021                    Revision Date - 09/24/2021                                                       7
                                                                                                               Facility Condition Assessment
                                                                                                DeKalb County SD - Martin Luther King, Jr. High School


Life Cycle Capital Renewal Forecast
During the facility condition assessment, assessors inspected all major building systems. If an assessor identified a need
for immediate replacement, a deficiency was created with the item's repair costs. The identified deficiency contributes to the
facility's total current repair costs.

However, capital planning scenarios span multiple years, as opposed to being constrained to immediate repairs.
Construction projects may begin several years after the initial facility condition assessment. Therefore, in addition to the
current year repair costs, it is necessary to forecast the facility's future costs using a ten-year life cycle renewal forecast
model.

Life cycle renewal is the projection of future building system costs based upon each individual system’s expected
serviceable life. Building systems and components age over time, eventually break down, reach the end of their useful lives,
and may require replacement. While an item may be in good condition now, it might reach the end of its life before a
planned construction project occurs.

The following tables show ten-year life cycle capital renewal projections. The projections outline costs for major building
systems in which a component is expected to reach the end of its useful life and require capital funding for replacement.



Table 3a: Capital Renewal Forecast (Yrs 1-5)

                                                            Life Cycle Capital Renewal Projections
                                   Year 1              Year 2               Year 3                  Year 4             Year 5
System                              2022                2023                 2024                    2025               2026                 Total 1-5
Site                                             $0             $294,078                  $0                     $0                 $0      $294,078

Roofing                                          $0                  $0                   $0                     $0                 $0             $0

Exterior                                    $207,645                 $0                   $0                     $0              $9,054     $216,699

Interior                                         $0         $2,611,464                  $682             $1,129,171         $1,699,555     $5,440,871

Mechanical                                  $886,534            $712,073             $481,200            $2,516,589             $26,290    $4,622,686

Electrical                                       $0                  $0                   $0                 $30,535        $5,353,213     $5,383,748

Plumbing                                         $0             $946,862              $24,693                 $4,134                $0      $975,689

Fire and Life Safety                             $0                  $0          $1,119,121              $3,107,059                 $0     $4,226,180

Conveyances                                      $0                  $0                   $0                     $0                 $0             $0

Specialties                                      $0             $298,294                  $0                     $0         $2,517,685     $2,815,979

Total                                   $1,094,179          $4,862,771           $1,625,696              $6,787,488         $9,605,796    $23,975,930




M▪A▪P▪P▪S ©, Jacobs 2021                                Revision Date - 09/24/2021                                                                       8
                                                                                                                  Facility Condition Assessment
                                                                                                     DeKalb County SD - Martin Luther King, Jr. High School


Table 3b: Capital Renewal Forecast (Yrs 6-10)

                                                                      Life Cycle Capital Renewal Projections
                                                Year 6               Year 7           Year 8            Year 9         Year 10
System                         Total 1-5         2027                 2028             2029              2030           2031             Total 6-10     Total 1-10
Site                           $294,078             $301,048                  $0               $0                $0              $0      $301,048       $595,126

Roofing                              $0                     $0                $0               $0                $0       $2,872,665    $2,872,665     $2,872,665

Exterior                       $216,699                     $0                $0               $0                $0              $0             $0      $216,699

Interior                     $5,440,871             $589,127                  $0           $28,091        $1,618,402        $296,637    $2,532,258     $7,973,129

Mechanical                   $4,622,686                     $0                $0        $1,737,700               $0              $0     $1,737,700     $6,360,387

Electrical                   $5,383,748                     $0                $0        $2,124,583               $0         $354,094    $2,478,677     $7,862,425

Plumbing                       $975,689                  $4,697               $0          $387,316               $0              $0      $392,014      $1,367,703

Fire and Life Safety         $4,226,180                     $0                $0        $2,311,205          $550,041             $0     $2,861,247     $7,087,426

Conveyances                          $0             $119,810                  $0               $0                $0              $0      $119,810       $119,810

Specialties                  $2,815,979           $1,855,681                  $0          $513,659               $0         $276,609    $2,645,949     $5,461,928

Total                       $23,975,930           $2,870,364                  $0        $7,102,554        $2,168,444      $3,800,004   $15,941,366    $39,917,295




Figure 3: Ten Year Capital Renewal Forecast




M▪A▪P▪P▪S ©, Jacobs 2021                                          Revision Date - 09/24/2021                                                                         9
                                                                                               Facility Condition Assessment
                                                                                    DeKalb County SD - Martin Luther King, Jr. High School

Summary of High Priority Deficiencies


Priority 1 - Mission Critical Concerns                                                             Cost
  Emergency Exit Signage Replacement                                                              $1,197

  Fire Alarm Panel Replacement                                                                    $6,457

                                                                 Total for Priority 1             $7,654



Priority 2 - Indirect Impact to Educational Mission                                                Cost
  Metal Roof Architectural Roof Covering Replacement                                             $33,751

  Modified Membrane Has Holes That Should Be Repaired                                               $244

  Modified Roof Covering Replacement                                                           $2,981,140

  Aluminum Storefront Exterior Door Replacement                                                  $82,093

  Aluminum Window Replacement                                                                   $402,995

  Metal Exterior Door Replacement                                                               $104,556

  Storefront/Curtain Wall Replacement (Bldg SF)                                                   $3,410

  Ductless Split System AC Replacement                                                            $5,100

  Security Alarm Panel Replacement                                                                $8,906

                                                                 Total for Priority 2         $3,622,196




M▪A▪P▪P▪S ©, Jacobs 2021                               Revision Date - 09/24/2021                                                     10
                                                                                                                        Facility Condition Assessment
                                                                                                           DeKalb County SD - Martin Luther King, Jr. High School



Deficiency Summary
(Items below detail the totals referenced in Table 2)

Site Level Deficiencies
Site
Deficiency                                                                                   Category                    Qty UoM    Priority   Repair Cost    ID
Asphalt Driveway Replacement                                                                 Capital Renewal         64,000 SF         3         $386,924    6942
             Note:     Repave Driveway Starting Directly North-West Of Teams Courts, All The Way To South Parking Lot.
Concrete Walks Replacement                                                                   Capital Renewal           7,800 SF        3          $83,066    6944
             Location: Sidewalks Adjacent To The Parking Area West Of Track And Field Track (South Of Tennis Courts)
Asphalt Paving Replacement                                                                   Capital Renewal             188 CAR       4         $256,432    6939
             Note:     Repave All Parking Spots West Of Track And Field Track (South Of Tennis Courts). Old, Cracked, Deficient.
Paving Restriping                                                                            Deferred                    188 CAR       5           $5,878    6943
                                                                                             Maintenance
             Note:     Restripe All Parking Spots West Of Track And Field Track (South Of Tennis Courts)
                                                                                             Sub Total for System         4 items                $732,300
                                                                               Sub Total for School and Site Level        4 items                $732,300

Building: 5010 - Building 5010
Roofing
Deficiency                                                                                   Category                    Qty UoM    Priority   Repair Cost    ID
Metal Roof Architectural Roof Covering Replacement                                           Capital Renewal             900 SF        2          $33,751    7219
             Note:     Replace All Door Awning Structures (Arched, Standing Seam). Rusted On Underside, Deficient.
Modified Roof Covering Replacement                                                           Capital Renewal         92,000 SF         2       $2,981,140    7223
             Note:     Original Roof, Advise To Replace In Entirety - Leaking Issues.
Debris In Gutter Removal                                                                     Deferred                    100 LF        3             $485    7227
                                                                                             Maintenance
             Note:     Clean Gutters Along Gymnasium (316) And Auditorium (216) Standing Seam System.
             Location: Along Gymnasium 316 And Auditorium 216 Standing Seam System.
Gutter Replacement                                                                           Deferred                    150 LF        3           $2,869    7228
                                                                                             Maintenance
             Note:     Fascia Along South Wall Of 316 Gymnasium Is Coming Off. Repair And Re-Fasten Caping.
             Location: Along South Wall Of 316 Gymnasium
Membrane Flashing At Parapet (>2') Repair                                                    Deferred                    150 LF        3           $1,111 7238
                                                                                             Maintenance
             Note:     Membrane + Lashing Requires Replacement Along Entire East Wall
             Location: Along East Wall - Room 405 - Dining Commons
Modified Covering Has Blisters That Should Be Repaired                                       Deferred                    30 Ea.        3           $5,780    7225
                                                                                             Maintenance
             Note:     Significant Blistering. Repair It, Not Replacing Roof
                                                                                             Sub Total for System         6 items              $3,025,136

Exterior
Deficiency                                                                                   Category                    Qty UoM    Priority   Repair Cost    ID
Aluminum Storefront Exterior Door Replacement                                                Capital Renewal             22 Door       2          $82,093    7019
             Note:     Old, Deficient
Aluminum Window Replacement                                                                  Capital Renewal           1,280 SF        2         $127,998    7011
             Note:     Old, Deficient
             Location: Stairwells
Aluminum Window Replacement                                                                  Capital Renewal           2,050 SF        2         $204,997    7012
             Note:     4'X2' Size. Old, Deficient
             Location: Clerestories At Classrooms And Cafeteria (405)
Aluminum Window Replacement                                                                  Capital Renewal             100 SF        2          $10,000    7013
             Note:     Old, Deficient
             Location: Fast And Facade
Aluminum Window Replacement                                                                  Capital Renewal             600 SF        2          $59,999    7016
             Note:     Old, Deficient
             Location: Round Windows At East Wing Hallways (By Classrooms) And North Wall At Gym


M▪A▪P▪P▪S ©, Jacobs 2021                                         Revision Date - 09/24/2021                                                                         11
                                                                                                                     Facility Condition Assessment
                                                                                                       DeKalb County SD - Martin Luther King, Jr. High School

Exterior
Deficiency                                                                               Category                    Qty UoM     Priority   Repair Cost    ID
Metal Exterior Door Replacement                                                          Capital Renewal              30 Door       2         $104,556    7018
             Note:     Old, Deficient
                                                                                        Sub Total for System           6 items                $589,644

Interior
Deficiency                                                                               Category                    Qty UoM     Priority   Repair Cost    ID
Athletic Sport Flooring Replacement                                                      Capital Renewal            1,863 SF        3          $26,871 10750
Rubber Flooring Replacement                                                              Capital Renewal            1,863 SF        3          $26,478 10748
Acoustical Ceiling Tile Replacement                                                      Capital Renewal            1,050 SF        4           $5,773    7028
             Note:     Replace Tile
             Location: 326
Carpet Flooring Replacement                                                              Capital Renewal            1,863 SF        4          $22,175 10749
Terrazzo Flooring Replacement                                                            Capital Renewal             500 SF         4          $16,019    7038
             Note:     Replace (3) 9X12 Terrazzo Tiles, Cracked
             Location: Room 405 - Dining Commons
Toilet Partition Replacement                                                             Capital Renewal              65 Stall      4         $123,229    7029
             Note:     Old, Damaged
             Location: Replace In All Bathrooms And Locker Rooms Across Buildings
Vinyl Composition Tile Replacement                                                       Capital Renewal            2,500 SF        4          $19,996    7039
             Note:     Replace
Wood Flooring Replacement                                                                Capital Renewal           11,176 SF        4         $226,327 10747
                                                                                        Sub Total for System           8 items                $466,868

Mechanical
Deficiency                                                                               Category                    Qty UoM     Priority   Repair Cost    ID
Ductless Split System AC Replacement                                                     Capital Renewal               1 Ea.        2           $5,100    7170
             Note:     Not Working, East Roof Section, They Have A New Unit On The Roof But It Is Not Connected
             Location: East Roof Section
Small Diameter Exhausts/Hoods Replacement                                                Capital Renewal               6 Ea.        3          $11,055    7171
             Note:     2 Damaged Above Kitchen And 4 Damaged On East Roof Section
             Location: Above Kitchen And East Roof Section
Existing Controls Are Obsolete                                                           Capital Renewal          186,272 SF        4         $472,357 10515
                                                                                        Sub Total for System           3 items                $488,512

Electrical
Deficiency                                                                               Category                    Qty UoM     Priority   Repair Cost    ID
2 X 4 Interior Fluorescent Lighting Replacement                                          Capital Renewal             150 Ea.        3          $61,809    7106
             Note:     Old
             Location: Multiple Locations
2 X 4 Interior Fluorescent Lighting Replacement                                          Capital Renewal              28 Ea.        3          $11,538    7113
2 X 4 Interior Fluorescent Lighting Replacement                                          Capital Renewal            1,502 Ea.       3         $618,913    7114
Canopy Lighting Replacement                                                              Capital Renewal              10 Ea.        3          $19,583    7095
             Location: Multiple Locations
Exterior Mounted Building Lighting Replacement                                           Capital Renewal               2 Ea.        3           $1,696    7100
             Note:     Replace
             Location: Outside Mech And Electrical Room (401 And 402)
H.I.D. Lighting Replacement                                                              Capital Renewal              36 Ea.        3          $19,968    7109
             Note:     Old Lights (Fluorescent)
             Location: Gym
Interior Power Wiring Replacement                                                        Deferred                   2,000 SF        3           $2,233    7111
                                                                                         Maintenance
             Note:     Replace Power Wiring
             Location: Where Waste Leakage Has Caused Damage
Lightning Protection System Installation                                                 Functional Deficiency    186,272 SF        3         $136,759    7091
Mounted Building Lighting Installation                                                   Functional Deficiency         3 Ea.        3           $4,176    7098
             Note:     Install Lights Behind Building




M▪A▪P▪P▪S ©, Jacobs 2021                                      Revision Date - 09/24/2021                                                                         12
                                                                                                                    Facility Condition Assessment
                                                                                                         DeKalb County SD - Martin Luther King, Jr. High School

Electrical
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Public Address System Replacement, Non-main Building                                       Deferred               10,254 SF         3           $6,824    7078
                                                                                           Maintenance
             Note:     Replace Pa System
1 X 4 Interior Fluorescent Light Fixture Replacement                                       Capital Renewal           136 Ea.        4          $36,315    7103
             Note:     Old
             Location: Multiple Locations
1 X 4 Interior Fluorescent Light Fixture Replacement                                       Capital Renewal           136 Ea.        4          $36,315    7112
2 X 2 Interior Fluorescent Lighting Replacement                                            Capital Renewal            28 Ea.        4           $7,409    7105
             Location: 405 Dining Commons
Pendant Lighting Replacement                                                               Capital Renewal            30 Ea.        4          $20,099    7108
             Note:     Old
             Location: Auditorium
Stage Lighting Replacement                                                                 Capital Renewal             3 Ea.        4           $2,008    7110
             Note:     Old Lights
             Location: Stage
                                                                                           Sub Total for System       15 items                $985,645

Plumbing
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Restroom Lavatories Plumbing Fixtures Replacement                                          Capital Renewal             1 Ea.        4           $2,554    7142
             Note:     Falling Off
             Location: Room 324
                                                                                           Sub Total for System        1 items                  $2,554

Fire and Life Safety
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Emergency Exit Signage Replacement                                                         Capital Renewal             2 Ea.        1           $1,197    7086
             Location: Multiple Locations
Fire Alarm Panel Replacement                                                               Capital Renewal             1 Ea.        1           $6,457    7084
             Note:     Replace Old Panel
             Location: Electrical Room
                                                                                           Sub Total for System        2 items                  $7,654

Specialties
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Bleacher Replacement                                                                       Capital Renewal         2,880 Seat       4       $1,118,567    7047
             Note:     Bleachers Are Original From Building - Old, Deficient And Mech Issues. Replace.
Metal Gym Locker Replacement                                                               Capital Renewal           682 Ea.        4         $311,297    7044
             Note:     Gym Lockers In Abysmal Condition. Relace.
             Location: Rooms 324 And 317 Boys Locker. Also Rooms 402, 308, 407 (Kitchen, Staff Lockers)
Replace Cabinetry In Classes/Labs                                                          Capital Renewal             6 Room       4          $49,651    7041
             Note:     Fixed Casework Ok In Most Rooms - Except Rooms 1010 - Art. Replace 6X16Lf = 96Lf
                                                                                           Sub Total for System        3 items              $1,479,515
                                                                    Sub Total for Building 5010 - Building 5010       44 items              $7,045,527

Building: 5011 - Building 5011
Roofing
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Modified Membrane Has Holes That Should Be Repaired                                        Deferred                    5 Ea.        2             $244    7328
                                                                                           Maintenance
             Note:     Leaks
             Location: Rooms 2154, 2179, 2Nd Floor Hallway (East) Next To Room 2161, East Stairwell
Modified Covering Has Blisters That Should Be Repaired                                     Deferred                   20 Ea.        3           $3,854    7327
                                                                                           Maintenance
             Note:     Several Blisters, Repair
                                                                                           Sub Total for System        2 items                  $4,098




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                                        13
                                                                                                                        Facility Condition Assessment
                                                                                                           DeKalb County SD - Martin Luther King, Jr. High School

Exterior
Deficiency                                                                                   Category                    Qty UoM      Priority    Repair Cost    ID
Storefront/Curtain Wall Replacement (Bldg SF)                                                Capital Renewal             150 SF          2            $3,410    7260
             Note:     (5) 3.5'X7' Curtainwall Glass Panels Have Shattered (Internal Pane In 4 Cases, External Pane In 1 Case). Replace Panels.
             Location: Room 160, 1St Floor Hallway. Room 161, 2153, 2154, And 2Nd Floor Hallway, Opp 2159 And 2156 Rooms. Specified Hallways Are In East Wing
                       Of Building
Exterior Cleaning                                                                            Deferred                  3,000 SF          5           $10,924    7261
                                                                                             Maintenance                     Wall
             Note:     Power Wash All Curtainwall And Metal Panels At East And West Stairwells
                                                                                           Sub Total for System            2 items                   $14,334

Interior
Deficiency                                                                                   Category                    Qty UoM      Priority    Repair Cost    ID
Interior Ceiling Repainting                                                                  Deferred                    100 SF          5              $196    7272
                                                                                             Maintenance
             Note:     North Storefront Doors Near 405 Dining Commons (Building 1020) Have Gypsum Ceiling And Soffit Which Constantly Leaks. Inspect, Repair Leak
                       And Repaint
             Location: North Storefront Doors Near 405 Dining Commons (Building 1020)
                                                                                           Sub Total for System            1 items                      $196

Mechanical
Deficiency                                                                                   Category                    Qty UoM      Priority    Repair Cost    ID
Existing Controls Are Obsolete                                                               Capital Renewal         76,673 SF           4          $194,431 10514
                                                                                           Sub Total for System            1 items                  $194,431

Electrical
Deficiency                                                                                   Category                    Qty UoM      Priority    Repair Cost    ID
Electrical Receptacle Replacement                                                            Capital Renewal               6 Ea.         3              $754    7313
             Location: Multiple Locations
Ground Mounted Lighting Installation                                                         Functional Deficiency         1 Ea.         3            $1,773    7321
             Note:     Install Behind Room 164
             Location: Behind Room 164
Lightning Protection System Installation                                                     Functional Deficiency   76,673 SF           3           $56,293    7319
Mounted Building Lighting Installation                                                       Functional Deficiency         2 Ea.         3            $2,784    7322
             Note:     Install New Light In The Area Outside New Dining Commons
Ground Mounted Lighting Replacement                                                          Capital Renewal               7 Ea.         5            $8,199    7320
             Note:     Install Behind Room 164. Replace
             Location: Behind Room 164
                                                                                           Sub Total for System            5 items                   $69,802

Fire and Life Safety
Deficiency                                                                                   Category                    Qty UoM      Priority    Repair Cost    ID
Security Alarm Panel Replacement                                                             Capital Renewal               2 Ea.         2            $8,906    7315
             Note:     Replace Front Panels And The One In Electrical Room And Fix Errors.
             Location: Electrical Room
                                                                                           Sub Total for System            1 items                    $8,906

Conveyances
Deficiency                                                                                   Category                    Qty UoM      Priority    Repair Cost    ID
Elevator is Not ADA Compliant                                                                ADA Compliance                2 Stop        3           $60,358    7248
             Note:     Elevator Is Not Working Due To Electrical And Security System Issues (Not Mech Issues) Check And Repair The Front Card Access Panel.
                                                                                           Sub Total for System            1 items                   $60,358
                                                                    Sub Total for Building 5011 - Building 5011           13 items                  $352,125
                                                                                                Total for Campus          61 items                $8,129,953




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                                              14
                                                                                                                         Facility Condition Assessment
                                                                                                            DeKalb County SD - Martin Luther King, Jr. High School



Life Cycle Summary Yrs 1-10
(Items below detail the totals referenced in Tables 3a & 3b)

Site Level Life Cycle Items
Site
Uniformat Description                    LC Type Description                                     Priority         Qty UoM        Repair Cost Remaining Life
Athletic Areas                           Competition Style Track                                    4               1 Ea.          $294,078        2
Fences and Gates                         Fencing - Chain Link (4 Ft)                                3            1,200 LF           $63,581        6
Fences and Gates                         Fencing - Chain Link (8-10 Ft)                             3            2,700 LF          $237,467        6
                                                                                      Sub Total for System          3 items        $595,126

Electrical
Uniformat Description                    LC Type Description                                     Priority         Qty UoM        Repair Cost Remaining Life
Parking Lot Lighting                     Pole Lighting                                              3              65 Ea.          $450,520        8
                                                                                      Sub Total for System          1 items        $450,520
                                                                                   Sub Total for Building -         4 items       $1,045,647

Building: 5010 - Building 5010
Roofing
Uniformat Description                    LC Type Description                                     Priority         Qty UoM        Repair Cost Remaining Life
Steep Slope Roofing                      Metal (Architectural - Standing Seam)                      2           57,000 SF         $2,872,665       10
                                                                                      Sub Total for System          1 items       $2,872,665

Exterior
Uniformat Description                    LC Type Description                                     Priority         Qty UoM        Repair Cost Remaining Life
Exterior Operating Windows               Aluminum - Windows per SF                                  2            2,016 SF          $207,645        1
Exterior Utility Doors                   Overhead Door                                              3               1 Door           $9,054        5
                                                                                      Sub Total for System          2 items        $216,699

Interior
Uniformat Description                    LC Type Description                                     Priority         Qty UoM        Repair Cost Remaining Life
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                4          167,645 SF          $977,874        2
Wall Painting and Coating                Painting/Staining (Bldg SF)                                5          171,370 SF          $765,919        2
Interior Door Supplementary Components   Door Hardware                                              3             299 Door         $442,755        2
Suspended Plaster and                    Painted ceilings                                           5            3,725 SF            $8,209        4
Resilient Flooring                       Vinyl Composition Tile Flooring                            4          117,351 SF         $1,056,429       4
Interior Coiling Doors                   Interior Overhead Doors                                    3               2 Ea.           $11,188        4
Acoustical Suspended Ceilings            Ceilings - Acoustical Grid System                          4          167,645 SF          $760,884        5
Tile Flooring                            Ceramic Tile                                               4            9,314 SF          $179,349        5
Tile Flooring                            Quarry Tile                                                4            5,588 SF          $166,493        5
Interior Swinging Doors                  Wooden Door                                                3             290 Door         $592,829        5
Carpeting                                Carpet                                                     4            7,451 SF          $105,897        6
Carpeting                                Carpet                                                     4            1,863 SF           $28,091        8
Wall Painting and Coating                Painting/Staining (Bldg SF)                                5          171,370 SF          $941,983        9
Compartments and Cubicles                Toilet Partitions                                          4              65 Stall        $165,609        10
Interior Swinging Doors                  Metal Door (Steel)                                         3               9 Door          $32,907        10
                                                                                      Sub Total for System         15 items       $6,236,416

Mechanical
Uniformat Description                    LC Type Description                                     Priority         Qty UoM        Repair Cost Remaining Life
Heat Generation                          Boiler - Steel Tube (2400 MBH)                             3               1 Ea.           $96,980        1
Heat Generation                          Boiler - Copper Tube (400 MBH)                             2               4 Ea.           $87,634        1
Decentralized Cooling                    Condenser - Outside Air Cooled (3 Tons)                    2               2 Ea.           $12,439        1
Decentralized Cooling                    Ductless Split System (2 Ton)                              2               2 Ea.            $9,194        1
Air Distribution                         Make-up Air Unit                                           3               2 Ea.           $17,214        1
HVAC Air Distribution                    Energy Recovery Unit (8,000 CFM)                           3               7 Ea.          $154,060        1
HVAC Air Distribution                    Roof Top Unit - DX Gas (25 Ton)                            2               2 Ea.          $124,456        1
                                  Note: 2001
HVAC Air Distribution                    Roof Top Unit - DX Gas (15 Ton)                            2               4 Ea.          $122,881        1
                                  Note: 2001
HVAC Air Distribution                    Roof Top Unit - DX Gas (10 Ton)                            2               2 Ea.           $46,939        1
                                  Note: 2001


M▪A▪P▪P▪S ©, Jacobs 2021                                               Revision Date - 09/24/2021                                                             15
                                                                                                                                  Facility Condition Assessment
                                                                                                                      DeKalb County SD - Martin Luther King, Jr. High School

Mechanical
Uniformat Description                   LC Type Description                                                Priority         Qty UoM        Repair Cost Remaining Life
HVAC Air Distribution                   Roof Top Unit - DX Gas (10 Ton)                                       2               5 Ea.          $117,347        1
                                  Note: 2001
HVAC Air Distribution                   Roof Top Unit - DX Gas (5 Ton)                                        2               1 Ea.           $15,406        1
                                  Note: 2001
Exhaust Air                             Roof Exhaust Fan - Small                                              3              35 Ea.           $66,420        1
Exhaust Air                             Roof Exhaust Fan - Large                                              3               2 Ea.           $15,564        1
Decentralized Heating Equipment         Unit Heater Electric (5 KW)                                           3               1 Ea.            $1,296        2
Decentralized Cooling                   Heat Pump (3 Ton)                                                     5              80 Ea.          $710,776        2
Central Cooling                         Cooling Tower - Metal (300 Tons)                                      2               1 Ea.           $59,410        3
Facility Hydronic Distribution          2-Pipe System (Cold)                                                  3          186,272 SF          $342,195        3
Facility Hydronic Distribution          Pump - 1HP or Less (Ea.)                                              4               1 Ea.            $4,431        3
Facility Hydronic Distribution          Pump - 1HP or Less (Ea.)                                              4               1 Ea.            $4,431        3
Facility Hydronic Distribution          Pump- 25HP (Ea.)                                                      4               2 Ea.           $29,550        3
Facility Hydronic Distribution          Pump- 10HP (Ea.)                                                      4               2 Ea.           $23,754        3
Facility Hydronic Distribution          Pump - 1HP or Less (Ea.)                                              4               1 Ea.            $4,431        3
Exhaust Air                             Interior Ceiling Exhaust Fan                                          3               3 Ea.            $1,500        3
Exhaust Air                             Kitchen Exhaust Hoods                                                 3               1 Ea.           $11,498        3
HVAC Air Distribution                   Ductwork (Bldg.SF)                                                    3          186,272 SF         $2,516,589       4
Heat Generation                         Heat Exchanger - Water to Water (Flat Plate - 800 GPM)                2               1 Ea.          $145,563        8
HVAC Air Distribution                   Roof Top Unit - DX Gas (25 Ton)                                       2               3 Ea.          $229,597        8
                                  Note: 2014
HVAC Air Distribution                   Roof Top Unit - DX Gas (15 Ton)                                       2               3 Ea.          $113,345        8
                                  Note: 2014
                                                                                                 Sub Total for System        28 items       $5,084,902

Electrical
Uniformat Description                   LC Type Description                                                Priority         Qty UoM        Repair Cost Remaining Life
Lighting Fixtures                       Building Mounted Fixtures (Ea.)                                       4              16 Ea.           $15,268        4
Lighting Fixtures                       Canopy Mounted Fixtures (Ea.)                                         4              31 Ea.           $70,378        5
Lighting Fixtures                       Light Fixtures (Bldg SF)                                              4          186,272 SF         $3,723,096       5
Electrical Service                      Switchgear - Main Dist Panel (3000 Amps)                              2               5 Ea.          $405,095        8
Transfer Switches                       Automatic Transfer Switch (Amps)                                      3             400 Amps          $16,365        8
Electrical Service                      Transformer (112.5 KVA)                                               2               5 Ea.           $59,002        8
Electrical Service                      Transformer (75 KVA)                                                  2               4 Ea.           $34,717        8
Electrical Service                      Transformer (45 KVA)                                                  2               1 Ea.            $7,050        8
Electrical Service                      Transformer (45 KVA)                                                  2               1 Ea.            $7,050        8
Electrical Service                      Transformer (30 KVA)                                                  2               1 Ea.            $6,573        8
Power Distribution                      Panelboard - 120/208 225A                                             3              21 Ea.          $137,546        8
                                  Note: (a)
Power Distribution                      Panelboard - 120/208 400A                                             3               9 Ea.          $132,288        8
                                  Note: RR, 1R, 2R, 3R, 4R, 5R, 6R, 7R, 8R
Power Distribution                      Panelboard - 120/208 400A                                             3               5 Ea.           $73,493        8
                                  Note: 9R, 10R, BR, CR (no name).
Power Distribution                      Panelboard - 120/208 100A                                             3               1 Ea.            $3,314        8
                                  Note: EQ
Power Distribution                      Panelboard - 277/480 100A                                             3               7 Ea.           $55,761        8
                                  Note: 1HLA, 1HLB, 2HLA, 2HLB, AHLA, DHLA, GHLA
Power Distribution                      Panelboard - 277/480 225A                                             3               1 Ea.           $11,163        8
                                  Note: HEM
Power Distribution                      Panelboard - 277/480 400A                                             3              10 Ea.          $165,436        8
                                  Note: GAC #2, AC1, AC2, AC3, AC4, AC42, AC5, AC6, AC7, AC8
Power Distribution                      Panelboard - 277/480 600A                                             3               2 Ea.           $43,403        8
                                  Note: GAC #1, AAC
Audio-Video Systems                     PA Communications No Head Unit (Bldg SF)                              2          186,272 SF          $157,040        8
Packaged Generator Assemblies           Emergency Generator (75 KW)                                           2               1 Ea.           $63,546        10
Power Distribution                      Power Wiring                                                          3          186,272 SF          $279,529        10
                                                                                                 Sub Total for System        21 items       $5,467,113

Plumbing
Uniformat Description                   LC Type Description                                                Priority         Qty UoM        Repair Cost Remaining Life
Plumbing Fixtures                       Classroom Lavatory                                                    4             100 Ea.          $255,789        2
Plumbing Fixtures                       Restroom Lavatory                                                     3              50 Ea.          $135,465        2



M▪A▪P▪P▪S ©, Jacobs 2021                                               Revision Date - 09/24/2021                                                                       16
                                                                                                                                          Facility Condition Assessment
                                                                                                                             DeKalb County SD - Martin Luther King, Jr. High School

Plumbing
Uniformat Description                       LC Type Description                                                   Priority         Qty UoM        Repair Cost Remaining Life
Plumbing Fixtures                           Sink - Service / Mop Sink                                                5               7 Ea.            $5,557        2
Plumbing Fixtures                           Showers                                                                  5              27 Ea.           $35,184        2
Plumbing Fixtures                           Toilets                                                                  3              80 Ea.          $403,709        2
Plumbing Fixtures                           Urinals                                                                  3              27 Ea.           $36,470        2
Plumbing Fixtures                           Refrigerated Drinking Fountain                                           4              34 Ea.           $74,688        2
Domestic Water Equipment                    Water Heater - Electric - 40 gallon                                      2               1 Ea.            $2,757        3
Domestic Water Equipment                    Water Heater - Electric - 30 gallon                                      2               8 Ea.           $17,549        3
Domestic Water Equipment                    Backflow Preventers - 2 in. (Ea.)                                        5               2 Ea.            $4,697        6
Facility Potable-Water Storage Tanks        Water Heater Storage Tank - 250 Gallon                                   3               1 Ea.           $19,768        8
                                       Note: 2001
                                                                                                       Sub Total for System         11 items        $991,633

Fire and Life Safety
Uniformat Description                       LC Type Description                                                   Priority         Qty UoM        Repair Cost Remaining Life
Fire Detection and Alarm                    Fire Alarm                                                               1          186,272 SF         $1,119,121       3
Security System Component                   Security Alarm System                                                    1          186,272 SF         $2,201,062       4
Water-Based Fire-Suppression                Fire Sprinkler System (Bldg.SF)                                          1          186,272 SF         $2,311,205       8
                                                                                                       Sub Total for System          3 items       $5,631,387

Conveyances
Uniformat Description                       LC Type Description                                                   Priority         Qty UoM        Repair Cost Remaining Life
Elevators                                   Passenger elevator cab finishes                                          4               1 Ea.            $8,964        6
Elevators                                   Hydraulic (Passenger Elev)                                               4               1 Ea.          $110,846        6
                                                                                                       Sub Total for System          2 items        $119,810

Specialties
Uniformat Description                       LC Type Description                                                   Priority         Qty UoM        Repair Cost Remaining Life
Casework                                    Lockers, Gym                                                             4             616 Ea.          $298,294        2
Casework                                    Lockers                                                                  4            2,224 Ea.        $1,291,358       5
Casework                                    Lockers                                                                  4            2,112 Ea.        $1,226,326       5
Casework                                    Fixed Cabinetry                                                          4             114 Room        $1,126,442       6
Casework                                    Lockers, Gym                                                             4            1,338 Ea.         $729,239        6
Fixed Multiple Seating                      Auditorium Seating                                                       4             488 Ea.          $276,609        10
                                                                                                       Sub Total for System          6 items       $4,948,269
                                                                                  Sub Total for Building 5010 - Building 5010       89 items      $31,568,894

Building: 5011 - Building 5011
Interior
Uniformat Description                       LC Type Description                                                   Priority         Qty UoM        Repair Cost Remaining Life
Suspended Plaster and                       Painted ceilings                                                         5            2,300 SF            $4,777        2
Wall Painting and Coating                   Painting/Staining (Bldg SF)                                              5           76,673 SF          $342,681        2
Carpeting                                   Carpet                                                                   4            6,134 SF           $77,457        2
Acoustical Suspended Ceilings               Ceiling Exposed Metal Structure                                          5             767 SF               $682        3
Compartments and Cubicles                   Toilet Partitions                                                        4              25 Stall         $53,345        4
Acoustical Suspended Ceilings               Ceilings - Acoustical Tiles                                              4           73,606 SF          $483,231        6
Wall Painting and Coating                   Painting/Staining (Bldg SF)                                              5           76,673 SF          $421,455        9
Interior Door Supplementary Components      Door Hardware                                                            3             140 Door         $254,964        9
Carpeting                                   Carpet                                                                   4            6,134 SF           $98,121        10
                                                                                                       Sub Total for System          9 items       $1,736,713

Mechanical
Uniformat Description                       LC Type Description                                                   Priority         Qty UoM        Repair Cost Remaining Life
Facility Hydronic Distribution              Pump - 1HP or Less (Ea.)                                                 4               2 Ea.            $9,402        5
HVAC Air Distribution                       VAV Boxes / Terminal Device                                              4               4 Ea.           $16,888        5
Decentralized Heating Equipment             Heating Unit Vent - Electric                                             3               6 Ea.           $77,491        8
Decentralized Heating Equipment             Unit Heater Electric (5 KW)                                              3               3 Ea.            $4,643        8
Decentralized Cooling                       Ductless Split System (1 Ton)                                            2               9 Ea.           $32,200        8
Decentralized Cooling                       Heat Pump (12 Ton)                                                       2               7 Ea.          $214,444        8
HVAC Air Distribution                       Roof Top Unit - DX Gas (15 Ton)                                          2               1 Ea.           $37,781        8
HVAC Air Distribution                       Roof Top Unit - DX Gas (15 Ton)                                          2               1 Ea.           $37,781        8
HVAC Air Distribution                       Roof Top Unit - DX Gas (40 Ton)                                          2               1 Ea.           $97,800        8
HVAC Air Distribution                       Roof Top Unit - DX Gas (40 Ton)                                          2               1 Ea.           $97,800        8
HVAC Air Distribution                       Roof Top Unit - DX Gas (25 Ton)                                          2               1 Ea.           $76,533        8



M▪A▪P▪P▪S ©, Jacobs 2021                                                   Revision Date - 09/24/2021                                                                          17
                                                                                                               Facility Condition Assessment
                                                                                                   DeKalb County SD - Martin Luther King, Jr. High School

Mechanical
Uniformat Description             LC Type Description                                   Priority         Qty UoM        Repair Cost Remaining Life
Decentralized Cooling             Heat Pump (10 Ton)                                       2               6 Ea.          $171,817        8
Decentralized Cooling             Heat Pump (10 Ton)                                       2               4 Ea.          $114,544        8
Decentralized Cooling             Heat Pump (10 Ton)                                       2              10 Ea.          $286,361        8
                                                                              Sub Total for System        14 items       $1,275,485

Electrical
Uniformat Description             LC Type Description                                   Priority         Qty UoM        Repair Cost Remaining Life
Lighting Fixtures                 Building Mounted Fixtures (Ea.)                          4              16 Ea.           $15,268        4
Lighting Fixtures                 Canopy Mounted Fixtures (Ea.)                            4              12 Ea.           $27,243        5
Lighting Fixtures                 Light Fixtures (Bldg SF)                                 4           76,673 SF         $1,532,495       5
Transfer Switches                 Automatic Transfer Switch (Amps)                         3               2 Amps              $82        8
                           Note: (2Ea.) 7Amps
Electrical Service                Transformer (75 KVA)                                     2               2 Ea.           $17,359        8
Electrical Service                Transformer (30 KVA)                                     2               1 Ea.            $6,573        8
Electrical Service                Transformer (15 KVA)                                     2               2 Ea.           $12,761        8
Power Distribution                Distribution Panels (800 Amps)                           3               2 Ea.           $44,219        8
Power Distribution                Distribution Panels (600 Amps)                           3               1 Ea.           $21,202        8
                           Note: DHC
Power Distribution                Panelboard - 120/208 225A                                3               3 Ea.           $19,649        8
                           Note: L1A, (1,2,3)
Power Distribution                Panelboard - 120/208 225A                                3               3 Ea.           $19,649        8
                           Note: L1A, (1,2,3) - Install blanks.
Power Distribution                Panelboard - 120/208 225A                                3               3 Ea.           $19,649        8
                           Note: L1B (1,2,3)
Power Distribution                Panelboard - 120/208 125A                                3               1 Ea.            $1,738        8
                           Note: EL1
Power Distribution                Panelboard - 277/480 225A                                3               1 Ea.           $11,163        8
                           Note: HL1A
Power Distribution                Panelboard - 277/480 400A                                3               2 Ea.           $33,087        8
                           Note: HM2C
Power Distribution                Panelboard - 277/480 225A                                3               1 Ea.           $11,163        8
                           Note: HLC2
Audio-Video Systems               PA Communications No Head Unit (Bldg SF)                 2           76,673 SF           $64,641        8
Power Distribution                Panelboard - 277/480 225A                                3               2 Ea.           $22,324        8
                           Note: HL1B (1 AND 2)
Power Distribution                Panelboard - 277/480 400A                                3               1 Ea.           $16,544        8
                           Note: HM1B (1 AND 2)
Power Distribution                Panelboard - 277/480 225A                                3               1 Ea.           $11,163        8
                           Note: EHI
Power Distribution                Panelboard - 120/208 125A                                3               1 Ea.            $1,738        8
                           Note: LD
Power Distribution                Panelboard - 277/480 225A                                3               1 Ea.           $11,163        8
                           Note: HD
Power Distribution                Panelboard - 277/480 225A                                3               1 Ea.           $11,163        8
                           Note: EHM
Power Distribution                Panelboard - 120/208 125A                                3               1 Ea.            $1,738        8
                           Note: ELM
Landscape Lighting                Ground Mounted Fixtures (Ea.)                            4               7 Ea.           $11,019        10
                                                                              Sub Total for System        25 items       $1,944,791

Plumbing
Uniformat Description             LC Type Description                                   Priority         Qty UoM        Repair Cost Remaining Life
Domestic Water Equipment          Water Heater - Electric - 30 gallon                      2               2 Ea.            $4,387        3
Domestic Water Equipment          Water Heater - Instant 6.4 GPM                           2               1 Ea.            $1,828        4
Domestic Water Equipment          Water Heater - Instant 9.4 GPM                           2               1 Ea.            $2,306        4
Plumbing Fixtures                 Restroom Lavatory                                        3              32 Ea.          $103,522        8
Plumbing Fixtures                 Sink - Service / Mop Sink                                5               2 Ea.            $1,896        8
Plumbing Fixtures                 Showers                                                  5               1 Ea.            $1,556        8
Plumbing Fixtures                 Toilets                                                  3              33 Ea.          $198,845        8
Plumbing Fixtures                 Urinals                                                  3               9 Ea.           $14,516        8
Plumbing Fixtures                 Refrigerated Drinking Fountain                           4              18 Ea.           $47,214        8
                                                                              Sub Total for System         9 items        $376,069



M▪A▪P▪P▪S ©, Jacobs 2021                                          Revision Date - 09/24/2021                                                         18
                                                                                                               Facility Condition Assessment
                                                                                                   DeKalb County SD - Martin Luther King, Jr. High School

Fire and Life Safety
Uniformat Description       LC Type Description                                         Priority         Qty UoM        Repair Cost Remaining Life
Security System Component   Security Alarm System                                          1           76,673 SF          $905,997        4
Fire Detection and Alarm    Fire Alarm                                                     1           76,673 SF          $550,041        9
                                                                             Sub Total for System          2 items       $1,456,039

Specialties
Uniformat Description       LC Type Description                                         Priority         Qty UoM        Repair Cost Remaining Life
Casework                    Fixed Cabinetry                                                4              49 Room         $513,659        8
                                                                             Sub Total for System          1 items        $513,659
                                                       Sub Total for Building 5011 - Building 5011        60 items       $7,302,755

                                                     Total for: Martin Luther King, Jr. High School      153 items      $39,917,296




M▪A▪P▪P▪S ©, Jacobs 2021                            Revision Date - 09/24/2021                                                                       19
                                                                                                 Facility Condition Assessment
                                                                                   DeKalb County SD - Martin Luther King, Jr. High School



 Supporting Photos




South Elevation Of Building - East Side (Classrooms). Cover    South Elevation Of Building - West Side (Gymnasium). Cover
Photo                                                          Photo




Bleachers Aged And Deficient - Part Of Them Burned In An       Replace All Cabinetry In Rm 1010 - Art. Old, Worn Out
Incident. Mechanical Issues Retracting And Expanding -
Replace




                                                               Roof - Ponding Occurring In Several Areas
Roof - Blistering Throughout




M▪A▪P▪P▪S ©, Jacobs 2021                              Revision Date - 09/24/2021                                                     20
                                                                                                  Facility Condition Assessment
                                                                                    DeKalb County SD - Martin Luther King, Jr. High School




East Wing Of Building, From Open Courtyard                      Concrete Sidewalks, Asphalt Driveway And Parking Areas
                                                                Cracked, Deficient And Striping Faded - South Parking Lot,
                                                                Next To Running Track




Replace Fire Alarm Control Panel In The Main Electrical Room.
Ensure The Fire Alarm Systems Of 5010 And 5011 Are
Integrated




M▪A▪P▪P▪S ©, Jacobs 2021                              Revision Date - 09/24/2021                                                      21
 Revision Date - 09/27/2021




FACILITY CONDITION ASSESSMENT
                    Montclair Elementary School | 2021
                                                                                                                           Facility Condition Assessment
                                                                                                                DeKalb County SD - Montclair Elementary School


 Executive Summary
 Montclair Elementary School is located at 1680 Clairmont Place, NE in Atlanta, GA. It comprises 71,711 gross square feet.
 At the time of the assessment the oldest building was 53 years old.
 The findings contained within this report are the result of an assessment of building systems performed by building
 professionals experienced in disciplines including architecture, mechanical, plumbing and electrical. Only those systems
 that were identified as having either an associated deficiency or life cycle event within a 10-year window is contained within
 this report. The full list of each school's systems that are present along with the associated priorities can be found in the flat
 file data grids submitted to Dekalb County. The projected replacement year of those assets within each system is also
 included within this table.The total current deficiencies for this site, in 2020 construction cost dollars, are estimated at
 $3,792,826. A ten-year need was developed to provide an understanding of the current need as well as the projected
 needs in the near future. For Montclair Elementary School the ten-year need is $12,996,650.
 For planning purposes, the total current deficiencies and the first five years of projected life cycle needs were combined to
 calculate a Facility Condition Index (FCI). A 5-year FCI was calculated by dividing the 5-year need by the total replacement
 cost. Costs associated with new construction are not included in the FCI calculation. After the 5-year FCI was calculated,
 this value was subtracted from 100 to calculate the FCA Score in a similar fashion to report cards.
 The Montclair Elementary School facility has a FCA score of 63.74% which is considered "Poor".

Summary of Findings
The table below summarizes the condition findings at Montclair Elementary School.
Table 1: Facility Condition by Building


                                                                                                        Total 5 Yr Need      Total 10 Yr Need
                                                          Current       5-Year Life   Yrs 6-10 Life    (Yr 1-5 + Current    (Yr 1-10 + Current    Replacement      FCA
Number          Building Name                            Deficiencies   Cycle Cost     Cycle Cost             Defs)                Defs)              Cost         Score
Exterior Site
                Exterior Site                                $133,247      $157,514         $447,546            $290,761               $738,307
Permanent Building(s)
2010            Building 2010                              $2,141,594    $1,496,000       $3,035,218          $3,637,594             $6,672,812       $9,116,637   60.10%
2011            Building 2011                                $848,742      $338,326         $375,990          $1,187,067             $1,563,058       $2,676,487   55.65%
2012            Building 2012                                $490,391    $1,404,609       $1,725,348          $1,895,000             $3,620,348       $6,571,299   71.16%
2020            Building 2020                                $178,853       $21,216         $202,057            $200,069               $402,125       $1,518,885   86.83%
                Sub Total for Permanent Building(s):       $3,659,579    $3,260,151      $5,338,613          $6,919,730            $12,258,343      $19,883,308
                                       Total for Site:     $3,792,826    $3,417,665       $5,786,159          $7,210,490           $12,996,650       $19,883,308   63.74%

Note 1: Sitework improvements are proportionally incorporated into the building CRV and used to calulate the overall FCA Score.
Note 2: Aerial map including building number, gross SF, and year built of each building on the site is found on Page 3.




 M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/27/2021                                                                         2
                                                          Facility Condition Assessment
                                                    DeKalb County SD - Montclair Elementary School


Aerial Images




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/27/2021                                           3
                                                                                         Facility Condition Assessment
                                                                                   DeKalb County SD - Montclair Elementary School


Approach and Methodology
The facility condition assessment includes a visual assessment of building systems that are readily available during a
facility walk-through. The standard process does not reflect invasive, destructive assessment methods that would
require special equipment, testing or scheduled power outages. The assessment was accomplished with a view
toward identifying significant maintenance and repair deficiencies that need correction. For the purposes of this
assessment, deficient conditions captured were limited to those items that did not qualify as routine maintenance
repairs. Copies of previous reports and other documentation that were relevant to the inspection were utilized if made
available in the process. Additionally, feedback from appropriate personnel to provide background information relative
to specific building operations, function, equipment conditions, past improvements and planned upgrades were
incorporated into the results if made available to the teams while on site. Two components of the facility condition
assessment are combined to total the cost for facility need. The two components of the facility condition assessment
are current deficiencies and life cycle forecast.

Current Deficiencies: Deficiencies are items in need of repair or replacement as a result of being broken, obsolete,
deferred maintenance, or beyond useful life. The existing deficiencies that currently require correction are identified
and assigned a priority. An example of a current deficiency might include a broken lighting fixture or an inoperable
roof top air conditioning unit.

Life Cycle Forecast: Life cycle analysis evaluates the ages of a building's systems to forecast system replacement as
they reach the end of serviceable life. Estimated Useful Lives were determined based on a combination of our
(Jacobs) professional experience, RS Means, and from industry standard tables (BOMA, ASHRAE). An example of a
life cycle system replacement is a roof with a 20-year life that has been in place for 15 years and may require
replacement in five years.

All members of the survey team recorded existing conditions, identified problems and deficiencies, and documented
corrective action and quantities. The team took digital photos at each site to better identify significant deficiencies.

Facility Deficiency Priority Levels
Deficiencies were ranked according to five priority levels, with Priority 1 items being the most critical to address:

Priority 1 – Mission Critical Concerns: Deficiencies or conditions that may directly affect the site’s ability to remain
open or deliver the educational curriculum. These deficiencies typically relate to building safety, code compliance,
severely damaged or failing building components, and other items that require near-term correction. An example of a
Priority 1 deficiency is a fire alarm system replacement.

Priority 2 – Indirect Impact to Educational Mission: Items that may progress to a Priority 1 item if not addressed in the
near term. Examples of Priority 2 deficiencies include inadequate roofing that could cause deterioration of integral
building systems, and conditions affecting building envelopes, such as roof and window replacements.

Priority 3 – Short-Term Conditions: Deficiencies that are necessary to the site's mission but may not require
immediate attention. These items should be considered necessary improvements required to maximize facility
efficiency and usefulness. Examples of Priority 3 items include site improvements and plumbing deficiencies.

Priority 4 – Long-Term Requirements: Items or systems that may be considered improvements to the instructional
environment. The improvements may be aesthetic or provide greater functionality. Examples include cabinets,
finishes, paving, removal of abandoned equipment, and educational accommodations associated with special
programs.

Priority 5 – Enhancements: Deficiencies aesthetic in nature or considered enhancements. Typical deficiencies in this
priority include repainting, replacing carpet, improved signage, or other improvements to the facility environment.




M▪A▪P▪P▪S ©, Jacobs 2021                      Revision Date - 09/27/2021                                                       4
                                                                                         Facility Condition Assessment
                                                                                   DeKalb County SD - Montclair Elementary School


Facility Condition Assessment(FCA) Score
Facility Condition Assessment (FCA) Scores are assigned after the Facility Condition Index (FCI) is calculated.
The Facility Condition Index (FCI) is used throughout the facility condition assessment industry as a general
indicator of a building’s health. Since 1991, the facility management industry has used an index called the FCI
to benchmark the relative condition of a group of sites. The FCI is derived by dividing the total repair cost,
including site-related repairs, by the total replacement cost of all buildings. It should be noted that costs in the
New Construction category are not included in the FCI calculation. In an effort to match the report card metrics,
the FCI is subtracted from 100 to assign the FCA Score. A facility with a lower FCA Score has more need, or
higher priority, than a facility with a higher FCA Score.




The replacement value represents the estimated cost of replacing the current building with another building of
like size, based on 2021 estimated cost of construction in the DeKalb County area. The estimated replacement
cost for this facility is $19,883,308. For planning purposes, the total 5-year need at the Montclair Elementary
School is $7,210,490 (Life Cycle Years 1-5 plus the current FCI deficiency cost).

The Montclair Elementary School facility has an FCA Score of 63.74%. which is considered "Poor".




                              Figure 1: 5-Year FCI




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/27/2021                                                5
                                                                                                                   Facility Condition Assessment
                                                                                                           DeKalb County SD - Montclair Elementary School


The following table summarizes this site's current deficiencies by building system and priority.

Table 2: System by Priority (Site & Permanent Buildings)

                                                                                 Priority

                  System                     1                2                     3              4                    5              Total             % of Total
Site                                                  $0               $0                $72,250        $60,997                  $0        $133,247           3.51 %

Roofing                                               $0          $312,793                $9,120           $382                  $0        $322,295           8.50 %

Structural                                            $0               $0                    $0              $0                  $0                $0         0.00 %

Exterior                                              $0          $343,995                $4,685             $0               $1,209       $349,889           9.23 %

Interior                                              $0               $0               $237,662       $731,436                $378        $969,476          25.56 %

Mechanical                                            $0          $112,610               $70,384       $177,154              $32,300       $392,448          10.35 %

Electrical                                            $0            $5,189          $1,129,776               $0                  $0      $1,134,964          29.92 %

Plumbing                                              $0               $0                    $0         $24,111                  $0            $24,111        0.64 %

Fire and Life Safety                             $224,659              $0                    $0              $0                  $0        $224,659           5.92 %

Conveyances                                           $0               $0                $26,581             $0                  $0            $26,581        0.70 %

Specialties                                           $0               $0                    $0        $215,156                  $0        $215,156           5.67 %

Total:                                           $224,659         $774,587          $1,550,457     $1,209,236                $33,886     $3,792,826




The building systems at the site with the most need include:
                                                                             Electrical                -     $1,134,964
                                                                             Interior                  -          $969,476
                                                                             Mechanical                -          $392,448




M▪A▪P▪P▪S ©, Jacobs 2021                                    Revision Date - 09/27/2021                                                                                6
                                                                                    Facility Condition Assessment
                                                                              DeKalb County SD - Montclair Elementary School



The chart below represents the building systems and associated deficiency costs.




Figure 2: System Deficiencies




M▪A▪P▪P▪S ©, Jacobs 2021                    Revision Date - 09/27/2021                                                    7
                                                                                                           Facility Condition Assessment
                                                                                                   DeKalb County SD - Montclair Elementary School


Life Cycle Capital Renewal Forecast
During the facility condition assessment, assessors inspected all major building systems. If an assessor identified a need
for immediate replacement, a deficiency was created with the item's repair costs. The identified deficiency contributes to the
facility's total current repair costs.

However, capital planning scenarios span multiple years, as opposed to being constrained to immediate repairs.
Construction projects may begin several years after the initial facility condition assessment. Therefore, in addition to the
current year repair costs, it is necessary to forecast the facility's future costs using a ten-year life cycle renewal forecast
model.

Life cycle renewal is the projection of future building system costs based upon each individual system’s expected
serviceable life. Building systems and components age over time, eventually break down, reach the end of their useful lives,
and may require replacement. While an item may be in good condition now, it might reach the end of its life before a
planned construction project occurs.

The following tables show ten-year life cycle capital renewal projections. The projections outline costs for major building
systems in which a component is expected to reach the end of its useful life and require capital funding for replacement.



Table 3a: Capital Renewal Forecast (Yrs 1-5)

                                                          Life Cycle Capital Renewal Projections
                                   Year 1            Year 2               Year 3               Year 4              Year 5
System                              2022              2023                 2024                 2025                2026                 Total 1-5
Site                                           $0                $0                     $0              $157,514                 $0     $157,514

Roofing                                 $1,671,464               $0                     $0                   $0                  $0    $1,671,464

Exterior                                       $0                $0                     $0               $58,839             $28,282     $87,121

Interior                                       $0                $0                 $19,718             $281,475             $13,684    $314,877

Mechanical                                     $0             $5,478                $44,953             $304,343            $444,732    $799,507

Electrical                                     $0                $0                     $0                   $0                  $0            $0

Plumbing                                       $0                $0                  $8,633             $178,164                 $0     $186,796

Fire and Life Safety                           $0                $0                $200,385                  $0                  $0     $200,385

Conveyances                                    $0                $0                     $0                   $0                  $0            $0

Specialties                                    $0                $0                     $0                   $0                  $0            $0

Total                                   $1,671,464            $5,478               $273,689             $980,335            $486,698   $3,417,665




M▪A▪P▪P▪S ©, Jacobs 2021                              Revision Date - 09/27/2021                                                                     8
                                                                                                                  Facility Condition Assessment
                                                                                                          DeKalb County SD - Montclair Elementary School


Table 3b: Capital Renewal Forecast (Yrs 6-10)

                                                                      Life Cycle Capital Renewal Projections
                                                Year 6               Year 7            Year 8           Year 9         Year 10
System                         Total 1-5         2027                 2028              2029             2030           2031               Total 6-10    Total 1-10
Site                           $157,514             $182,637                     $0        $150,776              $0              $7,633    $341,047      $498,561

Roofing                      $1,671,464                     $0                   $0         $86,900              $0       $1,073,716      $1,160,617    $2,832,081

Exterior                        $87,121              $20,808                  $1,996            $0               $0                 $0      $22,804      $109,925

Interior                       $314,877             $109,831                     $0        $206,382         $244,916        $367,736       $928,866     $1,243,743

Mechanical                     $799,507             $432,858                     $0         $88,782              $0              $3,095    $524,735     $1,324,241

Electrical                           $0              $19,599                     $0         $42,551              $0       $1,690,496      $1,752,646    $1,752,646

Plumbing                       $186,796                  $4,321                  $0        $272,483              $0          $69,722       $346,527      $533,323

Fire and Life Safety           $200,385                     $0                   $0        $510,140              $0                 $0     $510,140      $710,525

Conveyances                          $0                     $0                   $0             $0               $0          $10,089        $10,089       $10,089

Specialties                          $0                     $0                   $0        $188,690              $0                 $0     $188,690      $188,690

Total                        $3,417,665             $770,055                  $1,996     $1,546,704         $244,916      $3,222,487      $5,786,159    $9,203,824




Figure 3: Ten Year Capital Renewal Forecast




M▪A▪P▪P▪S ©, Jacobs 2021                                          Revision Date - 09/27/2021                                                                          9
                                                                                   Facility Condition Assessment
                                                                             DeKalb County SD - Montclair Elementary School

Summary of High Priority Deficiencies


Priority 1 - Mission Critical Concerns                                                Cost
  Emergency Exit Signage Replacement                                                $13,760

  Fire Alarm Replacement                                                           $210,899

                                                      Total for Priority 1         $224,659



Priority 2 - Indirect Impact to Educational Mission                                   Cost
  Modified Roof Covering Replacement                                               $312,793

  Aluminum Window Replacement                                                      $343,995

  Cast Iron Water Boiler Replacement                                                $72,914

  Ductless Split System AC Replacement                                              $10,200

  Fan Coil Unit Replacement                                                          $6,678

  Heat Pump HVAC Component Replacement                                              $22,818

  Electrical Transformer Replacement                                                 $5,189

                                                      Total for Priority 2         $774,587




M▪A▪P▪P▪S ©, Jacobs 2021                   Revision Date - 09/27/2021                                                   10
                                                                                                                        Facility Condition Assessment
                                                                                                                DeKalb County SD - Montclair Elementary School



Deficiency Summary
(Items below detail the totals referenced in Table 2)

Site Level Deficiencies
Site
Deficiency                                                                                  Category                     Qty UoM      Priority   Repair Cost     ID
Asphalt Driveway Replacement                                                                Capital Renewal            5,000 SF          3           $30,228   1097
             Location: Kitchen Drive Lane
Playground Equipment Replacement                                                            Capital Renewal                2 Ea.         3           $42,022 10532
Asphalt Paving Resurfacing                                                                  Deferred                   9,100 SF          4           $35,586   1096
                                                                                            Maintenance
             Location: W Parking Lot
Fencing Replacement (8' - 10' high Chain Link Fence)                                        Capital Renewal              260 LF          4           $19,151   1627
             Note:      Damaged And Missing Fence
Fencing Replacement (Wood Fence)                                                            Deferred                     200 LF          4            $5,680   1094
                                                                                            Maintenance
             Note:      Damaged
Gate Replacement                                                                            Deferred                       1 Ea.         4              $580   1095
                                                                                            Maintenance
             Note:      Damaged
                                                                                            Sub Total for System           6 items                  $133,247
                                                                             Sub Total for School and Site Level           6 items                  $133,247

Building: 2010 - Building 2010
Roofing
Deficiency                                                                                  Category                     Qty UoM      Priority   Repair Cost     ID
Debris In Gutter Removal                                                                    Deferred                     300 LF          3            $1,456    643
                                                                                            Maintenance
             Note:      Leaves And Debris
Roof Cleaning                                                                               Deferred                     500 SF          4              $109    642
                                                                                            Maintenance
             Note:      Trees Debris And Growth
                                                                                            Sub Total for System           2 items                    $1,566

Exterior
Deficiency                                                                                  Category                     Qty UoM      Priority   Repair Cost     ID
Aluminum Window Replacement                                                                 Capital Renewal            2,310 SF          2          $230,997   1098
             Note:      Beyond Useful Life
Aluminum Window Replacement                                                                 Capital Renewal              144 SF          2           $14,400   1099
             Note:      Beyond Useful Life
Brick Exterior Repair                                                                       Deferred                     400 SF          3            $4,685    644
                                                                                            Maintenance                      Wall
             Note:      Brick Wall Failing
             Location: Ne Wall
Exterior Painting                                                                           Capital Renewal              986 SF          5            $1,209    645
                                                                                                                             Wall
             Note:      Concrete Columns And Beams
                                                                                            Sub Total for System           4 items                  $251,290

Interior
Deficiency                                                                                  Category                     Qty UoM      Priority   Repair Cost     ID
Existing Door Hardware Is Not ADA Compliant                                                 ADA Compliance                62 Door        3           $64,716    687
             Location: 106-110, 114, 2 Rooms North Of K112, S117.1, T117.2, K112, K11, 99.6, 99.15 Stor, 99.12, 99.12, 99.17 Office, 99.3 V, 99.11, 99.5, 101-105, 116,
                       117
Interior Door Replacement                                                                   Capital Renewal               73 Door        3          $128,727    663
             Note:      Beyond Useful Life -Replace
Acoustical Ceiling Tile Replacement                                                         Capital Renewal           31,894 SF          4          $175,359   1101
             Note:      Beyond Useful Life
Carpet Flooring Replacement                                                                 Capital Renewal            2,959 SF          4           $35,220    662
             Location: Media Center And Office


M▪A▪P▪P▪S ©, Jacobs 2021                                        Revision Date - 09/27/2021                                                                                11
                                                                                                                    Facility Condition Assessment
                                                                                                            DeKalb County SD - Montclair Elementary School

Interior
Deficiency                                                                              Category                    Qty UoM       Priority   Repair Cost    ID
Carpet Flooring Replacement                                                             Capital Renewal           2,959 SF           4          $35,220    1628
             Location: Media Center And Office
Ceiling Grid Replacement                                                                Capital Renewal          31,894 SF           4         $124,868    1100
             Note:     Beyond Useful Life
Toilet Partition Replacement                                                            Capital Renewal                7 Stall       4          $13,271    661
             Location: Boys And Girls
Vinyl Composition Tile Replacement                                                      Capital Renewal          21,208 SF           4         $169,631    1630
             Note:     Beyond Useful Life - Replace All
                                                                                        Sub Total for System           8 items                 $747,011

Mechanical
Deficiency                                                                              Category                    Qty UoM       Priority   Repair Cost    ID
Cast Iron Water Boiler Replacement                                                      Capital Renewal                1 Ea.         2          $72,914    666
             Location: Boiler Room
Ductless Split System AC Replacement                                                    Capital Renewal                2 Ea.         2          $10,200    669
             Location: 98.4 And 99.16
Fan Coil Unit Replacement                                                               Capital Renewal                2 Ea.         2           $6,678    670
             Note:     Fan Coil Above Ceiling Could Not Access, Based On Outdoor Unit Condition The Fan Coil Should Be Replaced
             Location: Admin Area And Media
Heat Pump HVAC Component Replacement                                                    Capital Renewal                2 Ea.         2          $22,818    671
             Location: Roof
Circulation Pump Replacement                                                            Capital Renewal                1 Ea.         3          $10,869    675
             Location: Mech Room/Boiler
Large Diameter Exhausts/Hoods Replacement                                               Capital Renewal                5 Ea.         3          $37,777    677
             Location: Roof
Air Curtain Replacement                                                                 Capital Renewal                1 Ea.         4           $2,424    1106
Circulation Pump Replacement                                                            Capital Renewal                2 Ea.         4           $8,110    673
             Location: Mech Room
Circulation Pump Replacement                                                            Capital Renewal                2 Ea.         4          $12,880    674
             Location: Mech Room
Existing Controls Are Obsolete                                                          Capital Renewal           9,864 SF           4          $31,705    667
             Location: Boiler Room
Existing Controls Are Obsolete                                                          Capital Renewal          23,016 SF           4          $33,483    668
             Location: Building
Duct Cleaning                                                                           Deferred                  6,500 SF           5           $6,952    676
                                                                                        Maintenance
                                                                                        Sub Total for System         12 items                  $256,811

Electrical
Deficiency                                                                              Category                    Qty UoM       Priority   Repair Cost    ID
Electrical Transformer Replacement                                                      Capital Renewal                1 Ea.         2           $5,189    678
             Location: Med 117
Canopy Lighting Replacement                                                             Capital Renewal              13 Ea.          3          $25,458    683
Exterior Mounted Building Lighting Replacement                                          Capital Renewal                4 Ea.         3           $3,391    684
Interior Power Wiring Replacement                                                       Deferred                 25,000 SF           3          $27,916    686
                                                                                        Maintenance
             Note:     Estimated Based Upon Existing Devices And Conduit
Lighting Fixtures Replacement                                                           Capital Renewal          23,000 SF           3         $396,550    685
             Note:     Beyond Useful Life
Lightning Protection System Installation                                                Functional Deficiency    32,880 SF           3          $24,140    682
             Note:     Not Installed
Public Address System Replacement, Non-main Building                                    Deferred                 32,880 SF           3          $21,882    679
                                                                                        Maintenance
                                                                                        Sub Total for System           7 items                 $504,527

Plumbing
Deficiency                                                                              Category                    Qty UoM       Priority   Repair Cost    ID
Replace classroom lavatory                                                              Capital Renewal                8 Ea.         4          $19,288    665



M▪A▪P▪P▪S ©, Jacobs 2021                                     Revision Date - 09/27/2021                                                                           12
                                                                                                                    Facility Condition Assessment
                                                                                                             DeKalb County SD - Montclair Elementary School

Plumbing
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost   ID
             Location: Classrooms 114, 113, 112, 111, 110, 109, 99.12, 99.1
                                                                                         Sub Total for System         1 items                 $19,288

Fire and Life Safety
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost   ID
Emergency Exit Signage Replacement                                                        Capital Renewal             8 Ea.        1           $4,786    681
Fire Alarm Replacement                                                                    Capital Renewal         32,880 SF        1         $180,780    680
                                                                                         Sub Total for System         2 items                $185,566

Conveyances
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost   ID
Platform Lift Needed for Access                                                           ADA Compliance              1 Ea.        3          $26,581    688
             Note:     No Chairlift Or Ramp
                                                                                         Sub Total for System         1 items                 $26,581

Specialties
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost   ID
Replace Cabinetry In Classes/Labs                                                         Capital Renewal            18 Room       4         $148,954    664
             Note:     Beyond Useful Life
                                                                                         Sub Total for System         1 items                $148,954
                                                                    Sub Total for Building 2010 - Building 2010      38 items              $2,141,594

Building: 2011 - Building 2011
Roofing
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost   ID
Modified Roof Covering Replacement                                                        Capital Renewal          9,653 SF        2         $312,793    690
             Note:     Age And Wear
Gutter Replacement                                                                        Deferred                  300 LF         3           $5,738    691
                                                                                          Maintenance
             Note:     Leaks And Damaged
                                                                                         Sub Total for System         2 items                $318,531

Exterior
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost   ID
Aluminum Window Replacement                                                               Capital Renewal           924 SF         2          $92,399    692
             Note:     Beyond Useful Life
Aluminum Window Replacement                                                               Capital Renewal            32 SF         2           $3,200    693
             Note:     Beyond Useful Life
                                                                                         Sub Total for System         2 items                 $95,599

Interior
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost   ID
Existing Door Hardware Is Not ADA Compliant                                               ADA Compliance              9 Door       3           $9,394    689
             Note:     None Compliant
             Location: Classrooms 120-126
Interior Door Hardware Replacement                                                        Capital Renewal             6 Door       3           $8,375    701
Interior Door Replacement                                                                 Capital Renewal            15 Door       3          $26,451    700
             Note:     Beyond Useful Life
Acoustical Ceiling Tile Replacement                                                       Capital Renewal          6,081 SF        4          $33,434    695
             Note:     Beyond Useful Life
             Location: Classrooms
Ceiling Grid Replacement                                                                  Capital Renewal          6,081 SF        4          $23,808    694
             Note:     Beyond Useful Life
             Location: Classroom
Gypsum Board Ceiling Repair                                                               Deferred                  278 SF         4           $1,491    696
                                                                                          Maintenance
Toilet Partition Replacement                                                              Capital Renewal            13 Stall      4          $24,646    698
             Note:     Beyond Useful Life




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/27/2021                                                                      13
                                                                                                                        Facility Condition Assessment
                                                                                                                DeKalb County SD - Montclair Elementary School

Interior
Deficiency                                                                                 Category                      Qty UoM      Priority      Repair Cost    ID
Vinyl Composition Tile Replacement                                                         Capital Renewal            8,495 SF           4             $67,947    699
             Note:     Beyond Useful Life
Interior Ceiling Repainting                                                                Deferred                     193 SF           5                $378    697
                                                                                           Maintenance
                                                                                           Sub Total for System            9 items                    $195,923

Mechanical
Deficiency                                                                                 Category                      Qty UoM      Priority      Repair Cost    ID
Existing Controls Are Obsolete                                                             Capital Renewal            9,653 SF           4             $14,043 10355
                                                                                           Sub Total for System            1 items                     $14,043

Electrical
Deficiency                                                                                 Category                      Qty UoM      Priority      Repair Cost    ID
Canopy Lighting Replacement                                                                Capital Renewal                 2 Ea.         3              $3,917    708
Electrical Receptacle Replacement                                                          Capital Renewal                 2 Ea.         3                $251    704
             Note:     Replace 2 Receptacles With (7F) Tyde In Pre-K Classrooms; All Electrical Panels For This Building Are Located In Bldg 2010
Exterior Mounted Building Lighting Replacement                                             Capital Renewal                 5 Ea.         3              $4,239    709
Lighting Fixtures Replacement                                                              Capital Renewal            7,500 SF           3            $129,310    710
             Note:     Beyond Useful Life - T8 Lamps
Lightning Protection System Installation                                                   Functional Deficiency      9,653 SF           3              $7,087    707
             Note:     Not Installed
Public Address System Replacement, Non-main Building                                       Deferred                   9,653 SF           3              $6,424    705
                                                                                           Maintenance
                                                                                           Sub Total for System            6 items                    $151,228

Plumbing
Deficiency                                                                                 Category                      Qty UoM      Priority      Repair Cost    ID
Replace classroom lavatory                                                                 Capital Renewal                 2 Ea.         4              $4,822    703
             Location: Classrooms 124 And 125
                                                                                           Sub Total for System            1 items                      $4,822

Fire and Life Safety
Deficiency                                                                                 Category                      Qty UoM      Priority      Repair Cost    ID
Emergency Exit Signage Replacement                                                         Capital Renewal                 4 Ea.         1              $2,393    706
                                                                                           Sub Total for System            1 items                      $2,393

Specialties
Deficiency                                                                                 Category                      Qty UoM      Priority      Repair Cost    ID
Replace Cabinetry In Classes/Labs                                                          Capital Renewal                 8 Room        4             $66,202    702
             Note:     Beyond Useful Life
                                                                                           Sub Total for System            1 items                     $66,202
                                                                    Sub Total for Building 2011 - Building 2011           23 items                    $848,742

Building: 2012 - Building 2012
Roofing
Deficiency                                                                                 Category                      Qty UoM      Priority      Repair Cost    ID
Metal Downspout Installation                                                               Deferred                       30 LF          3                $667    1103
                                                                                           Maintenance
             Note:     Missing
             Location: Nw Corner
                                                                                           Sub Total for System            1 items                        $667

Exterior
Deficiency                                                                                 Category                      Qty UoM      Priority      Repair Cost    ID
Aluminum Window Replacement                                                                Capital Renewal                30 SF          2              $3,000    711
             Note:     Broken Window
             Location: N Side
                                                                                           Sub Total for System            1 items                      $3,000




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/27/2021                                                                                14
                                                                                                         Facility Condition Assessment
                                                                                                  DeKalb County SD - Montclair Elementary School

Interior
Deficiency                                                                     Category                  Qty UoM     Priority   Repair Cost    ID
Toilet Partition Replacement                                                   Capital Renewal            14 Stall      4          $26,542    712
             Note:     Aged, Rust, Damage
             Location: Boys And Girls Restrooms
                                                                              Sub Total for System         1 items                 $26,542

Mechanical
Deficiency                                                                     Category                  Qty UoM     Priority   Repair Cost    ID
Circulation Pump Replacement                                                   Capital Renewal             2 Ea.        3          $21,738    714
             Location: Mech Room
Circulation Pump Replacement                                                   Capital Renewal             1 Ea.        4           $6,440    713
             Location: Mech Room
Existing Controls Are Obsolete                                                 Capital Renewal         23,700 SF        4          $60,100 10356
Duct Cleaning                                                                  Deferred                23,700 SF        5          $25,348    715
                                                                               Maintenance
                                                                              Sub Total for System         4 items                $113,625

Electrical
Deficiency                                                                     Category                  Qty UoM     Priority   Repair Cost    ID
Canopy Lighting Replacement                                                    Capital Renewal            10 Ea.        3          $19,583    718
Exterior Mounted Building Lighting Replacement                                 Capital Renewal            12 Ea.        3          $10,173    719
Lighting Fixtures Replacement                                                  Capital Renewal         17,000 SF        3         $293,103    720
             Note:     Beyond Useful Life - T8 Lamps
Lightning Protection Terminal Replacement                                      Deferred                23,700 SF        3           $3,736    4451
                                                                               Maintenance
             Note:     Not Installed
Public Address System Replacement, Non-main Building                           Deferred                23,700 SF        3          $15,773    716
                                                                               Maintenance
                                                                              Sub Total for System         5 items                $342,369

Fire and Life Safety
Deficiency                                                                     Category                  Qty UoM     Priority   Repair Cost    ID
Emergency Exit Signage Replacement                                             Capital Renewal             7 Ea.        1           $4,188    4450
                                                                              Sub Total for System         1 items                  $4,188
                                                         Sub Total for Building 2012 - Building 2012      13 items                $490,391

Building: 2020 - Building 2020
Roofing
Deficiency                                                                     Category                  Qty UoM     Priority   Repair Cost    ID
Debris In Gutter Removal                                                       Deferred                  200 LF         3             $971    722
                                                                               Maintenance
             Note:     Debris In Gutter
Gutter Replacement                                                             Deferred                   15 LF         3             $287    723
                                                                               Maintenance
             Note:     Damaged Gutter
             Location: Sw Corner
Roof Cleaning                                                                  Deferred                 1,250 SF        4             $273    721
                                                                               Maintenance
             Note:     Debris On Roof
                                                                              Sub Total for System         3 items                  $1,531

Mechanical
Deficiency                                                                     Category                  Qty UoM     Priority   Repair Cost    ID
Existing Controls Are Obsolete                                                 Capital Renewal          5,478 SF        4           $7,969 10357
                                                                              Sub Total for System         1 items                  $7,969

Electrical
Deficiency                                                                     Category                  Qty UoM     Priority   Repair Cost    ID
Canopy Lighting Replacement                                                    Capital Renewal            16 Ea.        3          $31,333    729
Exterior Mounted Building Lighting Replacement                                 Capital Renewal             4 Ea.        3           $3,391    730
Lighting Fixtures Replacement                                                  Capital Renewal          5,478 SF        3          $94,448    731




M▪A▪P▪P▪S ©, Jacobs 2021                               Revision Date - 09/27/2021                                                                    15
                                                                                                         Facility Condition Assessment
                                                                                                   DeKalb County SD - Montclair Elementary School

Electrical
Deficiency                                                                     Category                  Qty UoM     Priority   Repair Cost   ID
Lightning Protection System Installation                                       Functional Deficiency    5,478 SF        3           $4,022    728
             Note:    Not Installed
Public Address System Replacement, Non-main Building                           Deferred                 5,478 SF        3           $3,646    725
                                                                               Maintenance
                                                                              Sub Total for System         5 items                $136,840

Fire and Life Safety
Deficiency                                                                     Category                  Qty UoM     Priority   Repair Cost   ID
Emergency Exit Signage Replacement                                             Capital Renewal             4 Ea.        1           $2,393    727
             Note:    Beyond Useful Life
Fire Alarm Replacement                                                         Capital Renewal          5,478 SF        1          $30,119    726
                                                                              Sub Total for System         2 items                 $32,512
                                                         Sub Total for Building 2020 - Building 2020      11 items                $178,853
                                                                                  Total for Campus        91 items              $3,792,826




M▪A▪P▪P▪S ©, Jacobs 2021                               Revision Date - 09/27/2021                                                                   16
                                                                                                                         Facility Condition Assessment
                                                                                                                DeKalb County SD - Montclair Elementary School



Life Cycle Summary Yrs 1-10
(Items below detail the totals referenced in Tables 3a & 3b)

Site Level Life Cycle Items
Site
Uniformat Description                    LC Type Description                                       Priority       Qty UoM      Repair Cost Remaining Life
Fences and Gates                         Fencing - Chain Link (8-10 Ft)                               3         1,900 LF         $157,514        4
Roadway Pavement                         Asphalt Driveways                                            3         25,300 SF        $182,637        6
Parking Lot Pavement                     Asphalt                                                      3            80 CAR        $138,230        8
Pedestrian Pavement                      Sidewalks - Concrete                                         3           930 SF          $12,546        8
Fences and Gates                         Fencing - Wood                                               3           200 LF           $7,633        10
                                                                                        Sub Total for System        5 items      $498,561

Roofing
Uniformat Description                    LC Type Description                                       Priority       Qty UoM      Repair Cost Remaining Life
Canopy Roofing                           Aluminum panels                                              4         1,440 SF          $86,900        8
                                                                                        Sub Total for System        1 items       $86,900

Electrical
Uniformat Description                    LC Type Description                                       Priority       Qty UoM      Repair Cost Remaining Life
Parking Lot Lighting                     Pole Lighting                                                3             3 Ea.         $19,599        6
                                                                                        Sub Total for System        1 items       $19,599
                                                                                     Sub Total for Building -       7 items      $605,060

Building: 2010 - Building 2010
Roofing
Uniformat Description                    LC Type Description                                       Priority       Qty UoM      Repair Cost Remaining Life
Low-Slope Roofing                        Built-Up Roofing (BUR)                                       2         32,880 SF        $880,457        1
Low-Slope Roofing                        Modified Bitumen                                             2         24,656 SF       $1,073,716       10
                                                                                        Sub Total for System        2 items     $1,954,174

Exterior
Uniformat Description                    LC Type Description                                       Priority       Qty UoM      Repair Cost Remaining Life
Exterior Entrance Doors                  Steel - Insulated and Painted                                3            15 Door        $58,839        4
Exterior Wall Veneer                     Exterior Painting - Bldg SF basis                            2           986 SF           $1,996        7
                                                                                        Sub Total for System        2 items       $60,835

Interior
Uniformat Description                    LC Type Description                                       Priority       Qty UoM      Repair Cost Remaining Life
Suspended Plaster and                    Painted ceilings                                             5         1,315 SF           $2,898        4
Wall Painting and Coating                Painting/Staining (Bldg SF)                                  5         19,728 SF         $93,542        4
Interior Door Supplementary Components   Door Hardware                                                3            11 Door        $17,281        4
Tile Flooring                            Quarry Tile                                                  4         2,630 SF          $80,711        6
Carpeting                                Carpet                                                       4         2,959 SF          $44,616        8
Compartments and Cubicles                Toilet Partitions                                            4             7 Stall       $17,835        10
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                  4         31,894 SF        $235,668        10
                                                                                        Sub Total for System        7 items      $492,551

Mechanical
Uniformat Description                    LC Type Description                                       Priority       Qty UoM      Repair Cost Remaining Life
Exhaust Air                              Kitchen Exhaust Hoods                                        3             1 Ea.         $11,498        3
Decentralized Cooling                    Fan Coil - Water Cool/Water Heat ( 3 Ton)                    2            21 Ea.         $75,333        4
Decentralized Cooling                    Fan Coil - Water Cool/Water Heat (30 Ton)                    2             1 Ea.         $14,521        4
                                  Note: estimated
Central Cooling                          Chiller - Outdoor Air Cooled (175 Tons)                      2             1 Ea.        $208,593        5
Facility Hydronic Distribution           4-Pipe System                                                4         32,880 SF         $86,713        5
HVAC Air Distribution                    Ductwork (Bldg.SF)                                           3         6,500 SF          $93,165        6
Decentralized Heating Equipment          Radiant Heater - Fin Tube Water                              2             1 Ea.            $874        8
                                                                                        Sub Total for System        7 items      $490,696

Electrical
Uniformat Description                    LC Type Description                                       Priority       Qty UoM      Repair Cost Remaining Life
Lighting Fixtures                        Light Fixtures (Bldg SF)                                     4         32,880 SF        $761,859        10



M▪A▪P▪P▪S ©, Jacobs 2021                                                 Revision Date - 09/27/2021                                                         17
                                                                                                                                    Facility Condition Assessment
                                                                                                                           DeKalb County SD - Montclair Elementary School

Electrical
Uniformat Description                  LC Type Description                                                   Priority        Qty UoM      Repair Cost Remaining Life
Power Distribution                     Power Wiring                                                             3          32,880 SF         $49,342        10
Packaged Generator Assemblies          Emergency Generator (150 KW)                                             2              1 Ea.        $106,476        10
                                                                                                  Sub Total for System         3 items      $917,677

Plumbing
Uniformat Description                  LC Type Description                                                   Priority        Qty UoM      Repair Cost Remaining Life
Domestic Water Equipment               Water Heater - Electric - 40 gallon                                      2              1 Ea.          $2,757        3
                                 Note: janitor room
Plumbing Fixtures                      Restroom Lavatory                                                        3             10 Ea.         $28,743        4
Plumbing Fixtures                      Sink - Service / Mop Sink                                                5              1 Ea.            $842        4
Plumbing Fixtures                      Refrigerated Drinking Fountain                                           4              6 Ea.         $13,983        4
Domestic Water Equipment               Backflow Preventers - 3/4 in. (Ea.)                                      5              2 Ea.          $1,973        6
Compressed-Air Systems                 Air Compressor (5 hp)                                                    3              1 Ea.          $6,724        8
Plumbing Fixtures                      Toilets                                                                  3             18 Ea.        $108,461        8
Plumbing Fixtures                      Urinals                                                                  3              4 Ea.          $6,452        8
Domestic Water Equipment               Water Heater - Gas - 100 Gallon                                          2              1 Ea.          $8,066        10
                                 Note: boiler room
                                                                                                  Sub Total for System         9 items      $178,001

Fire and Life Safety
Uniformat Description                  LC Type Description                                                   Priority        Qty UoM      Repair Cost Remaining Life
Security System Component              Security Alarm System                                                    1          32,880 SF        $437,285        8
                                 Note: all cameras and system working according to Staff
                                                                                                  Sub Total for System         1 items      $437,285
                                                                             Sub Total for Building 2010 - Building 2010      31 items     $4,531,218

Building: 2011 - Building 2011
Exterior
Uniformat Description                  LC Type Description                                                   Priority        Qty UoM      Repair Cost Remaining Life
Exterior Entrance Doors                Steel - Insulated and Painted                                            3              7 Door        $28,282        5
                                                                                                  Sub Total for System         1 items       $28,282

Interior
Uniformat Description                  LC Type Description                                                   Priority        Qty UoM      Repair Cost Remaining Life
Acoustical Suspended Ceilings          Ceilings - Acoustical Tiles                                              4          3,282 SF          $19,718        3
Wall Painting and Coating              Painting/Staining (Bldg SF)                                              5          5,792 SF          $27,464        4
Tile Flooring                          Quarry Tile                                                              4            965 SF          $27,915        4
Acoustical Suspended Ceilings          Ceilings - Acoustical Grid System                                        4          3,282 SF          $15,342        6
Acoustical Suspended Ceilings          Ceilings - Acoustical Tiles                                              4          6,081 SF          $44,932        10
Suspended Plaster and                  Painted ceilings                                                         5            193 SF             $508        10
Compartments and Cubicles              Toilet Partitions                                                        4             13 Stall       $33,122        10
                                                                                                  Sub Total for System         7 items      $169,002

Mechanical
Uniformat Description                  LC Type Description                                                   Priority        Qty UoM      Repair Cost Remaining Life
Decentralized Cooling                  Fan Coil - Water Cool/Water Heat ( 3 Ton)                                2              8 Ea.         $28,698        4
Facility Hydronic Distribution         4-Pipe System                                                            4          9,653 SF          $25,458        5
Exhaust Air                            Roof Exhaust Fan - Large                                                 3              1 Ea.          $8,758        5
                                                                                                  Sub Total for System         3 items       $62,914

Electrical
Uniformat Description                  LC Type Description                                                   Priority        Qty UoM      Repair Cost Remaining Life
Lighting Fixtures                      Light Fixtures (Bldg SF)                                                 4          9,653 SF         $223,669        10
                                                                                                  Sub Total for System         1 items      $223,669

Plumbing
Uniformat Description                  LC Type Description                                                   Priority        Qty UoM      Repair Cost Remaining Life
Plumbing Fixtures                      Restroom Lavatory                                                        3              6 Ea.         $17,246        4
Plumbing Fixtures                      Toilets                                                                  3             15 Ea.         $80,305        4
Plumbing Fixtures                      Urinals                                                                  3              5 Ea.          $7,165        4
Plumbing Fixtures                      Refrigerated Drinking Fountain                                           4              4 Ea.          $9,321        4
Domestic Water Piping                  Domestic Water Piping System (Bldg.SF)                                   3          9,653 SF          $58,416        10
                                                                                                  Sub Total for System         5 items      $172,454




M▪A▪P▪P▪S ©, Jacobs 2021                                               Revision Date - 09/27/2021                                                                      18
                                                                                                                             Facility Condition Assessment
                                                                                                                    DeKalb County SD - Montclair Elementary School

Fire and Life Safety
Uniformat Description             LC Type Description                                                 Priority        Qty UoM      Repair Cost Remaining Life
Fire Detection and Alarm          Fire Alarm                                                             1          9,653 SF          $57,995        3
                                                                                           Sub Total for System         1 items       $57,995
                                                                      Sub Total for Building 2011 - Building 2011      18 items      $714,316

Building: 2012 - Building 2012
Roofing
Uniformat Description             LC Type Description                                                 Priority        Qty UoM      Repair Cost Remaining Life
Low-Slope Roofing                 Modified Bitumen                                                       2          23,700 SF        $791,007        1
                                                                                           Sub Total for System         1 items      $791,007

Interior
Uniformat Description             LC Type Description                                                 Priority        Qty UoM      Repair Cost Remaining Life
Wall Painting and Coating         Painting/Staining (Bldg SF)                                            5          23,700 SF        $112,375        4
Acoustical Suspended Ceilings     Ceilings - Acoustical Tiles                                            4          23,226 SF        $161,767        8
Resilient Flooring                Vinyl Composition Tile Flooring                                        4          22,752 SF        $237,443        9
Compartments and Cubicles         Toilet Partitions                                                      4             14 Stall       $35,670        10
                                                                                           Sub Total for System         4 items      $547,255

Mechanical
Uniformat Description             LC Type Description                                                 Priority        Qty UoM      Repair Cost Remaining Life
Heat Generation                   Boiler - Copper Tube (750 MBH)                                         2              1 Ea.         $33,455        3
Decentralized Heating Equipment   Unit Heater Gas (40 MBH)                                               3              1 Ea.          $2,959        4
Decentralized Cooling             Heat Pump (3 Ton)                                                      5             19 Ea.        $179,090        4
Decentralized Heating Equipment   Unit Heater Electric (5 KW)                                            3              2 Ea.          $2,750        4
Central Cooling                   Cooling Tower - Metal (100 Tons)                                       2              1 Ea.         $43,189        5
HVAC Air Distribution             Energy Recovery Unit (8,000 CFM)                                       3              1 Ea.         $24,771        5
Facility Hydronic Distribution    2-Pipe System (Cold)                                                   3          23,700 SF         $46,190        5
HVAC Air Distribution             Ductwork (Bldg.SF)                                                     3          23,700 SF        $339,693        6
Heat Generation                   Heat Exchanger - Water to Water (Flat Plate - 400 GPM)                 2              1 Ea.         $87,907        8
                                                                                           Sub Total for System         9 items      $760,005

Electrical
Uniformat Description             LC Type Description                                                 Priority        Qty UoM      Repair Cost Remaining Life
Lighting Fixtures                 Light Fixtures (Bldg SF)                                               4          23,700 SF        $549,150        10
                                                                                           Sub Total for System         1 items      $549,150

Plumbing
Uniformat Description             LC Type Description                                                 Priority        Qty UoM      Repair Cost Remaining Life
Domestic Water Equipment          Water Heater - Electric - 120 gallon                                   2              1 Ea.          $5,876        3
Plumbing Fixtures                 Sink - Service / Mop Sink                                              5              1 Ea.            $842        4
Plumbing Fixtures                 Urinals                                                                3              4 Ea.          $5,732        4
Plumbing Fixtures                 Refrigerated Drinking Fountain                                         4              6 Ea.         $13,983        4
Domestic Water Equipment          Backflow Preventers - 2 in. (Ea.)                                      5              1 Ea.          $2,349        6
Plumbing Fixtures                 Restroom Lavatory                                                      3              4 Ea.         $12,940        8
Plumbing Fixtures                 Toilets                                                                3             16 Ea.         $96,410        8
Plumbing Fixtures                 Classroom Lavatory                                                     4              1 Ea.          $3,240        10
                                                                                           Sub Total for System         8 items      $141,372

Fire and Life Safety
Uniformat Description             LC Type Description                                                 Priority        Qty UoM      Repair Cost Remaining Life
Fire Detection and Alarm          Fire Alarm                                                             1          23,700 SF        $142,390        3
                                                                                           Sub Total for System         1 items      $142,390

Conveyances
Uniformat Description             LC Type Description                                                 Priority        Qty UoM      Repair Cost Remaining Life
Elevators                         Passenger elevator cab finishes                                        4              1 Ea.         $10,089        10
                                                                                           Sub Total for System         1 items       $10,089

Specialties
Uniformat Description             LC Type Description                                                 Priority        Qty UoM      Repair Cost Remaining Life
Casework                          Fixed Cabinetry                                                        4             18 Room       $188,690        8
                                                                                           Sub Total for System         1 items      $188,690
                                                                      Sub Total for Building 2012 - Building 2012      26 items     $3,129,957




M▪A▪P▪P▪S ©, Jacobs 2021                                        Revision Date - 09/27/2021                                                                      19
                                                                                                                            Facility Condition Assessment
                                                                                                                    DeKalb County SD - Montclair Elementary School

Building: 2020 - Building 2020
Exterior
Uniformat Description             LC Type Description                                                 Priority       Qty UoM       Repair Cost Remaining Life
Exterior Entrance Doors           Steel - Insulated and Painted                                          3             5 Door         $20,808        6
                                                                                           Sub Total for System        1 items        $20,808

Interior
Uniformat Description             LC Type Description                                                 Priority       Qty UoM       Repair Cost Remaining Life
Suspended Plaster and             Painted ceilings                                                       5           219 SF              $497        5
Compartments and Cubicles         Toilet Partitions                                                      4             6 Stall        $13,187        5
Wall Painting and Coating         Painting/Staining (Bldg SF)                                            5          2,739 SF          $13,778        6
Acoustical Suspended Ceilings     Ceilings - Acoustical Grid System                                      4           329 SF            $1,681        9
Acoustical Suspended Ceilings     Ceilings - Acoustical Tiles                                            4           329 SF            $2,360        9
Resilient Flooring                Vinyl Composition Tile Flooring                                        4           329 SF            $3,433        9
                                                                                           Sub Total for System        6 items        $34,936

Mechanical
Uniformat Description             LC Type Description                                                 Priority       Qty UoM       Repair Cost Remaining Life
Decentralized Cooling             Thru-Wall AC (2 Ton)                                                   3             1 Ea.           $5,478        2
Decentralized Heating Equipment   Unit Heater Electric (3 KW)                                            3             1 Ea.             $993        4
Exhaust Air                       Interior Ceiling Exhaust Fan                                           3             2 Ea.           $1,061        5
Facility Hydronic Distribution    2-Pipe System (Cold)                                                   3          1,370 SF           $3,095        10
                                                                                           Sub Total for System        4 items        $10,627

Electrical
Uniformat Description             LC Type Description                                                 Priority       Qty UoM       Repair Cost Remaining Life
Power Distribution                Panelboard - 120/208 225A                                              3             1 Ea.           $6,549        8
Power Distribution                Panelboard - 277/480 225A                                              3             1 Ea.          $11,163        8
Electrical Service                Exterior Dry Type Transformer (75 KVA)                                 2             1 Ea.          $24,839        8
                                                                                           Sub Total for System        3 items        $42,551

Plumbing
Uniformat Description             LC Type Description                                                 Priority       Qty UoM       Repair Cost Remaining Life
Domestic Water Equipment          Water Heater - Electric - 5 to 10 gallon                               2             1 Ea.           $1,505        8
Plumbing Fixtures                 Restroom Lavatory                                                      3             2 Ea.           $6,471        8
Plumbing Fixtures                 Sink - Service / Mop Sink                                              5             1 Ea.             $948        8
Plumbing Fixtures                 Toilets                                                                3             4 Ea.          $24,103        8
Plumbing Fixtures                 Urinals                                                                3             2 Ea.           $3,225        8
Plumbing Fixtures                 Refrigerated Drinking Fountain                                         4             2 Ea.           $5,246        8
                                                                                           Sub Total for System        6 items        $41,497

Fire and Life Safety
Uniformat Description             LC Type Description                                                 Priority       Qty UoM       Repair Cost Remaining Life
Security System Component         Security Alarm System                                                  1          5,478 SF          $72,854        8
                                                                                           Sub Total for System        1 items        $72,854
                                                                      Sub Total for Building 2020 - Building 2020     21 items       $223,273

                                                                          Total for: Montclair Elementary School     103 items     $9,203,824




M▪A▪P▪P▪S ©, Jacobs 2021                                          Revision Date - 09/27/2021                                                                    20
                                                                                          Facility Condition Assessment
                                                                                   DeKalb County SD - Montclair Elementary School



 Supporting Photos




Classroom Cabinets Beyond Useful Life                     Classroom Doors Beyond Useful Life, Door Hardware Not ADA
                                                          Compliant




Restroom Partitions Deficient                             Existing Fire Alarm System Panels Need To Be Replaced




Existing Intercom System Is Beyond Useful Life            Replace The Standard Receptacle With A GFI Protected
                                                          Receptacle At The Sink.




M▪A▪P▪P▪S ©, Jacobs 2021                         Revision Date - 09/27/2021                                                   21
                                                            Facility Condition Assessment
                                                      DeKalb County SD - Montclair Elementary School




Pump                                Air Separator




Controls                            Small Pump




Pump                                Exterior Photos




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/27/2021                                            22
 Revision Date - 09/24/2021




FACILITY CONDITION ASSESSMENT
                 Panola Way Elementary School | 2021
                                                                                                                           Facility Condition Assessment
                                                                                                              DeKalb County SD - Panola Way Elementary School


 Executive Summary
 Panola Way Elementary School is located at 2170 Panola Way Court in Lithonia, GA. It comprises 86,218 gross square
 feet. At the time of the assessment the oldest building was 33 years old.
 The findings contained within this report are the result of an assessment of building systems performed by building
 professionals experienced in disciplines including architecture, mechanical, plumbing and electrical. Only those systems
 that were identified as having either an associated deficiency or life cycle event within a 10-year window is contained within
 this report. The full list of each school's systems that are present along with the associated priorities can be found in the flat
 file data grids submitted to Dekalb County. The projected replacement year of those assets within each system is also
 included within this table.The total current deficiencies for this site, in 2020 construction cost dollars, are estimated at
 $2,937,191. A ten-year need was developed to provide an understanding of the current need as well as the projected
 needs in the near future. For Panola Way Elementary School the ten-year need is $10,997,795.
 For planning purposes, the total current deficiencies and the first five years of projected life cycle needs were combined to
 calculate a Facility Condition Index (FCI). A 5-year FCI was calculated by dividing the 5-year need by the total replacement
 cost. Costs associated with new construction are not included in the FCI calculation. After the 5-year FCI was calculated,
 this value was subtracted from 100 to calculate the FCA Score in a similar fashion to report cards.
 The Panola Way Elementary School facility has a FCA score of 67.68% which is considered "Poor".

Summary of Findings
The table below summarizes the condition findings at Panola Way Elementary School.
Table 1: Facility Condition by Building


                                                                                                        Total 5 Yr Need      Total 10 Yr Need
                                                          Current       5-Year Life   Yrs 6-10 Life    (Yr 1-5 + Current    (Yr 1-10 + Current    Replacement      FCA
Number          Building Name                            Deficiencies   Cycle Cost     Cycle Cost             Defs)                Defs)              Cost         Score
Exterior Site
                Exterior Site                                $459,368      $320,372         $207,200            $779,739               $986,940
Permanent Building(s)
2010            Building 2010                              $1,751,536    $3,806,309       $2,759,721          $5,557,845             $8,317,565      $18,567,380   70.07%
2011            Building 2011                                $554,107      $546,420         $150,646          $1,100,527             $1,251,173       $3,819,394   71.19%
2020            Building 2020                                $172,182      $115,228         $154,707            $287,409               $442,117       $1,518,885   81.08%
                Sub Total for Permanent Building(s):       $2,477,824   $4,467,957       $3,065,074           $6,945,781           $10,010,855      $23,905,663
                                       Total for Site:     $2,937,191    $4,788,328       $3,272,275          $7,725,520           $10,997,795       $23,905,663   67.68%

Note 1: Sitework improvements are proportionally incorporated into the building CRV and used to calulate the overall FCA Score.
Note 2: Aerial map including building number, gross SF, and year built of each building on the site is found on Page 3.




 M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                                         2
                                                          Facility Condition Assessment
                                                   DeKalb County SD - Panola Way Elementary School


Aerial Images




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                           3
                                                                                         Facility Condition Assessment
                                                                                 DeKalb County SD - Panola Way Elementary School


Approach and Methodology
The facility condition assessment includes a visual assessment of building systems that are readily available during a
facility walk-through. The standard process does not reflect invasive, destructive assessment methods that would
require special equipment, testing or scheduled power outages. The assessment was accomplished with a view
toward identifying significant maintenance and repair deficiencies that need correction. For the purposes of this
assessment, deficient conditions captured were limited to those items that did not qualify as routine maintenance
repairs. Copies of previous reports and other documentation that were relevant to the inspection were utilized if made
available in the process. Additionally, feedback from appropriate personnel to provide background information relative
to specific building operations, function, equipment conditions, past improvements and planned upgrades were
incorporated into the results if made available to the teams while on site. Two components of the facility condition
assessment are combined to total the cost for facility need. The two components of the facility condition assessment
are current deficiencies and life cycle forecast.

Current Deficiencies: Deficiencies are items in need of repair or replacement as a result of being broken, obsolete,
deferred maintenance, or beyond useful life. The existing deficiencies that currently require correction are identified
and assigned a priority. An example of a current deficiency might include a broken lighting fixture or an inoperable
roof top air conditioning unit.

Life Cycle Forecast: Life cycle analysis evaluates the ages of a building's systems to forecast system replacement as
they reach the end of serviceable life. Estimated Useful Lives were determined based on a combination of our
(Jacobs) professional experience, RS Means, and from industry standard tables (BOMA, ASHRAE). An example of a
life cycle system replacement is a roof with a 20-year life that has been in place for 15 years and may require
replacement in five years.

All members of the survey team recorded existing conditions, identified problems and deficiencies, and documented
corrective action and quantities. The team took digital photos at each site to better identify significant deficiencies.

Facility Deficiency Priority Levels
Deficiencies were ranked according to five priority levels, with Priority 1 items being the most critical to address:

Priority 1 – Mission Critical Concerns: Deficiencies or conditions that may directly affect the site’s ability to remain
open or deliver the educational curriculum. These deficiencies typically relate to building safety, code compliance,
severely damaged or failing building components, and other items that require near-term correction. An example of a
Priority 1 deficiency is a fire alarm system replacement.

Priority 2 – Indirect Impact to Educational Mission: Items that may progress to a Priority 1 item if not addressed in the
near term. Examples of Priority 2 deficiencies include inadequate roofing that could cause deterioration of integral
building systems, and conditions affecting building envelopes, such as roof and window replacements.

Priority 3 – Short-Term Conditions: Deficiencies that are necessary to the site's mission but may not require
immediate attention. These items should be considered necessary improvements required to maximize facility
efficiency and usefulness. Examples of Priority 3 items include site improvements and plumbing deficiencies.

Priority 4 – Long-Term Requirements: Items or systems that may be considered improvements to the instructional
environment. The improvements may be aesthetic or provide greater functionality. Examples include cabinets,
finishes, paving, removal of abandoned equipment, and educational accommodations associated with special
programs.

Priority 5 – Enhancements: Deficiencies aesthetic in nature or considered enhancements. Typical deficiencies in this
priority include repainting, replacing carpet, improved signage, or other improvements to the facility environment.




M▪A▪P▪P▪S ©, Jacobs 2021                      Revision Date - 09/24/2021                                                      4
                                                                                         Facility Condition Assessment
                                                                                 DeKalb County SD - Panola Way Elementary School


Facility Condition Assessment(FCA) Score
Facility Condition Assessment (FCA) Scores are assigned after the Facility Condition Index (FCI) is calculated.
The Facility Condition Index (FCI) is used throughout the facility condition assessment industry as a general
indicator of a building’s health. Since 1991, the facility management industry has used an index called the FCI
to benchmark the relative condition of a group of sites. The FCI is derived by dividing the total repair cost,
including site-related repairs, by the total replacement cost of all buildings. It should be noted that costs in the
New Construction category are not included in the FCI calculation. In an effort to match the report card metrics,
the FCI is subtracted from 100 to assign the FCA Score. A facility with a lower FCA Score has more need, or
higher priority, than a facility with a higher FCA Score.




The replacement value represents the estimated cost of replacing the current building with another building of
like size, based on 2021 estimated cost of construction in the DeKalb County area. The estimated replacement
cost for this facility is $23,905,663. For planning purposes, the total 5-year need at the Panola Way Elementary
School is $7,725,520 (Life Cycle Years 1-5 plus the current FCI deficiency cost).

The Panola Way Elementary School facility has an FCA Score of 67.68%. which is considered "Poor".




                              Figure 1: 5-Year FCI




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                               5
                                                                                                                    Facility Condition Assessment
                                                                                                        DeKalb County SD - Panola Way Elementary School


The following table summarizes this site's current deficiencies by building system and priority.

Table 2: System by Priority (Site & Permanent Buildings)

                                                                                 Priority

                  System                     1                2                     3               4                    5             Total             % of Total
Site                                                  $0               $0               $321,658        $135,480              $2,356       $459,494          15.64 %

Roofing                                               $0               $0                $10,812             $0                  $0            $10,812        0.37 %

Structural                                            $0               $0                    $0              $0                  $0                $0         0.00 %

Exterior                                              $0               $0                $10,521             $0                  $0            $10,521        0.36 %

Interior                                              $0               $0                    $0          $48,158              $1,312           $49,470        1.68 %

Mechanical                                            $0          $627,246                   $0         $129,482              $3,719       $760,447          25.89 %

Electrical                                            $0          $180,374              $930,312             $0                  $0      $1,110,686          37.81 %

Plumbing                                              $0               $0                 $6,030             $0                  $0             $6,030        0.21 %

Fire and Life Safety                             $529,732              $0                    $0              $0                  $0        $529,732          18.04 %

Conveyances                                           $0               $0                    $0              $0                  $0                $0         0.00 %

Specialties                                           $0               $0                    $0              $0                  $0                $0         0.00 %

Total:                                           $529,732         $807,620          $1,279,333          $313,120              $7,387     $2,937,191




The building systems at the site with the most need include:
                                                                             Electrical                 -     $1,110,686
                                                                             Mechanical                 -          $760,447
                                                                             Fire and Life Safety       -          $529,732




M▪A▪P▪P▪S ©, Jacobs 2021                                    Revision Date - 09/24/2021                                                                                6
                                                                                   Facility Condition Assessment
                                                                            DeKalb County SD - Panola Way Elementary School



The chart below represents the building systems and associated deficiency costs.




Figure 2: System Deficiencies




M▪A▪P▪P▪S ©, Jacobs 2021                    Revision Date - 09/24/2021                                                   7
                                                                                                          Facility Condition Assessment
                                                                                              DeKalb County SD - Panola Way Elementary School


Life Cycle Capital Renewal Forecast
During the facility condition assessment, assessors inspected all major building systems. If an assessor identified a need
for immediate replacement, a deficiency was created with the item's repair costs. The identified deficiency contributes to the
facility's total current repair costs.

However, capital planning scenarios span multiple years, as opposed to being constrained to immediate repairs.
Construction projects may begin several years after the initial facility condition assessment. Therefore, in addition to the
current year repair costs, it is necessary to forecast the facility's future costs using a ten-year life cycle renewal forecast
model.

Life cycle renewal is the projection of future building system costs based upon each individual system’s expected
serviceable life. Building systems and components age over time, eventually break down, reach the end of their useful lives,
and may require replacement. While an item may be in good condition now, it might reach the end of its life before a
planned construction project occurs.

The following tables show ten-year life cycle capital renewal projections. The projections outline costs for major building
systems in which a component is expected to reach the end of its useful life and require capital funding for replacement.



Table 3a: Capital Renewal Forecast (Yrs 1-5)

                                                         Life Cycle Capital Renewal Projections
                                   Year 1           Year 2               Year 3               Year 4              Year 5
System                              2022             2023                 2024                 2025                2026                 Total 1-5
Site                                           $0                 $0                   $0              $183,048                 $0     $183,048

Roofing                                        $0                 $0                   $0                   $0              $94,217     $94,217

Exterior                                       $0                 $0                   $0                   $0              $20,202     $20,202

Interior                                       $0             $94,918               $5,760             $126,943        $1,175,112     $1,402,732

Mechanical                                     $0            $126,143              $21,565              $38,182        $1,014,922     $1,200,812

Electrical                                     $0                 $0                   $0               $43,107                 $0      $43,107

Plumbing                                       $0                 $0                $4,388             $426,172             $16,770    $447,330

Fire and Life Safety                           $0                 $0                   $0                   $0             $760,374    $760,374

Conveyances                                    $0                 $0                   $0                   $0                  $0            $0

Specialties                                    $0                 $0              $515,427             $121,080                 $0     $636,507

Total                                          $0            $221,061             $547,140             $938,531        $3,081,596     $4,788,328




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                                     8
                                                                                                                 Facility Condition Assessment
                                                                                                     DeKalb County SD - Panola Way Elementary School


Table 3b: Capital Renewal Forecast (Yrs 6-10)

                                                                   Life Cycle Capital Renewal Projections
                                                Year 6            Year 7           Year 8            Year 9           Year 10
System                         Total 1-5         2027              2028             2029              2030             2031            Total 6-10    Total 1-10
Site                           $183,048                  $0                $0          $207,201                 $0              $0     $207,201      $390,249

Roofing                         $94,217                  $0                $0               $0                  $0              $0            $0      $94,217

Exterior                        $20,202                  $0                $0               $0                  $0         $214,391    $214,391      $234,592

Interior                     $1,402,732             $413,911               $0           $77,635             $30,112        $138,435    $660,093     $2,062,825

Mechanical                   $1,200,812              $78,516               $0          $273,517                 $0              $0     $352,033     $1,552,845

Electrical                      $43,107                  $0                $0          $107,455                 $0       $1,088,221   $1,195,676    $1,238,783

Plumbing                       $447,330                  $0                $0          $626,680                 $0          $16,201    $642,881     $1,090,211

Fire and Life Safety           $760,374                  $0                $0               $0                  $0              $0            $0     $760,374

Conveyances                          $0                  $0                $0               $0                  $0              $0            $0            $0

Specialties                    $636,507                  $0                $0               $0                  $0              $0            $0     $636,507

Total                        $4,788,328             $492,427               $0        $1,292,488             $30,112      $1,457,248   $3,272,275    $8,060,603




Figure 3: Ten Year Capital Renewal Forecast




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                                         9
                                                                                    Facility Condition Assessment
                                                                             DeKalb County SD - Panola Way Elementary School

Summary of High Priority Deficiencies


Priority 1 - Mission Critical Concerns                                                 Cost
  Emergency Exit Signage Replacement                                                  $29,315

  Fire Alarm Replacement                                                             $474,041

  Security Alarm Camera Replacement                                                    $2,710

  Wall Pack Lighting Replacement                                                      $23,666

                                                      Total for Priority 1           $529,732



Priority 2 - Indirect Impact to Educational Mission                                    Cost
  Heat Pump HVAC Component Replacement                                               $570,450

  Steam Heat Exchanger Replacement                                                    $46,467

  Thru Wall AC Replacement                                                            $10,329

  Electrical Transformer Replacement                                                  $14,880

  Panelboard Replacement                                                             $112,921

  Switchgear Replacement                                                              $52,572

                                                      Total for Priority 2           $807,620




M▪A▪P▪P▪S ©, Jacobs 2021                   Revision Date - 09/24/2021                                                    10
                                                                                                                     Facility Condition Assessment
                                                                                                             DeKalb County SD - Panola Way Elementary School



Deficiency Summary
(Items below detail the totals referenced in Table 2)

Site Level Deficiencies
Site
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Asphalt Driveway Replacement                                                               Capital Renewal         41,669 SF        3         $251,918    1394
Concrete Walks Replacement                                                                 Capital Renewal          3,839 SF        3          $40,883    1392
             Location: In Front Of And In Back Of School
Parking Or Roadway Curbs Replacement                                                       Capital Renewal           300 LF         3           $7,719    1396
             Note:      Damaged Concrete Curbs
Playground Equipment Replacement                                                           Capital Renewal             1 Ea.        3          $21,011 10560
Asphalt Paving Replacement                                                                 Capital Renewal            80 CAR        4         $109,120    1395
Fencing Replacement (8' - 10' high Chain Link Fence)                                       Capital Renewal           350 LF         4          $25,780    1390
             Location: Back Lot And Front
Gate Replacement                                                                           Deferred                    1 Ea.        4             $580    1391
                                                                                           Maintenance
             Location: Near Gym
Sidewalk Requires Cleaning                                                                 Deferred                11,520 SF        5           $2,356    1397
                                                                                           Maintenance
                                                                                           Sub Total for System        8 items                $459,368
                                                                             Sub Total for School and Site Level       8 items                $459,368

Building: 2010 - Building 2010
Exterior
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Aluminum Window Repair                                                                     Deferred                    1 Ea.        3             $566    1124
                                                                                           Maintenance
             Note:      Weathering In Room 130 - Music
Brick Exterior Repair                                                                      Deferred                  100 SF         3           $1,171    1123
                                                                                           Maintenance                   Wall
             Note:      Building Shift (8 Sf) At Room 130. Vandalism (3 Sf) At Room 124
                                                                                           Sub Total for System        2 items                  $1,737

Interior
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Acoustical Ceiling Tile Replacement                                                        Capital Renewal            34 SF         4             $187    1127
             Note:      Wear And Tear At Corridor
Ceiling Grid Replacement                                                                   Capital Renewal           100 SF         4           $1,415    1126
             Note:      Water Leak
Gypsum Board Ceiling Repair                                                                Deferred                 1,000 SF        4           $5,365    1128
                                                                                           Maintenance
Interior Ceramic Walls Repair or Replacement                                               Capital Renewal          2,009 SF        4          $15,680    1129
Interior Wood Wall Replacement (LC)                                                        Capital Renewal            80 SF         4           $1,180    1130
Terrazzo Flooring Repair                                                                   Deferred                   20 SF         4             $956    1131
                                                                                           Maintenance
             Note:      Wear And Tear In Room 110 Comp Lab
Vinyl Composition Tile Replacement                                                         Capital Renewal            18 SF         4             $144    1483
             Location: East Entry
Interior Ceiling Repainting                                                                Deferred                  670 SF         5           $1,312    1125
                                                                                           Maintenance
                                                                                           Sub Total for System        8 items                 $26,239

Mechanical
Deficiency                                                                                 Category                  Qty UoM     Priority   Repair Cost    ID
Heat Pump HVAC Component Replacement                                                       Capital Renewal            38 Ea.        2         $433,542    1148
             Note:      R22 Factory Charged System
Steam Heat Exchanger Replacement                                                           Capital Renewal             1 Ea.        2          $46,467    1147
             Note:      200 GPM
             Location: Mech Room

M▪A▪P▪P▪S ©, Jacobs 2021                                        Revision Date - 09/24/2021                                                                       11
                                                                                                                       Facility Condition Assessment
                                                                                                             DeKalb County SD - Panola Way Elementary School

Mechanical
Deficiency                                                                                 Category                     Qty UoM        Priority   Repair Cost    ID
Circulation Pump Replacement                                                               Capital Renewal                   1 Ea.        4           $4,055    1149
             Note:      3 And 4 HP
             Location: Mech Room
Existing Controls Are Obsolete                                                             Capital Renewal          66,965 SF             4          $97,419 10561
Duct Grill Replacement                                                                     Deferred                      40 Ea.           5           $3,719    1150
                                                                                           Maintenance
             Location: Throughout Building
                                                                                           Sub Total for System              5 items                $585,202

Electrical
Deficiency                                                                                 Category                     Qty UoM        Priority   Repair Cost    ID
Electrical Transformer Replacement                                                         Capital Renewal                   1 Ea.        2           $5,565    1133
             Location: Mech 544
Electrical Transformer Replacement                                                         Capital Renewal                   1 Ea.        2           $9,315    1134
             Location: Mech 544
Panelboard Replacement                                                                     Capital Renewal               14 Ea.           2          $36,618    1137
             Location: Mech 544, Elec 105.3, Cr 122, Workroom 116.4, Elec 111.4, Elec 128.2, Stor 127.1, Elec 136.2, Stage
Panelboard Replacement                                                                     Capital Renewal                   4 Ea.        2          $20,682    1138
             Location: Mech 544, Kitchen
Panelboard Replacement                                                                     Capital Renewal                   1 Ea.        2          $11,603    1139
             Location: Mech 544
Panelboard Replacement                                                                     Capital Renewal                   7 Ea.        2          $44,018    1140
             Location: Elec 105.3, Workroom 116.4, Elec 111.4, Elec 128.2, Elec 136.2, Stage, Kitchen
Switchgear Replacement                                                                     Capital Renewal                   1 Ea.        2          $52,572    1132
             Location: Mech 544
Canopy Lighting Replacement                                                                Capital Renewal               20 Ea.           3          $39,167    1145
Exterior Mounted Building Lighting Replacement                                             Capital Renewal               14 Ea.           3          $11,869    1146
Interior Power Wiring Replacement                                                          Deferred                 50,000 SF             3          $55,831    1401
                                                                                           Maintenance
Lighting Fixtures Replacement                                                              Capital Renewal          20,000 SF             3         $344,827    1400
Lightning Protection System Installation                                                   Functional Deficiency    66,965 SF             3          $49,165    1144
Public Address System Replacement, Non-main Building                                       Deferred                 66,965 SF             3          $44,567    1135
                                                                                           Maintenance
                                                                                           Sub Total for System          13 items                   $725,800

Fire and Life Safety
Deficiency                                                                                 Category                     Qty UoM        Priority   Repair Cost    ID
Emergency Exit Signage Replacement                                                         Capital Renewal               38 Ea.           1          $22,734    1142
Fire Alarm Replacement                                                                     Capital Renewal          66,965 SF             1         $368,185    1141
Security Alarm Camera Replacement                                                          Capital Renewal                   1 Ea.        1           $1,355    1136
             Note:      Camera Not Working
Wall Pack Lighting Replacement                                                             Capital Renewal               42 Ea.           1          $20,285    1143
                                                                                           Sub Total for System              4 items                $412,559
                                                                    Sub Total for Building 2010 - Building 2010          32 items                 $1,751,536

Building: 2011 - Building 2011
Site
Deficiency                                                                                 Category                     Qty UoM        Priority   Repair Cost    ID
Exterior Entry Signage At The Building Entry Does Not Meet ADA Requirements                ADA Compliance                    1 Ea.        3             $126    1326
             Note:      Missing Sign At Room 205
                                                                                           Sub Total for System              1 items                    $126

Roofing
Deficiency                                                                                 Category                     Qty UoM        Priority   Repair Cost    ID
Metal Downspout Replacement                                                                Deferred                    396 LF             3           $8,810    1325
                                                                                           Maintenance
             Note:      Damaged On The Ne And Sw Sides Of The Building
                                                                                           Sub Total for System              1 items                  $8,810




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                                              12
                                                                                                                      Facility Condition Assessment
                                                                                                              DeKalb County SD - Panola Way Elementary School

Exterior
Deficiency                                                                                  Category                  Qty UoM     Priority   Repair Cost    ID
Brick Exterior Repair                                                                       Deferred                  750 SF         3           $8,784    1322
                                                                                            Maintenance                   Wall
                                                                                           Sub Total for System         1 items                  $8,784

Interior
Deficiency                                                                                  Category                  Qty UoM     Priority   Repair Cost    ID
Interior CMU Wall Repair                                                                    Deferred                  704 SF         4          $21,871    1323
                                                                                            Maintenance
             Location: Vestibule At Room 205, 207
Vinyl Composition Tile Replacement                                                          Capital Renewal           170 SF         4           $1,360    1324
             Note:      Damaged From Uneven Slab
                                                                                           Sub Total for System         2 items                 $23,231

Mechanical
Deficiency                                                                                  Category                  Qty UoM     Priority   Repair Cost    ID
Heat Pump HVAC Component Replacement                                                        Capital Renewal            12 Ea.        2         $136,908    1336
             Note:      R22 Factory Charged
Thru Wall AC Replacement                                                                    Capital Renewal             1 Ea.        2           $5,164    1337
             Location: Room 215
Existing Controls Are Obsolete                                                              Capital Renewal         13,775 SF        4          $20,039 10562
                                                                                           Sub Total for System         3 items                $162,112

Electrical
Deficiency                                                                                  Category                  Qty UoM     Priority   Repair Cost    ID
Electrical Receptacle Replacement                                                           Capital Renewal             4 Ea.        3             $502    1327
             Note:      Exposed Wiring At Exterior Electrical Receptacles.
Exterior Mounted Building Lighting Replacement                                              Capital Renewal             9 Ea.        3           $7,630    1333
Lighting Fixtures Replacement                                                               Capital Renewal         13,775 SF        3         $237,499    1402
Lightning Protection System Installation                                                    Functional Deficiency   13,775 SF        3          $10,113    1332
Public Address System Replacement, Non-main Building                                        Deferred                13,775 SF        3           $9,168    1328
                                                                                            Maintenance
                                                                                           Sub Total for System         5 items                $264,913

Plumbing
Deficiency                                                                                  Category                  Qty UoM     Priority   Repair Cost    ID
Toilet Replacement                                                                          Capital Renewal             1 Ea.        3           $4,757    1334
             Note:      Cracked In Room 214
                                                                                           Sub Total for System         1 items                  $4,757

Fire and Life Safety
Deficiency                                                                                  Category                  Qty UoM     Priority   Repair Cost    ID
Emergency Exit Signage Replacement                                                          Capital Renewal             7 Ea.        1           $4,188    1330
Fire Alarm Replacement                                                                      Capital Renewal         13,775 SF        1          $75,737    1329
Wall Pack Lighting Replacement                                                              Capital Renewal             3 Ea.        1           $1,449    1331
                                                                                           Sub Total for System         3 items                 $81,374
                                                                      Sub Total for Building 2011 - Building 2011      17 items                $554,107

Building: 2020 - Building 2020
Roofing
Deficiency                                                                                  Category                  Qty UoM     Priority   Repair Cost    ID
Metal Downspout Replacement                                                                 Deferred                   90 LF         3           $2,002    1385
                                                                                            Maintenance
             Location: Ne Side Of Building
                                                                                           Sub Total for System         1 items                  $2,002

Mechanical
Deficiency                                                                                  Category                  Qty UoM     Priority   Repair Cost    ID
Thru Wall AC Replacement                                                                    Capital Renewal             1 Ea.        2           $5,164    1389
             Note:      1.5 Ton
             Location: Admin Office




M▪A▪P▪P▪S ©, Jacobs 2021                                        Revision Date - 09/24/2021                                                                        13
                                                                                                        Facility Condition Assessment
                                                                                                 DeKalb County SD - Panola Way Elementary School

Mechanical
Deficiency                                                                     Category                  Qty UoM     Priority   Repair Cost    ID
Existing Controls Are Obsolete                                                 Capital Renewal         5,478 SF         4           $7,969 10563
                                                                              Sub Total for System         2 items                 $13,134

Electrical
Deficiency                                                                     Category                  Qty UoM     Priority   Repair Cost    ID
Canopy Lighting Replacement                                                    Capital Renewal             9 Ea.        3          $17,625    1407
Exterior Mounted Building Lighting Replacement                                 Capital Renewal             4 Ea.        3           $3,391    1408
Lighting Fixtures Replacement                                                  Capital Renewal         5,478 SF         3          $94,448    1409
Lightning Protection Terminal Replacement                                      Deferred                5,478 SF         3             $864    1406
                                                                               Maintenance
Public Address System Replacement, Non-main Building                           Deferred                5,478 SF         3           $3,646    1386
                                                                               Maintenance
                                                                              Sub Total for System         5 items                $119,974

Plumbing
Deficiency                                                                     Category                  Qty UoM     Priority   Repair Cost    ID
Urinal Replacement                                                             Capital Renewal             1 Ea.        3           $1,273    1388
                                                                              Sub Total for System         1 items                  $1,273

Fire and Life Safety
Deficiency                                                                     Category                  Qty UoM     Priority   Repair Cost    ID
Emergency Exit Signage Replacement                                             Capital Renewal             4 Ea.        1           $2,393    1404
Fire Alarm Replacement                                                         Capital Renewal         5,478 SF         1          $30,119    1403
Security Alarm Camera Replacement                                              Capital Renewal             1 Ea.        1           $1,355    1387
Wall Pack Lighting Replacement                                                 Capital Renewal             4 Ea.        1           $1,932    1405
                                                                              Sub Total for System         4 items                 $35,799
                                                         Sub Total for Building 2020 - Building 2020      13 items                $172,182
                                                                                  Total for Campus        70 items              $2,937,191




M▪A▪P▪P▪S ©, Jacobs 2021                               Revision Date - 09/24/2021                                                                    14
                                                                                                                       Facility Condition Assessment
                                                                                                              DeKalb County SD - Panola Way Elementary School



Life Cycle Summary Yrs 1-10
(Items below detail the totals referenced in Tables 3a & 3b)

Site Level Life Cycle Items
Site
Uniformat Description                    LC Type Description                                     Priority        Qty UoM       Repair Cost Remaining Life
Fences and Gates                         Fencing - Chain Link (8-10 Ft)                             3          2,208 LF          $183,048        4
Pedestrian Pavement                      Sidewalks - Concrete                                       3          15,359 SF         $207,200        8
                                                                                      Sub Total for System         2 items       $390,249

Roofing
Uniformat Description                    LC Type Description                                     Priority        Qty UoM       Repair Cost Remaining Life
Canopy Roofing                           Aluminum panels                                            4          1,706 SF           $94,217        5
                                                                                      Sub Total for System         1 items        $94,217

Electrical
Uniformat Description                    LC Type Description                                     Priority        Qty UoM       Repair Cost Remaining Life
Parking Lot Lighting                     Pole Lighting                                              3              7 Ea.          $43,107        4
                                                                                      Sub Total for System         1 items        $43,107
                                                                                   Sub Total for Building -        4 items       $527,572

Building: 2010 - Building 2010
Exterior
Uniformat Description                    LC Type Description                                     Priority        Qty UoM       Repair Cost Remaining Life
Exterior Operating Windows               Aluminum - Windows per SF                                  2            360 SF           $48,381        10
Exterior Operating Windows               Aluminum - Windows per SF                                  2            120 SF           $16,127        10
Exterior Entrance Doors                  Steel - Insulated and Painted                              3             32 Door        $149,883        10
                                                                                      Sub Total for System         3 items       $214,391

Interior
Uniformat Description                    LC Type Description                                     Priority        Qty UoM       Repair Cost Remaining Life
Carpeting                                Carpet                                                     4          3,348 SF           $42,277        2
Wall Painting and Coating                Painting/Staining (Bldg SF)                                5          25,447 SF         $120,659        4
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                4          65,626 SF         $418,293        5
Wall Paneling                            Wood Panel wall                                            4            670 SF           $11,451        5
Wall Coverings                           FRP Wall Finish                                            4          2,009 SF Wall      $16,659        5
Resilient Flooring                       Vinyl Composition Tile Flooring                            4          48,884 SF         $453,271        5
Interior Swinging Doors                  Wooden Door                                                3            103 Door        $216,873        6
Interior Door Supplementary Components   Door Hardware                                              3            106 Door        $176,664        6
Tile Flooring                            Ceramic Tile                                               4          2,009 SF           $42,272        8
Suspended Plaster and                    Painted ceilings                                           5            670 SF            $1,763        10
Carpeting                                Carpet                                                     4          3,348 SF           $53,555        10
Tile Flooring                            Quarry Tile                                                4          2,009 SF           $69,392        10
Interior Swinging Doors                  Storefront door (Aluminum/Glass)                           3              3 Door         $13,725        10
                                                                                      Sub Total for System        13 items     $1,636,855

Mechanical
Uniformat Description                    LC Type Description                                     Priority        Qty UoM       Repair Cost Remaining Life
Decentralized Cooling                    Ductless Split System (3 Ton)                              2              1 Ea.           $5,411        2
Facility Hydronic Distribution           2-Pipe System (Cold)                                       3          66,965 SF         $119,436        2
Exhaust Air                              Interior Ceiling Exhaust Fan                               3             12 Ea.           $6,000        3
Exhaust Air                              Kitchen Exhaust Hoods                                      3              1 Ea.          $11,498        3
HVAC Air Distribution                    Roof Top Unit - DX Gas (10 Ton)                            2              1 Ea.          $25,646        4
Facility Hydronic Distribution           Pump- 10HP (Ea.)                                           4              1 Ea.          $12,600        5
Facility Hydronic Distribution           Pump- 25HP (Ea.)                                           4              2 Ea.          $31,349        5
HVAC Air Distribution                    Ductwork (Bldg.SF)                                         3          66,965 SF         $931,858        5
Heat Generation                          Boiler - Steel Tube (2400 MBH)                             3              1 Ea.         $119,273        8
Decentralized Heating Equipment          Unit Heater Electric (3 KW)                                3              1 Ea.           $1,117        8
Central Cooling                          Cooling Tower - Metal (300 Tons)                           2              1 Ea.          $68,873        8
Other HVAC Distribution Systems          VFD (25 HP)                                                3              3 Ea.          $37,961        8
Other HVAC Distribution Systems          VFD (15 HP)                                                3              2 Ea.          $18,005        8
                                                                                      Sub Total for System        13 items     $1,389,027


M▪A▪P▪P▪S ©, Jacobs 2021                                                 Revision Date - 09/24/2021                                                         15
                                                                                                                                       Facility Condition Assessment
                                                                                                                             DeKalb County SD - Panola Way Elementary School

Electrical
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Lighting Fixtures                        Light Fixtures (Bldg SF)                                                 4           46,965 SF       $1,088,221       10
                                                                                                    Sub Total for System          1 items     $1,088,221

Plumbing
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Plumbing Fixtures                        Restroom Lavatory                                                        3              31 Ea.         $89,103        4
Plumbing Fixtures                        Sink - Service / Mop Sink                                                5               6 Ea.          $5,054        4
Plumbing Fixtures                        Toilets                                                                  3              35 Ea.        $187,379        4
Plumbing Fixtures                        Urinals                                                                  3              18 Ea.         $25,794        4
Plumbing Fixtures                        Classroom Lavatory                                                       4               6 Ea.         $16,770        5
Domestic Water Equipment                 Water Heater - Gas - 200 Gallon                                          2               2 Ea.         $32,850        8
Domestic Water Equipment                 Gas Piping System (BldgSF)                                               2           66,965 SF        $169,883        8
Domestic Water Piping                    Domestic Water Piping System (Bldg.SF)                                   3           66,965 SF        $381,979        8
Plumbing Fixtures                        Refrigerated Drinking Fountain                                           4              14 Ea.         $36,722        8
Plumbing Fixtures                        Classroom Lavatory                                                       4               5 Ea.         $16,201        10
                                                                                                    Sub Total for System         10 items      $961,735

Fire and Life Safety
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Water-Based Fire-Suppression             Fire Sprinkler System (Bldg.SF)                                          1           66,965 SF        $760,374        5
                                                                                                    Sub Total for System          1 items      $760,374

Specialties
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Casework                                 Fixed Cabinetry                                                          4              57 Room       $515,427        3
                                                                                                    Sub Total for System          1 items      $515,427
                                                                               Sub Total for Building 2010 - Building 2010       42 items     $6,566,029

Building: 2011 - Building 2011
Interior
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Compartments and Cubicles                Toilet Partitions                                                        4              10 Stall       $20,113        2
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                              4           13,500 SF         $86,047        5
Suspended Plaster and                    Painted ceilings                                                         5             138 SF             $313        5
Wall Painting and Coating                Painting/Staining (Bldg SF)                                              5           13,775 SF         $67,275        5
Resilient Flooring                       Vinyl Composition Tile Flooring                                          4           12,917 SF        $119,772        5
Tile Flooring                            Ceramic Tile                                                             4             551 SF          $10,928        6
Interior Door Supplementary Components   Door Hardware                                                            3              20 Door        $35,363        8
                                                                                                    Sub Total for System          7 items      $339,810

Mechanical
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Decentralized Cooling                    Condenser - Inside Air Cooled (3 ton)                                    2               1 Ea.          $6,796        4
Decentralized Cooling                    Ductless Split System (3 Ton)                                            2               1 Ea.          $5,740        4
Facility Hydronic Distribution           2-Pipe System (Cold)                                                     3           13,775 SF         $26,846        5
Decentralized Heating Equipment          Radiant Heater - Radiant Panels - Ceiling                                3               6 Ea.         $28,288        8
                                                                                                    Sub Total for System          4 items       $67,671

Electrical
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Electrical Service                       Transformer (75 KVA)                                                     2               1 Ea.          $8,679        8
Power Distribution                       Distribution Panels (600 Amps)                                           3               1 Ea.         $21,202        8
Power Distribution                       Panelboard - 120/208 225A                                                3               2 Ea.         $13,100        8
Power Distribution                       Panelboard - 277/480 400A                                                3               2 Ea.         $33,087        8
                                                                                                    Sub Total for System          4 items       $76,067

Plumbing
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Domestic Water Equipment                 Water Heater - Electric - 30 gallon                                      2               1 Ea.          $2,194        3
Plumbing Fixtures                        Restroom Lavatory                                                        3               7 Ea.         $20,120        4
Plumbing Fixtures                        Sink - Service / Mop Sink                                                5               1 Ea.            $842        4
Plumbing Fixtures                        Toilets                                                                  3              11 Ea.         $58,890        4
Plumbing Fixtures                        Urinals                                                                  3               4 Ea.          $5,732        4




M▪A▪P▪P▪S ©, Jacobs 2021                                               Revision Date - 09/24/2021                                                                         16
                                                                                                                                      Facility Condition Assessment
                                                                                                                             DeKalb County SD - Panola Way Elementary School

Plumbing
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Plumbing Fixtures                        Refrigerated Drinking Fountain                                           4              2 Ea.           $4,661        4
                                                                                                    Sub Total for System         6 items        $92,439

Specialties
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Casework                                 Fixed Cabinetry                                                          4             13 Room        $121,080        4
                                                                                                    Sub Total for System         1 items       $121,080
                                                                               Sub Total for Building 2011 - Building 2011      22 items       $697,066

Building: 2020 - Building 2020
Exterior
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Exterior Entrance Doors                  Steel - Insulated and Painted                                            3              5 Door         $20,202        5
                                                                                                    Sub Total for System         1 items        $20,202

Interior
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Wall Painting and Coating                Painting/Staining (Bldg SF)                                              5           5,478 SF          $24,483        2
Compartments and Cubicles                Toilet Partitions                                                        4              4 Stall         $8,045        2
Suspended Plaster and                    Painted ceilings                                                         5             219 SF             $469        3
Tile Flooring                            Ceramic Tile                                                             4             219 SF           $3,975        3
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                              4             219 SF           $1,316        3
Interior Door Supplementary Components   Door Hardware                                                            3              4 Door          $6,284        4
Resilient Flooring                       Vinyl Composition Tile Flooring                                          4             219 SF           $2,031        5
Acoustical Suspended Ceilings            Ceilings - Acoustical Grid System                                        4             219 SF           $1,023        6
Interior Swinging Doors                  Wooden Door                                                              3              4 Door          $8,423        6
Wall Painting and Coating                Painting/Staining (Bldg SF)                                              5           5,478 SF          $30,112        9
                                                                                                    Sub Total for System        10 items        $86,160

Mechanical
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Decentralized Heating Equipment          Unit Heater Electric (5 KW)                                              3              1 Ea.           $1,296        2
Decentralized Heating Equipment          Radiant Heater - Radiant Panels - Ceiling                                3              1 Ea.           $4,067        3
Exhaust Air                              Interior Ceiling Exhaust Fan                                             3              3 Ea.           $1,592        5
Facility Hydronic Distribution           2-Pipe System (Cold)                                                     3           5,478 SF          $10,677        5
HVAC Air Distribution                    Ductwork (Bldg.SF)                                                       3           5,478 SF          $78,516        6
                                                                                                    Sub Total for System         5 items        $96,148

Electrical
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Electrical Service                       Exterior Dry Type Transformer (75 KVA)                                   2              1 Ea.          $24,839        8
Power Distribution                       Panelboard - 120/208 225A                                                3              1 Ea.           $6,549        8
                                                                                                    Sub Total for System         2 items        $31,388

Plumbing
Uniformat Description                    LC Type Description                                                   Priority         Qty UoM      Repair Cost Remaining Life
Domestic Water Equipment                 Water Heater - Electric - 30 gallon                                      2              1 Ea.           $2,194        3
Plumbing Fixtures                        Restroom Lavatory                                                        3              2 Ea.           $5,749        4
Plumbing Fixtures                        Toilets                                                                  3              4 Ea.          $21,415        4
Plumbing Fixtures                        Urinals                                                                  3              1 Ea.           $1,433        4
Plumbing Fixtures                        Refrigerated Drinking Fountain                                           4              2 Ea.           $5,246        8
                                                                                                    Sub Total for System         5 items        $36,037
                                                                               Sub Total for Building 2020 - Building 2020      23 items       $269,935

                                                                                Total for: Panola Way Elementary School         91 items      $8,060,603




M▪A▪P▪P▪S ©, Jacobs 2021                                                 Revision Date - 09/24/2021                                                                       17
                                                                                                 Facility Condition Assessment
                                                                                       DeKalb County SD - Panola Way Elementary School



 Supporting Photos




Existing Gym Lighting Beyond Useful Life                       Location A Building Exterior Transformer




Main Electrical Switchboard Is Beyond Useful Life              Main Fire Alarm Panel Located In Main Electrical Room




The Old Fire Alarm Sub Panel Is Located In The Main Office     The Existing Rauland Intercom System Should Be Replaced.
Area. System Is Beyond Useful Life                             System Is Beyond Useful Life




M▪A▪P▪P▪S ©, Jacobs 2021                              Revision Date - 09/24/2021                                                   18
                                                                Facility Condition Assessment
                                                         DeKalb County SD - Panola Way Elementary School




Main Entry                          Classroom Casework




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                                19
 Revision Date - 09/24/2021




FACILITY CONDITION ASSESSMENT
                  Pine Ridge Elementary School | 2021
                                                                                                                            Facility Condition Assessment
                                                                                                                DeKalb County SD - Pine Ridge Elementary School


 Executive Summary
 Pine Ridge Elementary School is located at 750 Pine Ridge Drive in Stone Mountain, GA. It comprises 87,192 gross
 square feet. At the time of the assessment the oldest building was 32 years old.
 The findings contained within this report are the result of an assessment of building systems performed by building
 professionals experienced in disciplines including architecture, mechanical, plumbing and electrical. Only those systems
 that were identified as having either an associated deficiency or life cycle event within a 10-year window is contained within
 this report. The full list of each school's systems that are present along with the associated priorities can be found in the flat
 file data grids submitted to Dekalb County. The projected replacement year of those assets within each system is also
 included within this table.The total current deficiencies for this site, in 2020 construction cost dollars, are estimated at
 $1,899,910. A ten-year need was developed to provide an understanding of the current need as well as the projected
 needs in the near future. For Pine Ridge Elementary School the ten-year need is $9,626,225.
 For planning purposes, the total current deficiencies and the first five years of projected life cycle needs were combined to
 calculate a Facility Condition Index (FCI). A 5-year FCI was calculated by dividing the 5-year need by the total replacement
 cost. Costs associated with new construction are not included in the FCI calculation. After the 5-year FCI was calculated,
 this value was subtracted from 100 to calculate the FCA Score in a similar fashion to report cards.
 The Pine Ridge Elementary School facility has a FCA score of 68.33% which is considered "Poor".

Summary of Findings
The table below summarizes the condition findings at Pine Ridge Elementary School.
Table 1: Facility Condition by Building


                                                                                                         Total 5 Yr Need      Total 10 Yr Need
                                                          Current        5-Year Life   Yrs 6-10 Life    (Yr 1-5 + Current    (Yr 1-10 + Current    Replacement      FCA
Number          Building Name                            Deficiencies    Cycle Cost     Cycle Cost             Defs)                Defs)              Cost         Score
Exterior Site
                Exterior Site                                  $48,760      $328,221         $358,207            $376,980               $735,187
Permanent Building(s)
2010            Building 2010                              $1,292,226     $4,815,083         $625,845          $6,107,309             $6,733,154      $19,047,340   67.94%
2011            Building 2011                                $384,922       $455,128         $778,263            $840,049             $1,618,313       $3,609,501   76.73%
2020            Building 2020                                $174,003       $157,927         $207,642            $331,929               $539,572       $1,518,885   78.15%
                Sub Total for Permanent Building(s):       $1,851,150     $5,428,138      $1,611,751          $7,279,288             $8,891,039      $24,175,726
                                       Total for Site:     $1,899,910     $5,756,358       $1,969,957          $7,656,268             $9,626,225      $24,175,726   68.33%

Note 1: Sitework improvements are proportionally incorporated into the building CRV and used to calulate the overall FCA Score.
Note 2: Aerial map including building number, gross SF, and year built of each building on the site is found on Page 3.




 M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                                          2
                                                         Facility Condition Assessment
                                                   DeKalb County SD - Pine Ridge Elementary School


Aerial Images




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                           3
                                                                                         Facility Condition Assessment
                                                                                  DeKalb County SD - Pine Ridge Elementary School


Approach and Methodology
The facility condition assessment includes a visual assessment of building systems that are readily available during a
facility walk-through. The standard process does not reflect invasive, destructive assessment methods that would
require special equipment, testing or scheduled power outages. The assessment was accomplished with a view
toward identifying significant maintenance and repair deficiencies that need correction. For the purposes of this
assessment, deficient conditions captured were limited to those items that did not qualify as routine maintenance
repairs. Copies of previous reports and other documentation that were relevant to the inspection were utilized if made
available in the process. Additionally, feedback from appropriate personnel to provide background information relative
to specific building operations, function, equipment conditions, past improvements and planned upgrades were
incorporated into the results if made available to the teams while on site. Two components of the facility condition
assessment are combined to total the cost for facility need. The two components of the facility condition assessment
are current deficiencies and life cycle forecast.

Current Deficiencies: Deficiencies are items in need of repair or replacement as a result of being broken, obsolete,
deferred maintenance, or beyond useful life. The existing deficiencies that currently require correction are identified
and assigned a priority. An example of a current deficiency might include a broken lighting fixture or an inoperable
roof top air conditioning unit.

Life Cycle Forecast: Life cycle analysis evaluates the ages of a building's systems to forecast system replacement as
they reach the end of serviceable life. Estimated Useful Lives were determined based on a combination of our
(Jacobs) professional experience, RS Means, and from industry standard tables (BOMA, ASHRAE). An example of a
life cycle system replacement is a roof with a 20-year life that has been in place for 15 years and may require
replacement in five years.

All members of the survey team recorded existing conditions, identified problems and deficiencies, and documented
corrective action and quantities. The team took digital photos at each site to better identify significant deficiencies.

Facility Deficiency Priority Levels
Deficiencies were ranked according to five priority levels, with Priority 1 items being the most critical to address:

Priority 1 – Mission Critical Concerns: Deficiencies or conditions that may directly affect the site’s ability to remain
open or deliver the educational curriculum. These deficiencies typically relate to building safety, code compliance,
severely damaged or failing building components, and other items that require near-term correction. An example of a
Priority 1 deficiency is a fire alarm system replacement.

Priority 2 – Indirect Impact to Educational Mission: Items that may progress to a Priority 1 item if not addressed in the
near term. Examples of Priority 2 deficiencies include inadequate roofing that could cause deterioration of integral
building systems, and conditions affecting building envelopes, such as roof and window replacements.

Priority 3 – Short-Term Conditions: Deficiencies that are necessary to the site's mission but may not require
immediate attention. These items should be considered necessary improvements required to maximize facility
efficiency and usefulness. Examples of Priority 3 items include site improvements and plumbing deficiencies.

Priority 4 – Long-Term Requirements: Items or systems that may be considered improvements to the instructional
environment. The improvements may be aesthetic or provide greater functionality. Examples include cabinets,
finishes, paving, removal of abandoned equipment, and educational accommodations associated with special
programs.

Priority 5 – Enhancements: Deficiencies aesthetic in nature or considered enhancements. Typical deficiencies in this
priority include repainting, replacing carpet, improved signage, or other improvements to the facility environment.




M▪A▪P▪P▪S ©, Jacobs 2021                      Revision Date - 09/24/2021                                                       4
                                                                                         Facility Condition Assessment
                                                                                  DeKalb County SD - Pine Ridge Elementary School


Facility Condition Assessment(FCA) Score
Facility Condition Assessment (FCA) Scores are assigned after the Facility Condition Index (FCI) is calculated.
The Facility Condition Index (FCI) is used throughout the facility condition assessment industry as a general
indicator of a building’s health. Since 1991, the facility management industry has used an index called the FCI
to benchmark the relative condition of a group of sites. The FCI is derived by dividing the total repair cost,
including site-related repairs, by the total replacement cost of all buildings. It should be noted that costs in the
New Construction category are not included in the FCI calculation. In an effort to match the report card metrics,
the FCI is subtracted from 100 to assign the FCA Score. A facility with a lower FCA Score has more need, or
higher priority, than a facility with a higher FCA Score.




The replacement value represents the estimated cost of replacing the current building with another building of
like size, based on 2021 estimated cost of construction in the DeKalb County area. The estimated replacement
cost for this facility is $24,175,726. For planning purposes, the total 5-year need at the Pine Ridge Elementary
School is $7,656,268 (Life Cycle Years 1-5 plus the current FCI deficiency cost).

The Pine Ridge Elementary School facility has an FCA Score of 68.33%. which is considered "Poor".




                              Figure 1: 5-Year FCI




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                5
                                                                                                                      Facility Condition Assessment
                                                                                                            DeKalb County SD - Pine Ridge Elementary School


The following table summarizes this site's current deficiencies by building system and priority.

Table 2: System by Priority (Site & Permanent Buildings)

                                                                                 Priority

                  System                     1                2                     3               4                      5              Total             % of Total
Site                                                  $0               $0                $21,011         $27,749                    $0            $48,760        2.57 %

Roofing                                               $0             $697                 $7,394            $1,496                  $0             $9,587        0.50 %

Structural                                            $0               $0                    $0                $0                   $0                $0         0.00 %

Exterior                                              $0            $3,485                   $0                $0              $142,395       $145,880           7.68 %

Interior                                              $0               $0                $21,578               $0                   $0            $21,578        1.14 %

Mechanical                                            $0            $6,959              $196,441        $221,105                    $0        $424,505          22.34 %

Electrical                                            $0          $225,498              $480,769         $24,119                 $9,370       $739,756          38.94 %

Plumbing                                              $0            $5,507                $1,055               $0                   $0             $6,561        0.35 %

Fire and Life Safety                             $496,155              $0                    $0                $0                   $0        $496,155          26.11 %

Conveyances                                           $0               $0                    $0                $0                   $0                $0         0.00 %

Specialties                                           $0               $0                   $909            $6,217                  $0             $7,126        0.38 %

Total:                                           $496,155         $242,146              $729,157        $280,686               $151,765     $1,899,910




The building systems at the site with the most need include:
                                                                             Electrical                 -            $739,756
                                                                             Fire and Life Safety       -            $496,155
                                                                             Mechanical                 -            $424,505




M▪A▪P▪P▪S ©, Jacobs 2021                                    Revision Date - 09/24/2021                                                                                   6
                                                                                   Facility Condition Assessment
                                                                             DeKalb County SD - Pine Ridge Elementary School



The chart below represents the building systems and associated deficiency costs.




Figure 2: System Deficiencies




M▪A▪P▪P▪S ©, Jacobs 2021                    Revision Date - 09/24/2021                                                    7
                                                                                                          Facility Condition Assessment
                                                                                                  DeKalb County SD - Pine Ridge Elementary School


Life Cycle Capital Renewal Forecast
During the facility condition assessment, assessors inspected all major building systems. If an assessor identified a need
for immediate replacement, a deficiency was created with the item's repair costs. The identified deficiency contributes to the
facility's total current repair costs.

However, capital planning scenarios span multiple years, as opposed to being constrained to immediate repairs.
Construction projects may begin several years after the initial facility condition assessment. Therefore, in addition to the
current year repair costs, it is necessary to forecast the facility's future costs using a ten-year life cycle renewal forecast
model.

Life cycle renewal is the projection of future building system costs based upon each individual system’s expected
serviceable life. Building systems and components age over time, eventually break down, reach the end of their useful lives,
and may require replacement. While an item may be in good condition now, it might reach the end of its life before a
planned construction project occurs.

The following tables show ten-year life cycle capital renewal projections. The projections outline costs for major building
systems in which a component is expected to reach the end of its useful life and require capital funding for replacement.



Table 3a: Capital Renewal Forecast (Yrs 1-5)

                                                         Life Cycle Capital Renewal Projections
                                   Year 1           Year 2               Year 3               Year 4               Year 5
System                              2022             2023                 2024                 2025                 2026                 Total 1-5
Site                                           $0             $0                       $0              $175,012             $153,209    $328,221

Roofing                                        $0             $0                       $0                   $0                   $0            $0

Exterior                                       $0             $0                       $0                   $0              $215,159    $215,159

Interior                                       $0             $0                  $311,191             $244,025         $1,240,614     $1,795,831

Mechanical                                     $0             $0                   $57,474             $261,945         $1,401,093     $1,720,512

Electrical                                     $0             $0                       $0                $1,909              $13,621     $15,530

Plumbing                                       $0             $0                    $1,630             $472,113              $77,499    $551,242

Fire and Life Safety                           $0             $0                       $0              $757,310                  $0     $757,310

Conveyances                                    $0             $0                       $0                   $0                   $0            $0

Specialties                                    $0             $0                       $0              $372,555                  $0     $372,555

Total                                          $0             $0                  $370,296           $2,284,868         $3,101,194     $5,756,358




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                                      8
                                                                                                                  Facility Condition Assessment
                                                                                                         DeKalb County SD - Pine Ridge Elementary School


Table 3b: Capital Renewal Forecast (Yrs 6-10)

                                                                      Life Cycle Capital Renewal Projections
                                                Year 6               Year 7           Year 8            Year 9         Year 10
System                         Total 1-5         2027                 2028             2029              2030           2031               Total 6-10    Total 1-10
Site                           $328,221                     $0                $0          $268,576               $0                 $0     $268,576      $596,796

Roofing                              $0                     $0                $0               $0                $0          $89,631        $89,631       $89,631

Exterior                       $215,159                     $0                $0          $132,448               $0         $205,707       $338,155      $553,314

Interior                     $1,795,830                     $0                $0          $131,747          $124,304        $111,671       $367,722     $2,163,553

Mechanical                   $1,720,512                     $0                $0          $340,742               $0                 $0     $340,742     $2,061,254

Electrical                      $15,530                     $0                $0          $150,477               $0          $48,153       $198,630      $214,160

Plumbing                       $551,242                     $0                $0               $0                $0              $7,400       $7,400     $558,641

Fire and Life Safety           $757,310                     $0                $0          $229,493               $0                 $0     $229,493      $986,803

Conveyances                          $0                     $0                $0               $0                $0                 $0            $0            $0

Specialties                    $372,555                  $3,815               $0          $125,794               $0                 $0     $129,609      $502,164

Total                        $5,756,358                  $3,815               $0        $1,379,277          $124,304        $462,561      $1,969,957    $7,726,315




Figure 3: Ten Year Capital Renewal Forecast




M▪A▪P▪P▪S ©, Jacobs 2021                                          Revision Date - 09/24/2021                                                                          9
                                                                                        Facility Condition Assessment
                                                                                  DeKalb County SD - Pine Ridge Elementary School

Summary of High Priority Deficiencies


Priority 1 - Mission Critical Concerns                                                     Cost
  Emergency Exit Signage Replacement                                                       $7,179

  Fire Alarm Replacement                                                                 $479,396

  Security Alarm Camera Replacement                                                        $8,131

  Wall Pack Lighting Replacement                                                           $1,449

                                                           Total for Priority 1          $496,155



Priority 2 - Indirect Impact to Educational Mission                                        Cost
  Gutter Joint Repair                                                                        $697

  Metal Exterior Door Replacement                                                          $3,485

  Ductwork Replacement (SF Basis)                                                          $6,002

  Infrared Electric Radiant Heater Replacement                                               $957

  Electrical Transformer Replacement                                                      $32,637

  Generator Replacement                                                                   $47,284

  Panelboard Replacement                                                                 $109,488

  Switchgear Replacement                                                                  $36,090

  Water Heater Replacement                                                                 $5,507

                                                           Total for Priority 2          $242,146




M▪A▪P▪P▪S ©, Jacobs 2021                         Revision Date - 09/24/2021                                                   10
                                                                                                        Facility Condition Assessment
                                                                                                DeKalb County SD - Pine Ridge Elementary School



Deficiency Summary
(Items below detail the totals referenced in Table 2)

Site Level Deficiencies
Site
Deficiency                                                                    Category                  Qty UoM     Priority   Repair Cost    ID
Playground Equipment Replacement                                              Capital Renewal             1 Ea.        3          $21,011 10565
Asphalt Paving Replacement                                                    Capital Renewal             2 CAR        4           $2,728    2253
             Location: Near Loading And Unloading
Exterior Basketball Goal Replacement                                          Capital Renewal             4 Ea.        4          $25,021    2251
                                                                              Sub Total for System        3 items                 $48,760
                                                                Sub Total for School and Site Level       3 items                 $48,760

Building: 2010 - Building 2010
Roofing
Deficiency                                                                    Category                  Qty UoM     Priority   Repair Cost    ID
Skylight Repair                                                               Deferred                    4 Ea.        3           $7,127    2301
                                                                              Maintenance
             Note:     Minor Leaks
             Location: Roof
                                                                              Sub Total for System        1 items                  $7,127

Exterior
Deficiency                                                                    Category                  Qty UoM     Priority   Repair Cost    ID
Metal Exterior Door Replacement                                               Capital Renewal             1 Door       2           $3,485    2262
             Location: Near Can Wash
Exterior Cleaning                                                             Deferred                34,262 SF        5         $124,754    2259
                                                                              Maintenance                    Wall
             Location: Power Wash Exterior
                                                                              Sub Total for System        2 items                $128,239

Interior
Deficiency                                                                    Category                  Qty UoM     Priority   Repair Cost    ID
Entry Door Does Not Have Power Assist Device                                  ADA Compliance              1 Ea.        3          $14,892    2257
             Location: Missing / Main Entrance
Interior Door Hardware Replacement                                            Capital Renewal             1 Door       3           $1,396    2265
             Location: Storage Room 201.5
Interior Door Replacement                                                     Capital Renewal             3 Door       3           $5,290    2263
             Location: Kitchen Room 150
                                                                              Sub Total for System        3 items                 $21,578

Mechanical
Deficiency                                                                    Category                  Qty UoM     Priority   Repair Cost    ID
Ductwork Replacement (SF Basis)                                               Capital Renewal           500 SF         2           $6,002    2295
             Location: Replace Duct At Stage
Infrared Electric Radiant Heater Replacement                                  Capital Renewal             1 Ea.        2             $957    2294
             Location: Kitchen Locker Room Rr
Large Diameter Exhausts/Hoods Replacement                                     Capital Renewal            26 Ea.        3         $196,441    2297
             Note:     Beyond Useful Life
             Location: Roof
Existing Controls Are Obsolete                                                Capital Renewal         68,696 SF        4         $174,202 10566
                                                                              Sub Total for System        4 items                $377,602

Electrical
Deficiency                                                                    Category                  Qty UoM     Priority   Repair Cost    ID
Electrical Transformer Replacement                                            Capital Renewal             4 Ea.        2          $22,260    2267
             Note:     Beyond Useful Life
             Location: Room 99.16,105C,199.2, And 99.16




M▪A▪P▪P▪S ©, Jacobs 2021                                  Revision Date - 09/24/2021                                                                11
                                                                                                  Facility Condition Assessment
                                                                                           DeKalb County SD - Pine Ridge Elementary School

Electrical
Deficiency                                                               Category                 Qty UoM     Priority   Repair Cost    ID
Electrical Transformer Replacement                                       Capital Renewal            2 Ea.        2          $10,377    2268
             Note:      Beyond Useful Life
             Location: Room 406.2 And 96.1
Generator Replacement                                                    Capital Renewal            1 Ea.        2          $47,284    2279
             Note:      Beyond Useful Life - Actual 60KW
Panelboard Replacement                                                   Capital Renewal            5 Ea.        2          $18,865    2269
             Note:      Beyond Useful Life
             Location: Room 99.16, 96.1, 105C And 406.2
Panelboard Replacement                                                   Capital Renewal            5 Ea.        2          $44,058    2270
             Note:      Beyond Useful Life
             Location: Room 99.16, 105C, 406.2, 96.1
Panelboard Replacement                                                   Capital Renewal            3 Ea.        2          $15,511    2271
             Note:      Actual 120 And 208 150A
             Location: Room 99.16, 105C
Panelboard Replacement                                                   Capital Renewal            2 Ea.        2           $5,231    2272
             Note:      Beyond Useful Life
             Location: Room 406.2 And 96.1
Panelboard Replacement                                                   Capital Renewal            2 Ea.        2          $23,206    2273
             Note:      Beyond Useful Life
             Location: Kitchen
Panelboard Replacement                                                   Capital Renewal            1 Ea.        2           $2,616    2274
             Note:      Actual 120 And 208 And 60A
             Location: Room 96.1
Switchgear Replacement                                                   Capital Renewal            1 Ea.        2          $36,090    2266
             Note:      Beyond Useful Life
             Location: Mech Room 96.1
Canopy Lighting Replacement                                              Capital Renewal            6 Ea.        3          $11,750    2281
             Note:      Beyond Useful Life
Exterior Mounted Building Lighting Replacement                           Capital Renewal           11 Ea.        3           $9,326    2283
             Note:      Beyond Useful Life
Interior Power Wiring Replacement                                        Deferred               45,000 SF        3          $50,248    2288
                                                                         Maintenance
             Note:      Beyond Useful Life
             Location: Old Wires
Lightning Protection Terminal Replacement                                Deferred               68,696 SF        3          $10,830    2284
                                                                         Maintenance
             Location: Not Installed
Public Address System Replacement, Non-main Building                     Deferred               68,698 SF        3          $45,720    2275
                                                                         Maintenance
             Note:      Beyond Useful Life
                                                                         Sub Total for System      15 items                $353,373

Plumbing
Deficiency                                                               Category                 Qty UoM     Priority   Repair Cost    ID
Water Heater Replacement                                                 Capital Renewal            2 Ea.        2           $2,983    2289
             Location: Jan Closet 100 And 200 Hall
Water Heater Replacement                                                 Capital Renewal            1 Ea.        2           $2,523    2290
             Location: Storage Off Mech Room
Emergency Eyewash Replacement                                            Capital Renewal            1 Ea.        3           $1,055    2292
             Location: Science Lab 405
                                                                         Sub Total for System       3 items                  $6,561

Fire and Life Safety
Deficiency                                                               Category                 Qty UoM     Priority   Repair Cost    ID
Emergency Exit Signage Replacement                                       Capital Renewal            8 Ea.        1           $4,786    2278
             Note:      Beyond Useful Life
Fire Alarm Replacement                                                   Capital Renewal        68,696 SF        1         $377,702    2277
             Note:      Beyond Useful Life


M▪A▪P▪P▪S ©, Jacobs 2021                                   Revision Date - 09/24/2021                                                         12
                                                                                                                    Facility Condition Assessment
                                                                                                             DeKalb County SD - Pine Ridge Elementary School

Fire and Life Safety
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Security Alarm Camera Replacement                                                         Capital Renewal             6 Ea.        1           $8,131    2276
             Location: Owner Stated Not Working
                                                                                         Sub Total for System         3 items                $390,619

Specialties
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Counter Heights Exceed Maximum ADA Height Requirements (Modify Full)                      ADA Compliance             15 LF         3             $909    2255
             Location: Main Office
Base Storage Cabinet Replacement                                                          Capital Renewal            12 LF         4           $6,217    2264
             Location: Room 104
                                                                                         Sub Total for System         2 items                  $7,126
                                                                    Sub Total for Building 2010 - Building 2010      33 items              $1,292,226

Building: 2011 - Building 2011
Roofing
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Gutter Joint Repair                                                                       Deferred                    3 Ea.        2             $697    2204
                                                                                          Maintenance
             Location: North And South Outside Room 312, 307, 309
Metal Downspout Replacement                                                               Deferred                   12 LF         3             $267    2205
                                                                                          Maintenance
             Location: North And South Side
                                                                                         Sub Total for System         2 items                    $964

Mechanical
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Existing Controls Are Obsolete                                                            Capital Renewal         13,018 SF        4          $33,012 10567
                                                                                         Sub Total for System         1 items                 $33,012

Electrical
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Canopy Lighting Replacement                                                               Capital Renewal             1 Ea.        3           $1,958    2200
             Note:      Beyond Useful Life
Exterior Mounted Building Lighting Replacement                                            Capital Renewal             8 Ea.        3           $6,782    2201
             Note:      Beyond Useful Life
Lighting Fixtures Replacement                                                             Capital Renewal         13,018 SF        3         $224,448    2202
             Note:      Old T8 Lamps
Lightning Protection System Installation                                                  Functional Deficiency   13,018 SF        3           $9,558    2199
             Location: Not Installed
Public Address System Replacement, Non-main Building                                      Deferred                13,018 SF        3           $8,664    2195
                                                                                          Maintenance
             Note:      System Is Served From Building 2010
Pendant Lighting Replacement                                                              Capital Renewal            36 Ea.        4          $24,119    2203
             Note:      Old T8 Lamps - Pendant Fixtures Are 4'
                                                                                         Sub Total for System         6 items                $275,529

Fire and Life Safety
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Emergency Exit Signage Replacement                                                        Capital Renewal             4 Ea.        1           $2,393    2197
             Note:      Beyond Useful Life
Fire Alarm Replacement                                                                    Capital Renewal         13,018 SF        1          $71,575    2196
             Note:      Beyond Useful Life
Wall Pack Lighting Replacement                                                            Capital Renewal             3 Ea.        1           $1,449    2198
             Note:      Beyond Useful Life
                                                                                         Sub Total for System         3 items                 $75,417
                                                                    Sub Total for Building 2011 - Building 2011      12 items                $384,922




M▪A▪P▪P▪S ©, Jacobs 2021                                         Revision Date - 09/24/2021                                                                     13
                                                                                                            Facility Condition Assessment
                                                                                                     DeKalb County SD - Pine Ridge Elementary School

Building: 2020 - Building 2020
Roofing
Deficiency                                                                         Category                 Qty UoM     Priority   Repair Cost    ID
Roof Cleaning                                                                      Deferred                6,848 SF        4           $1,496    2238
                                                                                   Maintenance
             Note:      Dirty
             Location: Roof
                                                                                  Sub Total for System        1 items                  $1,496

Exterior
Deficiency                                                                         Category                 Qty UoM     Priority   Repair Cost    ID
Exterior Cleaning                                                                  Deferred                4,845 SF        5          $17,641    2240
                                                                                   Maintenance                   Wall
             Location: Dirty Building
                                                                                  Sub Total for System        1 items                 $17,641

Mechanical
Deficiency                                                                         Category                 Qty UoM     Priority   Repair Cost    ID
Existing Controls Are Obsolete                                                     Capital Renewal         5,478 SF        4          $13,891 10568
                                                                                  Sub Total for System        1 items                 $13,891

Electrical
Deficiency                                                                         Category                 Qty UoM     Priority   Repair Cost    ID
Exterior Mounted Building Lighting Replacement                                     Capital Renewal            4 Ea.        3           $3,391    2234
             Note:      Beyond Useful Life
Lighting Fixtures Replacement                                                      Capital Renewal         5,478 SF        3          $94,448    2235
             Note:      Beyond Useful Life
Public Address System Replacement, Non-main Building                               Deferred                5,478 SF        3           $3,646    2231
                                                                                   Maintenance
             Note:      System Served From Building 2010
Ground Mounted Lighting Replacement                                                Capital Renewal            8 Ea.        5           $9,370    2233
             Note:      Beyond Useful Life
                                                                                  Sub Total for System        4 items                $110,855

Fire and Life Safety
Deficiency                                                                         Category                 Qty UoM     Priority   Repair Cost    ID
Fire Alarm Replacement                                                             Capital Renewal         5,478 SF        1          $30,119    2232
             Note:      Beyond Useful Life
                                                                                  Sub Total for System        1 items                 $30,119
                                                             Sub Total for Building 2020 - Building 2020      8 items                $174,003
                                                                                      Total for Campus       56 items              $1,899,910




M▪A▪P▪P▪S ©, Jacobs 2021                                   Revision Date - 09/24/2021                                                                   14
                                                                                                                        Facility Condition Assessment
                                                                                                               DeKalb County SD - Pine Ridge Elementary School



Life Cycle Summary Yrs 1-10
(Items below detail the totals referenced in Tables 3a & 3b)

Site Level Life Cycle Items
Site
Uniformat Description                    LC Type Description                                      Priority       Qty UoM       Repair Cost Remaining Life
Parking Lot Pavement                     Asphalt                                                     3           114 CAR         $175,012        4
Roadway Pavement                         Asphalt Driveways                                           3         21,860 SF         $153,208        5
Fences and Gates                         Fencing - Chain Link (8-10 Ft)                              3         1,875 LF          $174,951        8
Pedestrian Pavement                      Sidewalks - Concrete                                        3         6,940 SF           $93,624        8
                                                                                       Sub Total for System        4 items       $596,796

Roofing
Uniformat Description                    LC Type Description                                      Priority       Qty UoM       Repair Cost Remaining Life
Canopy Roofing                           Aluminum panels                                             4         1,400 SF           $89,631        10
                                                                                       Sub Total for System        1 items        $89,631
                                                                                    Sub Total for Building -       5 items       $686,427

Building: 2010 - Building 2010
Exterior
Uniformat Description                    LC Type Description                                      Priority       Qty UoM       Repair Cost Remaining Life
Exterior Operating Windows               Aluminum - Windows per SF                                   2         1,856 SF          $215,159        5
Exterior Entrance Doors                  Steel - Insulated and Painted                               3            30 Door        $132,448        8
                                                                                       Sub Total for System        2 items       $347,607

Interior
Uniformat Description                    LC Type Description                                      Priority       Qty UoM       Repair Cost Remaining Life
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                 4         51,522 SF         $309,544        3
Interior Door Supplementary Components   Door Hardware                                               3           152 Door        $238,787        4
Acoustical Suspended Ceilings            Ceilings - Acoustical Grid System                           4         51,522 SF         $233,841        5
Compartments and Cubicles                Toilet Partitions                                           4            38 Stall        $83,516        5
Carpeting                                Carpet                                                      4         5,496 SF           $75,836        5
Tile Flooring                            Ceramic Tile                                                4         6,183 SF          $119,059        5
Resilient Flooring                       Vinyl Composition Tile Flooring                             4         41,905 SF         $388,558        5
Interior Swinging Doors                  Wooden Door                                                 3           151 Door        $308,681        5
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                 4         15,113 SF         $111,671        10
                                                                                       Sub Total for System        9 items     $1,869,494

Mechanical
Uniformat Description                    LC Type Description                                      Priority       Qty UoM       Repair Cost Remaining Life
Central Cooling                          Cooling Tower - Plastic (140 Tons)                          2             1 Ea.          $37,114        3
Facility Hydronic Distribution           Pump - 1HP or Less (Ea.)                                    4             2 Ea.           $8,862        3
Exhaust Air                              Kitchen Exhaust Hoods                                       3             1 Ea.          $11,498        3
Heat Generation                          Steam Condensate Receiver, Tank and Pump                    2             2 Ea.          $32,201        4
Decentralized Heating Equipment          Unit Heater Gas (200 MBH)                                   3             1 Ea.           $5,486        4
Decentralized Cooling                    Condenser - Outside Air Cooled (3 Tons)                     2             2 Ea.          $13,593        4
Decentralized Cooling                    Ductless Split System (2 Ton)                               2             2 Ea.          $10,046        4
Air Distribution                         Make-up Air Unit                                            3             1 Ea.           $9,405        4
Facility Hydronic Distribution           2-Pipe System (Cold)                                        3         68,696 SF         $133,885        5
Facility Hydronic Distribution           Pump- 25HP (Ea.)                                            4             2 Ea.          $31,349        5
Facility Hydronic Distribution           Pump- 10HP (Ea.)                                            4             1 Ea.          $12,600        5
HVAC Air Distribution                    Ductwork (Bldg.SF)                                          3         68,696 SF         $955,947        5
Exhaust Air                              Wall Exhaust Fan                                            3             1 Ea.           $5,156        5
Exhaust Air                              Interior Ceiling Exhaust Fan                                3             4 Ea.           $2,121        5
Heat Generation                          Boiler - Copper Tube (2400 MBH)                             2             1 Ea.         $116,044        8
HVAC Air Distribution                    Roof Top Unit - DX Gas (40 Ton)                             2             1 Ea.          $97,800        8
HVAC Air Distribution                    Roof Top Unit - DX Gas (20 Ton)                             2             1 Ea.          $55,771        8
                                                                                       Sub Total for System       17 items     $1,538,877

Electrical
Uniformat Description                    LC Type Description                                      Priority       Qty UoM       Repair Cost Remaining Life
Lighting Fixtures                        Building Mounted Fixtures (Ea.)                             4             2 Ea.           $1,909        4


M▪A▪P▪P▪S ©, Jacobs 2021                                                 Revision Date - 09/24/2021                                                         15
                                                                                                                                      Facility Condition Assessment
                                                                                                                             DeKalb County SD - Pine Ridge Elementary School

Electrical
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Lighting Fixtures                        Canopy Mounted Fixtures (Ea.)                                            4              6 Ea.          $13,621        5
Electrical Service                       Transformer (75 KVA)                                                     2              3 Ea.          $26,037        8
Power Distribution                       Panelboard - 120/208 225A                                                3              6 Ea.          $39,299        8
Power Distribution                       Power Wiring                                                             3          23,696 SF          $35,560        10
                                                                                                    Sub Total for System         5 items       $116,427

Plumbing
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Plumbing Fixtures                        Restroom Lavatory                                                        3             26 Ea.          $74,732        4
Plumbing Fixtures                        Sink - Service / Mop Sink                                                5              4 Ea.           $3,369        4
Plumbing Fixtures                        Toilets                                                                  3             43 Ea.         $230,208        4
Plumbing Fixtures                        Urinals                                                                  3             14 Ea.          $20,062        4
Plumbing Fixtures                        Refrigerated Drinking Fountain                                           4             10 Ea.          $23,305        4
Domestic Water Equipment                 Water Heater - Electric - 20 gallon                                      2              1 Ea.           $1,730        5
Domestic Water Equipment                 Water Heater - Gas - 100 Gallon                                          2              1 Ea.           $6,958        5
Plumbing Fixtures                        Classroom Lavatory                                                       4             24 Ea.          $67,081        5
Domestic Water Equipment                 Water Heater - Electric - 20 gallon                                      2              2 Ea.           $4,009        10
Domestic Water Equipment                 Water Heater - Electric - 40 gallon                                      2              1 Ea.           $3,391        10
                                                                                                    Sub Total for System        10 items       $434,844

Fire and Life Safety
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Water-Based Fire-Suppression             Fire Sprinkler System (Bldg.SF)                                          1          68,696 SF         $757,310        4
                                                                                                    Sub Total for System         1 items       $757,310

Specialties
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Casework                                 Fixed Cabinetry                                                          4             40 Room        $372,555        4
Casework                                 Lockers, Gym                                                             4              7 Ea.           $3,815        6
                                                                                                    Sub Total for System         2 items       $376,370
                                                                               Sub Total for Building 2010 - Building 2010      46 items     $5,440,928

Building: 2011 - Building 2011
Exterior
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Exterior Operating Windows               Aluminum - Windows per SF                                                2          1,217 SF          $163,552        10
Exterior Entrance Doors                  Steel - Insulated and Painted                                            3              4 Door         $18,736        10
                                                                                                    Sub Total for System         2 items       $182,287

Interior
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Carpeting                                Carpet                                                                   4            391 SF            $5,238        4
Compartments and Cubicles                Toilet Partitions                                                        4              8 Stall        $17,583        5
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                              4          12,823 SF          $89,311        8
Interior Door Supplementary Components   Door Hardware                                                            3             20 Door         $35,363        8
Resilient Flooring                       Vinyl Composition Tile Flooring                                          4          11,911 SF         $124,304        9
                                                                                                    Sub Total for System         5 items       $271,799

Mechanical
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Decentralized Cooling                    Package DX Unit (3 Ton)                                                  2             13 Ea.         $129,789        4
HVAC Air Distribution                    Roof Top Unit - DX Gas (5 Ton)                                           2              2 Ea.          $33,670        4
HVAC Air Distribution                    Ductwork (Bldg.SF)                                                       3          13,018 SF         $181,153        5
Exhaust Air                              Interior Ceiling Exhaust Fan                                             3              2 Ea.           $1,061        5
Decentralized Heating Equipment          Radiant Heater - Infrared Electric                                       3              1 Ea.           $1,212        8
Decentralized Heating Equipment          Radiant Heater - Radiant Panels - Ceiling                                3              1 Ea.           $4,715        8
                                                                                                    Sub Total for System         6 items       $351,599

Electrical
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Electrical Service                       Transformer (45 KVA)                                                     2              1 Ea.           $7,050        8
Power Distribution                       Panelboard - 120/208 100A                                                3              1 Ea.           $3,314        8
Power Distribution                       Panelboard - 120/208 225A                                                3              2 Ea.          $13,100        8
Power Distribution                       Panelboard - 277/480 100A                                                3              1 Ea.           $7,965        8



M▪A▪P▪P▪S ©, Jacobs 2021                                                 Revision Date - 09/24/2021                                                                       16
                                                                                                                                      Facility Condition Assessment
                                                                                                                             DeKalb County SD - Pine Ridge Elementary School

Electrical
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Power Distribution                       Panelboard - 277/480 225A                                                3              2 Ea.          $22,324        8
                                                                                                    Sub Total for System         5 items        $53,753

Plumbing
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Plumbing Fixtures                        Restroom Lavatory                                                        3              1 Ea.           $2,875        4
Plumbing Fixtures                        Sink - Service / Mop Sink                                                5              1 Ea.             $842        4
Plumbing Fixtures                        Toilets                                                                  3              9 Ea.          $48,183        4
Plumbing Fixtures                        Urinals                                                                  3              3 Ea.           $4,299        4
Plumbing Fixtures                        Refrigerated Drinking Fountain                                           4              4 Ea.           $9,321        4
Plumbing Fixtures                        Group Wash Fountain                                                      5              2 Ea.          $19,385        4
Domestic Water Equipment                 Water Heater - Electric - 20 gallon                                      2              1 Ea.           $1,730        5
                                                                                                    Sub Total for System         7 items        $86,635

Fire and Life Safety
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Water-Based Fire-Suppression             Fire Sprinkler System (Bldg.SF)                                          1          13,018 SF         $161,523        8
                                                                                                    Sub Total for System         1 items       $161,523

Specialties
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Casework                                 Fixed Cabinetry                                                          4             12 Room        $125,794        8
                                                                                                    Sub Total for System         1 items       $125,794
                                                                               Sub Total for Building 2011 - Building 2011      27 items     $1,233,391

Building: 2020 - Building 2020
Exterior
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Exterior Entrance Doors                  Steel - Insulated and Painted                                            3              5 Door         $23,419        10
                                                                                                    Sub Total for System         1 items        $23,419

Interior
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                              4            274 SF            $1,647        3
Acoustical Suspended Ceilings            Ceilings - Acoustical Grid System                                        4            274 SF            $1,244        5
Suspended Plaster and                    Painted ceilings                                                         5            274 SF              $621        5
Compartments and Cubicles                Toilet Partitions                                                        4              3 Stall         $6,594        5
Resilient Flooring                       Vinyl Composition Tile Flooring                                          4            548 SF            $5,081        5
Interior Door Supplementary Components   Door Hardware                                                            3              4 Door          $7,072        8
                                                                                                    Sub Total for System         6 items        $22,259

Mechanical
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Decentralized Heating Equipment          Unit Heater Gas (200 MBH)                                                3              4 Ea.          $21,944        4
Decentralized Cooling                    Thru-Wall AC (2 Ton)                                                     3              1 Ea.           $5,812        4
HVAC Air Distribution                    Ductwork (Bldg.SF)                                                       3          5,478 SF           $76,229        5
Exhaust Air                              Interior Ceiling Exhaust Fan                                             3              3 Ea.           $1,592        5
Decentralized Heating Equipment          Radiant Heater - Radiant Panels - Ceiling                                3              2 Ea.           $9,430        8
HVAC Air Distribution                    Roof Top Unit - DX Gas (20 Ton)                                          2              1 Ea.          $55,771        8
                                                                                                    Sub Total for System         6 items       $170,778

Electrical
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Power Distribution                       Panelboard - 120/208 225A                                                3              1 Ea.           $6,549        8
Electrical Service                       Exterior Dry Type Transformer (75 KVA)                                   2              1 Ea.          $24,839        8
Landscape Lighting                       Ground Mounted Fixtures (Ea.)                                            4              8 Ea.          $12,592        10
                                                                                                    Sub Total for System         3 items        $43,981

Plumbing
Uniformat Description                    LC Type Description                                                   Priority        Qty UoM       Repair Cost Remaining Life
Domestic Water Equipment                 Water Heater - Electric - 20 gallon                                      2              1 Ea.           $1,630        3
Plumbing Fixtures                        Restroom Lavatory                                                        3              2 Ea.           $5,749        4
Plumbing Fixtures                        Sink - Service / Mop Sink                                                5              1 Ea.             $842        4
Plumbing Fixtures                        Toilets                                                                  3              4 Ea.          $21,415        4




M▪A▪P▪P▪S ©, Jacobs 2021                                                 Revision Date - 09/24/2021                                                                       17
                                                                                                                       Facility Condition Assessment
                                                                                                               DeKalb County SD - Pine Ridge Elementary School

Plumbing
Uniformat Description          LC Type Description                                               Priority        Qty UoM       Repair Cost Remaining Life
Plumbing Fixtures              Urinals                                                              3              2 Ea.           $2,866        4
Plumbing Fixtures              Refrigerated Drinking Fountain                                       4              2 Ea.           $4,661        4
                                                                                      Sub Total for System         6 items        $37,163

Fire and Life Safety
Uniformat Description          LC Type Description                                               Priority        Qty UoM       Repair Cost Remaining Life
Water-Based Fire-Suppression   Fire Sprinkler System (Bldg.SF)                                      1          5,478 SF           $67,970        8
                                                                                      Sub Total for System         1 items        $67,970
                                                                 Sub Total for Building 2020 - Building 2020      23 items       $365,569

                                                                   Total for: Pine Ridge Elementary School       101 items     $7,726,316




M▪A▪P▪P▪S ©, Jacobs 2021                                   Revision Date - 09/24/2021                                                                       18
                                                                                                Facility Condition Assessment
                                                                                         DeKalb County SD - Pine Ridge Elementary School



 Supporting Photos




Replace Water Heater In Janitors Closets In 100 And 200 Halls   Replace Eye Wash In Science Lab 405




Electrical Panels To Be Replaced In Room 99.16                  Existing Intercom Should Be Replaced




Existing Kitchen Panels Should Be Replaced                      Switchboard In Mechanical Room 96.1 Is Beyond Useful Life




M▪A▪P▪P▪S ©, Jacobs 2021                              Revision Date - 09/24/2021                                                     19
                                                                                                Facility Condition Assessment
                                                                                        DeKalb County SD - Pine Ridge Elementary School




Electrical Panels In Mechanical Room 96.1 Should Be            Existing Emergency Generator Is Beyond Useful Life
Replaced




Existing Fluorescent T8 Light Fixtures Should Be Replaced      Resurface Pavement




Damaged Cabinet                                                Clogged Gutter




M▪A▪P▪P▪S ©, Jacobs 2021                              Revision Date - 09/24/2021                                                    20
                                                         Facility Condition Assessment
                                                   DeKalb County SD - Pine Ridge Elementary School




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                          21
 Revision Date - 09/24/2021




FACILITY CONDITION ASSESSMENT
               Shadow Rock Elementary School | 2021
                                                                                                                             Facility Condition Assessment
                                                                                                             DeKalb County SD - Shadow Rock Elementary School


 Executive Summary
 Shadow Rock Elementary School is located at 1040 Kingway Dr in Lithonia, GA. It comprises 117,776 gross square feet.
 At the time of the assessment the oldest building was 29 years old.
 The findings contained within this report are the result of an assessment of building systems performed by building
 professionals experienced in disciplines including architecture, mechanical, plumbing and electrical. Only those systems
 that were identified as having either an associated deficiency or life cycle event within a 10-year window is contained within
 this report. The full list of each school's systems that are present along with the associated priorities can be found in the flat
 file data grids submitted to Dekalb County. The projected replacement year of those assets within each system is also
 included within this table.The total current deficiencies for this site, in 2020 construction cost dollars, are estimated at
 $685,867. A ten-year need was developed to provide an understanding of the current need as well as the projected needs
 in the near future. For Shadow Rock Elementary School the ten-year need is $12,074,685.
 For planning purposes, the total current deficiencies and the first five years of projected life cycle needs were combined to
 calculate a Facility Condition Index (FCI). A 5-year FCI was calculated by dividing the 5-year need by the total replacement
 cost. Costs associated with new construction are not included in the FCI calculation. After the 5-year FCI was calculated,
 this value was subtracted from 100 to calculate the FCA Score in a similar fashion to report cards.
 The Shadow Rock Elementary School facility has a FCA score of 78.05% which is considered "Below Average".

Summary of Findings
The table below summarizes the condition findings at Shadow Rock Elementary School.
Table 1: Facility Condition by Building


                                                                                                          Total 5 Yr Need      Total 10 Yr Need
                                                          Current        5-Year Life    Yrs 6-10 Life    (Yr 1-5 + Current    (Yr 1-10 + Current    Replacement      FCA
Number          Building Name                            Deficiencies    Cycle Cost      Cycle Cost             Defs)                Defs)              Cost         Score
Exterior Site
                Exterior Site                                  $89,042             $0         $482,775             $89,042               $571,817
Permanent Building(s)
2010            Building 2010                                $584,166     $6,436,200        $4,148,066          $7,020,366           $11,168,432       $31,136,870   77.45%
2020            Building 2020                                  $12,659       $47,228          $274,550             $59,886               $334,436       $1,518,885   96.06%
                Sub Total for Permanent Building(s):         $596,824     $6,483,428       $4,422,616          $7,080,252            $11,502,868      $32,655,751
                                       Total for Site:       $685,867     $6,483,428        $4,905,391          $7,169,295           $12,074,685       $32,655,751   78.05%

Note 1: Sitework improvements are proportionally incorporated into the building CRV and used to calulate the overall FCA Score.
Note 2: Aerial map including building number, gross SF, and year built of each building on the site is found on Page 3.




 M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                                           2
                                                          Facility Condition Assessment
                                                 DeKalb County SD - Shadow Rock Elementary School


Aerial Images




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                          3
                                                                                         Facility Condition Assessment
                                                                                DeKalb County SD - Shadow Rock Elementary School


Approach and Methodology
The facility condition assessment includes a visual assessment of building systems that are readily available during a
facility walk-through. The standard process does not reflect invasive, destructive assessment methods that would
require special equipment, testing or scheduled power outages. The assessment was accomplished with a view
toward identifying significant maintenance and repair deficiencies that need correction. For the purposes of this
assessment, deficient conditions captured were limited to those items that did not qualify as routine maintenance
repairs. Copies of previous reports and other documentation that were relevant to the inspection were utilized if made
available in the process. Additionally, feedback from appropriate personnel to provide background information relative
to specific building operations, function, equipment conditions, past improvements and planned upgrades were
incorporated into the results if made available to the teams while on site. Two components of the facility condition
assessment are combined to total the cost for facility need. The two components of the facility condition assessment
are current deficiencies and life cycle forecast.

Current Deficiencies: Deficiencies are items in need of repair or replacement as a result of being broken, obsolete,
deferred maintenance, or beyond useful life. The existing deficiencies that currently require correction are identified
and assigned a priority. An example of a current deficiency might include a broken lighting fixture or an inoperable
roof top air conditioning unit.

Life Cycle Forecast: Life cycle analysis evaluates the ages of a building's systems to forecast system replacement as
they reach the end of serviceable life. Estimated Useful Lives were determined based on a combination of our
(Jacobs) professional experience, RS Means, and from industry standard tables (BOMA, ASHRAE). An example of a
life cycle system replacement is a roof with a 20-year life that has been in place for 15 years and may require
replacement in five years.

All members of the survey team recorded existing conditions, identified problems and deficiencies, and documented
corrective action and quantities. The team took digital photos at each site to better identify significant deficiencies.

Facility Deficiency Priority Levels
Deficiencies were ranked according to five priority levels, with Priority 1 items being the most critical to address:

Priority 1 – Mission Critical Concerns: Deficiencies or conditions that may directly affect the site’s ability to remain
open or deliver the educational curriculum. These deficiencies typically relate to building safety, code compliance,
severely damaged or failing building components, and other items that require near-term correction. An example of a
Priority 1 deficiency is a fire alarm system replacement.

Priority 2 – Indirect Impact to Educational Mission: Items that may progress to a Priority 1 item if not addressed in the
near term. Examples of Priority 2 deficiencies include inadequate roofing that could cause deterioration of integral
building systems, and conditions affecting building envelopes, such as roof and window replacements.

Priority 3 – Short-Term Conditions: Deficiencies that are necessary to the site's mission but may not require
immediate attention. These items should be considered necessary improvements required to maximize facility
efficiency and usefulness. Examples of Priority 3 items include site improvements and plumbing deficiencies.

Priority 4 – Long-Term Requirements: Items or systems that may be considered improvements to the instructional
environment. The improvements may be aesthetic or provide greater functionality. Examples include cabinets,
finishes, paving, removal of abandoned equipment, and educational accommodations associated with special
programs.

Priority 5 – Enhancements: Deficiencies aesthetic in nature or considered enhancements. Typical deficiencies in this
priority include repainting, replacing carpet, improved signage, or other improvements to the facility environment.




M▪A▪P▪P▪S ©, Jacobs 2021                      Revision Date - 09/24/2021                                                      4
                                                                                         Facility Condition Assessment
                                                                               DeKalb County SD - Shadow Rock Elementary School


Facility Condition Assessment(FCA) Score
Facility Condition Assessment (FCA) Scores are assigned after the Facility Condition Index (FCI) is calculated.
The Facility Condition Index (FCI) is used throughout the facility condition assessment industry as a general
indicator of a building’s health. Since 1991, the facility management industry has used an index called the FCI
to benchmark the relative condition of a group of sites. The FCI is derived by dividing the total repair cost,
including site-related repairs, by the total replacement cost of all buildings. It should be noted that costs in the
New Construction category are not included in the FCI calculation. In an effort to match the report card metrics,
the FCI is subtracted from 100 to assign the FCA Score. A facility with a lower FCA Score has more need, or
higher priority, than a facility with a higher FCA Score.




The replacement value represents the estimated cost of replacing the current building with another building of
like size, based on 2021 estimated cost of construction in the DeKalb County area. The estimated replacement
cost for this facility is $32,655,751. For planning purposes, the total 5-year need at the Shadow Rock
Elementary School is $7,169,295 (Life Cycle Years 1-5 plus the current FCI deficiency cost).

The Shadow Rock Elementary School facility has an FCA Score of 78.05%. which is considered "Below
Average".




                              Figure 1: 5-Year FCI




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                              5
                                                                                                                    Facility Condition Assessment
                                                                                                    DeKalb County SD - Shadow Rock Elementary School


The following table summarizes this site's current deficiencies by building system and priority.

Table 2: System by Priority (Site & Permanent Buildings)

                                                                                  Priority

                  System                     1               2                       3              4                    5             Total             % of Total
Site                                                 $0              $0                   $43,231        $39,685              $6,126           $89,042       12.98 %

Roofing                                              $0              $0                    $2,949           $109                 $0             $3,058        0.45 %

Structural                                           $0              $0                       $0             $0                  $0                $0         0.00 %

Exterior                                             $0           $3,485                     $108            $0               $1,943            $5,536        0.81 %

Interior                                             $0              $0                       $0         $11,375                 $0            $11,375        1.66 %

Mechanical                                           $0          $94,155                 $224,893       $171,337                 $0        $490,384          71.50 %

Electrical                                           $0              $0                   $86,470            $0                  $0            $86,470       12.61 %

Plumbing                                             $0              $0                       $0             $0                  $0                $0         0.00 %

Fire and Life Safety                                 $0              $0                       $0             $0                  $0                $0         0.00 %

Conveyances                                          $0              $0                       $0             $0                  $0                $0         0.00 %

Specialties                                          $0              $0                       $0             $0                  $0                $0         0.00 %

Total:                                               $0          $97,640                 $357,651       $222,506              $8,070       $685,867




The building systems at the site with the most need include:
                                                                           Mechanical                   -          $490,384
                                                                           Site                         -           $89,042
                                                                           Electrical                   -           $86,470




M▪A▪P▪P▪S ©, Jacobs 2021                                   Revision Date - 09/24/2021                                                                                 6
                                                                                    Facility Condition Assessment
                                                                           DeKalb County SD - Shadow Rock Elementary School



The chart below represents the building systems and associated deficiency costs.




Figure 2: System Deficiencies




M▪A▪P▪P▪S ©, Jacobs 2021                    Revision Date - 09/24/2021                                                   7
                                                                                                           Facility Condition Assessment
                                                                                             DeKalb County SD - Shadow Rock Elementary School


Life Cycle Capital Renewal Forecast
During the facility condition assessment, assessors inspected all major building systems. If an assessor identified a need
for immediate replacement, a deficiency was created with the item's repair costs. The identified deficiency contributes to the
facility's total current repair costs.

However, capital planning scenarios span multiple years, as opposed to being constrained to immediate repairs.
Construction projects may begin several years after the initial facility condition assessment. Therefore, in addition to the
current year repair costs, it is necessary to forecast the facility's future costs using a ten-year life cycle renewal forecast
model.

Life cycle renewal is the projection of future building system costs based upon each individual system’s expected
serviceable life. Building systems and components age over time, eventually break down, reach the end of their useful lives,
and may require replacement. While an item may be in good condition now, it might reach the end of its life before a
planned construction project occurs.

The following tables show ten-year life cycle capital renewal projections. The projections outline costs for major building
systems in which a component is expected to reach the end of its useful life and require capital funding for replacement.



Table 3a: Capital Renewal Forecast (Yrs 1-5)

                                                         Life Cycle Capital Renewal Projections
                                   Year 1           Year 2               Year 3                Year 4              Year 5
System                              2022             2023                 2024                  2025                2026                 Total 1-5
Site                                           $0                $0                    $0                    $0                  $0            $0

Roofing                                        $0                $0                    $0                    $0                  $0            $0

Exterior                                       $0                $0                    $0                    $0                  $0            $0

Interior                                       $0                $0                    $0                    $0             $774,664    $774,664

Mechanical                                     $0            $49,555              $136,341                $3,742            $625,530    $815,168

Electrical                                     $0                $0                    $0               $130,280        $2,244,547     $2,374,827

Plumbing                                       $0                $0                    $0               $368,139             $80,313    $448,453

Fire and Life Safety                           $0                $0                    $0           $2,070,317                   $0    $2,070,317

Conveyances                                    $0                $0                    $0                    $0                  $0            $0

Specialties                                    $0                $0                    $0                    $0                  $0            $0

Total                                          $0            $49,555              $136,341          $2,572,478          $3,725,054     $6,483,428




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                                      8
                                                                                                              Facility Condition Assessment
                                                                                                  DeKalb County SD - Shadow Rock Elementary School


Table 3b: Capital Renewal Forecast (Yrs 6-10)

                                                                  Life Cycle Capital Renewal Projections
                                                Year 6           Year 7           Year 8            Year 9         Year 10
System                         Total 1-5         2027             2028             2029              2030           2031            Total 6-10     Total 1-10
Site                                 $0                  $0               $0               $0                $0         $380,339    $380,339       $380,339

Roofing                              $0                  $0               $0               $0                $0         $102,436    $102,436       $102,436

Exterior                             $0                  $0               $0               $0                $0              $0            $0             $0

Interior                       $774,664                  $0               $0          $171,495          $999,022             $0    $1,170,517     $1,945,181

Mechanical                     $815,168                  $0          $194,926         $719,582               $0              $0     $914,509      $1,729,677

Electrical                   $2,374,827                  $0          $120,643         $327,563               $0         $232,066    $680,272      $3,055,099

Plumbing                       $448,453                  $0           $33,734          $64,550               $0              $0      $98,284       $546,736

Fire and Life Safety         $2,070,317                  $0           $70,732              $0                $0       $1,478,214   $1,548,946     $3,619,263

Conveyances                          $0                  $0               $0               $0                $0          $10,089     $10,089        $10,089

Specialties                          $0                  $0               $0               $0                $0              $0            $0             $0

Total                        $6,483,428                  $0          $420,036       $1,283,190          $999,022      $2,203,143   $4,905,391    $11,388,819




Figure 3: Ten Year Capital Renewal Forecast




M▪A▪P▪P▪S ©, Jacobs 2021                                      Revision Date - 09/24/2021                                                                        9
                                                                                      Facility Condition Assessment
                                                                             DeKalb County SD - Shadow Rock Elementary School

Summary of High Priority Deficiencies


Priority 2 - Indirect Impact to Educational Mission                                      Cost
  Metal Exterior Door Replacement                                                       $3,485

  Boiler Replacement                                                                   $94,155

                                                      Total for Priority 2             $97,640




M▪A▪P▪P▪S ©, Jacobs 2021                   Revision Date - 09/24/2021                                                     10
                                                                                                          Facility Condition Assessment
                                                                                               DeKalb County SD - Shadow Rock Elementary School



Deficiency Summary
(Items below detail the totals referenced in Table 2)

Site Level Deficiencies
Site
Deficiency                                                                      Category                  Qty UoM     Priority   Repair Cost    ID
Asphalt Driveway Replacement                                                    Capital Renewal           200 SF         3           $1,209    7022
             Note:     Potholes
             Location: Left Driveway
Playground Equipment Replacement                                                Capital Renewal             2 Ea.        3          $42,022 10599
Asphalt Paving Resurfacing                                                      Deferred                10,000 SF        4          $39,105    7021
                                                                                Maintenance
             Note:     Cracking
             Location: Front Lot
Gate Replacement                                                                Deferred                    1 Ea.        4             $580    7020
                                                                                Maintenance
             Note:     Broken
             Location: Right Entrance Gate
Site Signage Replacement                                                        Capital Renewal            27 Ea.        5           $6,126    7023
             Note:     Beyond Useful Life - Faded Signage
             Location: Throughout Site
                                                                                Sub Total for System        5 items                 $89,042
                                                                  Sub Total for School and Site Level       5 items                 $89,042

Building: 2010 - Building 2010
Roofing
Deficiency                                                                      Category                  Qty UoM     Priority   Repair Cost    ID
Debris In Gutter Removal                                                        Deferred                  200 LF         3             $971    7027
                                                                                Maintenance
             Note:     Leaf Debris Build Up
             Location: Above Cafeteria
Roof Drain Cleaning                                                             Deferred                   20 Ea.        3           $1,311    7026
                                                                                Maintenance
             Note:     Leaf Debris Built Up
             Location: Various Locations
Roof Cleaning                                                                   Deferred                  500 SF         4             $109    7025
                                                                                Maintenance
             Note:     Leaf Debris Build Up
             Location: Various Locations
                                                                                Sub Total for System        3 items                  $2,391

Exterior
Deficiency                                                                      Category                  Qty UoM     Priority   Repair Cost    ID
Metal Exterior Door Replacement                                                 Capital Renewal             1 Door       2           $3,485    7033
             Note:     Rusted
             Location: Steeple At Roof
Exterior Metal Door Repainting                                                  Deferred                    1 Door       3             $108    7035
                                                                                Maintenance
             Note:     Rusted Paint
             Location: Steeple At Roof
Exterior Cleaning                                                               Deferred                  500 SF         5           $1,821    7031
                                                                                Maintenance                   Wall
             Note:     Stained And Dirty
             Location: Back Side Of Building 2010
Exterior Painting                                                               Capital Renewal           100 SF         5             $123    7030
                                                                                                              Wall
             Note:     Paint Is Peeling
             Location: Windows In Front Of Building 2010
                                                                                Sub Total for System        4 items                  $5,536


M▪A▪P▪P▪S ©, Jacobs 2021                                    Revision Date - 09/24/2021                                                                11
                                                                                                                   Facility Condition Assessment
                                                                                                       DeKalb County SD - Shadow Rock Elementary School

Interior
Deficiency                                                                              Category                   Qty UoM     Priority   Repair Cost    ID
Interior Toilet Partition Repair                                                        Deferred                     6 Ea.        4          $11,375    7036
                                                                                        Maintenance
             Note:      Beyond Useful Life And Broken
             Location: Boys Restrooms, Room 105.10, 112.5
                                                                                       Sub Total for System          1 items                 $11,375

Mechanical
Deficiency                                                                              Category                   Qty UoM     Priority   Repair Cost    ID
Boiler Replacement                                                                      Capital Renewal              1 Ea.        2          $94,155    7009
             Note:      Beyond Useful Life 1500 Mbh
             Location: Boiler Room
Testing And Balancing                                                                   Deferred                112,298 SF        3         $224,893    7010
                                                                                        Maintenance
             Note:      Test
             Location: Building 2010
Existing Controls Are Obsolete                                                          Capital Renewal         112,298 SF        4         $163,368 10600
                                                                                       Sub Total for System          3 items                $482,415

Electrical
Deficiency                                                                              Category                   Qty UoM     Priority   Repair Cost    ID
Lightning Protection System Installation                                                Functional Deficiency   112,298 SF        3          $82,448    7014
             Note:      Not Existing
             Location: Building 2010
                                                                                       Sub Total for System          1 items                 $82,448
                                                                  Sub Total for Building 2010 - Building 2010       12 items                $584,166

Building: 2020 - Building 2020
Roofing
Deficiency                                                                              Category                   Qty UoM     Priority   Repair Cost    ID
Metal Downspout Replacement                                                             Deferred                    30 LF         3             $667    7024
                                                                                        Maintenance
             Note:      Bent And Damaged At Bottom Of Downspout
             Location: Front Side Of Building 2020
                                                                                       Sub Total for System          1 items                    $667

Mechanical
Deficiency                                                                              Category                   Qty UoM     Priority   Repair Cost    ID
Existing Controls Are Obsolete                                                          Capital Renewal          5,478 SF         4           $7,969 10601
                                                                                       Sub Total for System          1 items                  $7,969

Electrical
Deficiency                                                                              Category                   Qty UoM     Priority   Repair Cost    ID
Lightning Protection System Installation                                                Functional Deficiency    5,478 SF         3           $4,022    7015
             Note:      Not Existing
             Location: Building 2020
                                                                                       Sub Total for System          1 items                  $4,022
                                                                  Sub Total for Building 2020 - Building 2020        3 items                 $12,659
                                                                                           Total for Campus         20 items                $685,867




M▪A▪P▪P▪S ©, Jacobs 2021                                    Revision Date - 09/24/2021                                                                         12
                                                                                                                                   Facility Condition Assessment
                                                                                                                        DeKalb County SD - Shadow Rock Elementary School



Life Cycle Summary Yrs 1-10
(Items below detail the totals referenced in Tables 3a & 3b)

Site Level Life Cycle Items
Site
Uniformat Description                   LC Type Description                                                Priority         Qty UoM       Repair Cost Remaining Life
Parking Lot Pavement                    Asphalt                                                               3             100 CAR         $183,310        10
Roadway Pavement                        Asphalt Driveways                                                     3           24,250 SF         $197,029        10
                                                                                                 Sub Total for System         2 items       $380,339

Roofing
Uniformat Description                   LC Type Description                                                Priority         Qty UoM       Repair Cost Remaining Life
Canopy Roofing                          Aluminum panels                                                       4            1,600 SF         $102,436        10
                                                                                                 Sub Total for System         1 items       $102,436
                                                                                           Sub Total for Building -           3 items       $482,775

Building: 2010 - Building 2010
Interior
Uniformat Description                   LC Type Description                                                Priority         Qty UoM       Repair Cost Remaining Life
Acoustical Suspended Ceilings           Ceilings - Acoustical Tiles                                           4          112,298 SF         $715,774        5
Compartments and Cubicles               Toilet Partitions                                                     4              26 Stall        $57,143        5
Fluid-Applied Flooring                  Epoxy Coating                                                         4           11,230 SF         $161,210        8
Resilient Flooring                      Vinyl Composition Tile Flooring                                       4           95,453 SF         $996,161        9
                                                                                                 Sub Total for System         4 items     $1,930,289

Mechanical
Uniformat Description                   LC Type Description                                                Priority         Qty UoM       Repair Cost Remaining Life
Central Cooling                         Cooling Tower - Metal (130 Tons)                                      2               1 Ea.          $49,555        2
                                  Note: 120 tons
Heat Generation                         Boiler - Steel Tube (2400 MBH)                                        3               1 Ea.         $102,886        3
                                  Note: 1500 MBH
Heat Generation                         Boiler - Copper Tube (750 MBH)                                        2               1 Ea.          $33,455        3
                                  Note: 670 MBH
Decentralized Heating Equipment         Unit Heater Electric (5 KW)                                           3               2 Ea.           $2,750        4
Facility Hydronic Distribution          Pump - 50HP - (Ea.)                                                   4               2 Ea.         $125,789        5
                                  Note: 30 HP
Facility Hydronic Distribution          Pump- 10HP (Ea.)                                                      4               1 Ea.          $12,600        5
HVAC Air Distribution                   VAV Boxes / Terminal Device                                           4             115 Ea.         $485,549        5
Decentralized Cooling                   Condenser - Outside Air Cooled (5 Tons)                               2               4 Ea.          $46,125        7
Decentralized Cooling                   Condenser - Outside Air Cooled (3 Tons)                               2               2 Ea.          $14,853        7
Exhaust Air                             Roof Exhaust Fan - Small                                              3               3 Ea.           $6,798        7
Exhaust Air                             Roof Exhaust Fan - Large                                              3              13 Ea.         $120,799        7
Heat Generation                         Heat Exchanger - Water to Water (Flat Plate - 400 GPM)                2               1 Ea.          $87,907        8
Decentralized Cooling                   Ductless Split System (3 Ton)                                         2               1 Ea.           $6,461        8
Decentralized Cooling                   Condenser - Outside Air Cooled (3 Tons)                               2               1 Ea.           $7,649        8
Air Distribution                        Make-up Air Unit                                                      3               1 Ea.          $10,585        8
Facility Hydronic Distribution          2-Pipe Steam System (Hot)                                             3          112,298 SF         $568,953        8
Exhaust Air                             Kitchen Exhaust Hoods                                                 3               1 Ea.          $13,329        8
                                                                                                 Sub Total for System        17 items     $1,696,043

Electrical
Uniformat Description                   LC Type Description                                                Priority         Qty UoM       Repair Cost Remaining Life
Distributed Systems                     Public Address System Head End Unit                                   2               1 Ea.           $7,732        4
Distributed Systems                     PA Communications (Bldg.SF)                                           3          112,298 SF         $122,548        4
Lighting Fixtures                       Light Fixtures (Bldg SF)                                              4          112,298 SF       $2,244,547        5
Electrical Service                      Switchgear - Main Dist Panel (1200 Amps)                              2               1 Ea.          $45,718        8
Transfer Switches                       Automatic Transfer Switch (Amps)                                      3             600 Amps         $24,547        8
                                  Note: 600 amps 2 ea.
Electrical Service                      Transformer (75 KVA)                                                  2               4 Ea.          $34,717        8
Electrical Service                      Transformer (15 KVA)                                                  2               1 Ea.           $6,381        8
Electrical Service                      Transformer (45 KVA)                                                  2               1 Ea.           $7,050        8



M▪A▪P▪P▪S ©, Jacobs 2021                                              Revision Date - 09/24/2021                                                                       13
                                                                                                                                            Facility Condition Assessment
                                                                                                                                 DeKalb County SD - Shadow Rock Elementary School

Electrical
Uniformat Description                        LC Type Description                                                   Priority          Qty UoM       Repair Cost Remaining Life
Power Distribution                           Distribution Panel (1600 Amps)                                           3                1 Ea.          $29,983        8
                                       Note: 1200 amps
Electrical Service                           Transformer (45 KVA)                                                     2                1 Ea.           $7,050        8
Electrical Service                           Transformer (30 KVA)                                                     2                1 Ea.           $6,573        8
Power Distribution                           Panelboard - 120/208 125A                                                3                3 Ea.           $5,213        8
Power Distribution                           Panelboard - 120/208 400A                                                3                2 Ea.          $29,397        8
Power Distribution                           Panelboard - 120/208 225A                                                3                4 Ea.          $26,199        8
Power Distribution                           Panelboard - 120/208 225A                                                3                3 Ea.          $19,649        8
                                       Note: 120/208 200A
Power Distribution                           Panelboard - 120/208 225A                                                3                2 Ea.          $13,100        8
Power Distribution                           Panelboard - 120/208 225A                                                3                2 Ea.          $13,100        8
                                       Note: 120/208 200A
Power Distribution                           Panelboard - 120/208 125A                                                3                2 Ea.           $3,475        8
Power Distribution                           Panelboard - 277/480 400A                                                3                2 Ea.          $33,087        8
Power Distribution                           Panelboard - 277/480 225A                                                3                1 Ea.          $11,163        8
Power Distribution                           Panelboard - 277/480 225A                                                3                1 Ea.          $11,163        8
                                       Note: 277/480 125A
Packaged Generator Assemblies                Emergency Generator (75 KW)                                              2                1 Ea.          $63,546        10
                                       Note: 70 kw
Power Distribution                           Power Wiring                                                             3           112,298 SF         $168,520        10
                                                                                                        Sub Total for System          23 items     $2,934,455

Plumbing
Uniformat Description                        LC Type Description                                                   Priority          Qty UoM       Repair Cost Remaining Life
Plumbing Fixtures                            Restroom Lavatory                                                        3               29 Ea.          $83,354        4
Plumbing Fixtures                            Sink - Service / Mop Sink                                                5                4 Ea.           $3,369        4
Plumbing Fixtures                            Toilets                                                                  3               45 Ea.         $240,916        4
Plumbing Fixtures                            Urinals                                                                  3               12 Ea.          $17,196        4
Plumbing Fixtures                            Refrigerated Drinking Fountain                                           4               10 Ea.          $23,305        4
Domestic Water Equipment                     Water Heater - Electric - 5 to 10 gallon                                 2                1 Ea.           $1,377        5
Domestic Water Equipment                     Water Heater - Electric - 40 gallon                                      2                1 Ea.           $2,925        5
Domestic Water Equipment                     Water Heater - Electric - 66 gallon                                      2                1 Ea.           $4,404        5
                                       Note: 60 gallons
Plumbing Fixtures                            Classroom Lavatory                                                       4               25 Ea.          $69,878        5
Facility Potable-Water Storage Tanks         Water Heater Storage Tank - 250 Gallon                                   3                1 Ea.          $19,768        8
                                       Note: 200 gallon
Facility Potable-Water Storage Tanks         Water Heater Storage Tank - 250 Gallon                                   3                2 Ea.          $39,536        8
                                       Note: 119 gallon
                                                                                                        Sub Total for System          11 items       $506,027

Fire and Life Safety
Uniformat Description                        LC Type Description                                                   Priority          Qty UoM       Repair Cost Remaining Life
Security System Component                    Security Alarm System                                                    1           112,298 SF       $1,326,957        4
Fire Detection and Alarm                     Fire Alarm                                                               1           112,298 SF         $694,926        4
Fire Detection and Alarm                     Fire Alarm Panel                                                         1                1 Ea.           $7,267        4
Water-Based Fire-Suppression                 Fire Sprinkler System (Bldg.SF)                                          1           112,298 SF       $1,478,214        10
                                                                                                        Sub Total for System           4 items     $3,507,364

Conveyances
Uniformat Description                        LC Type Description                                                   Priority          Qty UoM       Repair Cost Remaining Life
Elevators                                    Passenger elevator cab finishes                                          4                1 Ea.          $10,089        10
                                                                                                        Sub Total for System           1 items        $10,089
                                                                                   Sub Total for Building 2010 - Building 2010        60 items    $10,584,266

Building: 2020 - Building 2020
Interior
Uniformat Description                        LC Type Description                                                   Priority          Qty UoM       Repair Cost Remaining Life
Acoustical Suspended Ceilings                Ceilings - Acoustical Tiles                                              4              274 SF            $1,747        5
Suspended Plaster and                        Painted ceilings                                                         5              274 SF              $679        8
Compartments and Cubicles                    Toilet Partitions                                                        4                4 Stall         $9,606        8
Resilient Flooring                           Vinyl Composition Tile Flooring                                          4              274 SF            $2,860        9
                                                                                                        Sub Total for System           4 items        $14,892



M▪A▪P▪P▪S ©, Jacobs 2021                                                   Revision Date - 09/24/2021                                                                           14
                                                                                                                                      Facility Condition Assessment
                                                                                                                            DeKalb County SD - Shadow Rock Elementary School

Mechanical
Uniformat Description                   LC Type Description                                                   Priority          Qty UoM       Repair Cost Remaining Life
Decentralized Heating Equipment         Unit Heater Electric (3 KW)                                              3                1 Ea.             $993        4
Exhaust Air                             Interior Ceiling Exhaust Fan                                             3                3 Ea.           $1,592        5
Decentralized Cooling                   Thru-Wall AC (2 Ton)                                                     3                1 Ea.           $6,351        7
                                  Note: 1.5 tons
Decentralized Heating Equipment         Unit Heater Gas (200 MBH)                                                3                4 Ea.          $24,698        8
                                                                                                   Sub Total for System           4 items        $33,634

Electrical
Uniformat Description                   LC Type Description                                                   Priority          Qty UoM       Repair Cost Remaining Life
Audio-Video Systems                     PA Communications No Head Unit (Bldg SF)                                 2             5,478 SF           $4,484        7
Lighting Fixtures                       Light Fixtures (Bldg SF)                                                 4             5,478 SF         $116,159        7
                                                                                                   Sub Total for System           2 items       $120,643

Plumbing
Uniformat Description                   LC Type Description                                                   Priority          Qty UoM       Repair Cost Remaining Life
Domestic Water Equipment                Water Heater - Electric - 20 gallon                                      2                1 Ea.           $1,730        5
Plumbing Fixtures                       Restroom Lavatory                                                        3                2 Ea.           $6,282        7
Plumbing Fixtures                       Sink - Service / Mop Sink                                                5                1 Ea.             $920        7
Plumbing Fixtures                       Toilets                                                                  3                4 Ea.          $23,401        7
Plumbing Fixtures                       Urinals                                                                  3                2 Ea.           $3,131        7
Plumbing Fixtures                       Refrigerated Drinking Fountain                                           4                2 Ea.           $5,246        8
                                                                                                   Sub Total for System           6 items        $40,710

Fire and Life Safety
Uniformat Description                   LC Type Description                                                   Priority          Qty UoM       Repair Cost Remaining Life
Fire Detection and Alarm                Fire Alarm                                                               1             5,478 SF          $33,899        4
Fire Detection and Alarm                Fire Alarm Panel                                                         1                1 Ea.           $7,267        4
Security System Component               Security Alarm System                                                    1             5,478 SF          $70,732        7
                                                                                                   Sub Total for System           3 items       $111,899
                                                                              Sub Total for Building 2020 - Building 2020        19 items       $321,778

                                                                          Total for: Shadow Rock Elementary School               82 items    $11,388,819




M▪A▪P▪P▪S ©, Jacobs 2021                                               Revision Date - 09/24/2021                                                                          15
                                                                            Facility Condition Assessment
                                                                   DeKalb County SD - Shadow Rock Elementary School



 Supporting Photos




Replace Door On Roof To Bell Tower            Fix Asphalt Damage




Front Of School                               Clean Roof Drains




Clean Roof                                    Replace Signs




M▪A▪P▪P▪S ©, Jacobs 2021             Revision Date - 09/24/2021                                                 16
                                                          Facility Condition Assessment
                                                 DeKalb County SD - Shadow Rock Elementary School




Resurface Asphalt




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                         17
 Revision Date - 09/24/2021




FACILITY CONDITION ASSESSMENT
                        Stephenson High School | 2021
                                                                                                                                 Facility Condition Assessment
                                                                                                                            DeKalb County SD - Stephenson High School


 Executive Summary
 Stephenson High School is located at 701 Stephenson Road in Stone Mountain, GA. It comprises 245,441 gross square
 feet. At the time of the assessment the oldest building was 24 years old.
 The findings contained within this report are the result of an assessment of building systems performed by building
 professionals experienced in disciplines including architecture, mechanical, plumbing and electrical. Only those systems
 that were identified as having either an associated deficiency or life cycle event within a 10-year window is contained within
 this report. The full list of each school's systems that are present along with the associated priorities can be found in the flat
 file data grids submitted to Dekalb County. The projected replacement year of those assets within each system is also
 included within this table.The total current deficiencies for this site, in 2020 construction cost dollars, are estimated at
 $9,684,492. A ten-year need was developed to provide an understanding of the current need as well as the projected
 needs in the near future. For Stephenson High School the ten-year need is $32,570,058.
 For planning purposes, the total current deficiencies and the first five years of projected life cycle needs were combined to
 calculate a Facility Condition Index (FCI). A 5-year FCI was calculated by dividing the 5-year need by the total replacement
 cost. Costs associated with new construction are not included in the FCI calculation. After the 5-year FCI was calculated,
 this value was subtracted from 100 to calculate the FCA Score in a similar fashion to report cards.
 The Stephenson High School facility has a FCA score of 74.66% which is considered "Below Average".

Summary of Findings
The table below summarizes the condition findings at Stephenson High School.
Table 1: Facility Condition by Building


                                                                                                              Total 5 Yr Need      Total 10 Yr Need
                                                          Current        5-Year Life    Yrs 6-10 Life        (Yr 1-5 + Current    (Yr 1-10 + Current    Replacement      FCA
Number          Building Name                            Deficiencies    Cycle Cost      Cycle Cost                 Defs)                Defs)              Cost         Score
Exterior Site
                Exterior Site                                  $72,567    $1,313,563        $1,174,609              $1,386,131             $2,560,739
Permanent Building(s)
5010            Building 5010                              $8,625,544     $8,146,506        $7,411,019             $16,772,050           $24,183,069       $69,928,720   76.02%
5011            Building 5011                                $927,091     $2,933,114        $1,739,220              $3,860,205             $5,599,425      $16,282,640   76.29%
5020            Building 5020                                  $23,605             $0           $9,367                 $23,605                $32,972        $784,190    96.99%
5030            Building 5030                                       $0       $86,920                    $0             $86,920                $86,920        $249,515    65.16%
5040            Building 5040                                   $4,999             $0           $7,753                  $4,999                $12,752         $64,161    92.21%
5050            Building 5050                                  $30,469          $611           $44,278                 $31,080                $75,358        $124,758    75.09%
5060            Building 5060                                     $216          $262           $18,345                    $478                $18,823         $53,468    99.11%
                Sub Total for Permanent Building(s):       $9,611,925    $11,167,413       $9,229,981             $20,779,338            $30,009,319      $87,487,448
                                       Total for Site:     $9,684,492    $12,480,976       $10,404,590             $22,165,468           $32,570,058       $87,487,448   74.66%

Note 1: Sitework improvements are proportionally incorporated into the building CRV and used to calulate the overall FCA Score.
Note 2: Aerial map including building number, gross SF, and year built of each building on the site is found on Page 3.




 M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                                               2
                                                         Facility Condition Assessment
                                                        DeKalb County SD - Stephenson High School


Aerial Images




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                          3
                                                                                         Facility Condition Assessment
                                                                                        DeKalb County SD - Stephenson High School


Approach and Methodology
The facility condition assessment includes a visual assessment of building systems that are readily available during a
facility walk-through. The standard process does not reflect invasive, destructive assessment methods that would
require special equipment, testing or scheduled power outages. The assessment was accomplished with a view
toward identifying significant maintenance and repair deficiencies that need correction. For the purposes of this
assessment, deficient conditions captured were limited to those items that did not qualify as routine maintenance
repairs. Copies of previous reports and other documentation that were relevant to the inspection were utilized if made
available in the process. Additionally, feedback from appropriate personnel to provide background information relative
to specific building operations, function, equipment conditions, past improvements and planned upgrades were
incorporated into the results if made available to the teams while on site. Two components of the facility condition
assessment are combined to total the cost for facility need. The two components of the facility condition assessment
are current deficiencies and life cycle forecast.

Current Deficiencies: Deficiencies are items in need of repair or replacement as a result of being broken, obsolete,
deferred maintenance, or beyond useful life. The existing deficiencies that currently require correction are identified
and assigned a priority. An example of a current deficiency might include a broken lighting fixture or an inoperable
roof top air conditioning unit.

Life Cycle Forecast: Life cycle analysis evaluates the ages of a building's systems to forecast system replacement as
they reach the end of serviceable life. Estimated Useful Lives were determined based on a combination of our
(Jacobs) professional experience, RS Means, and from industry standard tables (BOMA, ASHRAE). An example of a
life cycle system replacement is a roof with a 20-year life that has been in place for 15 years and may require
replacement in five years.

All members of the survey team recorded existing conditions, identified problems and deficiencies, and documented
corrective action and quantities. The team took digital photos at each site to better identify significant deficiencies.

Facility Deficiency Priority Levels
Deficiencies were ranked according to five priority levels, with Priority 1 items being the most critical to address:

Priority 1 – Mission Critical Concerns: Deficiencies or conditions that may directly affect the site’s ability to remain
open or deliver the educational curriculum. These deficiencies typically relate to building safety, code compliance,
severely damaged or failing building components, and other items that require near-term correction. An example of a
Priority 1 deficiency is a fire alarm system replacement.

Priority 2 – Indirect Impact to Educational Mission: Items that may progress to a Priority 1 item if not addressed in the
near term. Examples of Priority 2 deficiencies include inadequate roofing that could cause deterioration of integral
building systems, and conditions affecting building envelopes, such as roof and window replacements.

Priority 3 – Short-Term Conditions: Deficiencies that are necessary to the site's mission but may not require
immediate attention. These items should be considered necessary improvements required to maximize facility
efficiency and usefulness. Examples of Priority 3 items include site improvements and plumbing deficiencies.

Priority 4 – Long-Term Requirements: Items or systems that may be considered improvements to the instructional
environment. The improvements may be aesthetic or provide greater functionality. Examples include cabinets,
finishes, paving, removal of abandoned equipment, and educational accommodations associated with special
programs.

Priority 5 – Enhancements: Deficiencies aesthetic in nature or considered enhancements. Typical deficiencies in this
priority include repainting, replacing carpet, improved signage, or other improvements to the facility environment.




M▪A▪P▪P▪S ©, Jacobs 2021                      Revision Date - 09/24/2021                                                       4
                                                                                         Facility Condition Assessment
                                                                                       DeKalb County SD - Stephenson High School


Facility Condition Assessment(FCA) Score
Facility Condition Assessment (FCA) Scores are assigned after the Facility Condition Index (FCI) is calculated.
The Facility Condition Index (FCI) is used throughout the facility condition assessment industry as a general
indicator of a building’s health. Since 1991, the facility management industry has used an index called the FCI
to benchmark the relative condition of a group of sites. The FCI is derived by dividing the total repair cost,
including site-related repairs, by the total replacement cost of all buildings. It should be noted that costs in the
New Construction category are not included in the FCI calculation. In an effort to match the report card metrics,
the FCI is subtracted from 100 to assign the FCA Score. A facility with a lower FCA Score has more need, or
higher priority, than a facility with a higher FCA Score.




The replacement value represents the estimated cost of replacing the current building with another building of
like size, based on 2021 estimated cost of construction in the DeKalb County area. The estimated replacement
cost for this facility is $87,487,448. For planning purposes, the total 5-year need at the Stephenson High School
is $22,165,468 (Life Cycle Years 1-5 plus the current FCI deficiency cost).

The Stephenson High School facility has an FCA Score of 74.66%. which is considered "Below Average".




                              Figure 1: 5-Year FCI




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                               5
                                                                                                                    Facility Condition Assessment
                                                                                                                   DeKalb County SD - Stephenson High School


The following table summarizes this site's current deficiencies by building system and priority.

Table 2: System by Priority (Site & Permanent Buildings)

                                                                               Priority

                  System                     1               2                    3               4                      5              Total             % of Total
Site                                                 $0              $0                $46,963            $5,670              $19,933           $72,567        0.75 %

Roofing                                              $0              $0               $162,193               $0                   $0        $162,193           1.67 %

Structural                                           $0              $0                    $0                $0                   $0                $0         0.00 %

Exterior                                             $0              $0                $37,227             $211              $213,227       $250,666           2.59 %

Interior                                             $0              $0                $29,785        $429,264                 $1,960       $461,009           4.76 %

Mechanical                                           $0      $1,399,181           $1,331,896          $678,460                 $8,627     $3,418,165          35.30 %

Electrical                                           $0          $26,192          $4,139,972           $13,387                    $0      $4,179,552          43.16 %

Plumbing                                             $0           $5,047                $6,030         $25,814                    $0            $36,890        0.38 %

Fire and Life Safety                         $1,098,256              $0                    $0                $0                   $0      $1,098,256          11.34 %

Conveyances                                          $0              $0                    $0                $0                   $0                $0         0.00 %

Specialties                                          $0              $0                 $3,374            $1,821                  $0             $5,195        0.05 %

Total:                                       $1,098,256      $1,430,420           $5,757,441      $1,154,628                 $243,747     $9,684,492




The building systems at the site with the most need include:
                                                                           Electrical                 -       $4,179,552
                                                                           Mechanical                 -       $3,418,165
                                                                           Fire and Life Safety       -       $1,098,256




M▪A▪P▪P▪S ©, Jacobs 2021                                   Revision Date - 09/24/2021                                                                                  6
                                                                                    Facility Condition Assessment
                                                                                   DeKalb County SD - Stephenson High School



The chart below represents the building systems and associated deficiency costs.




Figure 2: System Deficiencies




M▪A▪P▪P▪S ©, Jacobs 2021                    Revision Date - 09/24/2021                                                    7
                                                                                                          Facility Condition Assessment
                                                                                                        DeKalb County SD - Stephenson High School


Life Cycle Capital Renewal Forecast
During the facility condition assessment, assessors inspected all major building systems. If an assessor identified a need
for immediate replacement, a deficiency was created with the item's repair costs. The identified deficiency contributes to the
facility's total current repair costs.

However, capital planning scenarios span multiple years, as opposed to being constrained to immediate repairs.
Construction projects may begin several years after the initial facility condition assessment. Therefore, in addition to the
current year repair costs, it is necessary to forecast the facility's future costs using a ten-year life cycle renewal forecast
model.

Life cycle renewal is the projection of future building system costs based upon each individual system’s expected
serviceable life. Building systems and components age over time, eventually break down, reach the end of their useful lives,
and may require replacement. While an item may be in good condition now, it might reach the end of its life before a
planned construction project occurs.

The following tables show ten-year life cycle capital renewal projections. The projections outline costs for major building
systems in which a component is expected to reach the end of its useful life and require capital funding for replacement.



Table 3a: Capital Renewal Forecast (Yrs 1-5)

                                                         Life Cycle Capital Renewal Projections
                                   Year 1           Year 2               Year 3               Year 4                Year 5
System                              2022             2023                 2024                 2025                  2026                  Total 1-5
Site                                           $0               $0                     $0              $317,041              $996,522    $1,313,564

Roofing                                        $0               $0                     $0                   $0           $1,463,658      $1,463,658

Exterior                                       $0             $873                     $0                   $0                    $0          $873

Interior                                       $0        $1,075,665                    $0          $1,473,474            $1,348,152      $3,897,291

Mechanical                                     $0               $0                 $60,201             $598,090              $220,803     $879,094

Electrical                                     $0               $0                 $94,173                  $0               $689,634     $783,807

Plumbing                                       $0               $0                 $19,682             $678,893              $338,204    $1,036,780

Fire and Life Safety                           $0               $0                $274,445                  $0                    $0      $274,445

Conveyances                                    $0               $0                     $0                   $0                    $0             $0

Specialties                                    $0               $0                     $0              $428,437          $2,403,029      $2,831,466

Total                                          $0        $1,076,538               $448,501         $3,495,936            $7,460,002     $12,480,976




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                                        8
                                                                                                                  Facility Condition Assessment
                                                                                                                DeKalb County SD - Stephenson High School


Table 3b: Capital Renewal Forecast (Yrs 6-10)

                                                                   Life Cycle Capital Renewal Projections
                                                Year 6            Year 7           Year 8            Year 9            Year 10
System                         Total 1-5         2027              2028             2029              2030              2031                Total 6-10     Total 1-10
Site                         $1,313,563                  $0                $0          $876,572                  $0                 $0      $876,572      $2,190,135

Roofing                      $1,463,658                  $0                $0           $30,644                  $0                 $0       $30,644      $1,494,302

Exterior                          $873                   $0                $0          $275,730               $1,074        $518,858        $795,662       $796,535

Interior                     $3,897,291           $1,239,744               $0          $686,398          $405,214                   $0     $2,331,356     $6,228,647

Mechanical                     $879,094                  $0                $0          $226,336                  $0       $1,050,373       $1,276,709     $2,155,803

Electrical                     $783,807                  $0                $0        $1,157,900                  $0                 $0     $1,157,900     $1,941,707

Plumbing                     $1,036,780              $12,274          $151,230         $248,241                  $0              $6,783     $418,528      $1,455,308

Fire and Life Safety           $274,445                  $0                $0        $2,609,099                  $0                 $0     $2,609,099     $2,883,544

Conveyances                          $0                  $0                $0               $0                   $0          $10,089         $10,089        $10,089

Specialties                  $2,831,466                  $0           $251,581         $646,452                  $0                 $0      $898,032      $3,729,498

Total                       $12,480,976           $1,252,017          $402,811       $6,757,372          $406,288         $1,586,102      $10,404,590    $22,885,566




Figure 3: Ten Year Capital Renewal Forecast




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                                               9
                                                                               Facility Condition Assessment
                                                                              DeKalb County SD - Stephenson High School

Summary of High Priority Deficiencies


Priority 1 - Mission Critical Concerns                                             Cost
  Emergency Exit Signage Replacement                                             $15,555

  Fire Alarm Replacement                                                       $1,078,636

  Security Alarm Camera Replacement                                               $4,065

                                                       Total for Priority 1   $1,098,256



Priority 2 - Indirect Impact to Educational Mission                                Cost
  Air Cooled Condenser Replacement                                                $6,038

  Air Handler HVAC Component Replacement                                        $161,632

  Boiler Replacement                                                            $185,305

  Ductless Split System AC Replacement                                            $5,100

  Electric Unit Heater Replacement                                               $14,635

  Exterior Metal Cooling Tower Replacement                                       $52,245

  Fan Coil Unit Replacement                                                       $1,852

  Gas Furnace HVAC Component Replacement                                         $17,429

  Gas Unit Heater Replacement                                                     $3,114

  Heat Pump HVAC Component Replacement                                          $838,804

  Package Roof Top Unit Replacement                                             $113,027

  Electrical Transformer Replacement                                              $5,037

  Panelboard Replacement                                                         $21,155

  Water Heater Replacement                                                        $5,047

                                                       Total for Priority 2   $1,430,420




M▪A▪P▪P▪S ©, Jacobs 2021                     Revision Date - 09/24/2021                                             10
                                                                                                                 Facility Condition Assessment
                                                                                                               DeKalb County SD - Stephenson High School



Deficiency Summary
(Items below detail the totals referenced in Table 2)

Site Level Deficiencies
Site
Deficiency                                                                              Category                 Qty UoM     Priority   Repair Cost    ID
Asphalt Driveway Replacement                                                            Capital Renewal         2,281 SF        3          $13,790    4008
             Note:      Repave
Concrete Walks Replacement                                                              Capital Renewal         3,115 SF        3          $33,173    4010
             Note:      Cracked And Damaged
Asphalt Paving Resurfacing                                                              Deferred                1,450 SF        4           $5,670    4007
                                                                                        Maintenance
Paving Restriping                                                                       Deferred                 490 CAR        5          $15,320    4009
                                                                                        Maintenance
Small Bench Replacement                                                                 Deferred                   1 Ea.        5           $1,943    4011
                                                                                        Maintenance
             Location: Outdoor Classroom
Tennis Courts, Nets, And Equipment Repair                                               Deferred                   2 Ea.        5           $2,670    4006
                                                                                        Maintenance
             Note:      Broken Net
                                                                                       Sub Total for System        6 items                 $72,567
                                                                         Sub Total for School and Site Level       6 items                 $72,567

Building: 5010 - Building 5010
Roofing
Deficiency                                                                              Category                 Qty UoM     Priority   Repair Cost    ID
Roof Drain Cleaning                                                                     Deferred                   8 Ea.        3             $524    4025
                                                                                        Maintenance
Tapered Insulation Installation To Eliminate Ponding When Re-Roofing                    Deferred               29,427 SF        3         $130,721    4026
                                                                                        Maintenance
             Location: All Around Roof Drains
                                                                                       Sub Total for System        2 items                $131,246

Exterior
Deficiency                                                                              Category                 Qty UoM     Priority   Repair Cost    ID
Aluminum Window Repair                                                                  Deferred                   5 Ea.        3           $2,828    4016
                                                                                        Maintenance
             Note:      Moisture Between Double Pane Window
             Location: Room 604, 615, 814, 810, 808
Brick Exterior Repair                                                                   Deferred                 600 SF         3           $7,027    4012
                                                                                        Maintenance                  Wall
             Location: Outside Room 812, 608, 95.7, 310.4 And On Roof Around Auditorium Wall
Brick Exterior Repointing                                                               Deferred                3,500 SF        3          $20,985    4014
                                                                                        Maintenance                   Wall
             Location: Around The Media Center Clerestory Wall On Roof
Exterior Metal Door Repainting                                                          Deferred                  25 Door       3           $2,701    4017
                                                                                        Maintenance
             Note:      Paint Is Peeling
Exterior Cleaning                                                                       Deferred               56,400 SF        5         $205,362    4015
                                                                                        Maintenance                   Wall
                                                                                       Sub Total for System        5 items                $238,904

Interior
Deficiency                                                                              Category                 Qty UoM     Priority   Repair Cost    ID
Entry Door Does Not Have Power Assist Device                                            ADA Compliance             2 Ea.        3          $29,785    4027
             Location: Main Entrance And Near Room 614
Acoustical Ceiling Tile Replacement                                                     Capital Renewal        19,809 SF        4         $108,913    4018
             Note:      Replace Tiles Damaged By Roof Leaks
Carpet Flooring Replacement                                                             Capital Renewal        23,542 SF        4         $280,213    4019
Wood Flooring Replacement                                                               Capital Renewal         1,982 SF        4          $40,138    4020
             Note:      Stage Floor


M▪A▪P▪P▪S ©, Jacobs 2021                                      Revision Date - 09/24/2021                                                                     11
                                                                                                 Facility Condition Assessment
                                                                                                DeKalb County SD - Stephenson High School

Interior
Deficiency                                                               Category                 Qty UoM    Priority   Repair Cost    ID
Interior Door Repainting                                                 Deferred                  8 Door       5             $336    4022
                                                                         Maintenance
             Location: Room 200.21, 200.19, 200 Around Weight Room
                                                                         Sub Total for System      5 items                $459,385

Mechanical
Deficiency                                                               Category                 Qty UoM    Priority   Repair Cost    ID
Air Cooled Condenser Replacement                                         Capital Renewal           1 Ea.        2           $6,038    4045
             Location: Roof
Air Handler HVAC Component Replacement                                   Capital Renewal           2 Ea.        2         $161,632    4059
             Location: Gym Penthouse
Boiler Replacement                                                       Capital Renewal           1 Ea.        2         $139,062    4035
             Location: Mech Room
Boiler Replacement                                                       Capital Renewal           2 Ea.        2          $46,243    4037
             Location: Gym Penthouse
Ductless Split System AC Replacement                                     Capital Renewal           1 Ea.        2           $5,100    4043
Electric Unit Heater Replacement                                         Capital Renewal           5 Ea.        2           $4,409    4038
             Location: Boys, 501.3, 314.1, 112.1
Electric Unit Heater Replacement                                         Capital Renewal           2 Ea.        2           $3,621    4039
             Location: Weight Room 200.9, Stor 200.10
Exterior Metal Cooling Tower Replacement                                 Capital Renewal           1 Ea.        2          $52,245    4042
             Location: Mech Yard
Fan Coil Unit Replacement                                                Capital Renewal           1 Ea.        2           $1,852    4044
             Location: Auditorium Control Room
Gas Furnace HVAC Component Replacement                                   Capital Renewal           2 Ea.        2          $17,429    4036
             Location: Gym Penthouse
Gas Unit Heater Replacement                                              Capital Renewal           1 Ea.        2           $3,114    4040
             Location: Mech Room
Heat Pump HVAC Component Replacement                                     Capital Renewal           7 Ea.        2          $58,623    4046
             Location: Above Corridor
Heat Pump HVAC Component Replacement                                     Capital Renewal           7 Ea.        2          $58,623    4047
             Location: Above Corridor
Heat Pump HVAC Component Replacement                                     Capital Renewal          48 Ea.        2         $401,985    4048
             Location: Above Corridor
Heat Pump HVAC Component Replacement                                     Capital Renewal          15 Ea.        2         $125,620    4049
             Location: Above Corridor
Heat Pump HVAC Component Replacement                                     Capital Renewal          17 Ea.        2         $193,953    4053
             Location: Above Corridor
Package Roof Top Unit Replacement                                        Capital Renewal           1 Ea.        2          $60,416    4061
             Location: Roof
Package Roof Top Unit Replacement                                        Capital Renewal           1 Ea.        2          $29,825    4062
             Location: Roof
Package Roof Top Unit Replacement                                        Capital Renewal           1 Ea.        2          $22,786    4063
             Location: Roof
Circulation Pump Replacement                                             Capital Renewal           3 Ea.        3          $40,563    4057
             Location: Mech Room
Circulation Pump Replacement                                             Capital Renewal           3 Ea.        3          $32,607    4058
             Location: Mech Room
Computer Room A/C Replacement                                            Capital Renewal           1 Ea.        3          $41,078    4050
             Location: Roof
Energy Recovery Unit Replacement                                         Capital Renewal           7 Ea.        3          $97,747    4052
             Location: Roof
Kitchen Exhaust Hood Replacement                                         Capital Renewal           2 Ea.        3          $21,044    4068
             Location: Kitchen
Kitchen Exhaust Hood Replacement                                         Capital Renewal           5 Ea.        3          $52,609    4184
             Note:     Roof Mounted Ventilator



M▪A▪P▪P▪S ©, Jacobs 2021                                   Revision Date - 09/24/2021                                                        12
                                                                                                                   Facility Condition Assessment
                                                                                                                 DeKalb County SD - Stephenson High School

Mechanical
Deficiency                                                                              Category                   Qty UoM     Priority   Repair Cost    ID
Large Diameter Exhausts/Hoods Replacement                                               Capital Renewal             82 Ea.        3         $619,545    4065
             Location: Roof
Make Up Air Equipment Replacement                                                       Capital Renewal              1 Ea.        3           $8,356    4051
             Location: Roof
Testing And Balancing                                                                   Deferred                196,181 SF        3         $392,881    4054
                                                                                        Maintenance
Circulation Pump Replacement                                                            Capital Renewal              3 Ea.        4          $12,165    4055
             Location: Cust. 96.4, 112.3, 501.1
Circulation Pump Replacement                                                            Capital Renewal              1 Ea.        4           $4,055    4056
             Location: Mech Room
Existing Controls Are Obsolete                                                          Capital Renewal         196,181 SF        4         $497,485    4041
Kitchen Air/Exhaust Replacement                                                         Capital Renewal              3 Ea.        4          $29,752    4066
             Location: Roof
Wall Exhaust Fan Ventilation Replacement                                                Capital Renewal              3 Ea.        4          $13,345    4067
             Location: Kitchen
Duct Register Replacement                                                               Deferred                    22 Ea.        5           $8,627    4060
                                                                                        Maintenance
             Location: Boys Locker
                                                                                        Sub Total for System        34 items              $3,264,434

Electrical
Deficiency                                                                              Category                   Qty UoM     Priority   Repair Cost    ID
Canopy Lighting Replacement                                                             Capital Renewal             31 Ea.        3          $60,709    4081
Electrical Receptacle Replacement                                                       Capital Renewal            169 Ea.        3          $21,230    4075
Exterior Mounted Building Lighting Replacement                                          Capital Renewal              8 Ea.        3           $6,782    4082
Lighting Fixtures Replacement                                                           Capital Renewal         175,000 SF        3       $3,017,232    4083
             Note:      Old T8 Lamps
Lightning Protection System Installation                                                Functional Deficiency   196,181 SF        3         $144,035    4080
             Note:      Not Installed
Public Address System Head-End Requires Replacement                                     Functional Deficiency        1 Ea.        3           $6,870    8785
Public Address System Replacement, Non-main Building                                    Deferred                196,181 SF        3         $130,563    4076
                                                                                        Maintenance
Stage Lighting Replacement                                                              Capital Renewal             20 Ea.        4          $13,387    4084
             Note:      Owner Stated System Entered Panels And 20 Fixtures Are Not Working
                                                                                        Sub Total for System         8 items              $3,400,808

Plumbing
Deficiency                                                                              Category                   Qty UoM     Priority   Repair Cost    ID
Water Heater Replacement                                                                Capital Renewal              2 Ea.        2           $5,047    4028
             Note:      Stor. 105.5, Cust 112.3. Has Bad Pressure Relief Value
Toilet Replacement                                                                      Capital Renewal              1 Ea.        3           $4,757    4031
             Location: Girls Locker
Urinal Replacement                                                                      Capital Renewal              1 Ea.        3           $1,273    4032
             Location: Boys Locker
Refrigerated Water Cooler Replacement                                                   Capital Renewal             10 Ea.        4          $20,706    4033
             Location: Corridors And Lockers
Restroom Lavatories Plumbing Fixtures Replacement                                       Capital Renewal              2 Ea.        4           $5,108    4030
             Location: Girls Locker
                                                                                        Sub Total for System         5 items                 $36,890

Fire and Life Safety
Deficiency                                                                              Category                   Qty UoM     Priority   Repair Cost    ID
Emergency Exit Signage Replacement                                                      Capital Renewal             10 Ea.        1           $5,983    4079
Fire Alarm Replacement                                                                  Capital Renewal         196,181 SF        1       $1,078,636    4078
Security Alarm Camera Replacement                                                       Capital Renewal              3 Ea.        1           $4,065    4077
             Note:      Cctv Cameras Not Working
                                                                                        Sub Total for System         3 items              $1,088,684




M▪A▪P▪P▪S ©, Jacobs 2021                                        Revision Date - 09/24/2021                                                                     13
                                                                                                                   Facility Condition Assessment
                                                                                                                 DeKalb County SD - Stephenson High School

Specialties
Deficiency                                                                               Category                  Qty UoM     Priority   Repair Cost    ID
Auditorium Seating Replacement                                                           Capital Renewal             8 Ea.        3           $3,374    4024
             Note:     Damaged
Repair Cabinetry In Classes/Labs                                                         Deferred                    2 Room       4           $1,821    4023
                                                                                         Maintenance
             Location: Art 306, 308
                                                                                        Sub Total for System         2 items                  $5,195
                                                                   Sub Total for Building 5010 - Building 5010      64 items              $8,625,544

Building: 5011 - Building 5011
Roofing
Deficiency                                                                               Category                  Qty UoM     Priority   Repair Cost    ID
Built Up Roofing (Bur) Covering Has Blisters That Should Be Repaired                     Deferred                    2 Ea.        3             $242    8878
                                                                                         Maintenance
Tapered Insulation Installation To Eliminate Ponding When Re-Roofing                     Deferred                 6,852 SF        3          $30,438    8879
                                                                                         Maintenance
             Note:     Near Gutters
                                                                                        Sub Total for System         2 items                 $30,680

Exterior
Deficiency                                                                               Category                  Qty UoM     Priority   Repair Cost    ID
Exterior Cleaning                                                                        Deferred                 2,160 SF        5           $7,865    8875
                                                                                         Maintenance                    Wall
             Note:     Around Metal Downspouts
                                                                                        Sub Total for System         1 items                  $7,865

Mechanical
Deficiency                                                                               Category                  Qty UoM     Priority   Repair Cost    ID
Energy Recovery Unit Replacement                                                         Capital Renewal             1 Ea.        3          $25,466    9136
             Note:     Roof
Existing Controls Are Obsolete                                                           Capital Renewal         45,680 SF        4         $115,837 10615
                                                                                        Sub Total for System         2 items                $141,304

Electrical
Deficiency                                                                               Category                  Qty UoM     Priority   Repair Cost    ID
Canopy Lighting Replacement                                                              Capital Renewal             6 Ea.        3          $11,750    9141
Electrical Receptacle Replacement                                                        Capital Renewal             3 Ea.        3             $377    9137
             Location: Crs 951, 952 And 955
Exterior Mounted Building Lighting Replacement                                           Capital Renewal             9 Ea.        3           $7,630    9142
Lighting Fixtures Replacement                                                            Capital Renewal         38,000 SF        3         $655,170    9143
             Note:     Old T8 Fl Lamps
Lightning Protection System Installation                                                 Functional Deficiency   45,680 SF        3          $33,538    9140
             Note:     Not Installed
Public Address System Replacement, Non-main Building                                     Deferred                45,680 SF        3          $30,401    9138
                                                                                         Maintenance
             Note:     Intercom System Served From Building 5010
                                                                                        Sub Total for System         6 items                $738,866

Fire and Life Safety
Deficiency                                                                               Category                  Qty UoM     Priority   Repair Cost    ID
Emergency Exit Signage Replacement                                                       Capital Renewal            14 Ea.        1           $8,376    9139
                                                                                        Sub Total for System         1 items                  $8,376
                                                                   Sub Total for Building 5011 - Building 5011      12 items                $927,091

Building: 5020 - Building 5020
Interior
Deficiency                                                                               Category                  Qty UoM     Priority   Repair Cost    ID
Concrete Flooring Repair Or Repainting                                                   Deferred                  200 SF         5           $1,624    3994
                                                                                         Maintenance
             Note:     Cracked Slab
                                                                                        Sub Total for System         1 items                  $1,624



M▪A▪P▪P▪S ©, Jacobs 2021                                     Revision Date - 09/24/2021                                                                        14
                                                                                               Facility Condition Assessment
                                                                                              DeKalb County SD - Stephenson High School

Mechanical
Deficiency                                                            Category                  Qty UoM    Priority   Repair Cost    ID
Electric Unit Heater Replacement                                      Capital Renewal            2 Ea.        2           $3,621    3988
Ceiling Exhaust Fan Replacement                                       Capital Renewal            3 Ea.        4           $1,373    3990
Wall Exhaust Fan Ventilation Replacement                              Capital Renewal            1 Ea.        4           $4,448    3989
                                                                     Sub Total for System        3 items                  $9,442

Electrical
Deficiency                                                            Category                  Qty UoM    Priority   Repair Cost    ID
Panelboard Replacement                                                Capital Renewal            1 Ea.        2           $9,728    3991
Lightning Protection System Installation                              Functional Deficiency   2,200 SF        3           $1,615    3993
             Note:     Not Installed
                                                                     Sub Total for System        2 items                 $11,343

Fire and Life Safety
Deficiency                                                            Category                  Qty UoM    Priority   Repair Cost    ID
Emergency Exit Signage Replacement                                    Capital Renewal            2 Ea.        1           $1,197    3992
                                                                     Sub Total for System        1 items                  $1,197
                                                Sub Total for Building 5020 - Building 5020      7 items                 $23,605

Building: 5040 - Building 5040
Mechanical
Deficiency                                                            Category                  Qty UoM    Priority   Repair Cost    ID
Electric Unit Heater Replacement                                      Capital Renewal            2 Ea.        2           $1,764    3985
                                                                     Sub Total for System        1 items                  $1,764

Electrical
Deficiency                                                            Category                  Qty UoM    Priority   Repair Cost    ID
Lighting Fixtures Replacement                                         Capital Renewal          180 SF         3           $3,103    3987
             Note:     Old T8 Lamps
Lightning Protection System Installation                              Functional Deficiency    180 SF         3             $132    3986
             Note:     Not Installed
                                                                     Sub Total for System        2 items                  $3,236
                                                Sub Total for Building 5040 - Building 5040      3 items                  $4,999

Building: 5050 - Building 5050
Roofing
Deficiency                                                            Category                  Qty UoM    Priority   Repair Cost    ID
Metal Downspout Replacement                                           Deferred                  12 LF         3             $267    4004
                                                                      Maintenance
             Note:     Damaged
                                                                     Sub Total for System        1 items                    $267

Exterior
Deficiency                                                            Category                  Qty UoM    Priority   Repair Cost    ID
Exterior Door Hardware Replacement                                    Capital Renewal            1 Ea.        3           $2,488    4003
Metal Exterior Door Repair                                            Deferred                   5 Door       3             $982    4002
                                                                      Maintenance
             Note:     Reinstall Doors
CMU Wall Replacement (Bldg SF)                                        Capital Renewal           10 SF         4             $211    4013
             Location: Back Of The Building
                                                                     Sub Total for System        3 items                  $3,681

Mechanical
Deficiency                                                            Category                  Qty UoM    Priority   Repair Cost    ID
Electric Unit Heater Replacement                                      Capital Renewal            1 Ea.        2           $1,222    3995
                                                                     Sub Total for System        1 items                  $1,222

Electrical
Deficiency                                                            Category                  Qty UoM    Priority   Repair Cost    ID
Electrical Transformer Replacement                                    Capital Renewal            1 Ea.        2           $5,037    3996
Panelboard Replacement                                                Capital Renewal            1 Ea.        2           $2,616    3997
Panelboard Replacement                                                Capital Renewal            1 Ea.        2           $8,812    3998


M▪A▪P▪P▪S ©, Jacobs 2021                      Revision Date - 09/24/2021                                                                   15
                                                                                                  Facility Condition Assessment
                                                                                                 DeKalb County SD - Stephenson High School

Electrical
Deficiency                                                               Category                  Qty UoM    Priority   Repair Cost    ID
Exterior Mounted Building Lighting Replacement                           Capital Renewal            3 Ea.        3           $2,543    4000
Lighting Fixtures Replacement                                            Capital Renewal          350 SF         3           $6,034    4001
             Note:    Old T8 Lamps
Lightning Protection System Installation                                 Functional Deficiency    350 SF         3             $257    3999
             Note:    Not Installed
                                                                        Sub Total for System        6 items                 $25,299
                                                   Sub Total for Building 5050 - Building 5050     11 items                 $30,469

Building: 5060 - Building 5060
Exterior
Deficiency                                                               Category                  Qty UoM    Priority   Repair Cost    ID
Exterior Metal Door Repainting                                           Deferred                   2 Door       3             $216    4005
                                                                         Maintenance
                                                                        Sub Total for System        1 items                    $216
                                                   Sub Total for Building 5060 - Building 5060      1 items                    $216
                                                                            Total for Campus      104 items              $9,684,492


Buildings with no reported deficiencies
5030 - Building 5030




M▪A▪P▪P▪S ©, Jacobs 2021                         Revision Date - 09/24/2021                                                                   16
                                                                                                                         Facility Condition Assessment
                                                                                                                      DeKalb County SD - Stephenson High School



Life Cycle Summary Yrs 1-10
(Items below detail the totals referenced in Tables 3a & 3b)

Site Level Life Cycle Items
Site
Uniformat Description                    LC Type Description                                      Priority        Qty UoM       Repair Cost Remaining Life
Fences and Gates                         Fencing - Chain Link (4 Ft)                                 3          3,332 LF          $166,409        4
Fences and Gates                         Fencing - Chain Link (8-10 Ft)                              3          1,817 LF          $150,632        4
Parking Lot Pavement                     Asphalt                                                     3            490 CAR         $774,812        5
Roadway Pavement                         Asphalt Driveways                                           3         31,634 SF          $221,710        5
Athletic Areas                           Competition Style Track                                     4              1 Ea.         $351,145        8
Pedestrian Pavement                      Sidewalks - Concrete                                        3         38,948 SF          $525,427        8
                                                                                       Sub Total for System         6 items      $2,190,135

Electrical
Uniformat Description                    LC Type Description                                      Priority        Qty UoM       Repair Cost Remaining Life
Parking Lot Lighting                     Pole Lighting                                               3             43 Ea.         $298,037        8
                                                                                       Sub Total for System         1 items       $298,037
                                                                                    Sub Total for Building -        7 items      $2,488,172

Building: 5010 - Building 5010
Exterior
Uniformat Description                    LC Type Description                                      Priority        Qty UoM       Repair Cost Remaining Life
Exterior Operating Windows               Aluminum - Windows per SF                                   2             36 SF            $4,560        8
Exterior Operating Windows               Aluminum - Windows per SF                                   2            384 SF           $48,643        8
Exterior Operating Windows               Aluminum - Windows per SF                                   2          1,404 SF          $177,852        8
Exterior Operating Windows               Steel - Windows per SF                                      2             80 SF           $13,771        8
Exterior Entrance Doors                  Steel - Insulated and Painted                               3             53 Door        $248,243        10
                                                                                       Sub Total for System         5 items       $493,069

Interior
Uniformat Description                    LC Type Description                                      Priority        Qty UoM       Repair Cost Remaining Life
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                 4         184,410 SF        $1,075,664       2
Acoustical Suspended Ceilings            Ceilings - Acoustical Grid System                           4         184,410 SF         $812,596        4
Interior Door Supplementary Components   Door Hardware                                               3            409 Door        $642,525        4
Suspended Plaster and                    Painted ceilings                                            5          7,847 SF           $17,811        5
Wall Paneling                            Wood Panel wall                                             4          7,847 SF          $134,122        5
Compartments and Cubicles                Toilet Partitions                                           4             65 Stall       $142,856        5
Resilient Flooring                       Vinyl Composition Tile Flooring                             4         78,472 SF          $727,622        5
Tile Flooring                            Ceramic Tile                                                4         19,618 SF          $389,094        6
Interior Swinging Doors                  Wooden Door                                                 3            404 Door        $850,650        6
Carpeting                                Carpet                                                      4         23,542 SF          $354,965        8
Resilient Flooring                       Rubber Tile Flooring                                        4          1,962 SF           $35,324        8
Interior Coiling Doors                   Interior Overhead Doors                                     3              5 Ea.          $31,481        8
                                                                                       Sub Total for System        12 items      $5,214,710

Mechanical
Uniformat Description                    LC Type Description                                      Priority        Qty UoM       Repair Cost Remaining Life
Exhaust Air                              Kitchen Exhaust Hoods                                       3              9 Ea.         $106,581        4
Decentralized Heating Equipment          Unit Heater Electric (3 KW)                                 3              8 Ea.           $7,939        4
Exhaust Air                              Kitchen Exhaust Hoods                                       3              2 Ea.          $24,396        5
Heat Generation                          Heat Exchanger - Water to Water                             2              1 Ea.          $35,015        5
HVAC Air Distribution                    Roof Top Unit - DX Gas (20 Ton)                             2              2 Ea.         $111,542        8
HVAC Air Distribution                    Roof Top Unit - DX Gas (25 Ton)                             2              1 Ea.          $76,533        8
Central Cooling                          Cooling Tower - Metal (450 Tons)                            2              1 Ea.          $70,213        10
Facility Hydronic Distribution           2-Pipe Steam System (Hot)                                   3         150,000 SF         $806,250        10
Exhaust Air                              Kitchen Exhaust Hoods                                       3              5 Ea.          $70,702        10
                                                                                       Sub Total for System         9 items      $1,309,171

Electrical
Uniformat Description                    LC Type Description                                      Priority        Qty UoM       Repair Cost Remaining Life
Electrical Service                       Switchgear - Main Dist Panel (4000 Amps)                    2              1 Ea.          $87,115        3


M▪A▪P▪P▪S ©, Jacobs 2021                                                 Revision Date - 09/24/2021                                                          17
                                                                                                                             Facility Condition Assessment
                                                                                                                           DeKalb County SD - Stephenson High School

Electrical
Uniformat Description           LC Type Description                                                   Priority         Qty UoM       Repair Cost Remaining Life
Transfer Switches               Automatic Transfer Switch (Amps)                                         3             200 Amps          $7,058        3
Packaged Generator Assemblies   Emergency Generator (100 KW)                                             2               1 Ea.          $56,388        5
Lighting Fixtures               Light Fixtures (Bldg SF)                                                 4          21,181 SF          $423,354        5
Lighting Fixtures               Building Mounted Fixtures (Ea.)                                          4              22 Ea.          $23,627        8
Power Distribution              Motor Controller (Loads)                                                 3              20 Ea.          $43,758        8
Electrical Service              Transformer (30 KVA)                                                     2               1 Ea.           $6,573        8
Electrical Service              Transformer (45 KVA)                                                     2               3 Ea.          $21,149        8
Electrical Service              Transformer (75 KVA)                                                     2               4 Ea.          $34,717        8
Power Distribution              Distribution Panels (800 Amps)                                           3               1 Ea.          $22,109        8
Power Distribution              Distribution Panels (800 Amps)                                           3               1 Ea.          $22,109        8
Power Distribution              Distribution Panels (600 Amps)                                           3               1 Ea.          $21,202        8
Electrical Service              Transformer (225 KVA)                                                    2               3 Ea.          $65,175        8
Electrical Service              Transformer (225 KVA)                                                    2               1 Ea.          $21,725        8
Power Distribution              Panelboard - 120/208 100A                                                3               4 Ea.          $13,253        8
Power Distribution              Panelboard - 120/208 400A                                                3               3 Ea.          $44,096        8
Power Distribution              Panelboard - 120/208 225A                                                3              17 Ea.          $111,347       8
Power Distribution              Panelboard - 277/480 225A                                                3              10 Ea.          $111,623       8
Power Distribution              Panelboard - 277/480 400A                                                3               3 Ea.          $49,631        8
Power Distribution              Panelboard - 277/480 100A                                                3               1 Ea.           $7,965        8
                                                                                           Sub Total for System         20 items      $1,193,974

Plumbing
Uniformat Description           LC Type Description                                                   Priority         Qty UoM       Repair Cost Remaining Life
Domestic Water Equipment        Water Heater - Electric - 40 gallon                                      2               1 Ea.           $2,757        3
Domestic Water Equipment        Water Heater - Gas - 200 Gallon                                          2               1 Ea.          $14,168        3
Plumbing Fixtures               Restroom Lavatory                                                        3              59 Ea.         $169,583        4
Plumbing Fixtures               Showers                                                                  5              31 Ea.          $42,856        4
Plumbing Fixtures               Toilets                                                                  3              73 Ea.         $390,819        4
Plumbing Fixtures               Urinals                                                                  3              20 Ea.          $28,660        4
Plumbing Fixtures               Refrigerated Drinking Fountain                                           4               9 Ea.          $20,975        4
Compressed-Air Systems          Air Compressor (5 hp)                                                    3               1 Ea.           $5,974        4
Plumbing Fixtures               Classroom Lavatory                                                       4              22 Ea.          $61,491        5
Plumbing Fixtures               Classroom Lavatory                                                       4              99 Ea.         $276,713        5
Domestic Water Equipment        Backflow Preventers - 2 in. (Ea.)                                        5               2 Ea.           $4,697        6
Domestic Water Equipment        Water Heater - Electric - 52 gallon                                      2               2 Ea.           $6,393        8
Plumbing Fixtures               Sink - Service / Mop Sink                                                5               8 Ea.           $7,583        8
Domestic Water Equipment        Water Heater - Electric - 52 gallon                                      2               2 Ea.           $6,783        10
                                                                                           Sub Total for System         14 items      $1,039,453

Fire and Life Safety
Uniformat Description           LC Type Description                                                   Priority         Qty UoM       Repair Cost Remaining Life
Security System Component       Security Alarm System                                                    1          196,181 SF        $2,609,099       8
                                                                                           Sub Total for System          1 items      $2,609,099

Specialties
Uniformat Description           LC Type Description                                                   Priority         Qty UoM       Repair Cost Remaining Life
Casework                        Fixed Cabinetry                                                          4              46 Room        $428,437        4
Casework                        Lockers                                                                  4           2,870 Ea.        $1,666,456       5
Casework                        Lockers, Gym                                                             4           1,392 Ea.         $736,573        5
Fixed Multiple Seating          Auditorium Seating                                                       4             485 Ea.         $251,580        7
Movable Multiple Seating        Bleachers                                                                4           1,250 Seat        $615,003        8
                                                                                           Sub Total for System          5 items      $3,698,049
                                                                      Sub Total for Building 5010 - Building 5010       66 items     $15,557,525

Building: 5011 - Building 5011
Roofing
Uniformat Description           LC Type Description                                                   Priority         Qty UoM       Repair Cost Remaining Life
Low-Slope Roofing               Built-Up Roofing (BUR)                                                   2          45,680 SF         $1,376,737       5
                                                                                           Sub Total for System          1 items      $1,376,737

Exterior
Uniformat Description           LC Type Description                                                   Priority         Qty UoM       Repair Cost Remaining Life
Exterior Operating Windows      Aluminum - Windows per SF                                                2              44 SF            $5,913        10



M▪A▪P▪P▪S ©, Jacobs 2021                                      Revision Date - 09/24/2021                                                                          18
                                                                                                                     Facility Condition Assessment
                                                                                                                  DeKalb County SD - Stephenson High School

Exterior
Uniformat Description                    LC Type Description                                   Priority       Qty UoM       Repair Cost Remaining Life
Exterior Operating Windows               Aluminum - Windows per SF                                2         1,368 SF          $183,845        10
Exterior Operating Windows               Aluminum - Windows per SF                                2           300 SF           $40,317        10
Exterior Entrance Doors                  Steel - Insulated and Painted                            3             5 Door         $23,419        10
                                                                                     Sub Total for System       4 items       $253,495

Interior
Uniformat Description                    LC Type Description                                   Priority       Qty UoM       Repair Cost Remaining Life
Carpeting                                Carpet                                                   4         1,370 SF           $18,354        4
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                              4         43,396 SF         $276,600        5
Suspended Plaster and                    Painted ceilings                                         5         2,284 SF            $5,184        5
Compartments and Cubicles                Toilet Partitions                                        4            20 Stall        $43,956        5
Fluid-Applied Flooring                   Epoxy Coating                                            4         3,654 SF           $52,454        8
Wood Flooring                            Wood Flooring - All Types                                4         1,370 SF           $35,145        8
Interior Coiling Doors                   Interior Overhead Doors                                  3             2 Ea.          $12,592        8
Interior Door Supplementary Components   Door Hardware                                            3            93 Door        $164,437        8
Resilient Flooring                       Vinyl Composition Tile Flooring                          4         38,828 SF         $405,214        9
                                                                                     Sub Total for System       9 items      $1,013,937

Mechanical
Uniformat Description                    LC Type Description                                   Priority       Qty UoM       Repair Cost Remaining Life
Facility Hydronic Distribution           Pump - 1HP or Less (Ea.)                                 4             1 Ea.           $4,431        3
Heat Generation                          Boiler - Steel Tube (1200 MBH)                           2             1 Ea.          $55,770        3
Decentralized Heating Equipment          Unit Heater Electric (5 KW)                              3             3 Ea.           $4,125        4
Decentralized Heating Equipment          Unit Heater Electric (3 KW)                              3             1 Ea.             $993        4
Decentralized Heating Equipment          Unit Heater Electric (5 KW)                              3             3 Ea.           $4,125        4
Decentralized Cooling                    Heat Pump (3 Ton)                                        5             3 Ea.          $28,277        4
Decentralized Cooling                    Heat Pump (3 Ton)                                        5             2 Ea.          $18,851        4
Decentralized Cooling                    Heat Pump (3 Ton)                                        5            27 Ea.         $254,497        4
Decentralized Cooling                    Heat Pump (3 Ton)                                        5             7 Ea.          $65,981        4
Decentralized Cooling                    Heat Pump (5 Ton)                                        5             7 Ea.          $89,887        4
HVAC Air Distribution                    Roof Top Unit - DX Gas (5 Ton)                           2             1 Ea.          $16,834        4
Central Cooling                          Cooling Tower - Metal (130 Tons)                         2             1 Ea.          $54,150        5
Facility Hydronic Distribution           Pump - 5HP                                               4             2 Ea.          $14,931        5
Facility Hydronic Distribution           Pump- 10HP (Ea.)                                         4             2 Ea.          $25,200        5
Facility Hydronic Distribution           Pump - 1HP or Less (Ea.)                                 4             2 Ea.           $9,402        5
Exhaust Air                              Roof Exhaust Fan - Large                                 3             6 Ea.          $52,553        5
Exhaust Air                              Wall Exhaust Fan                                         3             1 Ea.           $5,156        5
Heat Generation                          Heat Exchanger - Water to Water                          2             1 Ea.          $38,262        8
Facility Hydronic Distribution           2-Pipe System (Cold)                                     3         45,680 SF         $103,207        10
                                                                                     Sub Total for System      19 items       $846,632

Electrical
Uniformat Description                    LC Type Description                                   Priority       Qty UoM       Repair Cost Remaining Life
Packaged Generator Assemblies            Emergency Generator (100 KW)                             2             1 Ea.          $56,388        5
Lighting Fixtures                        Light Fixtures (Bldg SF)                                 4         7,680 SF          $153,503        5
Electrical Service                       Switchgear - Main Dist Panel (1200 Amps)                 2             1 Ea.          $45,718        8
Transfer Switches                        Automatic Transfer Switch (Amps)                         3           400 Amps         $16,365        8
Electrical Service                       Transformer (112.5 KVA)                                  2             2 Ea.          $23,601        8
Electrical Service                       Transformer (15 KVA)                                     2             1 Ea.           $6,381        8
Electrical Service                       Transformer (75 KVA)                                     2             1 Ea.           $8,679        8
Power Distribution                       Panelboard - 120/208 100A                                3             3 Ea.           $9,940        8
Power Distribution                       Panelboard - 120/208 225A                                3             1 Ea.           $6,549        8
Power Distribution                       Panelboard - 120/208 400A                                3             4 Ea.          $58,795        8
Power Distribution                       Panelboard - 277/480 100A                                3             1 Ea.           $7,965        8
Power Distribution                       Panelboard - 277/480 225A                                3             5 Ea.          $55,811        8
                                                                                     Sub Total for System      12 items       $449,696

Plumbing
Uniformat Description                    LC Type Description                                   Priority       Qty UoM       Repair Cost Remaining Life
Domestic Water Equipment                 Water Heater - Electric - 40 gallon                      2             1 Ea.           $2,757        3
Plumbing Fixtures                        Showers                                                  5             1 Ea.           $1,382        4
Plumbing Fixtures                        Refrigerated Drinking Fountain                           4             8 Ea.          $18,644        4
Domestic Water Equipment                 Backflow Preventers - 2 in. (Ea.)                        5             2 Ea.           $4,697        6



M▪A▪P▪P▪S ©, Jacobs 2021                                                 Revision Date - 09/24/2021                                                      19
                                                                                                                           Facility Condition Assessment
                                                                                                                         DeKalb County SD - Stephenson High School

Plumbing
Uniformat Description            LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Plumbing Fixtures                Classroom Lavatory                                                     4              1 Ea.           $2,879        6
Plumbing Fixtures                Classroom Lavatory                                                     4             51 Ea.         $151,230        7
Plumbing Fixtures                Restroom Lavatory                                                      3             25 Ea.          $80,876        8
Plumbing Fixtures                Sink - Service / Mop Sink                                              5              2 Ea.           $1,896        8
Plumbing Fixtures                Toilets                                                                3             23 Ea.         $138,590        8
Plumbing Fixtures                Urinals                                                                3              8 Ea.          $12,903        8
                                                                                          Sub Total for System        10 items       $415,855

Fire and Life Safety
Uniformat Description            LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Fire Detection and Alarm         Fire Alarm                                                             1          45,680 SF         $274,445        3
                                                                                          Sub Total for System         1 items       $274,445

Conveyances
Uniformat Description            LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Elevators                        Passenger elevator cab finishes                                        4              1 Ea.          $10,089        10
                                                                                          Sub Total for System         1 items        $10,089

Specialties
Uniformat Description            LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Casework                         Fixed Cabinetry                                                        4              3 Room         $31,449        8
                           Note: Each room had 2.5' of storage cab.
                                                                                          Sub Total for System         1 items        $31,449
                                                                     Sub Total for Building 5011 - Building 5011      58 items      $4,672,334

Building: 5020 - Building 5020
Exterior
Uniformat Description            LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Exterior Entrance Doors          Steel - Insulated and Painted                                          3              2 Door          $9,367        10
                                                                                          Sub Total for System         1 items         $9,367
                                                                     Sub Total for Building 5020 - Building 5020       1 items         $9,367

Building: 5030 - Building 5030
Roofing
Uniformat Description            LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Canopy Roofing                   Fabric Canopy / Awning                                                 3            700 SF           $86,920        5
                                                                                          Sub Total for System         1 items        $86,920
                                                                     Sub Total for Building 5030 - Building 5030       1 items        $86,920

Building: 5040 - Building 5040
Exterior
Uniformat Description            LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Exterior Entrance Doors          Steel - Insulated and Painted                                          3              1 Door          $4,684        10
Exterior Wall Veneer             Wood / Composite Siding - Bldg SF basis                                2            144 SF            $3,070        10
                                                                                          Sub Total for System         2 items         $7,753
                                                                     Sub Total for Building 5040 - Building 5040       2 items         $7,753

Building: 5050 - Building 5050
Roofing
Uniformat Description            LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Low-Slope Roofing                Metal (Structural - Corrugated Deck)                                   2            350 SF           $21,451        8
                                                                                          Sub Total for System         1 items        $21,451

Exterior
Uniformat Description            LC Type Description                                                 Priority        Qty UoM       Repair Cost Remaining Life
Exterior Wall Veneer             Exterior Painting - Bldg SF basis                                      2            350 SF              $611        2
Exterior Entrance Doors          Steel - Insulated and Painted                                          3              5 Door         $22,075        8
Exterior Wall Veneer             Exterior Painting - Bldg SF basis                                      2            350 SF              $752        9
                                                                                          Sub Total for System         3 items        $23,437
                                                                     Sub Total for Building 5050 - Building 5050       4 items        $44,889




M▪A▪P▪P▪S ©, Jacobs 2021                                         Revision Date - 09/24/2021                                                                     20
                                                                                                                   Facility Condition Assessment
                                                                                                                 DeKalb County SD - Stephenson High School

Building: 5060 - Building 5060
Roofing
Uniformat Description      LC Type Description                                                 Priority      Qty UoM       Repair Cost Remaining Life
Low-Slope Roofing          Metal (Structural - Corrugated Deck)                                   2          150 SF            $9,193        8
                                                                                    Sub Total for System       1 items         $9,193

Exterior
Uniformat Description      LC Type Description                                                 Priority      Qty UoM       Repair Cost Remaining Life
Exterior Wall Veneer       Exterior Painting - Bldg SF basis                                      2          150 SF              $262        2
Exterior Entrance Doors    Steel - Insulated and Painted                                          3            2 Door          $8,829        8
Exterior Wall Veneer       Exterior Painting - Bldg SF basis                                      2          150 SF              $322        9
                                                                                    Sub Total for System       3 items         $9,414
                                                               Sub Total for Building 5060 - Building 5060     4 items        $18,607

                                                                       Total for: Stephenson High School     143 items     $22,885,566




M▪A▪P▪P▪S ©, Jacobs 2021                                   Revision Date - 09/24/2021                                                                   21
                                                                                               Facility Condition Assessment
                                                                                             DeKalb County SD - Stephenson High School



 Supporting Photos




Existing Intercom System Is Beyond Useful Life               Existing Fire Alarm System Is Beyond Useful Life




Old T8 Lamps Fluorescent Light Fixtures That Are Beyond      Locker Hru
Useful Life




Rooftop Unit                                                 Cooling Tower




M▪A▪P▪P▪S ©, Jacobs 2021                            Revision Date - 09/24/2021                                                     22
                                                          Facility Condition Assessment
                                                         DeKalb County SD - Stephenson High School




Larger Pumps                         Boiler




Plate Frame Heat Exchange            Gym Air Hander




Building Exterior                    Building Exterior




M▪A▪P▪P▪S ©, Jacobs 2021    Revision Date - 09/24/2021                                         23
                                                         Facility Condition Assessment
                                                        DeKalb County SD - Stephenson High School




Damaged Seats




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                         24
 Revision Date - 09/24/2021




FACILITY CONDITION ASSESSMENT
                              Tucker Middle School | 2021
                                                                                                                                Facility Condition Assessment
                                                                                                                                DeKalb County SD - Tucker Middle School


 Executive Summary
 Tucker Middle School is located at 2160 Idlewood Road in Tucker, GA. It comprises 152,360 gross square feet. At the time
 of the assessment the oldest building was 16 years old.
 The findings contained within this report are the result of an assessment of building systems performed by building
 professionals experienced in disciplines including architecture, mechanical, plumbing and electrical. Only those systems
 that were identified as having either an associated deficiency or life cycle event within a 10-year window is contained within
 this report. The full list of each school's systems that are present along with the associated priorities can be found in the flat
 file data grids submitted to Dekalb County. The projected replacement year of those assets within each system is also
 included within this table.The total current deficiencies for this site, in 2020 construction cost dollars, are estimated at
 $724,493. A ten-year need was developed to provide an understanding of the current need as well as the projected needs
 in the near future. For Tucker Middle School the ten-year need is $14,216,775.
 For planning purposes, the total current deficiencies and the first five years of projected life cycle needs were combined to
 calculate a Facility Condition Index (FCI). A 5-year FCI was calculated by dividing the 5-year need by the total replacement
 cost. Costs associated with new construction are not included in the FCI calculation. After the 5-year FCI was calculated,
 this value was subtracted from 100 to calculate the FCA Score in a similar fashion to report cards.
 The Tucker Middle School facility has a FCA score of 91.13% which is considered "Good".

Summary of Findings
The table below summarizes the condition findings at Tucker Middle School.
Table 1: Facility Condition by Building


                                                                                                             Total 5 Yr Need      Total 10 Yr Need
                                                          Current        5-Year Life   Yrs 6-10 Life        (Yr 1-5 + Current    (Yr 1-10 + Current    Replacement      FCA
Number          Building Name                            Deficiencies    Cycle Cost     Cycle Cost                 Defs)                Defs)              Cost         Score
Exterior Site
                Exterior Site                                       $0      $515,951                   $0            $515,951               $515,951
Permanent Building(s)
4010            Building 4010                                $724,493     $3,003,218       $9,973,113              $3,727,711           $13,700,824       $47,857,800   92.21%
                Sub Total for Permanent Building(s):         $724,493     $3,003,218      $9,973,113               $3,727,711           $13,700,824      $47,857,796
                                       Total for Site:       $724,493     $3,519,169       $9,973,113              $4,243,662           $14,216,775       $47,857,796   91.13%

Note 1: Sitework improvements are proportionally incorporated into the building CRV and used to calulate the overall FCA Score.
Note 2: Aerial map including building number, gross SF, and year built of each building on the site is found on Page 3.




 M▪A▪P▪P▪S ©, Jacobs 2021                                           Revision Date - 09/24/2021                                                                              2
                                                        Facility Condition Assessment
                                                        DeKalb County SD - Tucker Middle School


Aerial Images




M▪A▪P▪P▪S ©, Jacobs 2021   Revision Date - 09/24/2021                                        3
                                                                                         Facility Condition Assessment
                                                                                          DeKalb County SD - Tucker Middle School


Approach and Methodology
The facility condition assessment includes a visual assessment of building systems that are readily available during a
facility walk-through. The standard process does not reflect invasive, destructive assessment methods that would
require special equipment, testing or scheduled power outages. The assessment was accomplished with a view
toward identifying significant maintenance and repair deficiencies that need correction. For the purposes of this
assessment, deficient conditions captured were limited to those items that did not qualify as routine maintenance
repairs. Copies of previous reports and other documentation that were relevant to the inspection were utilized if made
available in the process. Additionally, feedback from appropriate personnel to provide background information relative
to specific building operations, function, equipment conditions, past improvements and planned upgrades were
incorporated into the results if made available to the teams while on site. Two components of the facility condition
assessment are combined to total the cost for facility need. The two components of the facility condition assessment
are current deficiencies and life cycle forecast.

Current Deficiencies: Deficiencies are items in need of repair or replacement as a result of being broken, obsolete,
deferred maintenance, or beyond useful life. The existing deficiencies that currently require correction are identified
and assigned a priority. An example of a current deficiency might include a broken lighting fixture or an inoperable
roof top air conditioning unit.

Life Cycle Forecast: Life cycle analysis evaluates the ages of a building's systems to forecast system replacement as
they reach the end of serviceable life. Estimated Useful Lives were determined based on a combination of our
(Jacobs) professional experience, RS Means, and from industry standard tables (BOMA, ASHRAE). An example of a
life cycle system replacement is a roof with a 20-year life that has been in place for 15 years and may require
replacement in five years.

All members of the survey team recorded existing conditions, identified problems and deficiencies, and documented
corrective action and quantities. The team took digital photos at each site to better identify significant deficiencies.

Facility Deficiency Priority Levels
Deficiencies were ranked according to five priority levels, with Priority 1 items being the most critical to address:

Priority 1 – Mission Critical Concerns: Deficiencies or conditions that may directly affect the site’s ability to remain
open or deliver the educational curriculum. These deficiencies typically relate to building safety, code compliance,
severely damaged or failing building components, and other items that require near-term correction. An example of a
Priority 1 deficiency is a fire alarm system replacement.

Priority 2 – Indirect Impact to Educational Mission: Items that may progress to a Priority 1 item if not addressed in the
near term. Examples of Priority 2 deficiencies include inadequate roofing that could cause deterioration of integral
building systems, and conditions affecting building envelopes, such as roof and window replacements.

Priority 3 – Short-Term Conditions: Deficiencies that are necessary to the site's mission but may not require
immediate attention. These items should be considered necessary improvements required to maximize facility
efficiency and usefulness. Examples of Priority 3 items include site improvements and plumbing deficiencies.

Priority 4 – Long-Term Requirements: Items or systems that may be considered improvements to the instructional
environment. The improvements may be aesthetic or provide greater functionality. Examples include cabinets,
finishes, paving, removal of abandoned equipment, and educational accommodations associated with special
programs.

Priority 5 – Enhancements: Deficiencies aesthetic in nature or considered enhancements. Typical deficiencies in this
priority include repainting, replacing carpet, improved signage, or other improvements to the facility environment.




M▪A▪P▪P▪S ©, Jacobs 2021                      Revision Date - 09/24/2021                                                       4
                                                                                         Facility Condition Assessment
                                                                                          DeKalb County SD - Tucker Middle School


Facility Condition Assessment(FCA) Score
Facility Condition Assessment (FCA) Scores are assigned after the Facility Condition Index (FCI) is calculated.
The Facility Condition Index (FCI) is used throughout the facility condition assessment industry as a general
indicator of a building’s health. Since 1991, the facility management industry has used an index called the FCI
to benchmark the relative condition of a group of sites. The FCI is derived by dividing the total repair cost,
including site-related repairs, by the total replacement cost of all buildings. It should be noted that costs in the
New Construction category are not included in the FCI calculation. In an effort to match the report card metrics,
the FCI is subtracted from 100 to assign the FCA Score. A facility with a lower FCA Score has more need, or
higher priority, than a facility with a higher FCA Score.




The replacement value represents the estimated cost of replacing the current building with another building of
like size, based on 2021 estimated cost of construction in the DeKalb County area. The estimated replacement
cost for this facility is $47,857,796. For planning purposes, the total 5-year need at the Tucker Middle School is
$4,243,662 (Life Cycle Years 1-5 plus the current FCI deficiency cost).

The Tucker Middle School facility has an FCA Score of 91.13%. which is considered "Good".




                              Figure 1: 5-Year FCI




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                5
                                                                                                                     Facility Condition Assessment
                                                                                                                      DeKalb County SD - Tucker Middle School


The following table summarizes this site's current deficiencies by building system and priority.

Table 2: System by Priority (Site & Permanent Buildings)

                                                                                 Priority

                  System                     1               2                      3              4                      5              Total             % of Total
Site                                                 $0             $0                    $6,179       $135,889                $27,599       $169,666          23.42 %

Roofing                                              $0          $3,375                   $5,590              $0                   $0             $8,965        1.24 %

Structural                                           $0             $0                       $0               $0                   $0                $0         0.00 %

Exterior                                             $0          $5,018                      $0               $0               $12,020           $17,037        2.35 %

Interior                                             $0             $0                       $0            $3,571                  $0             $3,571        0.49 %

Mechanical                                           $0             $0                  $305,123              $0                   $0        $305,123          42.12 %

Electrical                                           $0             $0                  $220,131              $0                   $0        $220,131          30.38 %

Plumbing                                             $0             $0                       $0               $0                   $0                $0         0.00 %

Fire and Life Safety                                 $0             $0                       $0               $0                   $0                $0         0.00 %

Conveyances                                          $0             $0                       $0               $0                   $0                $0         0.00 %

Specialties                                          $0             $0                       $0               $0                   $0                $0         0.00 %

Total:                                               $0          $8,393                 $537,021       $139,460                $39,618       $724,493




The building systems at the site with the most need include:
                                                                          Mechanical                   -            $305,123
                                                                          Electrical                   -            $220,131
                                                                          Site                         -            $169,666




M▪A▪P▪P▪S ©, Jacobs 2021                                   Revision Date - 09/24/2021                                                                                   6
                                                                                   Facility Condition Assessment
                                                                                   DeKalb County SD - Tucker Middle School



The chart below represents the building systems and associated deficiency costs.




Figure 2: System Deficiencies




M▪A▪P▪P▪S ©, Jacobs 2021                    Revision Date - 09/24/2021                                                  7
                                                                                                          Facility Condition Assessment
                                                                                                           DeKalb County SD - Tucker Middle School


Life Cycle Capital Renewal Forecast
During the facility condition assessment, assessors inspected all major building systems. If an assessor identified a need
for immediate replacement, a deficiency was created with the item's repair costs. The identified deficiency contributes to the
facility's total current repair costs.

However, capital planning scenarios span multiple years, as opposed to being constrained to immediate repairs.
Construction projects may begin several years after the initial facility condition assessment. Therefore, in addition to the
current year repair costs, it is necessary to forecast the facility's future costs using a ten-year life cycle renewal forecast
model.

Life cycle renewal is the projection of future building system costs based upon each individual system’s expected
serviceable life. Building systems and components age over time, eventually break down, reach the end of their useful lives,
and may require replacement. While an item may be in good condition now, it might reach the end of its life before a
planned construction project occurs.

The following tables show ten-year life cycle capital renewal projections. The projections outline costs for major building
systems in which a component is expected to reach the end of its useful life and require capital funding for replacement.



Table 3a: Capital Renewal Forecast (Yrs 1-5)

                                                         Life Cycle Capital Renewal Projections
                                   Year 1           Year 2               Year 3               Year 4                Year 5
System                              2022             2023                 2024                 2025                  2026                 Total 1-5
Site                                           $0             $0                       $0                   $0               $515,951    $515,951

Roofing                                        $0             $0                       $0          $1,231,982                     $0    $1,231,982

Exterior                                       $0             $0                       $0                $2,823                   $0        $2,823

Interior                                       $0             $0                  $130,513             $102,056              $669,688    $902,257

Mechanical                                     $0             $0                    $4,860                  $0               $847,867    $852,728

Electrical                                     $0             $0                       $0                   $0                    $0            $0

Plumbing                                       $0             $0                       $0                $7,579                $5,850     $13,429

Fire and Life Safety                           $0             $0                       $0                   $0                    $0            $0

Conveyances                                    $0             $0                       $0                   $0                    $0            $0

Specialties                                    $0             $0                       $0                   $0                    $0            $0

Total                                          $0             $0                  $135,374         $1,344,439            $2,039,356     $3,519,169




M▪A▪P▪P▪S ©, Jacobs 2021                             Revision Date - 09/24/2021                                                                       8
                                                                                                               Facility Condition Assessment
                                                                                                                    DeKalb County SD - Tucker Middle School


Table 3b: Capital Renewal Forecast (Yrs 6-10)

                                                                   Life Cycle Capital Renewal Projections
                                                Year 6            Year 7           Year 8            Year 9              Year 10
System                         Total 1-5         2027              2028             2029              2030                2031            Total 6-10     Total 1-10
Site                           $515,951                  $0                $0               $0                $0                   $0            $0      $515,951

Roofing                      $1,231,982                  $0                $0               $0                $0                   $0            $0     $1,231,982

Exterior                         $2,823                  $0                $0               $0                $0              $297,729    $297,729       $300,551

Interior                       $902,257                  $0                $0          $886,729        $1,272,040                  $0    $2,158,769     $3,061,026

Mechanical                     $852,728             $172,901          $741,380          $56,123               $0              $126,699   $1,097,103     $1,949,831

Electrical                           $0                  $0                $0          $167,135               $0            $3,661,056   $3,828,191     $3,828,191

Plumbing                        $13,429              $44,504               $0          $694,469               $0              $317,546   $1,056,518     $1,069,947

Fire and Life Safety                 $0           $1,007,969               $0               $0                $0                   $0    $1,007,969     $1,007,969

Conveyances                          $0                  $0                $0               $0                $0               $10,089     $10,089        $10,089

Specialties                          $0                  $0                $0               $0                $0              $516,747    $516,747       $516,747

Total                        $3,519,169           $1,225,373          $741,380       $1,804,455        $1,272,040           $4,929,864   $9,973,113    $13,492,282




Figure 3: Ten Year Capital Renewal Forecast




M▪A▪P▪P▪S ©, Jacobs 2021                                       Revision Date - 09/24/2021                                                                             9
                                                                             Facility Condition Assessment
                                                                             DeKalb County SD - Tucker Middle School

Summary of High Priority Deficiencies


Priority 2 - Indirect Impact to Educational Mission                            Cost
  Asphalt Shingle Roof Covering Repair                                         $1,749

  Gutter Joint Repair                                                          $1,626

  Aluminum Window Replacement                                                  $3,000

  Brick Exterior Replacement (Bldg SF)                                         $1,812

  Dryvit Exterior Repair                                                        $206

                                                      Total for Priority 2    $8,393




M▪A▪P▪P▪S ©, Jacobs 2021                   Revision Date - 09/24/2021                                            10
                                                                                                                   Facility Condition Assessment
                                                                                                                    DeKalb County SD - Tucker Middle School



Deficiency Summary
(Items below detail the totals referenced in Table 2)

Building: 4010 - Building 4010
Site
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Car Accessible Parking Spaces Restiriping                                                 ADA Compliance              6 Ea.        3             $641    4946
             Note:     Paint Faded
             Location: All Space
Concrete Walks Replacement                                                                Capital Renewal           520 SF         3            $5,538   4943
             Note:     Concrete Sidewalk. (420Sf) Replaced Cracked Sidewalk At Front Of School (100Sf).
Fencing Replacement (8' - 10' high Chain Link Fence)                                      Capital Renewal           180 LF         4           $13,258   4938
             Note:     10' Fence At Tennis Court. Replace 180'. Damaged By Vandals
             Location: By Vandals
Tennis Courts, Nets, And Equipment Replacement                                            Capital Renewal             1 Ea.        4           $69,834   4940
             Note:     Tennis Net Is Broken And Tennis Court Surface Is Deteriorated And Cracked.
             Location: Tennis Court
Track Repair                                                                              Deferred                    1 Ea.        4           $52,797   4939
                                                                                          Maintenance
             Note:     Track Needs To Be Resurfaced. Old, Cracked
             Location: Track
Bollard Replacement                                                                       Deferred                    3 Ea.        5            $3,508   4945
                                                                                          Maintenance
             Note:     Add Three Bollards To Protect Column Outside Kitchen Door At Back Of School. Column And Wall Corner Has Been Damaged By Vehicle Impact.
                       Need To Repair
Paving Restriping                                                                         Deferred                  149 CAR        5            $4,659   4942
                                                                                          Maintenance
             Note:     Faded
             Location: All Lots
Small Bench Replacement                                                                   Deferred                   10 Ea.        5           $19,432   4944
                                                                                          Maintenance
             Note:     Rotting
             Location: Various Locations
                                                                                         Sub Total for System         8 items                $169,666

Roofing
Deficiency                                                                                Category                  Qty UoM     Priority   Repair Cost    ID
Asphalt Shingle Roof Covering Repair                                                      Deferred                  400 SF         2            $1,749   4862
                                                                                          Maintenance
             Note:     Roof Soft Above Girls Locker Room At The Back Of Building (Behind Hvac Unity)
             Location: West End Of Girls Locker Room Roof
Gutter Joint Repair                                                                       Deferred                    7 Ea.        2            $1,626   4866
                                                                                          Maintenance
             Note:     Gutters Damaged In 7 Various Locations Around Building. Looks Like Damage Caused By People Climbing Onto Roof. Need To Clean Bricks At
                       Damaged Gutter Locations
Metal Downspout Replacement                                                               Deferred                   20 LF         3             $445    4867
                                                                                          Maintenance
             Note:     Replace Downspout At Column Outside Back Kitchen Door
             Location: Outside Back Kitchen Door
Modified Covering Has Blisters That Should Be Repaired                                    Deferred                   25 Ea.        3            $4,817   4863
                                                                                          Maintenance
             Note:     Bubbles
             Location: Various Locations
Roof Drain Cleaning                                                                       Deferred                    5 Ea.        3             $328    4864
                                                                                          Maintenance
             Note:     Leaves
             Location: Various
                                                                                         Sub Total for System         5 items                   $8,965




M▪A▪P▪P▪S ©, Jacobs 2021                                      Revision Date - 09/24/2021                                                                         11
                                                                                                                        Facility Condition Assessment
                                                                                                                          DeKalb County SD - Tucker Middle School

Exterior
Deficiency                                                                                   Category                    Qty UoM      Priority   Repair Cost    ID
Aluminum Window Replacement                                                                  Capital Renewal              30 SF            2          $3,000   4877
             Note:       Replace 30Sf Of Window Because Moisture Is Between Panes Of Glass. See Picture
             Location: Cafeteria
Brick Exterior Replacement (Bldg SF)                                                         Capital Renewal              40 SF            2          $1,812   4868
             Note:       Replace Missing Brick
             Location: Front Entrance Awning
Dryvit Exterior Repair                                                                       Deferred                     30 SF            2            $206   4869
                                                                                             Maintenance                     Wall
             Note:       Repair Dryvit At Three Locations. Corner Outside Back Kitchen Door (Hit By Vehicle), Back Corner Close To Cooling Tower (Rusting) And Above
                         Door At Courtyard
             Location: Corner Outside Back Kitchen Door, And Back Corner Close To Cooling Tower And Above Door At Courtyard.
Exterior Cleaning                                                                            Deferred                  3,200 SF            5         $11,652   4871
                                                                                             Maintenance                     Wall
             Note:       Power Wash Brick Where Roof Gutters Leaked And Caused Mold On Bricks. Power Wash All Precast Concrete Window Sills And Heads And
                         Architectural Items In Brick Because They Are Moldy And Very Dirty. Power Wash Back And Retaining Wall Because Stained
Exterior Painting                                                                            Capital Renewal             300 SF            5            $368   4870
                                                                                                                             Wall
             Note:       Paint Concrete Entrances To Buildings. Existing Paint Peeling Off Of Concrete On Side Of Doors And Top Of Doors
             Location: Entrances To Buildings
                                                                                             Sub Total for System          5 items                   $17,037

Interior
Deficiency                                                                                   Category                    Qty UoM      Priority   Repair Cost    ID
Carpet Flooring Replacement                                                                  Capital Renewal             300 SF            4          $3,571   4936
             Note:       Replace Carpet In Assistant Principal Office At Classroom Wings At Each Floor
             Location: Assistant Principal Office At Classroom Wings
                                                                                             Sub Total for System          1 items                    $3,571

Mechanical
Deficiency                                                                                   Category                    Qty UoM      Priority   Repair Cost    ID
Testing And Balancing                                                                        Deferred                152,360 SF            3       $305,123    4947
                                                                                             Maintenance
                                                                                             Sub Total for System          1 items                 $305,123

Electrical
Deficiency                                                                                   Category                    Qty UoM      Priority   Repair Cost    ID
Lightning Protection System Installation                                                     Functional Deficiency   152,360 SF            3        $111,862 4997
Public Address System Head-End Requires Replacement                                          Functional Deficiency         1 Ea.           3          $6,870   4993
Public Address System Replacement, Non-main Building                                         Deferred                152,360 SF            3       $101,399    4992
                                                                                             Maintenance
                                                                                             Sub Total for System          3 items                 $220,131
                                                                       Sub Total for Building 4010 - Building 4010        23 items                 $724,493
                                                                                                Total for Campus          23 items                 $724,493




M▪A▪P▪P▪S ©, Jacobs 2021                                         Revision Date - 09/24/2021                                                                            12
                                                                                                                                         Facility Condition Assessment
                                                                                                                                            DeKalb County SD - Tucker Middle School



Life Cycle Summary Yrs 1-10
(Items below detail the totals referenced in Tables 3a & 3b)

Site Level Life Cycle Items
Site
Uniformat Description                    LC Type Description                                                 Priority             Qty UoM               Repair Cost Remaining Life
Parking Lot Pavement                     Asphalt                                                                3                 149 CAR                  $235,606          5
Roadway Pavement                         Asphalt Driveways                                                      3             40,000 SF                    $280,345          5
                                                                                                  Sub Total for System              2 items                $515,951
                                                                                              Sub Total for Building -              2 items                $515,951

Building: 4010 - Building 4010
Roofing
Uniformat Description                    LC Type Description                                                 Priority             Qty UoM               Repair Cost Remaining Life
Steep Slope Roofing                      Composition Shingle                                                    2             63,400 SF                  $1,231,982          4
                                                                                                  Sub Total for System              1 items              $1,231,982

Exterior
Uniformat Description                    LC Type Description                                                 Priority             Qty UoM               Repair Cost Remaining Life
Exterior Wall Veneer                     Exterior Painting - Bldg SF basis                                      2               1,524 SF                     $2,823          4
Exterior Wall Veneer                     E.I.F.S. - Bldg SF basis                                               2               7,618 SF                   $297,728         10
                                                                                                  Sub Total for System              2 items                $300,551

Interior
Uniformat Description                    LC Type Description                                                 Priority             Qty UoM               Repair Cost Remaining Life
Compartments and Cubicles                Toilet Partitions                                                      4                  63 Stall                $130,513          3
Carpeting                                Carpet                                                                 4               7,618 SF                   $102,056          4
Wall Painting and Coating                Painting/Staining (Bldg SF)                                            5            137,124 SF                    $669,688          5
Acoustical Suspended Ceilings            Ceilings - Acoustical Tiles                                            4            121,888 SF                    $848,938          8
Suspended Plaster and                    Painted ceilings                                                       5             15,236 SF                     $37,790          8
Resilient Flooring                       Vinyl Composition Tile Flooring                                        4            121,888 SF                  $1,272,040          9
                                  Note: 1. Replace floor moulding in hallways in classroom wings (all three floors) old, cracked, damaged & peeling off. $9000 (see picture).   2.
                                        Replace stair treads (rubber covering) at center stair between 1st and 2nd floors. Old, cracked, damaged and peeling off. $9000 see picture.
                                                                                                  Sub Total for System              6 items              $3,061,026

Mechanical
Uniformat Description                    LC Type Description                                                 Priority             Qty UoM               Repair Cost Remaining Life
Exhaust Air                              Wall Exhaust Fan                                                       3                   1 Ea.                    $4,860          3
                                  Note: beyond service life - mechanical room
Heating System Supplementary             Controls - Electronic (Bldg.SF)                                        4            152,360 SF                    $256,952          5
Components
Central Cooling                          Cooling Tower - Metal (750 Tons)                                       2                   1 Ea.                  $114,885          5
                                  Note: beyond service life - yard
HVAC Air Distribution                    Roof Top Unit - DX Gas (5 Ton)                                         2                   1 Ea.                   $17,339          5
HVAC Air Distribution                    Roof Top Unit - DX Gas (40 Ton)                                        2                   2 Ea.                  $179,000          5
Facility Hydronic Distribution           Pump- 25HP (Ea.)                                                       4                   2 Ea.                   $31,349          5
                                  Note: beyond service life - mechanical room
Facility Hydronic Distribution           Pump - 50HP - (Ea.)                                                    4                   2 Ea.                  $125,789          5
                                  Note: beyond service life - mechanical room
Heat Generation                          Boiler - Steel Tube (3200 MBH)                                         2                   1 Ea.                  $122,553          5
Decentralized Cooling                    Ductless Split System (3 Ton)                                          2                   5 Ea.                   $30,448          6
HVAC Air Distribution                    Roof Top Unit - DX Gas (15 Ton)                                        2                   4 Ea.                  $142,453          6
HVAC Air Distribution                    Roof Top Unit - DX Gas (10 Ton)                                        2                   1 Ea.                   $28,024          7
HVAC Air Distribution                    Roof Top Unit - DX Gas (10 Ton)                                        2                   1 Ea.                   $28,024          7
HVAC Air Distribution                    VAV Boxes / Terminal Device                                            4                 153 Ea.                  $685,332          7
Decentralized Heating Equipment          Unit Heater Electric (5 KW)                                            3                   1 Ea.                    $1,548          8
Decentralized Heating Equipment          Unit Heater Electric (3 KW)                                            3                   3 Ea.                    $3,351          8
HVAC Air Distribution                    Roof Top Unit - DX Gas (5 Ton)                                         2                   2 Ea.                   $37,895          8
Exhaust Air                              Kitchen Exhaust Hoods                                                  3                   1 Ea.                   $13,329          8
Air Distribution                         Energy Recovery Unit (25,000 CFM)                                      3                   1 Ea.                   $70,877         10
HVAC Air Distribution                    Energy Recovery Unit (8,000 CFM)                                       3                   1 Ea.                   $28,717         10
Exhaust Air                              Roof Exhaust Fan - Small                                               3                   2 Ea.                    $4,952         10



M▪A▪P▪P▪S ©, Jacobs 2021                                               Revision Date - 09/24/2021                                                                                      13
                                                                                                                                      Facility Condition Assessment
                                                                                                                                         DeKalb County SD - Tucker Middle School

Mechanical
Uniformat Description                  LC Type Description                                                   Priority          Qty UoM               Repair Cost Remaining Life
Exhaust Air                            Roof Exhaust Fan - Large                                                 3                2 Ea.                   $20,308         10
Exhaust Air                            Interior Ceiling Exhaust Fan                                             3                3 Ea.                    $1,845         10
                                                                                                  Sub Total for System          22 items              $1,949,831

Electrical
Uniformat Description                  LC Type Description                                                   Priority          Qty UoM               Repair Cost Remaining Life
Power Distribution                     Distribution Panel (1600 Amps)                                           3                1 Ea.                   $29,983          8
                                Note: Distribution panel appears to be 1000 Amp based, but cannot get panel opened. Existing panel is locked at time of survey (no one on site has
                                      key!)
Audio-Video Systems                    PA Communications No Head Unit (Bldg SF)                                 2          152,360 SF                   $128,449          8
Distributed Systems                    Public Address System Head End Unit                                      3                1 Ea.                    $8,703          8
Packaged Generator Assemblies          Emergency Generator (100 KW)                                             2                1 Ea.                   $65,369         10
Packaged Generator Assemblies          Emergency Generator (100 KW)                                             2                1 Ea.                   $65,369         10
Lighting Fixtures                      Light Fixtures (Bldg SF)                                                 4          152,360 SF                 $3,530,317         10
                                                                                                  Sub Total for System           6 items              $3,828,191

Plumbing
Uniformat Description                  LC Type Description                                                   Priority          Qty UoM               Repair Cost Remaining Life
Plumbing Fixtures                      Sink - Service / Mop Sink                                                5                9 Ea.                    $7,579          4
Domestic Water Equipment               Water Heater - Electric - 40 gallon                                      2                1 Ea.                    $2,925          5
Domestic Water Equipment               Water Heater - Electric - 40 gallon                                      2                1 Ea.                    $2,925          5
Plumbing Fixtures                      Refrigerated Drinking Fountain                                           4               18 Ea.                   $44,504          6
Domestic Water Equipment               Water Heater - Gas - 100 Gallon                                          2                1 Ea.                    $7,603          8
Domestic Water Equipment               Water Heater - Gas - 100 Gallon                                          2                2 Ea.                   $15,206          8
Plumbing Fixtures                      Restroom Lavatory                                                        3               44 Ea.                  $142,342          8
Plumbing Fixtures                      Restroom Lavatory                                                        3                8 Ea.                   $25,880          8
Plumbing Fixtures                      Showers                                                                  5                6 Ea.                    $9,336          8
Plumbing Fixtures                      Toilets                                                                  3               82 Ea.                  $494,101          8
Plumbing Fixtures                      Classroom Lavatory                                                       4               98 Ea.                  $317,546         10
                                                                                                  Sub Total for System          11 items              $1,069,947

Fire and Life Safety
Uniformat Description                  LC Type Description                                                   Priority          Qty UoM               Repair Cost Remaining Life
Fire Detection and Alarm               Fire Alarm                                                               1          152,360 SF                 $1,000,259          6
Fire Detection and Alarm               Fire Alarm Panel                                                         1                1 Ea.                    $7,710          6
                                                                                                  Sub Total for System           2 items              $1,007,969

Conveyances
Uniformat Description                  LC Type Description                                                   Priority          Qty UoM               Repair Cost Remaining Life
Elevators                              Passenger elevator cab finishes                                          4                1 Ea.                   $10,089         10
                                                                                                  Sub Total for System           1 items                 $10,089

Specialties
Uniformat Description                  LC Type Description                                                   Priority          Qty UoM               Repair Cost Remaining Life
Movable Multiple Seating               Bleachers                                                                4              990 Seat                 $516,746         10
                                                                                                  Sub Total for System           1 items                $516,746
                                                                             Sub Total for Building 4010 - Building 4010        52 items             $12,976,331

                                                                                        Total for: Tucker Middle School         54 items             $13,492,282




M▪A▪P▪P▪S ©, Jacobs 2021                                              Revision Date - 09/24/2021                                                                                     14
                                                                                       Facility Condition Assessment
                                                                                       DeKalb County SD - Tucker Middle School



 Supporting Photos




Power Wash Brick And Dryvit. Repair Dryvit Above Door        Repair Gutters And Roof




Replace Window Panes In Cafeteria                            Pressure Wash Bricks




Repaint Handicap Parking Spaces




M▪A▪P▪P▪S ©, Jacobs 2021                            Revision Date - 09/24/2021                                             15
                                                                                                                                                                                                     79
                                                                                                                                                                                                          0




                                   AY L N
                                                                                                                                                                                            78
              0                                                                                                                                                                                  0
         80
                               E KW
                           CR E

                                                                                                                                                                            770
                  0
          79




                                                                                                                                                                                       770




                                                                                      780




                                            0
                                       79
 0
 79




                                                                                                                                                         HU
                                                                                                                                                            N   TW
                                                                                                                                                                     OO
                                                                                                                                                                        D




                                                                                                                                                                        CT
                                                                                              790


                                                           Bob Mathis Elementary Facility (F:0475)
                                                                       3505 Boring Road 30034 10.0 acres



                                                                                                    5402
                                                                  80




                                                                                                                5404
                                                                  0




                                                                                                    5403        5401
79
0




                                                                                                       B: 2011
                                                                                                    19,523 Sq.Ft.
                                                                                                     Year: 2003



                                                                                        810
                                                                                                                                    B: 2020
                                                                                                                                  5,478 Sq.Ft.
                                                                                                                                   Year: 2003

                                                                                                 B: 2010
                                                                                              44,400 Sq.Ft.
                                                                                               Year: 1975
                                                H AR
                                                    B OR
                                                   WO
                                                     OD S
                                                       RD




                                                                                                                       820

                                                                                                                       830



                                           RD
                                       S
                                     NG
                                RI
                           SP
                       G
                  BI
                                                                                                                                               D
                                                                                                                                     IN   GR
                                                                                                                              B   OR




                                                                                                                                  0
                                                                                                                             84




                                                                                                                                           0
                                                                                                                                      85

                                                                                                                                               0
                                      ±                                                                                                   86


   Bob Mathis Elementary Facility
               F:0475
 DCSD Planning Department 4/16/2019

                                                                                                                                                                                            DR
     0            40                       80               160                                                                                                                        ER
                                                                      0                                                                                                             RBL
                                                                   84                                                                                                             WA
                            Scale in Feet                                                                                                          870
                                                                                                                                                                                                                   0
                                                                                                                                                                                                                 97
                                                                                                                                                                                               DR
                                                                                                                                                                                               K
                                                                                                                                                                                           PAR
                                                                                                                     1010




                                                                                                                                                                                                                       980
                                                                                                                                                                                            ND
                                                                                                                                                                                          LA
                                                                                                                                                                                        OD
                                                                                                                                                                                      WO
                                                    Briarlake Elementary Facility (F:3051)
                                                                 3590 Lavista Road 30033 11.1 acres

                                                                                                                                                                        10
                                                                                                                                                                             20




                                                                                                                                                                    10 3
                                                                                                                                                                        0




                                                                                                                                           B: 2011




                                                                                                                                                                                                           990
                                                                                                                                                                                                    1000
                                                                                                                                         5,875 Sq.Ft.
                                                                                                                                          Year: 1963
                                                                             B: 2010                    B: 2012
                                                                          34,847 Sq.Ft.               7,100 Sq.Ft.
                                                                           Year: 1957                  Year: 2007




                                                                                                                                                B: 2020
                                                                                                                                              5,478 Sq.Ft.
                                        LAV




                                                                                                                                               Year: 2003
                                           IST
                                              AR




                                                                                                                            T-0
                                                D




                                                                                                                                28
                                                                                                                                   7
                                                                                                                                                               88
                                                                                                                                                             57


                                                                                                                                                  11
                                                                                                                                                47
                                                                                          10 4




                                                                                            0
                                             1030




                                                                                                                                         12
                                                                                                                                       47

                                  CIR
                      BRIARLAKE




                                                       10
                   ±




                                                            30

       Briarlake Elementary Facility
                                                                                                                                                                                           E   RD
                  F:3051                                                                                                                                                          BRIARLAK
    DCSD Planning Department 8/16/2019

0         45        90                     1 180
                                           02




               Scale in Feet
                                             0
870




                                                                                                                                                                       850
                                                                                                                                    860
                                                     Chapel Hill Elementary Facility (F:1053)
                                                               3536 Radcliffe Boulevard 30034 11.4 acres




                                                                                                                                            B: 2020
                                                                                                                                          5,478 Sq.Ft.




                                                                                                                                                                             RADCLIFFE BLVD
                                                                                                                                           Year: 2001




                                                                                    B: 2013
                                                                                  9,333 Sq.Ft.
                                                                                   Year: 1987



                                                                                                                                                                                              RADCLIFFE
                                                                                                                                                                                                 CT


                                                                            B: 2012                                    B: 2010
                                                                          5,523 Sq.Ft.                              32,299 Sq.Ft.
                                                                           Year: 1973                                Year: 1967




                                                                        B: 2011
                                                                     16,517 Sq.Ft.
                                                                      Year: 1969
            870




                                             880




                                                                                                                                                         0
                                                                                                                                                         86
                                                   880


                                                         870




                                                                                                                                                                   0
                                                                                                                                                              86




                                                                                                                              870




                                                                                                                                                                       850



                                                                                                                         WY
                                                                                                                    PK
                                                                                                               LS
                                                                                                         H   OA
                                                                                                    TS
                                                                                                 FLA




                         ±                                                                                                                                                                      MI L L
                                                                                                                                                                                            PEL
                                                                                                                                                                                        CH A BN D

        Chapel Hill Elementary Facility
                    F:1053
      DCSD Planning Department 4/16/2019
          880
      0         37.5        75         150

                       Scale in Feet                                        870                          87
                                                                                                              0                                           870
                                                                                                                                                                                                             98
                                                                                                                                                                                                                  0




                                                           0
                                                          91




                                                                                                                                                                                                  97
                                                                                                                                                                                                   0
                                                                    900




                                                                                                                                                                                                 960
                                                                                                                                                                                950
                                                                                            0
                                                                                         91
                                      900
                                                                                                               0
                                                                                                          92

                                                                                                                    930




                                                               0
                                                               90
                                                          0




        90
                                                          90




             0




                                                                                                                        rry Mill Facility

                                                                                                                                                                         970
                                                                                                                                      acres


                                                                                                                                                                          980                    LOMITA RD
                                                                                                                        Rd 30316 18.3
                                                                                                         Academy at Te
                                                                                                               tteville




                                                                                                                                                                                 TERRY MILL RD
                                                                                              (F:5068) 797 Faye



                                                                                                                                                                   990
                                                                                         Early Learning




                                                                                                                                                       B:
                                       FAYETT EVILLE CT




                                                                                                                                                             202
                                                                                                                                                   Sq 5,4 78 0
                                                                                                                                                     .F t                                        IONA DR
                                                                                                                                                         .
                                                                                                                                                     200 Yea r:
                                                                                                                                                           3


                                                                                                                                                   0
                                                                                                                                              99
                                                                                                                                   99
                                                                                       200 .
                                                                                   ar : q.F t
                                                                                           2




                                                                                                                                      0
                                                                                          4
                                                                                8,6 : 201




                                                                                                                       B: 2011
                                                                                        S




                                                                                                                        20,035
                                                                                    50
                                                                                    B




                                                                                                                        Sq.Ft.
                      940




                                                                                Ye




                                                                                                                      Year: 1969




                                                                                                                                                      B: 2010
                                                                                                                                                   34,256 Sq.Ft.
                                                                                                                                                    Year: 1958
                                                                                                                                                                                                           10
                                                                                                                                                                                                             10
                                                                                                                                                                                   10
                                                                                                                                                                                       00




                                                                          FAY
                                                                              ETT
                                                                                  EV   IL L
                                                                                           E   RD
                      ±




Early Learning Academy at Terry Mill Facility
       960        F:5068
    DCSD Planning Department 4/16/2019

   0             60       120         240
  950                                                                                                                                                                                                      99
                      Scale in Feet                                                                                                                                                                             0
                                                                                          SPRINGS DR
                                                                                                            0




                                                                                           CHRISTIAN
                                                                                                       85




                                                                                                                                                                                                                          83
                                                                                                                                                                                                                          0
                                  Edward L. Bouie, Sr. Elementary Facility
                                   (F:0297) 5100 Rock Springs Road 30038 35.9 acres
                         0
                        87




                                     0
                                    86




                                                          0
                                                      85




                                                                   0
                                                              84
                                                                            0
                                                                       83
                                                                                                                        820




                                                                                                                                                                                                                          800
                                                                                                                                     91,602 Sq.Ft.
                                                                                                                                      Year: 1996
                                                                                                                                        B: 2010




                                                                                   B: 2010
                                                                                91,602 Sq.Ft.
                                                                                                                                                                     830




                                                                                 Year: 1996




                                                                                                                                              0
                                                                                                                                      82


800
                                                                                          82
                                                                                             0




                         80
                              0
                                                                                                                                                                      0
                                                                                                                                                              810




                                                                                                                                                                     81



                                                                                                                                                                            0
                                                                                                                                                                            79




                                                                                                                                                          D
                                                                                                                                                 G   SR
                                                                                                                                          R   IN
                                                                                                                                     SP
                                                                                                                                CK
                                                                                                                790           RO
                                                                                                                                                                      790
                                                                                                                                                                        0
                                                                                                                                                                     80




                                                                                                                                                                                       FO
                                                                                                                                                                                            RR E
                                                                                                                                                                                                   S T BLUFF CT
                                                                                                                                                                                            0
                                                                                                                                                                                         82



                                                                                                                                                                                                      830

                                                                                                                                                                                                            FORREST RUN




      0                                                                         780
 79                                   M IL L                                                                      780
                                               ER R
                                                      D
            800
                  ±




Edward L. Bouie, Sr. Elementary Facility                                         79
                                                                                      0
                                                                                                                                                               790




    810         F:0297
 DCSD Planning Department 4/16/2019
                                                                                                                                                                                             FF    WAY
                                                                                                                                                                                        B LU
      0     65        130                260                                                                                                                                    R   EST
                                                                                                                                                                            FOR
      820
                  Scale in Feet
                                                                                                                                                                            810
                                                                                                                                                        88
                                                                                                                                                             0




                                                                                                                                                                                                                                                                                             CR IMSO N CT
                                                                                                                                                                                                                                AMBER C T
                                                                                                                                      87
                                                                                                                      860




                                                                                                                                 0
                                                                                                                                 86
                                                                                                                                    0
                                                                                                                                                                                                                  GILES RD




                                                                                                                                                                                                                                                                                                            0
                                                                                                                                                                                                                                                                                                       90
           LW
        HO
    NE
     BO




                                                                                                                                                                                                                                                              R
                                                                                                                                                                                                                                                     DA R T D
 IN G
    R
HER




                                                           CT
                                                       OY
                                                      D UR




                                                                                                                   860
                                                  CO R




                                                                                                                                                                                                                                                                             C   T
                                                                                                                                                                                                                                                                   BO B B IN
                                                                                               CT
                                                                                            AS
                                                                                          DR




                                                                                                                                                                                                                                                                                                 910
                                                                                                                                                                                                                                                                             900
                                                                                          MA




                                                                                                                                                                                                                                                                  890
                                                                                                                                                                                                                                       87




                                                                                                                                                                                                                                                              880
                                                                                                                                      T




                                                                                                                                                                                                                                            0
                                                                                                                                 OC
                                                                                                                      C AL I C




                                                                                                                                                                                                                               86
930




                                                                                                                                                                                                                               0
                                                                                                                                                                                                                      85




                                                                                                                                                                                                                                                                                                            90
                                                                                                                                                                                                                           0




                                                                                                                                                                                                                                                                                                             0
                                                                      SIN G ER                                                                                                                                   84
                                                                                 CT                                                                                                                                   0
                                                                                                                                                                                                    840




                                                                                                                                                                                                                                            BO
                                                                                                                                                                                                                                               BBI
                                                                                                                                                                                                                                                  N
                                                                                                                                                                                                                                                 LN
                                                                                                R WAY




           920




                                                                                                                                                                                                                                                                                                            0
                                                                                               SIN G E




                                                                                                                                                                                                                                                                                                            89
                                                                                                                            Marbut Elementary Facility (F:0197)
                                                                                                                                                         5776 Marbut Road 30058 47.1 acres




                                                                                                                                                                                                                                                                                      PATCH PL
        91
               0
                           TR L
                           T
                       DL O




                                                                                                                                                                                                                                    840
                        O




        90
                     WO




             0
                                                                                                                                                                    B: 2010
                                                                                                                                                                 86,000 Sq.Ft.                                                                                                              860
                                                                                                                                                                  Year: 1996
                                                                                                                                                                           850




    89                         SAI                                                                                                                                                                                                                                           POPLI N CT
           0                         NT
                                          T HO
                                                 MA
                                                      SD
                                                           R



    88                                                                                                                                                                      B: 2020
           0                                                                                                                                                              5,478 Sq.Ft.                                                                                                             890
                                                                                                                                                                           Year: 1996
                                                                                                                                                                                                                                                                                     880
                                                                                                                                                                                                                                                                     870
                                                                                                                                                                                              830




   870                                                                                                                                                                                                                                                                                   QU ILT CT

                                                                                 86
                                                                                      0




   850




                                                                                                                                                                                                                                                                                        T
                                                                                                                                                                                                                                                                            SEA M S
                                                                                          WE
                                                                                               LL
                                                                                                    BO
                                                                                                         RN                                                             MA
                                                                                      840                                                                                    R BU
                                                                                                                                                                                    TR
                                                                                                                                                                                          D
                                                                                                          OA




                      85
                                                                                                            KS




                           0
                                                                                                              CT
                                                                                                          840




                                                                                                                                                                                                          830




       0
  87
                      W EL LBO R N




                                                                                                                                                                                                                                                                                                            860




                                            ±                                                                       860
                                                                                                                                  S I LVER TH OR N CT




                                                                                                                                                                                                                                            CL
                         C R EE




                                                                                                                                                                                                                                                ON
                                                                                                                                                                                                                                            AY




        Marbut Elementary Facility                                                                                                                                                                                                                   RD
                                                                                                                                                                                                                                               T




                                                                                                                                                                                                                                                          G
                           K CT




                   F:0197                                                                                           870
    DCSD  Planning Department 4/16/2019
                                                                CED A R C R




       60
                                                                                                                                                                         D A R C R OF T




                 8
                       0
    0                87 112.5                225                         450                                                                                                                               820
                                                                      LN




                                                                                                                                                                           CT




                                                                                                                    880
                                                                           O




                                      Scale in Feet
                                                                    FT




                                                                                                                                                                        CE
 710




      0                                                                                                 0
 71                                                                                                73

                                                                                                             0
                                                                                                        74




                                                                                                                                                                                                                    DONNA WAY
                                                                                                   Martin Luther King, Jr. High Facility




                                                                                                                                                                                                                                  780
                                                                                                   (F:0103) 3991 Snapfinger Rd 30038 117.6 acres




                                                                                                                                                                                               79
                                                                                                                                                                                                0
                                                                                                                                                                                        810
                                  0
                             72




                                                                                                                                                         840




                                                                                                                                                                                                                             80
                                                                                                                                           83




                                                                                                                                                                                                                                  0
                                                                                                                                            0
71




                                                                                                                                                         820
0




                                                                                                 0
                                                                                               75
                                                                                                   0
                                                                                                 76




                                                                                                                                                                                                                        0
                                                                                                                                                                                                                   81



                                                                                                                                                                                                                        800


                                                                                                                                                                                                                                        0
                                                                                                                                                                                                                                79
 760
       750
0
75




                                                                                               0
                                                                                           84
                                                                                         830
                                                                                     820
                                                                                   810
                                                                           800
                                                                  790
                                                            780
                                                      770
                                                760
                                              750




                                                                                                                                                B: 5010
                                                                                                                                             186,272 Sq.Ft.
                                                                                                                                               Year: 2001



                                                                                                                                         B: 5011
                                                                                                                                          76,673
                                                                                                                                     Sq.Ft. Year: 2014
                                                                                                                                                                                  850




                                                                                                                                                                                                                        RIVERM IST CT




                                                                  76
                                                                       0
                                                            77
                                                             0




                                                                                                                                                                                 890
                                                                                                                             880
                                                                                                                        87
                                                                                                                         0
                                                                                                                        86




  850                                                                                                             840                                                                         880
                                                                                                                        0




                                                                                                                 85
                                                                                                                    0
                                                                                                                                                               89
                                                                                                                                                                    0
                                                                                                                                                                                                    870
                                      88
                                          0




                                                          SN A
     880                                                      PF I
                                                                   N   G ER
                                                                              RD
              890
                                                                                                                                                                                900




                            ±                                                  870
                                                                                                                                                                    910


                                                                                                                                                                          900




                                                                                                                                     910
                                                                               860
        Martin Luther King, Jr. High Facility
                                                                                                                                                     DOGWOO D FARM RD
                      F:0103
                                                                                                                                                                                                WO O DY H




       DCSD Planning Department 4/16/2019
                                                                                                                               910
                                                                              840
                                                                                           850




          0         105       210                   420
                                                                                                                                                                                                         ILL D R




                          Scale in Feet
                                                                                                                                                          8




                                                                                                                                                       80
                                                                                                                             89




                                                                                                                             0




                                                                                                                                                                 0
                                                                                                                                                               87
                                                                                                                                  8




                                                                                                                                  80

                                                                                                                                       0
                     Y
                 HW




                                                                                                                                      87
                  D
                OR
                 F
              BU




                                                                                                                                           860


                                                                                                                                                 870
           0
        86




                                                                                                         85




                                                                                                          0
                                                                                            B: 2012
                                                85                                       23,700 Sq.Ft.
                                                0




                                                                                          Year: 2003




                                                                                                                                                       880
                                                          B: 2011
                                                        9,653 Sq.Ft.
                                                         Year: 1971

                                                                          B: 2010
                                                                       32,880 Sq.Ft.                            B: 2020
                                                                        Year: 1967                            5,478 Sq.Ft.
                                                                                                               Year: 2003
                                                                                                                                                              880



                                                    0
                                                 85
                           85 0
                           84
                      860
                870




                              0
        880




                                                                                                                                                   89 0




                       ±
       Montclair Elementary Facility
                  F:4062
    DCSD Planning Department 8/27/2020
AFTON                                                                         CLAIRMONT PL
                                         8 40




  LN
   0       45         90           180

                 Scale in Feet
                                                                                            0
                                                                                          93




                                                                                                                                                   93
      930




                                                                                                                                                    0
                                                                                                                 PERCHING PL
                                  940                                                                        0
                                                                                                        94



                                       950
                                                                                          PAN OLA RD


                                                                                                                          940




                                                                                                                                           950




                                              970
                                       960                                                                                        960



                               970
                               980
                                 990
                                       4
                                     200
                                      r:
                                   ea




                                                                                                                 99
                           Sq : 2 011




                                                                                                                      0
                                 .Y
                             . Ft
                             B
                           775




                                                                                           B: 2020
                                                                                                                                   4692
                           13,




                                                                                         5,478 Sq.Ft.
                                                                                          Year: 2003




                                                                                                                                                                        990
                                                                                                                                4693

                                                                                                                                   4691




                                                                B: 2010                             Panola Way Elementary Facility (F:0188)
                                                             66,965 Sq.Ft.
                                                              Year: 1987                                                       2170 Panola Way Court 30058 14.6 acres




                               990




                                  PAN
                                      O    LA W
                                               AY
                                                  C   T




                                                                                                                      990
                                                                                                                                                                               990




                                                                                   980
                                                                     ST
                                                                   DE




                                                                             970
                                                                  OL
             ±




  Panola Way Elementary Facility
              F:0188         OL
             960               DE
DCSD Planning Department 4/16/2019S          CO
                                                  TL
0      40       80                160               AN
                                                         D
            Scale
              950in Feet                                                                                                                                                 990
                                                                           AL FO RD
                                                                              RD

                                                                                                                       Pine Ridge Elementary Facility (F:0190)
                                                                                                                             750 Pine Ridge Drive 30087 13.6 acres




                                                                                            900
                                                                                      890
                                          890




                                                                                                                                                 910




                                                                                                                                                                                 88
                                                                                                                                                                                 0
                                         N E DR
                               BR A LO R




                                                                                                                                                                           890
                                                                                                               B: 2011
                                                           D


                                                                                                            13,018 Sq.Ft.
                                                          ON R




                                                                                                             Year: 2004
                                                                       0
                                                         H EN S



                                                                   90
                                                        S TEP




                                                                                                                                               B: 2020
                                                                                                                                             5,478 Sq.Ft.
                                                                                                                                              Year: 2003
                                                                                                                                                                                                   TRADD CT




                                                                                                                                                                                      ASHLEY LN
                                                                                                                                                                     900
                                                                                                        B: 2010
                                                                                                     68,696 Sq.Ft.
                                                                                                      Year: 1988




                                                                                            92
                                                                                                 0
                    93
                    0




                         ±




94         Pine Ridge Elementary Facility
     0                 F:0190
                                                                                                                                                                                           870
         DCSD Planning Department 4/16/2019
                                                                  0
                                                                  93




     0         45         90                      180

                     Scale in Feet




                                                                                                                                                                                                  860
                   930

                         0
                    92




                                              KE
                                                S
                                                    DR
                                                                                            Shadow Rock Elementary School Facility
                                                                                               (F:1616) 1040 Kingway Dr 30058 15.2 acres
                                         LA
                                  OW
                               AD
                             SH




                                                                                                                                                                  960




                                                                                                                                                                        930
                                                                                                                                          B: 2010




                                                                                                                                                                              920
                                                                                                                                       112,298 Sq.Ft.
                                                                                                                                         Year: 1991
900




                                                                                          B: 2020
                                                                                        5,478 Sq.Ft.
                                                                                         Year: 2003
                         0
                    91


                                   0
                              92
                                        0
                                       93




                                                         0
                                                    94




                                                                                                                                                                               KIN G WAY WA LK
                                                                   950




                                                                                                                                                                        940
                                                                         940
                                       S CH
                                        OOL




                                                                                                                                                                                             0
                                                                                                                                                                                         95
                                         SID
                                         E DR




        930                                                                                         0
                                                                                               96
92
    0




                                                                                                             0
                                                                                                        95




                                                                                                                                                                                                 960
                             ±




                                                                               94
 Shadow Rock Elementary School Facility                                             0
                 F:1616
   DCSD Planning Department 4/16/2019

0             50             100                             200
                                                                                                                                                        KING WAY DR
                     Scale in Feet
                                                                                                                                                                                                         910
                                                                                                                                                                                            920




                                                                                                                                                                                                               900




                                                                                                                                                                                                                     890
                                                          0
                                                     87
                                     870
                                860
                                 880
                               890
                                        900
                                      910




                                                                                               B: 5060                                                        B: 5050
                                                                                              150 Sq.Ft.                                                     350 Sq.Ft.
                                                                                                Year:                                                          Year:




                                                                                                                                                                                  B: 5020

                                                                                          Stephenson High Facility (F:0497)                                                     2,200 Sq.Ft.
                                                                                                                                                                                 Year: 2000

                                                                                              701 Stephenson Road 30087 39.8 acres
                                                                          B: 5011
                                                                       45,680 Sq.Ft.                                                                                                         B: 5030
                                                                        Year: 2005                                                                                         B: 5040
                                                                                                                                                                          180 Sq.Ft.        700 Sq.Ft.
                                                                                                                                                                          Year: 2000        Year: 2000




                                                                                                                                                                                                  940
                                     930




                                                                                                                                                                                                                      STEPHENSON RDG
       92
       0




                                                                                                                                                                                 0




                                                                                                                                                                                                    950
                                                                                                                                                                                94




                                                                                                                                     B: 5010
                                                                                                                                  196,181 Sq.Ft.
                                                                                                                                    Year: 1996
                                                    930




                                                                                                                                                                   940




                                                                                                                                                                                       0
                                                                                                                                                                                       93




                                                                                                           ST
                                                                                                             EP
                                                                                                                  HE
                                                                                                                       NS
                                                                                                                            ON
                96                                                                                                               RD
                     0



                95
                     0


       94
            0
                                                                                          G
                                                                                         RD
                                                                                        INB
                                                                                       RO




                                                                                                                                       WR
                                                                                                                                          E
                           ±
                         930




                                                                                                                                              N
                                                                                                                                                  W
 920




                                                                                                                                                      AL
                                                                                                                                                         K
                                                         SP
                                                           AR
     Stephenson High Facility                                   R OW
                                                                        W AY
               F:0497
 DCSD Planning Department 4/16/2019
                                                                                                                                      LN
                                              0




                                                                                                                                  E
                                              92




                                                                                                                                V




 0          65                 130                 260
                                                                                                                             DO




                                                                   0
                         Scale in Feet                        91
91
0
                           90
                         10                                                                                                                              FELLOWSHIP CT
                           RD
                      SHIP
                O   W
           LL
         FE




                                                                                                                   BROWNINGS TRCE
                                                            Tucker Middle Facility (F:0605)
                                                              2160 Idlewood Road 30084 15.1 acres
                                                 0
                                             11 0




                                                                                                    1100
                                      1100




                                                                                                                                                                    WE
                                                                                                                                                                      ST
                                                                                                                                                  1090




                                                                                                                                                                        BR
                                                                                                                                                                       OO
                                                                                                                                                                         KC




                                                                                                                                                                              80
                                                                                                                                                                         T




                                                                                                                                                                              10
                                                                                                           108 0
                                                                       5406




                                                                                                                                           1080
                                                                       8188
                                                     1090




                                                                                                                             B: 4010
                                                                                                                          152,360 Sq.Ft.
                                                                                1080




                                                                                                                            Year: 2004
                                                                                                                                                                                      0
                                                                                                                                                                               10 6




                                                                                                    1080




1080




                                                                                                                                                           1 0 70
                                ±




                                                                                                                                                                          0
                                                                                                                                                                       106
            Tucker Middle Facility




                                                                                                                                                                               1070
                    F:0605
       DCSD Planning Department 8/5/2020

 0              50              100            200
                                                                  IDLEWOOD RD
                          Scale in Feet
                                                                                                                                                                                                                                                                                                                                            FACILITY# 644-0475-1055.01
                                                                                                                                                                                                                                                                                                                                                                  PARCEL#
                                                                                                                                                                                                     2                                                                                                                                      69,401 SQ. FT.
                                                                                                                                                                                                    5T16
                                                                                                                                                                                                   2   H
                                                                                                                                                                                                  4 16                                                                                                                                      10.6 ACRES
                                                                                                                                                                                                 76TH-5                    2
                       11                                                                                                                                                                          8 TH                   SP15
                      RE 5                                                                                                                                                                                         2
                                                                                                                                                                                                                  S 15
                                                                                                                                                                                                                        D    E
                                                                                                                                                                                                                                                                                                                        BOB MATHIS ELEMENTARY SCHOOL
                    1    G                                                                                                                                                                                       76P-ED                              2
                                                                                                                                                                                                                                                    5T14
                   SP15 SE            11                                                                                                                                                 2
                                                                                                                                                                                                                   8
                                                                                                                                                                                                                                                 2     H
                  76 -ED             RE 4                                                                                                                                              K 01                                                     4 14                                                                 3503 BORING RD., DECATUR, GA. 30034 (678) 874-5800
                    8                                                                                                                                                                 20                                                       76TH-5                         2
                                  1     G                                                                                                                                            K- 1                                                        8 T        H                K 13
                                 SP14 SE             11
                                                                                                                                                                                    76 3RD
                                                                                                                                                                                       8
                                                                                                                                                                                                         2
                                                                                                                                                                                                        PR02
                                                                                                                                                                                                                                                                     2
                                                                                                                                                                                                                                                                    K 13
                                76 -ED                                                                                                                                                                                                                             76-3RD                                  2
                                                    RE3                                                                                                                                                20 E-K                  GI
          10                      8                                                                                                                                                                 K 2
                                                                                                                                                                                                                            2 RL
                                                                                                                                                                                                                           R 03 S
                                                                                                                                                                                                                                                                      8                                  1S 12
         RE 1                                      1   G                                                                                                                                           76-3RD                23R G           BO                                                             21 T
                                                  SP13 SE
                                                                                                                                                                                                                                        2 YS
            G                                                                                                                                                                                        8                     9
                                                                                                                                                                                                                                       R 04                                                            K 2
       1                                                                                                                                                                                                                              25R B                                                           76-3RD
      SP01 SE            10                      76 -ED                 11
                                                                       RE6
                                                                                                                                                                                                                                        9             JA
                                                                                                                                                                                                                                                     2 NC
                                                                                                                                                                                                                                                               ST
                                                                                                                                                                                                                                                              20 AFF
                                                                                                                                                                                                                                                    C 06 L 3R6R S R
                                                                                                                                                                                                                                                                                                         8
     76 -ED                                        8                                                                                                                                                                2                                           5
                                                                                                                                                                                                                   ST03
                                                                                                                                                                                                                                                   77USTO

       8                RE 2                                        1     G
                                                                                                                                                                                                                  2 OR
                                                                                                                                                                                                                 ST 02.1 AG
                                                                                                                                                                                                                86 OR-N    E                              D


                                                                   SP16 SE
                                                                                                                                                                                                                        I

                      1    G                                                                                                                                                                                                   ST
                                                                                                                                                                                                                                 OR
                                                                                                                                                                                                                                               W

                     SP02 SE
                                                                                                                                                                        2011
                                                                                                                                                                                                                                    AG                                                     ST
                                                                                                                                                                                                                                               2 OR
                                                                                                                                                                                                                                         E                                                2 OR
                                                                                                                                                                                                                                                                                         S 10 AG
                                                                                                                                                                                                                                              T- 07 K R
                                                                  76 -ED
                                                                                                                                                                                                                                                                                        55TOR-N   E


                                            GI                                                     11                                                                   2003                                                                 32 WK      M                M                      I


                    76 -ED                                                                        RE 2
                                                                                                                                                                                                                                                                         2 ECH
                                                                                                                                                                                                                                                4 RM                    M 09.1 RM
                                                                                                                                                                                                                                                                                    M


                                        1 RL                        8                                                                                                   19,523 SF                                                                                      70 DF/ID
                                                                                                                                                                                                                                                                                F
                                                                                                                                                                                                                                                                                   20 ECH
                                                                                                                                                                                                                                                                                  O 9
                                                                                                                                                                                                                                                                               52THER
                                                                                                                                                                                                                                                                                          R  M


                      8                RR03 S BO                                               1     G                                                                                                                                                              CO
                                                                                                                                                                                                                                                                                        NI




                                                                                              SP12 SE
                                                                                                                                                                                                                                                                   2 NF
                                      23 B 10 YS                                                                                                                                                                                                                  O 08
                                                                                                                                                                                                                                                                 17THER
                                        9   R 4                                              76 -ED                                                                                                                                                                1    N     I
                                           25R G             ST                                8                                                                                                                                                                                                                  2020
                                   ST
                                             9               1 AF
                                                            R 05 F R
                                                           36R S
                                                                                                                                                                                                                                                                                                                  2003
                                  10 OR
                                 O 2. G A                                                                                                                                                                                                                                                                         5,478 SF
                                86THER1 E
                                       NI                                                                                                              111               112                  113
                                                   O                                  M                                                                2ND               2ND                  2ND
                                                   1 THE                              1 ECH
                                                                                     M 10
                                                                                                                                                        111              112                  113
                                                  T-W07 R
                                                                                             RM
                                                                                    55 ECH
                                                                                           RM

     2011                                        32 K       O                   M
                                                                                1 ECH
                                                                                                                                                        K-3RD            K-3RD                K-3RD
                                                    4 RM 10THE                 M 09. R
                                                                              70 ECH 1 M                                                                855              720                  855
     2003                                                 OF 8 R                     RM

                                                         17 FIC
     19,523 SF                                             6 E 1OTH                                                                       110
                                                                   O 08. R
                                                                        E                                                                 EIP MATH
                                                                  16THER1                                                                 110                                   GIRLS         114
                                                                    4    NI                                                               K-3RD                                 114.2
                                                                                                                                          855                                   RR G          2ND
                                                                                                                                                                                130
                                                                                                                                                                                              114
                                                                                                                                                                             BOYS
                                                                                                                                                                                              K-3RD
                                                                                                                                                                             114.1            855
                                                                                                                                                                             RR B

LOWER LEVEL FLOOR PLAN                                                                                                                                                       130

                                                                                                                                                                             ILT RM      OTHER    115         116                                                                                                               GYM
NOT TO SCALE                                                                                                                                                                             115.1    SP ED       4TH                                                                                                                 1
                                                                                                                                      119.1                                              COUNS
                                                                                                               107         109        OFFICE                                             224       115          116                                                                                                               PHY-ED
                                                                                                               3RD         MATH LAB                                                                SP-ED        K-3RD                                                                                               R
                                                                                                               107         109           BOYS
                                                                                                                                                                            GIRLS
                                                                                                                                                                            115.2
                                                                                                                                                                            RR G                   720          720                                                                                                               5478
                                                                                                               K-3RD       K-3RD          109.1                             112

                                                                                                                           708            RR B
                                                                                                               708                        168                                                                                                                                                                       R
                                                                                                                                                      MEDIA CENTER
                                                                                                                                                      123                      BOYS
                                                                                                                                                                               118.1
                                                                                                                                                      MEDIA                    RR B
                                                                                                                                                                               112       118                 117
                                                                                                                                                      3387                               3RD                 3RD
                                                                                                                                      GIRLS
                                                                                                               108         106        106.1                                    LIB.       118                117
                                                                                                                                                                            STORAGE
                                                                                                               1ST         3RD        RR G
                                                                                                                                      168                                                 K-3RD              K-3RD
                                                                                                               108         106         CTSS                                               720                720
                                                                                                               K-3RD       K-3RD       106.2
                                                                                                                                       MDF/IDF                                           CLINIC
                                                                                                               708         760         180
                                                                                                                                      BOYS
                                                                                                                                      105.1                                          R
                                                                                                                                      RR B                                               R
                                                                                                                           105        168                     101                             ADMIN
                                                                                                                           5TH                                5TH                                124
                                                                                                                            105                               101                                ADMIN      STORAGE
                                                                                                                                      GIRLS
                                                                                                                            4TH-5TH                                                              1808           V
                                                                                                                                      105.2
                                                                                                                                      RR G
                                                                                                                                                              4TH-5TH                                                                                                  CAFE ANNEX
                                                                                                                            720       168                     760                                                                                                                                                       MECH RM
                                                                                                         2010                                                                       R                                                                                                                                   126.1
                                                                                                         1975                                                                                               PRIN                         R                                                                              MECH RM
                                                                                                                                                                                                                                                                                                                        408
                                                                                                         44,400 SF                                                                                                             ST
                                                                                                                                                                                     JAN CL
                                                                                                                                                                                                                                                LOUNGE
                                                                                                                             104              103             102
                                                                                                                             SP ED            SP ED           5TH
                                                                                                                             104              103             102
                                                                                                                             SP-ED            SP-ED           4TH-5TH
 GDOE Minimum Required Areas                                                                                                 720              720             720                                                                                      R
 Space                -10%     Existing
 K-3      New          -75sf     675sf                                                                                                                                                                                                             R               CAFETERIA
 4-5         750sf    -66sf     594sf
                                                                                                                                                                                                                  ELEC
                                                                                                                                                                                                                                                                       125
 Art         660sf -100sf       900sf                                                                                                                                                                                                                                  CAFETERIA
 Music     1,000sf -100sf       900sf                                                                                                                                                                                                                                  4995
 PE        1,000sf -500sf 4,500sf                                                                                                                                                                                                                  BOYS
                                                                                                                                                                                                                                                   125.1
 Sp Ed    5.000sf      -75sf     675sf                                                                                                                                                                                                             RR B
             750sf                                                                                                                                                                               122                                               112
                                                                                                                                                                                                                                                                                                                             TRASH
                                                                                                                                                                                                 ART                                               GIRLS
 48 IU's = 750 FTE                                                                                                                                                                               122                                               125.2
                                                                                                                                                                                                                                                   RR G
 Media Center (for 750 FTE) 3,525sf                                                                                                                                                              ART                                               112                                                                       JAN CL

 Cafeteria (750 FTE x 5) = 3,750sf                                                                                                                                                               1000
 Total Kitchen = 2,000sf                                                                                                                                                                                                                                                                                                 R
                                                                                                                                                                                                         121
                                                                                                                                                                                                         MUSIC
           ROOM TAG LEGEND                                                                                                                                                                               121                                                                 STAGE                               STORAGE
           POSTED ROOM NUMBER                                                                                                                                                                            MUSIC
                                                                                                                                                                                                         1000
           ROOM/SPACE NAME
           DOE SPACE NUMBER                                                                                 MAIN LEVEL FLOOR PLAN
           DOE SPACE TYPE                                                                                   NOT TO SCALE
           SQUARE FOOTAGE

                                                                                                                                                                                                                                                                                                                                      UPDATED: 6/11/10 BY: AMP
BRIARLAKE ELEMENTARY FACILITY                           2830 HENDERSON MILL RD., CHAMBLEE, GA. 30341 (678)874-2902                                      FACILITY# 644-3051-1065.01    11.5 ACRES




                                                                                          MEDIA CENTER
                                                                                           24
                                                                                           MEDIA
                                                                                           2952

                                                                                                                                 2011
                                                                                                                                 1963
                                                                                         22                    21                5,875 SF
                                                                                         5TH                   4TH
                                                                                          22                   21
                                                                                          4TH-5TH              4TH-5TH
                                                                                          768                  768


                                                                                         19                    20
                                                                                         5TH                   5TH                                     GYM
                                                                                          19
                                                                                          6TH-8TH
                                                                                                               20                                       1
                                                                                                               6TH-8TH




                                                                                                                                                                                                                                       BRIARLAKE ELEMENTARY FACILITY
                                                                                          768                  768                                      PHY-ED
                                                                                                                                                        5478
                                                                                         GIRLS
                                                                                          18.1                 18
                                                104          101                          RR G                 4TH
                                                MUSIC        ART           ART PATIO      335                  18
                                                104          101                                               4TH-5TH                   STORAGE                  R       R
                                                MUSIC        ART                                               768                                 OFFICE

                                                1036         896

                                                                                                                            COVERED WALKWAY
                                2012
                                2005
                                6,500 SF                                                                        16               2020
                                                                                                                SP ED            2003
                                                107          110                                                16               5,478 SF
                                                3RD          3RD                                                SP-ED
                                                107          110                                                768
                                                K-3RD        K-3RD
                                                684          684

                                                108          109                          15
                                                3RD          3RD                          SP ED                                  2010
                                                                                          15                    ART
                                                108          109                                                GIFTED           1957
                                                K-3RD        K-3RD                        SP-ED                 16.1             34,847 SF
                                                684          684                          768
                                                                                                                K-3RD
                                                                                                                1013


                                                                                          14
                                                                                          1ST
                                                                                          14                                                                                      R
                                                                                          K-3RD                                                                                   R
                                                                                          768
                                                                                                                                                               STORAGE




                                                                                                                            CAFETERIA                         DISH WASH

                                                                   GIRLS                                       STAGE         101                                 KITCHEN
          1          3           5             7                   11.2    11                                                CAFETERIA
          K          K           HEARING IMP   1ST                 RR G    SP ED                                                                                 102
          1          3           5             7                   250     11                                                4638                                KITCHEN
          K-3RD      K-3RD       SP-ED         K-3RD                       SP-ED       COPY RM
                                                                                       14.2
                                                                                                 BK-WK-RM
                                                                                                 14.3
                                                                                                                                                                 1907
          768        768         768           768                         768         STOR-I    STOR-I
                                                                                       112       112                                                             FREEZER OFFICE

                                                                                                                                                                   CLINIC R
                                                                                                                                                                   100.3 100.4
                                                                                                                                                                   CLINIC ADMIN
                                                                                                                         LOUNGE                                    70
                                                                                                                                                                          28                                      ROOM LABEL LEGEND
                                                                                                                                                                          R
          2          4           6             8           9               10             12                   13        100.7       R                                                                            POSTED ROOM NUMBER
          PRE-K      K           S/PID         S/PID       1ST             2ND            2ND                  2ND       ADMIN                                                                                    ROOM/SPACE NAME
          2          4           6             8           9               10             12                   13        420
                                                                                                                                                                                                                  DOE SPACE NUMBER
          K-3RD      K-3RD       K-3RD         SP-ED       K-3RD           K-3RD          K-3RD                K-3RD
          768        768         768           768         768             768            768                  768                                                                                                DOE SPACE TYPE
                                                                                                                                                                                                                  SQUARE FOOTAGE



OVERALL FLOOR PLAN       NOT TO SCALE                                                                     Page 1 of 1                                                                              UPDATED: 6/28/2017 BY: AM
CHAPEL HILL ELEMENTARY FACILITY                             3536 RADCLIFFE BOULEVARD DECATUR, GA 30034 (678) 676-8400                        FACILITY# 644-1053-1120.01   10.4 ACRES




            156              157         119       120         121              122         124             126         128          130      132        134        136
            MUSIC            ART         1ST       1ST         4TH              4TH         EIP             2ND         2ND          3RD      3RD        3RD        3RD
            156              157         119       120         121              122     124                 126         128          130       132       134        136
            MUSIC            ART         K-3RD     K-3RD       4TH-5TH          4TH-5TH K-3RD               K-3RD       K-3RD        K-3RD     K-3RD     K-3RD      K-3RD
            1113             987         756       756         756              756     756                 756         756          756       756       756        756




             OFFICE                                117        118                123         125            127        129                     131      133       135
                                                   1ST        1ST                2ND         2ND            2ND        2ND                     3RD      5TH       5TH
              113                                   117       118                123          125           127        129                     131      133       135
              K                                     K-3RD     K-3RD              K-3RD        K-3RD         K-3RD      K-3RD                   K-3RD    4TH-5TH   4TH-5TH
              113                                   756       756                756          756           756        642                     756      756       756
              K-3RD
              1109




                                                                                                                                                                                                                          CHAPEL HILL ELEMENTARY FACILITY
               112
               K
2011           112                                                                       2012                                          2013
1969           K-3RD                                                                     1973                                          1987
16,517 SF      1109                                                                      5,523 SF                                      9,333 SF

                                                 152
                                                 MEDIA CENTER
               111
                                                 152
                                    STORAGE
                                    152.1        MEDIA                                                                                                                                              GYM
               1ST
               111
                                    STOR-NI
                                    160          3663                                   STAGE                                                                                                       1
                                                                                                                     MECH RM
               K-3RD                                                                                                                                                                                PHY-ED
               731                                                                                                                                                                                  5478
                                                                                                                                                                                           R
               110            115                             150
                                                                                                                    CAN WASH
               K              K                               4TH                                                                                                                          R
               110            115                             150
               K-3RD          K-3RD                           4TH-5TH
               731            731                             756
               109            114                             151                   CAFETERIA
               K              PRE-K                           4TH                   50
               109            114                             151                   CAFETERIA
               K-3RD          K-3RD                           4TH-5TH               4906                                    OFFICE
                                                                                                                                        2010                              2020
               731            731                             756                                                                       1967                              2001
                         STORAGE    STORAGE                           R                                                                 32,299 SF                         5,478 SF
               108
               K                                           R PRIN
               108        R           OFFICE
                                                           R                     BOYS               GIRLS
               K-3RD      R
               731                                                                                                FREEZER
                                                                                                                            RR




             107       106              105        104                 103          102             101             100
             5TH       5TH              5TH        5TH                 5TH          SP ED           4TH             4TH
             107       106              105        104                 103          102               101           100
             4TH-5TH   4TH-5TH          4TH-5TH    4TH-5TH             4TH-5TH      SP-ED             4TH-5TH       4TH-5TH
             756       756              756        756                 756          756               756           756
                                                                                                                                                                                                     ROOM LABEL LEGEND
                                                                                                                                                                                                     POSTED ROOM NUMBER
                                                                                                                                                                                                     ROOM/SPACE NAME
                                                                                                                                                                                                     DOE SPACE NUMBER
                                                                                                                                                                                                     DOE SPACE TYPE
                                                                                                                                                                                                     SQUARE FOOTAGE



OVERALL FLOOR PLAN     NOT TO SCALE                                                                 Page 1 of 1                                                                        UPDATED: 7/6/2017 BY: AM
Appendix F
                                                                                                                                                                                                                                                     FACILITY# 644-5068-1670.01
                                                                                                                                                                                                                                                                             PARCEL#

                                                                                                 139                                                                                                                                                 68,419 SQ. FT.
                                                                                                 4TH                             138            137
                                                                                                 01                              3RD            3RD                                                                                                  18.1 ACRES
                                                                                                 4TH-5TH
                                                                                                                  GIRLS   BOYS   03             06
                                                                                                                  08      07
                                                                                                 1084             RR G    RR B   K-3RD          4TH-5TH
                                                                                                                  330     330    750            750                                                                             DESA "DEKALB ELEMENTARY SCHOOL OF THE ARTS"
                                                                                                                                                                                                                             797 FAYETTEVILLE RD. S.E. ATLANTA, GA 30316 (678)874-1300
                                                                      2012                                        R
                                                                      2004                                 KILN
                                                                      8,650 SF                   140                             136            135
                                                                                                 ART                             3RD            4TH
                                                                                                 04                              02             05
                                         102          101                                        ART                             K-3RD          4TH-5TH
                                         K            K                                          1004                            750            750
                                         102          101
                                         K-3RD        K-3RD
                                         768          768



                                         104          103                                                                                             MECH RM                                            STORAGE
                                         1ST          K                                                 132                                           127.2                 125         127      129
                                         104          103                                               7TH                                           MECH RM               6TH         5TH      5TH
                                         K-3RD        K-3RD                                             123                                           598                   129         131      132
                                         768          768                                               K-3RD                                                               K-3RD       K-3RD    K-3RD
                                                                                                        750                                                                 750         750      750
                                                                                                                                                                                                                   COVERED
                                         106          105                                                                                                                                                                                    GYM
                                                                                                                                                                                                                   WALKWAY
                                         1ST          1ST                                                                                                                                                                                    1
                                         106          105                                                                                                                                                                                    PHY-ED
                                         K-3RD        K-3RD                                     OTHER
                                         768          768             2011                      135.2                                        COUNS        122       124        126       128     130                                         5478
                                                                      1969                      OTHER NI                                                                                                                          R
                                                                                                                                                          7TH       7TH        6TH       6TH     6TH
                                                                      20,035 SF                 200             MEDIA CENTER                              122       124        126       128     130                              R
                                                                                                                135                                       K-3RD     K-3RD      K-3RD     K-3RD   K-3RD
                                                                                                OTHER           MEDIA                                     750       750        750       750     750
                                                                                                135.3           4151
                                         108          107                                       OTHER NI                          OTHER
                                         2ND          2ND                                       200
                                                                                                                                  135.1
                                                                                                                                  OTHER NI
                                         108          107                                                                         200
                                         K-3RD        K-3RD
                                         768          768
                                                                                                                                                                                                     2020
                                                      R
                                                                                                                                                                                                     2003
                                                                                                                                                                                                     5,478 SF
                                                      CLINIC
                                                      R     R



                                                           PRIN
                                                      V                                           109              111            113                       115        117               119      121
                                                                                                  ART              DRAMA          DRAMA                     DANCE      DANCE             MUSIC    MUSIC
                                                                                    127
                                                                                                  109              111            113                       115        117               119      121
                                                                                    R
                                                                                    110.3
                                                                                    RR S
                                                                                                  K-3RD            K-3RD          K-3RD                     K-3RD      K-3RD             K-3RD    K-3RD
                                                                                    56
                                                                                                  768              768            768                       768        768               768      768


                                                                                                     110              112                                  114         116             118        120
                                                                                                     2ND              ART                                  DRAMA       DANCE           MUSIC      MUSIC
                                                           STAGE                                     110              112                                  114         116             118        120
                                                                                                     K-3RD            K-3RD                                K-3RD       K-3RD           K-3RD      K-3RD
                                                                                                     768              768                                  768         768             768        768

                                                                                   122
                                                                                   MECH RM
  GDOE Minimum Required Areas                                                       98.1
                                                                                   MECH RM
  Space  New       -10%     Existing                                               112
                                                                                   STOR

  K-3       750sf   -75sf     675sf
                                                                            STOR

                                                                                            R                                                                                                        2010
  4-5       660sf   -66sf     594sf                                                                                                                                                                  1958
                                                      CAFETERIA                                                                                                                                      34,256 SF
  Art     1,000sf -100sf      900sf
  Music   1,000sf -100sf      900sf                       99
  PE      5.000sf -500sf 4,500sf                          CAFETERIA         SERVE
  Sp Ed     750sf   -75sf     675sf                       4645              KITCHEN
  48 IU's = 750 FTE                                                          98
  Media Center (for 750 FTE) 3,525sf                                         KITCHEN
  Cafeteria (750 FTE x 5) = 3,750sf                                          2047
  Total Kitchen = 2,000sf                                                  DISH WASH



           ROOM TAG LEGEND
                                                      FREEZER     COOLER
           POSTED ROOM NUMBER
           ROOM/SPACE NAME
           DOE SPACE NUMBER            OVERALL FLOOR PLAN
           DOE SPACE TYPE
                                       NOT TO SCALE
           SQUARE FOOTAGE

                                                                                                                                                                                                                                        UPDATED: 8/18/2010 BY: AMP
E.L BOUIE ELEMENTARY FACILITY                                                           5100 ROCK SPRINGS RD., LITHONIA, GA (678)676-8202                                                                      FACILITY# 644-0297-1565.01                        35.8 ACRES




              504
              GYM                                                                                  247                                                                                    225
              504                                                                                  MUSIC                                                                                  ART
              PHY-ED                                                                                247
                                                                                                    MUSIC
                                                                                                                                                                                          225
                                                                                                                                                                                          ART
              5400                                                                                  1200                                                                                  1200



                       R   R



                                          260         258      256     254                                240                          236                  234                 232                      216                218              220
                                          2ND         2ND      3RD     3RD      GIRLS                     2ND                          4TH                  DISCOVERY           4TH         GIRLS        5TH                5TH              SP ED
                                          260         258      256     254      254.1                     240                          236                      234             232         232.1        216                218              220
                                          K-3RD       K-3RD    K-3RD   K-3RD    RR G                      K-3RD                        4TH-5TH                  OTHER NI        4TH-5TH     RR G         4TH-5TH            4TH-5TH          SP-ED
                                          820         820      820     820      420                       905                          905                      905             905         420          905                905              905
                                                                               CUSTOD
                                                                               254.2
                                                                               CUSTOD                                                                                                                                                                  222
                 2010                                                          20
                                                                                                                                                                                                                                                       SCI LAB - 2ND
                 2003                                                                                                                                                                                                                                  222
                 91,602 SF                                                                                                                                                                                                                             COMPUTER-LAB
                                                                                                                                                                                                                                                       1160
                                          259         257      255     253                                241     239                  237                  235                 233                      215                217              219
                                          EIP MATH    3RD      3RD     3RD      BOYS                      2ND     4TH                  4TH                  4TH                 4TH                      5TH                5TH              5TH
                                          259         257      255     253      253.1                     241     239                  237                      235             233         BOYS         215                217              219
                                          K-3RD       K-3RD    K-3RD   K-3RD    RR B                      K-3RD   4TH-5TH              4TH-5TH                  4TH-5TH         4TH-5TH     233.1        4TH-5TH            4TH-5TH          4TH-5TH
                                          820         820      820     820      420                       905     905                  905                      905             905         RR B         905                905              905
                                                                                                                                                                                            420




                                                                                             172
                                                                                             HUB
                                168     166          164      162      160      BOYS         172          175      179                 183                       187             191




                                                                                                                                                                                                                                                                                                               E.L BOUIE ELEMENTARY FACILITY
                                2ND     1ST          1ST      1ST      1ST      160.1        MDF/IDF
                                                                                             166          K        K                   K                         K               PRE-K
                                168      166         164      162      160      RR B                      175      179                 183                       187             191
                                K-3RD    K-3RD       K-3RD    K-3RD    K-3RD    420
                                                                                             173
                                                                                             OFFICE       K-3RD    K-3RD               K-3RD                     K-3RD           K-3RD                                198
                                                                                                 173
                                846      846         846      846      842                       OFFICE
                                                                                                 166
                                                                                                          920      920                 920                       920             920                                  MEDIA CENTER
                                                                                                                                                                                                                      198
                                                                                                                                                                                                                      MEDIA
                                                                                                                                                                                                                      3653
                                169     167          165      163      161                                177                          185                       189             193
                                2ND     2ND          2ND      1ST      1ST                                K                            K                         K               PRE-K                                  199
                                169      167         165      163      161      GIRLS                     177                          185                       189             193                                    OFFICE
                                K-3RD    K-3RD       K-3RD    K-3RD    K-3RD    161.1                     K-3RD                        K-3RD                     K-3RD           K-3RD                                  198.2
                                846      846         846      846      846      RR G                      920                          920                       920             920                                    MEDIA
                                                                                420                                                                                                                                     400

                                                                                                                                                                                                                    202
                                                                                                                                                                                                                    STUDIO/PHOTO
                                                                                                                                                                                                                    198.5
                                                                                                                                                                                                                    MEDIA
                                                                                                                                                                                                                    204




                                                                                                                                                                                                                                     112
                                                                                                                                                                                                                                     ASST PRIN
                                                                                                                                                                                                                                     300.6
                                                                                                                                                                                                                                     ADMIN
                                                                                                                                                                                                                                     166
                                                                                                                                                                                                          BOYS
                                                                                                                                                                                                           300.11
                                                                                                                                                                                                           RR B
                                                                                                                                                                                                           210


                                                                                    303 I-PURP
                                                                                    MULT
                                                                                        303 NI                                                                                                                                       110
                                                                                        OTHER
                                                                                        1025
                                                                                                                                                                  301    RIA
                                                                                                                                                                                                                                     PRIN
                                                                                                                                                                  CAFETE
                                                                                                                                                                                                                                     300.4
                                                                                                                                                                                                                                   R ADMIN

                                                                                                                                  STAGE                            301 RIA                                                           298
                                                                                                                                                                   CAFETE
                                                                                                                                                                   5700


                                                                                                                                                                             SERVE           GIRLS
                                                                                                                                             SERVE                                               301.2
                                                                                                                              GE                                                                 RR G
                                                                                                                         STORA                                                            200
                                                                                                                                                                           302   EN
                                                                                                                                                                           KITCH    301.3
                                                                                                                                                                                          CUSTOD

                                                                                                                                                                            302 N       ODCUST
                                                                                                                                                                                          104

                                                                                                                                                                             KITCHE
                                                                                                                         R                                             OFFICE 4340
                                                                                                                                                       CAN RM
                                                                                                                                                  GE
                                                                                                                                             STORA

                                                                                                                               E W/D   J C
                                                                                                                         STORAG                                                 304  RM
                                                                                                                                                                                MECH
                                                                                                                                                                                304    M
                                                                                                                                                                                MECH R
                                                                                                                                                                                1080


                                                                                                                                                                                                                                                                                          ROOM LABEL LEGEND
                                                                                                                                                                                         MECH YARD
                                                                                                                                                                                         COURT                                                                                            POSTED ROOM NUMBER
                                                                                                                                                                                                                                                                                          ROOM/SPACE NAME
                                                                                                                                                                                                                                                                                          DOE SPACE NUMBER
                                                                                                                                                                                                                                                                                          DOE SPACE TYPE
                                                                                                                                                                                                                                                                                          SQUARE FOOTAGE



  OVERALL FLOOR PLAN           NOT TO SCALE                                                                                       Page 1 of 1                                                                                                                           UPDATED: 7/11/2017 BY: AM
MARBUT ELEMENTARY FACILITY                                                 5776 MARBUT RD. LITHONIA, GA 30058 (678)676-8802                                      FACILITY# 644-0197-1795.01                        47 ACRES




                                                                                                                                                                                                                   65
                                                                                                                                                                                                                   GYM
                                                                                                                                                                                                                   65
                                                                                          57                                                                                                                       PHY-ED
                                                                                          MUSIC
                                                                                          57                                                                                                                       5400
                                                                                          MUSIC
                                                                                          1534
                                                                                                                                                                             2010
                                                                                                                                                                             1999
                                                                                                                                                                             91,602 SF
                                                                                                                                                                                                                            R    R




                                               44      42       40      38                    36           34           32        30            28                        26              24             22
                                               2ND     2ND      2ND     4TH       GIRLS       4TH          4TH          3RD       3RD           3RD             GIRLS     SPANISH         5TH            5TH
                                               44       42      40      38        38.1        36           34           32        30            28              28.1      26              24             22
                                               K-3RD    K-3RD   K-3RD   4TH-5TH   RR G        4TH-5TH      4TH-5TH      K-3RD     K-3RD         K-3RD           RR G      OTHER IU        4TH-5TH        6TH-8TH
                                               748      748     748     748       362         825          825          825       825           825             352       905             791            698
                                                                                                                                                                                                                         56
                                                                                                                                                                                                                         SCIENCE LAB
                                                                                                                                                                                                                         56
                                                                                                                                                                                                                         SP-ED
                                                                                                                                                                                                                         1160
                                               43      41       39      37                    35           33           31        29            27                           25           23             21
                                               2ND     2ND      2ND     4TH       BOYS        4TH          4TH          3RD       3RD           3RD             BOYS         5TH          5TH            5TH
                                               43       41      39      37        27.1        35           33           31        29            27              27.1          25          23             21
                                               K-3RD    K-3RD   K-3RD   4TH-5TH   RR B        4TH-5TH      4TH-5TH      K-3RD     K-3RD         K-3RD           RR B          4TH-5TH     4TH-5TH        4TH-5TH
                                               748      748     748     748       333         825          825          825       825           825             352           728         777            777




                                      20      18       16       14      12                                  8             6          4                2




                                                                                                                                                                                                                                                                        MARBUT ELEMENTARY FACILITY
                                      1ST     1ST      1ST      1ST     T-WK-RM GIRLS                       K             K          K                PRE-K
                                      20      18       16       14      12        12.1                       8            6             4             2                         55
                                      K-3RD   K-3RD    K-3RD    K-3RD   T-WK RM   RR G                       K-3RD        K-3RD         K-3RD         K-3RD                     MEDIA CENTER
                                      778     778      778      778     778       353                        920          920           920           920
                                                                                                                                                                                55
                                                                                                                                                                                MEDIA
                                                                                                                                                                                3883
                                      19      17       15       13                                9         7             5          3                1
                                      1ST     1ST      1ST      1ST               BOYS            ART RM    K             K          K                PRE-K
                                      19      17       15       13                11.1            9          7            5             3             1
                                      K-3RD   K-3RD    K-3RD    K-3RD             RR B            ART        K-3RD        K-3RD         K-3RD         K-3RD               AUD/VIS
                                      778     778      778      778               360             920        920          920           920           920                 55.1
                                                                                                                                                                          MEDIA R
                                                                                                                                                                          347 55.2
                                                                                                                                                                                 RR SSTUDIO
                                                                                                                                                                                 55 55.5
                                                                                                                                                                                     MEDIA
                                                                                                                                                                                 R 204
                                                                                                                                                                                 61.8
                                  2010                                                                                                                                           R
                                                                                                                                                                                 RR S
                                  1999                                                                                                                                           61.9
                                                                                                                                                                                 65
                                  91,602 SF                                                                                                                                      STORAGE
                                                                                                                                                                                 RR S
                                                                                                                                                                                 61.1
                                                                                                                                                                                 65
                                                                                                                                                                           R RSTOR-NI R
                                                                                                                                                                            61.1238      61.16
                                                                                                                                                                                61.13
                                                                                                                                                                            RR SRR S     RR S
                                                                                                                                                                                        CLINIC
                                                                                                                                                                            65 65        62
                                                                                                                                                                                        61.15
                                                                                                                                                                             61         ADMIN
                                                                                                                                                                             RECEPT 143         PRIN
                                                                                                                                  STORAGE                                    61                  61.3
                                                                                                                                  60.9
                                                                                                                                  62                                                    VAULTR
                                                                                                           45                                                                ADMIN      61.1 61.2ADMIN
                                                                                                           SP ED                  STOR-NI
                                                                                                                                  CAFETERIA                                  562                 236
                                                                                                           45                      62
                                                                                                                                   54                                                   ADMINRR S
                                                                                                                                   CAFETERIA                                            80 58
                                                                                                           SP-ED
                                                                                             STORAGE       787                     5740
                                                                                                                                  STORAGE
                                                                                             60.7                                 60.6
                                                                                             STOR-NI                              STOR-NI
                                                                                             60                                   54
                                                                                                                     STORAGE
                                                                                                                     45.1
                                                                                                  CUSTOD             STOR-NI                                  BOYSGIRLS
                                                                                                  60.3               408                                      60.1 60.2
                                                                                                  CUSTOD                                                      RR B RR G
                                                                                                  91                                                          182 200
                                                                                                                                                60
                                                                                                                                                KITCHEN
                                                                                                                                                60
                                                                                                                                                KITCHEN
                                                                                                                                                4340



                                                                                                                                                      MECH RM
                                                                                                                                                      60.5
                                                                                                                                                      MECH RM
                                                                                                                                                      1000


                                                                                                                                                                                                                                                   ROOM LABEL LEGEND
                                                                                                                                                                                                                                                   POSTED ROOM NUMBER
                                                                                                                                                                                                                                                   ROOM/SPACE NAME
                                                                                                                                                                                                                                                   DOE SPACE NUMBER
                                                                                                                                                                                                                                                   DOE SPACE TYPE
                                                                                                                                                                                                                                                   SQUARE FOOTAGE



  OVERALL FLOOR PLAN   NOT TO SCALE                                                                 Page 1 of 1                                                                                                                  UPDATED: 7/11/2017 BY: AM
MARTIN L. KING HIGH FACILITY                                                                                                               3991 SNAPFINGER RD., DECATUR, GA 30038 (678)                                                                                     FACILITY# 644-0103-1920.01                                                                                                              136 ACRES




                                                                                                                                                                                                                                                                                                                                                                     P.E.                                                   LAUNDRY                                             TRAINING
                                                                                                                                                                                                                                                                                                                                                                   STORAGE
                                                                                                                                                                                                                                                                                                                                                                                                                                                           WEIGHT     ST
                                                                                                                                                                                                                                                                                                                                                                                                                                          DANCE /          ROOM                LOCKERS




                                                                                                                                                                                                                                                                                                                                                                                 GIRLS ATHLETIC LOCKERS
                                                                                                                                                                                                                                                                                                                                                                                                                                        GYMNASTICS /
                                                                                                                                                                                                                                                                                                                                                                                                                                         WRESTLING




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  BOYS ATHLETIC LOCKERS
                                                                                                                                                                                                                                                                                                                                                                                                                              P.E.                                     EL
                                                                                                                                                                                                                                                                                                                                                                                                                            STORAGE
                                                                                                                                                                                                                                                                                                                                                                                                                                                              P.E.




                                                                                                                                                                                                                                                                                                                                                                                                           OFFICE
                                                                                                                                                                                                                                                                                                                                                                                                           COACH
                                                                                                                                                                                                                                                                                                                                                                                                                                                            STORAGE            OFF




                                                                                                                                                                                                                                                                                                                                            RIFLE RANGE




                                                                                                                                                                                                                                                                                                                                                                                                           OFFICE
                                                                                                                                                                                                                                                                                                                                                                                                           COACH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               OFF


                                                                                                                                                                                                                                   CAN
                                                                                                                                                                                                                                  WASH
                                                                                                                                                                                                              DRY                                             402                                                                                                                                            R                                                                 R
                                                                                                                                                                                                           STORAGE                         FRZR               OFFICE
                                                                                                                                                                                                                                                              402              301                                                                                 J




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          MARTIN L. KING HIGH FACILITY
                                                                                                                                                                                                                                 COOLER                       MECH RM          "ROTC"
                                                                                                                                                                                                                                                              940              301                                                                                                                                                                                                                                            J
                                                                                                                                                                                                                                                                               #N/A




                                                                                                                                                                                                                                                                                                                                                                                                             P.E. OFFICE
                                                                                                                                                                                                                                                                               5449                                                                                                                                                              316




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                P.E. OFFICE
                                                                                                                                                                                                      LAUNDRY




                                                                                                                                                                                                                                                                                                                                                                       SHOWERS
                                                                                                                                                                                                                                          407                                                                                                                                                                                                    GYM
                                                                                                                                                                                                               R   OFF                    KITCHEN                                                                                                                                                                                                 316
                                                                                                                                                                                                           J




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               SHOWERS
            UP
                 1041         1040               1039        1037        1035                                                                    1029       1028
                                                                                                                                                                                          UP
                                                                                                                                                                                                                                          407                 R       OFF                                                                                                                                                                         PHY-ED
                 COMPUTER SCI MATH               SOC STUDIES SOC STUDIES SOC STUDIES                                                             MATH       MATH                                                                          KITCHEN                                                                                                                                                                                                 29155




                                                                                                                                                                                                                                                                                                                                                          ARMORY
                                                                                                                                                                                                                                                                                                                                    STAFF
                 1041                 1040       1039       1037             1035                                                                1029       1028




                                                                                                                                                                                                                                                                                                                                                                                      GIRLS P.E. LOCKERS
                 COMPUTER-LAB         9TH-12TH   9TH-12TH   9TH-12TH         9TH-12TH                                                            9TH-12TH   9TH-12TH                                                                      4467               EL             OFF OFF OFF                    ST




                                                                                                                                                                                                                                                                                                                                      R




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              BOYS P.E. LOCKERS
                 840                  716        712        711              714                                                                 714        710
                                                                                                                                                                                                                                    SERVING LINE
                                                                                                                                                                                                                                                                            310
                                                                                                                                                                                                                                                                            STORAGE
                                                                                                                                                                                                                                                                            310
                                                                                                                                                                                                                                                                            STOR-NI
                                                                                                                                                                                                                                                                            134
                                                                                                                                                                                                                                                                                            UNIFORM ROOM
                                                                                                                                                                                                                                                                                      311
                                                                                                          1045
                                                                                                                           AV STORAGE                                                                                                                                                 STORAGE                         315
    1043                                                                                                  ASST PRIN
                                                                                                          1045             1001.4                                                                                                                                                     311                             HEALTH
    SP ED                                                                                                 OFFICE           MEDIA                                                          1004                                                                                        STOR-NI                         315
    1043           1042                          1038                1036               1034              145
                                                                                                                           406                                                            CUSTOD                                                                                      614                             #N/A
    SP-ED          SP ED                         BUSINESS LAB        BUSINESS LAB       ISS               W
                                                                                                                                                                       WK RM
                                                                                                                                                                                          1004
                                                                                                                                                                                          CUSTOD
                                                                                                                                                                                                                                                                                        313
                                                                                                                                                                                                                                                                                        MECH RM                       808
    719            1042                          1038                1036               1034              1046                                                                            65                                                                                            313
                             1024                                                                         RR S            PROD                                         1001.5                                                                                                           MECH RM
                   SP-ED     ELEC                BUSI-LAB            BUSI-LAB           OTHER IU          160             1001.3                                       MEDIA                                                                                                            50
                   639       1024                1300                1300               699                               MEDIA                                        307
    R                        MDF/IDF
                                                                                                                          297
                             144
                                                                                                          M               ELEC DISTRIB         1001                                                                                 405
                             1023
                             OFFICE                         OFFICE                                        1047            1001.2               MEDIA CENTER                                                                         CAFETERIA
                             1023                                                                         RR S
                                                                                                                          MEDIA
                             OFFICE
                             144
                                                                                                          160
                                                                                                                          410                  1001                             CONF RM
                                                                                                                                                                                                                                    405
    1020           1018                          1016                1015
    SP ED          SP ED                         BUSINESS LAB        BUSINESS LAB                                                              MEDIA                            1001.8                                              CAFETERIA                               214                          211                                                                     218
    1020           1018                          1016                1015                                                                      4609                             MEDIA
                                                                                                                                                                                337
                                                                                                                                                                                                                                    9869                                    GIRLS                        BOYS                                                                    BOOKS
                                                                                                                                                                                                                                                                                                                                                                                 218
    SP-ED          SP-ED                         BUSI-LAB            BUSI-LAB                                                                                                                                                                                               214                          211                                                                     STOR-I
    719            639                           1300                1300                                                                                                                                                                                                                                                                            ST                          132                                                     ST
                                                                                          CUSTOD                                                                                                                                                                            RR G                         RR B
                                                                                          1012
                                                                                          CUSTOD                                                                                                                                                                            509                          509                                                                                                                     ELEC
                                                                                          80




                                                                                                                                                                                                                                                                                                                         UNIFORMS
                                                                                                                                                                                                                                                                                        210
                                                                                                                                                                                                                     REGISTR                                 OFFICE                     MUSIC
                                                                                                                                                                                                                         121                                 117                         210
                                                                ST          RADIO                                                                                                                                        ADMIN                               ADMIN
                                                  OFF EL                                          DARK                                                                                                                   145                                 89                          CHORUS
                 1019                                                                                                               1010                1009                        ST                                                                      STORAGE                      2576
                 INT DESIGN
                                                                                          LECTURE ROOM                              ART                 FAMILY & CONSUMER SCI
                                                                                                                                                                                                                                                            116
                                                                                                                                                                                                                                                                                                                                                                   216
                                                                                                                                                                                                                                                            ADMIN
                  1019                                          1014                                                                1010                1009
                                                                                                                                                                                                   CAREER CTR
                                                                                                                                                                                                                                                            93
                  9TH-12TH                                      ENGINEERING & TECH                                 ST               ART                 FAMILY-LAB               DRESS
                                                                                                                                                                                                   124
                                                                                                                                                                                                   ADMIN
                                                                                                                                                                                                                           M RR
                                                                                                                                                                                                                            114                             WK RM                                                                                                  AUDITORIUM
                                                                1014                                                                                                               RM
                                                                                            CONTROL




                                                                                                                                                                                                                                           SECRTY
                  791                                           ENGIN-LAB                                                           2100                2149                              UP
                                                                                                                                                                                                   141                      ADMIN
                                                                                                                                                                                                                            190            104
                                                                                                                                                                                                                                           ADMIN
                                                                                                                                                                                                                                                            115
                                                                                                                                                                                                                                                            ADMIN
                                                                                                                                                                                                                                                                                                                                                                    216
                                                                3715                                  STUDIO       KILN                                                                                                    W RR
                                                                                                                                                                                                                                           145              404                                                                                                     #N/A
                                                                                                                                                                                                                            112
                                                                                                                                                                                                                            ADMIN                                                                                                                                   5853
                                                                                                                                                                                                                            190
                                                                                                                                                                                                                                                                                                           209
                                                                                                                                                                                                                           R
                                                                                                                                                                                                                            109                                              0FF           LIBR            ORCHESTRA
                                                                                                                                                                                                                            ADMIN
                                                                                                                                                                                                                            44                                                                              209
                                                                                                                                                                                                                                                                            PRAC                            STRINGS
                                                                                                                                                                                                                                                                                         PRAC               755
                                                                                                                                                                                                                            CONF RM
                                                                                                                                                                                                                            106                                             PRAC
                                                                                                                                                                                                                                                    PRIN                                 PRAC
                                                                                                                                                                                                                            ADMIN                   103                                                  EQUIP      ST
                                                                                                                                                                                                                            401                     ADMIN
                                                                                                                                                                       5010                                                                         422
                                                                                                                                                                       2001                                                                                                           201
                                                                                                                                                                       186,272 SF                                                                                                     MUSIC
                                                                                                                                                                                                                                                                                      201
                                                                                                                                                                                                                                                                                      CHORUS
                                                                                                                                                                                                                                                                                      2275
                                                                                                                                                                                                                                                                                                                                            ST
                                                                                                                                                                                                                                                                                                                 202                                               DRESSING                                                R R    DRESSING
                                                                                                                                                                                                                                                                                                                 KEYBOARDING                                          RM                                                            RM
                                                                                                                                                                                                                                                                                                                 202
                                                                                                                                                                                                                                                                                                                 SP-ED
                                                                                                                                                                                                                                                                                                                 650




                                                                                                                                                                                                                                                                                                  PRAC

                                                                                                                                                                                                                                                                                                          PRAC
                                                                                                                                                                                                                                                                            MUSIC
                                                                                                                                                                                                                                                                             LIBR     0FF

                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ROOM LABEL LEGEND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      POSTED ROOM NUMBER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ROOM/SPACE NAME
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      DOE SPACE NUMBER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      DOE SPACE TYPE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      SQUARE FOOTAGE



MAIN LEVEL FLOOR PLAN                                             NOT TO SCALE                                                                                                             Page 1 of 2                                                                                                                                                                                                                                  UPDATED: 7/10/2017 BY: AM
MONTCLAIR ELEMENTARY FACILITY                                          1680 CLAIRMONT PLACE, N.E., ATLANTA, GA. 30329(678)874-7302                                                           FACILITY# 644-4062-1445.01                            12.2 ACRES




  220                  207                                                                                                                                         135                    133
  ASST PRIN            5TH                                                                                                                                         2ND-ESOL               4TH-ESOL
   220                 207                                                                                                                                         135                    133
   OFFICE              4TH-5TH                                                                                                                                     K-3RD                  4TH-5TH
   198                 768                                                                                                                                         700                    700

                                                                                                                                                                                                                 132
                                 206                                                                                                                                                                             ART
              208.1
              MUSIC              5TH                                                                                                                                                                             132
   208        208.1              206                                                                                                                    134                                                      ART
              MUSIC
   MUSIC      120                4TH-5TH                                                                                                                COMPUTER LAB                                             870
   208                           858                                                                                                                    134
   MUSIC                                                                                                                                                COMPUTER-LAB                                                      132A
                                                                                                                                                                                                                          STORAGE
   930                                                                                                                                                  734                                                               132.1
                                                                                                                                                                                                                          ART
                                                     2012                                                                 2012                                                                                            90


                      205        204
                                                     2003                                                                 2003                                                    131
                      3RD        3RD                 23,700 SF                                                            23,700 SF                                               4TH                            130
                                                                                                                                                                                   106                           K
                      205        204                                                                                                                                                                             130
                      K-3RD      K-3RD                                                                                                                                             4TH-5TH
                      768        858                                                                                                                                               700                           K-3RD
                                                                                                                                                                                                                 700
                                                                                                                                                                                  129
                      203        202                                                                                                                                              4TH                            128
                      3RD        3RD                                                                                                                                               129                           4TH




                                                                                                                                                                                                                                                                                                                         MONTCLAIR ELEMENTARY FACILITY
                      203        202                                                                                                                                               4TH-5TH                       128
                      K-3RD      K-3RD                    125        124           123                        122           121           120                                      700                           4TH-5TH
                      768        768                                                                                                                                                                             700
                                                          PRE-K      PRE-K         2ND                        2ND           2ND           2ND
                                                          125        124           123                        122           121           120                                                                127.2
                                                                                                                                                                                                             MECH RM

                      201                                 K-3RD      K-3RD         K-3RD                      K-3RD         K-3RD         K-3RD                                   127                        127.2
                                                                                                                                                                                                             MECH RM

                      3RD                                 1142       1142          768                        768           768           768                                     K                          62


                      201                                                                                                                                                          127
                      K-3RD                                                                                                                                                        K-3RD
                      768                                                                                                                                                          700

                                                                                                                                                                                                     117.1
                                                                                            97.1                              98.3                                                                   STORAGE
                                                      126                                   BOILER RM                         STAGE                                                                  117.1                           114
                                                      2ND                                    97.1                             98.3
                                                                                                                                                                   117                               MEDIA                           K
                                                                                                                                                                                                     256
                                                      126                                    MECH RM                          CAFETERIA                            MEDIA CENTER                      117.2                           114
                                                      K-3RD                                  1107                             768                                  117                               T-WK-RM                         K-3RD
                                                      768                                                                                                          MEDIA
                                                                                                                                                                                                     117.2
                                                                                                                                                                                                     MEDIA
                                                                                                                                                                                                     160
                                                                                                                                                                                                                                     735                                            1
                                                                                                                                                                   2838                                                                                                             GYM
                                                                                                                                                                                                               112
                                                                                                                                                                                                               K
                                                                                                                                                                                                                                     113
                                                                                                                                                                                                                                     K
                                                                                                                                                                                                                                                                                        1
                                                                                                                                                                                                               112                   113                                                PHY-ED
                                                                                                                                                                                                               K-3RD
                                                                                                                                                                                                               735
                                                                                                                                                                                                                                     K-3RD
                                                                                                                                                                                                                                     735
                                                                                                                                                                                                                                                                                        4813
                                                                                                                             98                                                                                                                       2020
                                                                                                                                                                                                                                                      2003
                                                                                                                             CAFETERIA                           116                                           111                   110
                                                                                                                                                                                                                                                      5,478 SF
                                                                                                                                                                                                                                                                                         4
                                                                                                                                                                                                                                                                                         LOBBY

                                                                                                                             98                                  SP ED                                         K                     K                                3
                                                                                                                                                                                                                                                                      OFFICE
                                                                                                                                                                                                                                                                               2
                                                                                                                                                                                                                                                                               STORAGE
                                                                                                                                                                                                                                                                                         4
                                                                                                                                                                                                                                                                                         PHY-ED
                                                                                                                                                                                                                                                                                                  7    6
                                                                                                                                                                                                                                                                                                  BOYS ELEC
                                                                                                                                                                                                                                                                                                               5
                                                                                                                                                                                                                                                                                                               GIRLS
                                                                  2011                                                                                            116                                          111                   110                              3        2         110      7      6      5

                                                                  1971                                                       CAFETERIA                            K-3RD                                        K-3RD                 K-3RD
                                                                                                                                                                                                                                                                      PHY-ED
                                                                                                                                                                                                                                                                      140
                                                                                                                                                                                                                                                                               PHY-ED
                                                                                                                                                                                                                                                                               110
                                                                                                                                                                                                                                                                                                  PHY-ED PHY-ED PHY-ED
                                                                                                                                                                                                                                                                                                  120    35     150

                                                                  9,653 SF                                                   4287                                 768                                          735                   735
                                                                                                                                                        99.9                                                              99.16
                                                                                                                                                        R        99.1
                                                                                                                                                                           99.7
                                                                                                                                                                           R      99.6                                    CLINIC
                                                                                                                                                          99.9
                                                                                                                                                          RR S   T-WK-RM   99.7
                                                                                                                                                                           RR S
                                                                                                                                                                                  PRIN                                    99.16
                                                                                                                                                                                                                          CLINIC     109
                                                                                                    97.7
                                                                                                    COOLER
                                                                                                                                                          60
                                                                                                                                                             99.1          60     99.6               99.11       99.12
                                                                                                                                                                                                                          70
                                                                                                                                                                                                                        99.14
                                                                                                                                                                                                                        BOYS         K
                                                                                                    97.7                                                99.8
                                                                                                                                                        R    T-WK RM              ADMIN              ASST PRIN   CLINIC 99.14
                                                                                                                                                                                                                        RR B
                                                                                                                                                                                                                             30      109
                                                                                                    KITCHEN
                                                                                                                                                        99.8 640                  240                99.11       99.12      99.13
                                                                                     97.10
                                                                                     R
                                                                                     97.1
                                                                                             97.9
                                                                                             R
                                                                                                    100
                                                                                                    97.8
                                                                                             97.9 FREEZER
                                                                                                                                                        RR S
                                                                                                                                                          60
                                                                                                                                                                                                     ADMIN
                                                                                                                                                                                                     170         CLINIC
                                                                                                                                                                                                                            GIRLS
                                                                                                                                                                                                                             99.13
                                                                                                                                                                                                                             RR G
                                                                                                                                                                                                                                     K-3RD
                                                                                     RR S    RR S
                                                                                                  97.8
                                                                                                                                                                                                                 160         30
                                                                                                                                                                                                                                     735
                                                                                     60      60
                                                                                                    KITCHEN
                                                                                                    100




                                                                                             101                    102             103           104                                          106                     107                 108
                                                                                             1ST                    1ST             1ST           1ST                                          1ST                     1ST                 1ST
                                                                                             101                    102             103           104                                          106                     107                 108
                                                                  2010                       K-3RD                  K-3RD           K-3RD         K-3RD                                        K-3RD                   K-3RD               K-3RD
                                                                  1967                       768                    768             768           768                                          768                     768                 768
                                                                  32,880 SF




                                                                                                                                                                                                                                                                                            ROOM LABEL LEGEND
                                                                                                                                                                                                                                                                                            POSTED ROOM NUMBER
                                                                                                                                                                                                                                                                                            ROOM/SPACE NAME
                                                                                                                                                                                                                                                                                            DOE SPACE NUMBER
                                                                                                                                                                                                                                                                                            DOE SPACE TYPE
                                                                                                                                                                                                                                                                                            SQUARE FOOTAGE



FIRST & SECOND LEVEL FLOOR PLAN            NOT TO SCALE                                                                             Page 1 of 1                                                                                                             UPDATED: 7/13/2017 BY: AM
PANOLA WAY ELEMENTARY FACILITY                                              2170 PANOLA WAY COURT STONE MOUNTAIN, GA 30088(678)676-9302                         FACILITY# 644-0188-1760.01                   15.5 ACRES



                     218        219       221           222
                     2ND        2ND       2ND           2ND
                     218        219       221           222
                     K-3RD      K-3RD     K-3RD         K-3RD
                     678        678       678           678
        211
        2ND
        211
        K-3RD
        678                                                                                                                    1
                                                                                                                               GYM
        210                                                                                                                     1
        2ND                                                                                                                     PHY-ED
        210
        K-3RD                2011                                                                                               5478
        678                  2004                             117                             119
                             13,775 SF                        1ST                118          1ST
                                                                117              1ST           119
                                                                K-3RD            118           K-3RD
                                                                750              K-3RD         750                                       R   R
                                                                                 750
                                                                                                               COVERED WALKWAY
        207                  2010
        3RD                                                   116
        207                  1987                             1ST
        K-3RD                66,965 SF                          116
        678                                                     K-3RD                                         2020
                                                                750
                                                                                                              2003
        206                                                                                                   5,478 SF
        3RD




                                                                                                                                                                                                                                                              PANOLA WAY ELEMENTARY FACILITY
        206                      112            113           114
        K-3RD                    1ST            1ST           2ND
        678                       112           113             114               122         121
                                  K-3RD         K-3RD           K-3RD             2ND         SP ED
                                  750           750             759               122          121
        205                                                                       K-3RD        SP-ED
        3RD                                                                       675          600
        205
        K-3RD                             BOYS
        678                      111                                                          124
                                 1ST      111.1                                               SP ED
                                  111     RR B                                                 124
        204                       K-3RD   175                                                  SP-ED
        3RD                       750                                                          600
        204
        K-3RD
        678                                                                                                 MECH RM        96
                                                                                                            97.5           KITCHEN                          R
                                                                    COUNSL
                                                                                              STORAGE
                                                                                              99.2          MECH RM     96
        201                                                                                   MEDIA
                                                                                                            544
        3RD                      109                                99.9                      40
                                                                                                                        KITCHEN
        201                      SP ED                              MEDIA                               R       STORAGE 3182
        K-3RD                     109                               309                                         97.4                              STORAGE
                                  SP-ED                                                     LOUNGE
        678                                                                                 99.3                STOR-NI     SERVE
                                  750                                                                           323                                                131
                                                                                            OTHER NI                                                               SCIENCE LAB
                                                                                            492                                                                    131
        200
        3RD
                                                                  99                                                                                               COMPUTER-LAB
                                                      GIRLS
        200                      108                  108.2       MEDIA CENTER                                                                                     880
        K-3RD                    K                    RR G
                                                      190           99
        678                       108
                                  K-3RD                             MEDIA                                                   97                                    STROAGE STORAGE
                                  750                               3206                                                    CAFETERIA                             130.3
                                                                                                                                                                  STOR-NI
                                                                                                                                                                            131.3
                                                                                                                                                                            STOR-NI
                                                                                                                             97                   STAGE           163       167

                                                                                                                             CAFETERIA                                 130                             133       134          135
                                 106
                                 K
                                                107
                                                PRE-K
                                                                                                                             6228                                      MUSIC          GIRLSBOYS        4TH       5TH          5TH
                                  106           107                                                                                                                    130            130.1 133.1      133        134         135
                                                                                                                                                           DN          MUSIC          RR G RR B        4TH-5TH    4TH-5TH     4TH-5TH
                                  K-3RD         K-3RD                             CLINIC
                                                                                                                                                                                                       700        700         700
                                  750           750                               99.11                                                                                880            175 175
                                                                                  MEDIA                                                                                                 CUSTOD
                                                                                                                                                                                        130.2
                                                                                  168                                                                                                   CUSTOD
                                                                                                                                                                                        32




                                                                                           CONF RM
                                                                                           98.2
                                                              101                          ADMIN               125          126        127       128                   129                       132                        136
                                                              K                            203                 4TH          4TH        4TH       4TH                   ART                       4TH                        4TH
                                                                101               R
                                                                                  98.4
                                                                                                                125          126       127       128                   129                       132                        136
                                                                K-3RD             RR S
                                                                                  45                            4TH-5TH      4TH-5TH   4TH-5TH   4TH-5TH               ART                       4TH-5TH                    4TH-5TH
                                                                750                                             765          765       765       765                   880                       700                        700


                                                                                                                                                                                                 139             138          137
                                 104            103           102                                                                                                                                5TH             5TH          5TH        ROOM LABEL LEGEND
                                 K              K             K                                                                                                                                  139             138           137
                                  104           103             102                                                                                                                                                                      POSTED ROOM NUMBER
                                                                                                                                                                                                 4TH-5TH         4TH-5TH       4TH-5TH
                                  K-3RD         K-3RD           K-3RD                                                                                                                            750             770           750       ROOM/SPACE NAME
                                  750           750             750
                                                                                                                                                                                                                                         DOE SPACE NUMBER
                                                                                                                                                                                                                                         DOE SPACE TYPE
                                                                                                                                                                                                                                         SQUARE FOOTAGE



OVERALL FLOOR PLAN     NOT TO SCALE                                                                                      Page 1 of 1                                                                                   UPDATED: 7/14/2017 BY: AM
                                                                                                                                                                                                                                                                               FACILITY# 644-0190-1755.01
                                                                                                                                                                                                                                                                                                            PARCEL#

                                                                                                                                                                                                                                                                               87,192 SQ. FT.
                                                                                                                                                                                                                                        111
                                                                                                                                                                                                                                         K 1                                  14 ACRES
                                                                                                                                                                                                                                         11 RD
                                                                                                                                                                                                                          109             K-30
                                                                                                                                                                                                                           K 9             92
                                                                                                                                                                                                                           10 RD                          PINE RIDGE ELEMENTARY FACILITY
                                                                                                                                                                                                                LAB         K-30
                                                                                                                                                                                                    107 ADING               76
                                                                                                                                                                                                     RE 7
                                                                                                                                                                                                      10 ED                                110      750 PINE RIDGE DRIVE, STONE MOUNTAIN, GA. 30081 ( 678)676-3402
                                                                                                                                                                                                      SP-0                                  K
                                                                                                                                                                     105                               76                                   110RD
                                                                                                                                                                      K                                                        108           K-30
                                                                                                                                                                       105RD
                                                                                                                                                                                            OD
                                                                                                                                                                                        CUST2
                                                                                                                                                                                        107. OD


                                                                                                                                                103 ED                                                                                        92
                                                                                                                                                                                        CUST


                                                                                                                                                                       K-30
                                                                                                                                                                                         32
                                                                                                                                                                                                                                K 8
                                                                                                                                                 SP                     76                                                      10 RD
                                                                                          PRIN
                                                                                                                              SP ED               103ED                                                                          K-30
                                                                                          160.2                                                   SP-0                                                  106                      92
               150                                                                        ADMIN                         SP ED 101.2                76                                                    K 6
                                                                                          251                           101   OTHER IU                                                                   10 RD
               KITCHEN SERVE                                                                                                                                                        104                   K-30
                                                                                                                        SP-ED 219
               150                                 151
                                                                                           R   R
                                                                                                                        800
                                                                                                                                                                                     K 4                  92
                                                                                                                                                                                     10 RD
               KITCHEN                             CAFETERIA                                                                                                                          K-30
               3214                                                                                                                                        102                        92
                                    DISH           151                                                                                                      K 2
                                    WASH           CAFETERIA                                                                                                10 RD
                                                   4751                                                                                                      K-30
               OFFICE
                                                                                                                                                             92

                                SERVE                                     STORAGE/AV
                                                                          99.9                                                 T-WK-RM
                                                                          MEDIA                                                201.2
                           COOLER
                CAN
                                                                          416                                                  T-WK RM
               WASH                                                                                                            385
               JAN
                                                                                      99
                        FREEZER
                                                                                      MEDIA CENTER
                                                                                      99
                     W/D
               R            STORAGE                                                   MEDIA
                                                                                      3037
                                                                             STORAGE
                                           98                                99.10
               MECH RM                     MUSIC                             MEDIA
               96.1                        98                                355
               MECH RM                     MUSIC
               580                         1000

                                                        STORAGE STORAGE
                                                        402.1
                                                        STOR-NI
                                                                402.2
                                                                STOR-NI
                                                                            401         200                 199                                           203
                                                        110     110         5TH         5TH                 SP ED                                         DISCOVERY
                                                                            401         200                 199                                           203
                                                                            4TH-5TH     4TH-5TH             SP-ED                                         OTHER IU
                                                                            961         786                 648                                           700
                                                                                                                                                                   205
                                                                                                                                      202                          SPANISH
                                                                                                                                      ART                          205
                                                                                                                                      202                          OTHER IU
                                                                            403                                                       ART
                                                                            2ND                                                                                    700
                                                                                                                                      850
                                                                            403
                                                                            K-3RD                                                                   KILN
                                                                            840                                                                     202.2
                                                                                                                                                    ART
                                                                                                                                                    197       204
                                                                                                                                                              TITLE 1
                                                                                                                                                              204
                                                                                                                                                              OTHER IU                                 207
                                                                                                                                      0                       700                                      3RD
                                                                                                                                   30 T                                   206                          207
                                                                                                                                    1S 00                                 3RD
                                                           406                                                                       3 3RD                                                             K-3RD
                                                           5TH                                                R   1.3
                                                                                                               30 S                   K- 96                               206                          700
                                                           406                                        E         RR6                    6                                  K-3RD                                       209
                                                                                                  FIC
                                                                                                                 5
                                                           4TH-5TH                                                                                                        700                                         3RD
                                                                                               O F .1 1                                    2                                           208                            209
                   COVERED WALKWAY                         700                                     30 MIN             EC
                                                                                                                    EL01.6 F            30 T
                                                                                                    AD00             3 F/ID
                                                                                                                      MD6                1S 2                                          3RD                            K-3RD
                                                                                                     2                 5
                                                                                                                                          30 3RD                                       208                            700
                                                         ASST PRIN                                                                         K- 96                                       K-3RD                                    211
                                                         406.1                                                   1                           6                                         700                                      3RD
      R   R                                              ADMIN 406.2                                          30 T                                                                                      210                     211
                                                                                                               1S 01                                4
                                                                   ELEC
                                                         350    MDF/IDF
                                                                38
                                                                                                                3 3RD                            30 T                                                   1ST                     K-3RD
                                                                            407                                  K- 96                            1S 4                                                  210                     700
                                                                            4TH                                    6                               30 3RD                                               K-3RD
                                                                            407                                                                     K- 96                                               700
                                                                                                                           3                          6
               1                                                            4TH-5TH                                     30 T                                                                                           212
               GYM                                                          700                                          1S 3                            6
                                                                                                                          30 3RD                      30 T                                                             3RD
               1                                                                                                           K- 96                       1S 06                                                           212
               PHY-ED                                                                                                        6          S               3 3RD                                                          K-3RD
                                                                                                                                     RL                  K- 96
                                                                                                                                   GI 5.1                                                                              700                                                        GDOE Minimum Required Areas
               5478                                        408              409                                                     30 G                  6
                                                           4TH              4TH                                                       R
                                                                                                                                     R 8                                                                                                                                          Space  New       -10%     Existing
                                                           408              409                                                       30 YS                     8
                                                           4TH-5TH          4TH-5TH                                                   BO 5.2                  30 D                                                                                                                K-3       750sf   -75sf     675sf
                                                           700              700                                                         30 B                   2N08
                                                                                                                                         RR08                   3 3RD                                                                                                             4-5       660sf  -66sf      594sf
                                                                                                                                          3
                                                                                                                                                                 K- 96                                                                                                            Art                         900sf
                                                                                                                                                                  6                                                                                                                       1,000sf -100sf
                                                                                                                                       5
                                                                                                                                     30 D                                                                                                                                         Music   1,000sf -100sf      900sf
                                                           410              411                                                       2N05                          310 D
                                                                                                                                       3 3RD                         2N 0
                                                                                                                                                                                                                                                                                  PE      5.000sf -500sf 4,500sf
   2020
                                                           4TH              4TH
                                                                                        2011                                            K- 96                         31 3RD                      2010                                                                            Sp Ed     750sf   -75sf     675sf
                                                           410              411                                                          6
   2003                                                    4TH-5TH          4TH-5TH     2004                                                                           K- 96                      1988
   5,478 SF                                                                             13,018 SF                                            7                          6                         68,696 SF
                                                           700              700                                                            30 D
                                                                                                                                            2N 7
                                                                                                                                                                                                                                                                                  48 IU's = 750 FTE
                                                                                                                                             30 3RD                      312 D                                                                                                    Media Center (for 750 FTE) 3,525sf
                                                                                                                                              K- 96                       2N 2
                                                           412              413                                                                6                           31 3RD                                                                                                 Cafeteria (750 FTE x 5) = 3,750sf
                                                           4TH              4TH                                                                                             K- 6
                                                           412              413                                                                      9                       69                                                                                                   Total Kitchen = 2,000sf
                                                           4TH-5TH          4TH-5TH                                                                30 D
                                                           700              700                                                                     2N 9
                                                                                                                                                     30 3RD                                                                                                                                ROOM TAG LEGEND
                                                                                                                                                      K- 6
                                                                                                                                                       69                                                                                                                                  POSTED ROOM NUMBER
                                                                                                                                                                                                                                                                                           ROOM/SPACE NAME
OVERALL FLOOR PLAN                                                                                                                                                                                                                                                                         DOE SPACE NUMBER
NOT TO SCALE                                                                                                                                                                                                                                                                               DOE SPACE TYPE
                                                                                                                                                                                                                                                                                           SQUARE FOOTAGE

                                                                                                                                                                                                                                                                  UPDATED: 08/17/2011 BY: AMP
SHADOW ROCK ELEMENTARY FACILITY                                                                                      1040 KINGWAY DRIVE, LITHONIA, GA. 30058 (678)676-3902                               FACILITY# 644-1616-1755.01              15 ACRES




                                                                                                                                                                                                                           1
                                                                                                                                                                                                                           GYM
                                                                                                                                                                                                                           1
                                                                                                                                                                                                                           PHY-ED
                                                                                                                                                        2020                                                               5478
                                                                                                                                                        2003
                                                                                                                                                        5,478 SF

                                                                                                                                                                                                                                     R    R



                                                                                                                                                                                                                                    COVERED WALKWAY


                                                                                                                                                                        116                                                               118




                                                                                                                                                                                                                                                                                                      SHADOW ROCK ELEMENTARY FACILITY
                                                                                                                                                                        SP ED                                                             SP ED
                                                                                                                                                                        116                                                               118
                                                                                                                                                                        SP-ED                                                             SP-ED
                                                                                                                                                                        625                                                               660
                                                                                                                                                                                 OBSER RM
                                                                                                                                                                                 115.3
                                                                                                                                                                                 COUNS
                             1 P




                                                                                                                                                                                 38
                                       01 E




                                   10                                                                                                                                                                                                    119
                              S




                                                                                                                                                                        115
                                     1                                                                                                                                  SP ED                                     120                    SP ED
                                 SP 27

                                          D




                                                                                                                                                                        115                                       BOOKS                  119
                                  6
                                   -E




                                                                                                                                                                                                                  120                    SP-ED
                                      D




                                                                                                                                                                        SP-ED
                                                                                                                                                                        625                                       STOR-I                 660                           124
                                                                 SP                                                                                                                                               342
                                                                 10




                                                                                                                                                                        113                                                          121                               GYM
                                                                      3




                                                                      E                                                                                                 SP ED                                     122                MEETING RM                         124
                                                  10 -E




                                                                       D                                                                                                                                          ISS
                                                   SP 27




           SP                                                                                                                                                           113                                                          121                                PHY-ED
                                                    3 D
            10




                                                     6




                                                                                                                                                                        SP-ED                                     122                SP-ED                              1612
                 2




                E                                                                                                                                                                                                 SP-ED
      10 P-E 7




                    D                                                                                                                                                   622                                                          661
       S 2




                                                                                                                                                                                                                  327
        2 D
         6




                                                                                                                                                                    R
                                                                                                                                                                    113.2
                                                                                                                                                                    RR S
                                                                                                                                                                    32
                             10 P E




                                                                                                                                                                                                                                         123
                        S 04 -ED
                               4 D




                                                                                                                                                                                                                                         ART
                         1
                           SP 27




                                                                                                                                                                                                            BOYS                         123
                                                                                                                 PR 09 MIN
                            6




                                                                                                                  1 D 5




                                                                                                                                                                                                            112.5
                                                                                                                   IN .1




                                                                                                                                                                                                                                         SP-ED
                                                                                                                    A 3
                                                                                                                      2
                                   1 P




                                                                                                                                                                                                            RR B
                                                                               G 5
                                          06 E




                                                                                                                                                                                                                                         661
                                                                                                                         5
                                                                                                    ST 09 OR




                                      10
                                                                                IR .
                                    S




                                                                                                                                                                                                            170
                                                                                                1 T
                                                                                 10 R G6




                                                                                                      O .1 -NI
                                                                                                 S 0

                                                                                                        R 6
                                                                                                         A
                                                                                                  4
                                                                                      LS
                                                                                  R 3




                                                                                                           G
                                                                                                             E




                                         6
                                                                                    1




                                                                                                                 R
                                                                                     9
                                       SP 27




                                                                                                           10 R S
                                              D




                                                                                                            R 0
                                                                                                             9.
                                                                                           B 05 B



                                                                                                              6
                                        6




                                                                                                                17
                                         -E




                                                                                            O .
                                                                                            1
                                                                                             Y 1




                                                                                                                                                                                             STORAGE STORAGE STORAGE
                                                                                                                                                                  WAIT RM
                                           D




                                                                                      RR 44

                                                                                              S 0




                                                                                                                                                                                             111.10    111.11    111.12
                                                                                                                                                                                                                           ISS
                                                                                                                       O 09 UN




                                                 R                                                                                                                111.7
                                                                                       1




                                                                                                                                                                                             STOR-NI   STOR-NI   STOR-NI
                                                                                                                        B . S
                                                                                                                     1 O
                                                                                                                         SE 1




                                                10                                                                                                                                           19        19        19
                                                                                                                      C 8




                                                                                                                                                                  COUNS
                                                                                                                           R
                                                                                                                       3




                                                  6.
                                                                                                                             R




                                                                                                                                                                             MEDIA STORAGE                                 111.13
                                              RR 5




                                                                                                                               M




                                                    3                                                                                                             90
                                               2


                                                        R 07 S




                                                                                                                               ST 09 OR
                                                 S




                                                                                                                                                                             111.17
                                                                      10 P E
                                                     1 R




                                                                                                                            1 T
                                                                                                                                 O .7 -NI
                                                                                                                             S 0




                                                  25
                                                                                                                                   R
                                                      R




                                                                                                                                                                                                                           SP-ED
                                                                                                                                     A
                                                                                                                              3




                                                                                                                                                                             STOR-I
                                                                                                                                       G
                                                        .3




                                                             S 07 -ED




                                                                                                                                         E
                                                                        7




                                                                                                                                           O 09 UN




                                                                                                                                                                             505
                                                                                                                                            B . S




                                                                                                                                                                                                                           350
                                                                                                                                            1 O
                                                                                                                                             SE 6
                                                              1




                                                                                                                                              C 8


                                                                                                                                               R
                                                                                                                                               3



                                                                                                                                                 R
                                                                                                                                                   M
                                                                SP 27

                                                                           D
                                                                 6




                                                                                                                                                                                                                      2010                                                       ROOM LABEL LEGEND
                                                                                                                                                                                                                      1991                                                       POSTED ROOM NUMBER

                                                                                                                                                                                                                      33,290 SF                                                  ROOM/SPACE NAME
                                                                                                                                                                                                                                                                                 DOE SPACE NUMBER
                                                                                                                                                                                                                                                                                 DOE SPACE TYPE
                                                                                                                                                                                                                                                                                 SQUARE FOOTAGE



LOWER LEVEL FLOOR PLAN                        NOT TO SCALE                                                                                                 Page 1 of 2                                                                                      UPDATED: 7/14/2017 BY: AM
STEPHENSON HIGH FACILITY                                                                                                 701 STEPHENSON RD., STONE MOUNTAIN, GA 30087 (678)                                                                                         FACILITY# 644-0497-1765.01                        39.7 ACRES




                                                                                                                                                                                                                                                                                                  814             815
                                                                                                                                                                                                                                                                                                  SCIENCE LAB     SCIENCE LAB
                                                                                                                                                                                                                                                                                                  814             815
                                                                                                                                                                                                                                                                                                  SCI-LAB         SCI-LAB
                                                                                                                                                                                                                                                                                                  1193            984




                                                                                                                                                                                                                                                        614           615                                         813
                                                                                                                                                                                                                                                        SP ED         HISTORY                                     SCIENCE LAB
                                                                                                                                                                                                                                                        614           615                                         813
                                                                                                                                                                                                                                                                                                  812             SCI-LAB
                                                                                                                                                                                                                                                        SP-ED         9TH-12TH                    SCIENCE LAB
                                                                                                                                                                                                                                                        1050          750                                         984
                                                                                                                                                                                                                                                                                                  812
                                                                                                                                                                                                                                                                                                  SCI-LAB
                                                                                                                                                                                                                                                                                                  1193


                                                                                                                                                                                                                                               612                                                                811
                                                                                                                                                                                                                                               SP ED                                                              SCIENCE LAB
                                                                                                                                                                                                                                                612                                                               811
                                                                                                                                                                                                                                                SP-ED                        ASST PRIN                            SCI-LAB
                                                                                                                                                                                                                                                750                          611.1                810             1193
                                                                                                                                                                                                                                                                             OFFICE               SCIENCE LAB
                                                                                                                                                                                                                                                                    611   100
                                                                                                                                                                                                                                                                    ASST PRIN OFFICE              810
                                                                                                                                                                                                                                               610                  611           611.2
                                                                                                                                                                                                                                                                                                  SCI-LAB
                                                                                                                                                                                                                                                                    OFFICE        OFFICE
                                                                                                                                                                                                                                               LITERITURE           100           160             1193
                                                                                                                                                                                                                                                610                 STORAGE
                                                                                                                                                                                                                                                9TH-12TH            611.4
                                                                                                                                                                                                                                                750                 STOR-I
                                                                                                                                                                                                                                                                    100


                                                                                                                                                                                                                                               608                   609                                          809
                                                                                                                                                                                                                                               MATH                  LITERITURE                                   SCIENCE LAB
                                                                                                                                                                                                                                                608                  609                                          809
                                                                                                                                                                                                                                                9TH-12TH             9TH-12TH                                     SCI-LAB
                                                                                                                                                                                                                                                750                  750                          808             1193
                                                                                                                                                                                                                                                                                                  SCIENCE LAB
                                                                                                                                                                                                                                                                                                  808
                                                                                                                                                                                                                                               606                    607                         SCI-LAB
                                                                                                                                                                                                                                               SOC STUDIES            ENGLISH                     1193
                                                                                                                                                                                                                                                606                    607
                                                                                                                                                                                                                                                9TH-12TH               9TH-12TH                                    807
                                                                                                                                                                                                                                                750                    750                                         MATH
                                                                                                                                                                                                                                                                                                                   807
                                                                                                                                                          ELEC
                                                                                                                                                                           R
                                                                                                                                                                           95.9
                                                                                                                                                                                  CUSTOD
                                                                                                                                                                                  95.12                                                        604                    605                                          9TH-12TH
                                                                                                                                                          95.4
                                                                                                                                                                           RR S
                                                                                                                                                                           42
                                                                                                                                                                                  CUSTOD
                                                                                                                                                                                  47                                                           SOC STUDIES            ENGLISH                     806              955
                                                                                                                                                          MDF/IDF                                                                               604                    605                        SCIENCE LAB
                                                                                                                                                                                                                                                                                                  806




                                                                                                                                                                                                                                                                                                                                                                                                           STEPHENSON HIGH FACILITY
                                                                                                                                                          370                                  FREEZER                                          9TH-12TH               9TH-12TH                                   BOYS   GIRLS        502        504        506          508           510
                                                                                                                                                                                               95.8                                             750                    750                        SCI-LAB         501.3 501.4
                                                                                                                                                                                                                                                                                                  1193                                MATH       MATH       MATH         MATH          ENGLISH
                                            304                                                                                                                                                KITCHEN                                                                                                            RR B  RR G          502        504        506          508           510
                                            COMPUTER TECH                                                                                                                                      361                                             602                    603                                         300   300           9TH-12TH   9TH-12TH   9TH-12TH     9TH-12TH      9TH-12TH
                             STORAGE
                             304.3          304                                                                                                                                                                                                MATH                   ENGLISH                                            ELEC         750        750        750          750           750
                             STOR-NI                                                                                                                                                                                                                                                                                     501.2
                             90             COMPUTER-LAB                       WOODSHOP                                                                   MECH RM                                                                               602                    603                                               MDF/IDF
                                            3050                               304.5                                                                      95.3                                                                                  9TH-12TH               9TH-12TH                                          95
                             STORAGE
                             304.2
                             STOR-NI
                                                                               CONSTR-LAB                                                                 MECH RM                          919                                                  750                    750
                                                                               1330                                                                       875
                             90
                                                                                                                                                                                           KITCHEN
                                                                                                                                                                                           95                                                                         601
                                                                                                                                                                                                                                                                      ENGLISH
                                                                                                                                                                                           KITCHEN                                                                     601                                        805              501                      505          507          509
                                                                                                                                                                                           2154                                                                        9TH-12TH                                   STORAGE          MATH LAB                 ENGLISH      MATH         ENGLISH
                                                                                                          LAUNDRY
                                                                                                                                                                                                                                                                       750                                        805              501                      505          507          509
                                                                                                          308.1
                                                                                                          OTHER NI                LOUNGE                                                                                                                                                                          OTHER IU         9TH-12TH                 9TH-12TH     9TH-12TH     9TH-12TH
                                                                                                          42
                                                                                                                                  310.1                                                                                                                                                                           660              990                      750          750          750
                                            302                           306                                        310          T-WK RM                                                                    312          314                                         315             316
                                            ROTC                          ART                                        HOME ECON    502                                             SERVING                    COMPUTER LAB FINE ARTS                                   ISS             TV STUDIO
                                             302                           306                                       310                                                          95.1                       312                   314                    CUSTOD      315      316
                                             ROTC-1                        ART                                       FAMILY-LAB   R    R                  CONCESSION              KITCHEN                    COMPUTER-LAB          9TH-12TH               314.3
                                                                                                                                                                                                                                                          CUSTOD      OTHER IU VIDEO-LAB                LOUNGE
                                             955                           1700                                      1160         310.7 310.8
                                                                                                                                                          95.10
                                                                                                                                                          CONCESSIONS             1540                       900                   690                    63
                                                                                                                                                                                                                                                                      750      750                      318.1
           5010                                                                                                                   RR S RR S               295                                                                                                                                           T-WK RM
           1996                                                                                                                   107 107                                                                                                                                                               340
           196,181 SF

                                                                                                                                                STORAGE                                                                                MDF
                                                                                             SS




                                                                                                                                                201.3                                                                                  98.7
                                                                                    R
                                                                                            E




                                             303                                                                                                STOR-NI                                                                                MEDIA
                                                                                         R




                                                                                                                                                210
                                             MUSIC/CHORUS                                                                                                                                                                              520
                                                                                        D




                                             303
                                             CHORUS
                                             1518                     R
                                                                      303.12
                                                                                                                                  201                                      918
                                                                      RR S
                                                                      85                                                          AUDITORIUM                               CAFETERIA
                                                                      R
                                                                      303.11
                                                                                                                                      201                                  96                                       OFFICE
                                                                                                                                                                                                                    404.3
                                                                      RR S
                                                                      85                          STAGE                               THEATER                              CAFETERIA                                OFFICE
                                                                                                                                                                                                                    143
                                                                                                                                                                                                                                                                   98
                                                                                                                                      4209                                 8453                              404                                                   MEDIA CENTER
                                                                                                                                                                                                             MARKETING
                                                                                                                                                                                                             404
                                                                                                                                                                                                                                                                   98
                                         303.1
                                         MUSIC/BAND                                                                                                                                                          MARKETING-LAB                                         MEDIA
                                           303.1                                                                                                                                                             543                               STORAGE             5928
                                                                                             SS




                                           BAND                                                                                                                                                                                                98.9
                                                                                    R
                                                                                         E




                                                                   STORAGE                                                                                                                                                                     MEDIA
                                                                                        R




                                           2354                    303.2
                                                                                        D




                                                                   STOR-NI                                                                                                                                                                     785
                                                                   180

                                                                                                                                                                                                                                                                                                                                              114        116                      120
                                                                                                                                                                                                                                                                                                                                              HISTORY    BUSINESS                 ECONOMICS
                                                                                                                                                                                                                   STORAGE   STORAGE
                                                                                                                                                                                                                                                                                                                                              114        116                      120
                                                      R                                                                                                             CONCESSION                                     105.5     105.4                                                                                                            9TH-12TH   9TH-12TH                 9TH-12TH
                                                      200.14                                                                                                           96.1
                                 GIRLS      GIRLS PE RR S         101                   103                                                                            CONCESSIONS
                                                                                                                                                                                                                   STOR-NI
                                                                                                                                                                                                                   108
                                                                                                                                                                                                                             STOR-NI
                                                                                                                                                                                                                             108                                                                                                              750        750                      750
                                                     65
                                  200.12    200.13                ROTC                  OFFICE                                                                         240
                                  RR G      PHY-ED                101                   103
                                  600       525                   ROTC-1                OTHER NI
                                                                  756                   490

                                                                                                                                                          GIRLS
                                                                                                                                                          96.6                                                                                                                                        COUNSL
                                                                                                                                                          RR G                                                                                                                                        110          111                        115        117           119         121
                 WEIGHT RM                                                                                                                                395                                                                                                                                         COUNS        MATH                       HISTORY    MATH          MATH        MATH
                 200.9                                                                                                            200                                                                                                                                                                 400          111                        115        117           119          121
                 WEIGHT RM                                                                                                        GYM/STAGE                                                                                                                                                                        9TH-12TH                   9TH-12TH   9TH-12TH      9TH-12TH     9TH-12TH
                 1350                  WRESTLING RM                                                                                                                                                                                                                                                                750                        750        750           750          750
                                       200.20                                                                                     200
                                                               OFFICEOFFICE
                        WEIGHT RM      PHY-ED
                                       1960                    200.19 200.18                                                      PHY-ED                                                       97
                        200.21                                 OFFICE OFFICE                    STAGE                             15571                                                        MAIN OFFICE
                                                                                                                                                                                               97
                        PHY-ED                                 1077 1077                                                                                                                       ADMIN
                        840                                                                                                                                                                    325


                                                                                                                                                                                                                                                                                                                                                                                      ROOM LABEL LEGEND
                                         BOYS                  BOYS                                                                                                                                                                                                                                                                                                                   POSTED ROOM NUMBER
                   LOCKERS               200.6                 200.3
                   200.7                 RR B                  PHY-ED                    203                                                                                                                                                                                                                                                                                          ROOM/SPACE NAME
                   PHY-ED                775                   550                       HEALTH
                   1140
                                                                          CUSTOD
                                                                          200.1
                                                                          CUSTOD
                                                                                            203                                                                                                                                                                                                                                                                                       DOE SPACE NUMBER
                                                                          100               9TH-12TH
                                                                                            750                                                                                                                                                                                                                                                                                       DOE SPACE TYPE
                                                                                                                                                                                                                                                                                                                                                                                      SQUARE FOOTAGE



MAIN LEVEL FLOOR PLAN                           NOT TO SCALE                                                                                                                          Page 1 of 2                                                                                                                                                UPDATED: 7/10/2017 BY: AM
STEPHENSON HIGH FACILITY                                        701 STEPHENSON RD., STONE MOUNTAIN, GA 30087 (678)                 FACILITY# 644-0497-1765.01    39.7 ACRES




                952
                SCIENCE LAB
                952                                                                                                  917           918
  951           SCI-LAB                                                                                              SOC STUDIES
  SCIENCE LAB   890                                                                                                  917           CAFETERIA
  951                                                                                                                              918
                                                                                                                     9TH-12TH      CAFETERIA
  SCI-LAB                                                                                                            600
  890                                                                                                                              1281
                                                                                                                     916
                                                                                                                     SOC STUDIES
                                                                                                                     916
                955                                                                                                  9TH-12TH
                SCIENCE LAB                                                                                          600
                                                                                                                                     919
                955                                                                                                  915             KITCHEN
  949           SCI-LAB                                                                                              LANG ARTS       919
  SCIENCE LAB   890                                                                                                  915             KITCHEN
  949                               960     961               964                                                    9TH-12TH        1291




                                                                                                                                                                                                                  STEPHENSON HIGH FACILITY
  SCI-LAB                           MATH    MATH              LECTURE                                                600
  890                               960      961              964                                                    914
                                    9TH-12TH 9TH-12TH         OTHER IU                                               LANG ARTS           OFFICE
                                    630      600              1220                                                   914
                                                                                                                                         919.1
                                                                                                                                         OFFICE
                                                                                                                                         64
                                                                                                                     9TH-12TH
   947                                                                                                               600
   SCIENCE
   947                                                                                                               913
   9TH-12TH                                                                                                          LANG ARTS
   890                                                                                                               913
                                                                                                                     9TH-12TH                       923     926      927     930
                                            962                  965                                                 600                            MATH    MATH     HISTORY HEALTH
                    GIRLS BOYS              MATH                 MATH                                                                               923      926      927      930
                     954    954.1           962                  965                                                 912
                     RR G   RR B                                                                                     SP ED                          9TH-12TH 9TH-12TH 9TH-12TH 9TH-12TH
                     300    300             9TH-12TH             9TH-12TH                                                                           600      600      600      600
                                            600                  600                                                 912
   940                                                                                                               SP-ED
   HEALTH                                                                                                            600
   940
   9TH-12TH                                                                                                                                902
   890                                                                                                                                     COUNSL
                                                                                                                                           902
                                                                                                                                           COUNS
                                                                                                                                           130
                                                                                                                     911
                                                                                                                     SP ED
                                                        5011                                                         911                                     5011
                                                        2005                                                         SP-ED                                   2005
   938                                                  45,680 SF                                                    600                                     45,680 SF
   CHROUS                                                                                                            910
   938                                                                                                               MATH
   CHORUS                                                                                                            910
   1100                                                                                                              9TH-12TH
                                                                                                                     600




                                                                                                                                                                                             ROOM LABEL LEGEND
                                                                                                                                                                                             POSTED ROOM NUMBER
                                                                                                                                                                                             ROOM/SPACE NAME
                                                                                                                                                                                             DOE SPACE NUMBER
                                                                                                                                                                                             DOE SPACE TYPE
                                                                                                                                                                                             SQUARE FOOTAGE



UPPER & SECOND LEVEL FLOOR PLAN                NOT TO SCALE                                         Page 2 of 2                                                               UPDATED: 7/10/2017 BY: AM
TUCKER MIDDLE FACILITY                            2160 IDLEWOOD RD, TUCKER, GA 30084 (678)676-875-0902                                                      FACILITY# 644-0605-1860.01     14.48 ACRES




                                                                                                                                                                                       A137
                                                               R      FREEZER               DRY
                                                                                                                                                                                       MATH
                                                                                COOLER                                                                                                 1137
                                                                                          STORAGE                                                                                      6TH-8TH
                                                              W/D
                                                                                                                                                                                       757


                                                             OFFICE
                                                                                                                                                                         A135          A136
                                                   C150                                                                                                                  SOC STUDIES   SCIENCE
                                                   MECH RM         JAN
                                                                                                                                                                         1135          1136
                                                   3150                                                                                                                  6TH-8TH       SCI-LAB
                                                   MECH RM                                                                                                               732           1059
                                                             DISH               SERVING LINES
                                                   531       WASH
                                                                                                                                                                          A134
                                                                                                                                                                          ENG/LANG
                                                                                                                                                                          1134
                                                                                                                                                                          6TH-8TH
                                                                                                                                                                          730
                       C113                                                                                                                                                            A132
                       GYM                                                                                                                                                A131         SCIENCE
                       3113                                                C140                                                                                           ENG/LANG     1132
                       PHY-ED                       STAGE                  CAFETERIA                                              ART PATIO                               1131         SCI-LAB
                                                                                                                                                                                       1059
                                                                                                                                                                          6TH-8TH
                       10920                                               3140                                                                                           721
                                                                           CAFETERIA
                                                                           5806                                                                                          A129
                                                                                                                                                                         SOC STUDIES
                                                                                                                                                                                       A130
                                                                                                                                                                                       MATH
                                                                                                                                                                         1129          1130
                                                                                                                                                   B126                  6TH-8TH       6TH-8TH
                                                                                                                                                   COUNSL                733           737
                                                                                                                                                   2123.3




                                                                                                                                                                                                                                                       TUCKER MIDDLE FACILITY
                                                                                                                                                   OTHER NI
                                                                                                                                            B129   158
                                                                                                                                            ART    B125
                                                                                                                                                   COUNSL
                                                                                            B137                                            2129   2123.2                                                    A107    A104
                                                                                            WEIGHT RM                                       ART    OTHER NI
                                                                                                                                                                                         A124                ENGLISH ENGLISH
                                                                                                                                            1561   164
                                                                                            2137                                                              B123                       STORAGE             1107       1104
                                                                                 B140       WEIGHT RM                         PHOTO LAB                       COUNSL                     1124                6TH-8TH    6TH-8TH
                                                                                 R
                                                                                            792                               2129.4                          2123                                           731        730
                                                                                 2140
                                                                                 RR S                                         ART                             OTHER NI                   STOR-NI
                                                                                 65                                           144                             278                        357


                                                                                                 B115
                                                                                                 OFFICE/SRO     B116
                                                                                                 2104.12        CLINIC
                                                                                                 ADMIN          2104.13        B120
                                                                                                 200            ADMIN
                                                                                                                               FAM/CONSU/SCIENCE                           A116        A110        A109                A105          A103
                                                                                                                231 B117
                                     B246                                                                           R          2120                                        SP ED       MATH        SCIENCE             SCIENCE       MATH
                                     MUSIC/BAND
                                                                                                                    2104.14
                                                                                                                    ADMIN
                                                                                                                    50         FAMILY-LAB                                  1116        1110        1109                1105          1103
                                     2146                                                                                      2228                                        SP-ED       6TH-8TH     SCI-LAB             SCI-LAB       6TH-8TH
                                     BAND                                                                                                                                  733         738         1056                1056          729
                                     1736



                                                                                        B106           B108
                                                                                                       R
                                                                                                       2104.5

                                                                                        CONF RM        RR S
                                                                                                       36
                                                                                                       B107
                                                                                        2104.3         R
                                                                                                       2104.4

                                                                                        ADMIN          RR S
                                                                                                       36

                                                                                        470
                 4010
                 2004                B158
                 152,360 SF          CHORUS
                                     2158
                                     CHOR/INSTR
                                     1709




                                                                                                                                                                                                                                  ROOM LABEL LEGEND
                                                                                                                                                                                                                                  POSTED ROOM NUMBER
                                                                                                                                                                                                                                  ROOM/SPACE NAME
                                                                                                                                                                                                                                  DOE SPACE NUMBER
                                                                                                                                                                                                                                  DOE SPACE TYPE
                                                                                                                                                                                                                                  SQUARE FOOTAGE



  FIRST FLOOR PLAN    NOT TO SCALE                                                                         Page 1 of 3                                                                             UPDATED: 7/11/2017 BY: AM
TUCKER MIDDLE FACILITY                               2160 IDLEWOOD RD, TUCKER, GA 30084 (678)676-875-0902                           FACILITY# 644-0605-1860.01     14.48 ACRES




                                                                             4010
                                                                             2004                                                          A237
                                                                             152,360 SF                                                    MATH
                                                                                                                                               1237
                                                                                                                                               6TH-8TH
                                                                                                                                               757

                                                                                                                      A235
                                                                                                                      SOC STUDIES          A236
                                                                                                                      1235                 SCIENCE
                                                                                                                      6TH-8TH                  1236
                                                                                                                      732                      SCI-LAB
                                                                                                                                               1059
                                                                                                                       A234
                                                                                                                       SP ED
                                                                                                                       1234
                                                                                                                       SP-ED
                                                                                                                       730

                                                                                                                       A231                A232
                                                                                                                       ENG/LANG            SCIENCE
                                                                                                                       1231                    1232
                                                                                                                       6TH-8TH                 SCI-LAB
                                                                                                                       721                     1058

                                                                                                                      A229                 A230
                                                                                                                      SOC STUDIES          MATH




                                                                                                                                                                                                                  TUCKER MIDDLE FACILITY
                                                                                                                      1229                     1230
                                                                                                                      6TH-8TH                  6TH-8TH
                                                                                                                      733                      737

    B203      B204                    B209A     B209B                     B222                                                                                     A207     A204
    HEALTH    SP ED/SPEECH            ISS LAB   ENG/LANG                  CAREER TECH                                                                              ENG/LANG ENG/LANG
    2203      2204                    2209.1    2209.2                    2222                                                                                     1207          1204
    6TH-8TH   SP-ED                   6TH-8TH   6TH-8TH                   TECH-LAB                                                                                 6TH-8TH       6TH-8TH
    711       867                     640       725                       2108                                                       A223
                                                                                                                                     DATA RM
                                                                                                                                     1223
                                                                                                                                                                   729           730
                                                                                                                                     MDF/IDF
                                                                                                                                     42




                                                                                                                       A216
                                                     B221         B229                                      A218       SP ED                   A210      A209                    A205      A203
                                                     COMPUTER LAB BUSINESS LAB                              STORAGE
                                                                                                            1218
                                                                                                            STOR-NI    1216                    MATH      SCIENCE                 SCIENCE   MATH
                                                     2221                   2229                            50
                                                                                                                       SP-ED                   1210      1209                    1205      1203
                                                     COMPUTER-LAB           BUSI-LAB                        A217
                                                                                                            R
                                                                                                                       730                     6TH-8TH   SCI-LAB                 SCI-LAB   6TH-8TH
                                                     1119                   1086                            1216.1
                                                                                                            RR S
                                                                                                            68                                 737       1060                    1056      729
                             B212
                             MEDIA CENTER
                             2212
                             MEDIA
                             3360
                                                                                                                                                                                             ROOM LABEL LEGEND
                                                                                                                                                                                             POSTED ROOM NUMBER
                                                                                                                                                                                             ROOM/SPACE NAME
                                                                                                                                                                                             DOE SPACE NUMBER
                                                                                                                                                                                             DOE SPACE TYPE
                                                                                                                                                                                             SQUARE FOOTAGE



  SECOND FLOOR PLAN    NOT TO SCALE                                                          Page 2 of 3                                                                  UPDATED: 7/11/2017 BY: AM
TUCKER MIDDLE FACILITY              2160 IDLEWOOD RD, TUCKER, GA 30084 (678)676-875-0902                 FACILITY# 644-0605-1860.01   14.48 ACRES



                                                                                                     4010
                                                                                                     2004
                                                                          A337                       152,360 SF
                                                                          MATH
                                                                           1337
                                                                           6TH-8TH
                                                                           758

                                       A335
                                       SOC STUDIES                   A336
                                       1335                          SCIENCE
                                       6TH-8TH                        1336
                                       728                            COMPUTER-LAB
                                                                      1061
                                       A334
                                       ENG/LANG
                                       1334
                                       6TH-8TH
                                       723
                                                                          A332
                                       A331                               SCIENCE
                                       ENG/LANG                            1332
                                       1331                                SCI-LAB
                                       6TH-8TH                             1058
                                       731




                                                                                                                                                                                    TUCKER MIDDLE FACILITY
                                       A329                               A330
                                       SOC STUDIES                        MATH
                                       1329                                1330
                                       6TH-8TH                             6TH-8TH
                                       708                                 724




                                         A316                              A310            A309                A305          A303
                                         SP ED                             MATH            SCIENCE             SCIENCE       MATH
                                          1316                             1310            1309                 1305         1303
                                          SP-ED                            6TH-8TH         SCI-LAB              SCI-LAB      6TH-8TH
                                          725                              730             104                  1054         730
                                                                                                                                                               ROOM LABEL LEGEND
                                                                                                                                                               POSTED ROOM NUMBER
                                                                                                                                                               ROOM/SPACE NAME
                                                                                                                                                               DOE SPACE NUMBER
                                                                                                                                                               DOE SPACE TYPE
                                                                                                                                                               SQUARE FOOTAGE



  THIRD FLOOR PLAN   NOT TO SCALE                                           Page 3 of 3                                                      UPDATED: 7/11/2017 BY: AM
Revised APPENDIX H1
Bob Mathis Elementary School
AE Services for HVAC Replacement
                                                                                                                                              Anticipated
                                                                                                                Project Design, Review,                          Anticipated
                                                                                                                                             Construction
                                                                                                                      Permitting                                 Construction
                                                                                                                                             Procurement
                                        Pre-Submittal                 Final                Board
                           RFQu Opens    Conference Questions Due   Addendum   Due Date   Approval    NOA          NTP          End        Start       NTP     Start       End
       Bob Mathis ES        04/28/22     05/05/22      05/11/22     05/18/22   05/24/22   07/11/22   07/18/22    08/12/22     11/10/22    12/2022     3/2023   3/2023     8/2024
Revised APPENDIX H2
Briarlake Elementary School
AE Services for HVAC Replacement
                                                                                                                                              Anticipated
                                                                                                                Project Design, Review,                          Anticipated
                                                                                                                                             Construction
                                                                                                                      Permitting                                 Construction
                                                                                                                                             Procurement
                                        Pre-Submittal                 Final                Board
                           RFQu Opens    Conference Questions Due   Addendum   Due Date   Approval    NOA          NTP          End        Start       NTP     Start       End
       Briarlake ES         04/28/22     05/05/22      05/11/22     05/18/22   05/24/22   07/11/22   07/18/22    08/12/22     11/10/22    12/2022     3/2023   3/2023     8/2024
Revised APPENDIX H3
Chapel Hill Elementary School
AE Services for HVAC Replacement
                                                                                                                                              Anticipated
                                                                                                                Project Design, Review,                          Anticipated
                                                                                                                                             Construction
                                                                                                                      Permitting                                 Construction
                                                                                                                                             Procurement
                                        Pre-Submittal                 Final                Board
                           RFQu Opens    Conference Questions Due   Addendum   Due Date   Approval    NOA          NTP          End        Start       NTP     Start       End
       Chapel Hill ES       04/28/22     05/05/22      05/11/22     05/18/22   05/24/22   07/11/22   07/18/22    08/12/22     11/10/22    12/2022     3/2023   3/2023     8/2024
Revised APPENDIX H4
Early Learning Center
AE Services for HVAC Replacement
                                                                                                                                                  Anticipated
                                                                                                                    Project Design, Review,                          Anticipated
                                                                                                                                                 Construction
                                                                                                                          Permitting                                 Construction
                                                                                                                                                 Procurement
                                            Pre-Submittal                 Final                Board
                               RFQu Opens    Conference Questions Due   Addendum   Due Date   Approval    NOA          NTP          End        Start       NTP     Start       End
       Early Learning Center    04/28/22     05/05/22      05/11/22     05/18/22   05/24/22   07/11/22   07/18/22    08/12/22     11/10/22    12/2022     3/2023   3/2023     8/2024
Revised APPENDIX H5
Edward L. Bouie Elementary School
AE Services for HVAC Replacement
                                                                                                                                               Anticipated
                                                                                                                 Project Design, Review,                          Anticipated
                                                                                                                                              Construction
                                                                                                                       Permitting                                 Construction
                                                                                                                                              Procurement
                                         Pre-Submittal                 Final                Board
                            RFQu Opens    Conference Questions Due   Addendum   Due Date   Approval    NOA          NTP          End        Start       NTP     Start       End
       Edward L. Bouie ES    04/28/22     05/05/22      05/11/22     05/18/22   05/24/22   07/11/22   07/18/22    08/12/22     11/10/22    12/2022     3/2023   3/2023     8/2024
Revised APPENDIX H6
Marbut Elementary School
AE Services for HVAC Replacement
                                                                                                                                              Anticipated
                                                                                                                Project Design, Review,                          Anticipated
                                                                                                                                             Construction
                                                                                                                      Permitting                                 Construction
                                                                                                                                             Procurement
                                        Pre-Submittal                 Final                Board
                           RFQu Opens    Conference Questions Due   Addendum   Due Date   Approval    NOA          NTP          End        Start       NTP     Start       End
       Marbut ES            04/28/22     05/05/22      05/11/22     05/18/22   05/24/22   07/11/22   07/18/22    08/12/22     11/10/22    12/2022     3/2023   3/2023     8/2024
Revised APPENDIX H7
Martin Luther King Jr., High School
AE Services for HVAC Replacement
                                                                                                                                              Anticipated
                                                                                                                Project Design, Review,                          Anticipated
                                                                                                                                             Construction
                                                                                                                      Permitting                                 Construction
                                                                                                                                             Procurement
                                        Pre-Submittal                 Final                Board
                           RFQu Opens    Conference Questions Due   Addendum   Due Date   Approval    NOA          NTP          End        Start       NTP     Start       End
       MLK Jr., HS          04/28/22     05/05/22      05/11/22     05/18/22   05/24/22   07/11/22   07/18/22    08/12/22     11/10/22    12/2022     3/2023   3/2023     8/2024
Revised APPENDIX H8
Montclair Elementary School
AE Services for HVAC Replacement
                                                                                                                                              Anticipated
                                                                                                                Project Design, Review,                          Anticipated
                                                                                                                                             Construction
                                                                                                                      Permitting                                 Construction
                                                                                                                                             Procurement
                                        Pre-Submittal                 Final                Board
                           RFQu Opens    Conference Questions Due   Addendum   Due Date   Approval    NOA          NTP          End        Start       NTP     Start       End
       Montclair ES         04/28/22     05/05/22      05/11/22     05/18/22   05/24/22   07/11/22   07/18/22    08/12/22     11/10/22    12/2022     3/2023   3/2023     8/2024
Revised APPENDIX H9
Panola Way Elementary School
AE Services for HVAC Replacement
                                                                                                                                              Anticipated
                                                                                                                Project Design, Review,                          Anticipated
                                                                                                                                             Construction
                                                                                                                      Permitting                                 Construction
                                                                                                                                             Procurement
                                        Pre-Submittal                 Final                Board
                           RFQu Opens    Conference Questions Due   Addendum   Due Date   Approval    NOA          NTP          End        Start       NTP     Start       End
       Panola Way ES        04/28/22     05/05/22      05/11/22     05/18/22   05/24/22   07/11/22   07/18/22    08/12/22     11/10/22    12/2022     3/2023   3/2023     8/2024
Revised APPENDIX H10
Pine Ridge Elementary School
AE Services for HVAC Replacement
                                                                                                                                              Anticipated
                                                                                                                Project Design, Review,                          Anticipated
                                                                                                                                             Construction
                                                                                                                      Permitting                                 Construction
                                                                                                                                             Procurement
                                        Pre-Submittal                 Final                Board
                           RFQu Opens    Conference Questions Due   Addendum   Due Date   Approval    NOA          NTP          End        Start       NTP     Start       End
       Pine Ridge ES        04/28/22     05/05/22      05/11/22     05/18/22   05/24/22   07/11/22   07/18/22    08/12/22     11/10/22    12/2022     3/2023   3/2023     8/2024
Revised APPENDIX H11
Shadow Rock Elementary School
AE Services for HVAC Replacement
                                                                                                                                              Anticipated
                                                                                                                Project Design, Review,                          Anticipated
                                                                                                                                             Construction
                                                                                                                      Permitting                                 Construction
                                                                                                                                             Procurement
                                        Pre-Submittal                 Final                Board
                           RFQu Opens    Conference Questions Due   Addendum   Due Date   Approval    NOA          NTP          End        Start       NTP     Start       End
       Shadow Rock ES       04/28/22     05/05/22      05/11/22     05/18/22   05/24/22   07/11/22   07/18/22    08/12/22     11/10/22    12/2022     3/2023   3/2023     8/2024
Revised APPENDIX H12
Stephenson High School
AE Services for HVAC Replacement
                                                                                                                                              Anticipated
                                                                                                                Project Design, Review,                          Anticipated
                                                                                                                                             Construction
                                                                                                                      Permitting                                 Construction
                                                                                                                                             Procurement
                                        Pre-Submittal                 Final                Board
                           RFQu Opens    Conference Questions Due   Addendum   Due Date   Approval    NOA          NTP          End        Start       NTP     Start       End
       Stephenson HS        04/28/22     05/05/22      05/11/22     05/18/22   05/24/22   07/11/22   07/18/22    08/12/22     11/10/22    12/2022     3/2023   3/2023     8/2024
Revised APPENDIX H13
Tucker Middle School
AE Services for HVAC Replacement
                                                                                                                                              Anticipated
                                                                                                                Project Design, Review,                          Anticipated
                                                                                                                                             Construction
                                                                                                                      Permitting                                 Construction
                                                                                                                                             Procurement
                                        Pre-Submittal                 Final                Board
                           RFQu Opens    Conference Questions Due   Addendum   Due Date   Approval    NOA          NTP          End        Start       NTP     Start       End
       Tucker MS            04/28/22     05/05/22      05/11/22     05/18/22   05/24/22   07/11/22   07/18/22    08/12/22     11/10/22    12/2022     3/2023   3/2023     8/2024
                      APPENDIX I

        STANDARD FORM OF CONTRACT

        FOR ARCHITECTURAL SERVICES

     (STATE CAPITAL OUTLAY PROJECTS)

                     BETWEEN THE

  DEKALB COUNTY BOARD OF EDUCATION

                AND THE ARCHITECT


Architect:

Architect Address:



Project Name:        HVAC Replacement at Bob Mathis ES, Briarlake ES,
                     Chapel Hill ES, Early Learning Center, Edward L.
                     Bouie ES, Marbut ES, Martin Luther King Jr., HS,
                     Montclair ES, Panola Way ES, Pine Ridge ES,
                     Shadow Rock ES, Stephenson HS, and Tucker MS


Project Address:     Various

Project No.:         N/A

Solicitation No.:    RFQu No. 22-752-030

Cost Code:           420.4000.572000.31121.7520.4180.8010.040.2021
                                    TABLE OF                       CONTENTS


Table of Contents
ARTICLE 1 REPRESENTATIONS AND WARRANTIES ............................................................2
ARTICLE 2 PRELIMINARY CONSULTATION, EXAMINATION AND REPORT .........................3
ARTICLE 3 PRELIMINARY DESIGN AND PRICE ESTIMATES ................................................3
ARTICLE 4 CONSTRUCTION DOCUMENTS............................................................................4
ARTICLE 5 FINAL PRICE ESTIMATE .......................................................................................7
ARTICLE 6 EXCEEDING AN ESTABLISHED STATED COST LIMITATION .............................7
ARTICLE 7 DUTIES, OBLIGATIONS AND RESPONSIBILITIES AFTER DESIGN ....................7
ARTICLE 8 INDEMNITY ..........................................................................................................12
ARTICLE 9 SCHEDULE ..........................................................................................................13
ARTICLE 10 PERSONNEL AND CONSULTANTS ..................................................................13
ARTICLE 11 PAYMENTS ........................................................................................................14
ARTICLE 12 PROJECT RECORDS .........................................................................................18
ARTICLE 13 DUTIES, OBLIGATIONS AND RESPONSIBILITIES OF THE OWNER ...............18
ARTICLE 14 APPLICABLE LAW..............................................................................................19
ARTICLE 15 OWNERSHIP OF THE PRELIMINARY DESIGN AND THE CONSTRUCTION
             DOCUMENTS ....................................................................................................19
ARTICLE 16 SUCCESSORS AND ASSIGNS ..........................................................................20
ARTICLE 17 NO THIRD PARTY BENEFICIARIES ..................................................................20
ARTICLE 18 ERRORS AND OMISSIONS INSURANCE..........................................................20
ARTICLE 19 OTHER INSURANCE..........................................................................................21
ARTICLE 20 TERMINATION ...................................................................................................21
ARTICLE 21 COOPERATION WITH PROGRAM MANAGER AND CONSTRUCTION
             MANAGER.........................................................................................................21
ARTICLE 22 PROHIBITION AGAINST CONTINGENT FEES ..................................................22
ARTICLE 23 ASBESTOS STATEMENT ..................................................................................22
ARTICLE 24 MANDATORY ADDENDUM TO THE OWNER/ARCHITECT CONTRACT ..........22
ARTICLE 25 ENTIRE AGREEMENT .......................................................................................22
ARTICLE 26 MISCELLANEOUS ..............................................................................................23
EXHIBIT “A” LIST OF PROPOSAL DOCUMENTS FOR THE PROJECT ................................26
EXHIBIT “B” MANDATORY ADDENDUM ..............................................................................27
EXHIBIT “C” OTHER INSURANCE ..........................................................................................31
EXHIBIT “D” ASBESTOS EXCLUSION CERTIFICATION FORM ............................................33
EXHIBIT “E” ARCHITECT’S PROPOSAL …………………………………………………………. 34
EXHIBIT “F” CONTRACTOR AFFIDAVIT …………………………………………………………. 35
EXHIBIT “G” SUBCONTRACTOR AFFIDAVIT…………………………………………………….37
EXHIBIT “H” AFFIDAIT OF EXEMPTION …………………………………………………………. 39
EXHIBIT “I” SPECIAL SUPPLEMENTARY CONDITIONS……………………………………….42




                                                               i
              CONTRACT FOR ARCHITECTURAL SERVICES
       This contract (the "Contract") is made and entered into by and between the DeKalb County
Board of Education (the "Owner") and                         (the "Architect"). This Contract shall
be effective on the date executed by the last party to execute it.

        The architectural services required by this Contract are to be rendered for a construction
project identified as HVAC Replacement at Bob Mathis ES, Briarlake ES, Chapel Hill ES, Early
Learning Center, Edward L. Bouie ES, Marbut ES, Martin Luther King Jr., HS, Montclair ES,
Panola Way ES, Pine Ridge ES, Shadow Rock ES, Stephenson HS, and Tucker MS (the
"Project").

       NOW, THEREFORE, in consideration of the mutual promises, covenants and agreements
stated herein, and for other good and valuable consideration, the sufficiency of which is hereby
acknowledged, the Owner and the Architect agree:


                                            ARTICLE 1

                           REPRESENTATIONS AND WARRANTIES

         In order to induce the Owner to execute this Contract and recognizing that Owner is relying
thereon, and without limiting or restricting any other representation or warranty set forth elsewhere
in this Contract or implied by operation of law, the Architect, by executing this Contract, makes
the following express representations to the Owner:

        1.1     The Architect is professionally qualified to act as the architect for the Project and
is licensed to practice architecture by all public entities having jurisdiction over the Architect and
the Project;

       1.2     The Architect has and shall maintain all necessary licenses, permits or other
authorizations necessary to act as architect for the Project until the Architect's duties hereunder
have been fully satisfied;

       1.3    The Architect has become familiar with the Project site and the local conditions
under which the Project is to be designed, constructed, and operated;

         1.4    The Architect shall prepare all documents and things required by this Contract
including, but not limited to, all contract plans and specifications, in such a manner that they shall
be accurate, coordinated and adequate for construction and shall be in conformity and comply
with all applicable law, codes and regulations; and

        1.5    The Architect assumes full responsibility to the Owner for the improper acts and
omissions of Architect’s consultants or others employed or retained by the Architect in connection
with the Project.




                                                  2
                                            ARTICLE 2

               PRELIMINARY CONSULTATION, EXAMINATION AND REPORT

         Prior to the preparation of the Schematic Design as required by Article 3 below, the
Architect shall first consult in detail with the Owner, and shall carefully examine any information
provided by the Owner concerning the Owner’s policies, purposes, concepts, objectives, desires,
and design, construction, scheduling, budgetary or operational Project needs, restrictions or
requirements, and any other information provided by the Owner concerning the Owner’s criteria
for the Project (collectively, all of the foregoing information may be referred to as the “Owner’s
Criteria”). Following such examination, and in no event later than ten (10) calendar days after the
effective date of this Contract, the Architect shall prepare and submit to the Owner a written report
detailing the Architect’s budgetary, operational, or other problems or recommendations which may
result from the Owner’s Criteria. The written report of the Architect shall also include proposed
solutions, if appropriate; addressing each of such identified problems.


                                            ARTICLE 3

                       PRELIMINARY DESIGN AND PRICE ESTIMATES

       3.1     After reviewing with the Owner the written report required by Article 2 above,
agreeing upon any proposed solutions to identified problems resulting from the Owner's Criteria,
the Architect shall draft and submit to the Owner a “Schematic Design” for the Project per RFQu
Appendix H: Owner’s Master Schedule. The Schematic Design shall be consistent with the
Owner's Criteria, as, and if, modified, and shall include as a minimum the information outlined in
RFQu Appendix B: Design Review – Minimum Submittal Requirements. This includes:

               3.1.1   Schematic Design Drawings

               3.1.2   Preliminary Outline of Specifications

               3.1.3   Cost Estimate as described in Article 3.2 below

               3.1.4   Written description of major components of the Design


               3.1.5 Any other documents or things necessary or appropriate to describe and
       depict the Preliminary Design and the conformity of same with the Owner's Criteria (as,
       and if, modified as set forth above) for the Project.

        3.2    Upon completion of the Schematic Design and as part of the Schematic Design
submittal, the Architect shall submit to the Owner in writing, its preliminary estimate for
constructing the Project. This estimate may be based on current area, volume or similar
conceptual estimating techniques. As the design process progresses through the end of the
preparation of the Construction Documents (CD), the Architect shall update and refine the
preliminary estimate of the contractor’s anticipated price for constructing the Project. At a
minimum, the Architect shall submit to the Owner in writing its updated and refined estimate per
the requirements outlined in RFQu Appendix B: Design Review – Minimum Submittal
Requirements. The Architect shall advise the Owner of any adjustments to previous estimates
for constructing the Project. If at any time the Architect's estimate for constructing the Project
                                                 3
exceeds the Owner's Stated Cost Limitation (SCL) by more than 5%, the Architect shall make
appropriate revisions to the Design Documents to bring the cost within the SCL. These revisions
will be performed by the Architect at no additional cost to the Owner. The Architect will also be
responsible for creating a Recovery Schedule to complete the design per the original Design
Schedule.

        3.3    In preparing estimates of the contractor’s anticipated price for constructing the
Project, the Architect shall be permitted to include reasonable contingencies for design, bidding
and price escalation; to determine what materials, equipment, component systems and types of
construction acceptable to Owner are to be included in the Construction Documents (CD); to
make reasonable adjustments in the scope of the Project acceptable to Owner and to include in
the Design for Construction alternate bids acceptable to Owner as may be necessary to adjust
the estimated contractor’s anticipated price for constructing the Project to meet the Owner's
budget.

        3.4    Upon completion and submittal of the Schematic Design and the Preliminary
Estimate, the Owner, the Owner’s Representatives, and other parties as deemed necessary will
review the documents for general compliance with the Owner’s design criteria described in Article
2 of this Contract. The Architect will participate in a Design Review Meeting at the end of the
design review period and, once in agreement with the proposed comments/ revisions, will proceed
to the 50% Construction Drawings Phase, where he will promptly incorporate the agreed upon
comments/ revisions into the Design Documents.

       3.5      After reviewing with the Owner the design review comments identified in 3.4 above,
and agreeing upon any proposed solutions to identified problems resulting from the review, the
Architect shall draft and submit to the Owner a “ 50% Construction Drawings” submittal for the
Project per RFQu Appendix H: Owner’s Master Schedule. The 50% Construction Drawings
submittal shall be consistent with the Owner's Criteria, as, and if, modified, and shall include as a
minimum the information outlined in RFQu Appendix B: Design Review – Minimum Submittal
Requirements.: This includes:

               3.5.1   50% Construction Drawings

               3.5.2   Initial Draft of Specification Manual

               3.5.3   Cost Estimate as described in Article 3.2 above

               3.5.4 Any other documents or things necessary or appropriate to describe and
       depict the 50% Construction Drawings Concepts and the conformity of same with the
       Owner's Criteria (as, and if, modified as set forth above) for the Project.


                                            ARTICLE 4

                                CONSTRUCTION DOCUMENTS

        4.1     Upon written direction from the Owner, after reviewing with the Owner the 50%
Construction Drawings Submittal required by Article 3 above, and after incorporating any changes
or alterations authorized or directed by the Owner with respect to the 50% Construction Drawings
Submittal or with respect to the Owner's Criteria, as, and if, modified, , the Architect shall draft and

                                                 4
submit to the Owner the “Construction Documents (CD)” in the phased submittals outlined in RFQu
Appendix B: Design Review – Minimum Submittal Requirements and RFQu Appendix H: Owner’s
Master Schedule. The Construction Documents shall include plans and specifications which
describe with specificity all systems, elements, details, components, materials, equipment, and other
information necessary for construction of the Project. In preparing the Construction Documents,
including without limitation any changes thereto, the Architect shall, as and when necessary, file and
review all plans and specifications with all departments, divisions and offices of the State of Georgia
and of DeKalb County having jurisdiction and requiring such filing or review, including without
limitation the State of Georgia Department of Education, State of Georgia Environmental Protection
Division, DeKalb County Building Department, DeKalb County Development Department and
DeKalb County Fire Marshall, and incorporate all required review comments into the plans and
specifications. The Construction Documents shall be accurate, coordinated and adequate for
construction and shall be in strict conformity, and strictly comply, with all applicable law, codes and
regulations, and with all standards, criteria (including the Owner’s Criteria), and memoranda of policy
furnished by the Owner. Products, equipment and materials specified for use shall be readily
available unless written authorization to the contrary is given by the Owner. The services required
of the Architect under this Contract do include, without limitation, an Erosion, Sedimentation and
Pollution Control Plan in accordance with the State of Georgia Department of Natural Resources
Environmental Protection Division storm water discharge permit, building evacuation plans, site
evacuation plans, demolition plans (if demolition is applicable), and any and all other services
required by law or otherwise necessary to provide permittable drawings and specifications.

        4.2     All plans and specifications shall bear the signature and seal of the Architect.
Structural, electrical, and mechanical plans and specifications shall also bear the signature and
seal of the respective engineers, licensed in the State of Georgia. Five (5) sets of all plans, sized
30” x 42”, and specifications, properly signed and sealed, shall be furnished to the Owner at every
submittal stage. In addition:

             4.2.1 Architect shall provide Owner with all final plans on computer disk in
       AutoCAD version 2000, or scanned onto magnetic media that can be accessed by
       AutoCAD 2000;

               4.2.2 Drawings will be posted on the District’s Project Management software
       Proliance “Contract Manager System” (CMS) using an Owner supplied license, as
       follows:
                     4.2.2.1 Preliminary Consultation and Examination Report – Posted on
                             CMS as a PDF file.
                       4.2.2.2 Schematic Design Submittal – Drawings posted as one PDF file,
                               specifications posted as one PDF file, additional reports posted as
                               PDF files.
                       4.2.2.3 Construction Documents – 50% same as 4.2.2.2
                       4.2.2.4 100% Construction Documents – Each drawing and specification
                               section is to be posted as a separate PDF file.

              4.2.3 Architect shall provide Owner with 11” x 17” prints of the final site plan,
       grading plan, staking plan, and overall floor plan; and

               4.2.4   The maximum drawing sheet size shall be 30” x 42”.

                                                 5
                4.2.5 If the Project involves construction to an existing school structure, Architect
        shall create and submit to Owner an evacuation plan for use during construction. If the
        Project has more than one Phase, Architect shall provide an evacuation plan specific to
        each Phase of construction. Any such evacuation plan created by the Architect for the
        Project shall be submitted to and subject to approval by the DeKalb County Fire Marshall.
        The Architect shall supplement any evacuation plan as required and necessary.

       4.3      The Architect is responsible for the calculating in detail of all structural, mechanical,
and electrical work including, but not limited to, the furnishing to the Owner of life-cycle-costing
and energy consumption analyses for the purpose of ascertaining and verifying (i) adequacy and
correctness of equipment specified or shown on the plans and (ii) that the plans and specifications
do not violate sound and accepted engineering principles; and

               4.3.1 to confirm that there has been ample provision in the entire structural
        system for expansion and contraction, including but not limited to, building frames, the roof
        system, gravel stops, gutters, roof expansion joints, metal flashing and metal
        counterflashing, roof decks, and masonry walls; and

              4.3.2 to confirm that there has been ample provision in the mechanical work for
        expansion and contraction.

       4.4     The Architect shall design all buildings in such manner that, if such buildings are
constructed in accordance with the construction contract between the Owner and contractor
(hereinafter “Construction Contract”), such buildings will be free from leaks.

        4.5     The Architect agrees that budgetary limitations are not a justification for breach of
sound principles of architectural and engineering design. The Architect shall take no calculated
risks in the design of the work. The Architect agrees that in the event it cannot design the work
within the Owner’s financial limitations without disregarding sound principles of design or in the
event the Architect is requested by any person, agency, or public body to make any changes
involving quality or quantity of the work, Architect shall give written notice to the Owner and obtain
written direction from the Owner before proceeding.

        4.6      The Architect acknowledges and agrees that the Owner does not undertake to
approve or pass upon matters of design and that the Owner, therefore, assumes no responsibility
for design. The Architect acknowledges and agrees that the review of plans and specifications
by the Owner is limited to determining whether such documents are generally consistent with the
Owner’s Criteria, as, and if, modified. The Owner does not undertake to inquire into the adequacy,
fitness, suitability, or correctness of engineering or architectural design. The Architect agrees that
no review of plans and specifications by the Owner or by any person, body, or agency shall relieve
Architect of the responsibility for the adequacy and correctness of architectural and engineering
design and for designing the work in accordance with sound and accepted engineering and
architectural principles.

        4.7    The Architect shall create and provide to Owner a list of the plans, specifications
and other documents constituting the 100% Construction Documents (the “Design Document
List”). The Architect shall update the Design Document List and provide such updates to the
Owner and the contractor as and when Owner authorized addenda, Change Orders, or other
Owner authorized revisions to the Design for Construction are issued. The Architect shall ensure
that the Design Document List is at all times accurate, complete and current; taking into account
all Owner authorized changes to the Construction Contract.
                                                   6
                                            ARTICLE 5

                                    FINAL PRICE ESTIMATE

        Contemporaneously with the submission of the 50% Construction Documents, the
Architect shall submit to the Owner in writing its final estimate for constructing the Project. The
final estimate for constructing the Project shall be prepared and submitted in accordance with the
requirements of paragraphs 3.2 and 3.3 above. Once submitted, the final price estimate shall not
be increased or decreased by the Architect unless the Construction Documents are changed upon
authorization by the Owner. In such event the final price estimate shall be adjusted by the
Architect to reflect any increase or decrease in estimated price resulting from the change in
Construction Documents.


                                            ARTICLE 6

                EXCEEDING AN ESTABLISHED STATED COST LIMITATION

        Prior to the Architect starting the Preliminary Design, the Owner may establish and
communicate to the Architect a maximum amount for payment to the contractor as the Contract
Price for constructing the Project (the “Stated Cost Limitation”). In the event the Architect's final
anticipated price estimate as required by Article 5 exceeds the Stated Cost Limitation, or in the
event the lowest bid or guaranteed maximum price or negotiated proposal from a qualified
contractor exceeds the Stated Cost Limitation, the Owner may require the Architect, at no cost to
the Owner, to consult with the Owner and to revise the Design for Construction so as to obtain a
bid price or proposal at or below the Stated Cost Limitation. Absent clear and convincing evidence
of gross negligence of the Architect in making its final anticipated price estimate or in designing
the Project without regard to the Stated Cost Limitation, providing such revisions shall fulfill the
Architect's liability to the Owner in connection with the Stated Cost Limitation.


                                            ARTICLE 7

             DUTIES, OBLIGATIONS AND RESPONSIBILITIES AFTER DESIGN

       7.1    The Architect shall assist the Owner in obtaining bids or proposals and in tabulating
bids and assessing the qualifications of bidders.

        7.2   During construction of the Project, and at all times relevant thereto, the Architect
shall have and perform the following duties, obligations, and responsibilities;

       7.2.1 In addition to its duties, obligations and responsibilities set forth in the following
paragraphs of this Article 7, the Architect shall have and perform those duties, obligations and
responsibilities of the Architect set forth in the Construction Contract. The Architect hereby
acknowledges that it has received, reviewed and studied a true and correct unexecuted copy of
the form of the Construction Contract and same is herein incorporated by reference. Copies of
the Owner’s forms of the Construction Contracts are available for review on the Owner’s website.
Any changes to the form of Construction Contract made by the Owner shall be enforceable under
this Contract unless such change is inconsistent with this Contract and the Architect specifically
objects to such change, in writing, not later than five (5) days from the Architect’s receipt of such
change;
                                                 7
        7.2.2 The Architect shall, as contemplated herein and in the Construction Contract, but
not otherwise, act on behalf, and be the agent, of the Owner throughout construction of the
Project. Instructions, directions, and other appropriate communications from the Owner to the
contractor shall be given to the contractor by the Architect;

         7.2.3 Upon receipt, the Architect shall carefully review and examine the contractor's
Schedule of Values, together with any supporting documentation or data which the Owner or the
Architect may require from the contractor. The purpose of such review and examination shall be
to protect the Owner from an unbalanced Schedule of Values which allocates greater value to
certain elements of the work than is indicated by such supporting documentation or data, or than
is reasonable under the circumstances. If the Schedule of Values is not found to be appropriate,
or if the supporting documentation or data is inadequate, the Schedule of Values shall be returned
to the contractor for revision or supporting documentation or data. After making such
examination, if the Schedule of Values is found to be appropriate as submitted, or if necessary,
as revised, the Architect shall sign the Schedule of Values thereby indicating its informed belief
that the Schedule of Values constitutes a reasonable, balanced basis for payment of the Contract
Price to the contractor;

        7.2.4 The Architect shall inspect the work of the contractor whenever and wherever
necessary, including without limitation, within 24 hours of the Owner’s request, and shall, at a
minimum, inspect work at the Project site no less frequently than once per week. Such
inspections shall be performed personally by a principal of the Architect’s firm, licensed in the
State of Georgia, at least once per month. The Architect shall require its consultants to participate
in such inspections and to generate written reports within three (3) business days thereof with
respect to their respective disciplines periodically as necessary to protect the Owner. A copy of
any such written report shall be provided to Owner within three (3) business days of receipt by
Architect. The purpose of such inspections shall be to determine the quality and quantity of the
work in comparison with the requirements of the Construction Contract. While performing such
inspections, the Architect shall protect the Owner from deficient or defective work, from
unexcused delays in the schedule and from requests for payment which could result in
overpayment to the contractor. Within three (3) days of each inspection the Architect shall submit
a written report of such inspection, together with any appropriate comments or recommendations,
to the Owner;

        7.2.4.1 In addition to any other inspections required by this Contract, the Architect, through
its consultant(s) as applicable, shall timely inspect the installation of the control measures set
forth in the Erosion, Sedimentation and Pollution Control Plan in accordance with the State of
Georgia Department of Natural Resources Environmental Protection Division storm water
discharge permit;

        7.2.4.2 In addition to any other inspections required by this Contract, the Architect, through
its consultant(s) as applicable, shall timely perform such inspections as are required by the State
of Georgia Department of Natural Resources Environmental Protection Division storm water
discharge permit;

        7.2.4.3 The Architect, through its consultant(s) as applicable, shall perform the duties,
obligations and responsibilities of the “design professional” under the State of Georgia
Department of Natural Resources Environmental Protection Division storm water discharge
permit. As used in the immediately preceding sentence, the term “design professional” shall have

                                                  8
the meaning ascribed to it in the State of Georgia Department of Natural Resources
Environmental Protection Division storm water discharge permit;

        7.2.4.4 Excepting only the preparation of the Erosion, Sedimentation and Pollution Control
Plan referred to in paragraph 4.1, the inspections referred to in paragraphs 7.2.4.1 and 7.2.4.2,
and the performance of the duties, obligations and responsibilities of the “design professional”
referred to in paragraph 7.2.4.3, the Architect shall ensure that the construction contractor
provides, satisfies or otherwise complies with all requirements and conditions of the State of
Georgia Department of Natural Resources Environmental Protection Division storm water
discharge permit, including, without limitation, all notices, fees, plan implementation, monitoring,
sampling, inspections, reports, record keeping, submittals and any other requirements and
conditions of the State of Georgia Department of Natural Resources Environmental Protection
Division storm water discharge permit;

       7.2.5 The Architect shall initially approve periodic and final payments owed to the
contractor under the Construction Contract predicated upon inspections of the work as required
in paragraph 7.2.4 hereinabove and evaluations of the contractor's rate of progress in light of the
remaining Contract Time and shall issue to the Owner Approvals of Payment in such amounts.
By issuing an Approval of Payment to the Owner, the Architect reliably informs the Owner that
the Architect has made the inspection of the work required by paragraph 7.2.4 above, and that
the work for which payment is approved has reached the quantities or percentages of completion
shown, or both, that the quality of the contractor's work meets or exceeds the requirements of the
Construction Contract, and that under the terms and conditions of the Construction Contract, the
Owner is obligated to make payment to the contractor of the amount approved;

        7.2.6 The Architect shall promptly provide appropriate interpretations of the Contract
Documents as to not delay the critical path of the project schedule and for the proper execution
of the work after receiving a written request for information or other written inquiry from the Owner
or the Contractor;

       7.2.7 The Architect shall reject in writing any work of the contractor which is not in strict
compliance with the Construction Contract unless directed by the Owner, in writing, not to do so;

       7.2.8 The Architect shall require inspection or re-inspection and testing or retesting of
the work in accordance with the provisions of the Construction Contract whenever appropriate;

        7.2.9 The Architect shall receive and promptly examine, study, and approve, or
otherwise respond to, the contractor’s shop drawings and other submittals. Approval by the
Architect of the contractor's submittal shall constitute the Architect's representation to the Owner
that such submittal is in conformance with the Construction Contract;

        7.2.10 The Architect shall receive and promptly examine and promptly consult with and
advise the Owner concerning requests for Change Orders from the contractor. Upon request by
the Owner, the Architect shall draft Change Orders, whether initiated by the Owner, or by the
contractor and approved by the Owner, in accordance with the Construction Contract. No change
in the Construction Contract, such as the price, the work, or the time for completion, may be made
without the written consent of the Owner

               7.2.10.1 The Architect may, with the prior approval of the Owner, authorize or
       direct minor changes in the work which are consistent with the intent of the Construction
       Contract and do not involve a change in: the price of the Construction Contract; the time
                                                 9
for construction; the Project scope; aesthetics; visual concepts; or approved design
elements. Such minor changes shall be issued by written field order.

       7.2.10.2 The Architect shall timely administer and manage all Change Order
requests and Change Orders, and shall maintain appropriate records relative to Change
Orders, including, without limitation, a log of all Change Order requests and proposals, all
actions taken thereon, the dates thereof, the estimated and actual amounts of Change
Orders;

       7.2.10.3 The Architect shall promptly prepare required drawings, specifications
and other supporting data as necessary in connection with minor changes, Change Order
requests and Change Orders;

        7.2.10.4 The Architect shall review all Change Order requests or proposals
submitted, and, within ten (10) days after receipt thereof, or more expeditiously if
necessary to avoid delay to the construction schedule, the Architect shall advise Owner in
writing as to:

             1. the description and nature of the proposed change and by whom the
       change has been requested;

              2. the cause of the proposed change and whether the proposed change is
       due to error or omission, unforeseen conditions, owner requested change or other
       cause;
              3. the necessity of the proposed change;

               4. the purpose of the proposed change;

               5. the advantages and disadvantages of the proposed change;

               6. the likely cost of the proposed change;

              7. the likely effect on the construction schedule of the issuance or non-
       issuance of the proposed Change Order;

              8. all other impacts and problems that may result from the issuance or non-
       issuance of the proposed Change Order;

               9. any reasonable alternatives to the proposed change; and

               10. the course of action recommended by the Architect.

        7.2.11 The Architect shall require its consultants to participate in inspections of
the Project regarding the determination of whether Substantial Completion has been
achieved and the determination of whether Final Completion has been achieved, and shall
require each consultant to prepare a written listing of those items, if any, yet to be finished,
copies of which shall be furnished to the Owner together with the Architect's written listing
of items, if any, yet to be finished. Based upon inspections of the Project, the Architect
shall certify in writing to the Owner the fact that, and the date upon which, the contractor
has achieved Substantial Completion of the Project and the date upon which the
contractor has achieved Final Completion of the Project.
                                          10
                 If the Project is divided into two or more Phases, each Phase is described
in more detail in RFQu Appendix B: Design Review – Minimum Submittal Requirements.
In the event the Project is divided into Phases, the Architect shall require its consultants
to participate in inspections of each Phase of the Project regarding the determination of
whether Substantial Completion has been achieved for such Phase and determination of
whether Final Completion for such Phase has been achieved, and shall require each
consultant to prepare a written listing of those items, if any, yet to be finished, copies of
which shall be furnished to the Owner together with the Architect's written listing of items,
if any, yet to be finished. Based upon inspections of the Project, the Architect shall certify
in writing to the Owner the fact that, and the date upon which, the contractor has achieved
Substantial Completion of each Phase of the Project and the date upon which the
contractor has achieved Final Completion of each Phase of the Project.

        7.2.12 The Architect shall transmit to the Owner all manuals, operating
instructions, as-built plans, warranties, guarantees and other documents and things
required by the Construction Contract and submitted by the contractor;

       7.2.13 The Architect shall testify in any judicial proceeding concerning the design
and construction of the Project when requested in writing by the Owner, and the Architect
shall make available to the Owner any personnel or consultants employed or retained by
the Architect for the purpose of reviewing, studying, analyzing or investigating any claims,
contentions, allegations, or legal actions relating to, or arising out of, the design or
construction of the Project;

       7.2.14 The Architect shall review any as-built, or record, drawings furnished by the
contractor and shall certify to the Owner that same are adequate and complete. The
Architect shall update the Final Construction Documents to reflect the as-built or record
documents furnished by the contractor. The Architect shall provide the Owner with the
updated As-Built Final Construction Documents as per Article 4.2.

        7.2.15 The Architect shall be responsible for any errors, omissions, deficiencies,
inconsistencies or conflicts in the drawings, specifications or other documents prepared
by the Architect or its consultant(s), or both, and in any other work or services performed
by the Architect or its consultant(s), or both. The Architect shall, without additional
compensation, promptly correct any errors, omissions, deficiencies, inconsistencies or
conflicts in the drawings, specifications or other documents prepared by the Architect or
its consultant(s), or both, and in any other work or services performed by the Architect or
its consultant(s), or both;

        7.2.16 It shall be the responsibility of the Architect to utilize its position as Architect
to ascertain whether the contractor is performing the Construction Contract in strict
compliance with the requirements of the Contract Documents. The Architect promptly
shall provide the Owner with written notice in the event that the contractor is not performing
the Construction Contract in strict compliance with the requirements of the Contract
Documents, with such notice identifying the non-compliant work and recommending a
course of action to be taken by the Architect or the Owner, or both; and,

      7.2.17 Once site work begins, the Architect shall attend a job site progress
meeting at least once every two weeks.


                                            11
       7.3     Prior to the Project being substantially complete, the Architect shall have and
perform the following duties, obligations, and responsibilities;

                7.3.1 Assemble a furniture bid package and provide copies as needed to the
       Owner’s staff for issuance to vendors. The bid package shall consist of the spreadsheet
       of all the furniture required for each space, a keyed floor plan labeling the location and
       quantity of each product, and specifications for each product. The floor plan shall be
       keyed back to the spreadsheet.

             7.3.2 Assist Owner with bid tabulation as needed and coordinate with Owner to
       ensure timely ordering and delivery of furniture in coordination with the construction
       schedule.

             7.3.3 Assist Owner by tracking the furniture order and periodically providing
       updates on the status of the order.

              7.3.4 Coordinate the furniture delivery with the construction schedule to ensure
       timely delivery and installation of furniture. Confirm that furniture is installed after all
       construction activities, including punch list work and ensure the furniture is not damaged
       by construction activities.

               7.3.5 Conduct a Substantial Completion inspection of all furnishings, fixtures and
       equipment and prepare a punch list. Review project for final acceptance to confirm punch
       list completion prior to project being turned over the Owner.

              7.3.6 During FF&E warranty period the Architect shall review all problems, issues,
       and/or concerns as they relate to the FF&E phase for one-year duration from Substantial
       Completion and will follow-up with the vendors, as required, for all remedial actions.

               7.3.7 Approve all furniture invoices and submit to Owner for payment.

                                           ARTICLE 8

                                           INDEMNITY

        To the fullest extent permitted by law, the Architect shall indemnify and hold harmless the
Owner from and against all liability, claims, damage, loss, liens, costs and expenses, including
without limitation attorneys’ fees and litigation expenses, arising out of, or resulting from, the
services of the Architect. In the event the Owner is alleged to be liable on account of alleged acts
or omissions, or both, of the Architect, the Architect shall defend such allegations through counsel
chosen by the Owner and the Architect shall bear all costs, fees, expenses of such defense,
including but not limited to, all attorneys’ fees and expenses, court costs, expert witness fees and
expenses. The Architect shall not be required to indemnify or hold harmless the Owner against
claims for damages, losses, or expenses, including attorneys’ fees, caused by or resulting from
the negligence of the Owner.




                                                12
                                           ARTICLE 9

                                           SCHEDULE

         Time is of the essence in the performance of this Contract. Within the RFQu and now as
an integral part of this Contract, the Architect has been provided a detailed schedule for
completing the Contract Documents as provided in Articles 3 and 4 of this Contract (See RFQu
Appendix H: Owner’s Master Schedule). The Design Schedule shall constitute the schedule for
performance by the Architect of its duties hereunder, and shall not, except for good cause, be
exceeded by the Architect. Not less frequently than monthly (unless the parties otherwise agree
in writing) Architect shall update the Design Schedule to show actual progress and provide a copy
to the Owner. Should Architect, at any time during the course of performing the Contract, have
any reason to believe that it will be unable to meet any completion date in accordance with the
Design Schedule, it shall immediately notify the Owner in writing. In such notice, the Architect
shall state the reason for the delay including the party responsible, if any, and the steps being
taken to remedy or minimize the impact of the delay.

                                           ARTICLE 10

                              PERSONNEL AND CONSULTANTS

        10.1 The Architect shall assign only qualified personnel to perform any service
concerning the Project. The Architect’s management, design, and construction administration
staff assigned to the Project shall have experience in K-12 school design and construction. The
Owner shall have the right, but not the obligation, to interview the management, design, and
construction administration staff that will be assigned to this Project. At the time of execution of
this Contract, the parties anticipate that the following named individuals will perform those
functions indicated:

               NAME                                                  FUNCTION




So long as the individuals named above remain actively employed or retained by the Architect or
its consultants, they shall perform the functions indicated next to their names.

        10.2 Owner shall have the right, but not the obligation, to review the consultants being
considered for this Project prior to the Architect entering into a subcontract with such consultant.
Architect shall not enter into a subcontract with an intended consultant with reference to whom
Owner objects in writing. Any objection, lack of objection, or consent by Owner shall in no way
relieve Architect of any of its duties or warranties under the Contract. Identified below are the

                                                13
Architect’s proposed consultants for the disciplines stated, and such proposed consultants shall
not be changed by Architect without the Owner’s prior written consent:

        Civil:

        Structural:

        Mechanical:

        Plumbing:

        Electrical:

        Kitchen Consultant:

               All consultants retained by the Architect in connection with the services required
by this Contract shall be retained at the Architect’s sole cost and expense.

                Architect shall coordinate with all appropriate and applicable consultants to
schedule review sessions with Owner’s representatives as identified in RFQu Appendix B: Design
Review – Minimum Submittal Requirements and RFQu Appendix H: Owner’s Master Schedule.
Architect shall ensure that all meeting participants have allotted at least six (6) hours for such
review sessions. Upon completion of a review session, the Architect will incorporate the
comments agreed to in the Design Review Meeting prior to the next submittal for review.


                                              ARTICLE 11

                                              PAYMENTS

        For its assumption and performance of the duties, obligations and responsibilities set
forth herein, the Architect shall be paid as follows:

        11.1 The Architect shall be paid for those services required by this Contract the sum of
 Two Million Nine Hundred Six Thousand Four Hundred Eighty-Eight Dollars ($2,906,488.00),
allocated in the following manner:


                 A. Preliminary Consultation/                       $
                    Examination Report


                 B. Schematic Design Phase                          $
                      •   Provide items identified in Appendix B

                 C. Design Development Phase                        $
                      •   Provide items identified in Appendix B




                                                   14
       D. Construction Document Phase:
           30% complete CD phase                               $
              • 30% complete drawings
              • Detailed project manual
              • Detailed cost estimate

           80% complete CD phase                      $
              • Construction documents per Appendix B
              • Detailed project manual
              • Detailed cost estimate
              • Fire Marshall review
              • Submittal to GA DOE

           100% Complete CD Phase                     $
              • Construction documents per Appendix B
              • Detailed project manual
              • Submittal for permitting
              • Fire Marshall review
              • Submittal to GA DOE

       E. Sub-consultants                                      $ Included in Fee

       F. FF&E Services                                        $ N/A

       G. Reimbursable Expenses                                $ Included in Fee

       H. Construction Administration Fee                      $
          (Minimum of 15% of Fee Required)


Total Lump Sum for HVAC Replacement at                $ 2,906,488.00
Bob Mathis ES, Briarlake ES, Chapel Hill ES,
Early Learning Center, Edward L. Bouie ES, Marbut ES,
Martin Luther King Jr., HS, Montclair ES, Panola Way ES,
Pine Ridge ES, Shadow Rock ES, Stephenson HS, and Tucker MS

11.2 For additional engineering or consultant services actually, reasonably and
properly hired by the Architect to perform any such duties, obligations and
responsibilities, the Architect shall be reimbursed for the cost actually, reasonably
and properly incurred by the Architect for such services.

       (a)     For the number of hours actually, reasonably and properly
       expended by Architect’s personnel in the performance of such duties,
       obligations and responsibilities other than those services required by this
       Contract, Architect shall be paid at the applicable hourly rate set forth below
       opposite the title/position of such personnel performing such services:

               Title/Position                 Hourly Rate
               Principal:                     $ 210 per hour
               Director:                      $ 155 per hour
               Project Architect:             $ 110 per hour
                                         15
                       Project Manager:                   $ 110 per hour
                       Project Coordinator:               $ 100 per hour
                       Interior Designer:                 $ 110 per hour
                       Project Captain:                   $ 90 per hour
                       Technical Staff:                   $ 110 per hour
                       Contract Administrator:            $ 85 per hour
                       Clerical:                          $ 50 per hour
                       Estimator:                         $ 85 per hour
                       Scheduler:                         $ 90 per hour
                       Designer:                          $ 85 per hour
                       CADD:                              $ 65 per hour
                       Civil Engineer                     $ 110 per hour
                       Junior Civil Engineer              $ 75 per hour
                       Structural Engineer                $ 115 per hour
                       Junior Structural Engineer         $ 90 per hour
                       Mechanical Engineer                $ 117 per hour
                       Junior Mechanical Engineer         $ 90 per hour
                       Electrical Engineer                $ 117 per hour
                       Junior Electrical Engineer         $ 90 per hour
                       Fire Protection Engineer           $ 115 per hour
                       Junior Fire Protection Engineer    $ 90 per hour
                       FF&E Coordinator                   $ 80 per hour
                       Others as appropriate              $     per hour

              11.2.1 For the avoidance of doubt, the services required of the Architect by this
       Contract do not include, unless otherwise amended to the contrary:

                       (a)     flood plain study and delineation;
                       (b)     wetlands study and delineation;
                       (c)     offsite utility system design;
                       (d)     domestic and fire water wells, towers or pressure booster systems
                               design;
                       (e)     civil engineering services, studies, drawings/specifications required
                               for off-site road developments/improvements required by DeKalb
                               County Public Works or Georgia Department of Transportation;
                       (f)     interior design services other than color selections.

       11.3 All expenses of the Architect, including but not limited to transportation, long-
distance calls, and the actual cost of copying and postage or other reasonable mode of
transmission of plans, specifications, and other Project documents, are included in the amount to
be paid to the Architect pursuant to Article 11.1 and all such expenses shall be paid by the
Architect without reimbursement from the Owner.

        11.4 If the Architect's duties, obligations and responsibilities are materially changed
through no fault of the Architect after execution of this Contract, compensation due to the Architect
shall be equitably adjusted, either upward or downward;


                                                     16
         11.5 As a condition precedent for any payment due under this Article 11, the Architect
shall submit monthly to Owner, unless otherwise agreed in writing by the Owner, an invoice
requesting payment for services properly rendered and expenses due hereunder. The Architect's
invoice shall describe with reasonable particularity each service rendered, the date thereof, the
time expended if such services were rendered pursuant to paragraphs 11.2 or 11.4 hereinabove,
and the person(s) rendering such service. The Architect's invoice shall be in such form and
content and shall be accompanied by such supporting documentation or data as the Owner may
require. If payment is requested for services rendered by the Architect pursuant to paragraph
11.1 hereinabove, the invoice shall additionally reflect the allocations as provided in said
paragraph and shall state the percentage of completion as to each such allocation. Each invoice
shall bear the signature of the Architect, which signature shall constitute the Architect's
representation to the Owner that the services indicated in the invoice have reached the level
stated, have been properly and timely performed as required herein, that the expenses included
in the invoice have been reasonably incurred in accordance with this Contract, that all obligations
of the Architect covered by prior invoices have been paid in full, and that the amount requested
is currently due and owing, there being no reason known to the Architect that payment of any
portion thereof should be withheld. Submission of the Architect's invoice for final payment shall
further constitute the Architect's representation to the Owner that, upon receipt by the Owner of
the amount invoiced, all obligations of the Architect to others, including its consultants, incurred
in connection with the Project, will be paid in full;

        11.6 The Owner may decline to make payment, may withhold funds, and, if necessary,
may demand the return of some or all of the amount previously paid to the Architect, to protect
the Owner from loss, or risk of loss, because of any one or more of the following: (i) Services that
are defective and not remedied by the Architect nor, in the opinion of the Owner, likely to be
remedied by the Architect; (ii) claims, or potential claims, of third parties against the Owner or the
Owner’s property or third party property; (iii) failure by the Architect to pay subconsultants or
others in a prompt or proper fashion; (iv) damage to the Owner or to a third-party to whom the
Owner is, or may be, liable; or, (v) “premium costs” incurred by the Owner on account of any
errors, omissions, deficiencies, inconsistencies or conflicts in the drawings, specifications or other
documents prepared by the Architect or its consultant(s) or both. As used in paragraph 11.6(v),
the term “premium costs” means costs that would not have been incurred if such drawings,
specifications or other documents had been prepared free of any errors, omissions, deficiencies,
inconsistencies or conflicts;

       11.7 The Owner shall make payment to the Architect of all sums properly invoiced under
the provisions of this Article 11 within thirty (30) days of the Owner's receipt of such invoice.




                                                 17
                                            ARTICLE 12

                                       PROJECT RECORDS

         All records relating in any manner whatsoever to the Project, or any designated portion
thereof, which are in the possession of the Architect or the Architect's consultants, shall be made
available to the Owner for inspection and copying upon written request of the Owner. Additionally,
said records shall be made available, upon request by the Owner, to any state, federal or other
regulatory authorities and any such authority may review, inspect and copy such records. Said
records include, but are not limited to, all plans, specifications, submittals, correspondence,
minutes, memoranda, tape recordings, videos, or other writings or things which document the
Project, its design, and its construction. Said records expressly include those documents
reflecting the time expended by the Architect and its personnel in performing the obligations of
this Contract and the records of expenses incurred by the Architect in its performance under said
Contract. The Architect shall maintain and protect these records for no less than ten (10) years
after final completion of the Project, or for any longer period of time as may be required by
applicable law or good architectural practice.


                                            ARTICLE 13

              DUTIES, OBLIGATIONS AND RESPONSIBILITIES OF THE OWNER

       The Owner shall have and perform the following duties, obligations and responsibilities to
the Architect:

       13.1 The Owner shall provide the Architect with all information requested by Architect
and in Owner’s possession, including the Owner's Criteria;

        13.2 The Owner shall review any documents provided by or through the Architect
requiring the Owner's decision, and shall make any required decisions;

       13.3 The Owner shall, at its own expense, furnish a legal description and any necessary
survey of the real property upon which the Project is situated;

        13.4 As may be mandated by law or called for by the Construction Contract, the Owner
shall, at its own expense, provide for all required tests, inspections, filings, studies or reports
(except for those tests, inspections, filings, studies or reports expressly required of the Architect,
its consultants, or both, by this Contract);

         13.5 In the event the Owner learns of any failure to comply with the Construction
Contract by the contractor, or of any errors, omissions or inconsistencies in the work product of
the Architect, and in the further event that the Architect does not have notice of same, the Owner
shall inform the Architect;

       13.6 The Owner shall afford the Architect access to the Project site and to the work as
may be reasonably necessary for the Architect to properly perform its services under this
Contract;

       13.7    The Owner shall perform its duties set forth in this Article 13 in a timely manner;


                                                 18
         13.8 Except for documents requiring the Owner's decision as set forth in paragraph 13.2
above, the Owner's review of any documents prepared by the Architect or its consultants shall be
solely for the purpose of determining whether such documents are generally consistent with the
Owner’s Criteria, as, and if, modified. The review of such documents shall not relieve the Architect
of its responsibility for the accuracy, adequacy or coordination of its work product.


                                           ARTICLE 14

                                       APPLICABLE LAW

        The law applicable to this Contract is the law of the State of Georgia. Each and every
provision required by law to be inserted in this Contract shall be deemed to be inserted herein
and the Contract shall be read and enforced as though it were included herein. Architect
irrevocably consents to the non-exclusive venue of the courts sitting in the county in which the
Project is located regarding any matter arising out of or relating to this Contract.


                                           ARTICLE 15

 OWNERSHIP OF THE PRELIMINARY DESIGN AND THE CONSTRUCTION DOCUMENTS

        The Preliminary Design and the Construction Documents shall become “Instruments of
Service” and include all Drawings, Plans, Specifications, and other documents, including those in
electronic form, prepared specifically for this Project by the Architect and its consultants. The
Architect and its consultants agree and shall be deemed to have prepared their respective
Instruments of Service as architectural works as defined in 17 U.S.C. §§ 102(a)(8) and 201(b),
thereby transferring and vesting in the Owner, pursuant to 17 U.S.C. § 201(d), all common law,
statutory, and other reserved rights, including copyrights in the Instruments of Service and in the
buildings, improvements, and structures constituting the Project. The Instruments of Service shall
include the Space Plan and Design Concept, if any.

        Upon execution of this Agreement, the Architect expressly grants, assigns, transfers, and
otherwise quitclaims to the Owner, its successors, and assigns, pursuant to 17 U.S.C. §201(d),
all common law, statutory, and other reserved rights, including copyrights in both the Instruments
of Service and in the buildings, improvements, and structures embodying the architectural and
engineering works that constitute the Project, provided that the Owner shall comply with all
obligations, including prompt payment of all sums, when due, under this Agreement. The
Architect shall obtain similar grants, assignments, transfers, and quitclaims from its consultants
consistent with this Agreement. The Architect warrants (and shall cause each of the Architect's
consultants to warrant also) that this transfer of copyright and other rights is valid against the
world.

         The Architect hereby grants, assigns, transfers, and otherwise quitclaims to the Owner,
without reservation, all copyrights to all Project-related documents, models, computer drawings,
and other electronic expressions, photographs, and other expression or Instruments of Service
produced by the Architect. However, the Architect will retain all rights to any pre-existing
intellectual property or standard construction details or conventions contained in the Instruments
of Service.

     The Owner hereby grants to the Architect a nonexclusive license to reproduce such
documents for purposes relating directly to the Architect’s performance of this Project, for the
                                                19
Architect’s archival records, and for the Architect’s reproduction of drawings and photographs for
the Architect’s marketing materials provided that the content of those materials, as to this Project,
are approved by the Owner prior to publication. No other Project-related documents may be
reproduced for any other purpose without the express written permission of the Owner. The
Architect's materials shall not include the Owner's confidential or proprietary information.

                                            ARTICLE 16

                                 SUCCESSORS AND ASSIGNS

        The Architect shall not assign its rights hereunder, excepting its right to payment, nor shall
it delegate any of its duties hereunder without the written consent of the Owner. Subject to the
provisions of the immediately preceding sentence, each party hereto binds itself, its successors,
assigns and legal representatives to the other and to the successors, assigns and legal
representatives of such other party.


                                            ARTICLE 17

                               NO THIRD PARTY BENEFICIARIES

       Nothing contained herein shall create any relationship, contractual or otherwise, with, or
any rights in favor of, any third party.


                                            ARTICLE 18

                            ERRORS AND OMISSIONS INSURANCE

        The Architect shall provide and maintain Professional Liability Insurance at all times this
Contract is in effect and for a period of six (6) years after Final Completion of the Project, with a
minimum level of coverage as described herein below. Said coverage shall be written by an
insurer licensed to do business in the State of Georgia and acceptable to the Owner.

        18.1 Within five days after the execution of this Contract the Architect shall file with the
Owner and the GaDOE Facility Services Unit a valid Certificate of Insurance showing the Architect
is then insured with Professional Liability (Errors and Omissions) Insurance with limits not less
than the following:

               a.      For Projects with a Stated Cost Limitation of more than $30,000,000:
                       i. For the Architect - $3,000,000 per claim and $4,000,000 in aggregate
                       coverage;
                       ii. For the Architect’s subconsultant engineers and architects - $2,000,000
                       per claim and $3,000,000 in aggregate coverage; and
                       iii. For other professional subconsultants - $1,000,000 per claim and
                       $2,000,000 in aggregate coverage.

               b.      For Projects with a Stated Cost Limitation of $20,000,000 up to
                       $30,000,000:
                       i. For the Architect - $2,000,000 per claim and $3,000,000 in aggregate
                       coverage;
                       ii. For the Architect’s subconsultant engineers and architects - $1,000,000
                                                 20
                      per claim and $2,000,000 in aggregate coverage; and
                      iii. For other professional subconsultants - $1,000,000 per claim and
                      $1,000,000 in aggregate coverage.

               c.     For Projects with a Stated Cost Limitation of less than $20,000,000:
                      i. For the Architect - $1,000,000 per claim and $1,000,000 in aggregate
                      coverage;
                      ii. For the Architect’s subconsultant engineers and architects - $1,000,000
                      per claim and $1,000,000 in aggregate coverage; and
                      iii. For other professional subconsultants - $1,000,000 per claim and
                      $1,000,000 in aggregate coverage.

        18.2 For such period of time that Professional Liability insurance is required for the
Project, as set forth above, the Architect shall provide the Owner with an updated or renewed
Certificate of Insurance at least annually, or more frequently if requested by the Owner, showing
the required coverage and limits of coverage remain in place.

        18.3 The coverage provided herein shall contain an endorsement providing thirty (30)
days’ notice to the Owner prior to any cancellation of said coverage. Said coverage shall be
written by an insurer acceptable to the Owner and shall be in a form acceptable to the Owner.

                                          ARTICLE 19

                                     OTHER INSURANCE

        The Architect shall also maintain insurance in accordance with the requirements of
Exhibit C attached hereto and incorporated herein by reference.


                                          ARTICLE 20

                                         TERMINATION

        20.1 Either party hereto may terminate this Contract upon giving seven (7) days written
notice to the other in the event that such other party substantially fails to perform its material
obligations set forth herein;

         20.2 This Contract may be terminated by the Owner without cause upon seven (7) days
written notice to the Architect. In such event, the Owner shall pay the Architect for all services
rendered prior to the termination, plus any expenses incurred and unpaid which would otherwise
be payable hereunder. In such event, the Architect shall promptly submit to the Owner its invoice
for final payment which invoice shall comply with the provisions of Article 11.


                                          ARTICLE 21

     COOPERATION WITH PROGRAM MANAGER AND CONSTRUCTION MANAGER

        21.1 In the event the Owner gives the Architect written notice that Owner will employ
the services of a program manager or construction manager, then the terms of this Article 21 shall
apply to the services provided by the Architect.

                                               21
       21.2 In the event the Owner gives the Architect written notice that Owner will employ
the services of a construction manager, the term “contractor” as used in this Contract shall mean
“construction manager” and the term “Construction Contract” as used in this Contract shall mean
“Construction Management Contract”.

         21.3 The Architect shall fully cooperate with the Owner’s program manager (“Program
Manager”) and, if applicable, the construction manager. Such cooperation shall include, without
limitation, providing any requested information to the Program Manager and, if applicable, the
construction manager, and advising, meeting with, consulting with, and coordinating with the
Program Manager and, if applicable, the construction manager.

         21.4 The Architect acknowledges that it has received, reviewed, and studied the
contract between the Owner and Program Manager. To the extent that the Program Manager is
authorized by its contract with Owner to act as the agent of the Owner, Architect agrees to comply
with all directions and instructions given by the Program Manager. To the extent that the Program
Manager is authorized and responsible for providing certain services delegated to the Architect
hereinabove, the Architect’s role with reference thereto shall be to advise, consult, and cooperate
with the Program Manager in its provisions of such services.

        21.5 The Architect is not a third-party beneficiary of any agreement by and between
Owner and the Program Manager or any construction manager. It is expressly acknowledged
and agreed that Architect’s duties to Owner are independent of, and are not diminished by, any
duties owed to Owner by the Program Manager or any construction manager.


                                          ARTICLE 22

                        PROHIBITION AGAINST CONTINGENT FEES

        The Architect by execution of this Contract warrants that it has not employed or retained
any company or person, other than a bona fide employee working solely for it, to solicit or secure
this Contract and that he has not paid or agreed to pay any person, company, corporation,
individual, or firm, other than a bona fide employee working solely for it, any fees, commission,
percentage, gift, or other consideration contingent upon or resulting from the award or making of
this Contract.


                                          ARTICLE 23

                                   ASBESTOS STATEMENT

       The Architect shall sign and deliver to the Owner the Asbestos Statement of Declaration,
attached hereto as Exhibit C, or in such other form as may be required by the Georgia Department
of Education, at such time as the Owner may require.

                                          ARTICLE 24

           MANDATORY ADDENDUM TO THE OWNER/ARCHITECT CONTRACT

       Pursuant to the requirements of the Georgia Department of Education, the “Mandatory
Addendum to the Owner/Architect Agreement For Projects Funded in Whole or in Part with
State Capital Outlay Funds” attached hereto as Exhibit B is hereby incorporated herein and
                                                22
made a part hereof.
                                           ARTICLE 25

                                      ENTIRE AGREEMENT

       This Contract constitutes the entire and exclusive agreement between the parties with
reference to the Project and supersedes any and all prior communications, discussions,
negotiations, understandings, or agreements. This Contract may be amended only by a writing
signed by both the Owner and the Architect.

                                           ARTICLE 26

                                        MISCELLANEOUS

       26.1 Throughout the performance of its duties under this Contract, the Architect shall
comply with, and shall provide all services necessary for the Owner to comply with, all laws
applicable to the design of the Project or the administration of the Construction Contract, including
without limitation the rules, guidelines, and other requirements of the State of Georgia
Environmental Protection Division, the State of Georgia Department of Education and the
ordinances and codes of DeKalb County Georgia.

       26.2 Unless otherwise expressly provided to the contrary in this Contract, the term
”day” shall mean calendar day.

        26.3 In addition to, and not in limitation of, the Architect’s other obligations under this
Contract, the Architect shall, without additional compensation, promptly assist the Owner in
resolving any problems arising out of, resulting from or relating to the design of the Project or the
materials or equipment specified by the Architect or its consultant(s).


        26.4 Any claim, dispute or other matter in question arising out of or related to this
Contract shall be subject to mediation as a condition precedent to the institution of legal or
equitable proceedings by either party. If such matter relates to or is the subject of a lien arising
out of the Architect’s services, the Architect may proceed in accordance with applicable law to
comply with the lien notice or filing deadlines prior to resolution of the matter by mediation. The
Owner and Architect shall endeavor to resolve claims, disputes and other matters in question
between them by mediation which, unless the parties mutually agree otherwise, shall be in
accordance with the Construction Industry Mediation Rules of the American Arbitration
Association currently in effect. Request for mediation shall be filed in writing with the other party
to this Contract and with the American Arbitration Association. The request may be made
concurrently with the filing of a civil action but, in such event, mediation shall proceed in advance
of legal or equitable proceedings, which may be stayed pending mediation for a period of 60 days
from the date of filing, unless stayed for a longer period by agreement of the parties or a court
order. The parties shall share the mediator’s fee and any filing fees equally. The mediation shall
be held in the place where the Project is located, unless another location is mutually agreed upon.
Subject to the express approval of the DeKalb County Board of Education, agreements reached
in mediation shall be enforceable as settlement agreements in any court having jurisdiction
thereof.




                                                 23
[SIGNATURES ON NEXT PAGE]




           24
OWNER:                                             ARCHITECT:

DEKALB COUNTY BOARD OF EDUCATION
                                                                 [Typed Name]

By:                                                By:
               [Signature]                                       [Signature]

Mrs. Vickie B. Turner, Board Chairperson
       [Printed Name, Title]                                     [Printed Name, Title]


By:
               [Signature]

Dr. Vassanne S. Tinsley, Interim Superintendent
       [Printed Name, Title]

1701 Mountain Industrial Blvd.

Stone Mountain, Georgia 30083
       [Printed Address]                                 [Printed Address]


__________________________________                 __________________________________
       [Date of Execution]                               [Date of Execution]




Richard H. Boyd, Interim Chief Operating Officer




                                              25
                                        EXHIBIT “A”

                LIST OF PROPOSAL DOCUMENTS FOR THE PROJECT

[Here insert or attach list of document(s) for the Project, included herewith in by reference.]




                                              26
                                          EXHIBIT “B”

                       Mandatory Addendum to the Owner/Architect Contract
         For Projects Funded in Whole or in Part with State Capital Outlay Funds

The Owner may use any form of agreement mutually agreed upon by the Owner and Architect to
contract for the Architect’s Services for any project funded in whole or in part with State Capital
Outlay Funds provided by the Georgia Department of Education (“GaDOE”); provided, however,
that this Mandatory Addendum must and shall be incorporated into the Owner and Architect’s
selected form of agreement on any such State Capital Outlay Funded project. In the event of a
conflict or inconsistency between the terms and conditions of the selected form of agreement and
this Mandatory Addendum, the terms and conditions of this Mandatory Addendum shall prevail
and govern over conflicting or inconsistent terms and conditions of the selected form of
agreement. This Mandatory Addendum shall not be modified without prior written consent of the
GaDOE. THE GaDOE SHALL NOT RELEASE ANY STATE CAPITAL OUTLAY FUNDS FOR AN
APPROVED CAPITAL OUTLAY PROJECT IF THIS MANDATORY ADDENDUM IS NOT MADE
A PART OF THE OWNER/ARCHITECT CONTRACT.

1.     For purposes of this Mandatory Addendum, notwithstanding terminology used in the
       Owner/Architect Contract, the following terms are defined to mean:
          a. “Architect” shall be the architect, engineer, or architect/engineer, whether
             individually or as a firm or other legal entity, engaged to perform the Architect’s
             Services.
          b. “Architect’s Services” shall be the scope of the Architect’s services for the Project
             set forth in the Contract, including the services and requirements set forth in this
             Mandatory Addendum.
          c. “Owner” shall be the Local Board of Education that is engaging the Architect to
             perform the Architect’s Services for the Project.
          d. “Contract” shall be the form of agreement between the Owner and the Architect,
             to which this Mandatory Addendum is attached and is a part, and shall set forth
             the Architect’s Services for the Project.
          e. “Project” shall be the Project for which the Architect’s Services are engaged and
             performed pursuant to the Contract.
          f. “Program” shall be the Owner’s policies, purposes, concepts, goals and objectives,
             and design, construction, scheduling, budgetary or operational needs, restrictions,
             or requirements for the Project.
          g. “Stated Cost Limitation” shall be the maximum amount that the Owner is
             authorized to spend to construct the Project as determined and established by the
             Owner.
          h. “Record Plans and Specifications” shall be the as-built plans and specifications
             including, but not limited to, actual location of utility lines, and any approved
             change orders.

2.     The Architect agrees not to assign or transfer any interest or rights in the Contract to any
       person or entity without the advanced written consent of the Owner. The Architect agrees
       to utilize the design and management team represented to the Owner and agrees that no
       substitutions, additions, or deletions to this team shall occur without the advanced written
       consent of the Owner. The Owner agrees to provide a response to the Architect within 14
       days of any such request by the Architect.


                                                27
3.   Prior to beginning the “Preliminary Plans and Specifications,” the Architect shall first
     consult in detail with the Owner to determine and understand the Owner’s Program.
     Within 10 days of such consultation, the Architect shall prepare and submit to the Owner
     a written report detailing and confirming the Architect’s understanding of the Owner’s
     Program. The Architect’s report must include, but is not limited to, the identification of
     any design, construction, scheduling, budgetary, operational, or other issues, problems
     or impediments foreseen by the Architect concerning the Project, the Program, or both.
     The Architect’s report should include proposed solutions or recommendations, for the
     Owner’s consideration, to resolve, eliminate, minimize or mitigate any such issues,
     problems or impediments. The Architect’s report shall also include any applicable
     educational specifications and GaDOE requirements.

4.   The Architect shall obtain written authorization from the Owner before proceeding with
     each next stage of Architect’s Services, including the “Preliminary Plans and
     Specifications,” the “Check Set Plans and Specifications,” and the “Final Plans and
     Specifications,” as defined in “Guidelines for Submission of Documents for Review of
     Planning, Bidding, and Construction of Educational Facilities” (as may be amended from
     time to time, always using the most recently published edition).

5.   The Architect agrees to comply with all applicable federal, state and local laws, codes and
     ordinances in the design of the Project. The Architect also agrees to comply with all
     applicable GaDOE rules and guidelines and to make required submittals in a timely
     manner to GaDOE’s Facility Services Unit. The Architect shall respond to GaDOE’s
     Facility Services Unit review report comments in a timely fashion so as to ensure that the
     review process may proceed orderly, efficiently and does not impede the Project or the
     Program.

6.   The Architect assumes full responsibility to the Owner for the acts and omissions of the
     Architect and the Architect’s consultants, subconsultants and employees in connection
     with the Contract, the Project and the Program.

7.   The Architect agrees to design the Project within the Owner’s budgetary limits and
     consistent with the Owner’s Program for the construction of the Project which shall be
     referred to as the Stated Cost Limitation, as follows:

     The Stated Cost Limitation for the Project shall be $___________________________,
     which is composed of:

     State Capital Outlay Funds in the amount of $____________________________, and

     Required Local Funds in the amount of $________________________________, and

     Additional Required Local Funds in the amount of $__________________________.

8.   The Architect shall provide reasonably reliable cost estimates to the Owner at the following
     design stages: (1) Preliminary Plans and Specifications stage, (2) 65% completion stage,
     and (3) Check Set Plans and Specifications stage (95% completion).

9.   In the event the Architect’s final project cost estimate (at Check Set Plans and
     Specifications stage) exceeds the Stated Cost Limitation for the Project, the Owner may
                                              28
      require the Architect, at no additional cost to the Owner, to consult with the Owner and to
      revise the design so as to enable the Owner to obtain a final cost for the Project at or
      below the Stated Cost Limitation. The Architect acknowledges and agrees that the
      Stated Cost Limitation shall not be exceeded except as provided herein; provided,
      however, the Architect further acknowledges and agrees that budgetary limitations are
      never a justification for breach, disregard or circumvention of sound principles of
      architectural and engineering design. Therefore, the Architect shall take no calculated
      risks in the design of the Project. The Architect agrees that, in the event that the Architect
      determines that the Project cannot be designed so as to be fully and finally constructed
      within the Stated Cost Limitation and in keeping with sound principles of design, the
      Architect will give written notice of such determination immediately, and in no event more
      than seven (7) days after the Architect makes such a determination, to the Owner and to
      the GaDOE Facilities Services Unit.

10.   The Stated Cost Limitation may be amended by written mutual agreement signed by the
      Owner and the Architect at any time after the Contract between the Architect and Owner
      is executed. Prior to such amendment, the Architect shall provide the Owner with reliable
      and verifiable evidence through either internal-Architect estimates, third party estimates,
      materials supplier quotes, or other industry best management practices standards to
      establish that an increase in the Stated Cost Limitation is warranted and justifiable. The
      Owner reserves the right to request additional supporting documentation substantiating
      the need to increase the Stated Cost Limitation. The Owner reserves and has the right,
      in its sole discretion, to refuse to increase the Stated Cost Limitation.

11.   All plans, specifications, design calculations, designs, drawings, or other documents or
      data produced pursuant to the Contract by the Architect, or the Architect’s consultants,
      subconsultants, or employees shall be the sole property of the Owner regardless of the
      stage in which the development of the design has progressed, and shall be delivered to
      the Owner upon request. The Owner shall retain all ownership rights with regard to such
      plans, specifications, design calculations, designs, drawings, or other documents or data
      produced pursuant to the Contract.

12.   The Architect shall provide and maintain Professional Liability Insurance at all times this
      Contract is in effect and for a period of six (6) years after execution by the Architect of the
      “Certificate of Final Completion” indicating final completion of the Project, with a minimum
      level of coverage as described herein below. Said coverage shall be written by an insurer
      licensed to do business in the State of Georgia and acceptable to the Owner.

      Before the Owner executes the Contract, the Architect shall provide the Owner and the
      GaDOE Facility Services Unit with a valid Certificate of Insurance showing that the
      Architect is then insured with Professional Liability (Errors and Omissions) Insurance
      with limits not less than the following:

         a. For Projects with a Stated Cost Limitation of more than $30,000,000:
            i. For the Architect - $3,000,000 per claim and $4,000,000 in aggregate
            coverage;
            ii. For the Architect’s subconsultant engineers and architects - $2,000,000 per
            claim and $3,000,000 in aggregate coverage; and
            iii. For other professional subconsultants - $1,000,000 per claim and $2,000,000
            in aggregate coverage.

                                                29
         b. For Projects with a Stated Cost Limitation of $20,000,000 up to $30,000,000:
            i. For the Architect - $2,000,000 per claim and $3,000,000 in aggregate
            coverage;
            ii. For the Architect’s subconsultant engineers and architects - $1,000,000 per
            claim and $2,000,000 in aggregate coverage; and
            iii. For other professional subconsultants - $1,000,000 per claim and $1,000,000
            in aggregate coverage.

         c. For Projects with a Stated Cost Limitation of less than $20,000,000:
            i. For the Architect - $1,000,000 per claim and $1,000,000 in aggregate
            coverage;
            ii. For the Architect’s subconsultant engineers and architects - $1,000,000 per
            claim and $1,000,000 in aggregate coverage; and
            iii. For other professional subconsultants - $1,000,000 per claim and $1,000,000
            in aggregate coverage.

      For such period of time that Professional Liability insurance is required for the Project, as
      set forth above, the Architect shall provide the Owner with an updated or renewed
      Certificate of Insurance at least annually, or more frequently if requested by the Owner,
      showing the required coverage and limits of coverage remain in place.

13.   The Architect shall carefully inspect the work of the Contractor within 24 hours of the
      Owner’s request, and shall also, at a minimum, inspect work at the Project site
      ____________________________________, and in any event, no less frequent than
      once per month. At least once per month, the inspection shall be performed by an
      architect or engineer licensed in the State of Georgia. The purpose of such inspections,
      among other things, shall be to determine the quality and quantity of the work in
      comparison with the requirements of the contract documents for the Project. In
      performing such inspections, the Architect shall advise the Owner of: deficient or
      defective work; real or potential delays in the schedule or the work of the Project; and,
      requests for payment by the Contractor which could constitute overpayment for work not
      yet performed or completed. Within three (3) days of each site visit, the Architect shall
      submit a written report of such site visit which, in addition to the information required by
      the preceding sentence, shall include and convey any relevant information, comments or
      recommendations to the Owner.

14.   The Architect shall provide Owner a set of “Record Plans and Specifications” within thirty
      (30) days after execution by the Architect of the “Certificate of Substantial Completion.”
      Such “Record Plans and Specifications” shall include any authorized change orders,
      actual locations of all utility lines, and any other appropriate information. The drawings
      shall be presented in a Computer Aided Drafting (CAD) format or other format of the
      Owner’s choice, and the specifications shall be presented in a word processing format of
      the Owner’s choice.

15.   The Contract executed between the Owner and the Architect, to which this Mandatory
      Addendum is a part, shall include a provision for the termination of the Architect’s Services
      (or be deemed to include this Paragraph 15) giving the Owner the rights of (1) termination
      of the Architect’s Services with cause and (2) termination of the Architect’s Services
      without cause. In the event of termination, the Owner shall pay the Architect for the
      reasonable value of the Architect’s Services performed by the Architect prior to the
      termination. Payment for the Architect’s Services rendered prior to termination shall be

                                               30
       based on statements properly submitted by the Architect to the Owner and supported by
       time sheets, invoices and such other supporting documentation that the Owner may
       reasonably require; provided, however, that in no event shall the total payment to the
       Architect exceed an amount equal to the percentage of completion of the Architect’s
       Services for the Project at the time of termination.

16.    The Architect shall be responsible for the timely submittal and completion of all forms
       required by GaDOE and shall respond to GaDOE comments on submittals within twenty-
       one (21) days of receipt of GaDOE comments. Such forms may be obtained from the
       Facilities Services Unit, Georgia Department of Education, 1670 Twin Towers East, 205
       Jesse Hill Jr. Drive, SE, Atlanta, Georgia 30334. At the close of the Project, the Architect
       shall submit an “Architectural Certification” form, as provided by the GaDOE, to the
       Owner. Unless the Architect’s services are terminated by the Owner before final
       completion of the Project, the completion and submittal of this form is required prior to the
       Owner’s release of the final payment to the Architect.

17.    All architectural plans and specifications shall bear the signature and seal of the Architect,
       which shall be licensed to practice in the State of Georgia. Civil, survey, structural,
       electrical, and mechanical plans and specifications shall bear the signature and seal of
       the respective engineer, who shall be licensed to practice in the State of Georgia.

18.    A fully executed copy of the Contract between the Owner and the Architect, including a
       completed copy of this Mandatory Addendum, must be filed with the GaDOE Facilities
       Services Unit.

OWNER                                                 ARCHITECT


_____________________________________                 ___________________________________
Chairperson, Local Board of Education                 Firm:


Date: ________________________________                Date: ______________________________


________________________________
Superintendent, Local Board of Education

Date: _______________________________




                                                31
                                           EXHIBIT “C”

                                      OTHER INSURANCE

        1.1 The Architect shall maintain the following other insurance at all times this Contract is in
effect and for a period of six (6) years after Final Completion of the Project. The Architect shall secure
the following insurance at his own expense and shall file Certificates of Insurance with the Owner
within five (5) days after the execution of this Contract. Insurance will not be acceptable unless
written by a Company licensed by the State Insurance Department to do business in Georgia at the
time the policy is issued and the company must in addition be acceptable to the Owner.

              1.1.1   Workmen’s Compensation and Employer’s Liability to statutory limits.

              1.1.2 Comprehensive Commercial General Liability (“CGL”) including Owner’s &
              Contractor’s Protective with the following limits;

                      (a)     General Aggregate: $2,000,000, which shall apply on a per-project
                              basis;
                      (b)     Products and Completed Operations Aggregate: $1,000,000;
                      (c)     Personal & Advertising Injury: $1,000,000;
                      (d)     Each Occurrence: $1,000,000;
                      (e)     Fire Damage (Any one fire): $50,000; and,
                      (f)     Medical Expense (Any one person): $5,000.

              1.1.3 Automobile Liability (owned, non-owned, hired) with combined single limit of
              $2,000,000 annual aggregate, $1,000,000 per occurrence.

              1.1.4   Professional Liability (Errors and Omissions); as per Article 18.

              1.1.5 Excess/Umbrella Liability Insurance with limits of at least $5,000,000 per
              occurrence and in the aggregate which shall provide excess coverage above all
              insurance described in this Section 1.1.

              1.1.6 The Owner and the Architect waive all rights against (1) each other and any of
              their subcontractors, subconsultants, agents and employees, each of the other, and (2)
              the Contractor, the Contractor subcontractors, if any, and any of their subcontractors,
              sub-contractors, agents and employees, for damages caused by fire or other causes
              of loss to the extent fully covered by property insurance obtained pursuant to Paragraph
              (9) above or other property insurance applicable to Work, except such rights as they
              have to proceeds of such insurance held by the Architect as fiduciary.

        1.2 The Owner and DeKalb County School District shall be included as additional insured
on the coverages specified in subparagraphs 1.1.2, 1.1.3 and 1.1.5 and shall be indicated as such
on certificates of insurance required herein.

              1.2.1 With respect to CGL Insurance only, all CGL insurance policies shall contain
              additional insured endorsements forms CG 20 10 11 85, CG 20 10 10 01, CG 20 37 10
              01, or their substantial equivalents, so that the policies provide additional insured
              coverage for (a) both ongoing and completed operations; and (b) liability “arising out
              of” Architect’s work.


                                                  32
             1.2.2 Each certificate shall contain a provision that coverages afforded under the
             policies will not be canceled, changed or allowed to expire until thirty (30) days after
             the Owner has received written notice evidence by return receipt of registered letter.

             1.2.3 Each primary and excess/umbrella CGL and Automobile Liability insurance
             policy required to be maintained by the Architect and any of its subcontractors or
             subconsultants shall be primary to an non-contributory with any insurance carried by
             the Owner and DeKalb County School District, such that no primary, excess or umbrella
             insurance carried by the Owner or DeKalb County School District shall be required to
             respond to any claim, suit or demand, if at all, until all applicable primary and
             excess/umbrella CGL and Automobile Liability insurance policies maintained by the
             Architect and any of its subcontractors and subconsultants have been exhausted.

             1.2.4 The primary, excess/umbrella CGL and Automobile Liability insurance policies
             maintained by the Architect and any of its subcontractors or subconsultants shall not
             contain any insured vs. insured, cross-liability or cross-claim exclusion or endorsement
             barring coverage for any claims by the Owner or DeKalb County School District against
             the Architect or any other insured under said policies.

         1.3 In the event that the Architect elects to retain subcontractors or subconsultants and
the Owner approves said retention, the Architect shall require all such subcontractors and
subconsultants to comply with the insurance and notice requirements of this Exhibit C, including
but not limited to (a) maintaining the types and amounts of insurance described in Article 18 and
this Exhibit C; and (b) having the DeKalb County Board of Education and DeKalb County School
District named as additional insureds on all such insurance pursuant to Section 1.2 of this Exhibit
C. The Architect assumes all liability for its subconstracors’ and subconsultants’ failure to comply
with insurance provisions of this Exhibit C.




                                                33
                                         EXHIBIT “D”

                       ASBESTOS EXCLUSION CERTIFICATION FORM
                        (NEW CONSTRUCTION & ADDITIONS ONLY)


In compliance with AHERA Part 763 “Asbestos”, Subpart E “Asbestos Containing Materials in
Schools”, Section 763.99 “Exclusions” paragraph (a) (7), I
                                                           (Architect)

of record for                                        ,
                (Project Name)                           (Substantial Completion Date)

Located in      DeKalb County School District        ,
                (School System Name)                     (State Project Number)

certify that to the best of my knowledge no Asbestos Containing Building Material (ACBM) was
specified as a building material in any construction document, nor was any ACBM building
material installed on this project.

________________________________________
      (Architectural Firm)


________________________________________
      (Signature of Architect)


________________________________________
      (Date)

________________________________________
      (Georgia Architectural License Number)


_________________________________________
      (Seal and Signature)




                                                34
     EXHIBIT “E”
ARCHITECT’S PROPOSAL




         35
                                         EXHIBIT “F”

                                CONTRACTOR AFFIDAVIT

      By executing this affidavit, the undersigned Contractor verifies its compliance with
O.C.G.A. 13-10-91, and attests under oath that:

       (1)     the individual, firm, or corporation (“Contractor”) which is contracting with the
DeKalb County Board of Education has registered with, is authorized to use, uses, and will
continue throughout the contract term to use and participate in, a federal work authorization
program [any of the electronic verification of work authorization programs operated by the
United States Department of Homeland Security or any equivalent federal work authorization
program operated by the United States Department of Homeland Security to verify information
of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986 (IRCA),
P.L. 99-603], in accordance with the applicability provisions and deadlines established in
O.C.G.A. 13-10-91, as amended. As of the effective date of O.C.G.A. 13-10-91, the applicable
federal work authorization program is the “EEV/Basic Pilot Program” operated by the U. S.
Citizenship and Immigration Services Bureau of the U.S. Department of Homeland Security,
in conjunction with the Social Security Administration (SSA).

       (2)     Contractor’s correct user identification number and date of authorization is set
forth herein below.

       (3)      Contractor agrees that the Contractor will not employ or contract with any
subcontractor(s) in connection with the physical performance of services pursuant to this
contract with the DeKalb County Board of Education, unless at the time of the contract said
subcontractor:

       (a) is registered with and participates in the federal work authorization
       program;

       (b) provides Contractor with a duly executed, notarized affidavit with the
       same affirmations, agreements, and information as contained herein and in
       such form as required under applicable law; and

       (c) agrees to provide Contractor with notice of receipt and a copy of every sub-
       subcontractor Affidavit or other applicable verification procured by subcontractor
       at the time of contract with the sub-subcontractor(s) within five (5) business days
       after receiving the said Affidavit or verification.

Contractor agrees to maintain records of such compliance and to provide notice of receipt
and a copy of each such subcontractor Affidavit or other permissible verification to the DeKalb
County Board of Education at the time the subcontractor(s) is retained to perform such service or
within five (5) days after receiving the said Affidavit or verification, whichever first occurs.




                                               36
       (4)     Contractor further agrees to and shall provide DeKalb County Board of Education
with copies of all other affidavits or other applicable verification received by Contractor (i.e.: sub-
subcontractor affidavits and all other lower tiered affidavits) within five (5) days of receipt.

__________________________________________                   _______________________________
EEV/Basic Pilot Program User Identification Number                 Date of Authorization


If an applicable Federal work authorization program as described above is used, other than the
EV/Basic Pilot Program,please identify the program.


Company Name / Contractor Name                                               Date



BY:    Signature of Authorized Officer or Agent                              Date


Title of Authorized Officer or Agent of Contractor


Printed Name of Authorized Officer or Agent



SUBSCRIBED AND SWORN
BEFORE ME ON THIS THE
______ DAY OF_____________________, 20____


Notary Public
My Commission Expires:




                                                  37
                                         EXHIBIT “G”

                              SUBCONTRACTOR AFFIDAVIT

            By executing this affidavit, the undersigned subcontractor verifies its
compliance with O.C.G.A. 13-10-91, and attests under oath that:

       (1) the undersigned individual, firm or corporation (“Subcontractor”) is engaged in
the physical performance of services under a contract with                          (name
of Contractor), which has a contract with the DeKalb County Board of Education.

       (2) Subcontractor has registered with, is authorized to use, uses, and will continue
throughout the contract term to use and participate in, a federal work authorization program [any
of the electronic verification of work authorization programs operated by the United States
Department of Homeland Security or any equivalent federal work authorization program operated
by the United States Department of Homeland Security to verify information of newly hired
employees, pursuant to the Immigration Reform and Control Act of 1986 (IRCA), P.L. 99-603],
in accordance with the applicability provisions and deadlines established in O.C.G.A. 13-10-
91. As of the effective date of O.C.G.A. 13-10-91, the applicable federal work authorization
program is the “EEV/Basic Pilot Program” operated by the U. S. Citizenship and Immigration
Services Bureau of the U.S. Department of Homeland Security, in conjunction with the Social
Security Administration (SSA).

       (3) Subcontractor’s correct user identification number and date of authorization is set
forth herein below.

      (4) Subcontractor agrees that the Subcontractor will not employ or contract with any sub-
subcontractor(s) in connection with the physical performance of services pursuant to this
subcontract or the contract with the DeKalb County Board of Education, unless said sub-
subcontractor:

             (a) is registered with and participates in the federal work authorization
       program;

              (b) provides Subcontractor with a duly executed, notarized affidavit
       with the same affirmations, agreements, and information as contained herein
       and in such form as required under applicable law; and

              (c) agrees to provide Subcontractor with notice of receipt and a copy of
       every sub-subcontractor Affidavit or other permissible verification procured by sub-
       subcontractor at the time the sub-subcontractor(s) is retained to perform such
       service or within five (5) days after receiving the said Affidavit or verification,
       whichever first occurs.




                                               38
Subcontractor agrees to maintain records of such compliance and to provide notice of receipt
and a copy of each such sub-subcontractor Affidavit or other applicable verification to the
Contractor at the time the sub-subcontractor(s) is retained to perform such service or within five
(5) days after receiving the said Affidavit or verification, whichever first occurs.




EEV/Basic Pilot Program User Identification Number                  Date of Authorization


If an applicable Federal work authorization program as described above is used, other than the
EEV/Basic Pilot Program, please identify the program.



BY:   Authorized Officer or Agent                                                Date

_________________________________________
(Subcontractor Name)


Title of Authorized Officer or Agent of Subcontractor


Printed Name of Authorized Officer or Agent



SUBSCRIBED AND SWORN
BEFORE ME ON THIS THE
_____ DAY OF _____________________, 20____


Notary Public
My Commission Expires:




                                                39
                                         EXHIBIT H
                                 AFFIDAVIT OF EXEMPTION
                               (Under O.C.G.A. § 13-10-91(b)(1))

The undersigned, in connection with a proposed contract or subcontract with the DeKalb County
School District for the physical performance of service in the State of Georgia (the “Contract”),
hereby affirms and certifies under penalties of perjury that:
(a) I am exempt under Title 26 or Title 43
(b) If at any time hereafter I determine that I no longer qualify as exempt under Title 26 or Title
    43, then I will:
    (i.) immediately notify the School District in writing; and
    (ii.) register with, participate in and use, a federal work authorization program operated by
              the United States Department of Homeland Security or any equivalent federal work
              authorization program operated by the United States Department of Homeland
              Security to verify information of newly hired employees, pursuant to the Immigration
              Reform and Control Act of 1986 (IRCA), P.L. 99-603], in accordance with the
              applicability provisions and deadlines established in O.C.G.A. 13-10-91, as
              amended; and
    (iii.) Provide the School District with all affidavits required by O.C.G.A. § 13-10-90 et seq.
              and Georgia Department of Labor Rule 300-10-1-.02, 300-10-1-.03, 300-10-1-.07
              and 300-10-1-.08.


____________________________/
Signature                     Printed Name                                  Title

By signing above you are certifying that the representations made herein are true and correct.

Firm Name: _______________________________________________________________________

Street/Mailing Address:

City, State, Zip Code:

Telephone Number:                                     / email: ________________________________


Sworn to and subscribed before me this ________ day of                      , 20



Notary Public

My Commission Expires:




                                                40
                                            EXHIBIT I
                       SPECIAL SUPPLEMENTARY CONDITIONS

       THESE SPECIAL SUPPLEMENTARY CONDITIONS add the following Section 7.4 to
the Standard Form of Contract for Architectural Services (State Capital Outlay Projects) between
the DeKalb County Board of Education and the Architect for RFQu No. 22-752-030.

        7.4    Davis-Bacon Compliance Services. During construction, Architect shall perform
the following Davis-Bacon compliance services by, at minimum, ensuring:

           7.4.1 That the general contractor submits copies of all certified payroll records which
                 include all subcontractors of every tier;

           7.4.2 That the certified payroll records are accompanied by a statement of compliance
                 signed by the general contractor indicating that the certified payroll records are
                 correct and complete, that the wage rates contained therein are in accordance
                 with the Davis-Bacon Act and the regulations promulgated thereunder and that
                 the classifications set forth for each employee conform with the work
                 performed;

           7.4.3 That all the names, addresses and social security numbers of every individual,
                 laborer or craftsman working on the project appear on the certified payroll
                 records, and that this information is constantly monitored to ensure no fraud is
                 occurring;

           7.4.4 That all fringe benefit plans are verified;

           7.4.5 That all trade works, apprenticable craft, owner-operators, sole owners and
                 partners working on the project are monitored and reported in accordance with
                 the requirements of the Davis-Bacon Act;

           7.4.6 That all apprenticeship and trainee plans are registered and certified, and that
                 all established ratios for apprentices are adhered to;

           7.4.7 That audited time cards, payroll checks, check stubs, daily logs, employee sign-
                 in sheets, cancelled fringe benefit checks, fringe benefit statements and/or any
                 other records are maintained for the purposes of reporting payroll of all
                 contractors and subcontractors and that such payrolls are in compliance with
                 the Davis-Bacon Act;

           7.4.8 That information is in electronic format and that software used to monitor
                 compliance is available to Owner;

           7.4.9 That the copies of certified payroll records are maintained and available for
                 review by Owner and its auditors as requested;




                                                41
7.4.10 Provide assistance to Owner with any Federal, State or local audits of
       construction contracts to which the Davis-Bacon Act applies;

7.4.11 That the contractor and all subcontractors of every tier comply with any
       additional regulatory requirements not listed but which pertain to the Davis-
       Bacon Act to ensure that Owner is not in violation of any such additional
       regulatory requirements; and

7.4.12 That a noncompliance resolution process is maintained and enforced with
       respect to any violations of the Davis-Bacon Act or any regulations
       promulgated thereunder.




                                   42
DeKalb County School District                                                  RFQu No. 22-752-030
A/E Services for HVAC Replacement                                                  Project No. N/A
April 28, 2022                                                                         Page 1 of 1

                                         APPENDIX J

                           ACKNOWLEDGEMENT OF
                CONFLICT OF INTEREST POLICY AND DISCLOSURES

       Contemporaneous with the execution and delivery of this Acknowledgment,
_______________________ (name of firm) (“Consultant”) has entered into a contract with the
DeKalb County School District (“Owner”), pursuant to which Consultant will, among other things,
assist in the preparation and/or development of specifications or requirements for
_________________________________ (name and number of project/IFB/RFP/RFQu). In
connection therewith, and pursuant to and as required by O.C.G.A. § 36-80-28:

       (1) Consultant covenants and agrees to avoid any appearance of impropriety and follow all
           Owner policies and procedures with respect to conflicts of interest.
       (2) Consultant has disclosed any material transaction or relationship, including, but not
           limited to, any relationship involving Consultant, Consultant’s employees or
           Consultant’s agents or subsidiaries, which could be reasonably expected to give rise to
           a conflict of interest including, but not limited to, past, present or known prospective
           engagements, involvement in litigation or other dispute, client relationships, or other
           business or financial interest existing on the date hereof, as follows:

       ________________________________________________________________________
       ________________________________________________________________________
       ________________________________________________________________________
       ________________________________________________________________________
       ________________________________________________________________________
       (use additional pages if necessary)

       (3) Consultant covenants and agrees to immediately disclose any material transaction or
           relationship subsequently discovered during the pendency of the parties’ relationship
           by supplementing this Acknowledgement in writing.
       (4) Consultant acknowledges and agrees that any violation or threatened violation of this
           agreement may cause irreparable injury to the Owner, and that Owner is accordingly
           entitled to seek injunctive relief in addition to all other legal remedies which it may
           have.

       The undersigned further states that he is the ______________________ (title) of
Consultant and is authorized to execute and deliver this Acknowledgement on behalf of
Consultant.


By: _____________________

Name: ___________________

Title: ____________________

Date: ____________________
                              DeKalb County School District | 2022-2023 CALENDAR
                              (Approved by the Board of Education on December 13, 2021)

4       Independence Day                      JULY ‘22                           JANUARY ‘23
                                                                                                           2     Winter Break
                                    S   M     T    W    Th   F    S    S    M      T   W    Th   F    S
                                                                                                           3     Post/Pre-Planning Day
                                                             1    2    1    2      3   4    5    6    7
                                                                                                           4     First Day of 2nd Semester
                                    3   4     5    6    7    8    9    8    9     10   11   12   13   14   16    Dr. M. L. King, Jr. Day
                                   10   11    12   13   14   15   16   15   16    17   18   19   20   21
                                   17   18    19   20   21   22   23   22   23    24   25   26   27   28
                                   24   25    26   27   28   29   30   29   30 31
                                                                                                           19 Instructional Days
                                   31




                                             AUGUST ‘22                         FEBRUARY ‘23
1-5 Pre-Planning Days                                                                                      17      February Break
                                    S   M     T    W    Th   F    S    S    M      T   W    Th   F    S
  8 First Day of School                                                                                    20      Presidents’ Day
                                        1     2    3    4    5    6                    1    2    3    4
                                    7   8     9    10   11   12   13   5    6     7    8    9    10   11
                                   14   15    16   17   18   19   20   12   13    14   15   16   17   18
                                   21   22    23   24   25   26   27   19   20    21   22   23   24   25
                                   28   29    30   31                  26   27    28
18 Instructional Days                                                                                      18 Instructional Days




                                         SEPTEMBER ‘22                           MARCH ‘23
5      Labor Day                                                                                           10 Independent Learner
                                    S   M     T    W    Th   F    S    S    M      T   W    Th   F    S
                                                                                                              Day / Professional
                                                        1    2    3                    1    2    3    4       Development Day
                                    4   5     6    7    8    9    10   5    6     7    8    9    10   11
                                   11   12    13   14   15   16   17
                                                                       12   13    14   15   16   17   18
                                   18   19    20   21   22   23   24
                                                                       19   20    21   22   23   24   25
                                   25   26    27   28   29   30
21 Instructional Days                                                  26   27    28   29   30   31        23 Instructional Days




7 Fall Break                                OCTOBER ‘22                           APRIL ‘23
                                                                                                           3-7     Spring Break
                                    S   M     T    W    Th   F    S    S    M      T   W    Th   F    S
10 Columbus Day/
                                                                  1                                   1
   Indigenous Peoples
   Day                              2   3     4    5    6    7    8    2    3     4    5    6    7    8
                                    9   10    11   12   13   14   15   9    10    11   12   13   14   15
19 Instructional Days              16   17    18   19   20   21   22   16   17    18   19   20   21   22
                                   23   24    25   26   27   28   29   23   24    25   26   27   28   29   15 Instructional Days
                                   30   31                             30




                                        NOVEMBER ‘22                               MAY ‘23
8   Independent Learner                                                                                    24      Last Day of School
                                    S   M     T    W    Th   F    S    S    M      T   W    Th   F    S
    Day / Professional                                                                                     25      Post Planning
                                              1    2    3    4    5         1      2   3    4    5    6
    Development Day                                                                                        29      Memorial Day
                                    6   7     8    9    10   11   12   7    8      9   10   11   12   13
21-25 Thanksgiving Break           13   14    15   16   17   18   19   14   15    16   17   18   19   20

                                   20   21    22   23   24   25   26   21   22    23   24   25   26   27

                                   27   28    29 30                    28   29    30   31                  18 Instructional Days
17 Instructional Days




                                         DECEMBER ‘22                             JUNE ‘23                 First/Last Day of Semester
16    Last Day of 1st Semester                                                                             Holiday/Break (School Closed)
                                    S   M     T    W    Th   F    S    S    M      T   W    Th   F    S
19-30 Winter Break                                                                                         Teachers’ Workday/
                                                        1    2    3                         1    2    3
                                                                                                           Professional Development Day
                                    4   5     6    7    8    9    10   4    5      6   7    8    9    10   (School Closed)
12 Instructional Days              11   12    13   14   15   16   17   11   12    13   14   15   16   17        Independent Learner Day/
                                   18   19    20   21   22   23   24   18   19    20   21   22   23   24   Professional Development Day
87 Instructional Days Total        25   26    27   28   29   30   31   25   26    27   28   29   30
                                                                                                           93 Instructional Days Total
                        DeKalb County School District | 2023-2024 CALENDAR
                        (Approved by the Board of Education on December 13, 2021)
                                             July ‘23                          January ‘24
                                 S    M     T    W    Th   F    S    S    M      T   W    Th   F    S
                                                                                                          1     Winter Break
4 Independence Day                                                                                        2     Post/Pre-Planning Day
                                                                1         1      2   3    4    5    6
                                                                                                          3     First Day of 2nd Semester
                                 2    3     4    5    6    7    8    7    8      9   10   11   12   13   15     Dr. M. L. King, Jr. Day
                                 9    10    11   12   13   14   15   14   15    16   17   18   19   20
                                 16   17    18   19   20   21   22   21   22    23   24   25   26   27
31 Pre-Planning Day              23   24    25   26   27   28   29   28   29    30   31
                                                                                                         20 Instructional Days
                                 30   31



1-4 Pre-Planning Days                      August ‘23                          February ‘24
  7 First Day of School          S    M     T    W    Th   F    S
                                                                                                         16      February Break
                                                                     S    M      T   W    Th   F    S
                                                                                                         19      Presidents’ Day
                                            1    2    3    4    5                         1    2    3
                                 6    7     8    9    10   11   12   4    5      6   7    8    9    10
                                 13   14    15   16   17   18   19   11   12    13   14   15   16   17
                                 20   21    22   23   24   25   26   18   19    20   21   22   23   24
                                 27   28    29   30   31             25   26    27   28   29
19 Instructional Days                                                                                    19 Instructional Days



4 Labor Day                            September ‘23                            March ‘24                 8    Independent Learner
                                 S    M     T    W    Th   F    S    S    M      T   W    Th   F    S
                                                                                                               Day / Professional
                                                                                                               Development Day
                                                           1    2                              1    2
                                 3    4     5    6    7    8    9    3    4      5   6    7    8    8
                                 10   11    12   13   14   15   16
                                                                     10   11    12   13   14   15   16
                                 17   18    19   20   21   22   23
                                                                     17   18    19   20   21   22   23
                                 24   25    26   27   28   29   30
20 Instructional Days                                                24   25    26   27   28   29   30   21 Instructional Days
                                                                     31




                                           October ‘23                           April ‘24
6 Fall Break
                                 S    M     T    W    Th   F    S    S    M      T   W    Th   F    S
                                                                                                         1-5     Spring Break
                                 1    2     3    4    5    6    7         1      2   3    4    5    6
9 Columbus Day/
  Indigenous Peoples             8    9     10   11   12   13   14   7    8      9   10   11   12   13
  Day                            15   16    17   18   19   20   21   14   15    16   17   18   19   20
                                 22   23    24   25   26   27   28   21   22    23   24   25   26   27
20 Instructional Days                                                                                    17 Instructional Days
                                 29   30    31                       28   29    30




   7    Independent Learner            November ‘23                              May ‘24                 22      Last Day of School
        Day / Professional       S    M     T    W    Th   F    S    S    M      T   W    Th   F    S
                                                                                                         23      Post Planning
        Development Day                                                                                  27      Memorial Day
                                                 1    2    3    4                    1    2    3    4
                                 5    6     7    8    9    10   11   5    6      7   8    9    10   11
20-24 Thanksgiving Break
                                                                     12   13    14   15   16   17   18
                                 12   13    14   15   16   17   18
                                                                     19   20    21   22   23   24   25
                                 19   20    21   22   23   24   25
17 Instructional Days                                                                                    16 Instructional Days
                                                                     26   27    28   29   30   31
                                 26   27    28   29   30




15    Last Day of 1st Semester         December ‘23                             June ‘24                 First/Last Day of Semester
18-29 Winter Break                                                                                       Holiday/Break (School Closed)
                                 S    M     T    W    Th   F    S    S    M      T   W    Th   F    S
                                                                                                         Teachers’ Workday/
                                                           1    2                                   1
                                                                                                         Professional Development Day
11 Instructional Days            3    4     5    6    7    8    9    2    3      4   5    6    7    8
                                                                                                         (School Closed)
                                 10   11    12   13   14   15   16   9    10    11   12   13   14   15        Independent Learner Day/
                                 17   18    19   20   21   22   23   16   17    18   19   20   21   22   Professional Development Day
87 Instructional Days Total
                                 24   25    26   27   28   29   30   23   24    25   26   27   28   29
                                 31                                  30                                  93 Instructional Days Total